JP2749443B2 - How to create a planned distribution system - Google Patents

How to create a planned distribution system

Info

Publication number
JP2749443B2
JP2749443B2 JP2328142A JP32814290A JP2749443B2 JP 2749443 B2 JP2749443 B2 JP 2749443B2 JP 2328142 A JP2328142 A JP 2328142A JP 32814290 A JP32814290 A JP 32814290A JP 2749443 B2 JP2749443 B2 JP 2749443B2
Authority
JP
Japan
Prior art keywords
subject
switch
state
system operation
event
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2328142A
Other languages
Japanese (ja)
Other versions
JPH04197039A (en
Inventor
孝行 渡部
尚志 久津美
勝美 関戸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Meidensha Corp
Toshiba Corp
Tokyo Electric Power Co Holdings Inc
Original Assignee
Meidensha Corp
Toshiba Corp
Tokyo Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Meidensha Corp, Toshiba Corp, Tokyo Electric Power Co Inc filed Critical Meidensha Corp
Priority to JP2328142A priority Critical patent/JP2749443B2/en
Publication of JPH04197039A publication Critical patent/JPH04197039A/en
Application granted granted Critical
Publication of JP2749443B2 publication Critical patent/JP2749443B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】 A.産業上の利用分野 本発明は、配電系統に、計画される工事等に伴う系統
操作手順を作成するための操作予定時点の系統状態を作
成する配電系統の予定系統作成方法に関する。
DETAILED DESCRIPTION OF THE INVENTION A. Industrial Field of the Invention The present invention relates to a power distribution system that creates a system state at a scheduled operation time for preparing a system operation procedure for a planned construction or the like. It relates to a method for creating strains.

B.発明の概要 本発明は、配電系統の予定系統作成方法において、 工事等の事象に直接関連及び連鎖する事象の操作手順
を模擬実行し、今、操作手順を作成しようとしている事
象の系統操作範囲のみについて予定系統を作成すること
により、 情報処理量を軽減できるようにしたものである。
B. Summary of the Invention The present invention relates to a method for creating a scheduled power distribution system, which simulates an operation procedure of an event directly related to and chained to an event such as construction, and performs a system operation of an event for which an operation procedure is to be created. By creating a planned system only for the range, the amount of information processing can be reduced.

C.従来の技術 配電系統の監視制御システムは、系統構成機器及び設
備の運転状態を適切にすることで系統設備稼働率の向上
や電力供給の信頼度向上を図るようにしている。
C. Prior Art The monitoring and control system of the power distribution system is designed to improve the operation rate of the system equipment and the reliability of the power supply by making the operation state of the system components and equipment appropriate.

第2図はシステムの概略構成図を示す。配電線区分開
閉器(しゃ断器も含む)S1〜S10及び連係開閉器T1、T2
によって配電線区分及び配電線間の連係がなされて需要
家側への給電がなされる系統において、配電線の電流電
圧情報や開閉器S1〜S10,T1,T2の開閉情報が送受信装置T
Rによって受信され、逆に開閉器の操作情報が各開閉器
の操作装置に送信される。
FIG. 2 shows a schematic configuration diagram of the system. Distribution line switches (including circuit breakers) S1 to S10 and linked switches T1, T2
In the system in which the distribution line division and the distribution lines are linked to each other to supply power to the customer side, the current / voltage information of the distribution line and the switching information of the switches S1 to S10, T1, T2 are transmitted and received by the transmission / reception device T.
R, and conversely, switch operation information is transmitted to the operation device of each switch.

送受信装置TRが受信した情報は、監視制御装置本体SC
に収集され、該監視制御装置本体SCによって配電系統状
態表示のための加工がなされ、表示指令卓CNへ表示され
る。この表示指令卓CNでは監視員からの各種指令を本体
SCに与え、表示制御と共に送受信装置TRから開閉器操作
指令として送出される。
The information received by the transmitting / receiving device TR is the SC
Is processed by the monitoring and control device main body SC to display the state of the power distribution system, and is displayed on the display command table CN. In this display command table CN, various commands from monitoring personnel are
It is given to the SC and sent as a switch operation command from the transmission / reception device TR together with the display control.

こうした監視制御システムは、監視制御機能のほか
に、配電系統の将来の系統状態(予定系統)を作成し、
この系統状態の基で計画される工事、保守作業などの事
象(以下件名と呼ぶ)に伴う系統操作手順を作成する機
能を備える。
These monitoring and control systems, in addition to monitoring and control functions, create the future system status (planned system) of the distribution system,
A function is provided for creating a system operation procedure associated with an event (hereinafter, referred to as a subject) such as a construction work or a maintenance work planned based on the system state.

このような予定系統作成のため、従来は現在の系統状
態を表す情報を基に、今、操作手順を作成しようとする
件名の操作開始予定時刻までに操作開始予定となってお
り、操作手順が作成されている件名について時系列順に
操作個々の内容に応じた系統状態の変更を行う(模擬実
行と呼ぶ)ことにより系統全体についての将来の系統状
態を得るようにしている。
In order to create such a planned system, conventionally, based on information indicating the current system state, the operation is now scheduled to start by the scheduled operation start time of the subject for which the operation procedure is to be created. By changing the system status according to the content of each operation in the time series in the created subject (referred to as simulated execution), the future system status of the entire system is obtained.

D.発明が解決しようとする課題 従来の予定系統作成方法では、監視制御システムが対
象とする配電系統の規模が大きくなるにしたがって、処
理対象となる情報量が増大するだけでなく、一定期間内
に実施される件名の数も増大し、その処理量がますます
増加する問題があった。
D. Problems to be Solved by the Invention According to the conventional scheduled system creation method, as the size of the distribution system targeted by the monitoring and control system increases, not only does the amount of information to be processed increase, but also within a certain period of time. In addition, the number of subjects to be implemented has also increased, and there has been a problem that the processing amount has increased more and more.

本発明の目的は、予定系統情報作成のための情報処理
量を軽減する方法を提供するにある。
An object of the present invention is to provide a method for reducing the amount of information processing for creating scheduled system information.

E.課題を解決するための手段 本発明は上記目的を達成するため、配電系統の将来の
系統状態を作成し、この系統状態を基に、計画される工
事,保守作業などの事象に伴う系統操作手順を作成する
において、前記事象に対する系統操作終了時期前に系統
操作開始時期を有しかつ該事象による系統操作範囲と少
なくとも一部を共有する系統操作範囲を有する直接関連
事象と、この直接関連事象に連鎖する連鎖事象とを呼出
し、これら事象に伴う系統操作手順のみを時系列順に該
事象の系統操作開始時期まで模擬実行して当該系統操作
範囲の配電系統の将来の系統状態を作成する。
E. Means for Solving the Problems In order to achieve the above object, the present invention creates a future system state of the distribution system, and based on this system state, the system associated with events such as planned construction and maintenance work. In preparing the operation procedure, a direct related event having a system operation start time before the system operation end time for the event and having a system operation range at least partially sharing the system operation range by the event; A chain event linked to a related event is called, and only the system operation procedure associated with these events is simulated in chronological order until the system operation start time of the event to create a future system state of the distribution system in the system operation range. .

F.作用 配電系統に対する1つの件名の系統操作範囲は監視制
御システムが対象とする系統規模とは無関係に地域内に
限定されるのが殆どであり、系統の運用計画者は計画さ
れる件名に対してその操作範囲のおおよそを経験的に見
込むことができる。こうした事実から、予定系統の作成
は系統全体について行う必要がなく、件名から見込む系
統操作範囲に対してのみ作成すれば十分である。
F. Action The system operation scope of one subject for the distribution system is almost always limited to the area regardless of the system scale targeted by the monitoring and control system. On the other hand, the approximate operation range can be estimated empirically. Due to these facts, it is not necessary to create a planned system for the entire system, but only for the system operation range expected from the subject.

そこで、本発明では、予定系統の作成に、当該件名と
直接に関連する件名及び連鎖の件名についてのみ模擬実
行を行い、当該件名による系統操作の見込範囲と関連を
持たない件名の模擬実行を省略することで予定系統作成
のための処理時間を短縮及び情報処理量を軽減する。
Therefore, in the present invention, when creating a planned system, simulated execution is performed only on the subject directly related to the subject and the subject of the chain, and the simulated execution of the subject that is not related to the expected range of the system operation based on the subject is omitted. By doing so, the processing time for creating the scheduled system is reduced and the amount of information processing is reduced.

G.実施例 第2図の構成において、監視制御装置本体SCは対象系
統に対して計画される件名についてその系統操作範囲を
サーチする。ここで、件名の系統操作範囲は、当該操作
によって「入」,「切」などの状態が変更される開閉器
のみに限らず、開閉操作によって充/停電状態が変化す
るときの状態変化区間、及び充/停電状態が変化するこ
とを保証する区間、さらに充/停電状態の変化に伴って
状態変化かる開閉器を含む。また、充/停電状態が変化
しない場合は充/停電状態が変化しないことを保証する
区間を含む。
G. Embodiment In the configuration of FIG. 2, the monitoring control device main body SC searches the system operation range for the subject planned for the target system. Here, the system operation range of the subject is not limited to the switch whose state such as “ON” or “OFF” is changed by the operation, but also a state change section when the charging / power failure state is changed by the opening / closing operation. And a section that guarantees that the charging / power failure state changes, and further includes a switch that changes its state according to the change in the charging / power failure state. In addition, when the charging / power outage state does not change, a section that guarantees that the charging / power outage state does not change is included.

例えば、配電線を単位として取り扱うときの系統操作
範囲は以下のようになる。
For example, the system operation range when handling distribution lines as a unit is as follows.

(1)ループ投入操作 開閉器の両端が充電されている状態での開閉器投入操
作の系統操作範囲は、当該開閉器両側区間の所属配電線
すべてとする。
(1) Loop closing operation The system operation range of the switch closing operation in a state where both ends of the switch are charged is all the distribution lines belonging to both side sections of the switch.

(2)ループ開放操作 開閉器の両端共、その背後に電源が存在する状態での
開閉器開放操作の系統操作範囲は、当該開閉器両側区間
に、「入」状態の開閉器で、直接間接に接続されている
区間の所属配電線すべてとする。
(2) Loop opening operation The system operation range of the switch opening operation in the state where power is present at both ends of the switch and behind it is the switch in the “ON” state on both sides of the switch. All the distribution lines belonging to the section connected to.

(3)送電操作 開閉器の片端が充電、他端が停電の状態での開閉器投
入操作の系統操作範囲は、充電側の区間および、当該操
作により充電されることになる区間の所属配電線すべて
とする。
(3) Power transmission operation The system operation range of the switch closing operation when one end of the switch is charged and the other end is blackout is the distribution line belonging to the section on the charging side and the section to be charged by the operation. All.

(4)停止操作 開閉器の片端の背後には電源が存在し、他端背後には
電源が存在しない状態での開閉器開放操作の系統操作範
囲は、当該開閉器両側区間に、「入」状態の開閉器で、
直接間接に接続されている区間の所属配電線すべてとす
る。
(4) Stop operation The system operation range of the switch opening operation in a state where the power is present behind one end of the switch and the power is not present behind the other end is “on” in both sections of the switch. With the state switch,
All distribution lines belonging to sections directly and indirectly connected.

(5)停電中開閉操作、設定操作 開閉器両側区間が停電の状態での開閉器投入開放操
作、開閉器の入/切状態が変化しない開閉器操作(設定
操作)の系統操作範囲は、当該開閉器の所属配電線を操
作範囲とする。なお、異なる配電線間に接続する開閉器
(連係開閉器)は、ここでは、両方の配電線に所属して
いるものとする。
(5) Opening / closing operation during power failure, setting operation The system operation range of the switch operation (setting operation) where the switch on / off operation and the switch on / off state does not change when both switch sections are blackout The operating range is the distribution line to which the switch belongs. Note that a switch (coupling switch) connected between different distribution lines belongs to both distribution lines here.

上述のように定める系統操作範囲から、既に操作手順
が作成された件名の系統操作範囲が求められている。一
方、これから操作手順を作成しようとする件名に対する
系統操作範囲は作成されておらず、この作成にはまず運
用計画者が当該件名に対する系統操作範囲を見込み、操
作開始、終了予定時刻と共に指定する。
From the system operation range determined as described above, the system operation range of the subject for which the operation procedure has already been created is obtained. On the other hand, a systematic operation range for a subject for which an operation procedure is to be created has not yet been created, and in this creation, an operation planner first estimates a systematic operation range for the subject and specifies the system operation range along with the scheduled start and end times of the operation.

この見込み指定される系統操作範囲に対して、監視制
御装置本体SCは、直接関連する件名及び連鎖する件名を
呼出す。ここで、直接関連する件名は、これから作成し
ようとする件名(A)の操作終了予定時期前に系統操作
監視時期を有しかつ該件名(A)による系統操作範囲の
少なくとも一部を共有する件名(B)が存在するとき、
件名(B)が件名(A)に直接関連する件名になる。ま
た、件名(B)は件名(A)の直接関連件名と呼ぶ。ま
た、連鎖する件名は、上記件名(A)に対する直接関連
件名(B)の関係と同様に、件名(B)に対する直接関
連件名(C)が存在するときに該件名(C)を件名
(A)に連鎖する件名になる。
The supervisory control device main unit SC calls the directly related subject and the linked subject for the system operation range that is expected to be specified. Here, the directly related subject is a subject that has a system operation monitoring time before the scheduled operation end time of the subject (A) to be created and shares at least a part of the system operation range according to the subject (A). When (B) exists,
The subject (B) becomes a subject directly related to the subject (A). Also, the subject (B) is referred to as a directly related subject of the subject (A). In addition, as in the case of the directly related subject (B) with respect to the subject (A), the chained subject is changed to the subject (C) when the directly related subject (C) exists for the subject (B). ).

なお連鎖する件名の直接関連件名も連鎖する件名にな
る。
Note that the directly related subject of the chained subject is also the chained subject.

監視制御装置本体SCは上記直接関連件名及び連鎖件名
を呼出し、これら件名に伴う系統操作手順のみを時系列
順に模擬実行して行き、系統操作範囲の予定系統の作成
を行う。
The supervisory control device main unit SC calls the directly related subject and the chain subject, simulates only the system operation procedure associated with these subjects in chronological order, and creates a planned system of the system operation range.

上述の作成方法を第1図を参照して具体的に説明す
る。
The above-described creation method will be specifically described with reference to FIG.

第1図は第2図の系統図の一部で示し、各記号は以下
のとおりである。
FIG. 1 is a part of the system diagram of FIG. 2, and the respective symbols are as follows.

▲:「入」状態の区分開閉器 △:「切」状態の区分開閉器 □:「切」状態の連係開閉器 また、線分は配電線の区間を表し、区分開閉器S1〜S6は
時限投入機能や逆送ロック機能を持つものとする。
▲: Segmented switch in “ON” state △: Segmented switch in “OFF” state □: Linked switch in “OFF” state Also, the line segment indicates the section of the distribution line, and the segmented switches S1 to S6 are timed. It shall have a closing function and a reverse lock function.

第1図(a)は現在の配電系統状態を表し、この状態
から配電線F3を系統操作範囲に見込む件名Aの操作手順
を作成するための予定系統を作成する場合、件名Bが下
記表1に示す系統操作手順を持つ直接関連件名でありか
つ配電線F2、F3を系統操作範囲とし、件名Cが下記表2
の系統操作手順をもつ件名Bの直接関連件名でありかつ
配電線F1、F2を系統操作範囲とする。
FIG. 1 (a) shows the current state of the distribution system. From this state, when creating a planned system for creating an operation procedure for the subject A that allows the distribution line F3 to be included in the system operation range, the subject B is set in Table 1 below. And the distribution lines F2 and F3 are the system operation scope, and the subject C is shown in Table 2 below.
And the distribution lines F1 and F2 are system operation ranges.

装置本体SCはこれら件名B、Cについてのみ時系列順
の模擬実行によって件名Aの予定系統作成を行う。
The apparatus main body SC creates a scheduled system of the subject A only by simulating the subject B and C in chronological order.

まず、件名Cの模擬実行の系統状態は第1図(b)に
示すようになり、連係開閉器T1の投入時に区分開閉器S4
が逆送ロック状態となる。次に、件名Bの模擬実行の系
統状態は第1図(c)に示すようになり、区分開閉器S3
の投入操作時に区分開閉器S4が逆送ロック状態のため時
限投入機能が働かずに「切」状態のままとなり、次の連
係開閉器T2の投入操作と開放操作時に停電中操作にな
る。
First, the system state of the simulation execution of the subject C is as shown in FIG. 1 (b), and when the linked switch T1 is turned on, the sectional switch S4 is turned on.
Is in the reverse lock state. Next, the system status of the simulation execution of the subject B is as shown in FIG.
Since the sectional switch S4 is in the reverse lock state during the closing operation, the timed closing function does not operate and remains in the "OFF" state, and the operation during the power failure occurs when the next linking switch T2 is closed and opened.

次に、件名Aの直接関連件名Bのみ模擬実行する場合
を説明する。
Next, a case in which only the directly related subject B of the subject A is simulated will be described.

件名Bの模擬実行後の系統状態は第1図(d)に示す
ようになり、区分開閉器S3の投入時に区分開閉器S4は時
限投入機能によって一定時限後に「入」状態になり、次
の連係開閉器T2の投入時に区分開閉器S6が逆送電ロック
状態になる。
The system state after the simulation of the subject B is as shown in FIG. 1 (d). When the sectional switch S3 is turned on, the sectional switch S4 is turned on after a certain time period by the timed closing function. When the link switch T2 is turned on, the sectional switch S6 enters the reverse power transmission lock state.

即ち、直接関連件名のみの模擬実行では系統操作見込
み範囲(本件ではF3)についても実際に予定されている
系統状態にはならない。そこで、本発明ではさらにその
直接関連件名になる連鎖件名も含めた模擬実行によって
系統操作手順作成及び予定系統を得る。
That is, in the simulation execution of only the directly related subject, the expected system operation range (F3 in this case) does not become the actually planned system state. Therefore, in the present invention, a system operation procedure is created and a planned system is obtained by simulating execution including the chain subject which is the directly related subject.

H.発明の効果 以上のとおり、本発明によれば、予定系統の作成に当
該件名と直接に関連する件名及び連鎖の件名についての
み模擬実行を行い、当該件名による系統操作の見込範囲
と関連を持たない件名の模擬実行を省略するため、予定
系統作成のための処理時間を短縮及び情報処理量を軽減
することができる効果がある。
H. Effects of the Invention As described above, according to the present invention, the execution of the planned system is simulated only for the subject directly related to the subject and the subject of the chain, and the expected range of the system operation based on the subject is related to the subject. Since the simulated execution of a subject having no subject is omitted, there is an effect that the processing time for creating the planned system can be reduced and the amount of information processing can be reduced.

【図面の簡単な説明】[Brief description of the drawings]

第1図は本発明の一実施例を示す予定系統作成の系統状
態図、第2図は監視制御システムの概略構成図である。 S1〜S10…区分開閉器、T1,T2…連係開閉器、F1,FZ2,F3
…配電線、SC監視制御装置本体。
FIG. 1 is a system state diagram of scheduled system creation showing one embodiment of the present invention, and FIG. 2 is a schematic configuration diagram of a monitoring control system. S1 ~ S10… Segmented switch, T1, T2… Linked switch, F1, FZ2, F3
… Distribution line, SC monitoring and control device body.

フロントページの続き (72)発明者 久津美 尚志 東京都府中市東芝町1番地 株式会社東 芝府中工場内 (72)発明者 関戸 勝美 東京都品川区大崎2丁目1番17号 株式 会社明電舎内 (56)参考文献 特開 昭60−98829(JP,A) 特開 平1−152927(JP,A) 特開 平2−51327(JP,A)Continued on the front page (72) Inventor Naoshi Kutsumi 1 Toshiba-cho, Fuchu-shi, Tokyo Inside the Toshiba Fuchu Plant Co., Ltd. (72) Katsumi Sekido 2-1-1-17 Osaki, Shinagawa-ku, Tokyo Inside Meidensha Corporation (56 References JP-A-60-98829 (JP, A) JP-A-1-152927 (JP, A) JP-A-2-51327 (JP, A)

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】配電系統の将来の系統状態を作成し、この
系統状態を基に、計画される工事,保守作業などの事象
に伴う系統操作手順を作成するにおいて、前記事象に対
する系統操作終了時期前に系統操作開始時期を有しかつ
該事象による系統操作範囲と少なくとも一部を共有する
系統操作範囲を有する直接関連事象と、この直接関連事
象に連鎖する連鎖事象とを呼出し、これら事象に伴う系
統操作手順のみを時系列順に模擬実行して当該系統操作
範囲の将来の系統状態を作成することを特徴とする配電
系統の予定系統作成方法。
A system operation procedure for an event such as a planned construction or maintenance work is created based on the system state based on the system state. A directly related event having a system operation start time before the time and having a system operation range at least partially shared with a system operation range by the event, and a chain event chained to the directly related event are called, and these events are called. A planned distribution system creation method for a distribution system, wherein only the associated system operation procedure is simulated in chronological order to create a future system state in the system operation range.
JP2328142A 1990-11-28 1990-11-28 How to create a planned distribution system Expired - Fee Related JP2749443B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2328142A JP2749443B2 (en) 1990-11-28 1990-11-28 How to create a planned distribution system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2328142A JP2749443B2 (en) 1990-11-28 1990-11-28 How to create a planned distribution system

Publications (2)

Publication Number Publication Date
JPH04197039A JPH04197039A (en) 1992-07-16
JP2749443B2 true JP2749443B2 (en) 1998-05-13

Family

ID=18206968

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2328142A Expired - Fee Related JP2749443B2 (en) 1990-11-28 1990-11-28 How to create a planned distribution system

Country Status (1)

Country Link
JP (1) JP2749443B2 (en)

Also Published As

Publication number Publication date
JPH04197039A (en) 1992-07-16

Similar Documents

Publication Publication Date Title
EP2377222B1 (en) Hybrid distribution network power restoration control
Hotta et al. Implementation of a real-time expert system for a restoration guide in a dispatching center
Bernard et al. An expert system for fault diagnosis integrated in existing SCADA system
Chan et al. The implementation and evolution of a SCADA system for a large distribution network
JP2749443B2 (en) How to create a planned distribution system
CN109768619B (en) Automatic debugging system and debugging method for monitoring information
Liacco et al. Automation of the CEI System for Security
JP2003174724A (en) Power system monitor/control apparatus and program for making the apparatus operate
JP2848678B2 (en) Training simulator
JPH0334292B2 (en)
JPS60144116A (en) Power system simulator
JP2668134B2 (en) Method and apparatus for monitoring and controlling power system
JPH11134001A (en) Decentralized control system and storage medium where program thereof is recorded
Bernard et al. An expert system for fault diagnosis integrated in existing SCADA systems
JPH0531374B2 (en)
JP2003284263A (en) Automation system for distribution line
Kaur et al. Preparing to Teach IEC 61850 Digital Substations: A Laboratory Approach
JPS63117624A (en) Electric source system controller
Al-Abaidi et al. Upgrading the local area network of the 220kV libyan eastern network control center
JPH0224103B2 (en)
JPS6056378B2 (en) How to determine the order of power system restoration
JPH06225456A (en) Power distribution system operating apparatus
JPH09285040A (en) Automating system for distribution line
Goda et al. A method for locating fault section by using sequential information at substations
JPH09121476A (en) Monitor and operation device for power distribution system

Legal Events

Date Code Title Description
S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees