JP2023022870A - Program, information processing apparatus, and method - Google Patents

Program, information processing apparatus, and method Download PDF

Info

Publication number
JP2023022870A
JP2023022870A JP2021127919A JP2021127919A JP2023022870A JP 2023022870 A JP2023022870 A JP 2023022870A JP 2021127919 A JP2021127919 A JP 2021127919A JP 2021127919 A JP2021127919 A JP 2021127919A JP 2023022870 A JP2023022870 A JP 2023022870A
Authority
JP
Japan
Prior art keywords
man
information
project
worker
hour
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2021127919A
Other languages
Japanese (ja)
Other versions
JP7496336B2 (en
Inventor
祥 竹田
Sho Takeda
茂樹 増田
Shigeki Masuda
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Freee KK
Original Assignee
Freee KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Freee KK filed Critical Freee KK
Priority to JP2021127919A priority Critical patent/JP7496336B2/en
Publication of JP2023022870A publication Critical patent/JP2023022870A/en
Application granted granted Critical
Publication of JP7496336B2 publication Critical patent/JP7496336B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

To provide a program, an information processing apparatus, and a method that can reduce time and effort required for input of man-hours.SOLUTION: A program for performing man-hour management processing causes a computer comprising a processor and memory to execute the following steps, and the memory is registered in advance with information on the name of a project and information on operators of the project. The program causes the processor to execute the steps of: acquiring information on the project registered by the operators of the project in an external server; extracting, from the information on the project, man-hour information on work and man-hours related to the project; registering the extracted man-hour information as man-hour information on the project; and displaying the registered man-hour information and demanding the operators to check the man-hour information.SELECTED DRAWING: Figure 5

Description

本開示は、工数の管理を行うためのプログラム、情報処理装置及び方法に関する。 The present disclosure relates to a program, an information processing apparatus, and a method for man-hour management.

作業者の工数をまとめて管理する方法がある。特許文献1には、携帯可能端末において各受注番号とかかる時間とを入力し、上位装置においてその情報を集計することが開示されている。 There is a method for collectively managing man-hours of workers. Patent Literature 1 discloses inputting each order number and the time required in a portable terminal and summing up the information in a host device.

特開平3―226864号公報JP-A-3-226864

工数の入力を作業者自身で行う場合、その手間がかかってしまうと工数の入力に時間を要す可能性がある。特許文献1の方法では、携帯可能端末において工数に関する情報を入力できるが、作業の振り返りや入力の手間はかかってしまう。 When inputting the man-hours by the worker himself/herself, it may take time to input the man-hours if it takes time. In the method of Patent Document 1, information about the number of man-hours can be input on a portable terminal, but it takes time and effort to review and input work.

本発明は、工数の入力にかかる手間を削減することを目的とする。 SUMMARY OF THE INVENTION An object of the present invention is to reduce the time and effort required to input man-hours.

上記目的を達成するために、本発明のプログラムは、プロセッサと、メモリとを備えるコンピュータに実行させ、工数管理の処理を行うためのプログラムであって、前記メモリにはプロジェクトの名称に関する情報と、前記プロジェクトの作業者に関する情報とを予め登録されており、前記プログラムは、前記プロセッサに、前記プロジェクトの作業者が外部サーバにおいて登録した前記プロジェクトに関する情報を取得するステップと、前記プロジェクトに関する情報から、前記プロジェクトに関する作業と工数に関する工数情報を抽出するステップと、前記抽出した工数情報を前記プロジェクトの工数情報として登録するステップと、前記登録された工数情報を表示し、当該工数情報について前記作業者に確認を求めるステップとを実行させることを特徴とする、プログラム。 In order to achieve the above object, a program of the present invention is a program for executing man-hour management processing by a computer having a processor and a memory, wherein the memory contains information on a project name, and information on the project worker is registered in advance, and the program acquires in the processor information on the project registered by the project worker on an external server; and from the information on the project, a step of extracting man-hour information relating to work and man-hours relating to the project; a step of registering the extracted man-hour information as man-hour information of the project; displaying the registered man-hour information; a step of asking for confirmation;

本発明によれば、工数の入力にかかる手間を削減することができる。 According to the present invention, it is possible to reduce the labor involved in inputting man-hours.

工数管理システム100の構成例を示すブロック図。1 is a block diagram showing a configuration example of a man-hour management system 100; FIG. 本実施形態における端末装置30の構成例を示すブロック図。FIG. 2 is a block diagram showing a configuration example of a terminal device 30 according to the embodiment; 本実施形態における管理処理を示すフローチャート。4 is a flowchart showing management processing in the embodiment; 本実施形態における作業者の入力処理を示すフローチャート。4 is a flowchart showing input processing by a worker according to the embodiment; 本実施形態における工数の入力処理を示すフローチャート。A flow chart showing a process of inputting man-hours according to the present embodiment. (A)本実施形態における連携アプリの選択画面の表示例を示す図。(B)本実施形態におけるプロジェクトに関する入力画面の表示例を示す図。(A) A diagram showing a display example of a selection screen of a cooperative application according to the present embodiment. (B) A diagram showing a display example of an input screen regarding a project in the embodiment. (A)本実施形態におけるスケジュール画面の表示例を示す図。(B)本実施形態における開発管理画面の表示例を示す図。(C)本実施形態におけるタスク管理画面の表示例を示す図。(A) A diagram showing a display example of a schedule screen in the present embodiment. (B) A diagram showing a display example of a development management screen in the embodiment. (C) A diagram showing a display example of a task management screen according to the embodiment. (A)本実施形態における工数入力画面の表示例を示す図。(B)本実施形態における工数入力画面の表示例を示す図。(A) A diagram showing a display example of a man-hour input screen in the present embodiment. (B) A diagram showing a display example of a man-hour input screen in the present embodiment. (A)本実施形態における工数一覧画面の表示例を示す図。(B)本実施形態における工数申請画面の表示例を示す図。(A) A diagram showing a display example of a man-hour list screen in the present embodiment. (B) A diagram showing a display example of a man-hour application screen according to the present embodiment.

以下、図面を参照して本発明の好適な実施形態を説明する。図1に本発明を適用可能な工数管理システム100の一実施形態を示すブロック図を示す。工数管理システム100は、サーバ(コンピュータ、情報処理装置)20、端末装置30を中心に構成され、スケジュール管理サーバ10、タスク管理サーバ11、開発管理サーバ12とからデータをやり取りできる。実際に工数管理に関する処理を行なっているのは端末装置30にダウンロードされている工数管理アプリ、もしくは工数管理に関するサービスを提供するソフトウェアを制御するサーバ20である。端末装置30とサーバ20とスケジュール管理サーバ10、タスク管理サーバ11、開発管理サーバ12(外部サーバ)とは、ネットワーク80を介して相互に通信可能に接続されている。ネットワーク80は、有線または無線ネットワークにより構成される。本実施形態の工数管理システムでは、複数の作業者の工数を管理することができるものであり、複数の作業者がそれぞれの端末を有している可能性が高い。後述する実施形態においては、簡単のために端末装置30を用いて説明をする。端末装置30は作業者毎に有しているものであり、サーバ20やスケジュール管理サーバ10、タスク管理サーバ11、開発管理サーバ12等は複数の端末装置30に対して制御を行うことができる。 Preferred embodiments of the present invention will be described below with reference to the drawings. FIG. 1 shows a block diagram showing an embodiment of a man-hour management system 100 to which the present invention can be applied. The man-hour management system 100 mainly includes a server (computer, information processing device) 20 and a terminal device 30 , and can exchange data with the schedule management server 10 , task management server 11 and development management server 12 . It is the server 20 that controls the man-hour management application downloaded to the terminal device 30 or the software that provides the man-hour management service that actually performs the man-hour management process. The terminal device 30, the server 20, the schedule management server 10, the task management server 11, and the development management server 12 (external server) are connected via a network 80 so as to be able to communicate with each other. Network 80 is configured by a wired or wireless network. The man-hour management system of this embodiment can manage the man-hours of a plurality of workers, and it is highly possible that the plurality of workers have their own terminals. In the embodiments described later, the terminal device 30 will be used for the sake of simplicity. Each worker has a terminal device 30 , and the server 20 , schedule management server 10 , task management server 11 , development management server 12 , etc. can control a plurality of terminal devices 30 .

端末装置30は、各作業者が操作する装置である。ここで、作業者とは、端末装置30を使用して作業を行うもの、工数の管理を行うものを指す。端末装置30は、据え置き型のPC(Personal Computer)、ラップトップPC等により実現される。この他、端末装置30は、例えば移動体通信システムに対応したタブレットや、スマートフォン等の携帯端末であるとしてもよい。 The terminal device 30 is a device operated by each worker. Here, the worker refers to a person who uses the terminal device 30 to perform work and manages man-hours. The terminal device 30 is realized by a stationary PC (Personal Computer), a laptop PC, or the like. In addition, the terminal device 30 may be, for example, a mobile terminal such as a tablet compatible with a mobile communication system or a smart phone.

端末装置30は、ネットワーク80を介してサーバ20と通信可能に接続される。端末装置30は、4G、5G、LTE(Long Term Evolution)等の通信規格に対応した無線基地局81、IEEE(Institute of Electrical and Electronics Engineers)802.11等の無線LAN(Local Area Network)規格に対応した無線LANルータ82等の通信機器と通信することにより、ネットワーク80に接続される。 The terminal device 30 is communicably connected to the server 20 via the network 80 . The terminal device 30 is a wireless base station 81 compatible with communication standards such as 4G, 5G, and LTE (Long Term Evolution), and a wireless LAN (Local Area Network) standard such as IEEE (Institute of Electrical and Electronics Engineers) 802.11. It is connected to the network 80 by communicating with a compatible communication device such as a wireless LAN router 82 .

サーバ20は、工数管理をするサーバ(コンピュータ)であり、以下の構成を有する。 The server 20 is a server (computer) that manages man-hours and has the following configuration.

通信I/F22は、サーバ20が外部の装置と通信するため、信号を入出力するためのインタフェースである。 The communication I/F 22 is an interface for inputting and outputting signals for the server 20 to communicate with an external device.

記憶部26は、データを保存するための記憶装置であり、例えばフラッシュメモリ、HDD(Hard Disc Drive)である。もしくは、外部のクラウド上の記録部に記録をしている情報を取得しても良い。記憶部36には作業者情報が含まれている。作業者情報は、各端末装置30を使用している工数を管理する対象となる作業者の情報である。作業者情報としては、作業者を識別する情報(従業員ID)、作業者の名称、作業者が所属している企業等の組織情報等が含まれる。 The storage unit 26 is a storage device for storing data, and is, for example, a flash memory or a HDD (Hard Disc Drive). Alternatively, information recorded in a recording unit on an external cloud may be obtained. The storage unit 36 contains worker information. The worker information is information of a worker whose man-hours using each terminal device 30 is managed. The worker information includes information for identifying the worker (employee ID), the name of the worker, organizational information such as the company to which the worker belongs, and the like.

不揮発性メモリ25は、制御部50によって電気的に消去・記録・読出し可能な記録媒体としてのメモリであり、例えばEEPROM等が用いられる。不揮発性メモリ25には、制御部50の動作用の定数、プログラム等が記憶される。ここでいう、プログラムとは、本実施形態にて後述する各種フローチャートを実行するためのコンピュータプログラムのことである。 The nonvolatile memory 25 is a memory as a recording medium that can be electrically erased, recorded, and read by the control unit 50, and an EEPROM or the like is used, for example. The nonvolatile memory 25 stores constants for operation of the control unit 50, programs, and the like. The program here is a computer program for executing various flowcharts described later in this embodiment.

制御部50は、少なくとも1つのプロセッサを内蔵し、サーバ20を制御するハードウェアであり、演算装置、レジスタ、周辺回路などにより構成される。前述した不揮発性メモリ25に記録されたプログラムを実行することで、後述する本実施形態の各処理を実現する。 The control unit 50 is hardware that incorporates at least one processor and controls the server 20, and includes an arithmetic unit, registers, peripheral circuits, and the like. By executing the program recorded in the non-volatile memory 25 described above, each process of this embodiment, which will be described later, is realized.

ここで、サーバ20の制御部50の機能的な構成について説明をする。 Here, the functional configuration of the control unit 50 of the server 20 will be described.

プロジェクト情報取得モジュール(取得手段)50aは、プロジェクトの作業者が外部サーバにおいて登録したプロジェクトに関する情報を取得する。 A project information acquisition module (acquisition means) 50a acquires information about a project registered in an external server by a project worker.

工数情報抽出、登録モジュール(制御手段)50bは、プロジェクトに関する情報(後述する図3のS303で登録する情報)から、プロジェクトに関する作業と工数に関する工数情報を抽出し、記憶部26に登録する。 The man-hour information extraction/registration module (control means) 50b extracts man-hour information about work and man-hours related to the project from the information about the project (information registered in S303 of FIG. 3 described later) and registers it in the storage unit .

確認依頼モジュール(制御手段)50cは、登録された工数情報のステータスを確定した状態にするために承認者に確認依頼を送付するモジュールである。 The confirmation request module (control means) 50c is a module for sending a confirmation request to the approver in order to confirm the status of the registered man-hour information.

システムメモリ23には、RAMが用いられる。システムメモリ23には、制御部50の動作用の定数、変数、不揮発性メモリ25から読み出したプログラム等を展開する。 A RAM is used for the system memory 23 . In the system memory 23, constants and variables for operation of the control unit 50, programs read from the nonvolatile memory 25, and the like are developed.

入出力I/F24は、サーバ20への操作者からの入力操作を受け付け、サーバ20側から操作者へ出力を行うディスプレイ(表示部)、キーボード、タッチパネル等を含むものである。 The input/output I/F 24 includes a display (display unit), a keyboard, a touch panel, and the like that receives input operations from the operator to the server 20 and outputs from the server 20 side to the operator.

次に、スケジュール管理サーバ10について説明をする。スケジュール管理サーバ10は作業者のスケジュール管理アプリを制御するサーバである。スケジュール管理アプリ内においては、打ち合わせの情報とその場所、参加するメンバーを入力したり、作業情報とその作業場所を入力することもできるし、期限を入力することもできる。スケジュールは作業者同士で共有することもできるし、あるメンバーが他のメンバーのスケジュールに予定を入れることもできる。つまり、スケジュールの入力内容に基づき、ある作業者がどの作業をどのくらいの期間をかけて行っているのかわかる。スケジュール管理サーバ10はメール管理を行うメール管理サーバと兼用でも良く、アプリケーションとして作業者の端末装置30にダウンロードされている。スケジュール管理サーバ10は、制御部、システムメモリ、記憶部、不揮発性メモリ、通信I/F等を有する。記憶部には各作業者のスケジュール情報が記憶されている。記録部はその他のクラウド上の記憶部にスケジュール情報を記憶し、取得できるようにしても良い。制御部は、サーバ20より指示を受けると、ある作業者のスケジュール情報を外部に出力することができる。
タスク管理サーバ11は、複数の作業者の有するタスク(業務)を一覧で表示するものであり、グループ、課、部などの単位ごとにタスクの包括的な管理をするタスク管理アプリを制御するサーバである。タスク管理アプリでは、各タスクに紐づく担当者や作業日程に関する情報を入力するので、ある作業者がどの作業をどのくらいの期間をかけて行ったのかわかる。タスク管理サーバ11はメール管理を行うメール管理サーバと兼用でも良く、アプリケーションとして作業者の端末装置30にダウンロードされてる。タスク管理サーバ11は、制御部、システムメモリ、記憶部、不揮発性メモリ、通信I/F等を有する。記憶部にはタスク情報が記憶されている。記録部はその他のクラウド上の記憶部にタスク情報を記憶し、取得できるようにしても良い。制御部は、サーバ20より指示を受けると、タスク情報を外部に出力することができる。
Next, the schedule management server 10 will be explained. The schedule management server 10 is a server that controls a worker's schedule management application. Within the schedule management application, you can enter meeting information, its place, the members who will participate, work information and its work place, and you can also enter a deadline. Schedules can be shared between workers, and one member can add appointments to another member's schedule. In other words, based on the input contents of the schedule, it is possible to know which work a certain worker is doing and for how long. The schedule management server 10 may also be used as a mail management server for managing mail, and is downloaded to the terminal device 30 of the worker as an application. The schedule management server 10 has a control unit, system memory, storage unit, non-volatile memory, communication I/F and the like. The storage unit stores schedule information of each worker. The recording unit may store the schedule information in another storage unit on the cloud so that it can be acquired. Upon receiving an instruction from the server 20, the control section can output the schedule information of a certain worker to the outside.
The task management server 11 displays a list of tasks (work) owned by a plurality of workers, and is a server that controls a task management application that comprehensively manages tasks for each unit such as group, section, or department. is. With the task management app, you can enter information about the person in charge and the work schedule associated with each task, so you can see what work was done by a certain worker and how long it took. The task management server 11 may also serve as a mail management server for managing mail, and is downloaded to the terminal device 30 of the worker as an application. The task management server 11 has a control unit, system memory, storage unit, non-volatile memory, communication I/F and the like. Task information is stored in the storage unit. The recording unit may store the task information in another storage unit on the cloud so that it can be obtained. Upon receiving an instruction from the server 20, the control section can output the task information to the outside.

開発管理サーバ12は、複数の作業者がそれぞれ行なった開発の成果物をアップロードでき、バージョンの管理、修正、成果物の合体、問題共有等を行うことのできる開発管理アプリを制御するサーバである。開発管理アプリでは、各作業者がどの成果物を扱っており、前回の作業からどのくらい時間がかかったのか、問題の解決に時間がどのくらいかかったのか等の情報がわかる。つまり、ある作業者の成果物に対してどのくらいの時間を要したのかがわかる。開発管理サーバ12は、アプリケーションとして作業者の端末装置30にダウンロードされてる。開発管理サーバ12は、制御部、システムメモリ、記憶部、不揮発性メモリ、通信I/F等を有する。記憶部には、成果物と成果物や情報の入力をどの作業者がいつ行なったのかといった情報が記憶されている。記録部はその他のクラウド上の記憶部にタスク情報を記憶し、取得できるようにしても良い。制御部は、サーバ20より指示を受けると、成果物に関する情報を外部に出力することができる。 The development management server 12 is a server that controls a development management application that can upload development products developed by a plurality of workers, manage versions, modify, combine products, share problems, and the like. . The development management application provides information such as which deliverable each worker is handling, how long it took since the previous work, and how long it took to solve the problem. In other words, it is possible to know how much time was required for a certain worker's product. The development management server 12 is downloaded to the worker's terminal device 30 as an application. The development management server 12 has a control unit, system memory, storage unit, non-volatile memory, communication I/F and the like. The storage unit stores information such as which worker inputs the product and when the product and information are input. The recording unit may store the task information in another storage unit on the cloud so that it can be obtained. Upon receiving an instruction from the server 20, the control unit can output information about the product to the outside.

スケジュール管理サーバ10、タスク管理サーバ11、開発管理サーバ12が有する構成について簡単に説明をする。各不揮発性メモリは、各制御部によって電気的に消去・記録・読出し可能な記録媒体としてのメモリであり、例えばEEPROM等が用いられる。各不揮発性メモリには、制御部の動作用の定数、プログラム等が記憶される。ここでいう、プログラムとは、本実施形態にて後述する各種フローチャートを実行するためのコンピュータプログラムのことである。 Configurations of the schedule management server 10, task management server 11, and development management server 12 will be briefly described. Each nonvolatile memory is a memory as a recording medium that can be electrically erased, recorded, and read by each control unit, and an EEPROM or the like is used, for example. Each nonvolatile memory stores constants, programs, etc. for operation of the control unit. The program here is a computer program for executing various flowcharts described later in this embodiment.

各制御部は、少なくとも1つのプロセッサを内蔵し、スケジュール管理サーバ10、タスク管理サーバ11、開発管理サーバ12を制御するハードウェアであり、演算装置、レジスタ、周辺回路などにより構成される。前述した各不揮発性メモリに記録されたプログラムを実行することで、後述する本実施形態の各処理を実現する。 Each control unit is hardware that incorporates at least one processor and controls the schedule management server 10, the task management server 11, and the development management server 12, and is composed of arithmetic units, registers, peripheral circuits, and the like. By executing the program recorded in each non-volatile memory described above, each process of this embodiment, which will be described later, is realized.

各システムメモリには、RAMが用いられる。各システムメモリには、各制御部の動作用の定数、変数、各不揮発性メモリから読み出したプログラム等を展開する。 RAM is used for each system memory. In each system memory, constants and variables for operation of each control unit, programs read from each nonvolatile memory, and the like are developed.

次に、図2を用いて端末装置30を構成するブロック図について説明をする。端末装置30は、複数のアンテナ(アンテナ111、アンテナ112)と、各アンテナに対応する無線通信部(第1無線通信部32a、第2無線通信部32b)を含み、外部装置との通信を可能としている。 Next, a block diagram that configures the terminal device 30 will be described with reference to FIG. The terminal device 30 includes a plurality of antennas (antenna 111, antenna 112) and wireless communication units (first wireless communication unit 32a, second wireless communication unit 32b) corresponding to each antenna, and can communicate with external devices. and

アンテナ111は、端末装置30が発する信号を電波として放射する。また、アンテナ111は、空間から電波を受信して受信信号を第1無線通信部32aへ与える。 The antenna 111 radiates a signal emitted by the terminal device 30 as radio waves. Also, the antenna 111 receives radio waves from space and provides a received signal to the first wireless communication unit 32a.

アンテナ112は、端末装置30が発する信号を電波として放射する。また、アンテナ112は、空間から電波を受信して受信信号を第2無線通信部32bへ与える。 The antenna 112 radiates the signal emitted by the terminal device 30 as radio waves. Also, the antenna 112 receives radio waves from space and gives the received signal to the second wireless communication unit 32b.

第1無線通信部32aは、端末装置30が他の無線機器と通信するため、アンテナ111を介して信号を送受信するための変復調処理等を行う。第2無線通信部32bは、端末装置30が他の無線機器と通信するため、アンテナ112を介して信号を送受信するための変復調処理等を行う。第1無線通信部32aと第2無線通信部32bとは、チューナー、RSSI(Received Signal Strength Indicator)算出回路、CRC(Cyclic Redundancy Check)算出回路、高周波回路等を含む通信モジュールである。第1無線通信部32aと第2無線通信部32bとは、端末装置30が送受信する無線信号の変復調や周波数変換を行い、受信信号を制御部39へ与える。 The first wireless communication unit 32a performs modulation/demodulation processing and the like for transmitting and receiving signals via the antenna 111 in order for the terminal device 30 to communicate with other wireless devices. The second wireless communication unit 32b performs modulation/demodulation processing and the like for transmitting and receiving signals via the antenna 112 so that the terminal device 30 communicates with other wireless devices. The first radio communication unit 32a and the second radio communication unit 32b are communication modules including a tuner, an RSSI (Received Signal Strength Indicator) calculation circuit, a CRC (Cyclic Redundancy Check) calculation circuit, a high frequency circuit, and the like. The first radio communication unit 32 a and the second radio communication unit 32 b perform modulation/demodulation and frequency conversion of radio signals transmitted/received by the terminal device 30 and give received signals to the control unit 39 .

操作受付部34はキーボード34a及びマウス34bとを含み、作業者からの操作を受け付ける。キーボード34aは、端末装置30の作業者の入力操作を受け付ける。キーボード34aは、文字入力を行う装置であり、入力された文字情報を入力信号として制御部39へ出力する。 The operation reception unit 34 includes a keyboard 34a and a mouse 34b, and receives operations from the operator. The keyboard 34a accepts an input operation of the terminal device 30 by the operator. The keyboard 34a is a device for inputting characters, and outputs input character information to the control section 39 as an input signal.

マウス34bは、端末装置30の作業者の入力操作を受け付ける。マウス34bは、ディスプレイ31に表示されている表示物を選択等するためのポインティングデバイスであり、画面上で選択された位置情報と、ボタン押下されていることを示す情報とを入力信号として制御部39へ出力する。 The mouse 34b accepts an input operation of the terminal device 30 by the operator. The mouse 34b is a pointing device for selecting a display object displayed on the display 31, and the control unit receives position information selected on the screen and information indicating that a button is pressed as input signals. 39.

なお、操作受付部34は、例えば静電容量方式のタッチパネルを用いることによって、ディスプレイ31に対する作業者の接触位置を検出する、タッチスクリーンとして構成してもよい。 Note that the operation reception unit 34 may be configured as a touch screen that detects the contact position of the operator with respect to the display 31 by using a capacitive touch panel, for example.

ディスプレイ31は、制御部39の制御に応じて、画像、動画、テキスト等のデータを表示する。ディスプレイ31は、例えばLCD(Liquid Crystal Display)や有機EL(Electro-Luminescence)ディスプレイによって実現される。 The display 31 displays data such as images, moving images, and text under the control of the control unit 39 . The display 31 is implemented by, for example, an LCD (Liquid Crystal Display) or an organic EL (Electro-Luminescence) display.

音声処理部33は、マイクとスピーカ(不図示)を介して入出力される音声に関する音声信号の変復調を行う。音声処理部33は、マイクから与えられる信号を変調して、変調後の信号を制御部39へ与える。また、音声処理部33は、音声信号をスピーカへ与える。音声処理部33は、例えば音声処理用のプロセッサによって実現される。マイクは、音声入力を受け付けて、当該音声入力に対応する音声信号を音声処理部33へ与える。スピーカは、音声処理部33から与えられる音声信号を音声に変換して当該音声を端末装置30の外部へ出力する。 The audio processing unit 33 modulates and demodulates audio signals related to audio input and output via a microphone and a speaker (not shown). The audio processing unit 33 modulates the signal supplied from the microphone and supplies the modulated signal to the control unit 39 . Also, the audio processing unit 33 provides an audio signal to the speaker. The audio processing unit 33 is realized by, for example, a processor for audio processing. The microphone receives an audio input and provides an audio signal corresponding to the audio input to the audio processing section 33 . The speaker converts an audio signal provided from the audio processing unit 33 into audio and outputs the audio to the outside of the terminal device 30 .

図2では特に図示していない機能及び構成(例えば、電力を保持するためのバッテリー、バッテリーから各回路への電力の供給を制御する電力供給回路等)も有している。図2に示すように、端末装置30に含まれる各ブロックは、バス等により電気的に接続される。 It also has functions and configurations not particularly shown in FIG. 2 (for example, a battery for retaining power, a power supply circuit for controlling power supply from the battery to each circuit, etc.). As shown in FIG. 2, each block included in the terminal device 30 is electrically connected by a bus or the like.

記憶部36は、データを保存するための記憶装置であり、例えばフラッシュメモリ、HDD(Hard Disc Drive)である。もしくは、外部のクラウド上の記録部に記録をしている情報を取得しても良い。 The storage unit 36 is a storage device for storing data, and is, for example, a flash memory or a HDD (Hard Disc Drive). Alternatively, information recorded in a recording unit on an external cloud may be obtained.

不揮発性メモリ38は、制御部39によって電気的に消去・記録・読出し可能な記録媒体としてのメモリであり、例えばEEPROM等が用いられる。不揮発性メモリ38には、制御部39の動作用の定数、プログラム等が記憶される。ここでいう、プログラムとは、本実施形態にて後述する各種フローチャートを実行するためのコンピュータプログラムのことである。 The nonvolatile memory 38 is a memory as a recording medium that can be electrically erased, recorded, and read by the control unit 39, and an EEPROM or the like is used, for example. The nonvolatile memory 38 stores constants, programs, etc. for the operation of the control unit 39 . The program here is a computer program for executing various flowcharts described later in this embodiment.

制御部39は、少なくとも1つのプロセッサを内蔵し、端末装置30を制御するハードウェアであり、演算装置、レジスタ、周辺回路などにより構成される。前述した不揮発性メモリ38に記録されたプログラムを実行することで、後述する本実施形態の各処理を実現する。 The control unit 39 is hardware that incorporates at least one processor and controls the terminal device 30, and includes an arithmetic unit, registers, peripheral circuits, and the like. By executing the program recorded in the non-volatile memory 38 described above, each process of this embodiment, which will be described later, is realized.

システムメモリ35には、RAMが用いられる。システムメモリ35には、制御部39の動作用の定数、変数、不揮発性メモリ38から読み出したプログラム等を展開する。 A RAM is used for the system memory 35 . In the system memory 35, constants and variables for operation of the control unit 39, programs read from the nonvolatile memory 38, and the like are expanded.

本実施形態は、複数の作業者が自らの作業にかかった工数を管理して、月末などの決まった時期において管理者が承認をする処理を説明する。承認した工数の結果は、給与や評価に反映することができる。管理者は、作業者の工数を管理する管理職、承認者、リーダなど(承認者)であり、作業者のうちのいずれかでも良い。 In this embodiment, a process will be described in which a plurality of workers manages the number of man-hours spent on their own work, and the manager approves the man-hours at a fixed time such as the end of the month. The results of the approved man-hours can be reflected in salaries and evaluations. The manager may be a manager, an approver, a leader, or the like (approver) who manages man-hours of workers, and may be any one of workers.

次に、図3を用いて本実施形態における管理処理を示すフローチャートについて説明をする。この処理は、サーバ20の不揮発性メモリ25に記録されたプログラムをシステムメモリ23に展開して制御部50が実行することで実現する。図3においては、管理者が各作業者の工数管理のために連携するアプリの選択をし、各プロジェクト名称、その作業予定者等の情報を予め設定する作業を行う。さらに、各作業者から月末などに承認依頼が来るとその承認を行う処理を行うという説明をする。なお、この処理は、管理者が工数管理アプリを選択もしくは工数管理サービスを提供するソフトウェアにログインし、管理画面を表示すると開始する。なお、後述する管理者の端末装置30におけるディスプレイ31における表示処理や操作の受付処理などは端末装置30を介してサーバ20側が処理を行うものである。 Next, a flowchart showing management processing in this embodiment will be described with reference to FIG. This processing is realized by loading the program recorded in the nonvolatile memory 25 of the server 20 into the system memory 23 and executing it by the control unit 50 . In FIG. 3, the manager selects an application to be linked to manage the man-hours of each worker, and performs a task of presetting information such as the name of each project and the person scheduled to work on the project. Furthermore, it is explained that when an approval request is received from each worker at the end of the month, the approval process is performed. Note that this processing starts when the manager selects a man-hour management application or logs in to software that provides a man-hour management service and displays a management screen. Display processing on the display 31 of the terminal device 30 of the administrator and reception processing of operations, etc., which will be described later, are performed by the server 20 side via the terminal device 30 .

S301では、制御部50は、連携可能アプリの選択画面を管理者のディスプレイ31に表示する。図6Aには、本実施形態における管理画面の連携可能アプリの選択画面600の表示例を示す。管理画面の上部には各機能を示すアイテムが並んで表示されており、アプリ連携を示すアイテム601を選択すると選択画面600が表示される。アイテム602を選択すると、後述するプロジェクトに関する情報の入力画面606が表示される。アイテム603を選択すると、工数の申請や各作業者から送信された工数の承認をするための画面が表示される。管理者と作業者のユーザインターフェースは同じだが、管理者のみ承認の作業が行える。アイテム604を選択すると従業員ごとの単価を入力することができる。つまり、従業員(作業者)の工数がわかれば、単位に基づき給与を算出することができる。連携可能アプリの選択画面600では、複数のアプリを示すアイテム605が表示されており、いずれかのアプリとサーバ20を連携させるのかを作業者毎に設定することができる。例えば、全ての作業者のスケジュールと連携し、さらに一部のプログラマである作業者に対しては開発管理アプリと連携させ、一部の企画部門、販売部門の作業者に対しては、タスク管理アプリと連携させても良い。また、所属する部門毎に連携させるアプリを選択できるようにしても良い。 In S<b>301 , the control unit 50 displays a selection screen for cooperative applications on the display 31 of the administrator. FIG. 6A shows a display example of a selection screen 600 of the cooperative application of the management screen in this embodiment. Items indicating respective functions are displayed side by side in the upper part of the management screen, and when an item 601 indicating application cooperation is selected, a selection screen 600 is displayed. When the item 602 is selected, an input screen 606 for project-related information, which will be described later, is displayed. When an item 603 is selected, a screen for applying man-hours and approving the man-hours sent from each worker is displayed. The user interface for administrators and workers is the same, but only administrators can perform approval work. Selecting item 604 allows the user to enter a unit price for each employee. In other words, if the number of man-hours of an employee (worker) is known, the salary can be calculated based on the unit. An item 605 indicating a plurality of applications is displayed on the selection screen 600 of applications that can be linked, and it is possible for each worker to set which application should be linked with the server 20 . For example, all workers' schedules are linked, some programmer workers are linked with a development management application, and some planning and sales department workers are task management. You can link it with an app. Alternatively, an application to be linked may be selected for each department to which the user belongs.

S302では、制御部50は、連携アプリの選択を受け付け、記憶部26に記憶させる。 In S<b>302 , the control unit 50 accepts the selection of the cooperative application and stores it in the storage unit 26 .

S303では、制御部50は、プロジェクト名称、作業予定者、タグ名の入力を行う。図6Bに示すプロジェクトに関する情報の入力画面606において、管理者はプロジェクト名、作業予定者、タグ名を入力することができる。プロジェクト名は工数管理をする上で何に関する作業を行なったのか認識可能なものであると良い。また、作業予定者は、作業者の名前でも良いし、作業者固有のIDでも良い。タグ名は、対応するプロジェクトに関するものであると思われる識別子を示す。例えば、プロジェクトNは、B社からの受注であり、機能Cに関するデザインを設計するプロジェクトであり、窓口担当者が山田様である場合には、作業者がこれらのタグをスケジュール、開発管理、タスク管理に用いる可能性が高いのでこれらをタグとすると良い。なお、S303の処理は、別途プロジェクト管理用のデータベースにあらかじめ登録されていて、そのデータベースから読み取っても良い。ここまでの処理は各作業者が工数管理の入力をする前におこなう作業である。ここで、プロジェクトに関する情報(プロジェクト名称、作業予定者、タグ名)は複数のプロジェクトについて入力可能(登録可能)である。 In S303, the control unit 50 inputs a project name, a scheduled worker, and a tag name. On the project information input screen 606 shown in FIG. 6B, the administrator can input the project name, the scheduled work person, and the tag name. For the project name, it is good to be able to recognize what work was done for man-hour management. Also, the person scheduled to work may be the name of the worker or an ID specific to the worker. A tag name indicates an identifier that may be associated with the corresponding project. For example, project N is an order received from company B, a project to design a design for function C, and the person in charge is Mr. Yamada. Since there is a high possibility that they will be used for management, it is good to use them as tags. Note that the process of S303 may be registered in advance in a separate project management database, and may be read from that database. The processing up to this point is work performed before each worker inputs man-hour management. Here, project-related information (project name, scheduled work person, tag name) can be input (registered) for a plurality of projects.

なお、S303とS304の処理の間において図4で後述する工数入力処理を行う。 Note that a man-hour input process, which will be described later with reference to FIG. 4, is performed between the processes of S303 and S304.

S304では、制御部50は、各作業者の登録工数の承認依頼を受け付けたか否かを判定する。つまり、後述するように各作業者が所定期間における工数の入力を終え、管理者に承認の依頼を送信し、承認依頼を受け付けたか否かを判定する。S304において、Yesと判断した場合は、S305へ進み、そうでない場合は、S304の判定を繰り返す。なお、S303までの処理を一旦終えた後であっても、S301からS303の処理を繰り返すことはできる。 In S304, the control unit 50 determines whether or not a request for approval of the registered man-hours of each worker has been received. That is, as will be described later, each worker finishes inputting the number of man-hours for a predetermined period, transmits a request for approval to the manager, and determines whether or not the request for approval has been received. In S304, when it is judged as Yes, it progresses to S305, and when it is not so, the judgment of S304 is repeated. It should be noted that the processing from S301 to S303 can be repeated even after the processing up to S303 is completed.

S305では、制御部50は、受信した作業者の登録工数リスト(所定期間の工数の合計と各プロジェクトにかかった工数)を管理者のディスプレイ31に表示する。なお、S304において受信をしたことに応じて承認依頼が来た通知を管理者にするだけでも良いし、図6Aのアイテム603を選択したことに応じて表示される工数の申請や各作業者から送信された工数の承認をするための画面を更新するだけでも良い。 In S<b>305 , the control unit 50 displays the received registered man-hour list of the worker (total man-hours for a predetermined period and man-hours required for each project) on the display 31 of the manager. It should be noted that it is also possible to simply notify the administrator of the approval request received in response to the reception in S304, or to apply for man-hours displayed according to selection of the item 603 in FIG. 6A or from each worker It is also possible to simply update the screen for approving the submitted man-hours.

S306では、制御部50は、管理者が承認をしたか否かを判定する。S306において、Yesと判断した場合は、S307へ進み、そうでない場合は、S308へ進む。 In S306, the control unit 50 determines whether or not the administrator has given approval. In S306, when it is judged as Yes, it progresses to S307, and when it is not right, it progresses to S308.

S307では、制御部50は、給与データに反映する処理を行う。つまり承認者からの承認が下りると、工数情報のステータスが確定していない状態から確定した状態となる。そして所定のタイミングにおいて、承認された工数情報に基づき、各従業員の給与データに登録が行われる。 In S307, the control unit 50 performs processing to reflect the salary data. In other words, when the approval from the approver is obtained, the status of the man-hour information changes from an undetermined state to a determined state. Then, at a predetermined timing, the salary data of each employee is registered based on the approved man-hour information.

S308では、制御部50は、作業者に再確認依頼の通知をする。管理者が作業者の入力した工数に不備やミスがあったと判断した場合は、作業者に確認依頼を送ることができ、給与データには反映されない。つまり、確定した状態ではなく、再び承認者の承認が必要な状態になる。 In S308, the control unit 50 notifies the worker of a reconfirmation request. If the manager determines that the man-hours entered by the worker are incomplete or incorrect, a confirmation request can be sent to the worker, which will not be reflected in the salary data. In other words, it is not in a fixed state, but in a state where approval by the approver is required again.

なお、図3においてディスプレイ31への表示に関わる処理や、操作の受付に関わる処理は管理者の端末装置30側で制御を行う。 In FIG. 3, processing related to display on the display 31 and processing related to reception of operations are controlled by the terminal device 30 side of the administrator.

次に、図4を用いて、本実施形態における作業者の入力処理を示すフローチャートについて説明をする。この処理は、作業者の端末装置30の不揮発性メモリ38に記録されたプログラムをシステムメモリ35に展開して制御部39が、スケジュール管理サーバ10、タスク管理サーバ11、開発管理サーバ12と連携して処理を実行することで実現する。図4においては、各作業者がそれぞれの端末装置30において行う作業を示しており、スケジュール管理やタスク管理、開発管理などを行う処理である。作業者と上述した管理者の端末装置は簡単のため、ともに端末装置30としているが、別々の端末である。なお、この処理は、作業者が端末装置30を起動させると開始する。 Next, with reference to FIG. 4, a flowchart showing operator input processing in this embodiment will be described. In this process, the program recorded in the non-volatile memory 38 of the terminal device 30 of the worker is developed in the system memory 35, and the control unit 39 cooperates with the schedule management server 10, the task management server 11, and the development management server 12. It is realized by executing the process with FIG. 4 shows work performed by each worker on each terminal device 30, which is processing for schedule management, task management, development management, and the like. For the sake of simplicity, the terminal devices of the worker and the above-described manager are both terminal devices 30, but they are separate terminals. Note that this process starts when the operator activates the terminal device 30 .

S401では、制御部39は、スケジュール画面の表示指示がされたか否かを判定する。S401において、Yesと判断した場合は、S402へ進み、そうでない場合は、S405へ進む。 In S401, the control unit 39 determines whether or not an instruction to display the schedule screen has been given. If Yes in S401, proceed to S402; otherwise, proceed to S405.

以下のS402からS404に関する処理はスケジュール管理アプリ内での処理であり、スケジュール管理サーバ10の制御部が各処理を行うように制御する。 The processing from S402 to S404 below is processing within the schedule management application, and the control unit of the schedule management server 10 controls to perform each processing.

S402では、ディスプレイ31に作業者のスケジュールを表示する。図7Aは作業者のスケジュールの表示例を示したものであり、作業者は日付、時間、作業内容等のスケジュール情報を一覧で確認することができる。スケジュール情報はスケジュール管理サーバ10を介して取得することができる。なお、ディスプレイ31への表示制御は制御部39が行う。 In S402, the worker's schedule is displayed on the display 31. FIG. FIG. 7A shows a display example of a worker's schedule, and the worker can confirm schedule information such as date, time, and work content in a list. Schedule information can be acquired via the schedule management server 10 . Note that the display control on the display 31 is performed by the control unit 39 .

S403では、作業者からのスケジュールの変更操作があったか否かを判定する。スケジュールの変更操作とは、新たにスケジュールを入れる操作、削除する操作、時間や内容を変更する操作である。S403において、Yesと判断した場合は、S404へ進み、そうでない場合は、図4の処理を終了する。なお、上述したように、各作業者のスケジュールは本人でなくても入力可能であるので、スケジュール管理サーバ10は他の作業者からのスケジュール入力も受け付ける。 In S403, it is determined whether or not the operator has performed a schedule change operation. A schedule change operation is an operation to add a new schedule, an operation to delete a schedule, or an operation to change the time or contents. In S403, when it is judged as Yes, it progresses to S404, and when it is not right, the process of FIG. 4 is complete|finished. As described above, the schedule of each worker can be input by a person other than the worker himself/herself, so the schedule management server 10 also accepts schedule inputs from other workers.

S404では、変更されたスケジュールにおける業務内容、時間情報の受付をする。変更、入力されたスケジュール情報は、スケジュール管理サーバ10の記憶部に記憶される。 In S404, the work contents and time information in the changed schedule are accepted. The changed and input schedule information is stored in the storage unit of the schedule management server 10 .

なお、スケジュールに関するスケジュール情報は自動的にスケジュール管理サーバ10で記憶されるものである。制御部39は、スケジュール管理サーバ10から受け付けた指示に基づき表示制御や操作の受付処理等を行い、作業者からの指示を受け付けるとスケジュール管理サーバ10側に通知をしても良い。 The schedule information regarding the schedule is automatically stored in the schedule management server 10. FIG. The control unit 39 may perform display control, operation reception processing, and the like based on instructions received from the schedule management server 10, and may notify the schedule management server 10 side when instructions from the worker are received.

S405では、制御部39は、タスク管理画面の表示指示がされたか否かを判定する。S405において、Yesと判断した場合は、S406へ進み、そうでない場合は、S409へ進む。 In S405, the control unit 39 determines whether or not an instruction to display the task management screen has been given. In S405, when it is judged as Yes, it progresses to S406, and when it is not right, it progresses to S409.

以下のS406からS408に関する処理はタスク管理アプリ内での処理であり、タスク管理サーバ11の制御部が各処理を行うように制御する。 The processing from S406 to S408 below is processing within the task management application, and the control unit of the task management server 11 controls to perform each processing.

S406では、ディスプレイ31に作業者のタスク管理画面を表示する。図7Bは作業者のタスク管理画面の表示例を示したものであり、作業者はタスクの件名、担当者、作成日、見積もり時間、着手日、完了日等のタスク管理情報を一覧で確認することができる。タスク管理情報はタスク管理サーバ11を介して取得することができる。なお、ディスプレイ31への表示制御は制御部39が行う。 In S406, the display 31 displays the task management screen of the worker. FIG. 7B shows a display example of the task management screen of the worker, and the worker confirms the list of task management information such as the subject of the task, the person in charge, the date of creation, the estimated time, the date of start, and the date of completion. be able to. Task management information can be acquired via the task management server 11 . Note that the display control on the display 31 is performed by the control unit 39 .

S407では、作業者からのタスク管理の入力操作があったか否かを判定する。タスク管理の入力操作は、新たにタスクを作成する操作、タスク管理情報を変更する操作、削除する操作などである。S407において、Yesと判断した場合は、S408へ進み、そうでない場合は、図4の処理を終了する。なお、各作業者のタスク管理は本人でなくても入力可能であるので、タスク管理サーバ11は他の作業者からのタスク管理の入力も受け付ける。 In S407, it is determined whether or not the operator has performed an input operation for task management. Input operations for task management include an operation to create a new task, an operation to change task management information, an operation to delete, and the like. If Yes in S407, the process proceeds to S408; otherwise, the process of FIG. 4 ends. Note that the task management of each worker can be input by a person other than the worker himself/herself, so the task management server 11 also accepts input of task management from other workers.

S408では、入力されたタスク管理情報をタスク管理サーバ11において更新するようにする。入力されたタスク管理情報は、タスク管理サーバ11の記憶部に記憶される。 In S408, the task management server 11 updates the input task management information. The input task management information is stored in the storage unit of the task management server 11 .

なお、タスク管理に関するタスク管理情報は自動的にタスク管理サーバ11で記憶されるものである。制御部39は、タスク管理サーバ11から受け付けた指示に基づき表示制御や操作の受付処理等を行い、作業者からの指示を受け付けるとタスク管理サーバ11側に通知をしても良い。 Note that task management information regarding task management is automatically stored in the task management server 11 . The control unit 39 may perform display control, operation reception processing, and the like based on instructions received from the task management server 11, and may notify the task management server 11 side when instructions from the operator are received.

S409では、開発管理画面の表示指示がされたか否かを判定する。S409において、Yesと判断した場合は、S410へ進み、そうでない場合は、S411へ進む。 In S409, it is determined whether or not an instruction to display the development management screen has been given. In S409, when it is judged as Yes, it progresses to S410, and when it is not right, it progresses to S411.

以下のS410、S412からS415に関する処理は開発管理アプリ内での処理であり、開発管理サーバ12の制御部が各処理を行うように制御する。 Processing related to S410, S412 to S415 below is processing within the development management application, and the control unit of the development management server 12 controls to perform each processing.

S410では、ディスプレイ31に作業者の開発管理画面を表示する。図7Cは作業者の開発管理画面の表示例を示したものであり、成果物に関する情報が表示されており、作業者は成果物のアップロードや複数の成果物の合体依頼(マージリクエスト、プルリクエスト)を行うことができる。合体依頼後は、レビューも行うのでレビュー依頼でもある。この時、作業者同士で共有すべき問題がある場合にはイシュー(問題の提起)を作成することができる。また、アップロードされた成果物のバージョンや日付、担当者名も表示される。なお、ディスプレイ31への表示制御は制御部39が行う。 In S410, the display 31 displays the operator's development management screen. FIG. 7C shows a display example of a worker's development management screen, in which information about deliverables is displayed. )It can be performed. Since a review will also be done after the union request, it is also a review request. At this time, if there is a problem to be shared among workers, an issue (problem presentation) can be created. Also, the version, date, and name of the person in charge of the uploaded deliverable are displayed. Note that the display control on the display 31 is performed by the control unit 39 .

S411では、制御部39は、作業者からの各作業に関する処理を行う。各作業とは、オンラインでの打ち合わせ、開発作業、メール作業、資料作成などである。これらの作業はスケジュール管理アプリ、タスク管理アプリ、開発管理アプリに入力された作業であり、工数も各アプリから推測することができる。 In S411, the control unit 39 performs processing related to each work from the worker. Each work includes online meetings, development work, e-mail work, document creation, and the like. These tasks are tasks input to the schedule management application, task management application, and development management application, and the man-hours can also be estimated from each application.

S412では、作業者からイシューの作成や解決する作業がされたか否かを判定する。S412において、Yesと判断した場合は、S413へ進み、そうでない場合は、S414へ進む。 In S412, it is determined whether or not the worker has created or resolved an issue. In S412, when it is judged as Yes, it progresses to S413, and when it is not right, it progresses to S414.

S413では、イシューの作成日時もしくは完了日時等を開発管理サーバ12の記憶部において記憶するようにする。 In S413, the date and time when the issue was created or the date and time when the issue was completed are stored in the storage unit of the development management server 12. FIG.

S414では、作業者からのプルリクエストが送信もしくは受信されたかを判定する。S414において、Yesと判断した場合は、S415へ進み、そうでない場合は、図4の処理を終了する。 In S414, it is determined whether a pull request has been sent or received from the worker. If Yes in S414, the process proceeds to S415; otherwise, the process of FIG. 4 ends.

S415では、プルリクエストの送信がされた成果物の作成開始日時、プルリクエストの送信日時(もしくは最終更新日時)を開発管理サーバ12の記憶部において記憶するようにする。もしくは、プルリクエストの受信日時から作業者が確認をしてマージ操作を行った日時(マージ操作を拒絶する操作を行なった日時)等を開発管理サーバ12の記憶部において記憶するようにする。 In S415, the storage unit of the development management server 12 stores the creation start date and time of the deliverable to which the pull request was sent, and the transmission date and time of the pull request (or the last update date and time). Alternatively, the storage unit of the development management server 12 stores the date and time when the worker confirms and performs the merge operation (the date and time when the operation to reject the merge operation is performed) based on the date and time when the pull request is received.

なお、イシューやプルリクエストに関する情報(作成日時、作成者、タイトル、件名など)、成果物の件名、担当者などは全てのバージョンにおいて自動的に開発管理サーバ12で記憶されるものである。制御部39は、開発管理サーバ12から受け付けた指示に基づき表示制御や操作の受付処理等を行い、作業者からの指示を受け付けると開発管理サーバ12側に通知をしても良い。 Information on issues and pull requests (date and time of creation, creator, title, subject, etc.), subject of deliverables, person in charge, etc. are automatically stored in the development management server 12 for all versions. The control unit 39 may perform display control and operation reception processing based on instructions received from the development management server 12, and may notify the development management server 12 side when instructions from the operator are received.

図4の処理は全ての作業者がスケジュール管理アプリ、タスク管理アプリ、開発管理アプリを使用するわけではなく一部のアプリのみを使用する作業者もいる。 In the process of FIG. 4, not all workers use the schedule management application, task management application, and development management application, and some workers use only some applications.

次に、図5を用いて、本実施形態における工数の入力処理を示すフローチャートについて説明をする。この処理は、サーバ20の不揮発性メモリ25に記録されたプログラムをシステムメモリ23に展開して制御部50が、スケジュール管理サーバ10、タスク管理サーバ11、開発管理サーバ12と連携して処理を実行することで実現する。図5においては、各作業者がそれぞれの端末装置30において工数を入力する処理である。なお、この処理は、作業者が工数管理アプリを選択、もしくは工数管理に関するサービスを提供するソフトウェアにログインし、作業者の工数入力画面が表示されると開始する。 Next, a flowchart showing man-hour input processing in this embodiment will be described with reference to FIG. In this process, the program recorded in the non-volatile memory 25 of the server 20 is developed in the system memory 23, and the control unit 50 cooperates with the schedule management server 10, the task management server 11, and the development management server 12 to execute the process. It will be realized by doing. In FIG. 5, each worker inputs the number of man-hours on each terminal device 30 . Note that this processing starts when the worker selects a man-hour management application or logs in to software that provides a service related to man-hour management, and the worker's man-hour input screen is displayed.

S501では、制御部50は、ある作業者(作業者L)のプロジェクトNに関する工数管理入力が選択されたかを判定する。なお、図5の作業は基本的には各作業者が各自行うものなので、作業者Lの端末装置30にダウンロードされている工数管理アプリ、もしくは作業者Lの名前でソフトウェアにログインがされると、工数管理を行う対象者は作業者Lであるとする。よって、S501において工数を自動的に抽出するプロジェクトが選択されたか否かを判定すれば良い。図8A及び図8Bには、本実施形態における作業者の工数入力画面の表示例が示されている。アイテム801は、プロジェクトを選択するためのアイテムでありタブ形式になっている。タブ中にある選択候補は図3において管理者が登録したプロジェクトであり、作業者Lの担当しているプロジェクトが選択候補となる。S501において、Yesと判断した場合は、S502へ進み、そうでない場合は、S511へ進む。 In S501, the control unit 50 determines whether or not man-hour management input related to project N of a certain worker (worker L) has been selected. Since the work in FIG. 5 is basically performed by each worker individually, if the man-hour management application downloaded to the terminal device 30 of worker L or the software is logged in with the name of worker L, , the worker L is the target person for man-hour management. Therefore, in S501, it is sufficient to determine whether or not a project for automatically extracting man-hours has been selected. 8A and 8B show display examples of the worker's man-hour input screen in this embodiment. An item 801 is an item for selecting a project and has a tab format. The selection candidates in the tab are the projects registered by the administrator in FIG. In S501, when it is judged as Yes, it progresses to S502, and when it is not right, it progresses to S511.

S502では、制御部50は、作業者Lの連携アプリに関する情報を記憶部26より取得する。なお、以下では連携可能アプリから作業ログを抽出する作業について説明する。ただし、作業者ごとにどのアプリと連携するのかは予め設定されており、S502、503、505、507の判定を行わずに設定済みの連携アプリから作業ログから抽出をしても良い。 In S<b>502 , the control unit 50 acquires information about the cooperative application of the worker L from the storage unit 26 . In addition, below, the operation|work which extracts a work log from an application which can be cooperated is demonstrated. However, which application to cooperate with for each worker is set in advance, and the work log may be extracted from the set cooperation application without performing the determinations in S502, 503, 505, and 507. FIG.

S503では、制御部50は、S502で取得した情報に基づき、スケジュール管理アプリと連携しているか否かを判定する。S503において、Yesと判断した場合は、S504へ進み、そうでない場合は、S505へ進む。 In S503, based on the information acquired in S502, the control unit 50 determines whether or not it is linked with the schedule management application. In S503, when it is judged as Yes, it progresses to S504, and when it is not right, it progresses to S505.

S504では、制御部50は、プロジェクトNに関する作業ログ(業務内容、時間情報)を連携しているスケジュール管理サーバ10より取得し、ディスプレイ31に表示するようにする。つまり、スケジュール管理サーバ10に記憶されている作業者Lの作業内容等のスケジュール情報から管理者により設定されているプロジェクトNのタグ名に関する作業を抽出する。さらに、日付、時間等のスケジュール情報からかかった時間を算出する。ディスプレイ31上への表示制御自体は、端末装置30の制御部39において行う。図8Aにおいて、アイテム801上で工数管理するプロジェクトを選択すると右側の今日の作業ログを示す領域802に工数を示す情報と時間情報とが表示される。また、どの連携アプリによる作業ログの情報かも表示される。図8Aにおいては、各ログの横にスケジュールアプリと記載があり、スケジュール管理アプリによる情報であることが示されている。A社向け案件のプロジェクトに対して、管理者がA社やデザインといったタグ名を登録していた場合には、図8AのようにA社見積もりMTG、デザインすり合わせといった作業ログが抽出され表示される。図8Aにおいては、ある一日におけるA社向け案件のプロジェクトの作業ログを表示する例を示したが、1週間という単位における作業ログを取得しても良い。作業者はアイテム801において選択するプロジェクトを切り替えると、異なるプロジェクトに関する作業ログを表示させることができる。さらに、S504においては、作業ログを選択する操作を受け付ける。作業者はスケジュール管理アプリから取得された、あるプロジェクトに関する作業ログが正しいか否かを確認し、正しいと思われる作業ログを選択する。領域802に表示されている作業ログの一覧からいずれかの作業ログを選択すると、選択された作業ログは、記録する作業ログを示す領域803に表示される。図8Aにおいては「A社打ち合わせ」の作業ログが既に作業者に選択されている状態を示している。この時、「A社打ち合わせ」の作業ログが選択されたことに応じて、自動的にアイテム804の示す業務内容にはA社打ち合わせが選択される。さらにアイテム805の示す記録時間(工数)には、かかった時間が自動で入力される。このように、作業者は作業ログを選択することができる。なお、かかった時間については作業者が修正をしても良い。 In S<b>504 , the control unit 50 acquires the work log (work content, time information) regarding the project N from the linked schedule management server 10 and displays it on the display 31 . That is, the work related to the tag name of the project N set by the manager is extracted from the schedule information such as the work content of the worker L stored in the schedule management server 10 . Further, the time taken is calculated from schedule information such as date and time. Display control itself on the display 31 is performed by the control unit 39 of the terminal device 30 . In FIG. 8A, when a project whose man-hours are to be managed is selected on an item 801, information indicating man-hours and time information are displayed in an area 802 indicating today's work log on the right side. In addition, the information of the work log by which cooperative application is also displayed. In FIG. 8A, each log has a description "Schedule App" next to it, indicating that the information is from the schedule management app. If the manager has registered tag names such as Company A and Design for the project for Company A, the work log such as Company A's estimate MTG and design reconciliation is extracted and displayed as shown in FIG. 8A. . FIG. 8A shows an example of displaying the work log of the project for company A in one day, but the work log may be acquired in units of one week. By switching the project selected in the item 801, the worker can display work logs related to different projects. Furthermore, in S504, an operation to select a work log is accepted. The worker confirms whether or not the work log regarding a certain project obtained from the schedule management application is correct, and selects the work log that seems to be correct. When one of the work logs is selected from the list of work logs displayed in area 802, the selected work log is displayed in area 803 indicating the work log to be recorded. FIG. 8A shows a state in which the work log of "meeting with company A" has already been selected by the worker. At this time, in response to the selection of the work log of "meeting with company A", the meeting with company A is automatically selected as the work content indicated by the item 804 . Further, in the recording time (man-hours) indicated by item 805, the required time is automatically entered. Thus, the worker can select the work log. Note that the time taken may be corrected by the operator.

S505では、制御部50は、S502で取得した情報に基づき、タスク管理アプリと連携しているか否かを判定する。S505において、Yesと判断した場合は、S506へ進み、そうでない場合は、S507へ進む。 In S505, based on the information acquired in S502, the control unit 50 determines whether or not the task management application is linked. In S505, when it is judged as Yes, it progresses to S506, and when it is not right, it progresses to S507.

S506では、制御部50は、プロジェクトNに関する作業ログ(業務内容、時間情報)を連携しているタスク管理サーバ11より取得し、ディスプレイ31に表示するようにする。つまり、タスク管理サーバ11に記憶されているタスクの件名、担当者等のタスク管理情報から管理者により設定されているプロジェクトNのタグ名に関する作業であり、作業者Lの担当した作業を抽出する。さらに、作成日、見積もり時間、着手日、完了日等のタスク管理情報からかかった時間を算出する。ディスプレイ31上への表示制御自体は、端末装置30の制御部39において行う。 In S<b>506 , the control unit 50 acquires the work log (work content, time information) regarding the project N from the linked task management server 11 and displays it on the display 31 . In other words, the work related to the tag name of the project N set by the manager from the task management information such as the title of the task and the person in charge stored in the task management server 11, and the work in charge of the worker L is extracted. . Furthermore, the time taken is calculated from the task management information such as creation date, estimated time, start date, and completion date. Display control itself on the display 31 is performed by the control unit 39 of the terminal device 30 .

S507では、制御部50は、S502で取得した情報に基づき、開発管理アプリと連携しているか否かを判定する。S507において、Yesと判断した場合は、S506へ進み、そうでない場合は、S507へ進む。 In S507, based on the information acquired in S502, the control unit 50 determines whether or not it is linked with the development management application. In S507, when it is judged as Yes, it progresses to S506, and when it is not right, it progresses to S507.

S508では、制御部50は、プロジェクトNに関する作業ログ(業務内容、時間情報)を連携している開発管理サーバ12より取得し、ディスプレイ31に表示するようにする。つまり、開発管理サーバ12に記憶されている成果物の件名、イシュー内の記載、担当者等の情報から管理者により設定されているプロジェクトNのタグ名に関する作業であり、作業者Lの担当した作業を抽出する。さらに、作成開始日時、プルリクエストの送信日時、受信日時等のタスク管理情報からかかった時間を算出する。ディスプレイ31上への表示制御自体は、端末装置30の制御部39において行う。 In S<b>508 , the control unit 50 acquires the work log (work content, time information) regarding the project N from the linked development management server 12 and displays it on the display 31 . In other words, it is work related to the tag name of project N set by the administrator based on information such as the title of the deliverable, the description in the issue, and the person in charge stored in the development management server 12. Extract work. Furthermore, the time taken is calculated from task management information such as creation start date and time, pull request transmission date and time, and pull request reception date and time. Display control itself on the display 31 is performed by the control unit 39 of the terminal device 30 .

図8Bにおいては、タスク管理アプリと開発管理アプリと連携している作業者Lの1週間の作業ログの一覧の表示例を示している。アイテム806はアイテム801と同様に、選択中のプロジェクトが示されており、作業者は作業ログを表示するプロジェクトを選択できる。作業ログを示す領域807に工数を示す情報と時間情報とが表示される。開発管理アプリ内の成果物の件名にfunctioncが使用されているため、開発管理アプリ内から対象の成果物に関する作業を抽出することができる。また、成果物の作成開始日とプルリクエスト送信日が表示されており、作業者の勤怠情報、もしくは予め設定された勤務時間を考慮して合計の作業時間が算出される。さらに、図8Aと同様に、どの連携アプリによる作業ログの情報かも表示される。図8Bにおいては、各ログの横にタスク管理アプリ、開発管理アプリと記載があり、どの作業ログがどの連携アプリによる情報であることかわかる。A社向け案件のプロジェクトに対して、管理者が機能Cのタグ名を登録していた場合には、図8Bのように機能Cのデータ収集、01.b.functionc.development1といった作業ログが抽出され、表示される。 FIG. 8B shows a display example of a list of one-week work logs of worker L who cooperates with the task management application and the development management application. Item 806 indicates the project being selected, like item 801, and the worker can select the project whose work log is to be displayed. Information indicating man-hours and time information are displayed in an area 807 indicating a work log. Since functionc is used in the subject of the deliverable in the development management application, it is possible to extract the work related to the target deliverable from within the development management application. Also, the start date of creation of the deliverable and the date of pull request transmission are displayed, and the total work time is calculated in consideration of the worker's attendance information or preset working hours. Further, as in FIG. 8A, the work log information by which cooperative application is also displayed. In FIG. 8B, there are descriptions of a task management application and a development management application next to each log, and it can be understood which work log is information by which cooperative application. If the manager has registered the tag name of function C for the project for company A, data collection of function C, 01. b. function c. A work log such as development1 is extracted and displayed.

さらに、S506、508においては、作業ログを選択する操作を受け付ける。作業者はタスク管理アプリ、開発管理アプリから取得された、あるプロジェクトに関する作業ログが正しいか否かを確認し、正しいと思われる作業ログを選択する。領域807に表示されている作業ログの一覧からいずれかの作業ログを選択すると、選択された作業ログは、記録する作業ログを示す領域808に表示される。図8Bにおいては「機能Cのデータ収集」の作業ログが既に作業者に選択されている状態を示している。この時、「機能Cのデータ収集」の作業ログが選択されたことに応じて、自動的にアイテム809の示す業務内容には機能Cのデータ収集が選択される。さらにアイテム805の示す記録時間(工数)には、かかった時間が自動で入力される。このように、作業者は作業ログを選択することができる。 Furthermore, in S506 and S508, an operation to select a work log is accepted. The worker confirms whether or not the work log regarding a certain project acquired from the task management application and the development management application is correct, and selects the work log that seems correct. When one of the work logs is selected from the list of work logs displayed in area 807, the selected work log is displayed in area 808 indicating the work logs to be recorded. FIG. 8B shows a state in which the work log of "data collection for function C" has already been selected by the worker. At this time, data collection of function C is automatically selected as the work content indicated by the item 809 in accordance with the selection of the work log of "data collection of function C". Further, in the recording time (man-hours) indicated by item 805, the required time is automatically entered. Thus, the worker can select the work log.

S509では、制御部50は、作業時間の入力操作を受け付ける。開発管理アプリとタスク管理アプリの場合には、作業の開始から最終的に全ての作業を完了したと作業者が入力をしたタイミングまでの時間が算出される。よって、その間に他の作業を行なっていた場合には、他の作業にかけた時間も含めて算出される可能性が高い。そのため、作業者が自動的に算出された時間(工数)を修正する可能性がある。よって、S509においては作業時間の入力操作を受け付ける。アイテム810において工数として記録する時間を変更することができる。 In S509, the control unit 50 accepts an input operation for working hours. In the case of the development management application and the task management application, the time from the start of work to the timing when the worker finally completes all the work is calculated. Therefore, if other work was performed during that time, there is a high possibility that the time spent on the other work is also included in the calculation. Therefore, the worker may correct the automatically calculated time (man-hours). Therefore, in S509, an input operation for working hours is accepted. You can change the time recorded as man-hours in item 810 .

S510では、制御部50は、確認操作(登録操作)を受け付ける。確認操作とは、選択した作業ログを保存(登録)する操作である。図8A、図8Bのアイテム811を選択すると、領域803または808に表示されている作業ログが保存される。複数のプロジェクトを担当している場合には、作業者は複数のプロジェクトについて同様の作業を行う。 In S510, the control unit 50 accepts a confirmation operation (registration operation). The confirmation operation is an operation of saving (registering) the selected work log. Selecting item 811 in FIGS. 8A and 8B saves the work log displayed in area 803 or 808 . When a worker is in charge of multiple projects, the worker performs similar work on multiple projects.

S511では、制御部50は、(複数の)プロジェクトに関する所定期間における作業リストとその工数とを表示する。すなわち、S510までの処理において作業者が保存(登録)した作業ログの一覧を表示する。図9Aには工数の一覧画面の表示例を示している。図9Aには例として1週間分示しているが、日程と合わせて1ヶ月間分の作業リストと工数を一覧表示する。所定期間とは1日でも良いし、1週間でも良いし、1ヶ月でも良く、作業者が設定できるようにしても良い。 In S511, the control unit 50 displays a work list and its man-hours for a predetermined period regarding (a plurality of) projects. That is, a list of work logs saved (registered) by the worker in the processing up to S510 is displayed. FIG. 9A shows a display example of the man-hour list screen. Although one week is shown as an example in FIG. 9A, a work list and man-hours for one month are displayed together with the schedule. The predetermined period may be one day, one week, or one month, and may be set by the operator.

S512では、制御部50は、工数申請をする操作を受け付けたか否かを判定する。S512において、Yesと判断した場合は、S513へ進み、そうでない場合は、S503へ戻る。図9Aにおいて、工数申請を示すアイテムを選択した場合に、S512の判定はYesとなる。 In S512, the control unit 50 determines whether or not an operation for man-hour application has been accepted. If Yes in S512, the process proceeds to S513; otherwise, the process returns to S503. In FIG. 9A, when an item indicating man-hour application is selected, the determination in S512 is Yes.

S513では、制御部50は、複数のプロジェクトに関して、所定期間にかかった工数の合計を登録する処理を行う。つまり作業者が所定期間に作業を行なった合計の時間が登録される。 In S513, the control unit 50 performs a process of registering the total number of man-hours required for a predetermined period for a plurality of projects. In other words, the total time spent by the worker during the predetermined period of time is registered.

S514では、制御部50は、ディスプレイ31において、所定期間における作業者Lの全てのプロジェクトにかかった工数の合計であり、S513で登録した合計の時間を表示する。図9Bのアイテム901は1ヶ月の工数の合計を示しており、作業者の所定期間における合計の作業時間がわかる。 In S514, the control unit 50 displays on the display 31 the total number of man-hours required for all projects of the worker L in a predetermined period, which is the total time registered in S513. Item 901 in FIG. 9B indicates the total number of man-hours for one month, and the total work time of the worker in a predetermined period can be understood.

S515では、制御部50は、承認者への承認申請を行なったか否かを判定する。図9Bに示される「申請する」と示されているアイテムを選択すると、管理者に承認依頼が送信される。なお、図9Bに示すように11月と12月と複数の期間に対する工数の合計が表示されている場合には、それぞれの期間ごとに申請をすることができる。承認者への申請は月末などの決まった時期に行う必要があるため、承認者への申請が行われない場合には作業者に通知をしても良い。承認者とは予め決まっており、作業者の管理職などである。 In S515, the control unit 50 determines whether or not an approval application has been submitted to the approver. Selecting the item labeled "Apply" shown in FIG. 9B sends an approval request to the administrator. Note that when the total number of man-hours for a plurality of periods, November and December, is displayed as shown in FIG. 9B, an application can be made for each period. Since the application to the approver must be made at a fixed time such as the end of the month, the worker may be notified if the application to the approver is not made. The approver is determined in advance, and may be a manager of the worker or the like.

S516では、制御部50は、作業者Lの登録した工数を承認者に送信する処理を行う。つまり、作業者Lの所定期間の工数の合計と各プロジェクトにかかった工数との情報が承認者に送信され、承認の依頼を行う。S516の処理が行われると、図3のS304において承認依頼を受け付ける。 In S516, the control unit 50 performs a process of transmitting the man-hours registered by the worker L to the approver. In other words, information on the total number of man-hours of worker L in a predetermined period and the number of man-hours required for each project is sent to the approver, and approval is requested. After the processing of S516 is performed, an approval request is accepted in S304 of FIG.

以上、説明した実施形態によれば、作業者は工数入力にかかる作業の手間を削減することができる。事前に登録された作業者情報、プロジェクト名、タグ名の情報に基づき、連携アプリより作業者の行なった作業ログを抽出するので作業者は抽出された作業ログを確認すればよい。一から作業内容と時間とを書き出す必要がなくなる。 According to the embodiments described above, it is possible for the worker to reduce the labor involved in inputting man-hours. Based on the previously registered worker information, project name, and tag name information, the work log of the worker is extracted from the cooperative application, so the worker can check the extracted work log. There is no need to write down the work content and time from scratch.

なお、連携アプリ(外部アプリ)としては、Github(登録商標)、Backlog(登録商標)、JIRA(登録商標)、Google カレンダー(登録商標)等である。各アプリに登録された情報は、サーバ20の制御部50によるスクレイピング、API連携等により取得するものである。Github(登録商標)は、上述の実施形態においては開発管理サーバに該当し、イシューやプルリクエストの作成日、完了日をサーバ20は取得するものとする。Backlog(登録商標)、JIRA(登録商標)は、上述の実施形態においてはタスク管理サーバに該当し、タスクチケットの作業見積もり時間、着手日、作成完了日をサーバ20は取得するものとする。Google カレンダー(登録商標)が上述の実施形態においてはスケジュール管理サーバに該当し、予定の開始日時・時間、終了日時・時間とをサーバ20が取得するものとする。 Examples of cooperative applications (external applications) include Github (registered trademark), Backlog (registered trademark), JIRA (registered trademark), and Google Calendar (registered trademark). Information registered in each application is acquired by scraping by the control unit 50 of the server 20, API cooperation, or the like. Github (registered trademark) corresponds to the development management server in the above embodiment, and the server 20 acquires the creation dates and completion dates of issues and pull requests. Backlog (registered trademark) and JIRA (registered trademark) correspond to the task management server in the above-described embodiment, and the server 20 acquires the estimated work time, start date, and creation completion date of the task ticket. In the above embodiment, Google Calendar (registered trademark) corresponds to the schedule management server, and the server 20 acquires the scheduled start date/time and end date/time.

例えば、上記実施形態では、各機能を端末装置30またはサーバ20、スケジュール管理サーバ10、タスク管理サーバ11、開発管理サーバ12が備える態様の一例について説明したが、この形態に限定されることはない。一部の機能について上記実施形態と異なる態様で上記のいずれかが備える構成としてもよい。 For example, in the above embodiment, an example of a mode in which each function is provided by the terminal device 30 or the server 20, the schedule management server 10, the task management server 11, and the development management server 12 has been described, but the present invention is not limited to this form. . Any one of the above may have a configuration in which some functions are provided in a manner different from that of the above embodiment.

また、上記実施形態においてサーバ20、スケジュール管理サーバ10、タスク管理サーバ11、開発管理サーバ12に実行させるものとして記載されていた各ステップについても、端末装置30に実行させてもよい。 Further, each step described as being executed by the server 20, the schedule management server 10, the task management server 11, and the development management server 12 in the above embodiment may be executed by the terminal device 30 as well.

なお、制御部50が行うものとして説明した上述の各種の制御は1つのハードウェアが行ってもよいし、複数のハードウェアが処理を分担することで、装置全体の制御を行ってもよい。 The various controls described above performed by the control unit 50 may be performed by one piece of hardware, or a plurality of pieces of hardware may share the processing to control the entire apparatus.

また、本発明をその好適な実施形態に基づいて詳述してきたが、本発明はこれら特定の実施形態に限られるものではなく、この発明の要旨を逸脱しない範囲の様々な形態も本発明に含まれる。さらに、上述した各実施形態は本発明の一実施形態を示すものにすぎず、各実施形態を適宜組み合わせることも可能である。 Moreover, although the present invention has been described in detail based on its preferred embodiments, the present invention is not limited to these specific embodiments, and various forms within the scope of the present invention can be applied to the present invention. included. Furthermore, each embodiment described above merely shows one embodiment of the present invention, and it is also possible to combine each embodiment as appropriate.

また、上述した実施形態においては、本発明を工数管理システム100に適用した場合を例にして説明したが、これはこの例に限定されず、工数管理に関する一連の制御が可能なプログラムやシステムであれば適用可能である。 Further, in the above-described embodiment, the case where the present invention is applied to the man-hour management system 100 has been described as an example, but this is not limited to this example, and a program or system capable of a series of controls related to man-hour management can be used. applicable if available.

(他の実施形態) (Other embodiments)

本発明は、以下の処理を実行することによっても実現される。即ち、上述した実施形態の機能を実現するソフトウェア(プログラム)をネットワーク又は各種記録媒体を介してシステム或いは装置に供給し、そのシステム或いは装置のコンピュータ(又はCPUやMPU等)がプログラムコードを読み出して実行する処理である。この場合、そのプログラム、及び該プログラムを記憶した記録媒体は本発明を構成することになる。 The present invention is also realized by executing the following processing. That is, the software (program) that realizes the functions of the above-described embodiments is supplied to a system or device via a network or various recording media, and the computer (or CPU, MPU, etc.) of the system or device reads the program code. This is the process to be executed. In this case, the program and the recording medium storing the program constitute the present invention.

20 サーバ、30 端末装置、80 ネットワーク

20 server, 30 terminal device, 80 network

Claims (12)

プロセッサと、メモリとを備えるコンピュータに実行させ、工数管理の処理を行うためのプログラムであって、
前記メモリにはプロジェクトの名称に関する情報と、前記プロジェクトの作業者に関する情報とを予め登録されており、
前記プログラムは、前記プロセッサに、
前記プロジェクトの作業者が外部サーバにおいて登録した前記プロジェクトに関する情報を取得するステップと、
前記プロジェクトに関する情報から、前記プロジェクトに関する作業と工数に関する工数情報を抽出するステップと、
前記抽出した工数情報を前記プロジェクトの工数情報として登録するステップと、
前記登録された工数情報を表示部に表示し、当該工数情報について前記プロジェクトの作業者に確認を求めるステップと、を実行させることを特徴とする、プログラム。
A program for executing man-hour management processing by a computer comprising a processor and a memory,
information about a project name and information about a worker of the project are registered in advance in the memory;
The program causes the processor to:
obtaining information about the project registered by a worker of the project in an external server;
extracting man-hour information about work and man-hours for the project from the information about the project;
a step of registering the extracted man-hour information as the man-hour information of the project;
and a step of displaying the registered man-hour information on a display unit and requesting a worker of the project to confirm the man-hour information.
前記プログラムは、前記プロセッサに、
所定期間における前記工数情報の一覧を表示するステップを実行させることを特徴とする、請求項1に記載のプログラム。
The program causes the processor to:
2. The program according to claim 1, causing execution of a step of displaying a list of said man-hour information for a predetermined period.
前記プログラムは、前記プロセッサに、
前記確認を求めるステップを実行したあとに、
承認者へ前記工数情報に関する承認を求めるステップを実行させることを特徴とする、請求項1または2に記載のプログラム。
The program causes the processor to:
After performing the step of asking for confirmation,
3. The program according to claim 1, further comprising a step of asking an approver to approve the man-hour information.
前記プログラムは、前記プロセッサに、
前記承認者からの承認を受け付けると、前記工数情報のステータスを確定した状態にし、修正が必要な場合には前記承認者から再び承認が必要な状態するステップを実行させることを特徴とする、請求項3に記載のプログラム。
The program causes the processor to:
When the approval from the approver is received, the status of the man-hour information is confirmed, and if correction is necessary, the approval from the approver is required again. 4. The program according to item 3.
前記プログラムは、前記プロセッサに、
前記工数情報が確定された後、所定のタイミングにおいて、前記工数情報に基づき給与データを登録するステップを実行させることを特徴とする、請求項4に記載のプログラム。
The program causes the processor to:
5. The program according to claim 4, wherein after the man-hour information is determined, a step of registering salary data based on the man-hour information is executed at a predetermined timing.
前記外部サーバは、スケジュール管理サーバ、タスク管理サーバ、開発管理サーバのいずれかを含むことを特徴とする請求項1乃至5のいずれか1項に記載のプログラム。 6. The program according to any one of claims 1 to 5, wherein the external server includes any one of a schedule management server, a task management server, and a development management server. 前記プロジェクトの作業者が前記外部サーバにおいて登録した前記プロジェクトに関する情報を取得するステップにおいては、
前記外部サーバより、前記工数情報をスクレイピングもしくはAPI連携により取得することを特徴とする請求項1乃至6のいずれか1項に記載のプログラム。
In the step of acquiring information about the project registered in the external server by the worker of the project,
7. The program according to any one of claims 1 to 6, wherein the man-hour information is acquired from the external server by scraping or API cooperation.
前記プログラムは、前記プロセッサに、
前記外部サーバが前記開発管理サーバである場合には、問題の提起やレビュー依頼の作成日、完了日を取得するステップを実行させることを特徴とする、請求項6に記載のプログラム。
The program causes the processor to:
7. The program according to claim 6, wherein when said external server is said development management server, a step of obtaining a creation date and a completion date of a question raised or a review request is executed.
前記プログラムは、前記プロセッサに、
前記外部サーバが前記タスク管理サーバである場合には、各タスクチケットの作業の見積もり時間、着手日、作成完了日を取得するステップを実行させることを特徴とする、請求項6に記載のプログラム。
The program causes the processor to:
7. The program according to claim 6, wherein when said external server is said task management server, the step of obtaining the estimated time, start date, and creation completion date of each task ticket is executed.
前記プログラムは、前記プロセッサに、
前記外部サーバがスケジュール管理サーバである場合には、予定の開始日時、終了日時を取得するステップを実行させることを特徴とする、請求項6に記載のプログラム。
The program causes the processor to:
7. The program according to claim 6, wherein when said external server is a schedule management server, it causes execution of a step of acquiring a start date and time and an end date and time of a schedule.
プロジェクトの名称に関する情報と、前記プロジェクトの作業者に関する情報とが予め登録されている、作業者の工数を管理する情報処理装置であって、
前記プロジェクトの作業者が外部サーバにおいて登録した前記プロジェクトに関する情報を取得する取得手段と、
前記プロジェクトに関する情報から、前記プロジェクトに関する作業と工数に関する工数情報を抽出し、前記抽出した工数情報を前記プロジェクトの工数情報として登録し、
前記登録された工数情報を表示し、当該工数情報について前記プロジェクトの作業者に確認を求めるように制御する制御手段とを有することを特徴とする情報処理装置。
An information processing device for managing man-hours of a worker, in which information about a project name and information about a worker of the project are registered in advance,
Acquisition means for acquiring information about the project registered in an external server by a worker of the project;
extracting man-hour information related to work and man-hours related to the project from information related to the project, and registering the extracted man-hour information as man-hour information of the project;
and control means for displaying the registered man-hour information and requesting confirmation of the man-hour information from a worker of the project.
プロセッサと、メモリとを備えるコンピュータに実行させ、工数管理の処理を行うための方法であって、前記メモリにはプロジェクトの名称に関する情報と、前記プロジェクトの作業者に関する情報とを予め登録されており、
前記方法は、前記プロセッサが、
前記プロジェクトの作業者が外部サーバにおいて登録した前記プロジェクトに関する情報を取得するステップと、
前記プロジェクトに関する情報から、前記プロジェクトに関する作業と工数に関する工数情報を抽出するステップと、
前記抽出した工数情報を前記プロジェクトの工数情報として登録するステップと、
前記登録された工数情報を表示し、当該工数情報について前記プロジェクトの作業者に確認を求めるステップとを実行させることを特徴とする、方法。

A method for executing a man-hour management process by a computer having a processor and a memory, wherein information about a project name and information about a worker of the project are registered in advance in the memory. ,
The method comprises: the processor;
obtaining information about the project registered by a worker of the project in an external server;
extracting man-hour information about work and man-hours for the project from the information about the project;
a step of registering the extracted man-hour information as the man-hour information of the project;
and displaying the registered man-hour information and requesting confirmation of the man-hour information from a worker of the project.

JP2021127919A 2021-08-04 2021-08-04 PROGRAM, INFORMATION PROCESSING APPARATUS AND METHOD Active JP7496336B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021127919A JP7496336B2 (en) 2021-08-04 2021-08-04 PROGRAM, INFORMATION PROCESSING APPARATUS AND METHOD

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021127919A JP7496336B2 (en) 2021-08-04 2021-08-04 PROGRAM, INFORMATION PROCESSING APPARATUS AND METHOD

Publications (2)

Publication Number Publication Date
JP2023022870A true JP2023022870A (en) 2023-02-16
JP7496336B2 JP7496336B2 (en) 2024-06-06

Family

ID=85203978

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021127919A Active JP7496336B2 (en) 2021-08-04 2021-08-04 PROGRAM, INFORMATION PROCESSING APPARATUS AND METHOD

Country Status (1)

Country Link
JP (1) JP7496336B2 (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005216013A (en) 2004-01-29 2005-08-11 Applicore Corp Integrated job management system
JP5903390B2 (en) 2013-01-25 2016-04-13 エヌ・ティ・ティ・コムウェア株式会社 Document generation apparatus, document generation method, and program

Also Published As

Publication number Publication date
JP7496336B2 (en) 2024-06-06

Similar Documents

Publication Publication Date Title
JP5605891B1 (en) Information processing apparatus, information processing method, program, and recording medium
US11238405B2 (en) Electronic apparatus and operation method thereof
US20140207512A1 (en) Timeline-Based Visual Dashboard For Construction
CN112668283B (en) Document editing method and device and electronic equipment
KR101628318B1 (en) Construction project management method
JP7109116B1 (en) Program, information processing device and method
JP2023027949A (en) Program, information processing device, and method
CN117157662A (en) Program, information processing apparatus, and method
JP7496336B2 (en) PROGRAM, INFORMATION PROCESSING APPARATUS AND METHOD
JP6943306B2 (en) Work shift management device, program and work shift management support method
KR102640393B1 (en) Apparatus for managing wages and method thereof
JP2023027948A (en) Program, information processing device and method
JP6638708B2 (en) Information management device and program
JP2018088128A (en) Server, processing method thereof, and program
KR20200127882A (en) Vacation Information and Suggestion System
JP7571511B2 (en) Electronic shelf label display control system, electronic shelf label display control method, and program
JP7236779B1 (en) Program, information processing device and method
US20200175569A1 (en) Ordering system and program
JP7535480B2 (en) PROGRAM, INFORMATION PROCESSING APPARATUS AND METHOD
JP7244141B1 (en) Program, information processing device and method
JP6935958B1 (en) Programs, methods, information processing equipment
US20240020655A1 (en) Method and system for tracking assets
JP2014127003A (en) Information processor, information processing method, and computer program
US20210295274A1 (en) Workflow management device, workflow management system, method of managing workflow, and non-transitory recording medium
JP7514000B1 (en) Information processing device, program, and employment history management method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20231115

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20231115

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240126

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240325

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240521

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240527

R150 Certificate of patent or registration of utility model

Ref document number: 7496336

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150