JP2022069144A - Compaction management method - Google Patents

Compaction management method Download PDF

Info

Publication number
JP2022069144A
JP2022069144A JP2020178145A JP2020178145A JP2022069144A JP 2022069144 A JP2022069144 A JP 2022069144A JP 2020178145 A JP2020178145 A JP 2020178145A JP 2020178145 A JP2020178145 A JP 2020178145A JP 2022069144 A JP2022069144 A JP 2022069144A
Authority
JP
Japan
Prior art keywords
compaction
ccv
rolling
ground
management device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2020178145A
Other languages
Japanese (ja)
Other versions
JP6979503B1 (en
Inventor
淳 眞壁
Atsushi Makabe
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sakai Heavy Industries Ltd
Original Assignee
Sakai Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sakai Heavy Industries Ltd filed Critical Sakai Heavy Industries Ltd
Priority to JP2020178145A priority Critical patent/JP6979503B1/en
Application granted granted Critical
Publication of JP6979503B1 publication Critical patent/JP6979503B1/en
Publication of JP2022069144A publication Critical patent/JP2022069144A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

To provide a compaction management method capable of shortening a work time of a compaction construction.SOLUTION: A compaction management method managing a compaction construction by a rolling compaction vehicle performs: a measurement step of measuring CCV of a ground in a predetermined area; a determination step of determining whether the CCV measured in the measurement step across the whole ground in the predetermined area is equal to or larger than a predetermined target value after the rolling compaction vehicle performs a predetermined rolling compaction-numbered rolling compaction across the whole ground in the predetermined area; and a display processing step of displaying CCV of a ground where an arbitrarily numbered rolling compaction is performed as the CCV measured in the measurement step on a display device.SELECTED DRAWING: Figure 1

Description

特許法第30条第2項適用申請有り (1)令和1年11月6日に株式会社シライシ舗道へ販売 (2)令和1年11月20日に株式会社原商へ販売 (3)令和1年11月19日に光東株式会社へ販売 (4)令和1年11月21日に株式会社明成へ販売 (5)令和2年3月9日にテクノレンタル株式会社へ販売 (6)令和2年2月25日に株式会社ジツタ中国へ販売 (7)令和2年3月16日に株式会社浅田組へ販売 (8)令和2年3月18日に田中建材輸送株式会社へ販売 (9)令和2年6月3日にオーケーリース株式会社へ販売 (10)令和2年6月3日に日立建機日本株式会社へ販売 (11)令和2年6月3日に株式会社カナモトへ販売 (12)令和2年7月27日に八木建設株式会社へ販売 (13)令和2年7月31日に上新建設株式会社へ販売 (14)令和2年8月19日に株式会社道南土木へ販売 (15)令和2年10月12日に株式会社政工務店へ販売 (16)令和2年10月22日に喜多機械産業株式会社へ販売Application for application of Article 30, Paragraph 2 of the Patent Act (1) Sold to Shiraishi Pavement Co., Ltd. on November 6, 1st year of Reiwa (2) Sold to Harasho Co., Ltd. on November 20, 1st year of Reiwa (3) Sold to Koto Co., Ltd. on November 19, 1st year of Reiwa (4) Sold to Meisei Co., Ltd. on November 21, 1st year of Reiwa (5) Sold to Techno Rental Co., Ltd. on March 9, 1st year of Reiwa (6) Sold to Jitsuta China Co., Ltd. on February 25, 2nd year of Reiwa (7) Sold to Asada Gumi Co., Ltd. on March 16th, 2nd year of Reiwa (8) Tanaka Kenzai Co., Ltd. on March 18, 2nd year of Reiwa Sold to Transport Co., Ltd. (9) Sold to OK Lease Co., Ltd. on June 3, 2nd year of Reiwa (10) Sold to Hitachi Construction Machinery Japan Co., Ltd. on June 3, 2nd year of Reiwa (11) 2nd year of Rewa Sold to Kanamoto Co., Ltd. on June 3 (12) Sold to Yagi Construction Co., Ltd. on July 27, 2 (13) Sold to Kamishin Construction Co., Ltd. on July 31, 2 (14) Sold to Donan Civil Engineering Co., Ltd. on August 19, 2nd year of Reiwa (15) Sold to Seikouten Co., Ltd. on October 12, 2nd year of Reiwa (16) Kita Machinery Industry Co., Ltd. on 22nd October, 2nd year of Reiwa Sold to a corporation

本発明は、締固め管理装置、締固め管理方法、および、プログラムに関する。 The present invention relates to a compaction management device, a compaction management method, and a program.

近年、i-Constructionによる技術開発が盛んに進められている。例えば、特許文献1には、路面の締固め度を施工路面の全体にわたって面的、且つ、直接的に管理し得る振動ローラの締固め管理装置が開示されている。 In recent years, technological development by i-Construction has been actively promoted. For example, Patent Document 1 discloses a compaction management device for a vibrating roller that can directly control the compaction degree of a road surface over the entire construction road surface.

特開2000-110111号公報Japanese Unexamined Patent Publication No. 2000-110111

締固め施工の作業には多数の工程が存在する。前記工程として、例えば、振動ローラ等の転圧車両による所定回数の転圧、転圧後の地盤の現場密度測定(例:砂置換法、RI密度計による計測)、および、プルーフローリングがある。プルーフローリングは、施工した路面上に重量のあるダンプトラック等を走行させ、地面のたわみ具合を目視し、大きな変形を起こす不良箇所を見つける作業である。よって、これらの工程を含む締固め施工の作業には多大な時間を要するため、作業時間の短縮化が望まれている。 There are many steps in the compaction work. The steps include, for example, rolling a predetermined number of times by a rolling vehicle such as a vibrating roller, on-site density measurement of the ground after rolling (eg, sand replacement method, measurement by an RI densitometer), and proof flooring. Pave flooring is the work of running a heavy dump truck or the like on the constructed road surface, visually observing the degree of deflection of the ground, and finding defective parts that cause large deformation. Therefore, it takes a lot of time for the compaction work including these steps, and it is desired to shorten the work time.

そこで、本発明は、締固め施工の作業時間を短縮することができる締固め管理装置を提供することを課題とする。 Therefore, an object of the present invention is to provide a compaction management device capable of shortening the work time of compaction construction.

前記課題を解決するための手段として、本発明の締固め管理装置は、転圧車両による締固め施工を管理する締固め管理装置であって、所定領域の地盤のCCV(Compaction Control Value)を計測する計測部と、前記所定領域の地盤全体に亘って前記転圧車両が規定転圧回数番目の転圧を行った後、前記所定領域の地盤全体に亘って前記計測部が計測したCCVが所定の目標値以上であるか否かを判定する判定部と、を備えることを特徴とする。 As a means for solving the above-mentioned problems, the compaction management device of the present invention is a compaction management device that manages compaction work by a compaction vehicle, and measures CCV (Compaction Control Value) of the ground in a predetermined area. The CCV measured by the measuring unit over the entire ground in the predetermined area is predetermined after the compaction vehicle performs the rolling compaction of the specified number of times over the entire ground in the predetermined area. It is characterized by including a determination unit for determining whether or not the value is equal to or higher than the target value of.

また、本発明の締固め管理方法は、転圧車両による締固め施工を管理する締固め管理装置における締固め管理方法であって、前記締固め管理装置が、所定領域の地盤のCCVを計測する計測ステップと、前記所定領域の地盤全体に亘って前記転圧車両が規定転圧回数番目の転圧を行った後、前記所定領域の地盤全体に亘って前記計測ステップで計測されたCCVが所定の目標値以上であるか否かを判定する判定ステップと、を実行することを特徴とする。 Further, the compaction management method of the present invention is a compaction management method in a compaction management device that manages compaction construction by a compaction vehicle, and the compaction management device measures the CCV of the ground in a predetermined area. The CCV measured in the measurement step is predetermined over the entire ground in the predetermined region after the compaction vehicle performs the rolling compaction at the specified number of rolling compactions over the entire ground in the predetermined region. It is characterized by executing a determination step of determining whether or not the value is equal to or greater than the target value of.

前記構成によれば、所定の目標値を地盤の不良箇所がないとみなすことができる値とすることで、所定領域の地盤全体に亘って地盤の不良箇所が存在するか否かを客観的に判定することができる。このため、地盤の不良箇所が存在しないと判定することができた場合、プルーフローリングを省略することができる。その結果、締固め施工の作業時間を短縮することができる。 According to the above configuration, by setting a predetermined target value as a value that can be regarded as having no defective part of the ground, it is possible to objectively determine whether or not there is a defective part of the ground over the entire ground of the predetermined area. It can be determined. Therefore, if it can be determined that there is no defective part of the ground, the proof flooring can be omitted. As a result, the working time of compaction construction can be shortened.

また、前記転圧車両の位置を検出する検出部をさらに備え、前記計測部は、前記検出部が検出した位置ごとの前記地盤のCCVを計測することが好ましい。 Further, it is preferable to further include a detection unit for detecting the position of the compaction vehicle, and the measuring unit preferably measures the CCV of the ground at each position detected by the detecting unit.

前記構成によれば、転圧車両の走行軌跡を管理することができるとともに、所定領域の地盤全体の位置ごとのCCVの履歴を管理することができる。このため、所定領域の地盤全体に亘って地盤の不良箇所が存在するか否かの予測の精度を向上させることができる。 According to the above configuration, it is possible to manage the traveling locus of the compaction vehicle and also to manage the history of CCV for each position of the entire ground in a predetermined area. Therefore, it is possible to improve the accuracy of predicting whether or not there is a defective portion of the ground over the entire ground in a predetermined region.

また、前記計測部が計測したCCVとして、任意回数の転圧が行われた地盤のCCVを表示デバイスに表示させる表示処理部をさらに備えることが好ましい。 Further, as the CCV measured by the measuring unit, it is preferable to further include a display processing unit for displaying the CCV of the ground on which the rolling compaction has been performed an arbitrary number of times on the display device.

前記構成によれば、締固め施工の途中経過を都度確認することができる。 According to the above configuration, it is possible to confirm the progress of the compaction work each time.

また、前記規定転圧回数よりも少ない回数の転圧を行った段階で、前記計測部が計測したCCVが前記目標値以上となった位置が存在する場合、前記表示処理部は、当該位置において以降の転圧を中止する旨を前記表示デバイスに表示させることが好ましい。 Further, if there is a position where the CCV measured by the measuring unit is equal to or higher than the target value at the stage where the rolling compaction is performed a number of times less than the specified number of rolling compactions, the display processing unit is at the position. It is preferable to display on the display device that the subsequent rolling compaction is stopped.

前記構成によれば、過転圧による地盤の破壊を未然に防ぐことができる。また、締固め施工の作業時間の短縮にも貢献し得る。 According to the above configuration, it is possible to prevent the ground from being destroyed due to overrolling. It can also contribute to shortening the work time of compaction work.

また、本発明は、コンピュータを、上記の締固め管理装置として機能させるためのプログラムとすることが好ましい。 Further, it is preferable that the present invention is a program for making the computer function as the above-mentioned compaction management device.

前記構成によれば、締固め管理装置の普及を促進させることができる。 According to the above configuration, it is possible to promote the spread of the compaction management device.

本発明によれば、締固め施工の作業時間を短縮することができる。 According to the present invention, the working time of compaction construction can be shortened.

本実施形態の締固め管理装置の機能構成図の例である。It is an example of the functional block diagram of the compaction management apparatus of this embodiment. 施工条件のデータ構造図の例である。This is an example of a data structure diagram of construction conditions. 施工データのデータ構造図の例である。This is an example of a data structure diagram of construction data. 転圧車両による転圧の説明図である。It is explanatory drawing of the compaction by a compaction vehicle. 規定転圧回数到達時における締固め管理装置の処理を示すフローチャートである。It is a flowchart which shows the process of the compaction management apparatus at the time of reaching the specified rolling compaction number. 転圧回数とCCVとの関係を示すグラフである。It is a graph which shows the relationship between the number of rolling compactions and CCV.

本発明の実施形態について図面を参照しながら説明する。図面の説明において、同一の要素には同一の符号を付し、重複する説明を省略する。また、図面の寸法比率は、説明の都合上誇張され、実際の比率とは異なる場合がある。また、各図面の同一の要素は、適宜配置変更されている場合がある。 An embodiment of the present invention will be described with reference to the drawings. In the description of the drawings, the same elements are designated by the same reference numerals, and duplicate description is omitted. In addition, the dimensional ratios in the drawings are exaggerated for convenience of explanation and may differ from the actual ratios. In addition, the same elements in each drawing may be rearranged as appropriate.

<構成>
本実施形態の締固め管理装置は、転圧車両による締固め施工を管理する計算機である。図1に示すように、締固め管理装置1は、検出部11と、計測部12と、判定部13と、表示処理部14と、設定部15とを備えている。また、締固め管理装置1は、地図データd1と、施工条件d2と、施工データd3とを記憶している。
<Structure>
The compaction management device of the present embodiment is a computer that manages compaction work by a compaction vehicle. As shown in FIG. 1, the compaction management device 1 includes a detection unit 11, a measurement unit 12, a determination unit 13, a display processing unit 14, and a setting unit 15. Further, the compaction management device 1 stores the map data d1, the construction condition d2, and the construction data d3.

検出部11は、転圧車両の位置を検出する。検出部11は、例えば、転圧車両が備えるGNSS(Global Navigation Satellite System)アンテナによって転圧車両の位置を検出することができるが、これに限定されない。 The detection unit 11 detects the position of the compaction vehicle. The detection unit 11 can detect the position of the compacted vehicle by, for example, a GNSS (Global Navigation Satellite System) antenna included in the compacted vehicle, but the detection unit 11 is not limited to this.

計測部12は、締固め施工の対象となる所定領域の地盤のCCV(Compaction Control Value)を計測する。CCVは、加速度応答法に従い、締固めされた地盤の剛性値を示す指標である。CCVの詳細は、例えば、特開2018-154975号公報に開示されているため、説明は省略する。なお、特許文献1には、CCVと実質的に同等のCMV(COMPACTION METER VALUE)が開示されている。 The measuring unit 12 measures the CCV (Compaction Control Value) of the ground in a predetermined area to be compacted. CCV is an index showing the rigidity value of the compacted ground according to the acceleration response method. Since the details of CCV are disclosed in, for example, Japanese Patent Application Laid-Open No. 2018-154975, the description thereof will be omitted. In addition, Patent Document 1 discloses a CMV (COMPACTION MTER VALUE) substantially equivalent to CCV.

判定部13は、所定位置の地盤において計測部12が計測したCCVが所定の目標値以上であるか否かを判定する。所定の目標値は、設定部15が設定する目標値であるが、詳細については後記する。 The determination unit 13 determines whether or not the CCV measured by the measurement unit 12 on the ground at a predetermined position is equal to or higher than a predetermined target value. The predetermined target value is a target value set by the setting unit 15, but details will be described later.

表示処理部14は、所定の表示デバイスが締固め施工の管理状況を所定の表示態様で表示するように処理する。表示処理部14は、判定部13の判定結果を表示デバイスに表示させることができる。表示デバイスは、例えば、締固め管理装置1が備える表示部(図示略)や、締固め施工の作業員が携帯し、表示処理部14からの情報を取得可能なディスプレイ機器とすることができるが、これらに限定されない。 The display processing unit 14 processes the predetermined display device so as to display the management status of the compaction construction in a predetermined display mode. The display processing unit 14 can display the determination result of the determination unit 13 on the display device. The display device can be, for example, a display unit (not shown) included in the compaction management device 1 or a display device that can be carried by a compaction construction worker and can acquire information from the display processing unit 14. , Not limited to these.

設定部15は、締固め施工の各種目標値を設定する。設定部15が設定する各種目標値については後記する。 The setting unit 15 sets various target values for compaction work. Various target values set by the setting unit 15 will be described later.

地図データd1は、締固め施工の対象となる所定領域についての地形等を示すデータである。地図データd1は、例えば、GNSSから取得可能なデータとすることができるが、これに限定されない。 The map data d1 is data showing the topography and the like of a predetermined area to be compacted. The map data d1 can be, for example, data that can be acquired from GNSS, but is not limited thereto.

施工条件d2は、締固めに用いる土(盛土)に関するデータである。図2に示すように、施工条件d2は、締固め施工の対象となる地盤に対応する土質、最大乾燥密度、最適含水比、および管理基準を対応付けたデータであり、施工現場ごとにエントリが作成されている。 The construction condition d2 is data on the soil (filling) used for compaction. As shown in FIG. 2, the construction condition d2 is data in which the soil quality, the maximum dry density, the optimum water content ratio, and the management standard corresponding to the ground to be compacted are associated with each other, and there are entries for each construction site. Has been created.

土質は、例えば、レキ、砂、細粒との混合比で決定することができる。レキは、粒径が2mm~75mmの土であり、粗粒に分類される。砂は、粒径が0.075mm~2mmの土であり、粗粒に分類される。細粒は、粒径が0.075mm以下の土である。細粒は、シルト(粒径:0.075mm~0.005mm)、および、粘土(粒径:0.005mm以下)にさらに分類することができる。土質は、周知の室内試験によって決定することができる。 The soil quality can be determined, for example, by the mixing ratio with levies, sand and fine particles. Leki is soil having a particle size of 2 mm to 75 mm and is classified as coarse grain. Sand is soil having a particle size of 0.075 mm to 2 mm and is classified as coarse grain. The fine particles are soil having a particle size of 0.075 mm or less. The fine particles can be further classified into silt (particle size: 0.075 mm to 0.005 mm) and clay (particle size: 0.005 mm or less). Soil quality can be determined by well-known laboratory tests.

最大乾燥密度は、対応の土に対する周知の突固め試験を行うことで得られる土の乾燥密度の最大値である。突固め試験において、対象の土に含水させる水の量を変えて所定条件下で突固めを行うことにより、最大乾燥密度を求めることができる。 The maximum dry density is the maximum dry density of the soil obtained by performing a well-known compaction test on the corresponding soil. In the compaction test, the maximum dry density can be obtained by performing compaction under predetermined conditions by changing the amount of water contained in the target soil.

最適含水比は、対応の土の最大乾燥密度を実現する水の量(含水比)である。一般的には、土質に対して、最大乾燥密度および最適含水比は、一意に決まる。 The optimum water content is the amount of water (water content ratio) that achieves the maximum dry density of the corresponding soil. In general, the maximum dry density and optimum water content are uniquely determined for the soil quality.

管理基準は、対応の土を用いた締固め施工を管理するための基準値である。具体的には、管理基準は、後記する規定乾燥密度であるがこれに限定されない。 The management standard is a standard value for managing compaction work using the corresponding soil. Specifically, the control standard is, but is not limited to, the specified dry density described later.

施工データd3は、転圧車両による締固め施工の進捗状況を示すデータである。図3に示すように、施工データd3は、走行軌跡、転圧回数、CCVを含むデータであるが、施工データd3が含むデータは、これらに限定されない。 The construction data d3 is data showing the progress of compaction construction by the compaction vehicle. As shown in FIG. 3, the construction data d3 is data including a traveling locus, the number of rolling compactions, and CCV, but the data included in the construction data d3 is not limited to these.

施工データd3の走行軌跡は、地図データd1が示す領域における転圧車両の走行軌跡である。
施工データd3の転圧回数は、地図データd1が示す領域の位置ごとの転圧車両による転圧回数である。
施工データd3のCCVは、地図データd1が示す領域の位置ごとのCCVである。
表示処理部14は、施工データd3の内容を表示デバイスに表示させることができる。
The traveling locus of the construction data d3 is a traveling locus of the compaction vehicle in the region indicated by the map data d1.
The number of rolling compactions in the construction data d3 is the number of rolling compactions by the compaction vehicle for each position in the region indicated by the map data d1.
The CCV of the construction data d3 is a CCV for each position of the region indicated by the map data d1.
The display processing unit 14 can display the contents of the construction data d3 on the display device.

(規定転圧回数について)
設定部15は、締固め施工の目標値として規定転圧回数を設定することができる。規定転圧回数とは、締固めに用いる土の乾燥密度が規定乾燥密度に到達するまでに要する転圧回数をいう。規定乾燥密度は、例えば、最大乾燥密度の95%とすることができるが、これに限定されない。
(Regarding the specified number of rolling compactions)
The setting unit 15 can set a specified number of rolling compactions as a target value for compaction work. The specified number of rolling compactions is the number of rolling compactions required for the drying density of the soil used for compaction to reach the specified drying density. The specified dry density can be, for example, 95% of the maximum dry density, but is not limited to this.

設定部15は、締固め材料に起因する材料的条件と、転圧車両に起因する機械的条件とに基づいて規定転圧回数を設定することができる。材料的条件には、例えば、土の含水比、土質、撒き出し厚、地盤剛性が含まれるが、これらに限定されない。機械的条件には、転圧車両の起振力、振幅、振動数、輪荷重、走行速度が含まれるが、これらに限定されない。一般的には、転圧回数が増大すると土の乾燥密度が増大する傾向にあるが、地盤の破壊を引き起こす過転圧にならないように規定転圧回数が設定される。 The setting unit 15 can set the specified number of rolling compactions based on the material conditions caused by the compaction material and the mechanical conditions caused by the compaction vehicle. Material conditions include, but are not limited to, for example, soil water content, soil quality, sprinkling thickness, and ground stiffness. Mechanical conditions include, but are not limited to, the vibrating force, amplitude, frequency, wheel load, and running speed of the compacted vehicle. Generally, as the number of rolling compactions increases, the dry density of the soil tends to increase, but the specified number of rolling compactions is set so as not to cause overrolling that causes ground fracture.

(目標CCVについて)
設定部15は、締固め施工の目標値として目標CCVを設定することができる。目標CCVとは、締固め施工の対象となる所定領域の地盤のCCVの目標値をいう。目標CCVは、例えば、規定転圧回数の転圧が行われた地盤に対して得られるCCVとすることができるが、これに限定されない。
(About target CCV)
The setting unit 15 can set a target CCV as a target value for compaction work. The target CCV is the target value of the CCV of the ground in a predetermined area to be compacted. The target CCV can be, for example, a CCV obtained for the ground that has been compacted a specified number of times, but is not limited thereto.

設定部15は、前記した材料的条件および前記した機械的条件に基づいて目標CCVを設定することができる。一般的には、CCVと土の乾燥密度との間に一定以上の相関が確認されれば、CCVが増大すると土の乾燥密度が増大する傾向にあるが、地盤の破壊を引き起こす過転圧にならないように目標CCVが設定される。なお、本実施形態では、事前の試験施工によって、CCVと土の乾燥密度との間に一定以上の相関が確認されている土質を選択できた上で締固め施工を行うこととして説明を続ける。 The setting unit 15 can set the target CCV based on the above-mentioned material conditions and the above-mentioned mechanical conditions. Generally, if a certain degree of correlation is confirmed between CCV and soil dry density, the soil dry density tends to increase as CCV increases, but the overturning pressure that causes ground fracture The target CCV is set so that it does not become. In this embodiment, the description will be continued on the assumption that the compaction work is performed after the soil quality for which a certain level of correlation or more has been confirmed between the CCV and the dry density of the soil can be selected by the preliminary test work.

また、本実施形態では、指定の転圧車両を用いることとするため、機械的条件は決定済みであるとして説明を続ける。よって、材料的条件おいて撒き出し厚などの設計事項が決定している場合、設定部15によって、土質に対して、規定転圧回数および目標CCVは、一意に決まる。 Further, in the present embodiment, since the designated rolling vehicle is used, the description will be continued assuming that the mechanical conditions have been determined. Therefore, when the design items such as the sprinkling thickness are determined under the material conditions, the set number of rolling compactions and the target CCV are uniquely determined for the soil quality by the setting unit 15.

<処理>
次に、締固め管理装置1の処理について説明する。締固め管理装置1は、締固め施工の所定領域の規定転圧回数到達時(より詳細には、規定転圧回数番目の転圧完了時)に、本実施形態の処理を開始する。ここで、設定部15によって、規定転圧回数および目標CCVは設定済みであるとする。
<Processing>
Next, the processing of the compaction management device 1 will be described. The compaction management device 1 starts the processing of the present embodiment when the specified number of rolling compactions in a predetermined area of compactioning work is reached (more specifically, when the number of compaction compactions is completed). Here, it is assumed that the specified number of rolling compactions and the target CCV have already been set by the setting unit 15.

なお、図4に示すように、締固め施工の所定領域を転圧車両Vが転圧する場合、当該領域を複数のレーンに区切り、1レーン目から転圧車両Vが往復走行することで転圧(往復により2回分)を行う。1レーン目における1往復の走行が終了すると、引き続き同レーンを往復するか、または点線表示で示すように転圧車両Vのレーンチェンジを行い、2レーン目の転圧を行う。結果的に、転圧車両Vはすべてのレーンについて規定転圧回数の転圧を行う。 As shown in FIG. 4, when the compaction vehicle V rolls in a predetermined area of compaction work, the area is divided into a plurality of lanes, and the compaction vehicle V reciprocates from the first lane to roll the compaction. (Two round trips). When the traveling of one round trip in the first lane is completed, the vehicle continues to make a round trip in the same lane, or the rolling vehicle V is changed to the lane as shown by the dotted line display, and the rolling of the second lane is performed. As a result, the rolling vehicle V rolls all lanes a specified number of rolling times.

図5に示すように、まず、締固め管理装置1は、計測部12によって、締固め施工の所定領域の各位置のCCVを計測する(ステップS1)。CCVを計測する位置は、検出部11によって検出される。結果的に、計測部12は、所定領域の地盤全体に亘って規定転圧回数番目の転圧がなされた地盤の各位置のCCVを計測することができる。 As shown in FIG. 5, first, the compaction management device 1 measures CCV at each position in a predetermined region of compaction construction by the measuring unit 12 (step S1). The position where CCV is measured is detected by the detection unit 11. As a result, the measuring unit 12 can measure the CCV at each position of the ground where the specified number of rolling compactions has been made over the entire ground in the predetermined region.

次に、締固め管理装置1は、判定部13によって、計測部12が計測したCCVのうち目標CCVを下回るCCVが存在するか否かを判定する(ステップS2)。存在しない場合(ステップS2でNo)、締固め管理装置1は、完了処理を実行する(ステップS3)。完了処理は、例えば、所定領域の地盤全体に亘って規定転圧回数番目の転圧がなされた地盤の各位置のCCVが目標CCV以上となったことを通知する処理、追加転圧を必要としないことを通知する処理であるが、これらに限定しない。完了処理実行後、図5の処理を終了する。 Next, the compaction management device 1 determines whether or not there is a CCV that is lower than the target CCV among the CCVs measured by the measurement unit 12 by the determination unit 13 (step S2). If it does not exist (No in step S2), the compaction management device 1 executes the completion process (step S3). The completion process requires, for example, a process of notifying that the CCV at each position of the ground where the specified number of rolling compactions has been made over the entire ground in a predetermined area has reached the target CCV or higher, and additional rolling compaction. It is a process to notify that it is not done, but it is not limited to these. After the completion process is executed, the process shown in FIG. 5 is terminated.

一方、計測部12が計測したCCVのうち目標CCVを下回るCCVが存在する場合(ステップS2でYes)、締固め管理装置1は、追加転圧処理を実行する(ステップS4)。追加転圧処理は、例えば、目標CCVを下回る位置を表示デバイスから通知する処理、目標CCVを下回る位置にて追加転圧(規定転圧回数を超える回数の転圧)を要求する処理、追加転圧後の地盤のCCVを計測部12が計測する処理、計測したCCVが目標CCV以上となるか否かを判定部13が判定する処理であるが、これらに限定しない。追加転圧処理実行後、図5の処理を終了する。 On the other hand, when there is a CCV lower than the target CCV among the CCVs measured by the measuring unit 12 (Yes in step S2), the compaction management device 1 executes the additional compaction process (step S4). The additional rolling compaction process is, for example, a process of notifying the display device of a position below the target CCV, a process of requesting an additional rolling compaction (rolling force exceeding the specified number of rolling compactions) at a position below the target CCV, and an additional rolling compaction. The processing in which the measuring unit 12 measures the CCV of the ground after compression, and the processing in which the determining unit 13 determines whether or not the measured CCV is equal to or higher than the target CCV, but the present invention is not limited to these. After executing the additional rolling compaction process, the process of FIG. 5 is terminated.

本実施形態によれば、目標CCVを地盤の不良箇所がないとみなすことができる値とすることで、所定領域の地盤全体に亘って地盤の不良箇所が存在するか否かを客観的に判定することができる。このため、地盤の不良箇所が存在しないと判定することができた場合、プルーフローリングを省略することができる。その結果、締固め施工の作業時間を短縮することができる。 According to the present embodiment, by setting the target CCV to a value that can be regarded as having no defective ground, it is possible to objectively determine whether or not there is a defective ground over the entire ground in a predetermined area. can do. Therefore, if it can be determined that there is no defective part of the ground, the proof flooring can be omitted. As a result, the working time of compaction construction can be shortened.

また、計測部12は、検出部11が検出した位置ごとの地盤のCCVを計測することができる。このため、転圧車両の走行軌跡を管理することができるとともに、所定領域の地盤全体の位置ごとのCCVの履歴を管理することができる。このため、所定領域の地盤全体に亘って地盤の不良箇所が存在するか否かの予測の精度を向上させることができる。 Further, the measuring unit 12 can measure the CCV of the ground at each position detected by the detecting unit 11. Therefore, it is possible to manage the traveling locus of the compaction vehicle and also to manage the history of CCV for each position of the entire ground in a predetermined area. Therefore, it is possible to improve the accuracy of predicting whether or not there is a defective portion of the ground over the entire ground in a predetermined region.

例えば、規定転圧回数が10回であり、9回転圧した位置の地盤のCCVが9回転圧によって得られるCCV予測値よりも下回っていた場合、10回目の転圧をする前に、当該位置の地盤が不良箇所であることを予測することができる。この場合、10回よりも多く転圧を行った方が良いと予測される。9回転圧時にCCV予測値よりも大きく下回っていた場合は転圧を繰り返しても目標CCVに到達しないとの予測も可能となり、早期に地盤そのものに対策を打つことができる。 For example, if the specified number of rolling compactions is 10 and the CCV of the ground at the position where 9 rotations are applied is lower than the CCV predicted value obtained by 9 rotations, the position is before the 10th rolling. It can be predicted that the ground of is a defective part. In this case, it is predicted that it is better to perform compaction more than 10 times. If it is much lower than the CCV predicted value at the time of 9 rotation pressure, it is possible to predict that the target CCV will not be reached even if the rolling pressure is repeated, and it is possible to take measures on the ground itself at an early stage.

また、表示処理部14は、計測部12が計測したCCVとして、任意回数の転圧が行われた地盤のCCVを表示デバイスに表示させることができる。このため、締固め施工の途中経過を都度確認することができる。任意回数は、規定転圧回数以下の回数を含むが、規定転圧回数を超える回数であることを妨げない。 Further, the display processing unit 14 can display the CCV of the ground on which the rolling compaction has been performed an arbitrary number of times on the display device as the CCV measured by the measurement unit 12. Therefore, it is possible to check the progress of the compaction work each time. The arbitrary number of times includes the number of times less than or equal to the specified number of rolling compactions, but does not prevent the number of times exceeding the specified number of rolling compactions.

図6の曲線L1に示すように、室内試験によって、規定転圧回数:10回の転圧を行い目標CCVに到達可能な土を用いた締固め施工について説明する。計測部12は、所定領域の地盤について、転圧ごとのCCVを計測することができる。つまり、計測部12は、任意回数の転圧が行われたCCVを計測することができる。表示処理部14は、当該CCVを表示デバイスに表示させることができる。作業員は、表示デバイスを介して転圧ごとのCCVが適正であるか否かを確認することができる。例えば、転圧ごとのCCVが曲線L1(図6)と略同等であった場合、適正であるといえる。 As shown in the curve L1 of FIG. 6, a compaction work using soil capable of reaching the target CCV by rolling the specified number of rolling times: 10 times by a laboratory test will be described. The measuring unit 12 can measure the CCV for each rolling compaction with respect to the ground in a predetermined region. That is, the measuring unit 12 can measure the CCV that has been compacted an arbitrary number of times. The display processing unit 14 can display the CCV on the display device. The worker can confirm whether or not the CCV for each rolling compaction is appropriate via the display device. For example, when the CCV for each rolling compaction is substantially the same as the curve L1 (FIG. 6), it can be said that it is appropriate.

表示処理部14は、図6のグラフや、当該グラフ相当の数値群を表示デバイスに画面表示させることができる。また、表示処理部14は、CCVに代えて最大乾燥密度を用いて、グラフや数値群を表示デバイスに画面表示させることができる。 The display processing unit 14 can display the graph of FIG. 6 and a numerical group corresponding to the graph on the screen of the display device. Further, the display processing unit 14 can display the graph or the numerical value group on the screen of the display device by using the maximum dry density instead of the CCV.

図6の曲線L2の実線部分に示すように、7回転圧後に計測部12が計測したCCVが、室内試験によって得られた7回転圧後のCCVよりも大きく下回っていたとする。この場合、8回目以降の転圧を行っても、材料不良等により目標CCVに到達しないおそれがある(曲線L2の破線部分(予測値))。よって、作業員は、材料の入れ替えを実施すべきであると早期に判断することができる。 As shown in the solid line portion of the curve L2 in FIG. 6, it is assumed that the CCV measured by the measuring unit 12 after the 7-turn pressure is much lower than the CCV after the 7-turn pressure obtained by the laboratory test. In this case, even if the rolling compaction is performed after the 8th time, the target CCV may not be reached due to a material defect or the like (broken line portion (predicted value) of the curve L2). Therefore, the worker can determine at an early stage that the material should be replaced.

また、図6の曲線L3の実線部分に示すように、3回転圧後に計測部12が計測したCCVが、室内試験によって得られた3回転圧後のCCVよりも大きく上回っていたとする。この場合、4回目以降の転圧で早期に目標CCVに到達するため、規定転圧回数分の転圧を行うと過転圧のおそれがある(曲線L3の破線部分(予測値))。よって、作業員は、規定転圧回数よりも少ない回数の転圧を実施すべきであると早期に判断することができる。 Further, as shown in the solid line portion of the curve L3 in FIG. 6, it is assumed that the CCV measured by the measuring unit 12 after the three-turn pressure is much higher than the CCV after the three-turn pressure obtained by the laboratory test. In this case, since the target CCV is reached at an early stage by the fourth and subsequent rolling compactions, there is a risk of overrolling if the rolling compaction is performed for the specified number of rolling compactions (broken line portion (predicted value) of the curve L3). Therefore, the worker can determine at an early stage that the rolling compaction should be performed a number of times less than the specified number of rolling compactions.

なお、規定転圧回数よりも少ない回数の転圧を行った段階で、計測部12が計測したCCVが目標CCV以上となった位置が存在する場合、表示処理部14は、当該位置において以降の転圧を中止する旨を表示デバイスに表示させてもよい。かかる表示により、過転圧による地盤の破壊を未然に防ぐことができる。また、締固め施工の作業時間の短縮にも貢献し得る。 If there is a position where the CCV measured by the measuring unit 12 is equal to or higher than the target CCV at the stage where the rolling compaction is performed a number of times less than the specified number of rolling compactions, the display processing unit 14 will perform the subsequent rolling at that position. The display device may display that the rolling compaction is stopped. With such a display, it is possible to prevent the ground from being destroyed due to overrolling. It can also contribute to shortening the work time of compaction work.

上記のように、締固め施工の途中経過を都度確認することで、現場で起こり得る不均一なCCVを略同等にし、入れ替えようとする材料の選択や、転圧の必要回数を正しく評価することができる。また、CCVの増大または土の乾燥密度の増大を客観的に判定することができる。 As mentioned above, by checking the progress of compaction work each time, the non-uniform CCV that may occur at the site should be made almost the same, the selection of the material to be replaced, and the required number of compactions should be evaluated correctly. Can be done. In addition, an increase in CCV or an increase in soil dry density can be objectively determined.

<ハードウェア構成>
また、上述してきた締固め管理装置1は、所定のハードウェア構成で示されるコンピュータによって実現される。このコンピュータは、CPU、RAM、ROM、HDD、通信I/F(インターフェイス)、入出力I/F、およびメディアI/Fを有する。
<Hardware configuration>
Further, the compaction management device 1 described above is realized by a computer represented by a predetermined hardware configuration. This computer has a CPU, RAM, ROM, HDD, communication I / F (interface), input / output I / F, and media I / F.

CPUは、ROMまたはHDDに格納されたプログラムに基づいて動作し、各部(検出部11、計測部12、判定部13、表示処理部14、設定部15を含む)の制御を行う。ROMは、コンピュータの起動時にCPUによって実行されるブートプログラムや、コンピュータのハードウェアに依存するプログラム等を格納する。 The CPU operates based on a program stored in the ROM or HDD, and controls each unit (including the detection unit 11, the measurement unit 12, the determination unit 13, the display processing unit 14, and the setting unit 15). The ROM stores a boot program executed by the CPU when the computer starts up, a program depending on the hardware of the computer, and the like.

HDDは、CPUによって実行されるプログラム、および、かかるプログラムによって使用されるデータ等を格納する。通信I/Fは、通信網を介して他の機器からデータを受信してCPUへ送り、CPUが生成したデータを、通信網を介して他の機器へ送信する。 The HDD stores a program executed by the CPU, data used by the program, and the like. The communication I / F receives data from another device via the communication network and sends it to the CPU, and transmits the data generated by the CPU to the other device via the communication network.

CPUは、入出力I/Fを介して、ディスプレイやプリンタ等の出力装置、および、キーボードやマウス等の入力装置を制御する。CPUは、入出力I/Fを介して、入力装置からデータを取得する。また、CPUは、生成したデータを入出力I/Fを介して出力装置へ出力する。 The CPU controls an output device such as a display or a printer, and an input device such as a keyboard or a mouse via an input / output I / F. The CPU acquires data from the input device via the input / output I / F. Further, the CPU outputs the generated data to the output device via the input / output I / F.

メディアI/Fは、記録媒体に格納されたプログラムまたはデータを読み取り、RAMを介してCPUに提供する。CPUは、かかるプログラムを、メディアI/Fを介して記録媒体からRAM上にロードし、ロードしたプログラムを実行する。記録媒体は、例えばDVD(Digital Versatile Disc)、PD(Phase change rewritable Disk)等の光学記録媒体、MO(Magneto Optical disk)等の光磁気記録媒体、テープ媒体、磁気記録媒体、または半導体メモリ等である。 The media I / F reads the program or data stored in the recording medium and provides it to the CPU via the RAM. The CPU loads the program from the recording medium onto the RAM via the media I / F, and executes the loaded program. The recording medium may be, for example, an optical recording medium such as a DVD (Digital Versatile Disc) or PD (Phase change rewritable Disk), a magneto-optical recording medium such as MO (Magneto Optical disk), a tape medium, a magnetic recording medium, or a semiconductor memory. be.

例えば、コンピュータが締固め管理装置1として機能する場合、コンピュータのCPUは、RAM上にロードされたプログラムを実行することにより、各部の機能を実現する。プログラム実行の際、HDDが格納するデータ等が使用される。コンピュータのCPUは、これらのプログラムを記録媒体から読み取って実行するが、他の例として、他の装置から通信網を介してこれらのプログラムを取得してもよい。 For example, when the computer functions as the compaction management device 1, the CPU of the computer realizes the functions of each part by executing the program loaded on the RAM. When executing the program, the data stored in the HDD is used. The CPU of the computer reads these programs from the recording medium and executes them, but as another example, these programs may be acquired from another device via a communication network.

上記プログラムによれば、締固め管理装置1の普及を促進させることができる。 According to the above program, it is possible to promote the spread of the compaction management device 1.

<変形例>
(a):図5の処理に対して、判定部13による判定は、計測部12が各位置でのCCVの計測ごとに行うようにしてもよい。計測したCCVが目標CCVを下回っていた場合、転圧車両Vはその場で追加転圧を行うようにしてもよい。
<Modification example>
(A): With respect to the process of FIG. 5, the determination unit 13 may perform the determination by the determination unit 12 for each measurement of CCV at each position. If the measured CCV is below the target CCV, the compaction vehicle V may perform additional compaction on the spot.

(b):その他、各実施形態で説明した技術的特徴は、適宜組み合わせることが可能である。 (B): In addition, the technical features described in each embodiment can be combined as appropriate.

1 締固め管理装置
11 検出部
12 計測部
13 判定部
d1 地図データ
d2 施工条件
d3 施工データ
V 転圧車両
1 Compaction management device 11 Detection unit 12 Measurement unit 13 Judgment unit d1 Map data d2 Construction conditions d3 Construction data V Rolling vehicle

前記課題を解決するための手段として、本発明の締固め管理装置は、転圧車両による締固め施工を管理する締固め管理装置であって、所定領域の地盤のCCV(Compaction Control Value)を計測する計測部と、前記転圧車両の位置を検出する検出部と、前記所定領域の地盤全体に亘って前記転圧車両が規定転圧回数番目の転圧を行った後、前記所定領域の地盤全体に亘って前記計測部が計測したCCVが所定の目標値以上であるか否かを判定する判定部と、前記計測部が計測したCCVとして、任意回数の転圧が行われた地盤のCCVを表示デバイスに表示させる表示処理部を備え、前記計測部は、前記検出部が検出した位置ごとの前記地盤のCCVを計測し、前記規定転圧回数よりも少ない回数の転圧を行った段階で、前記計測部が計測したCCVが前記目標値以上となった位置が存在する場合、前記表示処理部は、当該位置において以降の転圧を中止する旨を前記表示デバイスに表示させ、前記規定転圧回数よりも少ない回数の転圧を行った段階で、前記計測部が計測したCCVが前記少ない回数の転圧によって得られるCCV予測値を下回った位置が存在する場合、前記表示処理部は、当該位置を表示デバイスに表示させることを特徴とする。 As a means for solving the above-mentioned problems, the compaction management device of the present invention is a compaction management device that manages compaction work by a compaction vehicle, and measures CCV (Compaction Control Value) of the ground in a predetermined area. The measuring unit, the detecting unit that detects the position of the compaction vehicle, and the compaction vehicle over the entire ground in the predetermined region, after the compaction vehicle performs the rolling compaction for the specified number of rolling compactions, the ground in the predetermined region. A determination unit that determines whether or not the CCV measured by the measurement unit is equal to or higher than a predetermined target value, and a CCV of the ground that has been compacted an arbitrary number of times as the CCV measured by the measurement unit. Is provided on the display device, and the measuring unit measures the CCV of the ground at each position detected by the detecting unit, and rolls the ground less than the specified number of rolling compactions. Then, when there is a position where the CCV measured by the measuring unit is equal to or higher than the target value, the display processing unit causes the display device to display that the subsequent rolling compaction is stopped at the position, and the above-mentioned regulation. If there is a position where the CCV measured by the measuring unit is lower than the CCV predicted value obtained by the smaller number of rolling compactions at the stage where the rolling compaction is performed less than the number of rolling compactions, the display processing unit is used. , The feature is to display the position on the display device .

また、本発明の締固め管理方法は、転圧車両による締固め施工を管理する締固め管理装置における締固め管理方法であって、前記締固め管理装置が、所定領域の地盤のCCVを計測する計測ステップと、前記所定領域の地盤全体に亘って前記転圧車両が規定転圧回数番目の転圧を行った後、前記所定領域の地盤全体に亘って前記計測ステップで計測されたCCVが所定の目標値以上であるか否かを判定する判定ステップと、前記計測ステップで計測したCCVとして、任意回数の転圧が行われた地盤のCCVを表示デバイスに表示させる表示処理ステップと、を実行し、前記規定転圧回数よりも少ない回数の転圧を行った段階で、前記計測ステップで計測したCCVが前記目標値以上となった位置が存在する場合、前記表示処理ステップにて、当該位置において以降の転圧を中止する旨を前記表示デバイスに表示させ、前記規定転圧回数よりも少ない回数の転圧を行った段階で、前記計測ステップで計測したCCVが前記少ない回数の転圧によって得られるCCV予測値を下回った位置が存在する場合、前記表示処理ステップにて、当該位置を表示デバイスに表示させることを特徴とする。 Further, the compaction management method of the present invention is a compaction management method in a compaction management device that manages compaction work by a compaction vehicle, and the compaction management device measures CCV of the ground in a predetermined area. The CCV measured in the measurement step is predetermined over the entire ground in the predetermined region after the compaction vehicle performs the rolling compaction at the specified number of rolling compactions over the entire ground in the predetermined region. A determination step for determining whether or not the value is equal to or higher than the target value of the above, and a display processing step for displaying the CCV of the ground on which the rolling compaction has been performed an arbitrary number of times on the display device as the CCV measured in the measurement step are executed. If there is a position where the CCV measured in the measurement step is equal to or higher than the target value at the stage where the rolling compaction is performed a number of times less than the specified rolling compaction number, the position is in the display processing step. At the stage where the display device is displayed to indicate that the subsequent rolling compaction is to be stopped and the rolling compaction is performed a number of times less than the specified number of rolling compactions, the CCV measured in the measurement step is subjected to the small number of rolling compactions. When there is a position below the obtained CCV predicted value, the display device is characterized in that the position is displayed in the display processing step .

前記構成によれば、所定の目標値を地盤の不良箇所がないとみなすことができる値とすることで、所定領域の地盤全体に亘って地盤の不良箇所が存在するか否かを客観的に判定することができる。このため、地盤の不良箇所が存在しないと判定することができた場合、プルーフローリングを省略することができる。その結果、締固め施工の作業時間を短縮することができる。
また、前記構成によれば、締固め施工の途中経過を都度確認することができる。
また、前記構成によれば、過転圧による地盤の破壊を未然に防ぐことができる。また、締固め施工の作業時間の短縮にも貢献し得る。
According to the above configuration, by setting a predetermined target value as a value that can be regarded as having no defective part of the ground, it is possible to objectively determine whether or not there is a defective part of the ground over the entire ground of the predetermined area. It can be determined. Therefore, if it can be determined that there is no defective part of the ground, the proof flooring can be omitted. As a result, the working time of compaction construction can be shortened.
Further, according to the above configuration, it is possible to confirm the progress of the compaction work each time.
Further, according to the above configuration, it is possible to prevent the ground from being destroyed due to overrolling. It can also contribute to shortening the work time of compaction work.

本発明は、締固め管理方法に関する。 The present invention relates to a compaction management method .

そこで、本発明は、締固め施工の作業時間を短縮することができる締固め管理方法を提供することを課題とする。 Therefore, it is an object of the present invention to provide a compaction management method capable of shortening the work time of compaction construction.

前記課題を解決するための手段として、本発明の締固め管理方法は、転圧車両による締固め施工を管理する締固め管理方法であって、所定領域の地盤のCCVを計測する計測ステップと、前記所定領域の地盤全体に亘って前記転圧車両が規定転圧回数番目の転圧を行った後、前記所定領域の地盤全体に亘って前記計測ステップで計測されたCCVが所定の目標値以上であるか否かを判定する判定ステップと、前記計測ステップで計測したCCVとして、任意回数の転圧が行われた地盤のCCVを表示デバイスに表示させる表示処理ステップと、を実行し、事前の試験施工で前記地盤と同じ土を用いてCCVと乾燥密度との間に一定以上の相関関係を確認した後、当該CCVと転圧回数との関係式(曲線L1)を算出し、前記規定転圧回数よりも少ない回数の転圧を行った段階で、前記計測ステップで計測したCCVが前記目標値以上となった位置が存在する場合、前記表示処理ステップにて、当該位置において以降の転圧を中止する旨を前記表示デバイスに表示させ、前記規定転圧回数よりも少ない回数の転圧を行った段階で、前記計測ステップで計測したCCVが、前記関係式を下回った位置が存在する場合、前記表示処理ステップにて、当該位置を表示デバイスに表示させることを特徴とする。 As a means for solving the above-mentioned problems, the compaction management method of the present invention is a compaction management method for managing compaction work by a compaction vehicle, and is a measurement step for measuring CCV of the ground in a predetermined area. The CCV measured in the measurement step over the entire ground of the predetermined region is the predetermined target after the compaction vehicle performs the rolling compaction of the specified number of rolling times over the entire ground of the predetermined region. A determination step for determining whether or not the value is equal to or higher than the value and a display processing step for displaying the CCV of the ground that has been compacted an arbitrary number of times on the display device as the CCV measured in the measurement step are executed. After confirming a certain or higher correlation between CCV and dry density using the same soil as the ground in the preliminary test construction, the relational expression (curve L1) between the CCV and the number of rolling compactions was calculated and described above. If there is a position where the CCV measured in the measurement step is equal to or higher than the target value at the stage where the rolling compaction is performed a number of times less than the specified number of rolling compactions, in the display processing step, after that position. There is a position where the CCV measured in the measurement step is lower than the relational expression at the stage where the display device is displayed to the effect that the rolling compaction is stopped and the rolling compaction is performed a number of times less than the specified number of rolling compactions. If so, it is characterized in that the position is displayed on the display device in the display processing step.

図6の曲線L1に示すように、前記事前の試験施工によって、規定転圧回数:10回の転圧を行い目標CCVに到達可能な土を用いた締固め施工について説明する。計測部12は、所定領域の地盤について、転圧ごとのCCVを計測することができる。つまり、計測部12は、任意回数の転圧が行われたCCVを計測することができる。表示処理部14は、当該CCVを表示デバイスに表示させることができる。作業員は、表示デバイスを介して転圧ごとのCCVが適正であるか否かを確認することができる。例えば、転圧ごとのCCVが曲線L1(図6)と略同等であった場合、適正であるといえる。 As shown in the curve L1 of FIG. 6, the compaction work using soil capable of reaching the target CCV by rolling the specified number of rolling times: 10 times by the preliminary test work will be described. The measuring unit 12 can measure the CCV for each rolling compaction with respect to the ground in a predetermined region. That is, the measuring unit 12 can measure the CCV that has been compacted an arbitrary number of times. The display processing unit 14 can display the CCV on the display device. The worker can confirm whether or not the CCV for each rolling compaction is appropriate via the display device. For example, when the CCV for each rolling compaction is substantially the same as the curve L1 (FIG. 6), it can be said that it is appropriate.

図6の曲線L2の実線部分に示すように、7回転圧後に計測部12が計測したCCVが、前記事前の試験施工によって得られた7回転圧後のCCVよりも大きく下回っていたとする。この場合、8回目以降の転圧を行っても、材料不良等により目標CCVに到達しないおそれがある(曲線L2の破線部分(予測値))。よって、作業員は、材料の入れ替えを実施すべきであると早期に判断することができる。 As shown in the solid line portion of the curve L2 in FIG. 6, it is assumed that the CCV measured by the measuring unit 12 after the 7-turn pressure is much lower than the CCV after the 7-turn pressure obtained by the preliminary test construction . In this case, even if the rolling compaction is performed after the 8th time, the target CCV may not be reached due to a material defect or the like (broken line portion (predicted value) of the curve L2). Therefore, the worker can determine at an early stage that the material should be replaced.

また、図6の曲線L3の実線部分に示すように、3回転圧後に計測部12が計測したCCVが、前記事前の試験施工によって得られた3回転圧後のCCVよりも大きく上回っていたとする。この場合、4回目以降の転圧で早期に目標CCVに到達するため、規定転圧回数分の転圧を行うと過転圧のおそれがある(曲線L3の破線部分(予測値))。よって、作業員は、規定転圧回数よりも少ない回数の転圧を実施すべきであると早期に判断することができる。 Further, as shown in the solid line portion of the curve L3 in FIG. 6, the CCV measured by the measuring unit 12 after the three-turn pressure was significantly higher than the CCV after the three-turn pressure obtained by the preliminary test construction . do. In this case, since the target CCV is reached at an early stage by the fourth and subsequent rolling compactions, there is a risk of overrolling if the rolling compaction is performed for the specified number of rolling compactions (broken line portion (predicted value) of the curve L3). Therefore, the worker can determine at an early stage that the rolling compaction should be performed a number of times less than the specified number of rolling compactions.

Claims (6)

転圧車両による締固め施工を管理する締固め管理装置であって、
所定領域の地盤のCCV(Compaction Control Value)を計測する計測部と、
前記所定領域の地盤全体に亘って前記転圧車両が規定転圧回数番目の転圧を行った後、前記所定領域の地盤全体に亘って前記計測部が計測したCCVが所定の目標値以上であるか否かを判定する判定部と、を備えることを特徴とする締固め管理装置。
It is a compaction management device that manages compaction work by a compaction vehicle.
A measuring unit that measures the CCV (Compaction Control Value) of the ground in a predetermined area,
After the compaction vehicle has rolled the specified number of times of rolling over the entire ground in the predetermined region, the CCV measured by the measuring unit over the entire ground in the predetermined region is equal to or higher than the predetermined target value. A compaction management device including a determination unit for determining whether or not there is a presence.
前記転圧車両の位置を検出する検出部をさらに備え、
前記計測部は、前記検出部が検出した位置ごとの前記地盤のCCVを計測することを特徴とする請求項1に記載の締固め管理装置。
Further provided with a detection unit for detecting the position of the compaction vehicle,
The compaction management device according to claim 1, wherein the measuring unit measures the CCV of the ground for each position detected by the detecting unit.
前記計測部が計測したCCVとして、任意回数の転圧が行われた地盤のCCVを表示デバイスに表示させる表示処理部をさらに備えることを特徴とする請求項1または請求項2に記載の締固め管理装置。 The compaction according to claim 1 or 2, wherein the CCV measured by the measuring unit further includes a display processing unit that displays the CCV of the ground that has been compacted an arbitrary number of times on the display device. Management device. 前記規定転圧回数よりも少ない回数の転圧を行った段階で、前記計測部が計測したCCVが前記目標値以上となった位置が存在する場合、前記表示処理部は、当該位置において以降の転圧を中止する旨を前記表示デバイスに表示させることを特徴とする請求項3に記載の締固め管理装置。 If there is a position where the CCV measured by the measuring unit is equal to or higher than the target value at the stage where the rolling compaction is performed a number of times less than the specified number of rolling compactions, the display processing unit will perform the subsequent rolling at that position. The compaction management device according to claim 3, wherein the display device displays that the compaction is stopped. 転圧車両による締固め施工を管理する締固め管理装置における締固め管理方法であって、
前記締固め管理装置が、
所定領域の地盤のCCVを計測する計測ステップと、
前記所定領域の地盤全体に亘って前記転圧車両が規定転圧回数番目の転圧を行った後、前記所定領域の地盤全体に亘って前記計測ステップで計測されたCCVが所定の目標値以上であるか否かを判定する判定ステップと、を実行することを特徴とする締固め管理方法。
It is a compaction management method in a compaction management device that manages compaction work by a compaction vehicle.
The compaction management device
A measurement step to measure the CCV of the ground in a predetermined area,
After the compaction vehicle has rolled the specified number of times of rolling over the entire ground in the predetermined region, the CCV measured in the measurement step over the entire ground in the predetermined region is equal to or higher than the predetermined target value. A compaction management method characterized by executing a determination step for determining whether or not the pressure is high.
コンピュータを、請求項1から請求項4のいずれか1項の締固め管理装置として機能させるためのプログラム。 A program for operating a computer as a compaction management device according to any one of claims 1 to 4.
JP2020178145A 2020-10-23 2020-10-23 Compaction management method Active JP6979503B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020178145A JP6979503B1 (en) 2020-10-23 2020-10-23 Compaction management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020178145A JP6979503B1 (en) 2020-10-23 2020-10-23 Compaction management method

Publications (2)

Publication Number Publication Date
JP6979503B1 JP6979503B1 (en) 2021-12-15
JP2022069144A true JP2022069144A (en) 2022-05-11

Family

ID=78870765

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020178145A Active JP6979503B1 (en) 2020-10-23 2020-10-23 Compaction management method

Country Status (1)

Country Link
JP (1) JP6979503B1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002327429A (en) * 2001-05-02 2002-11-15 Fudo Constr Co Ltd Compaction controlling method
JP2003166232A (en) * 2001-09-20 2003-06-13 Taisei Corp Compaction control device
JP2005030073A (en) * 2003-07-04 2005-02-03 Fudo Constr Co Ltd Compaction quality control method
US20150362414A1 (en) * 2014-06-11 2015-12-17 Caterpillar Paving Products Inc. System and Method for Determining a Modulus of Resilience
JP2018154975A (en) * 2017-03-15 2018-10-04 株式会社安藤・間 Quality control method of soil, and quality monitoring system of soil
JP2019152005A (en) * 2018-03-01 2019-09-12 株式会社安藤・間 Rolling compaction number prediction system and rolling compaction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002327429A (en) * 2001-05-02 2002-11-15 Fudo Constr Co Ltd Compaction controlling method
JP2003166232A (en) * 2001-09-20 2003-06-13 Taisei Corp Compaction control device
JP2005030073A (en) * 2003-07-04 2005-02-03 Fudo Constr Co Ltd Compaction quality control method
US20150362414A1 (en) * 2014-06-11 2015-12-17 Caterpillar Paving Products Inc. System and Method for Determining a Modulus of Resilience
JP2018154975A (en) * 2017-03-15 2018-10-04 株式会社安藤・間 Quality control method of soil, and quality monitoring system of soil
JP2019152005A (en) * 2018-03-01 2019-09-12 株式会社安藤・間 Rolling compaction number prediction system and rolling compaction method

Also Published As

Publication number Publication date
JP6979503B1 (en) 2021-12-15

Similar Documents

Publication Publication Date Title
US6973821B2 (en) Compaction quality assurance based upon quantifying compactor interaction with base material
US11460385B2 (en) Compaction control system for and methods of accurately determining properties of compacted and/or existing ground materials
US6460006B1 (en) System for predicting compaction performance
US7623951B2 (en) Machine and method of determining suitability of work material for compaction
US6122601A (en) Compacted material density measurement and compaction tracking system
CN103255755A (en) Lossless method for fast evaluating filling compaction quality of soil building stones in real time and evaluating device thereof
US20230020213A1 (en) Retrofit intelligent compaction analyzer
CN110939043A (en) Rapid detection method for compaction quality of soil-rock mixed filling roadbed
White et al. Implementing intelligent compaction specification on Minnesota TH-64: synopsis of measurement values, data management, and geostatistical analysis
Madun et al. Mathematical solution of the stone column effect on the load bearing capacity and settlement using numerical analysis
JP2018154975A5 (en)
JP6979503B1 (en) Compaction management method
JP2020176401A (en) Compaction management method, and compaction management system
JP6781669B2 (en) Compaction method and compaction management system
JP4084608B2 (en) Compaction management device
McGuire et al. Field-Scale Tests to Evaluate Foamed Glass Aggregate Compaction
Robinson et al. Naval expeditionary runway construction criteria: P-8 Poseidon pavement requirements
Kang et al. Improved index to quantitatively assess clogging potential based on mixing test results
CN114935524A (en) Method for testing maximum compression ratio and maximum molding density of stone filling material
JP4358036B2 (en) Method for estimating rolling characteristics of construction materials
Stokoe et al. Super-accelerated testing of flexible pavement with stationary dynamic deflectometer
JP6978577B1 (en) Compaction method and compaction management device
JP2004076420A (en) Method for predicting degree of compaction by rolling machine
Mampearachchi et al. Aggregate interlocking of open-graded friction courses with compaction effort
Chakraborty et al. Quality Control Aspects for Casing Material and Coarse Filter for Earth Core Rockfill Dam

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20201029

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20201029

A80 Written request to apply exceptions to lack of novelty of invention

Free format text: JAPANESE INTERMEDIATE CODE: A80

Effective date: 20201111

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20201203

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210302

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210428

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210608

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20210804

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20211004

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20211109

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20211115

R150 Certificate of patent or registration of utility model

Ref document number: 6979503

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150