JP2547505B2 - Bonded steel plate cleaning device for underground wall joints - Google Patents

Bonded steel plate cleaning device for underground wall joints

Info

Publication number
JP2547505B2
JP2547505B2 JP4242115A JP24211592A JP2547505B2 JP 2547505 B2 JP2547505 B2 JP 2547505B2 JP 4242115 A JP4242115 A JP 4242115A JP 24211592 A JP24211592 A JP 24211592A JP 2547505 B2 JP2547505 B2 JP 2547505B2
Authority
JP
Japan
Prior art keywords
steel plate
cleaning device
joint
guide
scraper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP4242115A
Other languages
Japanese (ja)
Other versions
JPH0688337A (en
Inventor
満 横山
昭郎 上田
俊介 根本
孝 田沢
敏久 高根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP4242115A priority Critical patent/JP2547505B2/en
Publication of JPH0688337A publication Critical patent/JPH0688337A/en
Application granted granted Critical
Publication of JP2547505B2 publication Critical patent/JP2547505B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Cleaning In General (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、地中連続壁継手の接合
鋼板清掃装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a steel plate cleaning device for a continuous continuous wall joint.

【0002】[0002]

【従来の技術】従来、地中連続壁の施工するに際して、
先ず、あらかじめガイドウォールWを設置する(図
5)。次いで、ベースマシン(図示の例ではクローラク
レーン)CCで掘削機DMを吊り下ろし、掘削溝D1を
掘り下げる(図6)。
2. Description of the Related Art Conventionally, when constructing a continuous underground wall,
First, the guide wall W is installed in advance (FIG. 5). Next, the excavator DM is hung by the base machine (crawler crane in the illustrated example) CC, and the excavation groove D1 is dug down (FIG. 6).

【0003】そこで、所定の深さまで掘り下げた後に掘
削溝D1内のスライムを吸い上げ除去して、さらに掘り
下げに用いた掘削循環泥水を良液GLで置換する(図
7)。次いで、クローラクレーンCCで吊り具Hを介し
て先行鉄筋篭B1を掘削溝Dの中に吊り下ろす(図
8)。そこで、クローラクレーンCCでトレミー管Tを
吊り下ろす(図9)。
Therefore, after excavating to a predetermined depth, the slime in the excavation groove D1 is sucked up and removed, and the excavation circulating mud used for the excavation is replaced with the good liquid GL (FIG. 7). Next, the crawler crane CC suspends the preceding rebar cage B1 into the excavation groove D through the suspending tool H (FIG. 8). Then, the tremie pipe T is hung by the crawler crane CC (FIG. 9).

【0004】次いで、砕石用ホッパSHにベルトコンベ
アCを連結し、鉄筋篭B1の外部に砕石Sを詰めて鉄筋
篭B1を安定させ、コンクリートポンプPをフレキシブ
ルホースFを介してトレミー管Tに接続し、コンクリー
トを打設して先行エレメントE1(図13)を築造する
(図10)。
Next, a belt conveyor C is connected to the crushing stone hopper SH, the crushed stones S are packed outside the rebar cage B1 to stabilize the rebar cage B1, and the concrete pump P is connected to the tremie pipe T via a flexible hose F. Then, concrete is poured to construct the preceding element E1 (FIG. 13) (FIG. 10).

【0005】後行エレメントE2(図18)の築造は、
先ず、図8と同様に、先行エレメントE1、E1の間の
部分に掘削溝D2を掘削する(図11)。
The construction of the trailing element E2 (FIG. 18) is
First, similarly to FIG. 8, the excavation groove D2 is excavated in the portion between the preceding elements E1 and E1 (FIG. 11).

【0006】次いで、先行エレメントE1の両面に設け
ておいた継手防護板DPをクローラクレーンCCで引き
抜く(図12)。なお、継手防護板DPは先行エレメン
トのジョイント部に掘削土がはいって後行エレメントの
ジョイント部が入らなくなるのを防ぐためのものであ
る。 そこで、ウィンチWMにより清掃機CMを先行エ
レメントE1の接合鋼板JPの端面に沿って昇降し、端
面を清掃する(図13)。
Next, the joint protection plates DP provided on both sides of the preceding element E1 are pulled out by the crawler crane CC (FIG. 12). The joint protection plate DP is for preventing excavated soil from entering the joint portion of the preceding element and preventing the joint portion of the following element from entering. Then, the winch WM moves the cleaner CM up and down along the end face of the joining steel plate JP of the preceding element E1 to clean the end face (FIG. 13).

【0007】次に、掘削溝D2内のスライムを処理して
掘削循環泥水を良液GLで置換する(図14)。そこ
で、クローラクレーンCCで鉄筋篭B2を建て込む(図
15)。次いで、図9と同様に、砕石を投入しトレミー
管Tを建て込む(図16)。そこで、コンクリートを打
設する(図17)。
Next, the slime in the excavation groove D2 is treated to replace the excavation circulating mud with the good liquid GL (FIG. 14). Therefore, the reinforced cage B2 is built with the crawler crane CC (Fig. 15). Then, similarly to FIG. 9, crushed stones are charged and the tremie pipe T is built (FIG. 16). Then, concrete is poured (Fig. 17).

【0008】最後に、グラウドポンプGで継手部にセメ
ントミルクをグラウトを注入する(図18)。
Finally, grout pump G is used to inject cement milk into the joint (FIG. 18).

【0009】上記の態様において、図10における砕石
Sは、後行エレメントE2の鉄筋籠B2の建込み前に、
継手部の機能を確実にするため、砕石Sを清掃する必要
がある。しかし、砕石Sは、圧密により自立、又は先行
エレメントE1のコンクリート打設時のセメントミルク
により接合鋼板JPに付着している場合がある。
In the above embodiment, the crushed stone S in FIG. 10 has the following structure before the rebar cage B2 of the trailing element E2 is installed:
The crushed stone S must be cleaned to ensure the function of the joint. However, the crushed stone S may be self-supporting due to compaction or adhered to the joining steel plate JP by cement milk at the time of placing concrete of the preceding element E1.

【0010】図13に示す従来の清掃機CMは、へら状
の下端部で砕石S等をかき落とし、また、固化した砕石
Sに対しては、別の図示しないくさび状の鋼材を落下さ
せて破砕するようにしている。
A conventional cleaning machine CM shown in FIG. 13 scrapes off crushed stones S and the like at the lower end of a spatula, and crushes the solidified crushed stones by dropping another wedge-shaped steel material (not shown). I am trying to do it.

【0011】[0011]

【発明が解決しようとする課題】砕石の除去清掃は、固
化していない比較的柔らかい砕石を広い範囲でかき落と
すへら状スクレーパと、そのスクレーパではかき落とせ
ない比較的硬い砕石を壊す落下体との2台が必要であっ
た。
To remove and clean crushed stones, a spatula scraper that scrapes off a relatively soft crushed stone that has not been solidified over a wide area and a falling body that breaks a relatively hard crushed stone that cannot be scraped off by the scraper are used. Two were needed.

【0012】また、ヘラ状スクレーパは、広い範囲の砕
石をかき落とすため、大型で重くなる。
Further, since the spatula scraper scrapes off a wide range of crushed stones, it becomes large and heavy.

【0013】また、へら状スクレーパでかき落とせない
場合に、落下体に取り変えるので、清掃効率が悪い。
Further, when the scraper scraper cannot scrape off, it is replaced with a falling body, so that the cleaning efficiency is poor.

【0014】本発明は、清掃効率が良く比較的に小型計
量な地中連続壁継手の接合鋼板清掃装置を提供すること
を目的としている。
An object of the present invention is to provide a jointed steel plate cleaning device for an underground continuous wall joint, which has a high cleaning efficiency and is relatively small and weighing.

【0015】[0015]

【課題を解決するための手段】本発明によれば、ガイド
手段により接合鋼板のガイドH鋼にガイドされる本体
に、砕石を破砕する複数の破砕用刃と、砕石をかき落と
す複数のスクレーパとを設けている。
According to the present invention, a plurality of crushing blades for crushing crushed stones and a plurality of scrapers for scraping crushed stones are provided in a main body guided by the guide H steel of the joined steel plate by the guide means. Is provided.

【0016】上記ガイド手段は、ガイドH鋼の中央部を
挟持する一対のガイドで構成し、本体の上部及び下部に
設けるのが好ましい。
The guide means preferably comprises a pair of guides for holding the central portion of the guide H steel and is provided at the upper and lower portions of the main body.

【0017】[0017]

【作用】上記のように構成された地中連続壁継手の接合
鋼板清掃装置においては、装置をガイドにより接合鋼板
のガイドH鋼にガイドさせて落下させる。すると、先
ず、破砕用刃が装置の自重で砕石内に食い込み、圧密自
立した砕石を緩め、または、固化した砕石にクラックを
発生させる。次いで、スクレーパが、装置の自重で緩ん
だ砕石又はクラックが入った固化砕石をかき落として清
掃する。この際、一回の落下でかき落とせない場合は、
装置を引き上げ、再度落下させてかき落とす。
In the cemented steel plate cleaning device for the underground continuous wall joint configured as described above, the device is guided by the guide H of the cemented steel plate and dropped. Then, first, the crushing blade bites into the crushed stone by its own weight, loosens the compacted self-supporting crushed stone, or causes cracks in the solidified crushed stone. The scraper then scrapes and cleans loose crushed stones or solidified crushed stones with the weight of the device. At this time, if you can not scrape with one drop,
Pull up the device and drop it again to scrape.

【0018】[0018]

【実施例】以下図面を参照して本発明のに実施例を説明
する。
Embodiments of the present invention will be described below with reference to the drawings.

【0019】図4には、先行エレメントE1(図13)
の鉄筋籠B1の接合鋼板JPが示されている。
FIG. 4 shows the preceding element E1 (FIG. 13).
The joining steel plate JP of the reinforced basket B1 of No. 3 is shown.

【0020】その接合鋼板JPに、中央部から振り分け
に一対のガイドH鋼20が、両端部には、保護アングル
21がそれぞれ突設され、中央部付近には、傾斜計用角
パイプ22が突設されている。また、保護アングル21
の付近には、後行エレメントE2の図示しないジョイン
トアームに係合するジョイントパイプ23が一体に形成
され、ジョイントパイプカバー24で覆われてる。な
お、図中の符号25は連結ロッドである。
On the jointed steel plate JP, a pair of guide H steels 20 are arranged to be distributed from the central portion, and protective angles 21 are respectively provided at both end portions, and an inclinometer square pipe 22 is projected near the central portion. It is set up. Also, the protection angle 21
A joint pipe 23 that engages with a joint arm (not shown) of the trailing element E2 is integrally formed in the vicinity of, and is covered with a joint pipe cover 24. Reference numeral 25 in the drawing is a connecting rod.

【0021】図1ないし図3において、全体を符号1で
示す清掃装置の本体2は、幅が接合鋼板JPの半幅より
若干狭い幅の断面長方形の板体に形成されている。その
本体2の中心線上の上下には、ガイドH鋼20の中央部
20aを挟持して本体2をガイドするガイド手段である
一対のガイド3がそれぞれ突設され、本体2の頂部に
は、3個の釣金具4が突設されている。
1 to 3, the main body 2 of the cleaning device, which is generally designated by reference numeral 1, is formed as a plate body having a rectangular cross section whose width is slightly narrower than the half width of the joining steel plate JP. Above and below the center line of the main body 2, a pair of guides 3 that are guide means for sandwiching the central portion 20a of the guide H steel 20 and guiding the main body 2 are provided in a protruding manner. Individual fishing fittings 4 are provided so as to project.

【0022】また、本体2の底部には、中央部から振り
分けに外側から第1破砕用刃5、第2破砕用刃6、第3
破砕用刃7及び第4破砕用刃8が突設され、また、第1
破砕用刃5の外側には、一対の隅部破砕用刃9が突設さ
れている。そして、第1、第2破砕用刃5、6を連結す
る第1スクレーパ10、第2、第3破砕用刃6、7を連
結する第2スクレーパ11及び第3、第4破砕用刃7、
8を連結する第3スクレーパ12が設けられ、第4破砕
用刃8の内側には、ガイドH鋼20の中央部20a用の
第4スクレーパ13が突設されている。
Further, at the bottom of the main body 2, the first crushing blade 5, the second crushing blade 6, and the third crushing blade are distributed from the center in order from the outside.
A crushing blade 7 and a fourth crushing blade 8 are provided so as to project, and
On the outer side of the crushing blade 5, a pair of corner crushing blades 9 are projected. Then, the first scraper 10 connecting the first and second crushing blades 5 and 6, the second scraper 11 connecting the second and third crushing blades 6 and 7, and the third and fourth crushing blades 7,
A third scraper 12 for connecting 8 is provided, and a fourth scraper 13 for the central portion 20a of the guide H steel 20 is provided inside the fourth crushing blade 8 so as to project.

【0023】前記第1、第3、第4破砕用刃5、7、8
は同形状であって、後縁部aが接合鋼板JP側に傾斜す
るテーパ状に形成され、第2破砕用刃6は、ジョイント
パイプカバー24に干渉しないように前後方向に短く形
成されている。
The first, third and fourth crushing blades 5, 7, 8
Have the same shape, the rear edge a is formed in a taper shape that is inclined toward the joint steel plate JP side, and the second crushing blade 6 is formed short in the front-rear direction so as not to interfere with the joint pipe cover 24. .

【0024】前記第1〜第3スクレーパ10〜12は、
前記後縁部aに平行に取付けられている。その第1スク
レーパ10は、ジョイントパイプカバー24に干渉しな
いように長さが短く形成され、第2スクレーパ11に
は、ジョイントパイプカバー24に干渉しないような切
欠部11aが形成されている。また、第3スクレーパ1
2には、連結ロッド25の頭部に干渉しないように切欠
部12aが形成されている。
The first to third scrapers 10 to 12 are
It is attached parallel to the rear edge a. The first scraper 10 is formed to have a short length so as not to interfere with the joint pipe cover 24, and the second scraper 11 is provided with a cutout portion 11 a that does not interfere with the joint pipe cover 24. Also, the third scraper 1
The notch 12a is formed in the connector 2 so as not to interfere with the head of the connecting rod 25.

【0025】更に、図示はしないが、破砕用刃5〜8及
び9の上方に、接合鋼板JPに付着したスライム等を清
掃する帯状のブラシを取付けるのが好ましい。
Further, although not shown, it is preferable to install a belt-shaped brush above the crushing blades 5 to 8 and 9 for cleaning slime and the like adhering to the joined steel plate JP.

【0026】次に、作用について説明する。Next, the operation will be described.

【0027】清掃に際し、装置1をガイド3を介して接
合鋼板JPの一方(図4において左側)のガイドH鋼2
0にガイドさせ、落下させる。すると、先ず、破砕用刃
5〜8及び9が、装置1の自重で砕石Sに食い込み、圧
密自立した砕石Sを緩め、または、固化した砕石Sにク
ラックを発生させる。
During cleaning, the apparatus 1 is guided through the guide 3 to the guide H steel 2 on one side (left side in FIG. 4) of the joined steel plate JP.
Guide to 0 and drop. Then, first, the crushing blades 5 to 8 and 9 bite into the crushed stone S by the weight of the device 1, loosen the compacted and self-standing crushed stone S, or cause cracks in the solidified crushed stone S.

【0028】次いで、装置1の全体の重量がスクレーパ
10〜14の刃先にかかり、緩んだ砕石S又はクラック
が発生した固化砕石Sを接合鋼板JP及びガイドH鋼2
0の表面からかき落とす。そして、一回の落下でかき落
とせないときは、装置1を、1〜2m引き上げ、再度落
下させて砕石Sをかき落として清掃する。そして、接合
鋼板JPの左側の清掃が終ったら、右側の清掃を行う。
Next, the entire weight of the apparatus 1 is applied to the blade edges of the scrapers 10 to 14, and the loose crushed stone S or the solidified crushed stone S in which cracks are generated is used for the joining steel plate JP and the guide H steel 2
Scrape from the 0 surface. Then, when the device 1 cannot be scraped off by one drop, the device 1 is pulled up by 1 to 2 m and dropped again to scrape the crushed stone S for cleaning. When the left side of the joined steel sheet JP is cleaned, the right side is cleaned.

【0029】[0029]

【発明の効果】本発明は、以上説明したように構成され
ているので、以下に記載されるような効果を奏する。
Since the present invention is configured as described above, it has the following effects.

【0030】(1) 砕石のかき落とし及び破砕かき落
としの清掃効率を向上し、作業時間を短縮することがで
きる。
(1) Cleaning efficiency for scraping and crushing crushed stones can be improved, and working time can be shortened.

【0031】(2) 比較的小型で、取扱いが容易であ
る。
(2) It is relatively small and easy to handle.

【0032】(3) かき落とし及び破砕かき落とし両
機能を備え、従来の段取り変え時間を不要にすることが
できる。
(3) Both the scraping and crushing scraping functions are provided, and the conventional setup change time can be eliminated.

【0033】(4) 機械的駆動部分がなく、故障のお
それがない。
(4) There is no mechanical drive part, and there is no risk of failure.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例を示す正面図。FIG. 1 is a front view showing an embodiment of the present invention.

【図2】図1の正面図。FIG. 2 is a front view of FIG. 1;

【図3】図1の上面図。3 is a top view of FIG.

【図4】清掃の態様を説明する上面図。FIG. 4 is a top view illustrating a cleaning mode.

【図5】地中連続壁施工態様を説明するガイドウォール
設置工程図。
FIG. 5 is a guide wall installation process diagram for explaining an underground continuous wall construction mode.

【図6】先行エレメントの掘削工程図。FIG. 6 is an excavation process diagram of a preceding element.

【図7】スライム処理、良液置換工程図。FIG. 7 is a process drawing of slime treatment and good liquid replacement.

【図8】鉄筋建て込み工程図。FIG. 8 is a reinforcing bar building process diagram.

【図9】トレミー管建て込み工程図。FIG. 9 is a process drawing of building a tremie pipe.

【図10】砕石投入、コンクリート打設工程図。FIG. 10 is a process drawing of crushed stone feeding and concrete placing.

【図11】後行エレメントの掘削工程図。FIG. 11 is an excavation process diagram of a trailing element.

【図12】継手防護板引き抜き工程図。FIG. 12 is a drawing of the joint protective plate drawing process.

【図13】継手部清掃工程図。FIG. 13 is a joint part cleaning process diagram.

【図14】スライム処理、良液置換工程図。FIG. 14 is a process drawing of slime treatment and good liquid replacement.

【図15】鉄筋建て込み工程図。FIG. 15 is a reinforcing bar building process diagram.

【図16】トレミー管建て込み工程図。FIG. 16 is a process drawing of a tremie pipe installation process.

【図17】コンクリート打設工程図。FIG. 17 is a concrete pouring process diagram.

【図18】グラウド注入工程図。FIG. 18 is a process diagram of a grout injection process.

【符号の説明】[Explanation of symbols]

B1,B2 鉄筋篭 BM ベースマシン C ベルトコンベア CM 清掃機 D1,D2 掘削溝 DM 掘削機 DP 継手防護板 E1 先行エレメント E2 後行エレメント F フレキシブルホース G グラウドポンプ GL 良液 H 吊り具 JP 接合鋼板 P コンクリートポンプ R 掘り残し部 S 砕石 SH 砕石用ホッパ T トレミー管 W ガイドウォール WH ウィンチ 1 清掃装置 2 本体 3 ガイド 4 吊金具 5 第1破砕用刃 6 第2破砕用刃 7 第3破砕用刃 8 第4破砕用刃 9 隅部破砕用刃 10 第1スクレーパ 11 第2スクレーパ 11a、12a 切欠部 12 第3スクレーパ 14 第4スクレーパ 20 ガイドH鋼 20a 中央部 21 保護アングル 22 傾斜計用角パイプ 23 ジョイントパイプ 24 ジョイントパイプカバー 25 連結ロッド B1, B2 Reinforcing bar cage BM Base machine C Belt conveyor CM Cleaning machine D1, D2 Excavation groove DM Excavator DP Joint protection plate E1 Leading element E2 Trailing element F Flexible hose G Glaude pump GL Good liquid H Lifting device JP Bonding steel plate P Concrete Pump R Uncut part S Crushed stone SH Crushed stone hopper T Tremy tube W Guide wall WH Winch 1 Cleaning device 2 Main body 3 Guide 4 Lifting metal fitting 5 1st crushing blade 6 2nd crushing blade 7 3rd crushing blade 8 4th Crushing blade 9 Corner crushing blade 10 1st scraper 11 2nd scraper 11a, 12a Notch part 12 3rd scraper 14 4th scraper 20 Guide H steel 20a Central part 21 Protective angle 22 Inclinometer square pipe 23 Joint pipe 24 Joint pipe cover 25 Connecting rod

───────────────────────────────────────────────────── フロントページの続き (72)発明者 田沢 孝 東京都港区元赤坂一丁目2番7号 鹿島 建設株式会社内 (72)発明者 高根 敏久 東京都港区元赤坂一丁目2番7号 鹿島 建設株式会社内 (56)参考文献 実開 昭55−163085(JP,U) 実開 昭56−39172(JP,U) ─────────────────────────────────────────────────── ─── Continuation of front page (72) Inventor Takashi Tazawa 1-2-7 Moto-Akasaka, Minato-ku, Tokyo Kashima Construction Co., Ltd. (72) Toshihisa Takane 1-2-7 Moto-Akasaka, Minato-ku, Tokyo Kashima Construction Co., Ltd. (56) References: Actual development: Sho 55-163085 (JP, U) Actual development: Sho 56-39172 (JP, U)

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 ガイド手段により接合鋼板のガイドH鋼
にガイドされる本体に、砕石を破砕する複数の破砕用刃
と、砕石をかき落とす複数のスクレーパとを設けたこと
を特徴とする地中連続壁継手の接合鋼板清掃装置。
1. The underground, characterized in that a main body guided by guide H steel of a joined steel plate by a guide means is provided with a plurality of crushing blades for crushing crushed stones and a plurality of scrapers for scraping crushed stones. A joint steel plate cleaning device for continuous wall joints.
JP4242115A 1992-09-10 1992-09-10 Bonded steel plate cleaning device for underground wall joints Expired - Fee Related JP2547505B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4242115A JP2547505B2 (en) 1992-09-10 1992-09-10 Bonded steel plate cleaning device for underground wall joints

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4242115A JP2547505B2 (en) 1992-09-10 1992-09-10 Bonded steel plate cleaning device for underground wall joints

Publications (2)

Publication Number Publication Date
JPH0688337A JPH0688337A (en) 1994-03-29
JP2547505B2 true JP2547505B2 (en) 1996-10-23

Family

ID=17084526

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4242115A Expired - Fee Related JP2547505B2 (en) 1992-09-10 1992-09-10 Bonded steel plate cleaning device for underground wall joints

Country Status (1)

Country Link
JP (1) JP2547505B2 (en)

Also Published As

Publication number Publication date
JPH0688337A (en) 1994-03-29

Similar Documents

Publication Publication Date Title
CN101608447A (en) A kind of cross steel plate water-stopping joint continuous concrete wall and joint construction method thereof
US20080010870A1 (en) Single pointed ripper bucket excavation tool
EP0056814A1 (en) Slurry trench method and apparatus for constructing underground walls
JP2547505B2 (en) Bonded steel plate cleaning device for underground wall joints
JP3188771B2 (en) Underground continuous wall forming machine
US3915238A (en) Scraper
CN208517998U (en) It is installed on the ground-connecting-wall brush wall device of chute forming machine grab bucket
JP2500112B2 (en) Bonded steel plate cleaning device for underground wall joints
JP2640841B2 (en) Slime treatment method in cast-in-place pile method
CN108487233B (en) Construction method of underground continuous wall with I-shaped steel joint
CN111155530A (en) A shovel mud ware for underground continuous wall connects processing
JP2633148B2 (en) Water jet device for cleaning steel plate cleaning device of underground continuous wall joint
CN211498994U (en) Transformer substation is with reverse construction method construction equipment
CN211735352U (en) Underground continuous wall is with brushing wall ware and digging machine soon
CN217811307U (en) Hydraulic shovel is with device of clearing soil certainly
CN214784227U (en) Advanced water stop structure of underground chamber bottom plate post-cast strip
CN217974554U (en) Anti-sticking bucket for high-unloading loader
JP7499694B2 (en) Steel element installation equipment
CN217563276U (en) Water conservancy construction pipeline is laid and is dimension foster device
JPH06346445A (en) Joint cleaner of underground continuous wall
CN213175568U (en) Stone fishing device for bored pile construction
SU1021724A1 (en) Scraper with rope traction
US3561143A (en) Drag line bucket with corrugated bottom
JP2613541B2 (en) Underground diaphragm wall joint cleaning machine
RU2007523C1 (en) Soil intake gear of suction-tube dredger

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees