JP2022149633A - Multi-boom type work machine - Google Patents

Multi-boom type work machine Download PDF

Info

Publication number
JP2022149633A
JP2022149633A JP2021051871A JP2021051871A JP2022149633A JP 2022149633 A JP2022149633 A JP 2022149633A JP 2021051871 A JP2021051871 A JP 2021051871A JP 2021051871 A JP2021051871 A JP 2021051871A JP 2022149633 A JP2022149633 A JP 2022149633A
Authority
JP
Japan
Prior art keywords
boom
pin
brackets
pin insertion
connecting pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2021051871A
Other languages
Japanese (ja)
Inventor
将明 大貫
Masaaki Onuki
俊夫 守田
Toshio Morita
駿佑 朝日
Shunsuke Asahi
弘美 大竹
Hiromi Otake
雅彦 渡邉
Masahiko Watanabe
啓充 加庭
Hiromitsu Kaniwa
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Construction Machinery Co Ltd
Original Assignee
Hitachi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co Ltd filed Critical Hitachi Construction Machinery Co Ltd
Priority to JP2021051871A priority Critical patent/JP2022149633A/en
Publication of JP2022149633A publication Critical patent/JP2022149633A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Component Parts Of Construction Machinery (AREA)

Abstract

To provide a multi-boom type work machine improved in connection efficiency of adjacent booms.SOLUTION: A multi-boom type work machine has a machine body, a boom device (40), an arm device, an attachment, and a connection device (70). The connection device includes right and left first brackets (72b), upper and lower first pin insertion holes, right and left second bracket (74b), upper and lower second pin insertion holes, upper and lower connection pins (76e), upper and lower pins inserting/withdrawing device (78a), right and left upper centering members (80c, 80e) supporting the upper connection pin from an above side so that an axial line of the upper connection pin aligns with the hole axial line of the upper second pin insertion hole, and right and left support members (90e) provided to a first boom (42) so as to support the upper connection pin from a down side. Each of the right and left support members is arranged separating from the right and left first brackets more than the distance in the right and left direction of the right and left first brackets and the right and left upper centering members.SELECTED DRAWING: Figure 4

Description

本発明はマルチブーム式作業機に関し、特に隣り合うブームを連結する連結装置を備えるマルチブーム式作業機に関する。 TECHNICAL FIELD The present invention relates to a multi-boom working machine, and more particularly to a multi-boom working machine provided with a connecting device for connecting adjacent booms.

一般に、高層建築物等の地上高さが大きな構造物を解体する場合には、解体作業用の作業装置を備えた機械が用いられる。この解体作業用の作業装置は、通常、マルチブームと呼ばれる複数のブームを有し、各ブームのうち最上段のブームの先端側にアームが取付けられ、アームの先端側には圧砕機、グラップル等の作業具が取付けられるものである。 2. Description of the Related Art In general, when dismantling a structure having a large height above the ground, such as a high-rise building, a machine equipped with a working device for dismantling work is used. This working device for demolition work usually has a plurality of booms called a multi-boom, and an arm is attached to the tip side of the topmost boom of each boom, and a crusher, grapple, etc. are attached to the work implement.

そして、マルチブームのうち隣合う2個のブームは、一方のブームに設けられたピン挿通孔と、他方のブームに設けられたピン挿通孔とに連結ピンを挿通することにより互いに連結される構成となっている(例えば特許文献1)。 Two adjacent booms of the multi-boom are connected to each other by inserting a connecting pin through a pin insertion hole provided in one boom and a pin insertion hole provided in the other boom. (For example, Patent Document 1).

特許文献1には、上部旋回体に回動可能に取付けられた下ブームに継ぎブームを連結するための2部材連結装置が記載されている。具体的には、特許文献1に記載の2部材連結装置は、継ぎブームに設けられた上芯出し部材の係合溝を下ブームに設けられたブラケットから突出した上連結ピンに係合させ、これにより、当該上連結ピンの軸線を継ぎブームに設けられたピン挿通孔の孔軸線に一致させる芯出しが行われるように構成されている。このように両軸線が一致した状態で、継ぎブームのピン挿通孔に当該連結ピンを挿通することで、下ブームと継ぎブームとの連結が完成する。 US Pat. No. 6,300,002 describes a two-member coupling device for coupling a patch boom to a lower boom pivotally mounted on an upper swing structure. Specifically, the two-member connecting device described in Patent Document 1 engages an engagement groove of an upper centering member provided on a joint boom with an upper connecting pin protruding from a bracket provided on a lower boom, As a result, the axis of the upper connecting pin is aligned with the axis of the pin insertion hole provided in the joint boom. By inserting the connecting pin into the pin insertion hole of the connecting boom in a state in which both axes are aligned in this way, the connection between the lower boom and the connecting boom is completed.

特開2010-230113号公報Japanese Patent Application Laid-Open No. 2010-230113

ところで、特許文献1に記載の2部材連結装置を用いて下ブームと継ぎブームとを連結する場合、上連結ピンの軸線を継ぎブームのピン挿通孔の孔軸線に一致させる芯出し作業を、作業者のマニュアル操作によって行う必要がある。この場合、作業者は下ブーム及び継ぎブームのいずれか一方を微操作しながら上芯出し部材の係合溝と上連結ピンとを互いに係合させている。このため、当該芯出し作業中に、上連結ピンと上芯出し部材とが強く接触するおそれがあった。 By the way, when connecting the lower boom and the connecting boom using the two-member connecting device described in Patent Document 1, the centering work to match the axis of the upper connecting pin with the hole axis of the pin insertion hole of the connecting boom is performed. manual operation by the operator. In this case, the operator engages the engaging groove of the upper centering member and the upper connecting pin with each other while slightly manipulating either one of the lower boom and the connecting boom. Therefore, there is a possibility that the upper connecting pin and the upper centering member come into strong contact with each other during the centering operation.

上連結ピンと上芯出し部材とが強く接触した場合、上連結ピンの軸線を継ぎブームのピン挿通孔の孔軸線に一致させることができず、継ぎブームのピン挿通孔に上連結ピンを挿通する作業に多大な時間を要することになる。この結果、下ブーム及び継ぎブームの連結作業の効率が低下するおそれがあった。 When the upper connecting pin and the upper centering member strongly contact each other, the axis of the upper connecting pin cannot be aligned with the axis of the pin insertion hole of the connecting boom, and the upper connecting pin is inserted into the pin insertion hole of the connecting boom. It will take a lot of time to work. As a result, there is a risk that the efficiency of connecting the lower boom and the joint boom will be reduced.

本発明はこのような課題に鑑みてなされたものであり、その目的とするところは、隣り合うブームの連結作業の効率化を図るマルチブーム式作業機を提供することにある。 SUMMARY OF THE INVENTION The present invention has been made in view of such problems, and an object of the present invention is to provide a multi-boom work machine that improves the efficiency of connecting work between adjacent booms.

上記目的を達成するため、本発明のマルチブーム式作業機は、機体と、前記機体に回動可能に取付けられた第1ブーム、及び、前記第1ブームに取付けられた第2ブームを含んで構成されるブーム装置と、前記ブーム装置に回動可能に取付けられたアーム装置と、前記アーム装置に取付けられ、作業を行うアタッチメントと、前記第1ブーム及び前記第2ブームを連結する連結装置と、を備え、前記連結装置は、左右方向で対面して前記第1ブームに設けられた左右の第1ブラケットと、前記左右の第1ブラケットにそれぞれ上下に離間して設けられた上下の第1ピン挿通孔と、前記左右の第1ブラケットと対面するように前記第2ブームに設けられた左右の第2ブラケットと、前記左右の第2ブラケットにそれぞれ上下に離間して設けられた上下の第2ピン挿通孔と、前記上下の第1ピン挿通孔と前記上下の第2ピン挿通孔とにそれぞれ挿通される上下の連結ピンと、前記左右の第1ブラケットの間に配置され、前記上下の連結ピンが前記上下の第1挿通孔に挿通された状態で、前記上下の連結ピンを前記上下の第2挿通孔に対して抜差しするように構成された上下の連結ピン抜差し装置と、前記左右の第1ブラケットを挟んで前記左右の第2ブラケットと対面するように前記第2ブームに設けられ、且つ、前記上連結ピンの軸線を前記上第2ピン挿通孔の孔軸線に一致させるように前記上連結ピンを上側から支持する左右の上芯出し部材と、を含んで構成されるマルチブーム式作業機において、前記連結装置は、前記上連結ピンを下側から支持するように前記第1ブームに設けられた左右の支持部材を更に含んで構成され、前記左右の支持部材はそれぞれ、前記左右の第1ブラケットと前記左右の上芯出し部材との左右方向での距離以上前記左右の第1ブラケットから離れて配置されている、ことを特徴とする。 To achieve the above object, a multi-boom work machine of the present invention includes a machine body, a first boom rotatably attached to the machine body, and a second boom attached to the first boom. a boom device, an arm device rotatably attached to the boom device, an attachment attached to the arm device for performing work, and a connecting device for connecting the first boom and the second boom. , wherein the connecting device includes left and right first brackets provided on the first boom facing each other in the left and right direction, and upper and lower first brackets provided on the left and right first brackets, respectively, with a space therebetween in the vertical direction. a pin insertion hole; left and right second brackets provided on the second boom so as to face the left and right first brackets; 2-pin insertion holes, upper and lower connection pins respectively inserted through the upper and lower first pin insertion holes and the upper and lower second pin insertion holes, and the upper and lower connection pins disposed between the left and right first brackets. an upper and lower connecting pin inserting and removing device configured to insert and remove the upper and lower connecting pins into and from the upper and lower second insertion holes in a state in which the pins are inserted through the upper and lower first insertion holes; The second boom is provided so as to face the left and right second brackets with the first bracket therebetween, and the axis of the upper connecting pin is aligned with the axis of the second upper pin insertion hole. In the multi-boom work machine including left and right upper centering members that support the upper connection pin from above, the connection device supports the upper connection pin from below. Each of the left and right support members is equal to or greater than the distance in the left and right direction between the left and right first brackets and the left and right upper centering members. It is characterized in that it is arranged away from the bracket.

本発明のマルチブーム式作業機によれば、連結装置は、上連結ピンを下側から支持するように第1ブームに配設された左右の支持部材を含んで構成されている。そして、左右の支持部材はそれぞれ、左右の第1ブラケットと左右の上芯出し部材との左右方向での距離以上左右の第1ブラケットから離れて配置されている。このため、上連結ピンの軸線を上第2ピン挿通孔の孔軸線に一致させる芯出し作業中、当該上連結ピンは、上側面において上芯出し部材に支持されるとともに、下側面において支持部材によって支持される。よって、上連結ピンの軸線を上第2挿通孔の孔軸線に一致させる芯出し作業を作業者のマニュアル操作によって行い、上連結ピンが上芯出し部材に強く接触した場合であっても、上芯出し部材及び支持部材によって上連結ピンの上下位置が維持されるため、上連結ピンの軸線と上第2ピン挿通孔の孔軸線とのずれを抑制することができる。このようにして、上第2ピン挿通孔に上連結ピンを挿通する作業を効率的に実行することができ、第1ブーム及び第2ブームの連結作業の効率化するマルチブーム式作業機を提供することができる。 According to the multi-boom work machine of the present invention, the connecting device includes left and right supporting members arranged on the first boom so as to support the upper connecting pin from below. The left and right support members are arranged apart from the left and right first brackets by a distance in the left and right direction between the left and right first brackets and the left and right upper centering members. For this reason, during the centering operation for matching the axis of the upper connecting pin with the hole axis of the second upper pin insertion hole, the upper connecting pin is supported by the upper centering member on the upper side and supported by the supporting member on the lower side. Supported by Therefore, even if the operator manually performs the centering work for aligning the axis of the upper connecting pin with the hole axis of the upper second insertion hole and the upper connecting pin strongly contacts the upper centering member, the upper Since the vertical position of the upper connecting pin is maintained by the centering member and the supporting member, deviation between the axis of the upper connecting pin and the hole axis of the upper second pin insertion hole can be suppressed. In this way, the operation of inserting the upper connecting pin into the upper second pin insertion hole can be efficiently performed, and a multi-boom work machine is provided that improves the efficiency of the connecting operation of the first boom and the second boom. can do.

本発明の実施形態に係るマルチブーム式作業機の全体構成を概略的に示す側面図であり、作業装置の複数の作業位置が示されている。1 is a side view schematically showing the overall configuration of a multi-boom working machine according to an embodiment of the present invention, showing a plurality of working positions of the working device; FIG. 図1のマルチブーム式作業機の作業装置を概略的に示す側面図であり、アタッチメントが取り外された状態が示されている。FIG. 2 is a side view schematically showing the work device of the multi-boom work machine of FIG. 1, showing a state in which an attachment is removed; 図2の作業装置を矢視Aで見た状態を示す部分拡大図であり、下ブームと上ブームとの連結部分が示されている。FIG. 3 is a partially enlarged view of the working device of FIG. 2 as viewed in the direction of arrow A, showing a connecting portion between a lower boom and an upper boom; 図3に示す連結部分を上ブームの側から下ブームの側を見て説明する斜視図であり、上ブームを部分的に破断して示すものである。FIG. 4 is a perspective view for explaining the connecting portion shown in FIG. 3 as viewed from the upper boom side to the lower boom side, with the upper boom being partially cut away. 図1に示す作業装置のうち、下ブームと当該下ブームに設けられた連結装置とを示す斜視図である。FIG. 2 is a perspective view showing a lower boom and a coupling device provided on the lower boom of the working device shown in FIG. 1; 図1に示すマルチブーム式作業機の作業装置における下ブームと上ブームとの連結作業を説明する図である。FIG. 3 is a view for explaining a connecting operation of a lower boom and an upper boom in the working device of the multi-boom work machine shown in FIG. 1;

以下、図面に基づき本発明の実施形態について説明する。本実施形態では、マルチブーム式作業機として2つのブームと2つのアームとを備えるものを例に挙げて説明する。しかし、本発明のマルチブーム式作業機は、これに限定されるものではなく、例えば3つのブームを備えるものであってもよい。 An embodiment of the present invention will be described below with reference to the drawings. In this embodiment, a multi-boom work machine having two booms and two arms will be described as an example. However, the multi-boom work machine of the present invention is not limited to this, and may have three booms, for example.

図1は、本発明の実施形態に係るマルチブーム式作業機1(以下、作業機1ともいう。)の全体構成を概略的に示す側面図であり、作業装置30の複数の作業位置が示されている。図2は、図1の作業機1の作業装置30を概略的に示す側面図であり、アタッチメント60が取り外された状態が示されている。図3は、図2の作業装置30を矢視Aで見た状態を示す部分拡大図であり、下ブーム42と上ブーム44との連結部分が示されている。図4は、図3に示す連結部分を上ブーム44の側から下ブーム42の側を見て説明する斜視図であり、上ブーム44を部分的に破断して示すものである。図5は、図1に示す作業装置30のうち、下ブーム42と当該下ブーム42に設けられた連結装置70とを示す斜視図である。図6は、図1に示す作業機1の作業装置30における下ブーム42と上ブーム44との連結作業を説明する図である。 FIG. 1 is a side view schematically showing the overall configuration of a multi-boom work machine 1 (hereinafter also referred to as work machine 1) according to an embodiment of the present invention, in which a plurality of work positions of a work device 30 are shown. It is FIG. 2 is a side view schematically showing the work device 30 of the work machine 1 of FIG. 1, showing a state in which the attachment 60 is removed. FIG. 3 is a partially enlarged view of the working device 30 of FIG. 2 as viewed in the direction of arrow A, and shows the connecting portion between the lower boom 42 and the upper boom 44. As shown in FIG. FIG. 4 is a perspective view for explaining the connecting portion shown in FIG. 3 as viewed from the upper boom 44 side to the lower boom 42 side, and shows the upper boom 44 partially broken away. FIG. 5 is a perspective view showing the lower boom 42 and the coupling device 70 provided on the lower boom 42 of the working device 30 shown in FIG. 6A and 6B are diagrams for explaining the operation of connecting the lower boom 42 and the upper boom 44 in the working device 30 of the working machine 1 shown in FIG.

なお、説明の便宜上、図1に示す作業機1の向きを基準に運転室21のオペレータから見て「前」、「後」、「左」、「右」をそれぞれ定義し、重力を基準に「上」、「下」を定義する。即ち、各図に示される矢印「前」及び「後」は図1に示す作業機1の前後方向を示し、矢印「左」及び「右」は図1に示す作業機1の左右(幅)方向を示し、矢印「上」及び「下」は作業機1の上下方向を示している。 For convenience of explanation, "front", "rear", "left", and "right" as seen from the operator in the operator's cab 21 are defined based on the orientation of the work implement 1 shown in FIG. Define "top" and "bottom". That is, the arrows "front" and "rear" shown in each figure indicate the front-rear direction of the working machine 1 shown in FIG. 1, and the arrows "left" and "right" indicate the width of the working machine 1 shown in FIG. The arrows "up" and "down" indicate the vertical direction of the work implement 1. As shown in FIG.

図1に示すように、マルチブーム式作業機1は、下部走行体10と、下部走行体10上に配置された上部旋回体(機体)20と、上部旋回体20に取付けられて解体作業を行う作業装置30と、連結装置70とを備えている。作業機1は、例えばビル等の高層建築物等の地上高さが大きな構造物を解体するのに好適に用いられるものである。 As shown in FIG. 1, the multi-boom work machine 1 includes a lower traveling body 10, an upper revolving body (body) 20 arranged on the lower traveling body 10, and attached to the upper revolving body 20 to perform demolition work. A work device 30 for performing the work and a connecting device 70 are provided. The working machine 1 is preferably used for demolishing a structure having a large height above the ground, such as a high-rise building such as a building.

下部走行体10は、作業機1が走行可能となるように上部旋回体20を支持する所謂クローラ型の走行装置である。 The lower traveling body 10 is a so-called crawler-type traveling device that supports the upper revolving body 20 so that the working machine 1 can travel.

上部旋回体20は、下部走行体10に旋回軸(上下方向軸線)周りに回転可能に取付けられている。上部旋回体20には、前側且つ左側に、オペレータが作業機1を運転操作するための運転室21が設けられている。運転室21は、下部走行体10の駆動や作業装置30の操作等、作業機1の操作をオペレータが搭乗して行う操縦室である。また、上部旋回体20の後側には、重量バランスを確保するカウンタウェイトが設けられている。また、運転室21とカウンタウェイトとの間には機械室が設けられている。当該機械室内にはディーゼルエンジンが配置されており、当該エンジンは、圧油を供給する油圧ポンプ(図示せず)を駆動するための駆動源として機能する。油圧ポンプより吐出された圧油は、下部走行体10に設けられた走行モータや上部旋回体20に設けられた旋回モータ(ともに図示せず)へ供給される。これにより、下部走行体10による作業機1の自走が可能となり、上部旋回体20が作業装置30とともに旋回軸周りで回転可能となる。 The upper revolving body 20 is attached to the lower traveling body 10 so as to be rotatable about a revolving shaft (vertical axis). A driver's cab 21 for an operator to operate the work implement 1 is provided on the front and left side of the upper revolving body 20 . The operator's cab 21 is a cockpit in which an operator rides and operates the working machine 1 , such as driving the lower traveling body 10 and operating the working device 30 . A counterweight is provided on the rear side of the upper swing body 20 to ensure weight balance. A machine room is provided between the cab 21 and the counterweight. A diesel engine is arranged in the machine room, and the engine functions as a drive source for driving a hydraulic pump (not shown) that supplies pressure oil. The pressure oil discharged from the hydraulic pump is supplied to a travel motor provided on the lower travel body 10 and a swing motor provided on the upper swing body 20 (both not shown). As a result, the work machine 1 can be self-propelled by the lower traveling body 10 , and the upper revolving body 20 can rotate about the revolving shaft together with the work device 30 .

図1に示すように、作業装置30は、上部旋回体20に上下方向で回動可能に取り付けられたブーム装置40と、ブーム装置40の先端に上下方向で回動可能に取り付けられたアーム装置50と、アーム装置50の先端に取付けられ、解体作業を行うアタッチメント60とを有している。 As shown in FIG. 1, the work device 30 includes a boom device 40 attached to the upper revolving body 20 so as to be able to rotate in the vertical direction, and an arm device attached to the tip of the boom device 40 so as to be able to rotate in the vertical direction. 50 and an attachment 60 attached to the tip of the arm device 50 for dismantling work.

ブーム装置40は、上部旋回体20に回動可能に取付けられた下ブーム42(第1ブーム)と、当該下ブーム42に取付けられた上ブーム44(第2ブーム)とを含んで構成される。なお、上ブーム44は、下ブーム42に対し相対回動不能に取付けられてもよいし、下ブーム42に対し上下方向で回動可能に取付けられてもよい。ブーム装置40は、上部旋回体20に対し下ブーム42を上下方向で回動させるように構成された下ブームシリンダ42aを含んで構成されている(図1)。 The boom device 40 includes a lower boom 42 (first boom) rotatably attached to the upper swing body 20 and an upper boom 44 (second boom) attached to the lower boom 42. . The upper boom 44 may be attached to the lower boom 42 so as not to be relatively rotatable, or may be attached to the lower boom 42 so as to be vertically rotatable. The boom device 40 includes a lower boom cylinder 42a configured to vertically rotate a lower boom 42 with respect to the upper swing body 20 (Fig. 1).

図1及び図2に示すように、アーム装置50は、上ブーム44の先端に回動可能に取付けられたミドルアーム52と、当該ミドルアーム52に回動可能に取付けられたアーム54とを含んで構成されている。また、アーム装置50は、上ブーム44に対しミドルアーム52を上下方向で回動させるように構成されたミドルアームシリンダ52aと、ミドルアーム52に対しアーム54を上下方向で回動させるように構成されたアームシリンダ54aとを含んで構成されている。アタッチメント60は、構造物を解体するのに用いられる例えば圧砕機であり、当該アタッチメント60を駆動するためのアタッチメントシリンダ60aを含んで構成されている。 As shown in FIGS. 1 and 2, the arm device 50 includes a middle arm 52 rotatably attached to the tip of the upper boom 44 and an arm 54 rotatably attached to the middle arm 52. consists of The arm device 50 also includes a middle arm cylinder 52a configured to vertically rotate the middle arm 52 with respect to the upper boom 44, and a configuration configured to vertically rotate the arm 54 with respect to the middle arm 52. and an arm cylinder 54a. The attachment 60 is, for example, a crusher used to dismantle a structure, and includes an attachment cylinder 60a for driving the attachment 60. As shown in FIG.

油圧ポンプより吐出された圧油の一部は、下ブームシリンダ42a、ミドルアームシリンダ52a、アームシリンダ54a、アタッチメントシリンダ60aへも供給される。これにより、圧油の供給度合い即ち油圧に応じてブーム装置40、アーム装置50、アタッチメント60が夫々駆動される。 A part of the pressure oil discharged from the hydraulic pump is also supplied to the lower boom cylinder 42a, the middle arm cylinder 52a, the arm cylinder 54a and the attachment cylinder 60a. As a result, the boom device 40, the arm device 50, and the attachment 60 are driven in accordance with the degree of pressure oil supply, that is, the hydraulic pressure.

図3から図5に示すように、連結装置70は、下ブーム42及び上ブーム44を連結するものであり、下ブーム側連結部72と、上ブーム側連結部74と、連結ピン76と、連結ピン抜差し装置78と、芯出し部材80と、支持部材90とを含んで構成されている。 As shown in FIGS. 3 to 5, the connecting device 70 connects the lower boom 42 and the upper boom 44, and includes a lower boom side connecting portion 72, an upper boom side connecting portion 74, a connecting pin 76, It includes a connecting pin inserting/removing device 78 , a centering member 80 , and a support member 90 .

図3及び図5に示すように、下ブーム側連結部72は、左右方向で対面して下ブーム42に設けられた一対の右側第1ブラケット72a(右第1ブラケット)及び一対の左側第1ブラケット72b(左第1ブラケット)を含んで構成されている。一対の右側第1ブラケット72a及び一対の左側第1ブラケット72bはそれぞれ、一定の間隔をもって左右方向で対面する2つの鋼板部材により形成されており、下ブーム42の前側において上側角隅から下側角隅に亘って上下方向に亘って延びている。一対の右側第1ブラケット72aは、下ブーム42の前側端部の右側に溶接等によって固定されている。一対の左側第1ブラケット72bは、下ブーム42の前側端部の左側に溶接等によって固定されている。そして、一対の右側第1ブラケット72aの間には、後述する右側第2ブラケット74a(右第2ブラケット)が配置され、一対の左側第1ブラケット72bの間には、後述する左側第2ブラケット74b(左第2ブラケット)が配置される構成となっている。 As shown in FIGS. 3 and 5, the lower boom side connecting portion 72 includes a pair of right first brackets 72a (right first brackets) and a pair of left first It is configured including a bracket 72b (left first bracket). The pair of right first brackets 72a and the pair of left first brackets 72b are each formed of two steel plate members that face each other in the left-right direction at a constant interval. It extends vertically over the corner. The pair of right first brackets 72a are fixed to the right side of the front end of the lower boom 42 by welding or the like. The pair of left first brackets 72b are fixed to the left side of the front end of the lower boom 42 by welding or the like. A right second bracket 74a (right second bracket) is arranged between the pair of right first brackets 72a, and a left second bracket 74b is arranged between the pair of left first brackets 72b. (Second left bracket) is arranged.

下ブーム側連結部72は、一対の右側第1ブラケット72aに上下に離間して設けられた一対の右上第1ピン挿通孔72c(上第1ピン挿通孔)及び一対の右下第1ピン挿通孔72d(下第1ピン挿通孔)と、一対の左側第1ブラケット72bに上下に離間して設けられた一対の左上第1ピン挿通孔72e(上第1ピン挿通孔)及び一対の左下第1ピン挿通孔72f(下第1ピン挿通孔)とを含んで構成されている。一対の右上第1ピン挿通孔72c及び一対の右下第1ピン挿通孔72dはそれぞれ、一対の右側第1ブラケット72aの上端側及び下端側に穿設されている。そして、一対の右上第1ピン挿通孔72c及び一対の右下第1ピン挿通孔72dはそれぞれ、後述する右上連結ピン76c(上連結ピン)及び右下連結ピン76d(下連結ピン)が抜差し可能に挿通される構成となっている。また、一対の左上第1ピン挿通孔72e及び一対の左下第1ピン挿通孔72fはそれぞれ、一対の左側第1ブラケット72bの上端側及び下端側に穿設されている。そして、一対の左上第1ピン挿通孔72e及び一対の左下第1ピン挿通孔72fはそれぞれ、後述する左上連結ピン76e(上連結ピン)及び図示しない左下連結ピン(下連結ピン)が抜差し可能に挿通される構成となっている。ここで、一対の右上第1ピン挿通孔72c及び一対の左上第1ピン挿通孔72eはそれぞれ、同一の孔軸線上に配置されるように左右方向に延在して形成されている。また、一対の右下第1ピン挿通孔72d及び一対の左下第1ピン挿通孔72fはそれぞれ、同一の孔軸線上に配置されるように左右方向に延在して形成されている。 The lower boom side connecting portion 72 includes a pair of upper right first pin insertion holes 72c (upper first pin insertion holes) and a pair of lower right first pin insertion holes 72c (upper first pin insertion holes) which are vertically spaced apart in a pair of right first brackets 72a. A pair of holes 72d (lower first pin insertion holes) and a pair of upper left first pin insertion holes 72e (upper first pin insertion holes) and a pair of lower left pin insertion holes 72e (upper first pin insertion holes) and a pair of upper left first pin insertion holes 72e (upper first pin insertion holes) provided in a pair of left first brackets 72b with a vertical separation. 1 pin insertion hole 72f (lower first pin insertion hole). A pair of upper right first pin insertion holes 72c and a pair of lower right first pin insertion holes 72d are formed in the upper end side and lower end side of the pair of right first brackets 72a, respectively. An upper right connecting pin 76c (upper connecting pin) and a lower right connecting pin 76d (lower connecting pin) can be inserted into and removed from the pair of upper right first pin insertion holes 72c and the pair of lower right first pin insertion holes 72d, respectively. It is configured to be inserted into the A pair of upper left first pin insertion holes 72e and a pair of left lower first pin insertion holes 72f are formed in the upper end side and the lower end side of the pair of left first brackets 72b, respectively. An upper left connecting pin 76e (upper connecting pin) and a lower left connecting pin (lower connecting pin) (not shown) can be inserted into and removed from the pair of upper left first pin insertion holes 72e and the pair of left lower first pin insertion holes 72f, respectively. It is configured to be inserted. Here, the pair of upper right first pin insertion holes 72c and the pair of upper left first pin insertion holes 72e are formed so as to extend in the left-right direction so as to be arranged on the same hole axis. Also, the pair of lower right first pin insertion holes 72d and the pair of lower left first pin insertion holes 72f are formed to extend in the left-right direction so as to be arranged on the same hole axis.

図3に示すように、上ブーム側連結部74は、一対の右側第1ブラケット72aと対面するように上ブーム44に設けられた右側第2ブラケット74a(右第2ブラケット)及び一対の左側第1ブラケット72bと対面するように上ブーム44に設けられた左側第2ブラケット74b(左第2ブラケット)を含んで構成されている。右側第2ブラケット74a及び左側第2ブラケット74bはそれぞれ、1つの鋼板部材により形成されており、上ブーム44の後側において上側角隅から下側角隅に亘って上下方向に亘って延びている。右側第2ブラケット74aは、上ブーム44の後側端部の右側に溶接等によって固定されている。右側第2ブラケット74aは、一対の右側第1ブラケット72aの間に配置され、一対の右側第1ブラケット72aと左右方向で対面するように構成されている。また、左側第2ブラケット74bは、上ブーム44の後側端部の左側に溶接等によって固定されている。左側第2ブラケット74bは、一対の左側第1ブラケット72bの間に配置され、一対の左側第1ブラケット72bと左右方向で対面するように構成されている。 As shown in FIG. 3, the upper boom side connecting portion 74 includes a right second bracket 74a (right second bracket) provided on the upper boom 44 so as to face a pair of right first brackets 72a and a pair of left first brackets 74a. It includes a left second bracket 74b (left second bracket) provided on the upper boom 44 so as to face the first bracket 72b. The right second bracket 74a and the left second bracket 74b are each formed of a single steel plate member, and extend vertically from the upper corner to the lower corner on the rear side of the upper boom 44. . The right second bracket 74a is fixed to the right side of the rear end of the upper boom 44 by welding or the like. The right second bracket 74a is disposed between the pair of right first brackets 72a and configured to face the pair of right first brackets 72a in the left-right direction. The left second bracket 74b is fixed to the left side of the rear end of the upper boom 44 by welding or the like. The left second bracket 74b is disposed between the pair of left first brackets 72b and configured to face the pair of left first brackets 72b in the left-right direction.

上ブーム側連結部74は、右側第2ブラケット74aに上下に離間して設けられた右上第2ピン挿通孔及び右下第2ピン挿通孔(いずれも図示せず)と、左側第2ブラケット74bに上下に離間して設けられた左上第2ピン挿通孔及び左下第2ピン挿通孔(いずれも図示せず)とを含んで構成されている。右上第2ピン挿通孔及び右下第2ピン挿通孔はそれぞれ、右側第2ブラケット74aの上端側及び下端側に穿設されている。また、左上第2ピン挿通孔及び左下第2ピン挿通孔はそれぞれ、左側第2ブラケット74bの上端側及び下端側に穿設されている。ここで、右上第2ピン挿通孔及び左上第2ピン挿通孔は、一対の右上第1ピン挿通孔72c及び一対の左上第1ピン挿通孔72eと同一の孔軸線上に配置されるように左右方向に延在して形成されている。また、右下第2ピン挿通孔及び左下第2ピン挿通孔は、一対の右下第1ピン挿通孔72d及び一対の左下第1ピン挿通孔72fと同一の孔軸線上に配置されるように左右方向に延在して形成されている。 The upper boom side connecting portion 74 includes an upper right second pin insertion hole and a lower right second pin insertion hole (both not shown) provided vertically spaced apart in the right second bracket 74a, and a left second bracket 74b. It includes an upper left second pin insertion hole and a lower left second pin insertion hole (both not shown) which are vertically spaced apart from each other. The upper right second pin insertion hole and the lower right second pin insertion hole are formed in the upper end side and the lower end side of the right second bracket 74a, respectively. Further, the upper left second pin insertion hole and the left lower second pin insertion hole are formed in the upper end side and the lower end side of the left second bracket 74b, respectively. Here, the upper right second pin insertion hole and the upper left second pin insertion hole are arranged on the same hole axis as the pair of upper right first pin insertion holes 72c and the pair of upper left first pin insertion holes 72e. It is formed extending in the direction. Also, the lower right second pin insertion hole and the lower left second pin insertion hole are arranged on the same hole axis as the pair of lower right first pin insertion holes 72d and the pair of lower left first pin insertion holes 72f. It is formed extending in the left-right direction.

図4及び図5に示すように、連結ピン76は、一対の右上第1ピン挿通孔72c及び右上第2ピン挿通孔に挿通される右上連結ピン76c(上連結ピン)と、一対の右下第1ピン挿通孔72d及び右下第2ピン挿通孔に挿通される右下連結ピン76d(下連結ピン)と、一対の左上第1ピン挿通孔72e及び左上第2ピン挿通孔に挿通される左上連結ピン76e(上連結ピン)と、一対の左下第1ピン挿通孔72f及び左下第2ピン挿通孔に挿通される左下連結ピン(図示せず)とを含んで構成されている。右上連結ピン76c、右下連結ピン76d、左上連結ピン76e、及び左下連結ピンは円柱状に形成されている。右上連結ピン76cは、左右方向に移動することにより右上第2ピン挿通孔に対して抜差しされるものである。同様に、右下連結ピン76dは、左右方向に移動することにより右下第2ピン挿通孔に対して抜差しされ、左上連結ピン76eは、左右方向に移動することにより左上第2ピン挿通孔に対して抜差しされ、左下連結ピンは、左右方向に移動することにより左下第2ピン挿通孔に対して抜差しされるものである。 As shown in FIGS. 4 and 5, the connecting pins 76 include a pair of upper right connecting pins 76c (upper connecting pins) inserted through a pair of upper right first pin insertion holes 72c and upper right second pin insertion holes, and a pair of lower right A lower right connecting pin 76d (lower connecting pin) inserted through the first pin insertion hole 72d and the second lower right pin insertion hole, and a pair of upper left first pin insertion hole 72e and upper left second pin insertion hole are inserted. It includes an upper left connecting pin 76e (upper connecting pin) and a lower left connecting pin (not shown) inserted through a pair of lower left first pin insertion hole 72f and second lower left pin insertion hole. The upper right connecting pin 76c, the lower right connecting pin 76d, the upper left connecting pin 76e, and the lower left connecting pin are formed in a cylindrical shape. The upper right connecting pin 76c is inserted into and removed from the upper right second pin insertion hole by moving in the left-right direction. Similarly, the lower right connecting pin 76d moves laterally to be inserted into or removed from the lower right second pin insertion hole, and the left upper connecting pin 76e moves laterally to fit into the upper left second pin insertion hole. The lower left connecting pin is inserted into and removed from the second lower left pin insertion hole by moving in the left-right direction.

図3から図5に示すように、連結ピン抜差し装置78は、上連結ピン抜差し装置78a及び下連結ピン抜差し装置78bから構成されている。上連結ピン抜差し装置78a及び下連結ピン抜差し装置78bはそれぞれ、左右方向において、一対の右側第1ブラケット72a及び一対の左側第1ブラケット72bの間に配置されている。そして、上連結ピン抜差し装置78aは、右上連結ピン76cが一対の右上第1ピン挿通孔72cのうち左側(幅方向内側)の挿通孔に挿通された状態で右上連結ピン76cを右上第2ピン挿通孔に対して抜差し、且つ、左上連結ピン76eが一対の左上第1ピン挿通孔72eのうち右側(幅方向内側)の挿通孔に挿通された状態で左上連結ピン76eを左上第2ピン挿通孔に対して抜差しするように構成されている。また、下連結ピン抜差し装置78bは、右下連結ピン76dが一対の右下第1ピン挿通孔72dのうち左側(幅方向内側)の挿通孔に挿通された状態で右下連結ピン76dを右下第2ピン挿通孔に対して抜差し、且つ、左下連結ピンが一対の左下第1ピン挿通孔72fのうち右側(幅方向内側)の挿通孔に挿通された状態で左下連結ピンを左下第2ピン挿通孔に対して抜差しするように構成されている。 As shown in FIGS. 3 to 5, the connecting pin inserting/removing device 78 comprises an upper connecting pin inserting/removing device 78a and a lower connecting pin inserting/removing device 78b. The upper connecting pin inserting/removing device 78a and the lower connecting pin inserting/removing device 78b are respectively arranged between the pair of right first brackets 72a and the pair of left first brackets 72b in the left-right direction. Then, the upper connecting pin inserting/removing device 78a moves the upper right connecting pin 76c to the upper right second pin in a state in which the upper right connecting pin 76c is inserted into the left (inner side in the width direction) insertion hole of the pair of upper right first pin insertion holes 72c. The upper left connecting pin 76e is inserted into and removed from the insertion hole, and the upper left connecting pin 76e is inserted into the upper left second pin insertion hole in a state in which the upper left connecting pin 76e is inserted into the right (widthwise inner) insertion hole of the pair of upper left first pin insertion holes 72e. It is configured to be inserted into and removed from the hole. In addition, the lower connecting pin inserting/removing device 78b moves the lower right connecting pin 76d to the right while the lower right connecting pin 76d is inserted into the left (inner side in the width direction) insertion hole of the pair of lower right first pin insertion holes 72d. With the lower left connecting pin inserted into and removed from the second lower pin insertion hole, and the lower left connecting pin being inserted into the right (widthwise inner) insertion hole of the pair of first lower left pin insertion holes 72f, the lower left connecting pin is inserted into the second lower left pin insertion hole. It is configured to be inserted into and removed from the pin insertion hole.

上連結ピン抜差し装置78a及び下連結ピン抜差し装置78bは、油圧源から圧油が給排されて往復動する上油圧シリンダ78h及び下油圧シリンダ78iと、一端において当該上油圧シリンダ78h及び下油圧シリンダ78iに回動可能にピン結合されたレバーとを含んで構成されている。なお、図4では、当該レバーとして左上レバー78eが示されている。左上レバー78eは、一端において上油圧シリンダ78hに回動可能に結合されており、他端において左上連結ピン76eに回動可能に結合されている。なお、右上レバー、右下レバー、及び左下レバーは、左上レバー78eに対応する構成を有しているので、その詳細な説明を省略する。上連結ピン抜差し装置78a及び下連結ピン抜差し装置78bは、上油圧シリンダ78h及び下油圧シリンダ78iを用いて連結ピン76を左右方向に移動させるように構成されている。なお、連結ピン抜差し装置78の構成は公知であるため、その詳細な説明を省略する。 The upper connecting pin extracting/inserting device 78a and the lower connecting pin extracting/inserting device 78b include an upper hydraulic cylinder 78h and a lower hydraulic cylinder 78i which reciprocate by supplying and discharging pressure oil from a hydraulic source, and one end of the upper hydraulic cylinder 78h and the lower hydraulic cylinder. 78i and a lever rotatably connected with a pin. In addition, in FIG. 4, the upper left lever 78e is shown as the said lever. The upper left lever 78e has one end rotatably coupled to the upper hydraulic cylinder 78h and the other end rotatably coupled to the upper left connecting pin 76e. Since the upper right lever, the lower right lever, and the lower left lever have a structure corresponding to the upper left lever 78e, detailed description thereof will be omitted. The upper connecting pin inserting/removing device 78a and the lower connecting pin inserting/removing device 78b are configured to move the connecting pin 76 in the horizontal direction using an upper hydraulic cylinder 78h and a lower hydraulic cylinder 78i. Since the configuration of the connecting pin inserting/removing device 78 is well known, a detailed description thereof will be omitted.

図3及び図4に示すように、芯出し部材80は、一対の右側第1ブラケット72aを挟んで右側第2ブラケット74aと対面するように上ブーム44に設けられた右上芯出し部材80c(上芯出し部材)と、一対の左側第1ブラケット72bを挟んで左側第2ブラケット74bと対面するように上ブーム44に設けられた左上芯出し部材80e(上芯出し部材)とを含んで構成されている。具体的には、右上芯出し部材80cは、一対の右側第1ブラケット72aの間に右側第2ブラケット74aを配置したときに、一対の右側第1ブラケット72aのうち左側のブラケットを挟んで右側第2ブラケット74aと対面するように配置されている。また、左上芯出し部材80eは、一対の左側第1ブラケット72bの間に左側第2ブラケット74bを配置したときに、一対の左側第1ブラケット72bのうち右側のブラケットを挟んで左側第2ブラケット74bと対面するように配置されている。図4に示すように、右上芯出し部材80c及び左上芯出し部材80eはそれぞれ、右側第2ブラケット74a及び左側第2ブラケット74bと平行に対面しつつ、上ブーム44の上角隅から右上第2ピン挿通孔及び左上第2ピン挿通孔に対応する位置まで延びている。 As shown in FIGS. 3 and 4, the centering member 80 is an upper right centering member 80c (upper centering member 80c) provided on the upper boom 44 so as to face the right second bracket 74a across the pair of right first brackets 72a. and an upper left centering member 80e (upper centering member) provided on the upper boom 44 so as to face the left second bracket 74b across the pair of left first brackets 72b. ing. Specifically, when the right second bracket 74a is arranged between the pair of right first brackets 72a, the upper right centering member 80c is arranged to extend to the right side of the pair of right first brackets 72a with the left bracket interposed therebetween. It is arranged so as to face the second bracket 74a. Further, when the left second bracket 74b is arranged between the pair of left first brackets 72b, the upper left centering member 80e is configured to extend to the left second bracket 74b with the right bracket of the pair of left first brackets 72b interposed therebetween. are placed facing each other. As shown in FIG. 4, the upper right centering member 80c and the upper left centering member 80e face the right second bracket 74a and the left second bracket 74b in parallel, respectively, and extend from the upper corner of the upper boom 44 to the upper right second bracket. It extends to a position corresponding to the pin insertion hole and the upper left second pin insertion hole.

右上芯出し部材80cは、右上連結ピン76cの軸線を右上第2ピン挿通孔の孔軸線に一致させるように右上連結ピン76cを上側から支持するものであり、左上芯出し部材80eは、左上連結ピン76eの軸線を左上第2ピン挿通孔の孔軸線に一致させるように左上連結ピン76eを上側から支持するものである。右上芯出し部材80c及び左上芯出し部材80eはそれぞれ、板体を用いて全体として略三角形状に形成され、上ブーム44の上角隅に溶接等により固定されている。右上芯出し部材80c及び左上芯出し部材80eはそれぞれ、右上連結ピン76c及び左上連結ピン76eを上側から支持するように上方に凹んで形成された係合溝部を含んでいる。なお、図4では、左上芯出し部材80eの係合溝部80gのみが示されている。係合溝部80gは、左上第2ピン挿通孔とほぼ等しい曲率半径を有する円弧状に形成され、左上連結ピン76eに上方から係合するようになっている。右上芯出し部材80cの係合溝部は、左上芯出し部材80eの係合溝部80gと同じ構成であるため、その詳細な説明を省略する。 The upper right centering member 80c supports the upper right connecting pin 76c from above so that the axis of the upper right connecting pin 76c is aligned with the hole axis of the upper right second pin insertion hole. The upper left connecting pin 76e is supported from above so that the axis of the pin 76e coincides with the hole axis of the upper left second pin insertion hole. The upper right centering member 80c and the upper left centering member 80e are each formed in a generally triangular shape using a plate body, and are fixed to the upper corners of the upper boom 44 by welding or the like. The upper right centering member 80c and the upper left centering member 80e each include an engagement groove portion recessed upward so as to support the upper right connecting pin 76c and the upper left connecting pin 76e from above. Note that FIG. 4 shows only the engagement groove portion 80g of the upper left centering member 80e. The engaging groove portion 80g is formed in an arc shape having a radius of curvature substantially equal to that of the upper left second pin insertion hole, and engages with the upper left connecting pin 76e from above. Since the engaging groove portion of the upper right centering member 80c has the same configuration as the engaging groove portion 80g of the upper left centering member 80e, detailed description thereof will be omitted.

また、芯出し部材80は、一対の右側第1ブラケット72aを挟んで右側第2ブラケット74aと対面するように上ブーム44に設けられた右下芯出し部材(図示せず)と、一対の左側第1ブラケット72bを挟んで左側第2ブラケット74bと対面するように上ブーム44に設けられた左下芯出し部材(図示せず)とを更に含んで構成されている。右下芯出し部材は、右下連結ピン76dの軸線を右下第2ピン挿通孔の孔軸線に一致させるように右下連結ピン76dを支持するものであり、左下芯出し部材は、左下連結ピンの軸線を左下第2ピン挿通孔の孔軸線に一致させるように左下連結ピンを支持するものである。右下芯出し部材及び左下芯出し部材はそれぞれ、右側第2ブラケット74a及び左側第2ブラケット74bと平行に対面しつつ、上ブーム44の下角隅から右下第2ピン挿通孔及び左下ピン挿通孔に対応する位置まで延びている。右下芯出し部材及び左下芯出し部材はそれぞれ、板体を用いて全体として略三角形状に形成され、上ブーム44の下角隅に溶接等により固定されている。なお、芯出し部材80の構成は公知であるため、その詳細な説明を省略する。 The centering members 80 include a lower right centering member (not shown) provided on the upper boom 44 so as to face the right second bracket 74a across the pair of right first brackets 72a, and a pair of left side brackets 72a. It further includes a left lower centering member (not shown) provided on the upper boom 44 so as to face the left second bracket 74b across the first bracket 72b. The lower right centering member supports the lower right connecting pin 76d so that the axis of the lower right connecting pin 76d coincides with the hole axis of the lower right second pin insertion hole, and the lower left centering member supports the lower left connecting pin. The lower left connecting pin is supported so that the axis of the pin coincides with the hole axis of the lower left second pin insertion hole. The lower right centering member and the lower left centering member face the second right bracket 74a and the second left bracket 74b in parallel, respectively, and extend from the lower corner of the upper boom 44 to the lower right second pin insertion hole and the lower left pin insertion hole. extends to a position corresponding to Each of the lower right centering member and the lower left centering member is formed in a generally triangular shape as a whole using a plate body, and is fixed to the lower corner of the upper boom 44 by welding or the like. Since the configuration of the centering member 80 is well known, detailed description thereof will be omitted.

図3から図5に示すように、支持部材90は、右上連結ピン76cを下側から支持するように下ブーム42に設けられた右側支持部材90cと、左上連結ピン76eを下側から支持するように下ブーム42に設けられた左側支持部材90eとから構成されている。右側支持部材90cは、一対の右側第1ブラケット72aのうち左側(幅方向内側)のブラケットと右上芯出し部材80cとの左右方向での距離W1以上当該ブラケットから離れて配置されている。具体的には、右側支持部材90cは、右上連結ピン76cを挟んで右上芯出し部材80cと対面する位置に設けられている。同様に、左側支持部材90eは、一対の左側第1ブラケット72bのうち右側(幅方向内側)のブラケットと左上芯出し部材80eとの左右方向での距離W2以上当該ブラケットから離れて配置されている。具体的には、左側支持部材90eは、左上連結ピン76eを挟んで左上芯出し部材80eと対面する位置に設けられている。右側支持部材90c及び左側支持部材90eはそれぞれ、右上芯出し部材80c及び左上芯出し部材80eの幅と同一又は略同一の幅、若しくは右上芯出し部材80c及び左上芯出し部材80eの幅よりも広幅で形成されている。右側支持部材90c及び左側支持部材90eはそれぞれ、右上連結ピン76c及び左上連結ピン76eに対応して左右対称に配置されている。 As shown in FIGS. 3 to 5, the support member 90 supports the right support member 90c provided on the lower boom 42 so as to support the upper right connection pin 76c from below and the upper left connection pin 76e from below. and a left support member 90e provided on the lower boom 42 as described above. The right support member 90c is arranged away from the right first bracket 72a by a distance W1 or more in the left-right direction between the left (inner side in the width direction) bracket and the upper right centering member 80c. Specifically, the right support member 90c is provided at a position facing the upper right centering member 80c with the upper right connecting pin 76c interposed therebetween. Similarly, the left support member 90e is arranged away from the left first bracket 72b by a distance W2 or more in the left-right direction between the right (inner side in the width direction) bracket of the pair of left first brackets 72b and the upper left centering member 80e. . Specifically, the left support member 90e is provided at a position facing the upper left centering member 80e across the upper left connecting pin 76e. The right support member 90c and the left support member 90e each have a width that is the same as or substantially the same as the width of the upper right centering member 80c and the upper left centering member 80e, or wider than the width of the upper right centering member 80c and the upper left centering member 80e. is formed by The right support member 90c and the left support member 90e are symmetrically arranged corresponding to the upper right connecting pin 76c and the upper left connecting pin 76e, respectively.

右側支持部材90cは、一対の右側第1ブラケット72aの間に右側第2ブラケット74aを配置したときに、一対の右側第1ブラケット72aのうち左側のブラケットより左側(幅方向内側)に配置されている。また、左側支持部材90eは、一対の左側第1ブラケット72bの間に左側第2ブラケット74bを配置したときに、一対の左側第1ブラケット72bのうち右側のブラケットより右側(幅方向内側)に配置されている。右側支持部材90c及び左側支持部材90eはそれぞれ、板体を用いて形成され、一対の右側第1ブラケット72a及び一対の左側第1ブラケット72bと平行に対面しつつ、下ブーム42において右上第2ピン挿通孔及び左上第2ピン挿通孔に対応する位置に溶接等により固定されている。なお、下ブーム42に対する右側支持部材90c及び左側支持部材90eの固定手段は溶接に限られるものではなく、例えばボルト及びナットによる締結であってもよい。右側支持部材90c及び左側支持部材90eはそれぞれ、右上連結ピン76c及び左上連結ピン76eを下側から支持するように下方に凹んで形成された係合凹部を含んでいる。なお、図4では、左側支持部材90eの係合凹部90gのみが示されている。係合凹部90gは、左上第2ピン挿通孔とほぼ等しい曲率半径を有する円弧状に形成され、左上連結ピン76eに下方から係合するようになっている。右側支持部材90cの係合凹部は、左側支持部材90eの係合凹部90gと同じ構成であるため、その詳細な説明を省略する。 The right support member 90c is arranged on the left side (inward in the width direction) of the left bracket of the pair of right first brackets 72a when the right second bracket 74a is arranged between the pair of right first brackets 72a. there is Further, the left support member 90e is arranged on the right side (inward in the width direction) of the right bracket of the pair of left first brackets 72b when the left second bracket 74b is arranged between the pair of left first brackets 72b. It is The right side support member 90c and the left side support member 90e are each formed using a plate body, face the pair of right side first brackets 72a and the pair of left side first brackets 72b in parallel, and are attached to the upper right second pin of the lower boom . It is fixed by welding or the like at a position corresponding to the insertion hole and the upper left second pin insertion hole. The means for fixing the right support member 90c and the left support member 90e to the lower boom 42 is not limited to welding, and may be fastening using bolts and nuts, for example. The right support member 90c and the left support member 90e respectively include engaging recesses that are recessed downward to support the upper right connecting pin 76c and the upper left connecting pin 76e from below. Note that FIG. 4 shows only the engaging recess 90g of the left support member 90e. The engaging recess 90g is formed in an arc shape having a radius of curvature substantially equal to that of the upper left second pin insertion hole, and engages the upper left connecting pin 76e from below. Since the engagement recess of the right support member 90c has the same configuration as the engagement recess 90g of the left support member 90e, detailed description thereof will be omitted.

次いで、連結装置70を用いて、作業装置30を構成する下ブーム42の先端側に上ブーム44を取付ける連結作業について説明する。 Next, a connection operation for attaching the upper boom 44 to the distal end side of the lower boom 42 constituting the working device 30 using the connecting device 70 will be described.

まず、図2に示すように、地面Gに置台95を載置しておく。作業装置30を構成する部品のうち、上ブーム44、ミドルアーム52、アーム54、及びアタッチメント60は予め組立ておき、この組立体即ち下ブーム42を除く作業装置30の部分を置台95に預けておく(但し、図2では、連結装置70を用いて、下ブーム42及び上ブーム44が連結された後の状態が示されている)。他方、下ブーム42は、予め上部旋回体20に取付けられている。そして、運転室21に搭乗したオペレータが下ブーム42を動かすことで、下ブーム42及び上ブーム44を連結することになる。具体的には図6に示すように、オペレータは、右上連結ピン76c及び左上連結ピン76eがそれぞれ右上芯出し部材80cの係合溝部及び左上芯出し部材80eの係合溝部80gに係合するように下ブーム42を操作する。なお、図6では、右上連結ピン76c及びこれに関連する構成が示されており、左上連結ピン76e及びこれに関連する構成が省略されている。このとき、右上連結ピン76cは、下側から右側支持部材90cの係合凹部に保持され、左上連結ピン76eは下側から左側支持部材90eの係合凹部90gに保持されている。つまり、右上連結ピン76c及び左上連結ピン76eはそれぞれ、右上芯出し部材80c及び左上芯出し部材80e、並びに、右側支持部材90c及び左側支持部材90eによって上下方向で保持される。これにより、右上連結ピン76cの軸線が右上第2ピン挿通孔の孔軸線に一致し、左上連結ピン76eの軸線が左上第2ピン挿通孔の孔軸線に一致した状態となる。この状態で、上連結ピン抜差し装置78aを用いて、右上連結ピン76c及び左上連結ピン76eをそれぞれ、一対の右上第1ピン挿通孔72c及び一対の左上第1ピン挿通孔72e、並びに、右上第2ピン挿通孔及び左上第2ピン挿通孔に挿通させる。次いで、オペレータは、右下連結ピン76d及び左下連結ピンがそれぞれ右下芯出し部材及び左下芯出し部材に保持されるまで下ブーム42を操作する。これにより、右下第2ピン挿通孔及び左下第2ピン挿通孔の孔軸線と、一対の右下第1ピン挿通孔72d及び一対の左下第1ピン挿通孔72fの孔軸線とが一致する。最後に、下連結ピン抜差し装置78bを用いて、右下連結ピン76d及び左下連結ピンをそれぞれ、一対の右下第1ピン挿通孔72d及び一対の左下第1ピン挿通孔72f、並びに、右下第2ピン挿通孔及び左下第2ピン挿通孔に挿通させる。これにより、下ブーム42の先端側に上ブーム44を取付ける連結作業が完了する。 First, as shown in FIG. 2, a stand 95 is placed on the ground G. As shown in FIG. The upper boom 44, the middle arm 52, the arm 54, and the attachment 60 among the parts constituting the working device 30 are assembled in advance, and this assembly, that is, the working device 30 except for the lower boom 42, is deposited on the stand 95. (However, FIG. 2 shows the state after the lower boom 42 and the upper boom 44 are connected using the connecting device 70). On the other hand, the lower boom 42 is attached to the upper swing body 20 in advance. When the operator in the cab 21 moves the lower boom 42, the lower boom 42 and the upper boom 44 are connected. More specifically, as shown in FIG. 6, the operator should make sure that the upper right connecting pin 76c and the upper left connecting pin 76e are engaged with the engaging groove portion 80g of the upper right centering member 80c and the upper left centering member 80e, respectively. , the lower boom 42 is operated. Note that FIG. 6 shows the upper right connecting pin 76c and related components, and the upper left connecting pin 76e and related components are omitted. At this time, the upper right connecting pin 76c is held in the engaging recess of the right supporting member 90c from below, and the upper left connecting pin 76e is held in the engaging recess 90g of the left supporting member 90e from below. That is, the upper right connecting pin 76c and the upper left connecting pin 76e are held vertically by the upper right centering member 80c and the upper left centering member 80e, and the right support member 90c and the left support member 90e, respectively. As a result, the axis of the upper right connecting pin 76c coincides with the hole axis of the upper right second pin insertion hole, and the axis of the upper left connecting pin 76e coincides with the hole axis of the upper left second pin insertion hole. In this state, the upper right connecting pin 76c and the upper left connecting pin 76e are inserted into the pair of upper right first pin insertion holes 72c and the pair of upper left first pin insertion holes 72e and the upper right first pin insertion holes 72c and 72e, respectively. It is made to pass through the 2 pin insertion hole and the upper left second pin insertion hole. The operator then operates the lower boom 42 until the lower right connecting pin 76d and the lower left connecting pin are held by the lower right centering member and the lower left centering member, respectively. As a result, the hole axes of the lower right second pin insertion hole and the lower left second pin insertion hole coincide with the hole axes of the pair of lower right first pin insertion holes 72d and the pair of lower left first pin insertion holes 72f. Finally, using the lower connecting pin inserting/removing device 78b, the lower right connecting pin 76d and the lower left connecting pin are moved to the pair of lower right first pin insertion holes 72d and the pair of lower left first pin insertion holes 72f, respectively, and the lower right connecting pin. It is made to pass through the second pin insertion hole and the lower left second pin insertion hole. This completes the connection work for attaching the upper boom 44 to the tip side of the lower boom 42 .

次いで、本発明の第1実施形態に係るマルチブーム式作業機1の作用、効果について説明する。本発明の第1実施形態に係る作業機1によれば、連結装置70は、右上連結ピン76c及び左上連結ピン76eをそれぞれ下側から支持するように下ブーム42に配設された右側支持部材90c及び左側支持部材90eを含んで構成されている。そして、右側支持部材90cは、一対の右側第1ブラケット72aのうち左側(幅方向内側)のブラケットと右上芯出し部材80cとの左右方向での距離W1以上当該ブラケットから離れて配置されている。具体的には、右側支持部材90cは、右上連結ピン76cを挟んで右上芯出し部材80cと対面する位置に設けられている。また、左側支持部材90eは、一対の左側第1ブラケット72bのうち右側(幅方向内側)のブラケットと左上芯出し部材80eとの左右方向での距離W2以上当該ブラケットから離れて配置されている。具体的には、左側支持部材90eは、左上連結ピン76eを挟んで左上芯出し部材80eと対面する位置に設けられている。 Next, functions and effects of the multi-boom work machine 1 according to the first embodiment of the present invention will be described. According to the work machine 1 according to the first embodiment of the present invention, the connecting device 70 includes a right supporting member provided on the lower boom 42 so as to support the upper right connecting pin 76c and the upper left connecting pin 76e from below. 90c and a left support member 90e. The right support member 90c is arranged away from the right first bracket 72a by a distance W1 or more in the left-right direction between the left (inner side in the width direction) bracket and the upper right centering member 80c. Specifically, the right support member 90c is provided at a position facing the upper right centering member 80c with the upper right connecting pin 76c interposed therebetween. The left supporting member 90e is arranged away from the left first bracket 72b by a distance W2 or more between the right (widthwise inner) bracket and the upper left centering member 80e. Specifically, the left support member 90e is provided at a position facing the upper left centering member 80e across the upper left connecting pin 76e.

このため、右上連結ピン76c及び左上連結ピン76eの軸線を右上第2ピン挿通孔及び左上第2ピン挿通孔の孔軸線に一致させる芯出し作業中、当該右上連結ピン76c及び左上連結ピン76eはそれぞれ、上側面において右上芯出し部材80c及び左上芯出し部材80eに支持されるとともに、下側面において右側支持部材90c及び左側支持部材90eによって支持される。よって、当該芯出し作業において、右上連結ピン76c及び左上連結ピン76eがそれぞれ右上芯出し部材80c及び左上芯出し部材80eに強く接触し、これにより右上芯出し部材80c及び左上芯出し部材80eから荷重を受けた場合であっても、右上芯出し部材80c及び左上芯出し部材80e及び右側支持部材90c及び左側支持部材90eによって右上連結ピン76c及び左上連結ピン76eの上下位置が維持されるため、右上連結ピン76c及び左上連結ピン76eの軸線と右上第2ピン挿通孔及び左上第2ピン挿通孔の孔軸線とのずれを抑制することができる。このようにして、右上第2ピン挿通孔及び左上第2ピン挿通孔に右上連結ピン76c及び左上連結ピン76eを円滑に挿入することができ、当該作業を効率的に実行することができ、下ブーム42及び上ブーム44の連結作業の効率化するマルチブーム式作業機1を提供することができる。 Therefore, during the centering operation for matching the axes of the upper right connecting pin 76c and the upper left connecting pin 76e with the hole axes of the upper right second pin insertion hole and the upper left second pin insertion hole, the upper right connecting pin 76c and the upper left connecting pin 76e do not move. They are respectively supported on the upper side by the upper right centering member 80c and the upper left centering member 80e, and on the lower side by the right supporting member 90c and the left supporting member 90e. Therefore, in the centering operation, the upper right connecting pin 76c and the upper left connecting pin 76e are in strong contact with the upper right centering member 80c and the upper left centering member 80e, respectively. Since the upper right connecting pin 76c and the upper left connecting pin 76e are maintained in the vertical position by the upper right centering member 80c, the upper left centering member 80e, the right side supporting member 90c, and the left side supporting member 90e, even when the upper right It is possible to suppress the deviation between the axes of the connecting pin 76c and the upper left connecting pin 76e and the hole axes of the upper right second pin insertion hole and the upper left second pin insertion hole. In this manner, the upper right connecting pin 76c and the upper left connecting pin 76e can be smoothly inserted into the upper right second pin insertion hole and the upper left second pin insertion hole, and the work can be efficiently performed. It is possible to provide the multi-boom work machine 1 that improves the efficiency of the work for connecting the boom 42 and the upper boom 44 .

以上、本発明の好適な実施形態の説明をしたが、本発明の態様は上記実施形態に限定されるものではない。例えば、上記実施形態では、右側支持部材90cが、右上連結ピン76cを挟んで右上芯出し部材80cと対面する位置に設けられている場合、左側支持部材90eが、左上連結ピン76eを挟んで左上芯出し部材80eと対面する位置に設けられている場合について説明した。しかし、右側支持部材90c及び左側支持部材90eの配置はこれに限定されるものではな。例えば、右側支持部材90cは、右上芯出し部材80cよりも左側(幅方向内側)に配置されてもよい。つまり、右上芯出し部材80cが、一対の右側第1ブラケット72aのうち左側のブラケットと右側支持部材90cとの間に配置されていてもよい。また、左側支持部材90eは、左上芯出し部材80eよりも右側(幅方向内側)に配置されてもよい。つまり、左上芯出し部材80eが、一対の左側第1ブラケット72bのうち右側のブラケットと左上支持部材90eとの間に配置されていてもよい。 Although the preferred embodiments of the present invention have been described above, aspects of the present invention are not limited to the above embodiments. For example, in the above-described embodiment, when the right support member 90c is provided at a position facing the upper right centering member 80c with the upper right connecting pin 76c interposed therebetween, the left support member 90e is positioned at the upper left corner with the upper left connecting pin 76e interposed therebetween. The case where it is provided at a position facing the centering member 80e has been described. However, the arrangement of the right support member 90c and the left support member 90e is not limited to this. For example, the right support member 90c may be arranged on the left side (inward in the width direction) of the right upper centering member 80c. That is, the right upper centering member 80c may be arranged between the left bracket of the pair of right first brackets 72a and the right support member 90c. Further, the left support member 90e may be arranged on the right side (inward in the width direction) of the upper left centering member 80e. That is, the upper left centering member 80e may be arranged between the right bracket of the pair of left first brackets 72b and the upper left support member 90e.

また、本発明は上記実施形態に係る作業機1に限定されるものではなく、本発明の概念及び特許請求の範囲に含まれるあらゆる態様を含む。また、上述した課題及び効果を奏するように、各構成を適宜選択的に組み合わせても良い。例えば、上記実施形態における各構成要素の形状、材料、配置、サイズ等は、本発明の具体的態様によって適宜変更され得る。 Moreover, the present invention is not limited to the working machine 1 according to the above-described embodiment, and includes all aspects included in the concept of the present invention and the scope of claims. Moreover, each configuration may be selectively combined as appropriate so as to achieve the above-described problems and effects. For example, the shape, material, arrangement, size, etc. of each component in the above embodiments may be changed as appropriate according to specific aspects of the present invention.

1 マルチブーム式作業機
20 上部旋回体(機体)
40 ブーム装置
42 下ブーム(第1ブーム)
44 上ブーム(第2ブーム)
50 アーム装置
60 アタッチメント
70 連結装置
72a 一対の右側第1ブラケット(右第1ブラケット)
72b 一対の左側第1ブラケット(左第1ブラケット)
72c 一対の右上第1ピン挿通孔(上第1ピン挿通孔)
72d 一対の右下第1ピン挿通孔(下第1ピン挿通孔)
72e 一対の左上第1ピン挿通孔(上第1ピン挿通孔)
72f 一対の左下第1ピン挿通孔(下第1ピン挿通孔)
74a 右側第2ブラケット(右第2ブラケット)
74b 左側第2ブラケット(左第2ブラケット)
76c 右上連結ピン(上連結ピン)
76d 右下連結ピン(下連結ピン)
76e 左上連結ピン(上連結ピン)
78a 上連結ピン抜差し装置
78b 下連結ピン抜差し装置
80c 右上芯出し部材(上芯出し部材)
80e 左上芯出し部材(上芯出し部材)
90c 右側支持部材(右支持部材)
90e 左側支持部材(左支持部材)
W1,W2 距離
1 Multi-boom type work machine 20 Upper revolving body (fuselage)
40 boom device 42 lower boom (first boom)
44 upper boom (second boom)
50 arm device 60 attachment 70 connecting device 72a pair of right first brackets (right first brackets)
72b A pair of left first brackets (left first brackets)
72c Pair of upper right first pin insertion holes (upper first pin insertion holes)
72d A pair of lower right first pin insertion holes (lower first pin insertion holes)
72e Pair of upper left first pin insertion holes (upper first pin insertion holes)
72f A pair of lower left first pin insertion holes (lower first pin insertion holes)
74a right second bracket (right second bracket)
74b left second bracket (left second bracket)
76c upper right connecting pin (upper connecting pin)
76d lower right connecting pin (lower connecting pin)
76e Upper left connecting pin (upper connecting pin)
78a Upper connecting pin inserting/removing device 78b Lower connecting pin inserting/removing device 80c Upper right centering member (upper centering member)
80e upper left centering member (upper centering member)
90c right supporting member (right supporting member)
90e left support member (left support member)
W1, W2 distance

Claims (2)

機体と、
前記機体に回動可能に取付けられた第1ブーム、及び、前記第1ブームに取付けられた第2ブームを含んで構成されるブーム装置と、
前記ブーム装置に回動可能に取付けられたアーム装置と、
前記アーム装置に取付けられ、作業を行うアタッチメントと、
前記第1ブーム及び前記第2ブームを連結する連結装置と、を備え、
前記連結装置は、
左右方向で対面して前記第1ブームに設けられた左右の第1ブラケットと、
前記左右の第1ブラケットにそれぞれ上下に離間して設けられた上下の第1ピン挿通孔と、
前記左右の第1ブラケットと対面するように前記第2ブームに設けられた左右の第2ブラケットと、
前記左右の第2ブラケットにそれぞれ上下に離間して設けられた上下の第2ピン挿通孔と、
前記上下の第1ピン挿通孔と前記上下の第2ピン挿通孔とにそれぞれ挿通される上下の連結ピンと、
前記左右の第1ブラケットの間に配置され、前記上下の連結ピンが前記上下の第1挿通孔に挿通された状態で、前記上下の連結ピンを前記上下の第2挿通孔に対して抜差しするように構成された上下の連結ピン抜差し装置と、
前記左右の第1ブラケットを挟んで前記左右の第2ブラケットと対面するように前記第2ブームに設けられ、且つ、前記上連結ピンの軸線を前記上第2ピン挿通孔の孔軸線に一致させるように前記上連結ピンを上側から支持する左右の上芯出し部材と、を含んで構成されるマルチブーム式作業機において、
前記連結装置は、前記上連結ピンを下側から支持するように前記第1ブームに設けられた左右の支持部材を更に含んで構成され、前記左右の支持部材はそれぞれ、前記左右の第1ブラケットと前記左右の上芯出し部材との左右方向での距離以上前記左右の第1ブラケットから離れて配置されている、ことを特徴とするマルチブーム式作業機。
Airframe and
a boom device including a first boom rotatably attached to the airframe and a second boom attached to the first boom;
an arm device rotatably attached to the boom device;
an attachment that is attached to the arm device and performs work;
a connecting device that connects the first boom and the second boom,
The connecting device is
Left and right first brackets provided on the first boom facing each other in the left-right direction;
upper and lower first pin insertion holes vertically spaced apart from each other in the left and right first brackets;
Left and right second brackets provided on the second boom so as to face the left and right first brackets;
upper and lower second pin insertion holes vertically spaced apart from each other in the left and right second brackets;
upper and lower connecting pins respectively inserted through the upper and lower first pin insertion holes and the upper and lower second pin insertion holes;
The upper and lower connecting pins are arranged between the left and right first brackets and are inserted into and removed from the upper and lower second through holes in a state in which the upper and lower connecting pins are inserted into the upper and lower first through holes. an upper and lower connecting pin inserting/removing device configured as follows;
It is provided on the second boom so as to face the left and right second brackets with the left and right first brackets interposed therebetween, and the axis of the upper connecting pin is aligned with the hole axis of the upper second pin insertion hole. and left and right upper centering members that support the upper connecting pin from above as follows:
The connecting device further includes left and right support members provided on the first boom so as to support the upper connection pin from below, and the left and right support members are respectively connected to the left and right first brackets. and the left and right upper centering members are separated from the left and right first brackets by a distance in the left and right direction or more.
前記左右の支持部材はそれぞれ、前記上連結ピンを挟んで前記左右の上芯出し部材と対面する位置に設けられている、ことを特徴とする請求項1記載のマルチブーム式作業機。 2. The multi-boom working machine according to claim 1, wherein the left and right support members are provided at positions facing the left and right upper centering members with the upper connecting pin interposed therebetween.
JP2021051871A 2021-03-25 2021-03-25 Multi-boom type work machine Pending JP2022149633A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021051871A JP2022149633A (en) 2021-03-25 2021-03-25 Multi-boom type work machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021051871A JP2022149633A (en) 2021-03-25 2021-03-25 Multi-boom type work machine

Publications (1)

Publication Number Publication Date
JP2022149633A true JP2022149633A (en) 2022-10-07

Family

ID=83465165

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021051871A Pending JP2022149633A (en) 2021-03-25 2021-03-25 Multi-boom type work machine

Country Status (1)

Country Link
JP (1) JP2022149633A (en)

Similar Documents

Publication Publication Date Title
JP4713516B2 (en) Construction machinery
US9945093B1 (en) Excavator, excavator boom, stick object coupler receiver for the same and method of using the same
JP2007162454A (en) Counterweight attaching/detaching device
JP4791788B2 (en) Counterweight attachment / detachment unit and method of attaching / detaching counterweight
JPH1018347A (en) Boom installing device of construction machine
KR101625076B1 (en) Device for connecting two members
US6718663B1 (en) Assembly for coupling implements to excavating machines
JP2022149633A (en) Multi-boom type work machine
WO2020066120A1 (en) Work machine
JP5466672B2 (en) Front device for construction machine and its mounting table
JP5905818B2 (en) Connecting pin attachment / detachment device
JP2021147994A (en) Work machine
JP4609431B2 (en) Detachment device for connecting pin
JP2016003443A (en) Revolving frame of construction machine
RU65832U1 (en) LOADING AND UNLOADING MACHINE
JP4351841B2 (en) Construction machine swivel frame
JP7410832B2 (en) How to jack up construction machinery and the vehicle body of construction machinery
EP4379147A1 (en) Work machine
JP7287056B2 (en) Auxiliary equipment for connecting undulating bodies
JP2020011843A (en) Construction machine and method of mounting winch body
JP6250382B2 (en) Boom desorption structure
JP6250383B2 (en) Construction machine, boom mounting method, and boom disassembling method
JP2024040834A (en) Two-member connection device and construction machine
JP2021147782A (en) Work machine
JP2024051942A (en) Work Machine

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20231212

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20231212

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20231212