JP2023147031A - Concrete placing management device, concrete placing management method, and concrete placing management program - Google Patents

Concrete placing management device, concrete placing management method, and concrete placing management program Download PDF

Info

Publication number
JP2023147031A
JP2023147031A JP2022054559A JP2022054559A JP2023147031A JP 2023147031 A JP2023147031 A JP 2023147031A JP 2022054559 A JP2022054559 A JP 2022054559A JP 2022054559 A JP2022054559 A JP 2022054559A JP 2023147031 A JP2023147031 A JP 2023147031A
Authority
JP
Japan
Prior art keywords
time
concrete
ready
recording
construction site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2022054559A
Other languages
Japanese (ja)
Other versions
JP7509817B2 (en
Inventor
哲也 廣中
Tetsuya Hironaka
篤志 高尾
Atsushi Takao
隆弘 齋藤
Takahiro Saito
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okumura Corp
Original Assignee
Okumura Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Okumura Corp filed Critical Okumura Corp
Priority to JP2022054559A priority Critical patent/JP7509817B2/en
Publication of JP2023147031A publication Critical patent/JP2023147031A/en
Application granted granted Critical
Publication of JP7509817B2 publication Critical patent/JP7509817B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)

Abstract

To provide a device, a method and a program for managing concrete placement more easily.SOLUTION: A concrete placing management device includes: an acquisition part for acquiring slip image data which is obtained with imaging equipment by reading a slip utilized when transporting ready mixed-concrete manufactured at a factory to a construction site; a reading part for reading a vehicle number, a loading capacity and shipping time of an agitator vehicle which are recorded on a slip, from the image data; a first recording part for recording the read content in association with each other; a second recording part for recording, as placing start time, the time at which an operator presses a start button to record unloading start time and which is displayed in a display of a portable terminal distributed, upon arrival at the site, in association with a vehicle number; a third recording part for recording, as placing finish time, the time at which an operator presses a finish button to record unloading finish time and which is displayed in the display, in association with a vehicle number; and a display control part for displaying any recorded data in the display.SELECTED DRAWING: Figure 2

Description

本発明は、コンクリート打設管理装置、コンクリート打設管理方法およびコンクリート打設管理プログラムに関する。 The present invention relates to a concrete placement management device, a concrete placement management method, and a concrete placement management program.

上記技術分野において、特許文献1には、生コンクリート搬送車の運転者にICカードを所持させ、運転者が、生コンクリートの出荷時、現場到着時、打設完了時にICカードをカードリーダにかざすと、搬送車の識別情報等が管理サーバに送信される。管理サーバは、搬送車の識別情報とその受信時刻とに基づいて、出荷時刻、運搬・待機時間、打込時間、打込終了までの時間を自動計算して生コンクリートの搬送時間を管理することが開示されている(同文献段落[0041]、図2等)。 In the above technical field, Patent Document 1 discloses that the driver of a ready-mixed concrete transport vehicle is made to carry an IC card, and the driver holds the IC card over a card reader when shipping ready-mixed concrete, when arriving at the site, and when pouring is completed. Then, the identification information of the guided vehicle and the like are transmitted to the management server. The management server automatically calculates the shipping time, transportation/waiting time, pouring time, and time until completion of pouring based on the identification information of the conveyance vehicle and the reception time, and manages the conveyance time of the ready-mixed concrete. is disclosed (paragraph [0041] of the same document, FIG. 2, etc.).

特開2011-46086号公報Japanese Patent Application Publication No. 2011-46086

しかしながら、上記特許文献1に記載の技術では、ICカードなどの情報通信媒体をコンクリート車に積載し、ICカードリーダで情報を読み取ることにより、生コンクリートの搬送時間を管理していた。そのため、情報通信媒体などの新たな機器を取り付けなければならず、コストが嵩み、簡易にコンクリートの打設を管理できなかった。 However, in the technique described in Patent Document 1, an information communication medium such as an IC card is loaded onto a concrete vehicle, and the information is read by an IC card reader to manage the transportation time of ready-mixed concrete. Therefore, new equipment such as information communication media had to be installed, which increased costs and made it impossible to easily manage concrete placement.

上記課題を解決するため、本発明に係るコンクリート打設管理装置は、
生コンクリート製造工場で製造された生コンクリートをコンクリートの打設場所へ運搬する際に利用される伝票を、前記生コンクリートの出荷時に、撮像機器を用いて読み込んで生成された前記伝票の画像データを取得する取得部と、
前記画像データから前記伝票に記載された、アジテータ車の車両番号、前記生コンクリートの積載量および前記生コンクリートの出荷時刻を読み取る読取部と、
読み取られた、前記車両番号、前記積載量および前記出荷時刻を紐付けて記録する第1記録部と、
前記打設場所への前記アジテータ車の到着時に、前記打設場所に配布された少なくとも1つの携帯端末のディスプレイに表示された、前記生コンクリートの荷卸し開始時刻を記録するための開始ボタンを前記打設場所の作業者が押下した時刻を、前記コンクリートの打設開始時刻として、前記車両番号に紐付けて記録する第2記録部と、
前記ディスプレイに表示された、前記生コンクリートの荷卸し終了時刻を記録するための終了ボタンを前記打設場所の作業者が押下した時刻を、前記コンクリートの打設終了時刻として、前記車両番号に紐付けて記録する第3記録部と、
記録された、前記車両番号、前記積載量、前記出荷時刻、打設開始時刻および前記打設終了時刻の少なくともいずれかを前記ディスプレイに表示させる表示制御部と、
を備えた。
In order to solve the above problems, the concrete placement management device according to the present invention includes:
The image data of the slip, which is generated by reading the slip used when transporting the ready-mixed concrete manufactured at the ready-mixed concrete manufacturing factory to the concrete placement site using an imaging device at the time of shipping the ready-mixed concrete, is generated. an acquisition unit that acquires;
a reading unit that reads the vehicle number of the agitator vehicle, the loading amount of the ready-mixed concrete, and the shipping time of the ready-mixed concrete written on the slip from the image data;
a first recording unit that records the read vehicle number, the loading amount, and the shipping time in a linked manner;
When the agitator vehicle arrives at the pouring site, a start button for recording the time to start unloading the ready-mixed concrete, which is displayed on the display of at least one mobile terminal distributed to the pouring site, is pressed. a second recording unit that records the time when a worker at a pouring site presses the button, as the concrete pouring start time, in association with the vehicle number;
The time at which the worker at the pouring location presses the end button displayed on the display for recording the time when unloading of the ready-mixed concrete is pressed is linked to the vehicle number as the concrete pouring end time. a third recording section for attaching and recording;
a display control unit that causes the display to display at least one of the recorded vehicle number, the loading amount, the shipping time, the pouring start time, and the pouring end time;
Equipped with

上記課題を解決するため、本発明に係るコンクリート打設管理方法は、
生コンクリート製造工場で製造された生コンクリートをコンクリートの打設場所へ運搬する際に利用される伝票を、前記生コンクリートの出荷時に、撮像機器を用いて、読み込んで、前記伝票の画像データを取得する取得ステップと、
前記画像データから前記伝票に記載された、アジテータ車の車両番号、前記生コンクリートの積載量および前記生コンクリートの出荷時刻を読み取る読取ステップと、
読み取られた、前記車両番号、前記積載量および前記出荷時刻を紐付けて記録する第1記録ステップと、
前記打設場所への前記アジテータ車の到着時に、前記打設場所に配布された少なくとも1つの携帯端末のディスプレイに表示された、前記生コンクリートの荷卸し開始時刻を記録するための開始ボタンを前記打設場所の作業者が押下した時刻を、前記コンクリートの打設開始時刻として、前記車両番号に紐付けて記録する第2記録ステップと、
前記ディスプレイに表示された、前記生コンクリートの荷卸し終了時刻を記録するための終了ボタンを前記打設場所の作業者が押下した時刻を、前記コンクリートの打設終了時刻として、前記車両番号に紐付けて記録する第3記録ステップと、
記録された、前記車両番号、前記積載量、前記出荷時刻、打設開始時刻および前記打設終了時刻の少なくともいずれかを前記ディスプレイに表示させる表示制御ステップと、
を含む。
In order to solve the above problems, the concrete placement management method according to the present invention includes:
When the ready-mixed concrete is shipped, an imaging device is used to read the slip used when transporting the ready-mixed concrete manufactured at a ready-mixed concrete manufacturing factory to a concrete placement site, and to obtain image data of the slip. an acquisition step,
a reading step of reading the vehicle number of the agitator vehicle, the loading amount of the ready-mixed concrete, and the shipping time of the ready-mixed concrete written on the slip from the image data;
a first recording step of recording the read vehicle number, the loading amount, and the shipping time in a linked manner;
When the agitator vehicle arrives at the pouring site, a start button for recording the time to start unloading the ready-mixed concrete, which is displayed on the display of at least one mobile terminal distributed to the pouring site, is pressed. a second recording step of recording the time at which the worker at the pouring site presses the button, as the concrete pouring start time, in association with the vehicle number;
The time at which the worker at the pouring location presses the end button displayed on the display for recording the time when unloading of the ready-mixed concrete is pressed is linked to the vehicle number as the concrete pouring end time. a third recording step of attaching and recording;
a display control step of displaying at least one of the recorded vehicle number, the loading amount, the shipping time, the pouring start time, and the pouring end time on the display;
including.

上記課題を解決するため、本発明に係るコンクリート打設管理プログラムは、
生コンクリート製造工場で製造された生コンクリートをコンクリートの打設場所へ運搬する際に利用される伝票を、前記生コンクリートの出荷時に、撮像機器を用いて、読み込んで、前記伝票の画像データを取得する取得ステップと、
前記画像データから前記伝票に記載された、アジテータ車の車両番号、前記生コンクリートの積載量および前記生コンクリートの出荷時刻を読み取る読取ステップと、
読み取られた、前記車両番号、前記積載量および前記出荷時刻を紐付けて記録する第1記録ステップと、
前記打設場所への前記アジテータ車の到着時に、前記打設場所に配布された少なくとも1つの携帯端末のディスプレイに表示された、前記生コンクリートの荷卸し開始時刻を記録するための開始ボタンを前記打設場所の作業者が押下した時刻を、前記コンクリートの打設開始時刻として、前記車両番号に紐付けて記録する第2記録ステップと、
前記ディスプレイに表示された、前記生コンクリートの荷卸し終了時刻を記録するための終了ボタンを前記打設場所の作業者が押下した時刻を、前記コンクリートの打設終了時刻として、前記車両番号に紐付けて記録する第3記録ステップと、
記録された、前記車両番号、前記積載量、前記出荷時刻、打設開始時刻および前記打設終了時刻の少なくともいずれかを前記ディスプレイに表示させる表示制御ステップと、
をコンピュータに実行させる。
In order to solve the above problems, the concrete placement management program according to the present invention,
When the ready-mixed concrete is shipped, an imaging device is used to read the slip used when transporting the ready-mixed concrete manufactured at a ready-mixed concrete manufacturing factory to a concrete placement site, and to obtain image data of the slip. an acquisition step,
a reading step of reading the vehicle number of the agitator vehicle, the loading amount of the ready-mixed concrete, and the shipping time of the ready-mixed concrete written on the slip from the image data;
a first recording step of recording the read vehicle number, the loading amount, and the shipping time in a linked manner;
When the agitator vehicle arrives at the pouring site, a start button for recording the time to start unloading the ready-mixed concrete, which is displayed on the display of at least one mobile terminal distributed to the pouring site, is pressed. a second recording step of recording the time at which the worker at the pouring site presses the button, as the concrete pouring start time, in association with the vehicle number;
The time at which the worker at the pouring location presses the end button displayed on the display for recording the time when unloading of the ready-mixed concrete is pressed is linked to the vehicle number as the concrete pouring end time. a third recording step of attaching and recording;
a display control step of displaying at least one of the recorded vehicle number, the loading amount, the shipping time, the pouring start time, and the pouring end time on the display;
have the computer execute it.

本発明によれば、工場出荷時に使用する伝票を利用するので、より簡易にコンクリート打設を管理することができる。 According to the present invention, since the slip used at the time of factory shipment is used, concrete placement can be managed more easily.

本発明の第1実施形態に係るコンクリート打設管理装置の動作の概要を説明するための図である。FIG. 2 is a diagram for explaining an overview of the operation of the concrete placement management device according to the first embodiment of the present invention. 本発明の第1実施形態に係るコンクリート打設管理装置における開始ボタンの操作画面を説明するための図である。It is a figure for explaining the operation screen of the start button in the concrete placement management device concerning a 1st embodiment of the present invention. 本発明の第1実施形態に係るコンクリート打設管理装置の構成を説明するためのブロック図である。BRIEF DESCRIPTION OF THE DRAWINGS It is a block diagram for demonstrating the structure of the concrete placement management apparatus based on 1st Embodiment of this invention. 本発明の第1実施形態に係るコンクリート打設管理装置が有する画像データテーブルの一例を示す図である。It is a figure showing an example of the image data table which the concrete placement management device concerning a 1st embodiment of the present invention has. 本発明の第1実施形態に係るコンクリート打設管理装置のハードウェア構成を説明するための図である。BRIEF DESCRIPTION OF THE DRAWINGS It is a figure for demonstrating the hardware structure of the concrete placement management apparatus based on 1st Embodiment of this invention. 本発明の第1実施形態に係るコンクリート打設管理装置の処理手順を説明するためのフローチャートである。It is a flowchart for explaining the processing procedure of the concrete placement management device concerning a 1st embodiment of the present invention. 本発明の第2実施形態に係るコンクリート打設管理装置の構成を説明するためのブロック図である。It is a block diagram for explaining the composition of the concrete placement management device concerning a 2nd embodiment of the present invention. 本発明の第2実施形態に係るコンクリート打設管理装置が管理する帳票の一例を示す図である。It is a figure which shows an example of the form managed by the concrete placement management apparatus based on 2nd Embodiment of this invention. 本発明の第2実施形態に係るコンクリート打設管理装置が有する画像データテーブルの一例を示す図である。It is a figure which shows an example of the image data table which the concrete placement management apparatus based on 2nd Embodiment of this invention has. 本発明の第2実施形態に係るコンクリート打設管理装置のハードウェア構成を説明するための図である。It is a figure for explaining the hardware configuration of the concrete placement management device concerning a 2nd embodiment of the present invention. 本発明の第2実施形態に係るコンクリート打設管理装置の処理手順を説明するためのフローチャートである。It is a flow chart for explaining the processing procedure of the concrete placement management device concerning a 2nd embodiment of the present invention.

以下に、本発明を実施するための形態について、図面を参照して、例示的に詳しく説明する。ただし、以下の実施形態に記載されている、構成、数値、処理の流れ、機能要素などは一例に過ぎず、その変形や変更は自由であって、本発明の技術範囲を以下の記載に限定する趣旨のものではない。 EMBODIMENT OF THE INVENTION Below, the form for implementing this invention will be exemplarily described in detail with reference to drawings. However, the configuration, numerical values, process flow, functional elements, etc. described in the following embodiments are merely examples, and modifications and changes may be made freely, and the technical scope of the present invention is limited to the following description. It is not intended to do so.

[第1実施形態]
本発明の第1実施形態としてのコンクリート打設管理装置100について、図1A~図5を用いて説明する。コンクリート打設管理装置100は、生コンクリートの運搬や打設の作業を行う際に使用されている伝票の画像データを用いて、コンクリートの運搬管理や打設管理を行うための装置である。
[First embodiment]
A concrete placement management device 100 as a first embodiment of the present invention will be explained using FIGS. 1A to 5. The concrete placement management device 100 is a device for managing the transportation and placement of concrete using image data of slips used when transporting and placing fresh concrete.

図1Aおよび図1Bを参照して、コンクリート打設管理装置100の動作の概要などについて説明する。図1Aに示したように、製造工場130で製造された生コンクリートは、製造工場130から出荷されて、施工現場160へ運搬される。この場合、製造工場130からの出荷時に製造工場130の従業員などが、紙製の伝票120に生コンクリートの出荷時刻などを含む必要項目をそれぞれの該当項目欄に記入する。そして、従業員は、必要項目を記入した伝票120を、生コンクリートを運搬する運搬車両であるアジテータ車140の運転手に渡し、運転手は、伝票120を持って、施工現場160へ向けて出発する。 An overview of the operation of the concrete placement management device 100 will be described with reference to FIGS. 1A and 1B. As shown in FIG. 1A, ready-mixed concrete manufactured at manufacturing factory 130 is shipped from manufacturing factory 130 and transported to construction site 160. In this case, at the time of shipment from the manufacturing factory 130, an employee of the manufacturing factory 130 fills in necessary items, including the shipping time of ready-mixed concrete, on the paper slip 120 in each corresponding item column. The employee then hands the slip 120 with the necessary items filled in to the driver of the agitator vehicle 140, which is a transport vehicle for transporting the ready-mixed concrete, and the driver takes the slip 120 and leaves for the construction site 160. do.

そして、本実施形態においては、製造工場130からアジテータ車140が出発する際に、アジテータ車140の運転手や製造工場130の従業員等が、タブレット端末などの携帯端末に設けられたカメラ190で伝票120を撮像する。伝票120の撮像が完了したら、運転手等は、伝票120の画像データ191をコンクリート打設管理装置100へ無線通信または有線通信を介して送信する。 In this embodiment, when the agitator car 140 leaves the manufacturing factory 130, the driver of the agitator car 140, the employees of the manufacturing factory 130, etc. use the camera 190 installed on a mobile terminal such as a tablet terminal. The slip 120 is imaged. When the image capturing of the slip 120 is completed, the driver or the like transmits the image data 191 of the slip 120 to the concrete placement management device 100 via wireless communication or wired communication.

なお、製造工場130における伝票120の撮像は、アジテータ車140の運転手や製造工場130の従業員等が、タブレット端末に設けられたカメラ190を用いても、製造工場130に備え付けられた伝票読取用のカメラを用いてもよい。あるいは、コンクリート打設管理装置100に設けられているカメラを用いてもよい。 Note that the slip 120 at the manufacturing plant 130 can be imaged by the driver of the agitator vehicle 140, an employee of the manufacturing plant 130, or the like using a camera 190 installed on a tablet terminal. A standard camera may also be used. Alternatively, a camera provided in the concrete placement management device 100 may be used.

そして、コンクリート打設管理装置100は、送信された伝票120の画像データ191を取得する。コンクリート打設管理装置100は、取得した伝票120の画像データ191をOCR(Optical Character Recоgnition:光文字認識)処理して、伝票120の記載内容を読み取る。伝票120から読み取られる記載内容は、例えば、アジテータ車140の車両番号、生コンクリートの積載量および生コンクリートの出荷時刻である。記載内容の読み取りが完了したら、コンクリート打設管理装置100は、伝票120から読み取った車両番号、積載量および出荷時刻を紐付けて記録する。これらの作業が完了したら、アジテータ車140の運転手は、施工現場160へ向けて出発する。 The concrete placement management device 100 then acquires the image data 191 of the sent slip 120. The concrete placement management device 100 performs OCR (Optical Character Recognition) processing on the image data 191 of the acquired slip 120 to read the written contents of the slip 120. The written contents read from the slip 120 include, for example, the vehicle number of the agitator vehicle 140, the loading amount of ready-mixed concrete, and the shipping time of the ready-mixed concrete. Once the written content has been read, the concrete placement management device 100 records the vehicle number, loading amount, and shipping time read from the slip 120 in association with each other. Once these tasks are completed, the driver of the agitator vehicle 140 leaves for the construction site 160.

そして、アジテータ車140が施工現場160へ到着すると、施工現場160の作業者などに対して配付された少なくとも1つのタブレット端末などの携帯端末195のディスプレイに表示された操作ボタンを、作業者が操作する。作業者が操作する操作ボタンは、製造工場130から施工現場160に運搬された生コンクリートの荷卸し開始時刻を記録するための開始ボタンである。作業者は、携帯端末195のディスプレイに表示された開始ボタンを押下する。コンクリート打設管理装置100は、開始ボタンの押下時間を荷卸開始時刻として、アジテータ車140の車両番号と紐付けて記録して、コンクリートの運搬や打設を管理する。なお、携帯端末195は、打設場所の作業者に配布するのではなく、打設場所に配車された1台のポンプ車150ごとに1つの携帯端末195を配置してもよい。この場合、携帯端末195とポンプ車150とが一対一で対応することとなるので、予めポンプ車150を識別するための識別番号を携帯端末195に持たせておけば、作業者が、荷卸し開始ボタンを操作すれば、荷卸し対象のポンプ車150を自動的に選択することができる(ポンプ車150の識別番号を選択できる)。 When the agitator vehicle 140 arrives at the construction site 160, the worker operates the operation button displayed on the display of at least one mobile terminal 195 such as a tablet terminal distributed to the worker at the construction site 160. do. The operation button operated by the worker is a start button for recording the start time of unloading the ready-mixed concrete transported from the manufacturing factory 130 to the construction site 160. The worker presses the start button displayed on the display of the mobile terminal 195. The concrete placement management device 100 records the press time of the start button as the unloading start time in association with the vehicle number of the agitator vehicle 140, and manages the transportation and placement of concrete. Note that instead of distributing the mobile terminals 195 to workers at the pouring site, one mobile terminal 195 may be arranged for each pump truck 150 that is dispatched to the pouring site. In this case, the mobile terminal 195 and the pump truck 150 will have a one-to-one correspondence, so if the mobile terminal 195 has an identification number for identifying the pump truck 150 in advance, the worker can unload the cargo. By operating the start button, the pump truck 150 to be unloaded can be automatically selected (the identification number of the pump truck 150 can be selected).

このように、コンクリート打設管理装置100においては、生コンクリートの製造工場130からの出荷時には、従来から広く使用されている紙製の伝票120をOCR処理して、生コンクリートの運搬管理を行う。そして、コンクリート打設管理装置100は、生コンクリートが、施工現場160へ到着したら、施工現場160の作業者のボタン操作により、施工現場160における打設管理を行う。 As described above, in the concrete placement management device 100, when shipping the ready-mixed concrete from the manufacturing factory 130, the paper slip 120, which has been widely used in the past, is subjected to OCR processing to manage the transportation of the ready-mixed concrete. Then, when the ready-mixed concrete arrives at the construction site 160, the concrete placement management device 100 performs pouring management at the construction site 160 by a button operation by a worker at the construction site 160.

次に、図1Bを参照して、アジテータ車140が施工現場160へ到着した際のコンクリート打設管理装置100における開始ボタンの操作画面について説明する。アジテータ車140が施工現場160に到着すると、例えば、施工現場160の作業者が有する携帯端末195のディスプレイには、画面170が表示される。画面170は、開始終了選択画面171、荷卸開始画面172(終了画面)および確認画面173の3つの画面から構成される。 Next, with reference to FIG. 1B, the operation screen of the start button in the concrete placement management device 100 when the agitator vehicle 140 arrives at the construction site 160 will be described. When the agitator vehicle 140 arrives at the construction site 160, a screen 170 is displayed on the display of a mobile terminal 195 owned by a worker at the construction site 160, for example. The screen 170 is composed of three screens: a start/end selection screen 171, an unloading start screen 172 (end screen), and a confirmation screen 173.

そして、施工現場160の作業者が所持する携帯端末195のディスプレイには、開始終了選択画面171が表示され、作業者は、これから行う作業が、荷卸しの開始なのか、荷卸しの終了なのかを選択する。なお、図1Bにおいては、荷卸しの開始を例に説明をするが、荷卸しの終了であっても、表示されるボタンが変わるだけで、画面操作は大きく異なることはない。 Then, a start/end selection screen 171 is displayed on the display of the mobile terminal 195 owned by the worker at the construction site 160, and the worker can decide whether the work to be performed is to start unloading or end unloading. Select. In addition, in FIG. 1B, explanation will be given using the start of unloading as an example, but even when unloading ends, the screen operation does not differ significantly, only the displayed button changes.

これから施工現場160で行われる作業は、荷卸し作業であるので、施工現場160の作業者は、開始終了選択画面171に表示されている開始ボタン174を押下する。そうすると、画面170の表示が、開始終了選択画面171から、荷卸開始画面172に遷移する。荷卸開始画面172の下部には、生コンクリートの出荷時刻の早い順に、現在、製造工場130から施工現場160へ生コンクリートを運搬中のアジテータ車140のリストが表示されている。 Since the work to be performed at the construction site 160 from now on is unloading work, the worker at the construction site 160 presses the start button 174 displayed on the start/end selection screen 171. Then, the display on the screen 170 changes from the start/end selection screen 171 to the unloading start screen 172. At the bottom of the unloading start screen 172, a list of agitator vehicles 140 currently transporting ready-mixed concrete from the manufacturing plant 130 to the construction site 160 is displayed in descending order of shipping time of the ready-mixed concrete.

例えば、「09:30」に出荷された生コンクリートは、製造工場130が、第一プラントで、当該コンクリートを運搬しているアジテータ車140を識別するための車番(車両番号)が、「037」である。また、当該生コンクリートの運搬量(積載量)は、「4.5[m]」であることが表示されている。 For example, for ready-mixed concrete shipped at "09:30", the manufacturing factory 130 at the first plant has the vehicle number (vehicle number) for identifying the agitator vehicle 140 transporting the concrete as "037". ”. Further, it is displayed that the transport amount (loading amount) of the ready-mixed concrete is "4.5 [m 3 ]".

そして、「09:30」に製造工場130を出発した、車番「037」のアジテータ車140が、施工現場160へ到着し、荷卸しを開始する場合、施工現場160の作業者は、荷卸開始ボタン175を押下する。荷卸開始ボタン175を押下すると、荷卸開始ボタン175を押下した時刻が、コンクリートの打設開始時刻として、車番「037」と紐付けられて記録される。 When the agitator vehicle 140 with vehicle number "037" that left the manufacturing factory 130 at "09:30" arrives at the construction site 160 and starts unloading, the worker at the construction site 160 starts unloading. Press button 175. When the unloading start button 175 is pressed, the time when the unloading start button 175 is pressed is recorded in association with the car number "037" as the concrete placement start time.

また、車番「037」および「844」の右側に表示されている荷卸開始ボタン175と、車番「036」の右側に表示されている荷卸開始ボタンとの表示位置が、交互にずれて配置されている。このように、荷卸開始画面172においては、作業者が、ボタン操作をし易くするため(誤操作を防止するため)、図示したような、荷卸開始ボタンの配置としている。 Additionally, the display positions of the unloading start button 175 displayed on the right side of car numbers "037" and "844" and the unloading start button displayed on the right side of car number "036" are alternately arranged. has been done. In this way, on the unloading start screen 172, the unloading start buttons are arranged as shown in the figure in order to make it easier for the operator to operate the buttons (to prevent erroneous operations).

なお、荷卸開始ボタン175を押下すると、荷卸開始画面172が遷移して、確認画面173が表示される。確認画面173は、施工現場160の作業者が荷卸開始画面172で選択したアジテータ車140の車番に間違いがないかを、作業者に確認させるための画面である。そして、選択内容に間違いがなければ、作業者は、「荷卸開始OK」ボタンを押下すると、荷卸開始時刻(打設開始時刻)が記録される。選択内容に間違いがあれば、作業者は、「元に戻す」ボタンを押下すれば、荷卸開始画面172に戻るので、作業者は、再度、正しい車番の荷卸開始ボタンを押下すればよい。なお、荷卸終了の場合であっても、荷卸開始画面172の表示内容のうち、主に荷卸開始ボタン175が、荷卸終了ボタンに変更されて表示されるため、詳しい説明は省略する。 Note that when the unloading start button 175 is pressed, the unloading start screen 172 changes and a confirmation screen 173 is displayed. The confirmation screen 173 is a screen for allowing the worker at the construction site 160 to confirm whether the vehicle number of the agitator vehicle 140 selected on the unloading start screen 172 is correct. If the selection is correct, the operator presses the "OK to start unloading" button, and the unloading start time (casting start time) is recorded. If the selection is incorrect, the operator can press the "Undo" button to return to the unloading start screen 172, so the operator can press the unloading start button for the correct vehicle number again. Note that even in the case of the end of unloading, the unloading start button 175 among the displayed contents of the unloading start screen 172 is changed to the unloading end button and is therefore displayed, so a detailed explanation will be omitted.

次に図2を参照して、コンクリート打設管理装置100の構成について説明する。コンクリート打設管理装置100は、取得部201、読取部202、第1記録部203、第2記録部204、第3記録部205および表示制御部206を有する。 Next, with reference to FIG. 2, the configuration of the concrete placement management device 100 will be described. The concrete placement management device 100 includes an acquisition section 201, a reading section 202, a first recording section 203, a second recording section 204, a third recording section 205, and a display control section 206.

取得部201は、生コンクリート製造工場で製造された生コンクリートをコンクリートの施工現場160へ運搬する際に利用される伝票120を、生コンクリートの出荷時に、撮像機器を用いて読み込んで生成された伝票120の画像データ191を取得する。つまり、コンクリート打設管理装置100においては、生コンクリートの製造工場130で製造された生コンクリートを施工現場160へアジテータ車140により運搬する際に利用される紙製の伝票120の画像データ191を利用する。そのため、コンクリート打設管理装置100において、紙製の伝票120を利用することができるように、製造工場130の従業員やアジテータ車140の運転手などが所持する携帯端末のカメラ190(撮像機器)を用いて、紙製の伝票120を読み込んで(撮像して)、画像データ191を生成する。 The acquisition unit 201 reads the slip 120 used when transporting the ready-mixed concrete produced at the ready-mixed concrete manufacturing factory to the concrete construction site 160 using an imaging device at the time of shipping the ready-mixed concrete, and generates a slip. 120 image data 191 is acquired. That is, the concrete placement management device 100 uses the image data 191 of the paper slip 120 used when transporting the ready-mixed concrete manufactured at the ready-mixed concrete manufacturing factory 130 to the construction site 160 by the agitator vehicle 140. do. Therefore, in order to be able to use the paper slip 120 in the concrete placement management device 100, a camera 190 (imaging device) of a mobile terminal owned by an employee of the manufacturing plant 130, a driver of the agitator vehicle 140, etc. is used to read (image) the paper slip 120 and generate image data 191.

このように、紙製の伝票120をカメラ190で読み込んで、画像データ191を生成することにより、コンクリート打設管理装置100において、伝票120をデジタルデータとして取り扱うことができるようになる。生成された画像データ191は、コンクリート打設管理装置100に対して送信される。ここで、コンクリート打設管理装置100と、アジテータ車140の運転手などが所持する携帯端末とは、無線通信または有線通信を介して接続されている。 In this way, by reading the paper slip 120 with the camera 190 and generating the image data 191, the slip 120 can be handled as digital data in the concrete placement management apparatus 100. The generated image data 191 is transmitted to the concrete placement management device 100. Here, the concrete placement management device 100 and a mobile terminal carried by a driver of the agitator vehicle 140 or the like are connected via wireless communication or wired communication.

そして、取得部201は、アジテータ車140の運転手などが所持する携帯端末から送信された画像データ191を取得する。なお、送信される画像データ191には、撮像条件や撮像時刻などの情報も含まれている。 The acquisition unit 201 then acquires image data 191 transmitted from a mobile terminal owned by a driver of the agitator vehicle 140 or the like. Note that the transmitted image data 191 also includes information such as imaging conditions and imaging time.

読取部202は、画像データ191から伝票120に記載された、アジテータ車140の車両番号、生コンクリートの積載量および生コンクリートの出荷時刻を読み取る。読取部202は、取得した画像データ191について、OCR処理を実行することにより、伝票120の記載内容を読み取る。なお、読取部202が読み取る伝票120の内容は、車両番号、積載量および出荷時刻には限定されない。 The reading unit 202 reads the vehicle number of the agitator vehicle 140, the loading amount of ready-mixed concrete, and the shipping time of the ready-mixed concrete written on the slip 120 from the image data 191. The reading unit 202 reads the written contents of the slip 120 by performing OCR processing on the acquired image data 191. Note that the contents of the slip 120 read by the reading unit 202 are not limited to the vehicle number, loading amount, and shipping time.

ここで、アジテータ車140の車両番号は、例えば、アジテータ車140の車体の側面のドア部分や車体の前面などに表示されている1桁~4桁で表示される数字であり、ドアナンバーと呼ばれる番号である。ドアナンバーは、自動車登録番号(ナンバープレート)と比べると、見易い位置に表示されているため、製造工場130などにおいて、監視カメラを用いた監視がし易く、広く利用されている。また、見易い位置に表示されているため、生コンクリートの積み込みの車両管理や、待機車両の把握なども容易に行え、ドアナンバーは、アジテータ車140の管理番号として広く利用されている番号である。 Here, the vehicle number of the agitator vehicle 140 is, for example, a 1- to 4-digit number displayed on the side door or the front of the vehicle body of the agitator vehicle 140, and is called a door number. It's a number. Since the door number is displayed in a position that is easier to see than the vehicle registration number (license plate), it is easier to monitor using a surveillance camera in the manufacturing factory 130 and the like, so it is widely used. Furthermore, since it is displayed in an easily visible position, it is easy to manage vehicles for loading ready-mixed concrete and to keep track of waiting vehicles.The door number is a number that is widely used as a management number for the agitator vehicle 140.

第1記録部203は、読み取られた、車両番号、積載量および出荷時刻を紐付けて記録する。なお、伝票120の記載内容が不鮮明であったり、記載位置がずれていたりして、読取部202により、出荷時刻が読み取れない場合、第1記録部203は、次のような処理を行ってもよい。つまり、第1記録部203は、カメラ190により伝票120を読み込んだ時刻を出荷時刻として記録する。これにより、伝票120において、所定記載位置に出荷時刻が記載されていなかったり、所定記載位置からずれた位置に記載されていたりする場合などであっても、生コンクリートの運搬時間(運搬時間の算出に必要な出荷時刻)の管理を行うことができる。以上により、生コンクリートの出荷時の一連の処理が完了し、生コンクリートの運搬時間の管理が開始される。 The first recording unit 203 records the read vehicle number, loading amount, and shipping time in association with each other. Note that if the shipping time cannot be read by the reading unit 202 because the written content of the slip 120 is unclear or the written position is shifted, the first recording unit 203 may perform the following processing. good. That is, the first recording unit 203 records the time when the slip 120 is read by the camera 190 as the shipping time. As a result, even if the shipping time is not written in the predetermined position on the slip 120 or is written in a position shifted from the predetermined position, the transportation time of the ready-mixed concrete (transportation time calculation) (Shipping time required for shipping) can be managed. With the above steps, a series of processes at the time of shipping the ready-mixed concrete are completed, and management of the transportation time of the ready-mixed concrete is started.

第2記録部204は、施工現場160へのアジテータ車140の到着時に、施工現場160に配布された少なくとも1つの携帯端末195のディスプレイに表示された、生コンクリートの荷卸し開始時刻を記録するための開始ボタンを施工現場160の作業者が、押下した時刻を、コンクリートの打設開始時刻として、車両番号に紐付けて記録する。 The second recording unit 204 records the unloading start time of ready-mixed concrete displayed on the display of at least one mobile terminal 195 distributed to the construction site 160 when the agitator vehicle 140 arrives at the construction site 160. The time at which the worker at the construction site 160 presses the start button is recorded as the concrete placement start time in association with the vehicle number.

つまり、製造工場130を出荷した生コンクリートが施工現場160へ到着して、荷卸しが開始されると、それ程時間を空けずにコンクリートの打設が開始される。そのため、第2記録部204は、荷卸開始ボタン175の押下時刻をコンクリートの打設開始時刻として記録する。このような処理をすることにより、アジテータ車140による生コンクリートの運搬の完了と、コンクリートの打設開始とをシームレスに管理することができる。また、施工現場160の作業者にとっても、一度のボタン操作により、生コンクリートの運搬完了の管理と、コンクリートの打設開始の管理とを行うことができるため、簡便かつ確実にコンクリートの打設管理を行うことができる。 In other words, when the ready-mixed concrete shipped from the manufacturing factory 130 arrives at the construction site 160 and unloading is started, concrete pouring begins shortly after. Therefore, the second recording unit 204 records the time when the unloading start button 175 is pressed as the concrete placement start time. By performing such processing, it is possible to seamlessly manage the completion of transportation of fresh concrete by the agitator vehicle 140 and the start of concrete pouring. Additionally, workers at the construction site 160 can manage the completion of fresh concrete transport and the start of concrete pouring with a single button operation, allowing them to manage concrete pouring easily and reliably. It can be performed.

なお、施工現場160に配布された携帯端末195は、施工現場160の作業者が所持する端末であっても、アジテータ車140や施工現場160、施工現場160に配車されているポンプ車150などに備え付けられた端末であってもよい。また、携帯端末195は、施工現場160に複数存在していてもよい。 Note that even if the mobile terminal 195 distributed to the construction site 160 is owned by a worker at the construction site 160, it may be used in the agitator vehicle 140, the construction site 160, the pump truck 150 distributed to the construction site 160, etc. It may be an installed terminal. Further, a plurality of mobile terminals 195 may exist at the construction site 160.

第3記録部205は、ディスプレイに表示された、生コンクリートの荷卸し終了時刻を記録するための終了ボタンを施工現場160の作業者が押下した時刻を、コンクリートの打設終了時刻として、車両番号に紐付けて記録する。 The third recording unit 205 sets the time when the worker at the construction site 160 presses the end button displayed on the display for recording the time when unloading of ready-mixed concrete is finished, as the concrete placement end time, and the vehicle number. Record it by linking it to.

つまり、アジテータ車140が施工現場160へ到着すると、アジテータ車140の生コンクリートの貯蔵用ドラムをシュートによりポンプ車150と接続して、アジテータ車140からポンプ車150へと生コンクリートを流し込む。そして、アジテータ車140により運搬されてきた生コンクリートが、貯蔵用ドラムからなくなれば、ポンプ車150への生コンクリートの流し込みは終了する。すなわち、この段階で、打設箇所へ供給される生コンクリートがなくなるので、アジテータ車140により運搬されてきたコンクリートの打設は終了することとなる。 That is, when the agitator car 140 arrives at the construction site 160, the fresh concrete storage drum of the agitator car 140 is connected to the pump car 150 through a chute, and the fresh concrete is poured from the agitator car 140 to the pump car 150. When the ready-mixed concrete transported by the agitator car 140 disappears from the storage drum, pouring of the ready-mixed concrete into the pump car 150 ends. That is, at this stage, there is no more fresh concrete to be supplied to the pouring location, so the pouring of concrete transported by the agitator vehicle 140 is completed.

したがって、第3記録部205は、施工現場160の作業者が、荷卸終了ボタンを押下した時刻をコンクリートの打設終了の時刻としてアジテータ車140の車両番号とともに記録する。これにより、一度のボタン操作により生コンクリートの荷卸しの終了と、コンクリートの打設の完了とを管理することができ、施工現場160の作業者は、簡便かつ確実にコンクリートの打設管理を行うことができる。 Therefore, the third recording unit 205 records the time when the worker at the construction site 160 presses the unloading end button, together with the vehicle number of the agitator vehicle 140, as the time when concrete placement ends. With this, it is possible to manage the completion of unloading of fresh concrete and the completion of concrete pouring with a single button operation, and workers at the construction site 160 can easily and reliably manage concrete pouring. be able to.

表示制御部206は、記録された、車両番号、積載量、出荷時刻、打設開始時刻および打設終了時刻の少なくともいずれかをディスプレイに表示させる。表示制御部206は、施工現場160の作業者が所持するタブレット端末などの携帯端末195のディスプレイに記録された各種データを表示させる。これにより、施工現場160の作業者は、施工現場160での打設作業と、記録されたデータとを見比べながら、作業の進捗具合や計画の達成度合いなどを確認することができる。 The display control unit 206 causes the display to display at least one of the recorded vehicle number, loading amount, shipping time, pouring start time, and pouring end time. The display control unit 206 displays various data recorded on the display of a mobile terminal 195 such as a tablet terminal owned by a worker at the construction site 160. Thereby, the worker at the construction site 160 can check the progress of the work, the degree of achievement of the plan, etc. while comparing the pouring work at the construction site 160 with the recorded data.

また、コンクリート打設管理装置100は、記録された出荷時刻および到着時刻から算出される生コンクリートの運搬時間が、運搬基準時間を超えた場合に、アラートを報知する報知部を有してもよい。このアラートが報知されることで、管理時間の接近を警告し、作業者等に対して注意喚起を促すことができる。ここで、運搬基準時間は、運搬管理時間よりも所定時間手前に設定された、アジテータ車140が、当該時間までに施工現場160へ到着しなければならない時間である。また、運搬管理時間は、製造工場130で製造された生コンクリートが施工現場160に運搬されるまでに許された時間であり、この時間を超えて施工現場160へ運搬されてきた生コンクリートを打ち込むことができなくなる時間である。すなわち、運搬管理時間は、日本産業規格(JIS)やコンクリート標準示方書などにより、定められた、コンクリートの品質を保つための1つの基準となる時間である。運搬時間が、運搬管理時間を超えた場合には、コンクリートを荷卸しせずに、返却しなければならない。そして、運搬基準時間は、運搬管理時間よりも短い時間として設定されているが、これは、コンクリート打込みに要する時間を考慮して設定された時間となっている。すなわち、運搬基準時間は、この時間までに生コンクリートが運搬されれば、コンクリートの打込み終了までの時間が、運搬管理時間以内に収まるように計算された時間となっている。運搬基準時間は、例えば、運搬管理時間よりも10分~15分短く設定された時間となっている。 Further, the concrete placement management device 100 may include a notification unit that notifies an alert when the transportation time of ready-mixed concrete calculated from the recorded shipping time and arrival time exceeds the transportation reference time. . By reporting this alert, it is possible to warn that the management time is approaching and to urge workers and the like to be careful. Here, the transportation reference time is a time, which is set a predetermined time before the transportation management time, by which the agitator vehicle 140 must arrive at the construction site 160. Further, the transportation management time is the time allowed until the ready-mixed concrete manufactured at the manufacturing factory 130 is transported to the construction site 160, and if the ready-mixed concrete that has been transported to the construction site 160 is poured beyond this time. This is the time when you will no longer be able to do anything. That is, the transportation control time is a time defined by Japanese Industrial Standards (JIS), concrete standard specifications, etc., and is one of the standards for maintaining the quality of concrete. If the transportation time exceeds the transportation control time, the concrete must be returned without being unloaded. The transportation reference time is set to be shorter than the transportation management time, but this time is set in consideration of the time required for pouring concrete. That is, the transportation reference time is a time calculated such that if the ready-mixed concrete is transported by this time, the time until the concrete placement is completed will be within the transportation management time. The transportation reference time is, for example, a time set to be 10 to 15 minutes shorter than the transportation management time.

さらに、コンクリート打設管理装置100は、記録された到着時刻から推定される打込み終了時刻(荷卸し終了時刻)が、打込み基準時間を超えた場合に、アラートを報知する報知部を有してもよい。つまり、このアラートが報知された場合には、運搬されてきた生コンクリートを製造工場130へ返却しなければならない。ここで、打込み基準時間は、打込み管理時間よりも所定時間手前に設定された、運搬された生コンクリートが、当該時間までに打込みが終了しなければならない時間である。所定時間は、コンクリートの打ち込みに要する時間に基づいて決定される時間である。また、打込み管理時間は、製造工場130で製造された生コンクリートが、施工現場160において、打ち込みが終了するまでに許された時間であり、この時間を超えて打ち込みが終了すると、硬化後のコンクリートの品質が保てなくなる時間である。すなわち、打込み管理時間は、日本産業規格やコンクリート標準示方書などにより、定められた、打込み後のコンクリートの品質を保つための1つの基準となる時間である。そして、打込み基準時間は、打込み管理時間よりも短い時間として設定されているが、打ち込まれたコンクリートの安全を確保するために、設定された時間となっている。打込み基準時間は、例えば、打込み管理時間から、打ち込みに要する想定時間を引いた時間となっている。 Furthermore, the concrete placement management device 100 may include a notification unit that issues an alert when the placing end time (unloading end time) estimated from the recorded arrival time exceeds the standard placing time. good. That is, when this alert is reported, the transported ready-mixed concrete must be returned to the manufacturing factory 130. Here, the pouring reference time is a time, which is set a predetermined time before the pouring management time, by which pouring of the transported ready-mixed concrete must be completed. The predetermined time is a time determined based on the time required for pouring concrete. In addition, the pouring control time is the time allowed for ready-mixed concrete manufactured at the manufacturing factory 130 to finish pouring at the construction site 160, and if the pouring is completed beyond this time, the hardened concrete will This is the time when quality cannot be maintained. That is, the pouring control time is a time defined by the Japanese Industrial Standards, the Standard Specification for Concrete, etc., and is one of the standards for maintaining the quality of concrete after pouring. The pouring reference time is set as a shorter time than the pouring control time, but is set to ensure the safety of poured concrete. The driving reference time is, for example, the time obtained by subtracting the estimated time required for driving from the driving management time.

次に図3を参照して、コンクリート打設管理装置100が有する画像データテーブル301の一例について説明する。画像データテーブル301は、画像データID(Identifier)311に関連付けて画像データ情報312、読取内容データ313、荷卸開始時刻314および荷卸終了時刻315を記憶する。画像データID311は、カメラ190で撮像した伝票120の画像データ191を識別するための識別子である。画像データ情報312は、伝票120の撮像条件や撮像時刻などについての情報である。読取内容データ313は、伝票120の画像データ191からOCR処理により読み取った内容についてのデータであり、車両番号や出荷時刻、積載量などを含む。荷卸開始時刻314は、施工現場160の作業者が荷卸開始ボタン175を押下した時刻である。荷卸終了時刻315は、施工現場160の作業者が荷卸終了ボタンを押下した時刻である。 Next, with reference to FIG. 3, an example of the image data table 301 included in the concrete placement management device 100 will be described. The image data table 301 stores image data information 312, read content data 313, unloading start time 314, and unloading end time 315 in association with image data ID (Identifier) 311. The image data ID 311 is an identifier for identifying the image data 191 of the slip 120 captured by the camera 190. The image data information 312 is information regarding the imaging conditions of the slip 120, the imaging time, and the like. The read content data 313 is data about the content read from the image data 191 of the slip 120 by OCR processing, and includes the vehicle number, shipping time, loading amount, and the like. The unloading start time 314 is the time when the worker at the construction site 160 presses the unloading start button 175. The unloading end time 315 is the time when the worker at the construction site 160 presses the unloading end button.

図4を参照して、コンクリート打設管理装置100のハードウェア構成について説明する。CPU(Central Processing Unit)410は、演算制御用のプロセッサであり、プログラムを実行することで図2のコンクリート打設管理装置100の各機能構成を実現する。CPU410は複数のプロセッサを有し、異なるプログラムやモジュール、タスク、スレッドなどを並行して実行してもよい。ROM(Read Only Memory)420は、初期データおよびプログラムなどの固定データおよびその他のプログラムを記憶する。また、ネットワークインタフェース430は、ネットワークを介して他の装置などと通信する。なお、CPU410は1つに限定されず、複数のCPUであっても、あるいは画像処理用のGPU(Graphics Processing Unit)を含んでもよい。また、ネットワークインタフェース430は、CPU410とは独立したCPUを有して、RAM(Random Access Memory)440の領域に送受信データを書き込みあるいは読み出しするのが望ましい。また、RAM440とストレージ450との間でデータを転送するDMAC(Direct Memory Access Controller)を設けるのが望ましい(図示なし)。さらに、CPU410は、RAM440にデータが受信あるいは転送されたことを認識してデータを処理する。また、CPU410は、処理結果をRAM440に準備し、後の送信あるいは転送はネットワークインタフェース430やDMACに任せる。 The hardware configuration of the concrete placement management device 100 will be described with reference to FIG. 4. A CPU (Central Processing Unit) 410 is a processor for arithmetic control, and realizes each functional configuration of the concrete placement management device 100 shown in FIG. 2 by executing a program. The CPU 410 has multiple processors and may execute different programs, modules, tasks, threads, etc. in parallel. ROM (Read Only Memory) 420 stores fixed data such as initial data and programs, and other programs. Further, the network interface 430 communicates with other devices via a network. Note that the number of CPUs 410 is not limited to one, and may be a plurality of CPUs or may include a GPU (Graphics Processing Unit) for image processing. Further, it is preferable that the network interface 430 has a CPU independent of the CPU 410 and writes or reads transmitted and received data in a RAM (Random Access Memory) 440 area. Further, it is desirable to provide a DMAC (Direct Memory Access Controller) that transfers data between the RAM 440 and the storage 450 (not shown). Further, the CPU 410 recognizes that data has been received or transferred to the RAM 440 and processes the data. Further, the CPU 410 prepares the processing results in the RAM 440 and leaves subsequent transmission or transfer to the network interface 430 or DMAC.

RAM440は、CPU410が一時記憶のワークエリアとして使用するランダムアクセスメモリである。RAM440には、本実施形態の実現に必要なデータを記憶する記憶領域が確保されている。伝票画像データ441は、伝票120を撮像機器で撮像した画像データであり、製造工場130からの出荷時に撮像された伝票120の画像データである。画像データ情報442は、伝票120を撮像した際の撮像条件や撮像時刻などを含む情報である。読取データ443は、画像データ191から読み取った伝票120の記載内容に関するデータである。開始終了時刻データ444は、施工現場160の作業者が、荷卸開始ボタン175および荷卸終了ボタンを押下した時刻に関するデータである。 The RAM 440 is a random access memory used by the CPU 410 as a temporary storage work area. A storage area is secured in the RAM 440 to store data necessary for realizing this embodiment. The slip image data 441 is image data of the slip 120 captured by an imaging device, and is image data of the slip 120 captured at the time of shipment from the manufacturing factory 130. The image data information 442 is information including the imaging conditions and imaging time when the slip 120 was imaged. The read data 443 is data related to the written contents of the slip 120 read from the image data 191. The start/end time data 444 is data related to the time when the worker at the construction site 160 presses the unloading start button 175 and the unloading end button.

送受信データ445は、ネットワークインタフェース430を介して送受信されるデータである。また、RAM440は、各種アプリケーションモジュールを実行するためのアプリケーション実行領域446を有する。 Transmission/reception data 445 is data transmitted/received via network interface 430. The RAM 440 also has an application execution area 446 for executing various application modules.

ストレージ450には、データベースや各種パラメータ、あるいは本実施形態の実現に必要な以下のデータまたはプログラムが記憶されている。ストレージ450は、画像データテーブル301を格納する。画像データテーブル301は、図3に示した、画像データID311と画像データ情報312などとの関係を管理するテーブルである。 The storage 450 stores a database, various parameters, and the following data or programs necessary for realizing this embodiment. Storage 450 stores image data table 301. The image data table 301 is a table that manages the relationship between the image data ID 311, the image data information 312, etc. shown in FIG.

ストレージ450は、さらに、取得モジュール451、読取モジュール452、第1記録モジュール453、第2記録モジュール454、第3記録モジュール455および表示制御モジュール456を格納する。取得モジュール451は、伝票120の画像データ191を取得するモジュールである。読取モジュール452は、画像データ191から伝票120に記載された、車両番号、積載量および出荷時刻を読み取るモジュールである。第1記録モジュール453は、読み取られた、車両番号、積載量および出荷時刻を紐付けて記録するモジュールである。第2記録モジュール454は、施工現場160の作業者が、荷卸開始ボタン175を押下した時刻をコンクリートの打設開始時刻として車両番号と紐付けて記録するモジュールである。第3記録モジュール455は、施工現場160の作業者が、荷卸終了ボタンを押下した時刻をコンクリートの打設終了時刻として車両番号と紐付けて記録するモジュールである。表示制御モジュール456は、車両番号、積載量、出荷時刻および到着時刻を携帯端末のディスプレイに表示させるモジュールである。これらのモジュール451~456は、CPU410によりRAM440のアプリケーション実行領域446に読み出され、実行される。制御プログラム457は、コンクリート打設管理装置100の全体を制御するためのプログラムである。 The storage 450 further stores an acquisition module 451, a reading module 452, a first recording module 453, a second recording module 454, a third recording module 455, and a display control module 456. The acquisition module 451 is a module that acquires the image data 191 of the slip 120. The reading module 452 is a module that reads the vehicle number, loading amount, and shipping time written on the slip 120 from the image data 191. The first recording module 453 is a module that records the read vehicle number, loading amount, and shipping time in association with each other. The second recording module 454 is a module that records the time when the worker at the construction site 160 presses the unloading start button 175 as the concrete placement start time in association with the vehicle number. The third recording module 455 is a module that records the time when the worker at the construction site 160 presses the unloading end button as the concrete placement end time in association with the vehicle number. The display control module 456 is a module that displays the vehicle number, loading amount, shipping time, and arrival time on the display of the mobile terminal. These modules 451 to 456 are read into the application execution area 446 of the RAM 440 by the CPU 410 and executed. The control program 457 is a program for controlling the entire concrete placement management device 100.

入出力インタフェース460は、入出力機器との入出力データをインタフェースする。入出力インタフェース460には、表示部461、操作部462、が接続される。また、入出力インタフェース460には、さらに、記憶媒体464が接続されてもよい。さらに、音声出力部であるスピーカ463や、音声入力部であるマイク(図示せず)、あるいは、GPS位置判定部が接続されてもよい。なお、図4に示したRAM440やストレージ450には、コンクリート打設管理装置100が有する汎用の機能や他の実現可能な機能に関するプログラムやデータは図示されていない。 The input/output interface 460 interfaces input/output data with input/output equipment. A display section 461 and an operation section 462 are connected to the input/output interface 460. Further, a storage medium 464 may be further connected to the input/output interface 460. Furthermore, a speaker 463 as an audio output section, a microphone (not shown) as an audio input section, or a GPS position determination section may be connected. Note that the RAM 440 and storage 450 shown in FIG. 4 do not show programs or data related to general-purpose functions or other realizable functions that the concrete placement management device 100 has.

次に図5に示したフローチャートを参照して、コンクリート打設管理装置100の処理手順について説明する。このフローチャートは、図4のCPU410がRAM440を使用して実行し、図2のコンクリート打設管理装置100の各機能構成を実現する。 Next, the processing procedure of the concrete placement management device 100 will be explained with reference to the flowchart shown in FIG. This flowchart is executed by the CPU 410 in FIG. 4 using the RAM 440 to realize each functional configuration of the concrete placement management device 100 in FIG. 2.

ステップS501において、取得部201は、製造工場130の出荷時にカメラ190を用いて読み込んで生成された伝票120の画像データ191を取得する。ステップS503において、読取部202は、画像データ191から伝票120に記載された、アジテータ車140の車両番号、生コンクリートの積載量、生コンクリートの出荷時刻を読み取る。 In step S<b>501 , the acquisition unit 201 acquires image data 191 of the slip 120 that was read and generated using the camera 190 at the time of shipment from the manufacturing factory 130 . In step S503, the reading unit 202 reads the vehicle number of the agitator vehicle 140, the loading amount of ready-mixed concrete, and the shipping time of the ready-mixed concrete written on the slip 120 from the image data 191.

ステップS505において、第1記録部203は、出荷時刻が読み取れるか否かを判定する。出荷時刻が読み取れると判定した場合(ステップS505のYES)、第1記録部203は、ステップS507へ進む。ステップS507において、第1記録部203は、読み取られた、車両番号、積載量および出荷時刻を紐付けて記録する。 In step S505, the first recording unit 203 determines whether the shipping time can be read. If it is determined that the shipping time can be read (YES in step S505), the first recording unit 203 proceeds to step S507. In step S507, the first recording unit 203 records the read vehicle number, loading amount, and shipping time in association with each other.

出荷時刻が読み取れないと判定した場合(ステップS505のNO)、第1記録部203は、ステップS509へ進む。ステップS509において、第1記録部203は、カメラ190で伝票120を読み込んだ時刻を、生コンクリートの出荷時刻として、車両番号などと紐付けて記録する。 If it is determined that the shipping time cannot be read (NO in step S505), the first recording unit 203 proceeds to step S509. In step S509, the first recording unit 203 records the time when the slip 120 is read by the camera 190, as the ready-mixed concrete shipping time, in association with the vehicle number or the like.

ステップS511において、第2記録部204は、施工現場160の作業者が荷卸開始ボタン175を押下した時刻を、コンクリートの打設開始時刻として、アジテータ車140の車両番号と紐付けて記録する。ステップS513において、第3記録部205は、施工現場160の作業者が荷卸終了ボタンを押下した時刻を、コンクリートの打設終了時刻として、アジテータ車140の車両番号と紐付けて記録する。ステップS515において、表示制御部206は、記録された、車両番号、積載量、出荷時刻、打設開始時刻および打設終了時刻の少なくともいずれかを携帯端末のディスプレイに表示させる。 In step S511, the second recording unit 204 records the time when the worker at the construction site 160 presses the unloading start button 175 in association with the vehicle number of the agitator vehicle 140 as the concrete placement start time. In step S513, the third recording unit 205 records the time when the worker at the construction site 160 presses the unloading end button, as the concrete placement end time, in association with the vehicle number of the agitator vehicle 140. In step S515, the display control unit 206 displays at least one of the recorded vehicle number, load capacity, shipping time, pouring start time, and pouring end time on the display of the mobile terminal.

本実施形態によれば、コンクリートの出荷時に伝票に記入された記載内容をそのまま利用するので、記入ミスや入力ミスなどの人為的ミスが発生する余地がなく、迅速かつ正確にコンクリート打設を管理することができる。また、打設場所においては、出荷時に記録したデータをそのまま利用するので、出荷時と同様に人為的ミスが発生する余地がない。さらに、読み取った内容をアジテータ車の車両番号に紐付けて記録するので、アジテータ車で運搬したコンクリートの打設先や製造元などを一元的に管理することができる。また、コンクリートの運搬時間およびコンクリートの打込み時間の管理を容易に行うことができる。 According to this embodiment, since the contents entered on the slip at the time of concrete shipment are used as is, there is no room for human errors such as entry errors and input errors, and concrete placement is managed quickly and accurately. can do. Furthermore, at the pouring site, the data recorded at the time of shipment is used as is, so there is no room for human error to occur, just as there is at the time of shipment. Furthermore, since the read information is recorded in association with the vehicle number of the agitator vehicle, it is possible to centrally manage the destination and manufacturer of concrete transported by the agitator vehicle. Furthermore, the concrete transport time and concrete placement time can be easily managed.

[第2実施形態]
次に本発明の第2実施形態に係るコンクリート打設管理装置について、図6A~図9を用いて説明する。図6Aは、本実施形態に係るコンクリート打設管理装置600の構成を説明するためのブロック図である。本実施形態に係るコンクリート打設管理装置600は、上記第1実施形態と比べると、受付部601および第4記録部602を有する点で異なる。その他の構成および動作は第1実施形態と同様であるため、同じ構成および動作については同じ符号を付してその詳しい説明を省略する。
[Second embodiment]
Next, a concrete placement management device according to a second embodiment of the present invention will be described using FIGS. 6A to 9. FIG. 6A is a block diagram for explaining the configuration of a concrete placement management device 600 according to this embodiment. The concrete placement management device 600 according to this embodiment differs from the first embodiment in that it includes a reception section 601 and a fourth recording section 602. Since the other configurations and operations are the same as those in the first embodiment, the same configurations and operations will be denoted by the same reference numerals and detailed description thereof will be omitted.

コンクリート打設管理装置600は、受付部601および第4記録部602を有する。受付部601は、施工現場160の作業者が、生コンクリートを所定の打設場所へ供給するために、施工現場160に配置された少なくとも1台のポンプ車150を識別するための識別番号を、少なくとも1つの携帯端末195を用いて選択した識別番号を受け付ける。つまり、アジテータ車140が施工現場160へ到着すると、運搬されてきた生コンクリートを送り込むポンプ車150を決定しなければならない。 The concrete placement management device 600 has a reception section 601 and a fourth recording section 602. The reception unit 601 receives an identification number for a worker at the construction site 160 to identify at least one pump truck 150 placed at the construction site 160 in order to supply ready-mixed concrete to a predetermined pouring location. At least one mobile terminal 195 is used to accept the selected identification number. That is, when the agitator vehicle 140 arrives at the construction site 160, it is necessary to determine the pump vehicle 150 to which the transported ready-mixed concrete will be delivered.

この場合、まず、施工現場160の誘導員が、施工現場160へ到着したアジテータ車140を施工現場160内のポンプ車150が停車している打設場所へ誘導する。すなわち、誘導員は、アジテータ車140の運転手に対して、ポンプ車150が複数ある場合には、どのポンプ車150のもとへ向かうべきかを指示する。そして、アジテータ車140の運転手は、当該指示に従って、指定されたポンプ車150のもとへアジテータ車140を移動させる。 In this case, first, a guide at the construction site 160 guides the agitator vehicle 140 that has arrived at the construction site 160 to a pouring location within the construction site 160 where the pump vehicle 150 is parked. That is, the guide instructs the driver of the agitator car 140 which pump car 150 to go to if there are a plurality of pump cars 150. Then, the driver of the agitator car 140 moves the agitator car 140 to the designated pump car 150 in accordance with the instruction.

次に、施工現場160の作業者やポンプ車150のオペレータ、アジテータ車140の運転手などは、施工現場160(打設場所)に配布された携帯端末195やポンプ車150に備え付けられた携帯端末195などを用いて、携帯端末195に予め紐付けられたポンプ車150の識別番号を抽出する。そして、受付部601でその識別番号を受け付ける。そして、受付部601は、選択された識別番号を受け付ける。 Next, the workers at the construction site 160, the operator of the pump truck 150, the driver of the agitator truck 140, etc., use the mobile terminal 195 distributed at the construction site 160 (place of pouring) or the mobile terminal installed in the pump truck 150. 195, etc., to extract the identification number of the pump truck 150 that is linked to the mobile terminal 195 in advance. Then, the reception unit 601 receives the identification number. Then, the receiving unit 601 receives the selected identification number.

第4記録部602は、構造物の3次元設計情報であって、前記3次元設計情報を所定サイズの大ブロックに区分して、区分された前記大ブロックのそれぞれを、所定サイズの小ブロックに分割した分割データを有する3次元設計情報における、前記生コンクリートが打設された小ブロックの情報を、受付部601が受け付けたポンプ車150の識別番号と、アジテータ車140の車両番号とに紐付けて記録する。このように、ポンプ車150の識別番号とアジテータ車の車両番号とを紐付けて記録することにより、アジテータ車140で運搬されてきた生コンクリートが、どこの小ブロック(打設場所)へ打設されたかを、打設完了後であっても追跡することが可能となる。そして、どの車両番号を有するアジテータ車140が、どのポンプ車150にコンクリートを荷卸しし、荷卸しされたコンクリートが打ち込まれた小ブロックの情報や、運搬時間の情報、打込み時間の情報などは、例えば、図6Bに示したような帳票の形で記録される。なお、アジテータ車140の車両番号の他にも、ナンバープレートのナンバーなどの識別番号なども帳票に記録してもよい。 A fourth recording unit 602 stores three-dimensional design information of a structure, divides the three-dimensional design information into large blocks of a predetermined size, and converts each of the divided large blocks into small blocks of a predetermined size. In the three-dimensional design information having the divided division data, information on the small block in which the ready-mixed concrete is placed is linked to the identification number of the pump truck 150 received by the reception unit 601 and the vehicle number of the agitator truck 140. and record it. In this way, by linking and recording the identification number of the pump truck 150 and the vehicle number of the agitator truck, it is possible to determine which small block (place of pouring) the fresh concrete transported by the agitator truck 140 will be poured into. This makes it possible to track what has been done even after the pouring is completed. Then, the agitator car 140 with which vehicle number unloads concrete to which pump car 150, information on the small block into which the unloaded concrete was poured, information on transportation time, information on pouring time, etc. For example, it is recorded in the form of a form as shown in FIG. 6B. In addition to the vehicle number of the agitator vehicle 140, an identification number such as a license plate number may also be recorded in the form.

構造物のコンクリート打込みを行う場合、アジテータ車140で未硬化のコンクリートを運搬し、例えば、1日の施工領域に組み立てられた型枠内に、順次、未硬化のコンクリートを打ち込む。そして、先に打ち込まれたコンクリートが硬化する前に、次のコンクリートを打ち重ね、バイブレータなどによりコンクリートを締め固め、打ち重ねたコンクリートと打ち重ねられたコンクリートとの両方のコンクリートを一体化させる。この打込みから一体化までの作業を繰り返すことで、施工領域へのコンクリートの打込みが完了する。コンクリートの打込み完了後は、一定期間養生して硬化させ、組み立てた型枠の脱型を行う。 When pouring concrete for a structure, unhardened concrete is transported by an agitator vehicle 140, and, for example, the unhardened concrete is successively poured into formwork assembled in a construction area on one day. Then, before the previously poured concrete hardens, the next concrete is poured, and the concrete is compacted using a vibrator, etc., and both the poured concrete and the piled concrete are integrated. By repeating this work from pouring to integration, pouring of concrete into the construction area is completed. After the concrete is poured, it is cured for a certain period of time to harden, and the assembled formwork is removed from the mold.

この場合、構造物にコンクリートを順次打ち込むときに、先行して打込んだコンクリートが硬化する前に、打ち重ねられたコンクリートと打ち重ねたコンクリートとをバイブレータなどによって一体化させる必要がある。このとき、コンクリートの打重ね時間が管理時間を超過すると、コンクリートの打重ね部分にコールドジョイントなどが発生し、弱部となるおそれがある。そのため、構造物のコンクリート打込みにおいては、材料練り混ぜからの時間管理や、コンクリートの打込み順序、打重ね時間の管理などが重要となる。 In this case, when pouring concrete into a structure one after another, it is necessary to use a vibrator or the like to integrate the poured concrete and the piled concrete before the previously poured concrete hardens. At this time, if the concrete stacking time exceeds the control time, cold joints may occur in the concrete stacking area, which may become a weak part. Therefore, when pouring concrete for structures, it is important to manage the time from mixing the materials, the order of concrete pouring, and the time required to pour the concrete.

ここで、コンクリートの施工領域の規模が大きくなると、多量のコンクリートが必要となり、コンクリートを運搬するために必要となるアジテータ車140の台数が多くなる。さらに、大規模構造物のコンクリートを打ち込むためには、アジテータ車140の運搬可能量などに応じて、当該構造物を複数の層に分けるなどして、順序立ててコンクリートを打ち込まなければならず、コンクリートの層数も多くなる傾向にある。そのため、打ち継ぎ部も多くなるので、コールドジョイントなどの弱部が発生することがないように、コンクリートの打重ね時間などを考慮した上で、打込み順序や打込み層厚などを決めてコンクリートの打設計画を立てる必要があった。 Here, as the scale of the concrete construction area increases, a large amount of concrete is required, and the number of agitator vehicles 140 required to transport the concrete increases. Furthermore, in order to pour concrete for a large-scale structure, it is necessary to divide the structure into multiple layers depending on the transportable amount of the agitator vehicle 140, etc., and pour concrete in an orderly manner. The number of concrete layers also tends to increase. As a result, there will be many joints, so in order to prevent weak points such as cold joints from occurring, the order of pouring, thickness of pouring layers, etc. should be decided upon, taking into consideration the time required for pouring concrete. I needed to draw up a plan.

打設計画の立案は、例えば、3次元CAD(Computer-Aided Design)などを用いて設計した構造物の3次元データ等を含む3次元設計情報を用いて行われる。3次元設計情報には、例えば、工区や工期などの情報も含まれている。3次元設計情報は、所定期間に打設可能なコンクリートの量に応じて設定された施工領域であり、複数の大ブロックに分けられている。すなわち、構造物は、複数の大ブロックを含んでいる。そして、複数の大ブロックを、アジテータ車140の運搬可能量に応じて、いくつかの小ブロックに分割する。このように、3次元設計情報は、構造物を複数の小ブロックに分割した分割データを有しており、コンクリートの打込みは、小ブロック単位で行われることとなる。 The pouring plan is created using, for example, three-dimensional design information including three-dimensional data of a structure designed using three-dimensional CAD (Computer-Aided Design) or the like. The three-dimensional design information also includes information such as the construction area and construction period, for example. The three-dimensional design information is a construction area set according to the amount of concrete that can be placed in a predetermined period, and is divided into a plurality of large blocks. That is, the structure includes a plurality of large blocks. Then, the plurality of large blocks are divided into several small blocks according to the transportable amount of the agitator vehicle 140. In this way, the three-dimensional design information includes division data in which the structure is divided into a plurality of small blocks, and concrete is poured in units of small blocks.

次に図7を参照して、コンクリート打設管理装置600が有する画像データテーブル701の一例について説明する。画像データテーブル701は、画像データID311に関連付けて識別番号711を記憶する。識別番号711は、アジテータ車140が運搬してきた生コンクリートの供給先のポンプ車150を識別するための識別子である。 Next, with reference to FIG. 7, an example of the image data table 701 included in the concrete placement management device 600 will be described. The image data table 701 stores an identification number 711 in association with the image data ID 311. The identification number 711 is an identifier for identifying the pump truck 150 to which the fresh concrete transported by the agitator truck 140 is supplied.

図8を参照して、コンクリート打設管理装置600のハードウェア構成について説明する。RAM840は、CPU410が一時記憶のワークエリアとして使用するランダムアクセスメモリである。RAM840には、本実施形態の実現に必要なデータを記憶する領域が確保されている。識別番号データ841は、ポンプ車150を識別するための識別子に関するデータである。 The hardware configuration of concrete placement management device 600 will be described with reference to FIG. 8. The RAM 840 is a random access memory used by the CPU 410 as a temporary storage work area. The RAM 840 has an area reserved for storing data necessary for realizing this embodiment. Identification number data 841 is data regarding an identifier for identifying pump truck 150.

ストレージ850には、データベースや各種パラメータ、あるいは本実施形態の実現に必要な以下のデータまたはプログラムが記憶されている。ストレージ850は、画像データテーブル701を格納する。画像データテーブル701は、図7に示した、画像データID311と識別番号711などとの関係を管理するテーブルである。 The storage 850 stores a database, various parameters, and the following data or programs necessary to realize this embodiment. Storage 850 stores image data table 701. The image data table 701 is a table that manages the relationship between the image data ID 311, the identification number 711, etc. shown in FIG.

ストレージ850は、さらに、受付モジュール851および第4記録モジュール852を格納する。受付モジュール851は、施工現場160の作業者が選択したポンプ車150を識別するための識別子を受け付けるモジュールである。第4記録モジュール852は、ポンプ車150の識別番号と、アジテータ車140の車両番号とを紐付けて記録するモジュールである。これらのモジュール851~852は、CPU410によりRAM840のアプリケーション実行領域446に読み出され、実行される。制御プログラム457は、コンクリート打設管理装置600の全体を制御するためのプログラムである。 The storage 850 further stores a reception module 851 and a fourth recording module 852. The reception module 851 is a module that receives an identifier for identifying the pump truck 150 selected by the worker at the construction site 160. The fourth recording module 852 is a module that records the identification number of the pump truck 150 and the vehicle number of the agitator truck 140 in a linked manner. These modules 851 to 852 are read into the application execution area 446 of the RAM 840 by the CPU 410 and executed. The control program 457 is a program for controlling the entire concrete placement management device 600.

次に図9に示したフローチャートを参照して、コンクリート打設管理装置600の処理手順について説明する。このフローチャートは、図8のCPU410がRAM840を使用して実行し、図6のコンクリート打設管理装置600の各機能構成を実現する。 Next, the processing procedure of the concrete placement management device 600 will be explained with reference to the flowchart shown in FIG. This flowchart is executed by the CPU 410 in FIG. 8 using the RAM 840 to realize each functional configuration of the concrete placement management device 600 in FIG. 6.

ステップS901において、受付部601は、施工現場160に配置された少なくとも1つのポンプ車150を識別するための識別番号を受け付ける。識別番号は、施工現場160の作業者が選択したポンプ車150を識別するための番号である。ステップS903において、第4記録部602は、受け付けた識別番号とアジテータ車140の車両番号とを紐付けて記録する。 In step S901, the receiving unit 601 receives an identification number for identifying at least one pump truck 150 placed at the construction site 160. The identification number is a number for identifying the pump truck 150 selected by the worker at the construction site 160. In step S903, the fourth recording unit 602 records the received identification number and the vehicle number of the agitator vehicle 140 in association with each other.

本実施形態によれば、アジテータ車の車両番号とポンプ車の識別番号とを紐付けて記録するので、コンクリートに関する全ての情報を小ブロックに紐付けて管理することができ、製造工場から運搬された生コンクリートがどの打設箇所へ打設されたかを、打設完了後であっても追跡することができる。 According to this embodiment, since the vehicle number of the agitator vehicle and the identification number of the pump truck are linked and recorded, all information related to concrete can be managed by linking it to small blocks, and the concrete is transported from the manufacturing plant. It is possible to track where fresh concrete has been poured even after pouring is complete.

以上、実施形態を参照して本発明を説明したが、本発明は、上述した実施形態に制限されず適宜変更可能である。本発明の構成や詳細には、本発明のスコープ内で当業者が理解し得る様々な変更をすることができる。また、それぞれの実施形態に含まれる別々の特徴を如何様に組み合わせたシステムまたは装置も、本発明の範疇に含まれる。 Although the present invention has been described above with reference to the embodiments, the present invention is not limited to the embodiments described above and can be modified as appropriate. The configuration and details of the present invention can be modified in various ways that can be understood by those skilled in the art within the scope of the present invention. Furthermore, systems or devices that combine the separate features included in each embodiment in any way are also included within the scope of the present invention.

また、本発明は、複数の機器から構成されるシステムに適用されてもよいし、単体の装置に適用されてもよい。さらに、本発明は、実施形態の機能を実現する情報処理プログラムが、システムあるいは装置に供給され、内蔵されたプロセッサによって実行される場合にも適用可能である。したがって、本発明の機能をコンピュータで実現するために、コンピュータにインストールされるプログラム、あるいはそのプログラムを格納した媒体、そのプログラムをダウンロードさせるWWW(World Wide Web)サーバも、プログラムを実行するプロセッサも本発明の技術的範囲に含まれる。特に、少なくとも、上述した実施形態に含まれる処理ステップをコンピュータに実行させるプログラムを格納した非一時的コンピュータ可読媒体(non-transitory computer readable medium)は本発明の技術的範囲に含まれる。
Moreover, the present invention may be applied to a system composed of a plurality of devices, or may be applied to a single device. Furthermore, the present invention is also applicable when an information processing program that implements the functions of the embodiments is supplied to a system or device and executed by a built-in processor. Therefore, in order to realize the functions of the present invention on a computer, a program installed on the computer, a medium storing the program, a WWW (World Wide Web) server from which the program is downloaded, and a processor executing the program are also falls within the technical scope of the invention. In particular, a non-transitory computer readable medium storing at least a program that causes a computer to execute the processing steps included in the embodiments described above is within the technical scope of the present invention.

Claims (6)

生コンクリート製造工場で製造された生コンクリートをコンクリートの施工現場へ運搬する際に利用される伝票を、前記生コンクリートの出荷時に、撮像機器を用いて読み込んで生成された前記伝票の画像データを取得する取得部と、
前記画像データから前記伝票に記載された、アジテータ車の車両番号、前記生コンクリートの積載量および前記生コンクリートの出荷時刻を読み取る読取部と、
読み取られた、前記車両番号、前記積載量および前記出荷時刻を紐付けて記録する第1記録部と、
前記施工現場への前記アジテータ車の到着時に、前記施工現場に配布された少なくとも1つの携帯端末のディスプレイに表示された、前記生コンクリートの荷卸し開始時刻を記録するための開始ボタンを前記施工現場の作業者が押下した時刻を、前記コンクリートの打設開始時刻として、前記車両番号に紐付けて記録する第2記録部と、
前記ディスプレイに表示された、前記生コンクリートの荷卸し終了時刻を記録するための終了ボタンを前記施工現場の作業者が押下した時刻を、前記コンクリートの打設終了時刻として、前記車両番号に紐付けて記録する第3記録部と、
記録された、前記車両番号、前記積載量、前記出荷時刻、打設開始時刻および前記打設終了時刻の少なくともいずれかを前記ディスプレイに表示させる表示制御部と、
を備えたコンクリート打設管理装置。
Obtain image data of the slip that is generated by reading the slip used when transporting the ready-mixed concrete produced at the ready-mixed concrete manufacturing factory to the concrete construction site using an imaging device when the ready-mixed concrete is shipped. an acquisition unit to
a reading unit that reads the vehicle number of the agitator vehicle, the loading amount of the ready-mixed concrete, and the shipping time of the ready-mixed concrete written on the slip from the image data;
a first recording unit that records the read vehicle number, the loading amount, and the shipping time in a linked manner;
When the agitator vehicle arrives at the construction site, a start button for recording the time to start unloading the ready-mixed concrete displayed on the display of at least one mobile terminal distributed to the construction site is pressed at the construction site. a second recording unit that records the time when the worker presses the button, as the concrete placement start time, in association with the vehicle number;
The time at which a worker at the construction site presses an end button displayed on the display for recording the time when unloading of the ready-mixed concrete is pressed is linked to the vehicle number as the concrete placement end time. a third recording section for recording;
a display control unit that causes the display to display at least one of the recorded vehicle number, the loading amount, the shipping time, the pouring start time, and the pouring end time;
Concrete placement management device equipped with
前記作業者が、前記生コンクリートを前記施工現場内の所定の打設場所へ供給するために、前記所定の打設場所に配置された少なくとも1台のポンプ車を識別するための識別番号を、前記少なくとも1つの携帯端末を用いて選択した前記識別番号を受け付ける受付部と、
構造物の3次元設計情報であって、前記3次元設計情報を所定サイズの大ブロックに区分して、区分された前記大ブロックのそれぞれを、所定サイズの小ブロックに分割した分割データを有する3次元設計情報における、前記生コンクリートが打設された小ブロックの情報を前記識別番号と、前記車両番号とに紐付けて記録する第4記録部と、
をさらに備えた請求項1に記載のコンクリート打設管理装置。
In order for the worker to supply the ready-mixed concrete to a predetermined placement location within the construction site, an identification number for identifying at least one pump truck placed at the predetermined placement location, a reception unit that receives the identification number selected using the at least one mobile terminal;
Three-dimensional design information of a structure, comprising divided data in which the three-dimensional design information is divided into large blocks of a predetermined size, and each of the partitioned large blocks is divided into small blocks of a predetermined size. a fourth recording unit that records information on the small block in which the ready-mixed concrete is placed in the dimensional design information in association with the identification number and the vehicle number;
The concrete placement management device according to claim 1, further comprising:
前記出荷時刻および前記到着時刻から算出される生コンクリートの運搬時間が、運搬基準時間を超えた場合にアラートを報知し、
前記到着時刻から推定されるコンクリートの打設終了時刻が、打設基準時間を超えた場合にアラートを報知する、報知部を備えた請求項1または2に記載のコンクリート打設管理装置。
Notifying an alert when the transportation time of the ready-mixed concrete calculated from the shipping time and the arrival time exceeds the transportation reference time;
3. The concrete placement management device according to claim 1, further comprising a notification unit that notifies an alert when a concrete placement end time estimated from the arrival time exceeds a concrete placement reference time.
前記車両番号は、前記アジテータ車のドアナンバーおよび自動車登録番号の少なくともいずれかである請求項1~3のいずれか1項に記載のコンクリート打設管理装置。 4. The concrete placement management device according to claim 1, wherein the vehicle number is at least one of a door number and a vehicle registration number of the agitator vehicle. 生コンクリート製造工場で製造された生コンクリートをコンクリートの施工現場へ運搬する際に利用される伝票を、前記生コンクリートの出荷時に、撮像機器を用いて、読み込んで、前記伝票の画像データを取得する取得ステップと、
前記画像データから前記伝票に記載された、アジテータ車の車両番号、前記生コンクリートの積載量および前記生コンクリートの出荷時刻を読み取る読取ステップと、
読み取られた、前記車両番号、前記積載量および前記出荷時刻を紐付けて記録する第1記録ステップと、
前記施工現場への前記アジテータ車の到着時に、前記施工現場に配布された少なくとも1つの携帯端末のディスプレイに表示された、前記生コンクリートの荷卸し開始時刻を記録するための開始ボタンを前記施工現場の作業者が押下した時刻を、前記コンクリートの打設開始時刻として、前記車両番号に紐付けて記録する第2記録ステップと、
前記ディスプレイに表示された、前記生コンクリートの荷卸し終了時刻を記録するための終了ボタンを前記施工現場の作業者が押下した時刻を、前記コンクリートの打設終了時刻として、前記車両番号に紐付けて記録する第3記録ステップと、
記録された、前記車両番号、前記積載量、前記出荷時刻、打設開始時刻および前記打設終了時刻の少なくともいずれかを前記ディスプレイに表示させる表示制御ステップと、
を含むコンクリート打設管理方法。
A slip used when transporting the ready-mixed concrete manufactured at a ready-mixed concrete manufacturing factory to a concrete construction site is read using an imaging device when the ready-mixed concrete is shipped, and image data of the slip is obtained. an acquisition step;
a reading step of reading the vehicle number of the agitator vehicle, the loading amount of the ready-mixed concrete, and the shipping time of the ready-mixed concrete written on the slip from the image data;
a first recording step of recording the read vehicle number, the loading amount, and the shipping time in a linked manner;
When the agitator vehicle arrives at the construction site, a start button for recording the time to start unloading the ready-mixed concrete displayed on the display of at least one mobile terminal distributed to the construction site is pressed at the construction site. a second recording step of recording the time when the worker presses the button, as the concrete placement start time, in association with the vehicle number;
The time at which a worker at the construction site presses an end button displayed on the display for recording the time when unloading of the ready-mixed concrete is pressed is linked to the vehicle number as the concrete placement end time. a third recording step of recording the
a display control step of displaying at least one of the recorded vehicle number, the loading amount, the shipping time, the pouring start time, and the pouring end time on the display;
Concrete placement management methods including.
生コンクリート製造工場で製造された生コンクリートをコンクリートの施工現場へ運搬する際に利用される伝票を、前記生コンクリートの出荷時に、撮像機器を用いて、読み込んで、前記伝票の画像データを取得する取得ステップと、
前記画像データから前記伝票に記載された、アジテータ車の車両番号、前記生コンクリートの積載量および前記生コンクリートの出荷時刻を読み取る読取ステップと、
読み取られた、前記車両番号、前記積載量および前記出荷時刻を紐付けて記録する第1記録ステップと、
前記施工現場への前記アジテータ車の到着時に、前記施工現場に配布された少なくとも1つの携帯端末のディスプレイに表示された、前記生コンクリートの荷卸し開始時刻を記録するための開始ボタンを前記施工現場の作業者が押下した時刻を、前記コンクリートの打設開始時刻として、前記車両番号に紐付けて記録する第2記録ステップと、
前記ディスプレイに表示された、前記生コンクリートの荷卸し終了時刻を記録するための終了ボタンを前記施工現場の作業者が押下した時刻を、前記コンクリートの打設終了時刻として、前記車両番号に紐付けて記録する第3記録ステップと、
記録された、前記車両番号、前記積載量、前記出荷時刻、打設開始時刻および前記打設終了時刻の少なくともいずれかを前記ディスプレイに表示させる表示制御ステップと、
をコンピュータに実行させるコンクリート打設管理プログラム。
A slip used when transporting the ready-mixed concrete manufactured at a ready-mixed concrete manufacturing factory to a concrete construction site is read using an imaging device when the ready-mixed concrete is shipped, and image data of the slip is obtained. an acquisition step;
a reading step of reading the vehicle number of the agitator vehicle, the loading amount of the ready-mixed concrete, and the shipping time of the ready-mixed concrete written on the slip from the image data;
a first recording step of recording the read vehicle number, the loading amount, and the shipping time in a linked manner;
When the agitator vehicle arrives at the construction site, a start button for recording the time to start unloading the ready-mixed concrete displayed on the display of at least one mobile terminal distributed to the construction site is pressed at the construction site. a second recording step of recording the time when the worker presses the button, as the concrete placement start time, in association with the vehicle number;
The time at which a worker at the construction site presses an end button displayed on the display for recording the time when unloading of the ready-mixed concrete is pressed is linked to the vehicle number as the concrete placement end time. a third recording step of recording the
a display control step of displaying at least one of the recorded vehicle number, the loading amount, the shipping time, the pouring start time, and the pouring end time on the display;
A concrete placement management program that allows a computer to execute the following.
JP2022054559A 2022-03-29 2022-03-29 Concrete pouring management device, concrete pouring management method, and concrete pouring management program Active JP7509817B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022054559A JP7509817B2 (en) 2022-03-29 2022-03-29 Concrete pouring management device, concrete pouring management method, and concrete pouring management program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022054559A JP7509817B2 (en) 2022-03-29 2022-03-29 Concrete pouring management device, concrete pouring management method, and concrete pouring management program

Publications (2)

Publication Number Publication Date
JP2023147031A true JP2023147031A (en) 2023-10-12
JP7509817B2 JP7509817B2 (en) 2024-07-02

Family

ID=88286452

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022054559A Active JP7509817B2 (en) 2022-03-29 2022-03-29 Concrete pouring management device, concrete pouring management method, and concrete pouring management program

Country Status (1)

Country Link
JP (1) JP7509817B2 (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009157739A (en) * 2007-12-27 2009-07-16 Hazama Corp System for managing quality information of concrete structure
JP2010285748A (en) * 2009-06-09 2010-12-24 Tekken Constr Co Ltd Quality control system for concrete delivered to construction site
JP2011046086A (en) * 2009-08-27 2011-03-10 Maeda Corp Conveying time management system of ready-mixed concrete
JP2011129014A (en) * 2009-12-21 2011-06-30 Toda Constr Co Ltd Ready mixed concrete management system
JP2017182208A (en) * 2016-03-28 2017-10-05 大成建設株式会社 Delivery of freshly mixed concrete, placement management system, delivery of the system, and placement management method
JP2017188013A (en) * 2016-04-08 2017-10-12 大成建設株式会社 Shipment and delivery management method of ready mixed concrete, and shipment and delivery management system
JP2018001658A (en) * 2016-07-06 2018-01-11 大成建設株式会社 Delivery and placement management system of ready-mixed concrete
JP2018035628A (en) * 2016-09-01 2018-03-08 株式会社大林組 Placing management system, placing management method, and placing management program

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009157739A (en) * 2007-12-27 2009-07-16 Hazama Corp System for managing quality information of concrete structure
JP2010285748A (en) * 2009-06-09 2010-12-24 Tekken Constr Co Ltd Quality control system for concrete delivered to construction site
JP2011046086A (en) * 2009-08-27 2011-03-10 Maeda Corp Conveying time management system of ready-mixed concrete
JP2011129014A (en) * 2009-12-21 2011-06-30 Toda Constr Co Ltd Ready mixed concrete management system
JP2017182208A (en) * 2016-03-28 2017-10-05 大成建設株式会社 Delivery of freshly mixed concrete, placement management system, delivery of the system, and placement management method
JP2017188013A (en) * 2016-04-08 2017-10-12 大成建設株式会社 Shipment and delivery management method of ready mixed concrete, and shipment and delivery management system
JP2018001658A (en) * 2016-07-06 2018-01-11 大成建設株式会社 Delivery and placement management system of ready-mixed concrete
JP2018035628A (en) * 2016-09-01 2018-03-08 株式会社大林組 Placing management system, placing management method, and placing management program

Also Published As

Publication number Publication date
JP7509817B2 (en) 2024-07-02

Similar Documents

Publication Publication Date Title
JP5399816B2 (en) Raw concrete transport time management system
JP6709117B2 (en) Fresh concrete delivery and placement management system
CN106779355A (en) A kind of container terminal AIMS and method
DE112018005021T5 (en) SYSTEMS AND METHODS FOR ESTABLISHING A DIGITAL CHAIN-OF-CUSTODY
JP4486375B2 (en) Concrete construction management support device, concrete construction management support system, and concrete construction management support program
JP2017199320A (en) Container position management system
JP2022042354A (en) Installation management system of cast-in-place concrete
JP2005082349A (en) Container crane working management system, container crane working management method, and container crane
JP2023147031A (en) Concrete placing management device, concrete placing management method, and concrete placing management program
KR102204886B1 (en) Logistics tracking system using virtual terminal
JP7444916B2 (en) Concrete placement management device, concrete placement management method, and concrete placement management program
KR20140011786A (en) A vehicle cargo management system
CN116342027A (en) Digital storage system and storage method for bulk raw materials
JP7509818B2 (en) Concrete pouring management device, concrete pouring management method, and concrete pouring management program
KR102422616B1 (en) Cargo vehicle site monitoring system and method using artificial intelligence
JP2006076768A (en) Work management system and work management method
JP2023147034A (en) Concrete casting management device, concrete casting management method and concrete casting management program
US20220180310A1 (en) System and Method for Outputting Coordination of Transport of Items
CN115146808A (en) In-plant logistics management system and management method
JP5144239B2 (en) Container status check system at container terminal gate
JP2000356040A (en) Physical distribution system for use in construction work
TW202141411A (en) System and method for managing containers
JP7091077B2 (en) Outpatient work management system and outpatient work management method
TWM600880U (en) Container Management Assistant System
JP2012071974A (en) Yard operation support method and yard operation support processing apparatus for product yard

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20221003

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20231212

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20240130

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240322

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240604

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240620

R150 Certificate of patent or registration of utility model

Ref document number: 7509817

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150