JP2529644B2 - How to build an underground structure - Google Patents

How to build an underground structure

Info

Publication number
JP2529644B2
JP2529644B2 JP5345590A JP34559093A JP2529644B2 JP 2529644 B2 JP2529644 B2 JP 2529644B2 JP 5345590 A JP5345590 A JP 5345590A JP 34559093 A JP34559093 A JP 34559093A JP 2529644 B2 JP2529644 B2 JP 2529644B2
Authority
JP
Japan
Prior art keywords
excavator
pipe
engaging portion
main body
shaped engaging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP5345590A
Other languages
Japanese (ja)
Other versions
JPH06280470A (en
Inventor
▲しん▼市 豊福
Original Assignee
株式会社イセキ開発工機
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社イセキ開発工機 filed Critical 株式会社イセキ開発工機
Priority to JP5345590A priority Critical patent/JP2529644B2/en
Publication of JPH06280470A publication Critical patent/JPH06280470A/en
Application granted granted Critical
Publication of JP2529644B2 publication Critical patent/JP2529644B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、少なくとも1つの係合
部を備える複数の管を、隣り合う管の係合部が互いに係
合するように、管推進工法により水平に配置して、地中
壁、補強体、止水体等の地下構造物を構築する方法に関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention arranges a plurality of pipes having at least one engaging portion horizontally by a pipe propulsion method so that the engaging portions of adjacent pipes engage with each other. The present invention relates to a method of constructing an underground structure such as an inner wall, a reinforcement body, and a water stop body.

【0002】[0002]

【従来の技術】地下構造物を管推進工法により構築する
いわゆるパイプルーフ工法に用いられる管は、一般に、
主体部の外周面に該主体部の長手方向へ伸びるように配
置された少なくとも1つの係合部を備え、隣り合う管の
係合部が互いに係合するように水平に配置される。
2. Description of the Related Art Pipes used in the so-called pipe roof construction method for constructing underground structures by the pipe propulsion method are generally
At least one engaging portion arranged to extend in the longitudinal direction of the main body portion is provided on the outer peripheral surface of the main body portion, and the engaging portions of adjacent pipes are horizontally arranged so as to engage with each other.

【0003】この種の管を用いるパイプルーフ工法にお
いては、一般に、パイプの外径とほぼ同じ外径を有する
ケーシング内にアースオーガーを回転可能に配置された
掘削機のように、パイプとほぼ同じ外径の筒状部を有す
る掘削機を用いて地盤を掘削している。また、主体部の
外周に係合部を備えた管を地中に配置するとき、地下水
が管の周りから発進用立て坑へ流出することを防止しな
ければならないことから、従来では、管の断面形状に対
応した形状の穴をゴム板に形成し、該ゴム板を発進用立
て坑の側壁に取り付け、掘削機および管を前記穴を介し
て地中に押し込む方法を採用している。
In the pipe roof construction method using this type of pipe, generally, it is almost the same as a pipe such as an excavator in which a ground auger is rotatably arranged in a casing having an outer diameter substantially the same as that of the pipe. The ground is excavated using an excavator having a cylindrical portion with an outer diameter. Further, when a pipe provided with an engaging portion on the outer periphery of the main body portion is arranged in the ground, it is necessary to prevent groundwater from flowing out from around the pipe to the start pit, so in the conventional case, A method is employed in which a hole having a shape corresponding to the cross-sectional shape is formed in a rubber plate, the rubber plate is attached to a side wall of a starting shaft, and an excavator and a pipe are pushed into the ground through the hole.

【0004】しかし、管の断面形状が複雑であるから、
該管と発進用立て坑の側壁との間の液密性を確実に維持
する形状の穴をゴム板に形成することは難しい。このた
め、従来では、管を配置する全長さ領域にわたって止水
剤を注入しなければならなかった。
However, since the cross-sectional shape of the pipe is complicated,
It is difficult to form a hole in the rubber plate having a shape that reliably maintains the liquid tightness between the pipe and the side wall of the starting shaft. For this reason, conventionally, the water blocking agent had to be injected over the entire length region in which the pipe was arranged.

【0005】[0005]

【解決しようとする課題】本発明の他の目的は、発進用
立て坑の側壁と管との間の液密性を容易にかつ確実に維
持することができるようにすることにある。
Another object of the present invention is to make it possible to easily and reliably maintain the liquid tightness between the side wall of the starting shaft and the pipe.

【0006】[0006]

【解決手段、作用、効果】本発明の地下構造物の構築方
法では、筒状の主体部と、該主体部の外側面にあって該
主体部の長手方向へ伸びる少なくとも1つの係合部とを
備える複数の管を用いる。各管は、隣り合う管の係合部
が互いに係合するように、地中に配置される。
In the method of constructing an underground structure according to the present invention, a tubular main body and at least one engaging portion on an outer surface of the main body and extending in a longitudinal direction of the main body. Using a plurality of tubes. Each pipe is arranged in the ground such that the engaging portions of the adjacent pipes engage with each other.

【0007】本発明の地下構造物の構築方法は、先ず、
前記係合部に対応する第1の部材を、筒状部を有する掘
削機の外側面に前記主体部の外側面における前記係合部
の位置に対応させて配置することにより、前記掘削機と
前記第1の部材との組立体の断面形状を前記管のそれと
ほぼ同じにする。次いで、弾性変形可能の第2の部材を
前記掘削機と前記第1の部材との組立体の周りに配置
し、型枠を前記第2の部材の周りに配置し、モルタルの
ように固化性の充填材を前記型枠内に供給して、前記第
2の部材を固化した充填材を介して発進用立て坑の側壁
に担持させる。
The method of constructing an underground structure of the present invention is as follows.
By disposing the first member corresponding to the engaging portion on the outer surface of the excavator having a tubular portion so as to correspond to the position of the engaging portion on the outer surface of the main body, The cross-sectional shape of the assembly with the first member is approximately the same as that of the tube. Then, an elastically deformable second member is placed around the assembly of the excavator and the first member, a formwork is placed around the second member, and solidifying like mortar. Is supplied to the inside of the mold, and the second member is supported on the side wall of the starting shaft by way of the solidified filler.

【0008】第2の部材は、型枠内に供給した充填材に
より、掘削機と第1の部材との外周面に押圧され、充填
材が固化することにより、固化した充填材の内側に維持
され、また固化した充填材を介して発進用立て坑の側壁
に維持される。第2の部材は、固化した充填材に維持さ
れた状態および発進用立て坑の側壁に維持された状態に
おいて、前記管の断面形状に対応する形状を有する穴を
形成する。
The second member is pressed against the outer peripheral surfaces of the excavator and the first member by the filler supplied into the mold, and the filler is solidified, so that the second member is maintained inside the solidified filler. And is maintained on the side wall of the starting shaft through the solidified filler. The second member forms a hole having a shape corresponding to the cross-sectional shape of the pipe in a state maintained by the solidified filler and a state maintained by the side wall of the starting shaft.

【0009】第2の部材により形成される穴に管が挿入
されると、第2の部材が自己の復元力により管の外周面
に押圧されるから、その管と発進用立て坑の側壁との間
の液密性は、第2の部材と固化した充填材とにより確実
に維持される。
When the pipe is inserted into the hole formed by the second member, the second member is pressed against the outer peripheral surface of the pipe by its own restoring force, so that the pipe and the side wall of the starting vertical shaft. The liquid-tightness between the two is reliably maintained by the second member and the solidified filler.

【0010】本発明の構築方法によれば、掘削機と第1
の部材との組立体の断面形状を配置すべき管のそれとほ
ぼ同じにし、弾性変形可能の第2の部材を掘削機と前記
第1の部材との組立体の周りに配置し、型枠を第2の部
材の周りに配置し、モルタルのように固化性の充填材を
型枠内に供給することにより、第2の部材を固化した充
填材を介して発進用立て坑の側壁に担持させるから、発
進用立て坑の側壁と管との間の液密性を容易にかつ確実
に維持することができる。
According to the construction method of the present invention, the excavator and the first
The cross-sectional shape of the assembly with the member is substantially the same as that of the pipe to be arranged, the elastically deformable second member is arranged around the assembly of the excavator and the first member, and the form is The second member is arranged around the second member, and a solidifying filler such as mortar is supplied into the mold, so that the second member is carried on the side wall of the starting shaft through the solidified filler. Therefore, the liquid tightness between the side wall of the starting shaft and the pipe can be easily and surely maintained.

【0011】配置すべき管は、第2の部材を発進用立て
坑の側壁に担持させた後、掘削機により地盤を掘削しつ
つ掘削機を前進させると同時に、掘削機の後部に続く前
記管の周りの水密性を第2の部材および固化した充填材
に維持させつつ管を前進させることにより、地中に配置
される。
The pipe to be arranged is such that after the second member is supported on the side wall of the vertical shaft for starting, the excavator advances the excavator while excavating the ground, and at the same time, the pipe continues to the rear part of the excavator. It is placed in the ground by advancing the tube while maintaining the water tightness around the second member and the solidified filler.

【0012】前記第1の部材は前記係合部の断面の大き
さとほぼ同じ大きさの断面を有し、前記掘削機は前記主
体部の断面とほぼ同じ大きさの断面を有することが好ま
しい。前記第2の部材は、前記掘削機および前記管を前
進させる前に除去してもよいし、前記管の前進時に前記
管の係合部により破壊してもよい。
It is preferable that the first member has a cross section that is substantially the same size as the cross section of the engaging portion, and the excavator has a cross section that is substantially the same size as the cross section of the main body portion. The second member may be removed before advancing the excavator and the pipe, or may be broken by the engagement portion of the pipe when advancing the pipe.

【0013】地下構造物は、筒状の主体部と該主体部の
外周面にあって該主体部の長手方向へ伸びかつC字状の
断面形状を有する少なくとも1つのC型係合部とを備え
る第1の管と、筒状の主体部と該主体部の外周面にあっ
て該主体部の長手方向へ伸びかつC字状の断面形状を有
するC型係合部と前記主体部の外周面にあって該主体部
の長手方向へ伸びかつT字状の断面形状を有するT型係
合部とを備える複数の第2の管とを、隣り合う管のC型
係合部とT型係合部とが係合するように管推進工法によ
り水平に配置することにより、構築することもできる。
The underground structure has a tubular main body and at least one C-shaped engaging portion on the outer peripheral surface of the main body that extends in the longitudinal direction of the main body and has a C-shaped cross-sectional shape. A first pipe provided, a cylindrical main body portion, a C-shaped engaging portion on the outer peripheral surface of the main body portion, extending in the longitudinal direction of the main body portion, and having a C-shaped cross-sectional shape, and the outer periphery of the main body portion. A plurality of second pipes each having a T-shaped engaging portion extending in the longitudinal direction of the main body portion and having a T-shaped cross-sectional shape, and a T-shaped engaging portion and a C-shaped engaging portion of adjacent pipes. It can also be constructed by arranging horizontally by the pipe propulsion method so that the engaging portion is engaged.

【0014】この場合、先ず、前記第1の管のC型係合
部に対応する第1の部材を掘削機の外側面に前記第1の
管の主体部の外側面における前記C型係合部の位置に対
応させて配置することにより、前記掘削機と前記第1の
部材との組立体の断面形状を前記第1の管のそれとほぼ
同じにする。
In this case, first, the first member corresponding to the C-shaped engaging portion of the first pipe is attached to the outer surface of the excavator by the C-shaped engagement on the outer surface of the main portion of the first pipe. The cross-sectional shape of the assembly of the excavator and the first member is substantially the same as that of the first pipe by arranging the parts corresponding to the positions of the parts.

【0015】次いで、弾性変形可能の第2の部材を前記
組立体の周りに配置し、型枠を前記第2の部材の周りに
配置し、モルタルのように固化性の充填材を前記型枠内
に供給することにより、前記第2の部材を固化した充填
材を介して発進用立て坑の側壁に担持させる。
Next, an elastically deformable second member is arranged around the assembly, a mold is arranged around the second member, and a solidifying filler such as mortar is added to the mold. By supplying the second member, the second member is supported on the side wall of the starting shaft by way of the solidified filler.

【0016】次いで、前記掘削機により地盤を掘削しつ
つ前記掘削機を前進させると同時に、前記掘削機の後部
に続く前記第1の管と前記側壁との間の水密性を前記第
2の部材および前記固化した充填材に維持させつつ前記
第1の管を前進させて、前記第1の管を地中に配置す
る。
Next, the excavator is moved forward while excavating the ground by the excavator, and at the same time, the watertightness between the first pipe and the side wall following the rear portion of the excavator is maintained by the second member. And the first tube is advanced while maintaining the solidified filler to place the first tube in the ground.

【0017】次いで、前記第2の管のC型係合部に対応
する第3の部材を掘削機の外周面に前記第2の管の主体
部の外周面における前記C型係合部の位置に対応するよ
うに配置することにより、前記掘削機と前記第3の部材
との組立体の断面形状を前記第2の管のそれとほぼ同じ
にする。
Next, a third member corresponding to the C-shaped engaging portion of the second pipe is provided on the outer peripheral surface of the excavator and the position of the C-shaped engaging portion on the outer peripheral surface of the main portion of the second pipe. By arranging so as to correspond to, the cross-sectional shape of the assembly of the excavator and the third member is substantially the same as that of the second pipe.

【0018】次いで、弾性変形可能の第4の部材を前記
組立体の周りに配置し、型枠を前記第4の部材の周りに
配置し、モルタルのように固化性の充填材を前記型枠内
に供給することにより、前記第4の部材を固化した充填
材を介して発進用立て坑の側壁に担持させる。
Next, an elastically deformable fourth member is arranged around the assembly, a mold is arranged around the fourth member, and a solidifying filler such as mortar is added to the mold. By being supplied into the inside, the fourth member is supported on the side wall of the starting vertical shaft through the solidified filler.

【0019】次いで、前記掘削機により地盤を掘削しつ
つ前記掘削機を前進させると同時に、前記掘削機の後部
に続く前記第2の管と前記側壁との間の水密性を前記第
4の部材および前記固化した充填材に維持させつつ、前
記第2の管のT型係合部を当該第2の管に先立って配置
された管のC型係合部に係合させた状態で、前記第2の
管を前進させる工程を複数回行って前記第2の管を地中
に配置する。
Next, the excavator is moved forward while excavating the ground by the excavator, and at the same time, the watertightness between the second pipe and the side wall continuing to the rear portion of the excavator is maintained by the fourth member. While maintaining the solidified filler, the T-shaped engaging portion of the second pipe is engaged with the C-shaped engaging portion of the pipe arranged prior to the second pipe, The step of advancing the second pipe is performed multiple times to arrange the second pipe in the ground.

【0020】円錐形のキャップを前記C型係合部の前端
部に配置し、それにより、前記第1または第2の管を前
進させるとき、土砂が前記C型係合部の前端部から前記
C型係合部内に入ることを前記キャップにより防止する
ことが好ましい。
A conical cap is located at the front end of the C-engagement portion such that when advancing the first or second tube, earth and sand are transferred from the front end of the C-engagement portion to the front end. It is preferable to prevent the cap from entering the C-shaped engaging portion.

【0021】硬化剤を封入した袋を前記C型係合部内に
配置し、それにより、前記第1または第2の管を前進さ
せるとき、前記C型係合部内の液密性を前記袋に維持さ
せることができる。前記袋は、次の第2の管を前進させ
るときに、該次の第2の管のT型係合部により破壊する
ことができる。
A bag encapsulating a hardening agent is placed in the C-shaped engaging portion, so that when the first or second pipe is advanced, the liquid-tightness in the C-shaped engaging portion is kept in the bag. Can be maintained. The bag can be broken by the T-shaped engagement portion of the next second tube when advancing the next second tube.

【0022】前記掘削機はシールド型トンネル掘削機で
あることが好ましい。
The excavator is preferably a shield tunnel excavator.

【0023】[0023]

【実施例】図1を参照して、本発明で用いる第1および
第2の管10および12の実施例について説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT An embodiment of the first and second pipes 10 and 12 used in the present invention will be described with reference to FIG.

【0024】図1において、第1の管10は、円筒状の
主体部14と、C字状の断面形状を有しかつ主体部14
の外周面を主体部14の長手方向へ伸びる一対のC型係
合部16とを備える。
In FIG. 1, the first pipe 10 has a cylindrical main body portion 14 and a C-shaped cross-sectional shape and has a main body portion 14
And a pair of C-shaped engaging portions 16 extending in the longitudinal direction of the main body portion 14.

【0025】両C型係合部16は、主体部14と同じ長
さを有しており、また、C型係合部16の間隙18が主
体部14の半径方向外方となるように主体部14に溶接
されている。各間隙18は、対応するC型係合部16の
一端から他端まで連続して伸びている。
The two C-shaped engaging portions 16 have the same length as the main body portion 14, and the main body portion 14 is arranged so that the gap 18 between the C-shaped engagement portions 16 is located outward of the main body portion 14 in the radial direction. It is welded to the portion 14. Each gap 18 continuously extends from one end to the other end of the corresponding C-shaped engaging portion 16.

【0026】これに対し、第2の管12は、円筒状の主
体部20と、C字状の断面形状を有しかつ主体部20の
外周面を主体部20の長手方向へ伸びるC型係合部22
と、C型係合部16,22に係合可能のT字状の断面形
状を有するT型係合部24とを備える。
On the other hand, the second pipe 12 has a cylindrical main body 20 and a C-shaped member having a C-shaped cross section and having an outer peripheral surface of the main body 20 extending in the longitudinal direction of the main body 20. Joint part 22
And a T-shaped engaging portion 24 having a T-shaped cross-sectional shape capable of engaging with the C-shaped engaging portions 16 and 22.

【0027】C型係合部22は、主体部20とほぼ同じ
長さを有しており、また、C型係合部22の間隙26が
主体部20の半径方向外方となるように主体部20に溶
接されている。各間隙26も、対応するC型係合部22
の一端から他端まで連続して伸びている。T型係合部2
4は、主体部20とほぼ同じ長さを有しており、また、
主体部20に溶接されている。
The C-shaped engaging portion 22 has substantially the same length as the main body portion 20, and the main body 20 is arranged so that the gap 26 of the C-shaped engaging portion 22 is radially outward of the main body portion 20. It is welded to the part 20. Each gap 26 also has a corresponding C-shaped engaging portion 22.
Extends continuously from one end to the other. T type engaging part 2
4 has almost the same length as the main body 20, and
It is welded to the main body portion 20.

【0028】第1および第2の管10,12のそれぞれ
は、同じ断面形状および大きさを有する複数の短尺管ユ
ニットに分割されている。短尺管ユニットは、管推進工
法による敷設時にボルト、溶接等により互いに連結され
る。
Each of the first and second tubes 10 and 12 is divided into a plurality of short tube units having the same sectional shape and size. The short pipe units are connected to each other by bolts, welding or the like when laid by the pipe propulsion method.

【0029】次に、図2〜図14を参照して、第1およ
び第2の管10,12を用いるパイプルーフ工法の実施
例について説明する。
Next, an embodiment of a pipe roof construction method using the first and second pipes 10 and 12 will be described with reference to FIGS.

【0030】第1の管10の敷設 Laying the first tube 10

【0031】A1)先ず、図2および図3に示すよう
に、第1の管10およびシールド型トンネル掘削機30
を発進させるための穴32が発進立て坑34の側壁36
に形成される。
A1) First, as shown in FIGS. 2 and 3, the first pipe 10 and the shield tunnel excavator 30.
The hole 32 for starting the
Formed.

【0032】穴32は、第1の管10およびシールド型
トンネル掘削機30の通過を許すベく、第1の管10の
断面形状とほぼ同じ断面形状を有し、また、第1の管1
0の断面の大きさよりやや大きい。立て坑34の周りの
土砂38には、予め止水剤を注入する止水処理がなされ
ている。止水処理は、少なくとも掘削機30の長さの範
囲にわたって行われている。
The hole 32 has a cross-sectional shape that is substantially the same as the cross-sectional shape of the first pipe 10 so that the first pipe 10 and the shield tunnel excavator 30 can pass therethrough.
It is slightly larger than the size of the 0 cross section. The earth and sand 38 around the vertical shaft 34 is previously water-stopped by injecting a water-stopping agent. The water stop process is performed at least over the range of the length of the excavator 30.

【0033】掘削機30は、管推進工法に用いられてい
る既知の装置であり、立て坑34内に設置された元押し
装置によりレール組立体40上をほぼ水平に前進され
て、その先端部が穴32に受け入れられるように配置さ
れる。
The excavator 30 is a known device used in the pipe propulsion method. The excavator 30 is advanced substantially horizontally on the rail assembly 40 by the original pushing device installed in the vertical shaft 34, and its tip end portion is advanced. Are arranged to be received in the holes 32.

【0034】A2)次いで、図4および図5に示すよう
に、第1の管10と側壁36との間の液密性を維持する
シール手段42を形成するために用いる棒状の一対の第
1の部材44が、掘削機30の外周面に第1の管10の
主体部12の外周面におけるC型係合部14の位置に対
応させて配置される。
A2) Next, as shown in FIGS. 4 and 5, a pair of first rod-shaped members used to form a sealing means 42 for maintaining liquid tightness between the first tube 10 and the side wall 36. The member 44 is disposed on the outer peripheral surface of the excavator 30 so as to correspond to the position of the C-shaped engaging portion 14 on the outer peripheral surface of the main body portion 12 of the first pipe 10.

【0035】両第1の部材44は、第1の管10のC型
係合部14の直径とほぼ同じ直径の円形の断面形状を有
しており、また、掘削機30の長手方向へ伸びるよう
に、接着等により、掘削機30の外周面に配置される。
これにより、掘削機30と第1の部材44とを組み合せ
た組立体の断面形状が第1の管10のそれとほぼ同じに
される。第1の部材44は、発泡スチロールで製作する
ことができる。
Both first members 44 have a circular cross-sectional shape having a diameter substantially the same as the diameter of the C-shaped engaging portion 14 of the first pipe 10, and extend in the longitudinal direction of the excavator 30. Thus, it is arranged on the outer peripheral surface of the excavator 30 by adhesion or the like.
As a result, the sectional shape of the assembly in which the excavator 30 and the first member 44 are combined is approximately the same as that of the first pipe 10. The first member 44 can be made of polystyrene foam.

【0036】A3)次いで、図6および図7に示すよう
に、ゴムのように弾性変形可能の第2の部材46が掘削
機30と両第1の部材44との組立体の周りに配置され
る。
A3) Then, as shown in FIGS. 6 and 7, a second member 46, which is elastically deformable like rubber, is arranged around the assembly of the excavator 30 and the first members 44. It

【0037】第2の部材46は、長い板状の主体部46
aと、該主体部の一方の面の側に主体部の幅方向に間隔
をおいて形成されたリブ状の複数の突部46bとを備え
る。この場合は、たとえば、掘削機30および両第1の
部材44を図示のように配置した後に、第2の部材46
を配置することができる。
The second member 46 is a long plate-shaped main body 46.
a, and a plurality of rib-shaped protrusions 46b formed on one surface side of the main body portion at intervals in the width direction of the main body portion. In this case, for example, after the excavator 30 and the both first members 44 are arranged as shown, the second member 46 is arranged.
Can be arranged.

【0038】しかし、筒状の主体部と、該主体部の外周
面に軸線方向へ間隔をおいて形成されたリブ状の複数の
突部とを備える第2の部材を用いてもよい。この場合
は、たとえば、第1および第2の部材44,46を掘削
機30に予め配置した状態で、掘削機30を図示のよう
に配置してもよい。
However, a second member having a cylindrical main body and a plurality of rib-shaped projections formed on the outer peripheral surface of the main body at intervals in the axial direction may be used. In this case, for example, the excavator 30 may be arranged as illustrated while the first and second members 44 and 46 are arranged in advance in the excavator 30.

【0039】第2の部材46は、複数のバンド48およ
び該バンドを相互に連結する複数の止め具50により、
掘削機30と第1の部材44との組立体に締付けられ
る。
The second member 46 comprises a plurality of bands 48 and a plurality of fasteners 50 interconnecting the bands.
Fastened to the excavator 30 and first member 44 assembly.

【0040】A4)次いで、図6および図7に示すよう
に、型枠52と複数のアンカー54とが第2の部材46
の周りに配置される。
A4) Next, as shown in FIGS. 6 and 7, the mold 52 and the plurality of anchors 54 are joined to each other by the second member 46.
Placed around.

【0041】型枠52は、底板部52aと、一対の側板
部52bと、後板部52cとを備えており、また、両側
板部52bが第2の部材46およびバンド48の外周面
に接触し、後板部52cが第2の部材46の後端縁に接
するように配置される。このため、側壁36と型枠52
とにより規定される空間は、掘削機30、第1および第
2の部材44,46ならびにバンド48により上下の室
に区画される。
The mold 52 has a bottom plate portion 52a, a pair of side plate portions 52b, and a rear plate portion 52c. Both side plate portions 52b contact the outer peripheral surfaces of the second member 46 and the band 48. Then, the rear plate portion 52c is arranged so as to contact the rear end edge of the second member 46. Therefore, the side wall 36 and the form 52
The space defined by and is divided into upper and lower chambers by the excavator 30, the first and second members 44 and 46, and the band 48.

【0042】アンカー54は、側壁36に取り付けられ
る。掘削機30の上方に配置されたアンー54は複数の
鉄筋56により互いに連結され、下方に配置されたアン
カー54は他の複数の鉄筋56により互いに連結され
る。各側板部52bも、該側板部から内方へ伸びる複数
のアンカー58を有する。
The anchor 54 is attached to the side wall 36. The anchor 54 arranged above the excavator 30 is connected to each other by a plurality of reinforcing bars 56, and the anchor 54 arranged below is connected to each other by a plurality of other reinforcing bars 56. Each side plate portion 52b also has a plurality of anchors 58 extending inwardly from the side plate portion.

【0043】型枠52の後板部52cには、第1の管1
0の断面とほぼ同じ形状および同じ大きさを有する穴が
形成されている。
On the rear plate portion 52c of the form 52, the first pipe 1
A hole having substantially the same shape and size as the zero cross section is formed.

【0044】A5)次いで、図6および図7に示すよう
に、側壁36と型枠52とにより規定される空間にモル
タルが打設される。モルタルは、上方から上方の室に注
入されるとともに後板部52cに形成された注入口60
から下方の室に注入される。これにより、図4に示すよ
うに、第2の部材46は、弾性変形されて掘削機30お
よび第1の部材44に押し付けられる。
A5) Next, as shown in FIGS. 6 and 7, mortar is placed in the space defined by the side wall 36 and the mold 52. The mortar is injected into the upper chamber from above and an injection port 60 formed in the rear plate portion 52c.
Is injected into the lower chamber. Thereby, as shown in FIG. 4, the second member 46 is elastically deformed and pressed against the excavator 30 and the first member 44.

【0045】モルタルが凝結すると、第2の部材46
は、凝結したモルタル62を介して側壁36に支持され
る。掘削機30と側壁36との間の空間は、第2の部材
46および凝結したモルタル62により閉鎖される。こ
れにより、第1および第2の部材44,46ならびに凝
結したモルタル62は、掘削機30と側壁36との間の
空間を液密的に閉鎖する。
When the mortar solidifies, the second member 46
Are supported on the side wall 36 via the set mortar 62. The space between the excavator 30 and the sidewall 36 is closed by the second member 46 and the solidified mortar 62. Thereby, the first and second members 44, 46 and the condensed mortar 62 liquid-tightly close the space between the excavator 30 and the side wall 36.

【0046】A6)次いで、図8に示すように、掘削機
30が所定距離前進された後、第1の管10の最初の短
尺管ユニットが複数のボルトにより掘削機30の後端部
に連結される。最初の短尺管ユニットは、その主体部が
掘削機30と一致し、C型係合部が第1の部材44と一
致するように配置される。
A6) Next, as shown in FIG. 8, after the excavator 30 is advanced a predetermined distance, the first short pipe unit of the first pipe 10 is connected to the rear end of the excavator 30 by a plurality of bolts. To be done. The first short pipe unit is arranged such that its main body part is aligned with the excavator 30 and the C-shaped engagement part is aligned with the first member 44.

【0047】掘削機30の前進時、第2の部材46は、
凝結したモルタル62を介して側壁36に支持されてい
るから、前進されないが、自己の復元力により掘削機3
0の外面に押圧される。
During the forward movement of the excavator 30, the second member 46 is
It is not advanced because it is supported by the side wall 36 through the condensed mortar 62, but due to its own restoring force the excavator 3
Pressed against the outer surface of zero.

【0048】A7)次いで、図9に示すように、掘削機
30により土砂を掘削しつつ掘削機30および第1の管
10を前進させる工程と、最後部の短尺管ユニットに次
の短尺管ユニットを連結する工程とを、掘削機30が到
達立て坑に到達するまで繰り返す。
A7) Next, as shown in FIG. 9, a step of advancing the excavator 30 and the first pipe 10 while excavating the sand by the excavator 30, and a short pipe unit next to the rear short pipe unit. And the process of connecting are repeated until the excavator 30 reaches the reaching shaft.

【0049】この間、第1の管10が第2の部材46の
内側を移動し、また、第2の部材46が自己の復元力に
より第1の管10の外面に押圧されるから、第2の部材
46とモルタル54は、側壁36と第1の管10との間
の空間を液密的に閉鎖するシール手段42として作用す
る。このため、第1の管10を敷設する間、発進立て坑
34への地下水の漏出が防止される。
During this time, the first tube 10 moves inside the second member 46, and the second member 46 is pressed against the outer surface of the first tube 10 by its own restoring force. The member 46 and the mortar 54 act as a sealing means 42 that liquid-tightly closes the space between the side wall 36 and the first tube 10. Therefore, while the first pipe 10 is being laid, leakage of groundwater to the start shaft 34 is prevented.

【0050】図10に示すように、最先端の短尺管ユニ
ットのC型係合部16の最前端部は、円錐状のキャップ
64により予め閉鎖されている。このため、土砂または
地下水が最先端部の短尺管ユニットのC型係合部16の
最前端部からC型係合部16に入ることが防止される。
また、水ガラスのような硬化剤を封入した袋65が各短
尺管ユニットの各C型係合部に配置されている。このた
め、C型係合部16が液密的に閉鎖されるから、土砂ま
たは地下水がC型係合部16の間隙18からC型係合部
16内へ入ることが防止されるとともに、各C型係合部
16が水道として作用することが防止される。
As shown in FIG. 10, the front end of the C-shaped engaging portion 16 of the shortest short tube unit is previously closed by a conical cap 64. Therefore, sediment or groundwater is prevented from entering the C-shaped engaging portion 16 from the foremost end of the C-shaped engaging portion 16 of the shortest pipe unit at the most distal end.
A bag 65 containing a hardening agent such as water glass is arranged at each C-shaped engaging portion of each short tube unit. For this reason, the C-shaped engaging portion 16 is liquid-tightly closed, so that earth and sand or groundwater is prevented from entering the C-shaped engaging portion 16 from the gap 18 of the C-shaped engaging portion 16, and The C-shaped engaging portion 16 is prevented from acting as water.

【0051】第1の部材44は、工程A7の実施に先立
って除去してもよいし、除去しなくてもよい。第1の部
材44を工程A7の実施に先立って除去しないときは、
第1の部材44は、土圧またはキャップ64により破壊
される。
The first member 44 may or may not be removed prior to performing step A7. When the first member 44 is not removed prior to performing step A7,
The first member 44 is broken by earth pressure or the cap 64.

【0052】A8)図11に示すように、掘削機30が
到達立て坑66の直前に到達すると、到達立て坑66の
側壁68に穴70が形成される。穴70は、掘削機30
を到達立て坑66内に移動させ、第1の管10の先端部
を受け入れるべく、第1の管10の断面とほぼ同じ形状
および大きさを有する。
A8) As shown in FIG. 11, when the excavator 30 arrives just before the reaching shaft 66, a hole 70 is formed in the side wall 68 of the reaching shaft 66. The hole 70 is for the excavator 30.
Has a shape and size substantially the same as the cross section of the first tube 10 so as to be moved into the reaching shaft 66 and receive the tip portion of the first tube 10.

【0053】立て坑66の周りの土砂72にも、予め止
水剤を注入する止水処理がなされている。止水処理は、
少なくとも掘削機30の長さの範囲にわたって行われて
いる。
The earth and sand 72 around the vertical shaft 66 is also water-stopped by previously injecting a water-stopping agent. The still water treatment is
It is carried out at least over the range of the length of the excavator 30.

【0054】A9)図11に示すように、第1の管10
の先端部が到達立て坑66内に達すると、第1の管10
と穴70との間を液密的に維持するシール手段74が形
成される。
A9) As shown in FIG. 11, the first tube 10
When the tip of the pipe reaches the inside of the vertical shaft 66, the first pipe 10
A sealing means 74 is formed which maintains a liquid-tight space between the hole 70 and the hole 70.

【0055】シール手段74は、シール手段42と同様
に、第1の管の周りに配置される弾性変形可能の部材7
6、該部材を第1の管に取り付ける複数のバンド(図示
せず)、該バンドを互いに連結する止め具(図示せず)
および型枠78とを用い、側壁68と型枠78とにより
規定される空間にモルタルを打設し、該モルタルを凝結
させることにより形成することができる。しかし、モル
タルを穴70に注入し、該モルタルを凝結させることに
より、穴を凝結したモルタルで閉鎖させてもよい。
The sealing means 74, like the sealing means 42, is an elastically deformable member 7 arranged around the first tube.
6, a plurality of bands (not shown) for attaching the member to the first tube, and fasteners (not shown) for connecting the bands to each other
It is also possible to form the mortar by using the mold frame 78 and the mortar by casting in a space defined by the side wall 68 and the mold frame 78. However, the hole may be closed with the solidified mortar by pouring the mortar into the hole 70 and solidifying the mortar.

【0056】A10)その後、第2の管12を敷設され
た第1の管の隣りに敷設すべく、掘削機30が到達立て
坑から取り出され、再び発進立て坑に設置される。
A10) Thereafter, the excavator 30 is taken out of the reaching vertical shaft and installed again in the starting vertical shaft so that the second pipe 12 can be installed next to the installed first vertical pipe.

【0057】第2の管12の敷設 Laying the second pipe 12

【0058】B1)図12に示すように、先ず、型枠5
2の一方の側板部52bが、それに取り付けられている
アンカー58をシール手段42に残すように除去され
る。これにより、第1の管10に巻け付けられた第1の
部材46およびバンド48のうち、除去された側板部に
当接されていた部位と、除去された側板部に設けられて
いたアンカー58の端面とがシール手段42の側面に露
出される。
B1) As shown in FIG. 12, first, the form 5
One side plate portion 52b of the two is removed so as to leave the anchor 58 attached to the sealing means 42. As a result, of the first member 46 and the band 48 wound around the first tube 10, the portion that is in contact with the removed side plate portion and the anchor 58 that is provided on the removed side plate portion. And the end surface of the sealing means 42 is exposed to the side surface of the sealing means 42.

【0059】B2)次いで、第1の部材46およびバン
ド48の露出された部位が切除される。これにより、一
方のC型係合部16の間隙18がシール手段42の側面
に開口される。
B2) Next, the exposed portions of the first member 46 and the band 48 are cut off. As a result, the gap 18 of the one C-shaped engaging portion 16 is opened to the side surface of the sealing means 42.

【0060】B3)次いで、第2の管12および掘削機
30を発進させるための穴80が発進立て坑34の側壁
36に形成される。
B3) Next, a hole 80 for starting the second pipe 12 and the excavator 30 is formed in the side wall 36 of the starting shaft 34.

【0061】穴80は、第2の管12および掘削機30
の通過を許すべく、T型係合部24を除く第2の管12
の断面形状ほぼ同じ断面形状を有しており、また、第1
の管10の断面の大きさよりやや大きい。掘削機30
は、その先端部が穴80に受け入れられるように配置さ
れる。
The hole 80 is formed in the second pipe 12 and the excavator 30.
Second tube 12 excluding the T-shaped engaging portion 24 to allow passage of
Has substantially the same cross-sectional shape, and
It is slightly larger than the cross-sectional size of the tube 10. Excavator 30
Are arranged such that their tips are received in the holes 80.

【0062】穴80は、第2の管12のT型係合部24
が第13図に示すように第1の管10の一方のC型係合
部16と係合することができるように、第1の管10の
ために側壁36に形成された穴と連通される。
The hole 80 is formed in the T-shaped engaging portion 24 of the second pipe 12.
Is in communication with the hole formed in the sidewall 36 for the first tube 10 so that it can engage one C-shaped engagement portion 16 of the first tube 10 as shown in FIG. It

【0063】B4)次いで、図12に示すように、第2
の管12と側壁36との間の液密性を維持するシール手
段82を形成するために用いる、棒状の第3の部材84
が掘削機30の外周面に第2の管12の主体部20の外
周面におけるC型係合部22の位置に対応させて配置さ
れる。
B4) Then, as shown in FIG.
Rod-shaped third member 84, which is used to form a sealing means 82 for maintaining liquid tightness between the tube 12 and the side wall 36.
Are arranged on the outer peripheral surface of the excavator 30 so as to correspond to the positions of the C-shaped engaging portions 22 on the outer peripheral surface of the main body portion 20 of the second pipe 12.

【0064】第3の部材84は、第2の管12のC型係
合部22の直径とほぼ同じ直径の円形の断面形状を有し
ており、また、掘削機30の長手方向へ伸びるように、
接着等により、掘削機30の外周面に配置される。これ
により、掘削機30と第2の部材84とを組み合せた組
立体の断面形状はT型係合部24を除いた第2の管10
のそれとほぼ同じになる。第3の部材84は、発泡スチ
ロールで製作することができる。
The third member 84 has a circular cross-sectional shape having a diameter substantially the same as the diameter of the C-shaped engaging portion 22 of the second pipe 12, and extends in the longitudinal direction of the excavator 30. To
It is arranged on the outer peripheral surface of the excavator 30 by adhesion or the like. As a result, the sectional shape of the assembly in which the excavator 30 and the second member 84 are combined is the second pipe 10 excluding the T-shaped engaging portion 24.
It will be almost the same as that. The third member 84 can be made of Styrofoam.

【0065】B5)次いで、図12に示すように、ゴム
のように弾性変形可能の第4の部材86が掘削機30と
第2の部材84との組立体の周りに配置される。
B5) Next, as shown in FIG. 12, the elastically deformable fourth member 86 is arranged around the assembly of the excavator 30 and the second member 84.

【0066】第4の部材86として、第2の部材46と
同様に、長い板状の主体部と、該主体部の一方の面の側
に主体部の幅方向に間隔をおいて形成されたリブ状の複
数の突部とを備えるものを用いることができる。
As the fourth member 86, like the second member 46, a long plate-shaped main body portion is formed on one side of the main body portion with a space in the width direction of the main body portion. What has a plurality of rib-shaped protrusions can be used.

【0067】第4の部材86は、複数のバンド88およ
び該バンドを相互に連結する複数の止め具90により、
掘削機30と第3の部材84との組立体に締付けられ
る。各バンド88は、シール手段42に残存するアンカ
ー58に連結される。
The fourth member 86 comprises a plurality of bands 88 and a plurality of fasteners 90 interconnecting the bands,
The excavator 30 and the third member 84 are fastened to the assembly. Each band 88 is connected to an anchor 58 remaining on the sealing means 42.

【0068】B6)次いで、図12に示すように、型枠
92と複数のアンカー94とが第4の部材96の周りに
配置される。
B6) Next, as shown in FIG. 12, the mold 92 and the plurality of anchors 94 are arranged around the fourth member 96.

【0069】型枠92は、底板部92aと、側板部92
bと、後板部(図示せず)とを備えており、また、側板
部92bが第4の部材86およびバンド88の外周面に
接触し、後板部が第4の部材86の後端縁に接し、さら
にシール手段42が1つの側板部として作用するよう
に、配置される。このため、側壁36、シール手段42
および型枠92とにより規定される空間は、掘削機3
0、第3および第4の部材84,86ならびにバンド8
8により上下の室に区画される。
The mold 92 includes a bottom plate portion 92a and side plate portions 92.
b and a rear plate portion (not shown), the side plate portion 92b is in contact with the outer peripheral surfaces of the fourth member 86 and the band 88, and the rear plate portion is the rear end of the fourth member 86. It is arranged so that it abuts the edge and that the sealing means 42 also acts as one side plate. Therefore, the side wall 36 and the sealing means 42
The space defined by and the form 92 is the excavator 3
0, third and fourth members 84, 86 and band 8
It is divided into upper and lower chambers by 8.

【0070】アンカー94は、側壁36に取り付けられ
る。掘削機30の上方に配置されたアンカー94は複数
の鉄筋96により互いに連結され、下方に配置されたア
ンカー94は他の複数の鉄筋96により互いに連結され
る。側板部92bも、該側板部から内方へ伸びる複数の
アンカー98を有する。
The anchor 94 is attached to the side wall 36. The anchors 94 arranged above the excavator 30 are connected to each other by a plurality of reinforcing bars 96, and the anchors 94 arranged below are connected to each other by a plurality of other reinforcing bars 96. The side plate portion 92b also has a plurality of anchors 98 extending inwardly from the side plate portion.

【0071】型枠92の後板部には、第2の管12の断
面とほぼ同じ形状および同じ大きさを有する穴が形成さ
れている。
A hole having substantially the same shape and size as the cross section of the second tube 12 is formed in the rear plate portion of the mold 92.

【0072】B7)次いで、前記した工程A5と同様
に、側壁36と型枠92とにより規定される空間にモル
タルが打設される。モルタルは、上方から上方の室に注
入されるとともに後板部に形成された注入口から下方の
室に注入される。これにより、図12に示すように、第
4の部材86は、弾性変形されて掘削機30および第3
の部材84に押し付けられる。
B7) Next, similarly to the above-mentioned step A5, mortar is cast in the space defined by the side wall 36 and the mold 92. The mortar is injected into the upper chamber from above and also into the lower chamber through the inlet formed in the rear plate portion. As a result, as shown in FIG. 12, the fourth member 86 is elastically deformed and the excavator 30 and the third member 86 are deformed.
Member 84 is pressed.

【0073】モルタルが凝結すると、第4の部材86
は、凝結したモルタル62を介して発進立て坑の側壁3
6に支持される。掘削機30と側壁36との間の空間
は、第4の部材86および凝結したモルタル100によ
り閉鎖される。これにより、第3および第4の部材8
4,86および凝結したモルタル100は、掘削機30
と側壁36との間の空間を液密的に閉鎖する。
When the mortar solidifies, the fourth member 86
Is the side wall 3 of the starting shaft through the solidified mortar 62.
6 is supported. The space between the excavator 30 and the side wall 36 is closed by the fourth member 86 and the solidified mortar 100. Thereby, the third and fourth members 8
4,86 and the condensed mortar 100 are
The space between the side wall 36 and the side wall 36 is liquid-tightly closed.

【0074】B8)次いで、工程A6と同様に、掘削機
30が所定距離前進された後、第2の管12の最初の短
尺管ユニットが複数のボルトにより掘削機30の後端部
に連結される。最初の短尺管ユニットは、その主体部が
掘削機30と一致し、C型係合部26が第3の部材84
と一致し、T型係合部24が敷設された第1の管10の
C型係合部16と一致するように配置される。
B8) Next, as in step A6, after the excavator 30 has been advanced a predetermined distance, the first short pipe unit of the second pipe 12 is connected to the rear end of the excavator 30 by a plurality of bolts. It The main body of the first short pipe unit matches the excavator 30, and the C-shaped engaging portion 26 has the third member 84.
And the T-shaped engaging portion 24 is arranged so as to coincide with the C-shaped engaging portion 16 of the laid first pipe 10.

【0075】掘削機30の前進時、第4の部材86は、
凝結したモルタル100を介して発進立て坑の側壁36
に支持されているから、前進されないが、自己の復元力
により掘削機30の外面に押庄される。
When the excavator 30 is moving forward, the fourth member 86
Side wall 36 of the vertical shaft that was launched through the condensed mortar 100
However, it is not advanced, but is pushed to the outer surface of the excavator 30 by its own restoring force.

【0076】B9)次いで、前記した工程A7と同様
に、掘削機30により土砂を掘削しつつ掘削機30およ
び第2の管12を前進させる工程と、最後部の短尺管ユ
ニットに次の短尺管ユニットを連結する工程とを、掘削
機30が到達立て坑66に到達するまで繰り返す。
B9) Next, as in the step A7 described above, a step of advancing the excavator 30 and the second pipe 12 while excavating the earth and sand by the excavator 30, and the next short pipe to the rear short pipe unit. The process of connecting the units is repeated until the excavator 30 reaches the reaching shaft 66.

【0077】この間、第2の管12が第4の部材86の
内側を移動し、また、第4の部材86が自己の復元力に
より第2の管12の外面に押圧される。これにより、第
2の管12を敷設する間、発進立て坑34への地下水の
漏出が防止される。
During this time, the second tube 12 moves inside the fourth member 86, and the fourth member 86 is pressed against the outer surface of the second tube 12 by its own restoring force. This prevents groundwater from leaking to the starting shaft 34 while the second pipe 12 is being laid.

【0078】第2の管12を敷設されるときも、図10
に示すキャッブ64と同種のキャップが、最先端の短尺
管ユニットのC型係合部の最前端部に配置され、また、
硬化剤を封入した袋が各短尺管ユニットの各C型係合部
に配置される。
Even when the second pipe 12 is laid, FIG.
A cap of the same type as the cab 64 shown in FIG. 2 is arranged at the foremost end of the C-shaped engaging portion of the shortest tube unit, and
A bag containing a curing agent is placed in each C-shaped engaging portion of each short tube unit.

【0079】第2の管12の敷設時、第2の管12のT
型係合部24は、図13に示すように、敷設された第1
の管10のC型係合部16に係合されており、また、C
型係合部16に配置された袋を破壊する。
When the second pipe 12 is laid, the T of the second pipe 12 is
As shown in FIG. 13, the die engagement portion 24 is a first laid portion.
Is engaged with the C-shaped engaging portion 16 of the pipe 10 of
The bag arranged in the mold engaging portion 16 is destroyed.

【0080】B10)掘削機30が到達立て坑の直前に
到達すると、工程A8と同様に、掘削機30を到達立て
坑内に移動させ、第2の管12の先端部を受け入れる穴
が到達立て坑の側壁に形成される。
B10) When the excavator 30 arrives just before the reaching shaft, the excavator 30 is moved into the reaching shaft and the hole for receiving the tip end of the second pipe 12 is reached in the reaching shaft as in the step A8. Formed on the side wall of.

【0081】また、第2の管12の先端部が到達立て坑
内に達すると、工程A9と同様に、第2の管12と到達
立て坑の即壁に形成された前記穴との間を液密的に維持
するシール手段が形成される。
When the tip of the second pipe 12 reaches the inside of the reaching shaft, liquid is passed between the second pipe 12 and the hole formed on the immediate wall of the reaching shaft as in step A9. A sealing means is formed that maintains a tight seal.

【0082】B12)次いで、次の第2の管12を敷設
された第2の管12の隣りに敷設すべく、掘削機30が
到達立て坑から取り出され、再び発進立て坑に設置され
る。
B12) Next, the excavator 30 is taken out of the reaching shaft and installed again in the starting shaft so that the next second pipe 12 can be installed next to the installed second pipe 12.

【0083】B13)その後は、第2の管12を敷設さ
れた敷設された第2の管の隣りに敷設すべく、工程B1
〜B12が敷設すべき第2の管の数により決定される回
数繰り返される。
B13) Then, in order to lay the second pipe 12 next to the laid second pipe, the process B1
~ B12 is repeated a number of times determined by the number of second tubes to be laid.

【0084】上記の工程において、掘削機30ならびに
第1および第2の管は、少なくとも1つのジャッキを用
いた元押し装置により前進させることができる。
In the above process, the excavator 30 and the first and second pipes can be advanced by the original pushing device using at least one jack.

【0085】上記の工程を行うことにより、地中には、
係合部が互いに係合された複数の管からなる、図14に
示す地下構造物102が構築される。地下構造物の断面
形状は、四角形、円形、コ字状、U字状、V字状、逆U
字状、逆V字状等の他の形状であってもよい。
By performing the above steps,
The underground structure 102 shown in FIG. 14 is constructed in which the engaging portions are composed of a plurality of pipes that are engaged with each other. The cross-sectional shape of the underground structure is square, circular, U-shaped, U-shaped, V-shaped, inverted U
Other shapes such as a V shape and an inverted V shape may be used.

【0086】第1の管10の主体部14の軸線を中心と
する両C型係合部16のなす角度は、図示の例のように
180度である必要はなく、構築すべき地下構造物の断
面形状に応じて任意な角度とすることができる。同様
に、第2の管12の主体部20の軸線を中心とするC型
係合部22とT型係合部24との角度も、構築すべき地
下構造物の断面形状に応じて任意な角度とすることがで
きる
The angle formed by the two C-shaped engaging portions 16 around the axis of the main body portion 14 of the first pipe 10 does not need to be 180 degrees as in the example shown in the figure, and an underground structure to be constructed. The angle can be any angle depending on the cross-sectional shape. Similarly, the angle between the C-shaped engaging portion 22 and the T-shaped engaging portion 24 about the axis of the main body portion 20 of the second pipe 12 is also arbitrary depending on the sectional shape of the underground structure to be constructed. Can be angled

【0087】図14に示す地下構造物102は、第1の
管10の両側のそれぞれに第2の管12を順次敷設する
ことにより形成されている。しかし、図示の例のように
開放された断面形状を有する地下構造物を構築する場
合、第2の管12のみで構築してもよい。また、断面が
矩形または円形の地下構造物ように、閉鎖された断面形
状の地下構造物を構築する場合、最後に敷設される管
は、2つの係合部が両隣りの管のC型係合部に係合され
るT型係合部であるものとすることができる。
The underground structure 102 shown in FIG. 14 is formed by sequentially laying the second pipes 12 on both sides of the first pipe 10. However, when constructing an underground structure having an open cross-sectional shape as in the illustrated example, it may be constructed only by the second pipe 12. When constructing an underground structure with a closed cross-sectional shape, such as an underground structure with a rectangular or circular cross section, the pipe to be laid last is a C-shaped joint of two adjacent pipes. It may be a T-shaped engaging portion that is engaged with the joining portion.

【0088】シールド型トンネル掘削機としては、たと
えば、実開昭63−121698号公報等に記載されて
いる公知の装置ように、駆動源と該駆動源により駆動さ
れて切羽を掘削するカッタ組立体とを備えた機械式のシ
ールド型トンネル掘削機を用いることが好ましい。元押
し装置としては、たとえば、実開昭59−80594号
公報等に記載されている公知の装置を用いることができ
る。型枠により規定される空間内に供給する充填材は、
モルタル以外の、固化性の水ガラス等、他の性の材料で
あってもよい。
As the shield type tunnel excavator, for example, as in a known device disclosed in Japanese Utility Model Laid-Open No. 63-121698, a drive source and a cutter assembly for excavating a face driven by the drive source. It is preferable to use a mechanical shield type tunnel excavator equipped with and. As the original pushing device, for example, a known device described in Japanese Utility Model Laid-Open No. 59-80594 can be used. The filler supplied in the space defined by the formwork is
Other than mortar, a material having other properties such as solidifying water glass may be used.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明で用いる第1および第2の管の一実施例
を示す断面図である。
FIG. 1 is a cross-sectional view showing an embodiment of first and second pipes used in the present invention.

【図2】本発明の一つの工程を示す断面図である。FIG. 2 is a cross-sectional view showing one step of the present invention.

【図3】図2の3−3線に沿って得た断面図である。FIG. 3 is a sectional view taken along line 3-3 of FIG.

【図4】本発明の他の一つの工程を示す断面図である。FIG. 4 is a cross-sectional view showing another process of the present invention.

【図5】図4の5−5線に沿って得た断面図である。5 is a cross-sectional view taken along line 5-5 of FIG.

【図6】本発明の他の一つの工程を示す断面図である。FIG. 6 is a cross-sectional view showing another process of the present invention.

【図7】図6の7−7線に沿って得た断面図である。7 is a cross-sectional view taken along line 7-7 of FIG.

【図8】本発明の他の一つの工程を示す断面図である。FIG. 8 is a cross-sectional view showing another process of the present invention.

【図9】本発明の他の一つの工程を示す断面図である。FIG. 9 is a cross-sectional view showing another process of the present invention.

【図10】C型係合部に配置されたキャップと袋を示す
図である。
FIG. 10 is a view showing a cap and a bag arranged in a C-shaped engaging portion.

【図11】本発明の他の一つの工程を示す断面図であ
る。
FIG. 11 is a cross-sectional view showing another process of the present invention.

【図12】本発明の他の一つの工程を示す図3と同様の
断面図である。
FIG. 12 is a sectional view similar to FIG. 3, showing another step of the present invention.

【図13】C型係合部とT型係合部とを係合させた状態
を示す断面図である。
FIG. 13 is a cross-sectional view showing a state in which a C-shaped engaging portion and a T-shaped engaging portion are engaged with each other.

【図14】構築された地下構造物の一実施例を示す断面
図である。
FIG. 14 is a cross-sectional view showing an example of the constructed underground structure.

【符号の説明】[Explanation of symbols]

10 第1の管 12 第2の管 14,20 主体部 16,22 C型係合部 24 T型係合部 30 シールド型トンネル掘削機 32 穴 34 発進立て坑 36 側壁 42,82 シール手段 44 第1の部材 46 第2の部材 52 型枠 62,100 モルタル 64 キャップ 66 袋 84 第3の部材 86 第4の部材 10 1st pipe 12 2nd pipe 14,20 Main part 16,22 C-type engaging part 24 T-type engaging part 30 Shield type tunnel excavator 32 Hole 34 Start stand shaft 36 Side wall 42,82 Sealing means 44th 1st member 46 2nd member 52 Formwork 62,100 Mortar 64 Cap 66 Bag 84 Third member 86 Fourth member

Claims (10)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 筒状の主体部と、該主体部の外側面にあ
って該主体部の長手方向へ伸びる少なくとも1つの係合
部とを備える複数の管を、隣り合う管の係合部が互いに
係合するように、地中に配置することにより地下構造物
を構築する方法であって、前記係合部に対応する第1の
部材を、筒状部を有する掘削機の外側面に前記主体部の
外側面における前記係合部の位置に対応させて配置し、
弾性変形可能の第2の部材を前記掘削機と前記第1の部
材との組立体の周りに配置し、型枠を前記第2の部材の
周りに配置し、固化性の充填材を前記型枠内に供給し
て、前記第2の部材を固化した充填材を介して発進用立
て坑の側壁に担持させることを含む、地下構造物の構築
方法。
1. A plurality of pipes each having a tubular main body and at least one engaging portion on an outer surface of the main body and extending in a longitudinal direction of the main body, wherein an engaging portion of adjacent pipes is provided. A method of constructing an underground structure by arranging in the ground so that they engage with each other, wherein a first member corresponding to the engaging portion is provided on an outer surface of an excavator having a tubular portion. Arranged corresponding to the position of the engaging portion on the outer surface of the main body portion,
An elastically deformable second member is arranged around an assembly of the excavator and the first member, a mold is arranged around the second member, and a solidifying filler is applied to the mold. A method for constructing an underground structure, which comprises supplying the second member to a side wall of a start shaft for escaping through a solidified filling material by supplying the second member into the frame.
【請求項2】 さらに、前記掘削機により地盤を掘削し
つつ前記掘削機を前進させると同時に、前記掘削機の後
部に続く前記管の周りの水密性を前記第2の部材および
前記固化した充填材に維持させつつ前記管を前進させ
て、前記管を地中に配置することを含む、請求項1に記
載の構築方法。
2. The excavator further advances the excavator while excavating the ground, and at the same time the watertightness around the pipe following the rear part of the excavator is enhanced by the second member and the solidified filling. The method of claim 1 including advancing the tube while maintaining the material to place the tube in the ground.
【請求項3】 前記第1の部材は前記係合部の断面の大
きさとほぼ同じ大きさの断面を有し、前記掘削機は前記
主体部の断面とほぼ同じ大きさの断面を有する、請求項
1または2に記載の構築方法。
3. The first member has a cross section that is substantially the same size as the cross section of the engaging portion, and the excavator has a cross section that is substantially the same size as the cross section of the main body portion. Item 3. The construction method according to Item 1 or 2.
【請求項4】 さらに、前記管を前進させる前に前記第
1の部材を除去することを含む、請求項2または3に記
載の構築方法。
4. The construction method according to claim 2 or 3, further comprising removing the first member before advancing the tube.
【請求項5】 筒状の主体部と該主体部の外周面にあっ
て該主体部の長手方向へ伸びかつC字状の断面形状を有
する少なくとも1つのC型係合部とを備える第1の管
と、筒状の主体部と該主体部の外側面にあって該主体部
の長手方向へ伸びかつC字状の断面形状を有するC型係
合部と前記主体部の外側面にあって該主体部の長手方向
へ伸びかつT字状の断面形状を有するT型係合部とを備
える複数の第2の管とを、隣り合う管のC型係合部とT
型係合部とが係合するように、地中に配置して地下構造
物を構築する方法であって、前記第1の管のC型係合部
に対応する第1の部材を、筒状部を有する掘削機の外側
面に前記第1の管の主体部の外側面における前記C型係
合部の位置に対応させて配置し、弾性変形可能の第2の
部材を前記掘削機と前記第1の部材との組立体の周りに
配置し、型枠を前記第2の部材の周りに配置し、固化性
の充填材を前記型枠内に供給して、前記第2の部材を固
化した充填材を介して発進用立て坑の側壁に担持させ、
前記掘削機により地盤を掘削しつつ前記掘削機を前進さ
せると同時に、前記掘削機の後部に続く前記第1の管と
前記側壁との間の水密性を前記第2の部材および前記固
化した充填材に維持させつつ前記第1の管を前進させて
前記第1の管を地中に配置し、前記第2の管のC型係合
部に対応する第3の部材を掘削機の外側面に前記第2の
管の主体部の外側面における前記C型係合部の位置に対
応するように配置し、弾性変形可能の第4の部材を掘削
機と前記第3の部材との組立体の周りに配置し、型枠を
前記第4の部材の周りに配置し、固化性の充填材を前記
型枠内に供給して、前記第4の部材を固化した充填材を
介して発進用立て坑の側壁に担持させ、前記掘削機によ
り地盤を掘削しつつ前記掘削機を前進させると同時に、
前記掘削機の後部に続く前記第2の管と前記側壁との間
の水密性を前記第4の部材および前記固化した充填材に
維持させつつ、前記第2の管のT型係合部を当該第2の
管に先立って配置された管のC型係合部に係合させた状
態で、前記第2の管を前進させる工程を複数回行って前
記第2の管を地中に配置することを含む、地下構造物の
構築方法。
5. A first main body having a tubular main body and at least one C-shaped engaging portion on an outer peripheral surface of the main body that extends in a longitudinal direction of the main body and has a C-shaped cross section. Of the pipe, the cylindrical main body portion, the C-shaped engaging portion on the outer surface of the main body portion which extends in the longitudinal direction of the main body portion and has a C-shaped cross-section, and the outer surface of the main body portion. A plurality of second pipes each having a T-shaped engaging portion extending in the longitudinal direction of the main body portion and having a T-shaped cross-sectional shape, and a C-shaped engaging portion of an adjacent pipe and a T-shaped engaging portion.
A method for constructing an underground structure by arranging in the ground so as to engage with a mold engaging portion, wherein a first member corresponding to the C-shaped engaging portion of the first pipe is A second member that is elastically deformable and is disposed on the outer surface of the excavator having a grooved portion in correspondence with the position of the C-shaped engaging portion on the outer surface of the main body of the first pipe, and the excavator. The second member is placed around the assembly with the first member, the mold is placed around the second member, and a solidifying filler is supplied into the mold. It is carried on the side wall of the starting shaft through the solidified filler,
The excavator is moved forward while excavating the ground by the excavator, and at the same time, the watertightness between the first pipe and the side wall following the rear part of the excavator is reduced by the second member and the solidified filling. The first pipe is moved forward while maintaining the material, and the first pipe is arranged in the ground, and the third member corresponding to the C-shaped engaging portion of the second pipe is provided on the outer surface of the excavator. A fourth member that is elastically deformable and is disposed so as to correspond to the position of the C-shaped engaging portion on the outer surface of the main body portion of the second pipe, and is an assembly of the excavator and the third member. For placing the mold around the fourth member, supplying a solidifying filler into the mold, and starting the fourth member through the solidified filler. Supported on the side wall of the vertical shaft, while advancing the excavator while excavating the ground by the excavator,
While maintaining the watertightness between the second pipe continuing to the rear part of the excavator and the side wall in the fourth member and the solidified filler, the T-shaped engaging portion of the second pipe is The second pipe is arranged in the ground by performing the step of advancing the second pipe a plurality of times in a state of being engaged with the C-shaped engaging portion of the pipe arranged prior to the second pipe. A method of constructing an underground structure, including:
【請求項6】 前記第1および第2の部材はそれぞれ前
記C型係合部の断面の大きさとほぼ同じ大きさの断面を
有し、前記掘削機は前記主体部の断面とほぼ同じ大きさ
の断面を有する、請求項5に記載の構築方法。
6. The first and second members each have a cross section that is substantially the same size as the cross section of the C-shaped engaging portion, and the excavator is substantially the same size as the cross section of the main body portion. The method of construction according to claim 5, having a cross-section.
【請求項7】 円錐形のキャップを前記C型係合部の前
端部に配置し、それにより、前記第1または第2の管を
前進させるとき、土砂が前記C型係合部の前端部から前
記C型係合部内に入ることを前記キャップにより防止す
る、請求項5または6に記載の構築方法。
7. A conical cap is disposed at the front end of the C-engagement portion such that when advancing the first or second tube, earth and sand are deposited at the front end of the C-engagement portion. 7. The construction method according to claim 5, wherein the cap prevents the cap from entering into the C-shaped engaging portion.
【請求項8】 硬化剤を封入した袋を前記C型係合部内
に配置し、それにより、前記第1または第2の管を前進
させるとき、前記袋により前記C型係合部内を液密的に
閉塞する、請求項7に記載の構築方法。
8. A bag encapsulating a curing agent is disposed in the C-shaped engaging portion, whereby the bag is liquid-tight in the C-shaped engaging portion when the first or second pipe is advanced. The method of construction according to claim 7, wherein the construction is occluded.
【請求項9】 前記袋を、次の第2の管を前進させると
きに、該次の第2の管のT型係合部により破壊する、請
求項8に記載の構築方法。
9. The construction method according to claim 8, wherein the bag is broken by a T-shaped engaging portion of the next second tube when advancing the next second tube.
【請求項10】 前記掘削機は、シールド型トンネル掘
削機である、請求項1〜9のいずれか1項に記載の構築
方法。
10. The construction method according to claim 1, wherein the excavator is a shield tunnel excavator.
JP5345590A 1993-12-22 1993-12-22 How to build an underground structure Expired - Fee Related JP2529644B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5345590A JP2529644B2 (en) 1993-12-22 1993-12-22 How to build an underground structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5345590A JP2529644B2 (en) 1993-12-22 1993-12-22 How to build an underground structure

Publications (2)

Publication Number Publication Date
JPH06280470A JPH06280470A (en) 1994-10-04
JP2529644B2 true JP2529644B2 (en) 1996-08-28

Family

ID=18377628

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5345590A Expired - Fee Related JP2529644B2 (en) 1993-12-22 1993-12-22 How to build an underground structure

Country Status (1)

Country Link
JP (1) JP2529644B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561405A (en) * 2010-12-09 2012-07-11 上海市基础工程有限公司 Opening treatment method for pipe-roofing continuous perforation

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4846129A (en) * 1971-10-15 1973-07-02

Also Published As

Publication number Publication date
JPH06280470A (en) 1994-10-04

Similar Documents

Publication Publication Date Title
JPH09217584A (en) Pipe joint for pipe roof, watertight packing of shaft, and water cutoff method in pipe roof construction method
JP2529644B2 (en) How to build an underground structure
JP3890528B2 (en) Tunnel construction method
JPH0438397A (en) Building of underground structure
JP3332507B2 (en) How to build underground structures
JP2685426B2 (en) Tube mounting method for buried objects
JP2602152B2 (en) Method and apparatus for filling inner and outer voids of sheath tube
JP3795988B2 (en) How to build a pipe roof
JP2908735B2 (en) Construction method of earth anchor on steel pipe column retaining wall
KR102579407B1 (en) Waterproof structure of Drug Inlet for tunnel segment
JP4234313B2 (en) Construction method of widening tunnel
JP7389698B2 (en) Formation method of starting port and starting port structure
JPH08144687A (en) Pipe and pipe loop method by use the same
JPH0423994Y2 (en)
JPH0144849B2 (en)
JPH07896B2 (en) Construction method for underground wall
JPH06322756A (en) Junction of steel-pipe pile
JP3655559B2 (en) Water stop method for gaps between excavation holes and buried pipes
JP3734890B2 (en) Water stop structure and water stop method
JPH10325299A (en) Shield excavation machine and tunnel-lining method by using the same
JP2689667B2 (en) Shield tunnel lining method
JP2519124B2 (en) pipe
JP3783120B2 (en) Start method of shield excavator
JPH074174A (en) Pit mouth sealing device
JPH06158980A (en) Method and device for starting shield machine and arriving method and device for the same

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees