Prior art keywords
project
indirect
allocation
work
sales
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2022035428A
Other languages
Japanese (ja)
Inventor
晶浩 古川
Akihiro Furukawa
剛光 上野
Takemitsu Ueno
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obic Co Ltd
Original Assignee
Obic Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obic Co Ltd filed Critical Obic Co Ltd
Priority to JP2022035428A priority Critical patent/JP2023130871A/en
Publication of JP2023130871A publication Critical patent/JP2023130871A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Abstract

To provide a device, a method and a program for managing indirect expenses, that categorize work contents of sales management and support department workers into direct project work and indirect project work, and that allocate indirect expenses required for indirect project occupation by referring to allocation criteria of indirect expense allocation.SOLUTION: A device for managing indirect expenses comprises a control part and includes: classifying means which can access a project table, an allocation criteria master, a daily report table, and a purchase table, and refers to the project table, the daily report table and the allocation criteria master to calculate occupation time spent on direct projects and indirect projects by which sales management and support department workers have been occupied, and to classify the sales management and support work expenses into direct expenses and indirect expenses according to occupation time ratios; and allocating means for allocating indirect expenses to direct projects by referring to the allocation criteria master.SELECTED DRAWING: Figure 1

Description

本発明は、間接費用管理装置、間接費用管理方法、および間接費用管理プログラムに関する。 The present invention relates to an indirect cost management device, an indirect cost management method, and an indirect cost management program.

コンサルティング業界やIT業界などの人手不足の業界では、社員等の業務活動をサポートするために、派遣社員やアルバイト等を使用している。派遣社員やアルバイト等の業務は、ドキュメント作成といった売上活動にかかわる業務(直接業務)から、社内的な事務作業(間接業務)まで多岐にわたる。派遣社員やアルバイト等の雇用が広がる一方、派遣社員やアルバイト等を含む販管・支援部門従事者の人件費を実際の営業活動と結び付けて可視化するのは難しく、手間もかかるので、派遣社員やアルバイト等の担当業務の妥当性の検討や、継続使用の判断はし難いものとなっている。派遣社員やアルバイト等の業務に関して運用管理を行う場合、事務的な効率性が問題となっていた。 In industries with labor shortages such as the consulting industry and the IT industry, temporary workers and part-time workers are used to support the business activities of employees. The work of temporary employees and part-time workers is wide-ranging, from work related to sales activities such as document creation (direct work) to in-house clerical work (indirect work). While the employment of temporary workers and part-time workers is expanding, it is difficult and time-consuming to visualize the personnel costs of sales, administration and support division workers, including temporary workers and part-time workers, in connection with actual sales activities. It is difficult to examine the appropriateness of the work they are responsible for and to decide whether to continue using the system. Administrative efficiency has been a problem when managing operations for temporary employees, part-time workers, etc.

特許文献1では、活動基準原価計算法(ABC原価計算法)に基づいて、業務を細かい活動単位に分割し、各活動単位に要した作業時間や人員数などを基に、業務における人件費を活動単位ごとに配分し、間接費の配賦と製造原価の計算を行う間接費配賦計算システムが提案されている。 In Patent Document 1, based on the activity-based costing method (ABC costing method), a business is divided into small activity units, and personnel costs for the business are calculated based on the work time required for each activity unit, the number of personnel, etc. An indirect cost allocation calculation system has been proposed that allocates to each activity unit and allocates indirect costs and calculates manufacturing costs.

特開2010-282524号公報JP2010-282524A

特許文献1のシステムでは、活動単位に分割しにくい運転監視業務について、監視画面にて運転監視した時間と実際の担当工程設備の稼働時間とを採取することで間接費の配分を行っているが、派遣社員やアルバイト等を含む販管・支援部門従事者の業務にかかわる費用のうちの事務作業等の間接費用の配分については何ら考慮されていない。 In the system of Patent Document 1, for operation monitoring work that is difficult to divide into activity units, indirect costs are allocated by collecting the time of operation monitoring on the monitoring screen and the actual operating time of the process equipment in charge. , there is no consideration given to the allocation of indirect costs such as administrative work among the costs associated with the work of sales, administration and support department personnel, including temporary employees and part-time workers.

本発明は、上記問題点に鑑みてなされたものであって、派遣社員やアルバイト等を含む販管・支援部門従事者の作業内容を直接プロジェクト作業と間接プロジェクト作業とに分類した日報情報として管理し、集計した間接プロジェクト従事に要した間接費用を、間接費配賦の配賦基準を参照して配賦することが可能な間接費用管理装置、間接費用管理方法、および間接費用管理プログラムを提供することを目的とする。 The present invention has been made in view of the above-mentioned problems, and manages the work contents of sales, administration and support division workers, including temporary employees and part-time workers, as daily report information classified into direct project work and indirect project work. , provides an indirect cost management device, an indirect cost management method, and an indirect cost management program that can allocate aggregated indirect costs required for engaging in indirect projects with reference to allocation standards for indirect cost allocation. The purpose is to

上述した課題を解決し、目的を達成するために、本発明に係る間接費用管理装置は、御部を備える間接費用管理装置であって、間接費用の配賦基準を格納する配賦基準マスタと、製造部門従事者および販管・支援部門従事者が従事した作業内容を格納する日報テーブルと、前記販管・支援部門従事者の業務により生じた販管・支援業務費用を格納する仕入テーブルと、前記間接費用の配賦先のプロジェクトを設定する配賦設定テーブルと、製造部門従事者のプロジェクトおよび作業工程毎の従事時間を集計したPJ別集計テーブルと、にアクセス可能であって、前記配賦基準マスタ、前記日報テーブルおよび仕入テーブルを参照して、前記販管・支援部門従事者が従事した直接プロジェクトと間接プロジェクトへの従事時間を算出し、前記販管・支援業務費用を従事時間比に応じて直接費用と間接費用とに仕分けする仕分け手段と、前記PJ別集計テーブルおよび前記配賦設定テーブルを参照して、前記仕分け手段により仕分けされた間接費用を、前記配賦先のプロジェクトに配賦する配賦手段と、を備えることを特徴とする。 In order to solve the above-mentioned problems and achieve the purpose, an indirect cost management device according to the present invention is an indirect cost management device that includes a control section, and includes an allocation standard master that stores allocation standards for indirect costs. , a daily report table that stores the work contents of the manufacturing department employees and the sales, administration, and support department employees; a purchase table that stores the sales, administration, and support business expenses incurred by the work of the sales, administration, and support department employees; It is possible to access an allocation setting table that sets the project to which indirect costs are allocated, and a project-by-project summary table that summarizes the working hours of manufacturing department workers for each project and work process, and the allocation standard By referring to the master data, the daily report table, and the purchasing table, calculate the hours of engagement in the direct and indirect projects that the sales, administration, and support staff were engaged in, and calculate the sales, administration, and support work costs according to the ratio of hours worked. A sorting means for sorting into direct costs and indirect costs, and referring to the project-by-project aggregation table and the allocation setting table, and allocating the indirect costs sorted by the sorting means to the allocation destination project. It is characterized by comprising an allocation means.

また、本発明に係る間接費用管理装置は、前記製造部門従事者および前記販管・支援部門従事者が従事する作業工程を格納する作業内容マスタ、にアクセス可能であって、前記仕分け手段は、前記作業内容マスタ、前記配賦基準マスタ、前記日報テーブルおよび仕入テーブルを参照して、前記販管・支援部門従事者が従事したプロジェクトおよび作業工程毎に従事時間を算出し、前記販管・支援業務費用を算出した従事時間比に応じてプロジェクトおよび作業工程毎に仕分けし、前記配賦手段は、前記PJ別集計テーブルおよび前記配賦設定テーブルを参照して、前記間接プロジェクトの各作業工程に要した間接費用を、前記製造部門従事者が従事したプロジェクトおよび作業工程毎の従事時間比に基づき、前記プロジェクトに配賦することを特徴とする。 Further, the indirect cost management device according to the present invention is capable of accessing a work content master that stores work processes in which the manufacturing department workers and the sales, administration and support department workers are engaged, and the sorting means is configured to By referring to the work content master, the allocation standard master, the daily report table, and the purchasing table, calculate the hours worked for each project and work process in which the sales, administration, and support department personnel were engaged, and calculate the sales, administration, and support work expenses. are sorted into projects and work processes according to the calculated engagement time ratio, and the allocation means refers to the project-by-project aggregation table and the allocation setting table to calculate the amount of time required for each work process of the indirect project. The method is characterized in that indirect costs are allocated to the projects in which the manufacturing department workers were engaged based on the projects in which they worked and the ratio of their working hours for each work process.

また、本発明に係る間接費用管理装置は、前記製造部門従事者および前記販管・支援部門従事者が従事する作業予定を格納する作業予定テーブル、にアクセス可能であって、前記日報テーブルは、前記製造部門従事者および前記販管・支援部門従事者が前記作業予定テーブルを修正することにより作成されることを特徴とする。 Further, the indirect cost management device according to the present invention is capable of accessing a work schedule table that stores work schedules in which the manufacturing department workers and the sales, administration and support department workers are engaged, and the daily report table is configured to It is characterized in that the work schedule table is created by a manufacturing department employee and the sales, management/support department employee modifying the work schedule table.

また、本発明に係る間接費用管理方法は、制御部を備える間接費用管理装置で実行される間接費用管理方法であって、間接費用の配賦基準を格納する配賦基準マスタと、製造部門従事者および販管・支援部門従事者が従事した作業内容を格納する日報テーブルと、前記販管・支援部門従事者の業務により生じた販管・支援業務費用を格納する仕入テーブルと、前記間接費用の配賦先のプロジェクトを設定する配賦設定テーブルと、製造部門従事者のプロジェクトおよび作業工程毎の従事時間を集計したPJ別集計テーブルと、にアクセス可能であって、前記配賦基準マスタ、前記日報テーブルおよび仕入テーブルを参照して、前記販管・支援部門従事者が従事した直接プロジェクトと間接プロジェクトへの従事時間を算出し、販管・支援業務費用を従事時間比に応じて直接費用と間接費用とに仕分けする仕分けステップと、前記PJ別集計テーブルおよび前記配賦設定テーブルを参照して、前記仕分けステップで仕分けされた間接費用を、前記配賦先のプロジェクトに配賦する配賦ステップと、を含むこと、を特徴とする。 Further, the indirect cost management method according to the present invention is an indirect cost management method executed by an indirect cost management device including a control unit, and includes an allocation standard master storing an allocation standard for indirect costs, and a manufacturing department staff member. a daily report table that stores the work contents of the sales, administration, and support department employees; a purchasing table that stores the sales, administration, and support business expenses generated by the work of the sales, administration, and support department employees; and a distribution table for the indirect costs. It is possible to access the allocation setting table that sets the allocation destination project and the project-by-project summary table that summarizes the working hours of manufacturing department workers for each project and work process, and the allocation standard master and the daily report. With reference to the table and purchasing table, calculate the hours spent on direct projects and indirect projects by the sales, administration and support staff, and calculate the sales, administration and support work costs into direct costs and indirect costs according to the ratio of hours worked. an allocation step of allocating the indirect costs sorted in the sorting step to the allocation destination projects by referring to the project-by-project aggregation table and the allocation setting table; It is characterized by including.

本発明に係る間接費用管理プログラムは、制御部を備える間接費用管理装置で実行される間接費用管理プログラムであって、間接費用の配賦基準を格納する配賦基準マスタと、製造部門従事者および販管・支援部門従事者が従事した作業内容を格納する日報テーブルと、前記販管・支援部門従事者の業務により生じた販管・支援業務費用を格納する仕入テーブルと、前記間接費用の配賦先のプロジェクトを設定する配賦設定テーブルと、製造部門従事者のプロジェクトおよび作業工程毎の従事時間を集計したPJ別集計テーブルと、にアクセス可能であって、前記配賦基準マスタ、前記日報テーブルおよび仕入テーブルを参照して、前記販管・支援部門従事者が従事した直接プロジェクトと間接プロジェクトへの従事時間を算出し、販管・支援業務費用を従事時間比に応じて直接費用と間接費用とに仕分けする仕分けステップと、前記PJ別集計テーブルおよび前記配賦設定テーブルを参照して、前記仕分けステップで仕分けされた間接費用を、前記配賦先のプロジェクトに配賦する配賦ステップと、をコンピュータで実行することを特徴とする。 The indirect cost management program according to the present invention is an indirect cost management program executed by an indirect cost management device including a control unit, and includes an allocation standard master that stores allocation standards for indirect costs, manufacturing department workers, and A daily report table that stores the work contents of the sales, administration and support department workers, a purchasing table that stores the sales, administration and support business expenses generated by the work of the sales, administration and support department workers, and a destination for allocating the indirect costs. The allocation setting table that sets the projects of Referring to the purchasing table, calculate the hours spent on direct and indirect projects by the sales, administration and support staff, and divide sales, administration and support costs into direct costs and indirect costs according to the ratio of hours worked. A sorting step of sorting, and an allocation step of allocating the indirect costs sorted in the sorting step to the destination projects by referring to the project-by-project total table and the allocation setting table. It is characterized by being executed.

本発明によれば、販管・支援部門業務者の作業内容を直接プロジェクト作業と間接プロジェクト作業とに分類した日報情報として管理し、集計した間接プロジェクト従事に要した間接費用を、間接費配賦の配賦基準を参照して配賦することができるという効果を奏する。 According to the present invention, the work contents of sales, administration and support department workers are managed as daily report information classified into direct project work and indirect project work, and the aggregated indirect costs required for indirect project work are calculated in the indirect cost allocation. This has the effect that allocation can be made with reference to the allocation standard.

図1は、本実施の形態に係る間接費用管理装置100の構成の一例を示す図である。FIG. 1 is a diagram showing an example of the configuration of an indirect cost management device 100 according to the present embodiment. 図2は、本実施の形態で説明する間接費用配賦のモデルケースを示す図である。FIG. 2 is a diagram showing a model case of indirect cost allocation explained in this embodiment. 図3は、原価要素マスタ106aの一例を示す図である。FIG. 3 is a diagram showing an example of the cost element master 106a. 図4は、作業内容マスタ106bの一例を示す図である。FIG. 4 is a diagram showing an example of the work content master 106b. 図5は、部署マスタ106cの一例を示す図である。FIG. 5 is a diagram showing an example of the department master 106c. 図6は、社員マスタ106dの一例を示す図である。FIG. 6 is a diagram showing an example of the employee master 106d. 図7は、配賦基準マスタ106eの一例を示す図である。FIG. 7 is a diagram showing an example of the allocation standard master 106e. 図8は、プロジェクトテーブル106fの一例を示す図である。FIG. 8 is a diagram showing an example of the project table 106f. 図9は、作業予定テーブル106gの一例を示す図である。FIG. 9 is a diagram showing an example of the work schedule table 106g. 図10は、日報テーブル106hの一例を示す図である。FIG. 10 is a diagram showing an example of the daily report table 106h. 図11は、仕入テーブル106iの一例を示す図である。FIG. 11 is a diagram showing an example of the purchase table 106i. 図12は、配賦設定テーブル106jの一例を示す図である。FIG. 12 is a diagram showing an example of the allocation setting table 106j. 図13は、作業内容集計テーブル106kデータの一例を示す図である。FIG. 13 is a diagram showing an example of the work content summary table 106k data. 図14は、PJ別集計テーブル106lの一例を示す図である。FIG. 14 is a diagram showing an example of the project-by-project total table 106l. 図15は、配賦結果テーブル106mの一例を示す図である。FIG. 15 is a diagram showing an example of the allocation result table 106m.

以下に、本発明に係る間接費用管理装置、間接費用管理方法、および間接費用管理プログラムの実施形態を、図面に基づいて詳細に説明する。なお、本実施形態により本発明が限定されるものではない。 DESCRIPTION OF EMBODIMENTS Below, embodiments of an indirect cost management device, an indirect cost management method, and an indirect cost management program according to the present invention will be described in detail based on the drawings. Note that the present invention is not limited to this embodiment.

[1.構成]
本実施形態に係る間接費用管理装置の構成の一例について、図1等を参照して説明する。図1は、本実施の形態に係る間接費用管理装置100の構成の一例を示す図である。
[1. composition]
An example of the configuration of the indirect cost management device according to this embodiment will be described with reference to FIG. 1 and the like. FIG. 1 is a diagram showing an example of the configuration of an indirect cost management device 100 according to the present embodiment.

間接費用管理装置100は、市販のデスクトップ型パーソナルコンピュータを基に構築したものである。なお、間接費用管理装置100は、デスクトップ型パーソナルコンピュータのような据置型情報処理装置を基に構築したものに限らず、市販のノート型パーソナルコンピュータ、PDA(Personal Digital Assistants)、スマートフォンまたはタブレット型パーソナルコンピュータなどの携帯型情報処理装置を基に構築したものであってもよい。 The indirect cost management device 100 is constructed based on a commercially available desktop personal computer. Note that the indirect cost management device 100 is not limited to one constructed based on a stationary information processing device such as a desktop personal computer, but may also be a commercially available notebook personal computer, a PDA (Personal Digital Assistant), a smartphone, or a tablet personal computer. It may be constructed based on a portable information processing device such as a computer.

間接費用管理装置100は、制御部102と通信インターフェース部104と記憶部106と入出力インターフェース部108と、を備えている。間接費用管理装置100が備えている各部は、任意の通信路を介して通信可能に接続されている。 The indirect cost management device 100 includes a control section 102, a communication interface section 104, a storage section 106, and an input/output interface section 108. Each unit included in the indirect cost management device 100 is communicably connected via an arbitrary communication path.

通信インターフェース部104は、ルータ等の通信装置および専用線等の有線または無線の通信回線を介して、間接費用管理装置100をネットワーク300に通信可能に接続する。通信インターフェース部104は、他の装置と通信回線を介してデータを通信する機能を有する。ここで、ネットワーク300は、間接費用管理装置100とサーバ装置200とを相互に通信可能に接続する機能を有し、例えばインターネットやLAN(Local Area Network)等である。なお、記憶部106に格納されるデータは、例えばサーバ装置200に格納されてもよい。 The communication interface unit 104 communicatively connects the indirect cost management device 100 to the network 300 via a communication device such as a router and a wired or wireless communication line such as a dedicated line. The communication interface unit 104 has a function of communicating data with other devices via a communication line. Here, the network 300 has a function of connecting the indirect cost management device 100 and the server device 200 so that they can communicate with each other, and is, for example, the Internet or a LAN (Local Area Network). Note that the data stored in the storage unit 106 may be stored in the server device 200, for example.

入出力インターフェース部108には、入力装置400および出力装置500が接続されている。出力装置500には、モニタ(家庭用テレビを含む)の他、スピーカやプリンタを用いることができる。入力装置400には、キーボード、マウス、及びマイクの他、マウスと協働してポインティングデバイス機能を実現するモニタを用いることができる。なお、以下では、出力装置500をモニタ500とし、入力装置400をキーボード400またはマウス400として記載する場合がある。 An input device 400 and an output device 500 are connected to the input/output interface section 108. As the output device 500, in addition to a monitor (including a home television), a speaker or a printer can be used. As the input device 400, in addition to a keyboard, a mouse, and a microphone, a monitor that cooperates with the mouse to realize a pointing device function can be used. In addition, below, the output device 500 may be described as a monitor 500, and the input device 400 may be described as a keyboard 400 or a mouse 400.

記憶部106には、各種のデータベース、テーブルおよびファイルなどが格納される。記憶部106には、OS(Operating System)と協働してCPU(Central Processing Unit)に命令を与えて各種処理を行うためのコンピュータプログラムが記録される。記憶部106として、例えば、RAM(Random Access Memory)・ROM(Read Only Memory)等のメモリ装置、ハードディスクのような固定ディスク装置、フレキシブルディスク、および光ディスク等を用いることができる。 The storage unit 106 stores various databases, tables, files, and the like. The storage unit 106 stores a computer program for giving instructions to a CPU (Central Processing Unit) to perform various processes in cooperation with an OS (Operating System). As the storage unit 106, for example, a memory device such as a RAM (Random Access Memory) or a ROM (Read Only Memory), a fixed disk device such as a hard disk, a flexible disk, an optical disk, etc. can be used.

記憶部106は、例えば、原価要素マスタ106aと、作業内容マスタ106bと、部署マスタ106cと、社員マスタ106dと、配賦基準マスタ106eと、プロジェクトテーブル106fと、作業予定テーブル106gと、日報テーブル106hと、仕入テーブル106iと、配賦元テーブル106jと、作業内容集計テーブル106kと、PJ別集計テーブル106lと、配賦結果テーブル106m等が格納されている。 The storage unit 106 stores, for example, a cost element master 106a, a work content master 106b, a department master 106c, an employee master 106d, an allocation standard master 106e, a project table 106f, a work schedule table 106g, and a daily report table 106h. , a purchase table 106i, an allocation source table 106j, a work content summary table 106k, a project-based summary table 106l, an allocation result table 106m, and the like are stored.

原価要素マスタ106aには、図3に一例を示すように、原価要素コード、原価要素名、要素区分が格納されている。 The cost element master 106a stores cost element codes, cost element names, and element classifications, as shown in an example in FIG.

作業内容マスタ106bは、製造部門従事者および販管・支援部門従事者を含む業務従事者の作業内容の区分に関するマスタであり、図4に一例を示すように、作業内容コード、作業内容名、原価要素コードが格納されている。図4に示す、作業内容コードYT01の引合工程、YT02の設計工程、YT03の開発工程は、図3の原価要素マスタ106aにおいて原価要素コードG01の直接費に該当し、図4に示す作業内容コードYT90の事務作業は、図3の原価要素マスタ106aにおいて原価要素コードG90の販管費に該当する。 The work content master 106b is a master related to the classification of work content of business workers including manufacturing department workers and sales, administration and support department workers, and includes work content codes, work content names, and costs, as shown in an example in FIG. Contains the element code. The inquiry process of work content code YT01, the design process of YT02, and the development process of YT03 shown in FIG. 4 correspond to the direct costs of cost element code G01 in the cost element master 106a of FIG. 3, and the work content code shown in FIG. The office work YT90 corresponds to the selling, general and administrative expenses of cost element code G90 in the cost element master 106a of FIG. 3.

部署マスタ106cには、図5に一例を示すように、部署名に対応する部署コードが格納されている。 The department master 106c stores department codes corresponding to department names, as shown in an example in FIG.

社員マスタ106dには、図6に一例を示すように、社員、すなわち、製造部門従事者および販管・支援部門従事者の社員コード、社員名、部署コード、社員属性が格納されている。 As an example shown in FIG. 6, the employee master 106d stores employee codes, employee names, department codes, and employee attributes of employees, that is, employees in the manufacturing department and employees in the sales, administration, and support departments.

配賦基準マスタ106eは、間接費用、すなわち事務作業に要した費用の配賦基準に関するマスタであり、図7に一例を示すように、配賦基準コードと配賦基準名が格納されている。 The allocation standard master 106e is a master regarding allocation standards for indirect costs, that is, costs required for office work, and stores allocation standard codes and allocation standard names, as shown in an example in FIG.

プロジェクトテーブル106fは、図8に一例を示すように、現在進行しているプロジェクトに関するテーブルであり、プロジェクトNO、部署コード、部署、期間、直接・間接区分が格納されている。図8では、P001~P003が直接プロジェクトであり、KP001が間接プロジェクトである。KP001に分類される間接費用が、直接プロジェクトP001~P003に配賦される。 As an example is shown in FIG. 8, the project table 106f is a table related to projects currently in progress, and stores the project number, department code, department, period, and direct/indirect classification. In FIG. 8, P001 to P003 are direct projects, and KP001 is an indirect project. Indirect costs classified as KP001 are directly allocated to projects P001 to P003.

作業予定テーブル106gは、業務従事者が従事する作業予定に関するテーブルであり、図9に一例を示すように、社員コード、社員名、社員属性、期間、プロジェクトNO、作業内容コード、作業工程、日時、プロジェクトおよび作業工程ごとに従事した合計(時間)が格納されている。 The work schedule table 106g is a table related to work schedules in which business workers are engaged, and as an example is shown in FIG. 9, employee code, employee name, employee attribute, period, project number, work content code, work process, date and time. , the total number of hours worked for each project and work process is stored.

日報テーブル106hは、業務従事者が従事した作業内容に関するテーブルであり、図10に一例を示すように、社員コード、社員名、社員属性、期間、プロジェクトNO、作業内容コード、作業工程、日時、合計(時間)が格納されている。日報テーブル106hは、業務従事者自身が作業予定テーブル106gを修正することにより作成される。例えば、図9の作業予定テーブル106g-1では、社員コード「SH01」、社員「田中」の4/1のプロジェクトNO「P001」の引合工程に従事する時間は「1時間」が予定されているが、従事した時間と異なる場合、図10に示すように、業務従事者自身が、実際従事した時間「0時間」に修正し、日報テーブル106h-1が格納される。 The daily report table 106h is a table related to the work contents that the workers engaged in, and as an example is shown in FIG. The total (time) is stored. The daily report table 106h is created by the worker himself/herself modifying the work schedule table 106g. For example, in the work schedule table 106g-1 in FIG. 9, the time for employee code "SH01" and employee "Tanaka" to engage in the inquiry process for project number "P001" of 4/1 is scheduled to be "1 hour". If the actual working time is different from the working time, the worker himself corrects the working time to "0 hours", and the daily report table 106h-1 is stored, as shown in FIG.

仕入テーブル106iは、販管・支援部門従事者の業務により生じた販管・支援部門業務費用に関するテーブルであり、図11に一例を示すように、計上日、プロジェクトNO、直接・間接区分、部署コード、部署、社員コード、社員名、費目、金額が格納されている。 The purchase table 106i is a table related to sales, management and support department business expenses generated by the work of sales, management and support department workers, and as an example is shown in FIG. , department, employee code, employee name, expense item, and amount are stored.

配賦設定テーブル106jは、間接費用の配賦先プロジェクトに関するマスタであり、図12に一例を示すように、配賦元プロジェクトNO、配賦元部署、配賦基準コード、配賦基準名、配賦先プロジェクトNO、配賦元部署が格納されている。配賦設定テーブル106jは、配賦基準マスタ106eおよびプロジェクトテーブル106fに基づき作成される。図12の配賦設定テーブル106jでは、間接プロジェクトKP001で発生した間接費用は、配賦基準HO3「工程別作業時間比」により、システム1部の3つのプロジェクトP001~P003に配賦されるように設定されている。 The allocation setting table 106j is a master record regarding projects to which indirect costs are allocated, and as shown in an example in FIG. The destination project number and the allocation source department are stored. The allocation setting table 106j is created based on the allocation standard master 106e and the project table 106f. In the allocation setting table 106j of FIG. 12, the indirect costs generated in the indirect project KP001 are allocated to the three projects P001 to P003 of the system part 1 based on the allocation standard HO3 "work time ratio by process". It is set.

作業内容集計テーブル106kは、販管・支援部門従事者の作業工程毎の直接費用、間接費用を集計したテーブルであり、図13に一例を示すように、部署コード、部署、期間、費目、金額、作業内容コード、作業工程、基準時間、工程別対象額、直接(業務)時間、直接(業務)費用、間接(業務)時間、間接(業務)時間が格納されている。図13では、販管・支援部門従事者の雇用により発生した外注費180万が、引合工程、設計工程、開発工程、事務作業に分類され、さらに、各作業工程に分類した従事時間が直接プロジェクトに従事した時間と間接プロジェクトに従事した時間との時間比で、直接割合額と間接割合額とに分類される。引合工程、設計工程、開発工程の直接割合額は、従事した直接プロジェクトに加算され、引合工程、設計工程、開発工程、事務作業の間接割合額の合計124万が配賦基準に基づき各プロジェクトに配賦される。 The work content summary table 106k is a table that summarizes direct costs and indirect costs for each work process for employees in the sales, administration and support departments.As an example is shown in FIG. The work content code, work process, standard time, target amount by process, direct (business) time, direct (business) cost, indirect (business) time, and indirect (business) time are stored. In Figure 13, the outsourcing costs of 1.8 million yen generated by hiring employees in the sales, administration and support departments are classified into the inquiry process, design process, development process, and office work, and the time spent in each work process is directly allocated to the project. The amount is classified into direct percentage amount and indirect percentage amount based on the time ratio between the time engaged in and the time engaged in indirect projects. The direct proportion of the inquiry process, design process, and development process will be added to the direct project involved, and the indirect proportion of the inquiry process, design process, development process, and administrative work, totaling 1.24 million yen, will be added to each project based on the allocation criteria. Allocated.

PJ別集計テーブル106lは、製造部門従事者のプロジェクト、工程別の従事時間を集計したテーブルであり、図14に一例を示すように、プロジェクトNO、各工程、すなわち引合工程、設計工程、開発工程ごとの合計の業務時間、各プロジェクトに費やした業務時間の合計時間が格納されている。 The PJ summary table 106l is a table that summarizes the working hours of manufacturing department workers by project and process, and as an example is shown in FIG. The total working time for each project and the total working time spent on each project are stored.

配賦結果テーブル106mは、間接費用の各プロジェクトへの最終配賦受額に関するテーブルであり、図15に一例を示すように、部署コード、部署、期間、費目、プロジェクトNO、最終配賦受額が格納されている。 The allocation result table 106m is a table regarding the final allocated amount of indirect costs to each project, and as an example is shown in FIG. 15, department code, department, period, cost item, project number, final allocated amount is stored.

制御部102は、間接費用管理装置100を統括的に制御するCPU等である。制御部102は、OS等の制御プログラム・各種の処理手順等を規定したプログラム・所要データなどを格納するための内部メモリを有し、格納されているこれらのプログラムに基づいて種々の情報処理を実行する。 The control unit 102 is a CPU or the like that controls the indirect cost management device 100 in an integrated manner. The control unit 102 has an internal memory for storing control programs such as an OS, programs specifying various processing procedures, required data, etc., and performs various information processing based on these stored programs. Execute.

制御部102は、機能概念的に、仕分け部102a、配賦部102bなどを備える。 Functionally, the control unit 102 includes a sorting unit 102a, an allocation unit 102b, and the like.

仕分け部102aは、販管・支援部門従事者の従事時間を直接費用と間接費用に仕分けする。配賦基準コードがHO3「工程別作業時間比」である場合、仕分け部102aは、作業内容マスタ106b、配賦基準マスタ106e、日報テーブル106h-1および仕入テーブル106iを参照して、販管・支援部門従事者が従事したプロジェクトおよび作業工程毎に従事時間を算出し、販管・支援業務費用を算出した従事時間比に応じてプロジェクトおよび作業工程毎に仕分けする。仕分け部102aにより販管・支援部門従事者が従事したプロジェクトおよび作業工程毎の従事時間、費用の集計結果が作業内容集計テーブル106kとして格納される。 The sorting unit 102a sorts the working hours of sales, administration and support department workers into direct costs and indirect costs. When the allocation standard code is HO3 "work time ratio by process", the sorting unit 102a refers to the work content master 106b, the allocation standard master 106e, the daily report table 106h-1, and the purchasing table 106i, The hours worked by support department workers are calculated for each project and work process, and sales, administrative and support costs are sorted by project and work process according to the calculated working time ratio. The sorting unit 102a stores the results of aggregation of hours and costs for each project and work process in which the sales, administration and support department workers have been engaged, as a work content aggregation table 106k.

配賦部102bは、仕分け部102aにより仕分けられた間接費用を各プロジェクトに配賦する。配賦基準コードがHO3「工程別作業時間比」である場合、PJ別集計テーブル106lを参照して、間接プロジェクトの各作業工程に要した間接費用を、製造部門従事者が従事したプロジェクトおよび作業工程毎の従事時間比に基づき、各プロジェクトに配賦する。間接費用を製造部門従事者が従事したプロジェクトおよび作業工程毎の従事時間比に基づき、各プロジェクトに精度高く配賦することで、直接業務と間接業務の的確な妥当性の判断や計画が可能となる。 The allocation unit 102b allocates the indirect costs sorted by the sorting unit 102a to each project. If the allocation standard code is HO3 "work time ratio by process", refer to the project summary table 106l and calculate the indirect costs required for each work process of the indirect project by the project and work in which the manufacturing department employee was engaged. Allocate to each project based on the ratio of time spent in each process. By allocating indirect costs to each project with high precision based on the projects in which manufacturing department workers were engaged and the ratio of their working hours for each work process, it is possible to accurately judge and plan the appropriateness of direct work and indirect work. Become.

なお、配賦基準コードをHO1「直接作業時間比」とし、仕分け部102aが、配賦基準マスタ106e、日報テーブル106h-1および仕入テーブル106iを参照して、販管・支援部門従事者の従事時間を直接費用と間接費用に仕分け、PJ別集計テーブル106lおよび配賦設定テーブル106jを参照して、仕分け部102aにより仕分けられた間接費用を、製造部門従事者が従事した直接プロジェクトの従事時間比に基づき、各プロジェクトに配賦する配賦することもできる。 Note that the allocation standard code is set to HO1 "direct work time ratio", and the sorting unit 102a refers to the allocation standard master 106e, the daily report table 106h-1, and the purchasing table 106i, and determines the engagement of sales, management and support department workers. The time is divided into direct costs and indirect costs, and the indirect costs classified by the sorting unit 102a are calculated by referring to the project-by-project aggregation table 106l and the allocation setting table 106j, and the ratio of the working hours of the direct projects in which the manufacturing department workers were engaged. It is also possible to allocate allocations to each project based on the following.

[2.処理]
ここでは、間接費用管理装置100で実行される処理の具体例について、図2~15を参照して説明する。
[2. process]
Here, specific examples of processing executed by the indirect cost management device 100 will be described with reference to FIGS. 2 to 15.

以下、図2に示すモデルケースにおける間接費用の配賦について説明する。 The allocation of indirect costs in the model case shown in FIG. 2 will be explained below.

従来、販管・支援部門従事者の業務内容の把握が難しいことにより、日報情報は管理されておらず、販管・支援部門従事者の業務従事により発生した費用(外注費)は、販管・支援部門従事者の業務内容にかかわらず、製造部門従事者の従事時間(直接作業時間比)により配賦されていた。例えば、製造部門従事者のプロジェクト毎の従事時間、図2の例では、直接PJ(1)が60時間、直接PJ(2)が30時間、直接PJ(3)が10時間であるため、60:30:10の比で外注費は各プロジェクトに配賦されていた。従来の配賦では、販管・支援部門従事者が直接PJの直接作業工程に従事した場合でも、製造部門従事者の作業時間比で配賦されるため、販管・支援部門従事者を使用しないで業務を行うプロジェクトに多く外注費が配賦され、不公平感を伴うものであった。 Traditionally, daily report information has not been managed due to the difficulty of understanding the work content of employees in the sales, administration and support departments, and costs (outsourcing costs) incurred by employees in the sales, administration and support departments are transferred to the sales, administration and support departments. Regardless of the worker's work content, the allowance was allocated based on the working hours (direct work time ratio) of the manufacturing department workers. For example, in the example in Figure 2, the working hours for each project of manufacturing department workers are 60 hours for direct PJ (1), 30 hours for direct PJ (2), and 10 hours for direct PJ (3), so Outsourcing costs were allocated to each project at a ratio of 30:10. In conventional allocation, even if employees in the sales, administration, and support departments are directly engaged in the direct work process of a project, they are allocated based on the working hours of the employees in the manufacturing department, so employees in the sales, administration, and support departments are not used. A large amount of outsourcing costs were allocated to the projects in which work was carried out, which created a sense of unfairness.

本実施の形態では、作業予定テーブル106gと日報テーブル106hとを使用することにより、製造部門従事者のみならず、販管・支援部門従事者の作業内容の把握を容易とする。作業予定テーブル106gは、業務従事者の作業を管理する立場のものに作成され、作業を行った業務従事者が作業予定テーブル106gを初期表示させて、日報テーブル106hを作成する。作業予定テーブル106g通りの作業を行った場合、作業予定テーブル106gの内容がそのまま日報テーブル106hとして格納される。作業予定テーブル106gと異なる作業を行った場合、作業時間当を変更した日報テーブル106hが格納される。作業予定テーブル106gを用いて日報テーブル106hを作成するため、正確な日報情報の登録のサポートが可能となり、効率的に日報データを作成することができる。また、作業予定テーブル106gに基づき日報テーブル106hを作成するため、作業習熟が低い販管・支援部門従事者にも日報テーブル106hの作成を容易に行い得るという効果を有する。 In this embodiment, by using the work schedule table 106g and the daily report table 106h, it is possible to easily grasp the work contents not only for the manufacturing department employees but also for the sales, management and support department employees. The work schedule table 106g is created by someone in a position of managing the work of a worker, and the worker who has performed the work initially displays the work schedule table 106g and creates a daily report table 106h. When the work is performed according to the work schedule table 106g, the contents of the work schedule table 106g are stored as is as a daily report table 106h. When a task different from that in the work schedule table 106g is performed, a daily report table 106h with changed work hours is stored. Since the daily report table 106h is created using the work schedule table 106g, accurate registration of daily report information can be supported, and daily report data can be created efficiently. Furthermore, since the daily report table 106h is created based on the work schedule table 106g, it is possible to easily create the daily report table 106h even by employees in the sales, management and support departments who have little work proficiency.

本実施の形態の間接費用管理装置100では、月末日等の計上日に、販管・支援部門業務者の日報テーブル106hに基づき、外注費の合計が集計されて仕入テーブル106iが作成される。 In the indirect cost management device 100 of the present embodiment, the total outsourcing costs are totaled and the purchase table 106i is created on the accounting date such as the last day of the month based on the daily report table 106h of the sales, administrative and support department workers.

仕入テーブル106iが作成された後、仕分け部102aは、作業内容マスタ106b、配賦基準マスタ106e、日報テーブル106h-1および仕入テーブル106iを参照して、販管・支援部門従事者が従事したプロジェクトおよび作業工程毎に従事時間を算出し、販管・支援業務費用を算出した従事時間比に応じてプロジェクトおよび作業工程毎に仕分けする。図13の作業内容集計テーブル106kは、配賦基準コードHO3「工程別作業時間比」により、販管・支援部門従事者の販管・支援業務費用(外注費)をプロジェクトおよび作業工程毎に仕分けしたものである。引合工程に40時間(40万)、設計工程に40時間(40万)、開発工程に40時間(40万)、事務作業に60時間(60万)従事し、引合工程、設計工程及び開発工程ではさらに従事時間を、直接プロジェクトに従事した直接時間と、間接プロジェクトに従事した従事時間に仕分けをしている。 After the purchasing table 106i is created, the sorting unit 102a refers to the work content master 106b, the allocation standard master 106e, the daily report table 106h-1, and the purchasing table 106i, and determines which employees in the sales, management, and support departments were engaged in the work. Work hours are calculated for each project and work process, and sales, administrative and support costs are sorted by project and work process according to the calculated work time ratio. The work content summary table 106k in FIG. 13 is a table in which the sales, administration and support work expenses (outsourcing costs) of sales, administration and support department staff are sorted by project and work process using the allocation standard code HO3 "work time ratio by process". It is. 40 hours (400,000 yen) in the inquiry process, 40 hours (400,000 yen) in the design process, 40 hours (400,000 yen) in the development process, 60 hours (600,000 yen) in administrative work, This further divides the engaged time into direct time engaged in direct projects and engaged time engaged in indirect projects.

配賦部102bは、販管・支援部門従事者の間接業務に従事した時間(費用)を各直接プロジェクトに配賦する。販管・支援部門従事者の間接業務に従事した時間(費用)は、引合工程の間接時間の20時間(20万)、設計工程の間接時間の20時間(20万)、開発工程の間接時間の24時間(24万)、事務作業の60時間(60万)である。引合工程、設計工程、開発工程の各直接時間は、従事した各直接プロジェクトに配賦される。図2に示すように、引合工程の直接時間20時間(20万)は直接プロジェクト(1)に、設計工程の直接時間20時間(20万)は直接プロジェクト(2)に、開発工程の直接時間16時間(16万)は直接プロジェクト(3)に配賦される。 The allocation unit 102b allocates the time (cost) spent by sales, administrative and support department employees engaged in indirect work to each direct project. The time (costs) spent on indirect work by sales, administration and support department staff includes 20 hours (200,000) of indirect time in the inquiry process, 20 hours (200,000) of indirect time in the design process, and 20 hours (200,000) of indirect time in the development process. 24 hours (240,000) and 60 hours (600,000) of office work. Direct time for the inquiry process, design process, and development process is allocated to each direct project worked on. As shown in Figure 2, 20 hours (200,000) of the direct time of the inquiry process goes directly to project (1), 20 hours (200,000) of the direct time of the design process goes directly to project (2), and the direct time of the development process goes directly to project (2). 16 hours (160,000) are allocated directly to project (3).

配賦部102bは、配賦基準コードがHO3「工程別作業時間比」である場合、PJ別集計テーブル106lを参照して、間接プロジェクトの各作業工程に要した間接費用を、製造部門従事者が従事したプロジェクトおよび作業工程毎の従事時間比に基づき、各プロジェクトに配賦する。例えば、引合工程の間接時間20万は、PJ別集計テーブル106lの引合工程で製造部門従事者が従事した時間比、図14ではプロジェクトP001のみに従事するため、直接プロジェクト(1)(P001)に100%配賦される。また、設計工程の間接時間20万は、PJ別集計テーブル106lの設計工程で製造部門従事者が従事した時間比、図14では直接プロジェクト(1)(P001)に10時間、直接プロジェクト(2)(P002)に10時間従事するため、直接プロジェクト(1)と直接プロジェクト(2)で10:10の割合で配賦される。開発工程の間接時間24万は、PJ別集計テーブル106lの開発工程で製造部門従事者が従事した時間比、図14では直接プロジェクト(1)(P001)に30時間、直接プロジェクト(2)(P002)に20時間、直接プロジェクト(3)(P003)に10時間従事するため、直接プロジェクト(1)、直接プロジェクト(2)、直接プロジェクト(3)に30:20:10の比で配賦される。また、事務作業の間接時間60万は、PJ別集計テーブル106lの製造部門従事者が各プロジェクトに従事した合計時間比、図14では直接プロジェクト(1)(P001)に60時間、直接プロジェクト(2)(P002)に30時間、直接プロジェクト(3)(P003)に10時間従事するため、直接プロジェクト(1)、直接プロジェクト(2)、直接プロジェクト(3)に60:30:10の比で配賦される。 When the allocation standard code is HO3 "work time ratio by process", the allocation unit 102b refers to the project-by-project summary table 106l and assigns the indirect costs required for each work process of the indirect project to the manufacturing department workers. Allocate to each project based on the project in which the employee was engaged and the ratio of hours worked for each work process. For example, the indirect time of 200,000 yen in the inquiry process is the ratio of time spent by manufacturing department workers in the inquiry process in the project summary table 106l. 100% allocated. In addition, the indirect time in the design process of 200,000 hours is the ratio of the time spent by manufacturing department workers in the design process in the project summary table 106l. (P002) for 10 hours, so the ratio will be allocated to direct project (1) and direct project (2) at a ratio of 10:10. The 240,000 hours of indirect time in the development process is the ratio of the time spent by manufacturing department workers in the development process in the project summary table 106l. ) and 10 hours on Direct Project (3) (P003), so they will be allocated to Direct Project (1), Direct Project (2), and Direct Project (3) in the ratio of 30:20:10. . In addition, the 600,000 hours of indirect office work is the ratio of the total time that manufacturing department workers worked on each project in the project summary table 106l, and in Figure 14, 60 hours were spent on direct project (1) (P001), ) (P002) and 10 hours on Direct Project (3) (P003), so the ratio of 60:30:10 will be allocated to Direct Project (1), Direct Project (2), and Direct Project (3). will be charged.

なお、配賦基準コードをHO1「直接作業時間比」とする場合、図2に示す販管・支援部門従事者の間接時間124時間を、製造部門従事者が従事した時間比、直接プロジェクト(1)(P001)に60時間、直接プロジェクト(2)(P002)に30時間、直接プロジェクト(3)(P003)に10時間従事するため、直接プロジェクト(1)、直接プロジェクト(2)、直接プロジェクト(3)に60:30:10の比で配賦される。 In addition, when the allocation standard code is HO1 "direct work time ratio", the 124 hours of indirect time of sales, administration and support department workers shown in Figure 2 is calculated as the ratio of time spent by manufacturing department workers, direct project (1). (P001) for 60 hours, Direct Project (2) (P002) for 30 hours, Direct Project (3) (P003) for 10 hours; Direct Project (1), Direct Project (2), Direct Project (3). ) in the ratio of 60:30:10.

以上、本実施の形態によれば、販管・支援部門従事者の従事時間を作業予定テーブルおよび日報テーブルにより、簡易に把握でき、集計した間接プロジェクトに従事した間接費用を、間接費配賦の配賦基準コードを適宜選択して精度高く各プロジェクトに配賦することができ、各プロジェクトの利益率等の把握が容易となる。 As described above, according to the present embodiment, the working hours of sales, administration and support department staff can be easily grasped using the work schedule table and the daily report table, and the indirect costs engaged in the aggregated indirect projects can be calculated in the indirect cost allocation. The allocation standard code can be appropriately selected and allocated to each project with high accuracy, making it easy to understand the profit rate of each project.

[3.国連が主導する持続可能な開発目標(SDGs)への貢献]
本実施形態により、業務効率化や企業の適切な経営判断を推進することに寄与することができるので、SDGsの目標8及び9に貢献することが可能となる。
[3. Contribution to the Sustainable Development Goals (SDGs) led by the United Nations]
This embodiment can contribute to improving business efficiency and promoting appropriate business decisions of companies, and thus can contribute to Goals 8 and 9 of the SDGs.

また、本実施形態により、廃棄ロス削減や、ペーパレス・電子化を推進することに寄与することができるので、SDGsの目標12、13及び15に貢献することが可能となる。 Furthermore, this embodiment can contribute to reducing waste loss and promoting paperless and electronic systems, making it possible to contribute to Goals 12, 13, and 15 of the SDGs.

また、本実施形態により、統制、ガバナンス強化に寄与することができるので、SDGsの目標16に貢献することが可能となる。 Furthermore, this embodiment can contribute to strengthening control and governance, making it possible to contribute to Goal 16 of the SDGs.

[4.他の実施形態]
本発明は、上述した実施形態以外にも、特許請求の範囲に記載した技術的思想の範囲内において種々の異なる実施形態にて実施されてよいものである。
[4. Other embodiments]
In addition to the embodiments described above, the present invention may be implemented in various different embodiments within the scope of the technical idea described in the claims.

例えば、実施形態において説明した各処理のうち、自動的に行われるものとして説明した処理の全部または一部を手動的に行うこともでき、あるいは、手動的に行われるものとして説明した処理の全部または一部を公知の方法で自動的に行うこともできる。 For example, among the processes described in the embodiments, all or part of the processes described as being performed automatically can be performed manually, or all of the processes described as being performed manually can be performed manually. Alternatively, some of the steps can be performed automatically using known methods.

また、本明細書中や図面中で示した処理手順、制御手順、具体的名称、各処理の登録データや検索条件等のパラメータを含む情報、画面例、データベース構成については、特記する場合を除いて任意に変更することができる。 In addition, unless otherwise specified, information including processing procedures, control procedures, specific names, parameters such as registered data and search conditions for each process, screen examples, and database configurations shown in this specification and drawings are included. It can be changed arbitrarily.

また、間接費用管理装置100に関して、図示の各構成要素は機能概念的なものであり、必ずしも物理的に図示の如く構成されていることを要しない。 Further, regarding the indirect cost management device 100, each illustrated component is functionally conceptual, and does not necessarily need to be physically configured as illustrated.

例えば、間接費用管理装置100が備える処理機能、特に制御部にて行われる各処理機能については、その全部または任意の一部を、CPUおよび当該CPUにて解釈実行されるプログラムにて実現してもよく、また、ワイヤードロジックによるハードウェアとして実現してもよい。尚、プログラムは、本実施形態で説明した処理を情報処理装置に実行させるためのプログラム化された命令を含む一時的でないコンピュータ読み取り可能な記録媒体に記録されており、必要に応じて間接費用管理装置100に機械的に読み取られる。すなわち、ROMまたはHDD(Hard Disk Drive)などの記憶部などには、OSと協働してCPUに命令を与え、各種処理を行うためのコンピュータプログラムが記録されている。このコンピュータプログラムは、RAMにロードされることによって実行され、CPUと協働して制御部を構成する。 For example, the processing functions provided by the indirect cost management device 100, especially each processing function performed by the control unit, may be realized in whole or in part by a CPU and a program interpreted and executed by the CPU. Alternatively, it may be realized as hardware using wired logic. Note that the program is recorded on a non-temporary computer-readable recording medium containing programmed instructions for causing an information processing device to execute the processing described in this embodiment, and indirect cost management is performed as necessary. Mechanically read by device 100. That is, a storage unit such as a ROM or an HDD (Hard Disk Drive) stores a computer program that cooperates with an OS to give instructions to a CPU and perform various processes. This computer program is executed by being loaded into the RAM, and constitutes a control unit in cooperation with the CPU.

また、このコンピュータプログラムは、間接費用管理装置100に対して任意のネットワークを介して接続されたアプリケーションプログラムサーバに記憶されていてもよく、必要に応じてその全部または一部をダウンロードすることも可能である。 Further, this computer program may be stored in an application program server connected to the indirect cost management device 100 via any network, and it is also possible to download all or part of it as necessary. It is.

また、本実施形態で説明した処理を実行するためのプログラムを、一時的でないコンピュータ読み取り可能な記録媒体に格納してもよく、また、プログラム製品として構成することもできる。ここで、この「記録媒体」とは、メモリーカード、USB(Universal Serial Bus)メモリ、SD(Secure Digital)カード、フレキシブルディスク、光磁気ディスク、ROM、EPROM(Erasable Programmable Read Only Memory)、EEPROM(登録商標)(Electrically Erasable and Programmable Read Only Memory)、CD-ROM(Compact Disk Read Only Memory)、MO(Magneto-Optical disk)、DVD(Digital Versatile Disk)、および、Blu-ray(登録商標) Disc等の任意の「可搬用の物理媒体」を含むものとする。 Further, a program for executing the processing described in this embodiment may be stored in a non-temporary computer-readable recording medium, or may be configured as a program product. Here, the "recording medium" includes a memory card, a USB (Universal Serial Bus) memory, an SD (Secure Digital) card, a flexible disk, a magneto-optical disk, a ROM, an EPROM (Erasable Programmable Read Only Memory), and an EE. PROM (registration Trademark) (Electrically Erasable and Programmable Read Only Memory), CD-ROM (Compact Disk Read Only Memory), MO (Magneto-Optical disk) ), DVD (Digital Versatile Disk), Blu-ray (registered trademark) Disc, etc. shall include any “portable physical medium”.

また、「プログラム」とは、任意の言語または記述方法にて記述されたデータ処理方法であり、ソースコードまたはバイナリコード等の形式を問わない。なお、「プログラム」は必ずしも単一的に構成されるものに限られず、複数のモジュールやライブラリとして分散構成されるものや、OSに代表される別個のプログラムと協働してその機能を達成するものをも含む。なお、実施形態に示した各装置において記録媒体を読み取るための具体的な構成および読み取り手順ならびに読み取り後のインストール手順等については、周知の構成や手順を用いることができる。 Further, a "program" is a data processing method written in any language or writing method, and does not matter in the form of source code or binary code. Note that a "program" is not necessarily limited to a unitary structure, but may be distributed as multiple modules or libraries, or may work together with separate programs such as an OS to achieve its functions. Including things. Note that well-known configurations and procedures can be used for the specific configuration and reading procedure for reading the recording medium in each device shown in the embodiments, and the installation procedure after reading.

記憶部に格納される各種のデータベース等は、RAM、ROM等のメモリ装置、ハードディスク等の固定ディスク装置、フレキシブルディスク、および、光ディスク等のストレージ手段であり、各種処理やウェブサイト提供に用いる各種のプログラム、テーブル、データベース、および、ウェブページ用ファイル等を格納する。 The various databases stored in the storage unit are storage devices such as memory devices such as RAM and ROM, fixed disk devices such as hard disks, flexible disks, and optical disks, and are used for various processing and website provision. Stores programs, tables, databases, web page files, etc.

また、間接費用管理装置100は、既知のパーソナルコンピュータまたはワークステーション等の情報処理装置として構成してもよく、また、任意の周辺装置が接続された当該情報処理装置として構成してもよい。また、間接費用管理装置100は、当該装置に本実施形態で説明した処理を実現させるソフトウェア(プログラムまたはデータ等を含む)を実装することにより実現してもよい。 Further, the indirect cost management device 100 may be configured as an information processing device such as a known personal computer or workstation, or may be configured as the information processing device to which any peripheral device is connected. Further, the indirect cost management device 100 may be realized by installing software (including programs, data, etc.) that causes the device to realize the processing described in this embodiment.

更に、装置の分散・統合の具体的形態は図示するものに限られず、その全部または一部を、各種の付加等に応じてまたは機能負荷に応じて、任意の単位で機能的または物理的に分散・統合して構成することができる。すなわち、上述した実施形態を任意に組み合わせて実施してもよく、実施形態を選択的に実施してもよい。 Furthermore, the specific form of dispersion and integration of devices is not limited to what is shown in the diagram, and all or part of them can be functionally or physically divided into arbitrary units according to various additions or functional loads. It can be configured in a distributed/integrated manner. That is, the embodiments described above may be implemented in any combination, or the embodiments may be implemented selectively.

本発明は、特に、コンサルティング業界やIT業界など派遣社員やアルバイト等を多く雇用する企業において有用である。 The present invention is particularly useful in companies such as the consulting industry and the IT industry that employ many temporary workers and part-time workers.

100 間接費用管理装置
102 制御部
102a 仕分け部
102b 配賦部
104 通信インターフェース部
106 記憶部
106a 原価要素マスタ
106b 作業内容マスタ
106c 部署マスタ
106d 社員マスタ
106e 配賦基準マスタ
106f プロジェクトテーブル
106g 作業予定テーブル
106h 日報テーブル
106i 仕入テーブル
106j 配賦元テーブル
106k 作業内容集計テ^ブル
106l PJ別集計テーブル
106m 配賦結果テーブル
108 入出力インターフェース部
200 サーバ
300 ネットワーク
400 入力装置
500 出力装置
100 Indirect cost management device 102 Control unit 102a Sorting unit 102b Allocation unit 104 Communication interface unit 106 Storage unit 106a Cost element master 106b Work content master 106c Department master 106d Employee master 106e Allocation standard master 106f Project table 106g Work schedule table 10 6h daily report Table 106i Purchase table 106j Allocation source table 106k Work content summary table 106l Project-specific summary table 106m Allocation result table 108 Input/output interface section 200 Server 300 Network 400 Input device 500 Output device

Claims (5)

制御部を備える間接費用管理装置であって、
間接費用の配賦基準を格納する配賦基準マスタと、
製造部門従事者および販管・支援部門従事者が従事した作業内容を格納する日報テーブルと、
前記販管・支援部門従事者の業務により生じた販管・支援業務費用を格納する仕入テーブルと、
前記間接費用の配賦先のプロジェクトを設定する配賦設定テーブルと、
前記製造部門従事者のプロジェクトおよび作業工程毎の従事時間を集計したPJ別集計テーブルと、
にアクセス可能であって、
前記配賦基準マスタ、前記日報テーブルおよび前記仕入テーブルを参照して、前記販管・支援部門従事者が従事した直接プロジェクトと間接プロジェクトへの従事時間を算出し、販管・支援業務費用を従事時間比に応じて直接費用と間接費用とに仕分けする仕分け手段と、
前記PJ別集計テーブルおよび前記配賦設定テーブルを参照して、前記仕分け手段により仕分けされた間接費用を、前記配賦先のプロジェクトに配賦する配賦手段と、
を備えることを特徴とする間接費用管理装置。
An indirect cost management device comprising a control unit,
An allocation base master that stores allocation bases for indirect costs;
A daily report table that stores the work content of the manufacturing department employees and the sales, administration and support department employees;
a purchasing table that stores sales, management and support business expenses incurred by the work of the sales, management and support department personnel;
an allocation setting table for setting a project to which the indirect costs are allocated;
a project-by-project tally table that tallies the working hours of the manufacturing department workers for each project and work process;
is accessible to
With reference to the allocation standard master, the daily report table, and the purchasing table, calculate the hours worked on the direct projects and indirect projects in which the sales, administration, and support department staff were engaged, and calculate the sales, administration, and support work costs by calculating the hours worked. a sorting means for sorting into direct costs and indirect costs according to the ratio;
an allocation means for allocating the indirect costs sorted by the sorting means to the projects to which the allocation is made, with reference to the project-by-project aggregation table and the allocation setting table;
An indirect cost management device comprising:
前記製造部門従事者および前記販管・支援部門従事者が従事する作業工程を格納する作業内容マスタ、
にアクセス可能であって、
前記仕分け手段は、前記作業内容マスタ、前記配賦基準マスタ、前記日報テーブルおよび仕入テーブルを参照して、前記販管・支援部門従事者が従事したプロジェクトおよび作業工程毎に従事時間を算出し、前記販管・支援業務費用を算出した従事時間比に応じてプロジェクトおよび作業工程毎に仕分けし、
前記配賦手段は、前記PJ別集計テーブルおよび前記配賦設定テーブルを参照して、前記間接プロジェクトの各作業工程に要した間接費用を、前記製造部門従事者が従事したプロジェクトおよび作業工程毎の従事時間比に基づき、前記プロジェクトに配賦することを特徴とする請求項1に記載の間接費用管理装置。
a work content master that stores work processes in which the manufacturing department worker and the sales management/support department worker are engaged;
is accessible to
The sorting means refers to the work content master, the allocation standard master, the daily report table, and the purchase table, and calculates the working hours for each project and work process in which the sales, administration and support department worker was engaged; The above-mentioned sales, administrative and support business expenses are sorted by project and work process according to the calculated engagement time ratio,
The allocation means refers to the project-by-project summary table and the allocation setting table, and calculates the indirect costs required for each work process of the indirect project for each project and work process in which the manufacturing department employee was engaged. 2. The indirect cost management device according to claim 1, wherein the indirect cost management device allocates to the project based on an engagement time ratio.
前記製造部門従事者および前記販管・支援部門従事者が従事する作業予定を格納する作業予定テーブル、
にアクセス可能であって、
前記日報テーブルは、前記製造部門従事者および前記販管・支援部門従事者が前記作業予定テーブルを修正することにより作成されることを特徴とする請求項1または2に記載の間接費用管理装置。
a work schedule table that stores work schedules in which the manufacturing department workers and the sales, management and support department workers are engaged;
is accessible to
3. The indirect cost management device according to claim 1, wherein the daily report table is created by a worker in the manufacturing department and a worker in the sales, administration and support department modifying the work schedule table.
制御部を備える間接費用管理装置で実行される間接費用管理方法であって、
間接費用の配賦基準を格納する配賦基準マスタと、
製造部門従事者および販管・支援部門従事者が従事した作業内容を格納する日報テーブルと、
前記販管・支援部門従事者の業務により生じた販管・支援業務費用を格納する仕入テーブルと、
前記間接費用の配賦先のプロジェクトを設定する配賦設定テーブルと、
製造部門従事者のプロジェクトおよび作業工程毎の従事時間を集計したPJ別集計テーブルと、
にアクセス可能であって、
前記配賦基準マスタ、前記日報テーブルおよび前記仕入テーブルを参照して、前記非正規従事者が従事した直接プロジェクトと間接プロジェクトへの従事時間を算出し、販管・支援業務費用を従事時間比に応じて直接費用と間接費用とに仕分けする仕分けステップと、
前記PJ別集計テーブルおよび前記配賦設定テーブルを参照して、前記仕分けステップで仕分けされた間接費用を、前記配賦先のプロジェクトに配賦する配賦ステップと、
を含むこと、
を特徴とする間接費用管理方法。
An indirect cost management method executed by an indirect cost management device comprising a control unit, the method comprising:
An allocation base master that stores allocation bases for indirect costs;
A daily report table that stores the work content of the manufacturing department employees and the sales, administration and support department employees;
a purchasing table that stores sales, management and support business expenses incurred by the work of the sales, management and support department personnel;
an allocation setting table for setting a project to which the indirect costs are allocated;
A summary table by project that summarizes the working hours of manufacturing department workers for each project and work process,
is accessible to
With reference to the allocation standard master, the daily report table, and the purchasing table, calculate the hours of engagement in the direct and indirect projects that the non-regular worker was engaged in, and calculate the sales, administrative and support work expenses as a ratio of hours engaged. a sorting step of sorting into direct costs and indirect costs according to the cost;
an allocation step of allocating the indirect costs sorted in the sorting step to the allocation destination projects with reference to the project-by-project summary table and the allocation setting table;
including;
An indirect cost management method characterized by:
制御部を備える間接費用管理装置で実行される間接費用管理プログラムであって、
間接費用の配賦基準を格納する配賦基準マスタと、
製造部門従事者および販管・支援部門従事者が従事した作業内容を格納する日報テーブルと、
前記販管・支援部門従事者の業務により生じた販管・支援業務費用を格納する仕入テーブルと、
前記間接費用の配賦先のプロジェクトを設定する配賦設定テーブルと、
製造部門従事者のプロジェクトおよび作業工程毎の従事時間を集計したPJ別集計テーブルと、
にアクセス可能であって、
前記配賦基準マスタ、前記日報テーブルおよび前記仕入テーブルを参照して、前記販管・支援部門従事者が従事した直接プロジェクトと間接プロジェクトへの従事時間を算出し、販管・支援業務費用を従事時間比に応じて直接費用と間接費用とに仕分けする仕分けステップと、
前記PJ別集計テーブルおよび前記配賦設定テーブルを参照して、前記仕分けステップで仕分けされた間接費用を、前記配賦先のプロジェクトに配賦する配賦ステップと、
をコンピュータで実行することを特徴とする間接費用管理プログラム。
An indirect cost management program executed by an indirect cost management device including a control unit,
An allocation base master that stores allocation bases for indirect costs;
A daily report table that stores the work content of the manufacturing department employees and the sales, administration and support department employees;
a purchasing table that stores sales, management and support business expenses incurred by the work of the sales, management and support department personnel;
an allocation setting table for setting a project to which the indirect costs are allocated;
A summary table by project that summarizes the working hours of manufacturing department workers for each project and work process,
is accessible to
With reference to the above-mentioned allocation standard master, the above-mentioned daily report table, and the above-mentioned purchasing table, the hours worked on the direct projects and indirect projects in which the sales, administration and support department personnel were engaged are calculated, and the sales, administration and support work expenses are calculated based on the hours worked. a sorting step of sorting into direct costs and indirect costs according to the ratio;
an allocation step of allocating the indirect costs sorted in the sorting step to the allocation destination projects with reference to the project-by-project summary table and the allocation setting table;
An indirect cost management program that runs on a computer.
JP2022035428A 2022-03-08 2022-03-08 Device, method and program for managing indirect expenses Pending JP2023130871A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022035428A JP2023130871A (en) 2022-03-08 2022-03-08 Device, method and program for managing indirect expenses

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022035428A JP2023130871A (en) 2022-03-08 2022-03-08 Device, method and program for managing indirect expenses

Publications (1)

Publication Number Publication Date
JP2023130871A true JP2023130871A (en) 2023-09-21

Family

ID=88050550

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022035428A Pending JP2023130871A (en) 2022-03-08 2022-03-08 Device, method and program for managing indirect expenses

Country Status (1)

Country Link
JP (1) JP2023130871A (en)

Similar Documents

Publication Publication Date Title
JP6798856B2 (en) Amount calculation device, amount calculation method and amount calculation program
JP2023130871A (en) Device, method and program for managing indirect expenses
JP7170392B2 (en) Crew Assignment Device, Crew Assignment Method and Crew Assignment Program
JP2020194397A (en) Journal approval work support device, journal approval work support method and journal approval work support program
JP6830835B2 (en) Personnel cost allocation device, personnel cost allocation method and personnel cost allocation program
JP2020004213A (en) Sales transfer classification apparatus, sales transfer classification method and sales transfer classification program
Kozlov et al. Classification of parameters of innovative projects in the framework of digital transformation programs for sustainable development of industrial enterprises
JP2018139053A (en) Amount data generation device, amount data generation method and amount data generation program
JP2018109869A (en) Amount calculation apparatus, amount calculation method and amount calculation program
JP7131936B2 (en) Common expense management device, common expense management method, and common expense management program
JP6994934B2 (en) Operation difficulty acquisition device, operation difficulty acquisition method and operation difficulty acquisition program
JP2019168979A (en) Journalizing data creation device, journalizing data creation method and journalizing data creation program
JP2020166623A (en) Contract information analysis device, contract information analysis method, and contract information analysis program
Shiau Effectivity date analysis and scheduling
JP2020004196A (en) Business related information management support device, business related information management support method and business related information management support program
JP7492446B2 (en) TASK MANAGEMENT DEVICE, TASK MANAGEMENT METHOD, AND TASK MANAGEMENT PROGRAM
JP7406464B2 (en) Inspection date data generation device, inspection date data generation method, and inspection date data generation program
JP7108405B2 (en) Allocation data creation device, allocation data creation method, and allocation data creation program
JP7361524B2 (en) Business support devices, business support methods, and business support programs
JP7458256B2 (en) Inventory management device, inventory management method, and inventory management program
JP6830792B2 (en) Sales management equipment, sales management methods and sales management programs
JP7300431B2 (en) Productivity Index Calculation Device, Productivity Index Calculation Method, and Productivity Index Calculation Program
JP2021152877A (en) Cost allocation device, cost allocation method, cost allocation program
JP7108404B2 (en) Vehicle allocation device, vehicle allocation method and vehicle allocation program
JP2023116314A (en) Cost control device, cost control method, and cost control program