JP2023123249A - Unloading device - Google Patents

Unloading device Download PDF

Info

Publication number
JP2023123249A
JP2023123249A JP2022027217A JP2022027217A JP2023123249A JP 2023123249 A JP2023123249 A JP 2023123249A JP 2022027217 A JP2022027217 A JP 2022027217A JP 2022027217 A JP2022027217 A JP 2022027217A JP 2023123249 A JP2023123249 A JP 2023123249A
Authority
JP
Japan
Prior art keywords
pair
lifting
frame
shaped
members
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2022027217A
Other languages
Japanese (ja)
Inventor
雅之 浜野
Masayuki Hamano
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
STEP UP KK
Original Assignee
STEP UP KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by STEP UP KK filed Critical STEP UP KK
Priority to JP2022027217A priority Critical patent/JP2023123249A/en
Publication of JP2023123249A publication Critical patent/JP2023123249A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Movable Scaffolding (AREA)

Abstract

To provide an unloading device that can stably transport materials to a high place without swaying back and forth from side to side, even when materials necessary to assemble scaffolding are placed on it, and to prevent materials, etc. falling outside the scaffolding even if the materials, etc. being transported fall.SOLUTION: An unloading device 2 comprises: a suspension fixture 10 with an engagement plate 11 that engages a suspension portion 3 of a lifting mechanism, and a plurality of L-shaped members 12 that are attached to the engagement plate 11 and place a fastening portion of a post 91; a pair of elevating bodies 20 that are raised and lowered along a pair of guide pipes 81, 82 arranged at intervals; a pair of elevating body fixing boxes 30, 40 that fix each of the pair of elevating bodies 20; a shackle 14 that connects the suspension fixture 10 and the pair of elevating body fixing boxes 30, 40; and a lifting frame 70 that holds the pair of lifting body fixing boxes 30, 40 so that the pair of lifting bodies 20 remain horizontal and are raised and lowered along the pair of guide pipes 81, 82.SELECTED DRAWING: Figure 1

Description

本発明は、足場を組み立てるのに使用される資材を高所まで運搬するための荷揚げ装置に関するものである。 The present invention relates to a lifting device for transporting materials used for assembling scaffolding to high places.

建築工事においては、各種足場が使用されるが、足場の材料には鋼製のパイプ等が使用され、足場を組み立てる際には、下から順に各種パイプ等が組み合わされ、所定の高さの足場が組み立てられる。
そして、中高層の足場を組み立てるには、使用されるパイプ等の資材を高所まで運搬する必要があり、その際、資材を吊り下げてウインチ(巻き揚げ機)等により昇降される吊り具や、資材を載せた荷台をガイドレール等の垂直棒状部材に沿って昇降させる荷揚げ装置が用いられことも多く、一度にできるだけ多くの資材を効率よく運搬するために種々の吊り具や荷揚げ装置が提案されている。
Various types of scaffolding are used in construction work, and steel pipes and the like are used as materials for the scaffolding. is assembled.
In order to assemble scaffolding for mid-to-high-rise buildings, it is necessary to transport materials such as pipes to high places. Unloading devices are often used to raise and lower a loading platform on which materials are placed along a vertical rod-shaped member such as a guide rail, and various slings and unloading devices have been proposed to efficiently transport as many materials as possible at one time. ing.

例えば、特許文献1(特開2019-206436号公報)には、外側に突出する突出部が周面に設けられた棒状部材を吊り上げる吊り具であって、吊り上げ機構の吊り部に係合する係合部材と、第1の水平方向(左右方向)に延びる縦部材と、前記第1の水平方向と直交する第2の水平方向(前後方向)に延びる複数の横部材とを備え、前記係合部材は、前記縦部材又は前記横部材に取り付けられ、前記第2の水平方向における前記横部材の中央部は、前記縦部材に取り付けられ、前記第1の水平方向における前記横部材の間隔は、前記棒状部材の軸方向と直交する方向の横幅より大きく、前記突出部の前記軸方向と直交する方向の外幅より小さく、前記第2の水平方向おける前記横部材の両端部には、垂直方向に起立する起立部が形成されている吊り具が開示されている。
しかしながら、特許文献1の吊り具を使用して足場を組み立てるのに必要な資材(支柱等の棒状部材)をウインチ等のつり上げ機で吊り上げて運搬する場合、資材を載せた吊り具が風にあおられる等して左右前後に揺れると、吊り具上の資材が、周囲の既に組み立てた足場の支柱や手摺等に衝突して落下する危険性がある。
For example, Patent Document 1 (Japanese Patent Application Laid-Open No. 2019-206436) discloses a lifting tool for lifting a rod-shaped member having a protrusion that protrudes outward on its peripheral surface, and is engaged with a lifting portion of a lifting mechanism. a connecting member, a vertical member extending in a first horizontal direction (left-right direction), and a plurality of horizontal members extending in a second horizontal direction (front-rear direction) perpendicular to the first horizontal direction; A member is attached to the longitudinal member or the transverse member, a central portion of the transverse member in the second horizontal direction is attached to the longitudinal member, and the spacing of the transverse members in the first horizontal direction is: larger than the lateral width in the direction perpendicular to the axial direction of the rod-shaped member and smaller than the outer width of the protrusion in the direction perpendicular to the axial direction, and at both ends of the lateral member in the second horizontal direction, vertical A sling is disclosed in which an upright portion is formed.
However, when materials (rod-shaped members such as posts) necessary for assembling a scaffold using the lifting tool of Patent Document 1 are lifted and transported by a lifting machine such as a winch, the lifting tool on which the materials are placed is blown by the wind. If the material on the hoisting tool swings left and right and back and forth due to being caught, there is a risk that the material on the hoisting tool will collide with the surrounding already-assembled scaffold posts, handrails, etc. and fall.

また、特許文献2(特開2010-281072号公報)には、足場用パイプによって枠組みが形成された足場と、前記足場の一部に垂直方向に開放された荷台昇降用空間と、前記荷台昇降用空間の両側の足場用パイプに固定されて垂直に設置された一対のガイドレールと、前記荷台昇降用空間に配置されるかご型の昇降荷台と、前記昇降荷台の両側部に設けられ、前記一対のガイドレールを走行するように回転するとともに、前記昇降荷台の水平方向の位置を規制するガイドローラと、前記荷台昇降用空間の最上部に設置され、前記昇降荷台の上部に固着されたチェーンを巻き上げるチェーンブロックと、前記昇降荷台が所定以上の速度で落下したときに作動して前記昇降荷台を停止させるリフト落下安全装置とを備えた足場作業用リフトが開示されている。
しかしながら、特許文献2の足場作業用リフトでは、足場の一部に荷台昇降用空間が必要となり、足場を組み立てるのに使用される資材を積載したかご型の昇降荷台を、足場に固定したガイドレールに沿って昇降させることから、かご型の昇降荷台という体積の大きい重量体が必要で装置が大掛かりとなるのみならず、昇降荷台の前半分が足場から外側に突出することから、昇降荷台に積載した資材が落下したり、資材を積載した昇降荷台が落下すると、足場の外側にいる作業者等に危害を加える危険性がある。
In addition, Patent Document 2 (Japanese Patent Application Laid-Open No. 2010-281072) discloses a scaffold in which a framework is formed by scaffolding pipes, a space for lifting and lowering a loading platform opened vertically in a part of the scaffolding, and the lifting and lowering of the loading platform. A pair of guide rails fixed to the scaffolding pipes on both sides of the space and installed vertically, a cage-shaped lifting platform arranged in the space for lifting and lowering the loading platform, A guide roller that rotates so as to run on a pair of guide rails and regulates the horizontal position of the loading platform; and a lift drop safety device that operates to stop the platform when it drops at a speed higher than a predetermined speed.
However, in the scaffold work lift of Patent Document 2, a part of the scaffold requires a space for lifting and lowering the loading platform. Because it is lifted and lowered along the path, it requires a large weight body called a basket-shaped loading platform, which not only makes the equipment large, but also the front half of the loading platform protrudes outside from the scaffolding, so it can be loaded on the loading platform. There is a risk of injury to workers outside the scaffolding if the materials on the scaffold fall or if the platform on which the materials are loaded falls.

さらに、特許文献3(特開2021-67065号公報)には、断面が円形の垂直棒状部材に沿って昇降する調整箱と、該調整箱に連結された資材運搬体とを備えた荷揚げ装置であって、前記調整箱は、前記垂直棒状部材の周面上を昇降する昇降体と、前記資材運搬体の落下を防止する落下防止機構とを備え、前記落下防止機構は、前記調整箱を吊り上げる吊り上げ装置の吊り上げ部材に係合する係合部と、前記吊り上げ部材の吊り上げが解除されたときに、前記垂直棒状部材の周面を挟み込むように該周面に押し付けられるロック部材と、前記ロック部材を傾斜させて前記垂直状棒部材の周面に前記ロック部材を押し付ける付勢部材と、前記ロック部材が傾斜するのを案内する案内部材とを備えた荷揚げ装置が開示されている。
しかしながら、特許文献3の荷揚げ装置では、特許文献2の足場作業用リフトのように足場の一部に荷台昇降用空間を必要としないものの、特許文献2と同様の問題、すなわち、足場を組み立てるのに使用される資材を積載した資材運搬体を、足場に固定したパイプに沿って昇降させることから、資材運搬体という体積の大きい箱型の重量体が必要で装置が大掛かりとなるのみならず、資材運搬体全体が足場から外側に突出することから、資材運搬体に積載した資材が落下したり、資材を積載した資材運搬体が落下すると、足場の外側にいる作業者等に危害を加える危険性が高いという問題が生ずる。
Furthermore, Patent Document 3 (Japanese Patent Application Laid-Open No. 2021-67065) discloses a loading device equipped with an adjustment box that moves up and down along a vertical rod-shaped member having a circular cross section and a material carrier connected to the adjustment box. The adjustment box includes an elevating body that ascends and descends on the peripheral surface of the vertical rod-shaped member, and a fall prevention mechanism that prevents the material carrier from falling, and the fall prevention mechanism lifts the adjustment box. an engaging portion that engages with a lifting member of a lifting device; a locking member that is pressed against the peripheral surface of the vertical bar member so as to sandwich the peripheral surface of the vertical rod member when the lifting member is released; and the locking member. and a guide member for guiding the inclination of the lock member.
However, although the unloading device of Patent Document 3 does not require a space for raising and lowering the loading platform in part of the scaffolding unlike the lift for scaffolding work of Patent Document 2, it has the same problem as Patent Document 2, that is, it is difficult to assemble the scaffolding. Since the material carrier loaded with the materials used in the scaffolding is moved up and down along the pipe fixed to the scaffolding, a box-shaped heavy body with a large volume called the material carrier is required, which not only makes the equipment large, Since the entire material carrier protrudes outward from the scaffolding, there is a risk of injury to workers outside the scaffolding if the materials loaded on the material carrier or the material carrier that is loaded with materials falls. There is a problem of high volatility.

特開2019-206436号公報JP 2019-206436 A 特開2010-281072号公報JP 2010-281072 A 特開2021-67065号公報Japanese Patent Application Laid-Open No. 2021-67065

本発明が解決しようとする課題は、体積の大きい箱型の重量体を使用せず、装置が大掛かりになることなく、足場を組み立てるのに必要な資材を載置しても、左右前後に揺れることなく資材を高所まで安定して運搬できて、資材等が落下する危険性が少なく、また、運搬している資材等が落下しても、足場の外側に資材等を落下させないようにし、作業者等に危害を加える危険性を最小限に止めるようにすることである。 The problem to be solved by the present invention is that it does not use a box-shaped weight body with a large volume, does not make the device large-scale, and even if the materials necessary for assembling the scaffolding are placed, it shakes left and right and back and forth. It is possible to stably transport materials to high places without any trouble, and there is little risk of materials, etc. falling. It is to minimize the risk of harming workers.

請求項1の発明は、吊り上げ機構を使用して、外側に突出する突出部が周面に設けられた棒状資材を運搬する荷揚げ装置であって、前記吊り上げ機構の吊り部に係合する係合部材と該係合部材に取り付けられて前記棒状資材の前記突出部を載せる複数の棒状資材載置部材とを備えた吊り具と、間隔を空けて配置された一対の垂直棒状部材に沿って昇降する一対の昇降体と、前記一対の昇降体の各々を固定する一対の昇降体固定部材と、前記吊り具と前記一対の昇降体固定部材とを連結する連結具と、前記一対の昇降体が水平を保って前記一対の垂直棒状部材に沿って昇降するように前記一対の昇降体固定部材を保持する昇降フレームとを備えた荷揚げ装置を提供して、上記課題を解決するものである。 A first aspect of the invention is a lifting device for transporting a rod-shaped material having a peripheral surface provided with a projecting portion that protrudes outward using a lifting mechanism. Lifting tool comprising a member and a plurality of rod-shaped material placing members attached to the engaging member for placing the projecting portion of the rod-shaped material, and a pair of vertical rod-shaped members arranged with a space therebetween. a pair of elevating bodies, a pair of elevating body fixing members that fix each of the pair of elevating bodies, a connector that connects the hanging fixture and the pair of elevating body fixing members, and the pair of elevating bodies An object of the present invention is to solve the above-mentioned problems by providing a lifting frame that holds the pair of lifting body fixing members so as to keep them horizontal and move up and down along the pair of vertical bar members.

請求項2の発明は、前記昇降フレームは、前記一対の昇降体固定部材に固定される一対の垂直枠と、該一対の垂直枠に掛け渡された水平枠を備えている荷揚げ装置を提供して、上記課題を解決するものである。 The invention according to claim 2 provides a loading device, wherein the elevating frame includes a pair of vertical frames fixed to the pair of elevating body fixing members, and a horizontal frame spanned between the pair of vertical frames. to solve the above problems.

請求項3の発明は、吊り上げ機構を使用して、外側に突出する突出部が周面に設けられた棒状資材を運搬する荷揚げ装置であって、前記吊り上げ機構の吊り部に係合する係合部材と、間隔を空けて配置された一対の垂直棒状部材に沿って昇降する一対の昇降体と、前記一対の昇降体の各々を固定する一対の昇降体固定部材と、前記係合部材と前記一対の昇降体固定部材とを連結する連結具と、前記一対の昇降体が水平を保って前記一対の垂直棒状部材に沿って昇降するように前記一対の昇降体固定部材を保持する昇降フレームと、前記昇降フレームに取り付けられて前記棒状資材の前記突出部を載せる複数の棒状資材載置部材を備えた吊り具とを備えた荷揚げ装置を提供して、上記課題を解決するものである。 According to a third aspect of the invention, a lifting mechanism is used to transport a rod-shaped material having a protrusion protruding outward on the peripheral surface thereof, the engaging portion being engaged with the suspending portion of the lifting mechanism. a member, a pair of elevating bodies that ascend and descend along a pair of spaced apart vertical bar-shaped members, a pair of elevating body fixing members that fix each of the pair of elevating bodies, the engaging member and the a connector that connects the pair of lifting body fixing members; and a lifting frame that holds the pair of lifting body fixing members so that the pair of lifting bodies are kept horizontal and moved up and down along the pair of vertical rod-shaped members. and a hoisting tool provided with a plurality of rod-shaped material placement members that are attached to the lifting frame and on which the protrusions of the rod-shaped materials are placed, thereby solving the above-mentioned problems.

請求項4の発明は、前記昇降フレームは、前記一対の昇降体固定部材に固定される一対の垂直枠を有し、前記吊り具は、前記一対の垂直枠に固定されている荷揚げ装置を提供して、上記課題を解決するものである。 According to a fourth aspect of the invention, the lifting frame has a pair of vertical frames fixed to the pair of lifting body fixing members, and the lifting device is fixed to the pair of vertical frames. Then, the above problem is solved.

請求項5の発明は、前記棒状資材は、くさび緊結式足場に使用される支柱であり、前記突出部は、前記支柱に取り付けられた緊結部であり、前記棒状資材載置部材は、前記支柱の外径より広い間隔で配置されたL字状部材である荷揚げ装置を提供して、上記課題を解決するものである。 In the invention of claim 5, the rod-shaped material is a post used in a wedge binding scaffold, the projecting portion is a binding portion attached to the post, and the rod-shaped material placing member is the post. The above problem is solved by providing a cargo unloading device which is an L-shaped member arranged at intervals wider than the outer diameter of the .

請求項6の発明は、前記吊り具は、板状の資材を引っ掛ける板状資材引掛け部材を備えている荷揚げ装置を提供して、上記課題を解決するものである。 The sixth aspect of the invention solves the above problems by providing a loading device in which the hoisting tool is provided with a plate-like material hooking member for hooking the plate-like material.

請求項1に記載の発明の荷揚げ装置においては、吊り具の複数の棒状資材載置部材に棒状資材の突出部を載せられるため、体積の大きい箱型の重量体を使用せず、装置が大掛かりになることなく、一対の垂直棒状部材に沿って昇降する一対の昇降体を固定する一対の昇降体固定部材と吊り具が連結具で連結されているため、足場を組み立てるのに必要な資材を吊り具に載置しても、左右前後に揺れることなく資材を高所まで安定して運搬できて、資材等が落下する危険性が少なく、一対の昇降体が水平を保って一対の垂直棒状部材に沿って昇降するように一対の昇降体固定部材が昇降フレームに保持されるため、吊り具に資材を載せて吊り上げても、左右のバランスがとれた状態で円滑に上昇し、吊り具に載せた資材が前方に突出せず、運搬している資材等が落下しても、足場の外側に資材等が落下せず、作業者等に危害を加える危険性を最小限に止めるようにできるという効果を奏する。 In the unloading device of the first aspect of the invention, since the protruding portion of the rod-shaped material can be placed on the plurality of rod-shaped material placement members of the hoisting tool, the device is large-sized without using a box-shaped weight body with a large volume. Since the pair of lifting body fixing members for fixing the pair of lifting bodies that move up and down along the pair of vertical bar members and the sling are connected by the connector, the materials necessary for assembling the scaffolding are reduced. Even when placed on a sling, materials can be stably transported to high places without swaying left and right, and there is little risk of materials falling. Since a pair of lifting body fixing members are held by the lifting frame so as to move up and down along the members, even if the material is placed on the hoisting tool and lifted, it rises smoothly with left-right balance, and the hoisting tool moves up and down. It is possible to minimize the danger of injuring workers, etc. by preventing materials, etc. placed on the scaffold from protruding forward, and even if the materials, etc. being transported, fall, they will not fall outside the scaffolding. It has the effect of

請求項2に記載の発明の荷揚げ装置においては、さらに、昇降フレームが一対の垂直枠と水平枠を備えているため、簡単な構造で、一対の昇降体が水平を保って前記一対の垂直棒状部材に沿って昇降できるという効果を奏する。 In the cargo unloading device according to the second aspect of the invention, the lifting frame further includes a pair of vertical frames and a horizontal frame. It is effective in being able to go up and down along the member.

請求項3に記載の発明の荷揚げ装置においては、吊り具の複数の棒状資材載置部材に棒状資材の突出部を載せられるため、体積の大きい箱型の重量体を使用せず、装置が大掛かりになることなく、一対の垂直棒状部材に沿って昇降する一対の昇降体を固定する一対の昇降体固定部材を保持する昇降フレームに吊り具が取り付けられているため、足場を組み立てるのに必要な資材を吊り具に載置しても、左右前後に揺れることなく資材を高所まで安定して運搬できて、資材等が落下する危険性が少なく、対の昇降体が水平を保って一対の垂直棒状部材に沿って昇降するように一対の昇降体固定部材が昇降フレームに保持されるため、吊り具に資材を載せて吊り上げても、左右のバランスがとれた状態で円滑に上昇し、吊り具に載せた資材が前方に突出せず、運搬している資材等が落下しても、足場の外側に資材等が落下せず、作業者等に危害を加える危険性を最小限に止めるようにできるという効果を奏する。 In the unloading device according to the third aspect of the invention, since the protruding portion of the rod-shaped material can be placed on the plurality of rod-shaped material placement members of the hoisting tool, the device is large-sized without using a box-shaped weight body with a large volume. Since the sling is attached to the lifting frame that holds the pair of lifting body fixing members that fix the pair of lifting bodies that move up and down along the pair of vertical bar members without becoming Even if the material is placed on the sling, the material can be stably transported to a high place without swaying left and right, and there is little risk of the material falling. Since the pair of lifting body fixing members are held by the lifting frame so as to move up and down along the vertical rod-shaped member, even if the material is placed on the hoisting tool and lifted, the material can be lifted smoothly while maintaining left-right balance. The material placed on the tool does not protrude forward, and even if the material being transported falls, it will not fall outside the scaffolding, minimizing the risk of harming workers. It has the effect of being able to

請求項4に記載の発明の荷揚げ装置においては、さらに、吊り具が、昇降フレームが備える一対の垂直枠に固定されているため、吊り具の左右前後の揺れが完全に防止されるという効果を奏する。 In the cargo unloading apparatus according to the fourth aspect of the invention, furthermore, since the hoisting tools are fixed to the pair of vertical frames provided in the elevating frame, the swaying of the hoisting tools in the left-right and back-and-forth direction can be completely prevented. Play.

請求項5に記載の発明の荷揚げ装置においては、さらに、棒状資材載置部材がL字状部材であるため、棒状資材の支柱が棒状資材載置部材から滑って落下するのを防止できるという効果を奏する。 In the unloading device according to the fifth aspect of the invention, since the rod-shaped material placement member is an L-shaped member, it is possible to prevent the post of the rod-shaped material from slipping and falling from the rod-shaped material placement member. play.

請求項6に記載の発明の荷揚げ装置においては、さらに、板状資材引掛け部材により板状の資材も運搬できるという効果を奏する。 In the unloading device of the sixth aspect of the invention, there is an effect that the plate-like materials can also be transported by the plate-like material hooking member.

本第1発明(請求項1に係る発明)の荷揚げ装置と、この荷揚げ装置を含む荷揚げシステム全体の構成を表した斜視図である。BRIEF DESCRIPTION OF THE DRAWINGS It is a perspective view showing the structure of the whole unloading system containing the unloading apparatus of this 1st invention (invention which concerns on Claim 1), and this unloading apparatus. 図1の荷揚げシステムの平面図である。Figure 2 is a plan view of the unloading system of Figure 1; 図1の荷揚げシステムの正面図である。Figure 2 is a front view of the unloading system of Figure 1; 図1の荷揚げシステムの右側面図である。Fig. 2 is a right side view of the unloading system of Fig. 1; シャックル14の左側面図である。4 is a left side view of the shackle 14; FIG. 昇降体20の平面図、背面図、右側面図、X-X断面図である。FIG. 3 is a plan view, a rear view, a right side view, and an XX cross-sectional view of the lifting body 20. FIG. 昇降体固定箱30に昇降体20とクランプ50を取り付けた状態の平面図、正面図、背面図左側面図、右側面図である。FIG. 10 is a plan view, a front view, a rear view, a left side view, and a right side view of a state in which the lifting body 20 and the clamp 50 are attached to the lifting body fixing box 30. FIG. 昇降フレーム70の垂直枠の斜視図と平面図、昇降フレーム70の水平枠の斜視図である。7A and 7B are a perspective view and a plan view of a vertical frame of an elevating frame 70, and a perspective view of a horizontal frame of the elevating frame 70. FIG. くさび緊結式足場に使用される長尺の支柱の斜視図、足場に使用される踏板の斜視図である。1 is a perspective view of a long strut used in a wedge binding scaffold, and a perspective view of a tread plate used in the scaffold. FIG. 荷揚げ装置2の吊り具10に支柱91と踏板100を載せて運搬する状態を表した斜視図である。FIG. 10 is a perspective view showing a state in which a strut 91 and a footboard 100 are placed on a sling 10 of the unloading device 2 and transported. 本第2発明(請求項3に係る発明)の荷揚げ装置と、この荷揚げ装置を含む荷揚げシステム全体の構成を表した斜視図である。It is a perspective view showing the structure of the whole unloading system containing the unloading apparatus of this 2nd invention (invention which concerns on Claim 3), and this unloading apparatus. 図11の荷揚げシステムの平面図である。Figure 12 is a plan view of the unloading system of Figure 11; 図11の荷揚げシステムの正面図である。Figure 12 is a front view of the unloading system of Figure 11; 図11の荷揚げシステムの背面図である。Figure 12 is a rear view of the unloading system of Figure 11; 図11の荷揚げシステムの右側面図である。Figure 12 is a right side view of the unloading system of Figure 11; 荷揚げ装置102の吊り具20、30に支柱と踏板を載せて運搬する状態を表した斜視図である。FIG. 10 is a perspective view showing a state in which a strut and a footboard are placed on the slings 20 and 30 of the unloading device 102 and transported.

[本第1発明の荷揚げ装置の全体構成]
図1は、本第1発明(請求項1に係る発明)の荷揚げ装置と、この荷揚げ装置を含む荷揚げシステム全体の構成を表した斜視図、図2は、図1の荷揚げシステムの平面図、図3は、図1の荷揚げシステムの正面図、図4は図1の荷揚げシステムの右側面図である。
図中、1は荷揚げシステム、2は荷揚げ装置、3は吊り上げ装置のフック部、10は吊り具、11は係合板、11a、11bは穴、11c、11dは窓部、11eは垂下片、12はL字状部材、12aは水平部、12bは垂直部、13は逆への字状部材、13aは水平部、13bは傾斜部、14はシャックル、20は昇降体、30、40は昇降体固定箱、50、60はクランプ、70は昇降フレーム、71は垂直枠、75は水平枠、81、82は案内パイプであり、各図において、Xは左右方向、Yは前後方向、Zは上下方向である。
図に示すように、荷揚げシステム1は、荷揚げ装置2、フック部3を備えた吊り上げ装置、荷揚げ装置2の昇降を案内する案内パイプ81、82から構成され、本第1発明における吊り上げ機構の吊り部がフック部3となる。
また、荷揚げ装置2は、吊り具10、シャックル14、昇降体20、昇降体固定箱30、40、クランプ50、60、昇降フレーム70から構成される。
[Overall Configuration of the Unloading Device of the First Invention]
FIG. 1 is a perspective view showing the configuration of the loading device of the first invention (the invention according to claim 1) and the entire loading system including this loading device, FIG. 2 is a plan view of the loading system of FIG. 3 is a front view of the unloading system of FIG. 1, and FIG. 4 is a right side view of the unloading system of FIG.
In the figure, 1 is a loading system, 2 is a loading device, 3 is a hook portion of the lifting device, 10 is a lifting tool, 11 is an engaging plate, 11a and 11b are holes, 11c and 11d are windows, 11e is a hanging piece, and 12 is an L-shaped member, 12a is a horizontal portion, 12b is a vertical portion, 13 is an inverted inverted-shaped member, 13a is a horizontal portion, 13b is an inclined portion, 14 is a shackle, 20 is an elevating body, and 30 and 40 are an elevating body. 71 is a vertical frame; 75 is a horizontal frame; 81 and 82 are guide pipes; is the direction.
As shown in the figure, the cargo unloading system 1 comprises a cargo unloading device 2, a lifting device provided with a hook portion 3, and guide pipes 81 and 82 for guiding the lifting of the cargo unloading device 2. The part becomes the hook part 3.
The unloading device 2 is composed of a sling 10, a shackle 14, an elevating body 20, elevating body fixing boxes 30, 40, clamps 50, 60, and an elevating frame .

[吊り具10、シャックル14]
吊り具10は、本第1発明の係合部材となる略5角形の係合板11、L字状部材12、本発明の板状資材引掛け部材となる逆への字状部材13から構成され、これらの構成部材は、鉄、アルミ等の金属材料、繊維強化プラスチック等からなる。
吊り具10において、係合板11は、略5角形であり、中央上部に穴11aが設けられ、左右端部にも穴11bが設けられ、左右に窓部11c、11dが設けられ、中央下部と左右下部のそれぞれに垂下片11eが設けられている。
係合板11においては、左右の窓部11c、11dの各々の下側に、X方向に等間隔で配置された8個のL字状部材12が取り付けられ、垂下片11eの下端には、逆への字状部材13が取り付けられている。
L字状部材12は、水平部12aと垂直部12bからなり、その間隔は、くさび緊結式足場に使用される支柱(後述する)の外径より少し広くなっており、その支柱の周面に突出する緊結部がL字状部材12の水平部12aに載置される。
また、逆への字状部材13は、水平部13aと傾斜部13bからなり、これに踏板等の板状の資材が引っ掛けられる。
図5は、シャックル14の左側面図であり、図中、14aはリング部、14bはボルト、14cはナットである。
シャックル14は、本第1発明の連結具となるもので、U字状のリング部14a、ボルト14b、ナット14cを備えている。
シャックル14のボルト14bの軸部を、吊り具10の係合板11の左右端部の穴11bに挿通し、ナット14cを螺合することにより、2個のシャックル14が、吊り具10のフレーム板11の左右端部に取り付けられる。
なお、L字状部材12の個数は、図に示す16個(8個×2)に限定されるものではなく、係合板11の左右方向の長さ等に応じて、2個~30個の範囲内で適宜選択され、逆への字状部材13の個数も、図に示す3個に限定されるものではなく、1~10個の範囲内で適宜選択される。
[Hanging tool 10, shackle 14]
The hanging tool 10 is composed of a substantially pentagonal engaging plate 11, an L-shaped member 12, and an upside-down-shaped member 13, which serves as the engaging member of the present invention. , These constituent members are made of metal materials such as iron and aluminum, fiber reinforced plastics, and the like.
In the hanger 10, the engaging plate 11 has a substantially pentagonal shape, and has a hole 11a in the upper center, holes 11b in the left and right ends, and windows 11c and 11d in the left and right, respectively. A hanging piece 11e is provided on each of the left and right lower portions.
In the engaging plate 11, eight L-shaped members 12 arranged at equal intervals in the X direction are attached to the lower sides of the left and right windows 11c and 11d, respectively. A V-shaped member 13 is attached.
The L-shaped member 12 consists of a horizontal portion 12a and a vertical portion 12b. The protruding binding portion is placed on the horizontal portion 12 a of the L-shaped member 12 .
In addition, the inverted V-shaped member 13 is composed of a horizontal portion 13a and an inclined portion 13b, on which a plate-like material such as a footboard is hooked.
FIG. 5 is a left side view of the shackle 14, in which 14a is a ring portion, 14b is a bolt, and 14c is a nut.
The shackle 14 serves as a connector of the first invention, and includes a U-shaped ring portion 14a, a bolt 14b, and a nut 14c.
The shafts of the bolts 14b of the shackles 14 are inserted into the holes 11b at the left and right ends of the engaging plate 11 of the sling 10, and the nuts 14c are screwed together, so that the two shackles 14 are attached to the frame plate of the sling 10. 11 are attached to the left and right ends.
The number of L-shaped members 12 is not limited to 16 (8×2) shown in the drawing, but may be 2 to 30 depending on the length of the engaging plate 11 in the left-right direction. The number of the reverse-vertical-shaped members 13 is not limited to three as shown in the drawing, but may be appropriately selected within the range of 1 to 10.

[昇降体20]
図6(a)は、昇降体20の平面図、図6(b)は、昇降体20の背面図、図6(c)は、昇降体20の右側面図、図6(d)は、図6(b)のX-X断面図である。
図中、21はフレーム、21aはフレーム本体、21bは端部、21cはリング部、21dは穴、22は第1ボールベアリング、23は第2ボールベアリング、24は割りピン、GAは間隙部である。
昇降体20は、C字状のフレーム21、一対の第1ボールベアリング22、一対の第2ボールベアリング23、割りピン24を備えた構造となっている。
フレーム21は、断面が円形のフレーム本体21a、端部21b、端部21bと対向する位置にあるリング部21cから構成され、リング部21cには穴21dが形成されている。
左側のフレーム本体21aの端部21bと右側のフレーム本体21aの端部21bは、離間して間隙部GAを形成している。
第1ボールベアリング22は、フレーム本体21aのリング部21c側に嵌め込まれ、対になって互いに向き合うように配置されている。
第2ボールベアリング23は、フレーム本体21aの端部21bにはめ込まれ、対になって互いに向き合うように配置されている。
この場合、端部21bの外径は、フレーム本体21aの外径より若干小さく、端部21bが段付き部となり、第2ボールベアリング23がフレーム本体21a側に移動しないようになっている。
割りピン24は、第2ボールベアリング23の脱落を防止するもので、端部21bの先端部に設けられたピン穴に挿入されている。
そして、昇降体20のフレーム21の内側に案内パイプ81、82が挿通され、第1ボールベアリング22と第2ボールベアリング23が、案内パイプ81、82の周面上を転がり、昇降体20が案内パイプ81、82に沿って昇降する。
[Elevator 20]
6(a) is a plan view of the lifting body 20, FIG. 6(b) is a rear view of the lifting body 20, FIG. 6(c) is a right side view of the lifting body 20, and FIG. 6B is a cross-sectional view taken along line XX of FIG. 6B; FIG.
In the figure, 21 is a frame, 21a is a frame main body, 21b is an end portion, 21c is a ring portion, 21d is a hole, 22 is a first ball bearing, 23 is a second ball bearing, 24 is a split pin, and GA is a gap portion. be.
The lifting body 20 has a structure including a C-shaped frame 21 , a pair of first ball bearings 22 , a pair of second ball bearings 23 and split pins 24 .
The frame 21 is composed of a frame body 21a having a circular cross section, an end portion 21b, and a ring portion 21c located opposite the end portion 21b, and a hole 21d is formed in the ring portion 21c.
An end portion 21b of the left frame body 21a and an end portion 21b of the right frame body 21a are separated from each other to form a gap portion GA.
The first ball bearings 22 are fitted in the ring portion 21c side of the frame body 21a and are arranged in pairs so as to face each other.
The second ball bearings 23 are fitted in the end portion 21b of the frame body 21a and arranged in pairs so as to face each other.
In this case, the outer diameter of the end portion 21b is slightly smaller than the outer diameter of the frame body 21a, and the end portion 21b is a stepped portion so that the second ball bearing 23 does not move toward the frame body 21a.
The split pin 24 prevents the second ball bearing 23 from coming off, and is inserted into a pin hole provided at the tip of the end portion 21b.
The guide pipes 81 and 82 are inserted inside the frame 21 of the lifting body 20, the first ball bearing 22 and the second ball bearing 23 roll on the peripheral surfaces of the guide pipes 81 and 82, and the lifting body 20 is guided. It goes up and down along pipes 81 and 82 .

[昇降体固定箱30、40、クランプ50、60]
図7は、昇降体固定箱30に昇降体20とクランプ50を取り付けた状態の図であり、同図(a)は平面図、同図(b)は正面図、同図(c)は背面図、同図(d)は左側面図、同図(e)は右側面図である。
図中、31は箱枠体、31aは上面板、31bは正面板、31cは側面板、31dは底面板、11eは縦枠、32はアイボルト、32aはリング、32bは軸部、32cはナット、32dは座金、25は固定ボルト、26はナット、51はクランプ本体、52はクランプ片、53、54はピン、55は締付ボルト、56はナット、57は取付ボルト、58はナットである。
昇降体固定箱30は、本第1発明の昇降体固定部材となるもので、箱枠体31とアイボルト32からなり、箱枠体31は、L字型の上面板31a、正面板31b、側面板31c、底面板31d及び縦枠11eを備え、アイボルト32は、リング32aと軸部32bを備え、軸部32bの先端は、ナット32cが螺合するネジ部となっている。
箱枠体31の上面板31aの右下部には挿通穴が設けられ、この挿通穴にアイボルト32の軸部32bが挿通され、ナット32cが軸部32bの先端に螺合されて、上面板31aにアイボルト32が固定される。
箱枠体31の底面板31dの左上部は半円形に膨らんだ形状となっており、その半円形部には固定ボルト25が挿通する挿通穴が設けられている。
そして、昇降体20のC字状のフレーム21の穴21dと底面板31dの挿通穴が一致するように、フレーム21が箱枠体31の底面板31d上に配置され、固定ボルト25が穴21dと底面板31dの挿通穴に挿通され、ナット26が固定ボルト25に螺合され、これにより昇降体20が箱枠体31に固定される。
[Elevating body fixing boxes 30, 40, clamps 50, 60]
7A and 7B are views showing a state in which the lifting body 20 and the clamp 50 are attached to the lifting body fixing box 30. FIG. 7A is a plan view, FIG. 7B is a front view, and FIG. Fig. 1(d) is a left side view, and Fig. 1(e) is a right side view.
In the figure, 31 is a box frame, 31a is a top plate, 31b is a front plate, 31c is a side plate, 31d is a bottom plate, 11e is a vertical frame, 32 is an eyebolt, 32a is a ring, 32b is a shaft, and 32c is a nut. , 32d is a washer, 25 is a fixing bolt, 26 is a nut, 51 is a clamp body, 52 is a clamp piece, 53 and 54 are pins, 55 is a tightening bolt, 56 is a nut, 57 is a mounting bolt, and 58 is a nut. .
The lifting body fixing box 30 is a lifting body fixing member of the first invention, and consists of a box frame 31 and an eyebolt 32. The box frame 31 is composed of an L-shaped upper plate 31a, a front plate 31b, and a side plate. The eyebolt 32 includes a face plate 31c, a bottom plate 31d and a vertical frame 11e. The eyebolt 32 includes a ring 32a and a shaft portion 32b.
An insertion hole is provided in the lower right portion of the top plate 31a of the box frame 31, and the shaft portion 32b of the eyebolt 32 is inserted through this insertion hole, and a nut 32c is screwed onto the tip of the shaft portion 32b to secure the top plate 31a. The eyebolt 32 is fixed to.
The upper left portion of the bottom plate 31d of the box frame 31 has a semicircular bulging shape, and the semicircular portion is provided with an insertion hole through which the fixing bolt 25 is inserted.
Then, the frame 21 is placed on the bottom plate 31d of the box frame 31 so that the hole 21d of the C-shaped frame 21 of the lifting body 20 and the insertion hole of the bottom plate 31d are aligned, and the fixing bolt 25 is inserted into the hole 21d. and the bottom plate 31d, and the nuts 26 are screwed onto the fixing bolts 25, whereby the lifting body 20 is fixed to the box frame 31. As shown in FIG.

クランプ50は、図7に示すように、クランプ本体51、クランプ片52、取付ボルト57等を備えている。
クランプ50おいては、クランプ本体51の右端側には、クランプ片52の右端側がピン53により回転可能に連結され、クランプ本体51の左端側には、ピン54により締付ボルト55が回転可能に取り付けられ、クランプ本体51の背面側には、取付ボルト57が外側に突出して取り付けられている。
そして、取付ボルト57を箱枠体31の正面板31bの中央左寄りの位置に設けられた挿通穴に挿通し、取付ボルト57にナット58を螺合させて締め付けることにより、クランプ50が箱枠体31に固定される。
また、昇降体固定箱40は、本第1発明の昇降体固定部材となるもので、昇降体固定箱30と左右対称構造となっており、箱枠体31と左右対称構造の箱枠体とアイボルト32を備え、クランプ60は、クランプ50と同一構造であり、クランプ50のクランプ本体51、クランプ片52、取付ボルト57等と同じクランプ本体、クランプ片、取付ボルト等を備え、クランプ50と左右対称に配置される。
そして、昇降体固定箱40の箱枠体の底面板には、連結箱30の箱枠体31と同様にして、昇降体20が固定され、連結箱40の箱枠体の正面板の中央右寄りの位置には、クランプ60が、クランプ50の場合と同様にして、取付ボルトとナットにより固定される。
As shown in FIG. 7, the clamp 50 includes a clamp body 51, clamp pieces 52, mounting bolts 57, and the like.
In the clamp 50, the right end side of the clamp piece 52 is rotatably connected to the right end side of the clamp body 51 by a pin 53, and the clamping bolt 55 is rotatably connected to the left end side of the clamp body 51 by a pin 54. A mounting bolt 57 is mounted on the rear side of the clamp body 51 so as to protrude outward.
Then, the mounting bolt 57 is inserted into an insertion hole provided at a position near the center left of the front plate 31b of the box frame 31, and a nut 58 is screwed onto the mounting bolt 57 and tightened, so that the clamp 50 is attached to the box frame. 31.
Also, the lifting body fixing box 40 serves as the lifting body fixing member of the first invention, and has a symmetrical structure with the lifting body fixing box 30, and the box frame 31 has a symmetrical structure. The clamp 60 has the same structure as the clamp 50 and has the same clamp body, clamp piece, mounting bolt, etc. as the clamp body 51, clamp piece 52, mounting bolt 57, etc. arranged symmetrically.
Similarly to the box frame 31 of the connecting box 30, the lifting body 20 is fixed to the bottom plate of the box frame of the lifting body fixing box 40. , a clamp 60 is fixed by a mounting bolt and nut in the same manner as the clamp 50.

[昇降フレーム70、案内パイプ81、82]
図8(a)は、昇降フレーム70の垂直枠の斜視図、図8(b)は、昇降フレーム70の垂直枠の平面図、図8(c)は、昇降フレーム70の水平枠の斜視図であり、図中、71は垂直枠、72は垂直パイプ、73a~73dはポケット金具、74a~74dはポケット部、75は水平枠、76は水平パイプ、77a、77bはくさび部である。
図1~図4に示すように、昇降フレーム70は、一対の垂直枠71と2本の水平枠75からなる。
垂直枠71は、くさび緊結式足場に使用される短い支柱であり、垂直パイプ72とポケット金具73a~73d等から構成される。
ポケット金具73a~73dは水平断面がコの字状をしており、4個のポケット金具73a~73dが垂直パイプ72の円周方向に段差を持って90度置きに配置され、ポケット金具73a~73dと垂直パイプ72の円周面との間にポケット部74a~44dが形成されている。
水平枠75は、くさび緊結式足場の支柱と組み合わせて使用される手摺であり、水平パイプ76はとくさび部77a、77b等から構成される。
そして、昇降フレーム70においては、一対の垂直枠71がX方向(左右方向)に並べて配置され、左右の垂直枠71の上側のポケット部74a~74dと下側のポケット部74a~74dのそれぞれに、Z方向(上下方向)に配置された2本の水平枠75のくさび部77a、77bのそれぞれが嵌め込まれている。
[lifting frame 70, guide pipes 81, 82]
8A is a perspective view of the vertical frame of the lifting frame 70, FIG. 8B is a plan view of the vertical frame of the lifting frame 70, and FIG. 8C is a perspective view of the horizontal frame of the lifting frame 70. In the figure, 71 is a vertical frame, 72 is a vertical pipe, 73a to 73d are pocket fittings, 74a to 74d are pocket portions, 75 is a horizontal frame, 76 is a horizontal pipe, and 77a and 77b are wedge portions.
As shown in FIGS. 1 to 4, the lift frame 70 consists of a pair of vertical frames 71 and two horizontal frames 75. As shown in FIGS.
The vertical frame 71 is a short strut used for wedge binding type scaffolding, and is composed of a vertical pipe 72 and pocket metal fittings 73a to 73d.
The pocket metal fittings 73a to 73d have a U-shaped horizontal cross section. Pocket portions 74a to 44d are formed between 73d and the circumferential surface of the vertical pipe 72. As shown in FIG.
The horizontal frame 75 is a handrail that is used in combination with the support of the wedge binding type scaffolding, and the horizontal pipe 76 is composed of wedge portions 77a, 77b and the like.
In the lift frame 70, a pair of vertical frames 71 are arranged side by side in the X direction (horizontal direction). , wedge portions 77a and 77b of two horizontal frames 75 arranged in the Z direction (vertical direction) are fitted.

案内パイプ81、82は、本第1発明における一対の垂直棒状部材となる長尺の金属製のパイプであり、間隔を空けてX方向(左右方向)に並べて配置され、先に組み立てられた足場部分の支柱等(図示せず)に固定される。
また、図1~図4に示すように、昇降フレーム70を構成する左側の垂直枠71の垂直パイプ72の上側を、昇降体固定箱30に固定されたクランプ50で挟持固定し、昇降フレーム70を構成する右側の垂直枠71の垂直パイプ72の上側を、昇降体固定箱40に固定されたクランプ60で挟持固定し、これにより、2個の昇降体20、昇降体固定箱30、40及び昇降フレーム70が一体となって、案内パイプ81、82に沿って昇降する。
The guide pipes 81 and 82 are long metal pipes that serve as a pair of vertical rod-like members in the first invention, and are arranged side by side in the X direction (horizontal direction) with a gap between them. It is fixed to a support post or the like (not shown) of the part.
Further, as shown in FIGS. 1 to 4, the upper side of the vertical pipe 72 of the left vertical frame 71 constituting the lifting frame 70 is clamped and fixed by the clamp 50 fixed to the lifting body fixing box 30, and the lifting frame 70 is fixed. The upper side of the vertical pipe 72 of the right vertical frame 71 constituting the The lifting frame 70 is integrally lifted along the guide pipes 81 and 82 .

[荷揚げシステム1の組立て]
図1~図4に示す荷揚げシステム1の組立てについて説明する。
まず、地面に立設されて足場を構成する2本の支柱等の一方に左側の案内パイプ81を取り付け、他方の支柱に右側の案内パイプ82を取り付ける。
次いで、昇降フレーム70の左右2本の垂直パイプ72に、昇降体20が固定された昇降体固定箱30、40をクランプ50、60で挟持固定する。
そして、昇降体20を案内パイプ81、82に通す(第1ボールベアリング22と第2ボールベアリング23の間に案内パイプ81、82が位置するようにする)。
この状態で吊り具10のフレーム板11の左右端部の穴11bと、昇降体固定箱30、40のアイボルト14のリング14aをシャックル14により連結する。
最後に、吊り上げ装置のフック部3を、吊り具10のフレーム板11の上部の穴11aに引っ掛ける。
これにより、吊り上げ装置により吊り具10が吊り上げられ、昇降体20が水平を保って案内パイプ81、82に沿った状態で、昇降体20、昇降体固定箱30、40及び昇降フレーム70が一体となって上昇する。
[Assembly of unloading system 1]
Assembly of the unloading system 1 shown in FIGS. 1 to 4 will be described.
First, the left guide pipe 81 is attached to one of two supports or the like erected on the ground to form a scaffold, and the right guide pipe 82 is attached to the other support.
Next, the lifting body fixing boxes 30 and 40 to which the lifting body 20 is fixed are clamped and fixed to the two vertical pipes 72 on the left and right of the lifting frame 70 by the clamps 50 and 60 .
Then, the lifting body 20 is passed through the guide pipes 81 and 82 (the guide pipes 81 and 82 are positioned between the first ball bearing 22 and the second ball bearing 23).
In this state, the holes 11b at the left and right ends of the frame plate 11 of the sling 10 and the rings 14a of the eyebolts 14 of the lifting body fixing boxes 30 and 40 are connected by the shackles 14. As shown in FIG.
Finally, the hook portion 3 of the lifting device is hooked to the hole 11a in the upper portion of the frame plate 11 of the lifting device 10. As shown in FIG.
As a result, the lifting device 10 is lifted by the lifting device, and the lifting body 20, the lifting body fixing boxes 30 and 40, and the lifting frame 70 are integrated together in a state in which the lifting body 20 is kept horizontal and along the guide pipes 81 and 82. rise.

[荷揚げシステム1による資材の運搬]
図9は、荷揚げシステム1(荷揚げ装置2)により運搬される資材の例を示した図で、図9(a)は、くさび緊結式足場に使用される長尺の支柱の斜視図、図9(b)は、足場に使用される踏板の斜視図であり、図において、91は支柱、92は垂直パイプ、93、94はポケット部、100は踏板である。
支柱91は、図9(a)に示すように、長尺の垂直パイプ92とポケット部93、94からなる。
ポケット部93、94は、本発明における緊結部となるもので、垂直枠71の垂直パイプ72のポケット金具73a~73dにより形成されるポケット部74a~74dと同じものである。
踏板100は、本発明における板状の資材となるもので、図9(b)に示すように、長方形状の枠に網が取り付けられ、枠の4隅にはブラケットや手摺に掛けるフックが取り付けられている。
なお、本発明における棒状資材は、上記のようなポケット部を有する支柱に限定されず、フランジ金具を有する支柱等であってもよく、その場合は、フランジ金具等が本発明における緊結部となる。
また、本発明における板状の資材は、踏板に限定されず、アンチ(布板)、足場板等であってもよい。
[Transportation of materials by unloading system 1]
Fig. 9 is a diagram showing an example of materials transported by the unloading system 1 (unloading device 2), Fig. 9(a) is a perspective view of a long strut used for a wedge-clamping scaffold, Fig. 9 (b) is a perspective view of a footboard used for scaffolding, in which reference numeral 91 denotes a post; 92, a vertical pipe; 93 and 94, pockets; and 100, a footboard.
The strut 91 consists of a long vertical pipe 92 and pocket portions 93 and 94, as shown in FIG. 9(a).
The pocket portions 93 and 94 serve as binding portions in the present invention, and are the same as the pocket portions 74a to 74d formed by the pocket fittings 73a to 73d of the vertical pipe 72 of the vertical frame 71. As shown in FIG.
The footboard 100 is a plate-shaped material in the present invention, and as shown in FIG. 9B, a net is attached to a rectangular frame, and brackets and hooks for hanging on handrails are attached to the four corners of the frame. It is
In addition, the rod-shaped material in the present invention is not limited to the post having the pocket portion as described above, and may be a post having a flange metal fitting. .
Further, the plate-like material in the present invention is not limited to the treads, and may be antis (cloth boards), scaffolding boards, and the like.

図10は、荷揚げ装置2の吊り具10に支柱91と踏板100を載せて運搬する状態を表した斜視図である。
図10に示すように、吊り具10のL字状部材12には、隣り合う水平部12aに跨って、支柱91のポケット部93が載置され(図では8本の支柱91がL字状部材12の水平部12aに載置され)、中央の逆への字状部材13には、踏板100の網部から逆への字状部材13の傾斜部が突出するようにして、水平部13aに踏板100が引っ掛けられている。
この場合、L字状部材12の垂直部12bにより、ポケット部93が水平部12aを滑って支柱91が落下するのが防止され、逆への字状部材13の傾斜部13bにより、踏板100が逆への字状部材13の水平部13aからずり落ちるのが防止される。
そして、吊り上げ装置により吊り具10を吊り上げると、昇降体20が案内パイプ81、82に沿って上昇し、昇降体固定箱30、40と昇降フレーム70も昇降体20と一体となって上昇し、吊り具10上の支柱91と踏板100が高所まで運搬される。
このとき、吊り具10は昇降体固定箱30、40に連結されているため、吊り具10に載せている棒状や板状の資材が風にあおられる等しても左右前後に揺れることがなく、資材を高所まで安定して運搬できて、資材等が落下する危険性が少ない。
また、昇降体固定箱30、40には昇降体20が取り付けられており、昇降体20が案内パイプ81、82に沿って上昇することから、吊り具10に棒状や板状の資材を載せて吊り上げても、吊り具10は円滑に安定して上昇し、資材等が落下する危険性が少ない。
その上、左右の昇降体固定箱30、40にはクランプ50、60により昇降フレーム70が取り付けられていることから、左右の昇降体固定箱30、40の水平が保たれ、吊り具10に棒状や板状の資材を載せて吊り上げても、左右のバランスがとれた状態で円滑に上昇する。
さらに、荷揚げ装置2には奥行きがなく、すなわち、吊り具10に載せた資材が前方に突出せず、運搬している資材等が落下しても、足場の外側に資材等が落下せず、作業者等に危害を加える危険性を最小限に止めるようにできる。
FIG. 10 is a perspective view showing a state in which the strut 91 and the footboard 100 are placed on the sling 10 of the unloading device 2 and transported.
As shown in FIG. 10, on the L-shaped member 12 of the sling 10, the pocket portions 93 of the struts 91 are placed across the adjacent horizontal portions 12a (in the figure, the eight struts 91 are L-shaped). The horizontal portion 12a of the member 12 is placed on the horizontal portion 12a of the member 12). The tread plate 100 is hooked on.
In this case, the vertical portion 12b of the L-shaped member 12 prevents the pocket portion 93 from slipping on the horizontal portion 12a and the post 91 from falling, and the sloped portion 13b of the inverted-shaped member 13 prevents the footboard 100 from falling. Slipping down from the horizontal portion 13a of the upside-down character-shaped member 13 is prevented.
When the lifting device 10 is lifted by the lifting device, the lifting body 20 rises along the guide pipes 81 and 82, and the lifting body fixing boxes 30 and 40 and the lifting frame 70 also rise together with the lifting body 20. The strut 91 and the footboard 100 on the sling 10 are carried to a high place.
At this time, since the hoisting device 10 is connected to the lifting body fixing boxes 30 and 40, even if the rod-shaped or plate-shaped material placed on the hoisting device 10 is swayed by the wind, it does not sway left and right and forward and backward. , materials can be stably transported to high places, and there is little risk of materials falling.
In addition, the lifting body 20 is attached to the lifting body fixing boxes 30 and 40, and the lifting body 20 rises along the guide pipes 81 and 82. Even when lifted, the hoisting tool 10 rises smoothly and stably, and there is little risk of the material or the like dropping.
In addition, since the lifting frames 70 are attached to the left and right lifting body fixing boxes 30 and 40 by the clamps 50 and 60, the left and right lifting body fixing boxes 30 and 40 are kept horizontal, and the sling 10 is attached to the rod-shaped lifting body fixing boxes 30 and 40. Even if a plate-shaped material is placed on it and lifted, it rises smoothly while keeping the right and left balance.
Furthermore, the unloading device 2 has no depth, that is, the materials placed on the sling 10 do not protrude forward, and even if the materials being transported fall, they do not fall outside the scaffolding. It is possible to minimize the risk of harming workers and the like.

[本第2発明の荷揚げ装置の全体構成]
図11は、本第2発明(請求項3に係る発明)の荷揚げ装置と、この荷揚げ装置を含む荷揚げシステム全体の構成を表した斜視図、図12は、図11の荷揚げシステムの平面図、図13は、図11の荷揚げシステムの正面図、図14は、図11の荷揚げシステムの背面図、図15は図11の荷揚げシステムの右側面図である。
図中、101は荷揚げシステム、102は荷揚げ装置、111は係合板、111a、111bは穴、111c、111dは窓部、120、130は吊り具、121、131はT字板、121a、131aは垂下片、122、132はL字状部材、122a、132aは水平部、122b、132bは垂直部、123、133は逆への字状部材、123a、133aは水平部、123b、133bは傾斜部、125、126、135、136は取付ボルト、125n、126n、135n、136nはナット、140は昇降フレーム、141、142は垂直枠、143、144は水平枠、150、160、170、180はクランプ、158、168、178、188はナットであり、各図において、Xは左右方向、Yは前後方向、Zは上下方向であり、図1~図4に示す荷揚げシステム1と同一のものには同一の符号を付す。
図に示すように、荷揚げシステム101は、荷揚げ装置102、フック部3を備えた吊り上げ装置、荷揚げ装置102の昇降を案内する案内パイプ81、82から構成され、本第2発明における吊り上げ機構の吊り部がフック部3となる。
また、荷揚げ装置102は、係合板111、吊り具120、130、シャックル14、昇降体20、昇降体固定箱30、40、クランプ50、60、昇降フレーム140から構成される。
[Overall Configuration of the Unloading Device of the Second Invention]
FIG. 11 is a perspective view showing the configuration of the loading device of the second invention (invention according to claim 3) and the entire loading system including this loading device, FIG. 12 is a plan view of the loading system of FIG. 13 is a front view of the unloading system of FIG. 11, FIG. 14 is a rear view of the unloading system of FIG. 11, and FIG. 15 is a right side view of the unloading system of FIG.
In the figure, 101 is a loading system, 102 is a loading device, 111 is an engaging plate, 111a and 111b are holes, 111c and 111d are windows, 120 and 130 are slings, 121 and 131 are T-shaped plates, 121a and 131a are Hanging pieces 122, 132 are L-shaped members, 122a, 132a are horizontal parts, 122b, 132b are vertical parts, 123, 133 are inverted-shaped members, 123a, 133a are horizontal parts, 123b, 133b are inclined parts , 125, 126, 135, 136 are mounting bolts, 125n, 126n, 135n, 136n are nuts, 140 is a lifting frame, 141, 142 are vertical frames, 143, 144 are horizontal frames, 150, 160, 170, 180 are clamps. , 158, 168, 178, and 188 are nuts, and in each figure, X is the left-right direction, Y is the front-rear direction, and Z is the vertical direction. The same symbols are attached.
As shown in the figure, the loading system 101 comprises a loading device 102, a lifting device having a hook portion 3, and guide pipes 81 and 82 for guiding the lifting and lowering of the loading device 102. The part becomes the hook part 3.
The unloading device 102 includes an engaging plate 111 , slings 120 and 130 , a shackle 14 , a lifting body 20 , lifting body fixing boxes 30 and 40 , clamps 50 and 60 and a lifting frame 140 .

[係合板111、吊り具120、130]
係合板111は、本第2発明の係合部材となるもので、本第1発明の荷揚げ装置2の係合板11と同様に略5角形であり、中央上部に吊り上げ装置のフック部3が引っ掛けられる穴111aが設けられ、左右端部にシャックル14のボルト14bの軸部が挿通する穴111bが設けられ、左右に窓部111c、111dが設けられ、鉄、アルミ等の金属材料、繊維強化プラスチック等からなる。
吊り具120は、T字板121とL字状部材122と逆への字状部材123からなり、吊り具130は、T字板131とL字状部材132と逆への字状部材133からなり、両吊り具とも鉄、アルミ等の金属材料、繊維強化プラスチック等からなる。
吊り具120と吊り具130は同一構造であり、両吊り具においては、T字板121、131の正面最上部に、X方向に等間隔で配置された8個のL字状部材122、132が取り付けられ、垂下片121a、131aの下端には、逆への字状部材123、133が取り付けられている。
L字状部材122、132は、吊り具10のL字状部材12と同様に、水平部122a、132aと垂直部122b、132bからなり、その間隔は、くさび緊結式足場に使用される支柱の外径より少し広くなっており、その支柱の周面に突出する緊結部がL字状部材122、132の水平部122a、132aに載置される。
また、逆への字状部材123、133は、吊り具10の逆への字状部材13と同様に、水平部123a、133aと傾斜部123b、133bからなり、これに踏板等の板状の資材が引っ掛けられる。
そして、吊り具120のT字板121の左右上部には、ボルト125、126が挿通するボルト穴が設けられ、吊り具130のT字板131の左右上部にも、ボルト135、136が挿通するボルト穴が設けられている。
なお、本第2発明の荷揚げ装置における吊り具は、吊り具120と吊り具130のような2個のT字板からなるものに限定されず、T字板121、131を一体化したT字板からなるものであってもよく、3個またはそれ以上のT字板からなるものであってもよい。
[Engaging plate 111, hangers 120 and 130]
The engaging plate 111 serves as the engaging member of the second aspect of the present invention, and is substantially pentagonal like the engaging plate 11 of the loading device 2 of the first aspect of the present invention. holes 111a are provided at the left and right ends thereof, holes 111b through which the shafts of the bolts 14b of the shackles 14 are inserted are provided, windows 111c and 111d are provided at the left and right, metal materials such as iron and aluminum, fiber reinforced plastics etc.
The hanger 120 consists of a T-shaped plate 121, an L-shaped member 122, and an inverted-shaped member 123. The hanger 130 consists of a T-shaped plate 131, an L-shaped member 132, and an inverted-shaped member 133. Both slings are made of metal materials such as iron and aluminum, fiber reinforced plastics, and the like.
The suspension tool 120 and the suspension tool 130 have the same structure. In both suspension tools, eight L-shaped members 122 and 132 are arranged at regular intervals in the X direction on the front uppermost part of the T-shaped plates 121 and 131. are attached, and reverse-vertical members 123, 133 are attached to the lower ends of the hanging pieces 121a, 131a.
The L-shaped members 122, 132 are composed of horizontal portions 122a, 132a and vertical portions 122b, 132b, similar to the L-shaped member 12 of the sling 10. The binding portion, which is slightly wider than the outer diameter and protrudes from the peripheral surface of the support, is placed on the horizontal portions 122a, 132a of the L-shaped members 122, 132, respectively.
Like the upside down member 13 of the sling 10, the upside down members 123, 133 are composed of horizontal portions 123a, 133a and inclined portions 123b, 133b. Materials are pulled.
Bolt holes through which bolts 125 and 126 are inserted are provided in the left and right upper portions of the T-shaped plate 121 of the lifting device 120, and the bolts 135 and 136 are also inserted through the left and right upper portions of the T-shaped plate 131 of the lifting device 130. Has bolt holes.
In addition, the hoisting tool in the cargo unloading device of the second invention is not limited to those consisting of two T-shaped plates such as the hoisting tool 120 and the hoisting tool 130. It may consist of a plate, or it may consist of three or more T-shaped plates.

[昇降フレーム140]
図11~図14に示すように、昇降フレーム140は、一対の垂直枠141、142、2本の水平枠143、144、クランプ150、160、170、180からなる。
垂直枠141、142は、短い金属製の垂直パイプからなり、荷揚げ装置2の昇降フレーム70の垂直枠71(くさび緊結式足場の支柱)とは異なり、周面にポケット金具のない一般的な垂直パイプである。
水平枠143、144は、短い金属製の水平パイプからなり、荷揚げ装置2の昇降フレーム70の水平枠75(くさび緊結式足場の手摺)とは異なり、両端にくさび部のない一般的な水平パイプである。
上側の水平枠143の左側部分には、T字板121のボルト穴が重なる位置にボルト穴が設けられ、取付ボルト125、126がT字板121と水平枠143に挿通され、取付ボルト125、126にナット125n、126nが螺合され、これにより、水平枠143の正面左側部分にT字板121が固定される。
同様に、水平枠143の右側部分には、T字板131のボルト穴が重なる位置にボルト穴が設けられ、取付ボルト135、136がT字板131と水平枠143に挿通され、取付ボルト135、136にナット135n、136nが螺合され、これにより、水平枠143の正面右側部分にT字板131が固定される。
また、上側の水平枠143の左右端部のクランプ150、160が重なる位置に、これらクランプの取付ボルトが挿通するボルト穴が設けられている。
同様に、下側の水平枠144の左右端部のクランプ170、180が重なる位置に、これらクランプの取付ボルトが挿通するホルト穴が設けられている。
クランプ150、160、170、180は、クランプ50と同一構造であり、クランプ50のクランプ本体51、クランプ片52、取付ボルト57等と同じクランプ本体、クランプ片、取付ボルト等を備えている(図7参照)。
[lifting frame 140]
As shown in FIGS. 11 to 14, the lift frame 140 consists of a pair of vertical frames 141, 142, two horizontal frames 143, 144, and clamps 150, 160, 170, 180. As shown in FIGS.
The vertical frames 141 and 142 are made of short metal vertical pipes, and unlike the vertical frame 71 of the lifting frame 70 of the unloading device 2 (the strut of the wedge binding type scaffolding), there is no pocket metal fitting on the peripheral surface. is a pipe.
The horizontal frames 143 and 144 are made of short metal horizontal pipes, and unlike the horizontal frame 75 (handrail of the wedge binding type scaffolding) of the lifting frame 70 of the unloading device 2, general horizontal pipes without wedges at both ends. is.
In the left portion of the upper horizontal frame 143, bolt holes are provided at positions where the bolt holes of the T-shaped plate 121 overlap. Nuts 125n and 126n are screwed to 126, thereby fixing the T-shaped plate 121 to the front left portion of the horizontal frame 143. As shown in FIG.
Similarly, on the right side of the horizontal frame 143, bolt holes are provided at positions where the bolt holes of the T-shaped plate 131 overlap. , 136 are screwed with nuts 135n and 136n, thereby fixing the T-shaped plate 131 to the front right portion of the horizontal frame 143. As shown in FIG.
Bolt holes through which mounting bolts for the clamps are inserted are provided at positions where the clamps 150 and 160 overlap on the left and right ends of the upper horizontal frame 143 .
Similarly, at positions where the clamps 170 and 180 overlap on the left and right ends of the lower horizontal frame 144, bolt holes are provided through which mounting bolts for these clamps are inserted.
The clamps 150, 160, 170, 180 have the same structure as the clamp 50, and include the same clamp body, clamp pieces, mounting bolts, etc. as the clamp body 51, clamp pieces 52, mounting bolts 57, etc. of the clamp 50 (Fig. 7).

[荷揚げシステム101の組立て]
図11~図15に示す荷揚げシステム101の組立てについて説明する。
まず、荷揚げシステム1と同様に、地面に立設されて足場を構成する2本の支柱等の一方に左側の案内パイプ81を取り付け、他方の支柱に右側の案内パイプ82を取り付ける。
次いで、昇降フレーム140の左右2本の垂直枠141、142の最上部付近に、昇降体20が固定された昇降体固定箱30、40をクランプ50、60で挟持固定する。
そして、荷揚げシステム1と同様に、昇降体20を案内パイプ81、82に通す(第1ボールベアリング22と第2ボールベアリング23の間に案内パイプ81、82が位置するようにする)。
この状態で係合板111の左右端部の穴111bと、昇降体固定箱30、40のアイボルト14のリング14aをシャックル14により連結する。
次いで、クランプ150、160の背面に、T字板121、131が固定された水平枠143の左右端部を当てがい、クランプ150、160の背面から外側に突出する取付ボルト(取付ボルト57と同じもの)を水平枠143の左右端部のボルト穴に挿通し、これらの取付ボルトにナット158、168を螺合し、クランプ150、160の背面に水平枠143を固定した状態で、左側の垂直枠141のクランプ50より下側をクランプ150で挟持固定し、右側の垂直枠142のクランプ50より下側をクランプ160で挟持固定する。
また、クランプ170、180の背面に水平枠144の左右端部を当てがい、クランプ170、180の背面から外側に突出する取付ボルト(取付ボルト57と同じもの)を水平枠144の左右端部のボルト穴に挿通し、これらの取付ボルトにナット178、188を螺合し、クランプ170、180の背面に水平枠144を固定した状態で、左側の垂直枠141の下側をクランプ170で挟持固定する。
[Assembly of unloading system 101]
Assembly of the unloading system 101 shown in FIGS. 11 to 15 will be described.
First, as in the unloading system 1, the left guide pipe 81 is attached to one of the two pillars standing on the ground to form a scaffold, and the right guide pipe 82 is attached to the other pillar.
Next, the lifting body fixing boxes 30 and 40 to which the lifting body 20 is fixed are sandwiched and fixed by clamps 50 and 60 near the uppermost portions of the left and right vertical frames 141 and 142 of the lifting frame 140 .
Then, similarly to the unloading system 1, the lifting body 20 is passed through the guide pipes 81 and 82 (the guide pipes 81 and 82 are positioned between the first ball bearing 22 and the second ball bearing 23).
In this state, the holes 111b at the left and right ends of the engaging plate 111 and the rings 14a of the eyebolts 14 of the lifting body fixing boxes 30 and 40 are connected by the shackles 14. As shown in FIG.
Next, the left and right ends of the horizontal frame 143 to which the T-plates 121 and 131 are fixed are applied to the rear surfaces of the clamps 150 and 160, and mounting bolts (same as the mounting bolts 57) protruding outward from the rear surfaces of the clamps 150 and 160 are applied. ) are inserted into the bolt holes at the left and right ends of the horizontal frame 143, nuts 158 and 168 are screwed onto these mounting bolts, and with the horizontal frame 143 fixed to the back of the clamps 150 and 160, the left vertical A clamp 150 clamps and fixes the frame 141 below the clamp 50 , and a clamp 160 clamps and fixes a right vertical frame 142 below the clamp 50 .
The left and right ends of the horizontal frame 144 are applied to the rear surfaces of the clamps 170 and 180, and mounting bolts (same as the mounting bolts 57) protruding outward from the rear surfaces of the clamps 170 and 180 are attached to the left and right ends of the horizontal frame 144. Nuts 178 and 188 are screwed onto these mounting bolts, and with the horizontal frame 144 fixed to the rear surface of the clamps 170 and 180, the lower side of the left vertical frame 141 is clamped and fixed by the clamp 170. do.

そして、クランプ150、160の背面に水平枠143を固定した状態で、左側の垂直枠141の上側をクランプ150で挟持固定し、右側の垂直枠142の上側をクランプ160で挟持固定し、また、クランプ170、180の背面に水平枠144を固定した状態で、左側の垂直枠141の最下部付近をクランプ170で挟持固定し、右側の垂直枠142の最下部付近をクランプ180で挟持固定する。
これにより、左右の垂直枠141、142と上下の水平枠143、144が、クランプ150、160、170、180により固定された昇降フレーム140が形成される。
最後に、吊り上げ装置のフック部3を、係合板111の上部の穴111aに引っ掛ける。
これにより、吊り上げ装置により係合板111が吊り上げられ、昇降体20が水平を保って案内パイプ81、82に沿った状態で、昇降体20、昇降体固定箱30、40及び吊り具120、130が取り付けられた昇降フレーム140が一体となって上昇する。
なお、本第2発明の荷揚げ装置における昇降フレームは、昇降フレーム140(一対の垂直枠141、142、2本の水平枠143、144及びクランプ150、160、170、180からなるもの)に限定されるものではなく、さらに、上側の水平枠143の中央部と下側の水平枠144の中央部を連結する連結棒を取り付け、また、垂直枠141、142に代えて、本第1発明の荷揚げ装置の昇降フレーム70に使用した垂直枠71のようなポケット金具のある垂直パイプを使用し、左右の垂直パイプを対向するポケット金具にくさび部を嵌め込んだ手摺で連結し、昇降フレームの剛性を高めるようにしてもよい。
Then, with the horizontal frame 143 fixed to the back surface of the clamps 150 and 160, the upper side of the left vertical frame 141 is clamped and fixed by the clamp 150, the upper side of the right vertical frame 142 is clamped and fixed by the clamp 160, and With the horizontal frame 144 fixed to the back surface of the clamps 170 and 180, the left vertical frame 141 near the bottom is clamped and fixed by the clamp 170, and the right vertical frame 142 near the bottom is clamped and fixed by the clamp 180. - 特許庁
As a result, the lift frame 140 in which the left and right vertical frames 141, 142 and the upper and lower horizontal frames 143, 144 are fixed by the clamps 150, 160, 170, 180 is formed.
Finally, the hook portion 3 of the lifting device is hooked into the hole 111a in the upper portion of the engaging plate 111. As shown in FIG.
As a result, the engaging plate 111 is lifted by the lifting device, and the lifting body 20, the lifting body fixing boxes 30, 40, and the lifting tools 120, 130 are lifted in a state in which the lifting body 20 is kept horizontal and along the guide pipes 81, 82. The attached elevating frame 140 rises together.
The lifting frame in the loading device of the second invention is limited to the lifting frame 140 (consisting of a pair of vertical frames 141, 142, two horizontal frames 143, 144, and clamps 150, 160, 170, 180). Instead, a connecting rod that connects the center part of the upper horizontal frame 143 and the center part of the lower horizontal frame 144 is attached, and instead of the vertical frames 141 and 142, the unloading of the first invention Vertical pipes with pocket metal fittings such as the vertical frame 71 used in the lifting frame 70 of the device are used, and the right and left vertical pipes are connected by handrails with wedges fitted in the opposing pocket metal fittings to increase the rigidity of the lifting frame. You can make it higher.

[荷揚げシステム101による資材の運搬]
図16は、荷揚げ装置102の吊り具20、30に支柱と踏板を載せて運搬する状態を表した斜視図であり、図において、191は支柱、192は垂直パイプ、193、194はポケット部、200は踏板である。
支柱191は、図9(a)に示す支柱91と同じ種類の支柱であり、長尺の垂直パイプ192とポケット部193、194からなる。
踏板200は、図9(b)示す踏板100と同じものである。
図16に示すように、吊り具120のL字状部材122には、隣り合う水平部122aに跨って、支柱191のポケット部193が載置され(図では4本の支柱191がL字状部材122の水平部122aに載置され)、中央の逆への字状部材123には、踏板200の網部から逆への字状部材123の傾斜部123bが突出するようにして、水平部123aに踏板200が引っ掛けられている。
同様に吊り具130のL字状部材132には、隣り合う水平部132aに跨って、支柱191のポケット部193が載置され(図では4本の支柱191がL字状部材122の水平部132aに載置され)、中央の逆への字状部材133には、踏板200の網部から逆への字状部材133の傾斜部133bが突出するようにして、水平部133aに踏板200が引っ掛けられている。
この場合、L字状部材122、132の垂直部122b、133bにより、ポケット部193が水平部122a、132aを滑って支柱191が落下するのが防止され、逆への字状部材123、133の傾斜部123b、133bにより、踏板200が逆への字状部材123、133の水平部123a、133aからずり落ちるのが防止される。
そして、吊り上げ装置により係合板111を吊り上げると、昇降体20が案内パイプ81、82に沿って上昇し、昇降体固定箱30、40と吊り具120、130が取り付けられた昇降フレーム140も昇降体20と一体となって上昇し、吊り具120、130上の支柱191と踏板200が高所まで運搬される。
[Transportation of materials by unloading system 101]
FIG. 16 is a perspective view showing a state in which the struts and footboards are placed on the slings 20 and 30 of the unloading device 102 and transported. 200 is a step board.
The strut 191 is of the same type as the strut 91 shown in FIG.
The footboard 200 is the same as the footboard 100 shown in FIG. 9(b).
As shown in FIG. 16, on the L-shaped member 122 of the sling 120, the pocket portions 193 of the struts 191 are placed across the adjacent horizontal portions 122a (in the figure, four struts 191 are L-shaped). The horizontal portion 122a of the member 122 is placed on the horizontal portion 122a of the member 122), and the inclined portion 123b of the inverted character-shaped member 123 protrudes from the mesh portion of the footboard 200 to the central inverted-character-shaped member 123. A footboard 200 is hooked on 123a.
Similarly, on the L-shaped member 132 of the hanger 130, the pocket portions 193 of the struts 191 are placed across the adjacent horizontal portions 132a (in the figure, the four struts 191 are the horizontal portions of the L-shaped member 122). 132a), and the tread plate 200 is placed on the horizontal portion 133a so that the inclined portion 133b of the tread plate 200 protrudes from the mesh portion of the tread plate 200 on the tread plate 133 in the center. is hooked.
In this case, the vertical portions 122b and 133b of the L-shaped members 122 and 132 prevent the pocket portion 193 from slipping on the horizontal portions 122a and 132a and the post 191 from falling. The inclined portions 123b and 133b prevent the footboard 200 from slipping off the horizontal portions 123a and 133a of the upside-down members 123 and 133, respectively.
Then, when the engaging plate 111 is lifted by the lifting device, the lifting body 20 rises along the guide pipes 81 and 82, and the lifting frame 140 to which the lifting body fixing boxes 30 and 40 and the hanging tools 120 and 130 are attached is also lifted. 20, and the struts 191 and the treads 200 on the slings 120 and 130 are transported to a high place.

このように、吊り具120、130は、水平枠143に固定された状態でクランプ150、160により垂直枠141、141に固定されて昇降フレーム140に取り付けられ、この昇降フレーム140が昇降体固定箱30、40が固定されて昇降するため、吊り具120、130に載せている棒状や板状の資材(支柱191、踏板200)が風にあおられる等しても左右前後に揺れることがなく、資材を高所まで安定して運搬できて、資材等が落下する危険性が少ない。
特に、吊り具120、130は、クランプ150、160により垂直枠141、141に固定されている水平枠143に固定されていることから、水平枠75に固定されない荷揚げ装置2の吊り具10比べて、より左右前後の揺れが防止される。
また、昇降体固定箱30、40には昇降体20が取り付けられており、昇降体20が案内パイプ81、82に沿って上昇することから、吊り具120、130に棒状や板状の資材を載せて吊り上げても、吊り具120、130は円滑に安定して上昇し、資材等が落下する危険性が少ない。
その上、吊り具120、130は昇降フレーム140の水平枠143に取り付けられていることから、その水平が保たれ、吊り具120、130に棒状や板状の資材を載せて吊り上げても、左右のバランスがとれた状態で円滑に上昇する。
さらに、荷揚げ装置102には奥行きがなく、すなわち、吊り具120、130に載せた資材が前方に突出せず、運搬している資材等が落下しても、足場の外側に資材等が落下せず、作業者等に危害を加える危険性を最小限に止めるようにできる。
In this way, the slings 120 and 130 are fixed to the vertical frames 141 and 141 by the clamps 150 and 160 while being fixed to the horizontal frame 143, and attached to the lifting frame 140. The lifting frame 140 is attached to the lifting body fixing box. Since the 30 and 40 are fixed and lifted, even if the rod-shaped or plate-shaped materials (posts 191 and treads 200) placed on the slings 120 and 130 are blown by the wind, they do not sway from side to side and back and forth. Materials can be stably transported to high places, and there is little risk of materials falling.
In particular, since the hoisting devices 120 and 130 are fixed to the horizontal frame 143 which is fixed to the vertical frames 141 and 141 by the clamps 150 and 160, compared to the hoisting devices 10 of the unloading device 2 which are not fixed to the horizontal frame 75, , the rocking in the left-right and back-and-forth directions is prevented.
In addition, since the lifting body 20 is attached to the lifting body fixing boxes 30 and 40, and the lifting body 20 rises along the guide pipes 81 and 82, rod-shaped or plate-shaped materials are attached to the hanging tools 120 and 130. Even if it is put on and lifted, the hoisting tools 120 and 130 rise smoothly and stably, and there is little risk of the material or the like dropping.
In addition, since the hoisting tools 120 and 130 are attached to the horizontal frame 143 of the elevating frame 140, the horizontality of the hoisting tools 120 and 130 is maintained. is balanced and rises smoothly.
Furthermore, the unloading device 102 has no depth, that is, the materials placed on the slings 120 and 130 do not protrude forward, and even if the materials being transported fall, they do not fall outside the scaffolding. It is possible to minimize the risk of harming workers, etc.

本発明の荷揚げ装置は、体積の大きい箱型の重量体を使用せず、装置が大掛かりになることなく、資材を載置しても、左右前後に揺れることなく資材を高所まで安定して運搬できて、資材等が落下する危険性が少なく、また、運搬している資材等が落下しても、足場の外側に資材等を落下させないようにし、作業者等に危害を加える危険性を最小限に止めるように、足場を組み立てるのに使用される資材を高所まで運搬するのに利用できる。 The unloading device of the present invention does not use a box-shaped weight body with a large volume, does not make the device large-scale, and even if the material is placed, it can stably hold the material up to a high place without swaying left and right and back and forth. It can be transported, and there is little danger of materials, etc. falling, and even if materials, etc. being transported fall, the materials, etc. will not fall outside the scaffold, and the danger of harming workers, etc. It can be used to carry the materials used to construct the scaffolding up to a height to keep it to a minimum.

1 荷揚げシステム
2 荷揚げ装置
3 吊り上げ装置のフック部
10 吊り具
11 係合板
11a、11b 穴
11c、11d 窓部
11e 垂下片
12 L字状部材
12a 水平部
12b 垂直部
13 逆への字状部材
13a 水平部、
13b 傾斜部
14 シャックル
14a リング部
14b ボルト
14c ナット
20 昇降体
21 フレーム
21a フレーム本体
21b 端部
21c リング部
21d 穴
22 第1ボールベアリング
23 第2ボールベアリング
24 割りピン
25 固定ボルト
26 ナット
30 昇降体固定箱
31 箱枠体
31a 上面板
31b 正面板
31c 側面板
31d 底面板
11e 縦枠
32 アイボルト
32a リング
32b 軸部
32c ナット
32d 座金
30 昇降体固定箱
50 クランプ
51 クランプ本体
52 クランプ片
53、54 ピン
55 締付ボルト
56 ナット、
57 取付ボルト、
58 ナット
60 クランプ
70 昇降フレーム
71 垂直枠
72 垂直パイプ
73a~73d ポケット金具
74a~74d ポケット部
75 水平枠
76 水平パイプ
77a、77b くさび部
81、82 案内パイプ
91 支柱
92 垂直パイプ
93、94 ポケット部
100 踏板
101 荷揚げシステム
102 荷揚げ装置
111 係合板
111a、111b 穴
111c、111d 窓部
120、130 吊り具
121、131 T字板
121a、131a 垂下片
122、132 L字状部材
122a、132a 水平部
122b、132b 垂直部
123、133 逆への字状部材
123a、133a 水平部
123b、133b 傾斜部
125、126、135、136 取付ボルト
125n、126n、135n、136n ナット
140 昇降フレーム
141、142 垂直枠
143、144 水平枠
150、160、170、180 クランプ
158、168、178、188 ナット
191 支柱
192 垂直パイプ
193、194 ポケット部
200 踏板
GA 間隙部
1 unloading system 2 unloading device 3 hook portion 10 of hoisting device hoisting tool 11 engaging plates 11a, 11b holes 11c, 11d window portion 11e hanging piece 12 L-shaped member 12a horizontal portion 12b vertical portion 13 reverse-shaped member 13a horizontal part,
13b inclined portion 14 shackle 14a ring portion 14b bolt 14c nut 20 lifting body 21 frame 21a frame main body 21b end portion 21c ring portion 21d hole 22 first ball bearing 23 second ball bearing 24 split pin 25 fixing bolt 26 nut 30 lifting body fixing Box 31 Box frame 31a Top plate 31b Front plate 31c Side plate 31d Bottom plate 11e Vertical frame 32 Eyebolt 32a Ring 32b Shaft 32c Nut 32d Washer 30 Lifting body fixing box 50 Clamp 51 Clamp body 52 Clamp piece 53, 54 Pin 55 Tightening attached bolt 56 nut,
57 mounting bolts,
58 Nut 60 Clamp 70 Lifting frame 71 Vertical frame 72 Vertical pipes 73a to 73d Pocket fittings 74a to 74d Pocket portion 75 Horizontal frame 76 Horizontal pipes 77a, 77b Wedge portions 81, 82 Guide pipe 91 Post 92 Vertical pipes 93, 94 Pocket portion 100 Footboard 101 Unloading system 102 Unloading device 111 Engaging plates 111a, 111b Holes 111c, 111d Windows 120, 130 Hanging tools 121, 131 T-shaped plates 121a, 131a Hanging pieces 122, 132 L-shaped members 122a, 132a Horizontal parts 122b, 132b Vertical portions 123, 133 Upside-down members 123a, 133a Horizontal portions 123b, 133b Inclined portions 125, 126, 135, 136 Mounting bolts 125n, 126n, 135n, 136n Nuts 140 Lifting frames 141, 142 Vertical frames 143, 144 Horizontal Frames 150, 160, 170, 180 Clamps 158, 168, 178, 188 Nut 191 Post 192 Vertical pipes 193, 194 Pocket 200 Footboard GA Gap

Claims (6)

吊り上げ機構を使用して、外側に突出する突出部が周面に設けられた棒状資材を運搬する荷揚げ装置であって、
前記吊り上げ機構の吊り部に係合する係合部材と該係合部材に取り付けられて前記棒状資材の前記突出部を載せる複数の棒状資材載置部材とを備えた吊り具と、
間隔を空けて配置された一対の垂直棒状部材に沿って昇降する一対の昇降体と、
前記一対の昇降体の各々を固定する一対の昇降体固定部材と、
前記吊り具と前記一対の昇降体固定部材とを連結する連結具と、
前記一対の昇降体が水平を保って前記一対の垂直棒状部材に沿って昇降するように前記一対の昇降体固定部材を保持する昇降フレームと
を備えたことを特徴とする荷揚げ装置。
A lifting device that uses a lifting mechanism to transport a rod-shaped material having a protrusion that protrudes outward on the peripheral surface,
a lifting tool comprising: an engaging member that engages with the hanging portion of the lifting mechanism;
a pair of elevating bodies that ascend and descend along a pair of spaced apart vertical bar-shaped members;
a pair of lifting body fixing members for fixing each of the pair of lifting bodies;
a connector that connects the hanging device and the pair of lifting body fixing members;
and a lifting frame that holds the pair of lifting body fixing members so that the pair of lifting bodies are kept horizontal and moved up and down along the pair of vertical bar members.
前記昇降フレームは、前記一対の昇降体固定部材に固定される一対の垂直枠と、該一対の垂直枠に掛け渡された水平枠を備えていることを特徴とする請求項1記載の荷揚げ装置。 2. The unloading apparatus according to claim 1, wherein the lifting frame comprises a pair of vertical frames fixed to the pair of lifting body fixing members, and a horizontal frame spanned between the pair of vertical frames. . 吊り上げ機構を使用して、外側に突出する突出部が周面に設けられた棒状資材を運搬する荷揚げ装置であって、
前記吊り上げ機構の吊り部に係合する係合部材と、
間隔を空けて配置された一対の垂直棒状部材に沿って昇降する一対の昇降体と、
前記一対の昇降体の各々を固定する一対の昇降体固定部材と、
前記係合部材と前記一対の昇降体固定部材とを連結する連結具と、
前記一対の昇降体が水平を保って前記一対の垂直棒状部材に沿って昇降するように前記一対の昇降体固定部材を保持する昇降フレームと、
前記昇降フレームに取り付けられて前記棒状資材の前記突出部を載せる複数の棒状資材載置部材を備えた吊り具と
を備えたことを特徴とする荷揚げ装置。
A lifting device that uses a lifting mechanism to transport a rod-shaped material having a protrusion that protrudes outward on the peripheral surface,
an engaging member that engages with the suspension portion of the lifting mechanism;
a pair of elevating bodies that ascend and descend along a pair of spaced apart vertical bar-shaped members;
a pair of lifting body fixing members for fixing each of the pair of lifting bodies;
a connector that connects the engaging member and the pair of lifting body fixing members;
an elevating frame that holds the pair of elevating body fixing members so that the pair of elevating bodies are maintained horizontal and ascends and descends along the pair of vertical bar-shaped members;
A lifting device comprising a plurality of rod-shaped material placing members attached to the lifting frame and on which the projecting portions of the rod-shaped materials are placed.
前記昇降フレームは、前記一対の昇降体固定部材に固定される一対の垂直枠を有し、前記吊り具は、前記一対の垂直枠に固定されていることを特徴とする請求項3記載の荷揚げ装置。 4. Unloading according to claim 3, characterized in that said elevating frame has a pair of vertical frames fixed to said pair of elevating body fixing members, and said sling is fixed to said pair of vertical frames. Device. 前記棒状資材は、くさび緊結式足場に使用される支柱であり、
前記突出部は、前記支柱に取り付けられた緊結部であり、
前記棒状資材載置部材は、前記支柱の外径より広い間隔で配置されたL字状部材であることを特徴とする請求項1乃至請求項4のいずれかに記載した荷揚げ装置。
The rod-shaped material is a support used for a wedge binding scaffold,
The protruding portion is a binding portion attached to the support,
5. The unloading device according to claim 1, wherein the rod-shaped material placement members are L-shaped members arranged at intervals wider than the outer diameter of the support columns.
前記吊り具は、板状の資材を引っ掛ける板状資材引掛け部材を備えていることを特徴とする請求項1乃至請求項5のいずれかに記載した荷揚げ装置。 The unloading device according to any one of claims 1 to 5, wherein the hoisting device includes a plate-like material hooking member for hooking the plate-like material.
JP2022027217A 2022-02-24 2022-02-24 Unloading device Pending JP2023123249A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022027217A JP2023123249A (en) 2022-02-24 2022-02-24 Unloading device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022027217A JP2023123249A (en) 2022-02-24 2022-02-24 Unloading device

Publications (1)

Publication Number Publication Date
JP2023123249A true JP2023123249A (en) 2023-09-05

Family

ID=87885811

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022027217A Pending JP2023123249A (en) 2022-02-24 2022-02-24 Unloading device

Country Status (1)

Country Link
JP (1) JP2023123249A (en)

Similar Documents

Publication Publication Date Title
US9506267B2 (en) Method for supporting an upstanding mast
JP6017083B1 (en) Floor slab unit, floor slab construction method, and floor construction method
US20100230559A1 (en) Gantry device for use in the assembly or maintenance of heavy parts of a travelling device
JP2023123249A (en) Unloading device
JP7145499B2 (en) hanger
JP7241154B2 (en) MOVEMENT SYSTEMS, METHODS FOR MOVEMENT OF ARTICLES, AND RELATED COMPONENTS
JP2003135613A (en) Safety device for high lift work, and method for high lift work
JP3397733B2 (en) Elevator
CN210885075U (en) Equipment secondary transportation and hoist and mount frame of taking one's place
JP2008031667A (en) Funnel-shaped protective shelf device
JP3059899B2 (en) Elevator lifting equipment
JP7489108B2 (en) Formwork hanging jig
CN220150820U (en) Fitment moving platform
AU2007100972A4 (en) Improvements to transportable lifting devices
CN220245327U (en) Hoisting bracket
CN216917265U (en) Motor underlying type elevator loading platform
CN220282304U (en) Frame box and conveyer
JPH0317350A (en) Scaffold for building structure
JP7192708B2 (en) lifting body support
JP7314465B2 (en) Conveyor
JP2833688B2 (en) Glass plate mounting table
JPH09221858A (en) Fitting method and device for curtain wall
KR20130020382A (en) Hoist jig of bollard
JPH04153460A (en) Constructing method for building, and its equipment
JP2007275345A (en) Knockdown frame body apparatus for loading platform