JP2556242B2 - Gulf loading method - Google Patents
Gulf loading methodInfo
- Publication number
- JP2556242B2 JP2556242B2 JP4186825A JP18682592A JP2556242B2 JP 2556242 B2 JP2556242 B2 JP 2556242B2 JP 4186825 A JP4186825 A JP 4186825A JP 18682592 A JP18682592 A JP 18682592A JP 2556242 B2 JP2556242 B2 JP 2556242B2
- Authority
- JP
- Japan
- Prior art keywords
- container
- cargo
- deck
- loading
- yard
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Ship Loading And Unloading (AREA)
Description
【0001】[0001]
【産業上の利用分野】この発明は、接岸する貨物船への
コンテナの積み込みおよび積み下ろしをきわめて効率よ
く行えるようにした湾岸荷役方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of loading and unloading a container which enables extremely efficient loading and unloading of containers to and from a freighter on the shore.
【0002】[0002]
【従来の技術】湾岸の荷役では、近年、ユニット貨物と
してコンテナによる輸送が主体になりつつあるが、貨物
船へのコンテナの積み込みおよび積み下ろしには、大型
クレーンが使用されている。また、貨物船による海上輸
送は、トラック輸送等による陸上輸送に比べ、一度には
るかに大量の荷物を運べるが、輸送速度が遅いため、岸
壁における荷役の速度もあまり問題にならなかった。2. Description of the Related Art In recent years, in cargo handling on the Gulf, container transportation as a unit cargo has become the mainstream, but a large crane is used for loading and unloading containers on a cargo ship. Further, sea transportation by freighter can carry a much larger amount of cargo at one time than land transportation by truck, etc. However, since the transportation speed is slow, the speed of cargo handling on the quay was not a problem.
【0003】しかし、近年、高速船が開発され、高速船
の利点を生かすためにも、荷役速度の高速化が望まれて
きた。However, in recent years, high-speed ships have been developed, and in order to take advantage of the advantages of high-speed ships, it has been desired to increase the cargo handling speed.
【0004】[0004]
【発明が解決しようとする課題】しかし、現在のように
コンテナを一つ一つクレーンで吊って積み込みおよび積
み下ろしをしていたのでは、貨物船は相当の時間、岸壁
に拘束されることになるので、高速船の利点を有効に生
かすことができず、荷主の要求に充分に応じきれなくな
るという課題があった。However, if the containers are loaded and unloaded by cranes one by one as in the present case, the freighter will be restrained by the quay for a considerable time. Therefore, there is a problem that the advantage of the high-speed ship cannot be effectively utilized, and it becomes impossible to sufficiently meet the demand of the shipper.
【0005】この発明はこのような前記従来の課題を解
決するためになされたもので、接岸する貨物船への荷の
積み込みおよび荷下ろしを可能な限り速く、効率よく行
うことができて、高速貨物船の利点を有効に生かせるよ
うにした湾岸荷役方法を提供することを目的とする。The present invention has been made in order to solve the above-mentioned conventional problems. It is possible to load and unload a cargo on a freighter berth as fast as possible, efficiently and at high speed. It is an object of the present invention to provide a Gulf cargo handling method that effectively utilizes the advantages of a cargo ship.
【0006】[0006]
【課題を解決するための手段】この発明に係る湾岸荷役
方法は、貨物船を引き込む引込み水路と、この引込み水
路より高い位置に設けられた荷捌きヤードとを備え、前
記貨物船のデッキおよび荷捌きヤードを海面下に水没さ
せて前記デッキ上の上に積載された積み下ろしコンテナ
および前記荷捌きヤードの上に積載された積み込みコン
テナを海面上にそれぞれ浮かせ、つぎに、前記積み下ろ
しコンテナを荷捌きヤードまで、前記積み込みコンテナ
を貨物船のデッキまでそれぞれ曳航し、つぎに、前記貨
物船のデッキを海面上に浮上させ、前記荷捌きヤードを
排水することによってコンテナの積み込みおよび積み下
ろしを効率よく行うものである。According to the method of cargo handling according to the present invention, there is provided a cargo channel for pulling in a cargo ship and a cargo handling yard provided at a position higher than this cargo channel, and the deck and cargo handling of the cargo ship are provided. The yard is submerged below the sea level and the loading / unloading container loaded on the deck and the loading container loaded on the loading / unloading yard are floated above the sea level, and then the loading / unloading container is moved to the loading / unloading yard. The towing of the loading container to the deck of the cargo ship, then the deck of the cargo ship is floated above the sea surface, and the loading and unloading of the container is efficiently carried out by draining the handling yard. is there.
【0007】[0007]
【実施例】図1〜図3はこの発明に係る荷役方法の一実
施例を示し、図1および図2は作業工程を示す岸壁の断
面図、図3はその平面図である。1 to 3 show an embodiment of a cargo handling method according to the present invention, FIGS. 1 and 2 are sectional views of a quay showing working steps, and FIG. 3 is a plan view thereof.
【0008】図において、符号1は貨物船、2は貨物船
1の引込水路、3は荷捌きヤード、4は引込水路2の前
部を塞ぐ前面ゲート、5は荷捌きヤード3の後部を塞ぐ
後面ゲード、そして、符号6と7は、それぞれ積み込み
を待つコンテナと荷下ろしを待つコンテナである。In the drawings, reference numeral 1 is a cargo ship, 2 is a waterway of the cargo ship 1, 3 is a cargo handling yard, 4 is a front gate that closes the front of the waterway 2, and 5 is a rear portion of the cargo handling yard 3. The rear gates, and reference numerals 6 and 7 are a container waiting to be loaded and a container waiting to be unloaded, respectively.
【0009】引込水路2と荷捌ヤード3は連続して設け
られ、また、荷捌ヤード3は引込水路2より高い位置に
設けられ、さらに、引込水路2および荷捌ヤード3の両
側には同じ水位まで注水できるように側壁8,8 が連続し
て設けられている。The lead-in water channel 2 and the cargo handling yard 3 are continuously provided, and the cargo handling yard 3 is provided at a position higher than the lead-in water channel 2. Furthermore, both sides of the lead-in water channel 2 and the cargo handling yard 3 are filled to the same water level. Side walls 8 and 8 are continuously provided so as to be possible.
【0010】このような構成において、前面ゲート4と
後面ゲート5を閉め、引込水路2および荷捌ヤード3に
ポンプ注水して荷捌ヤード3の床面を完全に水没させる
ことができ、また、荷捌ヤード3のみをポンプ排水する
ことができる。In such a structure, the front gate 4 and the rear gate 5 are closed, and the floor surface of the cargo handling yard 3 can be completely submerged by pumping water into the lead-in water channel 2 and the cargo handling yard 3. Only 3 can be pumped out.
【0011】つづいて、作業方法を順をおって説明す
る。Next, the working method will be described step by step.
【0012】 最初に前面ゲート4を開けて貨物船1
を引込水路2内に入れる。そして、再び前面ゲート4を
閉め、同時に後部ゲート5も閉める。このとき、荷捌ヤ
ード3では、既に、コンテナ6の積み込み準備を完了さ
せ、待機させておく。First, the front gate 4 is opened to open the cargo ship 1
In the water channel 2. Then, the front gate 4 is closed again, and at the same time, the rear gate 5 is closed. At this time, in the loading / unloading yard 3, preparations for loading the container 6 have already been completed and kept in standby.
【0013】 次に、引込水路2および荷捌ヤード3
内に、海水をポンプ注水して荷捌きヤード3内のコンテ
ナ7を海面上に浮かせる。同時に、バラスト等によって
貨物船1の喫水を変化させて貨物船1のデッキを水没さ
せることにより、貨物船1のデッキの上のコンテナ7を
海水に浮かせる。Next, the lead-in water channel 2 and the cargo handling yard 3
A container 7 in the handling yard 3 is floated above the sea by pumping seawater into the inside. At the same time, the draft of the cargo ship 1 is changed by ballast or the like to submerge the deck of the cargo ship 1 so that the container 7 on the deck of the cargo ship 1 is floated in seawater.
【0014】なお、貨物船1のデッキを海面より低い位
置に設け、その後部にゲート9を設け、このゲ−ト9を
開けて、海面に浮いたコンテナ6を海水ごとデッキ内に
引き込み、再びゲート9を閉め、かつ、海水をポンプ排
水することによってコンテナの積み込みを行うようにし
てもよい(図4参照)。It should be noted that the deck of the cargo ship 1 is provided at a position lower than the sea level, the gate 9 is provided at the rear of the deck, the gate 9 is opened, and the container 6 floating on the sea level is pulled into the deck together with the seawater, The container may be loaded by closing the gate 9 and pumping out seawater (see FIG. 4).
【0015】 次に、海面に浮いたコンテナ7を荷捌
ヤード3側に曳航し、荷捌ヤード3の一角に設けられた
コンテナ置き場に係留する。Next, the container 7 floating on the sea surface is towed to the side of the cargo handling yard 3 and moored at a container storage space provided at one corner of the cargo handling yard 3.
【0016】 次に、コンテナ6を貨物船1側に引っ
張りだし、デッキまで曳航し 、デッキの真上に係留す
る。Next, the container 6 is pulled out to the cargo ship 1 side, towed to the deck, and moored right above the deck.
【0017】 次に、貨物船1を、デッキが海面上に
現れるまで浮上させる。これにより、海面上に浮いた状
態のコンテナ6がデッキの上に載せられ、積み込みが完
了する。Next, the freighter 1 is levitated until the deck appears above sea level. As a result, the container 6 floating on the sea surface is placed on the deck, and the loading is completed.
【0018】また、荷捌ヤード3の床面が海面上に現れ
るまで、荷捌ヤード3内の海水をポンプ排水する。これ
により、コンテナ置き場に係留されたコンテナ7はコン
テナ置き場に置かれ、荷下ろしが完了したことになる。Further, the seawater in the cargo handling yard 3 is pumped out until the floor surface of the cargo handling yard 3 appears above the sea surface. As a result, the container 7 moored at the container storage place is placed at the container storage place, and the unloading is completed.
【0019】なお、コンテナ6および7を容易に浮き易
くするためにフロート10を設けてもよく、この場合、フ
ロ−ト10ごとコンテナ6および7を出し入れするものと
する。A float 10 may be provided in order to easily float the containers 6 and 7, and in this case, the containers 6 and 7 are taken in and out together with the float 10.
【0020】[0020]
【発明の効果】この発明は以上説明したように構成さ
れ、貨物船へのコンテナの積み込みおよび貨物船からの
コンテナの荷下ろしは、全て、海水の浮力を利用して行
うため、特別な荷役機械の助けを借りないできわめて簡
単に行うことができる。The present invention is configured as described above, and since loading and unloading of containers from a cargo ship are all performed by utilizing the buoyancy of seawater, a special cargo handling machine is used. Very easy to do without the help of.
【0021】また、貨物船上のコンテナの一括積み卸し
および貨物船へのコンテナの一括積み込みが可能であ
り、コンテナの積み込みおよび積み下ろし作業をきわめ
て効率良く行うことができる。Further, the containers on the cargo ship can be collectively unloaded and the containers can be collectively loaded on the cargo ship, and the loading and unloading operations of the containers can be performed very efficiently.
【図1】この発明に係る湾岸荷役方法の一実施例の一工
程を示す側面図である。FIG. 1 is a side view showing a step of an embodiment of a method of cargo handling according to the present invention.
【図2】この発明に係る湾岸荷役方法の一実施例の一工
程を示す側面図である。FIG. 2 is a side view showing a step of an embodiment of the method of cargo handling according to the present invention.
【図3】図2の平面図である。FIG. 3 is a plan view of FIG. 2;
【図4】貨物船の側面図である。FIG. 4 is a side view of a cargo ship.
【図5】コンテナの側面図である。FIG. 5 is a side view of the container.
1…貨物船、2…引込水路、3…荷捌きヤード、4…前
面ゲート、5…後面ゲード、6…積み込みコンテナ、7
…積み下ろしコンテナ、8…側壁、9…ゲート、10…フ
ロ−ト。DESCRIPTION OF SYMBOLS 1 ... Cargo ship, 2 ... Intake channel, 3 ... Handling yard, 4 ... Front gate, 5 ... Rear gate, 6 ... Loading container, 7
… Unloading container, 8… side wall, 9… gate, 10… float.
Claims (1)
込み水路より高い位置に設けられた荷捌きヤードとを備
え、前記貨物船のデッキおよび荷捌きヤードを海面下に
水没させて前記デッキ上の上に積載された積み下ろしコ
ンテナおよび前記荷捌きヤードの上に積載された積み込
みコンテナを海面上にそれぞれ浮かせ、つぎに、前記積
み下ろしコンテナを荷捌きヤードまで、前記積み込みコ
ンテナを貨物船のデッキまでそれぞれ曳航し、つぎに、
前記貨物船のデッキを海面上に浮上させ、前記荷捌きヤ
ードを排水することを特徴とする湾岸荷役方法。1. A retracting waterway for drawing in a cargo ship, and a handling yard provided at a position higher than this drawingway. The deck of the cargo ship and the handling yard are submerged below the sea level and placed on the deck. The unloading container loaded above and the loading container loaded above the handling yard are floated above the sea surface, respectively, and then the unloading container is towed to the handling yard and the loading container is towed to the deck of the cargo ship. Then, next,
A method of loading and unloading a Gulf, wherein the deck of the cargo ship is floated above the sea surface and the handling yard is drained.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4186825A JP2556242B2 (en) | 1992-07-14 | 1992-07-14 | Gulf loading method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4186825A JP2556242B2 (en) | 1992-07-14 | 1992-07-14 | Gulf loading method |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0632278A JPH0632278A (en) | 1994-02-08 |
JP2556242B2 true JP2556242B2 (en) | 1996-11-20 |
Family
ID=16195275
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP4186825A Expired - Lifetime JP2556242B2 (en) | 1992-07-14 | 1992-07-14 | Gulf loading method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2556242B2 (en) |
-
1992
- 1992-07-14 JP JP4186825A patent/JP2556242B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH0632278A (en) | 1994-02-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3823681A (en) | Barge carrying transport vessel | |
US3610192A (en) | System of moving laden ships through shallow draft-limited waters | |
JP2003525170A (en) | Submerged heavy lift catamaran | |
US3318276A (en) | Ocean-going barge carrier | |
US3587505A (en) | Partially submersible carrier vessel | |
US3139197A (en) | Structure for loading and unloading cargo | |
JP2556242B2 (en) | Gulf loading method | |
US3870003A (en) | Storage-vessel | |
JPS588488A (en) | Transport ship | |
US4292915A (en) | Ocean-going barge carrier | |
JPS61115794A (en) | Float-on float-off vessel | |
KR101136095B1 (en) | Marine Cargo Loading and Unloading Method Using Cargo-Boxes | |
US3863585A (en) | Marine cargo vessel | |
US3540399A (en) | Timber carrying vessel | |
KR810001447B1 (en) | Barge-carrying waterborne vessel | |
KR101263247B1 (en) | Mobile harbor | |
KR820001819B1 (en) | Dockship | |
JP2527304Y2 (en) | Oil recovery combined equipment carrier | |
JPS5820833B2 (en) | ore carrier | |
KR810001448B1 (en) | Barge-carrying waterborne vessel transportation method | |
JPS5832076B2 (en) | Small vessel for container off-shore fishing | |
RU2059516C1 (en) | Dump scow | |
JPS592675B2 (en) | How to convert a tanker into a plant carrier | |
JPS61191495A (en) | Shipping of large structure | |
JPH088206Y2 (en) | Ship storage system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 19960716 |