Japan
Prior art keywords
floor
underground
skeleton
basement
constructed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2089355A
Other languages
Japanese (ja)
Other versions
JPH03287922A (en
Inventor
和伸 山本
洋一 帯
倫宏 正藤
正美 戸沢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Original Assignee
Shimizu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd filed Critical Shimizu Construction Co Ltd
Priority to JP2089355A priority Critical patent/JP2766888B2/en
Publication of JPH03287922A publication Critical patent/JPH03287922A/en
Application granted granted Critical
Publication of JP2766888B2 publication Critical patent/JP2766888B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、地下階を有する建築物の構築工法に関する
ものである。
Description: TECHNICAL FIELD The present invention relates to a construction method for a building having a basement floor.

〔従来の技術〕[Conventional technology]

従来、地下階を有する建築物を構築するにあたって
は、地下階のための地下空間を掘下げ、この地下空間に
腹起こしや切り梁などの仮設支持部材を渡して周囲の土
圧を支えた状態で、地下階の構築を行い、そののち構築
された前記地下階から上方へ地上階を構築するようにし
ている。また地下空間を掘下げながら下方へ地下階を構
築する(逆打ち)一方、同時に地上階を構築する場合も
あり、仮設費の削減や同時施工による工期の短縮を図る
試みもあった。
Conventionally, when constructing a building with an underground floor, the underground space for the underground floor is dug down, and temporary supporting members such as bellows and cut beams are passed through this underground space while supporting the surrounding earth pressure. The basement floor is constructed, and then the ground floor is constructed upward from the constructed basement floor. On the other hand, there are cases where the underground floor is built downward while digging into the underground space (reverse strike), while the ground floor is also built at the same time, and there have been attempts to reduce temporary construction costs and shorten the construction period by simultaneous construction.

〔発明が解決しようとする課題〕[Problems to be solved by the invention]

しかしながら、地下空間を形成したのち地下階を構築
する場合、上記仮設支持部材があることから施工が煩雑
になるという問題がある。また上記したように地下階を
逆打ちしながら地上階も構築する場合、前記地下階の逆
打ち部分が地下階平面の全範囲に亘って行われることか
ら、地下階の構築の進行がきわめて遅くなり、その影響
を受けて地上階、地下階同時施工による利点はそれほど
大きいものとはなっていなかった。
However, in the case of constructing an underground floor after forming an underground space, there is a problem that the construction becomes complicated due to the provision of the temporary support members. When the ground floor is also constructed while the basement floor is reversely hit as described above, the progress of the basement floor is extremely slow because the reverse of the basement floor is performed over the entire range of the basement floor plane. Under the influence, the advantage of the simultaneous construction of the ground floor and the basement floor was not so great.

そこで本発明においては、地下空間で仮設支持部材を
用いることなく地下階を構築し、かつその地下階の構築
をより早く行えるようにすることをを課題とし、地上
階、地下階同時施工の利点を生かして工期の短縮化を図
ることを目的とする。
Therefore, in the present invention, an object of the present invention is to construct an underground floor without using a temporary support member in an underground space, and to make it possible to construct the underground floor more quickly. The aim is to shorten the construction period by taking advantage of.

〔課題を解決するための手段〕[Means for solving the problem]

本発明は、上記した課題を考慮してなされたもので、
掘下げてなる地下空間の内周に亘る地下階の躯体周辺部
を、地下階の躯体中央部よりも先行して構築し、前記躯
体中央部を、地下階の前記躯体周辺部上の地上階躯体周
辺部と共に構築することにより、上記課題を解消するも
のである。
The present invention has been made in view of the above problems,
The underground floor skeleton surrounding the inner periphery of the digged underground space is constructed ahead of the underground floor skeleton central part, and the skeleton central part is located above the underground floor skeleton peripheral part on the underground floor. The above-mentioned problem is solved by building together with the peripheral part.

〔作 用〕(Operation)

本発明においては、地下空間の内周に亘る地下階の躯
体周辺部が仮支持部材の代わりに土圧を支持し、前記躯
体周辺部(地下階)の先行構築によって形成された中央
のオープンスペースで、地上階と同一手法により躯体中
央部の構築が可能となり、この躯体中央部と地上階の躯
体とが同時施工で上方に向けて行われる。
In the present invention, the central open space formed by the preceding construction of the peripheral portion (basement floor) of the basement peripheral portion of the basement floor over the inner periphery of the underground space supports the earth pressure instead of the temporary support member. Thus, the center of the skeleton can be constructed in the same manner as the ground floor, and the center of the skeleton and the skeleton on the ground floor are simultaneously directed upward.

〔実施例〕〔Example〕

つぎに、本発明を第1図から第3図に示す実施例に基
づいて詳細に説明する。
Next, the present invention will be described in detail based on the embodiment shown in FIGS.

図中1は建物などの地下部分を構築する地下空間であ
って、矢板などの土止め壁によって囲まれた内部を掘下
げることによって形成される。そして地下空間1を掘下
げながら、該地下空間1の内周に沿う地下階の躯体周辺
部2が構築される(すなわち地下階の躯体周辺部が逆打
ちによって構築される)。
In the figure, reference numeral 1 denotes an underground space for constructing an underground portion of a building or the like, which is formed by digging an inside surrounded by a retaining wall such as a sheet pile. Then, while digging into the underground space 1, the framing portion 2 of the underground floor along the inner periphery of the underground space 1 is constructed (that is, the framing portion of the underground floor is constructed by reverse tapping).

この躯体周辺部2の構築によって地下空間1の周囲の
土圧が受け止められるとともに、地下空間1の中央にオ
ープンスペース3が形成される(第1図参照)。
The construction of the peripheral part 2 of the skeleton allows the earth pressure around the underground space 1 to be received and an open space 3 to be formed in the center of the underground space 1 (see FIG. 1).

そして第2図と第3図に示すように、このオープンス
ペース3にて地上階の構築手法により地下階の躯体中央
部4を構築すると共に、躯体周辺部4の上方に地上階の
躯体周辺部5を同時に構築するものであって、大部分の
地下階と地上階とが同方向(上方)に構築され、短期間
で建築物が得られるようになる。図示はしないが前記地
下階の躯体中央部4の構築が終了すると、これに連続し
て地上階中央部の構築に移る。
Then, as shown in FIGS. 2 and 3, a central portion 4 of the basement floor is constructed in the open space 3 by the method of constructing the ground floor, and a peripheral portion of the ground floor is located above the peripheral portion 4 of the basement. 5 are constructed at the same time, and most of the basement floor and the ground floor are constructed in the same direction (above), so that a building can be obtained in a short time. Although not shown, when the construction of the central part 4 of the basement on the basement floor is completed, the process proceeds to the construction of the central part of the ground floor continuously.

なお、地上階の躯体周辺部5の構築は地下階の躯体周
辺部2の逆打ち時に同時に構築し始めるようにしてもよ
い。
The construction of the peripheral part 5 of the ground floor may be started simultaneously with the reverse strike of the peripheral part 2 of the basement floor.

〔発明の効果〕〔The invention's effect〕

以上説明したように、本発明によると、掘下げてなる
地下空間の内周に亘る地下階の躯体周辺部を、地下階の
躯体中央部よりも先行して構築し、前記躯体中央部を、
地下階の前記躯体周辺部上の地上階躯体周辺部と共に構
築するので、地下空間の中央部分にオープンスペースが
形成され、仮支持部材などを用いることなく地下階の構
築が効率よく行えるようになる。そしてこの地下階の躯
体周辺部を搬入用などの構台として利用しつつ、このオ
ープンスペースで地上階と同様の手法により地下階の躯
体中央部が構築され、地上階の躯体周辺部とこの地下階
の躯体中央部とが同時に構築されて、工期の短縮が確実
に図れるようになるなど、実用性にすぐれた効果を奏す
るものである。
As described above, according to the present invention, the skeleton of the underground floor surrounding the inner periphery of the underground space that is dug down is constructed ahead of the skeleton center of the underground floor, and the skeleton central part is
Since the building is constructed together with the ground floor frame peripheral part on the basement floor peripheral part, an open space is formed in the central part of the basement space, and the basement floor can be efficiently constructed without using a temporary support member or the like. . The central part of the basement floor is constructed in the same way as the ground floor in this open space, while using the basement part of the basement floor as a gantry for carrying in. The central part of the frame is constructed at the same time, and the construction period can be shortened without fail.

【図面の簡単な説明】[Brief description of the drawings]

第1図は本発明に係る建築物の構築工法の一実施例にお
ける地下階の躯体周辺部を示す説明図、第2図は地下階
の躯体中央部と地上階の躯体周辺部の同時構築の状態を
示す説明図、第3図は地下階の躯体周辺部と躯体中央部
とを示す説明図である。 1……地下空間 2……躯体周辺部(地下階) 3……オープンスペース 4……躯体中央部(地下階) 5……躯体周辺部(地上階)
FIG. 1 is an explanatory view showing a skeleton on the basement floor in one embodiment of the construction method of a building according to the present invention, and FIG. 2 is a diagram showing simultaneous construction of a skeleton on the basement floor and a skeleton on the ground floor. FIG. 3 is an explanatory view showing a state, and FIG. 3 is an explanatory view showing a peripheral portion of the skeleton on the basement floor and a central portion of the skeleton. 1 ... Underground space 2 ... Periphery of the skeleton (basement floor) 3 ... Open space 4 ... Central part of the skeleton (basement floor) 5 ... Periphery of the skeleton (ground floor)

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】掘下げてなる地下空間の内周に亘る地下階
の躯体周辺部を、地下階の躯体中央部よりも先行して構
築し、前記躯体中央部を、地下階の前記躯体周辺部上の
地上階躯体周辺部と共に構築することを特徴とする建築
物の構築工法。
1. An underground floor surrounding a skeleton of an underground space extending over an inner circumference of an underground space is constructed before an underground floor of a skeleton central part, and the skeleton central part is formed of the underground floor of the skeleton surrounding part. A construction method for a building characterized by being built together with the surrounding area above the ground floor.
JP2089355A 1990-04-04 1990-04-04 Building construction method Expired - Fee Related JP2766888B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2089355A JP2766888B2 (en) 1990-04-04 1990-04-04 Building construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2089355A JP2766888B2 (en) 1990-04-04 1990-04-04 Building construction method

Publications (2)

Publication Number Publication Date
JPH03287922A JPH03287922A (en) 1991-12-18
JP2766888B2 true JP2766888B2 (en) 1998-06-18

Family

ID=13968405

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2089355A Expired - Fee Related JP2766888B2 (en) 1990-04-04 1990-04-04 Building construction method

Country Status (1)

Country Link
JP (1) JP2766888B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015025292A (en) * 2013-07-26 2015-02-05 株式会社大林組 Building construction method and building
JP7173460B2 (en) * 2018-01-24 2022-11-16 株式会社竹中工務店 Construction method of structures

Also Published As

Publication number Publication date
JPH03287922A (en) 1991-12-18

Similar Documents

Publication Publication Date Title
JPH0393923A (en) Connection method of steel pillar of cast-in-place pile and connection structure
JP2001262595A (en) Building construction method of underground building frame
JP2766888B2 (en) Building construction method
JP3084500B2 (en) How to build underground space
JP2917755B2 (en) How to dismantle underground structures
JPH1018322A (en) Construction method for base isolation building by reverse driving construction method
JP2926151B2 (en) Building structure and construction method
JPH06173282A (en) Construction method for underground structure under road
JPH03275816A (en) Building method for main slab in underground space
JPH0274727A (en) Construction method of underground structure
JPH059930A (en) Self-erecting type landslide protection wall construction
RU2245427C1 (en) Method of underground structure erection
JPH02204525A (en) Ground retaining and cut-beam process
JPH0758040B2 (en) How to construct an underground structure
JP2000328585A (en) Base isolating method
JPH1113287A (en) Large space constructing method applying diagonal tension system
JPH0788699B2 (en) Body construction method
JP2766889B2 (en) Underground floor construction method for buildings
JP2642303B2 (en) Ring support frame
JP2631428B2 (en) How to build a building with a basement
SU651101A1 (en) Composite large-span building curvilinear in plan
JPH04176960A (en) Building construction method
JPH06173278A (en) Foundation structure for building structure
JPH041331A (en) Construction of underground structure
JPH03103600A (en) Construction of large space of building in extremely deep underground

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees