JP2024027923A - Work management method, work management system, and work management program - Google Patents

Work management method, work management system, and work management program Download PDF

Info

Publication number
JP2024027923A
JP2024027923A JP2022131123A JP2022131123A JP2024027923A JP 2024027923 A JP2024027923 A JP 2024027923A JP 2022131123 A JP2022131123 A JP 2022131123A JP 2022131123 A JP2022131123 A JP 2022131123A JP 2024027923 A JP2024027923 A JP 2024027923A
Authority
JP
Japan
Prior art keywords
work
type
period
field
plan data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2022131123A
Other languages
Japanese (ja)
Inventor
右資 小島
Yusuke Kojima
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yanmar Holdings Co Ltd
Original Assignee
Yanmar Holdings Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yanmar Holdings Co Ltd filed Critical Yanmar Holdings Co Ltd
Priority to JP2022131123A priority Critical patent/JP2024027923A/en
Publication of JP2024027923A publication Critical patent/JP2024027923A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

To estimate a type of work of a working device with high accuracy without using any complicated algorithm.SOLUTION: A work management method includes estimating a second work type representing a type of second work on the basis of a first working period in which a dedicated device 32 performs first wok in a farm field, a second working period in which a working device 30 performs second work in the farm field, and work plan data 320 in the farm field. Further, the work management method includes outputting work information representing the estimated second work type. The dedicated device 31 performs only work of a first work type representing one of work types. Estimating the second work type may include extracting a relation between a first plan period in which the work of the first work type is scheduled to be performed in the farm field and a second plan period in which the work of the second work type is scheduled to be performed there, on the basis of the work plan data 320.SELECTED DRAWING: Figure 5A

Description

本発明は、作業管理方法、作業管理システム、及び作業管理プログラムに関するものである。 The present invention relates to a work management method, a work management system, and a work management program.

近年、圃場で作業を行う作業装置の位置と、作業装置の状態とを表す稼働情報を用いて、作業装置が行った作業を推定することが研究されている。 In recent years, research has been conducted into estimating the work performed by a working device using operation information representing the position of the working device and the state of the working device in a field.

例えば、特許文献1には、稼働情報から作業装置により行われた作業の種類、例えば耕耘、播種、収穫などを出力するように学習された機械学習モデルを用いて、作業装置が行った作業の種類を推定することが開示されている。 For example, in Patent Document 1, a machine learning model trained to output the type of work performed by a work device, such as plowing, sowing, harvesting, etc. from operation information, is used to determine the type of work performed by the work device. Estimating the type is disclosed.

特開2021-089477号公報JP2021-089477A

特許文献1に記載の技術では、作業装置が行った作業の種類を推定するために複雑なアルゴリズムが必要であった。また、機械学習モデルを用いる場合、作業の種類を推定する精度を高くするためには、最適な機械学習モデルを構築する必要がある。 The technique described in Patent Document 1 requires a complicated algorithm to estimate the type of work performed by the work device. Furthermore, when using a machine learning model, it is necessary to construct an optimal machine learning model in order to increase the accuracy of estimating the type of work.

上記の状況に鑑み、本開示は、複雑なアルゴリズムを用いずに、作業装置が行った作業の種類を精度よく推定することを目的の1つとする。他の目的については、以下の記載及び実施の形態の説明から理解することができる。 In view of the above situation, one of the objects of the present disclosure is to accurately estimate the type of work performed by a work device without using a complicated algorithm. Other objectives can be understood from the following description and description of the embodiments.

以下に、発明を実施するための形態で使用される番号・符号を用いて、課題を解決するための手段を説明する。これらの番号・符号は、特許請求の範囲の記載と発明を実施するための形態との対応関係の一例を示すために、参考として、括弧付きで付加されたものである。よって、括弧付きの記載により、特許請求の範囲は、限定的に解釈されるべきではない。 Below, means for solving the problems will be explained using numbers and symbols used in the detailed description. These numbers and symbols are added in parentheses for reference in order to show an example of the correspondence between the claims and the detailed description. Therefore, the scope of the claims should not be construed as being limited by the parenthesized descriptions.

上記目的を達成するための一実施の形態による作業管理方法は、専用装置(32)が圃場で第1作業を行った第1作業期間と、作業装置(30)が圃場で第2作業を行った第2作業期間と、圃場における作業計画データ(320)とに基づき、第2作業の種類を表す第2作業種別を推定することを含む。また、作業管理方法は、推定された第2作業種別を表す作業情報を出力することを含む。ここで、専用装置(32)は、作業の種類の1つを表す第1作業種別の作業のみを行う。 A work management method according to an embodiment for achieving the above purpose includes a first work period in which a dedicated device (32) performs a first work in a field, and a first work period in which a dedicated device (32) performs a second work in a field. The method includes estimating a second work type representing the type of the second work based on the second work period and work plan data (320) in the field. The work management method also includes outputting work information representing the estimated second work type. Here, the dedicated device (32) performs only work of a first work type representing one of the work types.

上記目的を達成するための一実施の形態による作業管理方法は、作業装置(30)が圃場で第2作業を行った第2作業期間と、圃場における作業計画データ(320)とに基づき、第2作業の種類を表す第2作業種別を推定することを含む。また、作業管理方法は、推定された第2作業種別を表す作業情報を出力することを含む。ここで、作業計画データ(320)は、圃場において、作業装置(30)により行われる作業の予定期間を表す。 A work management method according to an embodiment for achieving the above object is based on a second work period during which the work device (30) performed the second work in the field and work plan data (320) in the field. 2, including estimating a second work type representing the type of work. The work management method also includes outputting work information representing the estimated second work type. Here, the work plan data (320) represents the scheduled period of work to be performed by the work device (30) in the field.

上記目的を達成するための一実施の形態による作業管理システム(1000)は、種別推定部(180)と、出力部(190)とを備える。種別推定部(180)は、専用装置(32)が圃場で第1作業を行った第1作業期間と、作業装置(30)が圃場で第2作業を行った第2作業期間と、圃場における作業計画データ(320)とに基づき、第2作業の種類を表す第2作業種別を推定する。出力部(190)は、推定された第2作業種別を表す作業情報を出力する。ここで、専用装置(32)は、作業の種類の1つを表す第1作業種別の作業のみを行う。 A work management system (1000) according to an embodiment for achieving the above object includes a type estimation section (180) and an output section (190). The type estimation unit (180) determines the first work period in which the dedicated device (32) performed the first work in the field, the second work period in which the work device (30) performed the second work in the field, and the period in which the dedicated device (32) performed the first work in the field. A second work type representing the type of second work is estimated based on the work plan data (320). The output unit (190) outputs work information representing the estimated second work type. Here, the dedicated device (32) performs only work of a first work type representing one of the work types.

上記目的を達成するための一実施の形態による作業管理システム(1000)は、種別推定部(180)と、出力部(190)とを備える。種別推定部(180)は、作業装置(30)が圃場で第2作業を行った第2作業期間と、圃場における作業計画データ(320)とに基づき、第2作業の種類を表す第2作業種別を推定する。出力部(190)は、推定された第2作業種別を表す作業情報を出力することを含む。ここで、作業計画データ(320)は、圃場において、作業装置(30)により行われる作業の予定期間を表す。 A work management system (1000) according to an embodiment for achieving the above object includes a type estimation section (180) and an output section (190). The type estimating unit (180) calculates a second work representing the type of the second work based on the second work period in which the work device (30) performed the second work in the field and the work plan data (320) in the field. Estimate the type. The output unit (190) includes outputting work information representing the estimated second work type. Here, the work plan data (320) represents the scheduled period of work to be performed by the work device (30) in the field.

上記目的を達成するための一実施の形態による作業管理プログラム(330)は、専用装置(32)が圃場で第1作業を行った第1作業期間と、作業装置(30)が圃場で第2作業を行った第2作業期間と、圃場における作業計画データ(320)とに基づき、第2作業の種類を表す第2作業種別を推定することを演算装置(120、220)に実行させる。また、作業管理プログラム(330)は、推定された第2作業種別を表す作業情報を出力することを演算装置(120、220)に実行させる。ここで、専用装置(32)は、作業の種類の1つを表す第1作業種別の作業のみを行う。 A work management program (330) according to an embodiment for achieving the above purpose is configured to perform a first work period in which the dedicated device (32) performs the first work in the field, and a second work period in which the work device (30) performs the first work in the field. The calculation device (120, 220) is caused to estimate a second work type representing the type of the second work based on the second work period in which the work was performed and the work plan data (320) in the field. Further, the work management program (330) causes the computing device (120, 220) to output work information representing the estimated second work type. Here, the dedicated device (32) performs only work of a first work type representing one of the work types.

上記目的を達成するための一実施の形態による作業管理プログラム(330)は、作業装置(30)が圃場で第2作業を行った第2作業期間と、圃場における作業計画データ(320)とに基づき、第2作業の種類を表す第2作業種別を推定することを演算装置(120、220)に実行させる。また、作業管理プログラム(330)は、推定された第2作業種別を表す作業情報を出力することを演算装置(120、220)に実行させる。ここで、作業計画データ(320)は、圃場において、作業装置(30)により行われる作業の予定期間を表す。 A work management program (330) according to an embodiment for achieving the above purpose is based on the second work period in which the work device (30) performed the second work in the field and the work plan data (320) in the field. Based on the calculation result, the calculation device (120, 220) is caused to estimate a second work type representing the type of the second work. Further, the work management program (330) causes the computing device (120, 220) to output work information representing the estimated second work type. Here, the work plan data (320) represents the scheduled period of work to be performed by the work device (30) in the field.

上記の形態によれば、複雑なアルゴリズムを用いることなく、精度よく、作業装置の作業の種類を推定することができる。 According to the above embodiment, the type of work performed by the work device can be estimated with high accuracy without using a complicated algorithm.

一実施の形態における作業管理システムの概略図である。FIG. 1 is a schematic diagram of a work management system in one embodiment. 一実施の形態における作業実績データの構成を表す図である。FIG. 3 is a diagram showing the structure of work performance data in one embodiment. 一実施の形態における作業計画データの構成を表す図である。FIG. 3 is a diagram showing the structure of work plan data in one embodiment. 一実施の形態における作業管理システムが実行する機能ブロックを表す図である。It is a diagram showing functional blocks executed by the work management system in one embodiment. 一実施の形態における作業管理システムによる処理を表すフローチャートである。It is a flow chart showing processing by a work management system in one embodiment. 一実施の形態における作業管理システムによる処理を表すフローチャートである。It is a flow chart showing processing by a work management system in one embodiment. 一実施の形態における作業管理システムによる処理が実行されたときの作業実績データを表す図である。FIG. 3 is a diagram representing work performance data when processing is executed by the work management system in one embodiment. 一実施の形態において、作業管理システムによる処理が実行される前の作業実績データ例を表す図である。In one embodiment, it is a diagram showing an example of work performance data before processing by the work management system is executed. 一実施の形態における作業計画データを表す図である。It is a figure showing work plan data in one embodiment.

(実施の形態1)
本発明の本実施の形態による作業管理システム1000を、図面を参照して説明する。本実施の形態において、図1に示すように、作業管理システム1000は、作業管理装置100と、端末200とを備える。作業管理装置100は、ネットワーク20、例えばインターネットを介して、端末200と、汎用装置31と、専用装置32と通信可能に接続されている。
(Embodiment 1)
A work management system 1000 according to this embodiment of the invention will be described with reference to the drawings. In this embodiment, as shown in FIG. 1, a work management system 1000 includes a work management device 100 and a terminal 200. The work management device 100 is communicably connected to a terminal 200, a general-purpose device 31, and a dedicated device 32 via a network 20, such as the Internet.

汎用装置31は、圃場において複数の種類、例えば耕耘、代掻き、播種、除草散布、肥料散布、収穫などの作業を行う。汎用装置31は、圃場で1つ以上の種類の作業を行う任意の作業機械、例えば、耕耘機、除草剤・肥料を散布する散布機、収穫機などを牽引するトラクターなどを含む。 The general-purpose device 31 performs a plurality of types of work in the field, such as tilling, puddling, sowing, weeding, spraying, fertilizer, and harvesting. The general-purpose equipment 31 includes any working machine that performs one or more types of work in a field, such as a tiller, a spreader that sprays herbicides and fertilizers, a tractor that pulls a harvester, and the like.

専用装置32は、1つの種類の作業のみを行う。例えば、専用装置32は、作業を行う作業機械と一体に形成され、1つの種類、例えば播種、植付、収穫などの作業のみを行う。専用装置32は、例えば播種を行う播種機、苗の植付を行う移植機、収穫を行うコンバインなどを含む。ここでは、汎用装置31と専用装置32とを区別しない場合、これらを作業装置30と呼ぶ。 Specialized equipment 32 performs only one type of work. For example, the dedicated device 32 is formed integrally with a working machine that performs a task, and performs only one type of task, such as sowing, planting, or harvesting. The dedicated device 32 includes, for example, a seeding machine for sowing seeds, a transplanting machine for planting seedlings, a combine harvester for harvesting, and the like. Here, when the general-purpose device 31 and the dedicated device 32 are not distinguished from each other, they are referred to as a working device 30.

作業装置30は、圃場で作業を行っているときの稼働状態を表す稼働情報を作業管理装置100に送信する。例えば、作業装置30は、エンジンを停止したときに、エンジンを起動してからの稼働情報を作業管理装置100に出力する。例えば、稼働情報は、送信元の作業装置30を表す識別子、例えば型式、シリアル番号などを表す情報を含む。また、稼働情報は、各時刻における作業装置30の位置を表す位置情報を含む。作業装置30は、測位装置、例えばGNSS(Global Navigation Satellite System)の受信機を備え、作業装置30が移動した各時刻の位置を表す位置情報を取得する。例えば測位装置は、所定の時間間隔で作業装置30の位置を測定する。 The work device 30 transmits to the work management device 100 operation information indicating the operating state while working in the field. For example, when the engine is stopped, the work device 30 outputs operation information after starting the engine to the work management device 100. For example, the operation information includes an identifier representing the source work device 30, such as information representing the model, serial number, and the like. Further, the operation information includes position information indicating the position of the working device 30 at each time. The work device 30 includes a positioning device, for example, a GNSS (Global Navigation Satellite System) receiver, and acquires position information representing the position of each time the work device 30 moves. For example, the positioning device measures the position of the working device 30 at predetermined time intervals.

また、稼働情報は、例えば作業装置30の速度、操舵角、エンジン回転数、各種クラッチのON/OFF状況、作業装置30の各時刻の位置情報などを表す情報を含む。作業装置30が作業機械を牽引する車両、例えばトラクターであるとき、稼働情報には、作業機械に動力を伝達するときのPTO(power take-off)回転数、作業機械の姿勢を示すヒッチ高さやリフトアーム角度などの情報が含まれてもよい。 Further, the operation information includes information representing, for example, the speed of the work device 30, the steering angle, the engine rotation speed, the ON/OFF status of various clutches, the position information of the work device 30 at each time, and the like. When the working device 30 is a vehicle that pulls a working machine, such as a tractor, the operation information includes the PTO (power take-off) rotation speed when transmitting power to the working machine, the hitch height indicating the attitude of the working machine, and the like. Information such as lift arm angle may also be included.

作業管理装置100は、専用装置32により作業が行われたとき、行われた作業の種類を表す作業種別を決定する。また、作業種別が決定されると、作業管理装置100は、専用装置32が作業した圃場において、汎用装置31により行われた作業の作業種別を、作業計画データ320に基づき推定する。これにより、作業管理装置100は、作業装置30により行われた作業の作業種別を精度よく推定することができる。 When a work is performed by the dedicated device 32, the work management device 100 determines a work type representing the type of work performed. Further, once the work type is determined, the work management device 100 estimates the work type of the work performed by the general-purpose device 31 in the field where the dedicated device 32 worked, based on the work plan data 320. Thereby, the work management device 100 can accurately estimate the work type of the work performed by the work device 30.

(作業管理システムの構成)
図1に示す作業管理システム1000に含まれる作業管理装置100の構成を説明する。作業管理装置100は、入出力装置110と、演算装置120と、通信装置130と、記憶装置140とを備える。作業管理装置100は、例えば、コンピュータである。入出力装置110には、演算装置120が処理を実行するための情報が入力される。また、入出力装置110は、演算装置120が処理を実行した結果を出力する。入出力装置110は、様々な入力装置と出力装置とを含み、例えば、キーボード、マウス、マイク、ディスプレイ、スピーカー、タッチパネルなどを含む。入出力装置110は省略されてもよい。
(Work management system configuration)
The configuration of work management device 100 included in work management system 1000 shown in FIG. 1 will be described. The work management device 100 includes an input/output device 110, an arithmetic device 120, a communication device 130, and a storage device 140. Work management device 100 is, for example, a computer. Information for the arithmetic unit 120 to execute processing is input to the input/output device 110 . In addition, the input/output device 110 outputs the results of processing performed by the arithmetic device 120. The input/output device 110 includes various input devices and output devices, and includes, for example, a keyboard, a mouse, a microphone, a display, a speaker, a touch panel, and the like. The input/output device 110 may be omitted.

通信装置130は、ネットワーク20に電気的に接続され、ネットワーク20を介して各々の装置との通信を行う。例えば、通信装置130は、作業装置30から取得する稼働情報を演算装置120に転送する。また、演算装置120が生成した信号を端末200に転送する。通信装置130は、例えば、NIC(Network Interface Card)、USB(Universal Serial Bus)などの種々のインタフェースを含む。 The communication device 130 is electrically connected to the network 20 and communicates with each device via the network 20. For example, the communication device 130 transfers operating information acquired from the working device 30 to the computing device 120. Further, the signal generated by the arithmetic device 120 is transferred to the terminal 200. The communication device 130 includes various interfaces such as a NIC (Network Interface Card) and a USB (Universal Serial Bus).

記憶装置140は、圃場で汎用装置31により行われた作業の作業種別を推定するための様々なデータ、例えば装置データ300と、作業実績データ310と、作業計画データ320と、作業管理プログラム330とを格納する。記憶装置140は、作業管理プログラム330を記憶する非一時的記憶媒体(non-transitory tangible storage medium)として用いられる。作業管理プログラム330は、コンピュータ読み取り可能な記憶媒体1に記録されたコンピュータプログラム製品(computer program product)として提供されてもよく、または、サーバからダウンロード可能なコンピュータプログラム製品として提供されてもよい。 The storage device 140 stores various data for estimating the type of work performed by the general-purpose device 31 in the field, such as device data 300, work performance data 310, work plan data 320, and a work management program 330. Store. The storage device 140 is used as a non-transitory tangible storage medium that stores the work management program 330. The work management program 330 may be provided as a computer program product recorded on the computer readable storage medium 1 or may be provided as a computer program product downloadable from a server.

装置データ300は、作業装置30の識別子、例えば型式、シリアル番号などに対して、作業装置30が行う作業種別を表す。例えば、汎用装置31を表す識別子に対して複数の作業種別が関連付けられている。また、専用装置32を表す識別子に対して1つの作業種別が関連付けられている。例えば、コンバインを表す識別子に対して「収穫」が関連付けられている。また、汎用装置31を表す識別子に対して、1つの作業種別が特定されないことを表す情報が関連付けられてもよい。 The device data 300 represents the type of work performed by the work device 30 with respect to the identifier of the work device 30, such as the model and serial number. For example, a plurality of work types are associated with an identifier representing the general-purpose device 31. Furthermore, one work type is associated with the identifier representing the dedicated device 32. For example, "harvest" is associated with an identifier representing a combine harvester. Furthermore, information indicating that one type of work is not specified may be associated with the identifier representing the general-purpose device 31.

作業実績データ310は、作業装置30により行われた作業に関する情報を表す。例えば、作業実績データ310は、図2に示すように、作業装置30により作業が行われた圃場と、作業が行われた期間を表す作業期間と、行われた作業の作業種別とを表す。例えば、図2に示す作業実績データ310は、圃場Aにおいて、5月7日に、播種作業400が行われたことを表す。また、作業実績データ310は、圃場Aにおいて、4月9日と、5月2日に作業が行われたが、その作業の作業種別が決定されていないことを表す。例えば、作業実績データ310は、4月9日と5月2日とに、汎用装置31により作業が行われて、その作業の作業種別が分からないことを表す。また、作業実績データ310は、作業装置30から出力された稼働情報を格納してもよい。また、作業実績データ310は、稼働情報から決定される情報、例えば作業装置30により作業が行われた領域などを表す情報を格納してもよい。 Work performance data 310 represents information regarding work performed by work device 30. For example, as shown in FIG. 2, the work performance data 310 represents the field where the work was performed by the work device 30, the work period representing the period during which the work was performed, and the work type of the work performed. For example, work performance data 310 shown in FIG. 2 indicates that sowing work 400 was performed in field A on May 7th. Further, the work performance data 310 indicates that work was performed in the field A on April 9th and May 2nd, but the work type of the work has not been determined. For example, the work performance data 310 indicates that work was performed by the general-purpose device 31 on April 9th and May 2nd, and the work type of the work is unknown. Further, the work performance data 310 may store operation information output from the work device 30. Further, the work performance data 310 may store information determined from the operation information, for example, information representing the area in which work was performed by the work device 30.

図1に示す作業計画データ320は、1つ以上の圃場において、作業装置30により作業が行われる作業の予定を表す。例えば、作業計画データ320は、図3に示すように、作業装置30により作業が行われる予定の圃場と、行われる作業の作業種別と、その作業が行われる時期を表す計画時期とを表す。図3に示す作業計画データ320は、圃場Aにおいて、「耕耘」が行われてから3週間後に「代掻き」が行われることを表す。また、作業計画データ320は、圃場Aにおいて、「代掻き」が行われてから1週間後に「播種」が行われることを表す。作業計画データ320は、圃場Aにおいて、「播種」が行われてから3週間後に「除草散布」が行われることを表す。作業計画データ320は、作業装置30により作業が行われる圃場の領域を表す情報を含んでもよい。 Work plan data 320 shown in FIG. 1 represents a work schedule to be performed by work device 30 in one or more fields. For example, as shown in FIG. 3, the work plan data 320 represents the field where the work is scheduled to be performed by the work device 30, the work type of the work to be performed, and a planned time indicating the time when the work will be performed. The work plan data 320 shown in FIG. 3 indicates that "plowing" will be performed in the field A three weeks after "cultivation" is performed. Further, the work plan data 320 indicates that "seeding" will be performed in the field A one week after "plowing" is performed. The work plan data 320 indicates that "weeding and spraying" will be performed in field A three weeks after "seeding" is performed. The work plan data 320 may include information representing the area of the field where the work is performed by the work device 30.

図1に示す演算装置120は、作業管理プログラム330を実行して、汎用装置31により行われた作業の作業種別を推定するための様々なデータ処理に使用される。例えば、演算装置120は、中央演算処理装置(CPU;Central Processing Unit)などを含む。 The computing device 120 shown in FIG. 1 executes the work management program 330 and is used for various data processing to estimate the work type of the work performed by the general-purpose device 31. For example, the arithmetic device 120 includes a central processing unit (CPU).

演算装置120は、作業管理プログラム330を読み出し実行することで、図4に示すように、データ記憶部150と、期間決定部160と、専用装置判定部170と、種別推定部180と、出力部190とを実現する。データ記憶部150は、装置データ300と、作業実績データ310と、作業計画データ320とを記憶する。また、データ記憶部150は、作業装置30の稼働情報に基づき、作業装置30により作業が行われた圃場を決定する。期間決定部160は、作業装置30の稼働情報に基づき、作業装置30が作業を行った作業期間を決定する。専用装置判定部170は、装置データ300と、稼働情報とに基づき、作業を行った作業装置30が専用装置32であるか否かを判定する。種別推定部180は、作業装置30の作業期間に基づき、作業装置30により行われた作業の作業種別を推定する。出力部190は、推定された作業種別を表す作業情報を出力する。 By reading and executing the work management program 330, the computing device 120 stores the data storage section 150, the period determining section 160, the dedicated device determining section 170, the type estimating section 180, and the output section, as shown in FIG. 190. The data storage unit 150 stores device data 300, work performance data 310, and work plan data 320. Furthermore, the data storage unit 150 determines the field where the work was performed by the work device 30 based on the operation information of the work device 30. The period determination unit 160 determines the work period in which the work device 30 performed the work based on the operation information of the work device 30. The dedicated device determination unit 170 determines whether the working device 30 that performed the work is the dedicated device 32 based on the device data 300 and the operation information. The type estimation unit 180 estimates the work type of the work performed by the work device 30 based on the work period of the work device 30. The output unit 190 outputs work information representing the estimated work type.

次に、端末200の構成を説明する。端末200は、図1に示すように、入出力装置210と、演算装置220と、通信装置230と、記憶装置240とを備える。端末200は、例えば、コンピュータ、タブレット、携帯電話などを含む。入出力装置210には、演算装置220が処理を実行するための情報が入力される。また、入出力装置210は、演算装置220が処理を実行した結果を出力する。入出力装置210は、様々な入力装置と出力装置とを含み、例えば、キーボード、マウス、マイク、ディスプレイ、スピーカー、タッチパネルなどを含む。 Next, the configuration of the terminal 200 will be explained. As shown in FIG. 1, the terminal 200 includes an input/output device 210, an arithmetic device 220, a communication device 230, and a storage device 240. Terminal 200 includes, for example, a computer, a tablet, a mobile phone, and the like. Information for the arithmetic unit 220 to execute processing is input to the input/output device 210 . In addition, the input/output device 210 outputs the results of processing performed by the arithmetic device 220. The input/output device 210 includes various input devices and output devices, and includes, for example, a keyboard, a mouse, a microphone, a display, a speaker, a touch panel, and the like.

通信装置230は、ネットワーク20に電気的に接続され、ネットワーク20を介して各々の装置との通信を行う。例えば、通信装置230は、作業管理装置100から取得する情報を演算装置220に転送する。また、演算装置220が生成した信号を作業管理装置100に転送する。通信装置230は、例えば、無線LAN(Local Area Network)やセルラーネットワークなどの無線通信に用いられる送受信機、NIC(Network Interface Card)、USB(Universal Serial Bus)などの種々のインタフェースを含む。 The communication device 230 is electrically connected to the network 20 and communicates with each device via the network 20. For example, the communication device 230 transfers information acquired from the work management device 100 to the computing device 220. Further, the signal generated by the arithmetic device 220 is transferred to the work management device 100. The communication device 230 includes various interfaces such as a transceiver used for wireless communication such as a wireless LAN (Local Area Network) or a cellular network, a NIC (Network Interface Card), and a USB (Universal Serial Bus).

記憶装置240は、作業管理装置100から取得する作業情報を表示するための様々なデータ、例えば表示プログラム340を格納する。記憶装置240は、表示プログラム340を記憶する非一時的記憶媒体(non-transitory tangible storage medium)として用いられる。表示プログラム340は、コンピュータ読み取り可能な記憶媒体2に記録されたコンピュータプログラム製品(computer program product)として提供されてもよく、または、サーバからダウンロード可能なコンピュータプログラム製品として提供されてもよい。 The storage device 240 stores various data, such as a display program 340, for displaying work information acquired from the work management device 100. The storage device 240 is used as a non-transitory tangible storage medium that stores the display program 340. The display program 340 may be provided as a computer program product recorded on the computer readable storage medium 2 or may be provided as a computer program product downloadable from a server.

演算装置220は、表示プログラム340を読み出し実行することで、入出力装置210と協働して、図4に示すように、表示部250を実現する。表示部250は、作業管理装置100から作業情報を取得して、取得した作業情報を表示する。 By reading and executing the display program 340, the arithmetic device 220 cooperates with the input/output device 210 to realize the display section 250 as shown in FIG. The display unit 250 acquires work information from the work management device 100 and displays the acquired work information.

(作業管理装置の動作)
作業管理装置100の演算装置120は、作業装置30から稼働情報を受信すると、作業管理プログラム330を読み出し実行する。作業管理プログラム330を実行することで、演算装置120は、作業管理方法である図5A、5Bに示す処理を実行する。
(Operation of work management device)
When the computing device 120 of the work management device 100 receives the operation information from the work device 30, it reads and executes the work management program 330. By executing the work management program 330, the computing device 120 executes the processing shown in FIGS. 5A and 5B, which is a work management method.

ステップS110において、演算装置120により実行されるデータ記憶部150は、作業装置30の稼働情報に基づき、作業装置30が作業した圃場を決定する。例えば、データ記憶部150は、稼働情報に含まれる位置情報に基づき、作業装置30により作業された圃場を決定する。例えば、データ記憶部150は、位置情報に表される位置を含む圃場を作業装置30により作業された圃場として決定する。なお、圃場の領域を表す情報は、例えば作業計画データ320に格納されている。 In step S110, the data storage unit 150 executed by the arithmetic device 120 determines the field where the working device 30 worked based on the operation information of the working device 30. For example, the data storage unit 150 determines the field worked by the working device 30 based on the position information included in the operation information. For example, the data storage unit 150 determines the field including the position represented by the position information as the field worked by the working device 30. Note that information representing the field area is stored in the work plan data 320, for example.

ステップS120において、期間決定部160は、作業装置30の稼働情報に基づき、作業装置30が作業を行った作業期間を決定する。例えば、期間決定部160は、圃場内に含まれる位置を表す位置情報において、最初に測定された時刻から最後に測定された時刻までの期間を作業期間として決定する。期間決定部160は、位置情報に基づき、作業装置30のエンジンが起動した起動時刻と、停止した停止時刻とを決定し、起動時刻から停止時刻までの期間を作業時間として決定してもよい。 In step S120, the period determination unit 160 determines the work period in which the work device 30 performed the work based on the operation information of the work device 30. For example, the period determination unit 160 determines the period from the first measurement time to the last measurement time as the work period in the position information representing the position included in the field. The period determining unit 160 may determine the start time when the engine of the work device 30 starts and the stop time when the engine stops based on the position information, and determine the period from the start time to the stop time as the work time.

ステップS130において、専用装置判定部170は、装置データ300と、作業装置30の稼働情報とに基づき、作業を行った作業装置30が専用装置32であるか否かを判定する。例えば、専用装置判定部170は、作業装置30の稼働情報から、稼働情報を出力した作業装置30の識別子を抽出する。専用装置判定部170は、装置データ300から、抽出した識別子に対応する作業種別を検索する。検索された作業種別が1つであるとき、専用装置判定部170は、作業を行った作業装置30が専用装置32であると判定する。作業装置30が専用装置32であるとき、処理はステップS140に移行する。作業装置30が専用装置32でないとき、処理は図5Bに示すステップS210に移行する。 In step S130, the dedicated device determination unit 170 determines whether the work device 30 that performed the work is the dedicated device 32, based on the device data 300 and the operation information of the work device 30. For example, the dedicated device determination unit 170 extracts the identifier of the working device 30 that outputs the operating information from the operating information of the working device 30. The dedicated device determination unit 170 searches the device data 300 for the work type corresponding to the extracted identifier. When the searched work type is one, the dedicated device determination unit 170 determines that the work device 30 that performed the work is the dedicated device 32. When the work device 30 is the dedicated device 32, the process moves to step S140. When the work device 30 is not the dedicated device 32, the process moves to step S210 shown in FIG. 5B.

ステップS140において、種別推定部180は、装置データ300に基づき、作業装置30、具体的には専用装置32により行われた作業を表す第1作業の作業種別を決定する。種別推定部180は、ステップS130において検索された作業種別を、専用装置32により行われた第1作業の作業種別として決定する。例えば、図2に示すように、5月7日に、「播種」のみを行う専用装置32が圃場Aで作業を行ったとき、種別推定部180は、「播種」を5月7日に圃場Aで行われた作業の作業種別として決定する。 In step S140, the type estimating unit 180 determines the work type of the first work representing the work performed by the work device 30, specifically the dedicated device 32, based on the device data 300. The type estimating unit 180 determines the work type retrieved in step S130 as the work type of the first work performed by the dedicated device 32. For example, as shown in FIG. 2, when the dedicated device 32 that only performs "seeding" works in field A on May 7th, the type estimating unit 180 performs "seeding" on field A on May 7th. This is determined as the work type of the work performed at A.

ステップS150において、種別推定部180は、作業計画データ320に基づき、決定されていない第2作業の作業種別を推定する。例えば、種別推定部180は、最初に、作業実績データ310において、作業種別が未決定の第2作業を抽出する。図2に示す例において、種別推定部180は、作業種別が未決定の第2作業として、5月2日の作業と、4月9日の作業とを抽出する。 In step S150, the type estimation unit 180 estimates the work type of the undetermined second work based on the work plan data 320. For example, the type estimating unit 180 first extracts the second work whose work type is undetermined from the work performance data 310. In the example shown in FIG. 2, the type estimating unit 180 extracts the work on May 2nd and the work on April 9th as the second work for which the work type has not been determined.

次に、種別推定部180は、作業実績データ310に基づき、ステップS140において作業種別が決定された第1作業の作業期間と、抽出された未決定の第2作業の作業期間との関係を取得する。例えば、種別推定部180は、作業種別が決定された第1作業が行われた第1作業期間と、未決定の第2作業が行われた第2作業期間との差と順番とを決定する。例えば、図2に示す例において、種別推定部180は、5月2日の第2作業が、作業種別が決定された5月7日の第1作業の5日前に行われていることを表す情報を取得する。また、種別推定部180は、4月9日の第2作業が、作業種別が決定された5月7日の第1作業の28日前に行われていることを表す情報を取得する。 Next, the type estimation unit 180 acquires the relationship between the work period of the first work whose work type was determined in step S140 and the work period of the extracted second work whose work type has not been determined, based on the work performance data 310. do. For example, the type estimating unit 180 determines the difference and order between a first work period in which a first work whose work type has been determined is performed and a second work period in which a second work whose work type has not been determined is performed. . For example, in the example shown in FIG. 2, the type estimation unit 180 indicates that the second work on May 2 was performed five days before the first work on May 7, for which the work type was determined. Get information. The type estimating unit 180 also acquires information indicating that the second work on April 9th was performed 28 days before the first work on May 7th for which the work type was determined.

次に、種別推定部180は、作業計画データ320と、決定された第1作業の作業種別と、第1作業の作業期間と未決定の第2作業の作業期間との関係とに基づき、第2作業の作業種別を推定する。例えば、種別推定部180は、作業計画データ320において、決定された第1作業の作業種別が行われる予定の計画時期に対して、第1作業の第1作業期間に対する第2作業の第2作業期間の関係に該当する作業の作業種別を第2作業の作業種別として決定する。例えば、種別推定部180は、図3に示す作業計画データ320において、決定された第1作業の作業種別、例えば「播種」を抽出する。種別推定部180は、第1作業の作業種別「播種」の計画時期に対して、第1作業の作業期間に対する第2作業の作業期間の関係に該当する作業の作業種別を第2作業の作業種別として決定する。例えば、種別推定部180は、第1作業の作業種別「播種」の計画時期に対して、第1作業の作業期間に対する第2作業の作業期間の関係に最も近い作業の作業種別を第2作業の作業種別として決定する。 Next, the type estimating unit 180 determines the type of work to be performed based on the work plan data 320, the determined work type of the first work, and the relationship between the work period of the first work and the undetermined work period of the second work. 2. Estimate the work type of the work. For example, the type estimation unit 180 determines, in the work plan data 320, the second work of the second work for the first work period of the first work with respect to the planned time when the determined work type of the first work is scheduled to be performed. The work type of the work corresponding to the period relationship is determined as the work type of the second work. For example, the type estimating unit 180 extracts the determined work type of the first work, such as "seeding", from the work plan data 320 shown in FIG. 3 . The type estimating unit 180 determines the work type of the work corresponding to the relationship of the work period of the second work to the work period of the first work with respect to the planned time of the work type "seeding" of the first work. Determine as the type. For example, the type estimating unit 180 selects the work type of the work that is closest to the relationship of the work period of the second work to the work period of the first work with respect to the planned time of the work type "seeding" of the first work. This is determined as the work type.

図2に示す例において、第1作業である播種作業400の作業期間に対する第2作業、例えば5月2日の作業の作業期間の関係は5日前である。このため、種別推定部180は、作業計画データ320において、第1作業の作業種別「播種」に対して、第1作業の作業期間に対する第2作業の作業期間の関係である5日前の作業に該当する作業種別を抽出する。図3に示す例において、作業種別「播種」の5日前の時期に最も近い計画時期に該当する作業種別は、「播種」の1週間前に該当する「代掻き」である。このため、種別推定部180は、図6に示すように、「代掻き」を5月2日の作業の作業種別として決定する。 In the example shown in FIG. 2, the relationship between the work period of the first work, sowing work 400, and the work period of the second work, for example, the work on May 2, is five days earlier. Therefore, in the work plan data 320, the type estimating unit 180 calculates, for the work type "seeding" of the first work, the work 5 days ago, which is the relationship between the work period of the second work and the work period of the first work. Extract the applicable work type. In the example shown in FIG. 3, the work type that corresponds to the planning time closest to the five days before the work type "seeding" is "plowing" that corresponds to one week before "seeding". Therefore, the type estimating unit 180 determines "padding" as the work type for the work on May 2nd, as shown in FIG.

また、種別推定部180は、同様に、4月9日の作業の作業種別を決定する。第1作業である播種作業400の作業期間に対する4月9日の作業の作業期間の関係は28日前である。図3に示す例において、作業種別「播種」の28日前の時期に最も近い計画時期に該当する作業種別は、「播種」の1週間と3週間とを合計した4週間前の「耕耘」である。このため、種別推定部180は、図6に示すように、「耕耘」を4月9日の作業の作業種別として決定する。種別推定部180は、先に決定された代掻き作業410に対する4月9日の作業の作業期間の関係に基づき、4月9日の作業を決定してもよい。 Further, the type estimating unit 180 similarly determines the work type of the work on April 9th. The relationship between the work period of the sowing work 400, which is the first work, and the work period of the work on April 9 is 28 days ago. In the example shown in Figure 3, the work type that corresponds to the planning period closest to 28 days before the work type "Sowing" is "Pilling" which is 4 weeks before "Sowing", which is the sum of 1 week and 3 weeks before "Sowing". be. Therefore, the type estimating unit 180 determines "cultivation" as the work type for the work on April 9, as shown in FIG. The type estimating unit 180 may determine the work to be performed on April 9th based on the relationship of the work period of the work on April 9th to the previously determined puddling work 410.

図5AのステップS160において、出力部190は、決定された作業種別を表す作業情報を端末200に出力する。作業情報は、作業装置30により作業が行われた圃場の位置と、領域とを表す情報を含んでもよい。また、作業情報は、作業装置30により作業が行われた作業期間を表す情報を含んでもよい。 In step S160 of FIG. 5A, the output unit 190 outputs work information representing the determined work type to the terminal 200. The work information may include information representing the position and area of the field where the work was performed by the work device 30. Further, the work information may include information representing a work period in which the work was performed by the work device 30.

ステップS170において、端末200の表示部250は、作業管理装置100から取得した作業情報を表示する。例えば、表示部250は、作業装置30により行われた作業の作業種別を入出力装置210に表示する。また、表示部250は、作業装置30により作業が行われた圃場と、作業装置30により行われた作業種別とを地図上に表した画像を表示してもよい。表示部250は、さらに、作業装置30により作業が行われた作業期間を表示してもよい。 In step S170, the display unit 250 of the terminal 200 displays the work information acquired from the work management device 100. For example, the display unit 250 displays the type of work performed by the work device 30 on the input/output device 210. Further, the display unit 250 may display an image showing on a map the field where the work was performed by the work device 30 and the type of work performed by the work device 30. The display unit 250 may further display the work period in which the work was performed by the work device 30.

ステップS130において作業装置30が専用装置32に該当しないと判定されたとき、図5Bに示すステップS210において、種別推定部180は、作業実績データ310に、作業が行われた圃場において、決定されている作業種別が存在するかを判定する。作業実績データ310に、決定されている作業種別が存在するとき、種別推定部180は、ステップS220の処理を実行する。作業実績データ310に、決定されている作業種別が存在しないとき、処理はステップS230に移行する。 When it is determined in step S130 that the work device 30 does not correspond to the dedicated device 32, in step S210 shown in FIG. Determine whether the work type exists. When the determined work type exists in the work performance data 310, the type estimation unit 180 executes the process of step S220. When the determined work type does not exist in the work performance data 310, the process moves to step S230.

例えば、図7に示すように、作業管理装置100のデータ記憶部150は、5月28日の作業に関する稼働情報を取得したとする。この場合、作業実績データ310において、決定されている作業種別として、播種作業400と、代掻き作業410と、耕耘作業420とが存在する。このため、種別推定部180は、図5Bに示すステップS220の処理を実行する。 For example, as shown in FIG. 7, it is assumed that the data storage unit 150 of the work management device 100 has acquired operation information regarding the work on May 28th. In this case, in the work performance data 310, there are sowing work 400, plowing work 410, and plowing work 420 as determined work types. Therefore, the type estimation unit 180 executes the process of step S220 shown in FIG. 5B.

ステップS220において、種別推定部180は、ステップS150の処理と同様に、作業計画データ320に基づき、作業装置30により行われた作業の作業種別を推定する。例えば、最初に、種別推定部180は、作業実績データ310に基づき、作業種別が決定されている第1作業の第1作業期間と、作業装置30により行われた第2作業の第2作業期間との関係を取得する。例えば、図7に示す例において、作業種別が決定された播種作業400は5月7日に行われ、作業装置30による作業は5月28日に行われているため、第2作業の作業期間に対して、第1作業は21日前に行われている。このため、種別推定部180は、第1作業の第1作業期間と第2作業の第2作業期間との関係として、第1作業の21日後に第2作業が行われていることを取得する。 In step S220, the type estimating unit 180 estimates the work type of the work performed by the work device 30 based on the work plan data 320, similar to the process in step S150. For example, first, the type estimating unit 180 determines, based on the work performance data 310, the first work period of the first work for which the work type has been determined, and the second work period of the second work performed by the work device 30. Get a relationship with. For example, in the example shown in FIG. 7, the sowing work 400 for which the work type has been determined is performed on May 7th, and the work by the work device 30 is performed on May 28th, so the work period of the second work is In contrast, the first task was performed 21 days ago. Therefore, the type estimation unit 180 obtains that the second work is being performed 21 days after the first work, as the relationship between the first work period of the first work and the second work period of the second work. .

次に、種別推定部180は、作業計画データ320と、決定されている第1作業の作業種別と、第1作業の第1作業期間と第2作業の第2作業期間との関係とに基づき、第2作業の作業種別を推定する。例えば、種別推定部180は、図3に示す作業計画データ320において、決定されている第1作業の作業種別として「播種」を抽出する。図7において5月28日の作業は播種作業400の21日後であるため、種別推定部180は、図3に示す作業計画データ320において、作業種別「播種」の21日後の時期に最も近い計画時期に該当する作業種別として、「除草散布」を抽出する。種別推定部180は、抽出された「除草散布」を5月28日に行われた作業の作業種別として推定する。図7に示す例において、種別推定部180は、決定されている代掻き作業410に対する5月28日の作業の作業期間の関係に基づき、5月28日の作業を決定してもよい。また、種別推定部180は、決定されている耕耘作業420に対する5月28日の作業の作業期間の関係に基づき、5月28日の作業を決定してもよい。 Next, the type estimating unit 180 calculates the type of work based on the work plan data 320, the determined work type of the first work, and the relationship between the first work period of the first work and the second work period of the second work. , estimate the work type of the second work. For example, the type estimating unit 180 extracts "seeding" as the determined work type of the first work in the work plan data 320 shown in FIG. 3 . In FIG. 7, the work on May 28th is 21 days after the sowing work 400, so the type estimating unit 180 determines the plan that is closest to the time 21 days after the work type "seeding" in the work plan data 320 shown in FIG. "Weeding and spraying" is extracted as the work type that corresponds to the period. The type estimating unit 180 estimates the extracted "weeding and spraying" as the work type of the work performed on May 28th. In the example shown in FIG. 7, the type estimating unit 180 may determine the work on May 28th based on the relationship of the work period of the work on May 28th with respect to the determined puddling work 410. Further, the type estimating unit 180 may determine the work to be performed on May 28th based on the relationship of the work period of the work on May 28th to the determined tilling work 420.

図5Bに示すステップS230において、出力部190は、図5Aに示すステップS160の処理と同様に、作業種別を表す作業情報を端末200に出力する。 In step S230 shown in FIG. 5B, the output unit 190 outputs work information representing the work type to the terminal 200, similar to the process in step S160 shown in FIG. 5A.

ステップS240において、端末200の表示部250は、図5Aに示すステップS170の処理と同様に、作業管理装置100から取得した作業情報を表示する。例えば、表示部250は、作業装置30により行われた作業の作業種別を入出力装置210に表示する。また、表示部250は、作業装置30により作業が行われた圃場と、作業装置30により行われた作業種別とを地図上に表した画像を表示してもよい。表示部250は、さらに、作業装置30により作業が行われた作業期間を表示してもよい。 In step S240, the display unit 250 of the terminal 200 displays the work information acquired from the work management device 100, similar to the process in step S170 shown in FIG. 5A. For example, the display unit 250 displays the type of work performed by the work device 30 on the input/output device 210. Further, the display unit 250 may display an image showing on a map the field where the work was performed by the work device 30 and the type of work performed by the work device 30. The display unit 250 may further display the work period in which the work was performed by the work device 30.

このように、作業管理システム1000は、作業計画データ320を利用することで、トラクターなどの汎用装置31により行われた作業の作業種別を精度よく推定する。 In this manner, the work management system 1000 uses the work plan data 320 to accurately estimate the work type of the work performed by the general-purpose device 31 such as a tractor.

(変形例)
実施の形態において説明した構成は一例であり、機能を阻害しない範囲で構成を変更することができる。例えば、作業装置30の稼働情報は、作業装置30を表す識別子として、専用装置32であるか否かを表す情報を含んでもよい。また、稼働情報は、作業装置30が専用装置32であるとき、専用装置32により行われる作業の作業種別を表す情報を含んでもよい。この場合、図5Aに示すステップS130において、専用装置判定部170は、稼働情報に含まれる作業装置30の識別子が専用装置32を表すとき、作業装置30が専用装置32であると判定する。また、ステップS140において、種別推定部180は、作業装置30により行われた作業の作業種別として、稼働情報に含まれる作業装置30の識別子が表す作業種別を決定する。
(Modified example)
The configuration described in the embodiment is an example, and the configuration can be changed within a range that does not impede functionality. For example, the operation information of the work device 30 may include information representing whether the work device 30 is a dedicated device 32 as an identifier representing the work device 30. Furthermore, when the work device 30 is a dedicated device 32, the operation information may include information representing the type of work performed by the dedicated device 32. In this case, in step S130 shown in FIG. 5A, the dedicated device determining unit 170 determines that the working device 30 is the dedicated device 32 when the identifier of the working device 30 included in the operation information indicates the dedicated device 32. Further, in step S140, the type estimating unit 180 determines the work type represented by the identifier of the work device 30 included in the operation information as the work type of the work performed by the work device 30.

図1に示す装置データ300は、圃場で作業を行う専用装置32の識別子と、専用装置32が行う作業の作業種別とを関連付けた情報を格納してもよい。例えば、装置データ300は、汎用装置31に関する情報を含まなくてもよい。この場合、図5Aに示すステップS130において、専用装置判定部170は、稼働情報に表される作業装置30の識別子が装置データ300に含まれるとき、圃場で作業を行った作業装置30が専用装置32に該当すると判定する。また、稼働情報に表される作業装置30の識別子が装置データ300に含まれないとき、専用装置判定部170は、圃場で作業を行った作業装置30が汎用装置31に該当すると判定する。 The device data 300 shown in FIG. 1 may store information that associates the identifier of the dedicated device 32 that performs work in the field with the type of work performed by the dedicated device 32. For example, device data 300 may not include information regarding general-purpose device 31. In this case, in step S130 shown in FIG. 5A, the dedicated device determination unit 170 determines that when the identifier of the working device 30 represented in the operation information is included in the device data 300, the working device 30 that performed the work in the field is a dedicated device. 32. Further, when the identifier of the working device 30 represented in the operation information is not included in the device data 300, the dedicated device determination unit 170 determines that the working device 30 that performed the work in the field corresponds to the general-purpose device 31.

また、装置データ300は、作業装置30の識別子に関連付けて、作業装置30が専用装置32に該当するか否かを表す情報を格納してもよい。この場合、図5Aに示すステップS130において、専用装置判定部170は、稼働情報に表される作業装置30の識別子が装置データ300において専用装置32を表すとき、作業装置30が専用装置32に該当すると判定してもよい。 Further, the device data 300 may store information indicating whether or not the working device 30 corresponds to the dedicated device 32 in association with the identifier of the working device 30. In this case, in step S130 shown in FIG. 5A, the dedicated device determination unit 170 determines that when the identifier of the working device 30 represented in the operation information represents the dedicated device 32 in the device data 300, the working device 30 corresponds to the dedicated device 32. Then, it may be determined.

図5Aに示すステップS150において、種別推定部180は、作業種別が決定された第1作業の作業期間と、未決定の第2作業の作業期間との関係として、作業の順番に基づき、第2作業の作業種別を推定してもよい。例えば、図2に示す例において、種別推定部180は、作業計画データ320に表された作業の順番に基づき、4月9日の作業の作業種別と、5月2日との作業の作業種別とを推定してもよい。例えば、圃場Aにおいて、5月2日の作業は、5月7日の播種作業400の直前の作業に該当する。また、4月9日の作業は、5月7日の播種作業400の2つ前の作業に該当する。図3に示す例において、「播種」の作業に対する直前の作業の作業種別は、「代掻き」に該当する。このため、種別推定部180は、「代掻き」を5月2日の作業の作業種別として決定する。また、「播種」の作業に対する2つ前の作業の作業種別は、「耕耘」に該当する。このため、種別推定部180は、「耕耘」を4月9日の作業の作業種別として決定する。図5Bに示すステップS220においても同様に、種別推定部180は、作業種別が決定されている第1作業の作業期間と、作業装置30により行われた第2作業の作業期間との関係として、作業の順番に基づき、第2作業の作業種別を推定してもよい。 In step S150 shown in FIG. 5A, the type estimating unit 180 calculates the second work based on the order of the work as the relationship between the work period of the first work whose work type has been determined and the work period of the second work whose work type has not been determined. The work type of the work may be estimated. For example, in the example shown in FIG. 2, the type estimating unit 180 determines the work type of the work on April 9th and the work type of the work on May 2nd based on the order of the work expressed in the work plan data 320. It may be estimated that For example, in field A, the work on May 2nd corresponds to the work immediately before the sowing work 400 on May 7th. Further, the work on April 9th corresponds to the work two steps before the sowing work 400 on May 7th. In the example shown in FIG. 3, the work type of the work immediately preceding the "seeding" work corresponds to "plowing". For this reason, the type estimating unit 180 determines "padding" as the work type for the work on May 2nd. Furthermore, the work type of the second work before the "seeding" work corresponds to "cultivation". Therefore, the type estimating unit 180 determines "cultivation" as the work type for the work on April 9th. Similarly, in step S220 shown in FIG. 5B, the type estimating unit 180 calculates the relationship between the work period of the first work for which the work type has been determined and the work period of the second work performed by the work device 30. The work type of the second work may be estimated based on the order of the work.

図1に示す作業計画データ320は、1つ以上の圃場において、作業装置30により行われる作業の予定として予定期間、例えば予定日を表してもよい。この場合、図5Aに示すステップS150において、種別推定部180は、作業計画データ320と、未決定の第2作業の作業期間とに基づき、第2作業の作業種別を推定する。例えば、種別推定部180は、作業計画データ320に格納された予定期間のうち、未決定の第2作業の作業期間に最も近い予定期間に基づき、第2作業の作業種別を推定する。例えば、種別推定部180は、未決定の第2作業の作業期間に最も近い予定期間を抽出し、作業計画データ320において予定期間に行う予定の作業の作業種別を第2作業の作業種別として推定する。また、図5Bに示すステップS220においても同様に、種別推定部180は、作業計画データ320と、作業装置30により行われた作業の作業期間とに基づき、作業種別を推定してもよい。 The work plan data 320 shown in FIG. 1 may represent a scheduled period, for example, a scheduled date, as a scheduled work to be performed by the working device 30 in one or more fields. In this case, in step S150 shown in FIG. 5A, the type estimation unit 180 estimates the work type of the second work based on the work plan data 320 and the undetermined work period of the second work. For example, the type estimation unit 180 estimates the work type of the second work based on the scheduled period that is closest to the undetermined work period of the second work among the scheduled periods stored in the work plan data 320. For example, the type estimating unit 180 extracts the scheduled period closest to the undetermined work period of the second work, and estimates the work type of the work scheduled to be performed in the scheduled period in the work plan data 320 as the work type of the second work. do. Similarly, in step S220 shown in FIG. 5B, the type estimating unit 180 may estimate the work type based on the work plan data 320 and the work period of the work performed by the work device 30.

また、作業計画データ320は、作業の予定期間として、図8に示すように、栽培される作物と、作型とに応じた栽培暦を表してもよい。例えば、作型は、栽培されている作物の作型名称(例えば春植、夏植など)、作物の種類、品種(早生、中生、晩生)、栽培周期、栽培方式などの情報を含む。図8に示す例は、「作物A」を「作型A」で栽培するときの栽培暦を表す。この栽培暦は、3月後半から4月中旬の間に耕耘が行われることを表す。また、栽培暦は、4月中旬から5月初めまでの間に代掻きが行われることを表し、5月初めから5月終わりまでの間に播種が行われることを表す。また、栽培暦は、6月初めから7月初めまでの間に除草散布が行われることを表す。 Further, the work plan data 320 may represent a cultivation calendar according to the crops to be cultivated and the cropping type, as shown in FIG. 8, as the scheduled period of work. For example, the cropping type includes information such as the cropping type name of the cultivated crop (for example, spring planting, summer planting, etc.), crop type, variety (early maturing, middle maturing, late maturing), cultivation cycle, cultivation method, and the like. The example shown in FIG. 8 represents a cultivation calendar when "crop A" is cultivated using "crop type A." This cultivation calendar indicates that tillage is carried out between late March and mid-April. Furthermore, the cultivation calendar indicates that puddling is performed from mid-April to the beginning of May, and sowing is performed from the beginning of May to the end of May. Furthermore, the cultivation calendar indicates that weeding and spraying will be performed from the beginning of June to the beginning of July.

作業計画データ320が栽培暦を表すとき、図5Aに示すステップS150において、種別推定部180は、栽培暦と、未決定の第2作業の作業期間とに基づき、第2作業の作業種別を推定してもよい。例えば、種別推定部180は、栽培暦において、未決定の第2作業の作業期間に行われる作業の作業種別を、第2作業の作業種別として決定する。図2に示す例において作業が行われた4月9日は、図8に示す栽培暦において耕耘を行う時期に該当する。このため、種別推定部180は、4月9日に行われた作業の作業種別を「耕耘」として推定する。また、図2に示す例において作業が行われた5月2日は、図8に示す栽培暦において「代掻き」と「播種」とに該当する。播種作業400が5月9日に行われているため、種別推定部180は、5月2日に行われた作業の作業種別を「代掻き」として推定する。この場合、各圃場において栽培する作物と作型とは、ユーザにより入力されてもよい。また、図5Bに示すステップS220においても同様に、種別推定部180は、栽培暦と、作業装置30により行われた作業の作業期間とに基づき、作業種別を推定してもよい。 When the work plan data 320 represents a cultivation calendar, in step S150 shown in FIG. 5A, the type estimating unit 180 estimates the work type of the second work based on the cultivation calendar and the undetermined work period of the second work. You may. For example, the type estimating unit 180 determines the work type of the work to be performed during the work period of the undetermined second work in the cultivation calendar as the work type of the second work. April 9th, when the work was performed in the example shown in FIG. 2, corresponds to the time when plowing is performed in the cultivation calendar shown in FIG. Therefore, the type estimating unit 180 estimates the work type of the work performed on April 9th as "cultivation". Furthermore, May 2nd, when the work was performed in the example shown in FIG. 2, corresponds to "plowing" and "seeding" in the cultivation calendar shown in FIG. 8. Since the sowing work 400 was performed on May 9th, the type estimating unit 180 estimates the work type of the work performed on May 2nd as "plowing". In this case, the crops and cropping types to be cultivated in each field may be input by the user. Similarly, in step S220 shown in FIG. 5B, the type estimating unit 180 may estimate the work type based on the cultivation calendar and the work period of the work performed by the work device 30.

また、作業計画データ320は、作物に応じて、作業装置30により作業が行われる作業の予定を表してもよい。この場合、図5Aに示すステップS150と、図5Bに示すステップS220とにおいて、種別推定部180は、作業計画データ320から作業装置30により作業が行われた圃場において栽培されている作物に対応する作業の予定を抽出する。抽出された作業の予定に基づき、種別推定部180は未決定の第2作業の作業種別を推定する。 Further, the work plan data 320 may represent a work schedule to be performed by the work device 30 depending on the crop. In this case, in step S150 shown in FIG. 5A and step S220 shown in FIG. Extract work schedule. Based on the extracted work schedule, the type estimation unit 180 estimates the work type of the undetermined second work.

また、図5Aに示すステップS150において、種別推定部180は、複数の方法を用いて、未決定の第2作業の作業種別を推定してもよい。例えば、種別推定部180は、複数の方法を用いて、未決定の第2作業の作業種別を1つ以上推定し、最も多く推定された作業種別を第2作業の作業種別として推定する。また、種別推定部180は、未決定の第2作業の作業種別を1つ以上推定し、1つ以上の作業種別から任意の方法で1つの作業種別を第2作業の作業種別として推定してもよい。図5Bに示すステップS220においても同様に、種別推定部180は、複数の方法を用いて、作業装置30により行われた作業の作業種別を推定してもよい。 Further, in step S150 shown in FIG. 5A, the type estimating unit 180 may estimate the work type of the undetermined second work using a plurality of methods. For example, the type estimation unit 180 estimates one or more work types of the undetermined second work using a plurality of methods, and estimates the work type that is estimated the most as the work type of the second work. Further, the type estimating unit 180 estimates one or more work types of the undetermined second work, and estimates one work type as the work type of the second work from the one or more work types using an arbitrary method. Good too. Similarly, in step S220 shown in FIG. 5B, the type estimating unit 180 may estimate the work type of the work performed by the work device 30 using a plurality of methods.

また、図5Aに示すステップS170と、図5Bに示すステップS240とにおいて、端末200の表示部250は、専用装置32の種類に基づき決定された第1作業種別と、作業計画データ320に基づき推定された第2作業種別とを区別して表示してもよい。この場合、ユーザは、端末200の入出力装置210に、第2作業種別を確定するための確定操作が入力されてもよい。表示部250は、確定操作が入力されると、第2作業種別を確定したことを表す確定情報を作業管理装置100に出力する。作業管理装置100の種別推定部180は、確定情報に基づき、対応する作業種別が確定したことを表す情報を作業実績データ310に格納する。 Furthermore, in step S170 shown in FIG. 5A and step S240 shown in FIG. The displayed second work type may be distinguished from the second work type. In this case, the user may input a confirmation operation to confirm the second work type into the input/output device 210 of the terminal 200. When the confirmation operation is input, the display unit 250 outputs confirmation information indicating that the second work type has been confirmed to the work management device 100. Based on the confirmation information, the type estimating unit 180 of the work management device 100 stores information indicating that the corresponding work type has been confirmed in the work performance data 310.

また、作業装置30により作業が行われた圃場に関する圃場情報は、ユーザにより端末200の入出力装置210に入力されてもよい。この場合、端末200の表示部250は、圃場情報を作業管理装置100に出力する。作業管理装置100のデータ記憶部150は、圃場情報に基づき、作業装置30により作業が行われた圃場を決定してもよい。 Further, the field information regarding the field where the work was performed by the work device 30 may be input by the user to the input/output device 210 of the terminal 200. In this case, the display unit 250 of the terminal 200 outputs field information to the work management device 100. The data storage unit 150 of the work management device 100 may determine the field where the work was performed by the work device 30 based on the field information.

以上において説明した実施の形態および変形例は一例であり、各実施の形態および変形例で説明した構成は、機能を阻害しない範囲で、任意に変更してもよく、または/および、任意に組み合わせてもよい。さらに、必要となる機能を実現できれば、実施の形態および変形例で説明した一部の機能を省略してもよい。例えば、作業管理装置100の一部、または、すべての処理を端末200が実行してもよい。また、端末200の一部、または、すべての処理を作業管理装置100が実行してもよい。作業管理プログラム330は、表示プログラム340を含んでもよい。また、作業管理システム1000は、端末200を含まず、作業管理システム1000に含まれない外部端末に作業情報を表示させてもよい。また、作業装置30により作業が行われた作業期間は、複数の日にまたがっていてもよい。 The embodiments and modified examples described above are merely examples, and the configurations described in each embodiment and modified example may be arbitrarily changed and/or combined in any manner within a range that does not impede functionality. You can. Furthermore, some of the functions described in the embodiments and modified examples may be omitted if the necessary functions can be realized. For example, the terminal 200 may execute some or all of the processing of the work management device 100. Further, the work management device 100 may execute some or all of the processing of the terminal 200. Work management program 330 may include display program 340. Further, the work management system 1000 may not include the terminal 200 and may display work information on an external terminal that is not included in the work management system 1000. Furthermore, the work period in which the work is performed by the work device 30 may span multiple days.

(付記)
各実施の形態で記載した作業管理方法と、作業管理システムと、作業管理プログラムとは以下のように言うことができる。
(Additional note)
The work management method, work management system, and work management program described in each embodiment can be described as follows.

第1の態様に係る作業管理方法は、
専用装置が圃場で第1作業を行った第1作業期間と、作業装置が前記圃場で第2作業を行った第2作業期間と、前記圃場における作業計画データとに基づき、前記第2作業の種類を表す第2作業種別を推定することと、
前記推定された前記第2作業種別を表す作業情報を出力することと、
を含み、
前記専用装置は、作業の種類の1つを表す第1作業種別の作業のみを行う。
The work management method according to the first aspect is
The second work is performed based on the first work period in which the dedicated device performed the first work in the field, the second work period in which the work device performed the second work in the field, and the work plan data in the field. estimating a second work type representing the type;
outputting work information representing the estimated second work type;
including;
The dedicated device performs only work of a first work type representing one of the work types.

第2の態様に係る作業管理方法は、第1の態様に係る作業管理方法であって、
前記第2作業種別を推定することは、
前記作業計画データに基づき、前記圃場において、前記第1作業種別の作業が行われる予定の第1計画時期と、前記第2作業種別の作業が行われる予定の第2計画時期との関係を抽出することと、
前記第1作業期間と前記第2作業期間との関係と、前記第1計画時期と前記第2計画時期との関係とに基づき、前記第2作業種別を推定することと、
を含む。
The work management method according to the second aspect is the work management method according to the first aspect, comprising:
Estimating the second work type includes:
Based on the work plan data, extracting a relationship between a first planned time when work of the first work type is scheduled to be performed and a second planned time when work of the second work type is scheduled to be performed in the field. to do and
Estimating the second work type based on the relationship between the first work period and the second work period and the relationship between the first planning period and the second planning period;
including.

第3の態様に係る作業管理方法は、第2の態様に係る作業管理方法であって、
前記第1作業期間と前記第2作業期間との関係は、前記第1作業期間と前記第2作業期間との順番を表し、
前記第1計画時期と前記第2計画時期との関係は、前記第1計画時期と前記第2計画時期との順番を表す。
The work management method according to the third aspect is the work management method according to the second aspect, comprising:
The relationship between the first work period and the second work period represents the order of the first work period and the second work period,
The relationship between the first planning period and the second planning period represents the order of the first planning period and the second planning period.

第4の態様に係る作業管理方法は、第2または第3の態様に係る作業管理方法であって、
前記第1作業期間と前記第2作業期間との関係は、前記第1作業期間と前記第2作業期間との差を表し、
前記第1計画時期と前記第2計画時期との関係は、前記第1計画時期と前記第2計画時期との差を表す。
The work management method according to the fourth aspect is the work management method according to the second or third aspect, comprising:
The relationship between the first work period and the second work period represents the difference between the first work period and the second work period,
The relationship between the first planning period and the second planning period represents the difference between the first planning period and the second planning period.

第5の態様に係る作業管理方法は、第1から第4の態様のいずれか1つに係る作業管理方法であって、
前記作業計画データは、前記圃場において、前記専用装置と、前記作業装置とにより行われる作業の予定期間を表し、
前記第2作業種別を推定することは、
前記作業計画データにおいて、前記第2作業期間が該当する前記予定期間を決定することと、
前記作業計画データにおいて、前記予定期間に対応する作業種別を前記第2作業種別として推定することと、
を含む。
The work management method according to the fifth aspect is the work management method according to any one of the first to fourth aspects,
The work plan data represents a scheduled period of work to be performed by the dedicated device and the work device in the field,
Estimating the second work type includes:
In the work plan data, determining the scheduled period to which the second work period corresponds;
In the work plan data, estimating a work type corresponding to the scheduled period as the second work type;
including.

第6の態様に係る作業管理方法は、第5の態様に係る作業管理方法であって、
前記作業計画データにおける予定期間は、栽培暦を表す。
The work management method according to the sixth aspect is the work management method according to the fifth aspect, comprising:
The scheduled period in the work plan data represents a cultivation calendar.

第7の態様に係る作業管理方法は、
作業装置が圃場で第2作業を行った第2作業期間と、前記圃場における作業計画データとに基づき、前記第2作業の種類を表す第2作業種別を推定することと、
前記推定された前記第2作業種別を表す作業情報を出力することと、
を含み、
前記作業計画データは、前記圃場において、前記作業装置により行われる作業の予定期間を表す。
The work management method according to the seventh aspect includes:
Estimating a second work type representing the type of the second work based on a second work period during which a work device performed a second work in the field and work plan data in the field;
outputting work information representing the estimated second work type;
including;
The work plan data represents a scheduled period of work to be performed by the work device in the field.

第8の態様に係る作業管理システムは、
専用装置が圃場で第1作業を行った第1作業期間と、作業装置が前記圃場で第2作業を行った第2作業期間と、前記圃場における作業計画データとに基づき、前記第2作業の種類を表す第2作業種別を推定する種別推定部と、
前記推定された前記第2作業種別を表す作業情報を出力する出力部と、
を備え、
前記専用装置は、作業の種類の1つを表す第1作業種別の作業のみを行う。
The work management system according to the eighth aspect includes:
The second work is performed based on the first work period in which the dedicated device performed the first work in the field, the second work period in which the work device performed the second work in the field, and the work plan data in the field. a type estimation unit that estimates a second work type representing the type;
an output unit that outputs work information representing the estimated second work type;
Equipped with
The dedicated device performs only work of a first work type representing one of the work types.

第9の態様に係る作業管理システムは、
作業装置が圃場で第2作業を行った第2作業期間と、前記圃場における作業計画データとに基づき、前記第2作業の種類を表す第2作業種別を推定する種別推定部と、
前記推定された前記第2作業種別を表す作業情報を出力する出力部と、
を備え、
前記作業計画データは、前記圃場において、前記作業装置により行われる作業の予定期間を表す。
The work management system according to the ninth aspect includes:
a type estimating unit that estimates a second work type representing the type of the second work based on a second work period during which the work device performed the second work in the field and work plan data in the field;
an output unit that outputs work information representing the estimated second work type;
Equipped with
The work plan data represents a scheduled period of work to be performed by the work device in the field.

第10の態様に係る作業管理プログラムは、
専用装置が圃場で第1作業を行った第1作業期間と、作業装置が前記圃場で第2作業を行った第2作業期間と、前記圃場における作業計画データとに基づき、前記第2作業の種類を表す第2作業種別を推定することと、
前記推定された前記第2作業種別を表す作業情報を出力することと、
を演算装置に実行させ、
前記専用装置は、作業の種類の1つを表す第1作業種別の作業のみを行う。
The work management program according to the tenth aspect is
The second work is performed based on the first work period in which the dedicated device performed the first work in the field, the second work period in which the work device performed the second work in the field, and the work plan data in the field. estimating a second work type representing the type;
outputting work information representing the estimated second work type;
to be executed by a computing device,
The dedicated device performs only work of a first work type representing one of the work types.

第11の態様に係る作業管理プログラムは、
作業装置が圃場で第2作業を行った第2作業期間と、前記圃場における作業計画データとに基づき、前記第2作業の種類を表す第2作業種別を推定することと、
前記推定された前記第2作業種別を表す作業情報を出力することと、
を演算装置に実行させ、
前記作業計画データは、前記圃場において、前記作業装置により行われる作業の予定期間を表す。
The work management program according to the eleventh aspect is
Estimating a second work type representing the type of the second work based on a second work period during which a work device performed a second work in the field and work plan data in the field;
outputting work information representing the estimated second work type;
to be executed by a computing device,
The work plan data represents a scheduled period of work to be performed by the work device in the field.

1、2 :記憶媒体
20 :ネットワーク
30 :作業装置
31 :汎用装置
32 :専用装置
100 :作業管理装置
110 :入出力装置
120 :演算装置
130 :通信装置
140 :記憶装置
150 :データ記憶部
160 :期間決定部
170 :専用装置判定部
180 :種別推定部
190 :出力部
200 :端末
210 :入出力装置
220 :演算装置
230 :通信装置
240 :記憶装置
250 :表示部
300 :装置データ
310 :作業実績データ
320 :作業計画データ
330 :作業管理プログラム
340 :表示プログラム
400 :播種作業
410 :代掻き作業
420 :耕耘作業
1000 :作業管理システム
1, 2: Storage medium 20: Network 30: Work device 31: General-purpose device 32: Dedicated device 100: Work management device 110: Input/output device 120: Computing device 130: Communication device 140: Storage device 150: Data storage section 160: Period determination unit 170 : Dedicated device determination unit 180 : Type estimation unit 190 : Output unit 200 : Terminal 210 : Input/output device 220 : Arithmetic device 230 : Communication device 240 : Storage device 250 : Display unit 300 : Device data 310 : Work record Data 320: Work plan data 330: Work management program 340: Display program 400: Seeding work 410: Plowing work 420: Tilling work 1000: Work management system

Claims (11)

専用装置が圃場で第1作業を行った第1作業期間と、作業装置が前記圃場で第2作業を行った第2作業期間と、前記圃場における作業計画データとに基づき、前記第2作業の種類を表す第2作業種別を推定することと、
前記推定された前記第2作業種別を表す作業情報を出力することと、
を含み、
前記専用装置は、作業の種類の1つを表す第1作業種別の作業のみを行う
作業管理方法。
The second work is performed based on the first work period in which the dedicated device performed the first work in the field, the second work period in which the work device performed the second work in the field, and the work plan data in the field. estimating a second work type representing the type;
outputting work information representing the estimated second work type;
including;
The dedicated device performs only work of a first work type representing one of the work types.
前記第2作業種別を推定することは、
前記作業計画データに基づき、前記圃場において、前記第1作業種別の作業が行われる予定の第1計画時期と、前記第2作業種別の作業が行われる予定の第2計画時期との関係を抽出することと、
前記第1作業期間と前記第2作業期間との関係と、前記第1計画時期と前記第2計画時期との関係とに基づき、前記第2作業種別を推定することと、
を含む請求項1に記載の作業管理方法。
Estimating the second work type includes:
Based on the work plan data, extracting a relationship between a first planned time when work of the first work type is scheduled to be performed and a second planned time when work of the second work type is scheduled to be performed in the field. to do and
Estimating the second work type based on the relationship between the first work period and the second work period and the relationship between the first planning period and the second planning period;
The work management method according to claim 1, comprising:
前記第1作業期間と前記第2作業期間との関係は、前記第1作業期間と前記第2作業期間との順番を表し、
前記第1計画時期と前記第2計画時期との関係は、前記第1計画時期と前記第2計画時期との順番を表す
請求項2に記載の作業管理方法。
The relationship between the first work period and the second work period represents the order of the first work period and the second work period,
The work management method according to claim 2, wherein the relationship between the first planning period and the second planning period represents the order of the first planning period and the second planning period.
前記第1作業期間と前記第2作業期間との関係は、前記第1作業期間と前記第2作業期間との差を表し、
前記第1計画時期と前記第2計画時期との関係は、前記第1計画時期と前記第2計画時期との差を表す
請求項2または3に記載の作業管理方法。
The relationship between the first work period and the second work period represents the difference between the first work period and the second work period,
The work management method according to claim 2 or 3, wherein the relationship between the first planning period and the second planning period represents a difference between the first planning period and the second planning period.
前記作業計画データは、前記圃場において、前記専用装置と、前記作業装置とにより行われる作業の予定期間を表し、
前記第2作業種別を推定することは、
前記作業計画データにおいて、前記第2作業期間が該当する前記予定期間を決定することと、
前記作業計画データにおいて、前記予定期間に対応する作業種別を前記第2作業種別として推定することと、
を含む請求項1から3のいずれか1項に記載の作業管理方法。
The work plan data represents a scheduled period of work to be performed by the dedicated device and the work device in the field,
Estimating the second work type includes:
In the work plan data, determining the scheduled period to which the second work period corresponds;
In the work plan data, estimating a work type corresponding to the scheduled period as the second work type;
The work management method according to any one of claims 1 to 3, comprising:
前記作業計画データにおける予定期間は、栽培暦を表す
請求項5に記載の作業管理方法。
The work management method according to claim 5, wherein the scheduled period in the work plan data represents a cultivation calendar.
作業装置が圃場で第2作業を行った第2作業期間と、前記圃場における作業計画データとに基づき、前記第2作業の種類を表す第2作業種別を推定することと、
前記推定された前記第2作業種別を表す作業情報を出力することと、
を含み、
前記作業計画データは、前記圃場において、前記作業装置により行われる作業の予定期間を表す
作業管理方法。
Estimating a second work type representing the type of the second work based on a second work period during which a work device performed a second work in the field and work plan data in the field;
outputting work information representing the estimated second work type;
including;
The work plan data represents a scheduled period of work to be performed by the work equipment in the field.
専用装置が圃場で第1作業を行った第1作業期間と、作業装置が前記圃場で第2作業を行った第2作業期間と、前記圃場における作業計画データとに基づき、前記第2作業の種類を表す第2作業種別を推定する種別推定部と、
前記推定された前記第2作業種別を表す作業情報を出力する出力部と、
を備え、
前記専用装置は、作業の種類の1つを表す第1作業種別の作業のみを行う
作業管理システム。
The second work is performed based on the first work period in which the dedicated device performed the first work in the field, the second work period in which the work device performed the second work in the field, and the work plan data in the field. a type estimation unit that estimates a second work type representing the type;
an output unit that outputs work information representing the estimated second work type;
Equipped with
The dedicated device performs only work of a first work type representing one of the work types.A work management system.
作業装置が圃場で第2作業を行った第2作業期間と、前記圃場における作業計画データとに基づき、前記第2作業の種類を表す第2作業種別を推定する種別推定部と、
前記推定された前記第2作業種別を表す作業情報を出力する出力部と、
を備え、
前記作業計画データは、前記圃場において、前記作業装置により行われる作業の予定期間を表す
作業管理システム。
a type estimating unit that estimates a second work type representing the type of the second work based on a second work period during which the work device performed the second work in the field and work plan data in the field;
an output unit that outputs work information representing the estimated second work type;
Equipped with
The work plan data represents a scheduled period of work to be performed by the work equipment in the field. A work management system.
専用装置が圃場で第1作業を行った第1作業期間と、作業装置が前記圃場で第2作業を行った第2作業期間と、前記圃場における作業計画データとに基づき、前記第2作業の種類を表す第2作業種別を推定することと、
前記推定された前記第2作業種別を表す作業情報を出力することと、
を演算装置に実行させ、
前記専用装置は、作業の種類の1つを表す第1作業種別の作業のみを行う
作業管理プログラム。
The second work is performed based on the first work period in which the dedicated device performed the first work in the field, the second work period in which the work device performed the second work in the field, and the work plan data in the field. estimating a second work type representing the type;
outputting work information representing the estimated second work type;
to be executed by a computing device,
The dedicated device performs only work of a first work type representing one of the work types.A work management program.
作業装置が圃場で第2作業を行った第2作業期間と、前記圃場における作業計画データとに基づき、前記第2作業の種類を表す第2作業種別を推定することと、
前記推定された前記第2作業種別を表す作業情報を出力することと、
を演算装置に実行させ、
前記作業計画データは、前記圃場において、前記作業装置により行われる作業の予定期間を表す
作業管理プログラム。
Estimating a second work type representing the type of the second work based on a second work period during which a work device performed a second work in the field and work plan data in the field;
outputting work information representing the estimated second work type;
to be executed by a computing device,
The work plan data represents a scheduled period of work to be performed by the work equipment in the field. Work management program.
JP2022131123A 2022-08-19 2022-08-19 Work management method, work management system, and work management program Pending JP2024027923A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022131123A JP2024027923A (en) 2022-08-19 2022-08-19 Work management method, work management system, and work management program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022131123A JP2024027923A (en) 2022-08-19 2022-08-19 Work management method, work management system, and work management program

Publications (1)

Publication Number Publication Date
JP2024027923A true JP2024027923A (en) 2024-03-01

Family

ID=90040012

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022131123A Pending JP2024027923A (en) 2022-08-19 2022-08-19 Work management method, work management system, and work management program

Country Status (1)

Country Link
JP (1) JP2024027923A (en)

Similar Documents

Publication Publication Date Title
JP5157929B2 (en) Work recording apparatus, work recording system, and work recording program
EP3358519A1 (en) Field management system
US20140278233A1 (en) Calculation method, computer product, calculating apparatus
CN112330149A (en) Crop management system, method and device and electronic equipment
WO2022181258A1 (en) Work plan management method, work plan management device, work plan management system, and storage medium
JP2024027923A (en) Work management method, work management system, and work management program
JP7503009B2 (en) Work management method, work management device, and work management program
JP2016218949A (en) Display apparatus
JP7495889B2 (en) Trajectory information output system, trajectory information output program, and trajectory information output method
US20230060662A1 (en) Work management method, work management system, and work management program
WO2022163452A1 (en) Agricultural information management system, storage medium, and agricultural information management method
JP2023102334A (en) Work managing method, work managing system and work managing program
JP2023061574A (en) Field management method, field management system, and field management program
JP6163056B2 (en) Agricultural support system
JP2024114141A (en) Work management method, work management system, and work management program
JP2022190324A (en) Harvesting management method, harvesting management system and harvesting management program
JP7426921B2 (en) Work judgment system, work judgment method and work judgment program
WO2022176601A1 (en) Work management method, work management system, and storage medium
WO2022168605A1 (en) Work management system, storage medium, and work management method
KR20220147018A (en) Work management method, work management system and work management program
JP2023141280A (en) Method for managing farm field, farm field management system, and farm field management program
JP2023132539A (en) Work management method, work management system, and work management program
JP2022146349A (en) Work management method, work management system, and work management program
JP2023037741A (en) Method for managing farm field, farm field management system, and farm field management program
CN116420156A (en) Job information management device, job information management system, storage medium, and job information management method