JP2727777B2 - Wiring inspection data management system - Google Patents

Wiring inspection data management system

Info

Publication number
JP2727777B2
JP2727777B2 JP3046297A JP4629791A JP2727777B2 JP 2727777 B2 JP2727777 B2 JP 2727777B2 JP 3046297 A JP3046297 A JP 3046297A JP 4629791 A JP4629791 A JP 4629791A JP 2727777 B2 JP2727777 B2 JP 2727777B2
Authority
JP
Japan
Prior art keywords
inspection
wiring
data
wiring inspection
cad data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP3046297A
Other languages
Japanese (ja)
Other versions
JPH04282467A (en
Inventor
彰洋 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
Nippon Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Electric Co Ltd filed Critical Nippon Electric Co Ltd
Priority to JP3046297A priority Critical patent/JP2727777B2/en
Publication of JPH04282467A publication Critical patent/JPH04282467A/en
Application granted granted Critical
Publication of JP2727777B2 publication Critical patent/JP2727777B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は布線検査データ管理シス
テムに関し、特にネットワークシステムを用いた布線検
査データ管理システムに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a wiring inspection data management system, and more particularly to a wiring inspection data management system using a network system.

【0002】[0002]

【従来の技術】従来の布線検査データ管理システムは、
例えば、従来の布線検査データ管理システムの機能ブロ
ック図である図5に示すように、CADデータを記憶す
るCADデータ記憶手段2と、検査工程にプリント基板
が到着したことを入力する検査工程到着報告入力手段7
と、現在空いている布線検査装置を入力する空き布線検
査装置入力手段8と、検査工程到着報告入力手段7によ
って入力したプリント基板のCADデータをCADデー
タ記憶手段2から読み出し、空き布線検査装置入力手段
8によって入力された布線検査装置用にCADデータを
検査データに変換する変換手段5と、変換手段5が変換
した検査データを布線検査装置に通知する検査データ通
知手段6からなっている。
2. Description of the Related Art A conventional wiring inspection data management system includes:
For example, as shown in FIG. 5, which is a functional block diagram of a conventional wiring inspection data management system, a CAD data storage means 2 for storing CAD data, and an inspection process arrival input for inputting that a printed circuit board has arrived at the inspection process. Report input means 7
Read out the CAD data of the printed circuit board inputted by the empty wiring inspection device input means 8 for inputting the currently empty wiring inspection apparatus and the inspection process arrival report input means 7 from the CAD data storage means 2; Conversion means 5 for converting CAD data into inspection data for the wiring inspection device input by the inspection device input means 8 and inspection data notifying means 6 for notifying the inspection data converted by the conversion means 5 to the wiring inspection device. Has become.

【0003】検査工程にプリント基板が到着すると、作
業者が検査工程到着報告入力手段7によって布線検査デ
ータ管理システムに知らせる。布線検査装置が空いたと
きに空き布線検査装置入力手段8に よって空いた布線
検査装置が知らされると、CADデータ記憶手段2に記
憶されているCADデータの中から検査工程到着報告入
力手段7によって入力されたプリント基板のCADデー
タを変換手段5が読み出し、その布線検査装置用にデー
タ変換を行なう。そして、検査データ通知手段6が選択
された布線検査装置に検査データを通知していた。
When the printed circuit board arrives at the inspection step, an operator notifies the wiring inspection data management system by the inspection step arrival report input means 7. When the vacant wiring inspection device is notified by the vacant wiring inspection device input means 8 when the wiring inspection device is vacant, an inspection process arrival report is output from the CAD data stored in the CAD data storage means 2. The conversion means 5 reads the CAD data of the printed circuit board input by the input means 7 and performs data conversion for the wiring inspection apparatus. Then, the inspection data notifying means 6 notifies the selected wiring inspection apparatus of the inspection data.

【0004】[0004]

【発明が解決しようとする課題】一般的に、布線の検査
データは、布線検査装置に被検査基板をかけ、データ吸
い上げを行なうことにより作成される。但し、この方法
であると装置に装着する検査治具などに欠陥があると、
その部分の検査データを取り込むことが出来ないため、
完全に正しい検査を行なうことが出来ない。
Generally, wiring inspection data is created by placing a substrate to be inspected on a wiring inspection apparatus and performing data downloading. However, if this method has a defect in the inspection jig attached to the device,
Because it is not possible to capture the inspection data for that part,
A completely correct inspection cannot be performed.

【0005】そこで、プリント基板を作成する元のデー
タであるCADデータから布線の検査データを作成する
方法を考える。この場合は、CADデータから検査すべ
き点を抜き出し、それを布線検査装置で使用できるよう
にデータ変換を行なう必要がある。このデータ変換は、
布線検査装置の種類、あるいは使用する治具が異なる
と、違った変換をする必要がある。このため、どの布線
検査装置用に変換を行なうのかを前もって入力する必要
がある。
[0005] Therefore, a method of creating wiring inspection data from CAD data which is original data for creating a printed circuit board will be considered. In this case, it is necessary to extract points to be inspected from the CAD data and perform data conversion so that the points can be used in the wiring inspection apparatus. This data conversion
If the type of the wiring inspection device or the jig used is different, it is necessary to perform a different conversion. For this reason, it is necessary to input in advance which wiring inspection apparatus is to be converted.

【0006】前述した従来の布線検査データ管理システ
ムは、検査工程に検査対象のプリント基板が到着し、な
おかつ布線検査装置が空いてからでないとデータ変換を
行なうことが出来ないため、検査にはいるまでの時間が
長くなってしまう
In the conventional wiring inspection data management system described above, the data conversion cannot be performed until the printed circuit board to be inspected arrives at the inspection step and the wiring inspection apparatus is empty. It takes longer to enter

【課題を解決するための手段】本発明の布線検査データ
管理システムは、布線検査工程の前工程が完了したこと
を知らせる前工程完了報告手段と、プリント基板のCA
Dデータを記憶するCADデータ記憶手段と、布線検査
装置の検査状況を問い合わせる検査状況問い合わせ手段
と、検査状況問い合わせ手段が問い合わせた布線検査装
置の検査状況から検査を終了しそうな布線検査装置を判
断する検査状況判定手段と、前工程完了報告手段が報告
した基板のCADデータを、CADデータ記憶手段から
読み出し、検査状況判定手段が検査を終了しそうである
と判断した布線検査装置用にCADデータを検査データ
に変換する変換手段と、変換手段が変換した検査データ
を布線検査装置に通知する検査データ通知手段とにより
構成される。
According to the present invention, there is provided a wiring inspection data management system comprising: a pre-process completion reporting unit for notifying that a pre-process of a wiring inspection process has been completed;
CAD data storage means for storing D data, inspection status inquiry means for inquiring the inspection status of the wiring inspection device, and wiring inspection device which is likely to end the inspection from the inspection status of the wiring inspection device inquired by the inspection status inquiry device The CAD data of the substrate reported by the pre-process completion reporting means is read from the CAD data storage means, and the inspection situation determining means determines that the inspection is about to be completed. It is composed of a conversion means for converting CAD data into inspection data, and an inspection data notifying means for notifying the wiring inspection device of the inspection data converted by the conversion means.

【0007】[0007]

【実施例】次に、本発明の実施例について図面を参照し
て説明する。
Next, embodiments of the present invention will be described with reference to the drawings.

【0008】図1は、本発明の布線検査データ管理シス
テムの一実施例を示す機能ブロック図である。
FIG. 1 is a functional block diagram showing an embodiment of a wiring inspection data management system according to the present invention.

【0009】本実施例の布線検査データ管理システム
は、図1に示すように、布線検査工程の前工程が完了し
たことを知らせる前工程完了報告手段1と、プリント基
板のCADデータを記憶するCADデータ記憶手段2
と、布線検査装置の検査状況を問い合わせる検査状況問
い合わせ手段3と、検査状況問い合わせ手段3が問い合
わせた布線検査装置の検査状況から検査を終了しそうな
布線検査装置を判断する検査状況判定手段4と、前工程
完了報告手段1が報告した基板のCADデータを、CA
Dデータ記憶手段2から読み出し、検査状況判定手段4
が検査を終了しそうであると判断した布線検査装置用に
CADデータを検査データに変換する変換手段5と、変
換手段5が変換した検査データを布線検査装置に通知す
る検査データ通知手段6からなっている。
As shown in FIG. 1, the wiring inspection data management system according to the present embodiment stores pre-process completion reporting means 1 for notifying that the pre-process of the wiring inspection process has been completed, and CAD data of a printed circuit board. CAD data storage means 2
Inspection status inquiring means 3 for inquiring the inspection status of the wiring inspection device; and inspection status determining means for determining the wiring inspection device likely to end the inspection based on the inspection status of the wiring inspection device inquired by the inspection status inquiry device 3. 4 and the CAD data of the substrate reported by the
Read out from the D data storage means 2 and the inspection status determination means 4
Converting means 5 for converting CAD data into inspection data for the wiring inspection apparatus which has determined that the inspection is about to be completed, and inspection data notifying means 6 for notifying the wiring inspection apparatus of the inspection data converted by the conversion means 5. Consists of

【0010】上記検査状況問い合わせ手段3、検査状況
判定手段4、変換手段5、検査データ通知手段6は、図
2に示す布線検査工程管理用EWS13を構成し、この
布線検査工程管理用EWS13は、マイクロコンピュー
タを用いて構成できる。また、前工程完了報告手段1
は、図2に示す前工程管理用EWS12を構成し、CA
Dデータ記憶手段2は、図2に示すCADデータ記憶用
ミニコン11を構成する。
The inspection status inquiring means 3, the inspection status determining means 4, the converting means 5, and the inspection data notifying means 6 constitute a wiring inspection process management EWS 13 shown in FIG. Can be configured using a microcomputer. Also, the pre-process completion reporting means 1
Constitutes the pre-process management EWS 12 shown in FIG.
The D data storage means 2 constitutes the CAD data storage mini-computer 11 shown in FIG.

【0011】布線検査工程の前工程の処理が終了する
と、前工程完了報告手段1が完了報告aを変換手段5に
送信する。検査状況問い合わせ手順3は、常にシステム
内の布線検査装置の検査状況を問い合わせ、検査状況判
定手段4に知らせる。検査状況判定手段4は、検査が終
了しそうな布線検査装置を判断し、変換手段5に知らせ
る。変換手段5は、前工程完了報告手段1からの完了報
告aを受信すると、検査状況判定手段4からの空き布線
検査装置情報cに基づいて、CADデータ記憶手段2か
らCADデータbを読み出し、布線検査装置用にデータ
変換を行ない、検査データ通知手段6に知らせる。検査
データ通知手段6は、変換手段5が変換した検査データ
dを布線検査装置に通知する。
When the processing of the preceding step of the wiring inspection step is completed, the preceding step completion reporting means 1 sends a completion report a to the converting means 5. Inspection status inquiry procedure 3 always inquires of the inspection status of the wiring inspection device in the system and informs inspection status determination means 4. The inspection status determination means 4 determines a wiring inspection apparatus for which the inspection is likely to be completed, and notifies the conversion means 5. Upon receiving the completion report a from the pre-process completion report means 1, the conversion means 5 reads the CAD data b from the CAD data storage means 2 based on the vacant wiring inspection device information c from the inspection status determination means 4, Data conversion is performed for the wiring inspection device and the inspection data notification means 6 is notified. The inspection data notification unit 6 notifies the wiring inspection device of the inspection data d converted by the conversion unit 5.

【0012】図2は、本実施例のシステム構成を表わす
システム構成図である。
FIG. 2 is a system configuration diagram showing the system configuration of the present embodiment.

【0013】図2に示す布線検査データ管理システム
は、CADデータを記憶するCADデータ記憶用ミニコ
ン11と、布線検査工程の前工程の終了を知らせる前工
程管理用EWS12と、布線検査工程の管理を行なう布
線検査工程管理用EWS13と、実際に布線検査を行な
う複数の種類の異なる布線検査装置141、142、1
43と、CADデータ記憶用ミニコン11と前工程管理
用EWS12と布線検査工程管理用EWS13を結ぶ幹
線ネットワーク15と、布線検査工程管理用EWS13
と布線検査装置141、142、143とを結ぶLAN
16とから成っている。
The wiring inspection data management system shown in FIG. 2 includes a CAD data storing mini-computer 11 for storing CAD data, a pre-process management EWS 12 for notifying the end of the previous process of the wiring inspection process, and a wiring inspection process. EWS 13 for the wiring inspection process management for managing the wiring, and a plurality of types of different wiring inspection devices 141, 142, 1 for actually performing the wiring inspection.
43, a main network 15 connecting the CAD data storage mini-computer 11, the pre-process management EWS 12, and the wiring inspection process management EWS 13, and a wiring inspection process management EWS 13.
LAN connecting the wiring inspection devices 141, 142 and 143
It consists of 16.

【0014】前工程の完了報告を、前工程管理用EWS
12が幹線ネットワーク15を通じて布線検査工程管理
用EWS13に通知する。布線検査工程管理用EWS1
3は、LAN16を通じて接続されている布線検査装置
141、142、143の状態を監視しており、その中
で検査の終了しそうな布線検査装置を選択し、幹線ネッ
トワーク15を通じてCADデータ記憶用ミニコン11
からCADデータを読み出し、データ変換を行なって布
線検査装置に送信する。
[0014] The completion report of the preceding process is sent to the preceding process management EWS.
12 notifies the wiring inspection process management EWS 13 through the trunk network 15. EWS1 for wiring inspection process management
3 monitors the status of the wiring inspection devices 141, 142, and 143 connected via the LAN 16, selects a wiring inspection device whose inspection is likely to be completed, and stores the CAD inspection data through the trunk network 15 for storing CAD data. Minicomputer 11
, Read the CAD data from the device, convert the data, and send the data to the wiring inspection device.

【0015】図3は、本実施例の布線検査工程管理用E
WS13をマイクロコンピュータを用いて構成した場合
の基本構成図である。
FIG. 3 is a diagram showing a wiring inspection process control E according to this embodiment.
FIG. 3 is a basic configuration diagram when WS13 is configured using a microcomputer.

【0016】布線検査工程管理用EWS13を構成する
マイクロコンピュータシステムは、CPU13aと、R
OM13bと、RAM13cと、タイマ13dと、幹線
ネットワーク15用のネットワークコントローラ13e
と、LAN16用のネットワークコントローラ13fを
備えている。幹線ネットワーク15用のネットワークコ
ントローラ13eにはCADデータ記憶用ミニコン11
と、前工程管理用EWS12が接続されている。また、
LAN16用のネットワークコントローラ13fには、
種類の異なる布線検査装置141、142、143が接
続されている。ROM13bは、必要な基本プログラム
を記憶している。CPU13aは、ネットワークコント
ローラ13eを通じて、CADデータ記憶用ミニコン1
1と前工程管理用EWS12と通信を行なうことがで
き、さらにネットワークコントローラ13fを通じて、
布線検査装置141、142、143と通信を行なうこ
とが出来る。また、タイマ13dにより時間を計ること
が出来る。
A microcomputer system constituting the wiring inspection process management EWS 13 includes a CPU 13a,
OM 13b, RAM 13c, timer 13d, and network controller 13e for trunk network 15
And a network controller 13f for the LAN 16. The network controller 13e for the trunk network 15 has a minicomputer 11 for storing CAD data.
And the pre-process management EWS 12 are connected. Also,
The network controller 13f for the LAN 16 includes:
Different types of wiring inspection devices 141, 142, 143 are connected. The ROM 13b stores necessary basic programs. The CPU 13a communicates with the CAD data storage mini-computer 1 through the network controller 13e.
1 and the pre-process management EWS 12 and can communicate with each other.
Communication with the wiring inspection devices 141, 142, and 143 can be performed. The time can be measured by the timer 13d.

【0017】CPU13aは、ネットワークコントロー
ラ13eを常に監視している。前工程管理用EWS12
からの完了報告aを受信すると、ネットワークコントロ
ーラ13fを介して布線検査装置141,142,14
3の検査状況を取り込む。この時タイマ13dによって
適当なタイミングが作られ、検査状況を取り込んでい
く。検査状況からまもなく検査が終了することがわかる
と、ネットワークコントローラ13eを介して、CAD
データ記憶用ミニコン11からCADデータbを読み込
む。そして、対象となる布線検査装置用にデータ変換を
行なう。データ変換後、ネットワークコントローラ13
fを通じて、該当する布線検査装置に検査データを送信
する。これらの制御動作は、ソフトプログラムに従って
実行され、必要な制御信号が各部に送出されて上記した
本発明の制御動作が行なわれる。
The CPU 13a constantly monitors the network controller 13e. EWS12 for front process management
Receiving the completion report a from the network controller 13f via the network controller 13f.
The inspection status of 3 is taken in. At this time, an appropriate timing is generated by the timer 13d, and the inspection status is taken in. If it is known from the inspection status that the inspection will be completed soon, the CAD is sent via the network controller 13e.
The CAD data b is read from the minicomputer 11 for data storage. Then, data conversion is performed for the target wiring inspection apparatus. After the data conversion, the network controller 13
The inspection data is transmitted to the corresponding wiring inspection apparatus through f. These control operations are executed according to a software program, and necessary control signals are sent to the respective units to perform the above-described control operations of the present invention.

【0018】図4は、本実施例の制御動作プログラムの
フローチャートである。
FIG. 4 is a flowchart of a control operation program according to this embodiment.

【0019】プログラムの実行が開始されると、前工程
が終了した基板があるかどうかを判断する(ステップ1
00)。このステップでは、前工程完了報告手段1から
完了報告aを受信したかを判断している。完了報告aを
受信していない場合は、ステップ100を繰り返す。さ
て、完了報告aを受信している場合、タイマ13dがタ
イムアップしているかどうかを判断する(ステップ10
1)。タイムアップしていない場合は、ステップ101
を繰り返す。ステップ101においてタイマ13dがタ
イムアップしていると判断された場合、布線検査装置1
41、142、143に検査状況を問い合わせる(ステ
ップ102)。ステップ102で問い合わせた結果から
まもなく検査が終了しそうな布線検査装置があるかどう
かを判断する(ステップ103)。終了しそうな布線検
査装置がある場合はCADデータをCADデータ記憶用
ミニコン11から読み込む(ステップ104)。そし
て、ステップ103で判断した布線検査装置用にデータ
変換を行い(ステップ105)、この布線検査装置に検
査データを送信する(ステップ106)。ステップ10
3において終了しそうな布線検査装置がない場合はステ
ップ101に戻り、再度タイマ13dがタイムアップす
るのを待つ。このようにして、プログラムが繰り返し実
行されることになる。
When the execution of the program is started, it is determined whether or not there is a substrate for which the previous process has been completed (step 1).
00). In this step, it is determined whether or not the completion report a has been received from the previous process completion reporting means 1. If the completion report a has not been received, step 100 is repeated. When the completion report a has been received, it is determined whether or not the timer 13d has expired (step 10).
1). If the time is not up, step 101
repeat. If it is determined in step 101 that the timer 13d has expired, the wiring inspection apparatus 1
The inspection status is inquired to 41, 142, and 143 (step 102). It is determined from the result of the inquiry in step 102 whether or not there is a wiring inspection apparatus for which the inspection is likely to be completed soon (step 103). If there is a wiring inspection device that is likely to be completed, the CAD data is read from the CAD data storage minicomputer 11 (step 104). Then, data conversion is performed for the wiring inspection device determined in step 103 (step 105), and the inspection data is transmitted to the wiring inspection device (step 106). Step 10
If there is no wiring inspection device that is likely to be completed in step 3, the process returns to step 101 and waits for the timer 13d to time out again. In this way, the program is repeatedly executed.

【0020】[0020]

【発明の効果】以上説明したように、本発明の布線検査
データ管理システムは、布線検査工程の前工程が終了し
た段階、及び布線検査装置がまもなく空く段階でデータ
変換を行なうことが出来るため、プリント基板が布線検
査工程に到着した段階ですぐに検査を行なうことがで
き、時間のロスが少ない。
As described above, the wiring inspection data management system of the present invention can perform data conversion at the stage when the pre-process of the wiring inspection process is completed, and at the stage when the wiring inspection device is soon available. Since the printed circuit board can be inspected immediately when the printed circuit board arrives at the wiring inspection step, there is little time loss.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の布線検査データ管理システムの一実施
例を示す機能ブロック図である。
FIG. 1 is a functional block diagram showing an embodiment of a wiring inspection data management system according to the present invention.

【図2】本実施例のシステム構成を表わすシステム構成
図である。
FIG. 2 is a system configuration diagram showing a system configuration of the present embodiment.

【図3】本実施例の布線検査工程管理用EWS13をマ
イクロコンピュータを用いて構成した場合の基本構成図
である。
FIG. 3 is a basic configuration diagram when the wiring inspection process management EWS 13 of the present embodiment is configured using a microcomputer.

【図4】本実施例の制御動作プログラムのフローチャー
トである。
FIG. 4 is a flowchart of a control operation program according to the present embodiment.

【図5】従来の布線検査データ管理システムの機能ブロ
ック図である。
FIG. 5 is a functional block diagram of a conventional wiring inspection data management system.

【符号の説明】[Explanation of symbols]

1 前工程完了報告手段 2 CADデータ記憶手段 3 検査状況問い合わせ手段 4 検査状況判定手段 5 変換手段 6 検査データ通知手段 11 CADデータ記憶用ミニコン 12 前工程管理用EWS 13 布線検査工程管理用EWS 15 幹線ネットワーク 16 LAN 141、142、143 布線検査装置 1 Pre-process completion reporting means 2 CAD data storage means 3 Inspection status inquiry means 4 Inspection status determination means 5 Conversion means 6 Inspection data notification means 11 Minicomputer for storing CAD data 12 EWS for pre-process management 13 EWS for wiring inspection process management 15 Main line network 16 LAN 141, 142, 143 Wiring inspection device

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 布線検査工程の前工程が完了したことを
知らせる前工程完了報告手段と、プリント基板のCAD
データを記憶するCADデータ記憶手段と、布線検査装
置の検査状況を問い合わせる検査状況問い合わせ手段
と、前記検査状況問い合わせ手段が問い合わせた布線検
査装置の検査状況から検査を終了しそうな布線検査装置
を判断する検査状況判定手段と、前記前工程完了報告手
段が報告した基板のCADデータを、前記CADデータ
記憶手段から読み出して、CADデータを検査データに
変換する変換手段と、前記変換手段が変換した検査デー
タを前記検査状況判定手段が検査を終了しそうであると
判断した布線検査装置に通知する検査データ通知手段と
を含むことを特徴とする布線検査データ管理システム。
A pre-process completion reporting unit for notifying that a pre-process of a wiring inspection process has been completed;
CAD data storage means for storing data, inspection status inquiry means for inquiring the inspection status of the wiring inspection device, and wiring inspection device which is likely to end the inspection from the inspection status of the wiring inspection device inquired by the inspection status inquiry means Inspection condition determination means for judging the condition, reading the CAD data of the substrate reported by the pre-process completion report means from the CAD data storage means, and converting the CAD data into inspection data; A wiring inspection data notifying means for notifying the wiring inspection device that the inspection status determining means has determined that the inspection is likely to be completed, the inspection data notifying means.
JP3046297A 1991-03-12 1991-03-12 Wiring inspection data management system Expired - Lifetime JP2727777B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3046297A JP2727777B2 (en) 1991-03-12 1991-03-12 Wiring inspection data management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3046297A JP2727777B2 (en) 1991-03-12 1991-03-12 Wiring inspection data management system

Publications (2)

Publication Number Publication Date
JPH04282467A JPH04282467A (en) 1992-10-07
JP2727777B2 true JP2727777B2 (en) 1998-03-18

Family

ID=12743280

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3046297A Expired - Lifetime JP2727777B2 (en) 1991-03-12 1991-03-12 Wiring inspection data management system

Country Status (1)

Country Link
JP (1) JP2727777B2 (en)

Also Published As

Publication number Publication date
JPH04282467A (en) 1992-10-07

Similar Documents

Publication Publication Date Title
JPH05130324A (en) Image processor
JP2727777B2 (en) Wiring inspection data management system
JPH06300808A (en) Method for inspecting cable wiring
JPH0322159A (en) Multi-protocol supporting system
CN114363416B (en) Cross-chain processing method and device based on block chain, storage medium and server
JP3011051B2 (en) Overload test equipment for centralized maintenance management system
JP2625571B2 (en) Online system test method
JPH0981334A (en) Information processor and its data transfer method
JP3280690B2 (en) Automatic meter reading system
JPH10247616A (en) Exposure device, semiconductor production system and manufacture of semiconductor
JPH09282170A (en) Facsimile equipment
JP2500006Y2 (en) Programmable controller system
JP3483339B2 (en) Set value information transmission device
JPH05244650A (en) Protocol control system
JP2001136111A (en) Bank registration method
JPS6149701B2 (en)
JPH06301561A (en) Real time inter-process communication equipment
JPH09305409A (en) Remote program download control system
JPH11298476A (en) Network fault detection system, network device and network management device
JPH09247765A (en) Remote supervisory and controlling device
JP2000353008A (en) Monitor controller
JPH1083286A (en) Instruction controller
JPH03108865A (en) Facsimile store and forward exchange device
JPH0684083A (en) Information transmitting system for building management system
JPH04130918A (en) Printer sharing system in computer network

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19971111