JP2681250B2 - Breaking power pole temporary support method and temporary support - Google Patents

Breaking power pole temporary support method and temporary support

Info

Publication number
JP2681250B2
JP2681250B2 JP13904293A JP13904293A JP2681250B2 JP 2681250 B2 JP2681250 B2 JP 2681250B2 JP 13904293 A JP13904293 A JP 13904293A JP 13904293 A JP13904293 A JP 13904293A JP 2681250 B2 JP2681250 B2 JP 2681250B2
Authority
JP
Japan
Prior art keywords
utility pole
pole
broken
tubular body
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP13904293A
Other languages
Japanese (ja)
Other versions
JPH06323040A (en
Inventor
邦雄 村田
賢二 加納
国夫 斉木
昌彦 荒木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chubu Electric Power Co Inc
Original Assignee
Chubu Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chubu Electric Power Co Inc filed Critical Chubu Electric Power Co Inc
Priority to JP13904293A priority Critical patent/JP2681250B2/en
Publication of JPH06323040A publication Critical patent/JPH06323040A/en
Application granted granted Critical
Publication of JP2681250B2 publication Critical patent/JP2681250B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は高圧配電線路の電柱が
車両の衝突とか自然災害等により根元付近より折損した
場合、電柱の地中残存部を利用して支柱を建て、地上残
存部を支柱で支え速やかに送電復旧を可能とする折損電
柱仮支持工法およびその仮支柱に関する。
BACKGROUND OF THE INVENTION The present invention relates to a structure in which when a utility pole of a high-voltage power distribution line is damaged from the root due to a vehicle collision, natural disaster, etc., a pillar is built using the remaining portion of the utility pole and the remaining portion on the ground is used as a pillar. The present invention relates to a temporary support method for a broken power pole and a temporary support pole for the power pole, which enables quick restoration of power transmission.

【0002】[0002]

【従来の技術】電柱が根元付近で折損した場合、仮復旧
のため、地中に残存する電柱の管状内壁を利用し、単純
な杭状の支柱を挿入し、その内壁と支柱との隙間に土砂
とか固形物を詰めて固定し、その支柱に折損電柱をワイ
ヤー等で縛付けて固定する方法がある。
2. Description of the Related Art When a utility pole breaks near its root, a simple pile-shaped support pole is inserted using the tubular inner wall of the utility pole that remains in the ground for temporary restoration, and a gap is created between the inner wall and the support pole. There is a method in which earth and sand or solid matter is packed and fixed, and a broken utility pole is tied to the support pillar with a wire or the like.

【0003】[0003]

【発明が解決しようとする課題】従来の仮支柱による固
定方法では地中の残存電柱と支柱囲りの隙間に土砂等を
均等に詰める作業、ワイヤーで縛り付ける作業等に人
手、労力、長時間を要し、直立させることが困難で、か
つ、強度上の問題があり、新しい電柱に取替えに際し、
その仮支柱を引抜くとき、狭い間隙に固く詰めた土砂等
を取出すことは容易でなく、仮支柱の引抜きは困難とな
る等の問題があった。
In the conventional fixing method using a temporary support, it takes time, labor, and a long time to evenly fill the space between the remaining utility poles in the ground and the support surroundings with earth and sand, and to tie it with a wire. It is difficult to stand upright, and there is a problem with strength, so when replacing with a new utility pole,
When pulling out the temporary support, it is not easy to take out the earth and sand or the like tightly packed in the narrow gap, and it is difficult to pull out the temporary support.

【0004】本復旧には事故、災害等の度合いにもよる
が、何か月も先になる場合が多く、仮復旧といえども折
損電柱を短時間で強固に安定して支持しなければならな
いが、従来の仮支持工法と仮支柱では長時間を要し、強
固に安定して支持することは極めて困難であった。
Although depending on the degree of accident, disaster, etc., this restoration is often months ahead, and even in the case of temporary restoration, the broken pole must be firmly and stably supported in a short time. However, it takes a long time with the conventional temporary support construction method and the temporary support, and it has been extremely difficult to firmly and stably support them.

【0005】この発明は折損電柱の地中残存部の管状孔
を利用して支柱の埋込み部をその地中残存部に挿入し、
管体の回転軸を廻して埋込み部に内蔵したアウトリガー
を突出させて地中残存部の内壁に圧接して支柱を迅速に
立て、支柱上部の拘持部と折損電柱の地上残存部とにチ
ェーン等を巻付け、締付け具で固定する簡単な作業で折
損電柱の仮支持をし、迅速、的確に送電復旧を可能とす
る折損電柱仮支持工法及び仮支柱を提供することを目的
とする。
According to the present invention, the embedded portion of the column is inserted into the remaining portion of the underground by utilizing the tubular hole of the remaining portion of the broken utility pole in the underground,
Rotate the rotation axis of the pipe to project the outrigger built in the embedded part and press it against the inner wall of the underground remaining part to quickly stand up the pillar, and chain it to the holding part of the upper part of the pillar and the ground remaining part of the broken utility pole. An object of the present invention is to provide a temporary support method for a broken utility pole and a temporary support pole that temporarily and accurately support the broken utility pole by a simple work of winding and fixing the same with a fastener.

【0006】[0006]

【課題を解決するための手段】この発明の折損電柱仮支
持工法は下部を折損電柱の地中残存部の孔に挿入する埋
込み部、上部を折損電柱の地上残存部に添わせる電柱支
持部とした管体の埋込み部を折損電柱の地中残存部の孔
に挿入してから、管体内に備えた回転軸を適宜操作手段
で回動させて作動軸、起伏アームを介して複数のアウト
リガーを埋込み部周面の貫通孔を通じて外方へ突出させ
て地中残存部の孔の内壁に圧接固定させ、次いで、管体
の電柱支持部に折損電柱の地上残存部を適宜移動手段で
近付け、該地上残存部と電柱支持部の複数箇所の電柱拘
持部にチェーン、ワイヤー等を巻付け適宜締付け具で締
付け、支柱で折損電柱を仮支持するものである。
SUMMARY OF THE INVENTION A temporary support method for a broken utility pole of the present invention comprises a buried portion for inserting a lower portion into a hole in a remaining portion of a broken utility pole in the ground, and an upper portion for a utility pole support portion to be attached to a remaining portion of the broken power pole on the ground. After inserting the embedded part of the tubular body into the hole of the underground remaining part of the broken utility pole, rotate the rotating shaft provided in the tubular body by an appropriate operating means to operate a plurality of outriggers via the operating shaft and the undulating arm. By protruding outward through the through hole of the embedded portion peripheral surface to press-contact and fix to the inner wall of the hole of the underground residual portion, then bring the ground residual portion of the broken utility pole closer to the utility pole support portion of the tubular body by an appropriate moving means, Chains, wires, etc. are wound around the utility pole holding portions at a plurality of places on the ground remaining portion and the utility pole support portion, and are appropriately tightened with a tightening tool, and the broken utility pole is temporarily supported by the support pillar.

【0007】また、折損電柱仮支柱は長尺の管体の下部
を折損電柱の地中残存部の孔に挿入する埋込み部、その
上部を折損電柱の地上残存部に添わせる電柱支持部と
し、管体内に備えた回転軸に関連作動可能に連設させる
作動軸の運動により起伏アームを介してアウトリガーを
作動軸と直交する方向の運動に変換させ埋込み部周面の
貫通孔を通じて出没可能とし、該アウトリガーを地中残
存部の孔の内壁に圧接固定可能に設け、かつ、前記上部
支持部の複数箇所に任意の間隔をおいて電柱拘持部を備
えたものである。
Further, the breakage pole utility pole support is an embedded section in which the lower part of a long tubular body is inserted into a hole in the remaining portion of the breakage pole, and the upper part thereof is a utility pole support section to be attached to the ground retention section of the breakage pole. By the movement of the operating shaft that is operatively linked to the rotating shaft provided in the tubular body, the outrigger is converted into the motion in the direction orthogonal to the operating shaft through the undulating arm, and it is possible to appear and disappear through the through hole in the embedded surface. The outrigger is provided so as to be capable of being pressed and fixed to the inner wall of the hole of the remaining portion in the ground, and the electric pole holding portions are provided at a plurality of positions of the upper support portion at arbitrary intervals.

【0008】アウトリガーを地中残存部の内壁に圧接固
定する手段として、管体の上部の電柱支持部より下部の
埋込み部へ回転軸を回転自由に備え、埋込み部内におい
て回転軸の回転運動を軸方向の摺動運動に変換可能に作
動軸を連設し、該作動軸に所定間隔で起伏アームを起伏
自在に連結し、該アームにアウトリガーを枢支するとと
もに該アウトリガーを管体内に備える支持側板に前記作
動軸と直交方向に穿ったガイド溝に沿って移動可能に設
け、作動軸の摺動運動でアウトリガーを貫通孔を通じて
出没可能に設け、地中残存部の内壁に圧接固定可能とす
る。
As a means for fixing the outrigger to the inner wall of the remaining part in the ground by pressure, a rotary shaft is rotatably provided in the embedded part below the electric pole support part in the upper part of the tubular body, and the rotary motion of the rotary shaft is set in the embedded part. Supporting plate which is provided with an operating shaft that is convertible into a sliding motion in a predetermined direction, and to which an undulating arm is movably connected to the operating shaft at a predetermined interval so as to pivotally support an outrigger and to equip the outrigger in a tubular body. Is provided so as to be movable along a guide groove formed in the direction orthogonal to the operating shaft, and the outrigger can be retracted through the through hole by the sliding movement of the operating shaft so that it can be pressed and fixed to the inner wall of the underground remnant.

【0009】管体内に備えた回転軸の操作部を管体の電
柱支持部の上端に位置させ、上端に吊下げ部付き開閉蓋
を設けるか、或いは、管体の電柱支持部と埋込み部を分
離構造として相互に嵌合可能に設け、埋込み部の上部に
回転軸の操作部を備えるものである。
The operating portion of the rotary shaft provided in the pipe is located at the upper end of the electric pole support of the pipe, and an opening / closing lid with a hanging portion is provided at the upper end, or the electric pole support and the embedded portion of the pipe are installed. As a separate structure, they are provided so that they can be fitted to each other, and an operating part for the rotating shaft is provided on the upper part of the embedded part.

【0010】[0010]

【作用】高圧配電線路の電柱が根元付近より折損した場
合、先ず、管体の下部の埋込み部を折損電柱の地中残存
部の孔に挿入し、管体上端の蓋を開けて回転軸の操作部
を適宜操作手段で回動して作動軸、起伏アームを介して
各アウトリガーを作動軸に直交する方向に作動させ、埋
込み部周面の貫通孔を通じて突出させて地中残存部の孔
の内壁に圧接固定させ、支柱を地中残存部に直立状に立
てる。
[Operation] When the utility pole of the high-voltage power distribution line is broken from near the root, first insert the embedded part at the bottom of the tube into the hole in the remaining part of the broken utility pole, open the lid at the top of the tube and open the rotary shaft. The operation part is rotated by an appropriate operation means to actuate each outrigger in the direction orthogonal to the actuation axis via the actuation shaft and the undulating arm, and the outriggers are projected through the through holes on the peripheral surface of the embedded part so that the holes of the remaining part in the ground are It is fixed by pressure to the inner wall, and the column is erected upright on the remaining part in the ground.

【0011】管体の電柱支持部と埋込み部が分離構造の
場合は、上部の電柱支持部を分離して下部の埋込み部を
地中残存部の孔に挿入し、埋込み部の回転軸の操作部を
操作して前記と同様に埋込み部を地中残存部の孔の内壁
に圧接固定し、その埋込み部に上部の電柱支持部を嵌合
固定し、支柱を直立状に立てる。
When the electric pole support portion and the embedding portion of the tubular body are separated structures, the upper electricity pole support portion is separated and the lower embedding portion is inserted into the hole in the remaining portion in the ground, and the rotating shaft of the embedding portion is operated. Similarly to the above, the embedded portion is pressed and fixed to the inner wall of the hole of the remaining portion in the ground, the upper pole support portion is fitted and fixed to the embedded portion, and the column is erected upright.

【0012】しかる後、立てた管体の上部の電柱支持部
に折損電柱の地上残存部をクレーン等の移動手段で近付
け、支持部の電柱拘着部と地上残存部とにチェーンを巻
付けて締付け具で締付け固定して折損電柱を仮支持して
送電を開始する。
Thereafter, the ground remaining portion of the broken utility pole is brought close to the utility pole supporting portion above the standing tube by a moving means such as a crane, and a chain is wound around the utility pole retaining portion and the ground remaining portion of the supporting portion. Tighten and fix with a fastener to temporarily support the broken utility pole and start power transmission.

【0013】[0013]

【実施例】図1乃至図9において、Aは折損電柱の地中
残存部、aは孔の内壁、Bはその地上残存部である。1
は金属製等の長尺の管体で、下部を折損電柱の地中残存
部Aの孔より若干小径でその深さより若干短かい長さの
埋込み部2、上部を折損電柱の地上残存部Bに沿わせて
支持するに必要な長さの電柱支持部3とする。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS In FIGS. 1 to 9, A is a ground residual portion of a broken utility pole, a is an inner wall of a hole, and B is a ground residual portion thereof. 1
Is a long pipe made of metal or the like, the lower part of which is an embedded portion 2 having a diameter slightly smaller than the hole of the remaining portion A of the broken utility pole and slightly shorter than the depth thereof, and the upper portion of which is the ground remaining portion B of the broken utility pole. The utility pole support portion 3 has a length necessary to support the utility pole.

【0014】4は回転軸で、管体1の上部の電柱支持部
3より下部の埋込み部2の上端附近までの長さとして、
管体1内に固定した支持枠15の中心に回転自由に軸支
し、回転軸4の上端にラチェット等操作手段を嵌合する
六角頭部等の操作部13を設け、かつ回転軸4の下端の
連結軸16に作動軸5を螺合して連設する。支持枠15
は管体1の内径に合致する複数の円板17を任意の間隔
をおいて枠杆18で連結し、各円板17を管体1にビス
等で固定するようにしてあり、その円板17の中心の孔
に回転軸4を挿通して軸支してある。
Reference numeral 4 denotes a rotating shaft, which has a length from the upper pole supporting portion 3 of the upper portion of the tubular body 1 to the vicinity of the upper end of the lower embedded portion 2,
An operating portion 13 such as a hexagonal head for supporting an operating means such as a ratchet is provided on the upper end of the rotating shaft 4 so as to be freely rotatably supported at the center of a supporting frame 15 fixed in the tubular body 1, and the rotating shaft 4 The actuating shaft 5 is screwed into the connecting shaft 16 at the lower end, and is continuously provided. Support frame 15
Is to connect a plurality of discs 17 matching the inner diameter of the pipe body 1 with a frame rod 18 at arbitrary intervals, and fix each disc 17 to the pipe body 1 with screws or the like. The rotary shaft 4 is inserted through the hole at the center of the shaft 17 and is pivotally supported.

【0015】5は作動軸で、回転軸4の下端の連結軸1
6に螺合し、かつ、後述の支持体23に固定した廻り止
め板19で回転方向への回転を止め、軸方向にのみ摺動
可能に備える。この作動軸5に起伏アーム6を介してア
ウトリガー7を作動軸の軸方向に直交する方向に移動可
能に備える。
Reference numeral 5 denotes an operating shaft, which is a connecting shaft 1 at the lower end of the rotating shaft 4.
The rotation stopper plate 19 fixed to the support 23, which will be described later, stops rotation in the rotation direction and is slidable only in the axial direction. An outrigger 7 is provided on the operating shaft 5 via a hoisting arm 6 so as to be movable in a direction orthogonal to the axial direction of the operating shaft.

【0016】前記作動軸5を連結部20を介して連設
し、各連結部20に起伏アーム6の上端を軸21で枢支
し、かつ、起伏アーム6の他端の軸22をアウトリガー
7の内端中央に枢支させるとともに管体1内に備えた支
持側板12に作動軸5と直交方向に穿ったガイド溝11
に移動自由に嵌め、作動軸5の摺動運動により起伏アー
ム6を起伏させて軸22をガイド溝11に沿って移動さ
せアウトリガー7を管体1の周面に穿った貫通孔8を通
じて出没可能に設け、アウトリガー7を地中残存部Aの
内壁aに圧接固定可能に設ける。
The actuating shafts 5 are connected to each other via connecting portions 20, and the upper ends of the undulating arms 6 are pivotally supported by the shafts 21 at the respective connecting portions 20, and the shaft 22 at the other end of the undulating arms 6 is connected to the outriggers 7. A guide groove 11 is formed in a support side plate 12 provided in the tube body 1 in the center of the inner end of the
The movable arm 6 is movably fitted to the movable shaft 5, and the undulating arm 6 is undulated by the sliding motion of the operating shaft 5 to move the shaft 22 along the guide groove 11 so that the outrigger 7 can be retracted through the through hole 8 formed in the peripheral surface of the pipe body 1. And the outrigger 7 is provided so as to be capable of being pressed and fixed to the inner wall a of the underground residual portion A.

【0017】実施例において、23はアウトリガー7を
備える支持体で、管体1に合致する上下の円板24と両
側の支持側板12とからなり、両側板12のガイド溝1
1、11にアウトリガー7の軸22を嵌合してある。支
持体23は複数個積み重ねて管体1にビス等で固定し、
作動軸5を円板24の中心の孔に挿通し、連結部20で
連設する。又、アウトリガー7を備えた支持体23の向
きを各段毎90度づつ変えて、アウトリガー7を四方へ
出没可能に備えてある。
In the embodiment, reference numeral 23 is a support provided with the outriggers 7, which is composed of upper and lower discs 24 matching the pipe body 1 and support side plates 12 on both sides.
The shaft 22 of the outrigger 7 is fitted to the shafts 1 and 11. A plurality of support bodies 23 are stacked and fixed to the tube body 1 with screws or the like,
The actuating shaft 5 is inserted through the central hole of the disk 24, and is connected to the connecting portion 20. Further, the orientation of the support member 23 provided with the outriggers 7 is changed by 90 degrees for each step so that the outriggers 7 can be projected and retracted in all directions.

【0018】前記実施例でアウトリガー7は各段毎90
度づつ変位して四方に出没可能としてあるが、これに限
られるものではなく、60度づつ六方向に設けてもよ
い。また、アウトリガー7は組立上分割してあり支持体
23を管体内に挿通固定後に外方部をネジ止めして固定
する構造としてある。
In the above embodiment, the outriggers 7 are each 90 steps.
Although it is possible to move in and out in four directions by displacing each time, the present invention is not limited to this, and it may be provided in six directions every 60 degrees. Further, the outrigger 7 is divided for assembly and has a structure in which the support body 23 is inserted and fixed in the pipe body and then the outer portion is fixed by screwing.

【0019】25は管体1の上部の電柱支持部3と下部
の埋込み部2との堺に固着する受止板で、埋込み部2を
折損電柱の地中残存部Aに挿入時折損電柱の上端に受止
める。
Reference numeral 25 is a receiving plate fixed to the sakai between the upper pole support portion 3 of the tubular body 1 and the lower buried portion 2, and when the buried portion 2 is inserted into the underground remaining portion A of the broken pole, the broken pole is broken. Accept at the top.

【0020】9は電柱を仮支柱に本締めして拘持する電
柱拘持部で、一対の当接板26の基端に管体1の挿通孔
27を設け、その当接板26の間隔をチェーン10の幅
より若干広くし、その当接板26の先端間に電柱の曲面
に合致する曲面板28を形成したものであり、該電柱拘
持部を支柱に任意の間隔をおいて複数個嵌合し、各当接
板26間の管体1と電柱とにチェーン10を巻付けてチ
ェーンの両端をボルト29、ナット30で締付け、当接
板26を電柱に当接して締付ける。
Reference numeral 9 denotes an electric pole holding portion for holding the electric pole by fastening it to a temporary supporting pole. An insertion hole 27 of the pipe body 1 is provided at the base ends of the pair of abutting plates 26, and the abutting plates 26 are separated from each other. Is slightly wider than the width of the chain 10, and a curved plate 28 that matches the curved surface of the utility pole is formed between the ends of the abutting plate 26. A plurality of utility pole holding portions are provided on the support pillar at arbitrary intervals. Individually fit, the chain 10 is wound around the tube 1 and the electric pole between the contact plates 26, and both ends of the chain are tightened with bolts 29 and nuts 30, and the contact plate 26 is contacted with the electric pole and tightened.

【0021】9′は電柱を仮支柱に予め近づけて仮締め
をするための別の電柱拘持部で、一対のワイヤー装着板
31に管体1の挿通孔32を設け、その装着板31を所
定の間隔を存してボルト33で締付け、その装着板31
間と電柱にワイヤロープ34を巻付け、シメラー等の締
付け具35で締付けるようにしてある。
Reference numeral 9'denotes another utility pole holding portion for bringing the utility pole closer to the temporary support in advance and temporarily tightening it. A pair of wire mounting plates 31 are provided with insertion holes 32 of the tubular body 1 and the mounting plate 31 is attached. Tighten with bolts 33 at a predetermined interval, and mount plate 31
The wire rope 34 is wound around the space and the electric pole, and is tightened by a tightening tool 35 such as a shimerer.

【0022】14は管体1の電柱支持部3の上端の開閉
蓋で、その上面にクレーンのワイヤを掛ける吊下げ部3
8を設け、かつ開閉蓋の下面両側にL形溝孔付き案内ア
ーム37を設け、該溝孔を通じて締付けボルト36を管
体1の上端に螺合し、該締付けボルトを緩めて開閉蓋1
4の案内アーム37をボルトに沿って回動させ蓋を上方
へ略90度開放可能に備え、管体1の吊下げ時には蓋を
閉じて締付けボルトで締付け固定して吊下げ部を吊下げ
可能とし、又管体1内の回転軸4の操作部13の操作
時、蓋を開いて操作部13を露出させ、操作を終えると
蓋を閉じて締付けボルト36で締付けて固定できるよう
にする。
Reference numeral 14 denotes an opening / closing lid at the upper end of the electric pole supporting portion 3 of the pipe body 1, on which the hanging portion 3 for hanging the wire of the crane.
8 and the guide arms 37 with L-shaped groove holes are provided on both sides of the lower surface of the opening / closing lid, and the tightening bolt 36 is screwed to the upper end of the pipe body 1 through the groove hole, and the tightening bolt is loosened to open / close the opening / closing lid 1.
The guide arm 37 of 4 is rotated along the bolt so that the lid can be opened upward by approximately 90 degrees, and when the pipe body 1 is suspended, the lid can be closed and fixed with a tightening bolt to fix the hanging part. Further, when the operating portion 13 of the rotary shaft 4 in the tubular body 1 is operated, the lid is opened to expose the operating portion 13, and when the operation is finished, the lid is closed and tightened with the tightening bolts 36 so that it can be fixed.

【0023】図10は管体1の別の実施例で電柱支持部
3と埋込み部2を分離構造としたものを示す。この実施
例では埋込み部2の上部を地中より若干突出して受止め
る受止板25′を設け、その埋込み部2の上部の外径に
電柱支持部3の下端の内径を被嵌可能に設け、かつ回転
軸4は前記実施例より短かくして埋込み部2の上部より
若干突出状とし、その上端に操作部13′を設けてあ
る。なお、埋込み部内のアウトリガーを地中残存部に圧
接固定する手段、上部の電柱支持部の電柱拘持部の構成
は前記実施例とほぼ同じである。
FIG. 10 shows another embodiment of the tubular body 1 in which the utility pole supporting portion 3 and the embedding portion 2 are separated. In this embodiment, a receiving plate 25 'for receiving the upper portion of the embedded portion 2 slightly protruding from the ground is provided, and the outer diameter of the upper portion of the embedded portion 2 is provided so that the inner diameter of the lower end of the utility pole support portion 3 can be fitted. Further, the rotary shaft 4 is made shorter than that of the above-mentioned embodiment, and is slightly protruded from the upper portion of the embedded portion 2, and the operation portion 13 'is provided at the upper end thereof. The means for pressing and fixing the outrigger in the embedded portion to the remaining portion in the ground and the construction of the utility pole holding portion of the upper utility pole supporting portion are substantially the same as those in the above-described embodiment.

【0024】また電柱支持部、埋込み部を分離したの
で、クレーンで別個に吊下げる必要があり、電柱支持部
3には上端に吊下げ部38′を設け、かつ埋込み部2に
は受止め板25′に吊下げ部39を設ける。
Since the utility pole supporting portion and the embedding portion are separated, it is necessary to hang them separately by a crane. The utility pole supporting portion 3 is provided with a suspending portion 38 'at the upper end, and the embedding portion 2 is provided with a receiving plate. A suspension portion 39 is provided at 25 '.

【0025】さらに、電柱支持部3と埋込み部2との結
合手段として、例えば、埋込み部2の上端外周に軸方向
の凹溝40を設け、電柱支持部3の下部内周に凸条41
を形成し、凸条41を凹溝40に落し込み、係合固定す
るようにしてある。
Further, as a coupling means for connecting the utility pole supporting portion 3 and the embedding portion 2, for example, an axial groove 40 is provided on the outer periphery of the upper end of the embedding portion 2, and a ridge 41 is provided on the inner periphery of the lower portion of the utility pole supporting portion 3.
Is formed, and the ridge 41 is dropped into the groove 40 to be engaged and fixed.

【0026】この発明の折損電柱仮支持工法による仮復
旧工事を図7乃至図9の実施例で説明すると、折損電柱
の折損部分の鉄筋を切断して地上残存部Bを地中残存部
Aから分離し、クレーン車で地上残存部Bを保持し、一
方、仮支柱のアウトリガー7を引込ませた状態で仮支柱
の吊下げ部38にクレーンのワイヤーを掛けて、仮支柱
を吊上げ、折損電柱の地中残存部Aの孔に挿入する。
The temporary restoration work by the temporary broken pole support method of the present invention will be explained with reference to the embodiment of FIGS. 7 to 9. The reinforcing bar of the broken portion of the broken power pole is cut to remove the ground remaining portion B from the ground remaining portion A. Separate and hold the ground remaining part B with a crane vehicle, while hanging the temporary strut suspension part 38 with the wire of the crane in the state where the outrigger 7 of the temporary strut is retracted, the temporary strut is lifted, and the broken pole is broken. Insert into the hole of the remaining part A in the ground.

【0027】吊下げ部38の蓋14の締付けボルト36
を緩めて蓋14を外方へ開き、ラチェットを回転軸4の
操作部13へ嵌合して回動させ、回転軸4の回転により
作動軸5を摺動し、起伏アーム6によりアウトリガー7
をガイド溝11に沿って移動して貫通孔8より外方へ突
出させ、回転軸4を回動が停止するまで回わしてアウト
リガー7を地中残存部Aの孔の内壁aに圧接固定させ、
仮支柱を地中残存部に直立状に立てる。
Tightening bolt 36 for lid 14 of hanging portion 38
Loosen to open the lid 14 outward, fit the ratchet to the operating portion 13 of the rotary shaft 4 and rotate it, and the operating shaft 5 is slid by the rotation of the rotary shaft 4, and the outrigger 7 is moved by the undulating arm 6.
Is moved along the guide groove 11 so as to project outward from the through hole 8, and the rotary shaft 4 is rotated until the rotation is stopped to press and fix the outrigger 7 to the inner wall a of the hole of the underground remaining portion A. ,
The temporary support is set upright on the remaining part of the ground.

【0028】次いで、クレーン車で保持した折損電柱の
地上残存部Bを地中残存部に立てた仮支柱に近づけ、電
柱拘持部9′と電柱にワイヤロープ34を巻付けてシメ
ラーを用いて地上残存部Bを仮支柱に引寄せて仮止めす
る。
Next, the ground remaining portion B of the broken utility pole held by the crane truck is brought close to the temporary support pole standing on the remaining portion in the ground, and the wire rope 34 is wound around the utility pole holding portion 9'and the utility pole, and a shimerer is used. The remaining portion B on the ground is pulled to the temporary support and temporarily fixed.

【0029】しかる後、仮支柱の複数箇所の電柱拘持部
9と電柱にチェーン10を巻付け、ボルト、ナットを締
付けて固定して折損電柱を仮保持して、速やかに送電復
旧を可能とする。
After that, a chain 10 is wound around the utility pole holding portions 9 and utility poles at a plurality of positions of the temporary support, and bolts and nuts are tightened and fixed to temporarily hold the broken utility pole, so that power transmission can be promptly restored. To do.

【0030】仮支持した折損電柱を新しい電柱と建て替
えるため仮支柱を抜くときは、蓋を開いて回転軸を逆方
向に回わすことによりアウトリガーを引込めれば地中残
存部より支柱を簡単に抜脱することができる。
When pulling out the temporary support poles to replace the temporarily supported broken utility poles with new ones, open the lid and rotate the rotation axis in the opposite direction to retract the outriggers so that the support poles can be easily removed from the remaining part in the ground. Can be pulled out.

【0031】図10の分離型の実施例の場合にはクレー
ン車で先ず埋込み部の吊下げ部39を吊上げて地中残存
部Aの孔に挿入し、回転軸4の操作部13′を工具で回
転し前記と同様にアウトリガーを地中残存部に圧接固定
させ、埋込み部を直立状に立て、しかる後、クレーン車
で電柱支持部3を吊上げて直立させた埋込み部に嵌合し
て落し込んで固定し、仮支柱を地中残存部に直立状に立
てる。それ以後の作業は前記実施例と同様である。
In the case of the separation type embodiment of FIG. 10, first, the hanging portion 39 of the embedded portion is hoisted with a mobile crane and inserted into the hole of the remaining portion A in the ground, and the operating portion 13 'of the rotary shaft 4 is used as a tool. And rotate the outrigger to the remaining part in the ground under pressure to fix the embedment part in an upright state, and then lift the utility pole support part 3 with a mobile crane to fit it into the upright embedment part and drop it. Fix it in a sewn way, and stand the temporary support upright on the remaining part in the ground. The subsequent work is the same as that of the above-mentioned embodiment.

【0032】[0032]

【発明の効果】この発明の折損電柱仮支持工法によれ
ば、仮支柱を折損電柱の地中残存部に挿入し、支柱内の
回転軸を廻わすだけの簡単な操作でアウトリガーを地中
残存部の内壁に圧接固定し、支柱を直立状に立てること
ができ、その支柱に折損電柱の地上残存部をクレーンを
利用して近付け、支柱の電柱拘持部でチェーン、ワイヤ
ー等で締付けるだけで、折損電柱の地上残存部の仮保持
工事を極めて短時間で行うことができ、速やかに送電復
旧ができる。従来に比較し少人数で労力を要さず大巾に
時間が短縮された効果は大きい。
According to the temporary support method for a broken utility pole of the present invention, the outrigger remains in the ground by a simple operation of inserting the temporary support pole into the remaining portion of the breakable power pole and turning the rotary shaft in the support pole. It can be fixed to the inner wall of the part by pressure, and the pillar can be erected in an upright position.The ground remaining part of the broken utility pole can be brought close to the pillar using a crane, and the pole can be tightened with a chain, wire, etc. The temporary holding work of the ground remaining part of the broken utility pole can be performed in an extremely short time, and the power transmission can be promptly restored. Compared with the conventional method, the number of people is small and labor is not required, and the time is greatly shortened.

【0033】この発明の折損電柱仮支柱によれば、回転
軸を操作手段で回転すると作動軸、起伏アームを介しア
ウトリガーを外方、例えば四方、六方へ均等に突出さ
せ、地中残存部の孔の内面に均等に圧接固定できるか
ら、支柱を地中残存部に簡単に直立状に固定でき、折損
電柱の仮支持を従来に比して格段に安定させ強度を向上
させることができる。従って、本建て替えまでに長期を
要しても十分その安定した強度を保つことができる。新
しい電柱と建て替えるため仮支柱を抜くときは、回転軸
を逆に回すだけでアウトリガーを引込めて地中残存部よ
り支柱を簡単に抜脱することができ効率よく建て替えが
できるようになった。
According to the temporary pole post of the present invention, when the rotary shaft is rotated by the operating means, the outriggers are evenly projected outward, for example, in four or six directions, through the actuating shaft and the undulating arms, and the holes in the remaining portion in the ground are opened. Since the column can be evenly pressed and fixed to the inner surface of the column, the column can be easily fixed to the remaining portion in the ground in the upright state, and the temporary support of the broken pole can be remarkably stabilized and the strength can be improved as compared with the conventional case. Therefore, even if it takes a long time to completely rebuild the building, its stable strength can be sufficiently maintained. When pulling out the temporary support poles for rebuilding with a new utility pole, simply rotating the rotary shaft in the reverse direction allows the outriggers to be retracted, and the support poles can be easily removed from the remaining part in the ground, enabling efficient rebuilding.

【0034】管体の上下一体型は分離型より重量は増す
が、クレーン等の機動力を使用すればよく、上下の嵌め
込み固定作業が不要となる。又分離構造とすれば地上付
近で回転軸の操作が可能で、電柱支持部に回転軸と支持
枠が不要となる。
The vertically integrated type of the pipe body is heavier than the separated type, but the mechanical power of a crane or the like may be used, and the work of fitting and fixing the upper and lower parts is unnecessary. In addition, if the separated structure is used, the rotating shaft can be operated near the ground, and the rotating shaft and the supporting frame are not required in the utility pole supporting portion.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明の折損電柱仮支柱の正面図である。FIG. 1 is a front view of a broken utility pole temporary strut of the present invention.

【図2】アウトリガーを引込めた状態の同縦断面図であ
る。
FIG. 2 is a vertical sectional view of the same with the outriggers retracted.

【図3】アウトリガーを突出させた状態の同縦断面図で
ある。
FIG. 3 is a vertical cross-sectional view showing a state where an outrigger is projected.

【図4】アウトリガーの出没機構を示す拡大縦断面図で
ある。
FIG. 4 is an enlarged vertical sectional view showing a retracting mechanism of an outrigger.

【図5】同横断面図である。FIG. 5 is a transverse sectional view of the same.

【図6】電柱拘持部の平面図である。FIG. 6 is a plan view of a telephone pole holding section.

【図7】仮支柱を地中残存部へ挿入前の斜視図である。FIG. 7 is a perspective view before inserting the temporary support column into the remaining portion in the ground.

【図8】仮支柱を地中残存部へ挿入し圧接固定した状態
の斜視図である。
FIG. 8 is a perspective view showing a state in which the temporary support column is inserted into the remaining portion in the ground and fixed by pressure.

【図9】地中残存部に立てた支柱に地上残存部を締付け
仮支持した状態の斜視図である。
FIG. 9 is a perspective view showing a state in which the above-ground remaining portion is tentatively supported by being clamped to a column that is erected in the underground remaining portion.

【図10】仮支柱の別の実施例を示す斜視図である。FIG. 10 is a perspective view showing another embodiment of the temporary column.

【符号の説明】[Explanation of symbols]

A 折損電柱の地中残存部 a 内壁 B 折損電柱の地上残存部 1 管体 2 埋込み部 3 電柱支持部 4 回転軸 5 作動軸 6 起伏アーム 7 アウトリガー 8 貫通孔 9 電柱拘持部 10 チェーン 11 ガイド溝 12 支持側板 13 操作部 14 開閉蓋 A Remaining portion of broken pole in the ground a Inner wall B Remaining portion of broken pole 1 Ground body 2 Embedded portion 3 Utility pole support 4 Rotating shaft 5 Working shaft 6 Elevating arm 7 Outrigger 8 Through hole 9 Utility pole holding part 10 Chain 11 Guide Groove 12 Support side plate 13 Operation part 14 Open / close lid

───────────────────────────────────────────────────── フロントページの続き (72)発明者 加納 賢二 岐阜県多治見市本町4−35 中部電力株 式会社 多治見営業所内 (72)発明者 斉木 国夫 愛知県名古屋市熱田区白鳥町2−12−2 (72)発明者 荒木 昌彦 三重県四日市市黄金町58番地 内田鍛工 株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Kenji Kano Inventor Kenji Kano 4-35 Honmachi, Tajimi-shi, Gifu Chubu Electric Power Company Tajimi Sales Office (72) Inventor Kunio Saiki 2-12-2 Shiratori-cho, Atsuta-ku, Nagoya-shi, Aichi (72) Inventor Masahiko Araki 58 Uchinoda Forging Co., Ltd. 58 Koganecho, Yokkaichi-shi, Mie

Claims (5)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 下部を折損電柱の地中残存部(A)の孔
に挿入する埋込み部(2)、上部を折損電柱の地上残存
部(B)に添わせる電柱支持部(3)とした管体(1)
の埋込み部(2)を折損電柱の地中残存部(A)の孔に
挿入してから、管体(1)内に備えた回転軸(4)を適
宜操作手段で回動させて作動軸(5)、起伏アーム
(6)を介して複数のアウトリガー(7)を埋込み部周
面の貫通孔(8)を通じて外方へ突出させて地中残存部
(A)の内壁(a)に圧接固定させ、次いで、管体
(1)の電柱支持部(3)に折損電柱の地上残存部
(B)を適宜移動手段で近付け、該地上残存部(B)と
電柱支持部(3)の複数箇所の電柱拘持部(9)にチェ
ーン(10)、ワイヤー等を巻付け適宜締付け具で締付
け仮支持することを特徴とする折損電柱仮支持工法。
1. A buried portion (2) for inserting a lower portion into a hole in a remaining portion (A) of a broken utility pole, and an upper portion for a utility pole supporting portion (3) to be attached to a remaining portion (B) of the broken utility pole on the ground. Tubular body (1)
After inserting the embedding part (2) into the hole of the remaining underground part (A) of the broken utility pole, the rotary shaft (4) provided in the tubular body (1) is appropriately rotated by the operating means to operate the operating shaft. (5), a plurality of outriggers (7) are protruded outward through the through holes (8) on the peripheral surface of the embedding part via the undulating arms (6) and pressed against the inner wall (a) of the remaining underground part (A). After fixing, then the ground remaining portion (B) of the broken power pole is appropriately moved to the utility pole supporting portion (3) of the tubular body (1) by moving means, and a plurality of the ground remaining portion (B) and the utility pole supporting portion (3) are provided. A broken utility pole temporary support construction method characterized in that a chain (10), a wire, etc. are wound around a utility pole holding section (9) at a certain position and temporarily supported by a proper tightening tool.
【請求項2】 長尺の管体(1)の下部を折損電柱の地
中残存部(A)の孔に挿入する埋込み部(2)、かつ、
その上部を折損電柱の地上残存部(B)に添わせる電柱
支持部(3)とし、管体(1)内に備えた回転軸(4)
に関連作動可能に連設させる作動軸(5)の運動により
起伏アーム(6)を介してアウトリガー(7)を作動軸
と直交する方向の運動に変換させ埋込み部(2)の周面
の貫通孔(8)を通じて出没可能に備え、該アウトリガ
ーを地中残存部(A)の内壁(a)に圧接固定可能に設
け、かつ、前記電柱支持部(3)の複数箇所に任意の間
隔をおいて電柱拘持部(9)を備えたことを特徴とする
折損電柱仮支柱。
2. An embedding portion (2) for inserting a lower portion of a long tubular body (1) into a hole of a remaining underground portion (A) of a broken utility pole, and
A rotating shaft (4) provided in the tubular body (1), the upper part of which serves as a utility pole supporting portion (3) to be attached to the ground remaining portion (B) of the broken utility pole.
The movement of the actuating shaft (5) operably connected to the work piece causes the outrigger (7) to be converted into a motion in a direction orthogonal to the actuating shaft through the undulating arm (6) so as to penetrate the peripheral surface of the embedded portion (2). The outriggers are provided so as to be retractable through the holes (8), and the outriggers can be press-fitted and fixed to the inner wall (a) of the remaining part (A) in the ground, and the electric pole support parts (3) are provided with arbitrary intervals. A breakable utility pole temporary strut characterized by having a utility pole holding section (9).
【請求項3】 アウトリガー(7)を地中残存部(A)
の内壁(a)に圧接固定する手段として、管体(1)の
上部の電柱支持部(3)より下部の埋込み部(2)へ回
転軸(4)を回転自由に備え、埋込み部(2)内におい
て回転軸(4)の回転運動を軸方向の摺動運動に変換可
能に作動軸(5)と連設し、該作動軸(5)に所定の間
隔で起伏アーム(6)を起伏自在に連結し、該アーム
(6)にアウトリガー(7)を枢支すると共に該アウト
リガーを管体内の支持側板(12)に前記作動軸(5)
と直交方向に穿ったガイド溝(11)に沿って移動可能
に設け、作動軸(5)の摺動運動でアウトリガー(7)
を貫通孔(8)を通じて出没可能に設け、地中残存部
(A)の内壁(a)に圧接固定可能とした請求項2記載
の折損電柱仮支柱。
3. The outrigger (7) is replaced with a remaining portion (A) in the ground.
As means for press-fitting and fixing to the inner wall (a) of the tubular body (1), the rotary shaft (4) is rotatably provided from the upper pole support portion (3) of the tubular body (1) to the lower embedded portion (2) and the embedded portion (2). ), The rotary motion of the rotary shaft (4) is connected to the actuating shaft (5) so as to be converted into a sliding motion in the axial direction, and the undulating arms (6) are undulated on the actuating shaft (5) at predetermined intervals. The actuating shaft (5) is freely connected to the arm (6) to pivotally support the outrigger (7) and the outrigger to the supporting side plate (12) in the tubular body.
Is provided so as to be movable along a guide groove (11) formed in a direction orthogonal to the outrigger (7) by a sliding motion of the operating shaft (5).
The temporary pole post with a broken pole according to claim 2, wherein the pillar is provided so as to be capable of projecting and retracting through the through hole (8) and can be fixed to the inner wall (a) of the remaining portion (A) by pressure.
【請求項4】 管体(1)内に備えた回転軸(4)の操
作部(13)を管体(1)の電柱支持部(3)の上端に
位置させ、上端に吊下げ部付開閉蓋(14)を設けた請
求項2又は3記載の折損電柱仮支柱。
4. An operating portion (13) of a rotating shaft (4) provided in the tubular body (1) is located at an upper end of a utility pole supporting portion (3) of the tubular body (1), and a hanging portion is provided at the upper end. The broken utility pole temporary column according to claim 2 or 3, wherein an opening / closing lid (14) is provided.
【請求項5】 管体(1)の電柱支持部(3)と埋込み
部(2)を分離構造として相互に嵌合可能に設け、埋込
み部(2)の上部に回転軸(4)の操作部(13′)を
備えた請求項2記載の折損電柱仮支柱。
5. The utility pole support portion (3) and the embedding portion (2) of the tubular body (1) are provided as separate structures so that they can be fitted to each other, and the rotating shaft (4) is operated above the embedding portion (2). The broken utility pole temporary support according to claim 2, further comprising a portion (13 ').
JP13904293A 1993-05-17 1993-05-17 Breaking power pole temporary support method and temporary support Expired - Lifetime JP2681250B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13904293A JP2681250B2 (en) 1993-05-17 1993-05-17 Breaking power pole temporary support method and temporary support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13904293A JP2681250B2 (en) 1993-05-17 1993-05-17 Breaking power pole temporary support method and temporary support

Publications (2)

Publication Number Publication Date
JPH06323040A JPH06323040A (en) 1994-11-22
JP2681250B2 true JP2681250B2 (en) 1997-11-26

Family

ID=15236104

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13904293A Expired - Lifetime JP2681250B2 (en) 1993-05-17 1993-05-17 Breaking power pole temporary support method and temporary support

Country Status (1)

Country Link
JP (1) JP2681250B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3684778A (en) * 1970-04-28 1972-08-15 Du Pont Polymers of ethylene, sulfur dioxide and ethylenic monomers
JP5105994B2 (en) * 2007-08-16 2012-12-26 中国電力株式会社 Broken pole repair device and broken pole repair method using the same
KR100857774B1 (en) * 2008-06-04 2008-09-09 대원전기 주식회사 Pole clamp applied in uninterrupted replacement method of utility pole for distribution line
KR101341169B1 (en) * 2012-01-28 2013-12-13 주식회사 지앤지테크놀러지 Breaker of grout injecting punching machine for punching grout hole
JP5701926B2 (en) * 2013-04-15 2015-04-15 中国電力株式会社 Temporary fixing device for broken tapered hollow pillars
JP5897694B1 (en) * 2014-12-15 2016-03-30 中国電力株式会社 Fractured electric pole temporary support device and broken electric pole temporary support method

Also Published As

Publication number Publication date
JPH06323040A (en) 1994-11-22

Similar Documents

Publication Publication Date Title
JP2681250B2 (en) Breaking power pole temporary support method and temporary support
JP2016509643A (en) Dual Function Sequential Task Ear Alignment Picking Stack Alignment Building Material Handling System
CN110984675B (en) Pole erecting device for electric power laying and using method thereof
US4822006A (en) Pole pulling apparatus and method
JP4218883B2 (en) Method of moving frame construction method, method of moving frame drilling facility, and method of drilling at the intersection of frame using method frame moving drilling facility
KR102399918B1 (en) Detachable crane for pillar
JP2865208B2 (en) Hanger rope retractor for suspension bridge
JP2618614B2 (en) Hanging bracket for pile
JP2010047995A (en) Leader changing method of pile driver
JP2005105528A5 (en)
JPH01190831A (en) Device for forcing structure under-ground
JPH0722452Y2 (en) Stand type column tool
CN220618369U (en) Auxiliary tool for opening well lid
CN218203915U (en) Bed-jig is assembled to long span steel case roof beam
JP3717911B2 (en) Steel tower dismantling method and work jig by helicopter
CN218786475U (en) Building material lifting device for super high-rise building construction
JP3427118B2 (en) A device that moves an installed electric wire as it is live
CN117509421B (en) Lifting device for installation of lighting engineering
CN215924164U (en) Building curtain wall glass lifting and clamping device
JP2501246Y2 (en) Compound pillar remover
CN215756004U (en) Anti-slip device of gantry crane
JPH0681344A (en) Pliers for foundation pile
AU725211B2 (en) A safety lifting connection system
JPH0440353Y2 (en)
JPH027948Y2 (en)

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070808

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 11

Free format text: PAYMENT UNTIL: 20080808

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080808

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090808

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 12

Free format text: PAYMENT UNTIL: 20090808

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100808

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 14

Free format text: PAYMENT UNTIL: 20110808

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110808

Year of fee payment: 14

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120808

Year of fee payment: 15

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 16

Free format text: PAYMENT UNTIL: 20130808

EXPY Cancellation because of completion of term