JP2511062Y2 - Stairs for temporary scaffolding - Google Patents

Stairs for temporary scaffolding

Info

Publication number
JP2511062Y2
JP2511062Y2 JP1992054019U JP5401992U JP2511062Y2 JP 2511062 Y2 JP2511062 Y2 JP 2511062Y2 JP 1992054019 U JP1992054019 U JP 1992054019U JP 5401992 U JP5401992 U JP 5401992U JP 2511062 Y2 JP2511062 Y2 JP 2511062Y2
Authority
JP
Japan
Prior art keywords
tread
bulging portion
pillar
stairs
temporary scaffolding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1992054019U
Other languages
Japanese (ja)
Other versions
JPH0616607U (en
Inventor
勝次 山本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alinco Inc
Original Assignee
Alinco Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alinco Inc filed Critical Alinco Inc
Priority to JP1992054019U priority Critical patent/JP2511062Y2/en
Publication of JPH0616607U publication Critical patent/JPH0616607U/en
Application granted granted Critical
Publication of JP2511062Y2 publication Critical patent/JP2511062Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Ladders (AREA)
  • Steps, Ramps, And Handrails (AREA)

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】本考案は、土木や建築作業時の階
段として仮設される仮設足場用階段に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a stairway for temporary scaffolding, which is temporarily installed as a staircase for civil engineering or construction work.

【0002】[0002]

【従来の技術】この種の足場用階段は、左右一対の柱材
間に数枚以上の複数枚の踏板を配設するとともに、各踏
板の左右両側端面をそれぞれボルトなどで上記両柱材の
各内側面に固定してある。
2. Description of the Related Art A stairway for scaffolding of this kind has a plurality of treads arranged between a pair of left and right pillars, and the left and right end faces of each tread are respectively attached with bolts or the like. It is fixed to each inner surface.

【0003】このような階段は、収納や運搬時には、で
きるだけ嵩張らないように複数のものを横に積み重ねて
置かれるが、積み重ね高さが大きくならないように、踏
板の幅を左右の柱材間の間隔より若干小さく設定してい
る。
When storing and transporting such stairs, a plurality of stairs are placed side by side so that they are not as bulky as possible, but the width of the tread is set between the left and right column members so that the stacking height does not become large. It is set slightly smaller than the interval.

【0004】一般には、図6に示すように左右の柱材
1,1の各内側面と踏板2の両側端面との間にワッシャ
3を介在して両者1,2をボルト4で固定してある。つ
まり、上記ワッシャ3の介在によって柱材1,1間の間
隔を踏板2の幅よりも大きくして複数のものの密着した
積み重ねを可能にして、収納や運搬時の積み重ね高さを
小さくできるようにしてある。しかし普通は、踏板を片
側2個所でボルト止めしている関係上、踏板1枚につ
き、4個のワッシャ3が必要であり、これがために、組
立作業も煩雑となる。
Generally, as shown in FIG. 6, a washer 3 is interposed between each inner side surface of the left and right column members 1, 1 and both end surfaces of the tread 2 to fix the both members 1 and 2 with bolts 4. is there. That is, by interposing the washer 3, the interval between the pillars 1 and 1 is made larger than the width of the tread 2 so that a plurality of things can be stacked in close contact with each other, and the stacking height during storage and transportation can be reduced. There is. Normally, however, four washers 3 are required for each tread, because the tread is bolted at two locations on each side, and this complicates the assembly work.

【0005】このため、従来、すでに図7に示すように
ワッシャ3を使用する代わりに踏板2の両側端面のボル
ト挿通孔部分にバーリング加工による膨出部5を形成
し、これにより、組立性の改善を図ったものが提案され
ている。
For this reason, conventionally, as shown in FIG. 7, instead of using the washer 3, bulging portions 5 are formed by burring at the bolt insertion hole portions on both side end surfaces of the tread 2 to thereby improve the assemblability. Improvements have been proposed.

【0006】[0006]

【考案が解決しようとする課題】しかし、図7に示した
従来のものにおいては、各踏板2にバーリング加工によ
る膨出部5を形成する構成であるので、加工に時間がか
かってしまう。すなわち、数枚以上使用する踏板2を1
枚ずつ上記バーリング加工を施さなければならない。踏
板1枚について、両側端面で2回の加工を行う場合、た
とえば7枚の踏板2を使用したものでは、バーリング加
工の回数が14回にも達し、生産効率の悪いものとな
る。
However, in the conventional one shown in FIG. 7, since the bulging portion 5 is formed on each tread 2 by burring, it takes time to process. That is, one tread 2 which is used more than one
The above-mentioned burring process must be applied one by one. When processing is performed twice on both end faces of one tread plate, for example, when seven tread plates 2 are used, the number of burring processes reaches 14, resulting in poor production efficiency.

【0007】本考案は、上記従来のものの問題点を解消
するためになされたもので、組立が簡単であることは勿
論のこと、バーリング加工の回数を少なくして生産性を
高めることができる仮設足場用階段を提供することを目
的としている。
The present invention has been made in order to solve the problems of the above-mentioned conventional ones, and it is easy to assemble and needless to say, it is possible to increase the productivity by reducing the number of burring processes. The purpose is to provide stairs for scaffolding.

【0008】[0008]

【課題を解決するための手段】上記目的を達成するため
に本考案は、図中の参照符号を付して示すならば、左右
一対の柱材1,1の互いの対向側面である内側面1a,
1aに対して複数枚の踏板2の左右両側端面2a,2a
をそれぞれボルト4で固定する仮設足場用階段におい
て、上記各柱材1に形成されるボルト挿通孔5の孔回り
に、柱材1の内側面1aから踏板2の端面2aに対向す
るように突出する環状の膨出部6を形成してなる構成を
採用するものである。
In order to achieve the above-mentioned object, the present invention, if indicated by reference numerals in the drawings , is an inner side surface which is a side surface of a pair of left and right pillar members 1, 1 facing each other. 1a,
Left and right end faces 2a, 2a of the plurality of treads 2 with respect to 1a
In the stairway for temporary scaffolding in which the bolts 4 are respectively fixed, the inner surface 1a of the pillar 1 faces the end surface 2a of the tread 2 around the hole of the bolt insertion hole 5 formed in each of the pillars 1. In this configuration, the annular bulging portion 6 is formed so as to project.

【0009】[0009]

【作用】本考案においては、左右一対の柱材1,1の内
側面1a,1aに対して複数枚の踏板2の左右両側端面
2a,2aを、各柱材1のボルト挿通孔5より挿通した
ボルト4で固定すると、柱材1の内側面1aから突出す
る環状の膨出部6によって、両柱材1,1間の間隔が踏
板2の幅よりも大きくなり、複数のものを保管する際
に、密着状態で嵩高にならずに積み重ねることが可能と
なる。
In the present invention, the left and right end surfaces 2a, 2a of the plurality of treads 2 are inserted through the bolt insertion holes 5 of the respective pillar members 1 with respect to the inner side surfaces 1a, 1a of the pair of left and right pillar members 1, 1. When the bolts 4 are fixed with the bolts 4, the annular bulging portion 6 projecting from the inner surface 1a of the pillar member 1 makes the interval between the pillar members 1, 1 larger than the width of the tread 2, and stores a plurality of things. In this case, it is possible to stack the sheets in a close contact state without making them bulky.

【0010】さらに、ワッシャを使わないので、組立の
手間がかからなくなる。とくに本考案においては、環状
の膨出部6が柱材1側に形成されることから、この膨出
部6を、その加工が容易なバーリング加工によって形成
する場合に、1本の柱材1に所要数の環状膨出部6を同
時に形成できるので左右両柱材1,1の対して2回の加
工回数で膨出部6を形成でき、踏板2側に膨出部を形成
するものに比して大幅に工数を低減させることができ
る。また、膨出部6は、柱材1に形成される各ボルト挿
通孔5の孔回りに形成されるものであるから、この膨出
部6がボルト挿通孔5とは別の箇所に形成されるものに
比して、その加工がはるかに簡単容易となり、そしてと
くに上記バーリング加工による場合には、ボルト挿通孔
5と膨出部6とを同時に形成することも可能となって、
工数をより一層低減させることができ、生産性を大幅に
向上させることができる。
Further, since no washer is used, the labor for assembling is eliminated. Particularly, in the present invention, since the annular bulging portion 6 is formed on the side of the pillar material 1, when the bulging portion 6 is formed by burring processing which is easy to process, one pillar material 1 is used. Since the required number of annular bulging portions 6 can be formed at the same time, the bulging portions 6 can be formed on the left and right column members 1 and 1 by two times of machining, and the bulging portion can be formed on the tread 2 side. Compared with this, the number of steps can be reduced significantly. Further, since the bulging portion 6 is formed around each bolt insertion hole 5 formed in the pillar material 1, the bulging portion 6 is formed at a position different from the bolt insertion hole 5. Compared to the above, the machining is much simpler and easier, and especially when the burring process is performed, the bolt insertion hole 5 and the bulging portion 6 can be formed at the same time.
The number of steps can be further reduced, and the productivity can be significantly improved.

【0011】[0011]

【実施例】以下、本考案の実施例を図面に基づいて説明
する。
Embodiments of the present invention will be described below with reference to the drawings.

【0012】図1は本考案の一実施例による仮設足場用
階段に使用される柱材を示す側面図、図2は図1のII
−II線に沿った断面図である。これらの図において、
図7で示した従来のものと同一部所には、同一符号を付
して説明を省略する。
FIG. 1 is a side view showing a column member used in a stairway for temporary scaffolding according to an embodiment of the present invention, and FIG. 2 is a line II of FIG.
It is a sectional view taken along the line II. In these figures,
The same parts as those of the conventional one shown in FIG. 7 are designated by the same reference numerals and the description thereof will be omitted.

【0013】図1および図2において、アルミ合金材な
どの押出材からなる柱材1には、複数枚、たとえば7枚
の踏板2を1枚について片側で2個所をボルト止めする
ために、長手方向で7個所に2個ずつのボルト挿通孔
5,5が形成されている。そして、上記柱材1の各ボル
ト挿通孔5の孔回りには、バーリング加工により、柱材
1の内側面1aから踏板2の端面2aに対向するように
突出する環状の膨出部6が形成されている。なお、図1
中、7,7は上記柱材1の両端部に形成されてフック部
材8の固定用ホルト9(図3)を挿通させるボルト挿通
孔である。
In FIGS. 1 and 2, a pillar material 1 made of an extruded material such as an aluminum alloy material is provided with a plurality of, for example, seven treads 2 in order to bolt two parts on one side to each other. Two bolt insertion holes 5 and 5 are formed at seven locations in the direction. Around the hole of each bolt insertion hole 5 of the pillar material 1, an annular bulging portion 6 that protrudes from the inner side surface 1a of the pillar material 1 to face the end surface 2a of the tread plate 2 is formed by burring. Has been done. FIG.
Inside, 7 and 7 are bolt insertion holes which are formed at both ends of the column member 1 and through which the fixing holt 9 (FIG. 3) of the hook member 8 is inserted.

【0014】本実施例の仮設足場用階段を製作するに
は、アルミ合金の押出材を切断して所定長の左右一対の
柱材1,1を用意し、各柱材1に対してボルト挿通孔
5,7を形成するとともに、柱材1のボルト挿通孔5の
孔回りをバーリング加工により膨出部6を形成する。こ
の膨出部6は柱材1本について14個形成するが、これ
らは1回のバーリング加工によって同時に形成される。
In order to manufacture the stairs for temporary scaffolding of this embodiment, an extruded material of aluminum alloy is cut to prepare a pair of left and right column members 1 and 1 having a predetermined length, and bolts are inserted into each column member 1. The holes 5 and 7 are formed, and the bolt insertion holes 5 of the pillar 1 are
The bulging portion 6 is formed by burring around the hole . Fourteen bulges 6 are formed for each pillar material, but these are simultaneously formed by one burring process.

【0015】そして、別途、用意された7枚の踏板2を
それぞれ上記一対の柱材1,1に対して片側2個所のボ
ルト4およびナット(図示を省略)により図3および図
4のように取り付ける。さらに、各柱材1の両端部にそ
れぞれフック部材8をボルト9およびナット10で取り
付ける。これにより、上記仮設足場用階段100の組立
が完了する。
Separately, seven prepared treads 2 are respectively attached to the pair of pillar members 1 and 1 by using bolts 4 and nuts (not shown) at two positions on one side as shown in FIGS. 3 and 4. Install. Further, hook members 8 are attached to both ends of each pillar 1 with bolts 9 and nuts 10. This completes the assembly of the temporary scaffolding stairs 100.

【0016】上記仮設足場用階段100は、仮設用足場
枠などの横設パイプにフック部材8を掛止・固定して階
段として供用される。複数の階段100を運搬したり保
管する場合には、図5に示すように、横にして積み重ね
る。この時、上記柱材1側の膨出部6により、左右の柱
材1,1間の間隔は図4に示すように踏板2の幅よりも
大きく設定されているので、踏板2を他の階段110の
柱材1,1間に差し込んで積み重ねることにより、各階
段100が密着し、積み上げ高さHを小さく抑えること
ができる。
The staircase 100 for temporary scaffolding is used as a staircase by hooking and fixing the hook member 8 on a horizontal pipe such as a scaffolding frame for temporary construction. When transporting or storing a plurality of stairs 100, they are stacked side by side as shown in FIG. At this time, since the interval between the left and right pillars 1, 1 is set larger than the width of the tread 2 by the bulging portion 6 on the side of the pillar 1, as shown in FIG. By inserting and stacking between the pillar materials 1 and 1 of the stairs 110, the respective stairs 100 are brought into close contact with each other, and the stacking height H can be suppressed to be small.

【0017】ここで、上記左右の柱材1,1間の間隔を
前記膨出部6によって踏板2の幅よりも大きく設定して
複数の階段100の密着状態の積み重ねを可能にしたの
で、ワッシャなどが省け、組立易くなり、とくに、上記
膨出部6を柱材1側に形成したので、踏板2の枚数に対
応する数の膨出部6の加工を1本の柱材で1回行えばよ
く、したがって、踏板2側に膨出部を形成するものに比
して加工回数が大幅に低減されることになり、生産効率
が高められる。
Here, the interval between the left and right pillar members 1, 1 is set to be larger than the width of the tread 2 by the bulging portion 6 so that a plurality of stairs 100 can be stacked in close contact with each other. Since the bulging portion 6 is formed on the side of the pillar material 1 in particular, the bulging portion 6 is formed on the side of the pillar material 1, so that the number of bulging portions 6 corresponding to the number of the treads 2 is processed once with one pillar material. Therefore, the number of times of machining is significantly reduced as compared with the case where the bulging portion is formed on the tread 2 side, and the production efficiency is improved.

【0018】なお、上記踏板2の枚数は適宜、増減でき
るものであり、また、膨出部6はバーリング加工に限ら
ず、複数個所のものを同時に形成できる加工法であれば
よい。
The number of the treads 2 can be increased or decreased as appropriate, and the bulging portion 6 is not limited to burring and any processing method capable of simultaneously forming a plurality of bulging portions 6 may be used.

【0019】[0019]

【考案の効果】以上のように本考案は、複数の踏板がボ
ルトで固定される一対の柱材の各ボルト挿通孔の孔回り
に、踏板の端面に対向するように柱材の内側面から突出
する環状の膨出部を形成したので、ワッシャを用いるこ
となく組立容易にして複数のものを密着状態で積み重ね
できる仮設足場用階段を得ることができる。とくに、上
記膨出部を柱材側に形成したことによって膨出部の加工
回数を減らして生産性の向上に寄与させることができ
る。すなわち、この膨出部を、その加工が容易なバーリ
ング加工によって形成する場合には、1本の柱材に所要
数の環状膨出部を同時に形成できるので左右両柱材の対
して2回の加工回数で膨出部を形成でき、踏板側に膨出
部を形成するものに比して大幅に工数を低減させること
ができる。また、膨出部は、柱材に形成される各ボルト
挿通孔の孔回りに形成されるものであるから、この膨出
部がボルト挿通孔とは別の箇所に形成されるものに比し
て、その加工がはるかに簡単容易となり、とくに上記バ
ーリング加工による場合には、ボルト挿通孔と膨出部と
を同時に形成することも可能となって、工数をより一層
低減させることができ、生産性を大幅に向上させること
ができる。
As described above, according to the present invention, the pillar material is provided around the holes of the respective bolt insertion holes of the pair of pillar materials to which the plurality of foot boards are fixed by bolts so as to face the end surface of the foot board. Since the annular bulging portion projecting from the inner side surface is formed, it is possible to easily assemble without using a washer and obtain a stairway for temporary scaffolding in which a plurality of things can be stacked in a close contact state. In particular, by forming the bulging portion on the side of the column member, the number of times the bulging portion is processed can be reduced, which can contribute to improvement in productivity. That is, when the bulging portion is formed by a burring process which is easy to process, a required number of annular bulging portions can be simultaneously formed on one column member, so that the column member can be formed twice on both the left and right column members. The bulged portion can be formed by the number of times of processing, and the number of steps can be significantly reduced as compared with the case of forming the bulged portion on the tread side. Further, since the bulging portion is formed around each bolt insertion hole formed in the pillar material, the bulging portion is formed in comparison with the bulging portion formed at a position different from the bolt insertion hole. Therefore, the machining becomes much easier, especially when the burring process described above is performed, it is possible to form the bolt insertion hole and the bulging portion at the same time, and it is possible to further reduce the man-hour. It is possible to significantly improve the sex.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案の一実施例による仮設足場用階段におけ
る柱材を示す側面図である。
FIG. 1 is a side view showing a pillar member in a stairway for temporary scaffolding according to an embodiment of the present invention.

【図2】図1のII−II線に沿った断面図である。FIG. 2 is a sectional view taken along line II-II of FIG.

【図3】同実施例における仮設足場用階段を示す組立状
態の側面図である。
FIG. 3 is a side view of the stairs for temporary scaffolding according to the embodiment in an assembled state.

【図4】同実施例における仮設足場用階段の一部の正面
図である。
FIG. 4 is a front view of a part of the stairs for temporary scaffolding according to the embodiment.

【図5】同実施例における仮設足場用階段の積み重ね状
態の説明図である。
FIG. 5 is an explanatory diagram of a stacked state of the stairs for temporary scaffolding in the example.

【図6】従来例を示す説明断面図である。FIG. 6 is an explanatory sectional view showing a conventional example.

【図7】従来例を示す説明断面図である。FIG. 7 is an explanatory sectional view showing a conventional example.

【符号の説明】[Explanation of symbols]

1 柱材 1a 柱材の内側面 2 踏板 2a 踏板の端面 4 ボルト 5 ボルト挿通孔 6 膨出部 1 pillar material 1a inner surface of pillar material 2 tread plate 2a end surface of tread plate 4 bolt 5 bolt insertion hole 6 bulging part

Claims (1)

(57)【実用新案登録請求の範囲】(57) [Scope of utility model registration request] 【請求項1】 左右一対の柱材の互いの対向側面である
内側面に対して複数枚の踏板の左右両側端面をそれぞれ
ボルトで固定する仮設足場用階段において、上記各柱材
に形成されるボルト挿通孔の孔回りに、柱材の内側面か
ら踏板の端面に対向するように突出する環状の膨出部を
形成したことを特徴とする仮設足場用階段。
1. A stairway for temporary scaffolding, wherein left and right end faces of a plurality of treads are respectively fixed to inner side faces of a pair of left and right column members facing each other by bolts, in each of the above column members. A stairway for temporary scaffolding, characterized in that an annular bulge is formed around the hole for the bolt insertion hole formed in the above so as to project from the inner surface of the pillar material so as to face the end surface of the tread.
JP1992054019U 1992-07-31 1992-07-31 Stairs for temporary scaffolding Expired - Lifetime JP2511062Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1992054019U JP2511062Y2 (en) 1992-07-31 1992-07-31 Stairs for temporary scaffolding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1992054019U JP2511062Y2 (en) 1992-07-31 1992-07-31 Stairs for temporary scaffolding

Publications (2)

Publication Number Publication Date
JPH0616607U JPH0616607U (en) 1994-03-04
JP2511062Y2 true JP2511062Y2 (en) 1996-09-18

Family

ID=12958880

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1992054019U Expired - Lifetime JP2511062Y2 (en) 1992-07-31 1992-07-31 Stairs for temporary scaffolding

Country Status (1)

Country Link
JP (1) JP2511062Y2 (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5812991U (en) * 1981-07-20 1983-01-27 松下電器産業株式会社 printed wiring board equipment
JPS6252467A (en) * 1985-08-31 1987-03-07 Konishiroku Photo Ind Co Ltd Multilayered analytical element for analyzing protein

Also Published As

Publication number Publication date
JPH0616607U (en) 1994-03-04

Similar Documents

Publication Publication Date Title
JP2719124B2 (en) Panels and panel structures
JP2511062Y2 (en) Stairs for temporary scaffolding
JPS5842373Y2 (en) Escalator frame structure
JP2782453B2 (en) Column formwork device
JPH08237818A (en) Corner metal fittings for frame assembling, frame and assembling method of frrame
JPH0714550Y2 (en) Aluminum temporary scaffolding stairs
JP2693860B2 (en) Housing unit
JPH1181454A (en) Connecting structure for column and beam
JPS59213845A (en) Wall constructing method
JP3107749B2 (en) Steel House Frame Structure
JPH0636125Y2 (en) Independent pillar
JPS5911979Y2 (en) Elevator car equipment
JP2502218B2 (en) Steel plate concrete wall manufacturing method
JPH082165Y2 (en) Joint structure of sielter using deck plate
JPH06257225A (en) Joint structure between square steel pipe post or square steel pipe concrete post and beam
JPH05311872A (en) Reinforcement of mold for manufacturing precast concrete
JP2569618Y2 (en) Work stage for steel structure
JP2544914Y2 (en) Precast concrete beam-to-column joint structure
JPH05230914A (en) Structure of steel sheet fixing part of steel sheet concrete structure
JPH0225823Y2 (en)
JPH06100026B2 (en) Formwork manufacturing method
JPH04198547A (en) External wall composed of panel
JPH07100976B2 (en) Transportation jig for building unit
JP2500602Y2 (en) Beam material
JP2000211855A (en) Elevator car

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 19950926

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19960430

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250