JP2778847B2 - Pile head processing equipment - Google Patents

Pile head processing equipment

Info

Publication number
JP2778847B2
JP2778847B2 JP3109377A JP10937791A JP2778847B2 JP 2778847 B2 JP2778847 B2 JP 2778847B2 JP 3109377 A JP3109377 A JP 3109377A JP 10937791 A JP10937791 A JP 10937791A JP 2778847 B2 JP2778847 B2 JP 2778847B2
Authority
JP
Japan
Prior art keywords
concrete
pile head
pile
nozzle
nozzle insertion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP3109377A
Other languages
Japanese (ja)
Other versions
JPH04336114A (en
Inventor
勝介 粟野
寛 野坂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Caterpillar Japan Ltd
Original Assignee
Shin Caterpillar Mitsubishi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shin Caterpillar Mitsubishi Ltd filed Critical Shin Caterpillar Mitsubishi Ltd
Priority to JP3109377A priority Critical patent/JP2778847B2/en
Publication of JPH04336114A publication Critical patent/JPH04336114A/en
Application granted granted Critical
Publication of JP2778847B2 publication Critical patent/JP2778847B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】本発明は、地中にコンクリート杭を構築す
る際に、該コンクリート杭の杭頭部に形成される、コン
クリート不純物による強度低下部を除去する杭頭処理装
置に関する。
[0001] The present invention relates to a pile head treatment device for removing a portion of a concrete pile having a reduced strength due to concrete impurities formed at the pile head when the concrete pile is constructed underground.

【0002】[0002]

【従来の技術】地中にコンクリート杭を構築するには、
通常、次のようにしている。
2. Description of the Related Art To construct a concrete pile underground,
Usually, it is as follows.

【0003】すなわち、地中を掘削し、次いでケーシン
グを掘進・埋設し、次いで該ケーシング内に鉄筋籠を設
置し、次いで前記ケーシング内に該鉄筋籠を埋設するよ
うにコンクリートを打設し、この後前記ケーシングを引
き抜き、前記コンクリートを固化し、養生している。
[0003] That is, the ground is excavated, then the casing is excavated and buried, then a reinforcing bar is installed in the casing, and then concrete is poured into the casing so as to bury the reinforcing bar. Thereafter, the casing is pulled out, and the concrete is solidified and cured.

【0004】前記コンクリートを固化し、養生する際、
前記コンクリート杭の杭頭部(地表面レベルから数十セ
ンチメートル下がった箇所の部分)には、コンクリート
不純物による強度低下部が生成されるので、前記養生
後、次工程に移行する前に、所要の強度レベルが得られ
るまで前記杭頭部を除去するようにしている。
When the concrete is solidified and cured,
At the pile head of the concrete pile (at a position several tens of centimeters lower than the ground surface level), a reduced strength portion due to concrete impurities is generated. The pile head is removed until a strength level of?

【0005】しかし、従来、前記コンクリート杭の杭頭
部の除去作業は、人手に頼っていた。すなわち、数多く
の作業員により、除去する杭頭部の高さを割り出すレベ
ル測定(墨出し)作業、ブレーカによる杭頭部の破砕作
業、鉄筋に付着したコンクリートの除去作業等を行って
いたが、これら作業は、危険で、困難で、汚れる等の問
題がある上に、騒音公害を招く等の問題があった。
However, conventionally, the work of removing the pile head of the concrete pile relies on manual labor. In other words, many workers performed level measurement (inking) to determine the height of the pile head to be removed, crushing the pile head with a breaker, and removing concrete adhering to the rebar, etc. These operations are not only dangerous, difficult, and dirty, but also cause noise pollution.

【0006】そこで、ウォータジェット技術を利用し、
人手によらず杭頭部を除去することが考えられる。
Therefore, using water jet technology,
It is conceivable to remove the pile head without manual intervention.

【0007】[0007]

【発明が解決しようとする課題】しかしながら、前記ウ
ォータジェット技術は、切断能力に限界があり、直径1
メートルを越えるコンクリート杭の杭頭部を、その外周
から破砕することは非常に困難である。また、仮に、杭
頭部をその外周から破砕することが可能となったとして
も、コンクリート杭内に埋設された鉄筋を損傷すること
なく杭頭部を破砕することは、極めて困難である。
However, the water jet technique has a limited cutting ability and has a diameter of 1 mm.
It is very difficult to break a pile head of a concrete pile exceeding a meter from its outer periphery. Further, even if it becomes possible to crush the pile head from the outer periphery, it is extremely difficult to crush the pile head without damaging the reinforcing steel buried in the concrete pile.

【0008】従って、本発明の目的は、ウォータジェッ
ト技術を利用し、コンクリート杭中に埋設された鉄筋を
切断しないようにコンクリート杭の杭頭部を破砕して除
去することが可能な、杭頭処理方法及びその杭頭処理装
置を提供することにある。
Accordingly, an object of the present invention is to provide a pile head capable of crushing and removing a pile head of a concrete pile using a water jet technique so as not to cut a reinforcing bar buried in the concrete pile. An object of the present invention is to provide a processing method and a pile head processing device.

【0009】[0009]

【課題を解決するための手段】前記目的を達成するた
め、本発明は、コンクリートを打設して地中にコンクリ
ート杭を構築する際に、該コンクリート杭の杭頭部に形
成されるコンクリート不純物を除去する杭頭処理におい
て、該コンクリート杭を構築するコンクリートの固化前
に、該コンクリート杭の杭頭部となる部分にノズル挿入
用穴を形成する複数本の先行棒と、該先行棒を前記部分
に押し込む押し込み部材と、該押し込み部材をケーシン
グ内で昇降させるローラとを有するノズル挿入用穴処理
装置と、前記コンクリート杭のコンクリートが固化後、
前記ノズル挿入用穴内において前記コンクリート杭の杭
頭部を破砕して除去する複数本のウオータージェットノ
ズルと、該各ウオータージェットノズルを前記ノズル挿
入用穴内に回転させつつ下降させる駆動機構と、前記ウ
オータージェットノズルと前記駆動機構とを支持する移
動台と、前記移動台の下降、上昇を案内するキーを有す
る架台とで構成された杭頭除去装置とを具備したことを
特徴とする杭頭処理装置を提供するものである。
In order to achieve the above object, the present invention relates to a method for constructing a concrete pile in the ground by casting concrete, the concrete impurity formed on the pile head of the concrete pile. In the pile head treatment for removing the concrete pile, before solidifying the concrete for constructing the concrete pile, a plurality of preceding rods forming a nozzle insertion hole in a portion to be a pile head of the concrete pile, A pushing member for pushing into the portion, a nozzle insertion hole treatment device having a roller for raising and lowering the pushing member in the casing, and after the concrete of the concrete pile is solidified,
A plurality of water jet nozzles for crushing and removing the pile head of the concrete pile in the nozzle insertion hole, a drive mechanism for rotating and lowering each of the water jet nozzles into the nozzle insertion hole, and the water A pile head processing apparatus comprising: a moving table that supports a jet nozzle and the driving mechanism; and a pile head removing device that includes a frame having a key that guides the moving table to move downward and upward. Is provided.

【0010】[0010]

【0011】[0011]

【作用】本発明によれば、コンクリート杭のコンクリー
トが固化する前に、予めノズル挿入用穴をコンクリート
杭の杭頭部となる部分に複数形成しておき、コンクリー
トの固化後、各ウォータジェットノズルを、それぞれ回
転させつつ前記ノズル挿入用穴内に下降させるので、前
記ノズル挿入用穴の内側から該ノズル挿入用穴間の壁を
切断して杭頭部を破砕することが出来る。そして、この
杭頭部の破砕に際し、ウォータジェットノズルから吐出
する圧力流体の圧力、流量等を調整することにより、コ
ンクリート杭中に埋設された鉄筋を損傷させないように
することが出来る。
According to the present invention, before the concrete of the concrete pile is solidified, a plurality of nozzle insertion holes are formed in advance in the portion to be the pile head of the concrete pile, and after the concrete is solidified, each water jet nozzle is formed. Is lowered into the nozzle insertion hole while being rotated, so that the wall between the nozzle insertion holes can be cut from the inside of the nozzle insertion hole to break the pile head. By adjusting the pressure, flow rate, and the like of the pressure fluid discharged from the water jet nozzle when crushing the pile head, it is possible to prevent the reinforcing bars buried in the concrete pile from being damaged.

【0012】[0012]

【実施例】以下、本発明の一実施例を説明する。An embodiment of the present invention will be described below.

【0013】先ず、本発明の杭頭処理装置の一実施例を
図面を参照して説明する。
First, an embodiment of a pile head treatment apparatus according to the present invention will be described with reference to the drawings.

【0014】尚、図1乃至図4は本発明の杭頭処理装置
の一実施例を示すもので、図1はノズル挿入用穴処理装
置を示す一部省略断面図、図2は杭頭除去装置の一部省
略断面図、図3は図2に示す杭頭除去装置から架台等を
除いて示した一部省略平面図、図4は図2に示す杭頭除
去装置から架台等の他にさらに歯車機構等を除いて示し
た、図3と同様の一部省略平面図である。
FIGS. 1 to 4 show an embodiment of a pile head treatment apparatus according to the present invention. FIG. 1 is a partially omitted sectional view showing a nozzle insertion hole treatment apparatus, and FIG. 2 is a pile head removal apparatus. 3 is a partially omitted cross-sectional view of the device, FIG. 3 is a partially omitted plan view of the pile head removing device shown in FIG. 2 excluding the gantry, etc., and FIG. FIG. 4 is a partially omitted plan view similar to FIG. 3 except for a gear mechanism and the like.

【0015】(杭頭処理装置全体の概略)本実施例の杭
頭処理装置は、コンクリート杭1を構築するコンクリー
トの固化前に、該コンクリート杭1の杭頭部1a(図1
参照)となる部分にノズル挿入用穴2を形成する複数本
の先行棒11と、該複数本の先行棒11を前記部分1a
に押し込む押し込み部材12とからなるノズル挿入用穴
処理装置10(図1参照)と、前記コンクリート杭1の
コンクリートが固化した後、前記ノズル挿入用穴2内に
おいて前記杭頭部1aを破砕する複数本のウォータジェ
ットノズル21と、該複数本のウォータジェットノズル
21をそれぞれ回転させつつ前記ノズル挿入用穴2内に
下降させる駆動機構22と、該駆動機構22を支持する
架台23からなる杭頭除去装置20(図2参照)とを具
備して構成したもので、装置が大型化せず、杭頭部1a
を効率よく破砕し、除去することが可能である。以下、
各構成部分について詳細に説明する。
(Overview of Pile Head Processing Apparatus Overall) The pile head processing apparatus of the present embodiment has a pile head 1a (see FIG. 1) of the concrete pile 1 before solidifying concrete for constructing the concrete pile 1.
And a plurality of leading rods 11 that form the nozzle insertion hole 2 in a portion serving as a part 1a.
And a plurality of crushers for crushing the pile head 1a in the nozzle insertion hole 2 after the concrete of the concrete pile 1 is solidified. Pile head removal comprising: a plurality of water jet nozzles 21; a drive mechanism 22 for rotating the plurality of water jet nozzles 21 to descend into the nozzle insertion holes 2; and a gantry 23 supporting the drive mechanism 22. Device 20 (see FIG. 2), the device does not increase in size, and the pile head 1a
Can be efficiently crushed and removed. Less than,
Each component will be described in detail.

【0016】(ノズル挿入用穴処理装置10部分)前記
ノズル挿入用穴処理装置10の押し込み部材12は、図
1に示すように、円柱状の重錘からなり、コンクリート
杭1を構築する際に使用されるケーシング4内に、該ケ
ーシング4を引き上げる前に吊具13を介して吊り下げ
られるもので、その外周面にローラ14を設け、該外周
面と前記ケーシング4の内周面との間の間隔を一定に保
ち且つ前記ケーシング4内をスムーズに昇降出来るよう
にしてある。
(Part of the Nozzle Inserting Hole Processing Apparatus 10) As shown in FIG. 1, the pushing member 12 of the nozzle inserting hole processing apparatus 10 is formed of a column-shaped weight, and is used when the concrete pile 1 is constructed. A roller 14 is provided on the outer peripheral surface of the casing 4 to be hung through a hanging member 13 before the casing 4 is pulled up, and a roller 14 is provided between the outer peripheral surface and the inner peripheral surface of the casing 4. Are kept constant and the inside of the casing 4 can be raised and lowered smoothly.

【0017】前記先行棒11は、前記押し込み部材12
の底面の周辺部に適宜間隔を置いて複数本配置されるも
のである。ここで、前記先行棒11の間隔によって前記
ノズル挿入用穴2の間隔、すなわち該ノズル挿入用穴2
間の壁の厚さが設定される。従って、前記ウォータジェ
ットノズル21によって切断可能な厚さの前記壁が得ら
れるように、前記先行棒11の本数やその間隔が設定さ
れる。
The leading rod 11 is provided with the pushing member 12
Are arranged at appropriate intervals in the peripheral portion of the bottom surface of. Here, the interval between the nozzle insertion holes 2 according to the interval between the preceding rods 11, that is, the nozzle insertion holes 2
The thickness of the wall in between is set. Therefore, the number of the preceding rods 11 and the interval thereof are set so that the wall having a thickness that can be cut by the water jet nozzle 21 is obtained.

【0018】尚、前記ケーシング4の下端には、チュー
ウビングカッタ4aが設けられている。また、前記ケー
シング4の上端には、吊具4bが取り付けられている。
At the lower end of the casing 4, a tubing cutter 4a is provided. A hanging member 4b is attached to the upper end of the casing 4.

【0019】(杭頭除去装置20部分)前記杭頭除去装
置20の架台23は、略円筒状で、その上端に支持台部
23aが設けられ、図2に示すように、前記コンクリー
ト杭1のコンクリートが固化した後に前記杭頭部1a上
に取り付けられるものである。また、前記架台23内の
内側面(前記支持台部23aと前記杭頭部1aの上端部
との間の空間の内側面)には、前記ウォータジェットノ
ズル21と前記駆動機構22を支持する移動台24を昇
降可能に案内する一対のキー23bが設けられている。
また、前記架台23の支持台部23aの中央部には、前
記駆動機構22の送りネジ棒22aが螺合する雌ネジ2
3cが設けられ、その周辺部には、前記ウォータジェッ
トノズル21に加圧水等を送るための導入管25が前記
移動台24の昇降に伴って出没するための穴23dが設
けられている。
(Pile Head Removal Device 20) The pedestal 23 of the pile head removal device 20 is substantially cylindrical and has a support base 23a provided at the upper end thereof. As shown in FIG. It is mounted on the pile head 1a after the concrete has solidified. In addition, a movement supporting the water jet nozzle 21 and the drive mechanism 22 is provided on an inner surface inside the gantry 23 (an inner surface of a space between the support base 23a and the upper end of the pile head 1a). A pair of keys 23b for guiding the table 24 to be able to move up and down is provided.
A female screw 2 into which a feed screw rod 22a of the drive mechanism 22 is screwed is provided at the center of the support base 23a of the gantry 23.
3 c is provided, and a hole 23 d is provided in a peripheral portion thereof so that an introduction pipe 25 for sending pressurized water or the like to the water jet nozzle 21 is protruded and retracted as the movable table 24 moves up and down.

【0020】前記杭頭除去装置20の駆動機構22は、
図2に示すように、前記送りネジ棒22aと、該送りネ
ジ棒22aと前記ウォータジェットノズル21とを回転
駆動する駆動機22bと、該駆動機22bの回転を前記
送りネジ棒22aと前記ウォータジェットノズル21に
伝達する歯車機構22c(図3参照)とを具備して構成
されている。
The driving mechanism 22 of the pile head removing device 20 includes:
As shown in FIG. 2, the feed screw rod 22a, a driving device 22b for driving the feed screw rod 22a and the water jet nozzle 21 to rotate, and the rotation of the drive device 22b are controlled by the feed screw rod 22a and the water. And a gear mechanism 22c (see FIG. 3) for transmitting the jet to the jet nozzle 21.

【0021】前記送りネジ棒22aは、移動台24の中
央部に、軸受22dを介して軸方向に移動不能かつ軸ま
わりに回転可能に立設されている。
The feed screw rod 22a is erected at the center of the moving table 24 via a bearing 22d so as to be immovable in the axial direction and rotatable around the axis.

【0022】前記駆動機22bは、電動モータ22
1、減速機構22b2等から構成されており、前記移動
台24に支柱24aを介して設けた支持板24b上に配
置されている。前記駆動機22bの出力軸22b3(図
3、図4参照)には、前記歯車機構22cを構成する歯
車22c1が固定されている。
The driving device 22b includes an electric motor 22
b 1 , a speed reduction mechanism 22 b 2, and the like, and are arranged on a support plate 24 b provided on the moving table 24 via a support 24 a. Output shaft 22b 3 (see FIGS. 3 and 4) of the drive motor 22b, the gear 22c 1 constituting the gear mechanism 22c is fixed.

【0023】前記歯車機構22cは、前記歯車22c1
と、前記送りネジ棒22aに固定した歯車22c2およ
び歯車22c3と、前記ウォータジェットノズル21の
上端に固定されかつ該歯車22c3に螺合する複数の
(図3では5個)歯車22c4と、前記歯車22c1と前
記歯車22c2との間に配置した中間歯車22c5(図4
参照)とを具備して構成されている。
The gear mechanism 22c includes the gear 22c 1.
When the feed screw rod 22a gear 22c 2 and gear 22c 3 is fixed to the plurality of (five in FIG. 3) that is screwed to the water jet is fixed to the upper end of the nozzle 21 and the gear 22c 3 gear 22c 4 When the intermediate gear 22c 5 (FIG. 4 which is arranged between the gear 22c 1 and the gear 22c 2
Reference).

【0024】前記歯車22c1は、前記中間歯車22c5
を介して前記送りネジ棒22aに固定された前記一方の
歯車22c2に螺合している(図4参照)。従って、前
記駆動機22bが駆動すると、前記歯車22c1、歯車
22c5、歯車22c2を介して前記送りネジ棒22aに
回転が伝達され、該送りネジ棒22aは回転するが、該
送りネジ棒22aは、前記雌ネジ23cと螺合している
ため、回転しつつ上下方向に移動し、これにより前記移
動台24が上下方向に移動する。また、前記送りネジ棒
22aの回転により、該送りネジ棒22aに固定された
前記他方の歯車22c3から前記各歯車22c4に回転が
伝達し、該歯車22c4に固定された前記ウォータジェ
ットノズル21が回転する。
The gear 22c 1 is connected to the intermediate gear 22c 5
Is screwed to the one of the gear 22c 2 which is fixed to the feed screw rod 22a through a (see FIG. 4). Therefore, when the drive motor 22b is driven, the gear 22c 1, the gear 22c 5, rotating the feed screw rod 22a through the gear 22c 2 is transmitted, said transmission Ri threaded rod 22a is rotated, said transmission Ri threaded rod Since 22a is screwed with the female screw 23c, it moves up and down while rotating, whereby the movable table 24 moves up and down. Further, the by rotation of the feed screw rod 22a, the rotation is transmitted to the each gear 22c 4 from the other gear 22c 3 which is fixed to said transmission Ri threaded rod 22a, the water jet nozzle that is fixed to the gear 22c 4 21 rotates.

【0025】前記ウォータジェットノズル21は、軸受
26aとシール26bを介して前記移動台24に回転可
能に支持されており、前記送りネジ棒22aの回転によ
り前記ノズル挿入用穴2内を回転しつつ下降するもの
で、その下端にノズル部21aが設けられている。
The water jet nozzle 21 is rotatably supported by the moving table 24 via a bearing 26a and a seal 26b. The water jet nozzle 21 rotates in the nozzle insertion hole 2 by the rotation of the feed screw rod 22a. The nozzle 21a is provided at the lower end thereof.

【0026】前記移動台24には、前記導入管25の下
端部がシール25aを介して挿入されている。また、前
記移動台24の内部には、図4に示すように、前記導入
管25から前記各ウォータジェットノズル21に加圧流
体を送るための液圧通路25b、25cが設けられてい
る。
The lower end of the introduction tube 25 is inserted into the movable table 24 via a seal 25a. As shown in FIG. 4, hydraulic passages 25 b and 25 c for sending pressurized fluid from the introduction pipe 25 to each of the water jet nozzles 21 are provided inside the movable table 24.

【0027】尚、前記導入管25は、導入継手25dを
介して図示しない液圧発生装置に接続されている。
The introduction pipe 25 is connected to a hydraulic pressure generator (not shown) via an introduction joint 25d.

【0028】次に、本発明の杭頭処理方法の一実施例を
説明する。
Next, an embodiment of the pile head processing method of the present invention will be described.

【0029】本実施例の杭頭処理方法は、前記ノズル挿
入用穴処理装置10と、前記杭頭除去装置20とを使用
して行うもので、コンクリート杭1を構築するコンクリ
ートを打設した後、該コンクリートが固化する前に、コ
ンクリート杭1の杭頭部1aとなる部分に複数のノズル
挿入用穴2を形成するノズル挿入用穴処理工程と、前記
コンクリート杭1のコンクリートが固化した後に、前記
各ノズル挿入用穴2内にウォータジェットノズル21を
回転させつつ下降させ、該ウォータジェットノズル21
からの加圧流体により前記コンクリート杭1の杭頭部1
aを破砕して除去する杭頭除去工程とからなっている。
The pile head processing method of the present embodiment is performed using the nozzle insertion hole processing apparatus 10 and the pile head removal apparatus 20. After the concrete for constructing the concrete pile 1 is cast, Before the concrete is solidified, a nozzle insertion hole processing step of forming a plurality of nozzle insertion holes 2 in a portion to be the pile head 1a of the concrete pile 1, and after the concrete of the concrete pile 1 is solidified, The water jet nozzle 21 is lowered into the respective nozzle insertion holes 2 while rotating the water jet nozzle 21.
Pile head 1 of concrete pile 1 by pressurized fluid from
and a pile head removing step of crushing and removing a.

【0030】先ず、前記ノズル挿入用穴処理工程を、図
1を参照して詳細に説明する。
First, the nozzle insertion hole processing step will be described in detail with reference to FIG.

【0031】コンクリート杭1の構築に際しては、コン
クリートを打設しつつコンクリートの投入量に応じてケ
ーシング4を引き抜くが、その最終段階で、該ケーシン
グ4内に吊具13により重錘12を降ろし、該重錘12
の重量によって先行棒11を杭頭部1aとなる部分にそ
のコンクリートが固化しない前に押し込み、ノズル挿入
用穴2を複数本形成する。
When constructing the concrete pile 1, the casing 4 is pulled out according to the amount of the concrete while the concrete is being poured. At the final stage, the weight 12 is lowered into the casing 4 by the hanging tool 13. The weight 12
Due to the weight of the above, the leading rod 11 is pushed into the portion to be the pile head 1a before the concrete is solidified, and a plurality of nozzle insertion holes 2 are formed.

【0032】このように予めノズル挿入用穴2を形成す
ることによって、ウォータジェットノズル21を使用し
ての杭頭部1aの破砕が可能となる。ノズル挿入用穴2
の間隔(先行棒11間の間隔)は、前述のように、前記
ウォータジェットノズル21によって切断可能な壁が得
られるように設定される。
By previously forming the nozzle insertion holes 2 in this manner, the pile head 1a can be crushed using the water jet nozzle 21. Nozzle insertion hole 2
Is set so that a wall that can be cut by the water jet nozzle 21 is obtained as described above.

【0033】尚、重錘12を使用する代わりに、油圧シ
リンダ等によって先行棒11を押し込むようにしてもよ
い。
Instead of using the weight 12, the leading rod 11 may be pushed in by a hydraulic cylinder or the like.

【0034】次に、前記杭頭除去工程を、図2を参照し
て詳細に説明する。
Next, the pile head removing step will be described in detail with reference to FIG.

【0035】杭頭部1aから前記ケーシング4を引き抜
き、該杭頭部1aのコンクリートが固化した後、架台2
3を該杭頭部1aに設置する。次いで、駆動機22を動
作させて送りネジ棒22aを回転させ、各ウォータジェ
ットノズル21を回転させつつ前記ノズル挿入用穴2内
に下降させると共に、該各ウォータジェットノズル21
に、液圧発生装置から加圧流体を、導入継手25d、導
入管25、液圧通路25b、25cを介して供給し、該
加圧流体を、ウォータジェットノズル21の下端のノズ
ル部21aから前記ノズル挿入用穴2の内壁に向けて噴
射させ、前記ノズル挿入用穴2間の壁を切断し、杭頭部
1aのコンクリートを破砕する。このとき、ノズル部2
1aから噴射される加圧流体の圧力、流量等を調整する
ことにより、鉄筋3を損傷させず、該鉄筋3に付着した
コンクリートを除去することが出来る。
After the casing 4 is pulled out from the pile head 1a and the concrete of the pile head 1a is solidified,
3 is installed on the pile head 1a. Next, the driving device 22 is operated to rotate the feed screw rod 22a to lower the water jet nozzles 21 into the nozzle insertion holes 2 while rotating the respective water jet nozzles 21.
, A pressurized fluid from a hydraulic pressure generator is supplied through an introduction joint 25d, an introduction pipe 25, and hydraulic pressure passages 25b and 25c, and the pressurized fluid is supplied from a nozzle 21a at a lower end of the water jet nozzle 21 to the A jet is injected toward the inner wall of the nozzle insertion hole 2 to cut the wall between the nozzle insertion holes 2 to crush the concrete of the pile head 1a. At this time, the nozzle 2
By adjusting the pressure, flow rate, and the like of the pressurized fluid injected from 1a, the concrete adhering to the reinforcing bar 3 can be removed without damaging the reinforcing bar 3.

【0036】尚、ネジ棒22aの回転とウォータジェッ
トノズル21の回転とは必ずしも連動させる必要はな
く、個々の駆動機によって回転させてもよい。また、該
駆動機は電動のみならず、流体圧駆動であってもよい。
The rotation of the screw rod 22a and the rotation of the water jet nozzle 21 do not necessarily have to be linked with each other, but may be rotated by individual driving machines. In addition, the driving device may be driven not only electrically but also hydraulically.

【0037】以上のように本実施例の杭頭処理方法によ
れば、人手によらず、ウォータジェット技術を利用して
杭頭部1aを除去することから、作業員を、危険で、困
難で、汚れる等の作業から解放し、作業環境の改善を図
り、また騒音公害を可及的に低減することができる。
As described above, according to the pile head processing method of the present embodiment, since the pile head 1a is removed by using the water jet technique without using any manual operation, it is possible to reduce the worker's risk and difficulty. , The work environment can be improved, and noise pollution can be reduced as much as possible.

【0038】尚、本発明は、前記実施例に示すものに限
定されるものではなく、要は予めノズル挿入用穴を形成
し、ウォータジェットノズルを回転させつつ、該ノズル
挿入用穴内に下降させればよい。
It should be noted that the present invention is not limited to the one shown in the above-described embodiment. In short, a nozzle insertion hole is formed in advance, and the water jet nozzle is rotated and lowered into the nozzle insertion hole. Just do it.

【0039】[0039]

【発明の効果】以上説明したように本発明によれば、ウ
ォータジェット技術を利用し、コンクリート杭中に埋設
された鉄筋を切断しないようにコンクリート杭の杭頭部
を破砕して除去することが出来、機械化による杭頭部の
除去作業の能率化と作業環境の改善を図ることが可能と
なる。
As described above, according to the present invention, it is possible to crush and remove a pile head of a concrete pile using water jet technology so as not to cut a reinforcing bar buried in the concrete pile. It is possible to improve the efficiency of the work of removing the pile head and improve the working environment by mechanization.

【図面の簡単な説明】[Brief description of the drawings]

【図1】ノズル挿入用穴処理装置を示す一部省略断面図
である。
FIG. 1 is a partially omitted sectional view showing a nozzle insertion hole processing apparatus.

【図2】杭頭除去装置の一部省略断面図である。FIG. 2 is a partially omitted cross-sectional view of the pile head removing device.

【図3】図2に示す杭頭除去装置から架台等を除いて示
した一部省略平面図である。
FIG. 3 is a partially omitted plan view showing the pile head removing device shown in FIG. 2 excluding a gantry and the like.

【図4】図2に示す杭頭除去装置から架台等の他にさら
に歯車機構等を除いて示した、図3と同様の一部省略平
面図である。
4 is a partially omitted plan view similar to FIG. 3 and showing the pile head removing device shown in FIG. 2 in addition to a gantry and the like and further excluding a gear mechanism and the like.

【符号の説明】[Explanation of symbols]

1 コンクリート杭 1a 杭頭部 2 ノズル挿入用穴 3 鉄筋 4 ケーシング 10 ノズル挿入用穴処理装置 11 先行棒 12 押し込み部材(重り) 20 杭頭除去装置 21 ウォータジェットノズル 22 駆動機構 22a 送りネジ棒 22b 駆動機 22c 歯車機構 23 架台 23a 雌ネジ DESCRIPTION OF SYMBOLS 1 Concrete pile 1a Pile head 2 Nozzle insertion hole 3 Reinforcing bar 4 Casing 10 Nozzle insertion hole processing device 11 Leading rod 12 Push-in member (weight) 20 Pile head removal device 21 Water jet nozzle 22 Drive mechanism 22a Feed screw rod 22b Drive Machine 22c gear mechanism 23 mount 23a female screw

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.6,DB名) E02D 5/34──────────────────────────────────────────────────続 き Continued on front page (58) Field surveyed (Int.Cl. 6 , DB name) E02D 5/34

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 コンクリートを打設して地中にコンクリ
ート杭を構築する際に、該コンクリート杭の杭頭部に形
成されるコンクリート不純物を除去する杭頭処理におい
て、該コンクリート杭を構築するコンクリートの固化前
に、該コンクリート杭の杭頭部となる部分にノズル挿入
用穴を形成する複数本の先行棒と、該先行棒を前記部分
に押し込む押し込み部材と、該押し込み部材をケーシン
グ内で昇降させるローラとを有するノズル挿入用穴処理
装置と、前記コンクリート杭のコンクリートが固化後、
前記ノズル挿入用穴内において前記コンクリート杭の杭
頭部を破砕して除去する複数本のウオータージェットノ
ズルと、該各ウオータージェットノズルを前記ノズル挿
入用穴内に回転させつつ下降させる駆動機構と、前記ウ
オータージェットノズルと前記駆動機構とを支持する移
動台と、前記移動台の下降、上昇を案内するキーを有す
る架台とで構成された杭頭除去装置とを具備したことを
特徴とする杭頭処理装置。
In a pile head treatment for removing concrete impurities formed on a pile head of a concrete pile when casting concrete and constructing a concrete pile in the ground, concrete for constructing the concrete pile is provided. Prior to solidification of the concrete pile, a plurality of leading rods forming a nozzle insertion hole in a portion serving as a pile head of the concrete pile, a pushing member for pushing the leading rod into the portion, and a pushing member moving up and down in the casing A hole processing apparatus for nozzle insertion having a roller to be driven, and after the concrete of the concrete pile is solidified,
A plurality of water jet nozzles for crushing and removing the pile head of the concrete pile in the nozzle insertion hole, a drive mechanism for rotating and lowering each of the water jet nozzles into the nozzle insertion hole, and the water A pile head processing apparatus comprising: a moving table that supports a jet nozzle and the driving mechanism; and a pile head removing device that includes a frame having a key that guides the moving table to move downward and upward. .
JP3109377A 1991-05-14 1991-05-14 Pile head processing equipment Expired - Lifetime JP2778847B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3109377A JP2778847B2 (en) 1991-05-14 1991-05-14 Pile head processing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3109377A JP2778847B2 (en) 1991-05-14 1991-05-14 Pile head processing equipment

Publications (2)

Publication Number Publication Date
JPH04336114A JPH04336114A (en) 1992-11-24
JP2778847B2 true JP2778847B2 (en) 1998-07-23

Family

ID=14508703

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3109377A Expired - Lifetime JP2778847B2 (en) 1991-05-14 1991-05-14 Pile head processing equipment

Country Status (1)

Country Link
JP (1) JP2778847B2 (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5293107A (en) * 1976-02-02 1977-08-05 Takenaka Komuten Co Method of treating head of casttin place concrete pile applying high pressure jet
JPS5336911A (en) * 1976-09-17 1978-04-05 Taisei Corp Method of cutting head of casttin place reinforced concrete pile
JPH02157315A (en) * 1988-12-08 1990-06-18 Koberuko Kenki Eng Kk Method for destroying and treating head portion of concrete pile

Also Published As

Publication number Publication date
JPH04336114A (en) 1992-11-24

Similar Documents

Publication Publication Date Title
JP2778847B2 (en) Pile head processing equipment
JP2004068398A (en) Construction method and construction device for pile
CN115478543B (en) Artificial hole digging pile foundation pit supporting structure and construction method
JP4366597B2 (en) Cutting and removing existing piles
CN217352567U (en) Chain type cutting and ground breaking equipment capable of being fixed on open caisson
JP2001003363A (en) Crushing treatment device for underground buried pile
JP2010189952A (en) Existing pile removing device
JP2008274746A (en) Method of demolishing and removing underground structure
JP4040003B2 (en) Formwork device for concrete lining of shaft wall of shaft excavation and concrete lining method
JPH08120671A (en) Remover of underground pile
JPH05287745A (en) Mounting method for wale in column aligning method
KR100481135B1 (en) Mechanical equipment for removing earth inside of steel pipe pile
JP2007077631A (en) Construction method and equipment for destroying existing pile
JP2575086B2 (en) Method and apparatus for treating soil cement in pile holes
CN216428263U (en) Structure is handled to bored concrete pile head
CN113152561B (en) Manual hole digging mechanical auxiliary device and using method
JP5183510B2 (en) Crusher
JP4057764B2 (en) Cutting device for existing structures
JPH0676689B2 (en) Method and device for removing existing piles
JP5917265B2 (en) Continuous excavation and earthing device and method
JP2002115249A (en) Device and method for treating pile head
SU810976A1 (en) Large-diameter hole drilling apparatus
JP2702542B2 (en) Vertical liner plate construction method and press machine for liner plate construction
JP6681159B2 (en) Construction method and construction machine for hydraulic solidifying material liquid replacement column
CN114934507A (en) Construction method of pile foundation truncation and demolition system

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 19971007

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19980331