JP2024050885A - Server device, management method and management system - Google Patents

Server device, management method and management system Download PDF

Info

Publication number
JP2024050885A
JP2024050885A JP2024019163A JP2024019163A JP2024050885A JP 2024050885 A JP2024050885 A JP 2024050885A JP 2024019163 A JP2024019163 A JP 2024019163A JP 2024019163 A JP2024019163 A JP 2024019163A JP 2024050885 A JP2024050885 A JP 2024050885A
Authority
JP
Japan
Prior art keywords
equipment
registration
materials
server device
identification information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2024019163A
Other languages
Japanese (ja)
Inventor
晋 橋本
義明 町田
俊 千葉
健一 船橋
英範 齋藤
小絵 楢木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takasago Thermal Engineering Co Ltd
Original Assignee
Takasago Thermal Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takasago Thermal Engineering Co Ltd filed Critical Takasago Thermal Engineering Co Ltd
Priority to JP2024019163A priority Critical patent/JP2024050885A/en
Publication of JP2024050885A publication Critical patent/JP2024050885A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

【課題】建築設備に用いられる資機材を管理する際の管理負荷を低減させる。【解決手段】携帯端末と通信するサーバ装置であって、資機材の配置を示す3次元建物情報モデルを格納する格納部と、前記資機材に貼り付けられた識別部材より、前記資機材を識別するための識別情報を取得した前記携帯端末から、前記識別情報と前記資機材の作業工程とを含む実績登録データを受信する受信部と、前記実績登録データに基づいて、前記3次元建物情報モデル内の資機材の作業工程の情報を特定し、特定した資機材の作業工程を、前記3次元建物情報モデル内の資機材の属性情報に反映する登録部とを有する。【選択図】図10[Problem] To reduce the management burden when managing materials and equipment used in building facilities. [Solution] A server device that communicates with a mobile terminal, comprising: a storage unit that stores a 3D building information model showing the arrangement of materials and equipment; a receiving unit that receives, from the mobile terminal that has acquired identification information for identifying the materials and equipment from an identification member affixed to the materials and equipment, performance registration data including the identification information and the work process of the materials and equipment, and a registration unit that identifies information on the work process of the materials and equipment in the 3D building information model based on the performance registration data, and reflects the identified work process of the materials and equipment in the attribute information of the materials and equipment in the 3D building information model. [Selected Figure] Figure 10

Description

本発明は、サーバ装置、管理方法及び管理システムに関する。 The present invention relates to a server device, a management method, and a management system.

オフィスビルや工場等に納入される建築設備(例えば、空調システムや排煙設備等)には、多数の資機材が用いられる。一般に、これらの資機材は、部品業者によって製作され、工事業者によって現場に取り付けられた後、システム納入業者によって試運転が行われる。つまり、建築設備の一部として機能させるまでの間に、資機材は種々の作業工程を経ることになる。 Many materials and equipment are used in building facilities (e.g., air conditioning systems, smoke exhaust systems, etc.) delivered to office buildings, factories, etc. Generally, these materials and equipment are manufactured by parts suppliers, installed on-site by construction companies, and then test-run by the system supplier. In other words, the materials and equipment go through a variety of work processes before they are put into operation as part of the building facilities.

このため、システム納入業者は、建築設備を納入するまでの間、各資機材がいずれの作業工程にあるのかを管理しておくことが求められる。 For this reason, system suppliers are required to keep track of which work process each piece of equipment is in until the construction equipment is delivered.

特開2005-108015号公報JP 2005-108015 A 特開2017-046085号公報JP 2017-046085 A

"IoT、CPSを活用したスマート建設生産システム"、[online]、2016年3月3日、産業競争力懇談会COCN、[平成29年6月30日検索]、インターネット(URL:http://www.cocn.jp/thema85-L.pdf)"Smart Construction Production System Utilizing IoT and CPS", [online], March 3, 2016, Industrial Competitiveness Forum COCN, [searched June 30, 2017], Internet (URL: http://www.cocn.jp/thema85-L.pdf) "MANICAタッチレンタルNFCカスタマイズ導入事例"、[online]、Hayato Information、[平成29年6月30日検索]、インターネット(URL:http://www.hayato.info/home/jirei_kajima.htm)"MANICA Touch Rental NFC Customization Introduction Case Study", [online], Hayato Information, [searched June 30, 2017], Internet (URL: http://www.hayato.info/home/jirei_kajima.htm)

しかしながら、建築設備に用いられる資機材の数は膨大であり、資機材ごとに作業工程を管理しようとすると、システム納入業者等には高い管理負荷がかかることになる。 However, the number of materials and equipment used in construction facilities is enormous, and managing the work process for each material and equipment would impose a heavy management burden on system suppliers, etc.

本発明は上記課題に鑑みてなされたものであり、建築設備に用いられる資機材を管理する際の管理負荷を低減させることを目的とする。 The present invention was made in consideration of the above problems, and aims to reduce the management burden when managing materials and equipment used in building facilities.

本発明の各実施形態に係るサーバ装置は、以下のような構成を有する。すなわち、
携帯端末と通信するサーバ装置であって、
資機材の配置を示す3次元建物情報モデルを格納する格納部と、
前記資機材に貼り付けられた識別部材より、前記資機材を識別するための識別情報を取得した前記携帯端末から、前記識別情報と前記資機材の作業工程とを含む実績登録データを受信する受信部と、
前記実績登録データに基づいて、前記3次元建物情報モデル内の資機材の作業工程を特定し、特定した資機材の作業工程の情報を、前記3次元建物情報モデル内の資機材の属性情報に反映する登録部とを有する。
The server device according to each embodiment of the present invention has the following configuration.
A server device that communicates with a mobile terminal,
a storage unit for storing a three-dimensional building information model showing the arrangement of materials and equipment;
a receiving unit that receives, from the mobile terminal that has acquired identification information for identifying the equipment or materials from an identification member affixed to the equipment or materials, performance registration data including the identification information and a work process of the equipment or materials;
The system has a registration unit that identifies work processes for materials and equipment in the three-dimensional building information model based on the performance registration data, and reflects information on the identified work processes for materials and equipment in attribute information of the materials and equipment in the three-dimensional building information model.

本発明の各実施形態によれば、建築設備に用いられる資機材を管理する際の管理負荷を低減させることができる。 According to each embodiment of the present invention, it is possible to reduce the management burden when managing materials and equipment used in construction facilities.

複数の資機材を建築設備に取り付け、当該建築設備の一部として機能させるまでの作業工程の一例を示す図である。This is a diagram showing an example of the work process from attaching multiple equipment and materials to a construction facility to having them function as part of the construction facility. 各作業工程における登録処理の概要を示す図である。FIG. 13 is a diagram showing an outline of a registration process in each work step. 資機材に貼り付けられる識別部材の一例を示す図である。FIG. 13 is a diagram showing an example of an identification member attached to equipment and materials. 資機材に貼り付けられる識別部材の他の一例を示す図である。FIG. 11 is a diagram showing another example of an identification member that can be attached to equipment and materials. 資機材に貼り付けられる識別部材の他の一例を示す図である。FIG. 11 is a diagram showing another example of an identification member that can be attached to equipment and materials. 識別部材の資機材への貼り付け方法を示す図である。1A to 1C are diagrams illustrating a method of attaching an identification member to equipment and materials. 登録処理を実現する管理システムのシステム構成の一例を示す図である。FIG. 2 illustrates an example of a system configuration of a management system that realizes a registration process. 管理システムにおいて実行される処理の流れを示すシーケンス図である。FIG. 2 is a sequence diagram showing a flow of processing executed in the management system. サーバ装置に格納される管理データの一例を示す図である。FIG. 4 is a diagram illustrating an example of management data stored in a server device. サーバ装置に格納されるBIMデータの一例を示す図である。FIG. 2 is a diagram showing an example of BIM data stored in a server device. サーバ装置及びスマートフォンのハードウェア構成の一例を示す図である。FIG. 2 is a diagram illustrating an example of a hardware configuration of a server device and a smartphone. サーバ装置及びスマートフォンの機能構成の一例を示す図である。FIG. 2 is a diagram illustrating an example of a functional configuration of a server device and a smartphone. 実績登録フェーズにおいて実行される出荷登録処理の流れを示すシーケンス図である。FIG. 13 is a sequence diagram showing the flow of a shipment registration process executed in the result registration phase. スマートフォンに表示される出荷登録画面の一例を示す図である。FIG. 13 is a diagram illustrating an example of a shipping registration screen displayed on a smartphone. 実績登録フェーズにおいて実行される受取完了登録処理の流れを示すシーケンス図である。13 is a sequence diagram showing the flow of a receipt completion registration process executed in the result registration phase. FIG. スマートフォンに表示される受取完了登録画面の一例を示す図である。FIG. 13 is a diagram showing an example of a receipt completion registration screen displayed on the smartphone. 実績登録フェーズにおいて実行される仮置完了登録処理の流れを示すシーケンス図である。13 is a sequence diagram showing the flow of a temporary placement completion registration process executed in the result registration phase. FIG. スマートフォンに表示される仮置完了登録画面の一例を示す図である。FIG. 13 is a diagram illustrating an example of a temporary placement completion registration screen displayed on the smartphone. スマートフォンに表示される取付完了登録画面の一例を示す図である。FIG. 13 is a diagram illustrating an example of an installation completion registration screen displayed on the smartphone. スマートフォンに表示される検査完了登録画面の一例を示す図である。FIG. 13 is a diagram showing an example of an examination completion registration screen displayed on the smartphone. スマートフォンに表示される試運転完了登録画面の一例を示す図である。FIG. 13 is a diagram illustrating an example of a test run completion registration screen displayed on a smartphone. サーバ装置に格納される実績登録データの一例を示す図である。FIG. 11 is a diagram showing an example of result registration data stored in the server device. サーバ装置による閲覧処理の流れを示すフローチャートである。13 is a flowchart showing the flow of a browsing process performed by the server device. サーバ装置による履歴画面表示処理の流れを示すフローチャートである。13 is a flowchart showing the flow of a history screen display process by the server device. 一覧画面の一例を示す図である。FIG. 13 is a diagram illustrating an example of a list screen. 履歴画面の一例を示す図である。FIG. 13 illustrates an example of a history screen.

以下、各実施形態の詳細について添付の図面を参照しながら説明する。なお、各実施形態に係る明細書及び図面の記載に際して、実質的に同一の機能構成を有する構成要素については、同一の符号を付することにより重複した説明を省く。 Details of each embodiment will be described below with reference to the attached drawings. In describing the specification and drawings relating to each embodiment, components having substantially the same functional configuration will be assigned the same reference numerals to avoid redundant description.

[第1の実施形態]
<作業工程の流れ>
はじめに、オフィスビルや工場等に建築設備を納入するまでの作業工程(当該建築設備に用いられる複数の資機材を、当該建築設備に取り付け、当該建築設備の一部として機能させるまでの作業工程)の流れについて説明する。なお、建築設備とは、建築物に設ける電気、ガス、給水、排水、換気、暖房、冷房、消火、排煙もしくは汚物処理の設備または煙突、昇降機もしくは避雷針を指し、一例として空調システムや排煙設備等が挙げられる。
[First embodiment]
<Work process flow>
First, we will explain the flow of the work process up to the delivery of building equipment to an office building, factory, etc. (the work process up to the installation of multiple materials and equipment used in the building equipment to the building equipment and making it function as part of the building equipment). Note that building equipment refers to equipment for electricity, gas, water supply, drainage, ventilation, heating, cooling, fire extinguishing, smoke exhaust, or waste treatment, or chimneys, elevators, or lightning rods installed in a building, and examples include air conditioning systems and smoke exhaust equipment.

図1は、複数の資機材を建築設備に取り付け、当該建築設備の一部として機能させるまでの作業工程の一例を示す図である。なお、図1に示すように、本実施形態では、各作業工程を実行する実行主体を、部品業者110と、システム納入業者120と、工事業者130とに大別している。本実施形態では、システム納入業者120は、空調システムや排煙設備等の建築設備を設計、施工する建築設備業者である。 Figure 1 is a diagram showing an example of the work process from installing multiple materials and equipment to a building facility to having them function as part of the building facility. As shown in Figure 1, in this embodiment, the entities that carry out each work process are broadly divided into a parts supplier 110, a system supplier 120, and a construction company 130. In this embodiment, the system supplier 120 is a building facility contractor that designs and installs building facilities such as air conditioning systems and smoke exhaust systems.

ステップS101において、システム納入業者120は、管理データとBIM(Building Information Modeling)データとを作成する事前作業を行う。管理データとは、複数の資機材がいずれの作業工程にあるのかを管理するために、システム納入業者が事前に準備するデータである。BIMデータとは、3次元建物情報モデルを3次元CADで作成し、建築設備の設計、施工、維持管理において利用するデータである。本実施形態において、BIMデータは建築設備の維持管理において利用される。空調システムや排煙設備が設置される建築物のBIMデータは、ゼネコン等の建築物の設計業者から提供される。空調システムや排煙設備のBIMデータは、建築設備業者であるシステム納入業者120が3次元CADシステムを操作することにより作成される。システム納入業者120が作成するBIMデータには空調システムや排煙設備に利用される資機材の属性情報が含まれている。この属性情報をもとに、空調システムや排煙設備が施工される現場に取り付けられる資機材の一覧表が作成され、管理データとして作成される。 In step S101, the system supplier 120 performs preliminary work to create management data and BIM (Building Information Modeling) data. The management data is data prepared in advance by the system supplier to manage which work process multiple materials and equipment are in. The BIM data is data that is created by a three-dimensional building information model using three-dimensional CAD and is used in the design, construction, and maintenance of building facilities. In this embodiment, the BIM data is used in the maintenance of building facilities. The BIM data of the building in which the air conditioning system and smoke exhaust equipment are installed is provided by a building design company such as a general contractor. The BIM data of the air conditioning system and smoke exhaust equipment is created by the system supplier 120, who is a building equipment company, operating a three-dimensional CAD system. The BIM data created by the system supplier 120 includes attribute information of the materials and equipment used in the air conditioning system and smoke exhaust equipment. Based on this attribute information, a list of materials and equipment to be installed at the site where the air conditioning system and smoke exhaust equipment are installed is created as management data.

このように、発注作業を行う前に、現場ごとの管理データを作成することで、システム納入業者120は、多重発注を防止することができる。 In this way, by creating management data for each site before placing an order, the system supplier 120 can prevent multiple orders.

ステップS102において、システム納入業者120は、管理データに登録した資機材を、部品業者110に発注する発注作業を行う。 In step S102, the system supplier 120 performs an ordering process to order the materials and equipment registered in the management data from the parts supplier 110.

ステップS103において、部品業者110は、システム納入業者から発注された資機材を製作する製作作業を行う。資機材の製作が完了すると、部品業者110は、各資機材を識別する識別情報が含まれる識別部材を各資機材に貼り付ける。 In step S103, the parts supplier 110 performs production work to produce the equipment and materials ordered by the system supplier. When production of the equipment and materials is completed, the parts supplier 110 attaches an identification member containing identification information that identifies each equipment and materials to each equipment and materials.

ステップS104において、部品業者110は、各資機材を出荷する出荷作業を行う。部品業者110は、各資機材の出荷に際して、各資機材に貼り付けられた識別部材より、各資機材を識別する識別情報を読み取り、システム納入業者120が有するサーバ装置に登録する出荷登録処理を行う。これにより、システム納入業者120は、部品業者110による各資機材の出荷が完了したことを管理することができる。 In step S104, the parts supplier 110 performs shipping work to ship each equipment and material. When shipping each equipment and material, the parts supplier 110 reads the identification information that identifies each equipment and material from the identification member affixed to each equipment and material, and performs a shipping registration process to register the information in a server device owned by the system supplier 120. This allows the system supplier 120 to manage the completion of shipping each equipment and material by the parts supplier 110.

ステップS105において、システム納入業者120は、部品業者110によって出荷された各資機材を倉庫等にて受け取る受取作業を行う。システム納入業者120は、各資機材の受け取りに際して、各資機材に貼り付けられた識別部材より、各資機材を識別する識別情報を読み取り、システム納入業者120が有するサーバ装置に登録する受取完了登録処理を行う。これにより、システム納入業者120は、システム納入業者120による各資機材の受け取りが完了したことを管理することができる。 In step S105, the system supplier 120 receives the materials and equipment shipped by the parts supplier 110 at a warehouse or the like. When receiving the materials and equipment, the system supplier 120 reads the identification information identifying each material and equipment from the identification member affixed to each material and equipment, and performs a receipt completion registration process to register the information in a server device owned by the system supplier 120. This allows the system supplier 120 to manage the completion of receipt of each material and equipment by the system supplier 120.

ステップS106において、工事業者130は、システム納入業者120が受け取った各資機材を、現場近くの仮置き場に移動させる仮置作業を行う。なお、本実施形態において、「現場」とは、建築設備が納入される納入先(例えば、オフィスビル等)を指すものとする。工事業者130は、各資機材を仮置き場に移動させた後に、各資機材に貼り付けられた識別部材より、各資機材を識別する識別情報を読み取り、システム納入業者120が有するサーバ装置に登録する仮置完了登録処理を行う。これにより、システム納入業者120は、工事業者130による各資機材の仮置作業が完了したことを管理することができる。 In step S106, the construction company 130 performs temporary storage work by moving each of the materials and equipment received by the system supplier 120 to a temporary storage area near the site. In this embodiment, the "site" refers to the delivery destination (e.g., an office building, etc.) where the building equipment is delivered. After moving each of the materials and equipment to the temporary storage area, the construction company 130 reads the identification information identifying each of the materials and equipment from the identification member attached to each of the materials and equipment, and performs a temporary storage completion registration process to register the information in a server device owned by the system supplier 120. This allows the system supplier 120 to manage the completion of the temporary storage work of each of the materials and equipment by the construction company 130.

ステップS107において、工事業者130は、仮置き場に移動させた各資機材を、建築設備を納入する現場に搬入し、所定の取り付け位置に取り付ける取付作業を行う。各資機材を所定の取り付け位置に取り付けると、工事業者130は、各資機材に貼り付けられた識別部材より、各資機材を識別する識別情報を読み取り、システム納入業者120が有するサーバ装置に登録する取付完了登録処理を行う。これにより、システム納入業者120は、工事業者130による各資機材の取付作業が完了したことを管理することができる。 In step S107, the contractor 130 transports each of the materials and equipment that were moved to the temporary storage area to the construction site where the building equipment will be delivered, and performs installation work to install them in the designated installation positions. When each of the materials and equipment has been installed in the designated installation positions, the contractor 130 reads the identification information that identifies each of the materials and equipment from the identification member affixed to each of the materials and equipment, and performs an installation completion registration process to register the information in a server device owned by the system supplier 120. This allows the system supplier 120 to manage the completion of the installation work of each of the materials and equipment by the contractor 130.

ステップS108において、システム納入業者120は、各資機材が所定の取り付け位置に正しく取り付けられているか否かを検査する検査作業を行う。システム納入業者120は、資機材が所定の取り付け位置に正しく取り付けられていることを確認する検査作業を行う際に、当該資機材に貼り付けられた識別部材より、当該資機材を識別する識別情報を読み取る。次いで、システム納入業者120は、読み取った識別情報をサーバ装置に登録する検査完了登録処理を行う。これにより、システム納入業者120は、検査作業が完了したことを管理することができる。 In step S108, the system supplier 120 performs an inspection to check whether each equipment is correctly installed in the specified installation position. When performing the inspection to check that the equipment is correctly installed in the specified installation position, the system supplier 120 reads identification information that identifies the equipment from the identification member affixed to the equipment. Next, the system supplier 120 performs an inspection completion registration process to register the read identification information in the server device. This allows the system supplier 120 to manage the completion of the inspection work.

ステップS109において、システム納入業者120は、各資機材が、建築設備の一部として正しく機能するか否かを確認する試運転作業を行う。システム納入業者120は、試運転において各資機材が正しく機能していることを確認した場合、各資機材に貼り付けられた識別部材より、各資機材を識別する識別情報を読み取り、システム納入業者120が有するサーバ装置に登録する試運転完了登録処理を行う。これにより、システム納入業者120は、試運転作業が完了したことを管理することができる。 In step S109, the system supplier 120 performs a trial run to check whether each equipment and material functions properly as part of the building facilities. If the system supplier 120 checks that each equipment and material is functioning properly during the trial run, it reads the identification information identifying each equipment and material from the identification member affixed to each equipment and material, and performs a trial run completion registration process to register the information in a server device owned by the system supplier 120. This allows the system supplier 120 to manage the completion of the trial run work.

このように、本実施形態では、各作業工程において作業が完了すると、各作業工程の実行主体となる業者が、各作業工程において取り扱われた資機材に貼り付けられた識別部材より、当該資機材を識別する識別情報を読み取る。そして、各作業工程の実行主体となる業者が、システム納入業者120が有するサーバ装置に登録する登録処理を行う。これにより、システム納入業者120は、登録された識別情報を参照するだけで、各資機材がいずれの作業工程にあるのかを容易に管理することができる。つまり、本実施形態によれば、建築設備に用いられる資機材を管理する際の管理負荷を低減させることができる。 In this manner, in this embodiment, when work is completed in each work process, the contractor who is the main performer of each work process reads the identification information that identifies the equipment or materials from the identification member affixed to the equipment or materials handled in each work process. Then, the contractor who is the main performer of each work process performs a registration process to register the equipment or materials in the server device owned by the system supplier 120. In this way, the system supplier 120 can easily manage which work process each equipment or materials is in, simply by referring to the registered identification information. In other words, according to this embodiment, the management burden when managing equipment and materials used in building facilities can be reduced.

<各作業工程における登録処理の概要>
次に、各作業工程において、各作業工程の実行主体となる業者によって行われる登録処理の概要について説明する。図2は、各作業工程における登録処理の概要を示す図である。
<Overview of registration process at each step>
Next, an outline of the registration process performed by the contractor who is the executing entity of each work step will be described with reference to Fig. 2.

図2に示すように、識別情報をサーバ装置に登録するにあたり、各作業工程の実行主体となる業者(部品業者110、システム納入業者120、工事業者130)はスマートフォン210を用いる。 As shown in FIG. 2, when registering identification information in the server device, the vendors who will carry out each work process (parts vendor 110, system supplier 120, and construction vendor 130) use smartphones 210.

スマートフォン210は、撮像部212を搭載しており、資機材250に貼り付けられた識別部材の一例であるQR(Quick Response)コード(登録商標)を撮影することで、QRコード230より識別情報を読み取る。本実施形態において、QRコード230より読み取られる識別情報には、管理番号、機器番号、品名が含まれるものとする。なお、管理番号及び品名は、システム納入業者120が管理データを作成する際に決定するものとする。また、機器番号は、部品業者110が資機材を製作する際に決定するものとする。 The smartphone 210 is equipped with an imaging unit 212, and reads identification information from the QR code 230 by photographing a QR (Quick Response) code (registered trademark), which is an example of an identification member affixed to the equipment or material 250. In this embodiment, the identification information read from the QR code 230 includes a management number, equipment number, and item name. The management number and item name are determined by the system supplier 120 when creating the management data. The equipment number is determined by the parts supplier 110 when manufacturing the equipment or material.

また、スマートフォン210は、RFID(Radio Frequency Identifier)リーダの接続が可能である。RFIDリーダ220は、資機材250に貼り付けられた識別部材の一例であるRFID240より、識別情報を読み取る。本実施形態において、RFIDリーダ220によって読み取られる識別情報には、管理番号、機器番号、品名が含まれるものとする。 The smartphone 210 can also be connected to an RFID (Radio Frequency Identifier) reader. The RFID reader 220 reads identification information from an RFID 240, which is an example of an identification member affixed to the equipment or material 250. In this embodiment, the identification information read by the RFID reader 220 includes a management number, a device number, and a product name.

識別情報に応じたQRコード230及び識別情報が書き込まれたRFID240は、部品業者110によって製作され、資機材250に貼り付けられる。部品業者110は、RFIDの製造業者が製造したRFID240を、RFID240の製造業者から購入し、資機材250に貼り付ける作業を行うようにしてもよい。 The QR code 230 corresponding to the identification information and the RFID 240 with the identification information written therein are manufactured by the parts supplier 110 and affixed to the equipment/materials 250. The parts supplier 110 may purchase the RFID 240 manufactured by an RFID manufacturer from the RFID 240 manufacturer and affix it to the equipment/materials 250.

なお、識別情報を読み取るにあたり、読取手段として、撮像部212を用いるか、RFIDリーダ220を用いるかは、予め作業工程ごとに定められているものとする。 When reading the identification information, whether to use the imaging unit 212 or the RFID reader 220 as the reading means is determined in advance for each work process.

更に、スマートフォン210には、登録プログラムの一例である実績登録アプリケーション211がインストールされており、読み取った管理番号、機器番号、品名を含む各種情報を、実績登録データとして、ネットワーク260に送信する。 Furthermore, a performance registration application 211, which is an example of a registration program, is installed on the smartphone 210, and various information including the read control number, device number, and product name is transmitted to the network 260 as performance registration data.

このように、撮像部212を搭載し、かつ、RFIDリーダ220の接続が可能であり、かつ、実績登録アプリケーション211がインストールされたスマートフォン210を用いることで、各作業工程の実行主体は、登録処理を簡単に行うことができる。 In this way, by using a smartphone 210 that is equipped with an image capture unit 212, can connect to an RFID reader 220, and has a track record registration application 211 installed, the person executing each work process can easily perform the registration process.

つまり、本実施形態によれば、各作業工程の実行主体となる業者は、当該実績登録アプリケーションを用いることで、各資機材がいずれの作業工程にあるのかを管理するために必要となる情報を、簡単な操作のみでサーバ装置に送信することができる。 In other words, according to this embodiment, the contractor who is the executing entity of each work process can use the performance registration application to send the information required to manage which work process each piece of equipment is in to the server device with just a few simple operations.

<資機材に貼り付けられる識別部材の説明>
次に、資機材250に貼り付けられる識別部材(QRコード230、RFID240)のうち、RFID240について説明する。図3は、資機材に貼り付けられる識別部材の一例を示す図である。
<Explanation of identification members to be affixed to materials and equipment>
Next, a description will be given of the RFID 240 out of the identification members (QR code 230, RFID 240) affixed to the equipment/materials 250. Fig. 3 is a diagram showing an example of an identification member affixed to the equipment/materials.

このうち、図3(a)は、RFID240の上面図を示している。図3(a)に示すように、RFID240は、本体部310を形成する領域(第1の領域)とアンテナ部320を形成する領域(第2の領域)とを有する。本体部310を形成する領域とアンテナ部320を形成する領域とは、折り曲げ可能に一体化されている。 Of these, FIG. 3(a) shows a top view of RFID 240. As shown in FIG. 3(a), RFID 240 has an area (first area) forming main body 310 and an area (second area) forming antenna 320. The area forming main body 310 and the area forming antenna 320 are integrated so as to be foldable.

本体部310は、長さが43mmで幅が21mmの矩形形状を有するICタグである。本体部310は、RFIDリーダ220から電磁波が送信されることで起動し、内蔵するメモリに記録されたデータを、アンテナ部320を介して外部に送信する。アンテナ部320は、長さが17mmで幅が21mmの矩形形状を有しており、RFIDリーダ220からの電磁波を受信するとともに、本体部310が内蔵するメモリに記録されたデータを、外部に送信する。 The main body 310 is an IC tag having a rectangular shape with a length of 43 mm and a width of 21 mm. The main body 310 is activated by electromagnetic waves transmitted from the RFID reader 220, and transmits data recorded in its built-in memory to the outside via the antenna 320. The antenna 320 has a rectangular shape with a length of 17 mm and a width of 21 mm, and receives electromagnetic waves from the RFID reader 220 and transmits data recorded in the memory built into the main body 310 to the outside.

図3(b)は、RFID240の側面図を示している。図3(b)に示すように、本体部310及びアンテナ部320は、ともに厚さが0.1mmである。 Figure 3(b) shows a side view of RFID 240. As shown in Figure 3(b), both the main body 310 and the antenna 320 have a thickness of 0.1 mm.

図4は、資機材に貼り付けられる識別部材の他の一例を示す図である。図3との相違点は、図4(a)に示すRFID240の場合、本体部310が有する表裏面のうち、資機材250に貼り付けられる貼り付け面とは反対側の面に、QRコード230が印刷されている点である。図4に示すように、RFID240とQRコード230とを一体化させることで、資機材250に識別部材を貼り付ける際の、貼り付け面積を小さくすることができる。 Figure 4 is a diagram showing another example of an identification member affixed to equipment. The difference from Figure 3 is that in the case of RFID 240 shown in Figure 4 (a), a QR code 230 is printed on one of the front and back surfaces of main body 310 opposite the surface to be affixed to equipment 250. By integrating RFID 240 and QR code 230 as shown in Figure 4, the affixing area can be reduced when affixing an identification member to equipment 250.

図5は、資機材に貼り付けられる識別部材の他の一例を示す図である。図4との相違点は、図5(b)に示すRFID240の場合、アンテナ部320の一方の面(QRコード230が印刷されている面とは反対側の面に、緩衝材510が取り付けられている点である。 Figure 5 shows another example of an identification member that can be affixed to equipment. The difference with Figure 4 is that in the case of the RFID 240 shown in Figure 5 (b), a cushioning material 510 is attached to one side of the antenna unit 320 (the side opposite to the side on which the QR code 230 is printed).

これにより、資機材250に識別部材を貼り付けた際に、アンテナ部320が資機材250に直接接触することを回避することができる。一般に、資機材250は金属製であり、資機材250に識別部材を貼り付けた際に、アンテナ部320が資機材250に直接接触すると、RFIDリーダ220から送信された電磁波をアンテナ部320が精度よく受信できなくなる。これに対して、図5(b)に示すように緩衝材510が取り付けられ、アンテナ部320が資機材250に直接接触することを回避することで、RFID240は、RFIDリーダ220からの電磁波を精度よく受信することができる。 This makes it possible to prevent the antenna unit 320 from coming into direct contact with the equipment 250 when the identification member is affixed to the equipment 250. Generally, the equipment 250 is made of metal, and if the antenna unit 320 comes into direct contact with the equipment 250 when the identification member is affixed to the equipment 250, the antenna unit 320 will not be able to accurately receive the electromagnetic waves transmitted from the RFID reader 220. In response to this, as shown in FIG. 5(b), a cushioning material 510 is attached to prevent the antenna unit 320 from coming into direct contact with the equipment 250, allowing the RFID 240 to accurately receive the electromagnetic waves from the RFID reader 220.

<識別部材の貼り付け方法>
次に、識別部材(QRコード230、RFID240)の資機材250への貼り付け方法について説明する。図6は、識別部材の資機材への貼り付け方法を示す図である。
<Method of attaching identification member>
Next, a method of attaching the identification members (QR code 230, RFID 240) to the equipment and materials 250 will be described. Fig. 6 is a diagram showing a method of attaching the identification members to the equipment and materials.

図6(a)は、資機材250の一例である防煙・防火ダンパ610にQRコード230とRFID240とを別々に貼り付けた様子を示している。図6(a)に示すように、QRコード230、RFID240は、防煙・防火ダンパ610の外面であって、防煙・防火ダンパ610が現場に取り付けられた場合に露出する位置(外部から視認される位置)に貼り付けられる。ダンパ等の資機材は、ダクトと共に建築物に取り付けられた後、保温加工が施される。保温加工に際し、資機材が被覆部材により覆われるため、RFID240は、この被覆部材により覆われない箇所に貼り付けられる。ダンパで被覆部材で覆われない箇所とは、例えば開度調整レバーの取り付け金具である。 Figure 6 (a) shows a state where a QR code 230 and an RFID 240 are separately attached to a smoke/fire damper 610, which is an example of equipment 250. As shown in Figure 6 (a), the QR code 230 and the RFID 240 are attached to the outer surface of the smoke/fire damper 610 in a position that will be exposed (a position that can be seen from the outside) when the smoke/fire damper 610 is installed at the site. Equipment such as a damper is installed in a building together with a duct, and then subjected to a heat retention process. During the heat retention process, the equipment is covered with a covering material, so the RFID 240 is attached to a location that is not covered by this covering material. An example of a location on the damper that is not covered by the covering material is the mounting bracket for the opening adjustment lever.

なお、図6(a)に示すように、RFID240の場合、防煙・防火ダンパ610に貼り付けられるのは、本体部310を形成する領域のみであり、アンテナ部320を形成する領域は、防煙・防火ダンパ610の外面とは接触していない。つまり、RFID240は、アンテナ部320を形成する領域が防煙・防火ダンパ610の外面に対して非接触となるように、本体部310を形成する領域の貼り付け位置を決定したうえで、防煙・防火ダンパ610に貼り付けられる。 As shown in FIG. 6(a), in the case of RFID 240, only the area forming main body 310 is attached to smoke/fire damper 610, and the area forming antenna 320 is not in contact with the outer surface of smoke/fire damper 610. In other words, RFID 240 is attached to smoke/fire damper 610 after determining the attachment position of the area forming main body 310 so that the area forming antenna 320 is not in contact with the outer surface of smoke/fire damper 610.

図6(b)は、QRコード230がRFID240に印刷されている識別部材が、資機材250の一例である風量調整ダンパ620に貼り付けられた様子を示している。図6(b)に示すように、風量調整ダンパ620の場合、貼り付け領域が限られている。しかしながら、このような場合でも、QRコード230がRFID240に印刷されている識別部材を用いることで、アンテナ部320を形成する領域が風量調整ダンパ620の外面に接触することなく、識別部材を貼り付けることができる。 Figure 6 (b) shows an identification member with a QR code 230 printed on an RFID 240 attached to an air volume control damper 620, which is an example of equipment 250. As shown in Figure 6 (b), the area in which the identification member can be attached is limited in the case of the air volume control damper 620. However, even in such a case, by using an identification member with a QR code 230 printed on an RFID 240, the identification member can be attached without the area forming the antenna section 320 coming into contact with the outer surface of the air volume control damper 620.

図6(c)は、QRコード230がRFID240に印刷され、かつ、緩衝材510がアンテナ部320に取り付けられた識別部材が、資機材250の一例であるアネモスタット630に貼り付けられた様子を示している。図6(c)に示すように、緩衝材510が取り付けられた識別部材を用いることで、アンテナ部320を形成する領域がアネモスタット630の外面に直接接触することを回避することができる。 Figure 6(c) shows an identification member in which a QR code 230 is printed on an RFID 240 and in which a cushioning material 510 is attached to an antenna section 320, attached to an anemostat 630, which is an example of equipment 250. As shown in Figure 6(c), by using an identification member to which a cushioning material 510 is attached, it is possible to prevent the area forming the antenna section 320 from coming into direct contact with the outer surface of the anemostat 630.

このように、本実施形態では、本体部を形成する第1の領域と、アンテナ部を形成する第2の領域とを有する識別部材を、以下のような貼り付け方法により、資機材に貼り付ける。
・資機材の外面のうち、該資機材が所定の建築設備に取り付けられた場合に露出する位置であって、第1の領域を貼り付けた状態で第2の領域が資機材の外面に非接触となるように、第1の領域の貼り付け位置を決定する。
・第1の領域を貼り付けた状態で、第2の領域が資機材の外面に接触することを回避する部材を、第2の領域と資機材の外面との間に取り付ける。
・決定した貼り付け位置に第1の領域を貼り付けることで、識別部材を資機材に貼り付ける。
In this manner, in this embodiment, an identification member having a first region forming a main body portion and a second region forming an antenna portion is attached to equipment or materials by the following attachment method.
- Determine the attachment position of the first area so that the location on the outer surface of the equipment or material is exposed when the equipment or material is attached to a specified building facility, and so that the second area is not in contact with the outer surface of the equipment or material when the first area is attached.
With the first area attached, a member that prevents the second area from coming into contact with the outer surface of the equipment is attached between the second area and the outer surface of the equipment.
The identification member is attached to the equipment or material by attaching the first area to the determined attachment position.

<管理システムのシステム構成>
次に、登録処理を実現する管理システムのシステム構成について説明する。図7は、登録処理を実現する管理システムのシステム構成の一例を示す図である。図7に示すように、管理システム700は、システム納入業者120が有するBIMシステム710と、操作端末720と、サーバ装置730とを含む。
<System configuration of management system>
Next, the system configuration of the management system that realizes the registration process will be described. Fig. 7 is a diagram showing an example of the system configuration of the management system that realizes the registration process. As shown in Fig. 7, the management system 700 includes a BIM system 710, an operation terminal 720, and a server device 730 owned by the system supplier 120.

また、管理システム700は、部品業者110が有するスマートフォン210_1と、システム納入業者120が有するスマートフォン210_2と、工事業者130が有するスマートフォン210_3とを含む。 The management system 700 also includes a smartphone 210_1 owned by the parts supplier 110, a smartphone 210_2 owned by the system supplier 120, and a smartphone 210_3 owned by the construction company 130.

なお、サーバ装置730と、スマートフォン210_1~210_3とは、ネットワーク260を介して相互に接続される。また、BIMシステム710と、操作端末720と、サーバ装置730とは、例えば、システム納入業者120の所定のオフィス内の社内LAN(Local Area Network)等を介して接続される。 The server device 730 and the smartphones 210_1 to 210_3 are connected to each other via the network 260. The BIM system 710, the operation terminal 720, and the server device 730 are connected to each other via, for example, an in-house LAN (Local Area Network) in a specific office of the system supplier 120.

BIMシステム710は、システム納入業者120の社員751によって操作されることで、BIMデータを生成する。BIMシステム710によって生成されたBIMデータは、サーバ装置730に格納される。 The BIM system 710 generates BIM data by being operated by an employee 751 of the system supplier 120. The BIM data generated by the BIM system 710 is stored in the server device 730.

操作端末720は、システム納入業者120の社員752によって操作されることで、管理データを生成する。本実施形態において、管理データには、資機材一覧データ、ユーザ一覧データ、マスタデータが含まれる(詳細は後述)。操作端末720によって生成された管理データは、サーバ装置730に格納される。 The operation terminal 720 generates management data by being operated by an employee 752 of the system supplier 120. In this embodiment, the management data includes equipment and materials list data, user list data, and master data (details will be described later). The management data generated by the operation terminal 720 is stored in the server device 730.

また、操作端末720は、システム納入業者120の社員752によって操作されることで、サーバ装置730に登録された実績登録データについての閲覧要求を送信する。これにより、操作端末720は、サーバ装置730より送信された実績登録データについての一覧画面等を表示することができる。 The operation terminal 720 is operated by an employee 752 of the system supplier 120 to transmit a request to view the performance registration data registered in the server device 730. This allows the operation terminal 720 to display a list screen or the like of the performance registration data transmitted from the server device 730.

サーバ装置730は、各スマートフォン210_1~210_3からのアプリケーション要求に応じて、実績登録アプリケーション211を送信する。また、サーバ装置730は、各スマートフォン210_1~210_3からのマスタデータ要求に応じて、マスタデータを送信する。 The server device 730 transmits the performance registration application 211 in response to an application request from each of the smartphones 210_1 to 210_3. The server device 730 also transmits master data in response to a master data request from each of the smartphones 210_1 to 210_3.

また、サーバ装置730は、各作業工程において、各スマートフォン210_1~210_3にインストールされた実績登録アプリケーション211が登録処理を実行することで送信した実績登録データを受信し、格納する。また、サーバ装置730は、操作端末720からの閲覧要求に応じて、実績登録データについての一覧画面等を生成し、操作端末720に送信する。 In addition, the server device 730 receives and stores the achievement registration data transmitted by the achievement registration application 211 installed on each of the smartphones 210_1 to 210_3 executing the registration process in each work process. In addition, the server device 730 generates a list screen or the like of the achievement registration data in response to a viewing request from the operation terminal 720, and transmits it to the operation terminal 720.

スマートフォン210_1は、ステップS104における出荷作業の際に、部品業者110の部品工場において、部品業者110の社員761によって操作される。スマートフォン210_1は、製作された資機材250に貼り付けられた識別部材より読み取った識別情報(管理番号、機器番号、品名)を含む各種情報を、実績登録データとして、サーバ装置730に送信する。 The smartphone 210_1 is operated by an employee 761 of the parts supplier 110 at the parts factory of the parts supplier 110 during the shipping operation in step S104. The smartphone 210_1 transmits various information, including the identification information (control number, equipment number, and product name) read from the identification member attached to the manufactured equipment/material 250, to the server device 730 as performance registration data.

スマートフォン210_2は、ステップS104における受取作業の際に、システム納入業者120の倉庫において、システム納入業者120の社員753によって操作される。スマートフォン210_2は、受け取った資機材250に貼り付けられた識別部材より読み取った識別情報(管理番号、機器番号、品名)を含む各種情報を、実績登録データとして、サーバ装置730に送信する。 The smartphone 210_2 is operated by an employee 753 of the system supplier 120 at the warehouse of the system supplier 120 during the receiving operation in step S104. The smartphone 210_2 transmits various information, including the identification information (control number, equipment number, and product name) read from the identification member attached to the received equipment/material 250, to the server device 730 as performance registration data.

また、スマートフォン210_2は、ステップS108における検査作業の際に、現場において、システム納入業者120の社員753によって操作される。スマートフォン210_2は、取り付けられた資機材250に貼り付けられている識別部材より読み取った識別情報(管理番号、機器番号、品名)を含む各種情報を、実績登録データとして、サーバ装置730に送信する。 The smartphone 210_2 is operated by an employee 753 of the system supplier 120 at the site during the inspection work in step S108. The smartphone 210_2 transmits various information, including the identification information (control number, equipment number, and product name) read from the identification member affixed to the attached equipment/material 250, to the server device 730 as performance registration data.

更に、スマートフォン210_2は、ステップS109における試運転作業の際に、現場において、システム納入業者120の社員753によって操作される。スマートフォン210_2は、取り付けられた資機材250に貼り付けられている識別部材より読み取った識別情報(管理番号、機器番号、品名)を含む各種情報を、実績登録データとして、サーバ装置730に送信する。 Furthermore, the smartphone 210_2 is operated by an employee 753 of the system supplier 120 at the site during the trial operation in step S109. The smartphone 210_2 transmits various information, including the identification information (control number, equipment number, and product name) read from the identification member affixed to the installed equipment/material 250, to the server device 730 as performance registration data.

スマートフォン210_3は、ステップS106における仮置作業の際に、現場近くの仮置き場において、工事業者130の社員771によって操作される。スマートフォン210_3は、仮置きされた資機材250に貼り付けられている識別部材より読み取った識別情報(管理番号、機器番号、品名)を含む各種情報を、実績登録データとして、サーバ装置730に送信する。 The smartphone 210_3 is operated by an employee 771 of the construction company 130 at a temporary storage site near the work site during the temporary storage work in step S106. The smartphone 210_3 transmits various information, including identification information (control number, equipment number, and product name) read from an identification member attached to the temporarily stored equipment/material 250, to the server device 730 as performance registration data.

また、スマートフォン210_3は、ステップS107における取付作業の際に、現場において、工事業者130の社員771によって操作される。スマートフォン210_3は、取り付けられた資機材250に貼り付けられている識別部材より読み取った識別情報(管理番号、機器番号、品名)を含む各種情報を、実績登録データとして、サーバ装置730に送信する。 The smartphone 210_3 is operated by an employee 771 of the construction company 130 at the site during the installation work in step S107. The smartphone 210_3 transmits various information, including the identification information (control number, equipment number, and product name) read from the identification member affixed to the installed equipment/material 250, to the server device 730 as performance registration data.

<管理システムにおいて実行される処理>
次に、管理システム700において実行される処理の流れについて説明する。図8は、管理システムにおいて実行される処理の流れを示すシーケンス図である。図8に示すように、管理システム700において実行される処理は、事前準備フェーズと、実績登録フェーズと、維持管理フェーズとに大別することができる。
<Processing Executed in the Management System>
Next, a description will be given of the flow of processing executed in the management system 700. Fig. 8 is a sequence diagram showing the flow of processing executed in the management system. As shown in Fig. 8, the processing executed in the management system 700 can be broadly divided into a preparation phase, a performance registration phase, and a maintenance management phase.

(1)事前準備フェーズ
ステップS801において、システム納入業者120の社員752が操作端末720を操作することで、操作端末720は、資機材一覧データを生成する。操作端末720は、生成した資機材一覧データをサーバ装置730に送信する。
(1) Advance Preparation Phase In step S801, the employee 752 of the system supplier 120 operates the operation terminal 720, whereby the operation terminal 720 generates equipment and materials list data. The operation terminal 720 transmits the generated equipment and materials list data to the server device 730.

ステップS802において、サーバ装置730は、操作端末720から送信された資機材一覧データを管理データの1つとして格納する。 In step S802, the server device 730 stores the equipment list data sent from the operation terminal 720 as one of the management data.

ステップS803において、システム納入業者120の社員752が操作端末720を操作することで、操作端末720は、ユーザ一覧データを生成する。操作端末720は、生成したユーザ一覧データをサーバ装置730に送信する。 In step S803, an employee 752 of the system supplier 120 operates the operation terminal 720, causing the operation terminal 720 to generate user list data. The operation terminal 720 transmits the generated user list data to the server device 730.

ステップS804において、サーバ装置730は、操作端末720から送信されたユーザ一覧データを管理データの1つとして格納する。 In step S804, the server device 730 stores the user list data sent from the operation terminal 720 as one of the management data.

ステップS805において、システム納入業者120の社員752が操作端末720を操作することで、操作端末720は、マスタデータを生成する。操作端末720は、生成したマスタデータを管理データの1つとして格納する。 In step S805, an employee 752 of the system supplier 120 operates the operation terminal 720, causing the operation terminal 720 to generate master data. The operation terminal 720 stores the generated master data as one of the management data.

図9は、サーバ装置に格納される管理データの一例を示す図である。このうち、図9(a)は、資機材一覧データ910を示している。資機材一覧データ910は、現場ごとに生成される。図9(a)の例は、現場名="AAA"の現場に納入される建築設備に用いられる資機材一覧データであることを示している。 Figure 9 shows an example of management data stored in a server device. Of these, Figure 9(a) shows equipment and materials list data 910. Equipment and materials list data 910 is generated for each site. The example in Figure 9(a) shows equipment and materials list data used for construction equipment delivered to a site with site name = "AAA".

図9(a)に示すように、資機材一覧データ910は、情報の項目として、"管理番号"、"品名"を含む。"管理番号"には、現場に納入される建築設備に用いられる資機材を識別するための番号が格納される。"品名"には、"管理番号"によって識別される資機材の品名が格納される。 As shown in FIG. 9(a), the equipment and materials list data 910 includes information items such as "management number" and "product name." The "management number" stores a number for identifying the equipment and materials used in the construction facilities delivered to the site. The "product name" stores the name of the equipment and materials identified by the "management number."

図9(b)は、ユーザ一覧データ920を示している。ユーザ一覧データ920も、現場ごとに生成される。図9(b)の例は、現場名="AAA"の現場への建築設備の納入に携わる、部品業者110、システム納入業者120、工事業者130のユーザ一覧データであることを示している。 Figure 9(b) shows user list data 920. User list data 920 is also generated for each site. The example in Figure 9(b) shows user list data for a parts supplier 110, a system supplier 120, and a construction company 130 involved in the delivery of construction equipment to a site with a site name of "AAA".

図9(b)に示すように、ユーザ一覧データ920は、情報の項目として、"ユーザID"、"名前"、"パスワード"、"業者区分"を含む。 As shown in FIG. 9(b), the user list data 920 includes the following information items: "user ID," "name," "password," and "business type."

"ユーザID"には、スマートフォン210_1~210_3をそれぞれ操作する部品業者110の社員761、システム納入業者120の社員753、工事業者130の社員771を識別する識別子が格納される。 "User ID" stores identifiers that identify the employee 761 of the parts supplier 110, the employee 753 of the system supplier 120, and the employee 771 of the construction company 130 who operate the smartphones 210_1 to 210_3, respectively.

"名前"には、"ユーザID"によって識別される社員の名前("aaa"、"bbb"、"ccc")が格納される。"パスワード"には、"ユーザID"によって識別される識別子に対応付けられたパスワードが格納される。"業者区分"には、部品業者、システム納入業者、工事業者のいずれかの区分を示す情報が格納される。 "Name" stores the name of the employee identified by the "User ID" ("aaa", "bbb", "ccc"). "Password" stores the password associated with the identifier identified by the "User ID". "Vendor category" stores information indicating the category of either parts supplier, system supplier, or construction company.

図9(c)は、マスタデータ930を示している。マスタデータ930は、現場ごと、作業工程ごとに生成される。図9(c)の例は、現場名="AAA"の現場への建築設備の納入に際して、作業工程="取付作業"において用いられるマスタデータであることを示している。 Figure 9(c) shows master data 930. Master data 930 is generated for each site and each work process. The example in Figure 9(c) shows that the master data is used for work process = "installation work" when delivering construction equipment to a site with site name = "AAA".

図9(c)に示すように、マスタデータ930は、情報の項目として、"階"、"場所"を含む。"階"には、作業工程における作業が実行される建物(受取作業の場合には倉庫、仮置作業の場合には、仮置き場、取付作業・検査作業・試運転作業の場合には、現場)の階を示す情報が格納される。"場所"には、作業工程における作業が実行される建物内の場所を示す情報が格納される。 As shown in FIG. 9(c), the master data 930 includes "floor" and "location" as information items. "Floor" stores information indicating the floor of the building where the work in the work process is carried out (a warehouse for receiving work, a temporary storage area for temporary storage work, and the site for installation work, inspection work, and trial run work). "Location" stores information indicating the location within the building where the work in the work process is carried out.

図8の説明に戻る。ステップS807において、システム納入業者120の社員751がBIMシステム710を操作することで、BIMシステム710は、BIMデータを生成する。BIMシステム710は、生成したBIMデータをサーバ装置730に送信する。 Returning to the explanation of FIG. 8, in step S807, an employee 751 of the system supplier 120 operates the BIM system 710, causing the BIM system 710 to generate BIM data. The BIM system 710 transmits the generated BIM data to the server device 730.

ステップS808において、サーバ装置730は、BIMシステム710から送信されたBIMデータを格納する。 In step S808, the server device 730 stores the BIM data transmitted from the BIM system 710.

図10は、サーバ装置に格納されるBIMデータの一例を示す図である。BIMデータ1000は、現場ごと、階ごと、場所ごとに生成される。図10の例は、現場名="AAA"の現場に納入される建築設備のうち、階="1"、場所="エリア1_1"に取り付けられた資機材の配置を示すBIMデータであることを示している。このように、建築設備のBIMデータには、資機材の属性情報が含まれている。この属性情報をもとに、建築設備の現場に取り付けられるべき資機材の一覧データがシステム納入業者120の操作により作成される。 Figure 10 is a diagram showing an example of BIM data stored in a server device. BIM data 1000 is generated for each site, floor, and location. The example in Figure 10 shows BIM data showing the layout of materials and equipment installed on floor "1" and location "Area 1_1" of the building equipment delivered to the site with site name "AAA". In this way, the BIM data for the building equipment contains attribute information for the materials and equipment. Based on this attribute information, a list of materials and equipment to be installed at the building equipment site is created by the system supplier 120.

図10に示すように、BIMデータ1000には、当該現場、当該階、当該場所に取り付けられる資機材を示すイラスト(または記号)が、取り付け位置に応じて図示される。 As shown in FIG. 10, the BIM data 1000 shows illustrations (or symbols) of the equipment to be installed at the site, floor, and location according to the installation position.

また、BIMデータ1000には、試運転完了登録処理においてスマートフォン210_2から送信された実績登録データに含まれる識別情報(管理番号、機器番号、品名)が、各資機材を示すイラスト(または記号)に対応する位置に反映される。 In addition, in the BIM data 1000, the identification information (control number, equipment number, and item name) included in the performance registration data sent from the smartphone 210_2 during the trial run completion registration process is reflected in the position corresponding to the illustration (or symbol) indicating each equipment.

再び、図8の説明に戻る。ステップS809において、部品業者110の社員761がスマートフォン210_1を操作することで、スマートフォン210_1は、サーバ装置730に対して、実績登録アプリケーションのダウンロードを要求するアプリケーション要求を送信する。スマートフォン210_1によって送信されるアプリケーション要求には、部品業者110の社員761を識別するユーザIDが含まれているものとする。 Returning to the explanation of FIG. 8 again, in step S809, the employee 761 of the parts supplier 110 operates the smartphone 210_1, whereby the smartphone 210_1 transmits an application request to the server device 730, requesting download of the performance registration application. The application request transmitted by the smartphone 210_1 includes a user ID that identifies the employee 761 of the parts supplier 110.

同様に、システム納入業者120の社員753がスマートフォン210_2を操作することで、スマートフォン210_2は、サーバ装置730に対して、実績登録アプリケーションのダウンロードを要求するアプリケーション要求を送信する。スマートフォン210_2によって送信されるアプリケーション要求には、システム納入業者120の社員753を識別するユーザIDが含まれているものとする。 Similarly, when an employee 753 of the system supplier 120 operates the smartphone 210_2, the smartphone 210_2 transmits an application request to the server device 730 to request the download of a performance registration application. The application request transmitted by the smartphone 210_2 includes a user ID that identifies the employee 753 of the system supplier 120.

同様に、工事業者130の社員771がスマートフォン210_3を操作することで、スマートフォン210_3は、サーバ装置730に対して、実績登録アプリケーションのダウンロードを要求するアプリケーション要求を送信する。スマートフォン210_3によって送信されるアプリケーション要求には、工事業者130の社員771を識別するユーザIDが含まれているものとする。 Similarly, when an employee 771 of the construction company 130 operates the smartphone 210_3, the smartphone 210_3 transmits an application request to the server device 730 to request the download of the performance registration application. The application request transmitted by the smartphone 210_3 includes a user ID that identifies the employee 771 of the construction company 130.

ステップS810において、サーバ装置730は、スマートフォン210_1より送信されたアプリケーション要求に基づいて、ダウンロードすべき実績登録アプリケーションを決定する。具体的には、サーバ装置730は、アプリケーション要求に含まれるユーザIDに基づいて、ユーザ一覧データ920を参照し、部品業者110からのアプリケーション要求であることを認識する。そして、サーバ装置730は、ダウンロードすべき実績登録アプリケーションとして、出荷登録処理を実行可能な実績登録アプリケーションを決定する。更に、サーバ装置730は、決定した実績登録アプリケーションをスマートフォン210_1に送信する。 In step S810, the server device 730 determines the track record registration application to be downloaded based on the application request sent from the smartphone 210_1. Specifically, the server device 730 refers to the user list data 920 based on the user ID included in the application request, and recognizes that the application request is from the parts supplier 110. The server device 730 then determines a track record registration application capable of executing the shipment registration process as the track record registration application to be downloaded. Furthermore, the server device 730 transmits the determined track record registration application to the smartphone 210_1.

同様に、サーバ装置730は、スマートフォン210_2より送信されたアプリケーション要求に基づいて、ダウンロードすべき実績登録アプリケーションを決定する。具体的には、サーバ装置730は、アプリケーション要求に含まれるユーザIDに基づいて、ユーザ一覧データ920を参照し、システム納入業者120からのアプリケーション要求であることを認識する。そして、サーバ装置730は、ダウンロードすべき実績登録アプリケーションとして、受取完了登録処理、検査完了登録処理、試運転完了登録処理を実行可能な実績登録アプリケーションを決定する。更に、サーバ装置730は、決定した実績登録アプリケーションをスマートフォン210_2に送信する。 Similarly, the server device 730 determines the achievement registration application to be downloaded based on the application request sent from the smartphone 210_2. Specifically, the server device 730 refers to the user list data 920 based on the user ID included in the application request, and recognizes that the application request is from the system supplier 120. The server device 730 then determines, as the achievement registration application to be downloaded, an achievement registration application capable of executing the receipt completion registration process, the inspection completion registration process, and the test run completion registration process. Furthermore, the server device 730 transmits the determined achievement registration application to the smartphone 210_2.

同様に、サーバ装置730は、スマートフォン210_3より送信されたアプリケーション要求に基づいて、ダウンロードすべき実績登録アプリケーションを決定する。具体的には、サーバ装置730は、アプリケーション要求に含まれるユーザIDに基づいて、ユーザ一覧データ920を参照し、工事業者130からのアプリケーション要求であることを認識する。そして、サーバ装置730は、ダウンロードすべき実績登録アプリケーションとして、仮置完了登録処理、取付完了登録処理を実行可能な実績登録アプリケーションを決定する。更に、サーバ装置730は、決定した実績登録アプリケーションをスマートフォン210_3に送信する。 Similarly, the server device 730 determines the achievement registration application to be downloaded based on the application request sent from the smartphone 210_3. Specifically, the server device 730 refers to the user list data 920 based on the user ID included in the application request, and recognizes that the application request is from the contractor 130. The server device 730 then determines, as the achievement registration application to be downloaded, an achievement registration application capable of executing the temporary placement completion registration process and the installation completion registration process. Furthermore, the server device 730 transmits the determined achievement registration application to the smartphone 210_3.

ステップS811において、システム納入業者120の社員753がスマートフォン210_2を操作することで、スマートフォン210_2は、サーバ装置730に対して、マスタデータのダウンロードを要求する。スマートフォン210_2によって送信されるマスタデータ要求には、システム納入業者120の社員753を識別するユーザIDが含まれているものとする。 In step S811, an employee 753 of the system supplier 120 operates the smartphone 210_2, which causes the smartphone 210_2 to request the server device 730 to download the master data. The master data request sent by the smartphone 210_2 is assumed to include a user ID that identifies the employee 753 of the system supplier 120.

同様に、工事業者130の社員771がスマートフォン210_3を操作することで、スマートフォン210_3は、サーバ装置730に対して、マスタデータのダウンロードを要求する。スマートフォン210_3によって送信されるマスタデータ要求には、工事業者130の社員771を識別するユーザIDが含まれているものとする。 Similarly, when an employee 771 of the construction company 130 operates the smartphone 210_3, the smartphone 210_3 requests the server device 730 to download the master data. The master data request sent by the smartphone 210_3 includes a user ID that identifies the employee 771 of the construction company 130.

ステップS812において、サーバ装置730は、スマートフォン210_2より送信されたマスタデータ要求に基づいて、ダウンロードすべきマスタデータを決定する。具体的には、サーバ装置730は、マスタデータ要求に含まれるユーザIDに基づいて、ユーザ一覧データ920を参照し、システム納入業者120からのマスタデータ要求であることを認識する。そして、サーバ装置730は、ダウンロードすべきマスタデータとして、作業工程=受取作業、検査作業、試運転作業のマスタデータを決定する。更に、サーバ装置730は、決定したマスタデータをスマートフォン210_2に送信する。 In step S812, the server device 730 determines the master data to be downloaded based on the master data request sent from the smartphone 210_2. Specifically, the server device 730 refers to the user list data 920 based on the user ID included in the master data request, and recognizes that the master data request is from the system supplier 120. The server device 730 then determines the master data for the work processes = receiving work, inspection work, and trial run work as the master data to be downloaded. Furthermore, the server device 730 transmits the determined master data to the smartphone 210_2.

同様に、サーバ装置730は、スマートフォン210_3より送信されたマスタデータ要求に基づいて、ダウンロードすべきマスタデータを決定する。具体的には、サーバ装置730は、マスタデータ要求に含まれるユーザIDに基づいて、ユーザ一覧データ920を参照し、工事業者130からのマスタデータ要求であることを認識する。そして、サーバ装置730は、ダウンロードすべきマスタデータとして、作業工程=仮置作業、取付作業のマスタデータを決定する。更に、サーバ装置730は、決定したマスタデータをスマートフォン210_3に送信する。 Similarly, the server device 730 determines the master data to be downloaded based on the master data request sent from the smartphone 210_3. Specifically, the server device 730 refers to the user list data 920 based on the user ID included in the master data request, and recognizes that the master data request is from the contractor 130. The server device 730 then determines the master data for the work process = temporary placement work and installation work as the master data to be downloaded. Furthermore, the server device 730 transmits the determined master data to the smartphone 210_3.

(2)実績登録フェーズ
続いて、実績登録フェーズについて説明する。部品業者110が資機材の出荷作業を開始すると、ステップS821において、部品業者110の社員761はスマートフォン210_1を操作し、実績登録アプリケーション211を起動する。これにより、スマートフォン210_1は、サーバ装置730との間で、出荷登録処理を実行する。
(2) Actual result registration phase Next, the actual result registration phase will be described. When the parts supplier 110 starts the shipping operation of the equipment and materials, in step S821, the employee 761 of the parts supplier 110 operates the smartphone 210_1 to start the actual result registration application 211. As a result, the smartphone 210_1 executes the shipping registration process with the server device 730.

続いて、システム納入業者120が、資機材の受取作業を開始すると、ステップS822において、システム納入業者120の社員753はスマートフォン210_2を操作し、実績登録アプリケーション211を起動する。これにより、スマートフォン210_2は、サーバ装置730との間で、受取完了登録処理を実行する。 Next, when the system supplier 120 starts the process of receiving the materials and equipment, in step S822, the employee 753 of the system supplier 120 operates the smartphone 210_2 to start the performance registration application 211. As a result, the smartphone 210_2 executes a receipt completion registration process with the server device 730.

続いて、工事業者130が、資機材の仮置作業を開始すると、ステップS823において、工事業者130の社員771はスマートフォン210_3を操作し、実績登録アプリケーション211を起動する。これにより、スマートフォン210_3は、サーバ装置730との間で、仮置完了登録処理を実行する。 Next, when the contractor 130 starts the temporary placement of the materials and equipment, in step S823, the employee 771 of the contractor 130 operates the smartphone 210_3 to launch the performance registration application 211. As a result, the smartphone 210_3 executes the temporary placement completion registration process with the server device 730.

続いて、工事業者130が、資機材の取付作業を開始すると、ステップS824において、工事業者130の社員771はスマートフォン210_3を操作し、実績登録アプリケーション211を起動する。これにより、スマートフォン210_3は、サーバ装置730との間で、取付完了登録処理を実行する。 Next, when the contractor 130 starts the installation work of the equipment and materials, in step S824, the employee 771 of the contractor 130 operates the smartphone 210_3 to start the performance registration application 211. As a result, the smartphone 210_3 executes the installation completion registration process with the server device 730.

続いて、システム納入業者120が、資機材の検査作業を開始すると、ステップS825において、システム納入業者120の社員753はスマートフォン210_2を操作し、実績登録アプリケーション211を起動する。これにより、スマートフォン210_2は、サーバ装置730との間で、検査完了登録処理を実行する。 Next, when the system supplier 120 starts the inspection work of the equipment and materials, in step S825, the employee 753 of the system supplier 120 operates the smartphone 210_2 to start the performance registration application 211. As a result, the smartphone 210_2 executes the inspection completion registration process with the server device 730.

続いて、システム納入業者120が、資機材の試運転作業を開始すると、ステップS826において、システム納入業者120の社員753はスマートフォン210_2を操作し、実績登録アプリケーション211を起動する。これにより、スマートフォン210_2は、サーバ装置730との間で、試運転完了登録処理を実行する。 Next, when the system supplier 120 starts the trial operation of the equipment, in step S826, the employee 753 of the system supplier 120 operates the smartphone 210_2 to start the performance registration application 211. As a result, the smartphone 210_2 executes the trial operation completion registration process with the server device 730.

ステップS827において、システム納入業者120の社員752は、操作端末720を操作することで、サーバ装置730に対して、実績登録データの閲覧要求を送信する。これにより、操作端末720は、サーバ装置730との間で、閲覧処理を実行する。なお、閲覧処理は、ステップS821からS826の間のいずれのタイミングで実行されてもよい。 In step S827, an employee 752 of the system supplier 120 operates the operation terminal 720 to send a request to the server device 730 to view the performance registration data. As a result, the operation terminal 720 executes a viewing process between the server device 730 and the operation terminal 720. Note that the viewing process may be executed at any time between steps S821 and S826.

(3)維持管理フェーズ
続いて、維持管理フェーズについて説明する。ステップS831において、サーバ装置730は、試運転完了登録処理(ステップS826)において格納された実績登録データに含まれる識別情報(管理番号、機器番号、品名)をBIMデータ1000に反映させる。これにより、システム納入業者120は、納入した建築設備に用いられる各資機材について、BIMデータを参照しながら維持管理を行うことができる。
(3) Maintenance Phase Next, the maintenance phase will be described. In step S831, the server device 730 reflects the identification information (management number, equipment number, and product name) included in the performance registration data stored in the trial operation completion registration process (step S826) in the BIM data 1000. This allows the system supplier 120 to perform maintenance management of each equipment and material used in the delivered building facilities while referring to the BIM data.

なお、図8の説明では、サーバ装置730は、維持管理フェーズにおいて識別情報をBIMデータ1000に反映させるものとして説明したが、実績登録フェーズにおいて、反映させるように構成してもよい。具体的には、資機材の取り付けが完了したことを示す記号、検査が完了したことを示す記号、試運転が完了したことを示す記号等を、BIMデータ1000上の各資機材に対応付けて表示するように構成してもよい。 In the explanation of FIG. 8, the server device 730 is described as reflecting the identification information in the BIM data 1000 in the maintenance phase, but it may be configured to reflect it in the performance registration phase. Specifically, it may be configured to display, in association with each equipment and material on the BIM data 1000, a symbol indicating that the installation of the equipment and material is complete, a symbol indicating that the inspection is complete, a symbol indicating that the test run is complete, and the like.

これにより、システム納入業者120の社員752は、どの資機材の取り付け、検査、試運転が完了したのかを、BIMデータ1000上で確認することが可能となる。また、システム納入業者120の社員752は、検査が完了したことを示す記号が表示されたBIMデータ1000を、管理データとともに検査工程完了報告書として利用することができる。あるいは、システム納入業者120の社員752は、試運転が完了したことを示す記号が表示されたBIMデータ1000を、管理データとともに試運転工程完了報告書として利用することができる。 This allows the employee 752 of the system supplier 120 to check on the BIM data 1000 which equipment and materials have been installed, inspected, and commissioned. The employee 752 of the system supplier 120 can also use the BIM data 1000, which displays a symbol indicating that inspection has been completed, together with the management data, as an inspection process completion report. Alternatively, the employee 752 of the system supplier 120 can use the BIM data 1000, which displays a symbol indicating that commissioning has been completed, together with the management data, as a commissioning process completion report.

更に、システム納入業者120の社員752は、現場ごとの完成図書(システム納入後に作成される施工図面等)として、管理データとBIMデータ1000とを電子データにて納品することができる。なお、電子データによる完成図書の納品において、管理データやBIMデータは、例えば、リンク先として記載するようにしてもよい。 Furthermore, an employee 752 of the system supplier 120 can deliver the management data and BIM data 1000 in electronic form as the completion documents for each site (such as construction drawings created after the system is delivered). When delivering the completion documents in electronic form, the management data and BIM data may be listed as links, for example.

これにより、完成図書に記載されたリンク先にアクセスすることで、管理データやBIMデータを参照することができる。また、リニューアル工事等が発生した場合に、システム納入業者120の社員752は、管理データやBIMデータにアクセスすることで、リニューアル工事の提案書を簡単に作成することが可能となる。 This allows users to access the management data and BIM data by accessing the links listed in the completed documents. Furthermore, when renovation work or the like occurs, employees 752 of the system supplier 120 can easily create proposals for the renovation work by accessing the management data and BIM data.

<管理システムに含まれる各装置のハードウェア構成>
次に、管理システム700に含まれる各装置のうち、サーバ装置730とスマートフォン210のハードウェア構成について説明する。図11は、サーバ装置及びスマートフォンのハードウェア構成の一例を示す図である。
<Hardware configuration of each device included in the management system>
Next, a description will be given of the hardware configurations of the server device 730 and the smartphone 210 among the devices included in the management system 700. Fig. 11 is a diagram showing an example of the hardware configurations of the server device and the smartphone.

図11(a)に示すように、サーバ装置730は、CPU(Central Processing Unit)1101、ROM(Read Only Memory)1102、RAM(Random Access Memory)1103を有する。CPU1101、ROM1102、RAM1103は、いわゆるコンピュータを形成する。 As shown in FIG. 11(a), the server device 730 has a CPU (Central Processing Unit) 1101, a ROM (Read Only Memory) 1102, and a RAM (Random Access Memory) 1103. The CPU 1101, the ROM 1102, and the RAM 1103 form what is known as a computer.

また、サーバ装置730は、補助記憶部1104、入力部1105、表示部1106、通信部1107を備える。なお、サーバ装置730の各部は、バス1108を介して相互に接続されている。 The server device 730 also includes an auxiliary memory unit 1104, an input unit 1105, a display unit 1106, and a communication unit 1107. The various units of the server device 730 are connected to each other via a bus 1108.

CPU1101は、補助記憶部1104に格納された各種プログラム(例えば、後述する認証プログラム、実績管理プログラム、表示制御プログラム、生成プログラム等)を実行する。 The CPU 1101 executes various programs (e.g., the authentication program, performance management program, display control program, generation program, etc. described below) stored in the auxiliary memory unit 1104.

ROM1102は不揮発性メモリである。ROM1102は、補助記憶部1104に格納された各種プログラムを、CPU1101が実行するために必要な各種プログラム、データ等を格納する、主記憶デバイスとして機能する。具体的には、BIOS(Basic Input/Output System)やEFI(Extensible Firmware Interface)等のブートプログラムなどを格納する。 ROM 1102 is a non-volatile memory. ROM 1102 functions as a main storage device that stores various programs and data necessary for CPU 1101 to execute various programs stored in auxiliary storage unit 1104. Specifically, it stores boot programs such as BIOS (Basic Input/Output System) and EFI (Extensible Firmware Interface).

RAM1103は、DRAM(Dynamic Random Access Memory)やSRAM(Static Random Access Memory)等の揮発性メモリである。RAM1103は、補助記憶部1104に格納された各種プログラムがCPU1101によって実行される際に展開される作業領域を提供する、主記憶デバイスとして機能する。 RAM 1103 is a volatile memory such as a dynamic random access memory (DRAM) or a static random access memory (SRAM). RAM 1103 functions as a primary storage device that provides a working area in which various programs stored in auxiliary storage unit 1104 are expanded when executed by CPU 1101.

補助記憶部1104は、CPU1101によって実行される各種プログラム及び各種プログラムがCPU1101によって実行される際に利用される各種データを格納する補助記憶デバイスである。なお、後述する管理データ格納部、実績登録データ格納部、BIMデータ格納部は、補助記憶部1104において実現される。 The auxiliary memory unit 1104 is an auxiliary memory device that stores various programs executed by the CPU 1101 and various data used when the various programs are executed by the CPU 1101. Note that the management data storage unit, performance registration data storage unit, and BIM data storage unit described below are realized in the auxiliary memory unit 1104.

入力部1105は、各種指示を入力するための入力デバイスである。表示部1106は、サーバ装置730が有する各種情報を表示するための表示デバイスである。 The input unit 1105 is an input device for inputting various instructions. The display unit 1106 is a display device for displaying various information held by the server device 730.

通信部1107は、BIMシステム710、操作端末720、スマートフォン210_1~210_3と通信を行うための通信デバイスである。 The communication unit 1107 is a communication device for communicating with the BIM system 710, the operation terminal 720, and the smartphones 210_1 to 210_3.

また、図11(b)に示すように、スマートフォン210は、サーバ装置730と同様のハードウェア構成を有するため、ここでは、サーバ装置730との相違点について説明する。サーバ装置730のハードウェア構成との相違点は、スマートフォン210の場合、撮像部212、接続部1119を有する点である。 As shown in FIG. 11(b), the smartphone 210 has a similar hardware configuration to the server device 730, so here, differences between the smartphone 210 and the server device 730 will be described. The difference between the hardware configuration of the server device 730 and the smartphone 210 is that the smartphone 210 has an imaging unit 212 and a connection unit 1119.

撮像部212は、QRコード230を撮影し、撮影画像を生成する画像生成デバイスである。接続部1119は、RFIDリーダ220と接続するための接続デバイスである。 The imaging unit 212 is an image generating device that captures the QR code 230 and generates a captured image. The connection unit 1119 is a connection device for connecting to the RFID reader 220.

<管理システムに含まれる各装置の機能構成>
次に、管理システム700に含まれる各装置のうち、サーバ装置730とスマートフォン210の機能構成について説明する。図12は、サーバ装置及びスマートフォンの機能構成の一例を示す図であり、主に実績登録フェーズ及び維持管理フェーズにおいて実行される機能について示している。
<Functional configuration of each device included in the management system>
Next, a description will be given of the functional configurations of the server device 730 and the smartphone 210 among the devices included in the management system 700. Fig. 12 is a diagram showing an example of the functional configurations of the server device and the smartphone, and mainly shows functions executed in the performance registration phase and the maintenance management phase.

(1)サーバ装置の機能構成
サーバ装置730には、主に実績登録フェーズ及び維持管理フェーズにおいて実行されるプログラムとして、認証プログラム、実績管理プログラム、表示制御プログラム、生成プログラムがインストールされている。サーバ装置730は、実績登録フェーズ及び維持管理フェーズにおいて当該プログラムを実行することで、認証部1201、実績管理部1202、表示制御部1203、生成部1204として機能する(図12(a))。
(1) Functional configuration of the server device An authentication program, a record management program, a display control program, and a generation program are installed in the server device 730 as programs executed mainly in the record registration phase and the maintenance management phase. The server device 730 executes the programs in the record registration phase and the maintenance management phase, thereby functioning as an authentication unit 1201, a record management unit 1202, a display control unit 1203, and a generation unit 1204 ( FIG. 12A ).

認証部1201は、スマートフォン210の実績登録アプリケーション211起動時に入力されるユーザID、パスワードを受信した場合に、管理データ格納部1205に格納されたユーザ一覧データ920を参照する。 When the authentication unit 1201 receives the user ID and password entered when the performance registration application 211 of the smartphone 210 is started, it refers to the user list data 920 stored in the management data storage unit 1205.

また、認証部1201は、スマートフォン210より受信したユーザIDとパスワードとの組み合わせが、ユーザ一覧データ920に格納されたユーザIDとパスワードとの組み合わせと一致するか否かを判定する。一致すると判定した場合、認証部1201は、認証に成功したと判定し、ユーザ一覧データ920に格納された"名前"及び対応する"現場名"を、スマートフォン210に送信する。一方、一致しないと判定した場合、認証部1201は、認証に失敗したと判定し、スマートフォン210に対して認証エラーを送信する。 The authentication unit 1201 also determines whether the combination of user ID and password received from the smartphone 210 matches the combination of user ID and password stored in the user list data 920. If it is determined that they match, the authentication unit 1201 determines that the authentication has been successful, and transmits the "name" and the corresponding "site name" stored in the user list data 920 to the smartphone 210. On the other hand, if it is determined that they do not match, the authentication unit 1201 determines that the authentication has failed, and transmits an authentication error to the smartphone 210.

実績管理部1202は受信手段の一例であり、登録処理においてスマートフォン210より送信される実績登録データを受信する。また、実績管理部1202は格納手段の一例であり、受信した実績登録データを実績登録データ格納部1206に格納する。 The performance management unit 1202 is an example of a receiving means, and receives performance registration data sent from the smartphone 210 during the registration process. The performance management unit 1202 is also an example of a storage means, and stores the received performance registration data in the performance registration data storage unit 1206.

表示制御部1203は表示制御手段の一例であり、操作端末720から送信される閲覧要求に応じて、実績登録データ格納部1206より実績登録データを読み出し、一覧画面を生成して操作端末720に送信する。また、表示制御部1203は、操作端末720から送信される履歴画面表示要求に応じて、実績登録データ格納部1206より実績登録データを読み出し、履歴画面を生成して、操作端末720に送信する。 The display control unit 1203 is an example of a display control means, and in response to a viewing request sent from the operation terminal 720, reads out achievement registration data from the achievement registration data storage unit 1206, generates a list screen, and sends it to the operation terminal 720. In addition, in response to a history screen display request sent from the operation terminal 720, the display control unit 1203 reads out achievement registration data from the achievement registration data storage unit 1206, generates a history screen, and sends it to the operation terminal 720.

生成部1204は、試運転完了登録処理(ステップS826)において実績登録データ格納部1206に格納された実績登録データより、識別情報を読み出し、BIMデータ1000に反映させる。 The generation unit 1204 reads out the identification information from the performance registration data stored in the performance registration data storage unit 1206 during the trial operation completion registration process (step S826) and reflects it in the BIM data 1000.

(2)スマートフォンの機能構成
スマートフォン210にインストールされる実績登録アプリケーション211は、ログイン部1211及び実績登録部1212を有する。
(2) Functional Configuration of Smartphone The achievement registration application 211 installed on the smartphone 210 includes a login unit 1211 and an achievement registration unit 1212 .

ログイン部1211は、実績登録アプリケーション211起動時に、ユーザIDとパスワードの入力を受け付ける。また、ログイン部1211は、受け付けたユーザIDとパスワードとを、サーバ装置730に送信する。サーバ装置730に送信したことに応じて、サーバ装置730より、ユーザIDに対応する"名前"及び"現場名"を受信した場合、ログイン部1211は、当該"名前"及び"現場名"を実績登録部1212に通知する。一方、サーバ装置730より、認証エラーが送信された場合、ログイン部1211は、表示部1116に認証エラーを表示する。 When the achievement registration application 211 is launched, the login unit 1211 accepts input of a user ID and password. The login unit 1211 also transmits the accepted user ID and password to the server device 730. In response to transmitting the user ID and password to the server device 730, if the login unit 1211 receives a "name" and "site name" corresponding to the user ID from the server device 730, the login unit 1211 notifies the achievement registration unit 1212 of the "name" and "site name". On the other hand, if an authentication error is transmitted from the server device 730, the login unit 1211 displays the authentication error on the display unit 1116.

実績登録部1212は、ログイン部1211より通知を受けると、"名前"及び"現場名"を含む登録画面を表示する。また、実績登録部1212は、登録画面を介して各種操作を受け付けることで、マスタデータ格納部1213に格納されたマスタデータの中から選択された情報を登録画面に表示する。 When the performance registration unit 1212 receives a notification from the login unit 1211, it displays a registration screen including "name" and "site name". In addition, the performance registration unit 1212 accepts various operations via the registration screen, and displays information selected from the master data stored in the master data storage unit 1213 on the registration screen.

また、実績登録部1212は、登録画面を介して各種操作を受け付けることで、識別部材より識別情報を読み取り、登録画面に表示する。更に、実績登録部1212は、登録画面を介して各種操作を受け付けることで、登録画面に表示された各種情報を含む実績登録データをサーバ装置730に送信する。 In addition, the performance registration unit 1212 accepts various operations via the registration screen, reads the identification information from the identification member, and displays it on the registration screen. Furthermore, in response to various operations via the registration screen, the performance registration unit 1212 transmits performance registration data including the various information displayed on the registration screen to the server device 730.

<実績登録フェーズにおける登録処理の詳細>
次に、実績登録フェーズにおける各登録処理(ステップS821~S826)の詳細について説明する。
<Details of the registration process in the performance registration phase>
Next, each registration process (steps S821 to S826) in the result registration phase will be described in detail.

(1)出荷登録処理(ステップS821)の詳細
はじめに、実績登録フェーズにおいて実行される出荷登録処理(ステップS821)の詳細について説明する。図13は、実績登録フェーズにおいて実行される出荷登録処理の流れを示すシーケンス図である。
(1) Details of the Shipment Registration Process (Step S821) First, details of the shipment registration process (step S821) executed in the actual result registration phase will be described. Fig. 13 is a sequence diagram showing the flow of the shipment registration process executed in the actual result registration phase.

ステップS1301において、部品業者110の社員761は、スマートフォン210_1の表示画面1320において起動指示を入力する。具体的には、部品業者110の社員761は、出荷登録処理を実行可能な実績登録アプリケーションのアイコン1321を操作することで、起動指示を入力する。 In step S1301, an employee 761 of the parts supplier 110 inputs a start-up instruction on the display screen 1320 of the smartphone 210_1. Specifically, the employee 761 of the parts supplier 110 inputs the start-up instruction by operating the icon 1321 of a performance registration application capable of executing the shipment registration process.

ステップS1302において、スマートフォン210_1のログイン部1211は、起動指示が入力されたことに応じて、スマートフォン210_1にログイン画面1330を表示する。ログイン画面1330には、ユーザIDを入力する入力欄1331と、パスワードを入力する入力欄1332とが含まれる。 In step S1302, in response to the input of the start-up instruction, the login unit 1211 of the smartphone 210_1 displays a login screen 1330 on the smartphone 210_1. The login screen 1330 includes an input field 1331 for inputting a user ID and an input field 1332 for inputting a password.

ステップS1303において、部品業者110の社員761は、入力欄1331、1332に、ユーザIDとパスワードをそれぞれ入力する。 In step S1303, an employee 761 of the parts supplier 110 enters a user ID and password in input fields 1331 and 1332, respectively.

ステップS1304において、スマートフォン210_1のログイン部1211は、入力されたユーザIDとパスワードとを含む認証要求を、サーバ装置730に送信する。 In step S1304, the login unit 1211 of the smartphone 210_1 sends an authentication request including the input user ID and password to the server device 730.

ステップS1305において、サーバ装置730の認証部1201は、認証要求に含まれるユーザIDとパスワードとの組み合わせが、ユーザ一覧データ920に格納されたユーザIDとパスワードとの組み合わせと一致するか否かを判定する。ここでは、認証部1201は、一致すると判定したものとする。 In step S1305, the authentication unit 1201 of the server device 730 determines whether the combination of the user ID and password included in the authentication request matches the combination of the user ID and password stored in the user list data 920. Here, it is assumed that the authentication unit 1201 determines that they match.

ステップS1306において、サーバ装置730の認証部1201は、ユーザ一覧データ920の"名前"及び"現場名"をスマートフォン210_1に送信する。 In step S1306, the authentication unit 1201 of the server device 730 sends the "name" and "site name" from the user list data 920 to the smartphone 210_1.

ステップS1307において、ログイン部1211は、スマートフォン210_1に初期画面1340を表示する。初期画面1340には、出荷登録処理の実行を指示する「出荷」ボタン1341が含まれる。 In step S1307, the login unit 1211 displays an initial screen 1340 on the smartphone 210_1. The initial screen 1340 includes a "Ship" button 1341 that instructs the execution of the shipment registration process.

ステップS1308において、部品業者110の社員761が、「出荷」ボタン1341を選択すると、ステップS1309において、ログイン部1211は選択手段として機能し、「出荷」ボタン1341が選択されたことを、実績登録部1212に通知する。 In step S1308, when an employee 761 of the parts supplier 110 selects the "Ship" button 1341, in step S1309, the login unit 1211 functions as a selection means and notifies the performance registration unit 1212 that the "Ship" button 1341 has been selected.

ステップS1310において、実績登録部1212は、スマートフォン210_1に出荷登録画面を表示する。図14は、出荷登録画面の一例を示す図である。以下、図14の出荷登録画面1400を参照しながら、図13の出荷登録処理についての説明を進める。 In step S1310, the performance registration unit 1212 displays a shipment registration screen on the smartphone 210_1. FIG. 14 is a diagram showing an example of the shipment registration screen. Below, the shipment registration process in FIG. 13 will be explained with reference to the shipment registration screen 1400 in FIG. 14.

図14に示すように、出荷登録画面1400には、現場名("AAA")及び担当者の"名前"("aaa")が表示される。また、出荷登録画面1400には、QRコードを撮影する際の撮影画像を表示するQRコード撮影画像表示領域1401と、撮像部212に対する撮影指示を入力するための"撮影"ボタン1402とが含まれる。 As shown in FIG. 14, the shipping registration screen 1400 displays the site name ("AAA") and the "name" of the person in charge ("aaa"). The shipping registration screen 1400 also includes a QR code captured image display area 1401 that displays the captured image when capturing the QR code, and a "Capture" button 1402 for inputting a capture instruction to the imaging unit 212.

ステップS1311において、部品業者110の社員761は、QRコード撮影画像表示領域1401にQRコード230を表示させた状態で、"撮影"ボタン1402を押圧することで、読み込み操作を行う。 In step S1311, an employee 761 of the parts supplier 110 performs a read operation by pressing the "Capture" button 1402 while the QR code 230 is displayed in the QR code captured image display area 1401.

ステップS1312において、実績登録部1212は取得手段として機能し、QRコード230を撮影した撮像部212から、QRコード230の撮影画像を読み込み、QRコード230より識別情報を読み取ることで、識別情報を取得する。 In step S1312, the achievement registration unit 1212 functions as an acquisition unit, and acquires the identification information by reading the captured image of the QR code 230 from the imaging unit 212 that captured the QR code 230 and reading the identification information from the QR code 230.

ステップS1313において、実績登録部1212は、撮影したQRコード230より読み取った識別情報(管理番号、機器番号及び品名)を、出荷登録画面1400に表示する。図14に示すように、出荷登録画面1400には、読み取った識別情報を表示する識別情報表示欄1403が含まれる。なお、識別情報表示欄1403において、"作業工程"には、現在の作業工程(出荷作業が行われる作業工程)の1つ前の作業工程(発注作業が行われる作業工程)が表示される。 In step S1313, the performance registration unit 1212 displays the identification information (control number, equipment number, and item name) read from the captured QR code 230 on the shipment registration screen 1400. As shown in FIG. 14, the shipment registration screen 1400 includes an identification information display field 1403 that displays the read identification information. In the identification information display field 1403, the "work process" displays the work process (the work process where the ordering work is performed) that is one step before the current work process (the work process where the shipping work is performed).

出荷登録画面1400には、更に、識別情報表示欄1403に表示された識別情報を含む各種情報を、実績登録データとして、サーバ装置730に送信するための"登録"ボタン1404が含まれる。また、出荷登録画面1400には、識別情報表示欄1403に表示された情報をリセットするための"キャンセル"ボタン1405が含まれる。 The shipment registration screen 1400 further includes a "Register" button 1404 for sending various information, including the identification information displayed in the identification information display field 1403, to the server device 730 as performance registration data. The shipment registration screen 1400 also includes a "Cancel" button 1405 for resetting the information displayed in the identification information display field 1403.

ステップS1314において、部品業者110の社員761は、"登録"ボタン1404を押圧することで、登録指示を行う。 In step S1314, an employee 761 of the parts supplier 110 issues a registration instruction by pressing the "Register" button 1404.

ステップS1315において、実績登録部1212は送信手段として機能し、実績登録データをサーバ装置730に送信する。ステップS1315において送信される実績登録データには、
・識別情報表示欄1403に表示された識別情報(管理番号、機器番号、品名)、
・現在の作業工程(出荷)、
・現場名("AAA")
・担当者の"名前"("aaa")、
が含まれる。
In step S1315, the result registration unit 1212 functions as a transmission unit and transmits the result registration data to the server device 730. The result registration data transmitted in step S1315 includes the following:
- Identification information (control number, device number, product name) displayed in the identification information display field 1403,
- Current work process (shipment),
・Site name ("AAA")
- Name of person in charge ("aaa"),
Includes:

ステップS1316において、サーバ装置730の実績管理部1202は、受信した実績登録データを、実績登録データ格納部1206に格納する。 In step S1316, the performance management unit 1202 of the server device 730 stores the received performance registration data in the performance registration data storage unit 1206.

(2)受取完了登録処理(ステップS822)の詳細
次に、実績登録フェーズにおいて実行される受取完了登録処理(ステップS822)の詳細について説明する。図15は、実績登録フェーズにおいて実行される受取完了登録処理の流れを示すシーケンス図である。
(2) Details of the Receipt Completion Registration Process (Step S822) Next, details of the receipt completion registration process (step S822) executed in the result registration phase will be described. Fig. 15 is a sequence diagram showing the flow of the receipt completion registration process executed in the result registration phase.

なお、ステップS1501~ステップS1505までの処理は、図13のステップS1301~ステップS1305までの処理と同様であるため、ここでは説明を省略する。 Note that the processing from step S1501 to step S1505 is similar to the processing from step S1301 to step S1305 in FIG. 13, so a description thereof will be omitted here.

ステップS1507において、スマートフォン210_2のログイン部1211は、スマートフォン210_2に初期画面1540を表示する。初期画面1540には、受取完了登録処理、検査完了登録処理、試運転完了登録処理のいずれかの実行を指示する、「受取完了」ボタン1541、「検査完了」ボタン1542、「試運転完了」ボタン1543が含まれる。 In step S1507, the login unit 1211 of the smartphone 210_2 displays an initial screen 1540 on the smartphone 210_2. The initial screen 1540 includes a "Receipt Complete" button 1541, an "Inspection Complete" button 1542, and a "Test Run Complete" button 1543, which instruct the execution of any one of the receipt completion registration process, the inspection completion registration process, and the test run completion registration process.

ステップS1508において、システム納入業者120の社員753は、「受取完了」ボタン1541を選択する。ステップS1509において、スマートフォン210_2のログイン部1211は選択手段として機能し、「受取完了」ボタン1541が選択されたことを、実績登録部1212に通知する。 In step S1508, the employee 753 of the system supplier 120 selects the "Received" button 1541. In step S1509, the login unit 1211 of the smartphone 210_2 functions as a selection means and notifies the performance registration unit 1212 that the "Received" button 1541 has been selected.

ステップS1510において、実績登録部1212は、マスタデータ格納部1213を参照する。ステップS1511において、実績登録部1212は、受取完了登録処理に応じたマスタデータをマスタデータ格納部1213より読み出す。 In step S1510, the achievement registration unit 1212 refers to the master data storage unit 1213. In step S1511, the achievement registration unit 1212 reads out the master data corresponding to the receipt completion registration process from the master data storage unit 1213.

ステップS1512において、実績登録部1212は、スマートフォン210_2に受取完了登録画面を表示する。図16は、受取完了登録画面の一例を示す図である。以下、図16の受取完了登録画面1600を参照しながら、図15の受取完了登録処理についての説明を進める。 In step S1512, the achievement registration unit 1212 displays a receipt completion registration screen on the smartphone 210_2. FIG. 16 is a diagram showing an example of the receipt completion registration screen. Below, the receipt completion registration process in FIG. 15 will be explained with reference to the receipt completion registration screen 1600 in FIG. 16.

図16に示すように、受取完了登録画面1600には、現場名("AAA")及び担当者の"名前"("bbb")が表示される。また、受取完了登録画面1600には、RFIDリーダ220がRFID240より読み取った識別情報を表示するRFIDリーダ表示領域1601が含まれる。また、受取完了登録画面1600には、RFIDリーダ220に対する起動指示、出力指示を入力するための"起動"ボタン1602及び"出力"ボタン1603が含まれる。 As shown in FIG. 16, the receipt completion registration screen 1600 displays the site name ("AAA") and the "name" of the person in charge ("bbb"). The receipt completion registration screen 1600 also includes an RFID reader display area 1601 that displays the identification information read by the RFID reader 220 from the RFID 240. The receipt completion registration screen 1600 also includes a "start" button 1602 and an "output" button 1603 for inputting start instructions and output instructions to the RFID reader 220.

ステップS1513において、システム納入業者120の社員753は、"起動"ボタン1602を押圧し、RFIDリーダ220を起動する。また、システム納入業者120の社員753は、RFIDリーダ表示領域1601に識別情報を表示させた状態で、"出力"ボタン1603を押圧する。 In step S1513, the employee 753 of the system supplier 120 presses the "Start" button 1602 to start the RFID reader 220. The employee 753 of the system supplier 120 also presses the "Output" button 1603 with the identification information displayed in the RFID reader display area 1601.

ステップS1514において、スマートフォン210_2の実績登録部1212は取得手段として機能し、RFIDリーダ220によって読み取られた識別情報を読み込むことで、識別情報を取得する。 In step S1514, the track record registration unit 1212 of the smartphone 210_2 functions as an acquisition unit and acquires the identification information by reading the identification information read by the RFID reader 220.

ステップS1515において、スマートフォン210_2の実績登録部1212は、RFIDリーダ220によって読み取られた識別情報(管理番号、機器番号及び品名)を、受取完了登録画面1600に表示する。図16に示すように、受取完了登録画面1600には、読み取られた識別情報を表示する識別情報表示欄1605が含まれる。なお、識別情報表示欄1605において、"作業工程"には、現在の作業工程(受取作業が行われる作業工程)の1つ前の作業工程(出荷作業が行われる作業工程)が表示される。 In step S1515, the achievement registration unit 1212 of the smartphone 210_2 displays the identification information (control number, equipment number, and item name) read by the RFID reader 220 on the receipt completion registration screen 1600. As shown in FIG. 16, the receipt completion registration screen 1600 includes an identification information display field 1605 that displays the identification information that was read. In the identification information display field 1605, the "work process" displays the work process (the work process where the shipping work is performed) that is one step before the current work process (the work process where the receiving work is performed).

識別情報表示欄1605には、更に、システム納入業者120の社員753が、資機材を受け取った倉庫の"階"、"場所"を入力する項目が含まれる。識別情報表示欄1605の"階、""場所"には、受取完了登録処理に応じたマスタデータが表示される選択欄1604の中から、システム納入業者120の社員753によって選択された情報が表示される。 The identification information display field 1605 further includes an item in which the employee 753 of the system supplier 120 inputs the "floor" and "location" of the warehouse where the materials or equipment was received. The "floor" and "location" in the identification information display field 1605 display the information selected by the employee 753 of the system supplier 120 from the selection field 1604, which displays the master data corresponding to the receipt completion registration process.

受取完了登録画面1600には、更に、識別情報表示欄1605に表示された識別情報を含む各種情報を、実績登録データとして、サーバ装置730に送信するための"登録"ボタン1606が含まれる。受取完了登録画面1600には、識別情報表示欄1605に表示された情報をリセットするための"キャンセル"ボタン1607が含まれる。 The receipt completion registration screen 1600 further includes a "Register" button 1606 for sending various information, including the identification information displayed in the identification information display field 1605, to the server device 730 as performance registration data. The receipt completion registration screen 1600 also includes a "Cancel" button 1607 for resetting the information displayed in the identification information display field 1605.

ステップS1516において、システム納入業者120の社員753は、"登録"ボタン1606を押圧することで、登録指示を行う。 In step S1516, an employee 753 of the system supplier 120 issues a registration instruction by pressing the "Register" button 1606.

ステップS1517において、実績登録部1212は送信手段として機能し、実績登録データをサーバ装置730に送信する。ステップS1517において送信される実績登録データには、
・識別情報表示欄1605に表示された識別情報(管理番号、機器番号、品名)、
・現在の作業工程(受取)、
・現場名("AAA")
・担当者の"名前"("bbb")、
・資機材を受け取った倉庫の"階"、"場所"、
が含まれる。
In step S1517, the result registration unit 1212 functions as a transmission unit and transmits the result registration data to the server device 730. The result registration data transmitted in step S1517 includes the following:
- Identification information displayed in the identification information display field 1605 (control number, device number, product name),
- Current work process (receiving),
・Site name ("AAA")
- The name of the person in charge ("bbb"),
- The floor and location of the warehouse where the equipment was received,
Includes:

ステップS1518において、サーバ装置730の実績管理部1202は、受信した実績登録データを、実績登録データ格納部1206に格納する。 In step S1518, the performance management unit 1202 of the server device 730 stores the received performance registration data in the performance registration data storage unit 1206.

(3)仮置完了登録処理(ステップS823)の詳細
次に、実績登録フェーズにおいて実行される仮置完了登録処理(ステップS823)の詳細について説明する。図17は、実績登録フェーズにおいて実行される仮置完了登録処理の流れを示すシーケンス図である。
(3) Details of the Temporary Placement Completion Registration Process (Step S823) Next, details of the temporary placement completion registration process (step S823) executed in the actual result registration phase will be described. Fig. 17 is a sequence diagram showing the flow of the temporary placement completion registration process executed in the actual result registration phase.

なお、ステップS1701~ステップS1705までの処理は、図13のステップS1301~ステップS1305までの処理と同様であるため、ここでは説明を省略する。 Note that the processing from step S1701 to step S1705 is similar to the processing from step S1301 to step S1305 in FIG. 13, so a description thereof will be omitted here.

ステップS1707において、スマートフォン210_3のログイン部1211は、スマートフォン210_3に初期画面1740を表示する。初期画面1740には、仮置完了登録処理、取付完了登録処理のいずれかの実行を指示する、「仮置完了」ボタン1741、「取付完了」ボタン1742が含まれる。 In step S1707, the login unit 1211 of the smartphone 210_3 displays an initial screen 1740 on the smartphone 210_3. The initial screen 1740 includes a "Temporary Placement Complete" button 1741 and an "Installation Complete" button 1742 that instruct the execution of either the temporary placement completion registration process or the installation completion registration process.

ステップS1708において、工事業者130の社員771は、「仮置完了」ボタン1741を選択する。ステップS1709において、スマートフォン210_3のログイン部1211は選択手段として機能し、「仮置完了」ボタン1741が選択されたことを、実績登録部1212に通知する。 In step S1708, the employee 771 of the contractor 130 selects the "Temporary placement complete" button 1741. In step S1709, the login unit 1211 of the smartphone 210_3 functions as a selection means and notifies the performance registration unit 1212 that the "Temporary placement complete" button 1741 has been selected.

ステップS1710において、実績登録部1212は、マスタデータ格納部1213を参照する。ステップS1711において、実績登録部1212は、仮置完了登録処理に応じたマスタデータをマスタデータ格納部1213より読み出す。 In step S1710, the result registration unit 1212 refers to the master data storage unit 1213. In step S1711, the result registration unit 1212 reads out the master data corresponding to the provisional placement completion registration process from the master data storage unit 1213.

ステップS1712において、実績登録部1212は、スマートフォン210_3に仮置完了登録画面を表示する。図18は、仮置完了登録画面の一例を示す図である。以下、図18の仮置完了登録画面1800を参照しながら、図17の仮置完了登録処理についての説明を進める。 In step S1712, the result registration unit 1212 displays a temporary placement completion registration screen on the smartphone 210_3. FIG. 18 is a diagram showing an example of the temporary placement completion registration screen. Below, the temporary placement completion registration process in FIG. 17 will be described with reference to the temporary placement completion registration screen 1800 in FIG. 18.

図18に示すように、仮置完了登録画面1800には、現場名("AAA")及び担当者の"名前"("ccc")が表示される。また、仮置完了登録画面1800には、RFIDリーダ220がRFID240より読み取った識別情報を表示するRFIDリーダ表示領域1801が含まれる。また、仮置完了登録画面1800には、RFIDリーダ220に対する起動指示、出力指示を入力するための"起動"ボタン1802及び"出力"ボタン1803が含まれる。 As shown in FIG. 18, the temporary placement completion registration screen 1800 displays the site name ("AAA") and the "name" of the person in charge ("ccc"). The temporary placement completion registration screen 1800 also includes an RFID reader display area 1801 that displays the identification information read by the RFID reader 220 from the RFID 240. The temporary placement completion registration screen 1800 also includes a "Start" button 1802 and an "Output" button 1803 for inputting start instructions and output instructions to the RFID reader 220.

ステップS1713において、工事業者130の社員771は、"起動"ボタン1802を押圧し、RFIDリーダ220を起動する。また、工事業者130の社員771は、RFIDリーダ表示領域1801に識別情報を表示させた状態で、"出力"ボタン1803を押圧する。 In step S1713, the employee 771 of the construction company 130 presses the "Start" button 1802 to start the RFID reader 220. In addition, the employee 771 of the construction company 130 presses the "Output" button 1803 with the identification information displayed in the RFID reader display area 1801.

ステップS1714において、スマートフォン210_3の実績登録部1212は取得手段として機能し、RFIDリーダ220によって読み取られた識別情報を読み込むことで、識別情報を取得する。 In step S1714, the track record registration unit 1212 of the smartphone 210_3 functions as an acquisition unit and acquires the identification information by reading the identification information read by the RFID reader 220.

ステップS1715において、スマートフォン210_3の実績登録部1212は、RFIDリーダ220によって読み取られた識別情報(管理番号、機器番号及び品名)を、仮置完了登録画面1800に表示する。図18に示すように、仮置完了登録画面1800には、読み取られた識別情報を表示する識別情報表示欄1805が含まれる。なお、識別情報表示欄1805において、"作業工程"には、現在の作業工程(仮置作業が行われる作業工程)の1つ前の作業工程(受取作業が行われる作業工程)が表示される。 In step S1715, the result registration unit 1212 of the smartphone 210_3 displays the identification information (control number, equipment number, and item name) read by the RFID reader 220 on the temporary placement completion registration screen 1800. As shown in FIG. 18, the temporary placement completion registration screen 1800 includes an identification information display field 1805 that displays the read identification information. In the identification information display field 1805, the "work process" displays the work process (the work process where the receiving work is performed) that is one step before the current work process (the work process where the temporary placement work is performed).

識別情報表示欄1805には、更に、工事業者130の社員771が、資機材を仮置きした仮置き場の"階"、"場所"を入力する項目が含まれる。識別情報表示欄1805の"階"、"場所"には、仮置完了登録処理に応じたマスタデータが表示される選択欄1804の中から、工事業者130の社員771によって選択された情報が表示される。 The identification information display field 1805 further includes an item where the employee 771 of the contractor 130 inputs the "floor" and "location" of the temporary storage area where the materials and equipment are temporarily stored. The "floor" and "location" in the identification information display field 1805 display information selected by the employee 771 of the contractor 130 from the selection field 1804, which displays master data corresponding to the temporary storage completion registration process.

仮置完了登録画面1800には、更に、識別情報表示欄1805に表示された識別情報を含む各種情報を、実績登録データとして、サーバ装置730に送信するための"登録"ボタン1806が含まれる。仮置完了登録画面1800には、識別情報表示欄1805に表示された情報をリセットするための"キャンセル"ボタン1807が含まれる。 The provisional placement completion registration screen 1800 further includes a "Register" button 1806 for sending various information, including the identification information displayed in the identification information display field 1805, to the server device 730 as actual registration data. The provisional placement completion registration screen 1800 also includes a "Cancel" button 1807 for resetting the information displayed in the identification information display field 1805.

ステップS1716において、工事業者130の社員771は、"登録"ボタン1806を押圧することで、登録指示を行う。 In step S1716, an employee 771 of the construction company 130 issues a registration instruction by pressing the "Register" button 1806.

ステップS1717において、実績登録部1212は送信手段として機能し、実績登録データをサーバ装置730に送信する。ステップS1717において送信される実績登録データには、
・識別情報表示欄1805に表示された識別情報(管理番号、機器番号、品名)、
・現在の作業工程(仮置)、
・現場名("AAA")
・担当者の"名前"("ccc")、
・資機材を仮置きした仮置き場の"階"、"場所"、
が含まれる。
In step S1717, the result registration unit 1212 functions as a transmission unit and transmits the result registration data to the server device 730. The result registration data transmitted in step S1717 includes the following:
- Identification information displayed in the identification information display field 1805 (control number, device number, product name),
- Current work process (temporary),
・Site name ("AAA")
- The name of the person in charge ("ccc"),
- The "floor" and "location" of the temporary storage area where the equipment and materials are temporarily stored,
Includes:

ステップS1718において、サーバ装置730の実績管理部1202は、受信した実績登録データを、実績登録データ格納部1206に格納する。 In step S1718, the performance management unit 1202 of the server device 730 stores the received performance registration data in the performance registration data storage unit 1206.

(4)取付完了登録処理(ステップS824)の詳細
次に、実績登録フェーズにおいて実行される取付完了登録処理(ステップS824)の詳細について説明する。なお、実績登録フェーズにおいて実行される取付完了登録処理の流れは、図17を用いて説明した仮置完了登録処理の流れと概ね同じであるため、ここでは、登録画面の違いについて説明する。
(4) Details of the installation completion registration process (step S824) Next, details of the installation completion registration process (step S824) executed in the performance registration phase will be described. Note that the flow of the installation completion registration process executed in the performance registration phase is generally the same as the flow of the temporary placement completion registration process described using FIG. 17, so here, differences in the registration screen will be described.

図19は、取付完了登録画面の一例を示す図である。図19に示すように、取付完了登録画面1900には、現場名("AAA")及び担当者の"名前"("ccc")が表示される。また、取付完了登録画面1900には、QRコードを撮影する際の撮影画像を表示するQRコード撮影画像表示領域1901と、撮像部212に対する撮影指示を入力するための"撮影"ボタン1902とが含まれる。 Figure 19 is a diagram showing an example of an installation completion registration screen. As shown in Figure 19, the installation completion registration screen 1900 displays the site name ("AAA") and the "name" of the person in charge ("ccc"). The installation completion registration screen 1900 also includes a QR code captured image display area 1901 that displays the captured image when capturing the QR code, and a "Capture" button 1902 for inputting a capture instruction to the imaging unit 212.

また、図19に示すように、取付完了登録画面1900には、読み取った識別情報を表示する識別情報表示欄1904が含まれる。なお、識別情報表示欄1904において、"作業工程"には、現在の作業工程(取付作業が行われる作業工程)の1つ前の作業工程(仮置作業が行われる作業工程)が表示される。 As shown in FIG. 19, the installation completion registration screen 1900 includes an identification information display field 1904 that displays the read identification information. In the identification information display field 1904, the "work process" displays the work process (the work process where temporary placement work is performed) that is one step before the current work process (the work process where installation work is performed).

識別情報表示欄1904には、更に、工事業者130の社員771が、資機材を取り付けた現場の"階"、"場所"を入力する項目が含まれる。識別情報表示欄1904の"階"、"場所"には、取付完了登録処理に応じたマスタデータが表示される選択欄1903の中から、工事業者130の社員771によって選択された情報が表示される。 The identification information display field 1904 further includes an item where the employee 771 of the contractor 130 inputs the "floor" and "location" of the site where the equipment or materials were installed. The "floor" and "location" in the identification information display field 1904 display information selected by the employee 771 of the contractor 130 from the selection field 1903, which displays master data corresponding to the installation completion registration process.

取付完了登録画面1900には、更に、識別情報表示欄1904に表示された識別情報を含む各種情報を、実績登録データとして、サーバ装置730に送信するための"登録"ボタン1905が含まれる。取付完了登録画面1900には、識別情報表示欄1904に表示された情報をリセットするための"キャンセル"ボタン1906が含まれる。 The installation completion registration screen 1900 further includes a "Register" button 1905 for sending various information, including the identification information displayed in the identification information display field 1904, to the server device 730 as performance registration data. The installation completion registration screen 1900 includes a "Cancel" button 1906 for resetting the information displayed in the identification information display field 1904.

(5)検査完了登録処理(ステップS825)の詳細
次に、実績登録フェーズにおいて実行される検査完了登録処理(ステップS825)の詳細について説明する。なお、実績登録フェーズにおいて実行される検査完了登録処理の流れは、図15を用いて説明した受取完了登録処理の流れと概ね同じであるため、ここでは、登録画面の違いについて説明する。
(5) Details of the Examination Completion Registration Process (Step S825) Next, details of the examination completion registration process (step S825) executed in the result registration phase will be described. Note that the flow of the examination completion registration process executed in the result registration phase is almost the same as the flow of the receipt completion registration process described using FIG. 15, so here, differences in the registration screen will be described.

図20は、検査完了登録画面の一例を示す図である。図20に示すように、検査完了登録画面2000には、現場名("AAA")及び担当者の"名前"("bbb")が表示される。また、検査完了登録画面2000には、QRコードを撮影する際の撮影画像を表示するQRコード撮影画像表示領域2001と、撮像部212に対する撮影指示を入力するための"撮影"ボタン2002とが含まれる。 Figure 20 is a diagram showing an example of an inspection completion registration screen. As shown in Figure 20, the inspection completion registration screen 2000 displays the site name ("AAA") and the "name" of the person in charge ("bbb"). The inspection completion registration screen 2000 also includes a QR code captured image display area 2001 that displays the captured image when capturing the QR code, and a "Capture" button 2002 for inputting a capture instruction to the imaging unit 212.

また、図20に示すように、検査完了登録画面2000には、読み取った識別情報を表示する識別情報表示欄2004が含まれる。なお、識別情報表示欄2004において、"作業工程"には、現在の作業工程(検査作業が行われる作業工程)の1つ前の作業工程(取付作業が行われる作業工程)が表示される。 As shown in FIG. 20, the inspection completion registration screen 2000 includes an identification information display field 2004 that displays the read identification information. In the identification information display field 2004, the "work process" displays the work process (the work process where the installation work is performed) that is one step before the current work process (the work process where the inspection work is performed).

識別情報表示欄2004には、更に、システム納入業者120の社員753が検査した資機材が取り付けられている現場の"階"、"場所"を入力する項目が含まれる。識別情報表示欄2004の"階"、"場所"には、検査完了登録処理に応じたマスタデータが表示される選択欄2003の中から、システム納入業者120の社員753によって選択された情報が表示される。 The identification information display field 2004 further includes an item for inputting the "floor" and "location" of the site where the equipment inspected by the employee 753 of the system supplier 120 is installed. The "floor" and "location" in the identification information display field 2004 display information selected by the employee 753 of the system supplier 120 from the selection field 2003, which displays master data corresponding to the inspection completion registration process.

検査完了登録画面2000には、更に、識別情報表示欄2004に表示された識別情報を含む各種情報を、実績登録データとして、サーバ装置730に送信するための"登録"ボタン2005が含まれる。検査完了登録画面2000には、識別情報表示欄2004に表示された情報をリセットするための"キャンセル"ボタン2006が含まれる。 The inspection completion registration screen 2000 further includes a "Register" button 2005 for sending various information, including the identification information displayed in the identification information display field 2004, to the server device 730 as performance registration data. The inspection completion registration screen 2000 includes a "Cancel" button 2006 for resetting the information displayed in the identification information display field 2004.

(6)試運転完了登録処理(ステップS826)の詳細
次に、実績登録フェーズにおいて実行される試運転完了登録処理(ステップS826)の詳細について説明する。なお、実績登録フェーズにおいて実行される試運転完了登録処理の流れも、図15を用いて説明した受取完了登録処理の流れと概ね同じであるため、ここでは、登録画面の違いについて説明する。
(6) Details of the Trial Run Completion Registration Process (Step S826) Next, details of the trial run completion registration process (step S826) executed in the performance record registration phase will be described. Note that the flow of the trial run completion registration process executed in the performance record registration phase is also generally the same as the flow of the receipt completion registration process described using FIG. 15, so here, differences in the registration screen will be described.

図21は、試運転完了登録画面の一例を示す図である。図21に示すように、試運転完了登録画面2100には、現場名("AAA")及び担当者の"名前"("bbb")が表示される。また、検査完了登録画面2000には、QRコードを撮影する際の撮影画像を表示するQRコード撮影画像表示領域2101と、撮像部212に対する撮影指示を入力するための"撮影"ボタン2102とが含まれる。 Figure 21 is a diagram showing an example of a trial run completion registration screen. As shown in Figure 21, the trial run completion registration screen 2100 displays the site name ("AAA") and the "name" of the person in charge ("bbb"). The inspection completion registration screen 2000 also includes a QR code captured image display area 2101 that displays the captured image when capturing the QR code, and a "Capture" button 2102 for inputting a capture instruction to the imaging unit 212.

また、図21に示すように、試運転完了登録画面2100には、読み取った識別情報を表示する識別情報表示欄2104が含まれる。なお、識別情報表示欄2104において、"作業工程"には、現在の作業工程(試運転作業が行われる作業工程)の1つ前の作業工程(検査作業が行われる作業工程)が表示される。 As shown in FIG. 21, the trial run completion registration screen 2100 includes an identification information display field 2104 that displays the read identification information. In the identification information display field 2104, the "work process" displays the work process (the work process where the inspection work is performed) that is one step before the current work process (the work process where the trial run work is performed).

識別情報表示欄2104には、更に、システム納入業者120の社員753が、試運転を行った資機材が取り付けられている現場の"階"、"場所"を入力する項目が含まれる。識別情報表示欄2104の"階"、"場所"には、試運転登録処理に応じたマスタデータが表示される選択欄2103の中から、システム納入業者120の社員753によって選択された情報が表示される。 The identification information display field 2104 further includes an item in which the employee 753 of the system supplier 120 inputs the "floor" and "location" of the site where the equipment that has been test run is installed. The "floor" and "location" in the identification information display field 2104 display information selected by the employee 753 of the system supplier 120 from the selection field 2103, which displays the master data corresponding to the test run registration process.

試運転完了登録画面2100には、更に、識別情報表示欄2104に表示された識別情報を含む各種情報を、実績登録データとして、サーバ装置730に送信するための"登録"ボタン2105が含まれる。検査完了登録画面2000には、識別情報表示欄2104に表示された情報をリセットするための"キャンセル"ボタン2106が含まれる。 The trial run completion registration screen 2100 further includes a "Register" button 2105 for sending various information, including the identification information displayed in the identification information display field 2104, to the server device 730 as performance registration data. The inspection completion registration screen 2000 includes a "Cancel" button 2106 for resetting the information displayed in the identification information display field 2104.

<実績登録データの具体例>
次に、サーバ装置730の実績管理部1202によって、実績登録データ格納部1206に格納される実績登録データの具体例について説明する。図22は、サーバ装置に格納される実績登録データの一例を示す図である。
<Examples of performance registration data>
Next, a specific example of the result registration data stored in the result registration data storage unit 1206 by the result management unit 1202 of the server device 730 will be described. Fig. 22 is a diagram showing an example of the result registration data stored in the server device.

図22に示すように、サーバ装置730の実績管理部1202は、スマートフォン210から送信された実績登録データを、現場名、管理番号ごとに、分けて格納する。図22は、実績登録データ2201~2203は、現場名="AAA"で、管理番号="A-123"、"B-456"、"C-789"の実績登録データをそれぞれ示している。 As shown in FIG. 22, the performance management unit 1202 of the server device 730 stores the performance registration data sent from the smartphone 210 separately for each site name and management number. In FIG. 22, performance registration data 2201 to 2203 respectively show performance registration data for the site name = "AAA" and management numbers = "A-123", "B-456", and "C-789".

図22に示すように、実績登録データ2201には、情報の項目として、"処理日時"、"作業工程"、"場所"、"階"、"判定"、"備考"、"担当者"が含まれる。 As shown in FIG. 22, the performance registration data 2201 includes the following information items: "Processing date and time," "Work process," "Location," "Floor," "Judgment," "Notes," and "Person in charge."

"処理日時"には、登録処理が実行された日時が格納される。"作業工程"には、対応する処理日時にスマートフォン210から送信された実績登録データに含まれる"作業工程"が格納される。"場所"、"階"には、対応する登録処理において、スマートフォン210から送信された実績登録データに含まれる"場所"、"階"が格納される。 The "processing date and time" stores the date and time when the registration process was performed. The "work process" stores the "work process" included in the performance registration data sent from the smartphone 210 at the corresponding processing date and time. The "location" and "floor" stores the "location" and "floor" included in the performance registration data sent from the smartphone 210 during the corresponding registration process.

"判定"には、対応する登録処理が検査完了登録処理または試運転完了登録処理であった場合に、検査結果または試運転結果が格納される。 "Judgment" stores the inspection result or test run result if the corresponding registration process is an inspection completion registration process or a test run completion registration process.

"担当者"には、対応する登録処理において、スマートフォン210から送信された実績登録データに含まれる担当者の"名前"が格納される。 "Person in charge" stores the "name" of the person in charge contained in the performance registration data sent from the smartphone 210 during the corresponding registration process.

<サーバ装置による閲覧処理>
次に、サーバ装置730による閲覧処理(ステップS827)の詳細について説明する。図23は、サーバ装置による閲覧処理の流れを示すフローチャートである。
<Browse process by server device>
Next, the browsing process (step S827) by the server device 730 will be described in detail. Fig. 23 is a flowchart showing the flow of the browsing process by the server device.

操作端末720から、"現場名"が指定された閲覧要求が送信されると、サーバ装置730は、図23に示す閲覧処理を開始する。 When a viewing request specifying the "site name" is sent from the operation terminal 720, the server device 730 starts the viewing process shown in FIG. 23.

ステップS2301において、表示制御部1203は、送信された閲覧要求を受け付ける。ステップS2302において、表示制御部1203は、実績登録データ格納部1206を参照し、閲覧要求に含まれる"現場名"に対応する1の実績登録データを読み出す。 In step S2301, the display control unit 1203 accepts the transmitted viewing request. In step S2302, the display control unit 1203 refers to the performance registration data storage unit 1206 and reads out one performance registration data item that corresponds to the "site name" included in the viewing request.

ステップS2303において、表示制御部1203は、読み出した実績登録データの"管理番号"に格納された管理番号を読み出す。 In step S2303, the display control unit 1203 reads out the management number stored in the "management number" of the read performance registration data.

ステップS2304において、表示制御部1203は、読み出した実績登録データの"作業工程"に格納された異なる作業工程のうち、処理日時が最新の作業工程を読み出す。 In step S2304, the display control unit 1203 reads out the work process with the latest processing date and time from among the different work processes stored in the "work process" of the read performance registration data.

ステップS2305において、表示制御部1203は、ステップS2304において読み出した作業工程に対応する、"場所"、"階"、"判定"、"担当者"、"処理日時"を読み出す。 In step S2305, the display control unit 1203 reads out the "location," "floor," "judgment," "person in charge," and "processing date and time" corresponding to the work process read out in step S2304.

ステップS2306において、表示制御部1203は、実績登録データ格納部1206に格納された全ての実績登録データについて、ステップS2303からS2305の処理を実行したか否かを判定する。なお、ここでいう全ての実績登録データとは、閲覧要求に含まれる"現場名"に対応する全ての実績登録データである。 In step S2306, the display control unit 1203 determines whether or not the processing of steps S2303 to S2305 has been executed for all the performance registration data stored in the performance registration data storage unit 1206. Note that all the performance registration data here refers to all the performance registration data that corresponds to the "site name" included in the viewing request.

ステップS2306において、処理を実行していない実績登録データがあると判定した場合には(ステップS2306においてNoの場合には)、ステップS2302に戻る。一方、ステップS2306において、全ての実績登録データについて処理を実行したと判定した場合には(ステップS2306においてYesの場合には)、ステップS2307に進む。 If it is determined in step S2306 that there is performance registration data for which processing has not been performed (if No in step S2306), the process returns to step S2302. On the other hand, if it is determined in step S2306 that processing has been performed for all performance registration data (if Yes in step S2306), the process proceeds to step S2307.

ステップS2307において、表示制御部1203は、ステップS2303~ステップS2305において、管理番号、作業工程、場所、階、判定、担当者、処理日時が読み出された実績登録データを、管理番号順に並び替える。 In step S2307, the display control unit 1203 sorts the performance registration data, for which the management number, work process, location, floor, judgment, person in charge, and processing date and time were read in steps S2303 to S2305, in order of management number.

ステップS2308において、表示制御部1203は、管理番号順に並び替えられた実績登録データについて、一覧画面を生成し、操作端末720に一覧画面を送信する。 In step S2308, the display control unit 1203 generates a list screen for the performance registration data sorted in management number order, and transmits the list screen to the operation terminal 720.

ステップS2309において、表示制御部1203は、操作端末720より"現場名"及び"管理番号"が指定された履歴画面表示要求を受信したか否かを判定する。ステップS2309において、履歴画面表示要求を受信していないと判定した場合には(ステップS2309においてNoの場合には)、ステップS2311に進む。 In step S2309, the display control unit 1203 determines whether or not a history screen display request in which a "site name" and a "management number" are specified has been received from the operation terminal 720. If it is determined in step S2309 that a history screen display request has not been received (No in step S2309), the process proceeds to step S2311.

一方、ステップS2309において、履歴画面表示要求を受信したと判定した場合には(ステップS2309においてYesの場合には)、ステップS2310に進む。ステップS2310において、表示制御部1203は、履歴画面表示処理(詳細は後述)を実行する。 On the other hand, if it is determined in step S2309 that a history screen display request has been received (Yes in step S2309), the process proceeds to step S2310. In step S2310, the display control unit 1203 executes a history screen display process (described in detail below).

ステップS2311において、表示制御部1203は、閲覧処理を終了するか否かを判定する。ステップS2311において、閲覧処理を終了しないと判定した場合には(ステップS2311においてNoの場合には)、ステップS2309に戻る。 In step S2311, the display control unit 1203 determines whether or not to end the viewing process. If it is determined in step S2311 that the viewing process is not to be ended (No in step S2311), the process returns to step S2309.

一方、ステップS2311において、閲覧処理を終了すると判定した場合には(ステップS2311においてYesの場合には)、閲覧処理を終了する。 On the other hand, if it is determined in step S2311 that the viewing process is to be terminated (Yes in step S2311), the viewing process is terminated.

<履歴画面表示処理の流れ>
次に、サーバ装置730の表示制御部1203による履歴画面表示処理(ステップS2310)の詳細について説明する。図24は、履歴画面表示処理の流れを示すフローチャートである。
<History screen display process flow>
Next, a detailed description will be given of the history screen display process (step S2310) performed by the display control unit 1203 of the server device 730. Fig. 24 is a flowchart showing the flow of the history screen display process.

ステップS2401において、表示制御部1203は、履歴画面表示要求に含まれる現場名及び管理番号を認識する。ステップS2402において、表示制御部1203は、認識した現場名及び管理番号に対応する実績登録データを、実績登録データ格納部1206より読み出す。 In step S2401, the display control unit 1203 recognizes the site name and management number included in the history screen display request. In step S2402, the display control unit 1203 reads the performance registration data corresponding to the recognized site name and management number from the performance registration data storage unit 1206.

ステップS2403において、表示制御部1203は、読み出した実績登録データに基づいて、履歴画面を生成し、操作端末720に送信する。 In step S2403, the display control unit 1203 generates a history screen based on the retrieved performance registration data and transmits it to the operation terminal 720.

<一覧画面及び履歴画面の具体例>
次に、閲覧処理(図23)において操作端末720に送信される一覧画面、及び、履歴画面表示処理(図24)において操作端末720に送信される履歴画面の具体例について説明する。
<Examples of list screen and history screen>
Next, a specific example of a list screen transmitted to the operation terminal 720 in the browsing process (FIG. 23) and a history screen transmitted to the operation terminal 720 in the history screen display process (FIG. 24) will be described.

図25は、一覧画面の具体例を示す図である。図25に示すように、一覧画面2500には、現場名("AAA")が含まれる。また、一覧画面2500には、情報の項目として、"管理番号"、"作業工程"、"場所"、"階"、"担当者"、"検査"、"日時"が含まれる。なお、各項目には、図23のステップS2303~S2305において読み出された情報が表示される。 Figure 25 is a diagram showing a specific example of a list screen. As shown in Figure 25, list screen 2500 includes the site name ("AAA"). List screen 2500 also includes information items such as "control number", "work process", "location", "floor", "person in charge", "inspection", and "date and time". Each item displays the information read out in steps S2303 to S2305 of Figure 23.

このように、システム納入業者120の社員752は、操作端末720を介してサーバ装置730にアクセスすることで、各資機材がいずれの作業工程にあるのかを、容易に把握することができる。 In this way, an employee 752 of the system supplier 120 can easily ascertain which work process each piece of equipment or material is in by accessing the server device 730 via the operation terminal 720.

一覧画面2500には、更に、履歴画面表示要求を送信するための"履歴"ボタン2511が含まれる。システム納入業者120の社員752によって、"履歴"ボタン2511が押圧されることで、操作端末720は、現場名及び管理番号を指定した履歴画面表示要求を生成し、サーバ装置730に送信する。 The list screen 2500 further includes a "History" button 2511 for sending a request to display the history screen. When the "History" button 2511 is pressed by an employee 752 of the system supplier 120, the operation terminal 720 generates a request to display the history screen specifying the site name and management number, and sends the request to the server device 730.

なお、図25の例では、"履歴"ボタン2511が押圧されると、現場名="AAA"、管理番号="A-123"を含む履歴画面表示要求が生成され、サーバ装置730に送信される。 In the example of FIG. 25, when the "History" button 2511 is pressed, a history screen display request including the site name = "AAA" and the management number = "A-123" is generated and transmitted to the server device 730.

図26は、履歴画面の具体例を示す図である。図26に示すように、履歴画面2600には、履歴画面表示要求に含まれる現場名、管理番号を有する、実績登録データ2201が表示される。図26の例は、現場名="AAA"、管理番号="A-123"を有する、実績登録データが表示されたことを示している。 Figure 26 is a diagram showing a specific example of a history screen. As shown in Figure 26, a history screen 2600 displays actual result registration data 2201 having the site name and management number included in the history screen display request. The example in Figure 26 shows that actual result registration data having the site name = "AAA" and management number = "A-123" is displayed.

<まとめ>
以上の説明から明らかなように、本実施形態における実績登録アプリケーションは、
・資機材を、所定の建築設備に取り付け、該建築設備の一部として機能させるまでの複数の作業工程のうち、1の作業工程を選択することで、該作業工程に応じた登録画面を表示する。
・登録画面が表示された状態で、資機材に貼り付けられたQRコードまたはRFIDより識別情報を読み取り、読み取った識別情報を作業工程を示す情報と対応付けてサーバ装置に送信する。
<Summary>
As is clear from the above description, the result registration application in this embodiment:
- By selecting one of the multiple work processes from attaching equipment or materials to a specified building facility to having it function as part of that building facility, a registration screen corresponding to that work process is displayed.
With the registration screen displayed, identification information is read from the QR code or RFID attached to the equipment or material, and the read identification information is associated with information indicating the work process and transmitted to the server device.

これにより、各作業工程の実行主体は、当該実績登録アプリケーションを用いることで、各資機材がいずれの作業工程にあるのかを管理するために必要となる情報を、簡単な操作のみでサーバ装置に送信することが可能となる。 As a result, the entity carrying out each work process can use the performance registration application to send the information required to manage which work process each piece of equipment or material is in to the server device with just a few simple operations.

また、本実施形態におけるサーバ装置は、
・実績登録アプリケーションを実行する携帯端末と通信し、該携帯端末において取得された資機材を識別する識別情報と、作業工程を示す情報とを受信する。
・1の識別情報に対して受信した、複数の作業工程を示す情報のうち、受信したタイミングが最も遅い情報(つまり、現在の作業工程を示す情報)を、識別情報と対応付けて表示するよう制御する。
In addition, the server device in this embodiment
The system communicates with a mobile terminal executing a performance registration application, and receives identification information for identifying the equipment and materials acquired by the mobile terminal, and information indicating the work process.
- Among the information indicating multiple work processes received for one identification information, the information received latest (i.e., the information indicating the current work process) is controlled to be displayed in association with the identification information.

これにより、建築設備を納入するシステム納入業者は、サーバ装置にアクセスすることで、各資機材が現在いずれの作業工程にあるのかを、容易に把握することができる。 This allows system suppliers who deliver construction equipment to easily understand which work process each piece of equipment is currently in by accessing the server device.

また、本実施形態におけるRFIDは、
・本体部とアンテナ部とを有し、資機材の外面のうち、建築設備に取り付けた場合に露出する位置に取り付けられる。
・本体部を資機材の外面に貼り付けた状態で、アンテナ部が資機材の外面に非接触となるように、本体部の貼り付け位置を決定することで、資機材に貼り付けられる。
In addition, the RFID in this embodiment is
- It has a main body and an antenna, and is attached to the outer surface of the equipment in a position that will be exposed when attached to the building facility.
The main body can be attached to the equipment by determining the attachment position of the main body so that the antenna unit is not in contact with the outer surface of the equipment when the main body is attached to the outer surface of the equipment.

これにより、各作業工程の実行主体が、RFIDリーダを介してRFIDより識別情報を読み取る際に、確実に読み取ることができる。 This allows the person performing each work process to read the identification information from the RFID using an RFID reader with confidence.

この結果、本実施形態によれば、建築設備に用いられる資機材を管理する際の管理負荷を低減させることができる。 As a result, this embodiment can reduce the management burden when managing materials and equipment used in construction facilities.

[第2の実施形態]
上記第1の実施形態では、事前準備フェーズにおいて、スマートフォン210_1~210_3がサーバ装置730からマスタデータ930を取得するものとして説明した。しかしながら、マスタデータ930の取得タイミングはこれに限定されず、実績登録フェーズにおいて、スマートフォン210_1~210_3がサーバ装置730からマスタデータ930を取得するように構成してもよい。
Second Embodiment
In the above first embodiment, in the advance preparation phase, the smartphones 210_1 to 210_3 are described as acquiring the master data 930 from the server device 730. However, the timing of acquiring the master data 930 is not limited to this, and the smartphones 210_1 to 210_3 may be configured to acquire the master data 930 from the server device 730 in the achievement registration phase.

また、マスタデータ930を取得するためのマスタデータ要求は、例えば、所定周期ごとに自動で送信されるように構成してもよい。これにより、スマートフォン210_1~210_3は、最新のマスタデータ930を取得することができる。 The master data request for acquiring the master data 930 may be configured to be automatically transmitted at a predetermined interval, for example. This allows the smartphones 210_1 to 210_3 to acquire the latest master data 930.

また、上記第1の実施形態では、ユーザ一覧データ920をサーバ装置730が有し、実績登録アプリケーション211起動時の認証処理を、サーバ装置730が実行するものとして説明した。しかしながら、ユーザ一覧データ920をスマートフォン210に送信し、実績登録アプリケーション211起動時の認証処理を、スマートフォン210において実行するように構成してもよい。 In the above first embodiment, the user list data 920 is stored in the server device 730, and the authentication process when the achievement registration application 211 is started is executed by the server device 730. However, the user list data 920 may be transmitted to the smartphone 210, and the authentication process when the achievement registration application 211 is started may be executed by the smartphone 210.

これにより、実績登録フェーズにおける、スマートフォン210とサーバ装置730との間の通信回数を減らすことが可能となる。建築設備を納入する現場の場合、通信環境が整っていないことも多いことから、実績登録フェーズにおける、スマートフォン210とサーバ装置730との間の通信回数を減らすことで、管理システム700の利便性を向上させることができる。 This makes it possible to reduce the number of communications between the smartphone 210 and the server device 730 during the performance registration phase. Since the communication environment is often not in place at construction sites where construction equipment is delivered, reducing the number of communications between the smartphone 210 and the server device 730 during the performance registration phase can improve the convenience of the management system 700.

[第3の実施形態]
上記第1の実施形態では、各作業工程の実行主体を3つに大別し、それぞれの実行主体に、各作業工程を割り当てる構成としたが、各作業工程の実行主体は3つに限定されず、4つ以上であってもよい。なお、管理システム700において、スマートフォンの台数及び実績登録アプリケーションの種類は、実行主体の数に応じて決定されるものとする。
[Third embodiment]
In the first embodiment, the execution entities of each work process are roughly divided into three, and each work process is assigned to each execution entity, but the execution entities of each work process are not limited to three, and may be four or more. Note that in the management system 700, the number of smartphones and the type of achievement registration application are determined according to the number of execution entities.

また、上記第1の実施形態では、システム納入業者が受取作業と検査作業と試運転作業とを行い、工事業者が仮置作業と取付作業とを行うものとして説明した。しかしながら、各作業工程の作業の割り当てはこれに限定されない。なお、各実行主体への各作業工程の作業の割り当て結果に応じて、実績登録アプリケーションにおいて選択可能な作業工程が決定されるものとする。同様に、各実行主体への各作業工程の作業の割り当て結果に応じて、各スマートフォンに送信されるマスタデータが決定されるものとする。 In the above first embodiment, it has been described that the system supplier performs the receiving work, the inspection work, and the trial operation work, and the construction company performs the temporary placement work and the installation work. However, the allocation of work for each work process is not limited to this. Note that the work processes that can be selected in the track record registration application are determined according to the results of the allocation of work for each work process to each execution entity. Similarly, the master data to be sent to each smartphone is determined according to the results of the allocation of work for each work process to each execution entity.

[その他の実施形態]
上記第1の実施形態では、識別部材として、RFIDを用いるものとして説明したが、識別部材は、近距離無線通信が可能な部材であれば、RFID以外の部材であってもよい。
[Other embodiments]
In the above first embodiment, an RFID is used as the identification member. However, the identification member may be a member other than an RFID as long as it is capable of short-range wireless communication.

同様に、上記第1の実施形態では、識別部材として、QRコードを用いるものとして説明したが、識別部材は、QRコード以外の識別子であってもよい。 Similarly, in the first embodiment, a QR code is used as the identification member, but the identification member may be an identifier other than a QR code.

また、上記第1の実施形態では、出荷登録処理、取付完了登録処理、検査完了登録処理、試運転完了登録処理を実行する場合に、QRコードより識別情報を読み取るものとして説明した。また、受取完了登録処理、仮置完了登録処理を実行する場合に、RFIDより識別情報を読み取るものとして説明した。しかしながら、いずれの登録処理において、いずれの読取手段を介して識別部材より識別情報を読み取るように構成するかは任意である。 In the above first embodiment, it has been described that when executing the shipping registration process, the installation completion registration process, the inspection completion registration process, and the test run completion registration process, the identification information is read from the QR code. Also, when executing the receipt completion registration process and the temporary placement completion registration process, the identification information is read from the RFID. However, it is optional as to which reading means is used to read the identification information from the identification member in which registration process.

また、上記第1の実施形態では、アンテナ部320の一方の面に緩衝材510を取り付けるものとして説明した。しかしながら、緩衝材510の取り付け位置はこれに限定されず、アンテナ部320を形成する領域と、資機材250の外面との間の位置であれば、任意の位置に取り付けてもよい。 In the above first embodiment, the cushioning material 510 is described as being attached to one side of the antenna unit 320. However, the attachment position of the cushioning material 510 is not limited to this, and the cushioning material 510 may be attached at any position between the area forming the antenna unit 320 and the outer surface of the equipment 250.

なお、上記実施形態に挙げた構成等に、その他の要素との組み合わせなど、ここで示した構成に本発明が限定されるものではない。これらの点に関しては、本発明の趣旨を逸脱しない範囲で変更することが可能であり、その応用形態に応じて適切に定めることができる。 The present invention is not limited to the configurations shown here, including combinations of the configurations and other elements in the above-mentioned embodiments. These points can be changed without departing from the spirit of the present invention, and can be determined appropriately according to the application form.

210 :スマートフォン
220 :RFIDリーダ
230 :QRコード
240 :RFID
250 :資機材
310 :本体部
320 :アンテナ部
510 :緩衝材
710 :BIMシステム
720 :操作端末
730 :サーバ装置
910 :資機材一覧データ
920 :ユーザ一覧データ
930 :マスタデータ
1000 :BIMデータ
1201 :認証部
1202 :実績管理部
1203 :表示制御部
1204 :生成部
1211 :ログイン部
1212 :実績登録部
1400 :出荷登録画面
1600 :受取完了登録画面
1800 :仮置完了登録画面
1900 :取付完了登録画面
2000 :検査完了登録画面
2100 :試運転完了登録画面
2201~2203 :実績登録データ
2500 :一覧画面
2600 :履歴画面
210: Smartphone 220: RFID reader 230: QR code 240: RFID
250: Equipment and materials 310: Main body 320: Antenna 510: Cushioning material 710: BIM system 720: Operation terminal 730: Server device 910: Equipment and materials list data 920: User list data 930: Master data 1000: BIM data 1201: Authentication unit 1202: Results management unit 1203: Display control unit 1204: Generation unit 1211: Login unit 1212: Results registration unit 1400: Shipment registration screen 1600: Receipt completion registration screen 1800: Temporary placement completion registration screen 1900: Installation completion registration screen 2000: Inspection completion registration screen 2100: Trial run completion registration screen 2201 to 2203: Results registration data 2500: List screen 2600 : History screen

Claims (6)

携帯端末と通信するサーバ装置であって、
資機材の配置を示す3次元建物情報モデルを格納する格納部と、
前記資機材に貼り付けられた識別部材より、前記資機材を識別するための識別情報を取得した前記携帯端末から、前記識別情報と前記資機材の作業工程とを含む実績登録データを受信する受信部と、
前記実績登録データに基づいて、前記3次元建物情報モデル内の資機材の作業工程を特定し、特定した資機材の作業工程の情報を、前記3次元建物情報モデル内の資機材の属性情報に反映する登録部と
を有するサーバ装置。
A server device that communicates with a mobile terminal,
a storage unit for storing a three-dimensional building information model showing the arrangement of materials and equipment;
a receiving unit that receives, from the mobile terminal that has acquired identification information for identifying the equipment or materials from an identification member affixed to the equipment or materials, performance registration data including the identification information and a work process of the equipment or materials;
and a registration unit that identifies a work process for equipment and materials in the three-dimensional building information model based on the performance registration data, and reflects information on the identified work process for the equipment and materials in attribute information of the equipment and materials in the three-dimensional building information model.
前記登録部は、
前記携帯端末によって取付完了登録処理が実行されることで、前記識別情報と前記資機材の取付完了とを含む実績登録データが受信された場合に、前記実績登録データに基づいて特定される資機材の取付完了の情報を、前記3次元建物情報モデル内の資機材の属性情報に反映する、
請求項1に記載のサーバ装置。
The registration unit is
When the installation completion registration process is executed by the mobile terminal, and result registration data including the identification information and the completion of the installation of the equipment/material is received, the installation completion information of the equipment/material specified based on the result registration data is reflected in the attribute information of the equipment/material in the three-dimensional building information model.
The server device according to claim 1 .
前記登録部は、
前記携帯端末によって検査完了登録処理が実行されることで、前記識別情報と前記資機材の検査完了とを含む実績登録データが受信された場合に、前記実績登録データに基づいて特定される資機材の検査完了の情報を、前記3次元建物情報モデル内の資機材の属性情報に反映する、
請求項1に記載のサーバ装置。
The registration unit is
When the inspection completion registration process is executed by the mobile terminal and result registration data including the identification information and the inspection completion of the equipment/material is received, the inspection completion information of the equipment/material specified based on the result registration data is reflected in the attribute information of the equipment/material in the three-dimensional building information model.
The server device according to claim 1 .
前記登録部は、
前記携帯端末によって試運転完了登録処理が実行されることで、前記識別情報と前記資機材の試運転完了とを含む実績登録データが受信された場合に、前記実績登録データに基づいて特定される資機材の試運転完了の情報を、前記3次元建物情報モデル内の資機材の属性情報に反映する、
請求項1に記載のサーバ装置。
The registration unit is
When the trial run completion registration process is executed by the mobile terminal and result registration data including the identification information and the completion of the trial run of the equipment is received, the information on the trial run completion of the equipment specified based on the result registration data is reflected in the attribute information of the equipment in the three-dimensional building information model.
The server device according to claim 1 .
携帯端末と通信するサーバ装置が、
資機材の配置を示す3次元建物情報モデルを格納部に格納する工程と、
前記資機材に貼り付けられた識別部材より、前記資機材を識別するための識別情報を取得した前記携帯端末から、前記識別情報と前記資機材の作業工程とを含む実績登録データを受信する工程と、
前記実績登録データに基づいて、前記3次元建物情報モデル内の資機材の作業工程を特定し、特定した資機材の作業工程の情報を、前記3次元建物情報モデル内の資機材の属性情報に反映する工程と
を実行する管理方法。
A server device that communicates with the mobile terminal,
storing a three-dimensional building information model indicating the arrangement of materials and equipment in a storage unit;
receiving, from the mobile terminal that has acquired identification information for identifying the equipment from an identification member affixed to the equipment, performance registration data including the identification information and a work process for the equipment;
a step of identifying a work process for equipment and materials in the three-dimensional building information model based on the performance registration data, and reflecting information on the identified work process for the equipment and materials in attribute information of the equipment and materials in the three-dimensional building information model.
資機材の配置を示す3次元建物情報モデルを有する管理システムであって、
前記資機材に貼り付けられた識別部材より、前記資機材を識別するための識別情報を取得した携帯端末から、前記識別情報と前記資機材の作業工程とを含む実績登録データを受信する受信部と、
前記実績登録データに基づいて、前記3次元建物情報モデル内の資機材の作業工程を特定し、特定した資機材の作業工程の情報を、前記3次元建物情報モデル内の資機材の属性情報に反映する登録部と
を有する管理システム。
A management system having a three-dimensional building information model showing the arrangement of materials and equipment,
a receiving unit that receives, from a mobile terminal that has acquired identification information for identifying the equipment or materials from an identification member affixed to the equipment or materials, performance registration data including the identification information and a work process of the equipment or materials;
and a registration unit that identifies a work process for materials and equipment in the three-dimensional building information model based on the performance registration data, and reflects information on the identified work process for materials and equipment in attribute information of the materials and equipment in the three-dimensional building information model.
JP2024019163A 2017-07-03 2024-02-13 Server device, management method and management system Pending JP2024050885A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2024019163A JP2024050885A (en) 2017-07-03 2024-02-13 Server device, management method and management system

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2017130573A JP7097159B2 (en) 2017-07-03 2017-07-03 Registration program, mobile terminal and registration method
JP2021121223A JP7165790B2 (en) 2017-07-03 2021-07-26 Management system and management method
JP2022169600A JP7438309B2 (en) 2017-07-03 2022-10-24 Identification member and pasting method
JP2024019163A JP2024050885A (en) 2017-07-03 2024-02-13 Server device, management method and management system

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2022169600A Division JP7438309B2 (en) 2017-07-03 2022-10-24 Identification member and pasting method

Publications (1)

Publication Number Publication Date
JP2024050885A true JP2024050885A (en) 2024-04-10

Family

ID=65357861

Family Applications (4)

Application Number Title Priority Date Filing Date
JP2017130573A Active JP7097159B2 (en) 2017-07-03 2017-07-03 Registration program, mobile terminal and registration method
JP2021121223A Active JP7165790B2 (en) 2017-07-03 2021-07-26 Management system and management method
JP2022169600A Active JP7438309B2 (en) 2017-07-03 2022-10-24 Identification member and pasting method
JP2024019163A Pending JP2024050885A (en) 2017-07-03 2024-02-13 Server device, management method and management system

Family Applications Before (3)

Application Number Title Priority Date Filing Date
JP2017130573A Active JP7097159B2 (en) 2017-07-03 2017-07-03 Registration program, mobile terminal and registration method
JP2021121223A Active JP7165790B2 (en) 2017-07-03 2021-07-26 Management system and management method
JP2022169600A Active JP7438309B2 (en) 2017-07-03 2022-10-24 Identification member and pasting method

Country Status (1)

Country Link
JP (4) JP7097159B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7240573B2 (en) * 2019-03-15 2023-03-16 ダイダン株式会社 Construction support system and construction support device
JP7004925B2 (en) * 2020-03-03 2022-01-21 ダイキン工業株式会社 Shooting program

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1196223A (en) * 1997-09-17 1999-04-09 Toshiba Corp Method for managing process
JP2002180665A (en) * 2000-09-28 2002-06-26 Tokyu Home Corp Process control system for house construction
JP4712986B2 (en) 2001-03-06 2011-06-29 大日本印刷株式会社 Liquid container with RFID tag
JP2004059249A (en) * 2002-07-30 2004-02-26 Toppan Printing Co Ltd Housing material order delivery management method, ic tag, material, and ic tag management and issue server
JP2006277524A (en) 2005-03-30 2006-10-12 Sato Corp Rfid label and application method of the same
JP4639106B2 (en) 2005-03-29 2011-02-23 株式会社サトー Media to be printed
JP4872238B2 (en) 2005-05-10 2012-02-08 東洋製罐株式会社 IC tag compatible plastic material, IC tag and IC tag compatible container
JP4799094B2 (en) 2005-09-14 2011-10-19 株式会社サトー Labeling device
JP4753359B2 (en) 2005-09-28 2011-08-24 Necトーキン株式会社 Wireless tag
JP4727404B2 (en) 2005-12-07 2011-07-20 株式会社ホロニック Reading device and article management system
JP2007241788A (en) 2006-03-10 2007-09-20 Ic Brains Co Ltd Low dielectric constant spacer, low dielectric constant spacer unit, radio tag device and radio tag system
JP4914095B2 (en) 2006-03-28 2012-04-11 サトーホールディングス株式会社 RFID label and method of attaching the same
JP4040661B2 (en) 2006-05-01 2008-01-30 株式会社神戸製鋼所 RFID tag mounting structure and detection method
JP2007323497A (en) * 2006-06-02 2007-12-13 Chiyoda Corp Progress management system and management server
JP4933915B2 (en) 2007-02-14 2012-05-16 セイコーインスツル株式会社 Sheet material manufacturing apparatus and sheet material manufacturing method
JP6057607B2 (en) * 2012-05-23 2017-01-11 三菱重工業株式会社 Production management system and method
JP6571462B2 (en) * 2015-09-10 2019-09-04 千代田化工建設株式会社 Construction material management system and construction material management method

Also Published As

Publication number Publication date
JP2019016016A (en) 2019-01-31
JP7438309B2 (en) 2024-02-26
JP7097159B2 (en) 2022-07-07
JP2021168205A (en) 2021-10-21
JP2023015108A (en) 2023-01-31
JP7165790B2 (en) 2022-11-04

Similar Documents

Publication Publication Date Title
JP7438309B2 (en) Identification member and pasting method
US9467853B2 (en) Server for managing home appliance and system including the same
JP4564249B2 (en) Home appliance remote control system, service providing server, home server, home appliance, home appliance remote control supporting method for service providing server, and home appliance service providing support method for service providing server
CN105722081B (en) Intelligent equipment networking method and device
JP6376851B2 (en) Information processing apparatus, information processing apparatus control method, and program
JP2007304787A (en) Remote control system, control method and control program
JP2012185794A (en) Management apparatus, management method, management system, and network device
JP2011128994A (en) Apparatus and method for processing information, and computer program
JP2010152710A (en) Program distribution server, image forming apparatus, program distribution system, and contract document integration method
JP2017004175A (en) Management system and control method thereof, information processing device, and program
CN103391278A (en) Method and system for terminals to connect server
CN104703741A (en) Welding source management system and management method therefor
KR101834066B1 (en) System and method for managing collaboration between the devices based on machine socialization using access point
CN114127725A (en) Information processing apparatus, control method, and program
JP2017076857A (en) Management device, information processing unit, control method of management device, control method and program of information processing unit
JP2005258834A (en) User interface configuration method, device and program
KR101989828B1 (en) Home network service providing system using portable terminal
JP5006683B2 (en) Network terminal management apparatus, method, and program
US11210654B2 (en) Systems and methods for multicomputer data transferring to activate contactless communication
JP2014239369A (en) Energy consumption apparatus control device and energy consumption apparatus control method
KR101997938B1 (en) Device Registration/Service System and Method with BLE
JP2017073035A (en) Information processing device and control method therefor
JP2006018403A (en) License issuing system, license information issuing server and license management method
CN105323127A (en) Method and device for controlling functional module to work, and functional module integrated device
JP2008140324A (en) License issuing system, license information issuing server, and license management method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240213