JP2511669Y2 - Drilling rig - Google Patents

Drilling rig

Info

Publication number
JP2511669Y2
JP2511669Y2 JP6023590U JP6023590U JP2511669Y2 JP 2511669 Y2 JP2511669 Y2 JP 2511669Y2 JP 6023590 U JP6023590 U JP 6023590U JP 6023590 U JP6023590 U JP 6023590U JP 2511669 Y2 JP2511669 Y2 JP 2511669Y2
Authority
JP
Japan
Prior art keywords
hollow shaft
sheave
rotary arm
leader mast
sub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP6023590U
Other languages
Japanese (ja)
Other versions
JPH0417488U (en
Inventor
正人 大堀
Original Assignee
正人 大堀
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 正人 大堀 filed Critical 正人 大堀
Priority to JP6023590U priority Critical patent/JP2511669Y2/en
Publication of JPH0417488U publication Critical patent/JPH0417488U/ja
Application granted granted Critical
Publication of JP2511669Y2 publication Critical patent/JP2511669Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Earth Drilling (AREA)

Description

【考案の詳細な説明】 〔産業上の利用分野〕 本考案は、リーダマストのトップシーブより繰り出し
た索条によってオーガを昇降させて地盤を穿孔する掘削
装置に関する。
[Detailed Description of the Invention] [Industrial application] The present invention relates to an excavating device for perforating the ground by elevating and lowering an auger by a cord extended from a top sheave of a leader mast.

〔従来の技術〕[Conventional technology]

掘削装置では、主索条をリーダマスト頂上のトップシ
ーブから繰り出してオーガを昇降させて掘削すると共
に、主索条と別に設けた副索条に掘削孔建て込み用の鋼
材等を吊り下げて用いるが、従来この副索条はトップシ
ーブ本体の側部に固定した突出腕先端の副索条シーブか
ら繰り出されている。
In the excavation equipment, the main rope is fed from the top sheave on the top of the leader mast to elevate and lower the auger for excavation, and the auxiliary rope provided separately from the main rope is used for suspending steel material for building a drilling hole. However, conventionally, this auxiliary cord is paid out from the auxiliary cord sheave at the tip of the protruding arm fixed to the side portion of the top sheave body.

〔考案が解決しようとする課題〕[Problems to be solved by the device]

前記従来例の副索条用の固定式突出腕は、リーダマス
トの組み立て分解時、横に嵩張って取り扱いが不便であ
り、またオーガに対して鋼材等の吊り下げ位置を変える
ことができず、そして鋼材以外の部材、例えばオーガや
リーダマストの部材を吊り上げる場合吊り上げ位置を選
定できない等の問題点を有した。本考案はこれら問題点
を解決するためになされたもので、リーダマストの組み
立て分解に際してトップシーブに設けた副索条用の突出
腕が嵩張らず、取り扱う部材に応じて副索条の繰り出し
位置を変えられる掘削装置を得ることを目的とする。
The fixed projecting arm for the auxiliary cord of the conventional example is bulky laterally when the leader mast is assembled and disassembled and is inconvenient to handle, and the suspending position of steel or the like cannot be changed with respect to the auger. In addition, when a member other than steel, such as an auger or a leader mast, is lifted, the lifting position cannot be selected. The present invention has been made to solve these problems.When the leader mast is assembled and disassembled, the protruding arm for the auxiliary cord provided on the top sheave is not bulky, and the extension position of the auxiliary cord can be adjusted according to the member to be handled. The purpose is to obtain a changeable drilling rig.

〔課題を解決するための手段〕[Means for solving the problem]

本考案は第1図乃至第3図に例示するように、リーダ
マスト1のトップシーブAから繰り出される主索条10に
よってアースオーガ11を昇降させる掘削装置において、
トップシーブ本体3にリーダマスト1と軸平行な中空軸
7を枢着し、同中空軸7の頂端に横方向へ伸びる回転腕
Bの基部を固定して同回転腕Bの前端に副索条繰り出し
シーブ8を枢着し、中空軸7に回転腕Bを回転固定自在
にする回転駆動装置Cを連結して、同中空軸7の上端と
同中空軸7下方のトップシーブ本体3側に副索条繰り出
しシーブ8と軸平行な中間シーブ6,9を設け、部材昇降
用の副索条14を中空軸7の略軸心を通るようにして、副
索条繰り出しシーブ8,中間シーブ6,9に掛張して成る掘
削装置である。
As shown in FIGS. 1 to 3, the present invention is an excavation device for raising and lowering an earth auger 11 by a main rope 10 fed from a top sheave A of a leader mast 1,
A hollow shaft 7 which is axially parallel to the leader mast 1 is pivotally attached to the top sheave body 3, and the base of the rotary arm B extending in the lateral direction is fixed to the top end of the hollow shaft 7 and the auxiliary cord is attached to the front end of the rotary arm B. The feed sheave 8 is pivotally attached, and the hollow shaft 7 is connected to a rotary drive device C that allows the rotary arm B to be rotationally fixed, and the upper end of the hollow shaft 7 and a sub-sheave main body 3 side below the hollow shaft 7 are subordinate to each other. Intermediate sheaves 6 and 9 are provided which are axially parallel to the cord extending sheaves 8, and the sub-line 14 for raising and lowering the member is made to pass through substantially the center of the hollow shaft 7 so that the sub-line extending sheaves 8, the intermediate sheaves 6, It is a drilling device that is hung on 9.

〔作用〕[Action]

回転駆動装置Cを駆動すると、回転腕Bを中空軸7を
中心としてトップシーブ本体3の両側方において前後方
向へ回転させることができるから、回転駆動装置20によ
りリーダマスト1を回転させてアースオーガ11を適宜横
に位置換えして後、回転駆動装置Cによって回転腕Bを
横に回転させて、副索条繰り出しシーブ8から繰り出し
て降下させた副索条14下端のフック14aに鋼材を掛けて
吊り上げて、再び回転駆動装置Cにより回転腕Bを回転
させて同鋼材を、オーガ11によって穿孔した掘削孔の直
上へ運んで孔内へ吊り込む。若し鋼材を運ぶ途中、鋼材
が装置の各部に衝突するおそれがあるときは、回転駆動
装置Cを操作して回転腕Bの位置を変えて衝突を回避し
ながら、鋼材を掘削孔上へ運ぶ。また、モンケンの使用
時,リーダマストの部材等の吊り下げ時は、同様に回転
駆動装置Cにより回転腕Bを最適位置に回す。そしてリ
ーダマスト1の組立分解時、全装置の運搬時、格納時等
は、回転腕Bをトップシーブ本体3の長手方向に沿って
前方へ回しておくと、回転腕Bが嵩張ることがなく、ま
た外物に当たり難くなる。
When the rotary drive device C is driven, the rotary arm B can be rotated in the front-rear direction on both sides of the top sheave body 3 about the hollow shaft 7, so the rotary drive device 20 rotates the leader mast 1 to rotate the earth auger. After the lateral position of 11 is appropriately changed, the rotary arm B is laterally rotated by the rotation driving device C, and the steel material is hooked on the hook 14a at the lower end of the auxiliary cord 14 which is lowered from the auxiliary cord feeding sheave 8. Then, the rotary arm B is rotated again by the rotation driving device C to carry the steel material to a position right above the excavated hole drilled by the auger 11 and hang it inside the hole. If there is a risk that the steel material will collide with each part of the device during the transportation of the steel material, the steel material is transported to the excavation hole while operating the rotary drive device C to change the position of the rotary arm B to avoid the collision. . Further, when the monken is used or when the member or the like of the leader mast is suspended, the rotary arm B is similarly rotated by the rotary drive device C to the optimum position. Then, when the leader mast 1 is assembled and disassembled, the entire device is transported, stored, etc., if the rotary arm B is turned forward along the longitudinal direction of the top sheave body 3, the rotary arm B does not become bulky, It also makes it harder for external objects to hit.

〔実施例〕〔Example〕

本考案の一実施例を図によって詳述する。第1図にお
いて、1は回転型の機体2aに取り付けたブーム2によっ
て支持されるリーダマストである。Aは前記リーダマス
ト1の頂上に設けられたトップシーブで、トップシーブ
本体3の前端には主索条繰り出しシーブ4が設けられ、
後端には主索条導入シーブ5が設けられ、上部には副索
条繰り出しシーブ8を前端に軸支する回転腕Bが設けら
れている。第2図乃至第3図において、前記回転腕B部
分の構造を説明する。即ち、この構造はトップシーブ本
体3にリーダマスト1と軸平行な中空軸7を枢着し、同
中空軸7頂端に横方向へ伸びる副索条シーブ8の回転腕
Bの基部を固定し、同中空軸7に油圧駆動ウオーム装置
等から成る回転駆動装置Cを連結し回転腕Bを回転自在
且つ任意位置固定自在にし、同中空軸7の上端と同中空
軸7下方のトップシーブ本体3側に前記副索条繰り出し
シーブ8と軸平行な中間シーブ6,9を設けて、副捲上げ
機13から副索条繰り入れシーブ15を介して繰り出した副
索条14を中空軸7の略軸心を通るようにして前記副索条
繰り出しシーブ8,中間シーブ6,9に掛張したものであ
る。副索条14の下端にはフック14aが結合されている。
主捲上げ機10aから導出した主索条10は、主索条導入シ
ーブ5,繰り出しシーブ4,アースオーガ11の駆動モータ11
a上の動滑車12の順に掛けられる。回転駆動装置Cを駆
動すると、回転腕Bを後方からトップシーブ本体3の前
方を巡って一回転させるうる。この回転区間では、第4
図に示すように、前記中空軸7の軸心Kから副索条繰り
出し点pの軌跡円qに至る距離Lが、同軸心Kと主索条
繰り出し点Pとの距離Mより大きくなっている。このよ
うな関係のもとでは、ウオーム装置20によりリーダマス
ト1を回転させてアースオーガ11を適宜横に位置換えし
て後、回転駆動装置Cによって回転腕Bを横に回転させ
て、副索条繰り出しシーブ8から繰り出して降下させた
副索条14下端のフック14aに鋼材を掛けて吊り上げて、
再び回転駆動装置Cにより回転腕Bを回転させて同鋼材
をオーガ11の掘削孔の直上へ運んで吊り込む。
An embodiment of the present invention will be described in detail with reference to the drawings. In FIG. 1, reference numeral 1 is a leader mast supported by a boom 2 attached to a rotary type machine body 2a. A is a top sheave provided on the top of the leader mast 1, and a main rope-feeding sheave 4 is provided at the front end of the top sheave body 3.
The main rope introducing sheave 5 is provided at the rear end, and the rotary arm B for pivotally supporting the auxiliary rope feeding sheave 8 at the front end is provided at the upper portion. The structure of the rotary arm B portion will be described with reference to FIGS. 2 to 3. That is, in this structure, a hollow shaft 7 which is axially parallel to the leader mast 1 is pivotally attached to the top sheave body 3, and the base of the rotary arm B of the auxiliary cord sheave 8 extending laterally is fixed to the top end of the hollow shaft 7, The hollow shaft 7 is connected to a rotary drive device C such as a hydraulic drive worm device so that the rotary arm B is rotatable and can be fixed at an arbitrary position, and the upper end of the hollow shaft 7 and the top sheave body 3 side below the hollow shaft 7 are fixed. Is provided with intermediate sheaves 6, 9 which are axially parallel to the sub-line feeding sheave 8, and the sub-line 14 unwound from the sub-winding machine 13 via the sub-line feeding sheave 15 is approximately the center of the hollow shaft 7. The sheave 8, which extends through the sub-line, and the intermediate sheaves 6, 9 are hung on the auxiliary sheave 8. A hook 14a is coupled to the lower end of the auxiliary cord 14.
The main rope 10 derived from the main hoisting machine 10a includes a main rope introducing sheave 5, a feeding sheave 4, and a drive motor 11 for an earth auger 11.
a It can be hung in the order of the movable pulley 12 above. When the rotary drive device C is driven, the rotary arm B can be rotated once from the rear to the front of the top sheave body 3. In this rotation section, the fourth
As shown in the figure, the distance L from the axis K of the hollow shaft 7 to the locus circle q of the sub-rope feeding point p is larger than the distance M between the coaxial center K and the main cord feeding point P. . Under such a relationship, after the leader mast 1 is rotated by the worm device 20 to properly position the earth auger 11 laterally, the rotary arm device B is laterally rotated by the rotary drive device C, and the sub-rope is moved. The steel material is hung on the hook 14a at the lower end of the auxiliary rope 14 which is drawn out from the sheave 8 and lowered,
The rotary arm B is again rotated by the rotary drive device C to carry the steel material directly above the excavation hole of the auger 11 and hang it.

21はリーダマスト1をブーム2に対して支持する油圧
シリンダである。22はオーガ11を案内する主案内棒であ
る。23は副案内棒で、例えばモンケンをスライド自在に
取り付けて、回転腕Bを横に廻して前記副索条14によっ
て昇降させる。
Reference numeral 21 is a hydraulic cylinder that supports the leader mast 1 with respect to the boom 2. 22 is a main guide rod for guiding the auger 11. Reference numeral 23 is a sub guide rod, for example, a Monken is slidably attached, and the rotary arm B is turned sideways to be moved up and down by the sub rope 14.

16,17は軸受部で、18は鍔部である。19は過負荷保護
装置で、中空軸7に回転可能に嵌着したウオームホイー
ルC1上の固定片19aに螺着した締め付けネジ19bによって
摩擦板19cを中空軸7の側面に圧接したもので、回転腕
Bに大きなトルクが働いたとき、摩擦板19cと中空軸7
の接触面がスリップしてウオーム装置等の過負荷による
破損を防止する。
16 and 17 are bearings, and 18 is a collar. Reference numeral 19 denotes an overload protection device, which is a device in which a friction plate 19c is pressed against the side surface of the hollow shaft 7 by a tightening screw 19b screwed to a fixing piece 19a on the worm wheel C1 rotatably fitted to the hollow shaft 7. When a large torque acts on arm B, friction plate 19c and hollow shaft 7
Prevents the contact surface from slipping and damaging the worm device due to overload.

なお前記回転腕Bは油圧シリンダによって伸縮できる
ようにすると、取り扱いが便利となる。
If the rotary arm B can be expanded and contracted by a hydraulic cylinder, the handling becomes convenient.

〔考案の効果〕[Effect of device]

本考案は、トップシーブ本体3にリーダマスト1と軸
平行な中空軸7を枢着し、同中空軸7頂端に横方向へ伸
びる副索条繰り出しシーブ8の回転腕Bの基部を固定
し、同中空軸7に回転腕Bを回転固定自在にする回転固
定装置Cを連結し、中空軸7の上端と同中空軸7下方の
トップシーブ本体3側に中間シーブ6,9を設けて、部材
昇降用の副索条14を中空軸7の略軸心を通るようにして
前記副索条繰り出しシーブ8,中間シーブ6,9に掛張した
ものであるから、回転駆動装置Cによって回転腕Bを回
転させて副索条繰り出しシーブ8をトップシーブ本体の
周面より突出させ、副索条14によって例えば鋼材を吊り
上げて、回転腕Bを回転させながら鋼材をオーガ11の掘
削孔の直上へ運んで吊り込むことができる。しかも、こ
れらの作業中回転腕Bの回転によって、中間シー転腕B
を廻してこれを回避しうる。しかも、これらの作業を、
本考案ではリーダマスト全体を回転させず、回転腕Bを
回転させるだけで手軽になしうる。そして回転腕Bをト
ップシーブ本体3の長手方向に沿って前方へ伸ばしてお
くと、リーダマスト1の組立分解時、全装置の運搬時、
格納時等嵩張らない状態で取り扱いうる。
According to the present invention, a hollow shaft 7 which is axially parallel to the leader mast 1 is pivotally attached to the top sheave body 3, and the base of the rotary arm B of a sub-strand feeding sheave 8 extending in the lateral direction is fixed to the top end of the hollow shaft 7, A rotary fixing device C that allows the rotary arm B to be fixed in rotation is connected to the hollow shaft 7, and intermediate sheaves 6 and 9 are provided on the upper end of the hollow shaft 7 and on the side of the top sheave body 3 below the hollow shaft 7 to form a member. Since the auxiliary rope 14 for raising and lowering is hung on the auxiliary rope feeding sheave 8 and the intermediate sheaves 6 and 9 so as to pass through the substantial axis of the hollow shaft 7, the rotary arm B is rotated by the rotary drive device C. Is rotated to project the sub-line feed-out sheave 8 from the peripheral surface of the top sheave main body, and the sub-line 14 is used to hang steel material, for example, while rotating the rotary arm B, the steel material is carried directly above the excavation hole of the auger 11. You can hang it at. Moreover, due to the rotation of the rotary arm B during these operations,
Can be turned around to avoid this. Moreover, these tasks
In the present invention, it can be easily done by rotating the rotating arm B without rotating the entire reader mast. When the rotary arm B is extended forward along the longitudinal direction of the top sheave main body 3, when the leader mast 1 is assembled and disassembled, and all the devices are transported,
It can be handled without being bulky when it is stored.

【図面の簡単な説明】[Brief description of drawings]

第1図は本考案の一実施例の側面図、第2図は同実施例
の要部の拡大側面図、第3図は同要部の拡大平面図、第
4図は主索条繰り出し点と副索条繰り出し点との関係を
示す説明図である。 図中 A……トップシーブ、B……回転腕、C……回転
駆動装置、1……リーダマスト、2……ブーム、3……
トップシーブ本体、6……中間シーブ、7……中空軸、
8……副索条繰り出しシーブ、9……中間シーブ、10…
…主索条、15……副索条繰り入れシーブ、14……副索条
FIG. 1 is a side view of an embodiment of the present invention, FIG. 2 is an enlarged side view of an essential part of the embodiment, FIG. 3 is an enlarged plan view of the essential part, and FIG. It is explanatory drawing which shows the relationship between a sub-cord feed-out point. In the figure, A ... Top sheave, B ... Rotating arm, C ... Rotation drive device, 1 ... Leader mast, 2 ... Boom, 3 ...
Top sheave body, 6 ... intermediate sheave, 7 ... hollow shaft,
8 ... Secondary sheave, 9 ... Intermediate sheave, 10 ...
… Main line, 15… Subline transfer sheave, 14… Subline

Claims (1)

(57)【実用新案登録請求の範囲】(57) [Scope of utility model registration request] 【請求項1】リーダマスト(1)のトップシーブ(A)
から繰り出される主索条(10)によってアースオーガ
(11)を昇降させる掘削装置において、トップシーブ本
体(3)にリーダマスト(1)と軸平行な中空軸(7)
を枢着し、同中空軸(7)の頂端に横方向へ伸びる回転
腕(B)の基部を固定して、同回転腕(B)の前端に副
索条繰り出しシーブ(8)を枢着し、同中空軸(7)に
回転腕(B)を回転固定自在にする回転駆動装置(C)
を連結すると共に、中空軸(7)の上端と同中空軸
(7)下方のトップシーブ本体(3)側に中間シーブ
(6,9)を設けて、部材昇降用の副索条(14)を中空軸
(7)の略軸心を通るようにして前記副索条繰り出しシ
ーブ(8),中間シーブ(6,9)に掛張して成る掘削装
1. A top sheave (A) of a leader mast (1).
In a drilling device for raising and lowering an earth auger (11) by a main rope (10) fed out from a hollow shaft (7) parallel to a leader mast (1) in a top sheave body (3).
The base portion of the rotary arm (B) extending in the lateral direction is fixed to the top end of the hollow shaft (7), and the sub-strand feeding sheave (8) is pivotally connected to the front end of the rotary arm (B). Then, a rotary drive device (C) for freely fixing the rotary arm (B) to the hollow shaft (7).
And the upper end of the hollow shaft (7) and the intermediate sheaves (6, 9) on the side of the top sheave body (3) below the hollow shaft (7), the auxiliary rope (14) for raising and lowering the member. A drilling device in which a hollow shaft (7) is passed through the auxiliary shaft and the intermediate sheave (6, 9) so that the hollow shaft (7) passes through the shaft.
JP6023590U 1990-06-06 1990-06-06 Drilling rig Expired - Lifetime JP2511669Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6023590U JP2511669Y2 (en) 1990-06-06 1990-06-06 Drilling rig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6023590U JP2511669Y2 (en) 1990-06-06 1990-06-06 Drilling rig

Publications (2)

Publication Number Publication Date
JPH0417488U JPH0417488U (en) 1992-02-13
JP2511669Y2 true JP2511669Y2 (en) 1996-09-25

Family

ID=31587427

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6023590U Expired - Lifetime JP2511669Y2 (en) 1990-06-06 1990-06-06 Drilling rig

Country Status (1)

Country Link
JP (1) JP2511669Y2 (en)

Also Published As

Publication number Publication date
JPH0417488U (en) 1992-02-13

Similar Documents

Publication Publication Date Title
US3340938A (en) Semi-automated drilling rig
US4310098A (en) Portable boom structure
JPS61176788A (en) Drilling and/or lifting machine
US1507776A (en) Earth-boring machine
JP2511669Y2 (en) Drilling rig
JP2652808B2 (en) Down the hole drill rig
JP3615892B2 (en) Excavator soil removal equipment
JP2022135659A (en) earth drill machine
JP3637173B2 (en) Excavator lifting device
JPH0510071Y2 (en)
JPH08188374A (en) Iron plate gripping device
JP3025926B2 (en) Self-propelled drilling machine
JPH0455110Y2 (en)
JP2743350B2 (en) Suspension equipment for underground excavator hoses
JP2628263B2 (en) Mast lifting device
JPH09328750A (en) Top sheave device of pile driving machine
JP3608159B2 (en) Pile sheave top sheave
JP4136277B2 (en) Rotary press-fitting device with reduction gear
JPS5849242Y2 (en) Leader rotation device in a suspended type rotating two-sided leader pile driver
KR100784684B1 (en) Variable Type Jib Crane
JPH0523673Y2 (en)
JP2876590B2 (en) Low head crane
JP2743349B2 (en) How to suspend sludge hose of underground excavator
JP2786476B2 (en) Excavator
JPH0447275Y2 (en)