JP2592458Y2 - Hanging tool for long steel - Google Patents

Hanging tool for long steel

Info

Publication number
JP2592458Y2
JP2592458Y2 JP1993069142U JP6914293U JP2592458Y2 JP 2592458 Y2 JP2592458 Y2 JP 2592458Y2 JP 1993069142 U JP1993069142 U JP 1993069142U JP 6914293 U JP6914293 U JP 6914293U JP 2592458 Y2 JP2592458 Y2 JP 2592458Y2
Authority
JP
Japan
Prior art keywords
lifting
hanging
rack
steel
long steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP1993069142U
Other languages
Japanese (ja)
Other versions
JPH0738068U (en
Inventor
仁志 板倉
豊久 得丸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
JFE Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Steel Corp filed Critical JFE Steel Corp
Priority to JP1993069142U priority Critical patent/JP2592458Y2/en
Publication of JPH0738068U publication Critical patent/JPH0738068U/en
Application granted granted Critical
Publication of JP2592458Y2 publication Critical patent/JP2592458Y2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Description

【考案の詳細な説明】[Detailed description of the invention]

【0001】[0001]

【産業上の利用分野】本考案は、H形鋼、I形鋼、鋼
管、鋼矢板等の長尺鋼材をクレーンで搬送する際に使用
する吊具に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a hoist used when a long steel material such as an H-shaped steel, an I-shaped steel, a steel pipe, a steel sheet pile and the like is transported by a crane.

【0002】[0002]

【従来の技術】H形鋼、I形鋼、鋼管、鋼矢板等の長尺
鋼材をクレーンにより搬送する場合、従来は、クレーン
のフックに取り付けたリフティングマグネットで直接こ
れらの長尺鋼材を吸着して搬送するか、クレーンからこ
れら鋼材に見合う長尺のビームを吊り下げ、このビーム
から適当間隔でワイヤロープあるいはチェーンを玉掛け
して吊り上げることが行われていた。特開昭53−126663
号公報の従来技術の説明として記載されている図を図1
1、図12に示す。
2. Description of the Related Art When a long steel material such as an H-shaped steel, an I-shaped steel, a steel pipe and a steel sheet pile is conveyed by a crane, conventionally, the long magnet is attached directly to a lifting magnet attached to a hook of the crane. Or a long beam suitable for these steel materials is suspended from a crane, and a wire rope or a chain is slung at an appropriate interval from the beam to be lifted. JP-A-5-126666
FIG. 1 is a diagram described as a description of the prior art
1, shown in FIG.

【0003】1はビーム材、2は吊り手部、83は取り付
け金具、84はワイヤロープ、Sは長尺鋼材である。この
ような玉掛け作業は人力により行わなければならず、た
とえば吊り上げ段階ではワイヤロープの弛みがなくなる
まで人力によりワイヤロープを保持している必要があ
り、作業性が低くかつ危険な業務であった。そこで、玉
掛け作業を自動化し、クレーン運転台からの遠隔操作の
みにより長尺鋼材を搬送することが試みられ、たとえば
前記特開昭53−126663号公報によれば、図13、図14に示
すような自動玉掛け吊具装置が提案されている。
[0003] 1 is a beam material, 2 is a hanging part, 83 is a mounting bracket, 84 is a wire rope, and S is a long steel material. Such a slinging operation must be performed manually, and for example, in the lifting stage, it is necessary to hold the wire rope by hand until the wire rope is not loosened, which is a low workability and dangerous work. Therefore, an attempt has been made to automate the slinging operation and to transport the long steel material only by remote control from the crane cab. For example, according to the above-mentioned JP-A-53-126663, as shown in FIG. 13 and FIG. An automatic sling hanging device has been proposed.

【0004】図13はこの自動玉掛け吊具装置全体を示す
側面図、図14はその主要部の正面図で、この自動玉掛け
吊具装置は、クレーンのフックに吊り下げられているビ
ーム材1の所望位置につり下げられた門型フレーム95の
一方の脚部96に玉掛け用チェーン97を引き出し引き込み
自在に設け、他方の脚部98に一方へは屈曲するが他方へ
は屈曲しないノンベンドバックチェーン99を送り出しお
よび引き込み自在に設け、このノンベンドバックチェー
ン99を送り出した際対向する脚端に向かって前進して前
記チェーン97と係合連結し、このノンベンドバックチェ
ーン99を引き込むことにより玉掛け用チェーン97を対向
する脚部間に掛け渡すようにして脚部96、98間の空間に
長尺鋼材を保持するのである。
FIG. 13 is a side view showing the entire automatic sling hanging apparatus, and FIG. 14 is a front view of a main part thereof. The automatic sling hanging apparatus is provided with a beam member 1 suspended from a hook of a crane. A non-bend back chain in which a slinging chain 97 is provided so as to be able to be pulled out and pulled out from one leg 96 of a gate-shaped frame 95 suspended at a desired position, and is bent to one side but not to the other at the other leg 98. When the non-bend back chain 99 is sent out, it is advanced toward the opposing leg end to engage and connect with the chain 97, and the non-bend back chain 99 is pulled in for slinging. The long steel material is held in the space between the legs 96 and 98 by bridging the chain 97 between the opposing legs.

【0005】このような自動玉掛け吊具装置を使用すれ
ば、玉掛け作業員は不用となり、生産性と安全性は向上
する。しかし、長尺鋼材は一般にその形状特性上、クレ
ーンの有する巻き上げ能力一杯まで吊り荷を集積して搬
送するということは少なく、荷姿の寸法的な制約から搬
送単位が決められる場合が大部分である。このため、ク
レーン等による荷役能率が上がらず、船積みの場合など
に船の停泊時間を長引かせる原因の一つになっている。
[0005] If such an automatic sling hanging device is used, the slinging worker becomes unnecessary, and productivity and safety are improved. However, due to the shape characteristics of long steel materials, in general, it is rare that a suspended load is accumulated and transported to the full lifting capacity of a crane, and in most cases, the transport unit is determined due to dimensional restrictions on the form of loading. is there. For this reason, the efficiency of cargo handling by a crane or the like does not increase, which is one of the causes of prolonging the berthing time of a ship in the case of loading.

【0006】そこで、本出願人は、こうした長尺鋼材を
一括大量にハンドリングできる「輸送用ラック」を開発
し、実開平5−162828号公報により公開されている。こ
の輸送用ラックを、図15、図16により説明する。図15は
ラック体61の正面縦断面図、図16は1対のラック体61、
61を分離した状態で間隔を設けて配置した輸送用ラック
の斜視図である。
Accordingly, the present applicant has developed a "transport rack" capable of handling such a long steel material in a large amount in a lump, and has been disclosed in Japanese Utility Model Laid-Open No. 5-162828. This transport rack will be described with reference to FIGS. FIG. 15 is a front vertical sectional view of the rack body 61, and FIG. 16 is a pair of rack bodies 61.
It is a perspective view of the transport rack which arrange | positioned at intervals in the state which isolate | separated 61.

【0007】ラック体61は、底梁62の両側端に側梁63を
立設してなるU字形の鋼製枠体で、側梁63は、両側に柱
64、64を建て、その柱間に、上端付近部に係合孔66を設
け略三角形状に突出した突出部を有し、下端縁から前記
突出部の上端付近まで中央部に切り欠き部を形成した垂
直材65を取り付けて構成される。ラック体61は、両側の
側梁63と底梁62により形成されるU形空間部に材料を収
容できるので、図16に例示するように、適当な間隔を設
けてこれを2基配置して長尺鋼材Sを収容し、ラック体
61に設けられている係合孔66にクレーン側の吊具に備え
られているピン等を係合させることにより長尺鋼材を大
量にまとめてハンドリングできるばかりでなく、ラック
体61の側梁63が上記のごとく構成されていることによ
り、上下方向にラック体61を積み重ねたとき、下側ラッ
ク体の垂直材65の突出部が上側ラック体の垂直材65の切
り欠き部に嵌合するから、船倉やトラック等に、荷崩れ
を起こすことなく安定してラック体61を多数段積み重ね
て積み込むことができる。
The rack body 61 is a U-shaped steel frame in which side beams 63 are erected on both side ends of a bottom beam 62. The side beams 63 have columns on both sides.
64, 64 are built, and between the pillars, an engaging hole 66 is provided in the vicinity of the upper end and has a protrusion protruding in a substantially triangular shape, and a notch is provided in the center from the lower edge to the vicinity of the upper end of the protrusion. The vertical member 65 thus formed is attached. Since the rack body 61 can accommodate the material in the U-shaped space formed by the side beams 63 and the bottom beams 62 on both sides, as shown in FIG. Rack body that accommodates long steel material S
By engaging a pin or the like provided on a crane-side hanging tool with an engaging hole 66 provided in the crane 61, not only a large amount of long steel materials can be handled collectively, but also the side beams 63 of the rack body 61. Is configured as described above, when the rack bodies 61 are stacked in the vertical direction, the protrusions of the vertical members 65 of the lower rack body fit into the cutouts of the vertical members 65 of the upper rack body. In addition, a large number of rack bodies 61 can be stably stacked in a hold or a truck without causing collapse of the load.

【0008】さらに、本出願人は、このような輸送用ラ
ック体をクレーンにより吊り上げる吊り上げ装置を開発
し、実開平5-64182号公報により公開されている。図17
ないし図19によりこれを説明する。図17はこの吊り上げ
装置の実施例を示す側面図、図18は同じく正面図、図19
はこの吊り上げ装置の他の実施例の側面図である。
Further, the present applicant has developed a lifting device for lifting such a transport rack by a crane, and has been disclosed in Japanese Utility Model Laid-Open No. 5-64182. Fig. 17
This will be described with reference to FIG. FIG. 17 is a side view showing an embodiment of the lifting device, FIG.
FIG. 6 is a side view of another embodiment of the lifting device.

【0009】この吊り上げ装置は、さきに図15で示した
ラック体61の垂直材65にピン等により係合して保持する
係合部33を備える複数のラック体専用吊具32をビーム材
1に取り付けてなり、ビーム材1の上面には、クレーン
等に連結する吊り手部2が設けられている。図18の正面
図に、ラック体61とラック体専用吊具32との係合する状
態が示されている。すなわち、ラック体専用吊具32の下
方には、ラック体61の側梁63の間隔に対応して、遊合部
34を隔てた2枚の板と、これを挿通するピン35よりなる
係合部33が設けられている。図から容易にわかるよう
に、ラック体専用吊具32を吊り下ろし、この遊合部34を
ラック体61側の側梁63の垂直材65に嵌合させ、ピン35を
垂直材65の係合孔66に挿通することにより、ラック体61
はラック体専用吊具32に確実に係合され、安全に吊り上
げて搬送し、また吊り下ろすことができる。
This lifting device uses a plurality of rack body exclusive hanging members 32 each having an engaging portion 33 which is engaged with a vertical member 65 of a rack body 61 shown in FIG. The beam 1 is provided on the upper surface thereof with a hanging portion 2 connected to a crane or the like. The front view of FIG. 18 shows a state in which the rack body 61 and the rack body dedicated hanging tool 32 are engaged. In other words, below the rack-specific hanging tool 32, the play portion is provided in accordance with the interval between the side beams 63 of the rack body 61.
An engagement portion 33 including two plates separated by a pin 34 and a pin 35 inserted therethrough is provided. As can be easily understood from the drawing, the rack-specific hanging tool 32 is hung down, the loose portion 34 is fitted to the vertical member 65 of the side beam 63 of the rack body 61, and the pin 35 is engaged with the vertical member 65. The rack body 61 is inserted through the hole 66.
Is securely engaged with the rack-specific hanging tool 32, and can be safely lifted, transported, and hung.

【0010】また、長尺鋼材Sの長さが変化して、図16
に示したような長尺鋼材Sを収容する1対のラック体61
の間隔が変化する場合があるので、図19に示すように、
モータ71、スクリュー軸72、ガイドロッド73等によりビ
ーム材1に対するラック体専用吊具32の取り付け位置を
調整できる構造とすることが望ましい。
Further, the length of the long steel material S changes, and FIG.
A pair of rack bodies 61 accommodating the long steel material S as shown in FIG.
May change, so as shown in FIG.
It is desirable that the motor 71, the screw shaft 72, the guide rod 73, and the like have a structure in which the mounting position of the rack-type dedicated suspender 32 to the beam member 1 can be adjusted.

【0011】[0011]

【考案が解決しようとする課題】ところで、上記のよう
に玉掛け作業を人力で行うことなく、かつかなり材料を
集積し容積効率を向上させて長尺鋼材を搬送する手段は
各種提案されているが、生産ラインにおいてこれらの長
尺鋼材をロットや寸法、仕向け先等による搬送単位に仕
分けすると、前記のような輸送用ラック体によって出荷
するものと、ラック体を使用せず、結束したまま直接貨
車あるいは船積みにするものとが混在するのが普通であ
る。ところが、これらは異なる吊具を使用しなければな
らないため、その都度クレーンに対し吊具を付け替える
ことを行わなければならず、クレーンの使用効率が低下
するばかりでなく、場合によっては生産ラインにまで支
障を来たすことがあり、改善が望まれていた。
As described above, various means have been proposed for transporting a long steel material without manually performing the slinging operation as described above, accumulating a considerable amount of material and improving the volumetric efficiency. When these long steel materials are sorted into lots, dimensions, destinations, and other transport units on the production line, they can be shipped by transport racks as described above, and can be directly linked to freight wagons without using the racks. Or it is common to mix things with shipping. However, since these require the use of different lifting gear, it is necessary to replace the lifting gear on the crane each time, which not only reduces the efficiency of the crane but also in some cases extends to the production line. It could be a hindrance and improvements were desired.

【0012】本考案は、このような付け替え作業なし
に、ラック体に収納された長尺鋼材と結束したままのも
のとを随時選択して吊り上げることのできる長尺鋼材用
吊具を実現することを目的とする。
[0012] The present invention is to provide a long steel hanging material which can select and lift a long steel material housed in a rack body and a tied steel material at any time without such replacement work. With the goal.

【0013】[0013]

【課題を解決するための手段】本考案は、複数箇所の吊
り手部によりクレーン等に吊り下げるビーム材の下面
に、ビーム材の長手方向に移動可能な吊り下げ台車を介
して複数種類の鋼材吊り上げ手段をそれぞれ複数基ずつ
取り付けてなる長尺鋼材用吊具であって、一部種類の鋼
材吊り上げ手段が、底梁の両側端に側梁を立設してな
り、この底梁と両側端により形成されるU形空間部分に
材料を収容するラック体を吊り上げるための吊り下げ
台車の下部に設けられた一つの軸に軸支された上方に折
り畳み可能な一体の部材に、前記ラック体の側梁に取り
付けた垂直材と係合し、これと挿通するピンを備える係
合部を有する専用吊具であり、残部種類の鋼材吊り上げ
手段が、少なくともリフティングマグネットあるいはC
フックであることを特徴とする長尺鋼材用吊具である。
SUMMARY OF THE INVENTION According to the present invention, a plurality of types of steel materials are provided on a lower surface of a beam material suspended on a crane or the like by a plurality of suspending portions via a hanging carriage movable in the longitudinal direction of the beam material. a long steel product for suspender comprising a lifting means mounting each one by a plurality groups, some types of steel lifting hand stage, it was erected side beam at both side ends of the bottom beam, the bottom beam and the sides for lifting the rack member to accommodate the material in a U-shaped space portion formed by the end, hung
Fold upward on one shaft provided at the bottom of the bogie.
It is a dedicated hanging tool having an engaging portion having a pin which is engaged with a vertical member attached to the side beam of the rack body and is inserted into the foldable integral member , and the remaining type of steel material lifting means is provided. , At least lifting magnet or C
A hanging tool for a long steel material, which is a hook.

【0014】[0014]

【作 用】本考案の長尺鋼材用吊具は、複数箇所の吊り
手部によりクレーン等に吊り下げるビーム材の下面に、
ビーム材の長手方向に移動可能な吊り下げ台車を介して
複数種類の鋼材吊り上げ手段、すなわちラック体専用吊
具と、リフティングマグネットあるいはCフックをそれ
ぞれ複数基取り付けてなり、鋼材の荷姿によってこれら
鋼材吊り上げ手段を随時使い分けることのできる長尺鋼
材用吊具であって、複数種類の鋼材吊り上げ手段が常に
ビーム材に取り付けてあるから、鋼材の種類によってい
ちいちクレーンに吊具を付け替える必要がないのは勿論
であるが、一種類の鋼材吊り上げ手段を使用していると
きに他の鋼材吊り上げ手段が干渉しないことが必要であ
り、構造上最も引き上げの容易なラック体専用吊具をビ
ーム材方向へ引き上げ可能とし、かつリフティングマグ
ネットあるいはCフックの取り付け高さを適正に選定す
ることにより、前記の干渉を回避できるようにした。
[Operation] The long steel suspension tool of the present invention is attached to the lower surface of the beam suspended by a crane, etc. by a plurality of suspenders.
A plurality of types of steel material lifting means, that is, a rack-specific hanging tool, and a plurality of lifting magnets or C-hooks are respectively attached to the beam material via a hanging carriage movable in the longitudinal direction of the beam material. It is a long tool for long steel materials that can use lifting means at any time.Because a plurality of types of steel lifting means are always attached to the beam material, it is not necessary to change the lifting tool to the crane every time depending on the type of steel material. Of course, when using one type of steel lifting means, it is necessary that the other steel lifting means does not interfere, and the rack-specific lifting device that is the easiest to lift in the structure is raised in the beam direction. By selecting the mounting height of the lifting magnet or C hook properly, Was to the interference can be avoided.

【0015】[0015]

【実施例】【Example】

実施例1 本考案の第1の実施例を図1ないし図4により説明す
る。図1はこの実施例の側面図、図2は正面図で、1は
ビーム材、2は吊り手部、3はラック体吊り上げ部、4
はリフティングマグネット部で、ラック体吊り上げ部3
とリフティングマグネット部4はそれぞれ2組が吊り下
げ台車31、41を介してビーム材1の長手方向に移動可能
にビーム材1に取り付けられている。
Embodiment 1 A first embodiment of the present invention will be described with reference to FIGS. FIG. 1 is a side view of this embodiment, FIG. 2 is a front view, 1 is a beam member, 2 is a hanging portion, 3 is a rack lifting portion,
Is a lifting magnet part, a rack lifting part 3
And two lifting magnets 4 are attached to the beam 1 so as to be movable in the longitudinal direction of the beam 1 via hanging carts 31 and 41, respectively.

【0016】図1および図2はいずれもこの長尺鋼材用
吊具のラック体吊り上げ部3のラック体専用吊具32によ
りラック体61に収容された長尺鋼材Sを吊り上げようと
している状態を示しており、31は吊り下げ台車、32、33
はさきに図19において説明したものと同じである。図3
は側面図、図4は正面図で、図1、図2と同じ長尺鋼材
用吊具において、ラック体吊り上げ部3のラック体専用
吊具32を上方に折り畳み、リフティングマグネット部4
で長尺鋼材Sを吊り上げようとしている状態を示してお
り、この実施例では吊り下げ台車41からビームを介して
1箇所あたり2基のリフティングマグネット42が吊り下
げられている。
FIGS. 1 and 2 show a state in which the long steel material S housed in the rack 61 is to be lifted by the rack-specific hanging tool 32 of the rack lifting section 3 of the long steel material hanging tool. And 31 is the trolley, 32, 33
This is the same as that described earlier in FIG. FIG.
FIG. 4 is a side view, and FIG. 4 is a front view. In the same elongate steel material hanger as in FIG. 1 and FIG.
Shows a state in which the long steel material S is about to be lifted. In this embodiment, two lifting magnets 42 are suspended from a hanging carriage 41 via a beam at one location.

【0017】このようにして、この長尺鋼材用吊具によ
れば、ラック体61に収納された長尺鋼材と結束したまま
のものとを随時選択して吊り上げることができるが、一
方の吊具を使用しているときに他方の吊具が長尺鋼材等
周辺の部材と干渉しないことが必要であり、この実施例
では、ラック体専用吊具32を上方に折り畳み可能とする
とともに、図1の状態においてラック体専用吊具32の下
面よりもリフティングマグネット42の下面がh1= 0〜30
0mm の範囲で高く、また図3の状態においてリフティン
グマグネット42に吸着された鋼材表面よりもラック体専
用吊具32の下面がh2= 200〜700mm 高くなるよう構成し
てある。
In this way, according to the long steel material suspender, the long steel material housed in the rack body 61 and the one that remains bound can be selected and lifted at any time. It is necessary that the other hanging tool does not interfere with peripheral members such as a long steel material when the tool is used, and in this embodiment, the rack body dedicated hanging tool 32 can be folded upward and In the state of 1, the lower surface of the lifting magnet 42 is lower than the lower surface of the rack-specific hanging tool 32, h 1 = 0 to 30.
The height is within the range of 0 mm, and the lower surface of the rack-specific hanging tool 32 is higher than the surface of the steel material attracted to the lifting magnet 42 in the state of FIG. 3 by h 2 = 200 to 700 mm.

【0018】 実施例2 本考案の第2の実施例を図5〜図7に示す。図1〜4と
共通するものについては同一符号を使用しているほか、
5はCフック部である。図5は側面図で、この長尺鋼材
用吊具のラック体吊り上げ部3のラック体専用吊具32に
よりラック体61に収納された長尺鋼材Sを吊り上げよう
としている状態を示しており、さきの図1と同様の作業
が行われる。
Second Embodiment FIGS. 5 to 7 show a second embodiment of the present invention. The same reference numerals are used for those common to FIGS.
5 is a C hook portion. FIG. 5 is a side view showing a state in which the long steel material S stored in the rack body 61 is to be lifted by the rack-specific hanging tool 32 of the rack lifting section 3 of the long steel material hanging tool. The same operation as in FIG. 1 is performed.

【0019】一方、図6は側面図、図7は正面図で、図
5と同じ長尺鋼材用吊具において、ラック体吊り上げ部
3のラック体専用吊具32を上方に折り畳んで、Cフック
部5、すなわち吊り下げ台車51から吊り下げられたCフ
ック52により長尺鋼材Sをすくい上げようとしている状
態を示している。このようにして、この長尺鋼材用吊具
においても、ラック体に収納された長尺鋼材と、ばらば
らの、あるいは結束したままの長尺鋼材Sとを随時選択
して吊り上げることができるが、一方の吊具を使用して
いるときに他方の吊具が長尺鋼材等周辺の部材と干渉し
ないことが必要であり、この実施例では、ラック体専用
吊具32を上方に折り畳み可能とするとともに、図5の状
態においてラック体専用吊具3の下面よりもCフック5
の下面がh3=0〜300 mmの範囲で高く、また図6の状態
においてCフック52に積載された鋼材表面よりもラック
体専用吊具32の下面がh4= 300〜700mm 高くなるよう構
成した。
On the other hand, FIG. 6 is a side view, and FIG. 7 is a front view. In the same elongate steel material hanger as in FIG. The portion 5, that is, a state in which the long steel material S is about to be scooped by the C hook 52 suspended from the suspension cart 51. In this manner, in this long steel material hanging tool as well, the long steel material stored in the rack body and the long steel material S that is separated or untied can be selected and lifted at any time. When one of the hanging members is used, it is necessary that the other hanging member does not interfere with peripheral members such as a long steel material. In this embodiment, the rack body dedicated hanging member 32 can be folded upward. At the same time, in the state of FIG.
The lower surface is h 3 = 0 to 300 higher in the range of mm, also the lower surface of the C rack body dedicated than the stacked surface of the steel material to the hook 52 hanger 32 in the state of FIG. 6 h 4 = 300~700mm increases as Configured.

【0020】以上各実施例に共通するものとして、鋼材
吊り上げ手段であるラック体専用吊具32、リフティング
マグネット42、Cフック52のいずれも、少なくとも2基
が図8に例示するように吊り下げ台車を介して取り付け
られており、ビーム材1の長手方向にその位置を調整可
能である。そのための機構はとくに示さないが、たとえ
ば前記図19のようなねじ機構や、シリンダ形式、あるい
は電動自走式など、いかなる機構でもよい。なお、鋼材
吊り上げ手段を必要に応じて2基以上取り付けることは
任意である。
As is common to the above-described embodiments, at least two of the rack-specific hanging tools 32, lifting magnets 42, and C hooks 52, which are steel material lifting means, are suspended as shown in FIG. The position of the beam member 1 can be adjusted in the longitudinal direction. Although a mechanism for this is not particularly shown, any mechanism such as a screw mechanism as shown in FIG. 19, a cylinder type, or an electric self-propelled type may be used. It is optional to attach two or more steel lifting means as necessary.

【0021】また、本考案におけるラック体吊り上げ部
3のラック体専用吊具32は上方に折り畳み可能である。
図9、図10に折り畳み機構の例を示す。図9のものは、
モータ74により減速機を介してラック体専用吊具32を取
り付けた軸75を回転させる。また、図10のものは、吊り
下げ台車31を延長して電動ウインチ76を取り付け、ワイ
ヤロープ77によりラック体専用吊具32を引き上げるもの
である
The rack-specific lifting device 32 of the rack lifting section 3 according to the present invention can be folded upward.
9 and 10 show examples of the folding mechanism. In Fig. 9,
The shaft 75 to which the rack-specific hanging tool 32 is attached is rotated by the motor 74 via a speed reducer. In FIG. 10, the hanging cart 31 is extended, an electric winch 76 is attached, and the rack-specific hanging tool 32 is pulled up by a wire rope 77 .

【0022】[0022]

【考案の効果】本考案によれば、吊具の付け替え作業な
しに随時鋼材の荷姿に合わせて最適の吊具を選択使用で
きるから、長尺鋼材の積み出し、積み込み等のハンドリ
ング作業におけるクレーン使用効率が向上し、生産ライ
ンに支障を与えることもなくなるという、すぐれた効果
がある。
[Effects of the Invention] According to the present invention, it is possible to select and use the optimum hanging tool according to the form of the steel material at any time without replacement work of the hanging tool, so the use of the crane in the handling work of loading and unloading the long steel material. It has an excellent effect that the efficiency is improved and the production line is not hindered.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本考案の第1の実施例を示す側面図である。FIG. 1 is a side view showing a first embodiment of the present invention.

【図2】本考案の第1の実施例を示す正面図である。FIG. 2 is a front view showing the first embodiment of the present invention.

【図3】本考案の第1の実施例の図1と異なる状態を示
す側面図である。
FIG. 3 is a side view showing a state different from FIG. 1 of the first embodiment of the present invention;

【図4】本考案の第1の実施例の図1と異なる状態を示
す正面図である。
FIG. 4 is a front view showing a state different from FIG. 1 of the first embodiment of the present invention.

【図5】本考案の第2の実施例を示す側面図である。FIG. 5 is a side view showing a second embodiment of the present invention.

【図6】本考案の第2の実施例の図5と異なる状態を示
す側面図である。
FIG. 6 is a side view showing a state different from FIG. 5 of the second embodiment of the present invention.

【図7】本考案の第2の実施例の図6の状態における正
面図である。
FIG. 7 is a front view of the second embodiment of the present invention in the state of FIG. 6;

【図8】本考案の実施例における部分側面図である。FIG. 8 is a partial side view of the embodiment of the present invention.

【図9】本考案の実施例における部分正面図である。FIG. 9 is a partial front view of the embodiment of the present invention.

【図10】本考案の実施例における部分面図である。10 is a partial side view of the embodiment of the present invention.

【図11】従来の技術を示す側面図である。FIG. 11 is a side view showing a conventional technique.

【図12】図11の従来の技術を示す正面図である。FIG. 12 is a front view showing the conventional technique of FIG. 11;

【図13】他の従来の技術を示す側面図である。FIG. 13 is a side view showing another conventional technique.

【図14】図13の従来の技術を示す正面図である。FIG. 14 is a front view showing the conventional technique of FIG. 13;

【図15】本考案る係わるラック体の正面縦断面図であ
る。
FIG. 15 is a front vertical sectional view of a rack body according to the present invention.

【図16】本考案る係わる輸送用ラックの斜視図である。FIG. 16 is a perspective view of a transport rack according to the present invention.

【図17】さらに他の従来の技術を示す側面図である。FIG. 17 is a side view showing still another conventional technique.

【図18】図17の従来の技術を示す正面図である。FIG. 18 is a front view showing the conventional technique of FIG. 17;

【図19】図17の従来の技術を示す部分側面図である。FIG. 19 is a partial side view showing the conventional technique of FIG. 17;

【符号の説明】[Explanation of symbols]

1 ビーム材 2 吊り手部 3 ラック体吊り上げ部 31 吊り下げ台車 32 ラック体専用吊具 33 係合部 34 遊合部 35 ピン 4 リフティングマグネット部 41 吊り下げ台車 42 リフティングマグネット 5 Cフック部 51 吊り下げ台車 52 Cフック 61 ラック体 62 底梁 63 側梁 64 柱 65 垂直材 66 係合孔 71 モータ 72 スクリュー軸 73 ガイドロッド 74 モータ 75 軸 76 電動ウインチ 77 ワイヤロープ 83 取り付け金具 84 ワイヤロープ 95 門型フレーム 96 脚部 97 玉掛け用チェーン 98 脚部 99 ノンベンドバックチェーン100 部材 S 長尺鋼材DESCRIPTION OF SYMBOLS 1 Beam material 2 Hanging hand part 3 Rack lifting part 31 Hanging trolley 32 Rack-specific hanging tool 33 Engagement part 34 Playing part 35 Pin 4 Lifting magnet part 41 Hanging trolley 42 Lifting magnet 5 C hook part 51 Hanging Truck 52 C hook 61 Rack body 62 Bottom beam 63 Side beam 64 Column 65 Vertical member 66 Engagement hole 71 Motor 72 Screw shaft 73 Guide rod 74 Motor 75 shaft 76 Electric winch 77 Wire rope 83 Mounting bracket 84 Wire rope 95 Gate frame 96 Legs 97 Sling chain 98 Legs 99 Non-bend back chain 100 Material S Long steel

フロントページの続き (51)Int.Cl.6 識別記号 FI B66C 1/66 B66C 1/66 R (58)調査した分野(Int.Cl.6,DB名) B66C 1/00 - 1/68 Continuation of the front page (51) Int.Cl. 6 identification code FI B66C 1/66 B66C 1/66 R (58) Field surveyed (Int.Cl. 6 , DB name) B66C 1/00-1/68

Claims (2)

(57)【実用新案登録請求の範囲】(57) [Scope of request for utility model registration] 【請求項1】 複数箇所の吊り手部(2)によりクレー
ン等に吊り下げるビーム材(1)の下面に、ビーム材
(1)の長手方向に移動可能な吊り下げ台車(31、41、
51)を介して複数種類の鋼材吊り上げ手段(32、42、5
2)をそれぞれ複数基ずつ取り付けてなる長尺鋼材用吊
具であって、一部種類の鋼材吊り上げ手段が、底梁(6
2)の両側端に側梁(63)を立設してなり、この底梁(6
2)と両側端(63)により形成されるU形空間部分に材
料を収容するラック体(61)を吊り上げるための吊り
下げ台車(31)の下部に設けられた一つの軸(75)に軸支さ
れた上方に折り畳み可能な一体の部材(100) に、前記ラ
ック体(61)の側梁(63)に取り付けた垂直材(65)と
係合し、これと挿通するピン(35)を備える係合部(3
3)を有する専用吊具(32)であり、残部種類の鋼材吊り
上げ手段が、少なくともリフティングマグネット(42)
であることを特徴とする長尺鋼材用吊具。
1. A trolley (31, 41, 41, 41, 41) which can be moved in the longitudinal direction of a beam (1) on a lower surface of a beam (1) suspended by a crane or the like by a plurality of suspending portions (2).
51) through multiple types of steel lifting means (32, 42, 5
2) a respective suspender for long steel consisting attached by several groups, some types of steel lifting hand stage, Sokohari (6
Side beams (63) are erected at both ends of 2).
For lifting the rack member (61) for accommodating the material in a U-shaped space portion formed by 2) and both side ends (63), hanging
One shaft (75) provided at the lower part of the lowering cart (31)
The integrated upwardly foldable member (100) is provided with a pin (35) that engages with the vertical member (65) attached to the side beam (63) of the rack body (61) and passes therethrough. Engagement part (3
3) a lifting tool (32) having a special type of lifting tool , wherein the remaining type of steel lifting means is at least a lifting magnet (42).
A hanging tool for a long steel material, characterized in that:
【請求項2】 複数箇所の吊り手部(2)によりクレー
ン等に吊り下げるビーム材(1)の下面に、ビーム材
(1)の長手方向に移動可能な吊り下げ台車(31、41、
51)を介して複数種類の鋼材吊り上げ手段(32、42、5
2)をそれぞれ複数基ずつ取り付けてなる長尺鋼材用吊
具であって、一部種類の鋼材吊り上げ手段が、底梁(6
2)の両側端に側梁(63)を立設してなり、この底梁(6
2)と両側端(63)により形成されるU形空間部分に材
料を収容するラック体(61)を吊り上げるための、吊り
下げ台車(31)の下部に設けられた一つの軸(75)に軸支さ
れた上方に折り畳み可能な一体の部材(100) に、前記ラ
ック体(61)の側梁(63)に取り付けた垂直材(65)と
係合し、これと挿通するピン(35)を備える係合部(3
3)を有する専用吊具(32)であり、残部種類の鋼材吊り
上げ手段が、少なくとも Cフック(52)であることを特
徴とする長尺鋼材用吊具。
2. The method of claim 2, wherein the plurality of hanging portions (2) are used to lay the clay.
On the lower surface of the beam material (1)
(1) The trolley (31, 41,
51) through multiple types of steel lifting means (32, 42, 5
2) A suspension for long steel materials, each of which is attached to multiple units.
And some types of steel lifting means are provided with bottom beams (6
Side beams (63) are erected at both ends of 2).
2) The material in the U-shaped space formed by both ends (63)
For lifting the rack body (61) containing the material
One shaft (75) provided at the lower part of the lowering cart (31)
The above-mentioned lathe is attached to an integral member (100) that can be folded upward.
Vertical member (65) attached to the side beam (63) of the lock body (61)
An engaging portion (3) including a pin (35) engaged with and inserted therethrough.
3) A dedicated hanging tool (32) having
Up means, especially is at least C hook (52)
Suspender for long steel to symptoms.
JP1993069142U 1993-12-24 1993-12-24 Hanging tool for long steel Expired - Fee Related JP2592458Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1993069142U JP2592458Y2 (en) 1993-12-24 1993-12-24 Hanging tool for long steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1993069142U JP2592458Y2 (en) 1993-12-24 1993-12-24 Hanging tool for long steel

Publications (2)

Publication Number Publication Date
JPH0738068U JPH0738068U (en) 1995-07-14
JP2592458Y2 true JP2592458Y2 (en) 1999-03-24

Family

ID=13394109

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1993069142U Expired - Fee Related JP2592458Y2 (en) 1993-12-24 1993-12-24 Hanging tool for long steel

Country Status (1)

Country Link
JP (1) JP2592458Y2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108861990A (en) * 2018-06-11 2018-11-23 中车长江车辆有限公司 Boom hoisting

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ITVR20090111A1 (en) * 2009-07-24 2011-01-25 Massimo Fabbri HANDLING DEVICE PARTICULARLY, BUT NOT EXCLUSIVELY, OF BANDS OF PROFILES SUCH AS BEAMS, PUTRELLE, TUBES AND THE LIKE.
DE202012103280U1 (en) * 2012-08-29 2013-12-04 Scheffer Krantechnik Gmbh Load-carrying means for long-term magnetic goods

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108861990A (en) * 2018-06-11 2018-11-23 中车长江车辆有限公司 Boom hoisting

Also Published As

Publication number Publication date
JPH0738068U (en) 1995-07-14

Similar Documents

Publication Publication Date Title
US4715762A (en) Grappler system for lifting apparatus
JP6573822B2 (en) Suspension cart
US20090315004A1 (en) Container Lifting Device
AU2008330293B2 (en) Method and apparatus for stacking loads in vehicles
JP2592458Y2 (en) Hanging tool for long steel
GB2147266A (en) Grappler system for lifting apparatus
US1615813A (en) Method of handling material
JP2003128377A (en) Load-carrying platform for lengthy material, lengthy material handling method using it, and lengthy material conveying system
JPH072377U (en) Building material receiving method and lifting jig
CN220577729U (en) Tractor shipping frame box
CN211078215U (en) Ton bag is stabilized and is prevented shaking device of unloading
CN2659864Y (en) Overhead double-lazyarm fork
KR200452252Y1 (en) Jig for entering car deck carrier of ro ro type ship
JPH08231176A (en) Long material storage equipment
JP3216358U (en) Construction control sign storage transport stand
JP2645705B2 (en) Storage facility for container chassis
JPH0641939Y2 (en) Transport storage platform
JP3050462U (en) Detachable simple lift
CA1230905A (en) Grappler system for lifting apparatus
US5405029A (en) Portal crane with additional load carrier
CN2702926Y (en) Article stacking pallet
JPH027831Y2 (en)
JP3616747B2 (en) Loading and unloading equipment
JPS602140Y2 (en) automatic lifting device
JP2001335297A (en) Metal hanger piece

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees