JP2500841Y2 - Scaffolding for work in elevator hoistway - Google Patents

Scaffolding for work in elevator hoistway

Info

Publication number
JP2500841Y2
JP2500841Y2 JP1990037296U JP3729690U JP2500841Y2 JP 2500841 Y2 JP2500841 Y2 JP 2500841Y2 JP 1990037296 U JP1990037296 U JP 1990037296U JP 3729690 U JP3729690 U JP 3729690U JP 2500841 Y2 JP2500841 Y2 JP 2500841Y2
Authority
JP
Japan
Prior art keywords
work
hoistway
opening
scaffolding
landing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP1990037296U
Other languages
Japanese (ja)
Other versions
JPH03128154U (en
Inventor
隆司 石井
幸次 井上
Original Assignee
株式会社日立ビルシステムサービス
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社日立ビルシステムサービス filed Critical 株式会社日立ビルシステムサービス
Priority to JP1990037296U priority Critical patent/JP2500841Y2/en
Publication of JPH03128154U publication Critical patent/JPH03128154U/ja
Application granted granted Critical
Publication of JP2500841Y2 publication Critical patent/JP2500841Y2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【考案の詳細な説明】 〔産業上の利用分野〕 本考案はエレベータの昇降路内作業用足場に関する。[Detailed Description of the Invention] [Industrial field of application] The present invention relates to a scaffold for working in a hoistway of an elevator.

〔従来の技術〕 一般にエレベータの昇降路内作業用足場は、例えば特
公平1-43112号公報に示されるように昇降路の乗場床に
それぞれ回動自在に配設させた左右一対の直角三角形状
のフレームと、左右両フレーム間に架設された足場板と
を有し、両フレームを昇降路内に臨ませたとき足場板が
水平に配置されるように構成し、それを乗場から開口部
を通して昇降路内に張り出させ、その上で作業を行なつ
ていた。
[Prior Art] Generally, a scaffolding for working in an elevator hoistway has a pair of right and left triangular shapes rotatably arranged on the hoistway floor as shown in Japanese Patent Publication No. 1-43112, for example. It has a frame and a scaffolding board installed between both left and right frames, and the scaffolding board is arranged horizontally when both frames are faced in the hoistway. It was overhanging in the hoistway and the work was done on it.

〔考案が解決しようとする課題〕[Problems to be solved by the device]

エレベータの昇降路と乗場とは開口により連絡されて
いるが、この開口の幅は、昇降路の幅より狭いので、乗
場から昇降路内に張り出させることが可能な作業用足場
の幅は開口の幅程度となり、昇降路内に張り出された作
業用足場の側方と昇降路内壁との間に隙間が形成されて
しまう。そのため、その隙間から落下するおそれもある
とともに、昇降路の側壁付近の作業ができないという問
題があつた。
The elevator hoistway and the landing are connected by an opening, but since the width of this opening is narrower than the width of the hoistway, the width of the work scaffold that can be projected from the landing into the hoistway is open. Therefore, a gap is formed between the side of the work scaffold overhanging in the hoistway and the inner wall of the hoistway. As a result, there is a risk of dropping from the gap, and there is a problem in that work near the side wall of the hoistway cannot be performed.

本考案の目的は、昇降路の側壁付近での作業を安全に
行なうことができるエレベータの昇降路内作業用足場を
提供することにある。
An object of the present invention is to provide a scaffolding for work in an elevator hoistway, which can safely perform work near a side wall of the hoistway.

〔課題を解決するための手段〕[Means for solving the problem]

本考案は上記目的を達成するために、エレベータの乗
場開口部に支持され、前記乗場開口部から張り出した状
態で設置される支持枠組体を備えたエレベータの昇降路
内作業用足場において、 前記支持枠組体の上面に設置され、前記乗場開口部の
幅寸法よりも小さな幅寸法を有する固定作業床と、 この固定作業床の少なくとも一方側に形成され、前記
乗場開口部の幅方向に拡張可能に設置され、当該拡張時
には前記乗場開口部の幅寸法よりも大きな幅寸法を形成
し得る可動作業床とを備えたものである。
In order to achieve the above object, the present invention provides a hoistway working scaffolding for an elevator, comprising a support frame structure that is supported by an elevator landing opening and is installed so as to project from the landing opening. A fixed work floor installed on the upper surface of the framework and having a width dimension smaller than the width dimension of the landing opening, and formed on at least one side of the fixed work floor so as to be expandable in the width direction of the landing opening. And a movable work floor which is installed and can form a width dimension larger than the width dimension of the landing opening when the expansion is performed.

〔作用〕[Action]

本考案は上記の構成であるから、作業用足場を乗場か
ら昇降路に張り出した状態とした後、可動作業床を側方
に張り出させ、昇降路の側壁付近まで作業床を形成した
ので、作業用足場の側方と昇降路内壁間の隙間を実質的
になくすることができ、昇降路の側壁付近での作業を安
全に行なうことができる。
Since the present invention is configured as described above, after the work scaffold is extended from the landing to the hoistway, the movable work floor is laterally overhanged to form the work floor up to the side wall of the hoistway. It is possible to substantially eliminate the gap between the side of the work scaffold and the inner wall of the hoistway, and it is possible to safely work near the side wall of the hoistway.

〔実施例〕〔Example〕

以下本考案の一実施例を第1図〜第3図により説明す
る。
An embodiment of the present invention will be described below with reference to FIGS.

第1図は本考案の作業用足場の設置状態を示す側面
図、第2図は第1図の作業用足場を上から見た平面図、
第3図は第1図の作業用足場を昇降路内から見た正面図
である。
FIG. 1 is a side view showing an installed state of the working scaffold of the present invention, FIG. 2 is a plan view of the working scaffold of FIG. 1 seen from above,
FIG. 3 is a front view of the work scaffold of FIG. 1 as viewed from inside the hoistway.

図において1は油圧エレベータの昇降路、2は乗場、
3は昇降路の内壁、5は昇降路1と乗場2との間の壁に
形成された開口部を示し、この開口部5の下縁に沿つて
乗場床4が設けられる。また、開口部5の下端の両側に
はL形の支持板6がそれぞれ設置され、各支持板6には
それぞれ支柱9とブラケツト7が取付けられている。そ
れぞれのブラケツト7には支持枠組体15の一部をなすフ
レーム14がピン8により回動自在に取付けられている。
ここで、ブラケツト7は支柱9の内側にフレーム14を回
動したときに干渉しない位置に配置されている。支柱9
の上端部にはL形の当て座金10を有するスクリユーシヤ
フト11と、このスクリユーシヤフト11を伸縮させるため
のハンドル12が設けられている。左右のフレーム14は、
垂直アーム16、水平アーム17、および傾斜アーム18から
なり、相互に同形の直角三角形をなし、フレーム14を昇
降路1内に張り出させ、垂直アーム16を垂直位置に位置
させたときに水平アーム17が水平位置をとるように各部
の寸法が設定されている。右側水平アーム17a、左側水
平アーム17b間にはこれらのフレームを繋ぐ接続アーム1
9が少なくとも2本平行に設けられ、また、左右のフレ
ーム14の間には乗場床4と作業床20との間の昇降を行な
うための梯子24が設けられる。フレーム14、接続アーム
19、梯子24によつて支持枠組体15が構成される。左右の
水平アーム17の上部には作業床20が架設され、作業用足
場30を構成する。作業床20は左右のフレーム間に固定さ
れ、開口部5の幅寸法よりも小さな幅寸法を有する固定
作業床21と、蝶番22によつて固定作業床21の左右にそれ
ぞれ連結されて開口部5の幅方向に拡張可能になつてお
り、当該拡張時には開口部5の幅寸法よりも大きな幅寸
法を形成し得る可動作業床23a、23bとからなる。ここ
で、フレーム14、接続アーム19、作業床20、梯子24はお
互いに固定ボルト25によつて接続され、解体運搬時に
は、それぞれを分離することによつて運搬を容易にして
いる。
In the figure, 1 is a hoistway of a hydraulic elevator, 2 is a hall,
Reference numeral 3 denotes an inner wall of the hoistway, and 5 denotes an opening formed in a wall between the hoistway 1 and the hall 2. A landing floor 4 is provided along the lower edge of the opening 5. Further, L-shaped support plates 6 are installed on both sides of the lower end of the opening 5, and columns 9 and brackets 7 are attached to the support plates 6, respectively. A frame 14 forming a part of a support frame assembly 15 is rotatably attached to each bracket 7 by a pin 8.
Here, the bracket 7 is arranged inside the column 9 at a position where it does not interfere with the rotation of the frame 14. Prop 9
A screw shaft 11 having an L-shaped washer 10 and a handle 12 for expanding and contracting the screw shaft 11 are provided at an upper end portion of the screw shaft 11. The left and right frames 14 are
It consists of a vertical arm 16, a horizontal arm 17, and a tilting arm 18, which are in the shape of a right triangle having the same shape as each other. The frame 14 is extended into the hoistway 1 and the horizontal arm 16 is placed in the vertical position. The dimensions of each part are set so that 17 takes a horizontal position. A connecting arm 1 connecting these frames between the right horizontal arm 17a and the left horizontal arm 17b.
At least two 9s are provided in parallel, and a ladder 24 for raising and lowering between the landing floor 4 and the work floor 20 is provided between the left and right frames 14. Frame 14, connecting arm
The support frame assembly 15 is configured by the ladder ladder 24 and the ladder 24. A work floor 20 is installed above the left and right horizontal arms 17 to form a work scaffold 30. The work floor 20 is fixed between the left and right frames, and is connected to the left and right of the fixed work floor 21 by hinges 22 and the fixed work floor 21 having a width smaller than the width of the opening 5, respectively. Of the movable work floors 23a and 23b, which can be formed to have a width dimension larger than the width dimension of the opening 5 at the time of the expansion. Here, the frame 14, the connecting arm 19, the work floor 20, and the ladder 24 are connected to each other by the fixing bolts 25, and when dismantled and transported, they are separated from each other to facilitate transportation.

次に、このように構成された作業用足場の組立手順に
ついて説明する。
Next, a procedure for assembling the work scaffolding configured as described above will be described.

先ず、開口部5の下部両端に、あらかじめ設定された
位置に支持板6を配置し、それぞれの支柱9を立てる、
次にハンドル12を操作し、当て座金10が開口部上壁3cに
当たるまでスクリユーシヤフト11を伸長させ、開口部上
壁3cと乗場床4によつて支持板6および支柱9を堅固に
支持する。次に、左右のフレーム14をそれぞれのブラケ
ツト7にピン8によつて固定し、その後、接続アーム1
9、作業床20、梯子24をそれぞれ組立てる。
First, the support plates 6 are arranged at preset positions at both ends of the lower portion of the opening 5, and the columns 9 are set up.
Next, the handle 12 is operated to extend the screw shaft 11 until the contact washer 10 hits the opening upper wall 3c, and the support plate 6 and the pillar 9 are firmly supported by the opening upper wall 3c and the landing floor 4. . Next, the left and right frames 14 are fixed to the respective brackets 7 by the pins 8, and then the connecting arms 1
9. Assemble work floor 20, ladder 24 respectively.

以上の組立作業は全て乗場2において第1図中の二点
鎖線の位置で行ない、組立後はピン8を中心に回動さ
せ、乗場2から開口部5を通して昇降路1内の図中実線
位置に張り出させる。支柱9と支持枠組体15には、作業
床20が水平位置に位置したときに穴位置が合うよう通し
穴13が設けられており、この通し穴13に固定ピン26を通
すことによつて作業用足場30を固定する。
All of the above assembling work is carried out at the position of the chain double-dashed line in FIG. 1 at the landing 2. After assembly, the pin 8 is pivoted to move from the landing 2 through the opening 5 to the position of the solid line in the drawing in the hoistway 1. Overhang. Through holes 13 are provided in the support column 9 and the supporting frame assembly 15 so that the hole positions are aligned when the work floor 20 is located at the horizontal position. The fixing pin 26 is passed through the through holes 13 to perform the work. Secure scaffolding 30.

ここで、第2図は作業用足場30を昇降路1内に張り出
させ状態を上から見た平面図であるが、開口部を通して
作業用足場30を張り出させるため、作業床の横幅は開口
部5の幅の範囲内となる。昇降路1内における作業の一
部としては、レール27a、27bの据付作業があり、その作
業には二点鎖線で示すスペースが必要となり、作業用足
場30の側方に隙間28が生じることになる。このままでは
作業が非能率的となり、危険であるため作業床20を二点
鎖線の位置まで拡張させる。
Here, FIG. 2 is a plan view of the work scaffold 30 overhanging in the hoistway 1 as seen from above. However, since the work scaffold 30 overhangs through the opening, the width of the work floor is It is within the range of the width of the opening 5. Part of the work in the hoistway 1 is the installation work of the rails 27a and 27b, and the work requires a space indicated by a chain double-dashed line, which creates a gap 28 on the side of the work scaffold 30. Become. The work floor 20 is expanded to the position indicated by the alternate long and two short dashes line because the work is inefficient as it is and it is dangerous.

第3図は作業用足場30を昇降路1内に張り出させた状
態を昇降路内から見た正面図である。ここで、折りたた
んだ状態の可動作業床23a、23bを蝶番22によつて左右に
展開することによつて、左右のレール27、昇降路内壁3
との間の隙間は削減される。その結果、作業能率の向上
が図れると同時に、隙間から作業員が転落する等の事故
を防ぐことができ、安全性が確保できる。
FIG. 3 is a front view showing a state in which the work scaffold 30 is extended in the hoistway 1 as viewed from the inside of the hoistway. By unfolding the movable work floors 23a and 23b in the folded state to the left and right with the hinges 22, the left and right rails 27 and the hoistway inner wall 3 are formed.
The gap between and is reduced. As a result, the work efficiency can be improved, and at the same time, it is possible to prevent an accident such as the fall of a worker from the gap, and to ensure the safety.

なお、この実施例では固定作業床21の左右に可動作業
床23を設けているが作業現場によつては片側のみに設け
ることも可能である。
In this embodiment, the movable work floors 23 are provided on the left and right of the fixed work floor 21, but it is possible to provide the movable work floors 23 only on one side depending on the work site.

〔考案の効果〕[Effect of device]

本考案は以上のように構成したので、昇降路内作業に
おいて作業用足場の側方と昇降路内壁間の隙間を実質的
になくすることができ、これにより、昇降路の側壁付近
での作業を安全に行なうことができると共に作業効率の
向上が図れるという効果がある。
Since the present invention is configured as described above, it is possible to substantially eliminate the gap between the side of the work scaffold and the inner wall of the hoistway during work in the hoistway, and thus work near the side wall of the hoistway. There is an effect that the work can be performed safely and the work efficiency can be improved.

【図面の簡単な説明】 第1図は本考案の作業用足場の設置状態を示す側面図、
第2図は第1図の作業用足場を上から見た平面図、第3
図は第1図の作業用足場を昇降路内から見た正面図であ
る。 1……昇降路、2……乗場、15……支持枠組体、21……
固定作業床、23……可動作業床、30……作業用足場。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a side view showing an installed state of a work scaffold of the present invention,
2 is a plan view of the work scaffold of FIG. 1 seen from above, FIG.
The figure is a front view of the work scaffold of FIG. 1 as seen from inside the hoistway. 1 …… hoistway, 2 …… landing, 15 …… supporting frame, 21 ……
Fixed work floor, 23 …… Movable work floor, 30 …… Working scaffolding.

Claims (1)

(57)【実用新案登録請求の範囲】(57) [Scope of utility model registration request] 【請求項1】エレベータの乗場開口部に支持され、前記
乗場開口部から張り出した状態で設置される支持枠組体
を備えたエレベータの昇降路内作業用足場において、 前記支持枠組体の上面に設置され、前記乗場開口部の幅
寸法よりも小さな幅寸法を有する固定作業床と、 この固定作業床の少なくとも一方側に形成され、前記乗
場開口部の幅方向に拡張可能に設置され、当該拡張時に
は前記乗場開口部の幅寸法よりも大きな幅寸法を形成し
得る可動作業床とを備えたことを特徴とするエレベータ
の昇降路内作業用足場。
1. An elevator hoistway working scaffolding supported by an elevator landing opening and installed in a state of overhanging from the landing opening, the working frame being installed on an upper surface of the supporting frame assembly. And a fixed work floor having a width dimension smaller than the width dimension of the landing opening, and is formed on at least one side of the fixed work floor and installed so as to be expandable in the width direction of the landing opening. A scaffolding for working in an elevator hoistway, comprising a movable work floor capable of forming a width dimension larger than the width dimension of the landing opening.
JP1990037296U 1990-04-09 1990-04-09 Scaffolding for work in elevator hoistway Expired - Fee Related JP2500841Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1990037296U JP2500841Y2 (en) 1990-04-09 1990-04-09 Scaffolding for work in elevator hoistway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1990037296U JP2500841Y2 (en) 1990-04-09 1990-04-09 Scaffolding for work in elevator hoistway

Publications (2)

Publication Number Publication Date
JPH03128154U JPH03128154U (en) 1991-12-24
JP2500841Y2 true JP2500841Y2 (en) 1996-06-12

Family

ID=31544277

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1990037296U Expired - Fee Related JP2500841Y2 (en) 1990-04-09 1990-04-09 Scaffolding for work in elevator hoistway

Country Status (1)

Country Link
JP (1) JP2500841Y2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5117457B2 (en) * 2009-08-17 2013-01-16 株式会社日立ビルシステム Inspection stand device for equipment in elevator hoistway
JP5604315B2 (en) * 2011-01-18 2014-10-08 株式会社Ihi Temporary scaffolding structure in the furnace
JP5863543B2 (en) * 2012-04-05 2016-02-16 株式会社日立製作所 Inspection table for elevator equipment
CN108726316B (en) * 2018-08-15 2023-09-12 项达林 Building block type elevator shaft installation method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5873839U (en) * 1981-11-12 1983-05-19 三菱電機株式会社 Scaffolding for elevator installation work
JPS61197138U (en) * 1985-05-30 1986-12-09
JPS62163513U (en) * 1986-04-04 1987-10-17
JPS6389799A (en) * 1986-10-03 1988-04-20 長岡 弘一 Screw conveyor with segment conveyor
JPH076281B2 (en) * 1988-01-25 1995-01-30 鹿島建設株式会社 Concrete pillar forming equipment

Also Published As

Publication number Publication date
JPH03128154U (en) 1991-12-24

Similar Documents

Publication Publication Date Title
EP0702121B1 (en) Elevatable work facility
GB2422174A (en) Clamp comprising location surface and first and second clamp members
US5992565A (en) Lifting scaffold assembly
JP2500841Y2 (en) Scaffolding for work in elevator hoistway
KR100413854B1 (en) footing supporter
JP5169604B2 (en) Elevator installation work floor apparatus and its assembly method
JP2002046951A (en) Scaffold apparatus for maintenance of elevator
KR20040104223A (en) Scaffolding having vertically moving workplace
JPH0829905B2 (en) Hoistway scaffolding equipment
JPH0311298Y2 (en)
JPH0453394Y2 (en)
WO2005007551A1 (en) Working scaffold system of elevator
JPH08319070A (en) Elevator equipped with service platform for maintenance and inspection
JP2002275830A (en) Scaffold device for subsidiary work and subsidiary work method of elevated bridge
JPH0243963Y2 (en)
JP4047765B2 (en) Wall panel mounting method
JPH0712541Y2 (en) Scaffolding equipment
JP3137257B2 (en) Scaffolding equipment and scaffold construction method
JP3413760B2 (en) Passenger conveyor installation equipment
JP2807858B2 (en) Mountable work stage
JP3005711B2 (en) Scaffolding equipment
JP2003314054A (en) Temporary scaffold for steel work
JPH06248794A (en) Large-sized assembled-type moving scaffold
JP3214407B2 (en) Connection method of beam members and scaffolding equipment for work at height
JPH0715218B2 (en) Scaffold construction method and scaffolding equipment

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees