JP2557272Y2 - Mounting structure for paved flooring - Google Patents

Mounting structure for paved flooring

Info

Publication number
JP2557272Y2
JP2557272Y2 JP1992057041U JP5704192U JP2557272Y2 JP 2557272 Y2 JP2557272 Y2 JP 2557272Y2 JP 1992057041 U JP1992057041 U JP 1992057041U JP 5704192 U JP5704192 U JP 5704192U JP 2557272 Y2 JP2557272 Y2 JP 2557272Y2
Authority
JP
Japan
Prior art keywords
pavement
tightening
bolts
flooring
tightening bolts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP1992057041U
Other languages
Japanese (ja)
Other versions
JPH0618407U (en
Inventor
英臣 山本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Electric Works Co Ltd
Original Assignee
Matsushita Electric Works Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsushita Electric Works Ltd filed Critical Matsushita Electric Works Ltd
Priority to JP1992057041U priority Critical patent/JP2557272Y2/en
Publication of JPH0618407U publication Critical patent/JPH0618407U/en
Application granted granted Critical
Publication of JP2557272Y2 publication Critical patent/JP2557272Y2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)

Description

【考案の詳細な説明】[Detailed description of the invention]

【0001】[0001]

【産業上の利用分野】本考案は、道路から玄関ポーチま
での間の通路等を舗装するのに用いる舗装床材の取り付
け構造に関し、詳しくは乾式工法で舗装床材を取り付け
るのに用いる構造に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a structure for mounting a paved floor material used for paving a passage or the like from a road to an entrance porch, and more particularly to a structure used for mounting a paved floor material by a dry method. Things.

【0002】[0002]

【従来の技術】従来、住宅における道路から玄関ポーチ
までの間の通路等を舗装する場合、図6に示すように施
工していた。つまり、砕石地業にて砕石層1を形成し、
砕石層1の上にコンクリートを流し込んでコンクリート
層2を形成し、コンクリート層2の硬化後、コンクリー
ト層2の上にモルタル層3を設け、モルタル層3の上に
みかげ石等の石材4を積層して一体化している。
2. Description of the Related Art Conventionally, when paving a passage or the like between a road and an entrance porch in a house, it has been constructed as shown in FIG. In other words, crushed stone layer 1 is formed by crushed stone industry,
Concrete is poured into the crushed stone layer 1 to form a concrete layer 2. After the concrete layer 2 is hardened, a mortar layer 3 is provided on the concrete layer 2, and a stone material 4 such as granite is laminated on the mortar layer 3. And integrated.

【0003】[0003]

【考案が解決しようとする課題】ところが、上記従来例
にあっては、湿式工法で施工されるため施工に工期がか
かると共に工費もかかるという問題があった。本考案は
上記問題点に鑑みてなされたものであって、本考案の目
的とするところは乾式工法で施工できて工期を短縮でき
ると共に工費を削減でき、また締め付けボルトを挿通し
て締結するものでも複数本の締め付けボルトを簡単に連
結して施工できる舗装床材の取り付け構造を提供するに
ある。
However, in the above-mentioned conventional example, there is a problem that the construction is performed by a wet method, so that it takes a lot of time and cost to carry out the construction. The present invention has been made in view of the above problems, and the object of the present invention is to perform a dry construction method, thereby shortening the construction period and reducing the construction cost, and fastening by inserting a tightening bolt. However, it is an object of the present invention to provide a pavement floor material mounting structure that can be easily connected to a plurality of tightening bolts.

【0004】[0004]

【課題を解決するための手段】上記目的を達成するため
本考案舗装床材の取り付け構造は、砕石地業した砕石層
1の上に砂地業した砂層6を積層し、適当なサイズにブ
ロック化した舗装床材Aを砂層6の上に複数個並べ、各
舗装床材A内にパイプ12を埋設することで水平方向に
貫通するように設けた挿通孔7を対応させると共に複数
個の舗装床材Aに亙るように挿通孔7に複数本の締め付
けボルト8を一直線上に位置するように挿通し、隣り合
う締め付けボルト8の端部の半割り部5を互いに重合す
ると共に半割り部5の凹凸嵌合部5aを互いに嵌合して
複数本の締め付けボルト8を連結し、締め付けボルト8
に螺合した締め付けナット9にて複数個の舗装床材Aを
締結して成ることを特徴とする。
In order to achieve the above object, the present invention provides a pavement flooring installation structure in which a sandy ground sand layer 6 is laminated on a crushed stone ground 1 and is divided into blocks of an appropriate size. A plurality of the paved flooring materials A are arranged on the sand layer 6, and a pipe 12 is buried in each of the paved flooring materials A so as to correspond to the insertion holes 7 provided so as to penetrate in the horizontal direction. A plurality of tightening bolts 8 are inserted through the insertion hole 7 so as to extend over the material A so as to be located in a straight line, and the half portions 5 of the ends of the adjacent tightening bolts 8 are overlapped with each other and the half portion 5 is formed. The plurality of fastening bolts 8 are connected by fitting the concave and convex fitting portions 5a to each other, and the fastening bolts 8
A plurality of pavement floor materials A are fastened by fastening nuts 9 screwed into the pavement floor material A.

【0005】[0005]

【作用】上記構成によれば、工場で予めブロック化して
形成した舗装床材Aを砂層6の上に並べ、複数個の舗装
床材Aを締め付けボルト8と締め付けナット9で締結し
て舗装床材Aを取り付けることができる。これにより、
舗装床材Aを乾式工法で取り付け施工でき、工期を短縮
できると共に工費を削減できる。また締め付けボルト8
を挿通孔7に挿通するとき、締め付けボルト8の端部の
半割り部5同士を重合して凹凸嵌合部5a同士を嵌合し
て締め付けボルト8の端部同士を接続し、複数本の締め
付けボルト8を一直線上に接続して挿通できる。これに
より、複数個の舗装床材Aに締め付けボルト8を貫通さ
せるものでも所定の長さの締め付けボルト8を接続する
ことにより長い区間に締め付けボルト8を簡単に挿通し
て施工できる。
According to the above construction, the pavement flooring material A, which has been formed into blocks in advance at the factory, is arranged on the sand layer 6, and the plurality of pavement flooring materials A are fastened with the fastening bolts 8 and the fastening nuts 9 to thereby form the pavement flooring. Material A can be attached. This allows
The pavement flooring material A can be attached and constructed by a dry construction method, and the construction period can be shortened and the construction cost can be reduced. In addition, tightening bolt 8
Is inserted into the insertion hole 7, the halves 5 at the ends of the fastening bolts 8 are overlapped, the concave and convex fitting portions 5 a are fitted to each other, and the ends of the fastening bolts 8 are connected to each other. The fastening bolts 8 can be connected and inserted in a straight line. Thereby, even if the fastening bolts 8 penetrate the plurality of pavement floor materials A, the fastening bolts 8 having a predetermined length can be connected to easily connect the fastening bolts 8 in a long section to construct the work.

【0006】[0006]

【実施例】舗装床材Aは工場で適当な大きさにブロック
化して形成されており、コンクリート系の基材10の上
に表面仕上げ石材11を一体に設けてある。コンクリー
ト系の基材10としては例えばCFRC(カーボンファ
イバーレインホースコンクリート)のような材料を用い
てある。このCFRCを用いると、高強度で、軽量で、
耐久性があり、寸法安定性があり、耐火性のあるものが
得られる。表面仕上げ石材11としては御影石のような
天然石、人造石等が用いられる。舗装床材Aを製造する
とき、基材10内には一体にパイプ12が埋設され、こ
のパイプ12にて水平方向に貫通する挿通孔7が形成さ
れる。このパイプ12は縦方向及び横方向に埋設され、
縦方向及び横方向に挿通孔7が形成されている。また締
め付けボルト8はステンレス鋼等にて形成されるもので
あり、所定の定尺長さに形成してある。この締め付けボ
ルト8の端部には半割り部5を設けてあり、半割り部5
に歯状の凹凸嵌合部5aを設けてある。この締め付けボ
ルト8に螺合する締め付けナット9もステンレス鋼等で
形成してある。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A pavement flooring material A is formed into blocks of an appropriate size in a factory, and a surface finishing stone material 11 is integrally provided on a concrete base material 10. As the concrete base material 10, for example, a material such as CFRC (carbon fiber rain hose concrete) is used. When this CFRC is used, it is high strength, lightweight,
It is durable, dimensionally stable and fire resistant. Natural stones such as granite, artificial stones and the like are used as the surface finishing stone 11. When manufacturing the pavement flooring material A, the pipe 12 is embedded in the base material 10 integrally, and the insertion hole 7 penetrated in the horizontal direction by this pipe 12 is formed. This pipe 12 is buried vertically and horizontally,
Insertion holes 7 are formed in the vertical and horizontal directions. The fastening bolt 8 is made of stainless steel or the like and has a predetermined fixed length. Half ends 5 are provided at the ends of the tightening bolts 8.
Is provided with a tooth-shaped uneven fitting portion 5a. The fastening nut 9 screwed to the fastening bolt 8 is also formed of stainless steel or the like.

【0007】しかして上記のように構成せる舗装床材A
を用いて次のように道路と玄関ポーチとの間の通路の舗
装工事が行われる。まず地面13を一定の深さ掘削し、
掘削した部分に砕石地業を行って、図2に示すように砕
石層1を形成する。本実施例の場合、2回の砕石地業を
行って第1砕石層1aと第2砕石層1bを形成してあ
る。次いで砕石層1の上に砂地業を行って砂層6が積層
される。この砂層6の砂にはセメント等の固結剤を混入
してあってもよい。砂層6の上には舗装床材Aが図3に
示すように並べられ、隣り合う舗装床材Aの挿通孔7が
対応させられる。複数個の舗装床材Aに亙るように挿通
孔7に締め付けボルト8が挿通され、端部に位置する舗
装床材Aの側端面で締め付けボルト8に締め付けナット
9が螺合され、締め付けナット9を締め付けることによ
り、複数個の舗装床材Aが締結されて舗装床材Aが砂層
6の上に固定される。締め付けボルト8は上記のように
所定の定尺長さに形成してあるための舗装床材Aの個数
が多くて1本の締め付けボルト8では足りないときは、
一対の締め付けボルト8の半割り部5同士を重ねると共
に凹凸嵌合部5a同士を嵌合し、挿通孔7に挿通するこ
とにより複数本の締め付けボルト8を一直線上に接続す
る。このように締め付けボルト8を接続して挿通する
と、必要以上長い締め付けボルト8を用意する必要がな
く、締め付けボルト8の挿通がしやすいと共に狭いスペ
ースの施工場所でも簡単に施工できる。締め付けナット
9は端部に夫々2個づつ螺合してダブルナット構造とし
て緩み止めをしてある。締め付けボルト8を挿通して複
数個の舗装床材Aを締結するとき、縦方向及び横方向の
挿通孔7の両方に挿通して縦方向及び横方向の両方を締
結しても、いずれか一方であってもよい。
[0007] The pavement floor material A constructed as described above
The paving work of the passage between the road and the entrance porch is performed as follows. First, the ground 13 is excavated to a certain depth,
A crushed stone ground is formed on the excavated portion to form a crushed stone layer 1 as shown in FIG. In the case of this embodiment, the first crushed stone layer 1a and the second crushed stone layer 1b are formed by performing crushed stone ground twice. Next, the sand layer business is performed on the crushed stone layer 1, and the sand layer 6 is laminated. The sand of the sand layer 6 may be mixed with a binder such as cement. The pavement flooring materials A are arranged on the sand layer 6 as shown in FIG. 3, and the insertion holes 7 of the adjacent pavement flooring materials A are made to correspond to each other. A tightening bolt 8 is inserted into the insertion hole 7 so as to extend over the plurality of pavement floor materials A, and a tightening nut 9 is screwed into the tightening bolt 8 at a side end surface of the pavement floor material A located at an end, and a tightening nut 9 is provided. , The plurality of pavement floor members A are fastened to fix the pavement floor member A on the sand layer 6. When the fastening bolts 8 are formed to have a predetermined fixed length as described above and the number of pavement flooring materials A is large and one fastening bolt 8 is insufficient,
A plurality of fastening bolts 8 are connected in a straight line by overlapping the half-split portions 5 of the pair of fastening bolts 8 with each other, fitting the concave-convex fitting portions 5a together, and inserting the fastening bolts 8 into the insertion holes 7. When the tightening bolts 8 are connected and inserted in this way, it is not necessary to prepare the tightening bolts 8 longer than necessary, so that the tightening bolts 8 can be easily inserted and can be easily installed even in a narrow space. Tightening nuts 9 are screwed into the ends, two by two, to prevent loosening as a double nut structure. When fastening the plurality of pavement flooring materials A by inserting the fastening bolts 8, either one of the vertical direction and the horizontal direction is fastened by inserting both the vertical direction and the horizontal direction through holes 7. It may be.

【0008】また図3の縦方向の両側の端部に位置する
舗装床材A′の場合、図4に示すように基材10の側端
面にも表面仕上げ石材11を積層してあり、挿通孔7に
対応する部分で表面仕上げ石材11には開口14を設け
てあり、開口14の奥で基材10にはナット収納凹部1
5を設けてある。そしてナット収納凹部15に締め付け
ナット9を収納して締め付けてあり、開口14にはゴム
キャップ等のキャップ19を被着してある。また舗装床
材A′の基材10にはアンカー16を埋設してあり、ア
ンカー16にステンレス鋼製の補強材17を取り付けて
ある。この補強材17は砂層6内に埋設され、補強材1
7は補強の役目以外に舗装床材A′の横ずれを防止する
作用をするようになっている。
In the case of the pavement flooring material A 'located at both ends in the vertical direction in FIG. 3, a surface finish stone 11 is also laminated on the side end surface of the base material 10 as shown in FIG. An opening 14 is provided in the surface finishing stone 11 at a portion corresponding to the hole 7, and a nut storage recess 1
5 is provided. The tightening nut 9 is housed in the nut housing recess 15 and tightened, and the opening 14 is covered with a cap 19 such as a rubber cap. An anchor 16 is embedded in the base material 10 of the pavement floor material A ', and a stainless steel reinforcing member 17 is attached to the anchor 16. The reinforcing member 17 is embedded in the sand layer 6 and the reinforcing member 1
Numeral 7 serves to prevent lateral displacement of the paved floor material A 'in addition to the role of reinforcement.

【0009】[0009]

【考案の効果】本考案は叙述のように砕石地業した砕石
層の上に砂地業した砂層を積層し、適当なサイズにブロ
ック化した舗装床材を砂層の上に複数個並べ、各舗装床
材内に水平方向に貫通するように設けた挿通孔を対応さ
せると共に複数個の舗装床材に亙るように挿通孔に締め
付けボルトを挿通し、締め付けボルトに螺合した締め付
けナットにて複数個の舗装床材を締結しているので、砕
石地業や砂地業をした後、工場で予めブロック化して形
成した舗装床材を砂層の上に並べ、複数個の舗装床材を
締め付けボルトと締め付けナットで締結して舗装床材を
取り付けることができるものであって、舗装床材を乾式
工法で取り付け施工でき、工期を短縮できると共に工費
を削減できるものであり、また複数個の舗装床材に亙る
ように挿通孔に複数本の締め付けボルトを一直線上に位
置するように挿通し、隣り合う締め付けボルトの端部の
半割り部を互いに重合すると共に半割り部の凹凸嵌合部
を互いに嵌合して複数本の締め付けボルトを連結してい
るので、舗装床材の個数が多くても一定長さの締め付け
ボルトを接続しながら挿通孔に挿通することで対応でき
るものであって、舗装床材の数が変わっても簡単に対応
できると共に締め付けボルトの長さが必要以上長くなく
て施工が容易にできるものであり、さらに舗装床材にパ
イプを埋設することで挿通孔を形成したので、寸法精度
のよい挿通孔を舗装床材の全長に亙って形成できるもの
であって、締め付けボルトの外径と挿通孔の内径を近付
けてがたつかないようにしてもスムーズに締め付けボル
トを挿通できると共に締め付けボルトの外径と挿通孔の
内径を近付けて半割り部の凹凸嵌合部の嵌合が外れない
ようにできるものである。
[Effects of the Invention] As described above, the present invention stacks a sandy layered sand layer on a crushed stone layered rock layer, and arranges a plurality of pavement flooring materials in blocks of an appropriate size on the sand layer. inserting the fastening bolt into the insertion hole so over a plurality of paving flooring causes to correspond to the provided was the insertion hole so as to penetrate the horizontal direction in the bed material, a plurality in the tightened tightening screwed to bolt and nut Since the pavement floor material is fastened, after crushing and sanding and sanding, the pavement floor material formed in blocks at the factory is arranged on the sand layer, and multiple pavement floor materials are tightened with bolts It can fasten the pavement floor material by fastening with nuts, can install the pavement floor material by dry method, can shorten the construction period and reduce the construction cost, and can also be used for multiple pavement floor materials. Over the insertion hole A plurality of tightening bolts are inserted by inserting the tightening bolts so as to be located on a straight line, overlapping the half portions of the ends of the adjacent tightening bolts with each other, and fitting the concave and convex fitting portions of the half portions together. , So that even if the number of paving floor materials is large, it can be tightened to a certain length.
It can be handled by inserting the bolt into the insertion hole while connecting
And can easily respond to changes in the number of paved floor materials
And the length of the tightening bolt is not longer than necessary
Construction, making it easy to construct
Since the insertion hole was formed by burying the IP, dimensional accuracy
Capable of forming good insertion holes over the entire length of the paved flooring
And bring the outer diameter of the tightening bolt closer to the inner diameter of the insertion hole.
Even if you do not rattle, tighten the bolts smoothly.
Can be inserted, and the outer diameter of the tightening bolt and the insertion hole
The inner diameter is close and the fitting of the uneven fitting part of the half split part does not come off
It is something that can be done.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本考案の一実施例の要部の一部切欠断面図であ
る。
FIG. 1 is a partially cutaway sectional view of a main part of an embodiment of the present invention.

【図2】同上の舗装床材を取り付けた状態を示す一部切
欠断面図である。
FIG. 2 is a partially cutaway sectional view showing a state in which the paving floor material is attached.

【図3】同上の舗装床材を取り付けた状態の平面図であ
る。
FIG. 3 is a plan view showing a state where the paving floor material is attached.

【図4】図3の要部の拡大断面図である。FIG. 4 is an enlarged sectional view of a main part of FIG.

【図5】同上の締め付けボルトの接続を示し、(a)は
接続状態を示す正面図、(b)は分解正面図である。
5A and 5B show the connection of the same tightening bolts, FIG. 5A is a front view showing a connection state, and FIG. 5B is an exploded front view.

【図6】従来例を示す断面図である。FIG. 6 is a sectional view showing a conventional example.

【符号の説明】[Explanation of symbols]

A 舗装床材 1 砕石層 5 半割り部 5a 凹凸嵌合部 6 砂層 7 挿通孔 8 締め付けボルト 9 ナット A Pavement flooring material 1 Crushed stone layer 5 Half-split part 5a Concavo-convex fitting part 6 Sand layer 7 Insertion hole 8 Tightening bolt 9 Nut

Claims (1)

(57)【実用新案登録請求の範囲】(57) [Scope of request for utility model registration] 【請求項1】 砕石地業した砕石層の上に砂地業した砂
層を積層し、適当なサイズにブロック化した舗装床材を
砂層の上に複数個並べ、各舗装床材内にパイプを埋設す
ることで水平に貫通するように設けた挿通孔を対応させ
ると共に複数個の舗装床材に亙るように挿通孔に複数本
の締め付けボルトを一直線上に位置するように挿通し、
隣り合う締め付けボルトの端部の半割り部を互いに重合
すると共に半割り部の凹凸嵌合部を互いに嵌合して複数
本の締め付けボルトを連結し、締め付けボルトに螺合し
た締め付けナットにて複数個の舗装床材を締結して成る
ことを特徴とする舗装床材の取り付け構造。
1. A sand layer made of sand is laminated on a crushed layer made of crushed stone, a plurality of pavement floor materials which are formed into blocks of an appropriate size are arranged on the sand layer, and a pipe is embedded in each pavement floor material. You
By inserting a plurality of tightening bolts into the insertion holes so as to correspond to the insertion holes provided so as to penetrate horizontally and to extend over a plurality of pavement floor materials so as to be located on a straight line,
The half-split portions of the ends of adjacent tightening bolts are overlapped with each other, and the concave / convex fitting portions of the half-split portions are fitted to each other to connect a plurality of tightening bolts, and a plurality of tightening nuts screwed to the tightening bolts. A pavement floor mounting structure, wherein the pavement floors are fastened to each other.
JP1992057041U 1992-08-13 1992-08-13 Mounting structure for paved flooring Expired - Fee Related JP2557272Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1992057041U JP2557272Y2 (en) 1992-08-13 1992-08-13 Mounting structure for paved flooring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1992057041U JP2557272Y2 (en) 1992-08-13 1992-08-13 Mounting structure for paved flooring

Publications (2)

Publication Number Publication Date
JPH0618407U JPH0618407U (en) 1994-03-11
JP2557272Y2 true JP2557272Y2 (en) 1997-12-10

Family

ID=13044364

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1992057041U Expired - Fee Related JP2557272Y2 (en) 1992-08-13 1992-08-13 Mounting structure for paved flooring

Country Status (1)

Country Link
JP (1) JP2557272Y2 (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62291301A (en) * 1986-06-12 1987-12-18 住友セメント株式会社 Paving block
JPS63125702A (en) * 1986-11-15 1988-05-28 小山 富司 Roadbed material for road

Also Published As

Publication number Publication date
JPH0618407U (en) 1994-03-11

Similar Documents

Publication Publication Date Title
KR100662015B1 (en) Precast concrete panel for paving of road
JP2557272Y2 (en) Mounting structure for paved flooring
JPH0657705A (en) Pavement subgrade material installation structure
JP2001040620A (en) Soundproof wall formed of precast concrete, and method for constructing the same
US20030061781A1 (en) Support system for a structure
KR19980010326U (en) Fixed installation structure of construction angle
JP2988878B2 (en) Construction method of decorative material-implanted floorboard and floorboard
JPS64407Y2 (en)
JP2552864B2 (en) Wall panels such as basements
JPH0618409U (en) Pavement floor attachment structure
JPS59165737A (en) Strip foundation and its construction
JP2892972B2 (en) How to install a residential entrance
JP3108565B2 (en) Assembly blocks for underground structures
JPH0141786Y2 (en)
JP2780541B2 (en) Composite wall panel molding method
JP2612415B2 (en) Pillar construction materials
KR200212405Y1 (en) Precast concrete segment for arch type culvert
JP2546956Y2 (en) Box carton with foundation
JPH06167003A (en) Road curb stone forming method
JP3060180U (en) Connected natural stone for stairs
JP3335483B2 (en) PC version for road pavement and composite pavement method using the same
KR20020009116A (en) Precast concrete segment for arch type culvert and construction method using this segment
JP3040514U (en) Rock wall
JPH0618408U (en) Pavement floor attachment structure
JPH0120436Y2 (en)

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19970805

LAPS Cancellation because of no payment of annual fees