- power generation
- distributed power
- energy
- generation device
- energy charge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010248 power generation Methods 0.000 title claims abstract description 338
- 238000000034 method Methods 0.000 title claims abstract description 29
- 230000008439 repair process Effects 0.000 claims abstract description 97
- 230000005611 electricity Effects 0.000 claims abstract description 52
- 238000001514 detection method Methods 0.000 claims abstract description 24
- 238000005265 energy consumption Methods 0.000 claims description 8
- 239000006185 dispersion Substances 0.000 claims 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 141
- 239000007789 gas Substances 0.000 description 66
- 239000000446 fuel Substances 0.000 description 17
- 238000002485 combustion reaction Methods 0.000 description 11
- 238000002407 reforming Methods 0.000 description 11
- 239000002737 fuel gas Substances 0.000 description 8
- 238000006243 chemical reaction Methods 0.000 description 7
- 238000003745 diagnosis Methods 0.000 description 7
- 238000009434 installation Methods 0.000 description 6
- 239000002994 raw material Substances 0.000 description 6
- 238000011084 recovery Methods 0.000 description 5
- 230000002159 abnormal effect Effects 0.000 description 4
- 238000004364 calculation method Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000005303 weighing Methods 0.000 description 3
- MYMOFIZGZYHOMD-UHFFFAOYSA-N Dioxygen Chemical compound O=O MYMOFIZGZYHOMD-UHFFFAOYSA-N 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 229910001882 dioxygen Inorganic materials 0.000 description 2
- 238000007599 discharging Methods 0.000 description 2
- 239000003792 electrolyte Substances 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 238000009423 ventilation Methods 0.000 description 2
- 238000010438 heat treatment Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 238000000629 steam reforming Methods 0.000 description 1
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
本発明は、エネルギ料金を表示可能な分散型発電システム及びエネルギ料金表示方法に関する。 The present invention relates to a distributed power generation system capable of displaying an energy charge and an energy charge display method.
特許文献1には、ホスト装置がコージェネレーションシステム等の発電装置を遠隔監視することで、故障診断、保守、点検、整備などを行えるようにしている技術が開示されている。特許文献1では、複数の発電装置それぞれに対応して端末装置が設けられており、各発電装置の運転状況を各端末装置がホスト装置に送信する。ホスト装置は、各端末装置から送信された運転状況に基づいて、各コージェネレーションシステムの状態を判断する。これにより、各発電装置の故障等の判断を適切かつ経済的に行うことができる。 Patent Document 1 discloses a technique in which a host device remotely monitors a power generation device such as a cogeneration system to perform failure diagnosis, maintenance, inspection, maintenance, and the like. In Patent Document 1, terminal devices are provided corresponding to each of the plurality of power generation devices, and each terminal device transmits the operating status of each power generation device to the host device. The host device determines the state of each cogeneration system based on the operating status transmitted from each terminal device. As a result, it is possible to appropriately and economically determine the failure of each power generation device.
特許文献1では、各発電装置の故障等をホスト装置により検出できるものの、故障が発生した場合のユーザの対応方法については検討されていない。
例えば、発電装置に故障が発生した場合には、最初の手続きとして、当該発電装置が設置されているユーザ宅にサービスマンが訪問し、発電装置を診断する。この場合、サービスマンによる訪問と、故障箇所及び状態等の診断に応じて訪問費用が発生する。さらに、診断の結果、修理が必要な場合には修理料金がサービスマンから提示される。このように発電装置が故障した場合には、ユーザが修理に伴う手続きを行うか否かを選択する基準を与えられることなく、また、発電装置の修理を行うか否かに関わらず、サービスマンの訪問等に応じて訪問費用を払わなければならない。さらに、サービスマンの訪問の手続きを経なければ修理料金を把握することができない。よって、ユーザの利便性が考慮されていない側面がある。
In Patent Document 1, although a failure of each power generation device can be detected by a host device, a method of dealing with the user when a failure occurs has not been studied.
For example, when a failure occurs in a power generation device, a serviceman visits the user's house where the power generation device is installed and diagnoses the power generation device as the first procedure. In this case, a visit fee is incurred according to the visit by the service person and the diagnosis of the faulty part and the condition. Furthermore, as a result of the diagnosis, if repair is necessary, the repair fee will be presented by the serviceman. When the power generation device breaks down in this way, the serviceman is not given the criteria for selecting whether or not to carry out the repair procedure, and regardless of whether or not the power generation device is repaired. You have to pay the visit fee according to your visit. Furthermore, the repair fee cannot be ascertained without going through the procedure of visiting the serviceman. Therefore, there is an aspect that the convenience of the user is not considered.
また、発電装置を管理する側にとっても、ユーザが修理をするか否かに関わらず、サービスマンによる訪問、故障箇所及び状態等の診断の作業が発生し、煩雑である。 Further, the management side of the power generation device is also complicated because the serviceman visits the power generation device and diagnoses the faulty part and the state regardless of whether or not the user repairs the power generation device.
そこで、本発明は上述の課題に鑑みてなされたものであり、発電装置が故障した場合において、ユーザが修理に伴う手続きを行うか否かを選択する基準を提供することを目的とする。 Therefore, the present invention has been made in view of the above-mentioned problems, and an object of the present invention is to provide a standard for a user to select whether or not to perform a procedure for repair in the event of a failure of a power generation device.
本発明は、分散型発電装置と、前記分散型発電装置の運転を制御する制御装置と、熱源機とを備える分散型発電システムであって、その特徴構成は、
前記制御装置は、
前記分散型発電装置における故障の有無を検出する故障検出部と、
前記分散型発電装置において故障が発生すると、前記分散型発電装置を停止させ、前記熱源機を単独利用する場合における、ガス及び電気の少なくともいずれかを含むエネルギの消費量に対する費用である予測の第1エネルギ料金を表示部に表示するように制御する表示制御部とを有する点にある。
The present invention is a distributed power generation system including a distributed power generation device, a control device for controlling the operation of the distributed power generation device, and a heat source machine.
The control device
A failure detection unit that detects the presence or absence of a failure in the distributed power generation device, and
When a failure occurs in the distributed power generation device, the cost for energy consumption including at least one of gas and electricity when the distributed power generation device is stopped and the heat source device is used alone is the first prediction. 1 It has a display control unit that controls the energy charge to be displayed on the display unit.
上記特徴構成によれば、ユーザは、分散型発電装置において故障が発生すると、分散型発電装置を停止させ、熱源機を単独利用する場合の第1エネルギ料金を把握することができる。よって、ユーザは、修理に伴う手続きを行うか否かを選択する基準として第1エネルギ料金を得ることができるため、ユーザの利便性が向上する。 According to the above-mentioned feature configuration, when a failure occurs in the distributed power generation device, the user can stop the distributed power generation device and grasp the first energy charge when the heat source device is used independently. Therefore, the user can obtain the first energy charge as a criterion for selecting whether or not to perform the procedure associated with the repair, which improves the convenience of the user.
また、分散型発電装置の故障の修理をユーザが望む場合であっても望まない場合であってもサービスマンによる訪問と、故障箇所及び状態の診断等に応じて訪問費用が発生していたが、上記構成によれば、ユーザは訪問費用を支払うことなくエネルギ料金を確認可能である。
なお、第1エネルギ料金とは、分散型発電システムにおいて熱源機を単独利用した場合における、施設におけるガス及び電気の少なくともいずれかを含む予測のエネルギの料金である。
In addition, regardless of whether the user wants or does not want to repair the failure of the distributed power generation device, a visit by a serviceman and a visit fee are incurred depending on the diagnosis of the failure location and condition. According to the above configuration, the user can check the energy charge without paying the visit fee.
The first energy charge is a predicted energy charge including at least one of gas and electricity in the facility when the heat source unit is used alone in the distributed power generation system.
熱源機を単独利用すると、分散型発電装置の発電電力を施設内で利用し、系統電力を購入しないことにより享受していた利益、発電電力を逆潮することにより得ていた利益、分散型発電装置を利用することで系統電力からの買電電力の価格が安くなっていた利益、分散型発電装置を利用することでガス会社から購入するガス料金の価格が安くなっていた利益等が得られなくなる。ユーザはこれらの点等を考慮し、第1エネルギ料金を参照して修理を行うか否かを判断できる。また、第1エネルギ料金を分散型発電装置及び熱源機の少なくともいずれかを新品に交換するか否かの基準としてもよい。 When the heat source unit is used alone, the power generated by the distributed power generation device is used in the facility, and the profits enjoyed by not purchasing the grid power, the profits obtained by reversing the generated power, and the distributed power generation By using the equipment, the profit that the price of electricity purchased from the grid power was cheaper, and by using the distributed power generation equipment, the profit that the price of the gas charge purchased from the gas company was cheaper can be obtained. It disappears. In consideration of these points and the like, the user can determine whether or not to perform the repair by referring to the first energy charge. Further, the first energy charge may be used as a criterion for whether or not at least one of the distributed power generation device and the heat source device is replaced with a new one.
例えば、ユーザは、修理をしなければ第1エネルギ料金分の支払いが生じるが、修理料金を支払って修理をすることで上述の各種利益を得ることができ、修理料金を回収できるか否か等の判断ができる。
さらに、分散型発電装置を管理する側にとっても、修理を行うか否かのユーザの判断に基づいて作業を行える。よって、修理をするか否かが不明な時点で、故障等が発生した分散型発電装置が設置された施設への訪問、故障箇所の診断等の煩雑な作業を削減することができる。
For example, if the user does not repair, the first energy fee will be paid, but by paying the repair fee and repairing, the above-mentioned various benefits can be obtained, and whether or not the repair fee can be recovered, etc. Can be judged.
Further, the side managing the distributed power generation device can also perform the work based on the user's judgment as to whether or not to perform the repair. Therefore, when it is unclear whether or not to repair, it is possible to reduce complicated work such as visiting a facility where a distributed power generation device in which a failure has occurred is installed and diagnosing a failure location.
本発明に係る分散型発電システムの更なる特徴構成は、
前記第1エネルギ料金は、第2エネルギ料金表とは異なる第1エネルギ料金表に基づいており、
前記第1エネルギ料金表は、前記分散型発電装置を停止させ、前記熱源機を単独利用する場合におけるガス及び電気の少なくともいずれかを含むエネルギの料金表であり、
前記第2エネルギ料金表は、前記分散型発電装置を運転させ、前記熱源機が前記分散型発電装置からの熱を利用している場合におけるガス及び電気の少なくともいずれかを含むエネルギの料金表である点にある。
Further characteristic configurations of the distributed power generation system according to the present invention are:
The first energy charge is based on a first energy charge table different from the second energy charge table.
The first energy price list is a price list of energy including at least one of gas and electricity when the distributed power generation device is stopped and the heat source machine is used alone.
The second energy price list is a price list of energy including at least one of gas and electricity when the distributed power generation device is operated and the heat source machine uses heat from the distributed power generation device. There is a certain point.
分散型発電装置を運転させて熱源機を運転している場合と、分散型発電装置を停止させて熱源機を単独利用している場合とでは、エネルギ料金表が異なる場合がある。上記特徴構成によれば、第1エネルギ料金は、分散型発電装置を停止させて熱源機を運転している場合の第1エネルギ料金表に基づいているため、より正確に算出される。 The energy price list may differ depending on whether the distributed power generation device is operated to operate the heat source unit or the distributed power generation device is stopped and the heat source unit is used independently. According to the above feature configuration, the first energy charge is calculated more accurately because it is based on the first energy charge table when the distributed power generation device is stopped and the heat source unit is operated.
本発明に係る分散型発電システムの更なる特徴構成は、
前記表示制御部は、前記制御装置と通信可能に接続され、前記分散型発電装置の運転状態を管理するシステムサーバから前記第1エネルギ料金を受信し、当該第1エネルギ料金を前記表示部に表示するように制御する点にある。
Further characteristic configurations of the distributed power generation system according to the present invention are:
The display control unit is communicably connected to the control device, receives the first energy charge from a system server that manages the operating state of the distributed power generation device, and displays the first energy charge on the display unit. It is in the point of controlling to do so.
上記特徴構成によれば、分散型発電装置を停止させ、熱源機を単独利用する場合の第1エネルギ料金をシステムサーバから取得して表示できる。システムサーバは、例えば、第1エネルギ料金表を保持しており、これに基づいて第1エネルギ料金を算出している。あるいは、システムサーバは、例えば、ガス及び電気を含むエネルギの販売会社のエネルギ会社サーバから第1エネルギ料金表を取得して第1エネルギ料金を算出している。 According to the above-mentioned feature configuration, the first energy charge when the distributed power generation device is stopped and the heat source unit is used independently can be acquired from the system server and displayed. The system server holds, for example, a first energy charge table, and calculates the first energy charge based on the first energy charge table. Alternatively, the system server obtains the first energy charge table from the energy company server of the energy company that sells energy including gas and electricity, and calculates the first energy charge.
本発明に係る分散型発電システムの更なる特徴構成は、
前記表示制御部は、前記熱源機を含む施設にエネルギを供給するエネルギ会社に設けられ、前記制御装置と通信可能に接続されたエネルギ会社サーバから前記第1エネルギ料金を取得し、当該第1エネルギ料金を前記表示部に表示するように制御する点にある。
Further characteristic configurations of the distributed power generation system according to the present invention are:
The display control unit is provided in an energy company that supplies energy to a facility including the heat source unit, acquires the first energy charge from an energy company server communicably connected to the control device, and obtains the first energy charge. The point is to control the charge to be displayed on the display unit.
上記特徴構成によれば、表示制御部は、エネルギ会社サーバから第1エネルギ料金を取得して表示できる。エネルギ会社サーバは、例えば、エネルギ使用量ごとに第1エネルギ料金が対応付けられた第1エネルギ料金表を有しており、第1エネルギ料金表に基づいて第1エネルギ料金を算出している。 According to the above feature configuration, the display control unit can acquire the first energy charge from the energy company server and display it. The energy company server has, for example, a first energy charge table in which the first energy charge is associated with each energy usage amount, and calculates the first energy charge based on the first energy charge table.
本発明に係る分散型発電システムの更なる特徴構成は、
前記制御装置は、
前記分散型発電装置を停止させ、前記熱源機を単独利用する場合におけるガス及び電気の少なくともいずれかを含むエネルギの料金表である第1エネルギ料金表を記憶するエネルギ料金表記憶部と、
前記第1エネルギ料金表に基づいて、前記エネルギの消費量に応じた第1エネルギ料金を取得するエネルギ料金取得部とを有し、
前記表示制御部は、前記エネルギ料金取得部から前記第1エネルギ料金を取得し、当該第1エネルギ料金を前記表示部に表示するように制御する点にある。
Further characteristic configurations of the distributed power generation system according to the present invention are:
The control device
An energy charge table storage unit that stores a first energy charge table which is an energy charge table including at least one of gas and electricity when the distributed power generation device is stopped and the heat source unit is used independently.
Based on the first energy charge table, it has an energy charge acquisition unit that acquires the first energy charge according to the energy consumption.
The display control unit acquires the first energy charge from the energy charge acquisition unit and controls the display to display the first energy charge on the display unit.
上記特徴構成によれば、制御装置は、第1エネルギ料金表を有しているため、第1エネルギ料金を容易に取得して表示することができる。 According to the above-mentioned feature configuration, since the control device has the first energy charge table, the first energy charge can be easily acquired and displayed.
本発明に係る分散型発電システムの更なる特徴構成は、
前記表示制御部は、故障が発生した分散型発電装置を修理した場合において、修理した分散型発電装置を運転させ、前記熱源機が修理した分散型発電装置からの熱を利用している場合における、ガス及び電気の少なくともいずれかを含むエネルギの消費量に対する費用である予測の第2エネルギ料金を前記表示部に表示するように制御する点にある。
Further characteristic configurations of the distributed power generation system according to the present invention are:
When the display control unit repairs the distributed power generation device in which the failure has occurred, the repaired distributed power generation device is operated, and the heat source machine uses the heat from the repaired distributed power generation device. A second energy charge, which is a cost for energy consumption including at least one of gas and electricity, is controlled to be displayed on the display unit.
上記特徴構成によれば、ユーザは、故障が発生した分散型発電装置を修理せずに熱源機を単独利用した場合の第1エネルギ料金だけでなく、故障が発生した分散型発電装置を修理し、修理した分散型発電装置を運転させ、修理した分散型発電装置の発電運転による熱を熱源機が利用している場合の第2エネルギ料金を把握することができる。よって、ユーザは、第1エネルギ料金と第2エネルギ料金とを比較衡量して、分散型発電装置を修理して再利用するのか、あるいは、分散型発電装置を停止させ、熱源機を単独利用するのかを判断でき、ユーザの利便性が向上する。 According to the above feature configuration, the user repairs not only the first energy charge when the heat source unit is used alone without repairing the distributed power generation device in which the failure has occurred, but also the distributed power generation device in which the failure has occurred. , The repaired distributed power generation device is operated, and the second energy charge when the heat source machine uses the heat generated by the power generation operation of the repaired distributed power generation device can be grasped. Therefore, the user either repairs and reuses the distributed power generation device by weighing the first energy charge and the second energy charge, or stops the distributed power generation device and uses the heat source unit independently. It is possible to judge whether it is, and the convenience of the user is improved.
また、第1及び第2エネルギ料金が表示されることで、第1エネルギ料金及び第2エネルギ料金を比較衡量して、ユーザは、修理に伴う手続きを行うか否かを選択できる。つまり、ユーザは、修理をしない場合は第1エネルギ料金分の支払いが生じ、修理をした場合は修理料金及び第2エネルギ料金分の支払いが生じることが分かる。一般的に第2エネルギ料金の方が第1エネルギ料金よりも安いため、修理料金を払って修理を行っても、修理料金を回収できるか否か等の判断ができる。
また、第2エネルギ料金を分散型発電装置及び熱源機の少なくともいずれかを新品に交換するか否かの基準としてもよい。
Further, by displaying the first and second energy charges, the user can select whether or not to perform the procedure associated with the repair by weighing the first energy charge and the second energy charge. That is, it can be seen that the user pays the first energy fee if the repair is not performed, and pays the repair fee and the second energy fee if the repair is performed. Since the second energy charge is generally cheaper than the first energy charge, it is possible to judge whether or not the repair charge can be recovered even if the repair is performed by paying the repair charge.
Further, the second energy charge may be used as a criterion for whether or not at least one of the distributed power generation device and the heat source device is replaced with a new one.
本発明に係る分散型発電システムの更なる特徴構成は、
前記表示制御部は、前記制御装置と通信可能に接続され、前記分散型発電装置の運転状態を管理するシステムサーバから前第2エネルギ料金を受信し、当該第2エネルギ料金を前記表示部に表示するように制御する点にある。
Further characteristic configurations of the distributed power generation system according to the present invention are:
The display control unit is communicably connected to the control device, receives a front second energy charge from a system server that manages the operating state of the distributed power generation device, and displays the second energy charge on the display unit. It is in the point of controlling to do so.
上記特徴構成によれば、第2エネルギ料金をシステムサーバから取得して表示できる。
システムサーバは、例えば、第2エネルギ料金表を保持しており、これに基づいて第2エネルギ料金を算出している。あるいは、システムサーバは、例えば、ガス及び電気を含むエネルギの販売会社であるエネルギ会社のエネルギ会社サーバから第2エネルギ料金を取得している。
According to the above feature configuration, the second energy charge can be acquired from the system server and displayed.
The system server holds, for example, a second energy charge table, and calculates the second energy charge based on the second energy charge table. Alternatively, the system server obtains a second energy charge from, for example, an energy company server of an energy company that sells energy including gas and electricity.
本発明に係る分散型発電システムの更なる特徴構成は、
前記表示制御部は、前記熱源機を含む施設にエネルギを供給するエネルギ会社に設けられ、前記制御装置と通信可能に接続されたエネルギ会社サーバから前記第2エネルギ料金を取得し、当該第2エネルギ料金を前記表示部に表示するように制御する点にある。
Further characteristic configurations of the distributed power generation system according to the present invention are:
The display control unit is provided in an energy company that supplies energy to a facility including the heat source unit, acquires the second energy charge from an energy company server communicably connected to the control device, and obtains the second energy charge. The point is to control the charge to be displayed on the display unit.
上記特徴構成によれば、表示制御部は、エネルギ会社サーバから第2エネルギ料金を取得して表示できる。エネルギ会社サーバは、例えば、エネルギ使用量ごとにエネルギ料金が対応付けられた第2エネルギ料金表を有しており、第2エネルギ料金表に基づいて第2エネルギ料金を算出している。 According to the above feature configuration, the display control unit can acquire the second energy charge from the energy company server and display it. The energy company server has, for example, a second energy charge table in which energy charges are associated with each energy usage amount, and calculates the second energy charge based on the second energy charge table.
本発明に係る分散型発電システムの更なる特徴構成は、
前記制御装置は、
前記分散型発電装置を運転させ、前記熱源機が前記分散型発電装置からの熱を利用している場合におけるガス及び電気を含むエネルギの料金表である第2エネルギ料金表を記憶するエネルギ料金表記憶部と、
前記第2エネルギ料金表に基づいて、前記エネルギの消費量に応じた第2エネルギ料金を取得するエネルギ料金取得部とを有し、
前記表示制御部は、前記エネルギ料金取得部から前記第2エネルギ料金を取得し、当該第2エネルギ料金を前記表示部に表示するように制御する点にある。
Further characteristic configurations of the distributed power generation system according to the present invention are:
The control device
An energy price list that stores a second energy price list, which is a price list of energy including gas and electricity when the distributed power generation device is operated and the heat source machine uses heat from the distributed power generation device. Memory and
Based on the second energy charge table, it has an energy charge acquisition unit that acquires a second energy charge according to the amount of energy consumed.
The display control unit acquires the second energy charge from the energy charge acquisition unit and controls the display to display the second energy charge on the display unit.
上記特徴構成によれば、制御装置は、第2エネルギ料金表を有しているため、第2エネルギ料金を容易に取得して表示することができる。 According to the above-mentioned feature configuration, since the control device has the second energy charge table, the second energy charge can be easily acquired and displayed.
本発明に係る分散型発電システムの更なる特徴構成は、
前記第2エネルギ料金は、前記分散型発電システムが設置されている施設における、過去のガス及び電気の少なくともいずれかを含むエネルギの利用実績に基づいて予測されている点にある。
Further characteristic configurations of the distributed power generation system according to the present invention are:
The second energy charge is predicted based on the past record of energy utilization including at least one of gas and electricity in the facility where the distributed power generation system is installed.
上記特徴構成によれば、第2エネルギ料金は、過去のエネルギの利用実績に基づいて予測されているため、施設における将来の実態により即した値となっている。 According to the above characteristic configuration, the second energy charge is predicted based on the past energy usage record, and therefore is a value more suitable for the future actual condition of the facility.
本発明に係る分散型発電システムのさらなる特徴構成は、
前記表示制御部は、故障が発生した分散型発電装置から新たな分散型発電装置に交換した場合において、新たな分散型発電装置を運転させ、既存の熱源機が新たな分散型発電装置からの熱を利用している場合における、又は、故障が発生した分散型発電装置及び既存の熱源機から新たな分散型発電装置及び新たな熱源機に交換した場合において、新たな分散型発電装置を運転させ、新たな熱源機が新たな分散型発電装置からの熱を利用している場合における、ガス及び電気の少なくともいずれかを含むエネルギの消費量に対する費用である予測の第3エネルギ料金を前記表示部に表示するように制御する点にある。
Further characteristic configurations of the distributed power generation system according to the present invention are
When the distributed power generation device in which a failure has occurred is replaced with a new distributed power generation device, the display control unit operates the new distributed power generation device, and the existing heat source unit is released from the new distributed power generation device. Operate a new distributed power generation device when heat is used, or when a failed distributed power generation device or an existing heat source device is replaced with a new distributed power generation device or a new heat source device. The third energy charge, which is the cost for the energy consumption including at least one of gas and electricity, when the new heat source machine uses the heat from the new distributed power generator, is displayed above. The point is to control so that it is displayed on the unit.
上記特徴構成によれば、ユーザは、新たな分散型発電装置に交換した場合、又は、新たな分散型発電装置及び新たな熱源機に交換した場合において、新たな分散型発電装置を運転させて既存の熱源機又は新たな熱源機に熱を利用させている場合における第3エネルギ料金を把握することができる。一般的に新たな分散型発電装置は発電効率が良く、また新たな熱源機はエネルギ効率が良いため、ガス使用量及び電気使用量を抑制できる。よって、第3エネルギ料金は、経年劣化した分散型発電装置及び熱源機を使用した場合のエネルギ料金よりも安くなる。よって、ユーザは、第3エネルギ料金が提示されることで、交換によりこれまでよりもエネルギ料金がどの程度安くなるかを把握することができる。
また、熱源機を単独利用した場合の第1エネルギ料金、及び、故障した分散型発電装置を修理して運転させ、修理した分散型発電装置の発電運転による熱を熱源機が利用している場合の第2エネルギ料金、新たな分散型発電装置及び熱源機に交換した場合の第3エネルギ料金がユーザに提示される場合には、ユーザは、第1〜第3エネルギ料金を比較衡量できる。これにより、分散型発電装置を修理して再利用するのか、分散型発電装置を停止させ、熱源機を単独利用するのか、新たな分散型発電装置に交換するのか、あるいは、新たな分散型発電装置及び熱源機に交換するのかを判断でき、ユーザの利便性が向上する。なお、修理料金がユーザに提示されると、ユーザの利便性をより一層向上できる。
According to the above-mentioned feature configuration, the user operates the new distributed power generation device when the user replaces the new distributed power generation device with a new distributed power generation device or a new distributed power generation device and a new heat source device. It is possible to grasp the third energy charge when the heat is used by the existing heat source machine or the new heat source machine. In general, the new distributed power generation device has good power generation efficiency, and the new heat source machine has good energy efficiency, so that the amount of gas and electricity used can be suppressed. Therefore, the third energy charge is lower than the energy charge when the distributed power generation device and the heat source machine that have deteriorated over time are used. Therefore, the user can grasp how much the energy charge will be cheaper than before by the exchange by presenting the third energy charge.
In addition, when the heat source machine uses the first energy charge when the heat source machine is used alone, and the heat generated by the power generation operation of the repaired distributed power generation device after repairing and operating the failed distributed power generation device. When the second energy charge of the above, the third energy charge when replaced with a new distributed power generation device and the heat source unit is presented to the user, the user can weigh the first to third energy charges. As a result, the distributed power generation device can be repaired and reused, the distributed power generation device can be stopped and the heat source unit can be used independently, the new distributed power generation device can be replaced, or a new distributed power generation device can be used. It is possible to determine whether to replace the device and the heat source machine, which improves user convenience. If the repair fee is presented to the user, the convenience of the user can be further improved.
本発明に係る分散型発電システムのさらなる特徴構成は、
前記表示制御部は、故障が発生した分散型発電装置から新たな分散型発電装置に交換した場合における費用、又は、故障が発生した分散型発電装置及び既存の熱源機から新たな分散型発電装置及び新たな熱源機に交換した場合における費用である交換料金を前記表示部に表示するように制御する点にある。
Further characteristic configurations of the distributed power generation system according to the present invention are
The display control unit is the cost of replacing the failed distributed power generation device with a new distributed power generation device, or the new distributed power generation device from the failed distributed power generation device and the existing heat source device. The point is that the replacement fee, which is the cost when the machine is replaced with a new heat source machine, is controlled to be displayed on the display unit.
上記特徴構成によれば、ユーザは、新たな分散型発電装置に交換した場合、又は、新たな分散型発電装置及び新たな熱源機に交換した場合における交換料金を把握することができる。
第1〜第3エネルギ料金、交換料金がユーザに提示される場合には、ユーザは、第1〜第3エネルギ料金、交換料金を比較衡量できる。これにより、分散型発電装置を修理して再利用するのか、分散型発電装置を停止させ、熱源機を単独利用するのか、あるいは新たな分散型発電装置及び熱源機に交換するのかを判断でき、ユーザの利便性が向上する。なお、修理料金がユーザに提示されると、ユーザの利便性をより一層向上できる。
According to the above-mentioned feature configuration, the user can grasp the replacement fee when the replacement is made with a new distributed power generation device or when the replacement is made with a new distributed power generation device and a new heat source device.
When the first to third energy charges and exchange charges are presented to the user, the user can weigh the first to third energy charges and exchange charges. This makes it possible to determine whether to repair and reuse the distributed power generator, stop the distributed power generator and use the heat source unit alone, or replace it with a new distributed power generator and heat source unit. User convenience is improved. If the repair fee is presented to the user, the convenience of the user can be further improved.
本発明は、分散型発電装置と、前記分散型発電装置の運転を制御する制御装置と、熱源機とを備える分散型発電システムにおけるエネルギ料金表示方法であって、その特徴構成は、
前記制御装置が、
前記分散型発電装置における故障の有無を検出するステップと、
前記分散型発電装置において故障が発生すると、前記分散型発電装置を停止させ、前記熱源機を単独利用する場合における、ガス及び電気の少なくともいずれかを含むエネルギの消費量に対する費用である予測の第1エネルギ料金を表示部に表示するように制御するステップとを有する点にある。
The present invention is an energy charge display method in a distributed power generation system including a distributed power generation device, a control device for controlling the operation of the distributed power generation device, and a heat source machine, and the characteristic configuration thereof is as follows.
The control device
A step of detecting the presence or absence of a failure in the distributed power generation device, and
When a failure occurs in the distributed power generation device, the cost for energy consumption including at least one of gas and electricity when the distributed power generation device is stopped and the heat source device is used alone is the first prediction. 1 It has a step of controlling the energy charge to be displayed on the display unit.
〔実施形態〕
以下に、本発明の実施形態に係る分散型発電システムについて説明する。本実施形態に係る分散型発電システムに備えられた分散型発電装置において故障が発生すると、分散型発電装置を継続して使用する場合及び停止する場合において熱源機及び各種機器が必要とするエネルギのエネルギ料金を表示部に表示する。ユーザは、エネルギ料金が表示されることで、修理に伴う手続きを行うか否かを選択する基準を得ることができるため、ユーザの利便性が向上する。また、ユーザは、エネルギ料金を、分散型発電装置及び熱源機の少なくともいずれかを新品に交換するか否かの基準とすることもできる。
[Embodiment]
The distributed power generation system according to the embodiment of the present invention will be described below. When a failure occurs in the distributed power generation device provided in the distributed power generation system according to the present embodiment, the energy required by the heat source machine and various devices when the distributed power generation device is continuously used or stopped is generated. The energy charge is displayed on the display. By displaying the energy charge, the user can obtain a criterion for selecting whether or not to carry out the procedure associated with the repair, which improves the convenience of the user. The user can also use the energy charge as a criterion for replacing at least one of the distributed power generator and the heat source unit with a new one.
(1)分散型発電システムの構成
図1に示すように、分散型発電システム1には、後述の分散型発電装置20(20a、20b・・・)をそれぞれ有する複数の施設3(3a、3b・・・)と、各施設3の分散型発電装置20の運転状態等を管理するシステムサーバ5と、各施設3にガス及び電気等のエネルギを供給するエネルギ会社9とが含まれる。
(1) Configuration of Distributed Power Generation System As shown in FIG. 1, the distributed power generation system 1 has a plurality of facilities 3 (3a, 3b) each having distributed power generation devices 20 (20a, 20b ...) described later. ...), A
分散型発電装置20(20a、20b・・・)の制御装置10(10a、10b・・・)と、システムサーバ5と、エネルギ会社9のエネルギ会社サーバ90とは、ネットワーク8を介して通信可能に接続されている。
以下、施設3a、3b・・・を総称する場合は施設3という。また、後述の制御装置10、分散型発電装置20、熱源機30及び各種機器40が施設3a内に含まれる場合は、符号番号に添え字aを付し、これらの構成の符号は各施設3において同様に付される。
The control device 10 (10a, 10b ...) Of the distributed power generation device 20 (20a, 20b ...), The
Hereinafter, the
(a)施設
施設3は、燃料ガス及び空気等の供給を受けて発電を行う分散型発電装置20と、熱源機30と、家電機器等の各種機器40と、分散型発電装置20、熱源機30及び各種機器40の運転及び運転状況の把握等を行う制御装置10とを有している。制御装置10、分散型発電装置20、熱源機30及び各種機器40については後述する。
(A)
(b)エネルギ会社
エネルギ会社9は、各施設3とガス管及び電線等の供給ライン92を介して接続されており、各施設に系統電力等の電力及び都市ガス等のガスを含むエネルギを供給する。エネルギ会社9は、エネルギ会社9内での各種データの管理、外部との通信等を管理するエネルギ会社サーバ90を有している。エネルギ会社サーバ90は、エネルギ会社制御部90aと、エネルギ会社9が供給するガス及び電気等のエネルギ量とエネルギ料金とが対応付けられたエネルギ料金表を記憶しているエネルギ料金表DB90b(エネルギ料金表記憶部)とを有している(ここで、DBはデータベースを意味する。以下同様。)。エネルギ会社制御部90aは、エネルギ料金が外部から要求された場合には、エネルギ料金表DB90bから当該要求に対するエネルギ料金を読み出し、外部に送信する。
(B) Energy company The energy company 9 is connected to each
エネルギ料金表DB90bは、図2、図3に示すガスの使用量と料金との関係であるガス料金表(エネルギ料金表)を記憶している。図2は、熱源機30を単独利用する場合における、ガス使用量と第1ガス料金(第1エネルギ料金)との関係を示す第1エネルギ料金表である。図2の第1エネルギ料金表では、ガス使用量と、基本料金及び単位料金を含む第1ガス料金とが対応付けられている。
一方、図3は、分散型発電装置20を運転させ、熱源機30が分散型発電装置20からの熱を利用する場合における、ガス使用量と第2ガス料金(第2エネルギ料金)との関係を示す第2エネルギ料金表である。図3の第2エネルギ料金表では、ガス使用量と、基本料金及び単位料金を含む第2ガス料金とが対応付けられている。
The energy charge table DB 90b stores a gas charge table (energy charge table) which is a relationship between the amount of gas used and the charge shown in FIGS. 2 and 3. FIG. 2 is a first energy charge table showing the relationship between the amount of gas used and the first gas charge (first energy charge) when the
On the other hand, FIG. 3 shows the relationship between the amount of gas used and the second gas charge (second energy charge) when the distributed
ガス使用量が0m3から20m3までは、図2の第1エネルギ料金表では、第1ガス料金の基本料金は750円であり単位料金は1m3あたり190円である。一方、図3の第2エネルギ料金表では、ガス使用量が0m3から20m3までは、第2ガス料金の基本料金は700円であり単位料金は1m3あたり150円である。よって、エネルギとしてガスを利用し、熱源機30を単独利用する場合の第1エネルギ料金は、熱源機30が分散型発電装置20からの熱を利用する場合の第2エネルギ料金よりも割高である。
When the amount of gas used is from 0 m 3 to 20 m 3 , the basic charge for the first gas charge is 750 yen and the unit charge is 190 yen per 1 m 3 in the first energy charge table in FIG. On the other hand, in the second energy charge table of FIG. 3, when the gas usage amount is from 0 m 3 to 20 m 3 , the basic charge of the second gas charge is 700 yen and the unit charge is 150 yen per 1 m 3 . Therefore, the first energy charge when gas is used as energy and the
また、エネルギ料金表DB90bは、図4、図5に示す電気の使用量と料金との関係である電気料金表(エネルギ料金表)を記憶している。図4は、熱源機30を単独利用する場合における、電気使用量と第1電気料金(第1エネルギ料金)との関係を示す第1エネルギ料金表である。一方、図5は、分散型発電装置20を運転させ、熱源機30が分散型発電装置20からの熱を利用する場合における、電気使用量と第2電気料金(第2エネルギ料金)との関係を示す第2エネルギ料金表である。
Further, the energy charge table DB 90b stores an electricity charge table (energy charge table) which is a relationship between the amount of electricity used and the charge shown in FIGS. 4 and 5. FIG. 4 is a first energy charge table showing the relationship between the amount of electricity used and the first electricity charge (first energy charge) when the
電気使用量が0〜15kWhまでは、図4の第1エネルギ料金表では、第1電気料金は280円であり、一方、図5の第2エネルギ料金表では、電気使用量が0〜15kWhまでは、第2電気料金は250円である。よって、エネルギとして電気を利用し、熱源機30を単独利用する場合の第1エネルギ料金は、熱源機30が分散型発電装置20からの熱を利用する場合の第2エネルギ料金よりも割高である。
When the amount of electricity used is 0 to 15 kWh, the first electricity charge is 280 yen in the first energy charge table of FIG. 4, while the amount of electricity used is up to 0 to 15 kWh in the second energy charge table of FIG. The second electricity charge is 250 yen. Therefore, the first energy charge when electricity is used as energy and the
(c)システムサーバ
システムサーバ5は、各分散型発電装置20の発電電力量及び故障の有無などの各種運転状態等の管理及びエネルギ料金等を管理している。また、システムサーバ5は、エネルギ料金取得部5b及びエネルギ使用履歴DB5cを有している。
エネルギ使用履歴DB5cは、図6に示すように、ある一の施設3における過去のエネルギ使用履歴を記憶しており、一例として、ガス及び電気の年間のエネルギ使用量が各年度毎に記憶されている。エネルギ使用履歴DB5cは、複数の施設3ごとに同様のエネルギ使用履歴を記憶している。
(C) System server The
As shown in FIG. 6, the energy
エネルギ料金取得部5bは、エネルギ使用履歴DB5c内のエネルギ使用履歴とエネルギ料金表とに応じて、予測のエネルギ料金として第1エネルギ料金及び第2エネルギ料金の少なくともいずれかを取得する。
なお、前述の通り、第1エネルギ料金は、熱源機30を単独利用する場合のエネルギ料金であり、第1ガス料金及び第1電気料金等を含む。また、第2エネルギ料金は、一般的には、分散型発電装置20を運転し、熱源機30が分散型発電装置20からの熱を利用する場合のエネルギ料金であり、第2ガス料金及び第2電気料金等を含む。
The energy
As described above, the first energy charge is an energy charge when the
さらに説明すると、故障検出部11が分散型発電装置20の故障箇所を特定すると、エネルギ料金取得部5bは、当該故障箇所を有する分散型発電装置20が備えられた施設のエネルギ使用履歴をエネルギ使用履歴DB5c内から読み出す。読み出すエネルギ使用履歴DB5cとしては、前年分のエネルギ使用履歴、複数年分のエネルギ使用履歴の平均値等が挙げられる。そして、エネルギ料金取得部5bは、当該エネルギ使用履歴をエネルギ会社制御部90aに送信し、エネルギ使用履歴に応じた予測のエネルギ料金を要求する。
Further explaining, when the
エネルギ会社制御部90aは、エネルギ料金表DB90bの第1及び第2エネルギ料金表それぞれに基づいて当該エネルギ使用履歴に基づいた予測の第1及び第2エネルギ料金を算出し、エネルギ料金取得部5bに送信する。エネルギ料金取得部5bは、エネルギ会社制御部90aから当該エネルギ使用履歴に基づいた第1及び第2エネルギ料金を取得し、後述の表示制御部13に送信する。表示制御部13は、エネルギ料金取得部5bから第1及び第2エネルギ料金を受信し、表示部21に表示させる。
The energy
具体的には、第1及び第2エネルギ料金は次のように算出される。
例えば、図6では、2018年のガスの年間使用量は470m3(月平均約39m3)であり、電気の年間使用量は4000kWh(月平均約333kWh)である。
図2の第1ガス料金は、20m3をこえ50m3までは基本料金1400円、単位料金95円であるので、年額は(1400(円)+95(円)×39(m3))×12(カ月)≒61260円である。図4の第1電気料金は、120kWhをこえ350kWhまでは25円であるので、年額は25(円)×333(kWh)×12(カ月)≒99900円である。よって、例えば2019年の年間予測の第1エネルギ料金は、これらの第1ガス料金及び第1電気料金の合計から求められる。
Specifically, the first and second energy charges are calculated as follows.
For example, in FIG. 6, the annual amount of gas used in 2018 is 470 m 3 (monthly average of about 39 m 3 ), and the annual amount of electricity used is 4000 kWh (monthly average of about 333 kWh).
First gas rates of 2, up to 50 m 3 exceed 20 m 3 is the basic charge 1400 yen, since it is 95 yen fee, annual is (1400 (Yen) +95 (yen) × 39 (m 3)) × 12 (Month) ≈ 61260 yen. Since the first electricity charge in FIG. 4 is 25 yen up to 350 kWh over 120 kWh, the annual amount is 25 (yen) x 333 (kWh) x 12 (months) ≈99900 yen. Therefore, for example, the first energy charge for the annual forecast for 2019 is obtained from the sum of these first gas charges and the first electricity charges.
一方、図3の第2ガス料金は、20m3をこえ50m3までは基本料金1200円、単位料金80円であるので、年額は(1200(円)+80(円)×39(m3))×12(カ月)≒51840円である。図5の第2電気料金は、120kWhをこえ350kWhまでは20円であるので、年額は20(円)×333(kWh)×12(カ月)≒79920円である。よって、例えば2019年の年間予測の第2エネルギ料金は、これらの第2ガス料金及び第2電気料金の合計から求められる。
上述の通り、各第1及び第2エネルギ料金は、それぞれに対応して用意されている第1及び第2エネルギ料金表に基づいて算出されるため、より正確に算出される。
On the other hand, the second gas rates in Figure 3, until the 50 m 3 exceed 20 m 3 basic charge 1200 yen, since it is 80 yen fee, annual is (1200 (Yen) +80 (yen) × 39 (m 3)) × 12 (months) ≈ 51840 yen. Since the second electricity charge in FIG. 5 is 20 yen up to 350 kWh over 120 kWh, the annual amount is 20 (yen) x 333 (kWh) x 12 (months) ≈ 79920 yen. Therefore, for example, the second energy charge for the annual forecast for 2019 is obtained from the sum of these second gas charges and the second electricity charge.
As described above, each of the first and second energy charges is calculated based on the first and second energy charge tables prepared corresponding to each, and thus is calculated more accurately.
施設3の各部の構成についてさらに説明する。
(1−2)分散型発電装置
まず、分散型発電装置20について説明する。分散型発電装置20は、図7に示すように、電力発電部130aと、貯湯タンク130bと、電力変換装置120とを備えている。
The configuration of each part of the
(1-2) Distributed Power Generation Device First, the distributed
電力発電部130aは、基本的に、原燃料(例えば、都市ガス13A)を改質した燃料ガス及び酸素ガスを反応させて発電する燃料電池50と、燃料電池50から排出される燃焼排ガスの熱を回収する熱交換器60と、熱交換器60による熱回収後の燃焼排ガスからの凝縮水を回収して精製する水精製器75と、水精製器75により精製された凝縮水を回収する改質水タンク80と、凝縮水とは独立に、改質水タンク80へ水を供給可能な水供給部86と、分散型発電装置20の筐体温度を低下させるための換気ファン66a及び換気ファン66aの実際の回転数を測定する検出器111を含む換気部66とを備えている。
The electric
燃料電池50は、原燃料流路51を介して供給される原燃料を水蒸気改質して燃料ガスを生成する改質器52と、燃料ガス流路53を介して改質器52で生成された燃料ガスが供給されるアノード55と、空気流路54を介して空気(酸素ガスの一例)が供給されるカソード56と、アノード55とカソード56との間に介在させる電解質57と、を有しており、供給された燃料ガス及び空気を反応させて発電するようになっている。そして、これらアノード55、カソード56及び電解質57により1つの燃料電池セル50aが構成されており、そして複数個の燃料電池セル50aによりセルスタックが構成されている。
The
そして、燃料電池50は、アノード55とカソード56とから発電反応に用いられた後にそれぞれ排出される燃料ガス及び空気が供給される燃焼部58を備え、この燃焼部58により燃料ガス中に残存する燃料成分が燃焼されて燃焼排ガスが生じるようになっている。
The
なお、後述するように、改質器52には水供給路82を介して改質水タンク80から水が供給されるようになっており、改質器52は、改質水タンク80からの水を用いて原燃料の水蒸気改質を行うようになっている。
As will be described later, water is supplied to the
また、原燃料流路51には、改質器52に所定量の原燃料を供給するための原燃料ポンプ41が設けられており、検出器101は、原燃料ポンプ41の供給量を測定する。
空気流路54には、カソード56に所定量の空気を供給するための空気ブロア43が設けられており、検出器103は、空気ブロア43が供給する空気の供給量を測定する。
Further, the raw material /
The
熱交換器60には、燃料電池50から排出される燃焼排ガスが排ガス供給路61を介して供給され、熱回収後の燃焼排ガスが排ガス排出路62を介して排気されるようになっている。そして、熱交換器60には、湯水を貯える貯湯タンク130bと熱交換器60との間で湯水を循環させる循環路63を介して貯湯タンク130bからの湯水が供給されるようになっており、熱交換器60は、燃料電池50から排出される燃焼排ガスと湯水とを熱交換させるようになっている。なお、循環路63には、貯湯タンク130bからの湯水を熱交換器60に供給する循環ポンプ64と、放熱ファン65a及び放熱ファン65aの実際の回転数を測定する検出器107を備えるラジエータ65と、図示しない温度センサとが設けられている。また、貯湯タンク130bには、貯湯タンク130b中の湯水を出湯するための出湯路131、及び、湯水の出湯に応じて貯湯タンク130bに給水するための給水路132が設けられている。検出器105は、循環ポンプ64での湯水の供給量を測定する。
The combustion exhaust gas discharged from the
改質水タンク80は、熱交換器60による熱回収後の燃焼排ガスから凝縮水を回収する。また、本実施形態では、改質水タンク80に供給される凝縮水を水精製器75により精製するようになっており、具体的には、排ガス排出路62を流れる燃焼排ガスから凝縮水回収路71を介して凝縮水を水精製器75に回収して、水精製器75により精製された凝縮水が凝縮水回収路81を介して改質水タンク80に回収されるようになっている。改質水タンク80と改質器52との間は、水供給路82及び水供給路85により接続されており、水供給路82と水供給路85との間に設けられた改質水ポンプ83の運転により、改質水タンク80に貯留された凝縮水(及び水供給部86から供給される水)が改質器52に供給可能になっている。改質水タンク80には水位検出器84が設けられており、改質水タンク80における水位を検出可能になっている。
また、改質水タンク80には、凝縮水とは独立に、水供給部86から水を供給可能になっている。
The reforming
Further, water can be supplied to the reforming
さらに、分散型発電装置20は、電力変換装置120を備えている。電力変換装置120は、分散型発電装置20と商用電力系統との間で連系運転可能なように、分散型発電装置20で発電された直流電力の直流電圧を、商用電力系統の商用電力(系統電力)の交流電圧に変換する。また、電力変換装置120には、直流電圧から交流電圧への変換効率を検出する検出器121が設けられている。
Further, the distributed
上述の通り、分散型発電装置20の故障箇所を検出するため、例えば、検出器101、103、105、107、111及び水位検出器84等の検出器が設けられている。後述の故障検出部11は、これらの検出器からの検出結果に基づいて分散型発電装置20の故障箇所を検出する。ただし、これらの検出器はあくまでも一例であり、分散型発電装置20のあらゆる箇所の故障を検出可能なように、その他の各部にも検出器を配置可能である。
As described above, in order to detect the failure location of the distributed
(1−3)熱源機
図1に示すように、貯湯タンク130bからの湯水を出湯する出湯路131は、給水切換三方弁31を介して給湯路133に接続されている。熱源機30は、給湯路133に設けられており、貯湯タンク130bからの湯水の供給を、給水切換三方弁31を介して受ける。給水切換三方弁31は、貯湯タンク130bからの湯水の流量及び給水路132からの給水量を調整可能な弁である。
熱源機30は、給湯路133内を通流する湯水を加熱する熱交換器h、熱交換器hを加熱するバーナb、バーナbに燃焼用空気を供給するファンfを有する。
出湯路131には、貯湯タンク130bから出湯され、出湯路131を通流する湯水の温度を検出する貯湯出口温度センサ(図示せず)が設けられている。また、給湯路133には、熱源機130を出て給湯路133を通流する湯水の温度を検出する給湯温度センサ(図示せず)が設けられている。
(1-3) Heat source machine As shown in FIG. 1, the hot
The
The
熱源機130は、出湯路131を通流する湯水の温度及び給湯路133を通流する湯水の温度等に基づいて、後述の制御装置10の運転制御部22により制御され、給湯路133から所望の温度の湯水を給湯する。
例えば、制御装置10の操作部(図示せず)は、ユーザから給湯路133から給湯される湯水の所望の温度を受け付けている。運転制御部22は、貯湯タンク130bから出湯路131を介して供給される湯水の温度が、所望の温度よりも低い場合、熱交換器h、バーナb及びファンf等を作動して湯水を所望の温度まで加熱する。この場合、運転制御部22は、給水切換三方弁31を制御し、給水路132からの給水を受け付けず、貯湯タンク130bからの湯水が熱源機30に供給されるようにすることができる。
The heat source machine 130 is controlled by the
For example, the operation unit (not shown) of the
また、運転制御部22は、貯湯タンク130bから出湯路131を介して供給される湯水の温度が所望の温度よりも高い場合、熱交換器h、バーナb及びファンf等の作動を停止する。また、運転制御部22は、給水路132から給水される湯水の温度を所望の温度にするように給水切換三方弁31を制御する。つまり、運転制御部22は、貯湯タンク130bからの湯水に対して加える給水路132からの給水量を調整し湯水を所望の温度まで低下させることができる。
なお、運転制御部22は、貯湯タンク130bから出湯路131を介して供給される湯水の温度が所望の温度である場合には、貯湯タンク130bからの湯水をそのまま給湯路133から給湯する。この場合、運転制御部22は、熱交換器h、バーナb及びファンf等の作動を停止する。また、運転制御部22は、給水切換三方弁31を制御し、給水路132からの給水を受け付けず、貯湯タンク130bからの湯水が熱源機30に供給されるようにすることができる。
Further, the
When the temperature of the hot water supplied from the hot
(1−4)制御装置
図8に示すように、制御装置10は、故障検出部11と、表示制御部13と、選択受付部15と、モード切替部17と、表示部21、運転制御部22とを備えている。また、制御装置10は、図示しない操作部を有しており、分散型発電装置20等の運転及び停止、給湯路133からの給湯の温度等の各種入力をユーザから受け付ける。そして、本実施形態の制御装置10は、ユーザから各種入力を受付可能な例えばリモコン等から構成されている。
(1-4) Control device As shown in FIG. 8, the
運転制御部22は、分散型発電装置20等の運転及び停止、貯湯タンク130bへの給水及び出湯、熱源機30への出湯路131を介した湯水の供給、熱源機30への給水路132を介した湯水の供給、熱源機30での湯水の加熱等を制御している。
The
故障検出部11は、検出器101、103、105、107、111及び水位検出器84等からの検出結果が異常値を示している場合は、異常値が検出された検出器が設けられた箇所を分散型発電装置20の故障箇所として特定する。故障箇所は、例えばエラーコートとして表される。
故障検出部11は、分散型発電装置20の故障箇所をシステムサーバ5のエネルギ料金取得部5bに送信する。エネルギ料金取得部5bは、故障箇所に基づいてエネルギ料金を取得し、表示制御部13に送信する。表示制御部13は、エネルギ料金取得部5bからエネルギ料金(第1エネルギ料金及び第2エネルギ料金)を受信する。そして、表示制御部13は、図10に示すように、故障検出部11が検出した故障箇所に応じて、表示部21にエネルギ料金(第1エネルギ料金、第2エネルギ料金)を表示させるように制御する。
If the detection results from the
The
また、表示制御部13は、分散型発電装置20を停止させ、熱源機30を単独利用する第1選択、及び、分散型発電装置20の故障を修理する第2選択を表示部21に表示するように制御する。表示部21には、図9に示すように、分散型発電装置20を停止させ、熱源機30を単独利用する熱源機単独利用アイコン203(第1選択用のアイコン)と、分散型発電装置20の故障を修理する選択をするための修理アイコン201(第2選択用のアイコン)とが表示されている。
Further, the
なお、第1選択は、熱源機30を単独運転させ、分散型発電システム1の外のガス及び電気等のエネルギ等の供給を受けて熱源機30を運転する場合の選択である。また、第2選択は、分散型発電装置20を修理して運転させ、熱源機30に分散型発電装置20の発電運転による熱を利用させる場合の選択である。
The first selection is a selection when the
熱源機単独利用アイコン203及び修理アイコン201は、選択受付部15を構成している。ユーザが、熱源機単独利用アイコン203(第1選択用のアイコン)及び修理アイコン201(第2選択用のアイコン)のいずれかを押圧すると、選択受付部15は第1選択又は第2選択のうちアイコンが押圧された方が選択されたとして受け付ける。
The heat source machine
エネルギ料金の表示についてさらに説明を加える。
図9に示す修理アイコン201が選択されたと仮定した場合、つまり、分散型発電装置20の故障を修理して運転させ、修理後の分散型発電装置20の発電運転による熱を熱源機30及び各種機器40が利用すると仮定した場合の予測の第2エネルギ料金として、約14万円が表示されている。ここで、熱源機30及び各種機器40は、分散型発電装置20の発電運転による熱等のエネルギを利用し、不足分はエネルギ会社9からガス及び電気等のエネルギの供給を受ける。
Further explanation will be given to the display of energy charges.
Assuming that the
また、熱源機単独利用アイコン203が選択されたと仮定した場合、つまり、分散型発電装置20を修理せずに停止させ、熱源機30を単独利用すると仮定した場合の予測の第1エネルギ料金として、約25万円が表示されている。ここで、熱源機30及び各種機器40は、分散型発電装置20から熱の供給を受けることができないため、エネルギ会社9からガス及び電気等のエネルギの供給を受ける。
Further, assuming that the heat source unit
以上のように、第1エネルギ料金が表示部21に表示されることで、ユーザは、分散型発電装置20を停止させ、熱源機30を単独利用する場合の第1エネルギ料金を把握することができる。よって、ユーザは、修理に伴う手続きを行うか否かを選択する基準として第1エネルギ料金を得ることができるため、ユーザの利便性が向上する。
As described above, by displaying the first energy charge on the
なお、修理に伴う各種手続きとしては、例えば故障箇所及び状態等の詳しい故障診断、当該故障診断の結果による実際の実費修理料金の見積り、新しい分散型発電装置の購入、新しい熱源機の購入等が含まれる。
また、故障には、発電装置の少なくとも一部が故障により発電が不可能である場合だけでなく、発電装置及びその構成部品が動作するものの、期待されている動作を満たしていない場合等が含まれる。
In addition, various procedures associated with repair include, for example, detailed failure diagnosis of the failure location and condition, estimation of the actual actual repair fee based on the result of the failure diagnosis, purchase of a new distributed power generation device, purchase of a new heat source machine, etc. included.
In addition, the failure includes not only the case where at least a part of the power generation device cannot generate power due to the failure, but also the case where the power generation device and its components operate but do not meet the expected operation. Is done.
なお、熱源機30を単独利用すると、分散型発電装置20の発電電力を施設3内で利用し、系統電力を購入しないことにより享受していた利益、発電電力を逆潮することにより得ていた利益、分散型発電装置20を利用することで電力会社(エネルギ会社9)の系統電力からの買電電力の価格が安くなっていた利益、分散型発電装置20を利用することでガス会社(エネルギ会社9)から購入するガス料金の価格が安くなっていた利益等が得られなくなる。ユーザはこれらの点等を考慮し、第1エネルギ料金を参照して修理を行うか否かを判断できる。また、ユーザは、第1エネルギ料金を、分散型発電装置20及び熱源機30の少なくともいずれかを新品に交換するか否かの基準とすることもできる。
When the
また、第1エネルギ料金が表示されることで、例えば、ユーザは、修理をしなければ第1エネルギ料金分の支払いが生じるが、修理料金を支払って分散型発電装置20を修理をすることで上述の各種利益を得ることができ、修理料金を回収できるか否か等の判断ができる。
例えば、第1エネルギ料金が高い場合には、ユーザは分散型発電装置20を修理して再利用する選択を行える。一方、例えば、第1エネルギ料金が安い場合には、ユーザは分散型発電装置20を修理せずに停止させ、熱源機30を単独利用する選択ができる。
なお、第1エネルギ料金が安い場合でも修理を望む場合には、ユーザは分散型発電装置20を修理して再利用する選択を行える。また、第1エネルギ料金が高い場合であっても、ユーザは分散型発電装置20を停止させ、熱源機30を単独利用する選択を行える。
Further, by displaying the first energy charge, for example, the user pays for the first energy charge if the repair is not performed, but by paying the repair charge and repairing the distributed
For example, if the first energy charge is high, the user may choose to repair and reuse the distributed
If the user desires repair even when the first energy charge is low, the user can choose to repair and reuse the distributed
また、分散型発電装置20の故障の修理をユーザが望む場合であっても望まない場合であってもサービスマンによる訪問と、故障箇所及び状態の診断等に応じて訪問費用が発生していたが、上記構成によれば、ユーザは訪問費用を支払うことなくエネルギ料金を確認可能である。
In addition, regardless of whether the user desires or does not want to repair the failure of the distributed
また、第2エネルギ料金が表示部21に表示されることで、ユーザは、分散型発電装置20を修理して運転させ、修理した分散型発電装置20の発電運転による熱を熱源機30が利用している場合の第2エネルギ料金を把握することができる。よって、上記の第1エネルギ料金の場合と同様に、ユーザは、修理に伴う手続きを行うか否かを選択する基準として第2エネルギ料金を得ることができるため、ユーザの利便性が向上する。また、ユーザは、第2エネルギ料金を、分散型発電装置20及び熱源機30の少なくともいずれかを新品に交換するか否かの基準とすることもできる。
Further, when the second energy charge is displayed on the
特に上記実施形態では、第1及び第2エネルギ料金の両方が表示部21に表示されるため、ユーザは、第1エネルギ料金及び第2エネルギ料金を比較衡量して、分散型発電装置20を修理して再利用するのか、あるいは、分散型発電装置20を停止させ、熱源機30を単独利用するのかを判断でき、ユーザの利便性が向上する。
In particular, in the above embodiment, since both the first energy charge and the second energy charge are displayed on the
例えば、ユーザは、分散型発電装置20を修理をしない場合は第1エネルギ料金分の支払いが生じ、修理をした場合は修理料金及び第2エネルギ料金分の支払いが生じることが分かる。一般的に第2エネルギ料金の方が第1エネルギ料金よりも安いため、修理料金を払って修理を行っても、修理料金を回収できるか否か等の判断ができる。
なお、図9に示すように、例えば約3万円などの修理料金が表示部21に表示されてもよい。
For example, the user can see that if the distributed
As shown in FIG. 9, a repair fee of, for example, about 30,000 yen may be displayed on the
さらに、分散型発電装置20を管理する側にとっても、修理を行うか否かのユーザの判断に基づいて作業を行える。よって、修理をするか否かが不明な時点で、故障等が発生した分散型発電装置20が設置された施設3への訪問、故障箇所の診断等の煩雑な作業を削減することができる。
Further, the side managing the distributed
モード切替部17は、選択受付部15が熱源機単独利用アイコン203の入力を受け付けると、つまり、分散型発電装置20を停止させ、熱源機30を単独利用する選択を受け付けると、熱源機30を単独利用可能なモードに切り替える。モード切替部17は、このモード切替に伴って、分散型発電装置20を修理せずに停止させ、熱源機30を単独利用可能にする。
モード切替部17は、熱源機30の単独利用にあたり、分散型発電装置20での発電を停止させ、電力変換装置120から熱源機30への電力の供給を停止する。また、モード切替部17は、分散型発電装置20の循環ポンプ64、ラジエータ65等の各部の運転を完全に停止させるか、あるいは各部の運転が最小限となるように制御する。
When the
The
モード切替部17が分散型発電装置20から熱源機30へエネルギの供給を停止するため、サービスマンが現地に訪問して熱源機を単独利用するモードに切り替える設定を行う作業を省くことができる。
Since the
一方、選択受付部15が修理アイコン201の入力を受け付けると、選択受付部15は、システムサーバ5に修理の要求を送信する。システムサーバ5が図示しない修理会社のシステムに修理要求を送信すると、修理会社から、故障が発生した分散型発電装置20が設置されている施設3に修理担当者が派遣され、修理の業務が遂行される。
On the other hand, when the
上記では、制御装置10は、故障検出部11、表示制御部13、選択受付部15、モード切替部17、表示部21及び運転制御部22を有している。しかし、制御装置10は、例えばこれらの機能部のうちいずれかを有していればよい。例えば、制御装置10は、故障検出部11、表示制御部13を有しており、表示部21は、制御装置10とは別途の装置に設けられていてもよい。
In the above, the
(1−5)各種機器
施設3には、テレビ、冷蔵庫、エアコン、ガスストーブ及びガスコンロ等の各種機器40が備え付けられている。各種機器40には、分散型発電装置20が発電した電力、分散型発電システム1の外部からの系統電力及びガス等が供給される。各種機器40は制御装置10と通信可能であってもよく、表示制御部13は、表示部21にエネルギ料金を表示するのに代えて、あるいはそれと共に、例えばテレビの画面(表示部)にエネルギ料金を表示するように制御してもよい。
また、各種機器40にはスマートフォン等の携帯電話等の表示部を有する携帯機器が含まれてもよい。制御装置10の表示制御部13は、表示部21にエネルギ料金を表示するのに代えて、あるいはそれと共に、携帯機器と通信することで画面(表示部)に修理料金を表示するように制御してもよい。
(1-5) Various devices The
Further, the
(2)分散型発電システムでのエネルギ料金表示方法
次に、図10を用いて、エネルギ料金表示方法について説明する。
ステップS11:故障検出部11は、検出器101、103、105、107、111及び水位検出器84等からの検出結果が異常値を示している場合は、異常値が検出された検出器が設けられた箇所を分散型発電装置20の故障箇所として特定する。そして故障検出部11は、故障箇所有りとしてステップS12に処理を進める(ステップS11においてYes)。そうでない場合(ステップS11においてNo)は、故障検出部11は、ステップS11の処理を継続する。
(2) Energy charge display method in a distributed power generation system Next, an energy charge display method will be described with reference to FIG.
Step S11: When the detection results from the
ステップS12:故障検出部11が分散型発電装置20の故障箇所を特定すると、エネルギ料金取得部5bは、エネルギ使用履歴DB5c内のエネルギ使用履歴をエネルギ会社制御部90aに送信し、エネルギ使用履歴に応じた予測のエネルギ料金を要求する。
エネルギ会社制御部90aは、エネルギ料金表DB90bの第1及び第2エネルギ料金表それぞれに基づいて当該エネルギ使用履歴に基づいた予測の第1及び第2エネルギ料金を算出し、エネルギ料金取得部5bに送信する。エネルギ料金取得部5bは、第1及び第2エネルギ料金を取得し、表示制御部13に送信する。
ステップS13:表示制御部13は、エネルギ料金取得部5bから第1及び第2エネルギ料金を受信し、表示部21に第1及び第2エネルギ料金、修理アイコン201及び熱源機単独利用アイコン203を表示するように制御する。
ステップS14:選択受付部15は、修理アイコン201(第2選択用のアイコン)及び熱源機単独利用アイコン203(第1選択用のアイコン)を介して、いずれかの選択を受け付ける。
Step S12: When the
The energy
Step S13: The
Step S14: The
ステップS15、S16:モード切替部17は、選択受付部15が熱源機単独利用アイコン203の入力を受け付けると(ステップS15においてYes)、分散型発電装置20の運転を停止させ、熱源機30を単独させるモードに切り替える(S16)。
Steps S15, S16: When the
ステップS17:選択受付部15が修理アイコン201の入力を受け付けると(ステップS15においてNo)、選択受付部15は、システムサーバ5に修理の要求を送信する。これにより故障が発生している分散型発電装置20の修理が行われる。
Step S17: When the
〔他の実施形態〕
なお上述の実施形態(変形例を含む、以下同じ)で開示される構成は、矛盾が生じない限り、実施形態で開示される構成と組み合わせて適用することが可能であり、また、本明細書において開示された実施形態は例示であって、本発明の実施形態はこれに限定されず、本発明の目的を逸脱しない範囲内で適宜改変することが可能である。
(1)上記実施形態では、エネルギ料金取得部5bは、エネルギ使用履歴に応じた予測のエネルギ料金をエネルギ会社制御部90aに要求する。エネルギ料金取得部5bは、エネルギ会社制御部90aがエネルギ使用履歴及びエネルギ料金表に基づいて取得したエネルギ料金を、表示制御部13に表示制御をさせる。
[Other Embodiments]
The configurations disclosed in the above-described embodiments (including modifications, the same shall apply hereinafter) can be applied in combination with the configurations disclosed in the embodiments as long as there is no contradiction. The embodiment disclosed in the above is an example, and the embodiment of the present invention is not limited to this, and can be appropriately modified without departing from the object of the present invention.
(1) In the above embodiment, the energy
しかし、第1及び第2エネルギ料金の取得方法はこれに限定されない。
(a)例えば、エネルギ会社制御部90aは、エネルギ料金取得部5bの要求に応じて、図2〜図5のエネルギ料金表をエネルギ料金取得部5bに送信してもよい。この場合、エネルギ料金取得部5bは、エネルギ使用履歴DB5c内のエネルギ使用履歴と、エネルギ料金表とを参照し、エネルギ料金を取得してもよい。ここで、エネルギ料金表には、第1エネルギ料金表及び第2エネルギ料金表の少なくともいずれかが含まれる。
However, the method of obtaining the first and second energy charges is not limited to this.
(A) For example, the energy
その他、システムサーバ5は、エネルギ料金表DB90bと同様のエネルギ料金表DBを有しており、予め図2〜図5のエネルギ料金表を有してもよい。この場合、システムサーバ5は、選択受付部15が熱源機単独利用アイコン203及び修理アイコン201のいずれかの選択を受け付けると、エネルギ使用履歴DB5c内のエネルギ使用履歴を参照する。さらに、システムサーバ5は、自身が保有するエネルギ料金を参照し、当該エネルギ使用履歴に対応するエネルギ料金を取得する。この場合、エネルギ使用履歴の取得から、当該エネルギ使用履歴に対応するエネルギ料金の取得をシステムサーバ5内で完結できる。なお、システムサーバ5は、エネルギ会社サーバ90にアクセスし、エネルギ料金表を随時更新してもよい。
In addition, the
また、エネルギ料金表DB90bに記憶されているエネルギ料金表は、図2〜図5のようなエネルギ量に対応して段階的にエネルギの単価が変わる対応表でなくてもよい。例えば、定額のエネルギ料金プランが1つ以上記憶されていてもよい。 Further, the energy charge table stored in the energy charge table DB 90b does not have to be a correspondence table in which the unit price of energy changes stepwise according to the amount of energy as shown in FIGS. 2 to 5. For example, one or more flat-rate energy rate plans may be stored.
(b)また、前述の通り、制御装置10の表示制御部13は、システムサーバ5のエネルギ料金取得部5bを介してエネルギ料金を取得する。しかし、これとは異なり、制御装置10自身がエネルギ料金を取得してもよい。この場合、図11に示す制御装置10は、図8の制御装置10の故障検出部11、表示制御部13、選択受付部15及びモード切替部17に加えて、エネルギ料金取得部16、エネルギ料金表DB(制御装置のエネルギ料金表記憶部)18を備えている。
(B) Further, as described above, the
エネルギ料金表DB18内のエネルギ料金表は、上記の図2〜図5のエネルギ料金表と同様である。エネルギ料金取得部16は、選択受付部15が熱源機単独利用アイコン203及び修理アイコン201のいずれかの選択を受け付けると、エネルギ使用履歴DB5cからエネルギ使用履歴を取得する。また、エネルギ料金取得部16は、エネルギ使用履歴と、エネルギ料金表DB18内のエネルギ料金表とを参照し、当該エネルギ使用履歴に対応するエネルギ料金を取得する。この場合、エネルギ使用履歴の取得から、当該エネルギ使用履歴に対応するエネルギ料金の取得を制御装置10内で概ね完結できる。
なお、エネルギ料金表DB18のエネルギ料金表は、エネルギ会社サーバ90のエネルギ料金表DB90bに応じて随時更新されてもよい。
また、制御装置10は、システムサーバ5のエネルギ使用履歴DB5cからエネルギ使用履歴を取得するのではなく、制御装置10自身がエネルギ使用履歴DB5cを有していてもよい。
The energy charge table in the energy charge table DB18 is the same as the energy charge table of FIGS. 2 to 5 above. When the
The energy charge table of the energy
Further, the
また、制御装置10は、エネルギ料金取得部16を備えているものの、エネルギ料金表DB18を備えていなくてもよい。この場合、エネルギ料金取得部16がエネルギ会社サーバ90のエネルギ会社制御部90aにエネルギ料金を要求し、エネルギ料金表DB90b内のエネルギ使用履歴に対応するエネルギ料金を取得してもよい。
Further, although the
上記のように制御装置10自身がエネルギ料金を取得する場合には、システムサーバ5にエネルギ料金取得部5bが備えられている必要はない。また、エネルギ会社サーバ90にエネルギ料金表DB90bが備えられている必要はない。この場合、図1に示す分散型発電システム1において、システムサーバ5及びエネルギ会社9の少なくともいずれかが省略されてもよい。
When the
(c)また、上記実施形態では、システムサーバ5とエネルギ会社サーバ90とはネットワーク8を介して接続されている。そして、システムサーバ5のエネルギ料金取得部5bは、エネルギ会社サーバ90とネットワーク8を介して通信を行い、エネルギ料金を取得している。しかし、システムサーバ5及びエネルギ会社サーバ90が一の装置内に設けられていてもよい。一の装置内にあるサーバ間ではネットワーク8を介した通信は不要であり、ネットワーク8を介さずにエネルギ料金を取得可能に構成できる。
(C) Further, in the above embodiment, the
(2)上記実施形態では、エネルギ料金取得部5bは過去のエネルギ使用履歴に基づいたエネルギ料金を取得している。しかし、エネルギ料金取得部5bは、一般の施設の平均的なエネルギ料金を取得し、表示制御部13に出力してもよい。
(2) In the above embodiment, the energy
(3)上記実施形態では、第1エネルギ料金(分散型発電装置20を運転させ、熱源機30を単独利用する選択を受け付けた場合のエネルギ料金)及び第2エネルギ料金(分散型発電装置20の故障を修理して運転させ、修理後の分散型発電装置20の発電運転による熱を熱源機30が利用する選択を受け付けた場合のエネルギ料金)の両方が表示部21に表示される。しかし、表示部21には、第1エネルギ料金及び第2エネルギ料金の少なくともいずれかが表示されればよい。
(3) In the above embodiment, the first energy charge (energy charge when the distributed
(4)上記実施形態では、エネルギ料金の取得は、故障検出部11が分散型発電装置20の故障箇所を特定した場合に行われる。しかし、エネルギ料金の取得は、表示部21にエネルギ料金を表示するまでに行われていればよい。例えば、エネルギ料金取得部5bによるエネルギ料金の取得は、故障検出部11が分散型発電装置20の故障箇所を特定した後、選択受付部15が熱源機単独利用アイコン203及び修理アイコン201のいずれかの選択を受け付けると開始されてもよい。
(4) In the above embodiment, the acquisition of the energy charge is performed when the
(5)エネルギ料金の表示は、表示部21だけでなく、各種機器40の表示部及びスマートフォン等の携帯機器の画面等において行われてもよい。
(5) The energy charge may be displayed not only on the
(6)上記実施形態では、故障検出部11は、分散型発電装置20の故障箇所を検出している。しかし、故障検出部11は、例えば、分散型発電装置20に故障が有るか、あるいは無いかを特定するのみでもよい。そして、エネルギ料金取得部5bは、分散型発電装置20に故障が有る場合は、例えば定額の修理プランによるエネルギ料金を取得する。表示制御部13は、エネルギ料金取得部5bから定額の修理プランによるエネルギ料金を取得して表示部21に表示させる。
(6) In the above embodiment, the
(7)上記実施形態では、表示部21はエネルギ料金に加えて、修理アイコン201及び熱源機単独利用アイコン203を表示する。そして、選択受付部15がいずれかの選択を受け付ける。しかし、表示部21は修理アイコン201及び熱源機単独利用アイコン203を表示せず、エネルギ料金のみを表示してもよい。
(7) In the above embodiment, the
(8)上記実施形態では、分散型発電システム1は、施設3以外に、システムサーバ5、修理会社サーバ70及びエネルギ会社サーバ90を備えている。しかし、分散型発電システム1は、施設3内の制御装置10、分散型発電装置20及び熱源機30のみから構成されていてもよい。つまり、分散型発電システム1には、システムサーバ5、修理会社サーバ70及びエネルギ会社サーバ90は含まれない。さらには、分散型発電システム1には、システムサーバ5、修理会社サーバ70及びエネルギ会社サーバ90の少なくとも1つが含まれない構成であってもよい。
分散型発電システム1に何が含まれるかが異なるのみで、各種データのやり取りは、上述と同様である。
(8) In the above embodiment, the distributed power generation system 1 includes a
The exchange of various data is the same as described above, except that what is included in the distributed power generation system 1 is different.
(9)上記実施形態では、分散型発電装置20は、図7に示すように貯湯タンク130b及び熱交換器60を備えている。しかし、分散型発電装置20は、貯湯タンク130b及び熱交換器60を備えずに構成されていてもよい。
(9) In the above embodiment, the distributed
(10)上記実施形態では、表示部21は、図9に示すように、修理料金、修理アイコン201及び熱源機単独利用アイコン203を表示する。選択のためのアイコンとしては次の形態も挙げられる。図12に示すように、表示部21は、表示制御部13の制御により、修理アイコン201(第2選択用のアイコン)及び熱源機単独利用アイコン203(第1選択用のアイコン)に加えて、交換アイコン(第3選択用のアイコン)204、205を表示してもよい。第3選択は、故障が発生した分散型発電装置20から新たな分散型発電装置20に交換する場合、又は、故障が発生した分散型発電装置20及び既存の熱源機30から新たな分散型発電装置20及び新たな熱源機30に交換する場合の選択である。そして、交換アイコン204、205のうち、故障が発生した分散型発電装置20から新たな分散型発電装置20に交換する場合のアイコンが分散型発電装置新規購入アイコン204である。また、故障が発生した分散型発電装置20及び既存の熱源機30から新たな分散型発電装置20及び新たな熱源機30に交換する場合のアイコンが分散型発電装置&熱源機新規購入アイコン205である。
(10) In the above embodiment, as shown in FIG. 9, the
修理アイコン201、熱源機単独利用アイコン203、交換アイコン204、205は、選択受付部15を構成している。ユーザが、熱源機単独利用アイコン203(第1選択用のアイコン)、修理アイコン201(第2選択用のアイコン)、分散型発電装置新規購入アイコン204(第3選択用のアイコン)、分散型発電装置&熱源機新規購入アイコン205(第3選択用のアイコン)のいずれかを押圧すると、選択受付部15はいずれかのアイコンから選択を受け付ける。これにより、ユーザは、表示された修理料金を考慮した上で、新たな分散型発電装置20への交換、新たな分散型発電装置20及び新たな熱源機30への交換のいずれかを選択可能である。また、ユーザは、修理料金を参照し、修理に伴う手続きを行うか否か、新たな分散型発電装置20に交換するか否か、新たな分散型発電装置20及び新たな熱源機30に交換するか否かの基準とすることもできる。よって、ユーザの利便性が向上する。
The
なお、表示部21には、修理アイコン201、熱源機単独利用アイコン203、分散型発電装置新規購入アイコン204及び分散型発電装置&熱源機新規購入アイコン205の全てが表示されるのではなく、これらのアイコンのうち少なくとも1つのアイコンが表示されてもよい。
It should be noted that the
また、上記実施形態の図9では、エネルギ料金として、熱源機30を単独利用した場合の第1エネルギ料金、及び、故障した分散型発電装置20を修理して運転させ、修理した分散型発電装置20の発電運転による熱を熱源機30が利用している場合の第2エネルギ料金が表示部21に表示される。しかし、表示部21に表示されるエネルギ料金は第1エネルギ料金及び第2エネルギ料金に限られず、図12に示すように、後述の第3エネルギ料金(交換アイコン204、205が選択された場合のエネルギ料金)を含んでいてもよい。また、図12に示すように修理料金及び第1〜第3エネルギ料金に加えて、新しい分散型発電装置20に交換する場合の交換料金、また、新しい分散型発電装置20及び熱源機30に交換する場合の交換料金が表示部21に表示されてもよい。
Further, in FIG. 9 of the above embodiment, as the energy charge, the first energy charge when the
図12では、修理アイコン201が選択されたと仮定した場合、つまり、分散型発電装置20の故障を修理して運転させ、その発電運転による熱を熱源機30及び各種機器40が利用すると仮定した場合の予測の第2エネルギ料金として、約14万円が表示されている。また、熱源機単独利用アイコン203が選択されたと仮定した場合、つまり、分散型発電装置20を修理せずに停止させ、熱源機30を単独利用すると仮定した場合の予測の第1エネルギ料金として、約25万円が表示されている。
In FIG. 12, it is assumed that the
さらに、図12では、分散型発電装置新規購入アイコン204が選択されたと仮定した場合、つまり、故障が発生した分散型発電装置20から新たな分散型発電装置20に交換すると仮定した場合、そのための交換料金及び予測の第3エネルギ料金として、それぞれ約30万円及び約11万円が表示されている。また、分散型発電装置&熱源機新規購入アイコン205が選択されたと仮定した場合、つまり、故障が発生した分散型発電装置20及び既存の熱源機30から新たな分散型発電装置20及び新たな熱源機30に交換すると仮定した場合、そのための交換料金及び予測の第3エネルギ料金として、それぞれ約40万円及び約10万円が表示されている。
Further, in FIG. 12, it is assumed that the distributed power generation device
交換料金及び第3エネルギ料金の算出方法は、例えば次のように行われる。まず交換料金の算出方法について説明する。
図1のエネルギ会社サーバ90のエネルギ料金表DB90bには、エネルギ料金表に加えて交換料金表が含まれている。交換料金表としては、図13〜図15が含まれている。図13では、新しい分散型発電装置20の機種毎に価格が対応付けられている。図14では、新しい熱源機30の機種毎に価格が対応付けられている。図15では、故障した分散型発電装置20又は既存の熱源機30の撤去費用と、新しい分散型発電装置20又は新たな熱源機30の設置費用と、見積もり等の工賃とについて、基本料金及び超過時間ごとの料金が定められている。
The method of calculating the exchange fee and the third energy fee is, for example, as follows. First, the method of calculating the exchange fee will be described.
The energy charge table DB 90b of the
図1のシステムサーバ5のエネルギ料金取得部5bは、分散型発電装置新規購入アイコン204又は分散型発電装置&熱源機新規購入アイコン205が選択された場合の交換料金を、エネルギ会社サーバ90のエネルギ会社制御部90aに要求する。エネルギ会社制御部90aは、エネルギ料金表DB90bの交換料金表に基づいて交換料金を算出し、修理料金取得部5aに送信する。エネルギ料金取得部5bは、エネルギ会社制御部90aから交換料金を取得し、表示制御部13に送信する。表示制御部13は、エネルギ料金取得部5bから交換料金を受信し、制御装置10の表示部21に表示させる。
The energy
例えば、分散型発電装置新規購入アイコン204が選択され、図13の機種Bの分散型発電装置20が新たに購入されたとする。また、既存の分散型発電装置20の撤去費用は基本料金に加えて1hの超過時間があり、新たな分散型発電装置20の設置費用は基本料金であり、工賃として基本料金が発生する場合を考える。この場合、図13及び図15に基づいて、機種Bの分散型発電装置の価格(25万円)+撤去費用の基本料金(2万円)+撤去における1hの超過料金(5千円)+設置費用の基本料金(2万円)+工賃(5千円)の合計で30万円が、故障が発生した分散型発電装置20から新たな分散型発電装置20に交換する場合の交換料金として算出される。
For example, it is assumed that the distributed power generation device
また、例えば、分散型発電装置&熱源機新規購入アイコン205が選択されたとする。新たな分散型発電装置20への交換料金は前述と同様に算出され、例えば30万円として算出されたとする。また、図14に示す機種αの熱源機30が新たに購入されたとする。また、新たな熱源機30に関連して、既存の熱源機30の撤去費用は基本料金であり、新たな熱源機30の設置費用は基本料金に加えて1hの超過時間があり、工賃として基本料金が発生する場合を考える。この場合、図14及び図15に基づいて、機種αの熱源機の価格(5万円)+撤去費用の基本料金(2万円)+設置費用の基本料金(2万円)+設置における1hの超過料金(5千円)+工賃(5千円)の合計で10万円が熱源機30の交換料金として算出される。よって、30万円+10万円の合計40万円が、故障が発生した分散型発電装置20及び既存の熱源機30から新たな分散型発電装置20及び新たな熱源機30に交換する場合の交換料金として算出される。
Further, for example, it is assumed that the distributed power generation device & heat source machine
上記構成によれば、ユーザは、新たな分散型発電装置20に交換した場合、又は、新たな分散型発電装置20及び新たな熱源機30に交換した場合における交換料金を把握することができる。
According to the above configuration, the user can grasp the replacement fee when the new distributed
次に、第3エネルギ料金の算出方法について説明する。
第3エネルギ料金は、分散型発電装置新規購入アイコン204が選択された場合、つまり、新たな分散型発電装置20が運転され、既存の熱源機30が分散型発電装置20からの熱を利用する場合のエネルギ料金である。また、第3エネルギ料金は、分散型発電装置&熱源機新規購入アイコン205が選択された場合、つまり、新たな分散型発電装置20が運転され、新たな熱源機30が新たな分散型発電装置20からの熱を利用する場合のエネルギ料金である。
Next, a method of calculating the third energy charge will be described.
The third energy charge is when the
エネルギ会社9は、前述の通り、エネルギ料金表DB90bに図3及び図5に示すエネルギ料金表を記憶している。図3は、分散型発電装置20を運転させ、熱源機30が分散型発電装置20からの熱を利用する場合における、ガス使用量と第2ガス料金(第2エネルギ料金)との関係を示す第2エネルギ料金表である。図5は、分散型発電装置20を運転させ、熱源機30が分散型発電装置20からの熱を利用する場合における、電気使用量と第2電気料金(第2エネルギ料金)との関係を示す第2エネルギ料金表である。
As described above, the energy company 9 stores the energy charge tables shown in FIGS. 3 and 5 in the energy charge table DB 90b. FIG. 3 shows the relationship between the amount of gas used and the second gas charge (second energy charge) when the distributed
エネルギ料金取得部5bは、エネルギ使用履歴DB5c内のエネルギ使用履歴と図3及び図5の第2エネルギ料金表とを利用し、予測のエネルギ料金として第3エネルギ料金を取得する。第3エネルギ料金の算出方法は、第2エネルギ料金と同様の算出方法であるので説明を省略する。なお、第2エネルギ料金表は、分散型発電装置20を運転させ、熱源機30が分散型発電装置20からの熱を利用する場合の料金表であり、第3エネルギ料金の算出においても流用できる。
The energy
上記の構成によれば、ユーザは、新たな分散型発電装置20に交換した場合、又は、新たな分散型発電装置20及び新たな熱源機30に交換した場合における第3エネルギ料金を把握することができる。一般的に新たな分散型発電装置20は発電効率が良く、また新たな熱源機30はエネルギ効率が良いため、ガス使用量及び電気使用量を抑制できる。よって、第3エネルギ料金は、経年劣化した分散型発電装置20及び熱源機30を使用した場合のエネルギ料金よりも安くなる。よって、ユーザは、第3エネルギ料金が提示されることで、交換によりこれまでよりもエネルギ料金がどの程度安くなるかを把握することができる。
According to the above configuration, the user can grasp the third energy charge when the new distributed
また、修理料金、熱源機30を単独利用した場合の第1エネルギ料金、及び、故障した分散型発電装置20を修理して運転させ、修理した分散型発電装置20の発電運転による熱を熱源機30が利用している場合の第2エネルギ料金、新たな分散型発電装置20及び熱源機30に交換した場合の第3エネルギ料金、交換料金がユーザに提示される場合には、ユーザは、修理料金、第1〜第3エネルギ料金を比較衡量できる。これにより、分散型発電装置20を修理して再利用するのか、分散型発電装置20を停止させ、熱源機30を単独利用するのか、新たな分散型発電装置20に交換するのか、あるいは、新たな分散型発電装置20及び熱源機30に交換するのかを判断でき、ユーザの利便性が向上する。
In addition, the repair fee, the first energy charge when the
なお、交換料金の取得方法は、これに限定されないが、システムサーバ5のエネルギ料金取得部5bがエネルギ会社サーバ90のエネルギ会社制御部90aに要求してもよいし、エネルギ料金取得部5bがエネルギ会社制御部90aから交換料金表を取得して交換料金を算出してもよいし、システムサーバ5が予め交換料金表を記憶したエネルギ料金表DB90bを有してもよいし、図11のように構成された制御装置10のエネルギ料金取得部6がエネルギ料金表DB18内の交換料金表に基づいて交換料金を算出してもよい。
The method of acquiring the exchange charge is not limited to this, but the energy
また、第3エネルギ料金の取得方法は、これに限定されないが、システムサーバ5のエネルギ料金取得部5bがエネルギ会社サーバ90のエネルギ会社制御部90aに要求してもよいし、エネルギ料金取得部5bがエネルギ会社制御部90aからエネルギ料金表を取得して第3エネルギ料金を算出してもよいし、システムサーバ5が予めエネルギ料金表を記憶したエネルギ料金表DB90bを有してもよいし、図11のように構成された制御装置10のエネルギ料金取得部5bがエネルギ料金表DB90b内のエネルギ料金表に基づいて第3エネルギ料金を算出してもよい。
Further, the method of acquiring the third energy charge is not limited to this, but the energy
なお、表示部21には、第1〜第3エネルギ料金、交換料金の全てが表示されるのではなく、これらのうち少なくとも1つが表示されてもよい。
また、上記では、交換料金は、システムサーバ5のエネルギ料金取得部5bが取得している。しかし、システムサーバ5が別途の交換料金取得部(図示せず)を有しており、この交換料金取得部が交換料金を取得してもよい。
The
Further, in the above, the exchange fee is acquired by the energy
1 :分散型発電システム
5 :システムサーバ
5b :エネルギ料金取得部
9 :エネルギ会社
10 :制御装置
11 :故障検出部
13 :表示制御部
15 :選択受付部
16 :エネルギ料金取得部
17 :モード切替部
20 :分散型発電装置
21 :表示部
30 :熱源機
90 :エネルギ会社サーバ
90a :エネルギ会社制御部
201 :修理アイコン
203 :熱源機単独利用アイコン
18 :エネルギ料金表DB
5c :エネルギ使用履歴DB
90b :エネルギ料金表DB
1: Distributed power generation system 5:
5c: Energy usage history DB
90b: Energy price list DB
Claims (13)
前記制御装置は、
前記分散型発電装置における故障の有無を検出する故障検出部と、
前記分散型発電装置において故障が発生すると、前記分散型発電装置を停止させ、前記熱源機を単独利用する場合における、ガス及び電気の少なくともいずれかを含むエネルギの消費量に対する費用である予測の第1エネルギ料金を表示部に表示するように制御する表示制御部とを有する、分散型発電システム。 A distributed power generation system including a distributed power generation device, a control device for controlling the operation of the distributed power generation device, and a heat source device.
The control device
A failure detection unit that detects the presence or absence of a failure in the distributed power generation device,
When a failure occurs in the distributed power generation device, the cost for energy consumption including at least one of gas and electricity when the distributed power generation device is stopped and the heat source device is used alone is the first prediction. 1 A distributed power generation system having a display control unit that controls the energy charge to be displayed on the display unit.
前記第1エネルギ料金表は、前記分散型発電装置を停止させ、前記熱源機を単独利用する場合におけるガス及び電気の少なくともいずれかを含むエネルギの料金表であり、
前記第2エネルギ料金表は、前記分散型発電装置を運転させ、前記熱源機が前記分散型発電装置からの熱を利用している場合におけるガス及び電気の少なくともいずれかを含むエネルギの料金表である、請求項1に記載の分散型発電システム。 The first energy charge is based on a first energy charge table different from the second energy charge table.
The first energy price list is a price list of energy including at least one of gas and electricity when the distributed power generation device is stopped and the heat source machine is used alone.
The second energy price list is a price list of energy including at least one of gas and electricity when the distributed power generation device is operated and the heat source machine uses heat from the distributed power generation device. The distributed power generation system according to claim 1.
前記分散型発電装置を停止させ、前記熱源機を単独利用する場合におけるガス及び電気の少なくともいずれかを含むエネルギの料金表である第1エネルギ料金表を記憶するエネルギ料金表記憶部と、
前記第1エネルギ料金表に基づいて、前記エネルギの消費量に応じた第1エネルギ料金を取得するエネルギ料金取得部とを有し、
前記表示制御部は、前記エネルギ料金取得部から前記第1エネルギ料金を取得し、当該第1エネルギ料金を前記表示部に表示するように制御する、請求項1又は2に記載の分散型発電システム。 The control device
An energy charge table storage unit that stores a first energy charge table which is an energy charge table including at least one of gas and electricity when the distributed power generation device is stopped and the heat source unit is used independently.
Based on the first energy charge table, it has an energy charge acquisition unit that acquires the first energy charge according to the energy consumption.
The distributed power generation system according to claim 1 or 2, wherein the display control unit acquires the first energy charge from the energy charge acquisition unit and controls the first energy charge to be displayed on the display unit. ..
前記分散型発電装置を運転させ、前記熱源機が前記分散型発電装置からの熱を利用している場合におけるガス及び電気を含むエネルギの料金表である第2エネルギ料金表を記憶するエネルギ料金表記憶部と、
前記第2エネルギ料金表に基づいて、前記エネルギの消費量に応じた第2エネルギ料金を取得するエネルギ料金取得部とを有し、
前記表示制御部は、前記エネルギ料金取得部から前記第2エネルギ料金を取得し、当該第2エネルギ料金を前記表示部に表示するように制御する、請求項6に記載の分散型発電システム。 The control device
An energy price list that stores a second energy price list, which is a price list of energy including gas and electricity when the distributed power generation device is operated and the heat source machine uses heat from the distributed power generation device. Memory and
Based on the second energy charge table, it has an energy charge acquisition unit that acquires a second energy charge according to the amount of energy consumed.
The distributed power generation system according to claim 6, wherein the display control unit acquires the second energy charge from the energy charge acquisition unit and controls the display to display the second energy charge on the display unit.
前記制御装置が、
前記分散型発電装置における故障の有無を検出するステップと、
前記分散型発電装置において故障が発生すると、前記分散型発電装置を停止させ、前記熱源機を単独利用する場合における、ガス及び電気の少なくともいずれかを含むエネルギの消費量に対する費用である予測の第1エネルギ料金を表示部に表示するように制御するステップとを有する、エネルギ料金表示方法。 It is an energy charge display method in a distributed power generation system including a distributed power generation device, a control device for controlling the operation of the distributed power generation device, and a heat source device.
The control device
A step of detecting the presence or absence of a failure in the distributed power generation device, and
When a failure occurs in the distributed power generation device, the cost for energy consumption including at least one of gas and electricity when the distributed power generation device is stopped and the heat source machine is used alone is the first of the predictions. (1) An energy charge display method including a step of controlling the energy charge to be displayed on the display unit.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019061634 | 2019-03-27 | ||
JP2019061634 | 2019-03-27 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2020166845A true JP2020166845A (en) | 2020-10-08 |
JP7511361B2 JP7511361B2 (en) | 2024-07-05 |
Family
ID=72716674
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2020035282A Active JP7511361B2 (en) | 2019-03-27 | 2020-03-02 | Distributed power generation system capable of displaying energy charges and method for displaying energy charges |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP7511361B2 (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004263898A (en) * | 2003-02-28 | 2004-09-24 | Noritz Corp | Heating device and cogeneration system |
JP2013178012A (en) * | 2012-02-28 | 2013-09-09 | Denso Corp | Integrated remote control system |
JP2016012967A (en) * | 2014-06-27 | 2016-01-21 | トヨタホーム株式会社 | Energy saving effect display system |
JP2017175828A (en) * | 2016-03-25 | 2017-09-28 | 株式会社ノーリツ | Communication adapter apparatus |
-
2020
- 2020-03-02 JP JP2020035282A patent/JP7511361B2/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004263898A (en) * | 2003-02-28 | 2004-09-24 | Noritz Corp | Heating device and cogeneration system |
JP2013178012A (en) * | 2012-02-28 | 2013-09-09 | Denso Corp | Integrated remote control system |
JP2016012967A (en) * | 2014-06-27 | 2016-01-21 | トヨタホーム株式会社 | Energy saving effect display system |
JP2017175828A (en) * | 2016-03-25 | 2017-09-28 | 株式会社ノーリツ | Communication adapter apparatus |
Also Published As
Publication number | Publication date |
---|---|
JP7511361B2 (en) | 2024-07-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11927976B2 (en) | Utility console for controlling energy resources | |
EP1202594B1 (en) | Electricity generation equipment management system | |
JP4060095B2 (en) | Photovoltaic power generation management server, solar power generation management system, solar power generation management method, and machine-readable recording medium recording a program for realizing the method | |
US6697951B1 (en) | Distributed electrical power management system for selecting remote or local power generators | |
JP6145670B2 (en) | Power flow control system, management device, program | |
JP3631986B2 (en) | Power control and management system | |
WO2019130540A1 (en) | System, control device, method for controlling mining units, and program | |
JP2002101554A (en) | Solar energy generation control system, solar energy generation control server used therein, solar energy generation device, solar energy generation control method and machine readable record medium recorded with program to achieve the same method | |
JP2002367619A (en) | Household energy control system and device | |
KR101659862B1 (en) | Smart energy management system and smart energy management method using the system | |
JP2009146010A (en) | Electrical appliance information managing system | |
JP2021112078A (en) | Power supply system, server, and power generating installation | |
JP7511361B2 (en) | Distributed power generation system capable of displaying energy charges and method for displaying energy charges | |
JP7511360B2 (en) | Distributed power generation system capable of displaying repair costs and repair cost display method | |
JP2001102063A (en) | Fuel cell co-generation system | |
JP2004221021A (en) | Fuel cell cogeneration system | |
JP2003303244A (en) | Failure information system | |
JP7523364B2 (en) | Operation status management system | |
JP2020198696A (en) | Power supply system and power management method | |
JP2003303016A (en) | Equipment management system, equipment management server, equipment management method, controller, program, and recording medium | |
JP3680712B2 (en) | Energy-use equipment proper operation device and energy-use equipment proper operation method | |
JPWO2018078802A1 (en) | POWER MANAGEMENT SYSTEM, CONTROL DEVICE, AND POWER MANAGEMENT METHOD | |
JP2002032441A (en) | Method for introducing energy-saving equipment | |
JP2002098407A (en) | Method and system for introducing energy-saving apparatus | |
JP2005333751A (en) | Power supply system and power supply method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20221216 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20231109 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20231128 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20240123 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20240312 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20240509 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20240528 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20240625 |