JP2023165566A - Weed-proofing method for road - Google Patents

Weed-proofing method for road Download PDF

Info

Publication number
JP2023165566A
JP2023165566A JP2022076780A JP2022076780A JP2023165566A JP 2023165566 A JP2023165566 A JP 2023165566A JP 2022076780 A JP2022076780 A JP 2022076780A JP 2022076780 A JP2022076780 A JP 2022076780A JP 2023165566 A JP2023165566 A JP 2023165566A
Authority
JP
Japan
Prior art keywords
layer
urethane resin
control method
weed control
laminating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2022076780A
Other languages
Japanese (ja)
Inventor
一也 桑原
Kazuya Kuwabara
知弘 倉科
Tomohiro Kurashina
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Niigata Iji Service Co Ltd
Special Technology Co Ltd
Original Assignee
Niigata Iji Service Co Ltd
Special Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Niigata Iji Service Co Ltd, Special Technology Co Ltd filed Critical Niigata Iji Service Co Ltd
Priority to JP2022076780A priority Critical patent/JP2023165566A/en
Publication of JP2023165566A publication Critical patent/JP2023165566A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

To provide a weed-proofing method for a road capable of suppressing the generation of weeds in response to various road environments and improving road maintenance surfaces, traffic safety surfaces, landscape surfaces, and environmental surfaces.SOLUTION: A weed-proofing method has a step of forming an adhesive layer, a step of laminating a urethane resin layer on the adhesive layer, and a step of laminating a coating material layer on the urethane resin layer, and covers a construction range with a coating layer 13. The construction range is a part 2AA of the road surface 2A, a clearance part 8 between the road surface 2A and a traffic strip 1, the entire side surface 3B of the traffic strip 1, and the entire upper surface 3A of the traffic strip 1.SELECTED DRAWING: Figure 1

Description

特許法第30条第2項適用申請有り 公開日 2021年6月1日等 公開した場所 新潟県新潟市西区坂井地内等Application for application of Article 30, Paragraph 2 of the Patent Act Published date: June 1, 2021, etc. Published location: Sakai grounds, Nishi Ward, Niigata City, Niigata Prefecture, etc.

本発明は道路の防草工法に関するものである。 The present invention relates to a road weed control method.

近年、道路の維持管理作業には、多大な経費を必要とすると同時に、管理作業に道路規制による車両の渋滞を発生させたり、維持管理作業中に作業員が走行車両によって危険に晒される場合もあった。そこで、以下に示すとおりの道路の隙間をウレタン樹脂で被覆して、道路の隙間からの雑草の発生を抑え、道路維持面、交通安全面、景観面及び環境面の改善を図っていた(特許文献1)。 In recent years, road maintenance work requires a large amount of money, and at the same time, the maintenance work can also cause traffic congestion due to road regulations, and workers can be exposed to danger from moving vehicles during maintenance work. there were. Therefore, the gap in the road was coated with urethane resin as shown below to suppress the growth of weeds from the gap in the road and improve the road maintenance, traffic safety, landscape, and environment (patented Reference 1).

特開2002―54149号公報Japanese Patent Application Publication No. 2002-54149

しかしながら、特許文献1記載の道路の防草工法では、修繕箇所が他の正常な路面に対して継ぎ接ぎ状となり景観を損ねる、という課題があった。 However, the road weed control method described in Patent Document 1 has a problem in that the repaired area becomes patchy with respect to other normal road surfaces, spoiling the landscape.

本発明は、このような事情に鑑みてなされたもので、様々な道路環境に対応して雑草の発生を抑え、道路維持面、交通安全面、景観面及び環境面の改善を図る道路の防草工法を提供することを目的としている。 The present invention was made in view of the above circumstances, and is a road prevention system that suppresses the growth of weeds in various road environments and improves road maintenance, traffic safety, scenery, and the environment. The purpose is to provide grass construction methods.

請求項1の発明は、接着剤層を形成する工程と、前記接着剤層にウレタン樹脂層を積層する工程と、前記ウレタン樹脂層にコーティング材層を積層する工程と、を有し、被覆層によって施工範囲を被覆する防草工法であって、前記施工範囲が、道路面の一部と、前記道路面と分離帯との隙間と、前記分離帯の側面全体と、前記分離帯の上面全体であることを特徴とする。 The invention according to claim 1 includes the steps of forming an adhesive layer, laminating a urethane resin layer on the adhesive layer, and laminating a coating material layer on the urethane resin layer, and forming a coating layer. A weed control method for covering a construction area with a weed control method, wherein the construction area includes a part of the road surface, a gap between the road surface and the separation strip, the entire side surface of the separation strip, and the entire top surface of the separation strip. It is characterized by

請求項2の発明は、前記分離帯の側面にガラスビーズを添加した塗料を塗布する工程を有することを特徴とする。 The invention according to claim 2 is characterized by comprising the step of applying a paint containing glass beads to the side surface of the separation zone.

請求項3の発明は、接着剤層を形成する工程と、前記接着剤層にウレタン樹脂層を積層する工程と、前記ウレタン樹脂層にコーティング材層を積層する工程と、を有し、被覆層によって施工範囲を被覆する防草工法であって、前記施工範囲が、車道面の一部と、前記車道面と境界ブロックとの隙間と、前記境界ブロックの側面全体と、前記境界ブロックの上面全体と、前記境界ブロックと歩道面との隙間と、前記歩道面の一部であることを特徴とする。 The invention according to claim 3 includes the steps of forming an adhesive layer, laminating a urethane resin layer on the adhesive layer, and laminating a coating material layer on the urethane resin layer, and the coating layer A weed control method for covering a construction area by a weed control method, wherein the construction area includes a part of the roadway surface, a gap between the roadway surface and a boundary block, the entire side surface of the boundary block, and the entire top surface of the boundary block. , a gap between the boundary block and the sidewalk surface, and a part of the sidewalk surface.

請求項4の発明は、接着剤層を形成する工程と、前記接着剤層にウレタン樹脂層を積層する工程と、前記ウレタン樹脂層にコーティング材層を積層する工程と、を有し、被覆層によって施工範囲を被覆する防草工法であって、前記施工範囲が、道路面の一部と、前記道路面とコンクリート壁部との隙間と、前記コンクリート壁部全体であることを特徴とする。 The invention according to claim 4 includes a step of forming an adhesive layer, a step of laminating a urethane resin layer on the adhesive layer, and a step of laminating a coating material layer on the urethane resin layer. This is a weed control method for covering a construction area with a weed control method, characterized in that the construction area is a part of the road surface, a gap between the road surface and the concrete wall, and the entire concrete wall.

請求項5の発明は、接着剤層を形成する工程と、前記接着剤層にウレタン樹脂層を積層する工程と、前記ウレタン樹脂層にコーティング材層を積層する工程と、を有し、被覆層によって施工範囲を被覆する防草工法であって、前記施工範囲が、道路面の一部と、前記道路面とU字溝との隙間と、前記U字溝の側壁であることを特徴とする。 The invention according to claim 5 includes the steps of forming an adhesive layer, laminating a urethane resin layer on the adhesive layer, and laminating a coating material layer on the urethane resin layer, and forming a coating layer. A weed control method for covering a construction area with a weed control method, characterized in that the construction area is a part of the road surface, a gap between the road surface and the U-shaped groove, and a side wall of the U-shaped groove. .

請求項6の発明は、接着剤層を形成する工程と、前記接着剤層にウレタン樹脂層を積層する工程と、前記ウレタン樹脂層にコーティング材層を積層する工程と、を有し、被覆層によって施工範囲を被覆する防草工法であって、前記施工範囲が、地面に敷設した下地シートであることを特徴とする。 The invention according to claim 6 includes a step of forming an adhesive layer, a step of laminating a urethane resin layer on the adhesive layer, and a step of laminating a coating material layer on the urethane resin layer. This is a weed control method for covering a construction area with a weed control method, characterized in that the construction area is a base sheet laid on the ground.

請求項7の発明は、接着剤層を形成する工程と、前記接着剤層にウレタン樹脂層を積層する工程と、前記ウレタン樹脂層にコーティング材層を積層する工程と、を有し、被覆層によって施工範囲を被覆する防草工法であって、前記施工範囲が、道路面の一部と、前記道路面と境界ブロックとの隙間と、前記境界ブロックの上面全体と、前記境界ブロックと前記境界ブロックにより区画された植栽区域との隙間と、前記植栽区域の一部であることを特徴とする。 The invention according to claim 7 includes the steps of forming an adhesive layer, laminating a urethane resin layer on the adhesive layer, and laminating a coating material layer on the urethane resin layer, and the coating layer A weed control method for covering a construction range by a weed control method, wherein the construction range covers a part of the road surface, a gap between the road surface and a boundary block, the entire upper surface of the boundary block, and the boundary between the boundary block and the boundary block. It is characterized by having a gap between it and a planting area divided by blocks, and being a part of the planting area.

請求項8の発明は、前記植栽区域を水透過部材により被覆することを特徴とする。 The invention according to claim 8 is characterized in that the planting area is covered with a water permeable member.

本発明によれば、隙間部をウレタン樹脂層で被覆することで、雑草の発生を抑え、道路維持面、交通安全面、景観面及び環境面の改善を図ることができる。 According to the present invention, by covering the gap with a urethane resin layer, it is possible to suppress the growth of weeds and improve road maintenance, traffic safety, scenery, and the environment.

本発明の第1実施例を示す境界ブロック付近の道路の防草工法の断面図である。1 is a cross-sectional view of a weed control method for a road near a boundary block, showing a first embodiment of the present invention. 同上、図1における境界ブロックの立ち上げ部付近の拡大断面図である。FIG. 2 is an enlarged cross-sectional view of the vicinity of the rising portion of the boundary block in FIG. 1, same as above. 同上、(A)は防草工法施工後の境界ブロック付近の道路の斜視図であり、(B)防草工法施工前の境界ブロック付近の道路の斜視図である。Same as above, (A) is a perspective view of the road near the boundary block after the weed control method is applied, and (B) is a perspective view of the road near the boundary block before the weed control method is applied. 本発明の第2実施例を示す道路の断面図である。FIG. 3 is a sectional view of a road showing a second embodiment of the present invention. 同上、拡大断面図である。Same as above, it is an enlarged sectional view. 本発明の第3実施例を示す道路の断面図である。It is a sectional view of the road showing the third example of the present invention. 同上、拡大断面図である。Same as above, it is an enlarged sectional view. 本発明の第4実施例を示す道路の防草工法の斜視図である。It is a perspective view of the weed prevention construction method of the road which shows the 4th Example of this invention. 同上、排水用U字溝付近の道路の断面図である。It is a sectional view of the road near the drainage U-shaped groove, same as above. 本発明の第5実施例を示す道路の防草工法の断面図である。It is a sectional view of the weed prevention method of the road showing the fifth example of the present invention. 本発明の第6実施例を示す道路の斜視図であり、(A)は防草工法施工後の道路の斜視図であり、(B)は防草工法施工前の道路の斜視図である。It is a perspective view of the road which shows the 6th example of the present invention, (A) is a perspective view of the road after construction of the weed control method, and (B) is a perspective view of the road before construction of the weed control method. 同上、非舗装部の断面図である。It is a sectional view of the non-paved portion of the same as above. 本発明の第7実施例を示す道路の防草工法の斜視図である。It is a perspective view of the weed prevention construction method of the road which shows the 7th Example of this invention. 同上、道路の防草工法の断面図である。Same as above, it is a sectional view of the road weed control method. 同上、被覆層の断面図である。It is a sectional view of the coating layer same as above.

本発明における好適な実施の形態について、添付図面を参照して説明する。尚、以下に説明する実施の形態は、特許請求の範囲に記載された本発明の内容を限定するものではない。また、以下に説明される構成の全てが、本発明の必須要件であるとは限らない。 Preferred embodiments of the present invention will be described with reference to the accompanying drawings. Note that the embodiments described below do not limit the content of the present invention described in the claims. Moreover, not all of the configurations described below are essential requirements of the present invention.

以下、本発明に係る道路の防草工法の第1実施例について、図1~図3を参照しながら詳細に説明する。図1及び図3において、1に示す分離帯は、道路(ここでは、車道2)を分離する島状構造物である。分離帯1は、分離帯1と車道2の境界に沿って敷設された複数のコンクリート製の断面矩形状の境界ブロック3によって分離帯1の周縁が画設されており、複数の境界ブロック3によって囲まれた分離帯1の内部には、モルタルが充填されたモルタル層4と、モルタル層4の上からコンクリートが打設されたコンクリート層5が形成されており、コンクリート層5の上面5Aは、境界ブロック3の上面部3Aと面一となるように形成されている。尚、分離帯1の内部の構成については適宜変更可能とする。 Hereinafter, a first embodiment of the road weed control method according to the present invention will be described in detail with reference to FIGS. 1 to 3. In FIGS. 1 and 3, the separation strip shown at 1 is an island-like structure that separates a road (here, a roadway 2). In the separation strip 1, the periphery of the separation strip 1 is defined by a plurality of boundary blocks 3 made of concrete and having a rectangular cross section laid along the boundary between the separation strip 1 and the roadway 2. Inside the enclosed separation zone 1, a mortar layer 4 filled with mortar and a concrete layer 5 in which concrete is poured from above the mortar layer 4 are formed, and the upper surface 5A of the concrete layer 5 is It is formed to be flush with the upper surface portion 3A of the boundary block 3. Note that the internal configuration of the separation strip 1 can be changed as appropriate.

境界ブロック3とコンクリート層5の間の目地部6において、コンクリート層5を形成する際の乾燥によるコンクリート層5の収縮等によって僅かな隙間部7が形成してしまう場合には、隙間部7から雑草が発生する問題がある。 In the joint part 6 between the boundary block 3 and the concrete layer 5, if a slight gap part 7 is formed due to shrinkage of the concrete layer 5 due to drying when forming the concrete layer 5, etc., from the gap part 7. There is a problem with weeds.

図1に示すように、上記の分離帯1を備えた道路の防草工法の手順について説明する。最初に防草工法の下処理工程として、目地部6の隙間部7と車道2と境界ブロック3の隙間部8より繁茂する雑草を、取り除き、あるいは、伐根し、隙間部7、8に詰まっている夾雑物を除去する。ここで、境界ブロック3が破損している場合には、この段階で境界ブロック3の補修又は交換を行うことが好ましい。続いて、隙間部7、8の土砂をモルタル等の充填物に置換する。 As shown in FIG. 1, the procedure of the weed control method for a road provided with the above separation strip 1 will be explained. First, as a pretreatment process of the weed control method, weeds that grow thick in the gap 7 of the joint 6 and the gap 8 between the driveway 2 and the boundary block 3 are removed or cut down, and the weeds that are clogged in the gaps 7 and 8 are removed or cut down. Remove any impurities that may be present. Here, if the boundary block 3 is damaged, it is preferable to repair or replace the boundary block 3 at this stage. Subsequently, the earth and sand in the gaps 7 and 8 are replaced with a filler such as mortar.

次に防草工程に移行する。まずは、車道2の路面2Aの一部と、路面2Aと分離帯1(ここでは境界ブロック3)との隙間部8と、分離帯1(ここでは境界ブロック3)の側面3B全体と、前記分離帯1の上面全体(ここでは境界ブロック3の上面部3A及びコンクリート層5の上面部5A)まで連続してプライマー等の糊材からなる接着剤を塗布、噴霧または吹き付けして接着剤層9を形成する。 Next, move on to the weed control process. First, a part of the road surface 2A of the roadway 2, a gap 8 between the road surface 2A and the separation strip 1 (here, the boundary block 3), the entire side surface 3B of the separation strip 1 (here, the boundary block 3), and the separation An adhesive made of a glue material such as a primer is continuously applied, sprayed or sprayed to the entire upper surface of the strip 1 (here, the upper surface 3A of the boundary block 3 and the upper surface 5A of the concrete layer 5) to form an adhesive layer 9. Form.

続いて、該接着剤層9にウレタン樹脂を塗布、噴霧または吹き付けして積層し、ウレタン樹脂層10を形成する。ここで、ウレタン樹脂層10に使用されるウレタン樹脂は、2液混合タイプのウレタン樹脂を使用することで、速やかに乾燥固化する速攻乾燥性と、耐候性、耐摩耗性、耐水性、および耐透水性に優れ、ピンホール、クラック等の発生を防ぐ追従性を有している。 Subsequently, a urethane resin is applied, sprayed or sprayed onto the adhesive layer 9 to form a urethane resin layer 10. Here, the urethane resin used for the urethane resin layer 10 is a two-component mixed type urethane resin, so it has fast drying properties that quickly dry and solidify, and has weather resistance, abrasion resistance, water resistance, and resistance. It has excellent water permeability and conformability that prevents pinholes, cracks, etc.

さらに、ウレタン樹脂層10にコーティング材を塗布、噴霧または吹き付けてコーティング材層11を形成する。 Furthermore, a coating material layer 11 is formed by applying, spraying, or spraying a coating material onto the urethane resin layer 10 .

最後に、境界ブロック3の立ち上がり部3Bのコーティング材層11にガラスビーズを添付した塗料を塗布して塗装層12を形成する。尚、塗装層12は境界ブロックの立ち上がり部3B以外のコーティング材層11には形成しないものとする。 Finally, paint with glass beads attached is applied to the coating material layer 11 on the rising portion 3B of the boundary block 3 to form a paint layer 12. Note that the coating layer 12 is not formed on the coating material layer 11 other than the rising portion 3B of the boundary block.

本実施例では、接着剤層9、ウレタン樹脂層10およびコーティング材層11の順に積層してなる被覆層13は、車道2の路面2Aの一部と、路面2Aと分離帯1との隙間部と、分離帯1の側面全体たる境界ブロック3の立ち上がり部3Bと、前記分離帯の上面全体たる境界ブロック3の上面部3A及びコンクリート層5の上面部5Aまでを施工範囲として連続して施工されるものである。 In this embodiment, the coating layer 13 formed by laminating the adhesive layer 9, the urethane resin layer 10, and the coating material layer 11 in this order covers a part of the road surface 2A of the roadway 2 and a gap between the road surface 2A and the separation strip 1. The construction is carried out continuously from the rising part 3B of the boundary block 3, which is the entire side surface of the separation strip 1, to the upper surface 3A of the boundary block 3, which is the entire upper surface of the separation strip, and the upper surface 5A of the concrete layer 5. It is something that

ここで、被覆層13における路面2Aの一部2AAを被覆する範囲13Aとしては、隙間部7を被覆する部分から連続して路面2Aを数センチメートル~数十センチメートル程を被覆する範囲としている。 Here, the range 13A that covers part 2AA of the road surface 2A in the coating layer 13 is a range that covers several centimeters to several tens of centimeters of the road surface 2A continuously from the part that covers the gap 7. .

以上のように本実施例の道路の防草工法では、接着剤層9を形成する工程と、前記接着剤層9にウレタン樹脂層10を積層する工程と、前記ウレタン樹脂層10にコーティング材層11を積層する工程と、を有し、被覆層13によって施工範囲を被覆する防草工法であって、前記施工範囲が、道路面2Aの一部2AAと、前記道路面2Aと分離帯1との隙間部8と、前記分離帯1の側面3B全体と、前記分離帯1の上面3A全体としている。 As described above, the road weed control method of this embodiment includes the steps of forming the adhesive layer 9, laminating the urethane resin layer 10 on the adhesive layer 9, and layering the coating material on the urethane resin layer 10. 11, and covers a construction range with a covering layer 13, the construction range includes a part 2AA of the road surface 2A, and a part 2AA of the road surface 2A and the separation strip 1. , the entire side surface 3B of the separation strip 1, and the entire upper surface 3A of the separation strip 1.

この場合、隙間部7、8をウレタン樹脂層10で被覆するとともに、分離帯1の表面が被覆層13によって完全に被覆することで、太陽光が入る隙間が全く生じないため、極めて高い防草効果を有し、道路維持面、交通安全面、景観面及び環境面の改善を図ることができる。 In this case, by coating the gaps 7 and 8 with the urethane resin layer 10 and completely covering the surface of the separation strip 1 with the coating layer 13, there is no gap for sunlight to enter, resulting in extremely high weed control. It is effective and can improve road maintenance, traffic safety, scenery, and the environment.

前記分離帯1の側面3Bにガラスビーズを添加した塗料を塗布する工程を有することで、ガラスビーズによる光の再起反射特性により境界ブロック3を照らすヘッドライトの光が反射されるので、境界ブロック3の視認性を高めることができる。 By having the step of applying a paint containing glass beads to the side surface 3B of the separation strip 1, the light of the headlights illuminating the boundary block 3 is reflected due to the light recurrence characteristic of the glass beads. visibility can be increased.

図4及び図5は本発明の第2実施例を示し、上記第1実施例と同一部分に同一符号を付し、その詳細な説明を省略して詳述する。本実施例の道路の構成について図4に基いて説明すると、車道20と、歩道21と、車道20と歩道21の境界に沿って設置された境界ブロック22とを有している。 4 and 5 show a second embodiment of the present invention, in which the same parts as in the first embodiment are denoted by the same reference numerals, and detailed description thereof will be omitted and will be described in detail. The configuration of the road in this embodiment will be explained based on FIG. 4. It has a roadway 20, a sidewalk 21, and a boundary block 22 installed along the boundary between the roadway 20 and the sidewalk 21.

歩道21の路面21Aは、境界ブロック22の上面部22Aと面一となるように形成されているため、車道20の路面20Aよりも高く形成されている。 The road surface 21A of the sidewalk 21 is formed to be flush with the upper surface 22A of the boundary block 22, and is therefore higher than the road surface 20A of the roadway 20.

図4に示すように、上記の車道20と歩道21を備えた道路の防草工法の手順について説明する。最初に防草工法の下処理工程として、車道20と境界ブロック22の隙間部23と歩道21と境界ブロック22の隙間部24より繁茂する雑草を、取り除き、あるいは、伐根し、隙間部23、24に詰まっている夾雑物を除去する。ここで、境界ブロック22が破損している場合には、この段階で境界ブロック22の補修又は交換を行うことが好ましい。続いて、隙間部23、24の土砂をモルタル等の充填物に置換する。 As shown in FIG. 4, the procedure of the weed control method for a road including the above-mentioned roadway 20 and sidewalk 21 will be explained. First, as a pretreatment process of the weed control method, weeds growing in the gap 23 between the roadway 20 and the boundary block 22 and the gap 24 between the sidewalk 21 and the boundary block 22 are removed or root-cut. Remove any foreign matter stuck in 24. Here, if the boundary block 22 is damaged, it is preferable to repair or replace the boundary block 22 at this stage. Subsequently, the earth and sand in the gaps 23 and 24 is replaced with a filler such as mortar.

次に防草工程に移行する。まずは、車道20の路面20Aの一部20AAと、路面20Aと境界ブロック22との隙間部23と、境界ブロック22の側面部22B全体と、歩道21の路面21Aと境界ブロック22の上面部22Aの隙間部24と、歩道21の路面21Aの一部21AAまで連続してプライマー等の糊材からなる接着剤を塗布、噴霧または吹き付けして接着剤層25を形成する。 Next, move on to the weed control process. First, a portion 20AA of the road surface 20A of the roadway 20, a gap 23 between the road surface 20A and the boundary block 22, an entire side surface 22B of the boundary block 22, a road surface 21A of the sidewalk 21, and an upper surface 22A of the boundary block 22. An adhesive layer 25 is formed by applying, spraying, or spraying an adhesive made of a glue material such as a primer continuously to the gap part 24 and a part 21AA of the road surface 21A of the sidewalk 21.

続いて、該接着剤層25にウレタン樹脂を塗布、噴霧または吹き付けして積層し、ウレタン樹脂層26を形成する。ここで、ウレタン樹脂層26に使用されるウレタン樹脂は、実施例1と同じものである。 Subsequently, a urethane resin is applied, sprayed or sprayed onto the adhesive layer 25 to form a urethane resin layer 26. Here, the urethane resin used for the urethane resin layer 26 is the same as in Example 1.

さらに、ウレタン樹脂層26にコーティング材を塗布、噴霧または吹き付けてコーティング材層27を形成する。 Furthermore, a coating material layer 27 is formed by applying, spraying, or spraying a coating material onto the urethane resin layer 26 .

本実施例では、接着剤層25、ウレタン樹脂層26およびコーティング材層27の順に積層してなる被覆層28は、車道20の路面20Aの一部20AAと、路面20Aと境界ブロック22との隙間部23と、境界ブロック22の側面部22B全体と、歩道21の路面21Aと境界ブロック22の上面部22Aの隙間部24と、歩道21の路面21Aの一部21AAまでを施工範囲として連続して施工されるものである。 In this embodiment, the coating layer 28 formed by laminating the adhesive layer 25 , the urethane resin layer 26 , and the coating material layer 27 in this order covers a portion 20AA of the road surface 20A of the roadway 20 and a gap between the road surface 20A and the boundary block 22. section 23, the entire side surface 22B of the boundary block 22, the gap 24 between the road surface 21A of the sidewalk 21 and the upper surface 22A of the boundary block 22, and a portion 21AA of the road surface 21A of the sidewalk 21 as the construction range. It will be constructed.

ここで、被覆層28における路面20Aの一部20AA、21AAを被覆する範囲28A、28Bとしては、隙間部23、24を被覆する部分から連続して路面20A、21Aを数センチメートル~数十センチメートル程を被覆するような範囲としている。 Here, the ranges 28A and 28B that cover parts 20AA and 21AA of the road surface 20A in the coating layer 28 are several centimeters to several tens of centimeters from the part that covers the gaps 23 and 24 to the road surfaces 20A and 21A. The area is set to cover about meters.

以上のように本実施例の道路の防草工法では、接着剤層25を形成する工程と、前記接着剤層25にウレタン樹脂層26を積層する工程と、前記ウレタン樹脂層26にコーティング材層27を積層する工程と、を有し、被覆層28によって施工範囲を被覆する防草工法であって、前記施工範囲が、車道面20Aの一部20AAと、前記車道面20Aと境界ブロック22との隙間部23と、前記境界ブロック22の側面22B全体と、前記境界ブロック22の上面22A全体と、前記境界ブロック22と歩道面21Aとの隙間部24と、前記歩道面21Aの一部21AAとしている。 As described above, the road weed control method of this embodiment includes the steps of forming the adhesive layer 25, laminating the urethane resin layer 26 on the adhesive layer 25, and layering the coating material on the urethane resin layer 26. 27, and covers a construction range with a covering layer 28, the construction range includes a part 20AA of the road surface 20A, and a boundary block 22 between the road surface 20A and the road surface 20A. , the entire side surface 22B of the boundary block 22, the entire top surface 22A of the boundary block 22, the gap 24 between the boundary block 22 and the sidewalk surface 21A, and a part 21AA of the sidewalk surface 21A. There is.

この場合、車道面20A、境界ブロック22及び歩道面21と連続して被覆層28を形成することで、景観に優れた防草工法を提供することができる。 In this case, by forming the covering layer 28 continuously on the roadway surface 20A, the boundary block 22, and the sidewalk surface 21, it is possible to provide a weed control method with excellent scenery.

図6及び図7は本発明の第3実施例を示し、上記第1実施例と同一部分に同一符号を付し、その詳細な説明を省略して詳述する。本実施例の道路の構成について図6及び図7に基いて説明すると、歩道30に隣接するコンクリート擁壁31を備えている。コンクリート擁壁31は、例えばコンクリート製のブロック又はパネルを土壁の傾斜に沿って積載したものである。 6 and 7 show a third embodiment of the present invention, in which the same parts as in the first embodiment are denoted by the same reference numerals, and detailed description thereof will be omitted and will be described in detail. The configuration of the road in this embodiment will be explained based on FIGS. 6 and 7. A concrete retaining wall 31 is provided adjacent to a sidewalk 30. The concrete retaining wall 31 is, for example, a structure in which concrete blocks or panels are stacked along the slope of an earthen wall.

図6に示すように、上記の歩道30とコンクリート擁壁31を備えた道路の防草工法の手順について説明する。最初に防草工法の下処理工程として、歩道30と擁壁31の隙間部32より繁茂する雑草を、取り除き、あるいは、伐根し、隙間部32に詰まっている夾雑物を除去する。ここで、擁壁31が破損している場合には、この段階で擁壁31の補修又は交換を行うことが好ましい。続いて、隙間部32の土砂をモルタル等の充填物に置換する。 As shown in FIG. 6, the procedure of the weed control method for a road provided with the above-mentioned sidewalk 30 and concrete retaining wall 31 will be explained. First, as a pretreatment step of the weed control method, weeds growing in the gap 32 between the sidewalk 30 and the retaining wall 31 are removed or their roots are cut, and foreign substances clogging the gap 32 are removed. Here, if the retaining wall 31 is damaged, it is preferable to repair or replace the retaining wall 31 at this stage. Subsequently, the earth and sand in the gap 32 is replaced with a filler such as mortar.

次に防草工程に移行する。まずは、歩道30の路面30Aの一部30AAと、路面30Aと擁壁31との隙間部32と、擁壁31まで連続してプライマー等の糊材からなる接着剤を塗布、噴霧または吹き付けして接着剤層33を形成する。 Next, move on to the weed control process. First, an adhesive made of adhesive such as a primer is applied, sprayed, or sprayed on a part 30AA of the road surface 30A of the sidewalk 30, on the gap 32 between the road surface 30A and the retaining wall 31, and continuously up to the retaining wall 31. An adhesive layer 33 is formed.

続いて、該接着剤層33にウレタン樹脂を塗布、噴霧または吹き付けして積層し、ウレタン樹脂層34を形成する。ここで、ウレタン樹脂層34に使用されるウレタン樹脂は、実施例1のものと同じものである。 Subsequently, a urethane resin is applied, sprayed or sprayed onto the adhesive layer 33 to form a urethane resin layer 34. Here, the urethane resin used for the urethane resin layer 34 is the same as that in Example 1.

さらに、ウレタン樹脂層34にコーティング材を塗布、噴霧または吹き付けてコーティング材層35を形成する。 Furthermore, a coating material layer 35 is formed by applying, spraying, or spraying a coating material onto the urethane resin layer 34 .

本実施例では、図7に示すような接着剤層33、ウレタン樹脂層34およびコーティング材層35の順に積層してなる被覆層36は、歩道30の路面30Aの一部30AAと、路面30Aと擁壁31との隙間部32と、擁壁31までを施工範囲として連続して施工されるものである。 In this embodiment, a coating layer 36 formed by laminating an adhesive layer 33, a urethane resin layer 34, and a coating material layer 35 in this order as shown in FIG. The construction is performed continuously including the gap 32 between the retaining wall 31 and the retaining wall 31.

ここで、被覆層36における路面30Aの一部30AAを被覆する範囲36Aとしては、隙間部32を被覆する部分から連続して路面30Aを数センチメートル~数十センチメートル程を被覆するような範囲としている。 Here, the range 36A that covers the part 30AA of the road surface 30A in the coating layer 36 is a range that covers several centimeters to several tens of centimeters of the road surface 30A continuously from the part that covers the gap 32. It is said that

以上のように本実施例の道路の防草工法では、接着剤層33を形成する工程と、前記接着剤層33にウレタン樹脂層34を積層する工程と、前記ウレタン樹脂層34にコーティング材層35を積層する工程と、を有し、被覆層36によって施工範囲を被覆する防草工法であって、前記施工範囲が、道路面30Aの一部30AAと、前記道路面30Aとコンクリート壁部であるコンクリート擁壁31との隙間部32と、前記コンクリート擁壁31全体とする。 As described above, the road weed control method of this embodiment includes the steps of forming the adhesive layer 33, laminating the urethane resin layer 34 on the adhesive layer 33, and layering the coating material on the urethane resin layer 34. 35, and the weed control method covers a construction area with a covering layer 36, the construction area includes a part 30AA of the road surface 30A, and the road surface 30A and a concrete wall part. A gap 32 between a certain concrete retaining wall 31 and the concrete retaining wall 31 as a whole.

この場合、道路からコンクリート擁壁31まで連続して被覆層36を形成することで、景観に優れた防草工法を提供することができる。 In this case, by forming the covering layer 36 continuously from the road to the concrete retaining wall 31, it is possible to provide a weed control method with excellent scenery.

図8及び図9は本発明の第4実施例を示し、上記第1実施例と同一部分に同一符号を付し、その詳細な説明を省略して詳述する。本実施例の道路の構成について図8及び図9に基いて説明すると、車道40と歩道41の境界に埋設されたコンクリート製の排水用U字溝42を備えている。排水用U字溝42は、左右一対の側壁42A、42Bと、側壁42A、42Bの下端同士を連結する底面部42Cからなる上方を開口した断面略U字形状に形成されている。 8 and 9 show a fourth embodiment of the present invention, in which the same parts as in the first embodiment are denoted by the same reference numerals, and detailed description thereof will be omitted and will be described in detail. The configuration of the road according to this embodiment will be described with reference to FIGS. 8 and 9. A concrete U-shaped drainage groove 42 is buried at the boundary between the roadway 40 and the sidewalk 41. The drainage U-shaped groove 42 is formed into a substantially U-shaped cross section with an upwardly open opening, and includes a pair of left and right side walls 42A, 42B and a bottom surface portion 42C that connects the lower ends of the side walls 42A, 42B.

図8に示すように、上記の排水用U字溝42を備えた道路の防草工法の手順について説明する。最初に防草工法の下処理工程として、車道40と排水用U字溝52の隙間部43及び歩道41と排水用U字溝42の隙間部44より繁茂する雑草を、取り除き、あるいは、伐根し、隙間部43、44に詰まっている夾雑物を除去する。ここで、排水用U字溝42が破損している場合には、この段階で排水用U字溝42の補修又は交換を行うことが好ましい。続いて、隙間部43、44の土砂をモルタル等の充填物に置換する。 As shown in FIG. 8, the procedure of the weed control method for roads provided with the above-mentioned drainage U-shaped groove 42 will be explained. First, as a pretreatment process of the weed control method, weeds that grow thickly in the gap 43 between the roadway 40 and the drainage U-shaped groove 52 and the gap 44 between the sidewalk 41 and the drainage U-shaped groove 42 are removed, or their roots are removed. Then, the foreign matter stuck in the gaps 43 and 44 is removed. Here, if the drainage U-shaped groove 42 is damaged, it is preferable to repair or replace the drainage U-shaped groove 42 at this stage. Subsequently, the earth and sand in the gaps 43 and 44 are replaced with a filler such as mortar.

次に防草工程に移行する。まずは、車道40の路面40Aの一部40AAと、路面40Aと排水用U字溝42との隙間部43と、排水用U字溝42の側壁42Aから底面部42Cの一部までを連続した範囲と、歩道41の路面41Aの一部41AAと、路面41Aと排水用U字溝42との隙間部44と、排水用U字溝42の側壁42Bから底面部42Cまでを連続した範囲とに対して、それぞれプライマー等の糊材からなる接着剤を塗布、噴霧または吹き付けして接着剤層45A、45Bを形成する。 Next, move on to the weed control process. First, a continuous area 40AA of the road surface 40A of the roadway 40, a gap 43 between the road surface 40A and the drainage U-shaped groove 42, and a part of the bottom surface 42C from the side wall 42A of the drainage U-shaped groove 42. , a part 41AA of the road surface 41A of the sidewalk 41, a gap 44 between the road surface 41A and the drainage U-shaped groove 42, and a continuous range from the side wall 42B to the bottom surface 42C of the drainage U-shaped groove 42. Then, the adhesive layers 45A and 45B are formed by applying, spraying, or spraying an adhesive made of a glue material such as a primer, respectively.

続いて、該接着剤層45A、45Bにウレタン樹脂を塗布、噴霧または吹き付けして積層し、ウレタン樹脂層46A、46Bを形成する。ここで、ウレタン樹脂層46A、46Bに使用されるウレタン樹脂は、実施例1のものと同じものである。 Subsequently, urethane resin is applied, sprayed or sprayed onto the adhesive layers 45A and 45B to form urethane resin layers 46A and 46B. Here, the urethane resin used for the urethane resin layers 46A and 46B is the same as that of Example 1.

さらに、ウレタン樹脂層46A、46Bにコーティング材を塗布、噴霧または吹き付けてコーティング材層47A、47Bを形成する。 Further, a coating material is applied, sprayed or sprayed onto the urethane resin layers 46A, 46B to form coating material layers 47A, 47B.

本実施例では、接着剤層45A、ウレタン樹脂層46Aおよびコーティング材層47Aの順に積層してなる被覆層48Aは、車道40の路面40Aの一部40AAと、路面40Aと排水用U字溝42との隙間部43と、排水用U字溝42の側壁42Aから底面部42Cの一部までを施工範囲として連続して施工されるものである。また、接着剤層45B、ウレタン樹脂層46Bおよびコーティング材層47Bの順に積層してなる被覆層48Bは、歩道41の路面41Aの一部41AAと、路面41Aと排水用U字溝42との隙間部44と、排水用U字溝42の側壁42Bから底面部42Cの一部までを施工範囲として連続して施工されるものである。 In this embodiment, a coating layer 48A formed by laminating an adhesive layer 45A, a urethane resin layer 46A, and a coating material layer 47A in this order covers a portion 40AA of the road surface 40A of the roadway 40, a portion 40AA of the road surface 40A, and a drainage U-shaped groove 42. The construction is performed continuously from the side wall 42A of the drainage U-shaped groove 42 to a part of the bottom surface 42C. Further, a coating layer 48B formed by laminating an adhesive layer 45B, a urethane resin layer 46B, and a coating material layer 47B in this order is formed between a part 41AA of the road surface 41A of the sidewalk 41 and a gap between the road surface 41A and the drainage U-shaped groove 42. 44 and a portion of the side wall 42B of the drainage U-shaped groove 42 to a part of the bottom surface 42C as the construction range.

ここで、被覆層48Aにおける路面40Aの一部40AAを被覆する範囲48Aとしては、隙間部43を被覆する部分から連続して路面40Aを数センチメートル~数十センチメートル程を被覆するような範囲としている。同様に、被覆層48Bにおける路面41Aの一部41AAを被覆する範囲48BAとしては、隙間部44を被覆する部分から連続して路面41Aを数センチメートル~数十センチメートル程を被覆するような範囲としている。 Here, the range 48A that covers the part 40AA of the road surface 40A in the coating layer 48A is a range that covers several centimeters to several tens of centimeters of the road surface 40A continuously from the part that covers the gap 43. It is said that Similarly, the range 48BA that covers the part 41AA of the road surface 41A in the coating layer 48B is a range that covers several centimeters to several tens of centimeters of the road surface 41A continuously from the part that covers the gap 44. It is said that

以上のように本実施例の道路の防草工法では、接着剤層45A、45Bを形成する工程と、前記接着剤層45A、45Bにウレタン樹脂層46A、46Bを積層する工程と、前記ウレタン樹脂層46A、46Bにコーティング材層47A、47Bを積層する工程と、を有し、被覆層48A、48Bによって施工範囲を被覆する防草工法であって、前記施工範囲が、道路面40A、41Aの一部40AA、41AA、道路面40A、41AとU字溝42との隙間43、44と、前記U字溝42の側壁42A、42Bとしている。 As described above, the road weed control method of this embodiment includes a step of forming the adhesive layers 45A and 45B, a step of laminating the urethane resin layers 46A and 46B on the adhesive layers 45A and 45B, and a step of laminating the urethane resin layers 46A and 46B. The weed control method includes a step of laminating coating material layers 47A and 47B on layers 46A and 46B, and covers a construction range with coating layers 48A and 48B, wherein the construction range covers road surfaces 40A and 41A. Parts 40AA, 41AA, gaps 43, 44 between the road surfaces 40A, 41A and the U-shaped groove 42, and side walls 42A, 42B of the U-shaped groove 42.

この場合、道路からU字溝42まで連続して被覆層48A、48Bを形成することで、景観に優れた防草工法を提供することができる。 In this case, by forming the covering layers 48A and 48B continuously from the road to the U-shaped groove 42, it is possible to provide a weed control method with excellent scenery.

図10は本発明の第5実施例を示し、上記第1実施例と同一部分に同一符号を付し、その詳細な説明を省略して詳述する。本実施例の道路の構成について図10に基いて説明すると、車道50と隣接した法面51を備えている。車道50と法面51の間には、法面51の上端を保護するために現場打ちコンクリートによって形成された天端コンクリート52を備えている。天端コンクリート52にはガードレール53が設置されている。 FIG. 10 shows a fifth embodiment of the present invention, in which the same parts as in the first embodiment are denoted by the same reference numerals, and detailed description thereof will be omitted and will be described in detail. The configuration of the road in this embodiment will be explained based on FIG. 10. The road includes a roadway 50 and an adjacent slope 51. A crown concrete 52 is provided between the roadway 50 and the slope 51 to protect the upper end of the slope 51, which is made of cast-in-place concrete. A guardrail 53 is installed on the top concrete 52.

本実施例の法面51は表土が露出しており、法面51の一部又は全面には後述するウレタン樹脂層を形成する際に吹き付けられたウレタン樹脂を定着させるための下地シート54によって被覆されている。下地シート54は、L型アンカーなどの複数の固定手段55によって法面51に固定されている。 The topsoil of the slope 51 in this embodiment is exposed, and a part or the entire surface of the slope 51 is covered with a base sheet 54 for fixing the urethane resin sprayed when forming the urethane resin layer, which will be described later. has been done. The base sheet 54 is fixed to the slope 51 by a plurality of fixing means 55 such as L-shaped anchors.

図10に示すように、上記の車道50に法面51を隣接して備えた道路の防草工法の手順について説明する。最初に防草工法の下処理工程として、車道50と天端コンクリート52の隙間部56及び法面51と天端コンクリート52の隙間部57より繁茂する雑草を、取り除き、あるいは、伐根し、隙間部56、57に詰まっている夾雑物を除去する。ここで、法面51や天端コンクリート52が破損している場合には、この段階で法面51や天端コンクリート52の補修又は交換を行うことが好ましい。続いて、隙間部56、57の土砂をモルタル等の充填物に置換する。 As shown in FIG. 10, the procedure of the weed control method for a road having a slope 51 adjacent to the above-mentioned roadway 50 will be explained. First, as a pretreatment process of the weed control method, weeds growing in the gap 56 between the roadway 50 and the crown concrete 52 and the gap 57 between the slope 51 and the crown concrete 52 are removed or root-cut, and Remove foreign matter stuck in parts 56 and 57. Here, if the slope 51 or the crown concrete 52 is damaged, it is preferable to repair or replace the slope 51 or the crown concrete 52 at this stage. Subsequently, the earth and sand in the gaps 56 and 57 are replaced with a filler such as mortar.

次に防草工程に移行する。まずは、車道50の路面50Aの一部50AAと、路面50Aと天端コンクリート52との隙間部56と、天端コンクリート52の上面52A全体と、法面51と天端コンクリート52の隙間部57と、法面51における下地シート54によって覆われた箇所までを連続した範囲に対して、プライマー等の糊材からなる接着剤を塗布、噴霧または吹き付けして接着剤層58を形成する。 Next, move on to the weed control process. First, a portion 50AA of the road surface 50A of the roadway 50, a gap 56 between the road surface 50A and the crown concrete 52, an entire upper surface 52A of the crown concrete 52, and a gap 57 between the slope 51 and the crown concrete 52. An adhesive layer 58 is formed by applying, spraying, or spraying an adhesive made of a glue material such as a primer to a continuous range of the slope surface 51 up to the area covered by the base sheet 54 .

続いて、該接着剤層58にウレタン樹脂を塗布、噴霧または吹き付けして積層し、ウレタン樹脂層59を形成する。ここで、ウレタン樹脂層59に使用されるウレタン樹脂は、実施例1のものと同じものである。 Subsequently, a urethane resin is applied, sprayed or sprayed onto the adhesive layer 58 to form a urethane resin layer 59. Here, the urethane resin used for the urethane resin layer 59 is the same as that in Example 1.

さらに、ウレタン樹脂層59にコーティング材を塗布、噴霧または吹き付けてコーティング材層60を形成する。 Furthermore, a coating material layer 60 is formed by applying, spraying, or spraying a coating material onto the urethane resin layer 59 .

本実施例では、接着剤層58、ウレタン樹脂層59およびコーティング材層60の順に積層してなる被覆層61は、車道50の路面50Aの一部50AAと、路面50Aと天端コンクリート52との隙間部56と、天端コンクリート52の上面52A全体と、法面51と天端コンクリート52の隙間部57と、法面51における下地シート54によって覆われた箇所までを施工範囲として連続して施工されるものである。 In this embodiment, a coating layer 61 formed by laminating an adhesive layer 58, a urethane resin layer 59, and a coating material layer 60 in this order covers a portion 50AA of the road surface 50A of the roadway 50, and a portion 50AA of the road surface 50A and the crown concrete 52. Continuous construction is carried out including the gap 56, the entire upper surface 52A of the crown concrete 52, the gap 57 between the slope 51 and the crown concrete 52, and the part of the slope 51 covered by the base sheet 54. It is something that will be done.

ここで、被覆層61における路面50Aの一部50AAを被覆する範囲61Aとしては、隙間部56を被覆する部分から連続して路面50Aを数センチメートル~数十センチメートル程を被覆するような範囲としている。 Here, the range 61A that covers the part 50AA of the road surface 50A in the coating layer 61 is a range that covers several centimeters to several tens of centimeters of the road surface 50A continuously from the part that covers the gap 56. It is said that

以上のように本実施例の道路の防草工法では、接着剤層58を形成する工程と、前記接着剤層58にウレタン樹脂層59を積層する工程と、前記ウレタン樹脂層59にコーティング材層60を積層する工程と、を有し、被覆層61によって施工範囲を被覆する防草工法であって、施工範囲が、地面に敷設した下地シート54とすることで、地面への被覆層61の施工を簡便なものとし、景観に優れた防草工法を提供することができる。 As described above, the road weed control method of this embodiment includes a step of forming an adhesive layer 58, a step of laminating a urethane resin layer 59 on the adhesive layer 58, and a layer of a coating material on the urethane resin layer 59. 60, and covers the construction area with the covering layer 61, the construction area is the base sheet 54 laid on the ground, so that the covering layer 61 is not applied to the ground. It is possible to provide a weed control method that simplifies construction and provides excellent scenery.

図11及び図12は本発明の第6実施例を示し、上記第1実施例と同一部分に同一符号を付し、その詳細な説明を省略して詳述する。本実施例の構成について説明すると、図11(B)に示すように歩道70の一部には、所定の範囲だけ土壌が露出するよう複数の境界ブロック71で囲んで形成された非舗装部72を備えている。歩道70の一方(非舗装部72側)には用水路Wがあり、他方(用水路Wと反対側)には車道(図示せず)があるものとする。また、境界ブロック71には、柵Fが設置されている。 11 and 12 show a sixth embodiment of the present invention, in which the same parts as in the first embodiment are denoted by the same reference numerals, and detailed description thereof will be omitted and will be described in detail. To explain the configuration of this embodiment, as shown in FIG. 11(B), a part of the sidewalk 70 has an unpaved portion 72 surrounded by a plurality of boundary blocks 71 so that only a predetermined area of soil is exposed. It is equipped with It is assumed that there is an irrigation canal W on one side of the sidewalk 70 (on the side of the unpaved portion 72), and on the other side (on the opposite side to the irrigation canal W) there is a roadway (not shown). Further, a fence F is installed in the boundary block 71.

非舗装部72の一部は、境界ブロック71に沿って下地シート73によってその一部が覆われている。下地シート73は、L型アンカー等の固定手段(図示せず)によって非舗装部72の表面に固定されている。 A portion of the unpaved portion 72 is covered with a base sheet 73 along the boundary block 71. The base sheet 73 is fixed to the surface of the non-paved portion 72 by fixing means (not shown) such as an L-shaped anchor.

図11(A)に示すように、上記の歩道70に非舗装部72を備えた道路の防草工法の手順について説明する。最初に防草工法の下処理工程として、歩道00と境界ブロック71の隙間部74及び境界ブロック71と非舗装部72の隙間部75より繁茂する雑草を、取り除き、あるいは、伐根し、隙間部74、75に詰まっている夾雑物を除去する。ここで、境界ブロック71が破損している場合には、この段階で境界ブロック71の補修又は交換を行うことが好ましい。続いて、隙間部74、75の土砂をモルタル等の充填物に置換する。 As shown in FIG. 11(A), the procedure of the weed control method for a road in which the above-mentioned sidewalk 70 is provided with a non-paved portion 72 will be explained. First, as a pretreatment process of the weed control method, weeds growing in the gap 74 between the sidewalk 00 and the boundary block 71 and the gap 75 between the boundary block 71 and the non-paved area 72 are removed, or their roots are cut, and the weeds are removed from the gap. Remove foreign matter stuck in 74 and 75. Here, if the boundary block 71 is damaged, it is preferable to repair or replace the boundary block 71 at this stage. Subsequently, the earth and sand in the gaps 74 and 75 are replaced with a filler such as mortar.

次に防草工程に移行する。まずは歩道70の路面70Aの一部70AAと、路面70Aと境界ブロック71との隙間部74と、境界ブロック71の上面71A全体と、境界ブロック71と非舗装部72の隙間部75と、非舗装部72における下地シート73によって覆われた箇所までを連続した範囲に対して、プライマー等の糊材からなる接着剤を塗布、噴霧または吹き付けして接着剤層76を形成する。 Next, move on to the weed control process. First, a portion 70AA of the road surface 70A of the sidewalk 70, a gap 74 between the road surface 70A and the boundary block 71, the entire upper surface 71A of the boundary block 71, a gap 75 between the boundary block 71 and the non-paved portion 72, and the non-paved portion 70AA. An adhesive layer 76 is formed by applying, spraying, or spraying an adhesive made of a glue material such as a primer to a continuous range up to the portion covered by the base sheet 73 in the portion 72 .

続いて、該接着剤層76にウレタン樹脂を塗布、噴霧または吹き付けして積層し、ウレタン樹脂層77を形成する。ここで、ウレタン樹脂層77に使用されるウレタン樹脂は、実施例1のものと同じものである。 Subsequently, a urethane resin is applied, sprayed, or sprayed onto the adhesive layer 76 to form a urethane resin layer 77. Here, the urethane resin used for the urethane resin layer 77 is the same as that in Example 1.

さらに、ウレタン樹脂層77にコーティング材を塗布、噴霧または吹き付けてコーティング材層78を形成する。 Furthermore, a coating material layer 78 is formed by applying, spraying, or spraying a coating material onto the urethane resin layer 77 .

本実施例では、接着剤層76、ウレタン樹脂層77およびコーティング材層78の順に積層してなる被覆層79は、歩道70の路面70Aの一部70AAと、路面70Aと境界ブロック71との隙間部74と、境界ブロック71の上面71A全体と、境界ブロック71Aと非舗装部72の隙間部75と、非舗装部72における下地シート73によって覆われた箇所までを施工範囲として連続して施工されるものである。 In this embodiment, a coating layer 79 formed by laminating an adhesive layer 76, a urethane resin layer 77, and a coating material layer 78 in this order is formed between a part 70AA of the road surface 70A of the sidewalk 70 and a gap between the road surface 70A and the boundary block 71. 74, the entire upper surface 71A of the boundary block 71, the gap 75 between the boundary block 71A and the non-paved part 72, and the part covered by the base sheet 73 in the non-paved part 72 as the construction range. It is something that

ここで、被覆層79における路面70Aの一部70AAを被覆する範囲79Aとしては、隙間部74を被覆する部分から連続して路面70Aを数センチメートル~数十センチメートル程を被覆するような範囲としている。 Here, the range 79A that covers the part 70AA of the road surface 70A in the coating layer 79 is a range that covers several centimeters to several tens of centimeters of the road surface 70A continuously from the part that covers the gap 74. It is said that

以上のように本実施例の道路の防草工法では、接着剤層76を形成する工程と、前記接着剤層76にウレタン樹脂層77を積層する工程と、前記ウレタン樹脂層77にコーティング材層78を積層する工程と、を有し、被覆層79によって施工範囲を被覆する防草工法であって、施工範囲が、地面に敷設した下地シート73とすることで、地面への被覆層79の施工を簡便なものとし、景観に優れた防草工法を提供することができる。 As described above, the road weed control method of this embodiment includes the steps of forming the adhesive layer 76, laminating the urethane resin layer 77 on the adhesive layer 76, and layering the coating material on the urethane resin layer 77. This weed control method includes a step of laminating a base sheet 78 and covering a construction area with a covering layer 79, and the construction range is a base sheet 73 laid on the ground, so that the covering layer 79 is not applied to the ground. It is possible to provide a weed control method that simplifies construction and provides excellent scenery.

本実施例上の効果として、非舗装部72において少なくとも車道側に被覆層79を施工することで、柵Fを越えて車道側に雑草が広がることを防いでいる。 As an effect of this embodiment, by constructing the coating layer 79 at least on the roadway side in the unpaved portion 72, weeds are prevented from spreading beyond the fence F to the roadway side.

図13~図15は本発明の第7実施例を示し、上記第2実施例と同一部分に同一符号を付し、その詳細な説明を省略して詳述する。本実施例の道路の構成について図13~図15に基いて説明すると、実施例2の道路において歩道21に植樹桝80を備えている。植栽桝80では、実施例2に記載の歩道用の境界ブロック22と植栽桝用の境界ブロック81によって囲まれた土壌82には街路樹83が植栽されている。 13 to 15 show a seventh embodiment of the present invention, in which the same parts as in the second embodiment are denoted by the same reference numerals, and detailed description thereof will be omitted and will be described in detail. The configuration of the road according to this embodiment will be explained based on FIGS. 13 to 15. In the road according to the second embodiment, the sidewalk 21 is provided with a tree planting area 80. In the planting box 80, street trees 83 are planted in the soil 82 surrounded by the sidewalk boundary block 22 and the planting box boundary block 81 described in the second embodiment.

また、土壌82の表面には、天然材料の土あるいは砂等と固化剤混合材とを混合した舗装材で土壌82の表面を舗装する土舗装(土系舗装)が施工された水透過部材である土舗装層84が形成されている。 In addition, the surface of the soil 82 is a water-permeable member on which soil pavement (soil-based pavement) is constructed, in which the surface of the soil 82 is paved with a paving material made of a mixture of natural materials such as soil or sand and a solidifying agent mixture. A certain soil paving layer 84 is formed.

土壌82の表面に土舗装層84が形成されたことで、土壌82は防草性のみならず、自然環境と調和する景観性、高い透水性、高い保水性、適度な弾力性、適度な衝撃吸収性などの優れた効果を得ることになる。 By forming the soil paving layer 84 on the surface of the soil 82, the soil 82 not only has weed prevention properties, but also has a landscape that harmonizes with the natural environment, high water permeability, high water retention, moderate elasticity, and moderate impact. This results in superior effects such as absorbency.

図13に示すように、上記の歩道21に植栽桝80を備えた道路の防草工法の手順について説明する。尚、実施例2と重複する箇所についての説明は省略する。最初に防草工法の下処理工程として、境界ブロック22と土舗装層84の隙間部85、植栽桝用の境界ブロック81と土舗装層84の隙間部86、歩道21の路面21Aと植栽桝用の境界ブロック81の隙間部87より繁茂する雑草を、取り除き、あるいは、伐根し、隙間部85、86、87に詰まっている夾雑物を除去する。ここで、境界ブロック22、植栽桝用の境界ブロック81及び土舗装層84が破損している場合には、この段階で境界ブロック22、植栽桝用の境界ブロック81及び土舗装層84の補修又は交換を行うことが好ましい。続いて、隙間部85、86、87の土砂をモルタル等の充填物に置換する。 As shown in FIG. 13, the procedure of the weed control method for roads in which the above-mentioned sidewalk 21 is provided with a planting box 80 will be explained. Note that descriptions of parts that overlap with Example 2 will be omitted. First, as a preparation process of the weed control method, the gap 85 between the boundary block 22 and the soil paving layer 84, the gap 86 between the boundary block 81 for the planting box and the soil paving layer 84, the road surface 21A of the sidewalk 21, and the planting Weeds growing thickly in the gap 87 of the boundary block 81 for the box are removed or their roots are cut, and foreign matter clogged in the gap 85, 86, 87 is removed. Here, if the boundary block 22, the boundary block 81 for the planting box, and the soil paving layer 84 are damaged, the boundary block 22, the boundary block 81 for the planting box, and the soil paving layer 84 are damaged at this stage. Repair or replacement is preferred. Subsequently, the earth and sand in the gaps 85, 86, and 87 are replaced with a filler such as mortar.

次に防草工程に移行する。まずは、歩道21の路面21Aの一部21AAと、路面21Aと植栽桝用の境界ブロック81との隙間部87と、植栽桝用の境界ブロック81の上面81A全体と、植栽桝用の境界ブロック81と土舗装層84の隙間部86と、土舗装層84の一部までを連続した範囲と、実施例2に記載の被覆層28と連続する施工範囲として境界ブロック22と土舗装層84の隙間部85と、土舗装層84の一部までを連続した範囲とに対して、それぞれプライマー等の糊材からなる接着剤を塗布、噴霧または吹き付けして接着剤層88を形成する。 Next, move on to the weed control process. First, a part 21AA of the road surface 21A of the sidewalk 21, a gap 87 between the road surface 21A and the boundary block 81 for the planting box, the entire upper surface 81A of the boundary block 81 for the planting box, and the entire top surface 81A of the boundary block 81 for the planting box. A gap 86 between the boundary block 81 and the soil pavement layer 84, a continuous range up to a part of the soil pavement layer 84, and a construction range continuous with the covering layer 28 described in Example 2, the boundary block 22 and the soil pavement layer. An adhesive layer 88 is formed by applying, spraying, or spraying an adhesive made of a glue material such as a primer to the gap 85 of 84 and a continuous range up to a part of the soil paving layer 84.

続いて、該接着剤層88にウレタン樹脂を塗布、噴霧または吹き付けして積層し、ウレタン樹脂層89を形成する。ここで、ウレタン樹脂層89に使用されるウレタン樹脂は、実施例1のものと同じものである。 Subsequently, a urethane resin is applied, sprayed, or sprayed onto the adhesive layer 88 to form a urethane resin layer 89. Here, the urethane resin used for the urethane resin layer 89 is the same as that in Example 1.

さらに、ウレタン樹脂層89にコーティング材を塗布、噴霧または吹き付けてコーティング材層90を形成する。 Furthermore, a coating material layer 90 is formed by applying, spraying, or spraying a coating material onto the urethane resin layer 89 .

本実施例では、接着剤層88、ウレタン樹脂層89およびコーティング材層90の順に積層してなる被覆層91は、歩道21の路面21Aの一部21AAと、路面21Aと植栽桝用の境界ブロック81との隙間部87と、植栽桝用の境界ブロック81の上面81A全体と、植栽桝用の境界ブロック81と土舗装層84の隙間部86と、土舗装層84の一部84Aまでを連続した範囲と、実施例2に記載の被覆層28と連続する施工範囲として境界ブロック22と土舗装層84の隙間部85と、土舗装層84の一部84Bまでを連続した範囲までを施工範囲として連続して施工されるものである。 In this embodiment, a coating layer 91 formed by laminating an adhesive layer 88, a urethane resin layer 89, and a coating material layer 90 in this order covers a portion 21AA of the road surface 21A of the sidewalk 21, and a boundary between the road surface 21A and the planting box. A gap 87 between the block 81, the entire upper surface 81A of the boundary block 81 for the planting box, a gap 86 between the boundary block 81 for the planting box and the soil paving layer 84, and a part 84A of the soil paving layer 84. and a continuous range from the gap 85 between the boundary block 22 and the soil paving layer 84 to a part 84B of the soil paving layer 84 as a construction range continuous to the covering layer 28 described in Example 2. The construction area will be constructed continuously.

ここで、被覆層91における路面21Aの一部21AAを被覆する範囲91A、土舗装層84の一部84A、84Bを被覆する範囲91B、91Cとしては、各隙間部85、86、87を被覆する部分から連続して路面21A又は土舗装層84を数センチメートル~数十センチメートル程を被覆するような範囲としている。 Here, the range 91A of the covering layer 91 that covers the part 21AA of the road surface 21A, and the ranges 91B and 91C that covers the parts 84A and 84B of the soil paving layer 84 cover the respective gaps 85, 86, and 87. The area is such that it covers several centimeters to several tens of centimeters of the road surface 21A or the soil pavement layer 84 continuously from that part.

以上のように本実施例の道路の防草工法では、接着剤層88を形成する工程と、前記接着剤層88にウレタン樹脂層89を積層する工程と、前記ウレタン樹脂層89にコーティング材層90を積層する工程と、を有し、被覆層91によって施工範囲を被覆する防草工法であって、施工範囲が、道路面21Aの一部21AAと、前記道路面21Aと境界ブロック81との隙間部87と、境界ブロック81の上面81A全体と、前記境界ブロック81と前記境界ブロック81により区画された植栽区域である植栽桝80との隙間部86と、植栽桝80の一部84Aとすることで、道路から植栽区域まで連続して被覆層を形成することで、景観に優れた防草工法を提供することができる。 As described above, the road weed control method of this embodiment includes the steps of forming the adhesive layer 88, laminating the urethane resin layer 89 on the adhesive layer 88, and layering the coating material on the urethane resin layer 89. 90, and covers a construction range with a covering layer 91, the construction range includes a part 21AA of the road surface 21A and a boundary block 81 between the road surface 21A and the boundary block 81. A gap 87, the entire upper surface 81A of the boundary block 81, a gap 86 between the boundary block 81 and the planting area 80, which is a planting area divided by the boundary block 81, and a part of the planting area 80. 84A, it is possible to provide a weed control method with excellent scenery by forming a continuous covering layer from the road to the planting area.

また、植栽桝80を水透過部材である土舗装層84により被覆することにより、植栽桝80の街路樹83の生育を妨げることのない景観に優れた防草工法を提供することができる。 Furthermore, by covering the planting box 80 with the soil paving layer 84 which is a water-permeable member, it is possible to provide a weed control method that does not hinder the growth of the street trees 83 in the planting box 80 and is excellent in scenery. .

なお、本発明は上記実施例に限定されるものではなく、本発明の要旨の範囲内において種々の変形実施が可能である。 Note that the present invention is not limited to the above embodiments, and various modifications can be made within the scope of the gist of the present invention.

1 分離帯
2A 道路面
2AA 一部
3A 上面
3B 側面
8 隙間部
9、25 接着剤層
10、26 ウレタン樹脂層
11、27 コーティング材層
13、28 被覆層
22 境界ブロック
31 コンクリート擁壁(コンクリート壁部)
42 U字溝
54、73 下地シート
80 植栽桝(植栽区域)
1 Separation strip 2A Road surface 2AA Part 3A Top surface 3B Side surface 8 Gap portions 9, 25 Adhesive layer 10, 26 Urethane resin layer 11, 27 Coating material layer 13, 28 Covering layer 22 Boundary block 31 Concrete retaining wall (concrete wall portion )
42 U-shaped groove 54, 73 Base sheet 80 Planting box (planting area)

Claims (8)

接着剤層を形成する工程と、
前記接着剤層にウレタン樹脂層を積層する工程と、
前記ウレタン樹脂層にコーティング材層を積層する工程と、を有し、被覆層によって施工範囲を被覆する防草工法であって、
前記施工範囲が、道路面の一部と、前記道路面と分離帯との隙間と、前記分離帯の側面全体と、前記分離帯の上面全体であることを特徴とする防草工法。
forming an adhesive layer;
laminating a urethane resin layer on the adhesive layer;
A weed control method comprising the step of laminating a coating material layer on the urethane resin layer, and covering the construction area with the coating layer,
The weed control method is characterized in that the construction range includes a part of the road surface, a gap between the road surface and the separation strip, the entire side surface of the separation strip, and the entire upper surface of the separation strip.
前記分離帯の側面にガラスビーズを添加した塗料を塗布する工程を有することを特徴とする請求項1に記載の防草工法。 The weed control method according to claim 1, further comprising the step of applying a paint containing glass beads to the side surface of the separation strip. 接着剤層を形成する工程と、
前記接着剤層にウレタン樹脂層を積層する工程と、
前記ウレタン樹脂層にコーティング材層を積層する工程と、を有し、被覆層によって施工範囲を被覆する防草工法であって、
前記施工範囲が、車道面の一部と、前記車道面と境界ブロックとの隙間と、前記境界ブロックの側面全体と、前記境界ブロックの上面全体と、前記境界ブロックと歩道面との隙間と、前記歩道面の一部であることを特徴とする防草工法。
forming an adhesive layer;
laminating a urethane resin layer on the adhesive layer;
A weed control method comprising the step of laminating a coating material layer on the urethane resin layer, and covering the construction area with the coating layer,
The construction range includes a part of the roadway surface, a gap between the roadway surface and the boundary block, the entire side surface of the boundary block, the entire top surface of the boundary block, and the gap between the boundary block and the sidewalk surface, A weed control method characterized in that it is a part of the sidewalk surface.
接着剤層を形成する工程と、
前記接着剤層にウレタン樹脂層を積層する工程と、
前記ウレタン樹脂層にコーティング材層を積層する工程と、を有し、被覆層によって施工範囲を被覆する防草工法であって、
前記施工範囲が、道路面の一部と、前記道路面とコンクリート壁部との隙間と、前記コンクリート壁部全体であることを特徴とする防草工法。
forming an adhesive layer;
laminating a urethane resin layer on the adhesive layer;
A weed control method comprising the step of laminating a coating material layer on the urethane resin layer, and covering the construction area with the coating layer,
The weed control method is characterized in that the construction range includes a part of the road surface, a gap between the road surface and the concrete wall, and the entire concrete wall.
接着剤層を形成する工程と、
前記接着剤層にウレタン樹脂層を積層する工程と、
前記ウレタン樹脂層にコーティング材層を積層する工程と、を有し、被覆層によって施工範囲を被覆する防草工法であって、
前記施工範囲が、道路面の一部と、前記道路面とU字溝との隙間と、前記U字溝の側壁であることを特徴とする防草工法。
forming an adhesive layer;
laminating a urethane resin layer on the adhesive layer;
A weed control method comprising the step of laminating a coating material layer on the urethane resin layer, and covering the construction area with the coating layer,
The weed control method is characterized in that the construction area is a part of the road surface, a gap between the road surface and the U-shaped groove, and a side wall of the U-shaped groove.
接着剤層を形成する工程と、
前記接着剤層にウレタン樹脂層を積層する工程と、
前記ウレタン樹脂層にコーティング材層を積層する工程と、を有し、被覆層によって施工範囲を被覆する防草工法であって、
前記施工範囲が、地面に敷設した下地シートであることを特徴とする防草工法。
forming an adhesive layer;
laminating a urethane resin layer on the adhesive layer;
A weed control method comprising the step of laminating a coating material layer on the urethane resin layer, and covering the construction area with the coating layer,
A weed control method characterized in that the construction area is a base sheet laid on the ground.
接着剤層を形成する工程と、
前記接着剤層にウレタン樹脂層を積層する工程と、
前記ウレタン樹脂層にコーティング材層を積層する工程と、を有し、被覆層によって施工範囲を被覆する防草工法であって、
前記施工範囲が、道路面の一部と、前記道路面と境界ブロックとの隙間と、前記境界ブロックの上面全体と、前記境界ブロックと前記境界ブロックにより区画された植栽区域との隙間と、前記植栽区域の一部であることを特徴とする防草工法。
forming an adhesive layer;
laminating a urethane resin layer on the adhesive layer;
A weed control method comprising the step of laminating a coating material layer on the urethane resin layer, and covering the construction area with the coating layer,
The construction range includes a part of the road surface, a gap between the road surface and the boundary block, the entire upper surface of the boundary block, and a gap between the boundary block and a planting area divided by the boundary block, A weed control method characterized in that it is a part of the planting area.
前記植栽区域を水透過部材により被覆することを特徴とする請求項7に記載の防草工法。 8. The weed control method according to claim 7, wherein the planting area is covered with a water permeable member.
JP2022076780A 2022-05-06 2022-05-06 Weed-proofing method for road Pending JP2023165566A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022076780A JP2023165566A (en) 2022-05-06 2022-05-06 Weed-proofing method for road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022076780A JP2023165566A (en) 2022-05-06 2022-05-06 Weed-proofing method for road

Publications (1)

Publication Number Publication Date
JP2023165566A true JP2023165566A (en) 2023-11-16

Family

ID=88748783

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022076780A Pending JP2023165566A (en) 2022-05-06 2022-05-06 Weed-proofing method for road

Country Status (1)

Country Link
JP (1) JP2023165566A (en)

Similar Documents

Publication Publication Date Title
JP4210111B2 (en) Artificial grass for landscape
Jim Constraints to urban trees and their remedies in the built environment
Ryan et al. Forest Road Manual: Guidelines for the design, construction and management of forest roads
Øverby A Guide to the use of Otta seals
JP2023165566A (en) Weed-proofing method for road
JP2006241970A (en) Method of cutting structure such as existing concrete or asphalt and building for achieving weed growth prevention effect, and method of preventing weed from growth in structure such as existing concrete or asphalt structure and building
JP2005210906A (en) Weed suppressing tape and method for suppressing weed
Willey Urban geology of the Toowoomba conurbation, SE Queensland, Australia
Kittredge Jr et al. Massachusetts forestry best management practices manual
KR20010009377A (en) Method of and block for forming a grass grow plot on an inclined plane for public works
KR20120034970A (en) Gabion block and method of manufacturing the gabion block
KR100989448B1 (en) Holder of permeant block for paving pedestrian-vehicle passage and paving method of pedestrian-vehicle passage using this
JP5351540B2 (en) Weed suppression sheet and weed suppression method on pavement surface.
KR100538541B1 (en) Early Vine-Planting Structure of Sound Absorbing Wall and Construction Methods
KR100905972B1 (en) Working method for protecting cover made by synthetic organic material
Ambrose et al. Simplified site design
Morrall et al. Sustainable highway development in a national park
Heritage Constructed tracks in the Scottish Uplands
KR101104459B1 (en) Greening panel construction for structures
KR200340104Y1 (en) Artificial stone block for flower bed border
CN220685680U (en) Assembled concrete pavement structure
Williams Ryan Williams
Francesconi et al. Tunnel entrances integrated into a landscape: The example of the Gronda motorway bypass
JP3109644U (en) Repair structure for gaps on the road
KR200366907Y1 (en) A protection thickness use be sloped of a road the edge

Legal Events

Date Code Title Description
A80 Written request to apply exceptions to lack of novelty of invention

Free format text: JAPANESE INTERMEDIATE CODE: A80

Effective date: 20220513