JP2021138510A - Closing plate installation member for jamb, closing plate installation structure, and closing plate installation method - Google Patents

Closing plate installation member for jamb, closing plate installation structure, and closing plate installation method Download PDF

Info

Publication number
JP2021138510A
JP2021138510A JP2020038604A JP2020038604A JP2021138510A JP 2021138510 A JP2021138510 A JP 2021138510A JP 2020038604 A JP2020038604 A JP 2020038604A JP 2020038604 A JP2020038604 A JP 2020038604A JP 2021138510 A JP2021138510 A JP 2021138510A
Authority
JP
Japan
Prior art keywords
closing plate
locking
frame
vertical frame
plate installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2020038604A
Other languages
Japanese (ja)
Other versions
JP6903780B1 (en
Inventor
恒平 平賀
Kohei Hiraga
恒平 平賀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Elevator and Building Systems Corp
Original Assignee
Toshiba Elevator Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Elevator Co Ltd filed Critical Toshiba Elevator Co Ltd
Priority to JP2020038604A priority Critical patent/JP6903780B1/en
Priority to CN202011457247.8A priority patent/CN113428764A/en
Application granted granted Critical
Publication of JP6903780B1 publication Critical patent/JP6903780B1/en
Publication of JP2021138510A publication Critical patent/JP2021138510A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B13/00Doors, gates, or other apparatus controlling access to, or exit from, cages or lift well landings
    • B66B13/30Constructional features of doors or gates
    • B66B13/306Details of door jambs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B13/00Doors, gates, or other apparatus controlling access to, or exit from, cages or lift well landings
    • B66B13/30Constructional features of doors or gates
    • B66B13/308Details of seals and joints

Landscapes

  • Elevator Door Apparatuses (AREA)

Abstract

To provide a closing plate installation member of a jamb, a closing plate installation structure, and a closing plate installation method capable of performing installation work easily in accordance with the engagement with an opening part without requiring any welding and tools by shortening the installation time.SOLUTION: A jamb of an elevator that is installed at an opening part of an elevator landing and has a pair of vertical frames and a lateral frame connected to upper ends of the pair of vertical frames, includes a vertical frame fastening surface fastened to the vertical frames, which is a closing plate installation member for installing a closing plate for closing a gap between the jamb and the opening part, a closing plate locking surface that intersects with the vertical frame fastening surface to lock the closing plate, a locking piece formed on the closing plate locking surface to be locked with a locking hole opened in the closing plate, and a slit formed in a bent portion where the vertical frame fastening surface intersects with the closing plate locking surface and extends in the height direction of the vertical frame.SELECTED DRAWING: Figure 3

Description

本発明の実施形態は、三方枠の塞ぎ板据付部材、塞ぎ板据付構造及び塞ぎ板据付方法に関する。 An embodiment of the present invention relates to a three-sided frame closing plate installation member, a closing plate installation structure, and a closing plate installation method.

エレベータが設置される建屋の各階乗場には、開口部が設けられる。この開口部には、一対の縦枠と一対の縦枠の上端に連結された横枠とを有し、乗場ドアを取り付けるための三方枠が設置される。 An opening will be provided at each floor of the building where the elevator will be installed. This opening has a pair of vertical frames and a horizontal frame connected to the upper ends of the pair of vertical frames, and a three-sided frame for attaching a landing door is installed.

エレベータの昇降路は建物の垂直方向に貫通する空洞部であり、ある階で火災が発生すると、火災が昇降路を通して他の階に拡大するおそれがある。火災の拡大を防ぐために、三方枠と開口部との間の隙間を塞ぐ塞ぎ板を設置するようにしている。三方枠と開口部との間は躯体や階床によっても隙間が大きく誤差も大きいため、塞ぎ板としては、鋼板等を溶接して現場合わせで据え付けるようにしている。 Elevator hoistways are cavities that penetrate the building vertically, and if a fire breaks out on one floor, the fire can spread through the hoistway to other floors. In order to prevent the spread of fire, a closing plate is installed to close the gap between the three-sided frame and the opening. Since there is a large gap between the three-sided frame and the opening depending on the skeleton and the floor, and the error is large, a steel plate or the like is welded as a closing plate and installed at the site.

しかし、溶接作業には溶接機を必要とするなど、工事が大がかりで段取りの時間も増えてしまう。また溶接作業には経験が必要なため、熟練した作業者しか作業を行えない。さらに、メンテナンス作業時に取り外しが行えないといった作業の制約も発生してしまう。 However, the welding work requires a welding machine, which requires a large amount of work and increases the setup time. In addition, since welding work requires experience, only skilled workers can perform the work. Further, there are restrictions on the work such that the product cannot be removed during maintenance work.

従来、いわゆる溶接レスによる作業としては、溶接の代わりにボルト固定を用いているやり方がある。 Conventionally, as a so-called welding-less work, there is a method of using bolt fixing instead of welding.

特開2008−214078号公報Japanese Unexamined Patent Publication No. 2008-21408

しかし、溶接の代わりにボルト固定を用いるやり方では、ボルト固定するための工具スペースの確保が必要となる。このため、物件によっては建屋の開口部と三方枠の隙間が狭く、工具の取り回しが悪くなる場合がある。また一か所ごとにボルトを回さなくてはならないので、締結箇所が多くなると溶接に比べてそれほど作業時間が短縮できない。さらに、階床ごとに開口部と三方枠の取合いが変化することに対し、現地で調整しての据え付けを行うことができないという課題がある。 However, in the method of using bolt fixing instead of welding, it is necessary to secure a tool space for bolt fixing. For this reason, depending on the property, the gap between the opening of the building and the three-sided frame may be narrow, making it difficult to handle tools. In addition, since the bolts must be turned at each location, the work time cannot be shortened so much as compared with welding when the number of fastening points increases. Furthermore, there is a problem that it is not possible to adjust and install on-site because the connection between the opening and the three-sided frame changes for each floor.

本発明は、溶接及び工具を不要とし、据付時間を短縮して開口部との取合いに合わせて容易に据付作業を行うことができる三方枠の塞ぎ板据付部材、塞ぎ板据付構造及び塞ぎ板据付方法を提供することを目的としている。 The present invention eliminates the need for welding and tools, shortens the installation time, and allows the installation work to be easily performed according to the connection with the opening. It is intended to provide a method.

上記の目的を達成するため、本発明の態様は、エレベータ乗場の開口部に設置され、一対の縦枠と前記一対の縦枠の上端に連結された横枠とを有するエレベータの三方枠において、前記三方枠と前記開口部との間の隙間を塞ぐ塞ぎ板を据付ける塞ぎ板据付部材であって、前記縦枠と締結される縦枠締結面と、前記縦枠締結面と交叉すると共に、前記塞ぎ板を係止する塞ぎ板係止面と、前記塞ぎ板係止面に形成され、前記塞ぎ板に開口形成された係止孔が係止される係止片と、前記縦枠締結面と塞ぎ板係止面とが交叉する部分である曲げ部分に形成され、前記縦枠の高さ方向に伸びたスリットと、を備える三方枠の塞ぎ板据付部材である。 In order to achieve the above object, an aspect of the present invention is in a three-sided frame of an elevator which is installed in an opening of an elevator landing and has a pair of vertical frames and a horizontal frame connected to the upper ends of the pair of vertical frames. It is a closing plate installation member for installing a closing plate that closes the gap between the three-sided frame and the opening, and is crossed with the vertical frame fastening surface to be fastened to the vertical frame and the vertical frame fastening surface. A closing plate locking surface for locking the closing plate, a locking piece formed on the closing plate locking surface and for locking a locking hole formed in the closing plate, and the vertical frame fastening surface. It is a closing plate installation member of a three-sided frame formed in a bent portion which is a portion where the closing plate locking surface intersects with the closing plate, and includes a slit extending in the height direction of the vertical frame.

また、他の態様は、エレベータ乗場の開口部に設置され、一対の縦枠と前記一対の縦枠の上端に連結された横枠とを有するエレベータの三方枠において、前記三方枠と前記開口部との間隔を覆う塞ぎ板と、前記縦枠に設けられ、前記塞ぎ板と固定される固定ブラケットとを備え、前記塞ぎ板は係止孔を備え、前記固定ブラケットは、前記塞ぎ板の係止孔に挿入されて前記塞ぎ板を固定する係止片と、前記縦枠と前記塞ぎ板との間に高さ方向に伸びたスリットとを有し、前記スリットを支点として角度調整することで前記塞ぎ板により前記三方枠と前記開口部との隙間を塞ぐ、三方枠の塞ぎ板据付構造である。 Another aspect is the three-sided frame and the opening in the three-sided frame of the elevator which is installed in the opening of the elevator landing and has a pair of vertical frames and a horizontal frame connected to the upper ends of the pair of vertical frames. The closing plate is provided with a closing plate that covers the space between the two, and a fixing bracket that is provided on the vertical frame and is fixed to the closing plate. The closing plate is provided with a locking hole, and the fixing bracket is for locking the closing plate. It has a locking piece that is inserted into the hole and fixes the closing plate, and a slit that extends in the height direction between the vertical frame and the closing plate, and the angle is adjusted by using the slit as a fulcrum. It is a three-sided frame closing plate installation structure that closes the gap between the three-sided frame and the opening with a closing plate.

さらに他の態様は、三方枠の塞ぎ板据付部材の縦枠締結面と縦枠とを締結部材を介して固定し、前記塞ぎ板据付部材の塞ぎ板係止面に形成された係止片と塞ぎ板に開口形成された係止孔とを係止し、縦枠締結面と塞ぎ板係止面とが交叉する部分に形成され前記縦枠の高さ方向に伸びたスリットを支点として角度調整し、前記塞ぎ板により前記三方枠と前記開口部との隙間を塞ぐ、三方枠の塞ぎ板据付方法である。 In still another aspect, the vertical frame fastening surface and the vertical frame of the three-sided frame closing plate installation member are fixed via the fastening member, and the locking piece is formed on the closing plate locking surface of the closing plate installation member. The angle is adjusted by locking the locking hole formed in the closing plate and using the slit formed at the intersection of the vertical frame fastening surface and the closing plate locking surface as a fulcrum and extending in the height direction of the vertical frame. This is a method of installing a closing plate of a three-sided frame, in which the gap between the three-sided frame and the opening is closed by the closing plate.

本発明の第1実施形態の塞ぎ板据付部材、塞ぎ板据付構造及び塞ぎ板据付方法が適用される三方枠を昇降路側から見た正面図。A front view of a three-sided frame to which the closing plate installation member, the closing plate installation structure, and the closing plate installation method of the first embodiment of the present invention are applied, as viewed from the hoistway side. 本発明の第1実施形態の塞ぎ板据付部材、塞ぎ板据付構造及び塞ぎ板据付方法が適用された三方枠の水平断面図。A horizontal cross-sectional view of a three-sided frame to which the closing plate installation member, the closing plate installation structure, and the closing plate installation method of the first embodiment of the present invention are applied. 本発明の第1実施形態が適用された固定ブラケットの説明図。Explanatory drawing of the fixing bracket to which the 1st Embodiment of this invention was applied. 本発明の第1実施形態の塞ぎ板据付方法を説明するフローチャート。The flowchart explaining the closing plate installation method of 1st Embodiment of this invention. 本発明の第1実施形態の塞ぎ板据付部材、塞ぎ板据付構造及び塞ぎ板据付方法の説明図。It is explanatory drawing of the closing plate installation member, the closing plate installation structure, and the closing plate installation method of 1st Embodiment of this invention. 本発明の第2実施形態の塞ぎ板据付部材、塞ぎ板据付構造及び塞ぎ板据付方法を説明する水平断面図。The horizontal sectional view explaining the closing plate installation member, the closing plate installation structure, and the closing plate installation method of the 2nd Embodiment of this invention. 本発明の第2実施形態の塞ぎ板据付方法を説明するフローチャート。The flowchart explaining the closing plate installation method of 2nd Embodiment of this invention. 本発明の第2実施形態の塞ぎ板据付部材、塞ぎ板据付構造及び塞ぎ板据付方法の説明図。It is explanatory drawing of the closing plate installation member, the closing plate installation structure, and the closing plate installation method of the 2nd Embodiment of this invention. 本発明の第3実施形態の塞ぎ板据付部材、塞ぎ板据付構造及び塞ぎ板据付方法を説明する三方枠を昇降路側から見た正面図。A front view of a three-sided frame for explaining a closing plate installation member, a closing plate installation structure, and a closing plate installation method according to a third embodiment of the present invention as viewed from the hoistway side. 本発明の第3実施形態の塞ぎ板据付部材、塞ぎ板据付構造及び塞ぎ板据付方法を説明する水平断面図。The horizontal sectional view explaining the closing plate installation member, the closing plate installation structure, and the closing plate installation method of the 3rd Embodiment of this invention. 本発明の第4実施形態の塞ぎ板据付部材、塞ぎ板据付構造及び塞ぎ板据付方法の説明図。It is explanatory drawing of the closing plate installation member, the closing plate installation structure, and the closing plate installation method of 4th Embodiment of this invention. 本発明の第5実施形態の塞ぎ板据付部材、塞ぎ板据付構造及び塞ぎ板据付方法の説明図。It is explanatory drawing of the closing plate installation member, the closing plate installation structure, and the closing plate installation method of the 5th Embodiment of this invention. 本発明の第6実施形態の塞ぎ板据付部材、塞ぎ板据付構造及び塞ぎ板据付方法の説明図。The explanatory view of the closing plate installation member, the closing plate installation structure, and the closing plate installation method of the sixth embodiment of the present invention. 本発明の第6実施形態の塞ぎ板据付部材、塞ぎ板据付構造及び塞ぎ板据付方法の説明図。The explanatory view of the closing plate installation member, the closing plate installation structure, and the closing plate installation method of the sixth embodiment of the present invention. 本発明の第7実施形態に係る塞ぎ板据付部材、塞ぎ板据付構造及び塞ぎ板据付方法の説明図。It is explanatory drawing of the closing plate installation member, the closing plate installation structure, and the closing plate installation method which concerns on 7th Embodiment of this invention. 本発明の第7実施形態に係る塞ぎ板据付部材、塞ぎ板据付構造及び塞ぎ板据付方法の説明図。It is explanatory drawing of the closing plate installation member, the closing plate installation structure, and the closing plate installation method which concerns on 7th Embodiment of this invention.

<第1実施形態>
第1実施形態に係る塞ぎ板据付部材、塞ぎ板据付構造及び塞ぎ板据付方法について、図1〜図6を参照して説明する。図1は三方枠を昇降路側から見た正面図、図2は三方枠の水平断面図である。
<First Embodiment>
The closing plate installation member, the closing plate installation structure, and the closing plate installation method according to the first embodiment will be described with reference to FIGS. 1 to 6. FIG. 1 is a front view of the three-sided frame as viewed from the hoistway side, and FIG. 2 is a horizontal cross-sectional view of the three-sided frame.

躯体(建屋壁)1の開口部2に設置される三方枠3は、左右一対の縦枠4と縦枠4の上部に架け渡された横枠5から構成される。三方枠3には、乗場ドア6が乗場敷居の上をスライド可能に設置される。 The three-sided frame 3 installed in the opening 2 of the skeleton (building wall) 1 is composed of a pair of left and right vertical frames 4 and a horizontal frame 5 bridged over the vertical frames 4. A landing door 6 is slidably installed on the landing threshold in the three-sided frame 3.

躯体(建屋壁)1の開口部2と各縦枠4との間には構造上、図2に示すような隙間開口部7が存在する。この隙間開口部7を塞ぐために、開口部2と各縦枠4との間には、塞ぎ板8が据え付けられる。塞ぎ板8には、係止孔9(図5参照)が穿設されている。そして、塞ぎ板8は係止孔9を介して、縦枠4に取り付けられた固定ブラケット10に据え付けられる。 Structurally, there is a gap opening 7 as shown in FIG. 2 between the opening 2 of the skeleton (building wall) 1 and each vertical frame 4. In order to close the gap opening 7, a closing plate 8 is installed between the opening 2 and each of the vertical frames 4. A locking hole 9 (see FIG. 5) is bored in the closing plate 8. Then, the closing plate 8 is installed on the fixing bracket 10 attached to the vertical frame 4 via the locking hole 9.

図3は固定ブラケット10を昇降路側から見た斜視図である。 FIG. 3 is a perspective view of the fixing bracket 10 as viewed from the hoistway side.

同図に示すように、固定ブラケット10は、縦枠4に締結される縦枠締結面10aとこの締結面10aと直交するように折り曲げられた塞ぎ板係止面10bとを備える。縦枠締結面10aには縦枠4に対して締結ボルトやリベット等で固定するための締結孔14が穿設されている。 As shown in the figure, the fixing bracket 10 includes a vertical frame fastening surface 10a fastened to the vertical frame 4 and a closing plate locking surface 10b bent so as to be orthogonal to the fastening surface 10a. The vertical frame fastening surface 10a is provided with a fastening hole 14 for fixing the vertical frame 4 with fastening bolts, rivets, or the like.

また、塞ぎ板係止面10bは、係止片11を備えており、この係止片11は塞ぎ板係止面10bの開口部12を切り起こすことで形成される。 Further, the closing plate locking surface 10b includes a locking piece 11, and the locking piece 11 is formed by cutting up an opening 12 of the closing plate locking surface 10b.

さらに、縦枠締結面10aと塞ぎ板係止面10bとが交叉する折り曲げ部分には、上下方向にスリット13が形成されている。 Further, slits 13 are formed in the vertical direction at the bent portion where the vertical frame fastening surface 10a and the closing plate locking surface 10b intersect.

第1実施形態の固定ブラケット10について、更に詳述すると、塞ぎ板係止面10bに切り起こし形成された上向きの係止片11の先端は、塞ぎ板8に形成された係止孔9の挿入を容易にするため、塞ぎ板係止面10bの開口部12とは反対側に折り返えされた上部湾曲部11aを有している。係止片11の根元と上部湾曲部11aの間は、挿入後の塞ぎ板8を保持するためV字状に曲げられた曲げ部11bを有している。なお、図3に示す固定ブラケット10は、スリット13の部分に角度曲げを有しているが、縦枠4の形状や塞ぎ板8との位置関係によっては、必ずしも角度曲げを有しておらず、縦枠締結面10aと塞ぎ板係止面10bとが平板状(1枚板)であってもよい。 More specifically, the fixing bracket 10 of the first embodiment is inserted into the locking hole 9 formed in the closing plate 8 at the tip of the upward locking piece 11 cut up and formed on the closing plate locking surface 10b. The upper curved portion 11a is folded back on the side opposite to the opening 12 of the closing plate locking surface 10b in order to facilitate the above. Between the base of the locking piece 11 and the upper curved portion 11a, there is a bent portion 11b bent in a V shape to hold the closing plate 8 after insertion. The fixed bracket 10 shown in FIG. 3 has an angular bend in the slit 13 portion, but does not necessarily have an angular bend depending on the shape of the vertical frame 4 and the positional relationship with the closing plate 8. The vertical frame fastening surface 10a and the closing plate locking surface 10b may have a flat plate shape (single plate).

図3(a)は塞ぎ板8を昇降路側から見た部分投影図であり、(b)は塞ぎ板8と固定ブラケットが締結した際の昇降路側から見た部分投影図である。 FIG. 3A is a partial projection drawing of the closing plate 8 as viewed from the hoistway side, and FIG. 3B is a partial projection drawing of the closing plate 8 as viewed from the hoistway side when the closing plate 8 and the fixing bracket are fastened.

塞ぎ板8に穿設される係止孔9は係止片11より一回り大きい長孔が好適である。 The locking hole 9 formed in the closing plate 8 is preferably a long hole that is one size larger than the locking piece 11.

次に、塞ぎ板据付方法について、図4のフローチャート、図5、図6を参照して説明する。 Next, the closing plate installation method will be described with reference to the flowchart of FIG. 4, FIGS. 5 and 6.

図5は固定ブラケット10に塞ぎ板8を挿入する経過を示した昇降路側から見た斜視図およびその断面図である。 FIG. 5 is a perspective view and a cross-sectional view thereof as viewed from the hoistway side showing the process of inserting the closing plate 8 into the fixing bracket 10.

あらかじめ固定ブラケット10の縦枠締結面10aに形成されている締結孔14を介して、リベット等の締結部材により固定ブラケット10を縦枠4に取り付けておく(ステップS1)。 The fixing bracket 10 is attached to the vertical frame 4 by a fastening member such as a rivet through a fastening hole 14 formed in advance on the vertical frame fastening surface 10a of the fixing bracket 10 (step S1).

次に、固定ブラケット10の係止片11に、昇降路側から塞ぎ板8の係止孔9を被せ(ステップS2)、塞ぎ板8を係止片11の根元にあたるまで下側にスライドさせて固定する(ステップS3)。塞ぎ板係止面10bと係止片11の曲げ部11bとの間隙は、板厚よりも狭く形成することで、図5(e)、(f)の状態では、係止片11の曲げ部11bが塞ぎ板8側に付勢されるので、塞ぎ板8が係止片11から抜けることが防止される。 Next, the locking piece 11 of the fixing bracket 10 is covered with the locking hole 9 of the closing plate 8 from the hoistway side (step S2), and the closing plate 8 is slid downward until it hits the root of the locking piece 11 to be fixed. (Step S3). By forming the gap between the closing plate locking surface 10b and the bent portion 11b of the locking piece 11 narrower than the plate thickness, in the states of FIGS. 5 (e) and 5 (f), the bent portion of the locking piece 11 is formed. Since 11b is urged toward the closing plate 8, the closing plate 8 is prevented from coming off from the locking piece 11.

その後、図6に示すように、スリット13を支点にして、塞ぎ板8を躯体1に当接するまで折り曲げ、角度調整することで据え付が完了する(ステップS4)。 After that, as shown in FIG. 6, the closing plate 8 is bent until it comes into contact with the skeleton 1 with the slit 13 as a fulcrum, and the angle is adjusted to complete the installation (step S4).

このように、第1実施形態によれば、縦枠4に固定された固定ブラケット10の係止片11に塞ぎ板8の係止孔9を被せ、スリット13を支点として躯体1側に曲げることで、躯体1と三方枠3との間の隙間開口部7を塞ぐことができる。このため、溶接及び工具を不要とし、据付時間を短縮して開口部との取合いに合わせて容易に据付作業を行うことができる。 As described above, according to the first embodiment, the locking piece 11 of the fixing bracket 10 fixed to the vertical frame 4 is covered with the locking hole 9 of the closing plate 8 and bent toward the skeleton 1 side with the slit 13 as a fulcrum. Therefore, the gap opening 7 between the skeleton 1 and the three-sided frame 3 can be closed. Therefore, welding and tools are not required, the installation time can be shortened, and the installation work can be easily performed according to the connection with the opening.

<第2実施形態>
第2実施形態について、図7、図8を参照して説明する。
<Second Embodiment>
The second embodiment will be described with reference to FIGS. 7 and 8.

第2実施形態では、8(a)に示すように、塞ぎ板8には下側係止孔21と、上側係止孔22とが穿設されていることを特徴としている。なお、固定ブラケット10は第1実施形態と同じものを使用できる。 In the second embodiment, as shown in 8 (a), the closing plate 8 is characterized in that a lower locking hole 21 and an upper locking hole 22 are bored. The same fixing bracket 10 as in the first embodiment can be used.

下側係止孔21は、第1実施形態の係止孔9と同様の大きさに形成されているが、下側係止孔21の上方に形成される上側係止孔22は、係止片11の曲げ部11bが嵌合されるだけの口径を有する角孔が好適である。 The lower locking hole 21 is formed to have the same size as the locking hole 9 of the first embodiment, but the upper locking hole 22 formed above the lower locking hole 21 is locked. A square hole having a diameter sufficient to fit the bent portion 11b of the piece 11 is suitable.

次に、図7、図8を参照して、塞ぎ板据付方法について説明する。 Next, a method of installing the closing plate will be described with reference to FIGS. 7 and 8.

図8は固定ブラケットに塞ぎ板8を挿入する経過を示した昇降路側から見た斜視図およびその断面図である。塞ぎ板据付方法は、基本的に第1実施形態と同じである。 FIG. 8 is a perspective view and a cross-sectional view thereof as viewed from the hoistway side showing the process of inserting the closing plate 8 into the fixing bracket. The closing plate installation method is basically the same as that of the first embodiment.

先ず、あらかじめ固定ブラケット10の縦枠締結面10aに形成されている締結孔14を介して、リベット等の締結部材により固定ブラケット10を縦枠4に取り付けておく(図7ステップS11)。 First, the fixing bracket 10 is attached to the vertical frame 4 by a fastening member such as a rivet through a fastening hole 14 formed in advance on the vertical frame fastening surface 10a of the fixing bracket 10 (step S11 in FIG. 7).

次に、固定ブラケット10の係止片11に、昇降路側から塞ぎ板8の係止孔9を被せ(ステップS12、図8(a),(b))、塞ぎ板8を係止片11の根元にあたるまで下側にスライドさせて固定する(ステップS13、図8(c),(d))。 Next, the locking piece 11 of the fixing bracket 10 is covered with the locking hole 9 of the closing plate 8 from the hoistway side (step S12, FIGS. 8A and 8B), and the closing plate 8 is placed on the locking piece 11. Slide it downward until it hits the root to fix it (step S13, FIGS. 8 (c), 8 (d)).

塞ぎ板8が上側係止孔21bを有しているため、塞ぎ板8を下側係止孔21aに挿入後は、曲げ部11bと上側係止孔22とが嵌め合う位置関係になる(図8(e),(f))。このため、据付固定後、塞ぎ板8が抜けにくくなる。また、確実に挿入されているかを目視で確認することができ、作業性が向上する。 Since the closing plate 8 has the upper locking hole 21b, after the closing plate 8 is inserted into the lower locking hole 21a, the bent portion 11b and the upper locking hole 22 are in a positional relationship to be fitted (FIG. FIG. 8 (e), (f)). Therefore, it becomes difficult for the closing plate 8 to come off after the installation and fixing. In addition, it is possible to visually confirm whether the insertion is secure, and workability is improved.

最後に、スリット13を支点にして、塞ぎ板8を躯体1に当接するまで折り曲げ、角度調整することで据え付が完了する(ステップS14)。 Finally, with the slit 13 as a fulcrum, the closing plate 8 is bent until it comes into contact with the skeleton 1, and the angle is adjusted to complete the installation (step S14).

以上、第2実施形態によれば、溶接及び工具を不要とし、据付時間を短縮して開口部との取合いに合わせて容易に据付作業を行うことができる。 As described above, according to the second embodiment, welding and tools are not required, the installation time can be shortened, and the installation work can be easily performed according to the connection with the opening.

<第3実施形態>
第3実施形態について、図9、図10を参照して説明する。図9は三方枠を昇降路側から見た図であり、図10は三方枠を上方から見た部分断面図である。
<Third Embodiment>
The third embodiment will be described with reference to FIGS. 9 and 10. FIG. 9 is a view of the three-sided frame viewed from the hoistway side, and FIG. 10 is a partial cross-sectional view of the three-sided frame viewed from above.

第3実施形態では、塞ぎ板31は他のエレベータ機器との干渉や狭い昇降路での取り回しを容易にするため、上下方向に複数のスリット32を有することを特徴としている。スリット32が形成される位置は、躯体(建屋壁)1と三方枠3との距離や塞ぎ板31の幅にも依存するが、図10に示すように、塞ぎ板31の幅方向の中央付近が好適である。これにより、塞ぎ板31をスリット32から折り曲げて、躯体(建屋壁)1の壁面に沿わせて配置することができる。 In the third embodiment, the closing plate 31 is characterized by having a plurality of slits 32 in the vertical direction in order to facilitate interference with other elevator equipment and handling in a narrow hoistway. The position where the slit 32 is formed depends on the distance between the skeleton (building wall) 1 and the three-sided frame 3 and the width of the closing plate 31, but as shown in FIG. 10, near the center of the closing plate 31 in the width direction. Is preferable. As a result, the closing plate 31 can be bent from the slit 32 and arranged along the wall surface of the skeleton (building wall) 1.

このように、第3実施形態によれば、塞ぎ板31にスリット38を形成したので、躯体1の壁面と三方枠3との距離が長い場合等でも、塞ぎ板31を躯体1の壁面に沿わせて設置することができる。このため、塞ぎ板と躯体壁面との隙間を極力狭めることができるので、火災等の発生時においても、煙が乗場側に回り込むことを抑制できる。 As described above, according to the third embodiment, since the slit 38 is formed in the closing plate 31, the closing plate 31 is placed along the wall surface of the skeleton 1 even when the distance between the wall surface of the skeleton 1 and the three-sided frame 3 is long. Can be installed together. Therefore, since the gap between the closing plate and the wall surface of the skeleton can be narrowed as much as possible, it is possible to prevent smoke from wrapping around to the landing side even in the event of a fire or the like.

<第4実施形態>
第4実施形態について、図11を参照して説明する。
<Fourth Embodiment>
The fourth embodiment will be described with reference to FIG.

固定ブラケット40は、切り起こし形成により先端が下向きの係止片41を備えている。この係止片41は、根元から先端に向かうに連れて細くなる傾斜部43を有している。 The fixing bracket 40 includes a locking piece 41 whose tip is downward due to the cut-up formation. The locking piece 41 has an inclined portion 43 that becomes thinner from the root to the tip.

第4実施形態の塞ぎ板8は、縦方向に長いスリット上の係止孔9を有している。係止孔9を係止片41に挿入後、係止片41の先端を折り曲げて先端屈曲部44を形成することにより、係止孔9と係止片41の傾斜部43が接触し、強固に固定される構成となっている。 The closing plate 8 of the fourth embodiment has a locking hole 9 on a slit that is long in the vertical direction. After inserting the locking hole 9 into the locking piece 41, the tip of the locking piece 41 is bent to form the tip bent portion 44, so that the locking hole 9 and the inclined portion 43 of the locking piece 41 come into contact with each other and become strong. It is configured to be fixed to.

このように、第4実施形態によれば、溶接及び工具を不要とし、据付時間を短縮して開口部との取合いに合わせて容易に据付作業を行うことができる。 As described above, according to the fourth embodiment, welding and tools are not required, the installation time can be shortened, and the installation work can be easily performed according to the connection with the opening.

なお、第4実施形態では、係止片41は、切り起こし形成により先端が下向きとされているが、逆に、先端が上向きになるように切り起こし形成してもよい。 In the fourth embodiment, the locking piece 41 is formed by cutting and raising so that the tip is downward, but conversely, the locking piece 41 may be formed by cutting and raising so that the tip is upward.

<第5実施形態>
第5実施形態について、図12を参照して説明する。
<Fifth Embodiment>
A fifth embodiment will be described with reference to FIG.

固定ブラケット61は、切り起こしにより形成された一対の係止片62を有し、塞ぎ板51には、正方形等の角孔で構成された係止孔53が穿設されている。 The fixing bracket 61 has a pair of locking pieces 62 formed by cutting and raising, and the closing plate 51 is provided with a locking hole 53 formed of a square hole or the like.

係止片62は、開口側が互いに背くように形成されたコ字状の切欠き溝63から切り起こし形成された一対の突起片で構成されている。 The locking piece 62 is composed of a pair of protruding pieces formed by cutting up from a U-shaped notch groove 63 formed so that the opening sides are opposite to each other.

上記構成において、係止孔53に一対の係止片62を挿入後、係止片62を曲げ部64から係止孔53側に折り曲げることにより、係止片62が互いにストッパとなり、強固に固定することができる。 In the above configuration, after inserting the pair of locking pieces 62 into the locking holes 53, the locking pieces 62 are bent from the bent portion 64 toward the locking hole 53, so that the locking pieces 62 act as stoppers for each other and are firmly fixed. can do.

以上、第5実施形態によれば、溶接及び工具を不要とし、据付時間を短縮して開口部との取合いに合わせて容易に据付作業を行うことができる。 As described above, according to the fifth embodiment, welding and tools are not required, the installation time can be shortened, and the installation work can be easily performed according to the connection with the opening.

<第6実施形態>
第6実施形態について、図13、図14を参照して説明する。
<Sixth Embodiment>
The sixth embodiment will be described with reference to FIGS. 13 and 14.

固定ブラケット81は切り起こしにより形成された係止片82を有し、塞ぎ板71は係止孔73を有している。また、塞ぎ板71の端部には、半月状切欠き部74が形成されている。 The fixing bracket 81 has a locking piece 82 formed by cutting and raising, and the closing plate 71 has a locking hole 73. Further, a crescent-shaped notch 74 is formed at the end of the closing plate 71.

以上の構成において、係止片82に係止孔73を挿入後、係止片62を半月状切欠き部74側に折り曲げることにより、塞ぎ板71が縦枠4に固定される。 In the above configuration, the closing plate 71 is fixed to the vertical frame 4 by inserting the locking hole 73 into the locking piece 82 and then bending the locking piece 62 toward the half-moon-shaped notch portion 74.

このように、第6実施形態によれば、溶接及び工具を不要とし、据付時間を短縮して開口部との取合いに合わせて容易に据付作業を行うことができる。 As described above, according to the sixth embodiment, welding and tools are not required, the installation time can be shortened, and the installation work can be easily performed according to the connection with the opening.

<第7実施形態>
第7実施形態について、図15、図16を参照して説明する。
<7th Embodiment>
The seventh embodiment will be described with reference to FIGS. 15 and 16.

塞ぎ板91における縦板4と対向する端部には、上側切欠き溝92と下側切欠き溝93とが形成されている。上側切欠き溝92と下側切欠き溝93とで区画された係止部94には、切り起こしにより形成された係止片95が形成されている。 An upper notch groove 92 and a lower notch groove 93 are formed at an end of the closing plate 91 facing the vertical plate 4. A locking piece 95 formed by raising is formed in the locking portion 94 partitioned by the upper notch groove 92 and the lower notch groove 93.

一方、縦枠4に固定される固定ブラケット101の塞ぎ板係止面には、角孔から成る係止孔102と係止孔102を挟んで上下一対のスライド片(上側スライド片103、下側スライド片104)と、ストッパ片105と、スリット106が形成されている。 On the other hand, on the closing plate locking surface of the fixing bracket 101 fixed to the vertical frame 4, a pair of upper and lower slide pieces (upper slide piece 103, lower side) are sandwiched between the locking hole 102 made of square holes and the locking hole 102. A slide piece 104), a stopper piece 105, and a slit 106 are formed.

塞ぎ板91の据付時には、上側切欠き溝92を上側スライド片103、下側切欠き溝93を下側スライド片104にそれぞれ位置を合わせ、係止部94をストッパ片105に当接するまでスライドさせる。係止片95と係止孔102とは、スライド後にラップするような位置関係となっており、係止片95を係止孔102に曲げ込むことで抜け止めを防止するストッパとなり、塞ぎ板91の脱落が防止される。 When installing the closing plate 91, align the upper notch groove 92 with the upper slide piece 103 and the lower notch groove 93 with the lower slide piece 104, and slide the locking portion 94 until it comes into contact with the stopper piece 105. .. The locking piece 95 and the locking hole 102 are in a positional relationship so as to wrap after sliding, and by bending the locking piece 95 into the locking hole 102, it serves as a stopper to prevent the locking piece 95 from coming off, and the closing plate 91. Is prevented from falling off.

以上、第7実施形態によれば、溶接及び工具を不要とし、据付時間を短縮して開口部との取合いに合わせて容易に据付作業を行うことができる。 As described above, according to the seventh embodiment, welding and tools are not required, the installation time can be shortened, and the installation work can be easily performed according to the connection with the opening.

<実施形態の作用>
以上、各実施形態によれば、塞ぎ板を係止片に差し込みだけで固定可能なため、作業が容易で溶接作業を無くすことができる。また、溶接作業を無くせるため、溶接の段取りにかかっていた据付時間を削減できるうえに、容易に据付可能なため、据付時間を大幅に短縮できる。
<Action of the embodiment>
As described above, according to each embodiment, since the closing plate can be fixed only by inserting it into the locking piece, the work is easy and the welding work can be eliminated. Further, since the welding work can be eliminated, the installation time required for the welding setup can be reduced, and the installation time can be significantly shortened because the installation can be easily performed.

なお、以上の各実施形態において、固定ブラケットは別ピースのブラケットで構成され、縦枠4は固定ブラケットを上下方向に複数有していてもよい。また、固定ブラケットは縦枠と一体で構成するようにしてもよい。 In each of the above embodiments, the fixing bracket may be composed of brackets of different pieces, and the vertical frame 4 may have a plurality of fixing brackets in the vertical direction. Further, the fixing bracket may be integrally formed with the vertical frame.

以上、本発明のいくつかの実施形態を説明したが、これらの実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これら新規な実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これら実施形態やその変形は、発明の範囲や要旨に含まれるとともに、特許請求の範囲に記載された発明とその均等の範囲に含まれる。 Although some embodiments of the present invention have been described above, these embodiments are presented as examples and are not intended to limit the scope of the invention. These novel embodiments can be implemented in various other embodiments, and various omissions, replacements, and changes can be made without departing from the gist of the invention. These embodiments and modifications thereof are included in the scope and gist of the invention, and are also included in the scope of the invention described in the claims and the equivalent scope thereof.

1…躯体(建屋壁)、2…開口部、3…三方枠、4…縦枠、5…横枠、6…乗場ドア、7…隙間開口部、8…塞ぎ板、9…係止孔、10…固定ブラケット(塞ぎ板据付部材)、10a…縦枠締結面、10b…塞ぎ板係止面、11…係止片、11a…上部湾曲部、11b…曲げ部、12…開口部、13…スリット、14…締結孔、21…下側係止孔、22…上側係止孔、31…塞ぎ板、32…スリット、40…固定ブラケット(塞ぎ板据付部材)、41…係止片、42…曲げ部、43…傾斜部、44…先端屈曲部、51…塞ぎ板、53…係止孔、61…固定ブラケット(塞ぎ板据付部材)、62…係止片、63…切欠き溝、64…曲げ部、71…塞ぎ板、73…係止孔、74…半月状切欠き部、81…固定ブラケット(塞ぎ板据付部材)、82…係止片、83…曲げ部、91…塞ぎ板、92…上側切欠き溝、93…下側切欠き溝、94…係止部、95…係止片、101…固定ブラケット(塞ぎ板据付部材)、102…係止孔、103…上側スライド片、104…下側スライド片、105…ストッパ片、106…スリット 1 ... skeleton (building wall), 2 ... opening, 3 ... three-sided frame, 4 ... vertical frame, 5 ... horizontal frame, 6 ... landing door, 7 ... gap opening, 8 ... closing plate, 9 ... locking hole, 10 ... Fixed bracket (closing plate installation member), 10a ... Vertical frame fastening surface, 10b ... Closing plate locking surface, 11 ... Locking piece, 11a ... Upper curved portion, 11b ... Bending portion, 12 ... Opening, 13 ... Slit, 14 ... Fastening hole, 21 ... Lower locking hole, 22 ... Upper locking hole, 31 ... Closing plate, 32 ... Slit, 40 ... Fixed bracket (closing plate installation member), 41 ... Locking piece, 42 ... Bent part, 43 ... inclined part, 44 ... tip bent part, 51 ... closing plate, 53 ... locking hole, 61 ... fixing bracket (closing plate installation member), 62 ... locking piece, 63 ... notch groove, 64 ... Bending part, 71 ... closing plate, 73 ... locking hole, 74 ... crescent-shaped notch, 81 ... fixing bracket (closing plate installation member), 82 ... locking piece, 83 ... bending part, 91 ... closing plate, 92 ... upper notch groove, 93 ... lower notch groove, 94 ... locking part, 95 ... locking piece, 101 ... fixing bracket (closing plate installation member), 102 ... locking hole, 103 ... upper slide piece, 104 ... lower slide piece, 105 ... stopper piece, 106 ... slit

Claims (9)

エレベータ乗場の開口部に設置され、一対の縦枠と前記一対の縦枠の上端に連結された横枠とを有するエレベータの三方枠において、前記三方枠と前記開口部との間の隙間を塞ぐ塞ぎ板を据付ける塞ぎ板据付部材であって、
前記縦枠と締結される縦枠締結面と、
前記縦枠締結面と交叉すると共に、前記塞ぎ板を係止する塞ぎ板係止面と、
前記塞ぎ板係止面に形成され、前記塞ぎ板に開口形成された係止孔が係止される係止片と、
前記縦枠締結面と塞ぎ板係止面とが交叉する部分に形成され、前記縦枠の高さ方向に伸びたスリットと、を備える三方枠の塞ぎ板据付部材。
In a three-sided frame of an elevator installed at an opening of an elevator landing and having a pair of vertical frames and a horizontal frame connected to the upper ends of the pair of vertical frames, the gap between the three-sided frame and the opening is closed. It is a closing plate installation member that installs the closing plate.
A vertical frame fastening surface to be fastened to the vertical frame,
A closing plate locking surface that intersects the vertical frame fastening surface and locks the closing plate,
A locking piece formed on the closing plate locking surface and to which a locking hole formed in the closing plate is locked,
A three-sided frame closing plate installation member having a slit formed at a portion where the vertical frame fastening surface and the closing plate locking surface intersect and extending in the height direction of the vertical frame.
前記係止片は、
切り起こし形成された突起片で構成され、
当該突起片の根元は、V字状に切り起こされており、当該突起片の先端は、前記塞ぎ板係止面と反対向きに曲げられた上部湾曲部を有する、請求項1に記載の三方枠の塞ぎ板据付部材。
The locking piece is
It is composed of protrusions formed by cutting and raising.
The three sides according to claim 1, wherein the root of the protrusion is cut up in a V shape, and the tip of the protrusion has an upper curved portion bent in the direction opposite to the closing plate locking surface. Frame closing plate installation member.
前記係止片は、
切り起こし形成により先端が下向きの突起片で構成され、
当該突起片は、先端に向かうに連れて細くなる傾斜部を有し、
当該突起片が前記塞ぎ板の係止孔に挿入された後、突起片の先端を湾曲させることで塞ぎ板が縦板に固定される、請求項1に記載の三方枠の塞ぎ板据付部材。
The locking piece is
It is composed of protruding pieces with the tip pointing downward due to the cut-up formation.
The protrusion has an inclined portion that becomes thinner toward the tip.
The three-sided frame closing plate installation member according to claim 1, wherein the closing plate is fixed to the vertical plate by bending the tip of the protrusion after the protrusion is inserted into the locking hole of the closing plate.
前記係止片は、
前記塞ぎ板係止面において、開口側が互いに背くように形成されたコ字状の切欠き溝から切り起こし形成された一対の突起片で構成され、
当該一対の突起片が前記塞ぎ板の係止孔に挿入された後、当該突起片を切り起こし側とは反対方向に曲げることで前記塞ぎ板が前記縦枠に固定される、請求項1に記載の三方枠の塞ぎ板据付部材。
The locking piece is
The closing plate locking surface is composed of a pair of protrusions formed by cutting up from a U-shaped notch groove formed so that the opening sides are opposite to each other.
According to claim 1, after the pair of protrusions are inserted into the locking holes of the closing plate, the closing plate is fixed to the vertical frame by bending the protrusions in a direction opposite to the cut-up side. The three-sided frame closing plate installation member described.
前記係止片は、
切り起こし形成により横向きに成形された突起片で構成され
当該突起片が前記塞ぎ板の係止孔に挿入された後、突起片の先端を湾曲させることで前記塞ぎ板が前記縦枠に固定される、請求項1に記載の三方枠の塞ぎ板据付部材。
The locking piece is
It is composed of protrusions formed laterally by cutting and raising, and after the protrusions are inserted into the locking holes of the closing plate, the closing plate is fixed to the vertical frame by bending the tip of the protrusions. The three-sided frame closing plate installation member according to claim 1.
エレベータ乗場の開口部に設置され、一対の縦枠と前記一対の縦枠の上端に連結された横枠とを有するエレベータの三方枠において、
前記三方枠と前記開口部との間隔を覆う塞ぎ板と、
前記縦枠に設けられ、前記塞ぎ板と固定される固定ブラケットとを備え、
前記塞ぎ板は係止孔を備え、
前記固定ブラケットは、前記塞ぎ板の係止孔に挿入されて前記塞ぎ板を固定する係止片と、前記縦枠と前記塞ぎ板との間に高さ方向に伸びたスリットとを有し、
前記スリットを支点として角度調整することで前記塞ぎ板により前記三方枠と前記開口部との隙間を塞ぐ、三方枠の塞ぎ板据付構造。
In a three-sided frame of an elevator installed at the opening of an elevator landing and having a pair of vertical frames and a horizontal frame connected to the upper ends of the pair of vertical frames.
A closing plate that covers the distance between the three-sided frame and the opening,
A fixing bracket provided on the vertical frame and fixed to the closing plate is provided.
The closing plate has a locking hole and
The fixing bracket has a locking piece inserted into the locking hole of the closing plate to fix the closing plate, and a slit extending in the height direction between the vertical frame and the closing plate.
A three-sided frame closing plate installation structure in which the gap between the three-sided frame and the opening is closed by the closing plate by adjusting the angle with the slit as a fulcrum.
前記固定ブラケットの係止片は、切り起こし形成により先端が上向きの突起片で構成され、当該突起片の根元は、V字状に切り起こされており、当該突起片の先端は、前記塞ぎ板係止面と反対向きに曲げられた上部湾曲部を有し、当該上部湾曲部は、当該塞ぎ板係止面の向きにV字状に曲げられた曲げ部を有し、
前記塞ぎ板の係止孔は、上側係止孔と下側係止孔とを備え、前記塞ぎ板の据付の際には、前記下側係止孔から係止片を被せ入れた後、塞ぎ板を下方にスライドさせて前記上側係止孔に前記上部湾曲部を嵌合させる、請求項6に記載の三方枠の塞ぎ板据付構造。
The locking piece of the fixing bracket is composed of a protrusion whose tip is upward by cutting and raising, the root of the protrusion is cut and raised in a V shape, and the tip of the protrusion is the closing plate. It has an upper curved portion that is bent in the direction opposite to the locking surface, and the upper curved portion has a bent portion that is bent in a V shape in the direction of the closing plate locking surface.
The locking hole of the closing plate includes an upper locking hole and a lower locking hole, and when the closing plate is installed, a locking piece is put on the lower locking hole and then closed. The three-sided frame closing plate installation structure according to claim 6, wherein the plate is slid downward to fit the upper curved portion into the upper locking hole.
前記塞ぎ板には、高さ方向に伸びるスリットが形成されている、請求項6又は7に記載の三方枠の塞ぎ板据付構造。 The three-sided frame closing plate installation structure according to claim 6 or 7, wherein a slit extending in the height direction is formed in the closing plate. 請求項1に記載の三方枠の塞ぎ板据付部材の縦枠締結面と縦枠とを締結部材を介して固定し、
前記塞ぎ板据付部材の塞ぎ板係止面に形成された係止片と塞ぎ板に開口形成された係止孔とを係止し、
縦枠締結面と塞ぎ板係止面とが交叉する部分に形成され前記縦枠の高さ方向に伸びたスリットを支点として角度調整し、前記塞ぎ板により前記三方枠と前記開口部との隙間を塞ぐ、三方枠の塞ぎ板据付方法。
The vertical frame fastening surface and the vertical frame of the three-sided frame closing plate installation member according to claim 1 are fixed via the fastening member.
The locking piece formed on the closing plate locking surface of the closing plate installation member and the locking hole formed as an opening in the closing plate are locked.
The angle is adjusted using a slit formed at the intersection of the vertical frame fastening surface and the closing plate locking surface as a fulcrum and extending in the height direction of the vertical frame, and the gap between the three-sided frame and the opening is adjusted by the closing plate. How to install the closing plate of the three-sided frame to close the.
JP2020038604A 2020-03-06 2020-03-06 Three-sided frame closing plate installation member, closing plate installation structure and closing plate installation method Active JP6903780B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2020038604A JP6903780B1 (en) 2020-03-06 2020-03-06 Three-sided frame closing plate installation member, closing plate installation structure and closing plate installation method
CN202011457247.8A CN113428764A (en) 2020-03-06 2020-12-10 Door pocket closure mounting member, closure mounting structure, and closure mounting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020038604A JP6903780B1 (en) 2020-03-06 2020-03-06 Three-sided frame closing plate installation member, closing plate installation structure and closing plate installation method

Publications (2)

Publication Number Publication Date
JP6903780B1 JP6903780B1 (en) 2021-07-14
JP2021138510A true JP2021138510A (en) 2021-09-16

Family

ID=76753198

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020038604A Active JP6903780B1 (en) 2020-03-06 2020-03-06 Three-sided frame closing plate installation member, closing plate installation structure and closing plate installation method

Country Status (2)

Country Link
JP (1) JP6903780B1 (en)
CN (1) CN113428764A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7277000B1 (en) 2022-02-08 2023-05-18 東芝エレベータ株式会社 Three-way frame of elevator and its installation method
WO2023175891A1 (en) * 2022-03-18 2023-09-21 株式会社日立ビルシステム Closing plate installation structure, closing plate installation method, and elevator

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002211860A (en) * 2001-01-12 2002-07-31 Mitsubishi Electric Corp Mounting device for jamb for elevator
WO2003086938A1 (en) * 2002-04-16 2003-10-23 Mitsubishi Denki Kabushiki Kaisha Landing stage door of elevator
JP2004091134A (en) * 2002-08-30 2004-03-25 Mitsubishi Electric Corp Jamb of elevator
JP2009120314A (en) * 2007-11-14 2009-06-04 Mitsubishi Electric Corp Finishing lathing device for landing doorway of elevator
JP2010095375A (en) * 2008-10-20 2010-04-30 Toshiba Elevator Co Ltd Jamb installing structure for elevator
JP2012017175A (en) * 2010-07-07 2012-01-26 Toshiba Elevator Co Ltd Jamb and method for installing the same
JP2016069135A (en) * 2014-09-30 2016-05-09 株式会社日立製作所 Jamb of elevator device, elevator device using the same and jamb assembling method for elevator device

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3797802B2 (en) * 1998-09-07 2006-07-19 株式会社日立ビルシステム Curing device for elevator hall opening
JP2005306578A (en) * 2004-04-23 2005-11-04 Toshiba Elevator Co Ltd Smoke shielding device of elevator door
JP2008013356A (en) * 2006-07-10 2008-01-24 Mitsubishi Electric Corp Elevator entrance device and its attaching method
JP5080106B2 (en) * 2007-03-07 2012-11-21 東芝エレベータ株式会社 Elevator landing equipment
CN201080941Y (en) * 2007-09-11 2008-07-02 沈阳博林特电梯有限公司 Elevator car wall panel fast connecting structure
WO2009147706A1 (en) * 2008-06-02 2009-12-10 司ゴム電材株式会社 Smoke blocking structure
JP5327913B2 (en) * 2011-12-28 2013-10-30 東芝エレベータ株式会社 Elevator car
CN203308840U (en) * 2013-04-25 2013-11-27 西尼电梯(杭州)有限公司 Insert system type car wall installation structure
CN103342270A (en) * 2013-07-24 2013-10-09 允成机电科技(上海)有限公司 Wedged type elevator car wall assembling structure and mounting method thereof
CN105939953B (en) * 2014-02-21 2018-04-03 株式会社日立制作所 Elevator floor stops door gear
CN106800231A (en) * 2015-11-26 2017-06-06 株式会社日立制作所 Lift car and the lift appliance using the lift car
CN206092605U (en) * 2016-07-07 2017-04-12 图瓦斯(上海)安全系统有限公司 Rail panel is connected with right angle bending that can buckle
CN206069176U (en) * 2016-08-18 2017-04-05 杭州斯沃德电梯有限公司 Bank mounting bracket on a kind of hoistway door of angle adjustable

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002211860A (en) * 2001-01-12 2002-07-31 Mitsubishi Electric Corp Mounting device for jamb for elevator
WO2003086938A1 (en) * 2002-04-16 2003-10-23 Mitsubishi Denki Kabushiki Kaisha Landing stage door of elevator
JP2004091134A (en) * 2002-08-30 2004-03-25 Mitsubishi Electric Corp Jamb of elevator
JP2009120314A (en) * 2007-11-14 2009-06-04 Mitsubishi Electric Corp Finishing lathing device for landing doorway of elevator
JP2010095375A (en) * 2008-10-20 2010-04-30 Toshiba Elevator Co Ltd Jamb installing structure for elevator
JP2012017175A (en) * 2010-07-07 2012-01-26 Toshiba Elevator Co Ltd Jamb and method for installing the same
JP2016069135A (en) * 2014-09-30 2016-05-09 株式会社日立製作所 Jamb of elevator device, elevator device using the same and jamb assembling method for elevator device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7277000B1 (en) 2022-02-08 2023-05-18 東芝エレベータ株式会社 Three-way frame of elevator and its installation method
JP2023115835A (en) * 2022-02-08 2023-08-21 東芝エレベータ株式会社 Elevator jamb and method for installing the same
WO2023175891A1 (en) * 2022-03-18 2023-09-21 株式会社日立ビルシステム Closing plate installation structure, closing plate installation method, and elevator

Also Published As

Publication number Publication date
CN113428764A (en) 2021-09-24
JP6903780B1 (en) 2021-07-14

Similar Documents

Publication Publication Date Title
JP6903780B1 (en) Three-sided frame closing plate installation member, closing plate installation structure and closing plate installation method
EP2327649B1 (en) Structure for preventing deviation of elevator doors and insertion of foreign objects
JP2019142618A (en) Device and method for fixing elevator guide rail
US5479754A (en) Method and apparatus for installing an elevator shaft door
JP6895801B2 (en) Shutter device structure
KR20190022287A (en) Fixing device for construction protective net
JP2010137957A (en) Doorway device for elevator and renewal method for doorway device for elevator
KR101681168B1 (en) Cylinder cover of fire prevention door
EP1496005A1 (en) Landing stage door of elevator
JP7068078B2 (en) Connecting tools for building materials and their connecting methods
JP6740117B2 (en) Elevator
KR101879679B1 (en) Fixing device for construction protective net
JP5390957B2 (en) Scaffolding equipment
JP6218161B2 (en) Elevator Fesher Plate and Assembling Method of Fesher Plate
KR200490089Y1 (en) Cylinder cover of fire prevention door
JP7046725B2 (en) How to manufacture a fireproof structure for shutter guide rails
JP7011915B2 (en) Mounting structure of the vertical frame of the window shutter
JP6951031B2 (en) Elevator three-way frame fixture and three-way frame installation structure
JP2647202B2 (en) Mounting plate for reinforced concrete wall
JP5920675B2 (en) Elevator curtain panel assembly and renewal elevator panel installation method
JP2013227854A (en) Extraction prevention device for winding drum in building shutter device
KR102482835B1 (en) Guide rail reinforcement structure of fire screen shutter
JP2572203B2 (en) Refurbishment equipment for building openings
JP2012001988A (en) Reforming method of door frame structure and door device for reforming door device
JP6860363B2 (en) Locking tool

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200306

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210525

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210623

R150 Certificate of patent or registration of utility model

Ref document number: 6903780

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150