JP2684160B2 - Construction method of masonry wall - Google Patents

Construction method of masonry wall

Info

Publication number
JP2684160B2
JP2684160B2 JP18997594A JP18997594A JP2684160B2 JP 2684160 B2 JP2684160 B2 JP 2684160B2 JP 18997594 A JP18997594 A JP 18997594A JP 18997594 A JP18997594 A JP 18997594A JP 2684160 B2 JP2684160 B2 JP 2684160B2
Authority
JP
Japan
Prior art keywords
formwork
mold
fixed
masonry
stones
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP18997594A
Other languages
Japanese (ja)
Other versions
JPH0827820A (en
Inventor
守人 流
Original Assignee
守人 流
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 守人 流 filed Critical 守人 流
Priority to JP18997594A priority Critical patent/JP2684160B2/en
Publication of JPH0827820A publication Critical patent/JPH0827820A/en
Application granted granted Critical
Publication of JP2684160B2 publication Critical patent/JP2684160B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Retaining Walls (AREA)
  • Revetment (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、コンクリートによって
一体化される石積壁体を、特別な熟練を要することなく
簡易に構築でき、その工期の短縮及び施工コストの低減
を達成せしめる石積壁体の構築工法に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a masonry wall body that can be easily constructed without the need for special skill, and that the masonry wall body integrated with concrete can be shortened in construction period and construction cost. It concerns the construction method.

【0002】[0002]

【従来の技術】何段にも積み上げた石をその裏側におい
てコンクリート壁部に一体化せしめた石積壁体を構築す
る従来の構築工法は次のようであった。
2. Description of the Related Art A conventional construction method for constructing a masonry wall body in which stones piled up in multiple stages are integrated with a concrete wall portion on the back side thereof is as follows.

【0003】まず、石積壁体の構築部位に設けたコンク
リート基礎上に石を一段並置し、その際、石の表側の積
み上げ面が略面一状態となるように面を合わせ、然る
後、石列と、その裏側に所要間隔を隔てて立設された型
枠との間にコンクリートを打設して石間の隙間にコンク
リートを充填し、数日間放置してコンクリートを硬化さ
せた後、前記石列上に二段めの石を積み上げ、その際、
石の表側の面が上下方向及び列の長さ方向について面一
状態となるように十分注意を払い、前記と同様にして、
二段目の石列の裏側にコンクリートを打設して石間の隙
間にコンクリートを充填し、その後数日間放置してコン
クリートを硬化させ、これを繰り返して順次石を積み上
げ、石積み壁体を構築していた。
[0003] First, stones are laid one by one on a concrete foundation provided at the construction site of a masonry wall, and at this time, the surfaces are stacked so that the piled surface on the front side of the stones is substantially flush with each other. After pouring concrete between the stone rows and the formwork erected at the required interval on the back side, filling the gap between the stones with concrete and leaving it for several days to harden the concrete, The second stone is stacked on the stone row,
Pay close attention so that the surface on the front side of the stone is flush with the vertical direction and the length direction of the row, in the same manner as above,
Pour concrete into the back of the second row of stones and fill the gaps between the stones with concrete, then leave it for several days to harden the concrete, repeat this, pile up stones sequentially, and build a masonry wall Was.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、このよ
うにして石積壁体を構築する場合には次のような問題が
あった。
However, when constructing a masonry wall body in this way, there were the following problems.

【0005】 石を積み上げる際、石の表側の積み上
げ面(仕上げ面)が、略面一の平面や湾曲面に正しく仕
上がるように積み上げ面を注意深く観察しながら1つ1
つの石を安定的に積み上げなければならず、その施工に
は相当の熟練を要し、且つ石の積み上げに多大の手間と
時間を要した。
When stacking stones, one by one, carefully observing the stacking surface (finishing surface) on the front side of the stone so that the stacking surface is properly finished to be substantially flush or flat.
Two stones had to be piled up in a stable manner, which required considerable skill in the construction, and required a lot of time and effort to pile up the stones.

【0006】 又積み上げの各段毎に、積み上げ部の
裏側にコンクリートをその都度打設しなければならず、
又打設したコンクリートが硬化するまでの数日間は、次
段の積み上げ施工を行うことができず、従って工期の長
期化と施工コストの上昇を招く問題があった。
In addition, concrete must be placed on the back side of the stacking unit for each stacking stage,
Further, the next stage of stacking work cannot be carried out for several days until the cast concrete is hardened, so that there is a problem that the construction period is prolonged and the construction cost is increased.

【0007】 又、石を単に積み上げた状態で石の裏
側にコンクリートを打設していたため、石積み部分が不
安であってバイブレータを用いてコンクリートを締め固
めることができなかった。従って緻密なコンクリートの
打設が困難であり、石間に間隙が生じやすく、長期間の
内にこの間隙に水が侵入してコンクリートの剥離を招く
恐れがあり、石積壁体が構造的に不安定化しやすい問題
があった。
Further, since the concrete was placed on the back side of the stone in a state where the stones were simply piled up, the masonry portion was uneasy and the concrete could not be compacted using the vibrator. Therefore, it is difficult to cast dense concrete, and a gap is easily formed between the stones. Water may enter the gap in a long period of time and cause concrete to peel off. There was a problem that was easily stabilized.

【0008】本発明は、かかる問題点を解決しうる石積
壁体の構築工法の提供を目的とするものである。
An object of the present invention is to provide a method for constructing a masonry wall that can solve the above problems.

【0009】[0009]

【課題を解決するための手段】上記課題を解決するた
め、本発明は以下の手段を採用する。即ち本発明に係る
石積壁体の構築工法(以下構築工法という)の一は、立
設した型枠の裏面に沿って石を積み上げ、この石を型枠
に保持させるに際し、積み上げた石と型枠との間に形成
された隙間に粒状の充填材を充填する工程と、所要幅及
び所要高さ分の石積み部をひとまとまりとして、これに
固定網を被せ、該固定網の縁部或いは中間部の所要部位
を、型枠に設けた貫通孔を挿通する連結部材を介して、
型枠の表側で該型枠に固定せしめ、該固定網により前記
石積み部を該型枠に固定状態に保持せしめる工程とを含
む。その後、前記型枠と、石積み部を挟むように該型枠
に対向して立設せしめられた状態にある型枠との間にコ
ンクリートを打設する。そして該コンクリートの硬化
後、連結部材を前記型枠と分離して該型枠を取り外すと
共に、石と型枠との間隙に詰まっていた前記充填材を排
除することを特徴とするものである。
In order to solve the above problems, the present invention employs the following means. That is, one of the construction methods for the masonry wall body according to the present invention (hereinafter referred to as the construction method) is to stack stones along the back surface of the standing formwork, and hold the stones in the formwork. The step of filling a granular filling material in the gap formed between the frame and the stone masonry part of the required width and required height as a unit, covering this with a fixed net, the edge or the middle of the fixed net A required portion of the part, through a connecting member that inserts a through hole provided in the mold,
Fixing to the mold on the front side of the mold, and holding the masonry portion in the mold in a fixed state by the fixed net. After that, concrete is poured between the formwork and the formwork which is erected so as to face the formwork so as to sandwich the masonry portion. After the concrete is hardened, the connecting member is separated from the mold to remove the mold, and the filler filled in the gap between the stone and the mold is removed.

【0010】上記構築工法のより好ましい態様は、立設
した型枠の裏面に沿って石を積み上げ、この石を型枠に
保持させるに際し、積み上げた石と型枠との間に形成さ
れた隙間に粒状の充填材を充填する工程と、正方形状或
いは矩形状をなす網本体の少なくとも四隅部分の夫々
に、固定紐の一端を固着してなる固定網を用い、且つ、
型枠の表側に一端が固着された連結紐を、該型枠に設け
た貫通孔を挿通せしめて型枠の裏側に導き出し、所要幅
及び所要高さ分の石積み部をひとまとまりとして、これ
に前記固定網を被せ、前記固定紐を前記連結紐に連結
し、これによって、固定網により石積み部を型枠に固定
状態に保持せしめる工程とを含む。その後、前記型枠
と、石積み部を挟むように該型枠に対向して立設せしめ
られた状態にある型枠との間にコンクリートを打設す
る。そして該コンクリートの硬化後、連結紐を前記型枠
と分離して該型枠を取り外すと共に、石と該型枠との間
隙に詰まっていた前記充填材を排除することを特徴とす
るものである。
A more preferable aspect of the above-mentioned construction method is that stones are piled up along the back surface of the erected formwork, and when the stones are held in the formwork, a gap formed between the piled stones and the formwork. And a step of filling the granular filler with a fixed net formed by fixing one end of a fixed string to each of at least four corners of the square or rectangular net main body, and
A connecting cord, one end of which is fixed to the front side of the form, is inserted into a through hole provided in the form and led out to the back side of the form. Covering with the fixed net, connecting the fixed string to the connection string, and thereby holding the masonry portion in a fixed state by the fixed net with the fixed net. After that, concrete is poured between the formwork and the formwork which is erected so as to face the formwork so as to sandwich the masonry portion. After the concrete is hardened, the connecting cord is separated from the mold to remove the mold, and the filler clogged in the gap between the stone and the mold is removed. .

【0011】前記各構築工法において、石積み部に被っ
て該石積み部を型枠に固定状態に保持せしめた状態にあ
る固定網と石積み部との間に、適宜石を投入して、固定
網が全体的に張った状態とするのがよい。
In each of the construction methods described above, a stone is appropriately inserted between the fixed net and the masonry, which are in a state of covering the masonry and holding the masonry in a fixed state in the formwork, so that the fixed net is It is good to keep it stretched as a whole.

【0012】又本発明に係る構築工法のその他は、立設
した型枠の裏面に沿って積み上げられた石積み部を挟む
ように該型枠に対向して立設せしめられた状態にある型
枠にも、その裏面に沿って石を積み上げ、この石を型枠
に保持させるに際し、積み上げた石と該型枠との間に形
成された隙間に粒状の充填材を充填する工程と、所要幅
及び所要高さ分の石積み部をひとまとまりとして、これ
に固定網を被せ、該固定網の縁部或いは中間部の所要部
位を、該型枠に設けた貫通孔を挿通する連結部材を介し
て、型枠の表側において該型枠に固定せしめ、該固定網
により石積み部を型枠に固定状態に保持せしめる工程と
を含む。その後、両型枠間にコンクリートを打設する。
そして該コンクリートの硬化後、連結部材を前記型枠と
分離して該型枠を取り外すと共に、石と型枠との間隙に
詰まっていた前記充填材を排除することを特徴とするも
のである。
In addition, in the construction method according to the present invention, the formwork is erected so as to face the formwork so as to sandwich the masonry portion piled up along the back surface of the erected formwork. Also, when the stones are piled up along the back surface and the stones are held in the mold, a step of filling a granular filler in the gap formed between the piled stones and the mold, and a required width And a masonry portion of a required height as a unit, which is covered with a fixed mesh, and a predetermined portion of an edge or an intermediate portion of the fixed mesh is inserted through a through hole provided in the formwork through a connecting member. Fixing the front side of the mold to the mold, and holding the masonry portion in the mold in a fixed state by the fixed net. After that, concrete is placed between both forms.
After the concrete is hardened, the connecting member is separated from the mold to remove the mold, and the filler filled in the gap between the stone and the mold is removed.

【0013】上記構築工法のより好ましい態様は、立設
した型枠の裏面に沿って積み上げられた石積み部を挟む
ように該型枠に対向して立設せしめられた状態にある型
枠にも、その裏面に沿って石を積み上げ、この石を型枠
に保持させるに際し、積み上げた石と型枠との間に形成
された隙間に粒状の充填材を充填する工程と、正方形状
或いは矩形状をなす網本体の少なくとも四隅部分の夫々
に、固定紐の一端を固着してなる固定網を用い、且つ、
型枠の表側に一端が固着された連結紐を、該型枠に設け
た貫通孔を挿通せしめて型枠の裏側に導き出し、所要幅
及び所要高さ分の石積み部をひとまとまりとして、これ
に前記固定網を被せ、前記固定紐を前記連結紐に連結
し、これによって、固定網により石積み部を型枠に固定
状態に保持せしめる工程とを含む。その後、両型枠間に
コンクリートを打設する。そして該コンクリートの硬化
後、連結紐を前記型枠と分離して該型枠を取り外すと共
に、石と型枠との間隙に詰まっていた前記充填材を排除
することを特徴とするものである。
A more preferable aspect of the above-mentioned construction method is also for a formwork which is erected so as to face the formwork so as to sandwich a masonry portion piled up along the back surface of the erected formwork. , A step of stacking stones along the back surface and holding the stones in a formwork, filling a gap formed between the stacked stones and the formwork with a granular filler, and a square or rectangular shape A fixed net formed by fixing one end of a fixed string to each of at least four corners of the net body forming
A connecting cord, one end of which is fixed to the front side of the form, is inserted into a through hole provided in the form and led out to the back side of the form. Covering with the fixed net, connecting the fixed string to the connection string, and thereby holding the masonry portion in a fixed state by the fixed net with the fixed net. After that, concrete is placed between both forms. After the concrete is hardened, the connecting cord is separated from the mold to remove the mold, and the filler clogged in the gap between the stone and the mold is removed.

【0014】又本発明に係る構築工法のその他は、立設
した型枠の裏面に沿って石を積み上げるに際し、立設し
た型枠の裏面を固定網で覆い、該固定網の縁部或いは中
間部の所要部位を、型枠に設けた貫通孔を挿通する連結
部材を介して、型枠の表側で該型枠に固定せしめ、該固
定網と型枠との間に石を投入して、型枠の裏面に沿って
石を積み上げ状態とし、その際、積み上げた石と型枠と
の間に形成された隙間に粒状の充填材を充填する。その
後、前記型枠と、石積み部を挟むように該型枠に対向し
て立設せしめられた状態にある型枠との間にコンクリー
トを打設する。そして該コンクリートの硬化後、連結部
材を前記型枠と分離して該型枠を取り外すと共に、石と
該型枠との間隙に詰まっていた前記充填材を排除するこ
とを特徴とするものである。
In addition, in the construction method according to the present invention, when the stones are piled up along the back surface of the standing mold, the back surface of the standing mold is covered with a fixed net, and the edge or the middle of the fixed net is covered. The required portion of the part, through a connecting member that passes through a through hole provided in the formwork, is fixed to the formwork on the front side of the formwork, and stones are put between the fixed net and the formwork, Stones are piled up along the back surface of the mold, and at that time, a granular filler is filled in a gap formed between the piled stones and the mold. After that, concrete is poured between the formwork and the formwork which is erected so as to face the formwork so as to sandwich the masonry portion. Then, after hardening of the concrete, the connecting member is separated from the mold to remove the mold, and at the same time, the filling material clogged in the gap between the stone and the mold is removed. .

【0015】上記構築工法のより好ましい態様は、立設
した型枠の裏面に沿って石を積み上げるに際し、正方形
状或いは矩形状をなす網本体の少なくとも四隅部分の夫
々に、固定紐の一端を固着してなる固定網を用い、且
つ、型枠の表側に一端が固着された連結紐を、該型枠に
設けた貫通孔を挿通せしめて型枠の裏側に導き出し、立
設した型枠の裏面を固定網で覆うと共に、前記固定紐を
前記連結紐に連結し、該固定網と型枠との間に石を投入
して、型枠の裏面に沿って石を積み上げ状態とし、その
際、積み上げた石と型枠との間に形成された隙間に粒状
の充填材を充填する。その後、前記型枠と、石積み部を
挟むように該型枠に対向して立設せしめられた状態にあ
る型枠との間にコンクリートを打設する。そして該コン
クリートの硬化後、連結紐を前記型枠と分離して該型枠
を取り外すと共に、石と型枠との間隙に詰まっていた前
記充填材を排除することを特徴とするものである。
In a more preferable aspect of the above-mentioned construction method, when stones are piled up along the back surface of the standing formwork, one end of the fixing cord is fixed to each of at least four corners of the square or rectangular net body. The back side of the erected formwork, in which a connecting string having one end fixed to the front side of the formwork is inserted through a through hole provided in the formwork and led out to the backside of the formwork While covering with a fixed net, the fixed string is connected to the connection string, stones are put between the fixed net and the mold, and stones are piled up along the back surface of the mold, at that time, A granular filler is filled in the gap formed between the stacked stones and the mold. After that, concrete is poured between the formwork and the formwork which is erected so as to face the formwork so as to sandwich the masonry portion. After the concrete is hardened, the connecting cord is separated from the mold to remove the mold, and the filler clogged in the gap between the stone and the mold is removed.

【0016】上記各構築工法は、固定網により石積み部
を型枠に固定状態に保持せしめる工程を経た後に、積み
上げた石と型枠との間に形成された隙間に粒状の充填材
を充填する工程を行うのがよいが、積み上げた石と型枠
との間に形成された隙間に粒状の充填材を充填する工程
を経た後に、固定網により石積み部を型枠に固定状態に
保持せしめる工程を行ってもよい。
In each of the construction methods described above, after the step of holding the masonry portion in a fixed state by the fixed net is performed, the granular filler is filled in the gap formed between the piled stones and the formwork. It is better to perform the process, but after the process of filling the gap formed between the piled stones and the mold with the granular filler, the process of holding the masonry part in the mold by the fixed net You may go.

【0017】本発明に係る構築工法は何れも、連結部材
の一端部分を予め型枠に固定しておき、その他端部分
を、固定網の縁部或いは中間部の所要部位に、結着又は
掛着の手段によって連結するものであってよい。或い
は、連結部材の一端部分を予め固定網の縁部或いは中間
部の所要部位に固定しておき、その他端部分を型枠に固
定するものであってよい。
In each of the construction methods according to the present invention, one end portion of the connecting member is fixed to the formwork in advance, and the other end portion is bonded or hooked to an edge portion of the fixed mesh or a required portion of the intermediate portion. It may be connected by means of wearing. Alternatively, one end portion of the connecting member may be fixed in advance to a required portion of the edge portion or the middle portion of the fixed net, and the other end portion may be fixed to the mold.

【0018】[0018]

【実施例】以下本発明の実施例を図面に基づいて説明す
る。第1実施例 本発明に係る工法の第1の工程は、図1〜2に示すよう
に、立設した型枠1の裏面2に沿って石3を積み上げ、
この積み上げた石を固定網5を用いて型枠1に保持させ
る工程である。そのためには、石積壁体を構築すべき地
盤に、連続するコンクリート基礎6を形成する。然る
後、その一側縁に型枠1を立設する。該型枠1には上下
左右に約50センチメートル間隔で貫通孔7(図4)を
設けてなり、貫通孔の最下段列は、型枠の下端に近接さ
せてある。そして型枠の表面側において図3〜4に示す
ように、各貫通孔7に取り付けロープ9を対応させ、該
取り付けロープ9の中央部位に結着した連結紐10を、
該貫通孔7を内側に挿通して型枠の裏側に突出させ、左
右隣り合うロープ片9,9相互が、ロープ片が張った状
態となるように結ばれている。なお型枠の端部側に位置
するロープ片は、型枠に固着する。
Embodiments of the present invention will be described below with reference to the drawings. First Example In the first step of the construction method according to the present invention, as shown in FIGS. 1 and 2, stones 3 are piled up along the back surface 2 of the standing formwork 1,
This is a step of holding the stacked stones in the formwork 1 using the fixed net 5. For that purpose, a continuous concrete foundation 6 is formed on the ground where the masonry wall body is to be constructed. After that, the formwork 1 is erected on its one side edge. The mold 1 is provided with through holes 7 (FIG. 4) vertically and horizontally at intervals of about 50 cm, and the lowermost row of through holes is close to the lower end of the mold. Then, as shown in FIGS. 3 to 4 on the front surface side of the formwork, the connecting ropes 9 are made to correspond to the respective through holes 7, and the connecting cord 10 bound to the central portion of the attaching ropes 9,
The through hole 7 is inserted inward so as to project to the back side of the mold, and the left and right adjacent rope pieces 9, 9 are connected so that the rope pieces are in a tensioned state. The rope pieces located on the end side of the mold are fixed to the mold.

【0019】前記固定網5は、例えば魚網のような丈夫
な網素材を用いて形成されており、本実施例においては
図5に示すように、一辺が約50センチメートルの正方
形状をなす網本体11の四隅部分の夫々に、固定紐12
の一端を結着してなる。
The fixed net 5 is made of a strong net material such as a fish net, and in this embodiment, as shown in FIG. 5, a net having a square shape with one side of about 50 cm. Each of the four corners of the main body 11 is provided with a fixing cord 12
It is made by binding one end of.

【0020】然して石の積み上げに際しては、図1〜2
に示すように、最下段の左右隣り合う連結紐10a,1
0aに、固定網5の一辺両端の固定紐12a,12aを
対応させて、連結紐の先端部分と固定紐の先端部分とを
結ぶ。これを、型枠の長さ方向に並置される各固定網に
ついて行う。然る後前記基礎6上に、型枠1の裏面に沿
って、前記固定網の一辺長さに合わせて約50センチメ
ートル程度の高さに石を複数段に積み上げる。その際、
積み上げた石と該型枠との間に形成された隙間Gに粒状
の充填材(砂や粒形の小さい砂利、石のくず、紙製のチ
ップ等)13を充填する。
However, when the stones are piled up, as shown in FIGS.
As shown in, the left and right adjacent connecting cords 10a, 1
0a is made to correspond to the fixed strings 12a, 12a at both ends of the fixed net 5, and the tip part of the connecting string and the tip part of the fixed string are tied. This is performed for each fixed net arranged side by side in the length direction of the mold. Then, stones are piled up on the foundation 6 along the back surface of the formwork 1 at a height of about 50 cm according to the length of one side of the fixed net. that time,
The gap G formed between the stacked stones and the mold is filled with a granular filler material (sand or small gravel particles, stone debris, paper chips, etc.) 13.

【0021】その後、図1に示すように固定網を石積み
部15に被せ、該固定網の他片両端の固定紐12b,1
2bを、二段目に位置する左右隣り合う連結紐10b,
10bに対応させて、連結紐の先端部分と固定紐の先端
部分とを、連結紐を張った状態にして結ぶ。これによ
り、石積み部15を型枠1に固定状態に保持せしめる。
固定網の一部分が弛んだ状態にあるときは、固定網5と
型枠1との間に石を投入して固定網が全体的に張った状
態とすることにより、固定網による保持の安定性を増す
ことができる。これを、型枠の長さ方向に、各固定網に
ついて行う。
Thereafter, as shown in FIG. 1, a fixed net is put on the masonry portion 15, and the fixed strings 12b, 1 on both ends of the other end of the fixed net.
2b to the left and right adjacent connecting cords 10b,
Corresponding to 10b, the leading end portion of the connecting cord and the leading end portion of the fixing cord are tied together with the connecting cord in a tensioned state. As a result, the masonry portion 15 is held in the mold 1 in a fixed state.
When a part of the fixed net is in a loose state, stones are put between the fixed net 5 and the form 1 so that the fixed net is entirely stretched, so that the stability of the holding by the fixed net is stable. Can be increased. This is performed for each fixed net in the length direction of the form.

【0022】その後、二段目に位置する左右隣合う連結
紐10b,10bに、図2に示すように、固定網の一辺
両端の固定紐12a,12aを対応させ、連結紐の先端
部分と固定紐の先端部分相互を結び、同図に太い一点鎖
線で示すように、該固定紐5を一段目の石積み部15の
裏面部に垂れた状態にしておく。これを、型枠の長さ方
向に配置される各固定網について行う。然る後、前記石
積み部15上に、前記と同様にして、約50センチメー
トル程度の高さに、型枠裏面2に沿って、複数段に石を
積み上げる。その際前記と同様にして、積み上げた石と
型枠との間に形成された隙間Gに粒状の充填材13を、
適宜押し棒でつついて密に充填する。
After that, as shown in FIG. 2, the fixing cords 12a, 12a at one end of the fixed net are made to correspond to the connecting cords 10b, 10b adjacent to each other on the second stage, and fixed to the tip portion of the connecting cord. The tip portions of the cords are tied together, and the fixed cords 5 are hung on the back surface of the first stage masonry portion 15 as shown by the thick dashed line in the figure. This is performed for each fixed net arranged in the length direction of the mold. Then, stones are piled up on the masonry portion 15 in a plurality of steps along the form back surface 2 at a height of about 50 cm in the same manner as described above. At that time, in the same manner as described above, the granular filler 13 is placed in the gap G formed between the stacked stones and the mold,
If necessary, poke with a push rod and fill it closely.

【0023】その後図2に示すように、前記と同様にし
て、固定網5を該二段目の石積み部15に被せ、その上
端左右の固定紐12b,12bを、三段目に位置する左
右隣り合う連結紐10c,10cに対応させて、連結紐
の先端部分と固定紐の先端部分とを、連結紐を張った状
態にして結ぶ。これにより、石積み部15を型枠1に固
定状態に保持せしめる。これを、型枠の長さ方向に、各
固定網について行う。
Then, as shown in FIG. 2, in the same manner as described above, the fixed net 5 is put on the masonry portion 15 of the second stage, and the fixing cords 12b, 12b on the left and right of the upper end are placed on the left and right sides of the third stage. Corresponding to the adjacent connecting cords 10c, 10c, the leading end portion of the connecting cord and the leading end portion of the fixed cord are tied in a state in which the connecting cord is stretched. As a result, the masonry portion 15 is held in the mold 1 in a fixed state. This is performed for each fixed net in the length direction of the form.

【0024】その後、型枠の高さに応じて、連結紐への
固定網の連結、石積み部上への石の積み上げ、及びそれ
に続く固定網の被せ操作、連結紐と固定紐との連結を行
い、型枠の裏面に沿って積み上げた石を、固定網を介し
て型枠に安定的に固定せしめるのである。
Then, depending on the height of the formwork, connection of the fixed net to the connecting string, stacking of stones on the masonry part, and subsequent covering operation of the fixed net, connection between the connecting string and the fixed string are performed. The stones piled up along the back surface of the formwork are stably fixed to the formwork via a fixed net.

【0025】本発明の次工程は、図2に示すように、前
記型枠1と、石積み部15を挟むように該型枠1に対向
して立設された状態の型枠16とを、型枠と分離可能な
連結棒17で連結し、両型枠1,16間にコンクリート
Cを打設しこれをバイブレータで締め固める。固定網に
よって石積み部が型枠に固定状態に保持されていて石が
動く恐れがないことから、バイブレータによる締め固め
が可能となるのである。前記のように、積み上げた石3
と型枠1との間の隙間Gに目地材13が充填されている
ため、この部分には打設コンクリートが侵入しない。
In the next step of the present invention, as shown in FIG. 2, the mold 1 and the mold 16 in a state of being erected so as to face the mold 1 so as to sandwich the masonry portion 15, It is connected with a connecting rod 17 that can be separated from the form, concrete C is placed between both forms 1 and 16, and this is compacted with a vibrator. The fixed net holds the masonry in a fixed state on the formwork, and there is no risk of the stone moving, so compaction with a vibrator is possible. 3 stones piled up as described above
Since the joint material 13 is filled in the gap G between the mold 1 and the mold 1, the poured concrete does not enter this portion.

【0026】コンクリートが硬化した後、型枠の表面側
で張った状態にある前記取り付けロープ9を、貫通孔7
の近傍において切断する。これによって、連結紐10が
型枠1と分離される。又連結棒17の端部19(図2)
を型枠1,16と分離する。その後型枠1,16を取り
外し、石と型枠の間隙に詰まっている充填材13を排除
し、且つ、仕上げ面20の表面側に露出する紐や、型枠
相互を連結するために用いた連結軸の露出部分を適宜切
除すると、石の凹凸状態が仕上げ面20にそのまま表れ
た図6に示す石積壁体21が構築されることとなる。
After the concrete is hardened, the attachment rope 9 in a state of being stretched on the surface side of the formwork is inserted into the through hole 7
Cut near the. As a result, the connecting string 10 is separated from the formwork 1. Also, the end portion 19 of the connecting rod 17 (FIG. 2)
Is separated from the molds 1 and 16. After that, the molds 1 and 16 were removed, the filler 13 clogged in the gap between the stone and the mold was removed, and the string exposed on the surface side of the finishing surface 20 and the molds were used for connection. By appropriately cutting off the exposed portion of the connecting shaft, the masonry wall body 21 shown in FIG. 6 in which the concavo-convex state of the stone appears on the finished surface 20 as it is.

【0027】図7〜8は、立設した型枠1(又は16)
の裏面2に沿って比較的大きな石3を積み上げると共
に、適宜、隣合う石間等に比較的小さな石3aを配置
し、然る後この石積み部15に、前記と同様構成の固定
網5を被せ、該固定網5により前記石積み部15を型枠
に固定状態に保持せしめ、その後、積み上げた石と型枠
との間に形成された隙間Gに粒状の充填材13を充填す
る工程を説明するものである。その後の工程は前記実施
例における場合と同様である。
7 to 8 show the standing mold 1 (or 16).
The relatively large stones 3 are piled up along the back surface 2 of the, and the relatively small stones 3a are appropriately arranged between adjacent stones, and then the fixed net 5 having the same structure as the above is placed in the stone pile portion 15. The step of covering and holding the masonry portion 15 in a fixed state in the mold by the fixed net 5, and then filling the gap G formed between the piled stones and the mold with the granular filler 13 will be described. To do. Subsequent steps are the same as those in the above embodiment.

【0028】図9に一点鎖線で囲んで示すように、石積
み部15と対向して立設される型枠16は、既設のコン
クリート壁体であってもよい。又石積み部を支持する型
枠1は、垂直状態の他、傾斜状態や湾曲状態で立設され
ることもある。図7は傾斜状態で立設された場合を示
す。
As shown by the one-dot chain line in FIG. 9, the formwork 16 standing upright against the masonry portion 15 may be an existing concrete wall. Further, the formwork 1 supporting the masonry portion may be erected in an inclined state or a curved state in addition to the vertical state. FIG. 7 shows a case in which it is erected in an inclined state.

【0029】石積み部と対向して立設された型枠16に
も同様にして、図2に一点鎖線で示すように、固定網5
を用いて石積み部15を型枠16に保持させることがあ
る。その要領は前記と同様である。
In the same manner, the fixed net 5 as shown by the alternate long and short dash line in FIG.
May be used to hold the masonry portion 15 in the formwork 16. The procedure is the same as above.

【0030】図10は、立設した型枠1の裏面を固定網
5でゆとりを以て覆い、固定網5と型枠1との間に袋状
部22を形成し、この袋状部に石を投入する本発明の他
の実施例を示すものである。
In FIG. 10, the back surface of the standing mold 1 is covered with a fixed net 5 with a clearance, and a bag-like portion 22 is formed between the fixed net 5 and the mold 1, and a stone is placed in the bag-like portion. It shows another embodiment of the present invention to be charged.

【0031】これを、前記実施例における型枠1と固定
網5を用いる場合を例にとって説明すると、固定網5の
下、上の固定紐12a,12bを、型枠の裏側において
前記と同様にして突設してなる下、上の連結紐10a,
10bに対応させ、連結紐の先端部分と固定紐の先端部
分とを結着等の手段によって固定状態に連結23し、型
枠の裏面側に、該固定網による前記袋状部22を形成す
る。然る後、該袋状部22内に石3を投入し、その際、
石3と型枠1との間に形成された隙間Gに充填材13を
充填して、袋状部22が石で膨れた状態とすることによ
り、前記と同様にして、型枠1の裏面に沿って石3が積
み上げられた状態となる。その後におけるコンクリート
の打設及び脱型の工程は前記実施例における場合と同様
である。
This will be explained by taking as an example the case where the mold 1 and the fixed net 5 in the above-mentioned embodiment are used, and the fixing cords 12a and 12b above and below the fixed net 5 are the same as above on the back side of the mold. Lower and upper connecting cords 10a,
Corresponding to 10b, the tip portion of the connecting cord and the tip portion of the fixing cord are fixedly connected 23 by means of binding or the like, and the bag-like portion 22 is formed on the back surface side of the formwork by the fixing net. . After that, the stone 3 is put into the bag-shaped portion 22, and at that time,
By filling the gap G formed between the stone 3 and the mold 1 with the filler 13 so that the bag-shaped portion 22 is swollen with the stone, the back surface of the mold 1 is processed in the same manner as described above. Stones 3 are piled up along with. Subsequent steps of concrete pouring and demolding are the same as those in the above embodiment.

【0032】前記各実施例においては、型枠の裏側に突
出する連結紐10と固定網に突設した固定紐12とから
なる連結部材によって固定網が型枠に固定されている
が、該連結部材は、1本の連続した紐を持って構成して
もよい。例えば前記連結紐を長く形成し、その端部分
を、固定網の網目に通して該固定網に結着等によって固
定状態に連結することができる。或いは、前記固定紐を
長く形成して、これを型枠に設けた貫通孔に型枠表側に
向けて挿通せしめ、例えば隣合う固定紐の端部分相互を
結着する等によって、固定紐の端部分を型枠の表面側に
固着してもよい。又該連結部材は可撓性を有さないもの
を用いてもよく、その場合は、先端に鉤状部を設け、そ
れを固定網の所要の網目に掛着させてもよい。
In each of the above-mentioned embodiments, the fixed net is fixed to the mold by the connecting member consisting of the connecting cord 10 protruding to the back side of the form and the fixed string 12 protruding from the fixed net. The member may be constructed with a single continuous string. For example, the connecting cord can be formed long, and its end portion can be passed through the mesh of the fixed net and connected to the fixed net in a fixed state by binding or the like. Alternatively, the length of the fixing cord may be increased, and the fixing cord may be inserted into a through hole provided in the mold toward the front side of the mold. For example, the end portions of the adjacent fixing cords may be bonded to each other. You may fix a part to the surface side of a formwork. Further, the connecting member may be one having no flexibility, and in that case, a hook-like portion may be provided at the tip and the hook may be hooked on a required mesh of the fixed mesh.

【0033】又、前記実施例において説明したように、
積み上げた石と型枠との間に形成された隙間に粒状の充
填材を充填する工程は、石を積み上げつつ行ってもよい
し、石を固定網で固定状態に保持した後に行ってもよ
い。なお固定網の大きさは、石の大きさに合わせて、例
えば50センチメートル四方のものや1メートル四方の
もの等に設定される。又固定網は金網であってもよい。
Further, as explained in the above embodiment,
The step of filling the granular filler in the gap formed between the stacked stones and the mold may be performed while the stones are being stacked, or may be performed after the stones are held in a fixed state by a fixed net. . The size of the fixed net is set, for example, to a size of 50 cm square or a 1 m square according to the size of the stone. The fixed net may be a wire net.

【0034】[0034]

【発明の効果】本発明は以下の如き優れた効果を奏す
る。 型枠の裏面に沿って石を積み上げることから、図6
に示すように、石積み部の仕上げ面23が、平面や湾曲
面に自ずから正しく仕上がることになる。従って、熟練
者でなくても見栄えのよい石積み仕上げ面を容易に形成
できる。
The present invention has the following excellent effects. From stacking stones along the back of the formwork,
As shown in FIG. 3, the finished surface 23 of the masonry portion is naturally finished as a flat surface or a curved surface. Therefore, even an unskilled person can easily form a masonry finished surface that looks good.

【0035】 又、石積み部を固定網で型枠に保持さ
せるため、積み上げられた石が、所定の位置に安定した
固定状態となる。従って、型枠間に打設したコンクリー
トをバイブレータで締め固めることが可能となり、充填
材の充填部分を除く石積み部の隙間にコンクリートを密
に充填することができ、従来のように、石間の隙間に空
洞を生じさせる恐れがない。それ故従来のように、石積
壁体内への水の侵入を招きにくく、コンクリートの剥離
によって石が脱落する危険を回避でき、構造的に非常に
安定した安全性の高い石積壁体を構築することができ
る。
Further, since the masonry portion is held on the formwork by the fixed net, the piled stones are stably fixed at a predetermined position. Therefore, it becomes possible to compact the concrete placed between the formwork with a vibrator, and the concrete can be densely filled in the gaps in the masonry portion excluding the portion filled with the filler, and as in the conventional case, There is no fear of creating voids in the gap. Therefore, as in the past, it is difficult to invade water into the masonry wall, avoiding the risk of stone falling off due to concrete peeling, and constructing a structurally highly stable masonry wall. You can

【0036】 従来工法においては、打設コンクリー
トの硬化を待つために、数日の間隔をおいて石を一段づ
つ積み上げなければならなかったのであるが、固定網に
よって石を型枠に保持させる本発明によるときは、石が
崩れる恐れがないため、型枠の所要高さにまで石を高く
積み上げることが可能である。従って、石を積み上げた
部分の全体に亘って、型枠間にコンクリートを一度に打
設することが可能となり、従来に比しコンクリートの打
設作業を極めて能率化でき、工期の大幅な短縮及び施工
コストの低減を期しうることとなる。
In the conventional method, stones had to be stacked one by one at intervals of several days in order to wait for the setting concrete to harden. According to the invention, since there is no risk of the stones collapsing, it is possible to stack stones up to the required height of the formwork. Therefore, it is possible to pour concrete between the formwork at one time over the entire part where the stones are piled up, and the concrete pouring work can be made extremely efficient as compared with the conventional one, and the construction period can be greatly shortened. It will be possible to reduce the construction cost.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の構築工法を説明する斜視図である。FIG. 1 is a perspective view illustrating a construction method of the present invention.

【図2】本発明の構築工法を説明する断面図である。FIG. 2 is a cross-sectional view illustrating a construction method of the present invention.

【図3】連結紐を型枠に固定させる態様の一例を説明す
る斜視図である。
FIG. 3 is a perspective view illustrating an example of a mode in which a connecting string is fixed to a mold.

【図4】その断面図である。FIG. 4 is a sectional view thereof.

【図5】固定網を示す斜視図である。FIG. 5 is a perspective view showing a fixed net.

【図6】構築された石積壁体を示す斜視図である。FIG. 6 is a perspective view showing the constructed masonry wall body.

【図7】型枠の裏面に沿って積み上げた石を型枠に保持
させる他の要領を説明する平面図である。
FIG. 7 is a plan view illustrating another way of holding stones piled up along the back surface of the mold in the mold.

【図8】型枠の裏面に沿って積み上げた石を型枠に保持
させる他の要領を説明する側面図である。
FIG. 8 is a side view illustrating another way of holding stones piled up along the back surface of the mold in the mold.

【図9】本発明の構築工法の他の態様を説明する断面図
である。
FIG. 9 is a cross-sectional view illustrating another aspect of the construction method of the present invention.

【図10】本発明に係る構築工法のその他の態様を説明
する断面図である。
FIG. 10 is a cross-sectional view illustrating another aspect of the construction method according to the present invention.

【符号の説明】[Explanation of symbols]

1 型枠 2 型枠の裏面 3 石 5 固定網 6 コンクリート基礎 7 貫通孔 9 取り付けロープ 10 連結紐 11 網本体 12 固定紐 13 充填材 15 石積み部 22 袋状部 1 Formwork 2 Backside of Formwork 3 Stone 5 Fixed Net 6 Concrete Foundation 7 Through Hole 9 Attachment Rope 10 Connecting String 11 Net Main Body 12 Fixing String 13 Filling Material 15 Masonry Part 22 Bag-shaped Part

Claims (11)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 立設した型枠の裏面に沿って石を積み上
げ、この石を型枠に保持させるに際し、積み上げた石と
型枠との間に形成された隙間に粒状の充填材を充填する
工程と、所要幅及び所要高さ分の石積み部をひとまとま
りとして、これに固定網を被せ、該固定網の縁部或いは
中間部の所要部位を、型枠に設けた貫通孔を挿通する連
結部材を介して、型枠の表側で該型枠に固定せしめ、該
固定網により前記石積み部を該型枠に固定状態に保持せ
しめる工程とを含むものとし、 その後、前記型枠と、石積み部を挟むように該型枠に対
向して立設せしめられた状態にある型枠との間にコンク
リートを打設し、 該コンクリートの硬化後、連結部材を前記型枠と分離し
て該型枠を取り外すと共に、石と型枠との間隙に詰まっ
ていた前記充填材を排除することを特徴とする石積壁体
の構築工法。
1. A stone is piled up along the back surface of a standing formwork, and when this stone is held by the formwork, a granular filler is filled in a gap formed between the piled up stone and the formwork. Step, and the stone masonry part of required width and required height as one group, cover this with a fixed net, and insert the through hole provided in the form into the required part of the edge or intermediate part of the fixed net. Fixing the front side of the formwork to the formwork via a connecting member, and holding the masonry part in the formwork in a fixed state by the fixed net; thereafter, the formwork and the masonry part Concrete is placed between the mold and the mold in a state of being erected so as to face the mold so as to sandwich the mold, and after the concrete is hardened, the connecting member is separated from the mold to separate the mold. And remove the filler that was clogged in the gap between the stone and the formwork. Construction method of the masonry wall characterized by Rukoto.
【請求項2】 立設した型枠の裏面に沿って石を積み上
げ、この石を型枠に保持させるに際し、積み上げた石と
型枠との間に形成された隙間に粒状の充填材を充填する
工程と、正方形状或いは矩形状をなす網本体の少なくと
も四隅部分の夫々に、固定紐の一端を固着してなる固定
網を用い、且つ、型枠の表側に一端が固着された連結紐
を、該型枠に設けた貫通孔を挿通せしめて型枠の裏側に
導き出し、所要幅及び所要高さ分の石積み部をひとまと
まりとして、これに前記固定網を被せ、前記固定紐を前
記連結紐に連結し、これによって、固定網により石積み
部を型枠に固定状態に保持せしめる工程とを含むものと
し、 その後、前記型枠と、石積み部を挟むように該型枠に対
向して立設せしめられた状態にある型枠との間にコンク
リートを打設し、 該コンクリートの硬化後、連結紐を前記型枠と分離して
該型枠を取り外すと共に、石と該型枠との間隙に詰まっ
ていた前記充填材を排除することを特徴とする石積壁体
の構築工法。
2. A stone is piled up along the back surface of a standing formwork, and when this stone is held by the formwork, a granular filler is filled in a gap formed between the piled up stone and the formwork. And a connecting net having one end fixed to the front side of the form, using a fixed net formed by fixing one end of the fixing cord to each of at least four corners of the net body having a square shape or a rectangular shape. , The through hole provided in the mold is inserted and led out to the back side of the mold, and the fixed net is put on the masonry portion of the required width and the required height as a unit, and the fixing cord is the connecting cord. And the step of holding the masonry portion in a fixed state by the fixed net by the fixed net, and thereafter, standing upright the said masonry and the masonry portion so as to sandwich the masonry portion. Concrete between the formwork in the fixed condition After the hardening of the concrete, the connection string is separated from the formwork, the formwork is removed, and the filling material clogged in the gap between the stone and the formwork is removed. Construction method.
【請求項3】 石積み部に被って該石積み部を型枠に固
定状態に保持せしめた状態にある固定網と石積み部との
間に、適宜石を投入して、固定網が全体的に張った状態
とすることを特徴とする請求項1又は2記載の石積壁体
の構築工法。
3. A fixed net is stretched as a whole by appropriately inserting stones between the fixed net and the masonry which are in a state of covering the masonry with the masonry fixed to the formwork. The method for constructing a masonry wall body according to claim 1 or 2, characterized in that the construction is performed.
【請求項4】 立設した型枠の裏面に沿って積み上げら
れた石積み部を挟むように該型枠に対向して立設せしめ
られた状態にある型枠にも、その裏面に沿って石を積み
上げ、この石を型枠に保持させるに際し、積み上げた石
と該型枠との間に形成された隙間に粒状の充填材を充填
する工程と、所要幅及び所要高さ分の石積み部をひとま
とまりとして、これに固定網を被せ、該固定網の縁部或
いは中間部の所要部位を、該型枠に設けた貫通孔を挿通
する連結部材を介して、型枠の表側において該型枠に固
定せしめ、該固定網により石積み部を型枠に固定状態に
保持せしめる工程とを含むものとし、 その後、両型枠間にコンクリートを打設し、 該コンクリートの硬化後、連結部材を前記型枠と分離し
て該型枠を取り外すと共に、石と型枠との間隙に詰まっ
ていた前記充填材を排除することを特徴とする石積壁体
の構築工法。
4. A formwork in a state of being erected so as to face the formwork so as to sandwich a masonry portion piled up along the backside of the upright formwork also has stones along the backside thereof. When stacking the stones and holding the stones in the formwork, a step of filling a granular filler in the gap formed between the stacked stones and the formwork, As a unit, it is covered with a fixed mesh, and the required portion of the edge or the intermediate portion of the fixed mesh is connected to the front side of the mold via a connecting member that is inserted through a through hole provided in the mold. And fixing the masonry portion to the formwork in a fixed state by the fixed net, and then placing concrete between both formwork, and after hardening the concrete, the connecting member is connected to the formwork. And the mold is removed to separate the gap between the stone and the mold. Construction method of masonry wall, characterized in that to eliminate the filler which was clogged.
【請求項5】 立設した型枠の裏面に沿って積み上げら
れた石積み部を挟むように該型枠に対向して立設せしめ
られた状態にある型枠にも、その裏面に沿って石を積み
上げ、この石を型枠に保持させるに際し、積み上げた石
と型枠との間に形成された隙間に粒状の充填材を充填す
る工程と、正方形状或いは矩形状をなす網本体の少なく
とも四隅部分の夫々に、固定紐の一端を固着してなる固
定網を用い、且つ、型枠の表側に一端が固着された連結
紐を、該型枠に設けた貫通孔を挿通せしめて型枠の裏側
に導き出し、所要幅及び所要高さ分の石積み部をひとま
とまりとして、これに前記固定網を被せ、前記固定紐を
前記連結紐に連結し、これによって、固定網により石積
み部を型枠に固定状態に保持せしめる工程とを含むもの
とし、 その後、両型枠間にコンクリートを打設し、 該コンクリートの硬化後、連結紐を前記型枠と分離して
該型枠を取り外すと共に、石と型枠との間隙に詰まって
いた前記充填材を排除することを特徴とする石積壁体の
構築工法。
5. A stonework along the back surface of a formwork that is erected so as to face the formwork so as to sandwich a masonry portion stacked along the backside surface of the upright formwork. When stacking the stones and holding the stones in the formwork, the step of filling the gaps formed between the stacked stones and the formwork with granular filler, and at least the four corners of the square or rectangular net body A fixed net formed by fixing one end of a fixed cord to each of the parts is used, and a connecting cord whose one end is fixed to the front side of the mold is inserted through a through hole provided in the mold to form a mold. Leading to the back side, the stone masonry part of the required width and the required height is taken as a group, the fixed net is covered on this, and the fixed cord is connected to the connecting cord, whereby the masonry part is fixed to the formwork by the fixed net. And the step of holding it in a fixed state. Placing concrete between the frames, and after hardening the concrete, separating the connecting cord from the formwork and removing the formwork, and removing the filler clogged in the gap between the stone and the formwork. Construction method of masonry wall.
【請求項6】 立設した型枠の裏面に沿って石を積み上
げるに際し、立設した型枠の裏面を固定網で覆い、該固
定網の縁部或いは中間部の所要部位を、型枠に設けた貫
通孔を挿通する連結部材を介して、型枠の表側で該型枠
に固定せしめ、該固定網と型枠との間に石を投入して、
型枠の裏面に沿って石を積み上げ状態とし、その際、積
み上げた石と型枠との間に形成された隙間に粒状の充填
材を充填し、 その後、前記型枠と、石積み部を挟むように該型枠に対
向して立設せしめられた状態にある型枠との間にコンク
リートを打設し、 該コンクリートの硬化後、連結部材を前記型枠と分離し
て該型枠を取り外すと共に、石と該型枠との間隙に詰ま
っていた前記充填材を排除することを特徴とする石積壁
体の構築工法。
6. When stacking stones along the back surface of an upright mold, the back surface of the upright mold is covered with a fixed mesh, and the required portion of the edge or the middle part of the fixed mesh is used as a mold. Through the connecting member that passes through the provided through-hole, fixed to the mold on the front side of the mold, and put a stone between the fixed net and the mold,
The stones are piled up along the back surface of the formwork, in which case the granular filler is filled in the gap formed between the piled stones and the formwork, and then the formwork and the masonry section are sandwiched. Concrete is placed between the mold and the mold in a state of being erected so as to face the mold, and after the concrete hardens, the connecting member is separated from the mold and the mold is removed. At the same time, the method for constructing a masonry wall body is characterized in that the filler filled in the gap between the stone and the mold is removed.
【請求項7】 立設した型枠の裏面に沿って石を積み上
げるに際し、正方形状或いは矩形状をなす網本体の少な
くとも四隅部分の夫々に、固定紐の一端を固着してなる
固定網を用い、且つ、型枠の表側に一端が固着された連
結紐を、該型枠に設けた貫通孔を挿通せしめて型枠の裏
側に導き出し、立設した型枠の裏面を固定網で覆うと共
に、前記固定紐を前記連結紐に連結し、該固定網と型枠
との間に石を投入して、型枠の裏面に沿って石を積み上
げ状態とし、その際、積み上げた石と型枠との間に形成
された隙間に粒状の充填材を充填し、 その後、前記型枠と、石積み部を挟むように該型枠に対
向して立設せしめられた状態にある型枠との間にコンク
リートを打設し、 該コンクリートの硬化後、連結紐を前記型枠と分離して
該型枠を取り外すと共に、石と型枠との間隙に詰まって
いた前記充填材を排除することを特徴とする石積壁体の
構築工法。
7. A fixed net formed by fixing one end of a fixed string to each of at least four corners of a net body having a square shape or a rectangular shape when stacking stones along the back surface of an upright formwork. And, a connecting string having one end fixed to the front side of the form is led out to the back side of the form by inserting a through hole provided in the form, and the back surface of the standing form is covered with a fixed net, The fixed string is connected to the connection string, stones are put between the fixed net and the form, and stones are piled up along the back surface of the form, in which case the piled stone and the form Between the mold and the mold in a state of being erected so as to face the mold so as to sandwich the masonry portion, after filling the gap formed between After placing concrete, after hardening the concrete, separate the connecting cord from the formwork and remove the formwork. Both construction method of the masonry wall, characterized in that to eliminate the filler packed in the gap between the stone and the mold.
【請求項8】 固定網により石積み部を型枠に固定状態
に保持せしめる工程を経た後に、積み上げた石と型枠と
の間に形成された隙間に粒状の充填材を充填する工程を
行うことを特徴とする請求項1、2、4、5又は6記載
の石積壁体の構築工法。
8. A step of filling the gap formed between the piled stones and the mold with a granular filler after the step of holding the masonry portion in the mold in a fixed state by a fixed net. The method for constructing a masonry wall body according to claim 1, 2, 4, 5, or 6.
【請求項9】 積み上げた石と型枠との間に形成された
隙間に粒状の充填材を充填する工程を経た後に、固定網
により石積み部を型枠に固定状態に保持せしめる工程を
行うことを特徴とする請求項1、2、4、5又は6記載
の石積壁体の構築工法。
9. A step of holding a masonry part in a fixed state by a fixed net after a step of filling a granular filler in a gap formed between the piled stones and the mold The method for constructing a masonry wall body according to claim 1, 2, 4, 5, or 6.
【請求項10】 連結部材は、その一端部分が予め型枠
に固定されており、その他端部分を、固定網の縁部或い
は中間部の所要部位に、結着又は掛着の手段によって連
結することを特徴とする請求項1、4又は6記載の石積
壁体の構築工法。
10. The connecting member has one end portion fixed in advance to the formwork, and the other end portion is connected to a required portion of an edge portion or an intermediate portion of the fixed net by a binding or hooking means. The method for constructing a masonry wall body according to claim 1, 4, or 6.
【請求項11】 連結部材は、その一端部分が予め、固
定網の縁部或いは中間部の所要部位に固定されており、
その他端部分を型枠に固定することを特徴とする請求項
1、4又は6記載の石積壁体の構築工法。
11. The connecting member has one end portion fixed in advance to a required portion of an edge portion or an intermediate portion of the fixed net,
The method for constructing a masonry wall body according to claim 1, 4 or 6, wherein the other end portion is fixed to the formwork.
JP18997594A 1994-07-19 1994-07-19 Construction method of masonry wall Expired - Fee Related JP2684160B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18997594A JP2684160B2 (en) 1994-07-19 1994-07-19 Construction method of masonry wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18997594A JP2684160B2 (en) 1994-07-19 1994-07-19 Construction method of masonry wall

Publications (2)

Publication Number Publication Date
JPH0827820A JPH0827820A (en) 1996-01-30
JP2684160B2 true JP2684160B2 (en) 1997-12-03

Family

ID=16250314

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18997594A Expired - Fee Related JP2684160B2 (en) 1994-07-19 1994-07-19 Construction method of masonry wall

Country Status (1)

Country Link
JP (1) JP2684160B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115217069B (en) * 2021-04-19 2023-09-22 河南正合建筑科技有限公司 Silt dam with net template combined with net template box body and construction method of silt dam

Also Published As

Publication number Publication date
JPH0827820A (en) 1996-01-30

Similar Documents

Publication Publication Date Title
JPH06193068A (en) Earth retaining method
JP2684160B2 (en) Construction method of masonry wall
JP3006954U (en) Fixed net for building masonry walls
JP2001279695A (en) Block for greening retaining wall, and method and device for manufacturing the same
JPH0122405B2 (en)
JP3034215B2 (en) Formwork device for masonry wall construction and method of constructing masonry wall using it
JP2726983B2 (en) Formwork for manufacturing hollow concrete block mat and method for forming hollow section
JP2633199B2 (en) How to build a concrete foundation
JP3646265B2 (en) Retaining wall block manufacturing method
JP2698563B2 (en) Construction method of surface natural stone, back concrete casting structure
JP2834796B2 (en) Embankment slope formation method
JP2003034938A (en) Block for retaining wall
JPH11172701A (en) Method for constructing masonry wall
JP2005344349A (en) Method for constructing concrete structure by using permanent form and soil concrete
JP3047290B2 (en) Formwork for concrete casting
JPH11200392A (en) Greening block for retaining wall
JP2599974Y2 (en) Unit for civil engineering structures
JP2003334807A (en) Form for manufacturing block and method for manufacturing block having natural stone decorative surface using form
JP2670535B2 (en) Artificial megalith formwork and method for manufacturing artificial megalith
JP3027106B2 (en) Landscape landscape formwork applied to concrete structures and landscape landscape formwork
JP3816067B2 (en) Residual formwork method in concrete structures
JP3009588U (en) Surface gabion-like united concrete block
JPS6115085Y2 (en)
JP2004106505A5 (en)
JPH0637041B2 (en) Manufacturing method of natural stone bonded block

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19970701

LAPS Cancellation because of no payment of annual fees