JPH06225456A - Power distribution system operating apparatus - Google Patents

Power distribution system operating apparatus

Info

Publication number
JPH06225456A
JPH06225456A JP5308682A JP30868293A JPH06225456A JP H06225456 A JPH06225456 A JP H06225456A JP 5308682 A JP5308682 A JP 5308682A JP 30868293 A JP30868293 A JP 30868293A JP H06225456 A JPH06225456 A JP H06225456A
Authority
JP
Japan
Prior art keywords
distribution system
distribution
distribution line
office
jurisdiction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP5308682A
Other languages
Japanese (ja)
Inventor
Shigeto Sakano
成人 坂野
Yoshihiko Yoshimura
吉彦 吉村
Kenji Izaki
憲滋 井崎
Minoru Katsuyama
実 勝山
Hiroyuki Yabe
啓之 矢部
Akira Takahashi
昭 高橋
Koji Hikita
孝治 疋田
Akinori Nishi
昭憲 西
Mikiya Sakurai
幹也 桜井
Masanao Shimizu
正直 清水
Hitoshi Kanewa
均 金輪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP5308682A priority Critical patent/JPH06225456A/en
Publication of JPH06225456A publication Critical patent/JPH06225456A/en
Pending legal-status Critical Current

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

PURPOSE:To interchange a load between sales offices from a switch disposed in a boundary of the offices. CONSTITUTION:Power distribution system operating apparatuses 10, 20 have power distribution lead breakers 11, 21 at respective power distribution lines 12, 22, and switches S1-S9 for dividing power distribution lines into a plurality of sections wherein the apparatuses are mounted at sales offices A, B for managing power distribution systems, and comprise means for inputting from the other office each time of necessity of a load to be interchanged from the switch S4 disposed in a boundary of adjacent offices when interchange of the load is required at the lines between the adjacent offices.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は配電系統の自動化に係
り、特に隣接する営業所を経由する配電線における営業
所間の負荷の融通が可能な配電系統操作装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to automation of a distribution system, and more particularly to a distribution system operating device capable of accommodating a load between sales offices in a distribution line passing through adjacent sales offices.

【0002】[0002]

【従来の技術】図9によって配電系統操作装置を説明す
る。図において、10,20は配電用変電所であり、配電線
引出用遮断器11,21より配電線12,22が引出される。引
出された配電線12は複数の配電線自動化用常閉開閉器
(以下、常閉開閉器と言う)S1〜S3によって分割さ
れ、区間K1〜K3を形成している。又、配電線22は複
数の常閉開閉器S5〜S7によって区間に分割されてい
る。S4,S8,S9は配電自動化用常開開閉器(以
下、常開開閉器と言う)であり、他の変電所から引出さ
れた配電線と連系している。
2. Description of the Related Art A distribution system operating device will be described with reference to FIG. In the figure, 10 and 20 are distribution substations, and distribution lines 12 and 22 are drawn out from breakers 11 and 21 for drawing distribution lines. The drawn distribution line 12 is divided by a plurality of distribution line automation normally closed switches (hereinafter, referred to as normally closed switches) S1 to S3 to form sections K1 to K3. The distribution line 22 is divided into sections by a plurality of normally closed switches S5 to S7. S4, S8 and S9 are normally open switches for distribution automation (hereinafter referred to as normally open switches), which are connected to distribution lines drawn from other substations.

【0003】L1〜L5は開閉器遠方監視制御用子局
(以下、子局と言う)であり、伝送路13を介して営業所
に設置された開閉器遠方監視制御用親局(以下、親局と
言う)L6に接続され、営業所から開閉器の遠方監視制
御が可能となっている。L8は変電所の遮断器状態や保
護リレーの動作状態、バンク/配電線の電圧/電流情報
などを監視するための変電所監視子局であり、営業所に
設置された変電所監視親局L7に伝送路14を介して接続
されている。15は営業所に設置された中央演算処理装
置、16は配電系統設備データを記憶する記憶装置であ
る。
L1 to L5 are switch remote monitoring / controlling slave stations (hereinafter referred to as slave stations), and switch remote monitoring / controlling master stations (hereinafter referred to as master stations) installed at a sales office via a transmission line 13. It is connected to the L6 station, which enables remote monitoring and control of the switch from the sales office. L8 is a substation monitoring slave station for monitoring the circuit breaker status of the substation, the operation status of the protection relay, the voltage / current information of the bank / distribution line, etc., and the substation monitoring master station L7 installed in the sales office To the transmission line 14. Reference numeral 15 is a central processing unit installed in a business office, and 16 is a storage device for storing distribution system equipment data.

【0004】中央演算処理装置15の設置された営業所を
A営業所とし、A営業所の設備管理エリアは一点鎖線17
で示した範囲までとする。常開開閉器S8はA営業所管
轄エリア内の他の変電所と連系しており、S4は他の営
業所管轄エリアの変電所20から引出された配電線22と連
系していることとすると、記憶装置16にはA営業所管轄
エリア内の変電所設備データ及び配電線設備データ(開
閉器S1,S2,S3,S4,S8の設備データ及びそ
れらの接続状態など)を記憶している。
The sales office in which the central processing unit 15 is installed is called the A sales office, and the facility management area of the A sales office is a dashed line 17
Up to the range shown in. The normally open switch S8 is connected to the other substations in the A business area, and S4 is connected to the distribution line 22 drawn from the substation 20 in the other business area. Then, the storage device 16 stores the substation equipment data and distribution line equipment data (equipment data of the switches S1, S2, S3, S4, S8, and their connection states) in the A business office jurisdiction area. There is.

【0005】[0005]

【発明が解決しようとする課題】上記従来の配電系統操
作装置は、自営業所管轄内の配電系統設備データ及び自
営業所管轄内の配電系統運用状態を示す情報しか保有し
ていない。中央演算処理装置15では親局L6から夫々の
開閉器状態(入又は切状態など)を取り込む。又、変電
所監視親局L7から当該変電所の運転状態情報(遮断器
の状態)を取り込み、記憶装置16に記憶されている配電
線設備の接続状態と変電所遮断器状態、送出電圧の有無
などの情報から、各区間K1,K2,K3の状態(充電
又は停電)を判定する。
DISCLOSURE OF THE INVENTION The conventional distribution system operation device has only distribution system facility data within the jurisdiction of the self-employed office and information indicating the operating state of the distribution system within the jurisdiction of the self-employed office. The central processing unit 15 fetches each switch state (ON or OFF state) from the master station L6. In addition, the operating state information (state of the circuit breaker) of the substation is taken in from the substation monitoring master station L7, the connection state of the distribution line equipment stored in the storage device 16, the state of the substation circuit breaker, and the presence or absence of the sending voltage. The state (charging or power failure) of each section K1, K2, K3 is determined from such information.

【0006】ここで、常開開閉器S4から先は他の営業
所管轄の配電線と連系されているにも拘らず、その状態
を把握することができない。これは、常開開閉器S4か
ら先の他営業所管轄配電線の設備データをA営業所の記
憶装置16には保有していないためであり、例え、保有し
ていたとしても、他営業所管轄の変電所運転状態情報
や、連系先配電線の開閉器状態情報が取り込まれないた
め、運用状態を把握することはできない。一般的には、
配電線は網目の如く張り巡らされている。したがって、
一度台風などにより停電区間が発生した場合、健全な停
電区間を充電するために迂回ルートから電力を融通する
処置を行なっている。
Here, the state beyond the normally open switch S4 cannot be grasped even though it is connected to a distribution line under the control of another business office. This is because the equipment data of the distribution line under the jurisdiction of another sales office beyond the normally open switch S4 is not stored in the storage device 16 of the A sales office. The operational status cannot be grasped because the operating status information of the substation under the jurisdiction and the switch status information of the distribution destination distribution line are not captured. In general,
The distribution line is stretched around like a mesh. Therefore,
When a power outage section occurs once due to a typhoon, etc., measures are taken to accommodate power from a bypass route in order to charge a sound power outage section.

【0007】このため従来は、例えば区間K2において
負荷の融通の必要が生じ、他営業所管轄配電線から電力
を融通する場合、常開開閉器S4の連系先区間の充停電
状態などを他の営業所に無線や電話で問い合わせてか
ら、S4の投入制御を手動で行なわざるを得なかった。
For this reason, conventionally, for example, it becomes necessary to accommodate a load in the section K2, and when power is to be accommodated from a distribution line under the jurisdiction of another business office, the charging / discharging state of the section to which the normally-open switch S4 is connected can be changed. I had no choice but to manually perform S4 turn-on control after inquiring by radio or telephone from the sales office.

【0008】本発明は上記事情に鑑みてなされたもので
あり、隣接する営業所を経由する配電線における営業所
間の負荷の融通を円滑、かつ容易に行なうため、営業所
の境界にある開閉器から融通が可能な負荷に関する情報
のみを相手営業所より入手し、営業所間での負荷の融通
を行なうことが可能な配電系統操作装置を提供すること
を目的としている。
The present invention has been made in view of the above circumstances, and in order to smoothly and easily exchange loads between sales offices in a distribution line passing through an adjacent sales office, opening / closing at the boundary of the sales offices is performed. An object of the present invention is to provide a distribution system operation device capable of accommodating a load between business offices by obtaining only information regarding a load that can be accommodated from a power supply unit from a partner business office.

【0009】[0009]

【課題を解決するための手段】上記目的を達成するた
め、本発明の[請求項1]による配電系統操作装置は、
配電線毎に配電線引出用遮断器及び配電線を複数の区間
に区分する開閉器とを有し、配電系統を管理する各営業
所毎に設置される配電系統操作装置において、隣接する
営業所間を経由する配電線で負荷の融通が必要となると
き、当該隣接する営業所の境界にある開閉器から融通で
きる負荷に関する情報を必要の都度、前記相手営業所か
ら入手する手段を備えた。
In order to achieve the above-mentioned object, a distribution system operating device according to [Claim 1] of the present invention comprises:
Each distribution line has a breaker for pulling out the distribution line and a switch that divides the distribution line into multiple sections, and the distribution system operation device installed at each business office that manages the distribution system has an adjacent sales office. When it is necessary to accommodate a load on a distribution line passing through the space, a means for obtaining information about a load that can be accommodated from a switch at the boundary of the adjacent sales office from the partner sales office is provided each time the information is needed.

【0010】本発明の[請求項2]による配電系統操作
装置は、請求項1の装置において、相手営業所管轄から
の負荷融通計算に際し、自営業所管轄系統の配電線が他
営業所にまたがる場合における融通計算処理を、その配
電線の負荷側営業所より行なう手段を備えた。
In the distribution system operating device according to [Claim 2] of the present invention, in the device according to claim 1, the distribution line of the system under the jurisdiction of the self-employed business spans other business offices when calculating the load accommodation from the jurisdiction of the other business jurisdiction. A means for performing the accommodation calculation process in the case from the load side sales office of the distribution line was provided.

【0011】本発明の[請求項3]による配電系統操作
装置は、請求項1の装置において、当該配電系統操作装
置の管轄範囲に隣接する他の配電系統操作装置とネット
ワーク網で結合する手段と、当該配電系統操作装置の管
轄範囲にある配電線に接続する他の配電系統操作装置の
管轄範囲にある配電線の状態を他の配電系統操作装置か
ら入力する手段と、隣接管轄配電線の電力量情報を他の
配電系統操作装置から入力する手段と、当該配電系統操
作装置の管轄範囲にある配電線のみならず隣接管轄配電
線をも含めて健全な停電区間に他の配電線から融通送電
するための融通計算をする手段を備えた。
A distribution system operating device according to [Claim 3] of the present invention is, in the device of claim 1, a means for connecting to another distribution system operating device adjacent to a jurisdiction range of the distribution system operating device through a network. , A means for inputting the status of a distribution line connected to a distribution line within the jurisdiction of the relevant distribution system operation device from another distribution system operation device, and the power of the adjacent jurisdiction distribution line. Interchange transmission from other distribution lines to a sound power failure section including means for inputting quantity information from other distribution system operation devices and distribution lines within the jurisdiction of the distribution system operation device as well as adjacent distribution lines It was equipped with a means to calculate the flexibility to do so.

【0012】本発明の[請求項4]による配電系統操作
装置は、1つの営業所に設置される配電線監視制御装置
は、遠方監視制御装置に接続する演算処理装置内の監視
制御部と、監視制御に必要な配電系統設備データを記憶
する記憶装置と、記憶装置に記憶した配電系統設備デー
タを管理する演算処理装置内のデータ管理部と、他の配
電線監視制御装置と情報交換をする情報交換装置、及び
夫々の処理部分と接続し運用者と情報交換するマンマシ
ンインターフェース装置からなる。
In the distribution system operation device according to [Claim 4] of the present invention, the distribution line monitoring control device installed in one business office has a monitoring control unit in the arithmetic processing device connected to the remote monitoring control device, A storage device that stores the distribution system equipment data necessary for monitoring and control, a data management unit in the arithmetic processing unit that manages the distribution system equipment data stored in the storage device, and information exchange with other distribution line monitoring and control devices. It is composed of an information exchange device and a man-machine interface device which is connected to each processing part and exchanges information with an operator.

【0013】本発明の[請求項5]による配電系統操作
装置は、A営業所では配電線12上の開閉器S1,S2,
S3の開閉器情報は夫々に付随する子局L1,L2,L
3から伝送路13によって親局を経由して中央演算処理装
置15及びB営業所の中央演算処理装置23に取り込まれ
る。又、変電所10の運転状態情報は、変電所監視子局L
8から伝送路14を介して制御所400 を経由して中央演算
処理装置15及びB営業所の中央演算処理装置23に取り込
まれる。更にA営業所の中央演算処理装置15には、A営
業所管轄内の設備データとB営業所管轄内の設備データ
を記憶する記憶装置16が接続される。
The distribution system operation device according to [Claim 5] of the present invention is a switch S1, S2, on the distribution line 12 at the A sales office.
The switch information of S3 is associated with the slave stations L1, L2, L
It is taken into the central processing unit 15 and the central processing unit 23 of the B business office from 3 through the transmission line 13 via the master station. In addition, the operating status information of the substation 10 is the substation monitoring slave station L.
8 through the transmission line 14 to the central processing unit 15 of the control office 400 and the central processing unit 23 of the B sales office. Further, the central processing unit 15 of the A sales office is connected to a storage device 16 for storing equipment data within the jurisdiction of the A sales office and equipment data within the jurisdiction of the B sales office.

【0014】同様に、B営業所では配電線22上の開閉器
S4,S5,S6,S7の開閉器情報は夫々に付随する
子局L4,L5,L6,L7から伝送路18によって親局
を経由して中央演算処理装置23及びA営業所の中央演算
処理装置15に取り込まれる。又、変電所20の運転状態情
報は、変電所監視子局L15から伝送路19を介して制御所
400 を経由して中央演算処理装置23及びA営業所の中央
演算処理装置15に取り込まれる。更にB営業所の中央演
算処理装置23には、B営業所管轄内の設備データとA営
業所の管轄内の設備データを記憶する記憶装置24が接続
される。同じようにA営業所の中央演算処理装置15に
は、A営業所管轄内の設備データとB営業所管轄内の設
備データを記憶する記憶装置16が接続される。
Similarly, at the B office, the switch information of the switches S4, S5, S6, S7 on the distribution line 22 is transmitted from the associated slave stations L4, L5, L6, L7 to the master station via the transmission line 18. It is taken in via the central processing unit 23 and the central processing unit 15 of the A office. In addition, the operating state information of the substation 20 is transmitted from the substation monitoring slave station L15 via the transmission line 19 to the control station.
It is taken into the central processing unit 23 and the central processing unit 15 of the A sales office via 400. Further, the central processing unit 23 of the B business office is connected to a storage device 24 for storing equipment data within the jurisdiction of the B business office and equipment data within the jurisdiction of the A business office. Similarly, the central processing unit 15 of the A sales office is connected to the storage device 16 for storing the equipment data under the jurisdiction of the A sales office and the equipment data under the jurisdiction of the B sales office.

【0015】[0015]

【作用】[請求項1]による配電系統操作装置におい
て、A営業所管轄の配電線のうち、A営業所とB営業所
の境界を通過する配電線のA営業所側の区間に負荷の融
通の必要が生じた場合、A営業所に設置されている中央
演算処理装置は、記憶装置に保有している自営業所内の
設備データと配電系統の運用状態から、その配電線に負
荷の融通を行なう手段を考慮する。
In the distribution system operation device according to [Claim 1], among the distribution lines under the jurisdiction of the A sales office, the load is accommodated in the section on the A sales office side of the distribution line that passes through the boundary between the A sales office and the B sales office. If the need arises, the central processing unit installed in the A sales office will adjust the load to the distribution line based on the facility data in the own business office stored in the storage device and the operating status of the distribution system. Consider how to do it.

【0016】その結果、A営業所に設置されている中央
演算処理装置は、B営業所から融通を受ける以外に方法
がない場合、B営業所の配電系統の運用状態を把握し、
かつB営業所管轄の設備データを保有する相手記憶装置
と接続された相手中央演算処理装置に伝送路を介して、
B営業所がA営業所とB営業所の境界にある常開開閉器
からA営業所側へ融通できる負荷に関する情報を入手
し、融通が可能ならばA営業所,B営業所の境界にある
常開開閉器を操作し、融通操作を行なう。
As a result, the central processing unit installed in the A sales office grasps the operating state of the distribution system of the B sales office if there is no other option than to receive the accommodation from the B sales office.
And, via the transmission line, to the partner central processing unit connected to the partner storage device that holds the equipment data under the jurisdiction of B sales office,
The B sales office obtains information about the load that can be accommodated to the A sales office from the normally open switch on the boundary between the A sales office and the B sales office, and if the accommodation is possible, it is at the boundary between the A sales office and the B sales office. Operate the normally open switch to perform flexible operation.

【0017】[請求項2]による配電系統操作装置にお
いて、基本的な動作は請求項1と同様であるが、自営業
所管轄系統の配電線が他営業所にまたがる場合における
融通計算処理に際し、事故時における負荷側健全停電区
間が営業所境界で分割されるため、両営業所にて融通計
算処理が必要となるが、同時に融通計算処理をすること
により発生する矛盾を防止するため、及び電源側営業所
から融通処理することにより発生する子局の時限順送機
能による他営業所管轄内への自動投入を防止するため、
健全停電区間の負荷側営業所から融通計算処理を行なう
こととする。
In the power distribution system operation device according to [claim 2], the basic operation is the same as that of claim 1, but when the distribution line of the system under the jurisdiction of the self-employed office extends to another business office, Since the load-side normal blackout section at the time of an accident is divided at the sales office boundaries, both offices need to carry out accommodation calculation processing, but in order to prevent inconsistencies caused by the accommodation calculation processing at the same time, and the power supply In order to prevent automatic input into the jurisdiction of other sales offices due to the time-delayed forwarding function of the slave station that occurs due to the accommodation processing from the side sales office
The load side sales office in the normal power outage section will perform the accommodation calculation processing.

【0018】[請求項3]による配電系統操作装置にお
いて、配電系統で事故等が発生し融通計算が必要となる
と、融通計算要求手段が融通手順作成手段に融通手順作
成要求を行なう。その際、融通計算要求手段は、融通し
てほしい区間を融通手順作成手段に通知する。融通手順
計算手段は起動されると、被融通区間に融通可能な配電
線を検索するために、設備情報保存手段に保存されてい
る系統接続情報を参照し、被融通区間が接続する配電線
を求める。
In the power distribution system operation device according to [Claim 3], when an accident or the like occurs in the power distribution system and the accommodation calculation is required, the accommodation calculation requesting means requests the accommodation procedure creating means. At this time, the accommodation calculation requesting means notifies the accommodation procedure creating means of the section desired to be accommodated. When the accommodation procedure calculation means is activated, in order to search for a distribution line that can be accommodated in the concession section, the grid connection information stored in the equipment information storage means is referred to, and the distribution line to which the concession section connects is searched. Ask.

【0019】次に、上述より得られた配電線のオンライ
ン情報を、当該管轄配電線情報入力手段より取り込む。
即ち、当該配電線の負荷電流,当該配電線の所属バンク
の負荷電流,当該配電線に所属する区間の負荷電流,当
該配電線の上位系統,当該配電線に所属する開閉器の現
在状態(入切状態,異常情報,順送方向,操作禁止情
報,遠制可不可情報)がそれに相当する。更に得られた
配電線の中に隣接管轄配電線があれば、隣接管轄配電線
情報入力手段より、隣接管轄配電線のオンライン情報を
入力する。即ち、当該隣接管轄配電線の供給予備力,隣
接配電線と被融通区間の連系開閉器点における電圧、
又、当該連系開閉器が隣接管轄配電系統操作装置の管轄
である場合は、当該連系開閉器の現在状態がそれであ
る。
Next, the online information of the distribution line obtained as described above is fetched from the relevant distribution line information input means.
That is, the load current of the distribution line, the load current of the bank to which the distribution line belongs, the load current of the section that belongs to the distribution line, the upper system of the distribution line, the current state of the switch that belongs to the distribution line (on (OFF status, error information, progressive direction, operation prohibition information, distance control possible / impossible information) correspond to that. Further, if there is an adjacent jurisdiction distribution line among the obtained distribution lines, online information of the adjacent jurisdiction distribution line is input from the adjacent jurisdiction distribution line information input means. That is, the supply reserve of the adjacent jurisdiction distribution line, the voltage at the interconnection switch point between the adjacent distribution line and the concession section,
Further, when the interconnection switch is under the jurisdiction of the adjacent jurisdiction distribution system operating device, the current state of the interconnection switch is that.

【0020】上述において、隣接管轄配電線の供給予備
力は、当該隣接管轄配電線の所属バンクの予備力,当該
隣接管轄配電線のフィーダ予備力,当該隣接管轄配電線
に所属する各開閉器の通過許容予備力を考慮した予備力
である。融通手順作成手段は上述により得た設備情報,
当該管轄配電線オンライン情報,隣接管轄配電線オンラ
イン情報をもとに融通手順を作成する。
In the above description, the reserve capacity of the adjacent jurisdiction distribution line is defined as the reserve capacity of the bank to which the adjacent jurisdiction distribution line belongs, the feeder reserve capacity of the adjacent jurisdiction distribution line, and the switch of each switch belonging to the adjacent jurisdiction distribution line. This is a reserve force that takes into consideration the passage allowance reserve. The accommodation procedure creating means is the equipment information obtained as described above,
Create a flexible procedure based on the online information of the relevant distribution line and the adjacent distribution line online information.

【0021】本発明の[請求項4]による配電系統操作
装置は、配電線監視制御装置がA営業所,B営業所夫々
に設置,運用されるとして説明する。監視制御部は遠方
監視制御装置より自営業所管轄配電系統の被監視制御機
器の状態を取り込んで、記憶装置に記憶した配電系統設
備データを参照し、配電系統の状態変化に応じて被監視
制御機器を制御する。データ管理部5はマンマシンイン
ターフェース装置とのデータ入出力により記憶装置に自
営業所、及び他営業所管轄配電系統設備データを区別保
存,変更すること、更に情報交換装置にて他営業所より
送られてくる他営業所管轄配電系統設備データにてこれ
を更新する。
In the distribution system operation device according to [Claim 4] of the present invention, the distribution line monitoring and control device is installed and operated in each of the A sales office and the B sales office. The monitoring control unit fetches the status of the monitored and controlled equipment of the distribution system under the jurisdiction of the self-employed office from the remote monitoring and control equipment, refers to the distribution system equipment data stored in the storage device, and controls the monitoring according to the status change of the distribution system. Control the equipment. The data management unit 5 stores and changes the data of the distribution system equipment under the jurisdiction of the self-employed office and other sales offices in the storage device by inputting / outputting data from / to the man-machine interface device, and further transmits from the other sales office by the information exchange device. This will be updated with the data of the distribution system equipment under the jurisdiction of other sales offices.

【0022】記憶装置には自営業所及び他営業所管轄配
電系統設備データが区別記憶される。情報交換装置は他
営業所に設置された配電線監視制御装置と通信線で接続
され、夫々記憶した配電系統設備データの交換を行なう
マンマシンインターフェース装置は演算処理装置に接続
されて、演算処理装置の処理結果の出力や運用者からの
要求によるデータ入力を行なう。
In the storage device, the distribution system equipment data under the jurisdiction of the self-employed office and other sales offices are stored separately. The information exchange device is connected to the distribution line monitoring and control device installed in another business office by a communication line, and the man-machine interface device for exchanging the stored distribution system facility data is connected to the arithmetic processing device and the arithmetic processing device. Outputs the processing result of and the data input according to the request from the operator.

【0023】本発明の[請求項5]による配電系統操作
装置は、A,B両営業所の中央演算処理装置とも自営業
所と他営業所の設備データや運転状態情報を等しく保持
しているので、いずれの営業所の中央演算処理装置が故
障で停止しても、残りの健全側の営業所の中央演算処理
装置で自営業所と同じように他営業所の系統を監視・制
御できるため即座にバックアップが可能となる。
In the distribution system operation device according to [Claim 5] of the present invention, the central processing units of both the A and B business offices hold the same equipment data and operating state information of the self business office and other business offices. Therefore, even if the central processing unit of any of the sales offices is stopped due to a failure, the central processing units of the remaining healthy sales offices can monitor and control the system of other sales offices in the same way as the own business office. Backup can be done immediately.

【0024】[0024]

【実施例】以下図面を参照して実施例を説明する。図1
は本発明による配電系統操作装置の一実施例の構成図で
あり、図1において図9と同一部分については同一符号
を付して説明を省略する。A営業所側の構成は従来のも
のと同様である。同様にB営業所では、配電線22上の配
電線自動化用開閉器S5,S6,S7,S9の開閉器情
報は、夫々に付随する子局L10,L11,L12,L9から
伝送路18によって親局L13を中継して中央演算処理装置
23に取り込まれる。
Embodiments will be described below with reference to the drawings. Figure 1
FIG. 3 is a configuration diagram of an embodiment of a power distribution system operation device according to the present invention. In FIG. 1, the same parts as those in FIG. The structure of the A office is the same as the conventional one. Similarly, at the B sales office, the switch information of the switch S5, S6, S7, S9 for distribution line automation on the distribution line 22 is transmitted from the subsidiary stations L10, L11, L12, L9 attached to each of them by the transmission line 18. Central processing unit relaying station L13
Taken in 23.

【0025】又、変電所20の運転状態情報は変電所監視
子局L15から伝送路19を介して変電所監視親局L14を中
継して中央演算処理装置23に取り込まれる。更にB営業
所の中央演算処理装置23には、B営業所管轄内の設備デ
ータを記憶する記憶装置24が接続される。又、両営業所
の中央演算処理装置15及び23は伝送路25を介して接続す
る。A営業所,B営業所は夫々伝送路25を介して必要の
都度、A営業所とB営業所の境界にある常開開閉器S4
から融通が可能な負荷を相手営業所から入手することが
できる。
Further, the operating state information of the substation 20 is fetched by the central processing unit 23 from the substation monitoring slave station L15 via the transmission line 19 to the substation monitoring master station L14. Further, the central processing unit 23 of the B sales office is connected to a storage device 24 for storing equipment data within the jurisdiction of the B sales office. Further, the central processing units 15 and 23 of both business offices are connected via a transmission line 25. The A sales office and the B sales office each have a normally open switch S4 at the boundary between the A sales office and the B sales office each time they are required via the transmission line 25.
It is possible to obtain a load that can be accommodated from the partner business office.

【0026】次に作用について図2のフローチャートを
もとに説明する。図1に示すA営業所の中央演算処理装
置15は、親局L6から管内の夫々の開閉器状態を取り込
み、開閉器S1,S2,S3,S4,S8の状態(入又
は切状態など)を把握する。又、変電所監視親局L7か
ら当該変電所の運転状態情報を取り込み、遮断器11の状
態を把握すると共に、記憶装置16に記憶されている配電
線設備の接続状態と変電所遮断器状態、送出電圧の有無
などの情報から区間K1,K2,K3の状態(充電又は
停電)、及びA営業所とB営業所の境界にある常開開閉
器S4からB営業所側に対し融通できる負荷を判断す
る。
Next, the operation will be described with reference to the flowchart of FIG. The central processing unit 15 of the A office shown in FIG. 1 takes in the respective switch states in the pipe from the master station L6, and determines the states of the switches S1, S2, S3, S4 and S8 (on or off states, etc.). Figure out In addition, the operating state information of the substation is fetched from the substation monitoring master station L7 to grasp the state of the circuit breaker 11, and the connection state of the distribution line equipment and the substation circuit breaker state stored in the storage device 16, From the information such as the presence or absence of the sending voltage, the state of the sections K1, K2, K3 (charging or power failure), and the load that can be accommodated from the normally open switch S4 at the boundary between the A and B business offices to the B business office side to decide.

【0027】同様にB営業所の中央演算処理装置23は、
親局L13から管内の夫々の開閉器状態を取り込み、開閉
器S5,S6,S7,S9の状態を把握する。又、変電
所監視親局L14から当該変電所の運転状態情報を取り込
み、遮断器の状態を把握すると共に、記憶装置24に記憶
されている配電線設備の接続状態と変電所遮断器状態、
送出電圧の有無などの情報から各区間K4,K5,K6
の状態、及びA営業所とB営業所の境界にある常開開閉
器S4からA営業所側に対し融通できる負荷を判断す
る。これが図2に示した配電系統運用状態の把握F1で
ある。
Similarly, the central processing unit 23 of the B office is
The state of each switch in the pipe is fetched from the master station L13 and the states of the switches S5, S6, S7 and S9 are grasped. Further, the operating state information of the substation is fetched from the substation monitoring master station L14 to grasp the state of the circuit breaker, and the connection state of the distribution line equipment and the state of the substation circuit breaker stored in the storage device 24,
Each section K4, K5, K6 from the information such as the presence or absence of the sending voltage
And the load that can be accommodated by the A sales office side from the normally open switch S4 at the boundary between the A sales office and the B sales office. This is the grasp F1 of the operating state of the distribution system shown in FIG.

【0028】続くF2は把握した配電系統において負荷
を融通する必要があれば、負荷の融通操作を考慮,実行
する処理である。F3は負荷の融通がA営業所内で不可
能であれば、隣接するB営業所から負荷の融通を行なう
処理である。A営業所内で融通が可能であれば、A営業
所に設置されている中央演算処理装置15は融通操作を考
慮する処理F5を行ない、そして融通操作を実行する処
理F7を実施する。
The following F2 is a process for considering and executing the load accommodation operation if it is necessary to accommodate the load in the grasped distribution system. F3 is a process of accommodating the load from the adjacent B business office if the accommodation of the load is impossible in the A business office. If the accommodation is possible in the A sales office, the central processing unit 15 installed in the A sales office performs a processing F5 considering the accommodation operation, and then executes a processing F7 for executing the accommodation operation.

【0029】又、負荷の融通がA営業所内で不可能な場
合は、A営業所に設置されている中央演算処理装置15
は、B営業所との境界にある常開開閉器S4からB営業
所がA営業所に対し融通可能な負荷に関する情報(電力
量,電圧,位相差など)を、B営業所に設置された中央
演算処理装置23から伝送路25を介して入手する。これが
F4の処理である。続いて中央演算処理装置15は融通操
作を考慮する処理F6を行ない、そして融通操作を実行
する処理F7を実施する。
If the load cannot be accommodated in the A sales office, the central processing unit 15 installed in the A sales office is used.
Is installed in the B sales office, from the normally open switch S4 on the boundary with the B sales office, to the information about the load that the B sales office can accommodate with the A sales office (electric energy, voltage, phase difference, etc.). It is obtained from the central processing unit 23 via the transmission line 25. This is the process of F4. Subsequently, the central processing unit 15 carries out a process F6 in which the flexible operation is considered, and then carries out a process F7 which executes the flexible operation.

【0030】上記実施例によれば、隣接する営業所を経
由する配電線において、営業所の境界にある常開開閉器
から融通できる負荷に関する情報を必要の都度、相手営
業所から入手することにより、従来のように電話や無線
で隣接する相手営業所に確認する必要がなく、効率的な
配電系統の運用を行なうことができる。又、上記実施例
では、複数の営業所間に係る電力の負荷の融通を例に説
明したが、配電線事故時の停電区間に対する隣接営業所
からの電力の融通操作に適用できることは明らかであ
る。
According to the above embodiment, in the distribution line passing through the adjacent sales office, the information about the load that can be accommodated from the normally open switch on the boundary of the sales office is obtained from the partner sales office each time it is necessary. , It is possible to operate the power distribution system efficiently without the need to check with a neighboring sales office by telephone or wireless as in the conventional case. Further, in the above embodiment, the interchange of the load of the electric power between the plurality of business offices has been described as an example, but it is clear that it can be applied to the operation of accommodating the electric power from the adjacent business office to the power failure section at the time of the distribution line accident. .

【0031】図3は他の実施例の構成図であり、図3に
おいて図1と同一部分については同一符号を付して説明
を省略する。本実施例では事故時等における融通計算に
おいて、予備フィーダ(健全停電区間へ融通可能なフィ
ーダ)の対象となる他営業所管轄内の配電線情報等を、
隣接する営業所に設置された配電線自動制御装置間で授
受できるようにし、自営業所中央演算処理装置の融通計
算により、融通が円滑に行なわれることを可能とした。
更に、自営業所管轄系統の配電線が他営業所にまたがる
場合における融通計算処理方法を確立させることによ
り、営業所境界の開閉器種別によらない融通処理を可能
とした。
FIG. 3 is a block diagram of another embodiment. In FIG. 3, the same parts as in FIG. In this embodiment, in the flexible calculation in the event of an accident, the distribution line information in the other sales office jurisdiction which is the target of the spare feeder (the feeder that can be flexible to the healthy power failure section),
It is possible to exchange between distribution line automatic control devices installed in the adjacent business offices, and it is possible to smoothly carry out the accommodation by the accommodation calculation of the central processing unit of the own business office.
Furthermore, by establishing a flexible calculation processing method in the case where the distribution line under the jurisdiction of the self-employed office spans other sales offices, the flexible processing can be performed regardless of the switch type at the sales office boundary.

【0032】図3では、A営業所とB営業所との境界17
を常閉区分開閉器S3の位置とした。そのため、A営業
所管轄の配電用変電所10の配電線引出用遮断器11より引
出れた配電線12は、常閉区分開閉器S1,S2,S3に
より区分され、常開の連系開閉器S4,S8,S10まで
の区間K1,K2,K3に電力を供給している。そし
て、これらの各区間は、常開の連系開閉器S4,S8,
S10によって他の配電線22,100 ,101 に接続されてい
る。
In FIG. 3, the boundary 17 between the A sales office and the B sales office is shown.
Is the position of the normally closed section switch S3. Therefore, the distribution line 12 drawn from the distribution line drawing breaker 11 of the distribution substation 10 under the jurisdiction of the A sales office is divided by the normally closed switchgear S1, S2, S3, and is a normally open interconnection switch. Electric power is supplied to the sections K1, K2 and K3 up to S4, S8 and S10. And each of these sections is a normally open interconnection switch S4, S8,
It is connected to the other distribution lines 22, 100, 101 by S10.

【0033】又、常閉区分開閉器S1,S2,S3及び
常開の連系開閉器S8,S10には夫々子局L1,L2,
L3,L16,L5が付随しており、伝送路13によって親
局L6を中継して中央演算処理装置15に接続されてい
る。又、中央演算処理装置15から遠隔監視制御が可能な
構成となっている。更に、配電用変電所10の運転情報
は、変電所監視子局L8から伝送路14を介し変電所監視
親局L7を中継して中央演算処理装置15に取り込まれる
構成となっている。
Further, normally closed section switches S1, S2, S3 and normally open interconnection switches S8, S10 are slave stations L1, L2, respectively.
L3, L16 and L5 are attached, and are connected to the central processing unit 15 by relaying the master station L6 through the transmission line 13. Further, the central processing unit 15 is configured to allow remote monitoring control. Further, the operation information of the distribution substation 10 is configured to be fetched into the central processing unit 15 from the substation monitoring slave station L8 through the transmission line 14 to the substation monitoring master station L7.

【0034】次に、B営業所管轄の配電用変電所20の配
電線引出用遮断器21より引出された配電線22は、常閉区
分開閉器S5,S6,S7により区分され、常開の連系
開閉器S4,S11,S9までの区間K4,K5,K6,
K7に電力を供給している。区間K5,K6,K7は、
常開の連系開閉器S9,S11によって他の配電線201,2
03 ,202 に接続されている。
Next, the distribution line 22 drawn from the distribution line drawing breaker 21 of the distribution substation 20 under the jurisdiction of the B sales office is divided by the normally closed switchgear S5, S6, S7, and is normally open. Sections K4, K5, K6 to interconnection switches S4, S11, S9
Powering K7. Sections K5, K6, K7
Other distribution lines 201, 2 by normally open interconnection switches S9, S11
It is connected to 03 and 202.

【0035】又、常閉区分開閉器S5,S6,S7及び
常開の連系開閉器S4,S11,S9には夫々子局L10,
L11,L12,L4,L17,L9が付随しており、伝送路
18によって親局L13を中継して中央演算処理装置23に接
続されており、中央演算処理装置23から遠隔監視制御が
可能な構成となっている。更に、配電用変電所20の運転
情報は、変電所監視子局L15から伝送路19を介し変電所
監視親局L14を中継して、中央演算処理装置23に取り込
まれる構成となっている。又、両営業所の中央演算処理
装置15及び23は前記同様伝送路25を介して接続されてい
る。
Further, normally closed section switches S5, S6, S7 and normally open interconnection switches S4, S11, S9 are provided with slave stations L10,
L11, L12, L4, L17, L9 are attached, and the transmission line
The central processing unit 23 is connected to the central processing unit 23 by relaying the master station L13 by means of 18, and the central processing unit 23 enables remote monitoring control. Further, the operation information of the distribution substation 20 is configured to be fetched by the central processing unit 23 from the substation monitoring slave station L15 via the transmission line 19 to the substation monitoring master station L14. Further, the central processing units 15 and 23 of both business offices are connected via the transmission line 25 as described above.

【0036】例えば区間K1に事故が発生した場合、電
源側健全停電区間である区間K0へは子局の時限順送機
能及び配電線引出用遮断器11の再閉路機能により自動復
旧されるが、区間K2,K3は負荷側健全停電区間とし
て残る。ここで、区間K2はA営業所管轄内区間である
ため、A営業所中央演算処理装置15により融通処理が行
なわれ、区間K3はB営業所管轄内区間であるため、B
営業所中央演算処理装置23により融通処理が行なわれ
る。
For example, when an accident occurs in the section K1, the section K0, which is the power-supply side normal power failure section, is automatically restored by the time-sequential forwarding function of the slave station and the reclosing function of the distribution line drawing breaker 11. Sections K2 and K3 remain as a load-side healthy blackout section. Here, since the section K2 is under the jurisdiction of the A sales office, the accommodation processing is performed by the central processing unit 15 of the A sales office, and the section K3 is under the jurisdiction of the B sales office.
The central processing unit 23 of the sales office performs the accommodation processing.

【0037】この時、A営業所側より融通処理を行なう
と融通対象区間である区間K2へはS8を介して配電線
101 から融通することになるが、区間K2を充電させる
ことにより子局L3の時限順送機能でS3が投入され、
B営業所管轄である区間K3にまで送電してしまうこと
になり、他営業所管轄系統へ勝手に送電してしまうとい
う問題が起きる。更に、B営業所で融通処理が同時に行
なわれていた場合、B営業所では融通対象区間である区
間K3へはS4を介して配電線22から融通する手順を作
成することになるが、実系統では既に充電されていると
いった矛盾も生じてしまう。
At this time, if the accommodation processing is performed from the A sales office side, the distribution line is extended to the section K2, which is the section to be accommodated, through S8.
It will be accommodated from 101, but by charging the section K2, S3 is turned on by the timed progressive function of the slave station L3,
Power will be transmitted to the section K3 that is under the jurisdiction of the B business office, which causes a problem of arbitrarily transmitting power to the system under the jurisdiction of other business offices. Further, if the B office has been carrying out accommodation processing at the same time, the B office will create a procedure for accommodating the section K3, which is the section to be accommodated, from the distribution line 22 via S4. Then, there is a contradiction that it is already charged.

【0038】ここで、他営業所管轄にまたがる配電線に
おける融通処理を負荷側営業所から実施することを確立
させておくことにより、まずB営業所中央演算処理装置
23により区間K3を融通対象区間として融通処理を行な
う。この融通処理終了後、融通結果を中央演算処理装置
23から伝送路25を介して中央演算処理装置15に送信し、
A営業所中央演算処理装置15で区間K2を融通対象区間
として融通処理を行なう。
First, by establishing that the load side sales office will carry out the accommodation processing in the distribution line extending over the jurisdiction of other sales offices, the central processing unit of the B sales office will be processed first.
In accordance with 23, the section K3 is set as a section for accommodation and the accommodation processing is performed. After completion of this accommodation process, the accommodation result is calculated by the central processing unit.
23 to the central processing unit 15 via the transmission line 25,
The central processing unit 15 of the A sales office performs the accommodation process with the section K2 as the accommodation target section.

【0039】A営業所中央演算処理装置15ではB営業所
より融通結果(A営業所管轄系統と連系しているB営業
所管轄区間の充停電情報)を受信することにより区間K
3が充電されていることが判り、又、A営業所で融通計
算を行なうときに必要となる配電線22の配電線情報(現
在電流,常時許容電流等)や配電用変電所20の変電所情
報(送出電流,常時許容電流等)も伝送路25を介し受信
できるため、配電線101 と22を予備フィーダ対象とでき
る。
The central processing unit 15 of the A sales office receives the accommodation result from the B sales office (charging / outage information of the section under the jurisdiction of the B sales office that is connected to the system under the jurisdiction of the A sales office), and thus the section K
It can be seen that 3 is charged, and the distribution line information (current current, always allowable current, etc.) of distribution line 22 that is required when carrying out the accommodation calculation at the A sales office, and the substation of distribution substation 20 Since information (sending current, always-permitted current, etc.) can be received via the transmission line 25, the distribution lines 101 and 22 can be used as backup feeders.

【0040】その結果、A営業所側融通計算では、B営
業所からの負荷融通も可能となり、融通不能となるケー
スが極力抑えられた融通処理を行なうことができる。更
に、A営業所から融通処理を行なう場合に生じる他営業
所管轄への自動投入の防止及びA,B営業所同時に融通
処理する場合に生じる矛盾を防止することができる。
As a result, in the accommodation calculation on the A sales office side, it is possible to accommodate the load from the B sales office, and it is possible to perform the accommodation processing in which the case where the accommodation becomes impossible is suppressed as much as possible. Further, it is possible to prevent the automatic introduction into the jurisdiction of other business offices which occurs when carrying out the accommodation processing from the A sales office and the contradiction which occurs when the accommodation processing is carried out at the A and B sales offices simultaneously.

【0041】図4は更に他の実施例の構成図であり、本
実施例では各隣接システムを広域ネットワーク網で結合
し、隣接システムに所属する配電線も含めて、融通計算
を行ない、最適な融通手順を作成しようとするものであ
る。図4において、100 は当該営業所内の配電線を操作
する配電系統操作装置、200 は隣接営業所内の配電線を
操作する配電系統操作装置を示している。配電系統操作
装置は計算機,ソフトウェア,遠方監視制御装置,ネッ
トワーク網結合装置により構成される。異なる営業所の
配電系統操作装置は100a,100bで示されるネットワーク
網結合装置により、ネットワーク網を介して互いの情報
を交換することが可能となる。
FIG. 4 is a block diagram of still another embodiment. In this embodiment, the adjacent systems are connected by a wide area network, and the flexible calculation is performed including the distribution lines belonging to the adjacent systems. It is intended to create a flexible procedure. In FIG. 4, reference numeral 100 denotes a distribution system operation device that operates a distribution line in the business office, and 200 denotes a distribution system operation device that operates a distribution line in an adjacent business office. The distribution system operation device consists of a computer, software, remote monitoring and control device, and network connection device. The distribution system operation devices at different business offices can exchange information with each other via the network by the network connection devices 100a and 100b.

【0042】106 は隣接管轄配電線の機器状態を入力す
る隣接管轄配電線機器状態入力手段であり、107 は隣接
管轄配電線の電力量を入力するための隣接管轄配電線電
力量入力手段を示している。100c,100dは遠方監視制御
装置であり、各開閉器の状態や、バンク,配電線の電流
といった電力量の情報を得るものである。108 は当該管
轄配電系統情報監視手段を示しており、遠方監視制御装
置から入力された情報を基に、配電系統の機器状態及び
電力量に関するオンライン情報を作成している。
Reference numeral 106 denotes an adjacent jurisdiction distribution line device status input means for inputting a device state of an adjacent jurisdiction distribution line, and 107 denotes an adjacent jurisdiction distribution line power amount input means for inputting an electric energy of the adjacent jurisdiction distribution line. ing. 100c and 100d are remote monitoring and control devices that obtain information on the amount of electric power such as the state of each switch and the current of the bank and distribution line. Reference numeral 108 denotes the relevant distribution system information monitoring means, which creates online information about the device status and power amount of the distribution system based on the information input from the remote monitoring control device.

【0043】又、104 は配電系統のつながり,機器に関
する情報を蓄えている設備情報保存手段、101 は融通計
算要求手段を示しており、融通計算を行なう必要がある
場合に融通手順作成手段102 を起動する。102 は融通手
順作成手段であり、隣接管轄配電線機器状態入力手段,
隣接管轄配電線電力量入力手段,当該管理配電線系統情
報監視手段,設備情報保存手段によって得られた情報を
基に融通手順の作成を行なう。融通計算作成手段によっ
て作成された手順を実行するのが操作実行手段103 であ
る。
Further, reference numeral 104 denotes facility information storage means for storing information about the connection of the distribution system and equipment, and 101 denotes an accommodation calculation requesting means. When the accommodation calculation needs to be performed, the accommodation procedure creating means 102 is provided. to start. 102 is a flexible procedure creating means, which is a distribution line device status input means for the adjacent jurisdiction,
A flexible procedure is created based on the information obtained by the electric power amount input means of the adjacent jurisdiction distribution line, the managed distribution line system information monitoring means, and the facility information storage means. The operation execution means 103 executes the procedure created by the accommodation calculation creation means.

【0044】操作実行手段103 は操作手順が当該管轄配
電線に対するものであれば制御出力手段109 に出力要求
を出し、隣接管轄配電線に対するものであれば操作依頼
手段110 に出力要求を出す。制御手段109 では遠方監視
制御装置親局100dに信号を出力し、遠方監視制御装置子
局100cにより当該開閉器の入切の制御を行なう。又、隣
接管轄配電線に対する制御要求は、当該管轄配電線の電
力情報と共にネットワーク結合装置に送られ、ネットワ
ーク網を介して隣接営業所の配電系統操作装置に伝えら
れる。隣接営業所の配電系統操作装置により、隣接管轄
配電線の操作が行なわれる。
The operation execution means 103 issues an output request to the control output means 109 if the operation procedure is for the relevant distribution line, and issues an output request to the operation request means 110 if it is for the adjacent distribution line. The control means 109 outputs a signal to the remote monitoring control device master station 100d, and the remote monitoring control device slave station 100c controls the opening and closing of the switch. Further, the control request for the adjacent jurisdiction distribution line is sent to the network coupling device together with the power information of the jurisdiction distribution line, and transmitted to the distribution system operation device of the adjacent sales office via the network. The operation of the adjacent distribution line is performed by the distribution system operation device of the adjacent sales office.

【0045】次に作用について説明する。配電系統操作
装置100 ,200 は遠方監視制御装置100c,100dから得ら
れた当該管轄配電線に関する情報(各開閉器の現在状
態,バンク電圧,バンク電流,配電線電流)を配電系統
情報監視手段108 を介して取り込む。次に取り込んだ情
報をオンライン情報保存手段105 に格納すると共に、設
備情報保存手段104 に格納されているバンク及び配電線
の許容電流を取り出した後、現在電流の差である余裕電
流を計算しオンライン情報保存手段105 に格納する。
又、各配電線に所属している区間とその区間の標準区間
負荷を設備情報保存手段104 より取り出し、現在の配電
線電流を標準区間負荷で按分した現在区間負荷電流を計
算してオンライン情報保存手段105 に格納する。
Next, the operation will be described. The distribution system operation devices 100, 200 receive information (current state of each switch, bank voltage, bank current, distribution line current) regarding the relevant distribution line obtained from the remote monitoring control devices 100c, 100d from the distribution system information monitoring means 108. Take in through. Next, the fetched information is stored in the online information storage means 105, and the allowable currents of the banks and distribution lines stored in the equipment information storage means 104 are taken out, and then the surplus current, which is the difference between the currents, is calculated and online. It is stored in the information storage means 105.
Also, the section belonging to each distribution line and the standard section load of that section are taken out from the facility information storage means 104, the current section load current is proportionally divided by the standard section load, the current section load current is calculated, and the online information is stored. It is stored in the means 105.

【0046】配電系統で事故により停電が発生した場
合、あるいは特定の地域のみを停電させる必要がある場
合において、融通計算が必要になると融通計算要求手段
101 により、融通手順作成手段102 に被融通区間が通知
される。融通手順作成手段102では被融通区間に電力融
通可能な配電線を検索するために、設備情報保存手段10
4 及びオンライン情報保存手段105 を参照して配電系統
100fの接続情報を取り出し、被融通区間が接続する配電
線を求める。
When a power outage occurs due to an accident in the power distribution system, or when it is necessary to power out only in a specific area, the accommodation calculation is made when the accommodation calculation becomes necessary.
By 101, the concession procedure creating means 102 is notified of the concession section. In the accommodation procedure creating means 102, the equipment information storage means 10
4 and online information storage means 105
The connection information of 100f is taken out and the distribution line connected to the concession section is obtained.

【0047】次に融通手順作成に必要なバンク及び配電
線に関するオンライン情報を、当該管轄配電線について
はオンライン情報保存手段105 から取り出し、隣接管轄
配電線が含まれている場合にはネットワーク網結合装置
100a,100bによりネットワーク網を介して機器状態入力
手段106 及び電力量入力手段107 に情報が通知される。
Next, the online information about the bank and the distribution line necessary for creating the flexible procedure is retrieved from the online information storage means 105 for the relevant distribution line, and if the adjacent distribution line is included, the network connection device.
Information is notified to the device status input unit 106 and the power amount input unit 107 via the network by the units 100a and 100b.

【0048】機器状態入力手段106 には隣接管轄配電系
統操作装置の管轄である連系開閉器の機器状態が、電力
量入力手段107 には隣接管轄配電線の供給予備力,隣接
配電線と被融通区間の連系開閉点における電圧が通知さ
れる。ここでいう隣接管轄配電線の供給予備力とは、所
属バンクの予備力,配電線遮断器の予備力、配電線に所
属する各開閉器の通過許容予備力のうちの最小のもので
ある。
The equipment state input means 106 shows the equipment state of the interconnection switch under the jurisdiction of the distribution system operation device of the adjacent jurisdiction, and the electric energy input means 107 shows the reserve capacity of the adjacent jurisdiction distribution line, the adjacent distribution line The voltage at the interconnection switching point in the interchange section is notified. The supply reserve capacity of the adjacent distribution line as referred to herein is the minimum of the reserve capacity of the bank to which it belongs, the reserve capacity of the distribution line breaker, and the passage allowance capacity of each switch that belongs to the distribution line.

【0049】以上のようにして得られた被融通区間に接
続する配電線に関する情報を用いて融通手順が融通手順
作成手段102 により作成される。ここで用いる融通手順
の作成方法は従来のものと同様の方法である。融通手順
を作成した結果、融通できない区間が残る場合は、融通
できない区間の情報を配電系統情報通知手段111 を用い
て作成し、ネットワーク網結合装置100a,100bを介して
隣接営業所の配電系統操作装置200 に通知し、隣接管轄
配電線の供給予備力を増やしてもらう。
An accommodation procedure is created by the accommodation procedure creating means 102 using the information about the distribution line connected to the accommodation section obtained as described above. The method of creating the flexible procedure used here is the same as the conventional method. If there is a section that cannot be accommodated as a result of creating the accommodation procedure, information on the section that cannot be accommodated is created using the distribution system information notifying means 111, and the distribution system operation of the adjacent sales office is performed via the network network coupling devices 100a and 100b. Notify the device 200 to increase the supply reserve of the adjacent distribution line.

【0050】その後、再度融通手順作成手段102 により
融通手順の作成を行なう。融通手順が作成されるとその
手順は操作実行手段103 に通知される。操作実行手段10
3 では操作手順が当該管轄配電線に対するものかどうか
を設備情報保存手段104 により判定し、当該管轄配電線
に対する操作であれば制御出力手段109 に通知し、隣接
管轄配電線に対する操作であれば操作依頼手段110 に通
知する。
Thereafter, the accommodation procedure preparing means 102 prepares the accommodation procedure again. When the flexible procedure is created, the procedure is notified to the operation executing means 103. Operation execution means 10
In 3, the equipment information storage unit 104 determines whether the operation procedure is for the relevant distribution line, notifies the control output unit 109 if the operation is for the relevant distribution line, and operates if it is for the adjacent distribution line. Notify the requesting means 110.

【0051】制御出力手段109 は遠方監視制御装置100d
に指令を出し系統操作を行なう。又、操作依頼手段110
はネットワーク網結合装置100a,100bを介して隣接営業
所の配電系統操作装置200 に通知し系統操作を行なう。
上記実施例によれば、従来の方法では難しかった営業所
間の電力融通が自動的に行なわれるため、事故発生時の
停電区間の減少,停電時間の短縮が図られる。又、ある
エリアを一定時間停電させる場合でも、隣接管轄配電線
に余裕のある場合に隣接管轄配電線からの融通が行なえ
るため、余裕のある配電系統運用を行なうことが可能と
なり、電力を安定にき供給することが可能となる。
The control output means 109 is a remote monitoring control device 100d.
Command to operate the system. Also, the operation requesting means 110
Notifies the power distribution system operation device 200 of the adjacent business office via the network connection devices 100a and 100b to perform system operation.
According to the above-described embodiment, since the power exchange between the business offices, which is difficult with the conventional method, is automatically performed, it is possible to reduce the power outage section and the power outage time when an accident occurs. Also, even if there is a power outage in a certain area for a certain period of time, if there is a margin in the adjacent jurisdiction distribution line, it can be accommodated by the adjacent jurisdiction distribution line. It becomes possible to supply it at a later date.

【0052】図5は本発明の[請求項4]に係る配電系
統操作装置の一実施例の構成図であり、記憶装置を主と
して示したものである。本実施例では、複数の配電線監
視装置に共通に記憶した配電系統設備データの変更を同
一内容で、同時期に、効率良く行なおうとするものであ
る。
FIG. 5 is a block diagram of an embodiment of a power distribution system operating device according to [Claim 4] of the present invention, and mainly shows a storage device. In the present embodiment, the distribution system equipment data stored commonly in a plurality of distribution line monitoring devices is changed with the same contents and efficiently at the same time.

【0053】そして配電系統操作装置1は遠方監視制御
装置2に接続する演算処理装置3内の監視制御部4と、
監視制御に必要な配電系統設備データを記憶する記憶装
置6と、記憶装置6に記憶した配電系統設備データを管
理するデータ管理部5と、他の配電線監視制御装置と情
報交換をする情報交換装置7と、各処理部分と接続し運
用者と情報交換するマンマシンインターフェース装置8
から構成した。
The distribution system operation device 1 includes a monitoring control unit 4 in the arithmetic processing unit 3 connected to the distant monitoring control device 2,
A storage device 6 that stores distribution system facility data necessary for monitoring and control, a data management unit 5 that manages the distribution system facility data stored in the storage device 6, and an information exchange that exchanges information with other distribution line monitoring control devices. A device 7 and a man-machine interface device 8 for connecting each processing part and exchanging information with an operator.
Composed from.

【0054】上記配電系統操作装置はA営業所,B営業
所夫々に設置,運用されるとして説明する。監視制御部
4は遠方監視制御装置2より自営業所管轄配電系統の被
監視制御機器の状態を取り込んで、記憶装置6に記憶し
た配電系統設備データを参照し配電系統の状態変化に応
じて被監視制御機器を制御する。データ管理部5はマン
マシンインターフェース装置8とのデータ入出力により
記憶装置6に自営業所及び他営業所管轄配電系統設備デ
ータを区別保存、変更すること、更に情報交換装置7に
て他営業所より送られてくる他営業所管轄配電系統設備
データにてこれを更新する。
It is assumed that the distribution system operating device is installed and operated in each of the A sales office and the B sales office. The monitoring control unit 4 takes in the status of the monitored control equipment of the distribution system under the jurisdiction of the self-employed office from the remote monitoring control apparatus 2, refers to the distribution system equipment data stored in the storage device 6, and responds to the change in the distribution system status according to the change. Control supervisory control equipment. The data management unit 5 distinguishes and stores the data of the power distribution system equipment under the jurisdiction of the self-employed office and other sales offices in the storage device 6 by inputting / outputting data to / from the man-machine interface device 8. Update this with the distribution system equipment data sent by other sales offices.

【0055】記憶装置6には自営業所及び他営業所管轄
配電系統設備データが区別記憶される。情報交換装置7
は他営業所に設置された配電線監視制御装置と通信線で
接続され夫々記憶した配電系統設備データの交換を行な
う。マンマシンインターフェース装置8は演算処理装置
3に接続されて演算処理装置3の処理結果の出力や運用
者からの要求によるデータ入力を行なう。
The storage device 6 stores the distribution system equipment data under the jurisdiction of the self-employed office and other offices. Information exchange device 7
Is connected to a distribution line monitoring and control device installed in another business office by a communication line and exchanges the stored distribution system equipment data. The man-machine interface device 8 is connected to the arithmetic processing device 3 and outputs the processing result of the arithmetic processing device 3 and inputs data according to a request from an operator.

【0056】図6は記憶装置6内の配電系統構成データ
を示したものである。配電系統構成データは監視制御管
轄毎に配電系統Aファイル、配電系統Bファイルに区分
され、上記設備,機器毎に、設備容量,機器容量,設備
機器接続情報を予め記憶している。更に、設備,機器の
開閉状態、電圧,電流等の計測値を保存するエリアがあ
る。
FIG. 6 shows distribution system configuration data in the storage device 6. The power distribution system configuration data is divided into a power distribution system A file and a power distribution system B file for each supervisory control jurisdiction, and the equipment capacity, the equipment capacity, and the equipment connection information are stored in advance for each of the above equipment and equipment. Further, there is an area for storing measured values such as the open / closed state of equipment and devices, and voltage and current.

【0057】作用の概要は次の通りである。まず、標準
運用時、連系開閉器は開となっており配電線12は配電用
変電所10から順方向送電されており、配電線22は配電用
変電所20より順方向送電されている。この状態で区分開
閉器S1と区分開閉器S2間で事故が発生した場合、区
分開閉器S2と連系開閉器間の停電復旧のため、連系開
閉器を閉として配電用変電所20からこの区間に逆方向送
電をすることとなる。この場合、配電線操作装置内の監
視制御部4はこの逆方向送電のための開閉器操作手順を
配電系統Aファイル,配電系統Bファイルのデータを参
照して作成する。そして、その手順に従い遠方監視制御
装置により該当開閉器の開閉を制御する。
The outline of the operation is as follows. First, at the time of standard operation, the interconnection switch is open, the distribution line 12 is forwardly transmitted from the distribution substation 10, and the distribution line 22 is forwardly transmitted from the distribution substation 20. If an accident occurs between the division switch S1 and the division switch S2 in this state, the interconnection switch will be closed to recover from the distribution substation 20 in order to restore the power failure between the division switch S2 and the interconnection switch. Reverse power transmission will be performed in the section. In this case, the monitoring controller 4 in the distribution line operation device creates a switch operating procedure for this reverse power transmission by referring to the data of the distribution system A file and the distribution system B file. Then, according to the procedure, the remote monitoring control device controls the opening / closing of the corresponding switch.

【0058】一方、配電系統A,配電系統Bに変更が有
るとデータ管理部5により記憶装置6の配電系統Aファ
イル,配電系統Bファイルのデータを変更する必要があ
る。例えば、区分開閉器S3が交換のため一時的に撤去
されると、これに合わせ配電系統BファイルのS3機器
データ,S3監視計測データを削除することとなる。配
電系統BはB営業所管轄であり、このデータ変更はB営
業所の運用者によりB営業所に設置された配電線操作装
置に対して実施される。この内容は配電線操作装置のデ
ータ管理部5,情報交換装置7により他方の配電線操作
装置に伝送される。
On the other hand, when there is a change in the distribution system A and the distribution system B, the data management unit 5 needs to change the data of the distribution system A file and the distribution system B file in the storage device 6. For example, when the sorting switch S3 is temporarily removed for replacement, the S3 device data and S3 monitoring measurement data of the distribution system B file are deleted accordingly. The distribution system B is under the jurisdiction of the B sales office, and this data change is carried out by the operator of the B sales office to the distribution line operating device installed in the B sales office. This content is transmitted to the other distribution line operating device by the data management unit 5 and the information exchanging device 7 of the distribution line operating device.

【0059】これを受けたデータ管理部5はこの情報を
情報交換装置7経由入力し記憶装置6の配電系統Bファ
イルの対応機器データ,監視計測データを削除する。こ
の結果、配電線操作装置の配電系統Bファイルは他の配
電系統Bファイルの内容と同一となる。これらのデータ
変更はデータ管理部5によりお互いに同期を取り、更に
データ変更中は監視制御部4で参照更新されないよう排
他をとっている。
Upon receipt of this, the data management unit 5 inputs this information via the information exchange device 7 and deletes the corresponding device data and the monitoring measurement data of the distribution system B file of the storage device 6. As a result, the distribution system B file of the distribution line operating device has the same contents as the other distribution system B files. These data changes are synchronized with each other by the data management unit 5, and exclusion is made so that the reference control is not updated by the monitoring control unit 4 during the data changes.

【0060】以上説明したよに、夫々の営業所に設置し
た配電線監視制御装置に共通に記憶する配電系統設備デ
ータを効率よく常に同じに保ことができ、営業所間を連
系した広域の配電系統運用を確実に行なうことができ
る。
As described above, the distribution system equipment data commonly stored in the distribution line monitoring and control devices installed in the respective sales offices can be efficiently and always kept the same, and the sales offices are interconnected in a wide area. The power distribution system can be operated reliably.

【0061】配電系統工事に伴なう配電線監視制御装置
の配電系統設備データの変更は当該営業所の運用者が行
なうのが通例である。しかしながら、業務が多忙な時期
にはタイムリーにその変更を行なうことができない状況
が生じる。その結果、自営業所の配電線監視制御装置の
運用に支障が出るばかりでなく、その配電系統設備デー
タを共通に記憶し参照する他営業所の配電線監視制御装
置の運用にも支障が生じることになる。そこで、記憶装
置6に記憶した配電系統設備データの変更を他営業所の
配電線監視制御装置に依頼し、その実施内容を受け更
新,保存する機能をデータ管理部5に持つ。この機能に
より、本来、自営業所で実施すべき配電系統設備データ
の変更を他営業所で行なうことが可能となり、配電系統
運用業務の効率化が実現できる。
It is customary for the operator of the sales office to change the distribution system equipment data of the distribution line monitoring and control device accompanying the construction of the distribution system. However, when business is busy, a situation arises in which the change cannot be made in a timely manner. As a result, not only the operation of the distribution line monitoring and control device at the self-employed office will be hindered, but also the operation of the distribution line monitoring and control device at other sales offices that commonly stores and refers to the distribution system equipment data will be hindered. It will be. Therefore, the data management unit 5 has a function of requesting the distribution line monitoring and control device of another sales office to change the distribution system equipment data stored in the storage device 6, and receiving and updating the contents of the execution. With this function, it is possible to change the distribution system equipment data that should be originally carried out at the other business office at another business office, and it is possible to improve the efficiency of the distribution system operation work.

【0062】図5において、配電線監視制御装置のマン
マシンインターフェース装置8により運用者は配電系統
の運用状況を観ることができる。配電系統をCRT装置
に表示し、他営業所の配電系統も知ることは広域な配電
系統運用では特に必要となっている。ところが、配電系
統Bの工事に伴ない配電系統設備データの変更が実施さ
れている時、この状態が配電系統Aを監視制御する配電
線監視制御装置のCRT装置に表示されなければ運用者
が誤った判断をすることとなる。
In FIG. 5, the man-machine interface device 8 of the distribution line monitoring and control device allows the operator to see the operating status of the distribution system. Displaying the power distribution system on the CRT device and knowing the power distribution system of other sales offices is especially necessary for wide-area power distribution system operation. However, when the distribution system equipment data is being changed due to the construction of the distribution system B, if this state is not displayed on the CRT device of the distribution line monitoring control device that monitors and controls the distribution system A, the operator will make an error. It will be decided.

【0063】図5の構成において、記憶装置6に記憶し
た配電系統設備データの変更開始及び変更終了を他営業
所の配電線監視制御装置に伝送すること、又、その情報
を受け当該データに更新中の情報を付加する機能をデー
タ管理部5に持つ。マンマシンインターフェース装置8
はその更新中情報を識別し、その旨運用者が判断できる
形で出力する機能を持つ。例えばデータ変更中の配電線
は予め定めた色でCRT装置に表示することなどを行な
う。この機能により、他営業所で実施中の配電系統設備
データの変更を運用者は適切に知ることができ配電系統
運用業務の効率化が実現できる。
In the configuration of FIG. 5, the start and end of the change of the distribution system equipment data stored in the storage device 6 is transmitted to the distribution line monitoring and control device of another sales office, and the information is updated to the data. The data management unit 5 has a function of adding information inside. Man-machine interface device 8
Has a function of identifying the information being updated and outputting it in a form that can be judged by the operator. For example, the distribution line whose data is being changed is displayed on the CRT device in a predetermined color. With this function, the operator can appropriately know the change of the distribution system equipment data being executed at the other sales office, and the efficiency of the distribution system operation work can be realized.

【0064】図7は本発明の[請求項5]に係る配電系
統操作装置の一実施例の構成図である。図7においてA
営業所では配電線12上の開閉器S1,S2,S3の開閉
器情報は夫々に付随する子局L1,L2,L3から伝送
路13によって親局を経由して中央演算処理装置15及びB
営業所の中央演算処理装置23に取り込まれる。又、変電
所10の運転状態情報は、変電所監視子局L8から伝送路
14を介して制御所400 を経由して中央演算処理装置15及
びB営業所の中央演算処理装置23に取り込まれる。更に
A営業所の中央演算処理装置15には、A営業所管轄内の
設備データとB営業所管轄内の設備データを記憶する記
憶装置16が接続される。
FIG. 7 is a block diagram of an embodiment of the distribution system operating device according to [Claim 5] of the present invention. A in FIG.
At the sales office, the switch information of the switches S1, S2 and S3 on the distribution line 12 is transmitted from the respective slave stations L1, L2 and L3 via the transmission line 13 to the central processing unit 15 and B via the master station.
It is taken into the central processing unit 23 of the sales office. In addition, the operating status information of the substation 10 is transmitted from the substation monitoring slave station L8 to the transmission line.
It is taken into the central processing unit 15 via the control station 400 via 14 and the central processing unit 23 of the B sales office. Further, the central processing unit 15 of the A sales office is connected to a storage device 16 for storing equipment data within the jurisdiction of the A sales office and equipment data within the jurisdiction of the B sales office.

【0065】同様に、B営業所では配電線22上の開閉器
S4,S5,S6,S7の開閉器情報は夫々に付随する
子局L4,L5,L6,L7から伝送路18によって親局
を経由して中央演算処理装置23及びA営業所の中央演算
処理装置15に取り込まれる。又、変電所20の運転状態情
報は、変電所監視子局L15から伝送路19を介して制御所
400 を経由して中央演算処理装置23及びA営業所の中央
演算処理装置15に取り込まれる。
Similarly, at the B office, the switch information of the switches S4, S5, S6, S7 on the distribution line 22 is transmitted from the associated slave stations L4, L5, L6, L7 to the master station via the transmission line 18. It is taken in via the central processing unit 23 and the central processing unit 15 of the A office. In addition, the operating state information of the substation 20 is transmitted from the substation monitoring slave station L15 via the transmission line 19 to the control station.
It is taken into the central processing unit 23 and the central processing unit 15 of the A sales office via 400.

【0066】更にB営業所の中央演算処理装置23には、
B営業所管轄内の設備データとA営業所管轄内の設備デ
ータを記憶する記憶装置24が接続される。同じようにA
営業所の中央演算処理装置15には、A営業所管轄内の設
備データとB営業所管轄内の設備データを記憶する記憶
装置16が接続される。両営業所の中央演算処理装置11及
び22は伝送路300 を介して接続される。又、A営業所と
B営業所は夫々伝送路300 を介して、常時相手営業所の
運転状態を把握するための情報を入手することができ
る。
Further, in the central processing unit 23 of the B sales office,
A storage device 24 for storing the equipment data under the jurisdiction of the B sales office and the equipment data under the jurisdiction of the A sales office is connected. Similarly A
The central processing unit 15 of the business office is connected to a storage device 16 for storing equipment data within the jurisdiction of the A business office and equipment data within the jurisdiction of the B business office. The central processing units 11 and 22 of both offices are connected via a transmission line 300. Further, the A business office and the B business office can always obtain information for grasping the operating state of the other business office via the transmission line 300.

【0067】次に過負荷解消のための負荷融通方式につ
いて説明する。変電所10の配電線12で過負荷が発生した
とき制御所経由で取り込まれた変電所の運転状態情報か
らA営業所,B営業所で同時に過負荷を認識することが
できる。従ってどちらの営業所でも過負荷検出や過負荷
解消手順の作成が可能であるが、ここでは過負荷発生の
変電所の操作権を有しているA営業所が管理元営業所と
して当該の過負荷解消の操作権を持つ。図8に過負荷解
消操作の過負荷発生から切り戻しまでの処理を示す。
Next, a load accommodation method for overload elimination will be described. When an overload occurs on the distribution line 12 of the substation 10, it is possible to simultaneously recognize the overload at the A and B sales offices based on the operating state information of the substation acquired via the control station. Therefore, it is possible to create overload detection and overload elimination procedures at either of the sales offices. However, here, the A sales office, which has the operation right of the substation where the overload occurs, becomes the management office and is overloaded. Has the right to operate the load cancellation. FIG. 8 shows the processing from the occurrence of overload to the switching back of the overload elimination operation.

【0068】上記実施例によれば、変電所運転情報や開
閉器情報を各営業所が平等に保有することで、常時は自
営業所管轄系統に対して監視・制御を行なうが、必要時
には他営業所の管轄系統に対しても自営業所と同じよう
に監視・制御が可能となる。又、上述した手段を備えた
配電線自動制御装置では営業所にまたがる配電線の負荷
融通操作を管理元営業所が主体となって手順を作成し操
作を実行することで、両営業所で手順を作成する必要が
ないため作成手順の不一致となる誤操作を引き起こすこ
となく営業所間の負荷融通が可能となる。
According to the above-described embodiment, since the substation operation information and the switch information are equally held by each business office, the system under the jurisdiction of the self business office is always monitored and controlled, but when necessary, other It is possible to monitor and control the system under the jurisdiction of the sales office as well as the self-employed office. In addition, in the distribution line automatic control device equipped with the above-mentioned means, the load source operation of the distribution line across the sales offices is created mainly by the managing sales office, and the procedure is executed at both sales offices. Since it is not necessary to create a product, it is possible to accommodate the load between sales offices without causing an erroneous operation that causes a mismatch in the creation procedure.

【0069】[0069]

【発明の効果】以上説明したように、本発明による[請
求項1]の配電系統操作装置によれば、隣接する営業所
を経由する配電線において、営業所の境界にある常開開
閉器から融通できる負荷に関する情報を必要の都度、相
手営業所から入手することにより、隣接する営業所への
負荷の融通、あるいは隣接する営業所からの負荷の融通
を行なう場合、従来のように電話や無線で隣接する相手
営業所に確認する必要がなく、作業内容を自動化できる
ため、迅速かつ正確な対応ができ、運転,保守の省力
化,事故復旧時間の大幅な短縮が可能となる。
As described above, according to the distribution system operation device of [Claim 1] according to the present invention, in the distribution line passing through the adjacent sales office, the normally open switch at the boundary between the sales offices is provided. When information about the load that can be accommodated is obtained from the partner sales office each time it is needed, the load on the adjacent sales office or the load from the adjacent sales office can be accommodated by telephone or wireless as before. Since it is not necessary to check with an adjacent sales office, the work contents can be automated, which enables quick and accurate response, labor saving in operation and maintenance, and drastic reduction in accident recovery time.

【0070】又、[請求項2]の配電系統操作装置によ
れば、自営業所管轄内の配電線が他営業所にまたがる場
合でも、融通対象区間の負荷側営業所から融通処理を行
なうことにより、電源側営業所から融通処理した場合に
発生する、子局の時限順送機能による他営業所管轄内へ
の自動投入を防止することができ、より最適で安全性を
重視した融通処理を行なうことができる。
Further, according to the distribution system operation device of [Claim 2], even when the distribution line within the jurisdiction of the self-employed business office spans another business office, the accommodation processing is performed from the load side business office of the concession target section. By this, it is possible to prevent the automatic insertion into the jurisdiction of other sales offices due to the time-sequential forwarding function of the slave station, which occurs when the accommodation processing is performed from the power supply side sales office. Can be done.

【0071】又、[請求項3]の配電系統操作装置によ
れば、隣接管轄配電線を用いないことにより発生してい
た電力の供給支障区間を、隣接管轄配電線を用いて融通
手順を作成することにより融通可能とし、配電系統事故
等により引き起こされる社会的影響を最小限にとどめる
ことができる。
Further, according to the distribution system operation device of [Claim 3], an accommodation procedure is created by using the adjacent jurisdiction distribution line for the power supply interruption section that has occurred due to the fact that the adjacent jurisdiction distribution line is not used. By doing so, it can be made flexible, and the social impact caused by a distribution system accident or the like can be minimized.

【0072】又、[請求項4]の配電系統操作装置によ
れば、各営業所に共通に記憶する配電系統設備データを
効率よく、常に同じに保つことができ、営業所間に連系
した広域の配電系統運用を確実に行なうことができる。
According to the distribution system operation device of [claim 4], the distribution system facility data stored in common at each business office can be efficiently and always kept the same, and the business offices are interconnected. It is possible to reliably operate a wide area distribution system.

【0073】又、[請求項5]の配電系統操作装置によ
れば、変電所運転情報及び開閉器情報を各営業所が平等
に保有しているため、他営業所の管轄系統に対しても自
営業所と同じように監視・制御が可能となる。
Further, according to the distribution system operation device of [Claim 5], since the substation operation information and the switch information are evenly held by each business office, even for the jurisdiction systems of other business offices. It is possible to monitor and control as in a self-employed office.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明による配電系統操作装置を説明する一実
施例の構成図。
FIG. 1 is a configuration diagram of an embodiment for explaining a distribution system operation device according to the present invention.

【図2】処理内容を説明するフローチャート。FIG. 2 is a flowchart illustrating processing contents.

【図3】他の実施例の構成図。FIG. 3 is a configuration diagram of another embodiment.

【図4】更に他の実施例の構成図。FIG. 4 is a configuration diagram of still another embodiment.

【図5】更に他の実施例の構成図。FIG. 5 is a configuration diagram of still another embodiment.

【図6】記憶装置の構成図。FIG. 6 is a configuration diagram of a storage device.

【図7】更に他の実施例の構成図。FIG. 7 is a configuration diagram of still another embodiment.

【図8】過負荷解消処理の内容を示す図。FIG. 8 is a diagram showing the content of overload elimination processing.

【図9】従来装置を説明する図。FIG. 9 is a diagram illustrating a conventional device.

【符号の説明】[Explanation of symbols]

10,20 配電用変電所 11,21 配電線引出用遮断器 12,22 配電線 13,14,24 伝送路 15,23 中央演算処理装置 16,24 記憶装置 17 営業所境界線 100 配電系統操作装置 200 隣接営業所内の配電系統操作装置 101 融通計算要求手段 102 融通手順作成手段 103 操作実行手段 104 設備情報保存手段 105 オンライン情報保存手段 106 機器状態入力手段 107 電力量入力手段 108 配電系統情報監視手段 109 制御出力手段 110 操作依頼手順 111 配電系統情報通知手段 S 開閉器 K 区間 L 子局装置 10,20 Distribution substation 11,21 Distribution line outlet breaker 12,22 Distribution line 13,14,24 Transmission line 15,23 Central processing unit 16,24 Storage device 17 Branch office 100 Distribution system operation device 200 Distribution system operation device in adjacent sales office 101 Constraining calculation requesting means 102 Constraining procedure creating means 103 Operation executing means 104 Facility information saving means 105 Online information saving means 106 Equipment status input means 107 Electric energy input means 108 Distribution system information monitoring means 109 Control output means 110 Operation request procedure 111 Distribution system information notification means S Switch K section L Sub station device

───────────────────────────────────────────────────── フロントページの続き (72)発明者 勝山 実 東京都府中市東芝町1番地 株式会社東芝 府中工場内 (72)発明者 矢部 啓之 東京都港区芝浦一丁目1番1号 株式会社 東芝本社事務所内 (72)発明者 高橋 昭 宮城県仙台市青葉区本町二丁目1番29号 株式会社東芝東北支社内 (72)発明者 疋田 孝治 愛知県名古屋市西区葭原町四丁目21番地 株式会社東芝名古屋工場内 (72)発明者 西 昭憲 東京都港区芝浦一丁目1番1号 株式会社 東芝本社事務所内 (72)発明者 桜井 幹也 東京都府中市東芝町1番地 株式会社東芝 府中工場内 (72)発明者 清水 正直 東京都府中市東芝町1番地 株式会社東芝 府中工場内 (72)発明者 金輪 均 東京都府中市東芝町1番地 株式会社東芝 府中工場内 ─────────────────────────────────────────────────── ─── Continuation of front page (72) Inventor Minoru Katsuyama 1st Toshiba Town, Fuchu-shi, Tokyo Toshiba Corporation Fuchu Factory (72) Inventor Hiroyuki Yabe 1-1-1, Shibaura, Minato-ku, Tokyo Toshiba Headquarters Co., Ltd. (72) Inventor Akira Takahashi 2-29, Honmachi, Aoba-ku, Sendai-shi, Miyagi Toshiba Tohoku Branch Co., Ltd. (72) Inventor, Koji Hikita 4-chome, 21-chome, Nishihara-ku, Aichi Inside the factory (72) Akinori Nishi Nishi 1-1-1 Shibaura, Minato-ku, Tokyo Inside the headquarters office of Toshiba Corporation (72) Inventor Mikiya Sakurai 1 No. 1 Toshiba-cho, Fuchu-shi, Tokyo Inside the Toshiba Fuchu factory (72) Inventor Honest Shimizu 1 Toshiba Town, Fuchu City, Tokyo Inside the Fuchu Factory, Toshiba Corp. (72) Inventor Hitoshi Kanawa 1 Toshiba Town, Fuchu City, Tokyo Formula company Toshiba Fuchu in the factory

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 配電線毎に配電線引出用遮断器及び配電
線を複数の区間に区分する開閉器とを有し、配電系統を
管理する各営業所毎に設置される配電系統操作装置にお
いて、隣接する営業所間を経由する配電線で負荷の融通
が必要となるとき、当該隣接する営業所の境界にある開
閉器から融通できる負荷に関する情報を必要の都度、前
記相手営業所から入手する手段を備えたことを特徴とす
る配電系統操作装置。
1. A distribution system operating device installed at each business office that manages a distribution system, comprising a circuit breaker for extracting the distribution line for each distribution line and a switch for dividing the distribution line into a plurality of sections. , When the load needs to be accommodated by the distribution line passing between the adjacent sales offices, the information about the load that can be accommodated by the switch on the boundary of the adjacent sales office is obtained from the partner sales office whenever necessary. A distribution system operating device comprising means.
【請求項2】 相手営業所管轄からの負荷融通計算に際
し、自営業所管轄系統の配電線が他営業所にまたがる場
合における融通計算処理を、その配電線の負荷側営業所
より行なう手段を備えたことを特徴とする請求項1記載
の配電系統操作装置。
2. When the load accommodation calculation from the jurisdiction of the other business office, when the distribution line of the system under the jurisdiction of the self-employed business extends to another business office, it is provided with means for performing the accommodation calculation process from the load side business office of the distribution line. The power distribution system operation device according to claim 1, wherein
【請求項3】 当該配電系統操作装置の管轄範囲に隣接
する他の配電系統操作装置とネットワーク網で結合する
手段と、当該配電系統操作装置の管轄範囲にある配電線
に接続する他の配電系統操作装置の管轄範囲にある配電
線の状態を他の配電系統操作装置から入力する手段と、
隣接管轄配電線の電力量情報を他の配電系統操作装置か
ら入力する手段と、当該配電系統操作装置の管轄範囲に
ある配電線のみならず隣接管轄配電線をも含めて健全な
停電区間に他の配電線から融通送電するための融通計算
をする手段を備えたことを特徴とする請求項1記載の配
電系統操作装置。
3. A means for connecting to another distribution system operating device adjacent to the jurisdiction range of the distribution system operating device via a network, and another distribution system connected to a distribution line within the jurisdiction range of the distribution system operating device. Means for inputting the state of the distribution line within the jurisdiction of the operating device from another distribution system operating device,
A means for inputting the power amount information of the adjacent distribution line operation device from another distribution system operation device, and a healthy power failure section including not only the distribution line within the jurisdiction range of the distribution system operation device but also the adjacent distribution line operation device. 2. The distribution system operating device according to claim 1, further comprising: means for calculating accommodation for power transmission from the distribution line.
【請求項4】 遠方監視制御装置を経由して配電系統の
被監視制御機器の状態を取り込んで記憶し配電系統の状
態変化に応じて被監視制御機器を制御する手段と、その
ために必要な配電系統設備データを記憶し配電系統設備
の工事にあわせてそのデータ変更する手段と、更に夫々
の状態をマンマシンインターフェース装置に入出力する
手段を有する演算処理装置を備えた配電線監視制御装置
において、直接監視制御対象とする配電系統に連系する
配電系統の配電系統設備データを記憶する手段を有し、
この情報を夫々の配電線監視制御装置間で交換する手段
により複数の配電線監視制御装置に記憶した配電系統設
備データを常に等しくすることを特徴とする配電系統操
作装置。
4. A means for fetching and storing a state of a monitored and controlled device of a power distribution system via a remote monitoring and control device and controlling the monitored and controlled device according to a change in the condition of the power distribution system, and a power distribution necessary for that purpose. In a distribution line monitoring and control device equipped with an arithmetic processing unit having means for storing system equipment data and changing the data according to the construction of the distribution system equipment, and further means for inputting and outputting the respective states to the man-machine interface device, It has means for storing the distribution system equipment data of the distribution system directly connected to the distribution control target system,
A distribution system operating device characterized in that the distribution system facility data stored in a plurality of distribution line monitoring and control devices are always equalized by means of exchanging this information between the respective distribution line monitoring and control devices.
【請求項5】 配電線引き出し遮断器及び複数の区分開
閉器からなる配電線を監視制御するための営業所毎に設
置された配電系統操作装置において、常時は自営業所管
轄系統を対象に監視制御を実行し、他営業所の配電系統
操作装置が故障停止したとき、あるいは運用上の理由で
代行運転が必要なときに他営業所管轄系統に対しても監
視制御を可能とした手段を備えたことを特徴とする配電
系統操作装置。
5. A distribution system operation device installed at each sales office for monitoring and controlling a distribution line consisting of a distribution line breaker and a plurality of section switches is always monitored for the system under the jurisdiction of the self-employed office. It is equipped with means to execute control and enable monitoring control even to the systems under the jurisdiction of other sales offices when the operation of the distribution system operating equipment of other sales offices fails or stops, or when substitute operation is required for operational reasons. A power distribution system operation device characterized in that
JP5308682A 1992-11-13 1993-11-15 Power distribution system operating apparatus Pending JPH06225456A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5308682A JPH06225456A (en) 1992-11-13 1993-11-15 Power distribution system operating apparatus

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP4-328502 1992-11-13
JP32850292 1992-11-13
JP5308682A JPH06225456A (en) 1992-11-13 1993-11-15 Power distribution system operating apparatus

Publications (1)

Publication Number Publication Date
JPH06225456A true JPH06225456A (en) 1994-08-12

Family

ID=26565646

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5308682A Pending JPH06225456A (en) 1992-11-13 1993-11-15 Power distribution system operating apparatus

Country Status (1)

Country Link
JP (1) JPH06225456A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011239488A (en) * 2010-05-06 2011-11-24 Hitachi Ltd Distributed power supply output estimation system, total demand power estimation system, power alarm system, distributed power supply output estimation apparatus, total demand power estimation apparatus, power recording apparatus, and power alarm apparatus

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011239488A (en) * 2010-05-06 2011-11-24 Hitachi Ltd Distributed power supply output estimation system, total demand power estimation system, power alarm system, distributed power supply output estimation apparatus, total demand power estimation apparatus, power recording apparatus, and power alarm apparatus

Similar Documents

Publication Publication Date Title
EP2308149B1 (en) Feeder automation system and method for operating the same
CN101325326B (en) Control power system is with the abnormal method and apparatus of response circuit
CN102157931B (en) Method and system for detecting conflict between blackout request and power protection request in power grid
WO2010078132A2 (en) Hybrid distribution network power restoration control
EP2526645B1 (en) Method and apparatus for control of a commodity distribution system
Staszesky et al. Advanced feeder automation is here
CN104518564B (en) Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method
JPS62118716A (en) Control for preventing misoperation of switchgear of distribution equipment and controller for the same
JP2003299263A (en) Monitor control system
CN112134293A (en) Station terminal public unit and wide area autonomous method based on edge calculation
JP5112124B2 (en) Power distribution system operation device
CN111244919B (en) Distribution network topology self-adaptive identification method suitable for intelligent distributed FA
CN110221183A (en) Distribution Network Failure method for early warning and system towards non-power distribution automation overlay area
CN105391030A (en) Planned island division method through load gradual loading and aggregation based on network topology structure
JPH06225456A (en) Power distribution system operating apparatus
JP4969340B2 (en) Supervisory control system
Fan et al. Feeder automation within the scope of substation automation
CN106787216A (en) It is a kind of for many power supply ring network structures in intelligent distributed FA systems
CN105207182B (en) A kind of method and system of power distribution network locality protection
JPH09285040A (en) Automating system for distribution line
RU2454770C1 (en) Automation system of feed lines and method of its operation
JPH06165380A (en) Distribution system operation device
CN107834498B (en) Substation secondary automation equipment power supply smart managing and control system and management-control method
JPS6016141A (en) Power distributing operation monitoring device
JPH0731082A (en) Method and apparatus for remote monitor and control of power distribution line