JP2023027949A - Program, information processing device, and method - Google Patents

Program, information processing device, and method Download PDF

Info

Publication number
JP2023027949A
JP2023027949A JP2021133326A JP2021133326A JP2023027949A JP 2023027949 A JP2023027949 A JP 2023027949A JP 2021133326 A JP2021133326 A JP 2021133326A JP 2021133326 A JP2021133326 A JP 2021133326A JP 2023027949 A JP2023027949 A JP 2023027949A
Authority
JP
Japan
Prior art keywords
project
information
report
budget
user
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2021133326A
Other languages
Japanese (ja)
Inventor
祥 竹田
Sho Takeda
茂樹 増田
Shigeki Masuda
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Freee KK
Original Assignee
Freee KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Freee KK filed Critical Freee KK
Priority to JP2021133326A priority Critical patent/JP2023027949A/en
Publication of JP2023027949A publication Critical patent/JP2023027949A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

To provide a technique for presenting a budget/actual management report and a landing forecast report for project management.SOLUTION: A server 20 of a project management system 1 comprises, as its functions, a project schedule acquisition module 2033 that acquires schedule information including project budgets and scheduled man-hours, a project performance acquisition module 2034 that acquires performance information including project budget consumption and actual man-hours, a budget/actual management report generating/updating module 2035 for generating a budget/actual management report showing the actual performance against the project schedule based on the project schedule information and the project performance information, and a landing prediction report generation update module 2037 that generates a landing prediction report indicating the prediction of the transition of the project in the future based on the project schedule information and the project performance information.SELECTED DRAWING: Figure 3

Description

本開示は、プログラム、情報処理装置及び方法に関する。 The present disclosure relates to programs, information processing apparatuses, and methods.

特定の企業等を対象とするコンサルティングや、アプリケーションプログラムやシステム等を構築する案件のような、いわゆるプロジェクト型ビジネスでは、人件費を売上と突合させて収支を把握し、プロジェクトの進行状況を把握するための予実管理が行われている。 In so-called project-type businesses, such as consulting for specific companies and projects to build application programs and systems, labor costs are matched with sales to understand the income and expenditure, and to understand the progress of the project. For this reason, budget and actual management is being carried out.

このようなプロジェクト管理を行うための技術として、特許文献1には、プロジェクト最終コストの予測値を算出するシステムについての技術が開示されている。 As a technique for performing such project management, Patent Literature 1 discloses a technique for a system for calculating a predicted final cost of a project.

特開2012-238049号公報JP 2012-238049 A

ところで、プロジェクト管理を適切に行うためには、プロジェクトの進行状況を把握するだけではなく、プロジェクトの推移から予想される着地予想を適切に管理する必要がある。上記の特許文献1に記載のシステムでも、プロジェクト最終コストの予測値を算出することが可能であるが、進捗状況等の情報更新に対応したリアルタイムな管理が可能な機能が求められていた。 By the way, in order to properly manage a project, it is necessary not only to grasp the progress of the project, but also to appropriately manage the forecasted results based on the progress of the project. Although the system described in Patent Literature 1 can also calculate the estimated value of the final project cost, there has been a demand for a function capable of real-time management corresponding to information updates such as the progress status.

そこで、本開示では、進捗状況のような実績情報を取得し、取得した情報に基づいてリアルタイムに情報を更新して、プロジェクト管理のための予実管理レポート及び着地予想レポートを提示することを可能にする技術について説明する。 Therefore, in the present disclosure, it is possible to acquire performance information such as progress, update information in real time based on the acquired information, and present a budget/actual management report and a landing forecast report for project management. We will explain the technology to

本開示の一実施形態によると、プロセッサと、メモリとを備えるコンピュータに実行させ、ユーザの事業に係るプロジェクトの遂行を支援するためのプログラムが提供される。メモリには、プロジェクトの予定情報が登録される。プログラムは、プロセッサに、プロジェクトに従事する要員が、プロジェクトに従事した実績情報を取得するステップと、プロジェクトの予定情報と、取得したプロジェクトの実績情報とに基づき、プロジェクトの予定に対する実績を示す予実管理レポートを生成し、ユーザに提示するステップと、プロジェクトの予定情報と、取得したプロジェクトの実績情報とに基づき、将来におけるプロジェクトの推移予想を示す着地予想レポートを生成し、ユーザに提示するステップと、予実管理レポート及び着地予想レポートの生成後において、取得したプロジェクトの実績情報及びプロジェクトの予定情報に対する変更情報に基づき、予実管理レポート及び着地予想レポートを更新するステップと、を実行させる。 According to one embodiment of the present disclosure, there is provided a program that is executed by a computer that includes a processor and a memory to assist a user in executing a business project. Project schedule information is registered in the memory. The program instructs the processor to acquire performance information of the personnel engaged in the project, and budget/actual management indicating performance against the schedule of the project based on the schedule information of the project and the acquired performance information of the project. a step of generating a report and presenting it to the user; a step of generating and presenting to the user a forecast report showing future progress of the project based on the project schedule information and the acquired project performance information; After generating the budget/actual management report and the forecasted landing report, updating the forecasted/actual management report and the forecasted landing report based on the obtained project performance information and change information for the project schedule information.

本開示の一実施形態によると、制御部と、記憶部とを備え、ユーザの事業に係るプロジェクトの遂行を支援する情報処理装置が提供される。記憶部には、プロジェクトの予定情報が登録される。制御部は、プロジェクトに従事する要員が、プロジェクトに従事した実績情報を取得するステップと、プロジェクトの予定情報と、取得したプロジェクトの実績情報とに基づき、プロジェクトの予定に対する実績を示す予実管理レポートを生成し、ユーザに提示するステップと、プロジェクトの予定情報と、取得したプロジェクトの実績情報とに基づき、将来におけるプロジェクトの推移予想を示す着地予想レポートを生成し、ユーザに提示するステップと、予実管理レポート及び着地予想レポートの生成後において、取得したプロジェクトの実績情報及びプロジェクトの予定情報に対する変更情報に基づき、予実管理レポート及び着地予想レポートを更新するステップと、を実行する。 According to an embodiment of the present disclosure, an information processing device is provided that includes a control unit and a storage unit and supports execution of a project related to a user's business. Project schedule information is registered in the storage unit. The control unit prepares a budget/actual management report indicating the results of the project schedule based on the step of acquiring performance information of the personnel engaged in the project, the project schedule information, and the acquired project performance information. a step of generating and presenting it to a user; a step of generating and presenting to a user a landing forecast report showing a forecast of the future transition of the project based on the project schedule information and the acquired project performance information; After generating the report and the forecasted landing report, updating the forecast/actual management report and the forecasted landing report based on the acquired project performance information and change information for the project schedule information.

また、本開示の一実施形態によると、プロセッサと、メモリとを備えるコンピュータに実行され、ユーザの事業に係るプロジェクトの遂行を支援するための方法が提供される。メモリには、プロジェクトの予定情報が登録される。方法は、プロセッサが、プロジェクトに従事する要員が、プロジェクトに従事した実績情報を取得するステップと、プロジェクトの予定情報と、取得したプロジェクトの実績情報とに基づき、プロジェクトの予定に対する実績を示す予実管理レポートを生成し、ユーザに提示するステップと、プロジェクトの予定情報と、取得したプロジェクトの実績情報とに基づき、将来におけるプロジェクトの推移予想を示す着地予想レポートを生成し、ユーザに提示するステップと、予実管理レポート及び着地予想レポートの生成後において、取得したプロジェクトの実績情報及びプロジェクトの予定情報に対する変更情報に基づき、予実管理レポート及び着地予想レポートを更新するステップと、を実行する。 Also according to one embodiment of the present disclosure, there is provided a method, executed by a computer having a processor and a memory, for assisting a user in accomplishing a business project. Project schedule information is registered in the memory. The method includes a step of acquiring performance information of personnel engaged in the project in the project, and budget/actual management showing performance against the schedule of the project based on the schedule information of the project and the acquired performance information of the project. a step of generating a report and presenting it to the user; a step of generating and presenting to the user a forecast report showing future progress of the project based on the project schedule information and the acquired project performance information; After generating the budget/actual management report and the forecasted landing report, updating the forecasted/actual management report and the forecasted landing report based on the obtained project performance information and change information for the project schedule information.

本開示によれば、プロジェクトの予定情報とプロジェクトの実績情報とに基づき、予実管理レポート及び着地予想レポートを生成し、変更情報に基づいて更新する。そのため、リアルタイムな予実管理レポート及び着地予想レポートをユーザに提示することが可能になる。これにより、より正確なプロジェクトの状況把握が可能になる。 According to the present disclosure, a budget/actual management report and a landing forecast report are generated based on project schedule information and project performance information, and updated based on change information. Therefore, it is possible to present a real-time forecast/actual management report and a landing forecast report to the user. This allows for a more accurate understanding of the project status.

実施の形態1のプロジェクト管理システム1の全体の構成を示す図である。1 is a diagram showing the overall configuration of a project management system 1 according to Embodiment 1; FIG. 実施の形態1のプロジェクト管理システム1を構成する端末装置10の機能的な構成を示すブロック図である。2 is a block diagram showing a functional configuration of a terminal device 10 that constitutes the project management system 1 of Embodiment 1; FIG. 実施の形態1のプロジェクト管理システム1を構成するサーバ20の機能的な構成を示す図である。2 is a diagram showing a functional configuration of a server 20 that constitutes the project management system 1 of Embodiment 1; FIG. サーバ20が記憶するプロジェクト予定データベース2021、ユーザデータベース2022のデータ構造の例を示す図である。3 is a diagram showing an example of the data structure of a project schedule database 2021 and a user database 2022 stored by the server 20. FIG. サーバ20が記憶するプロジェクト実績データベース2023のデータ構造の例を示す図である。FIG. 4 is a diagram showing an example of the data structure of a project performance database 2023 stored by the server 20; 実施の形態1のプロジェクト管理システム1によるプロジェクト予定登録処理を行う流れの一例を示すフローチャートである。4 is a flow chart showing an example of the flow of project schedule registration processing by the project management system 1 of Embodiment 1. FIG. 実施の形態1のプロジェクト管理システム1によるレポート作成処理を行う流れの一例を示すフローチャートである。4 is a flow chart showing an example of the flow of report creation processing by the project management system 1 of Embodiment 1. FIG. 端末装置10に表示する予実管理レポートの画面例を示す図である。6 is a diagram showing an example screen of a budget/actual management report displayed on the terminal device 10. FIG. 端末装置10に表示する推移予想レポートの画面例を示す図である。6 is a diagram showing a screen example of a transition prediction report displayed on the terminal device 10. FIG.

以下、図面を参照しつつ、本開示の実施の形態について説明する。以下の説明では、同一の部品には同一の符号を付してある。それらの名称及び機能も同じである。従って、それらについての詳細な説明は繰り返さない。 Hereinafter, embodiments of the present disclosure will be described with reference to the drawings. In the following description, the same parts are given the same reference numerals. Their names and functions are also the same. Therefore, a detailed description thereof will not be repeated.

<概要>
以下、本開示に係るプロジェクト管理システムについて説明する。このプロジェクト管理システムは、特定の企業等を対象とするコンサルティングや、アプリケーションプログラムやシステム等を構築する案件のような、1または複数の企業等の事業者における、いわゆるプロジェクト型ビジネスにおいて使用されるシステムである。この工数管理システムは、プロジェクト策定時に算出、承認された予算と、実績(消化工数)とから、プロジェクトの遂行状況を把握する目的で予実管理を行うためのシステムである。
<Overview>
A project management system according to the present disclosure will be described below. This project management system is a system used in so-called project-type business, such as consulting for specific companies, etc., and projects for building application programs, systems, etc., by operators such as one or more companies. is. This man-hour management system is a system for performing budget and actual management for the purpose of grasping the progress of a project based on the budget calculated and approved at the time of project formulation and actual results (man-hours consumed).

本開示に係るプロジェクト管理システムは、上記のように企業等におけるプロジェクト管理を行う機能を単独で提供するシステムに限られず、1または複数の事業者に係る会計処理全般のサービスを提供するシステムであってもよい。例えば、プロジェクトにおける人件費や各種購買等の費用、入出金の情報を仕訳として生成して会計処理を行う機能も備えた会計サービスを提供するシステムとして提供してもよい。また、本開示に係るプロジェクト管理システムは、例えばクラウドサーバ等によりWebサービスとして、いわゆるSaaS(Software as a Service)によって提供されるシステムであり、管理対象であるプロジェクトに従事する要員が所定の認証によりアクセス可能に構成されている。 The project management system according to the present disclosure is not limited to a system that independently provides functions for managing projects in companies, etc. as described above, but is a system that provides general accounting processing services related to one or more business operators. may For example, the system may be provided as a system that provides an accounting service having a function of generating journal entries for labor costs, various purchase costs, and deposit/withdrawal information in a project and performing accounting processing. In addition, the project management system according to the present disclosure is a system provided by so-called SaaS (Software as a Service) as a Web service by, for example, a cloud server or the like. configured to be accessible.

上記のようなプロジェクト型ビジネスでは、プロジェクト全体の予算があらかじめ決定され、その予算を所定の期間内で消化するのでその消化率を把握する必要がある。さらに、実際のプロジェクトの進行状況も把握する必要がある。本開示に係るプロジェクト管理システムは、例えば、人件費のもとになる、プロジェクトに参画しているメンバー(特定の企業内メンバーに限られず、業務委託や派遣等により参画する他社のメンバーが含まれてもよい。)の工数からプロジェクト全体の消化工数を算出し、予算の消化状況を把握するためのシステムである。なお、工数とは、例えば、1人の者が1か月の間に作業可能な作業量を1人月として見積もり、プロジェクトの予算を策定する際に必要な作業量を見積もる際に使用するものであるが、人月単位の工数とは限られず、作業時間単位でもよい。 In the project type business as described above, the budget for the entire project is determined in advance, and the budget is consumed within a predetermined period, so it is necessary to grasp the consumption rate. In addition, it is necessary to grasp the progress of the actual project. The project management system according to the present disclosure, for example, includes members participating in the project (not limited to members within a specific company, but also members of other companies who participate by outsourcing or dispatching, etc.), which is the source of personnel expenses. It is a system for calculating the man-hours for the entire project from the man-hours for the project, and for grasping the state of budget consumption. The number of man-hours is, for example, the amount of work that one person can do in a month, which is estimated as one person-month, and is used when estimating the amount of work required when formulating a project budget. However, the number of man-hours is not limited to man-month units, and may be work hour units.

そのため、本開示に係るプロジェクト管理システムは、プロジェクトの予算や予定工数を含む予定情報と、プロジェクトの予算消化や実績工数を含む実績情報とに基づき、プロジェクトの予定に対する実績を示す予実管理レポートを生成する。この予実管理レポートは、当該プロジェクトのある時点での予定と実績とを対比可能に表示したものであり、プロジェクト全体、特定の要員等について表示可能に構成され、予算の消化状況を一目で把握することが可能な構成となっている。 Therefore, the project management system according to the present disclosure generates a budget/actual management report that shows the results against the project schedule based on the schedule information including the project budget and scheduled man-hours, and the actual information including the budget consumption and actual man-hours of the project. do. This budget/actual management report displays the schedule and actual performance of the project at a certain point in time so that it can be compared, and is configured so that the entire project, specific personnel, etc. can be displayed, and the budget consumption status can be grasped at a glance. It has a configuration that allows

また、本開示に係るプロジェクト管理システムは、プロジェクトの予算や予定工数を含む予定情報と、プロジェクトの予算消化や実績工数を含む実績情報とに基づき、将来におけるプロジェクトの推移予想を示す着地予想レポートを生成する。この着地予想レポートは、当該プロジェクトの実績の情報と、当該プロジェクトの将来予測の情報とを時系列の推移として表示したものであり、プロジェクトの着地状況を一目で把握することが可能な構成となっている。 In addition, the project management system according to the present disclosure generates a forecast report that shows the future transition forecast of the project based on the schedule information including the project budget and scheduled man-hours and the actual information including the budget consumption and actual man-hours of the project. Generate. This forecast report displays the information on the actual results of the project and the information on the future forecast of the project in chronological order. ing.

さらに、本開示に係るプロジェクト管理システムは、プロジェクトの予算消化や実績工数を含む実績情報が新たに入力されることにより、予実管理レポート及び着地予想レポートを更新する。 Furthermore, the project management system according to the present disclosure updates the budget/actual management report and the landing forecast report by newly inputting performance information including project budget consumption and actual man-hours.

上記のような構成により、リアルタイムな予実管理レポート及び着地予想レポートをユーザに提示することを可能にしている。 With the configuration as described above, it is possible to present a real-time forecast management report and landing prediction report to the user.

<第1の実施の形態>
以下、プロジェクト管理システム1について説明する。以下の説明では、例えば、端末装置10がサーバ20へアクセスすることにより、サーバ20が、端末装置10で画面を生成するための情報を応答する。端末装置10は、サーバ20から受信した情報に基づいて画面を生成し表示する。
<First Embodiment>
The project management system 1 will be described below. In the following description, for example, when the terminal device 10 accesses the server 20 , the server 20 responds with information for generating a screen on the terminal device 10 . The terminal device 10 generates and displays a screen based on information received from the server 20 .

<1 プロジェクト管理システム1の全体構成>
図1は、実施の形態1のプロジェクト管理システム1の全体の構成を示す図である。図1に示すように、プロジェクト管理システム1は、複数の端末装置(図1では、端末装置10A及び端末装置10Bを示している。以下、総称して「端末装置10」ということもある)と、サーバ20とを含む。端末装置10とサーバ20とは、ネットワーク80を介して相互に通信可能に接続されている。ネットワーク80は、有線または無線ネットワークにより構成される。
<1 Overall configuration of project management system 1>
FIG. 1 is a diagram showing the overall configuration of a project management system 1 according to Embodiment 1. As shown in FIG. As shown in FIG. 1, a project management system 1 includes a plurality of terminal devices (terminal device 10A and terminal device 10B are shown in FIG. 1; hereinafter collectively referred to as "terminal device 10"). , and the server 20 . The terminal device 10 and the server 20 are connected via a network 80 so as to be able to communicate with each other. Network 80 is configured by a wired or wireless network.

端末装置10は、各ユーザが操作する装置である。ここで、ユーザとは、端末装置10を使用してプロジェクト管理システム1の機能である、プロジェクトの予定情報及び実績情報を入力する、プロジェクトの要員(管理者を含む)であり、プロジェクトを遂行する企業の従業員等をいう。端末装置10は、据え置き型のPC(Personal Computer)、ラップトップPC等により実現される。この他、端末装置10は、例えば移動体通信システムに対応したタブレットや、スマートフォン等の携帯端末であるとしてもよい。 The terminal device 10 is a device operated by each user. Here, the user is a project personnel (including a manager) who uses the terminal device 10 to input project schedule information and performance information, which is a function of the project management system 1, and who carries out the project. Employees of a company, etc. The terminal device 10 is implemented by a stationary PC (Personal Computer), a laptop PC, or the like. In addition, the terminal device 10 may be, for example, a mobile terminal such as a tablet compatible with a mobile communication system or a smart phone.

端末装置10は、ネットワーク80を介してサーバ20と通信可能に接続される。端末装置10は、4G、5G、LTE(Long Term Evolution)等の通信規格に対応した無線基地局81、IEEE(Institute of Electrical and Electronics Engineers)802.11等の無線LAN(Local Area Network)規格に対応した無線LANルータ82等の通信機器と通信することにより、ネットワーク80に接続される。図1に端末装置10Bとして示すように、端末装置10は、通信IF(Interface)12と、入力装置13と、出力装置14と、メモリ15と、記憶部16と、プロセッサ19とを備える。 The terminal device 10 is communicably connected to the server 20 via the network 80 . The terminal device 10 is a wireless base station 81 compatible with communication standards such as 4G, 5G, and LTE (Long Term Evolution), and a wireless LAN (Local Area Network) standard such as IEEE (Institute of Electrical and Electronics Engineers) 802.11. It is connected to the network 80 by communicating with a compatible communication device such as a wireless LAN router 82 . As shown as terminal device 10B in FIG.

通信IF12は、端末装置10が外部の装置と通信するため、信号を入出力するためのインタフェースである。入力装置13は、ユーザからの入力操作を受け付けるための入力装置(例えば、キーボードや、タッチパネル、タッチパッド、マウス等のポインティングデバイス等)である。出力装置14は、ユーザに対し情報を提示するための出力装置(ディスプレイ、スピーカ等)である。メモリ15は、プログラム、及び、プログラム等で処理されるデータ等を一時的に記憶するためのものであり、例えばDRAM(Dynamic Random Access Memory)等の揮発性のメモリである。記憶部16は、データを保存するための記憶装置であり、例えばフラッシュメモリ、HDD(Hard Disc Drive)である。プロセッサ19は、プログラムに記述された命令セットを実行するためのハードウェアであり、演算装置、レジスタ、周辺回路等により構成される。 The communication IF 12 is an interface for inputting and outputting signals so that the terminal device 10 communicates with an external device. The input device 13 is an input device (for example, a keyboard, a touch panel, a touch pad, a pointing device such as a mouse, etc.) for receiving an input operation from a user. The output device 14 is an output device (display, speaker, etc.) for presenting information to the user. The memory 15 temporarily stores programs and data processed by the programs, and is a volatile memory such as a DRAM (Dynamic Random Access Memory). The storage unit 16 is a storage device for storing data, and is, for example, a flash memory or a HDD (Hard Disc Drive). The processor 19 is hardware for executing an instruction set described in a program, and is composed of arithmetic units, registers, peripheral circuits, and the like.

サーバ20は、プロジェクトの予定情報及び実績情報を管理する装置である。サーバ20は、プロジェクトの予算や予定工数を含む予定情報と、プロジェクトの予算消化や実績工数を含む実績情報とに基づき、プロジェクトの予定に対する実績を示す予実管理レポートを生成し、端末装置10へ送信する。サーバ20は、プロジェクトの予算や予定工数を含む予定情報と、プロジェクトの予算消化や実績工数を含む実績情報とに基づき、将来におけるプロジェクトの推移予想を示す着地予想レポートを生成し、端末装置10へ送信する。また、サーバ20は、プロジェクトの予算消化や実績工数を含む実績情報が新たに入力されることにより、予実管理レポート及び着地予想レポートを更新する。 The server 20 is a device that manages project schedule information and performance information. The server 20 generates a budget/actual management report showing the results against the schedule of the project based on the schedule information including the project budget and scheduled man-hours, and the performance information including the budget consumption and actual man-hours of the project, and transmits it to the terminal device 10. do. The server 20 generates a prediction report indicating the expected transition of the project in the future based on the schedule information including the project budget and scheduled man-hours, and the actual information including the budget consumption and actual man-hours of the project, and sends it to the terminal device 10. Send. In addition, the server 20 updates the budget/actual management report and the landing forecast report by newly inputting performance information including project budget consumption and actual man-hours.

サーバ20は、ネットワーク80に接続されたコンピュータである。サーバ20は、通信IF22と、入出力IF23と、メモリ25と、ストレージ26と、プロセッサ29とを備える。 Server 20 is a computer connected to network 80 . The server 20 includes a communication IF 22 , an input/output IF 23 , a memory 25 , a storage 26 and a processor 29 .

通信IF22は、サーバ20が外部の装置と通信するため、信号を入出力するためのインタフェースである。入出力IF23は、ユーザからの入力操作を受け付けるための入力装置、及び、ユーザに対し情報を提示するための出力装置とのインタフェースとして機能する。メモリ25は、プログラム、及び、プログラム等で処理されるデータ等を一時的に記憶するためのものであり、例えばDRAM(Dynamic Random Access Memory)等の揮発性のメモリである。ストレージ26は、データを保存するための記憶装置であり、例えばフラッシュメモリ、HDD(Hard Disc Drive)である。プロセッサ29は、プログラムに記述された命令セットを実行するためのハードウェアであり、演算装置、レジスタ、周辺回路等により構成される。 The communication IF 22 is an interface for inputting and outputting signals for the server 20 to communicate with an external device. The input/output IF 23 functions as an interface with an input device for receiving input operations from the user and an output device for presenting information to the user. The memory 25 temporarily stores programs and data processed by the programs, and is a volatile memory such as a DRAM (Dynamic Random Access Memory). The storage 26 is a storage device for storing data, such as a flash memory or HDD (Hard Disc Drive). The processor 29 is hardware for executing an instruction set described in a program, and is composed of arithmetic units, registers, peripheral circuits, and the like.

<1.1 端末装置10の構成>
図2は、実施の形態1のプロジェクト管理システム1を構成する端末装置10の機能的な構成を示すブロック図である。図2に示すように、端末装置10は、複数のアンテナ(アンテナ111、アンテナ112)と、各アンテナに対応する無線通信部(第1無線通信部121、第2無線通信部122)と、操作受付部130(キーボード131及びマウス132を含む)と、音声処理部140と、マイク141と、スピーカ142と、ディスプレイ150と、記憶部160と、制御部170とを含む。端末装置10は、図2では特に図示していない機能及び構成(例えば、電力を保持するためのバッテリー、バッテリーから各回路への電力の供給を制御する電力供給回路等)も有している。図2に示すように、端末装置10に含まれる各ブロックは、バス等により電気的に接続される。
<1.1 Configuration of terminal device 10>
FIG. 2 is a block diagram showing the functional configuration of the terminal device 10 that constitutes the project management system 1 of the first embodiment. As shown in FIG. 2, the terminal device 10 includes a plurality of antennas (antenna 111, antenna 112), wireless communication units (first wireless communication unit 121, second wireless communication unit 122) corresponding to each antenna, and an operation unit. It includes a reception unit 130 (including a keyboard 131 and a mouse 132 ), an audio processing unit 140 , a microphone 141 , a speaker 142 , a display 150 , a storage unit 160 and a control unit 170 . The terminal device 10 also has functions and configurations not particularly shown in FIG. 2 (for example, a battery for retaining power, a power supply circuit for controlling power supply from the battery to each circuit, etc.). As shown in FIG. 2, each block included in the terminal device 10 is electrically connected by a bus or the like.

アンテナ111は、端末装置10が発する信号を電波として放射する。また、アンテナ111は、空間から電波を受信して受信信号を第1無線通信部121へ与える。 The antenna 111 radiates a signal emitted by the terminal device 10 as radio waves. Antenna 111 also receives radio waves from space and provides a received signal to first wireless communication section 121 .

アンテナ112は、端末装置10が発する信号を電波として放射する。また、アンテナ112は、空間から電波を受信して受信信号を第2無線通信部122へ与える。 The antenna 112 radiates a signal emitted by the terminal device 10 as radio waves. Antenna 112 also receives radio waves from space and provides a received signal to second wireless communication section 122 .

第1無線通信部121は、端末装置10が他の無線機器と通信するため、アンテナ111を介して信号を送受信するための変復調処理等を行う。第2無線通信部122は、端末装置10が他の無線機器と通信するため、アンテナ112を介して信号を送受信するための変復調処理等を行う。第1無線通信部121と第2無線通信部122とは、チューナー、RSSI(Received Signal Strength Indicator)算出回路、CRC(Cyclic Redundancy Check)算出回路、高周波回路等を含む通信モジュールである。第1無線通信部121と第2無線通信部122とは、端末装置10が送受信する無線信号の変復調や周波数変換を行い、受信信号を制御部170へ与える。 The first wireless communication unit 121 performs modulation/demodulation processing and the like for transmitting and receiving signals via the antenna 111 in order for the terminal device 10 to communicate with other wireless devices. The second wireless communication unit 122 performs modulation/demodulation processing and the like for transmitting and receiving signals via the antenna 112 so that the terminal device 10 communicates with other wireless devices. The first radio communication unit 121 and the second radio communication unit 122 are communication modules including a tuner, an RSSI (Received Signal Strength Indicator) calculation circuit, a CRC (Cyclic Redundancy Check) calculation circuit, a high frequency circuit, and the like. The first radio communication unit 121 and the second radio communication unit 122 perform modulation/demodulation and frequency conversion of radio signals transmitted/received by the terminal device 10 and give received signals to the control unit 170 .

操作受付部130は、ユーザの入力操作を受け付けるための機構を有する。具体的には、操作受付部130は、キーボード131と、マウス132とを含む。なお、操作受付部130は、例えば静電容量方式のタッチパネルを用いることによって、タッチパネルに対するユーザの接触位置を検出する、タッチスクリーンとして構成してもよい。 The operation accepting unit 130 has a mechanism for accepting user input operations. Specifically, operation accepting unit 130 includes a keyboard 131 and a mouse 132 . Note that the operation reception unit 130 may be configured as a touch screen that detects the user's touch position on the touch panel, for example, by using a capacitive touch panel.

キーボード131は、端末装置10のユーザの入力操作を受け付ける。キーボード131は、文字入力を行う装置であり、入力された文字情報を入力信号として制御部170へ出力する。 The keyboard 131 accepts input operations by the user of the terminal device 10 . The keyboard 131 is a device for inputting characters, and outputs input character information to the control unit 170 as an input signal.

マウス132は、端末装置10のユーザの入力操作を受け付ける。マウス132は、ディスプレイ150に表示されている表示物を選択等するためのポインティングデバイスであり、画面上で選択された位置情報と、ボタン押下されていることを示す情報とを入力信号として制御部170へ出力する。 The mouse 132 receives input operations of the user of the terminal device 10 . The mouse 132 is a pointing device for selecting a display object displayed on the display 150. The control unit 132 receives position information selected on the screen and information indicating that a button is pressed as input signals. 170.

音声処理部140は、音声信号の変復調を行う。音声処理部140は、マイク141から与えられる信号を変調して、変調後の信号を制御部170へ与える。また、音声処理部140は、音声信号をスピーカ142へ与える。音声処理部140は、例えば音声処理用のプロセッサによって実現される。マイク141は、音声入力を受け付けて、当該音声入力に対応する音声信号を音声処理部140へ与える。スピーカ142は、音声処理部140から与えられる音声信号を音声に変換して当該音声を端末装置10の外部へ出力する。 The audio processing unit 140 modulates and demodulates an audio signal. Audio processing section 140 modulates the signal supplied from microphone 141 and supplies the modulated signal to control section 170 . Also, the audio processing unit 140 provides an audio signal to the speaker 142 . The audio processing unit 140 is implemented by, for example, a processor for audio processing. Microphone 141 receives a voice input and provides voice signal corresponding to the voice input to voice processing section 140 . The speaker 142 converts the audio signal provided from the audio processing unit 140 into audio and outputs the audio to the outside of the terminal device 10 .

ディスプレイ150は、制御部170の制御に応じて、画像、動画、テキスト等のデータを表示する。ディスプレイ150は、例えばLCD(Liquid Crystal Display)や有機EL(Electro-Luminescence)ディスプレイによって実現される。 The display 150 displays data such as images, moving images, and text under the control of the control unit 170 . The display 150 is implemented by, for example, an LCD (Liquid Crystal Display) or an organic EL (Electro-Luminescence) display.

記憶部160は、例えばフラッシュメモリ等により構成され、端末装置10が使用するデータ及びプログラムを記憶する。ある局面において、記憶部160は、ユーザ情報161を記憶する。 The storage unit 160 is configured by, for example, a flash memory or the like, and stores data and programs used by the terminal device 10 . In one aspect, storage unit 160 stores user information 161 .

ユーザ情報161は、端末装置10を使用してプロジェクト管理システム1の機能であるプロジェクトの予定情報及び実績情報を入力する、プロジェクトの要員(管理者を含む)であるユーザの情報である。ユーザ情報としては、ユーザを識別する情報(ユーザID)、ユーザの氏名、ユーザが所属している企業の組織情報等が含まれる。 The user information 161 is information of a user who is a project member (including a manager) who uses the terminal device 10 to input project schedule information and performance information, which are functions of the project management system 1 . The user information includes information for identifying the user (user ID), the name of the user, organization information of the company to which the user belongs, and the like.

制御部170は、記憶部160に記憶されるプログラムを読み込んで、プログラムに含まれる命令を実行することにより、端末装置10の動作を制御する。制御部170は、例えば予め端末装置10にインストールされているアプリケーションである。制御部170は、プログラムに従って動作することにより、入力操作受付部171と、送受信部172と、データ処理部173と、通知制御部174としての機能を発揮する。 The control unit 170 reads a program stored in the storage unit 160 and executes instructions included in the program to control the operation of the terminal device 10 . The control unit 170 is, for example, an application installed in the terminal device 10 in advance. The control unit 170 functions as an input operation reception unit 171, a transmission/reception unit 172, a data processing unit 173, and a notification control unit 174 by operating according to a program.

入力操作受付部171は、キーボード131等の入力装置に対するユーザの入力操作を受け付ける処理を行う。 The input operation reception unit 171 performs processing for receiving a user's input operation to the input device such as the keyboard 131 .

送受信部172は、端末装置10が、サーバ20等の外部の装置と、通信プロトコルに従ってデータを送受信するための処理を行う。 The transmission/reception unit 172 performs processing for the terminal device 10 to transmit/receive data to/from an external device such as the server 20 according to a communication protocol.

データ処理部173は、端末装置10が入力を受け付けたデータに対し、プログラムに従って演算を行い、演算結果をメモリ等に出力する処理を行う。 The data processing unit 173 performs processing according to a program to perform computation on data input by the terminal device 10, and outputs the computation result to a memory or the like.

通知制御部174は、ユーザに対し情報を提示する処理を行う。通知制御部174は、表示画像をディスプレイ150に表示させる処理、音声をスピーカ142に出力させる処理等を行う。 The notification control unit 174 performs processing for presenting information to the user. The notification control unit 174 performs processing for displaying a display image on the display 150, processing for outputting audio from the speaker 142, and the like.

<1.2 サーバ20の機能的な構成>
図3は、実施の形態1のプロジェクト管理システム1を構成するサーバ20の機能的な構成を示す図である。図3に示すように、サーバ20は、通信部201と、記憶部202と、制御部203としての機能を発揮する。
<1.2 Functional Configuration of Server 20>
FIG. 3 is a diagram showing the functional configuration of the server 20 that constitutes the project management system 1 of Embodiment 1. As shown in FIG. As shown in FIG. 3 , the server 20 functions as a communication section 201 , a storage section 202 and a control section 203 .

通信部201は、サーバ20が外部の装置と通信するための処理を行う。 The communication unit 201 performs processing for the server 20 to communicate with an external device.

記憶部202は、サーバ20が使用するデータ及びプログラムを記憶する。記憶部202は、プロジェクト予定データベース2021と、ユーザデータベース2022と、プロジェクト実績データベース2023等を記憶する。 The storage unit 202 stores data and programs used by the server 20 . The storage unit 202 stores a project schedule database 2021, a user database 2022, a project performance database 2023, and the like.

プロジェクト予定データベース2021は、プロジェクト管理システム1の管理対象であるプロジェクトの予定情報、具体的には必要な工程、見積工数、予算等の情報を保持するためのデータベースである。詳細は後述する。 The project schedule database 2021 is a database for holding schedule information of projects to be managed by the project management system 1, specifically information such as required processes, estimated man-hours, and budget. Details will be described later.

ユーザデータベース2022は、プロジェクト管理システム1の管理対象であるプロジェクトに従事する要員の情報を保持するためのデータベースである。詳細は後述する。 The user database 2022 is a database for holding information on personnel engaged in projects managed by the project management system 1 . Details will be described later.

プロジェクト実績データベース2023は、プロジェクト管理システム1の管理対象であるプロジェクトの実績情報、具体的には工程ごとの実績工数、消化済予算等の情報を保持するためのデータベースである。詳細は後述する。 The project performance database 2023 is a database for holding performance information of a project managed by the project management system 1, specifically information such as the actual number of man-hours for each process and the spent budget. Details will be described later.

制御部203は、サーバ20のプロセッサ29がプログラムに従って処理を行うことにより、各種モジュールとして受信制御モジュール2031、送信制御モジュール2032、プロジェクト予定取得モジュール2033、プロジェクト実績取得モジュール2034、予実管理レポート生成更新モジュール2035、予実管理レポート提示モジュール2036、着地予想レポート生成更新モジュール2037、及び着地予想レポート提示モジュール2038に示す機能を発揮する。 The control unit 203 has various modules such as a reception control module 2031, a transmission control module 2032, a project schedule acquisition module 2033, a project performance acquisition module 2034, and a forecast/actual management report generation/update module. 2035 , a forecast/actual management report presentation module 2036 , an expected landing report generation/update module 2037 , and an expected landing report presentation module 2038 .

受信制御モジュール2031は、サーバ20が外部の装置から通信プロトコルに従って信号を受信する処理を制御する。 The reception control module 2031 controls processing for the server 20 to receive a signal from an external device according to a communication protocol.

送信制御モジュール2032は、サーバ20が外部の装置に対し通信プロトコルに従って信号を送信する処理を制御する。 The transmission control module 2032 controls the processing by which the server 20 transmits signals to external devices according to a communication protocol.

プロジェクト予定取得モジュール2033は、プロジェクト管理システム1のユーザであるプロジェクトの要員(管理者)からの入力または取得指示により、プロジェクトの予算や予定工数を含む予定情報を取得する処理を制御する。プロジェクト型ビジネスでは、例えば、プロジェクトを策定する際に作業見積りを行い、当該プロジェクトを遂行するために必要な工数を算出する。その工数に対して単位時間当たりの人件費を掛け合わせ、その他必要な経費を算出して、プロジェクトに必要な予算を決定する。プロジェクト予定取得モジュール2033は、そのようにして算出された予定工数、及び予算の情報を予定情報として取得する。 The project schedule acquisition module 2033 controls processing for acquiring schedule information including project budgets and scheduled man-hours in response to inputs or acquisition instructions from project personnel (managers) who are users of the project management system 1 . In a project-type business, for example, when formulating a project, a work estimate is made and the man-hours required to carry out the project are calculated. The man-hours are multiplied by the labor cost per unit time, other necessary expenses are calculated, and the necessary budget for the project is determined. The project schedule acquisition module 2033 acquires information on the planned man-hours and budget thus calculated as schedule information.

プロジェクト予定取得モジュール2033は、ユーザが端末装置10から入力するプロジェクトの予定情報を受け付けることにより取得してもよく、ユーザが外部のサーバ装置等に登録してあるプロジェクトの予定情報を、外部のサーバ装置等にアクセスすることにより取得してもよい。ユーザが端末装置10から入力するプロジェクトの予定情報は、Webページ等による入力フォームに直接入力した入力情報でもよく、表計算ソフト等の所定のフォーマットであらかじめ作成されたファイルでもよい。外部のサーバ装置は、いわゆるSaaSによって提供される、プロジェクトに必要なプログラムソースコード等の資源管理を行うサービス等でもよい。 The project schedule acquisition module 2033 may acquire the project schedule information input by the user from the terminal device 10. The project schedule information registered by the user in an external server device or the like may be acquired by the external server device. It may be acquired by accessing a device or the like. The project schedule information that the user inputs from the terminal device 10 may be input information directly input to an input form such as a Web page, or may be a file created in advance in a predetermined format such as spreadsheet software. The external server device may be a service provided by a so-called SaaS that manages resources such as program source codes necessary for a project.

プロジェクト予定取得モジュール2033は、例えば、取得した予定情報をプロジェクト予定データベース2021に登録して記憶させる。 The project schedule acquisition module 2033 registers and stores the acquired schedule information in the project schedule database 2021, for example.

プロジェクト実績取得モジュール2034は、プロジェクト管理システム1のユーザであるプロジェクトの要員(管理者)からの入力または取得指示により、プロジェクトの予算消化や実績工数を含む実績情報を取得する処理を制御する。プロジェクト型ビジネスでは、例えば、プロジェクトを遂行するために消化された(プロジェクトの要員が実際に作業を行った)実績工数を算出する。その実績工数に対して単位時間当たりの人件費を掛け合わせ、その他必要な経費を算出して、プロジェクトの遂行のために消化した予算の実績を算出する。プロジェクト実績取得モジュール2034は、そのようにして算出された実績工数、及び予算の実績の情報を実績情報として取得する。 The project performance acquisition module 2034 controls processing for acquiring performance information including project budget consumption and actual man-hours in response to inputs or acquisition instructions from project personnel (managers) who are users of the project management system 1 . In a project-type business, for example, the actual number of man-hours consumed to carry out the project (the project personnel actually performed the work) is calculated. By multiplying the actual number of man-hours by the labor cost per unit time and calculating other necessary expenses, the actual amount of the budget consumed for the execution of the project is calculated. The project performance acquisition module 2034 acquires information on the actual man-hours and budget performance thus calculated as performance information.

プロジェクト実績取得モジュール2034は、ユーザが端末装置10から入力するプロジェクトの実績情報を受け付けることにより取得してもよく、ユーザが外部のサーバ装置等に登録してあるプロジェクトの実績情報を、外部のサーバ装置等にアクセスすることにより取得してもよい。ユーザが端末装置10から入力するプロジェクトの実績情報は、Webページ等による入力フォームに直接入力した入力情報でもよく、表計算ソフト等の所定のフォーマットであらかじめ作成されたファイルでもよい。外部のサーバ装置は、いわゆるSaaSによって提供される、プロジェクトに必要なプログラムソースコード等の資源管理を行うサービス等でもよい。 The project performance acquisition module 2034 may acquire the project performance information input by the user from the terminal device 10, and may acquire the project performance information registered by the user in an external server device or the like. It may be acquired by accessing a device or the like. The project performance information that the user inputs from the terminal device 10 may be input information directly input to an input form such as a web page, or may be a file created in advance in a predetermined format such as spreadsheet software. The external server device may be a service provided by a so-called SaaS that manages resources such as program source codes necessary for a project.

また、プロジェクト実績取得モジュール2034は、ユーザが登録した勤怠情報から実績工数を取得してもよい。プロジェクト実績取得モジュール2034は、例えば、ユーザが自己の勤怠情報として登録した情報から、実際に作業を行ったプロジェクトの情報(工程の情報が含まれてもよい)と作業時間とを取得し、1または複数のプロジェクトへの当てはめを行い、当てはまるプロジェクトの実績の工数情報として取得してもよい。さらに、プロジェクト実績取得モジュール2034は、ユーザが登録したスケジュール情報から実績工数を取得してもよい。プロジェクト実績取得モジュール2034は、例えば、ユーザが自己のスケジュール情報として登録した情報のうち、実際に行われた情報を判定し、実際に作業を行ったプロジェクトの情報(工程の情報が含まれてもよい)と作業時間とを取得してもよい。具体的には、スケジュール情報としてプロジェクト内の会議が登録され、実際に会議が行われたと判定される場合は、そのスケジュール情報を実績情報として取得する。 Also, the project performance acquisition module 2034 may acquire the actual man-hours from the attendance information registered by the user. For example, the project performance acquisition module 2034 acquires project information (which may include process information) and working hours of a project actually worked on from information registered by the user as his/her attendance information. Alternatively, it may be applied to a plurality of projects and obtained as the actual man-hour information of the applicable project. Furthermore, the project performance acquisition module 2034 may acquire the actual man-hours from the schedule information registered by the user. The project result acquisition module 2034, for example, determines the information actually performed among the information registered by the user as his/her own schedule information, and determines the information of the project in which the work was actually performed (even if the process information is included). may be obtained) and working time. Specifically, when a meeting within a project is registered as schedule information and it is determined that the meeting was actually held, the schedule information is acquired as performance information.

プロジェクト実績取得モジュール2034は、例えば、取得した予定情報をプロジェクト実績データベース2023に登録して記憶させる。 The project performance acquisition module 2034 registers and stores the acquired schedule information in the project performance database 2023, for example.

予実管理レポート生成更新モジュール2035は、プロジェクト予定取得モジュール2033が取得したプロジェクトの予定情報と、プロジェクト実績取得モジュール2034が取得したプロジェクトの実績情報とに基づき、プロジェクトの予定に対する実績を示す予実管理レポートを生成する処理を制御する。予実管理レポート生成更新モジュール2035が生成する予実管理レポートとは、プロジェクトの予定、例えば予算や予定工数に対する、ある時点での実績である予算の消化状況、作業実績工数(工数の消化状況)、実績の消化率等を示したものである。また、予実管理レポートは、予実管理レポートを生成した時点における、プロジェクトで消化予定であった予算や予定工数との対比を示したものであってもよい。 The budget/actual management report generating/updating module 2035 generates a budget/actual management report showing the actual performance of the project based on the project schedule information acquired by the project schedule acquisition module 2033 and the project performance information acquired by the project performance acquisition module 2034. Controls the processing to generate. The budget/actual management report generated by the budget/actual management report generation/update module 2035 includes the project schedule, for example, the budget consumption status, which is the actual results at a certain point in time, for the budget and the planned man-hours, the actual work man-hours (man-hour consumption status), and the actual results. It shows the digestibility of Also, the budget/actual management report may show a comparison with the budget and the planned man-hours that were scheduled to be consumed in the project at the time the budget/actual management report was generated.

また、予実管理レポート生成更新モジュール2035は、プロジェクト実績取得モジュール2034が取得したプロジェクトの実績情報に基づき、一度作成した後の予実管理レポートを更新する処理を制御する。プロジェクト実績取得モジュール2034がプロジェクトの実績情報を随時取得するので、予実管理レポート生成更新モジュール2035は、新たに取得したプロジェクトの実績情報を反映して、予実管理レポートを更新する。 Also, the budget/actual management report generation/update module 2035 controls the process of updating the budget/actual management report once created based on the project performance information acquired by the project performance acquisition module 2034 . Since the project performance acquisition module 2034 acquires project performance information as needed, the budget/actual management report generation/update module 2035 reflects the newly acquired project performance information to update the budget/actual management report.

予実管理レポート生成更新モジュール2035が生成する予実管理レポートは、Webブラウザで参照可能なWebページにより生成してもよく、所定の文書ファイル等により生成してもよい。 The budget/actual management report generated by the budget/actual management report generation/update module 2035 may be generated from a web page that can be referenced with a web browser, or from a predetermined document file or the like.

予実管理レポート提示モジュール2036は、予実管理レポート生成更新モジュール2035が生成した予実管理レポートを、例えば端末装置10へ送信してユーザに提示する処理を制御する。予実管理レポート生成更新モジュール2035が生成する予実管理レポートがWebページによる場合、予実管理レポート提示モジュール2036は、当該Webページの参照先に遷移するように指示する情報を送信してもよい。また、予実管理レポート生成更新モジュール2035が生成する予実管理レポートが所定の文書ファイル等による場合、予実管理レポート提示モジュール2036は、当該文書ファイルを開くように指示する情報を送信してもよい。 The budget/actual management report presentation module 2036 controls the process of transmitting the budget/actual management report generated by the budget/actual management report generation/update module 2035 to, for example, the terminal device 10 and presenting it to the user. When the budget/actual management report generated by the budget/actual management report generation/update module 2035 is based on a web page, the budget/actual management report presentation module 2036 may transmit information instructing transition to the reference destination of the web page. Further, when the budget/actual management report generated by the budget/actual management report generation/update module 2035 is based on a predetermined document file or the like, the budget/actual management report presentation module 2036 may transmit information instructing to open the document file.

着地予想レポート生成更新モジュール2037は、プロジェクト予定取得モジュール2033が取得したプロジェクトの予定情報と、プロジェクト実績取得モジュール2034が取得したプロジェクトの実績情報とに基づき、将来におけるプロジェクトの推移予想を示す着地予想レポートを生成する処理を制御する。着地予想レポート生成更新モジュール2037が生成する着地予想レポートとは、プロジェクトの予定、例えば予算や予定工数に対するある時点での実績である予算の消化状況、作業実績工数(工数の消化状況)、実績の消化率等から予想される、当該プロジェクトの完了予測、将来のある時点(例えば、完了予定の時点)における予算の消化状況、作業実績工数の予測値を示したものである。また、着地予想レポートは、将来のある時点における、プロジェクトで消化予定であった予算や予定工数との対比を示したものであってもよい。さらに、着地予想レポートは、将来のある時点における、プロジェクトにおける売上と支出との収支の予測や、利益の予測を示したものであってもよい。さらにまた、着地予想レポートは、将来のある時点におけるプロジェクトの予定情報と実績情報との乖離について異なる態様(例えば、異なる色彩で表示する、強調表示する等)で示してもよく、乖離の状況に応じて異なる態様(例えば、乖離に応じて異なる色彩で表示する、強調度合いを変化させて強調表示する等)で示してもよい。 The forecast report generating and updating module 2037 generates a forecast report showing a forecast of the future transition of the project based on the project schedule information acquired by the project schedule acquisition module 2033 and the project performance information acquired by the project performance acquisition module 2034. control the process of generating the . The expected arrival report generated by the expected arrival report generation update module 2037 includes a project schedule, for example, the budget consumption status, which is the actual results at a certain point in time with respect to the budget and the planned man-hours, the actual work man-hours (man-hour consumption status), and the actual man-hours. It shows the predicted completion of the project, the state of budget consumption at a certain point in the future (for example, the scheduled completion point), and the predicted value of the actual work man-hours, which are expected from the rate of completion. Also, the expected arrival report may show a comparison with the budget or man-hours planned for the project at a certain point in the future. Further, the forecast report may show the forecast of the balance between sales and expenses in the project and the forecast of profit at a certain point in the future. Furthermore, the forecast report may show the divergence between the planned information and the actual information of the project at a certain point in the future in different modes (for example, displaying in different colors, highlighting, etc.). Depending on the difference, it may be displayed in different modes (for example, displaying in different colors depending on the divergence, highlighting by changing the degree of highlighting, etc.).

また、着地予想レポート生成更新モジュール2037は、プロジェクト実績取得モジュール2034が取得したプロジェクトの実績情報に基づき、一度作成した後の着地予想レポートを更新する処理を制御する。プロジェクト実績取得モジュール2034がプロジェクトの実績情報を随時取得するので、着地予想レポート生成更新モジュール2037は、新たに取得したプロジェクトの実績情報を反映して、着地予想レポートを更新する。 In addition, the landing prediction report generation update module 2037 controls the process of updating the landing prediction report once created based on the project performance information acquired by the project performance acquisition module 2034 . Since the project performance acquisition module 2034 acquires the project performance information at any time, the landing forecast report generating/updating module 2037 reflects the newly acquired project performance information to update the landing forecast report.

着地予想レポート生成更新モジュール2037が生成する着地予想レポートは、Webブラウザで参照可能なWebページにより生成してもよく、所定の文書ファイル等により生成してもよい。また、予実管理レポート生成更新モジュール2035が生成する予実管理レポートと同時に(同一画面で)提示してもよく、異なる画面で表示してもよい。 The landing prediction report generated by the landing prediction report generation/update module 2037 may be generated from a web page that can be referenced by a web browser, or from a predetermined document file or the like. Further, the budget/actual management report generated by the budget/actual management report generation/update module 2035 may be presented simultaneously (on the same screen), or may be displayed on a different screen.

着地予想レポート提示モジュール2038は、着地予想レポート生成更新モジュール2037が生成した着地予想レポートを、例えば端末装置10へ送信してユーザに提示する処理を制御する。着地予想レポート生成更新モジュール2037が生成する着地予想レポートがWebページによる場合、着地予想レポート提示モジュール2038は、当該Webページの参照先に遷移するように指示する情報を送信してもよい。また、着地予想レポート生成更新モジュール2037が生成する着地予想レポートが所定の文書ファイル等による場合、着地予想レポート提示モジュール2038は、当該文書ファイルを開くように指示する情報を送信してもよい。 The expected landing report presentation module 2038 controls the process of transmitting the expected landing report generated by the expected landing report generation/update module 2037 to, for example, the terminal device 10 and presenting it to the user. When the expected landing report generated by the expected landing report generation update module 2037 is based on a web page, the expected landing report presentation module 2038 may transmit information instructing transition to the reference destination of the web page. Also, if the expected landing report generated by the expected landing report generation/update module 2037 is based on a predetermined document file or the like, the expected landing report presentation module 2038 may transmit information instructing to open the document file.

<2 データ構造>
図4は、サーバ20が記憶するプロジェクト予定データベース2021、ユーザデータベース2022のデータ構造の例を示す図である。また、図5は、サーバ20が記憶するプロジェクト実績データベース2023のデータ構造の例を示す図である。
<2 Data structure>
FIG. 4 is a diagram showing an example of the data structure of the project schedule database 2021 and user database 2022 stored by the server 20. As shown in FIG. 5 is a diagram showing an example of the data structure of the project performance database 2023 stored by the server 20. As shown in FIG.

図4に示すように、プロジェクト予定データベース2021のレコードのそれぞれは、項目「プロジェクトID」と、項目「プロジェクト名」と、項目「プロジェクト詳細情報」等を含む。 As shown in FIG. 4, each record in the project schedule database 2021 includes an item "project ID", an item "project name", an item "project detailed information", and the like.

項目「プロジェクトID」は、プロジェクト管理システム1の管理対象であるプロジェクトそれぞれを識別する情報である。 The item “project ID” is information for identifying each project managed by the project management system 1 .

項目「プロジェクト名」は、プロジェクト管理システム1の管理対象であるプロジェクトの名称を示す情報である。 The item “project name” is information indicating the name of the project managed by the project management system 1 .

項目「プロジェクト詳細情報」は、プロジェクト管理システム1の管理対象であるプロジェクトに関する情報であり、具体的には、項目「工程ID」と、項目「工程名」と、項目「見積工数」と、項目「作業期間」等を含む。 The item "project detailed information" is information about the project to be managed by the project management system 1. Specifically, the item "process ID", the item "process name", the item "estimated man-hours", and the item Including "work period" etc.

項目「工程ID」は、プロジェクト管理システム1の管理対象であるプロジェクトにおいて必要な工程それぞれを識別する情報である。 The item “process ID” is information for identifying each necessary process in the project managed by the project management system 1 .

項目「工程名」は、プロジェクト管理システム1の管理対象であるプロジェクトにおいて必要な工程の名称を示す情報である。プロジェクトの予定情報では、プロジェクトの工程ごとに見積もりが行われ、予算が策定されることがあるため、当該項目は、工程ごとに管理するために用いられる。 The item “process name” is information indicating the name of a process required in a project managed by the project management system 1 . In the project schedule information, an estimate is made for each process of the project, and a budget may be formulated. Therefore, this item is used for managing each process.

項目「見積工数」は、プロジェクト管理システム1の管理対象であるプロジェクトにおける工程ごとに見積もりが行われた工数を示す情報であり、例えば、1人の者が1か月の間に作業可能な作業量を1人月とした場合の作業量を示す値が格納されている。 The item "estimated man-hours" is information indicating the man-hours estimated for each process in the project managed by the project management system 1. For example, the work that can be performed by one person in one month. A value indicating the amount of work per man-month is stored.

項目「作業期間」は、プロジェクト管理システム1の管理対象であるプロジェクトにおける工程ごとの作業期間を示す情報であり、例えば、作業開始予定の年月日と作業終了予定の年月日が格納されている。 The item "work period" is information indicating the work period for each process in the project managed by the project management system 1. For example, the scheduled work start date and work end date are stored. there is

サーバ20のプロジェクト予定取得モジュール2033は、プロジェクトの予算や予定工数を含む予定情報を取得することに伴って、プロジェクト予定データベース2021の項目「プロジェクト詳細情報」のレコードを追加/削除する。 The project schedule acquisition module 2033 of the server 20 adds/deletes the record of the item "project detailed information" in the project schedule database 2021 in accordance with the acquisition of the schedule information including the project budget and scheduled man-hours.

ユーザデータベース2022のレコードのそれぞれは、項目「ユーザID」と、項目「所属」と、項目「氏名」と、項目「工数情報」等を含む。 Each record of the user database 2022 includes the item “user ID”, the item “affiliation”, the item “name”, the item “man-hour information”, and the like.

項目「ユーザID」は、プロジェクト管理システム1を使用する、プロジェクトの要員であるユーザ(アカウント登録しているユーザ)それぞれを識別する情報である。 The item “user ID” is information for identifying each user (user who has registered an account) who uses the project management system 1 and is a member of the project.

項目「所属」は、プロジェクト管理システム1を使用するユーザが所属している企業等の事業者や、当該企業等の部署を示す情報である。 The item “affiliation” is information indicating a business operator such as a company to which the user using the project management system 1 belongs, or a department of the company.

項目「氏名」は、プロジェクト管理システム1を使用するユーザの氏名を示す情報である。 The item “name” is information indicating the name of the user who uses the project management system 1 .

項目「工数情報」は、プロジェクト管理システム1を使用するユーザが実際に作業を行った実績の工数情報である。図4に示すように、1のユーザに対して1または複数の工数情報が格納されている。なお、ユーザごとの項目「工数情報」は、外部のサーバ装置等から取得する場合は格納されなくてもよく、勤怠情報として別途管理されてもよい。 The item “man-hour information” is man-hour information of actual work performed by the user using the project management system 1 . As shown in FIG. 4, one or more pieces of man-hour information are stored for one user. Note that the item "man-hour information" for each user may not be stored when acquired from an external server device or the like, and may be separately managed as attendance information.

図5に示すように、プロジェクト実績データベース2023のレコードのそれぞれは、項目「プロジェクトID」と、項目「プロジェクト名」と、項目「プロジェクト詳細情報」等を含む。 As shown in FIG. 5, each record in the project performance database 2023 includes an item “project ID”, an item “project name”, an item “project detailed information”, and the like.

項目「プロジェクトID」は、プロジェクト管理システム1の管理対象であるプロジェクトそれぞれを識別する情報であり、プロジェクト予定データベース2021の項目「プロジェクトID」に対応している。 The item “project ID” is information for identifying each project managed by the project management system 1 and corresponds to the item “project ID” of the project schedule database 2021 .

項目「プロジェクト名」は、プロジェクト管理システム1の管理対象であるプロジェクトの名称を示す情報であり、プロジェクト予定データベース2021の項目「プロジェクト名」に対応している。 The item “project name” is information indicating the name of the project managed by the project management system 1 and corresponds to the item “project name” of the project schedule database 2021 .

項目「プロジェクト詳細情報」は、プロジェクト管理システム1の管理対象であるプロジェクトに関する情報であり、具体的には、項目「工程ID」と、項目「期間」と、項目「予定工数」と、項目「実績工数」等を含む。 The item "project detailed information" is information about the project to be managed by the project management system 1. Specifically, the item "process ID", the item "period", the item "scheduled man-hours", and the item " including “actual man-hours”, etc.

項目「工程ID」は、プロジェクト管理システム1の管理対象であるプロジェクトにおいて必要な工程それぞれを識別する情報であり、プロジェクト予定データベース2021の項目「工程ID」に対応している。 The item “process ID” is information for identifying each necessary process in the project managed by the project management system 1 and corresponds to the item “process ID” of the project schedule database 2021 .

項目「期間」は、プロジェクト管理システム1の管理対象であるプロジェクトにおける工程ごとに定められる、工数の進捗状況を管理するための所定の期間を示す情報であり、例えば、作業開始予定の年月日と作業終了予定の年月日が格納されている。この項目「期間」は、プロジェクト予定データベース2021の項目「工程ID」と同一でもよく、当該工程をさらに細分化して進捗管理できるように複数の期間を設定してもよい。 The item "period" is information indicating a predetermined period for managing the progress of man-hours, which is determined for each process in a project managed by the project management system 1. For example, the date of scheduled start of work. and the scheduled work completion date are stored. This item "period" may be the same as the item "process ID" of the project schedule database 2021, and a plurality of periods may be set so that the process can be subdivided and progress managed.

項目「予定工数」は、プロジェクト管理システム1の管理対象であるプロジェクトにおける工程ごとに定められる、項目「期間」ごとの予定の工数を示す情報である。この項目「予定工数」は、プロジェクト予定データベース2021の項目「見積工数」と同一でもよく、当該工程の見積工数をさらに細分化して進捗管理できるように複数の見積工数を設定してもよい。 The item “scheduled man-hours” is information indicating the scheduled man-hours for each item “period”, which is determined for each process in the project managed by the project management system 1 . This item "scheduled man-hours" may be the same as the item "estimated man-hours" in the project schedule database 2021, and a plurality of estimated man-hours may be set so that the estimated man-hours of the process can be subdivided and progress managed.

項目「実績工数」は、プロジェクト管理システム1の管理対象であるプロジェクトにおける工程ごとに定められる項目「予定工数」に対応する、実績の工数を示す情報である。項目「期間」の作業終了予定の年月日が未到来の場合は、当該項目には格納されない。 The item “actual man-hours” is information indicating the actual man-hours corresponding to the item “scheduled man-hours” defined for each process in the project managed by the project management system 1 . If the scheduled work completion date for the item "Period" has not yet arrived, it is not stored in the item.

なお、図示は省略するが、プロジェクト実績データベース2023には、プロジェクトの予算とその予算に対する実績の消化予算を格納してもよく、実績の売上及び支出を格納してもよい。 Although illustration is omitted, the project performance database 2023 may store the project budget and the actual consumption budget for the budget, and may store the actual sales and expenses.

サーバ20のプロジェクト実績取得モジュール2034は、プロジェクトの予算消化や実績工数を含む実績情報を取得することに伴って、プロジェクト実績データベース2023の項目「プロジェクト詳細情報」にレコードを追加する。 The project performance acquisition module 2034 of the server 20 adds a record to the item “project details” of the project performance database 2023 in accordance with the acquisition of performance information including budget consumption and actual man-hours of the project.

<3 動作>
以下、図6及び図7を参照しながら、第1の実施の形態におけるプロジェクト管理システム1によるプロジェクト予定登録処理及びレポート作成処理について説明する。
<3 Operation>
Project schedule registration processing and report creation processing by the project management system 1 according to the first embodiment will be described below with reference to FIGS. 6 and 7. FIG.

図6は、実施の形態1のプロジェクト管理システム1によるプロジェクト予定登録処理を行う流れの一例を示すフローチャートである。 FIG. 6 is a flow chart showing an example of the flow of project schedule registration processing by the project management system 1 according to the first embodiment.

ステップS111の前処理として、端末装置10の入力操作受付部171は、プロジェクトの要員(管理者を含む)であるユーザから、プロジェクト管理システム1のサービスを利用するために必要な認証を行うためのユーザID及びパスワードを入力する操作を受け付ける。送受信部172は、受け付けたユーザID及びパスワード、及びユーザ情報をサーバ20へ送信する。サーバ20は、ユーザID及びパスワードを、通信部201を介して受け付けて当該ユーザのユーザID及びパスワードが正当であることを確認し、所定の認証を行う。正当である場合、サーバ20は、認証完了の情報を、端末装置10へ通信部201を介して送信する。端末装置10の送受信部172は、サーバ20から送信された認証完了の情報を受け付ける。通知制御部174は、受け付けた認証完了の情報を、ディスプレイ150に表示させ、ステップS111が開始される。 As a pre-process of step S111, the input operation reception unit 171 of the terminal device 10 receives a request from a user who is a member of the project (including a manager) for performing authentication necessary for using the service of the project management system 1. Accepts an operation to enter a user ID and password. The transmission/reception unit 172 transmits the received user ID and password and user information to the server 20 . The server 20 accepts the user ID and password via the communication unit 201, confirms that the user ID and password of the user is valid, and performs predetermined authentication. If it is valid, the server 20 transmits information of completion of authentication to the terminal device 10 via the communication unit 201 . The transmitting/receiving unit 172 of the terminal device 10 receives the authentication completion information transmitted from the server 20 . The notification control unit 174 displays the received authentication completion information on the display 150, and step S111 is started.

ステップS111において、端末装置10の入力操作受付部171は、ユーザからの操作により、プロジェクトの予算や予定工数を含む予定情報を入力する入力画面の表示指示を受け付ける。送受信部172は、受け付けた表示指示を、サーバ20へ送信する。端末装置10の送受信部172は、サーバ20から送信されたプロジェクトの予定情報を入力する入力画面の表示データを受け付ける。通知制御部174は、受け付けたプロジェクトの予定情報を入力する入力画面の表示データを、ディスプレイ150に表示させる。 In step S111, the input operation receiving unit 171 of the terminal device 10 receives an instruction to display an input screen for inputting schedule information including the project budget and scheduled man-hours by the user's operation. The transmitting/receiving unit 172 transmits the received display instruction to the server 20 . The transmitting/receiving unit 172 of the terminal device 10 receives display data of an input screen for inputting project schedule information transmitted from the server 20 . The notification control unit 174 causes the display 150 to display the display data of the input screen for inputting the received schedule information of the project.

ステップS121において、サーバ20は、端末装置10から送信されたプロジェクトの予定情報を入力する入力画面の表示指示を、通信部201を介して受け付ける。サーバ20は、プロジェクトの予定情報を入力する入力画面の表示データを、通信部201を介して端末装置10へ送信する。 In step S<b>121 , the server 20 receives, via the communication unit 201 , an instruction to display an input screen for inputting project schedule information transmitted from the terminal device 10 . The server 20 transmits display data of an input screen for inputting project schedule information to the terminal device 10 via the communication unit 201 .

ステップS112において、端末装置10の入力操作受付部171は、ユーザからの操作により、プロジェクトの予算や予定工数を含む予定情報の入力を受け付ける。送受信部172は、受け付けたプロジェクトの予定情報を、サーバ20へ送信する。 In step S112, the input operation receiving unit 171 of the terminal device 10 receives an input of schedule information including the project budget and scheduled man-hours by the user's operation. The transmitting/receiving unit 172 transmits the received schedule information of the project to the server 20 .

ステップS122において、サーバ20のプロジェクト予定取得モジュール2033は、端末装置10から送信されたプロジェクトの予定情報を、通信部201を介して受け付ける。プロジェクト予定取得モジュール2033は、受け付けたプロジェクトの予定情報をプロジェクト予定データベース2021に登録する。 In step S<b>122 , the project schedule acquisition module 2033 of the server 20 receives the project schedule information transmitted from the terminal device 10 via the communication unit 201 . The project schedule acquisition module 2033 registers the received project schedule information in the project schedule database 2021 .

なお、プロジェクト予定取得モジュール2033が外部のサーバ装置等にアクセスし、外部のサーバ装置等に登録してあるプロジェクトの予定情報を取得する場合、ステップS112及びステップS122の処理は行われない。 Note that when the project schedule acquisition module 2033 accesses an external server device or the like and acquires schedule information of a project registered in the external server device or the like, the processes of steps S112 and S122 are not performed.

以上のように、プロジェクト管理システム1では、ユーザからの入力により、または外部のサーバ装置等から、プロジェクトの予算や予定工数を含む予定情報を取得する。これらの情報は、プロジェクトの予実管理を行い、着地予想をするためのもとになる。 As described above, the project management system 1 acquires schedule information including project budgets and scheduled man-hours by user input or from an external server device or the like. These pieces of information serve as a basis for project budget management and forecasting.

図7は、実施の形態1のプロジェクト管理システム1による税務申告処理を行う流れの一例を示すフローチャートである。なお、ステップS211の前処理は、ステップS111の前処理と同様である。 FIG. 7 is a flow chart showing an example of the flow of tax return processing by the project management system 1 according to the first embodiment. Note that the preprocessing in step S211 is the same as the preprocessing in step S111.

ステップS211において、端末装置10の入力操作受付部171は、ユーザからの操作により、プロジェクトの予算消化や実績工数を含む実績情報を入力する入力画面を表示する表示指示を受け付ける。送受信部172は、受け付けた表示指示を、サーバ20へ送信する。端末装置10の送受信部172は、サーバ20から送信されたプロジェクトの実績情報を入力する入力画面の表示データを受け付ける。通知制御部174は、受け付けたプロジェクトの実績情報を入力する入力画面の表示データを、ディスプレイ150に表示させる。 In step S211, the input operation accepting unit 171 of the terminal device 10 accepts a display instruction to display an input screen for inputting performance information including project budget consumption and actual man-hours by an operation from the user. The transmitting/receiving unit 172 transmits the received display instruction to the server 20 . The transmitting/receiving unit 172 of the terminal device 10 receives the display data of the input screen for inputting the project performance information transmitted from the server 20 . The notification control unit 174 causes the display 150 to display the display data of the input screen for inputting the received performance information of the project.

ステップS221において、サーバ20は、端末装置10から送信されたプロジェクトの実績情報を入力する入力画面の表示指示を、通信部201を介して受け付ける。サーバ20は、プロジェクトの実績情報を入力する入力画面の表示データを、通信部201を介して端末装置10へ送信する。 In step S<b>221 , the server 20 receives, via the communication unit 201 , an instruction to display an input screen for inputting project performance information transmitted from the terminal device 10 . The server 20 transmits the display data of the input screen for inputting the project performance information to the terminal device 10 via the communication unit 201 .

ステップS212において、端末装置10の入力操作受付部171は、ユーザからの操作により、プロジェクトの予算消化や実績工数を含む実績情報の入力を受け付ける。送受信部172は、受け付けたプロジェクトの実績情報を、サーバ20へ送信する。 In step S212, the input operation receiving unit 171 of the terminal device 10 receives an input of performance information including project budget consumption and actual man-hours by an operation from the user. The transmitting/receiving unit 172 transmits the received project performance information to the server 20 .

ステップS222において、サーバ20のプロジェクト実績取得モジュール2034は、端末装置10から送信されたプロジェクトの実績情報を、通信部201を介して受け付ける。プロジェクト実績取得モジュール2034は、受け付けたプロジェクトの実績情報をプロジェクト実績データベース2023に登録する。 In step S<b>222 , the project performance acquisition module 2034 of the server 20 receives the project performance information transmitted from the terminal device 10 via the communication unit 201 . The project performance acquisition module 2034 registers the received project performance information in the project performance database 2023 .

ステップS223において、サーバ20の予実管理レポート生成更新モジュール2035は、ステップS122で受け付けた(または、外部のサーバ装置等から取得した)プロジェクトの予定情報と、ステップS222で受け付けたプロジェクトの実績情報とに基づき、プロジェクトの予定に対する実績を示す予実管理レポートを生成する。 In step S223, the budget/actual management report generation/update module 2035 of the server 20 compares the project schedule information received in step S122 (or obtained from an external server device or the like) with the project performance information received in step S222. Based on this, a budget/actual management report is generated that shows the actual performance against the project schedule.

ステップS224において、サーバ20の着地予想レポート生成更新モジュール2037は、ステップS122で受け付けた(または、外部のサーバ装置等から取得した)プロジェクトの予定情報と、ステップS222で受け付けたプロジェクトの実績情報とに基づき、将来におけるプロジェクトの推移予想を示す着地予想レポートを生成する。 In step S224, the landing prediction report generation update module 2037 of the server 20 compares the project schedule information received in step S122 (or obtained from an external server device or the like) with the project performance information received in step S222. Based on this, a landing forecast report is generated that shows the expected transition of the project in the future.

ステップS225において、サーバ20の予実管理レポート提示モジュール2036は、ステップS223で生成した予実管理レポートを、通信部201を介して端末装置10へ送信する。また、サーバ20の着地予想レポート提示モジュール2038は、ステップS224で生成した着地予想レポートを、通信部201を介して端末装置10へ送信する。 In step S<b>225 , the budget/actual management report presentation module 2036 of the server 20 transmits the budget/actual management report generated in step S<b>223 to the terminal device 10 via the communication unit 201 . Also, the landing prediction report presentation module 2038 of the server 20 transmits the landing prediction report generated in step S224 to the terminal device 10 via the communication unit 201. FIG.

ステップS215において、端末装置10の送受信部172は、サーバ20から送信された予実管理レポート及び着地予想レポートを受け付ける。通知制御部174は、受け付けた予実管理レポート及び着地予想レポートを、ディスプレイ150に表示させる。 In step S<b>215 , the transmitting/receiving unit 172 of the terminal device 10 receives the forecast/actual management report and the predicted landing report transmitted from the server 20 . The notification control unit 174 causes the display 150 to display the received forecast/actual management report and landing forecast report.

以上のように、プロジェクト管理システム1では、プロジェクトの予算や予定工数を含む予定情報と、プロジェクトの予算消化や実績工数を含む実績情報と、に基づき、プロジェクトの予定に対する実績を示す予実管理レポートと、将来におけるプロジェクトの推移予想を示す着地予想レポートを生成する。これにより、予算の消化状況及びプロジェクトの着地状況を一目で把握することが可能になる。 As described above, in the project management system 1, based on the schedule information including the project budget and scheduled man-hours, and the actual information including the budget consumption and actual man-hours of the project, a budget/actual management report showing the results against the project schedule can be generated. , to generate a forecast report that shows the expected transition of the project in the future. This makes it possible to grasp at a glance the status of budget consumption and the progress of projects.

<4 画面例>
以下、図8及び図9を参照しながら、プロジェクト管理システム1による申告書作成処理におけるコメント入力及びコメント詳細表示の画面例について説明する。
<4 Screen example>
An example of a comment input screen and a detailed comment display screen in the declaration creation process by the project management system 1 will be described below with reference to FIGS. 8 and 9. FIG.

図8は、端末装置10に表示する予実管理レポートの画面例を示す図である。図8の画面例は、予実管理レポート生成更新モジュール2035が生成した予実管理レポートが端末装置10に送信されて表示された画面例を示す。図7のステップS215に相当する。 FIG. 8 is a diagram showing a screen example of a budget/actual management report displayed on the terminal device 10. As shown in FIG. The screen example of FIG. 8 shows a screen example in which the budget/actual management report generated by the budget/actual management report generation/update module 2035 is transmitted to the terminal device 10 and displayed. This corresponds to step S215 in FIG.

図8に示すように、端末装置10のディスプレイ150には、予実管理レポートを表示する画面として、プロジェクトの進捗状況を示す進捗率表示欄1031aと、プロジェクトにおける売上を示す売上表示欄1031bと、プロジェクトにおける支出を示す支出表示欄1031cが表示されている。進捗率表示欄1031a、売上表示欄1031b、支出表示欄1031cに表示される各情報は、プロジェクト予定データベース2021に格納されているプロジェクトの予定情報と、プロジェクト実績データベース2023に格納されているプロジェクトの実績情報が読み込まれて表示されたものである。 As shown in FIG. 8, on the display 150 of the terminal device 10, as a screen for displaying the budget/actual management report, a progress rate display column 1031a indicating the progress of the project, a sales display column 1031b indicating sales in the project, and a project An expenditure display column 1031c indicating expenditure in . The information displayed in the progress rate display column 1031a, the sales display column 1031b, and the expenditure display column 1031c are the project schedule information stored in the project schedule database 2021 and the project performance stored in the project performance database 2023. Information is read and displayed.

図8に示す画面において、予実管理レポートは、例えば、プロジェクト全体について、特定の要員やチーム等について表示させることが可能であり、また、当該プロジェクトの遂行期間内のある時点について表示させることが可能に構成されている。 On the screen shown in FIG. 8, the budget/actual management report can be displayed for specific personnel, teams, etc. for the entire project, for example, and can be displayed for a certain point in the execution period of the project. is configured to

図9は、端末装置10に表示する推移予想レポートを表示する画面例を示す図である。図9の画面例は、着地予想レポート生成更新モジュール2037が生成した着地予想レポートが端末装置10に送信されて表示された画面例を示す。図7のステップS215に相当する。 FIG. 9 is a diagram showing an example of a screen displaying a transition prediction report displayed on the terminal device 10. As shown in FIG. The example screen of FIG. 9 shows an example of a screen in which the predicted landing report generated by the predicted landing report generation update module 2037 is transmitted to the terminal device 10 and displayed. This corresponds to step S215 in FIG.

図9に示すように、端末装置10のディスプレイ150には、将来におけるプロジェクトの推移予想を示す着地予想レポート表示欄1032aが表示されている。着地予想レポート表示欄1032aには、プロジェクトのある時点での予定情報と実績情報である予算の消化状況、作業実績工数(工数の消化状況)、実績の消化率等を示す実績表示欄1032bと、これらの情報から予想される、当該プロジェクトの完了予測、将来のある時点(例えば、完了予定の時点)における予算の消化状況、作業実績工数の予測値を示す予想表示欄1032cが表示されている。 As shown in FIG. 9, the display 150 of the terminal device 10 displays a landing prediction report display field 1032a that shows the prediction of the transition of the project in the future. In the expected landing report display field 1032a, there is a result display field 1032b that shows budget consumption status, actual work man-hours (man-hour consumption status), actual utilization rate, etc., which are schedule information and actual performance information at a certain point in the project, A prediction display field 1032c is displayed showing the predicted completion of the project, the state of budget consumption at a certain point in the future (for example, the scheduled completion time), and the predicted value of actual work man-hours, which are predicted from these pieces of information.

図9に示す画面において、着地予想レポートは、例えば、当該プロジェクトの遂行期間内のある時点について表示させることが可能になるように、期間選択欄1032dが設けられている。 In the screen shown in FIG. 9, the expected landing report is provided with a period selection column 1032d so that it is possible to display, for example, a certain point in the execution period of the project.

<小括>
以上のように、本実施形態によると、ユーザからの入力により、または外部のサーバ装置等から、プロジェクトの予算や予定工数を含む予定情報を取得する。その後、プロジェクトの予算消化や実績工数を含む実績情報を取得し、プロジェクトの予定情報と、プロジェクトの実績情報とに基づき、プロジェクトの予定に対する実績を示す予実管理レポートと、将来におけるプロジェクトの推移予想を示す着地予想レポートを生成する。これにより、予算の消化状況及びプロジェクトの着地状況を一目で把握することが可能になる。
<Summary>
As described above, according to the present embodiment, schedule information including the project budget and scheduled man-hours is acquired by input from the user or from an external server device or the like. After that, we acquire actual information including project budget consumption and actual man-hours, and based on the project schedule information and project actual information, we prepare a budget/actual management report that shows the actual results against the project schedule and an estimate of future changes in the project. Generate a predicted landing report showing This makes it possible to grasp at a glance the status of budget consumption and the progress of projects.

また、プロジェクトの予算消化や実績工数を含む実績情報を新たに取得すると、予実管理レポート及び着地予想レポートを更新する。そのため、リアルタイムな予実管理レポート及び着地予想レポートをユーザに提示することが可能になる。これにより、より正確なプロジェクトの状況把握が可能になる。 In addition, when newly acquiring performance information including project budget consumption and actual man-hours, the budget/actual management report and the landing forecast report are updated. Therefore, it is possible to present a real-time forecast/actual management report and a landing forecast report to the user. This allows for a more accurate understanding of the project status.

以上、開示に係る実施形態について説明したが、これらはその他の様々な形態で実施することが可能であり、種々の省略、置換及び変更を行なって実施することができる。これらの実施形態及び変形例ならびに省略、置換及び変更を行なったものは、特許請求の範囲の技術的範囲とその均等の範囲に含まれる。 Although the disclosed embodiments have been described above, they can be implemented in various other forms, and can be implemented with various omissions, substitutions, and modifications. These embodiments, modifications, omissions, substitutions and changes are included in the technical scope of the claims and their equivalents.

<付記>
以上の各実施形態で説明した事項を、以下に付記する。
<Appendix>
The items described in each of the above embodiments will be added below.

(付記1)プロセッサ29と、メモリ25とを備えるコンピュータに実行させ、ユーザの事業に係るプロジェクトの遂行を支援するためのプログラムであって、メモリ25には、プロジェクトの予定情報(2021)が登録され、プログラムは、プロセッサ29に、プロジェクトに従事する要員が、プロジェクトに従事した実績情報を取得するステップ(S222)と、プロジェクトの予定情報と、取得したプロジェクトの実績情報とに基づき、プロジェクトの予定に対する実績を示す予実管理レポートを生成し、ユーザに提示するステップ(S223、S225)と、プロジェクトの予定情報と、取得したプロジェクトの実績情報とに基づき、将来におけるプロジェクトの推移予想を示す着地予想レポートを生成し、ユーザに提示するステップ(S224、S225)と、予実管理レポート及び着地予想レポートの生成後において、取得したプロジェクトの実績情報及びプロジェクトの予定情報に対する変更情報に基づき、予実管理レポート及び着地予想レポートを更新するステップ(S223、S224)と、を実行させる、プログラム。 (Appendix 1) A program to be executed by a computer having a processor 29 and a memory 25 to support the execution of a project related to a user's business, wherein project schedule information (2021) is registered in the memory 25 Then, the program instructs the processor 29 to acquire information on the actual results of the personnel engaged in the project (S222); Steps (S223, S225) of generating a budget/actual management report showing the actual performance of the project and presenting it to the user (S223, S225); and presenting it to the user (S224, S225); and a step of updating the forecast report (S223, S224).

(付記2)プロジェクトの予定情報として、プロジェクトに必要な予算の情報と、プロジェクトを遂行するために必要な工数の情報と、が登録され、予実管理レポートを生成するステップにおいて、予算及び工数の消化状況についての予実管理レポートを生成し、ユーザに提示し、着地予想レポートを生成するステップにおいて、予算及び工数の将来における推移予想を示す着地予想レポートを生成し、ユーザに提示する、(付記1)に記載のプログラム。 (Appendix 2) Information on the budget required for the project and information on the number of man-hours required to carry out the project are registered as the project schedule information, and in the step of generating the budget/actual management report, the budget and the number of man-hours are consumed. In the step of generating a budget/actual management report about the situation, presenting it to a user, and generating a forecast report, generating a forecast report showing future transition forecasts of the budget and man-hours and presenting it to the user (Appendix 1) program described in .

(付記3)実績情報を取得するステップにおいて、要員の勤怠情報を取得する、(付記1)または(付記2)に記載のプログラム。 (Appendix 3) The program according to (Appendix 1) or (Appendix 2), wherein in the step of obtaining performance information, attendance information of the personnel is obtained.

(付記4)要員の勤怠情報を取得し、取得した勤怠情報に含まれるプロジェクトに関する情報から1または複数のプロジェクトへの当てはめを行い、プロジェクトの実績情報として取得する、(付記3)に記載のプログラム。 (Appendix 4) The program according to (Appendix 3), which acquires attendance information of personnel, applies information on projects included in the acquired attendance information to one or more projects, and acquires it as project performance information. .

(付記5)実績情報を取得するステップにおいて、要員のスケジュール情報を取得する、(付記1)または(付記2)に記載のプログラム。 (Appendix 5) The program according to (Appendix 1) or (Appendix 2), wherein in the step of obtaining performance information, schedule information of personnel is obtained.

(付記6)要員のスケジュール情報を取得し、取得したスケジュール情報に含まれるプロジェクトに関する情報から1または複数のプロジェクトへの当てはめを行い、プロジェクトの実績情報として取得する、(付記5)に記載のプログラム。 (Appendix 6) The program according to (Appendix 5), which acquires schedule information of personnel, applies information on projects included in the acquired schedule information to one or more projects, and acquires it as project performance information. .

(付記7)着地予想レポートを生成するステップにおいて、プロジェクトの売上と支出との収支についての推移予想を示す着地予想レポートを生成し、ユーザに提示する、(付記1)から(付記6)のいずれかに記載のプログラム。 (Appendix 7) In any of (Appendix 1) to (Appendix 6), in the step of generating a forecast report, a forecast report showing transition forecasts of the balance between sales and expenses of the project is generated and presented to the user. the program described in

(付記8)着地予想レポートを生成するステップにおいて、プロジェクトによる利益についての推移予想を示す着地予想レポートを生成し、ユーザに提示する、(付記1)から(付記7)のいずれかに記載のプログラム。 (Appendix 8) The program according to any one of (Appendix 1) to (Appendix 7), wherein, in the step of generating a forecasted earnings report, a forecasted earnings report showing expected changes in profits from the project is generated and presented to the user. .

(付記9)予実管理レポートを生成するステップにおいて、プロジェクトの予定情報とプロジェクトの実績情報との乖離について、乖離の状況に応じて異なる態様で提示する、(付記1)から(付記8)のいずれかに記載のプログラム。 (Appendix 9) Any of (Appendix 1) to (Appendix 8), in which, in the step of generating the budget/actual management report, the discrepancy between the project schedule information and the project performance information is presented in a different manner depending on the state of the discrepancy. the program described in

(付記10)制御部203と、記憶部202とを備え、ユーザの事業に係るプロジェクトの遂行を支援する情報処理装置であって、記憶部202には、プロジェクトの予定情報(2021)が登録され、制御部203は、プロジェクトに従事する要員が、プロジェクトに従事した実績情報を取得するステップ(S222)と、プロジェクトの予定情報と、取得したプロジェクトの実績情報とに基づき、プロジェクトの予定に対する実績を示す予実管理レポートを生成し、ユーザに提示するステップ(S223、S225)と、プロジェクトの予定情報と、取得したプロジェクトの実績情報とに基づき、将来におけるプロジェクトの推移予想を示す着地予想レポートを生成し、ユーザに提示するステップ(S224、S225)と、予実管理レポート及び着地予想レポートの生成後において、取得したプロジェクトの実績情報及びプロジェクトの予定情報に対する変更情報に基づき、予実管理レポート及び着地予想レポートを更新するステップ(S223、S224)と、を行う、情報処理装置。 (Appendix 10) An information processing device that includes a control unit 203 and a storage unit 202 and supports execution of a project related to a user's business, in which project schedule information (2021) is registered. , the control unit 203 acquires the project performance information of the personnel engaged in the project (S222), and based on the project schedule information and the acquired project performance information, the performance of the project schedule is calculated. generating a budget/actual management report to show and presenting it to the user (S223, S225), and based on the project schedule information and the acquired project performance information, a landing forecast report showing future transition forecast of the project is generated. , step of presenting to the user (S224, S225), and after generating the forecast/actual management report and the forecasted landing report, the forecast/actual management report and the forecasted forecast report are generated based on the acquired project performance information and change information for the project schedule information. An information processing device that performs updating steps (S223, S224).

(付記11)プロセッサ29と、メモリ25とを備えるコンピュータにより実行され、ユーザの事業に係るプロジェクトの遂行を支援するための方法であって、メモリ25には、プロジェクトの予定情報(2021)が登録され、方法は、プロセッサ29が、プロジェクトに従事する要員が、プロジェクトに従事した実績情報を取得するステップ(S222)と、プロジェクトの予定情報と、取得したプロジェクトの実績情報とに基づき、プロジェクトの予定に対する実績を示す予実管理レポートを生成し、ユーザに提示するステップ(S223、S225)と、プロジェクトの予定情報と、取得したプロジェクトの実績情報とに基づき、将来におけるプロジェクトの推移予想を示す着地予想レポートを生成し、ユーザに提示するステップ(S224、S225)と、予実管理レポート及び着地予想レポートの生成後において、取得したプロジェクトの実績情報及びプロジェクトの予定情報に対する変更情報に基づき、予実管理レポート及び着地予想レポートを更新するステップ(S223、S224)と、を実行する、方法。 (Appendix 11) A method for supporting the execution of a project related to a user's business, executed by a computer comprising a processor 29 and a memory 25, wherein project schedule information (2021) is registered in the memory 25. The method includes a step of obtaining the performance information of the personnel engaged in the project by the processor 29 (S222); Steps (S223, S225) of generating a budget/actual management report showing the actual performance of the project and presenting it to the user (S223, S225); and presenting it to the user (S224, S225); updating the forecast report (S223, S224); and

10 端末装置、20 サーバ、80 ネットワーク、130 操作受付部、161 ユーザ情報、22 通信IF、23 入出力IF、25 メモリ、26 ストレージ、29 プロセッサ、201 通信部、202 記憶部、2021 プロジェクト予定データベース、2022 ユーザデータベース、2023 プロジェクト実績データベース、203 制御部


10 terminal device, 20 server, 80 network, 130 operation reception unit, 161 user information, 22 communication IF, 23 input/output IF, 25 memory, 26 storage, 29 processor, 201 communication unit, 202 storage unit, 2021 project schedule database, 2022 user database, 2023 project results database, 203 control unit


Claims (11)

プロセッサと、メモリとを備えるコンピュータに実行させ、ユーザの事業に係るプロジェクトの遂行を支援するためのプログラムであって、
前記メモリには、前記プロジェクトの予定情報が登録され、
前記プログラムは、前記プロセッサに、
前記プロジェクトに従事する要員が、前記プロジェクトに従事した実績情報を取得するステップと、
前記プロジェクトの予定情報と、取得した前記プロジェクトの実績情報とに基づき、前記プロジェクトの予定に対する実績を示す予実管理レポートを生成し、前記ユーザに提示するステップと、
前記プロジェクトの予定情報と、取得した前記プロジェクトの実績情報とに基づき、将来における前記プロジェクトの推移予想を示す着地予想レポートを生成し、前記ユーザに提示するステップと、
前記予実管理レポート及び前記着地予想レポートの生成後において、取得した前記プロジェクトの実績情報及び前記プロジェクトの予定情報に対する変更情報に基づき、前記予実管理レポート及び前記着地予想レポートを更新するステップと、を実行させる、プログラム。
A program that is executed by a computer comprising a processor and a memory and supports the execution of a project related to a user's business,
Schedule information of the project is registered in the memory,
The program causes the processor to:
a step of acquiring performance information on the personnel engaged in the project, who engaged in the project;
a step of generating a budget/actual management report showing results against the project schedule based on the project schedule information and the acquired project performance information, and presenting the report to the user;
a step of generating and presenting to the user a landing forecast report showing a forecast of future transitions of the project based on the project schedule information and the obtained project performance information;
a step of updating the forecast/actual management report and the forecasted landing report based on the acquired change information for the project performance information and the project schedule information after the forecasted/actual management report and the forecasted landing report are generated. program.
前記プロジェクトの予定情報として、前記プロジェクトに必要な予算の情報と、前記プロジェクトを遂行するために必要な工数の情報と、が登録され、
前記予実管理レポートを生成するステップにおいて、前記予算及び前記工数の消化状況についての前記予実管理レポートを生成し、前記ユーザに提示し、
前記着地予想レポートを生成するステップにおいて、前記予算及び前記工数の将来における推移予想を示す着地予想レポートを生成し、前記ユーザに提示する、請求項1に記載のプログラム。
Information on the budget required for the project and information on the number of man-hours required to carry out the project are registered as the schedule information of the project;
In the step of generating the budget/actual management report, generating the budget/actual management report regarding the budget and the man-hour consumption status, and presenting it to the user;
2. The program according to claim 1, wherein, in said step of generating said landing prediction report, said landing prediction report indicating future transition predictions of said budget and said man-hours is generated and presented to said user.
前記実績情報を取得するステップにおいて、前記要員の勤怠情報を取得する、請求項1または請求項2に記載のプログラム。 3. The program according to claim 1, wherein in the step of acquiring performance information, attendance information of said personnel is acquired. 前記要員の勤怠情報を取得し、取得した前記勤怠情報に含まれる前記プロジェクトに関する情報から1または複数の前記プロジェクトへの当てはめを行い、前記プロジェクトの実績情報として取得する、請求項3に記載のプログラム。 4. The program according to claim 3, wherein the attendance information of the personnel is acquired, the information about the project included in the acquired attendance information is applied to one or more of the projects, and the result information of the project is acquired. . 前記実績情報を取得するステップにおいて、前記要員のスケジュール情報を取得する、請求項1または請求項2に記載のプログラム。 3. The program according to claim 1, wherein, in the step of acquiring performance information, schedule information of said personnel is acquired. 前記要員のスケジュール情報を取得し、取得した前記スケジュール情報に含まれる前記プロジェクトに関する情報から1または複数の前記プロジェクトへの当てはめを行い、前記プロジェクトの実績情報として取得する、請求項5に記載のプログラム。 6. The program according to claim 5, which acquires the schedule information of the personnel, applies the information on the project included in the acquired schedule information to one or more of the projects, and acquires the result information of the project. . 前記着地予想レポートを生成するステップにおいて、前記プロジェクトの売上と支出との収支についての推移予想を示す着地予想レポートを生成し、前記ユーザに提示する、請求項1から請求項6のいずれか1項に記載のプログラム。 7. The step of generating the forecasted landing report includes generating a forecasted landing report showing transition forecasts of balance between sales and expenses of the project and presenting it to the user. program described in . 前記着地予想レポートを生成するステップにおいて、前記プロジェクトによる利益についての推移予想を示す着地予想レポートを生成し、前記ユーザに提示する、請求項1から請求項7のいずれか1項に記載のプログラム。 8. The program according to any one of claims 1 to 7, wherein, in the step of generating the forecasted earnings report, a forecasted earnings report showing expected changes in profit from the project is generated and presented to the user. 前記予実管理レポートを生成するステップにおいて、前記プロジェクトの予定情報と前記プロジェクトの実績情報との乖離について、前記乖離の状況に応じて異なる態様で提示する、請求項1から請求項8のいずれか1項に記載のプログラム。 9. Any one of claims 1 to 8, wherein in the step of generating the budget/actual management report, the deviation between the project schedule information and the project performance information is presented in different manners according to the state of the deviation. The program described in Section. 制御部と、記憶部とを備え、ユーザの事業に係るプロジェクトの遂行を支援する情報処理装置であって、
前記記憶部には、前記プロジェクトの予定情報が登録され、
前記制御部は、
前記プロジェクトに従事する要員が、前記プロジェクトに従事した実績情報を取得するステップと、
前記プロジェクトの予定情報と、取得した前記プロジェクトの実績情報とに基づき、前記プロジェクトの予定に対する実績を示す予実管理レポートを生成し、前記ユーザに提示するステップと、
前記プロジェクトの予定情報と、取得した前記プロジェクトの実績情報とに基づき、将来における前記プロジェクトの推移予想を示す着地予想レポートを生成し、前記ユーザに提示するステップと、
前記予実管理レポート及び前記着地予想レポートの生成後において、取得した前記プロジェクトの実績情報及び前記プロジェクトの予定情報に対する変更情報に基づき、前記予実管理レポート及び前記着地予想レポートを更新するステップと、を実行する、情報処理装置。
An information processing device that includes a control unit and a storage unit and supports execution of a project related to a user's business,
Schedule information of the project is registered in the storage unit,
The control unit
a step of acquiring performance information on the personnel engaged in the project, who engaged in the project;
a step of generating a budget/actual management report showing results against the project schedule based on the project schedule information and the obtained project performance information, and presenting the report to the user;
a step of generating and presenting to the user a landing forecast report showing a forecast of future transitions of the project based on the project schedule information and the obtained project performance information;
and executing a step of, after generating the budget/actual management report and the forecasted landing report, updating the forecasted/actual management report and the forecasted landing report based on the acquired change information of the project performance information and the project schedule information. information processing device.
プロセッサと、メモリとを備えるコンピュータにより実行され、ユーザの事業に係るプロジェクトの遂行を支援するための方法であって、
前記メモリには、前記プロジェクトの予定情報が登録され、
前記方法は、前記プロセッサが、
前記プロジェクトに従事する要員が、前記プロジェクトに従事した実績情報を取得するステップと、
前記プロジェクトの予定情報と、取得した前記プロジェクトの実績情報とに基づき、前記プロジェクトの予定に対する実績を示す予実管理レポートを生成し、前記ユーザに提示するステップと、
前記プロジェクトの予定情報と、取得した前記プロジェクトの実績情報とに基づき、将来における前記プロジェクトの推移予想を示す着地予想レポートを生成し、前記ユーザに提示するステップと、
前記予実管理レポート及び前記着地予想レポートの生成後において、取得した前記プロジェクトの実績情報及び前記プロジェクトの予定情報に対する変更情報に基づき、前記予実管理レポート及び前記着地予想レポートを更新するステップと、を実行する、方法。


A computer-implemented method comprising a processor and a memory for assisting a user in completing a business project, the method comprising:
Schedule information of the project is registered in the memory,
The method comprises: the processor;
a step of obtaining performance information of the personnel engaged in the project, who engaged in the project;
a step of generating a budget/actual management report showing results against the project schedule based on the project schedule information and the acquired project performance information, and presenting the report to the user;
a step of generating and presenting to the user a landing forecast report showing a forecast of future transitions of the project based on the project schedule information and the obtained project performance information;
a step of updating the forecast/actual management report and the forecasted landing report based on the acquired change information for the project performance information and the project schedule information after the forecasted/actual management report and the forecasted landing report are generated. how to.


JP2021133326A 2021-08-18 2021-08-18 Program, information processing device, and method Pending JP2023027949A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021133326A JP2023027949A (en) 2021-08-18 2021-08-18 Program, information processing device, and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021133326A JP2023027949A (en) 2021-08-18 2021-08-18 Program, information processing device, and method

Publications (1)

Publication Number Publication Date
JP2023027949A true JP2023027949A (en) 2023-03-03

Family

ID=85331296

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021133326A Pending JP2023027949A (en) 2021-08-18 2021-08-18 Program, information processing device, and method

Country Status (1)

Country Link
JP (1) JP2023027949A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2023054338A (en) * 2018-01-31 2023-04-13 株式会社三洋物産 game machine
JP2023054339A (en) * 2018-01-31 2023-04-13 株式会社三洋物産 game machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2023054338A (en) * 2018-01-31 2023-04-13 株式会社三洋物産 game machine
JP2023054339A (en) * 2018-01-31 2023-04-13 株式会社三洋物産 game machine

Similar Documents

Publication Publication Date Title
JP2023027949A (en) Program, information processing device, and method
US20240046218A1 (en) Information processing apparatus and method
US20230281343A1 (en) Configuration and Implementation of Extra-Organizational Applications
US20240127194A1 (en) Management of Computing Devices Using Employee Records
US20230051206A1 (en) Multi-Platform Application Integration and Data Synchronization
CN105247547A (en) Automatic resource scheduling
JP2019194860A (en) Job vacancy information providing server and/or job search information providing server and job vacancy information receipt program
JP2022179191A (en) Program, information processing device and method
CN101841555A (en) Be used for effectively utilizing the system and method for the transmission structure of electric network
JP7109116B1 (en) Program, information processing device and method
JP6351807B1 (en) Information processing apparatus and program
JP7017597B2 (en) Information processing equipment, methods and programs
WO2024018722A1 (en) Program, information processing device, and method
CN113112181A (en) Project management method and related device
JP7244141B1 (en) Program, information processing device and method
WO2024018721A1 (en) Program, information processing device, and method
JP6935958B1 (en) Programs, methods, information processing equipment
US8700656B2 (en) Method and system for implementing an on-demand scheduler
JP2023022616A (en) Program, information processing apparatus, and method
JP2023027947A (en) Program, information processing device and method
JP7219989B1 (en) Program, information processing device and method
JP7420426B1 (en) Program, information processing device, and method
JP7168966B2 (en) Program, information processing device and method
US20210042682A1 (en) Method for computer assisted work management and work management system
JP2023128528A (en) Program, terminal device, method, and information processing apparatus

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20231115

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20231115

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240221

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20240419