Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2018069521A
Other languages
Japanese (ja)
Inventor
峰雄 馬場
Mineo Baba
峰雄 馬場
武彦 島田
Takehiko Shimada
武彦 島田
秋水 田中
Shusui Tanaka
秋水 田中
黒田 宏
Hiroshi Kuroda
宏 黒田
晴司 藤山
Seiji Fujiyama
晴司 藤山
翔平 浅野
Shohei Asano
翔平 浅野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa House Industry Co Ltd
Original Assignee
Daiwa House Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa House Industry Co Ltd filed Critical Daiwa House Industry Co Ltd
Priority to JP2018069521A priority Critical patent/JP2019178586A/en
Publication of JP2019178586A publication Critical patent/JP2019178586A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Floor Finish (AREA)

Abstract

To provide means to cut man hour of floor construction works to reduce the labor for floor construction.SOLUTION: A floor construction method in this invention comprises: a process, which erects, on a rising part R of a foundation B of a building 1, a sleeper 12 of an underfloor unit 20 that integrates the sleeper 12 supporting a floor panel 11 constituting a floor of the building 1 and a strut 13 supporting the sleeper 12, to locate the underfloor unit 20; a process, which forms a dirt floor FL by pouring concrete up to a level higher than the bottom end 15ca of the strut 13 after locating the underfloor unit 20; a process, in which, after forming the dirt floor FL, a leg member 16 that is provided on the strut 13 and vertically movable against the strut 13 is moved downwards to be anchored to the dirt floor FL; a process which places the floor panel 11 on the sleeper 12 in such a way that the top part of the strut 13 is exposed through the floor panel 11; and a process, which vertically alters the attachment position of the strut 13 against the sleeper 12 by working the top part 17 of a screw provided at the top of the strut 13 put together with the sleeper 12 in order to adjust the vertical position of the sleeper 12.SELECTED DRAWING: Figure 1

Description

本発明は、建物の床を施工する床施工方法に係り、特に、床を構成するパネル材が固定材によって固定され、固定材が支柱によって支持されている構造の床を施工する床施工方法及び当該床施工方法により構成される床構造に関する。   The present invention relates to a floor construction method for constructing a floor of a building, and in particular, a floor construction method for constructing a floor having a structure in which a panel material constituting the floor is fixed by a fixing material and the fixing material is supported by a support column, and The present invention relates to a floor structure constituted by the floor construction method.

建物の床構造として、床を構成するパネル材が大引等の固定材によって固定され、固定材が束等の支柱によって支持されている床構造は、既に知られている(例えば、特許文献1参照)。
特許文献1に記載の床構造では、支柱としての束が大引支持部と支柱本体とベース部とを備えている。ベース部は、土間床等に接地される。大引支持部は、角筒状の大引を嵌め込んで大引を固定する部分である。支柱本体は、大引支持部の下方位置で大引支持部を支持する。また、支柱本体は、その中途位置にターンバックルを備えており、ターンバックルを回すことで支柱本体の高さを変更することが可能である。これにより、大引支持部の上下位置を調整することが可能である。
As a floor structure of a building, a floor structure in which a panel material constituting a floor is fixed by a fixing material such as a large drawing and the fixing material is supported by a support such as a bundle is already known (for example, Patent Document 1). reference).
In the floor structure described in Patent Document 1, a bundle as a support column includes a large pull support portion, a support column body, and a base portion. The base part is grounded to a dirt floor or the like. The large pull support portion is a portion that fits a square tubular large pull and fixes the large pull. The column main body supports the large pull support portion at a position below the large pull support portion. Moreover, the support | pillar main body is equipped with the turnbuckle in the middle position, It is possible to change the height of a support | pillar main body by turning a turnbuckle. Thereby, it is possible to adjust the up-and-down position of the large pull support part.

特開2002−121883号公報JP 2002-121883 A

上記の従来技術では、大引と束を配置する前に土間が形成されていることが前提となっていた。そのため、床の施工に際し、土間にコンクリートを打設して硬化するのを待つ必要があり、床の施工に時間を要していた。   In the above-described prior art, it was assumed that a soil was formed before placing the draw and the bundle. Therefore, when constructing the floor, it is necessary to wait for the concrete to be placed between the soils and to be hardened, and it takes time to construct the floor.

そこで、本発明は、上記の課題に鑑みてなされたものであり、その目的は、床施工の工数を削減し、床施工に係る労力を軽減できる床施工方法及び床構造を提供することにある。   Then, this invention is made | formed in view of said subject, The objective is to provide the floor construction method and floor structure which can reduce the man-hour of floor construction, and can reduce the labor concerning floor construction. .

上記課題は、本発明に係る床施工方法によれば、建物の床を構成するパネル材を支持する固定材と、前記固定材を支持する支柱とを一体化した床下ユニットの前記固定材を前記建物の基礎の立ち上がり部に架設して、前記床下ユニットを配置する工程と、前記床下ユニットを配置した後に、前記支柱の下端部より高い位置までコンクリートを打設して前記床のベース部を形成する工程と、前記床のベース部を形成した後に、前記支柱に設けられ、前記支柱に対して上下に移動可能な脚部材を下方に移動させて前記床のベース部に定着させる工程と、前記パネル材から前記支柱の上部が露出するように、前記固定材の上に前記パネル材を配置する工程と、前記固定材の上下位置を調整するために、前記固定材に組み付けられた前記支柱の上部に設けられた被操作部を操作して、前記固定材に対する前記支柱の組み付け位置を上下方向において変更する工程と、を含むことにより解決される。
上記の床施工方法によれば、パネル材を支持する固定材と支柱とを一体化した床下ユニットを配置した後に、床のベース部を形成する。そして、床のベース部に支柱の一部を埋設するようにすることで、床のベース部に支柱を固定することができる。
そして、上記の床施工方法によれば、床下ユニットの上にパネル材を置いてから、支柱の高さを調整することができる。この際、パネル材の上から支柱の高さ調整が可能であるため、固定材及びパネル材の上下位置の調整を簡単に行うことができる。
すなわち、上記の床施工方法によれば、床施工の工数を削減し、床施工に係る労力を軽減できる。
According to the floor construction method according to the present invention, the above-described problem is that the fixing material of the underfloor unit in which the fixing material that supports the panel material constituting the floor of the building and the column that supports the fixing material are integrated is the above-described fixing material. A step of placing the underfloor unit on the rising part of the foundation of the building, and after placing the underfloor unit, concrete is cast to a position higher than the lower end of the column to form the base portion of the floor And, after forming the base portion of the floor, moving the leg member, which is provided on the support column and movable up and down with respect to the support column, to fix to the base portion of the floor, and The step of arranging the panel material on the fixing material so that the upper portion of the supporting material is exposed from the panel material, and the adjustment of the vertical position of the fixing material of the support material assembled to the fixing material At the top By operating the operated portion was kicked, the step of changing the mounting position of the strut relative to the stationary member in the vertical direction, is solved by containing.
According to the floor construction method described above, the floor base portion is formed after the underfloor unit in which the fixing material supporting the panel material and the support column are integrated. And a support | pillar can be fixed to the base part of a floor by burying a part of support | pillar in the base part of a floor.
And according to said floor construction method, after placing a panel material on an underfloor unit, the height of a support | pillar can be adjusted. At this time, since the height of the column can be adjusted from above the panel material, the vertical positions of the fixing material and the panel material can be easily adjusted.
That is, according to said floor construction method, the man-hour of floor construction can be reduced and the labor which concerns on floor construction can be reduced.

上記の床施工方法において、前記固定材の上下位置を調整するための前記被操作部の操作は、前記パネル材において前記固定材の上に載った部分のうち、前記被操作部の上方位置に設けられた開口部を通じて行われるとよい。
こうすることで、被操作部を操作しやすくすることができる。これにより、被操作部を操作して固定材の上下位置を調整することが簡単になる。
In the floor construction method, the operation of the operated portion for adjusting the vertical position of the fixing material is performed at a position above the operated portion in a portion of the panel material placed on the fixing material. It is good to carry out through the provided opening.
By doing so, the operated part can be easily operated. This makes it easy to operate the operated portion and adjust the vertical position of the fixing member.

上記の床施工方法において、前記固定材の上下位置を調整するための前記被操作部の操作は、前記パネル材において前記固定材の上に載った部分のうち、前記被操作部の上方位置に形成された穴又は切り欠きを通じて行われるとよい。
こうすることで、パネル材において固定材の上に載った部分のうち、被操作部の上方位置には、開口部として形成された穴又は切り欠きが設けられており、固定材の上下位置を調整する際には、この穴又は切り欠きを通じて被操作部の操作が可能である。これにより、被操作部を操作して固定材の上下位置を調整することが一層簡単になる。
In the floor construction method, the operation of the operated portion for adjusting the vertical position of the fixing material is performed at a position above the operated portion in a portion of the panel material placed on the fixing material. It may be performed through the formed hole or notch.
In this way, a hole or notch formed as an opening is provided at the upper position of the operated portion of the portion of the panel material that is placed on the fixing material, and the upper and lower positions of the fixing material are set. When adjusting, the operated portion can be operated through this hole or notch. Thereby, it becomes much easier to adjust the vertical position of the fixing member by operating the operated portion.

上記の床施工方法において、前記支柱は、前記固定材が嵌合可能な受け部と、前記受け部の底壁を貫通して該底壁よりも上方に突出した前記被操作部とを備え、前記床下ユニットは、前記支柱の前記受け部に、前記被操作部が前記固定材の底を貫通するように前記固定材を嵌合させて構成されるとよい。
こうすることで、支柱の受け部に固定材を嵌合させることで、支柱を固定材に簡単に組み付けることが可能となる。
In the floor construction method, the support column includes a receiving portion into which the fixing material can be fitted, and the operated portion that protrudes upward from the bottom wall through the bottom wall of the receiving portion, The underfloor unit may be configured by fitting the fixing member into the receiving portion of the support so that the operated portion penetrates the bottom of the fixing member.
By doing so, it is possible to easily assemble the column to the fixing member by fitting the fixing member to the receiving part of the column.

上記の床施工方法において、前記支柱のうち、前記被操作部を上端部に有する支柱本体を、前記固定材に形成された挿入孔に挿入して前記支柱が前記固定材に組み付けられ、前記固定材の上下位置を調整するための前記被操作部の操作は、前記パネル材において前記固定材の上に載った部分のうち、前記挿入孔の上方位置に形成された前記開口部を通じて行われるとよい。
こうすることで、固定材に形成された挿入孔に支柱の支柱本体を挿入することで、支柱を固定材に適切に組み付けることが可能となる。
In the floor construction method, the column main body having the operated portion at the upper end of the column is inserted into an insertion hole formed in the fixing material, and the column is assembled to the fixing material, and the fixing When the operation of the operated portion for adjusting the vertical position of the material is performed through the opening formed at a position above the insertion hole in the portion of the panel material that is placed on the fixing material. Good.
By doing so, it is possible to appropriately assemble the support column to the fixing material by inserting the support column body of the support column into the insertion hole formed in the fixing material.

上記の床施工方法において、前記建物の基礎の立ち上がり部には、互いに離間して配置された一対の保持具が設置されており、前記床下ユニットは、前記一対の前記保持具に、前記床下ユニットの前記固定材のそれぞれの端部を保持させるようにして配置されるとよい。
こうすることで、固定材の配置の位置決めを簡単に行うことができる。
In the floor construction method described above, a pair of holders that are spaced apart from each other are installed at a rising portion of the foundation of the building, and the underfloor unit is connected to the pair of holders and the underfloor unit. It is good to arrange | position so that each edge part of the said fixing material may be hold | maintained.
By doing so, the positioning of the fixing member can be easily performed.

上記の床施工方法において、前記支柱は、ネジ山が形成されたネジ部を有し、前記脚部材は、前記ネジ部に螺合し、前記支柱を軸として回転させることで前記ネジ部に沿って上下に移動する板状部材であるとよい。
こうすることで、脚部材を簡単な構造により実現できる。また、脚部材が板状に構成されていることで、支柱による支持を安定させることができる。
In the floor construction method described above, the support column has a screw portion in which a thread is formed, and the leg member is screwed into the screw portion and rotated about the support column along the screw portion. It is preferable that the plate member move up and down.
By doing so, the leg member can be realized with a simple structure. Moreover, the support by a support | pillar can be stabilized because the leg member is comprised by plate shape.

また、上記課題は、本発明に係る床構造によれば、建物の床構造であって、前記建物の床が設置されるベース部と、前記ベース部に設置され、前記建物の床を構成するパネル材を支持する固定材と、前記固定材を支持する支柱とを一体化した床下ユニットと、前記パネル材から前記支柱の上部が露出するように、前記固定材の上に配置される前記パネル材と、を備え、前記床下ユニットの前記固定材は、前記建物の基礎の立ち上がり部に架設され、前記支柱の下端は、前記ベース部に埋設しており、前記支柱は、前記支柱に設けられ、前記支柱に対して上下に移動可能な脚部材と、前記固定材の上下位置を調整するために、前記固定材に組み付けられた前記支柱の上部に設けられた被操作部と、を有し、前記脚部材は、前記ベース部に当接していることにより解決される。
上記の床構造によれば、床のベース部に支柱の一部を埋設するようにしたことで、床のベース部に支柱を固定することができる。そして、支柱に対して上下に移動する脚部材を床のベース部材と当接させるようにしたことで、支柱による床の支持を安定させることができる。
また、上記の床構造によれば、床下ユニットの上にパネル材を置いてから、支柱の高さを調整することができる。この際、パネル材の上から支柱の高さ調整が可能であるため、固定材及びパネル材の上下位置の調整を簡単に行うことができる。
Moreover, according to the floor structure which concerns on this invention, the said subject is a floor structure of a building, Comprising: The base part in which the floor of the said building is installed, and it is installed in the said base part and comprises the floor of the said building An underfloor unit in which a fixing material that supports a panel material and a column that supports the fixing material are integrated, and the panel that is disposed on the fixing material so that an upper portion of the column is exposed from the panel material The fixing material of the underfloor unit is erected on the rising part of the foundation of the building, the lower end of the column is embedded in the base part, and the column is provided on the column A leg member movable up and down with respect to the support; and an operated portion provided at an upper part of the support attached to the fixing member in order to adjust a vertical position of the fixing member. The leg member is in contact with the base portion. It is solved by that you are.
According to the above floor structure, the support column can be fixed to the base portion of the floor by burying a part of the support column in the base portion of the floor. And since the leg member which moves up and down with respect to the support | pillar was made to contact | abut with the base member of a floor, the support of the floor by a support | pillar can be stabilized.
Moreover, according to said floor structure, after placing a panel material on an underfloor unit, the height of a support | pillar can be adjusted. At this time, since the height of the column can be adjusted from above the panel material, the vertical positions of the fixing material and the panel material can be easily adjusted.

本発明によれば、床施工の工数を削減し、床施工に係る労力を軽減できる。   ADVANTAGE OF THE INVENTION According to this invention, the man-hour of floor construction can be reduced and the labor which concerns on floor construction can be reduced.

本発明の建物における床構造の一例を示す模式図である。It is a schematic diagram which shows an example of the floor structure in the building of this invention. 床下ユニットの組み立て手順を示す図である。It is a figure which shows the assembly procedure of an underfloor unit. 大引に束を組み付ける手順を説明する図である。It is a figure explaining the procedure which assembles a bundle in large drawing. 床下ユニットの配置例を示す図である。It is a figure which shows the example of arrangement | positioning of an underfloor unit. 床下ユニットの配置状態を示す側面図である。It is a side view which shows the arrangement | positioning state of an underfloor unit. 大引が保持具により保持されている状態を示す図である。It is a figure which shows the state currently held by the holding tool. 土間を構成するコンクリートを打設した状態を示す図である。It is a figure which shows the state which laid concrete which comprises soil. 床下ユニットに床パネルを配置した状態を示す図である。It is a figure which shows the state which has arrange | positioned the floor panel to the underfloor unit. 束の組み付け位置の調整を説明する図である。It is a figure explaining adjustment of the assembly position of a bundle. 変形例に係る束の組み付け位置の調整前の状態を示す図である。It is a figure which shows the state before adjustment of the assembly | attachment position of the bundle which concerns on a modification. 変形例に係る束の組み付け位置の調整後の状態を示す図である。It is a figure which shows the state after adjustment of the assembly | attachment position of the bundle which concerns on a modification. 変形例に係る床パネルを示す図である。It is a figure which shows the floor panel which concerns on a modification.

以下、図1乃至図12を参照しながら、本発明の建物及び当該建物の床の施工方法について説明する。なお、以下に説明する実施例は、本発明の理解を容易にするためのものであり、本発明を限定するものではない。すなわち、本発明は、その趣旨を逸脱することなく、変更、改良され得る。また、当然ながら、本発明にはその等価物が含まれ得る。   Hereinafter, the construction method of the building of the present invention and the floor of the building will be described with reference to FIGS. In addition, the Example described below is for making an understanding of this invention easy, and does not limit this invention. That is, the present invention can be changed and improved without departing from the spirit of the present invention. Of course, the present invention may include equivalents thereof.

なお、以下では、互いに直交する3つの方向をX方向、Y方向及びZ方向と呼ぶこととする。ここで、X方向及びY方向は、水平方向である。より具体的に説明すると、X方向は、後述する大引12の長手方向(所定方向に相当)に該当し、Y方向は、大引12の長手方向と交差(直交)する方向に該当する。また、Z方向は、鉛直方向(上下方向)である。   In the following, three directions orthogonal to each other are referred to as an X direction, a Y direction, and a Z direction. Here, the X direction and the Y direction are horizontal directions. More specifically, the X direction corresponds to a longitudinal direction (corresponding to a predetermined direction) of the large drawing 12 described later, and the Y direction corresponds to a direction intersecting (orthogonal) with the longitudinal direction of the large drawing 12. The Z direction is the vertical direction (up and down direction).

<<建物の構成>>
本実施形態に係る床施工方法により床を構築する建物(以下、建物1)は、例えば複数階建ての住宅や建屋であり、1階部分の床構造として、図1に図示した床構造を採用している。図1は、建物1における床構造の一例を示す模式図であり、X方向から床10及び床下ユニット20を見た図である。なお、図1に図示の床構造は、複数階建ての建物にのみ適用されるものではなく、平屋等、一階建ての建物にも適用可能である。
<< Building structure >>
A building that constructs a floor by the floor construction method according to the present embodiment (hereinafter referred to as “building 1”) is, for example, a multi-storey house or building, and employs the floor structure illustrated in FIG. 1 as the floor structure of the first floor portion. is doing. FIG. 1 is a schematic diagram illustrating an example of a floor structure in a building 1, and is a view of the floor 10 and the underfloor unit 20 viewed from the X direction. Note that the floor structure shown in FIG. 1 is not only applied to a multi-storey building, but can also be applied to a one-storey building such as a one-story building.

床10は、パネル材としての床パネル11を床設置スペースに敷きつめて不図示の化粧材を床パネル11の上に固定することで構成されている。床パネル11は、平面視で略長方形状の合板からなる。床下ユニット20は、図1に示すように床10と土間FLとの間に配置され、床10を下方から支えるものである。床下ユニット20は、図2及び図3に示すように固定材としての大引12と、支柱としての束13と、を組み付けて一体化したものである。   The floor 10 is configured by placing a floor panel 11 as a panel material in a floor installation space and fixing a decorative material (not shown) on the floor panel 11. The floor panel 11 is made of a substantially rectangular plywood in plan view. The underfloor unit 20 is disposed between the floor 10 and the soil FL as shown in FIG. 1 and supports the floor 10 from below. As shown in FIGS. 2 and 3, the underfloor unit 20 is an assembly in which a large pull 12 as a fixing material and a bundle 13 as a support are assembled and integrated.

大引12は、角筒状の鋼材からなり、その上端面には床パネル11が設置される。
また、大引12には所定の間隔で操作孔12aが形成されている。この操作孔12aは、上下に貫通した貫通孔であり、それぞれの操作孔12aの位置に束13が取り付けられる。
The large fork 12 is made of a square tubular steel material, and the floor panel 11 is installed on the upper end surface thereof.
In addition, the operating hole 12a is formed in the large pull 12 at a predetermined interval. This operation hole 12a is a through-hole penetrating vertically, and the bundle 13 is attached to the position of each operation hole 12a.

束13は、図1に示すように、大引12の下方位置で大引12を支持する部材である。束13は、X方向に沿って略一定の間隔で大引12に組み付けられる。なお、本実施形態において図示した束13の数は、例示であって、大引12の長さや、束13の配置間隔に応じて適宜変更され得る。   As shown in FIG. 1, the bundle 13 is a member that supports the large pull 12 at a position below the large pull 12. The bundle 13 is assembled to the fork 12 at substantially constant intervals along the X direction. In addition, the number of the bundles 13 illustrated in the present embodiment is an exemplification, and can be appropriately changed according to the length of the fork 12 and the arrangement interval of the bundles 13.

また、図1乃至図3に示すように、束13は、大引12が嵌合可能な受け部14と、鉛直方向に延出した支柱本体15と、支柱本体15に対して上下に移動可能に取り付けられた脚部材16とを有する。脚部材16は、土間FLが構成された後に、土間FLと当接して床10の荷重を支持する板状部材である。例えば、脚部材16は、プレートナットにより構成されることとしてよい。
支柱本体15は、棒状の第1ネジ部15aと、第1ネジ部15aが挿入される筒状部15bと、筒状部15bに挿入される第2ネジ部15cとを有する。第1ネジ部15a及び第2ネジ部15cの外周面には雄ネジが形成されており、筒状部15bの内周面に形成された雌ネジと係合(螺合)している。
なお、第1ネジ部15aは、筒状部15bに対し上部から突出するように設けられており、第2ネジ部15cは、筒状部15bに対し下部から突出するように設けられている。
As shown in FIGS. 1 to 3, the bundle 13 can be moved up and down with respect to the receiving portion 14 into which the large pull 12 can be fitted, the column main body 15 extending in the vertical direction, and the column main body 15. And a leg member 16 attached thereto. The leg member 16 is a plate-like member that abuts against the soil FL and supports the load on the floor 10 after the soil FL is formed. For example, the leg member 16 may be configured by a plate nut.
The column main body 15 includes a rod-shaped first screw portion 15a, a cylindrical portion 15b into which the first screw portion 15a is inserted, and a second screw portion 15c to be inserted into the cylindrical portion 15b. Male screws are formed on the outer peripheral surfaces of the first screw portion 15a and the second screw portion 15c, and are engaged (screwed) with female screws formed on the inner peripheral surface of the cylindrical portion 15b.
In addition, the 1st screw part 15a is provided so that it may protrude from the upper part with respect to the cylindrical part 15b, and the 2nd screw part 15c is provided so that it may protrude from the lower part with respect to the cylindrical part 15b.

また、第2ネジ部15cに対しては、脚部材16が取り付けられる。脚部材16は、中心部に貫通孔が形成されており、貫通孔の内周面には第2ネジ部15cと螺合する雌ネジが形成されている。そして、脚部材16は、第2ネジ部15cと螺合し、第2ネジ部15cに対して脚部材16を回転させることにより、脚部材16を上下に移動させることができる。
なお、第2ネジ部15cの下端部15caには、定着板15dが固定されている。定着板15dは、土間FLが構成された後に、土間FLの内部に埋め込まれる部材であり、土間FLと第2ネジ部15cとの固定を安定させるためのものである。
また、脚部材16は、第2ネジ部15cにおいて、筒状部15bと定着板15dとの間において上下に移動可能となっている。
A leg member 16 is attached to the second screw portion 15c. The leg member 16 has a through hole formed in the center thereof, and an internal thread that is screwed into the second screw portion 15c is formed on the inner peripheral surface of the through hole. And the leg member 16 can be moved up and down by screwing with the 2nd screw part 15c, and rotating the leg member 16 with respect to the 2nd screw part 15c.
A fixing plate 15d is fixed to the lower end portion 15ca of the second screw portion 15c. The fixing plate 15d is a member that is embedded in the interstices FL after the interstices FL are formed, and is for stabilizing the fixing of the interstices FL and the second screw portions 15c.
Further, the leg member 16 is movable up and down between the cylindrical portion 15b and the fixing plate 15d in the second screw portion 15c.

また、第1ネジ部15aが順回転すると、第1ネジ部15aが筒状部15bに対して上昇し、支柱本体15の高さが増加する。反対に、第1ネジ部15aが逆回転すると、第1ネジ部15aが筒状部15bに対して下降し、支柱本体15の高さが減少する。このように支柱本体15を含む束13の高さは、第1ネジ部15aを回転させることで調整することが可能である。   Moreover, when the 1st screw part 15a rotates forward, the 1st screw part 15a will raise with respect to the cylindrical part 15b, and the height of the support | pillar main body 15 will increase. On the other hand, when the first screw portion 15a rotates in the reverse direction, the first screw portion 15a descends with respect to the cylindrical portion 15b, and the height of the column main body 15 decreases. As described above, the height of the bundle 13 including the column main body 15 can be adjusted by rotating the first screw portion 15a.

第1ネジ部15aを回転させる際には、第1ネジ部15aの上端部に設けられたネジ頂部17を、工具(例えばドライバーやプラグレンチ)によって操作する(回転させる)。つまり、ネジ頂部17は、束13の上部に設けられた被操作部に相当し、束13の高さを変更する際に操作される部分である。   When rotating the first screw portion 15a, the screw top portion 17 provided at the upper end portion of the first screw portion 15a is operated (rotated) with a tool (for example, a screwdriver or a plug wrench). That is, the screw top portion 17 corresponds to an operated portion provided at the upper portion of the bundle 13 and is a portion that is operated when the height of the bundle 13 is changed.

受け部14は、束13の上方部分、より具体的には筒状部15bの上方位置に設けられた上向きC字状の鋼材からなる。この受け部14は、図3に示すように、底壁14aと、底壁の両側端から立設された一対の側壁14bとを有する。図3は、大引12を束13に組み付ける直前の状態を示す図である。なお、図3は、法線方向がX方向であって後述の操作孔12aを通過する断面を示した図となっている。   The receiving portion 14 is made of an upward C-shaped steel material provided at an upper portion of the bundle 13, more specifically, at an upper position of the cylindrical portion 15 b. As shown in FIG. 3, the receiving portion 14 has a bottom wall 14 a and a pair of side walls 14 b erected from both side ends of the bottom wall. FIG. 3 is a view showing a state immediately before the large pull 12 is assembled to the bundle 13. FIG. 3 is a view showing a cross section passing through an operation hole 12a, which will be described later, in which the normal direction is the X direction.

底壁14aには貫通孔14cが設けられており、図3に示すように貫通孔14cに第1ネジ部15aの上端部が挿通されている。換言すると、ネジ頂部17は、受け部14の底壁14aを貫通して当該底壁14aよりも上方に突出していることになる。なお、底壁14aの下面には、図3に示すように、ナット(以下、下方ナット18)が溶接されている。下方ナット18は、その孔と底壁14aの貫通孔14cとが連通するように底壁14aに固定されている。第1ネジ部15aの上端部は、下方ナット18と螺合して底壁14aを貫くように配設されている。   A through hole 14c is provided in the bottom wall 14a, and the upper end portion of the first screw portion 15a is inserted into the through hole 14c as shown in FIG. In other words, the screw top portion 17 penetrates the bottom wall 14a of the receiving portion 14 and projects upward from the bottom wall 14a. As shown in FIG. 3, a nut (hereinafter referred to as a lower nut 18) is welded to the lower surface of the bottom wall 14a. The lower nut 18 is fixed to the bottom wall 14a so that the hole communicates with the through hole 14c of the bottom wall 14a. The upper end portion of the first screw portion 15a is disposed so as to be screwed into the lower nut 18 and penetrate the bottom wall 14a.

一対の側壁14bは、互いに離れた状態で配置されており、それぞれ上方に向かって延出している。各側壁14bは、若干の弾性を有し、側壁14bの上端部同士の間隔(換言すると、受け部14の上端開口)が広がるように撓むことが可能である。また、各側壁14bの延出方向中途位置には、内側(対をなす側壁14bが位置する側)に突出した係合突起14dが形成されている。   The pair of side walls 14b are disposed apart from each other and extend upward. Each side wall 14b has some elasticity, and can bend so that the space | interval (in other words, upper end opening of the receiving part 14) of the upper end parts of the side wall 14b may spread. In addition, an engaging protrusion 14d that protrudes inward (side on which the paired side walls 14b are located) is formed at an intermediate position in the extending direction of each side wall 14b.

そして、受け部14は、図2及び図3に示すように、底壁14aと一対の側壁14bとによって囲まれたスペース内に大引12を入れ込むことで大引12と嵌合する。より具体的に説明すると、大引12は、図3に示すように受け部14の上方から受け部14内部のスペースに入り込む。また、受け部14における一対の側壁14bの間隔(横幅)は、大引12の両側部の間隔(横幅)と略一致する。このため、大引12を受け部14内に入れ込む際、受け部14の上端開口が広がるように側壁14bが撓む。これにより、大引12がスムーズに受け部14内に入り込むようになる。   As shown in FIGS. 2 and 3, the receiving portion 14 is fitted with the large pull 12 by inserting the large pull 12 into a space surrounded by the bottom wall 14 a and the pair of side walls 14 b. More specifically, as shown in FIG. 3, the large pull 12 enters a space inside the receiving portion 14 from above the receiving portion 14. In addition, the interval (horizontal width) between the pair of side walls 14 b in the receiving portion 14 is substantially the same as the interval (lateral width) between the both side portions of the large pull 12. For this reason, when putting in the large drawing 12 in the receiving part 14, the side wall 14b bends so that the upper end opening of the receiving part 14 may spread. As a result, the large pull 12 enters the receiving portion 14 smoothly.

以上のように受け部14内に大引12が入り込むことで束13が大引12に組み付けられる。また、大引12の両側部の各々には、内側(対をなす側部が位置する側)に窪んだ係合凹部12bが形成されている。束13が大引12に組み付けられた状態では、図8に示すように、大引12の両側部の各々と隣り合う位置に受け部14の側壁14bが位置し、係合突起14dが係合凹部12bと対向して係合凹部12b内に入り込む(係合する)ようになる。このように係合突起14dが係合凹部12bと係合することで、大引12と受け部14との嵌合状態(換言すると、大引12に対する束13の組み付け状態)を安定させることが可能となる。   As described above, the bundle 13 is assembled to the large drawing 12 by the large drawing 12 entering the receiving portion 14. In addition, an engagement recess 12 b that is recessed inward (side on which the paired side portions are located) is formed on each of both side portions of the large pull 12. In the state where the bundle 13 is assembled to the large pull 12, as shown in FIG. 8, the side wall 14b of the receiving portion 14 is positioned adjacent to each of both side portions of the large pull 12, and the engaging protrusion 14d is engaged. It faces the recess 12b and enters (engages) into the engagement recess 12b. By engaging the engagement protrusion 14d with the engagement recess 12b in this way, the fitting state of the large pull 12 and the receiving portion 14 (in other words, the assembled state of the bundle 13 with respect to the large pull 12) can be stabilized. It becomes possible.

また、束13が大引12に組み付けられた状態では、図8に示すように、ネジ頂部17を含む第1ネジ部15aの上端部が大引12の底を貫通し、大引12の底よりも上方に突出している。具体的に説明すると、大引12のうち、束13が組み付けられる部分の底には、図3に示すように、大引12を貫通した孔(以下、ネジ挿入孔12c)が形成されている。また、束13では、第1ネジ部15aの上端部が受け部14の底壁14aを貫くように配設されている。   Further, in the state where the bundle 13 is assembled to the large drawing 12, as shown in FIG. 8, the upper end portion of the first screw portion 15a including the screw top portion 17 penetrates the bottom of the large drawing 12, and the bottom of the large drawing 12 It protrudes upwards. More specifically, a hole (hereinafter referred to as a screw insertion hole 12c) penetrating the pulling 12 is formed at the bottom of the portion of the pulling 12 where the bundle 13 is assembled, as shown in FIG. . In the bundle 13, the upper end portion of the first screw portion 15 a is disposed so as to penetrate the bottom wall 14 a of the receiving portion 14.

そして、束13を大引12に組み付けるために大引12を受け部14に嵌合させるとき、上記のネジ挿入孔12c内に第1ネジ部15aの上端部を挿通させる。この結果、束13は、ネジ頂部17を含む第1ネジ部15aの上端部が大引12の底を貫通するように大引12に組み付けられる。   When the bundle 13 is fitted to the receiving portion 14 for assembling the bundle 13 to the large draw 12, the upper end portion of the first screw portion 15a is inserted into the screw insertion hole 12c. As a result, the bundle 13 is assembled to the large pull 12 so that the upper end portion of the first screw portion 15 a including the screw top portion 17 penetrates the bottom of the large pull 12.

なお、大引12の底を貫通した第1ネジ部15aの上端部には、図1及び図8に示すように座金付きナット(以下、上方ナット19)が取り付けられる。上方ナット19が第1ネジ部15aの上端部に取り付けられることで、大引12に組み付けられた束13が大引12に対して固定される。   A nut with a washer (hereinafter referred to as an upper nut 19) is attached to the upper end portion of the first screw portion 15a penetrating the bottom of the large pull 12 as shown in FIGS. By attaching the upper nut 19 to the upper end portion of the first screw portion 15 a, the bundle 13 assembled to the large pull 12 is fixed to the large pull 12.

また、図3に示すように、大引12の上壁のうち、ネジ挿入孔12cと対向する部分、換言すると、束13が大引12に組み付けられた状態において第1ネジ部15aの上端部の直上位置に在る部分には円穴状の操作孔12aが設けられている。この操作孔12aは、その径がネジ頂部17の外径よりも大きくなるように形成されている。より詳しく説明すると、操作孔12aの径は、上方ナット19の最外径(座金部分の外径)よりも若干大きくなっている。   Further, as shown in FIG. 3, a portion of the upper wall of the large pull 12 that faces the screw insertion hole 12 c, in other words, an upper end portion of the first screw portion 15 a in a state where the bundle 13 is assembled to the large pull 12. A circular hole-like operation hole 12a is provided in a portion located immediately above. The operation hole 12 a is formed such that its diameter is larger than the outer diameter of the screw top portion 17. More specifically, the diameter of the operation hole 12a is slightly larger than the outermost diameter of the upper nut 19 (the outer diameter of the washer portion).

そして、ネジ頂部17を操作する際には、操作孔12aを通じて操作する形になる。つまり、大引12に組み付けられた束13の高さを変更する際には、ネジ挿入孔12cを通って大引12の底を貫通したネジ頂部17を操作する。この際、操作孔12aを通じてネジ頂部17までアクセスしてネジ頂部17を操作する形になる。   And when operating the screw top part 17, it becomes the form operated through the operation hole 12a. That is, when changing the height of the bundle 13 assembled to the large drawing 12, the screw top portion 17 penetrating the bottom of the large drawing 12 through the screw insertion hole 12c is operated. At this time, the screw top 17 is accessed through the operation hole 12a and the screw top 17 is operated.

以上の要領でネジ頂部17を操作すると、束13の高さが変更される。そして、束13の高さが変わると、これに伴って大引12の上下位置が変化する。つまり、ネジ頂部17の操作により、大引12に対する束13の組み付け位置が上下方向において変更する。ここで、組み付け位置とは、束13の高さ方向(すなわち、Z方向)において、束13のうち、大引12に組み付けられている部位の位置を意味する。   When the screw top 17 is operated in the above manner, the height of the bundle 13 is changed. Then, when the height of the bundle 13 changes, the vertical position of the fork 12 changes accordingly. That is, by operating the screw top 17, the assembly position of the bundle 13 with respect to the large pull 12 is changed in the vertical direction. Here, the assembling position means the position of the part of the bundle 13 that is assembled to the pullout 12 in the height direction of the bundle 13 (that is, the Z direction).

より詳しく説明すると、ネジ頂部17の操作によって束13の高さが変化する一方で、ネジ頂部17に対する受け部14及び大引12の位置(相対位置)は、受け部14の下面に溶接された下方ナット18によって保持される。したがって、束13の高さが変わると、大引12に対する束13の組み付け位置(具体的には、受け部14の位置)が上下移動し、これに伴う形で大引12の上下位置が調整される。   More specifically, while the height of the bundle 13 is changed by the operation of the screw top portion 17, the positions (relative positions) of the receiving portion 14 and the large pull 12 with respect to the screw top portion 17 are welded to the lower surface of the receiving portion 14. It is held by the lower nut 18. Therefore, when the height of the bundle 13 changes, the assembly position of the bundle 13 with respect to the large pull 12 (specifically, the position of the receiving portion 14) moves up and down, and the vertical position of the large pull 12 is adjusted accordingly. Is done.

<<床の施工方法>>
次に、本実施形態に係る床10の施工方法について説明する。なお、以下では、図1に図示した構造の床10を施工する場合を例に挙げて説明する。
<< floor construction method >>
Next, the construction method of the floor 10 according to the present embodiment will be described. In the following, a case where the floor 10 having the structure shown in FIG. 1 is constructed will be described as an example.

[床下ユニット20の組み付け工程]
本実施形態に係る床10を施工する上では、先ず、大引12に束13を組み付けて床下ユニット20を構成する。なお、大引12と束13との組付けは、工場で行い、その後完成した床下ユニット20を建物1の建設現場に運んでもよいし、大引12と束13との組付けを建物1の建設現場で行ってもよい。
[Assembling process of underfloor unit 20]
When constructing the floor 10 according to the present embodiment, first, the underfloor unit 20 is configured by assembling the bundle 13 to the large pull 12. The assembly of the large drawing 12 and the bundle 13 may be performed at the factory, and then the completed underfloor unit 20 may be transported to the construction site of the building 1, or the assembly of the large drawing 12 and the bundle 13 may be performed on the building 1. It may be done at the construction site.

[床下ユニット20の配置工程]
そして、それぞれの床下ユニット20を基礎Bの立ち上がり部Rに架設して配置する。具体的には、図5及び図6に示されるように、各々の床下ユニット20を建物1の基礎Bの立ち上がり部Rに設けられた保持具40に、大引12の端部12dを載置することで、立ち上がり部Rに対して大引12を架設した状態で床下ユニット20を配置する。
なお、図5および図6に示されるように、基礎Bの立ち上がり部Rに対して、X方向において離間した位置に一対の保持具40が設けられる。
[Disposition process of underfloor unit 20]
And each underfloor unit 20 is constructed and installed on the rising part R of the foundation B. Specifically, as shown in FIGS. 5 and 6, each underfloor unit 20 is placed on a holder 40 provided at a rising portion R of a foundation B of a building 1, and an end portion 12 d of the overdraw 12 is placed. By doing so, the underfloor unit 20 is disposed in a state where the large pull 12 is installed on the rising portion R.
As shown in FIGS. 5 and 6, a pair of holders 40 are provided at positions separated from each other in the X direction with respect to the rising portion R of the foundation B.

保持具40は、板部材41と高さ調整部42とを備える。具体的には、板部材41は、Y方向に離間して設けられ、立ち上がり部Rの上面と側面に沿ったL字状の第1プレート41A及び第2プレート41Bと、第1プレート41Aと第2プレート41Bとを連結し、大引12の端部12dを支持する載置面部41Cと、を有する。
高さ調整部42は、第1プレート41Aに設けられ、第1プレート41Aと立ち上がり部Rの上面との距離を調整する第1高さ調整部42Aと、第2プレート41Bに設けられ、第2プレート41Bと立ち上がり部Rの上面との距離を調整する第2高さ調整部42Bとを有する。
なお、第1高さ調整部42A及び第2高さ調整部42Bは、ボルトを有し、ボルトを回転させることにより、第1プレート41A及び第2プレート41Bのそれぞれの上下位置を調整可能である。そして、第1プレート41Aと第2プレート41Bに伴って載置面部41Cの位置も変化し、これにより載置面部41Cにより支持される大引12の高さが調整可能となっている。
なお、本実施形態においては、保持具40は、束13の定着板15dが地業BFから離間する高さに予め調整されていることとする。地業BFは、砕石等により構成される。
The holder 40 includes a plate member 41 and a height adjustment unit 42. Specifically, the plate member 41 is provided to be separated in the Y direction, and the L-shaped first plate 41A and the second plate 41B along the upper surface and the side surface of the rising portion R, and the first plate 41A and the first plate 41A. A mounting surface portion 41C that connects the two plates 41B and supports the end portion 12d of the pulling 12;
The height adjusting unit 42 is provided on the first plate 41A, and is provided on the second plate 41B, the first height adjusting unit 42A that adjusts the distance between the first plate 41A and the upper surface of the rising portion R, and the second plate 41B. A second height adjusting portion 42B that adjusts the distance between the plate 41B and the upper surface of the rising portion R is provided.
The first height adjusting unit 42A and the second height adjusting unit 42B have bolts, and the vertical positions of the first plate 41A and the second plate 41B can be adjusted by rotating the bolts. . And the position of the mounting surface part 41C also changes with the 1st plate 41A and the 2nd plate 41B, and, thereby, the height of the large pull 12 supported by the mounting surface part 41C can be adjusted.
In the present embodiment, it is assumed that the holder 40 is adjusted in advance to a height at which the fixing plate 15d of the bundle 13 is separated from the local business BF. The local business BF is composed of crushed stone and the like.

上述したように、複数の床下ユニット20を基礎Bの立ち上がり部Rに架設して配置する。この際、それぞれの床下ユニット20の大引12を保持具40に架設するように配置することで、それぞれの床下ユニット20をX方向に沿って平行に配置することができる。
このように、保持具40に大引12を架設して床下ユニット20を配置することにより、床下ユニット20の基礎Bに対する位置決めを容易に行うことができる。
As described above, the plurality of underfloor units 20 are installed on the rising portion R of the foundation B. In this case, the underfloor units 20 can be arranged in parallel along the X direction by arranging the large pulls 12 of the underfloor units 20 so as to be installed on the holder 40.
In this way, by positioning the underfloor unit 20 by laying the large pull 12 on the holder 40, the positioning of the underfloor unit 20 with respect to the foundation B can be easily performed.

次に、図7に示されるように、地業BFの上にコンクリートを打設して土間FLを形成する。具体的には、土間FLは、束13の第2ネジ部15cの下端部15ca及び定着板15dが埋設するように形成する。
そして、土間FLが硬化した後に、束13の脚部材16を回転させて土間FLに向けて移動させ、脚部材16を土間FLに対して当接させる。こうすることで、束13は、脚部材16により荷重を支持可能となるため、束13による支持を安定させることができる。
Next, as shown in FIG. 7, concrete is placed on the ground business BF to form the soil FL. Specifically, the soil gap FL is formed so that the lower end portion 15ca of the second screw portion 15c of the bundle 13 and the fixing plate 15d are embedded.
Then, after the soil FL is cured, the leg members 16 of the bundle 13 are rotated and moved toward the soil FL, and the leg members 16 are brought into contact with the soil FL. By doing so, the bundle 13 can support the load by the leg member 16, so that the support by the bundle 13 can be stabilized.

次に、図8に示されるように、床下ユニット20の上に、複数の床パネル11を配置する。
具体的に説明すると、図8に示されるように、複数の床パネル11(図8では4つの床パネル11)をX方向に並べるようにして、大引12の上に配置する。
詳細に説明すると、各床パネル11は、平面視で略直方形状をなしており、その長辺が隣り合う床パネル11の長辺と重なるように配置する。
また、大引12のうちの一つ(以下、中央の大引12)には、Y方向における各床パネル11の中央部が載っている。残りの大引12(以下、端側の大引12)には、Y方向における床パネル11の端部が載っている。
Next, as shown in FIG. 8, a plurality of floor panels 11 are arranged on the underfloor unit 20.
More specifically, as shown in FIG. 8, a plurality of floor panels 11 (four floor panels 11 in FIG. 8) are arranged on the fork 12 so as to be arranged in the X direction.
More specifically, each floor panel 11 has a substantially rectangular shape in plan view, and is arranged so that its long side overlaps with the long side of the adjacent floor panel 11.
Moreover, the center part of each floor panel 11 in the Y direction is placed on one of the large pulls 12 (hereinafter, the central large pull 12). The end of the floor panel 11 in the Y direction rests on the remaining large fork 12 (hereinafter referred to as the end-side large fork 12).

なお、3つの大引12に固定されている床パネル11の配置では、図8に示すように、X方向における各大引12の一端部が、パネル群中、X方向において最も一端側に位置する床パネル11よりも幾分はみ出している。ただし、これに限定されるものではなく、床パネル11と大引12のX方向の端が揃っていてもよい。   In the arrangement of the floor panel 11 fixed to the three large pulls 12, as shown in FIG. 8, one end of each large pull 12 in the X direction is located on the most end side in the X direction in the panel group. It protrudes somewhat more than the floor panel 11 to be performed. However, the present invention is not limited to this, and the X-direction ends of the floor panel 11 and the large fork 12 may be aligned.

図8、図9に示されるように、床パネル11において大引12の上に載った部分のうち、操作孔12aの上方位置には開口部が設けられている。   As shown in FIGS. 8 and 9, an opening is provided at a position above the operation hole 12 a in the portion of the floor panel 11 that is placed on the large pull 12.

より詳しく説明すると、床パネル11において中央の大引12の上に載っている部分(すなわち、Y方向における床パネル11の中央部)には、図8に示すように開口部としての切り欠き11aが形成されている。この切り欠き11aは、Y方向における床パネル11の中央部の側縁(X方向における一端側の縁)を略三角形状に切り欠くことで形成されている。また、切り欠き11aは、図8及び図9に示すように、中央の大引12に形成された操作孔12aの直上位置に設けられている。さらに、切り欠き11aは、操作孔12aの開口サイズよりも幾分大きく、切り欠き11aの縁が操作孔12aの縁よりも外側に位置するように形成されている。   More specifically, a portion of the floor panel 11 that is placed on the central pulling 12 (that is, the central portion of the floor panel 11 in the Y direction) has a notch 11a as an opening as shown in FIG. Is formed. This notch 11a is formed by notching the side edge (the edge on one end side in the X direction) of the center part of the floor panel 11 in the Y direction into a substantially triangular shape. Further, as shown in FIGS. 8 and 9, the notch 11a is provided at a position immediately above the operation hole 12a formed in the central pulling 12. Further, the notch 11a is somewhat larger than the opening size of the operation hole 12a, and is formed so that the edge of the notch 11a is located outside the edge of the operation hole 12a.

また、床パネル11において端側の大引12の上に載っている部分(すなわち、X方向における床パネル11の端部)には、図8に示すように開口部としての切り欠き11bが形成されている。切り欠き11bは、図8に示すように、X方向において互いに隣り合う2つの床パネル11の各々の角部を略三角形状に面取りすることで形成されている。また、切り欠き11bは、端側の大引12に形成された操作孔12aの直上位置に設けられている。また、切り欠き11bは、操作孔12aの開口サイズよりも若干大きく、切り欠き11bの外縁が操作孔12aの縁よりも外側に位置するように設けられている。なお、切り欠き11bと操作孔12aとの位置関係については、切り欠き11aと操作孔12aとの位置関係(すなわち、図9に図示の位置関係)と略同様である。   In addition, a notch 11b as an opening is formed in the portion of the floor panel 11 that rests on the large pull 12 on the end side (that is, the end of the floor panel 11 in the X direction) as shown in FIG. Has been. As shown in FIG. 8, the notch 11b is formed by chamfering each corner of two floor panels 11 adjacent to each other in the X direction into a substantially triangular shape. Further, the notch 11b is provided at a position directly above the operation hole 12a formed in the end pulling 12. The notch 11b is slightly larger than the opening size of the operation hole 12a, and is provided so that the outer edge of the notch 11b is located outside the edge of the operation hole 12a. The positional relationship between the notch 11b and the operation hole 12a is substantially the same as the positional relationship between the notch 11a and the operation hole 12a (that is, the positional relationship illustrated in FIG. 9).

以上のように、床パネル11において大引12の上に載っている部分のうち、大引12に組み付けられた束13が有する第1ネジ部15aの直上位置にある箇所には、開口部としての切り欠き11a、11bが設けられている。つまり、大引12の底を貫通している第1ネジ部15aの頂部(すなわちネジ頂部17)は、操作孔12a及び切り欠き11a、11bを通じて床パネル11の上方空間に対して露出している。このため、ネジ頂部17は、切り欠き11a、11b及び操作孔12aを通じて操作可能となる。このような構成であれば、床パネル11の上方から切り欠き11a、11b及び操作孔12aを通じてネジ頂部17にアクセスしてネジ頂部17を操作することが可能となる。   As described above, in the portion of the floor panel 11 that rests on the large pull 12, an opening is provided at a position directly above the first screw portion 15 a of the bundle 13 assembled to the large pull 12. Notches 11a and 11b are provided. In other words, the top portion of the first screw portion 15a (that is, the screw top portion 17) penetrating the bottom of the large pull 12 is exposed to the upper space of the floor panel 11 through the operation hole 12a and the notches 11a and 11b. . For this reason, the screw top portion 17 can be operated through the notches 11a and 11b and the operation hole 12a. With such a configuration, the screw top 17 can be operated by accessing the screw top 17 through the notches 11a and 11b and the operation hole 12a from above the floor panel 11.

すなわち、床下ユニット20の上に床パネル11を配置した後に、大引12の上下位置(すなわち、床レベル)を調整する。具体的には、各束13が支柱本体15に備えた第1ネジ部15aのネジ頂部17を操作して束13の高さを変更する。この際、床パネル11において大引12の上に載った部分のうち、ネジ頂部17の上方位置に形成された切り欠き11a、11bを通じてネジ頂部17を操作する。   In other words, after the floor panel 11 is arranged on the underfloor unit 20, the vertical position (that is, the floor level) of the draw 12 is adjusted. Specifically, the height of the bundle 13 is changed by operating the screw top portion 17 of the first screw portion 15 a provided in the column main body 15 in each bundle 13. At this time, the screw top portion 17 is operated through the notches 11 a and 11 b formed in the upper position of the screw top portion 17 in the portion of the floor panel 11 placed on the large pull 12.

より詳しく説明すると、束13が大引12に組み付けられた状態において、ネジ頂部17の直上位置には、大引12の上壁に形成された操作孔12a、及び、床パネル11に形成された切り欠き11a、11bが設けられている。つまり、ネジ頂部17は、床パネル11の上方空間に対して露出している。これにより、床パネル11の上方から操作孔12a及び切り欠き11a、11bを通じてネジ頂部17を操作し得るようになる。より詳しく説明すると、作業者(すなわち、床の施工者)は、操作孔12a及び切り欠き11a、11bを通じて工具を差し込み、当該工具によってネジ頂部17を操作して第1ネジ部15aを回転させる。   More specifically, in a state where the bundle 13 is assembled to the large pull 12, the operation hole 12a formed in the upper wall of the large pull 12 and the floor panel 11 are formed at a position immediately above the screw top portion 17. Notches 11a and 11b are provided. That is, the screw top portion 17 is exposed to the upper space of the floor panel 11. Thereby, the screw top portion 17 can be operated from above the floor panel 11 through the operation hole 12a and the notches 11a and 11b. More specifically, an operator (that is, a floor installer) inserts a tool through the operation hole 12a and the notches 11a and 11b, and operates the screw top portion 17 with the tool to rotate the first screw portion 15a.

そして、第1ネジ部15aの回転によって束13の高さが変更し、これに伴って大引12の上下位置(床レベル)が調整される。最終的に大引12の上下位置が所望の位置に達した時点で、作業者は、操作孔12a及び切り欠き11a、11bを通じて上方ナット19をネジ頂部17に螺合させる。これにより、大引12が所望の高さに配置された状態で束13が大引12に対して固定されるようになる。   And the height of the bundle | flux 13 changes with rotation of the 1st screw part 15a, and the up-and-down position (floor level) of the large drawing 12 is adjusted in connection with this. When the vertical position of the large pull 12 finally reaches a desired position, the operator screws the upper nut 19 into the screw top 17 through the operation hole 12a and the notches 11a and 11b. As a result, the bundle 13 is fixed to the large pull 12 in a state where the large pull 12 is arranged at a desired height.

その後、化粧材の設置等を含む後段の工程が実施される。そして、床10の施工に関する一連の工程が実施されることで床10及び床下ユニット20が完成し、これを以て床10の施工作業が終了する。   Thereafter, subsequent steps including installation of a decorative material and the like are performed. Then, the floor 10 and the underfloor unit 20 are completed by performing a series of steps related to the construction of the floor 10, and the construction work of the floor 10 is completed.

<<変形例に係る建物及び床の施工方法>>
次に、変形例に係る建物及び床の施工方法について説明する。変形例では、固定材に相当する大引の構造、支柱に相当する束の構造、及び束を大引に組み付ける方法が上記の実施形態とは異なる。また、上記以外の点において、変形例は、上記の実施形態と共通するため、以下では、上記の実施形態からの相違点を主に説明する。
<< construction method of building and floor according to modification >>
Next, a construction method for a building and a floor according to a modification will be described. In the modified example, the structure of the large pull corresponding to the fixing member, the structure of the bundle corresponding to the support column, and the method of assembling the bundle large are different from the above embodiment. In addition to the above, the modified example is common to the above-described embodiment, and therefore, differences from the above-described embodiment will be mainly described below.

変形例に係る大引(以下、大引30)は、角柱状の部材であり、例えば木材や鋼管からなる。大引30の上面にはX方向に沿って複数の床パネル11が固定されている。また、大引30には、X方向において略一定間隔で円穴状の挿入孔30aが形成されている。   A large drawing (hereinafter referred to as a large drawing 30) according to a modification is a prismatic member, and is made of, for example, wood or steel pipe. A plurality of floor panels 11 are fixed to the upper surface of the large pull 30 along the X direction. In addition, the large pull 30 is formed with circular insertion holes 30a at substantially constant intervals in the X direction.

また、各床パネル11において大引30の上に載っている部分のうち、挿入孔30aの直上位置に在る箇所には、図10に示すように切り欠き11a、11b(図10では、図示の都合上、切り欠き11aのみ記載)が形成されている。この切り欠き11a、11bは、本実施形態における切り欠き11a、11bに相当する開口部であり、本実施形態における形成位置と略同じ位置に形成されている。なお、切り欠き11a、11bの代わりに円穴が開口部として形成されてもよい。切り欠き11a、11bは、その外縁が挿入孔30aの縁よりも外側に位置するように形成されている。図10は、変形例において大引30に束32を組み付ける手順を示す図である。なお、図10は、図9に示す断面に相当する。   Further, of the portions of each floor panel 11 that are placed on the large pull 30, notches 11a and 11b (shown in FIG. 10) are located at positions immediately above the insertion holes 30a. For convenience, only the notch 11a is shown). The notches 11a and 11b are openings corresponding to the notches 11a and 11b in the present embodiment, and are formed at substantially the same positions as the formation positions in the present embodiment. In addition, a circular hole may be formed as an opening instead of the notches 11a and 11b. The notches 11a and 11b are formed so that the outer edges thereof are located outside the edge of the insertion hole 30a. FIG. 10 is a diagram showing a procedure for assembling the bundle 32 to the draw 30 in the modification. 10 corresponds to the cross section shown in FIG.

さらに、大引30の下面には、図10に示すように、筒状の部品(以下、ネジ保持部材31)が取り付けられている。ネジ保持部材31は、その内部空間が挿入孔30aと連通した状態で大引30の下面に固定されている。ネジ保持部材31の内径は、挿入孔30aの径よりも僅かに小さくなっており、また、ネジ保持部材31の内周面にはネジ山が形成されている。   Further, as shown in FIG. 10, a cylindrical part (hereinafter, a screw holding member 31) is attached to the lower surface of the large pull 30. The screw holding member 31 is fixed to the lower surface of the large pull 30 with its internal space communicating with the insertion hole 30a. The inner diameter of the screw holding member 31 is slightly smaller than the diameter of the insertion hole 30a, and a screw thread is formed on the inner peripheral surface of the screw holding member 31.

変形例に係る束(以下、束32)は、複数の部品に分割されており、これらの部品を組み立てることで構成される。具体的に説明すると、束32は、支柱本体33とベース部36とを有する。支柱本体33及びベース部36は、図10に示すように分離可能であり、束32が大引30に組み付けられる時点で連結する。   A bundle according to the modification (hereinafter, bundle 32) is divided into a plurality of parts, and is configured by assembling these parts. More specifically, the bundle 32 includes a column main body 33 and a base portion 36. The column main body 33 and the base portion 36 are separable as shown in FIG. 10, and are connected when the bundle 32 is assembled to the large pull 30.

支柱本体33は、外周面の一部にネジ山が形成されたシャフトの部品であり、図10に示すように互いに形が異なる3つの部分(以下、小径ネジ部33a、中径部33b及び大径ネジ部33cという)を有する。小径ネジ部33aは、支柱本体33において最も小径であり、支柱本体33の下端部に位置する。中径部33bは、小径ネジ部33aよりも大径で、かつ、大径ネジ部33cよりも小径であり、支柱本体33の中央部に位置する。大径ネジ部33cは、支柱本体33において最も大径であり、支柱本体33の上端部に位置する。そして、小径ネジ部33a及び大径ネジ部33cの外周面にはネジ山が形成されている一方で、中径部33bの外周面は平坦面(ネジ山が形成されていない面)となっている。   The column main body 33 is a shaft component in which a thread is formed on a part of the outer peripheral surface, and as shown in FIG. 10, three portions (hereinafter referred to as a small-diameter screw portion 33a, a medium-diameter portion 33b, and a large-diameter portion) are formed. A diameter screw portion 33c). The small diameter screw portion 33 a has the smallest diameter in the column main body 33 and is located at the lower end of the column main body 33. The medium diameter portion 33 b is larger in diameter than the small diameter screw portion 33 a and smaller in diameter than the large diameter screw portion 33 c, and is located in the center portion of the column main body 33. The large diameter screw portion 33 c has the largest diameter in the column main body 33 and is positioned at the upper end of the column main body 33. The outer peripheral surfaces of the small-diameter screw portion 33a and the large-diameter screw portion 33c are threaded, while the outer peripheral surface of the medium-diameter portion 33b is a flat surface (a surface on which no thread is formed). Yes.

また、大径ネジ部33cの外周面に形成されたネジ山は、ネジ保持部材31の内周面に形成されたネジ山と係合(螺合)することが可能である。そして、支柱本体33は、大径ネジ部33cがネジ保持部材31内に挿入された状態で順方向に回転すると下方に向かって移動する。また、支柱本体33が下方に移動すると、やがて支柱本体33がネジ保持部材31の下端開口から突出するようになる。ネジ保持部材31の下端開口からの支柱本体33の突出量は、支柱本体33の移動の向き及び移動量によって調整可能である。   Further, the thread formed on the outer peripheral surface of the large-diameter screw portion 33 c can be engaged (screwed) with the thread formed on the inner peripheral surface of the screw holding member 31. The column main body 33 moves downward when rotating in the forward direction with the large-diameter screw portion 33c inserted in the screw holding member 31. Further, when the column main body 33 moves downward, the column main body 33 eventually protrudes from the lower end opening of the screw holding member 31. The protruding amount of the column main body 33 from the lower end opening of the screw holding member 31 can be adjusted by the moving direction and the moving amount of the column main body 33.

また、図10に示すように、支柱本体33の上端部には、被操作部としての軸頂部35が設けられている。大径ネジ部33cがネジ保持部材31内に挿入された状態で軸頂部35が操作されると、支柱本体33が回転して上下方向に移動する。   Further, as shown in FIG. 10, the top end portion of the column main body 33 is provided with a shaft top portion 35 as an operated portion. When the shaft top portion 35 is operated in a state where the large diameter screw portion 33c is inserted into the screw holding member 31, the column main body 33 rotates and moves in the vertical direction.

ベース部36は、図10に示すように、略円錐台状の接地部36aと、接地部36aの上端から上方に向かって立設された立設部36bと、を有する。接地部36aは、束32の下端部をなし、土間FLの上に接地される。立設部36bは、略円筒形状をなし、その外周面にはネジ山が形成されている。立設部36bの外径は、ネジ保持部材31の内径と略同径である。   As shown in FIG. 10, the base portion 36 includes a substantially truncated cone-shaped grounding portion 36 a and a standing portion 36 b erected upward from the upper end of the grounding portion 36 a. The grounding part 36a forms the lower end part of the bundle 32 and is grounded on the soil gap FL. The standing portion 36b has a substantially cylindrical shape, and a thread is formed on the outer peripheral surface thereof. The outer diameter of the standing portion 36 b is substantially the same as the inner diameter of the screw holding member 31.

また、大引30に対して束32を組み付け始める段階では、図10に示すように、立設部36bがネジ保持部材31の内部空間の下方領域に入り込んでいる。この状態において、立設部36bの外周面に形成されたネジ山と、ネジ保持部材31の内周面に形成されたネジ山とが螺合している。なお、ベース部36は、ネジ保持部材31に対して順方向に回転すると、立設部36bがネジ保持部材31内に入り込む向き(すなわち、上方)に移動する。反対に、ベース部36は、ネジ保持部材31に対して逆方向に回転すると、立設部36bがネジ保持部材31から外れる向き(すなわち、下方)に移動する。   Further, at the stage where the bundle 32 is started to be assembled to the large pull 30, the standing portion 36b enters the lower region of the internal space of the screw holding member 31, as shown in FIG. In this state, the screw thread formed on the outer peripheral surface of the standing portion 36b and the screw thread formed on the inner peripheral surface of the screw holding member 31 are screwed together. When the base portion 36 rotates in the forward direction with respect to the screw holding member 31, the base portion 36 b moves in a direction (that is, upward) in which the standing portion 36 b enters the screw holding member 31. On the other hand, when the base portion 36 rotates in the opposite direction with respect to the screw holding member 31, the base portion 36 moves in a direction in which the standing portion 36 b is detached from the screw holding member 31 (ie, downward).

また、ベース部36の略中央部分には、ベース部36を貫通する貫通孔が設けられている。この貫通孔には、大引30に対して束32を組み付ける際、図11に示すように小径ネジ部33aが挿入される。なお、貫通孔の内周面にはネジ山が形成されており、このネジ山が小径ネジ部33aのネジ山と係合(螺合)する。図11は、変形例において束32の組み付け位置が調整された状態を示す図であり、図10と同じ断面を示している。   In addition, a through hole that penetrates the base portion 36 is provided in a substantially central portion of the base portion 36. When the bundle 32 is assembled to the large pull 30, the small diameter screw portion 33 a is inserted into the through hole as shown in FIG. 11. In addition, a screw thread is formed on the inner peripheral surface of the through hole, and this screw thread engages (threads) with the screw thread of the small diameter screw portion 33a. FIG. 11 is a view showing a state in which the assembly position of the bundle 32 is adjusted in the modification, and shows the same cross section as FIG. 10.

そして、支柱本体33は、小径ネジ部33aがベース部36の貫通孔に差し掛かった状態で支柱本体33が順方向に回転すると、小径ネジ部33aが上記の貫通孔内に進入し、この結果、支柱本体33とベース部36とが連結するようになる。   When the column main body 33 rotates in the forward direction with the small-diameter screw portion 33a reaching the through-hole of the base portion 36, the small-diameter screw portion 33a enters the through-hole, and as a result, The column main body 33 and the base portion 36 are connected.

次に、上述した大引30に対して束32を組み付け、大引30の上下位置を調整する手順について説明する。大引30に束32を組み付け始める段階では、図10に示すように、立設部36bがネジ保持部材31の内部空間の下部に入り込んでおり、立設部36bのネジ山とネジ保持部材31のネジ山とが螺合している。かかる状態において、大引30に形成された各挿入孔30aに、支柱本体33を床パネル11の上方から挿入する。ここで、大引30の上に載っている床パネル11のうち、挿入孔30aの上方位置に在る部分には、挿入孔30aよりも大きな切り欠き11a、11bが形成されている。これにより、支柱本体33が挿入孔30a内にスムーズに挿入されるようになる。   Next, a procedure for assembling the bundle 32 to the above-described large drawing 30 and adjusting the vertical position of the large drawing 30 will be described. As shown in FIG. 10, at the stage where the bundle 32 is started to be assembled to the large pull 30, the standing portion 36 b has entered the lower part of the internal space of the screw holding member 31, and the screw thread of the standing portion 36 b and the screw holding member 31. Screw thread. In such a state, the column main body 33 is inserted from above the floor panel 11 into each insertion hole 30 a formed in the large pull 30. Here, notches 11a and 11b larger than the insertion hole 30a are formed in a portion of the floor panel 11 placed on the large pull 30 at a position above the insertion hole 30a. Thereby, the support | pillar main body 33 comes to be smoothly inserted in the insertion hole 30a.

支柱本体33が挿入孔30aに挿入されると、小径ネジ部33aがネジ保持部材31内に進入し、やがてネジ保持部材31に係合したベース部36の接地部36aに到達する。その後、作業者(すなわち、床の施工者)が軸頂部35を操作して支柱本体33を順方向に回転させると、小径ネジ部33aがベース部36に形成された貫通穴内に入り込み、当該貫通孔の内周面に形成されたネジ山と、小径ネジ部33aの外周面に形成されたネジ山とが螺合するようになる。また、小径ネジ部33aのネジ山と上記の貫通孔のネジ山とが螺合した状態で支柱本体33が順方向に回転すると、ベース部36が一体的に回転するようになる。つまり、ベース部36がネジ保持部材31に対して順方向に回転し、結果として、ベース部36の立設部36bがネジ保持部材31内に更に入り込むようになる。   When the column main body 33 is inserted into the insertion hole 30a, the small-diameter screw portion 33a enters the screw holding member 31 and eventually reaches the grounding portion 36a of the base portion 36 engaged with the screw holding member 31. Thereafter, when an operator (that is, a floor installer) operates the shaft top portion 35 to rotate the column main body 33 in the forward direction, the small-diameter screw portion 33a enters the through hole formed in the base portion 36, and the penetration The screw thread formed on the inner peripheral surface of the hole and the screw thread formed on the outer peripheral surface of the small diameter screw portion 33a are screwed together. Further, when the column main body 33 rotates in the forward direction in a state where the screw thread of the small diameter screw part 33a and the screw thread of the through hole are screwed together, the base part 36 rotates integrally. That is, the base portion 36 rotates in the forward direction with respect to the screw holding member 31, and as a result, the standing portion 36 b of the base portion 36 further enters the screw holding member 31.

作業者が更に軸頂部35を操作して支柱本体33を順方向に回転させ続けると、やがて小径ネジ部33aと中径部33bとの段差が立設部36bの上端面に当接する位置まで、小径ネジ部33aがベース部36の貫通孔に入り込む。その状態において作業者が軸頂部35を操作して支柱本体33を順方向に回転させる(分かり易くは、増し締めする)と、支柱本体33とベース部36とが連結し、束32として一体化するようになる。   When the operator further operates the shaft top portion 35 and continues to rotate the column main body 33 in the forward direction, the step between the small diameter screw portion 33a and the medium diameter portion 33b eventually reaches a position where the step comes into contact with the upper end surface of the standing portion 36b. The small diameter screw portion 33 a enters the through hole of the base portion 36. In this state, when the operator operates the shaft top portion 35 to rotate the column main body 33 in the forward direction (for easy understanding, it is tightened), the column main body 33 and the base portion 36 are connected and integrated as a bundle 32. To come.

作業者は、それまで行っていた操作の向きとは逆の向きに軸頂部35を操作することで、束32として一体化した支柱本体33及びベース部36を、ネジ保持部材31に対して逆方向に回転させる。これにより、ネジ保持部材31内に嵌まり込んでいるベース部36の立設部36bが下方に移動し、やがてネジ保持部材31の外に出てネジ保持部材31から外れる。この際、支柱本体33は、ベース部36に固定された状態でベース部36と一体的に移動し、具体的には、小径ネジ部33a及び中径部33bがネジ保持部材31の貫通孔内を通過する。そして、支柱本体33は、大径ネジ部33cのネジ山とネジ保持部材31の貫通孔内に形成されたネジ山とが螺合する位置まで移動する。以上までの手順により、大引30に対して束32が組み付けられる。   The operator operates the shaft top portion 35 in the direction opposite to the direction of the operation that has been performed so far, so that the column main body 33 and the base portion 36 integrated as a bundle 32 are reversed with respect to the screw holding member 31. Rotate in the direction. As a result, the standing portion 36 b of the base portion 36 fitted in the screw holding member 31 moves downward, and eventually comes out of the screw holding member 31 and comes off from the screw holding member 31. At this time, the column main body 33 moves integrally with the base portion 36 while being fixed to the base portion 36, and specifically, the small-diameter screw portion 33 a and the medium-diameter portion 33 b are in the through hole of the screw holding member 31. Pass through. The column main body 33 moves to a position where the screw thread of the large-diameter screw portion 33c and the screw thread formed in the through hole of the screw holding member 31 are screwed together. The bundle 32 is assembled to the large drawing 30 by the procedure described above.

その後、作業者は、図11に図示の治具Tを取り付けた工具(具体的には、不図示のインパクトドライバー)を用いて軸頂部35を引き続き操作する。治具Tは、有底筒型形状をなしており、治具Tの内部空間の底には嵌合突起Taが突出形成されている。この嵌合突起Taは、棒状レンチをなしており、治具T内に軸頂部35が挿入された際に、軸頂部35の上端面に形成された嵌合孔34に嵌合される。なお、嵌合突起Taの断面形状及び嵌合孔34の開口形状は、両者が対応するものである限り任意に設定することができ、例えば、円形、方形状あるいは六角形であってもよい。   Thereafter, the operator continues to operate the shaft top portion 35 using a tool (specifically, an impact driver not shown) to which the jig T shown in FIG. 11 is attached. The jig T has a bottomed cylindrical shape, and a fitting protrusion Ta is formed to protrude from the bottom of the internal space of the jig T. The fitting protrusion Ta forms a rod-like wrench, and is fitted into a fitting hole 34 formed in the upper end surface of the shaft top portion 35 when the shaft top portion 35 is inserted into the jig T. Note that the cross-sectional shape of the fitting protrusion Ta and the opening shape of the fitting hole 34 can be arbitrarily set as long as they correspond to each other, and may be, for example, a circle, a square, or a hexagon.

作業者は、図11に示すように、治具T内に支柱本体33の上端部を入れ、軸頂部35の嵌合孔34に治具Tの嵌合突起Taを嵌合させる。かかる状態でインパクトドライバーを操作すると、支柱本体33がネジ保持部材31に対して順方向に回転し、ベース部36とともに下方に向かって移動する。これにより、ベース部36は、接地部36aが土間FLに接地する位置まで下降するようになる。   As shown in FIG. 11, the operator puts the upper end portion of the column main body 33 in the jig T and fits the fitting protrusion Ta of the jig T into the fitting hole 34 of the shaft top portion 35. When the impact driver is operated in such a state, the column main body 33 rotates in the forward direction with respect to the screw holding member 31 and moves downward together with the base portion 36. Thereby, the base part 36 comes to fall to the position where the grounding part 36a contacts the soil gap FL.

作業者がインパクトドライバーにて軸頂部35を引き続き操作すると、支柱本体33及び大引30に対して下降し続け、ネジ保持部材31からの支柱本体33の突出量が徐々に増加する。これにより、大引30に対する束32の組み付け位置が変化し、これに伴って、大引30の上下位置が調整される(具体的には、大引30が徐々に土間FLから離れる)。   When the operator continues to operate the shaft top portion 35 with the impact driver, the column main body 33 and the large pull 30 continue to descend, and the amount of protrusion of the column main body 33 from the screw holding member 31 gradually increases. Thereby, the assembly position of the bundle 32 with respect to the large pull 30 changes, and accordingly, the vertical position of the large pull 30 is adjusted (specifically, the large pull 30 gradually leaves the soil FL).

作業者は、図11に示すように治具Tの先端が大引30における挿入孔30aの縁に係止される位置まで軸頂部35を操作し続ける。これにより、大引30の上下位置は、最終的に、図11に図示の位置(すなわち、治具Tの先端が大引30における挿入孔30aの縁に係止された時点での位置であり、以下、「最終調整位置」という)となる。   As shown in FIG. 11, the operator continues to operate the shaft top 35 to a position where the tip of the jig T is locked to the edge of the insertion hole 30 a in the large pull 30. Thus, the vertical position of the large pull 30 is finally the position illustrated in FIG. 11 (that is, the position at the time when the tip of the jig T is locked to the edge of the insertion hole 30a in the large pull 30). Hereinafter referred to as “final adjustment position”).

なお、変形例では、大引30の上下位置を調整するために軸頂部35を操作する際に、床パネル11において大引30の上に載った部分のうち、挿入孔30aの上方位置に形成された切り欠き11a、11bを通じて軸頂部35を操作する。これにより、床パネル11の上方から切り欠き11a、11bを通じて軸頂部35にアクセスして軸頂部35を操作することが可能となる。このような構成により、変形例では、大引30上に床パネル11が固定された状態であっても、大引30の上下位置を簡単に調整することが可能となる。   In the modified example, when the shaft top portion 35 is operated to adjust the vertical position of the large pull 30, the portion placed on the large pull 30 on the floor panel 11 is formed above the insertion hole 30 a. The shaft top 35 is operated through the cutouts 11a and 11b. Thereby, it becomes possible to access the shaft top portion 35 from the upper side of the floor panel 11 through the notches 11a and 11b and to operate the shaft top portion 35. With such a configuration, in the modified example, even when the floor panel 11 is fixed on the large pull 30, the vertical position of the large pull 30 can be easily adjusted.

また、変形例では、軸頂部35を操作する際に、図11に図示の治具Tを用いて操作する。そして、治具Tの先端が大引30における挿入孔30aの縁に係止されるようになるまで、軸頂部35を操作し続ける。これにより、ネジ保持部材31からの支柱本体33の突出量(換言すると、大引30に対する束32の組み付け位置)が予め設定された量となり、大引30の上下位置が一律の位置、具体的には最終調整位置に調整される。この結果、複数の束32を大引30に組み付ける際、各束32の組み付け位置を容易に揃えることが可能となる。   Moreover, in a modification, when operating the shaft top part 35, it operates using the jig | tool T shown in FIG. Then, the shaft top 35 is continuously operated until the tip of the jig T comes to be locked to the edge of the insertion hole 30 a in the large pull 30. Thereby, the protrusion amount of the column main body 33 from the screw holding member 31 (in other words, the assembly position of the bundle 32 with respect to the large pull 30) becomes a preset amount, and the vertical position of the large pull 30 is a uniform position, specifically Is adjusted to the final adjustment position. As a result, when assembling the plurality of bundles 32 to the large drawing 30, the assembly positions of the bundles 32 can be easily aligned.

<その他の実施形態>
本発明は、上記の実施形態に限定されるものではない。
例えば、床パネル11の開口部としては、切り欠き11a、11bに限定されるものではない。具体的には、図8において切り欠き11a、11bが形成されている箇所に、切り欠き11a、11bの代わりに、図12に示すように円穴11c(穴の一例)が形成されていてもよい。円穴11cは、大引12に形成された操作孔12aの直上位置に一つずつ設けられており、操作孔12aの径よりも若干大径となっている。このような円穴11cが設けられていることで、大引12の底を貫通している第1ネジ部15aの頂部(ネジ頂部17)は、床パネル11の上方空間に対して露出するようになる。この結果、図12に図示の構成においても、床パネル11の上方から円穴11c及び操作孔12aを通じてネジ頂部17にアクセスしてネジ頂部17を操作することが可能となる。
<Other embodiments>
The present invention is not limited to the above embodiment.
For example, the opening of the floor panel 11 is not limited to the notches 11a and 11b. Specifically, a circular hole 11c (an example of a hole) as shown in FIG. 12 may be formed in place of the notches 11a and 11b at the locations where the notches 11a and 11b are formed in FIG. Good. One circular hole 11c is provided at a position immediately above the operation hole 12a formed in the large pull 12, and is slightly larger in diameter than the diameter of the operation hole 12a. By providing such a circular hole 11 c, the top portion (screw top portion 17) of the first screw portion 15 a penetrating the bottom of the large pull 12 is exposed to the upper space of the floor panel 11. become. As a result, even in the configuration shown in FIG. 12, the screw top 17 can be operated by accessing the screw top 17 from above the floor panel 11 through the circular hole 11c and the operation hole 12a.

以上説明した床施工方法によれば、束13の一部を土間FLに埋め込んで固定することが可能となるため、束13の脚部材16を土間FLに釘等の固着具により固定する作業を省略することができる。これにより、床施工の工数を削減できる。
また、床下ユニット20を配置する際に、土間FLが予め打設されている必要がないため、土間FLが硬化するまで待機する必要がなくなる。この点からも、床施工の効率を向上できる。
According to the floor construction method described above, it is possible to embed and fix a part of the bundle 13 in the gap FL, so that the work of fixing the leg member 16 of the bundle 13 to the gap FL with a fixing tool such as a nail is performed. Can be omitted. Thereby, the man-hour of floor construction can be reduced.
In addition, when the underfloor unit 20 is arranged, it is not necessary to place the interstices FL in advance, so that it is not necessary to wait until the interstices FL is cured. Also from this point, the efficiency of floor construction can be improved.

また、上記の実施形態においては、束13の上部に設けられたネジ頂部17を操作することにより束13の受け部14の上下位置を調整することとしたが、これに限られない。例えば、第1ネジ部15aに取り付けられる下方ナット18と上方ナット19とを連結して構成したナット体を回すことにより、受け部14の上下位置を調整する機構としてもよい。   Further, in the above embodiment, the vertical position of the receiving portion 14 of the bundle 13 is adjusted by operating the screw top portion 17 provided on the upper portion of the bundle 13, but the present invention is not limited to this. For example, it is good also as a mechanism which adjusts the up-and-down position of the receiving part 14 by turning the nut body comprised by connecting the lower nut 18 and the upper nut 19 attached to the 1st screw part 15a.

また、上記の実施形態においては、大引12に形成された操作孔12aを通じて、束13のネジ頂部17を操作することとしたが、これに限られない。例えば、受け部14が複数の大引12を保持することとし、受け部14により保持される複数の大引12の隙間から、束13のネジ頂部17を操作するようにしてもよい。
こうした場合には、大引12に操作孔12aを形成する穴開け加工が不要となる。
また、脚部材16と土間FLに釘等の固着具を打ち込んで、脚部材16と土間FLを固定してもよい。
In the above-described embodiment, the screw top 17 of the bundle 13 is operated through the operation hole 12a formed in the large pull 12, but the present invention is not limited to this. For example, the receiving part 14 may hold a plurality of large pulls 12, and the screw tops 17 of the bundle 13 may be operated from the gaps between the multiple large pulls 12 held by the receiving part 14.
In such a case, drilling for forming the operation hole 12a in the large drawing 12 is not required.
Alternatively, the leg member 16 and the soil FL may be fixed by driving a fixing tool such as a nail into the leg member 16 and the soil FL.

また、上記の実施形態において、束13の高さを調整した後に、立ち上がり部Rから保持具40を取り外すようにしてもよい。
また、保持具40を立ち上がり部Rから取り外さずに固定するようにしてもよい。この場合には、例えば立ち上がり部Rから上方に延出するアンカーボルトを設け、アンカーボルトに保持具40を締結するようにしてよい。
また、保持具40から立ち上がり部Rに向けて釘等の固着具を打ち込んで、保持具40を立ち上がり部Rに固定してもよい。
また、保持具40と立ち上がり部Rとを接着剤により固定してもよい。
また、上記の実施形態では、立ち上がり部Rに保持具40を設けて、保持具40により大引12を保持するようにしたが、保持具40を設けずに立ち上がり部Rに大引12を直接置くようにしてもよい。
In the above embodiment, the holder 40 may be removed from the rising portion R after adjusting the height of the bundle 13.
Further, the holder 40 may be fixed without being removed from the rising portion R. In this case, for example, an anchor bolt extending upward from the rising portion R may be provided, and the holder 40 may be fastened to the anchor bolt.
Alternatively, the holder 40 may be fixed to the rising portion R by driving a fixing tool such as a nail from the holder 40 toward the rising portion R.
Moreover, you may fix the holder 40 and the standup | rising part R with an adhesive agent.
In the above embodiment, the holder 40 is provided at the rising portion R, and the large pull 12 is held by the holder 40. However, the large pull 12 is directly attached to the rising portion R without providing the holder 40. You may put it.

<まとめ>
以上説明した本実施形態に係る床施工方法及び床構造の主な特徴は以下の通りである。
<Summary>
The main features of the floor construction method and the floor structure according to the present embodiment described above are as follows.

[1]本実施形態に係る床施工方法は、建物1の床を構成する床パネル11を支持する大引12と、大引12を支持する束13とを一体化した床下ユニット20の大引12を建物1の基礎Bの立ち上がり部Rに架設して、床下ユニット20を配置する工程と、床下ユニット20を配置した後に、束13の下端部15caより高い位置までコンクリートを打設して土間FLを形成する工程と、土間FLを形成した後に、束13に設けられ、束13に対して上下に移動可能な脚部材16を下方に移動させて土間FLに定着させる工程と、床パネル11から束13の上部が露出するように、大引12の上に床パネル11を配置する工程と、大引12の上下位置を調整するために、大引12に組み付けられた束13の上部に設けられたネジ頂部17を操作して、大引12に対する束13の組み付け位置を上下方向において変更する工程と、を含む。
上記の床施工方法によれば、床パネル11を支持する大引12と束13とを一体化した床下ユニット20を配置した後に、土間FLを形成する。そして、土間FLに束13の一部を埋設するようにすることで、土間FLに束13を固定することができる。
そして、上記の床施工方法によれば、床下ユニット20の上に床パネル11を置いてから、束13の高さを調整することができる。この際、床パネル11の上から束13の高さ調整が可能であるため、大引12及び床パネル11の上下位置の調整を簡単に行うことができる。
すなわち、上記の床施工方法によれば、床施工の工数を削減し、床施工に係る労力を軽減できる。
[1] In the floor construction method according to the present embodiment, the large pull of the underfloor unit 20 in which the large pull 12 that supports the floor panel 11 constituting the floor of the building 1 and the bundle 13 that supports the large pull 12 is integrated. 12 is erected on the rising part R of the foundation B of the building 1 and the underfloor unit 20 is disposed. After the underfloor unit 20 is disposed, the concrete is cast to a position higher than the lower end 15ca of the bundle 13 A step of forming the FL, a step of moving the leg member 16 provided in the bundle 13 and being movable up and down with respect to the bundle 13 to be fixed to the floor FL, and the floor panel 11 In order to adjust the vertical position of the large pull 12, the process of arranging the floor panel 11 on the large pull 12 so that the upper portion of the bundle 13 is exposed to the upper portion of the bundle 13 Screw top 17 provided And work, and a step of changing the mounting position of the bundle 13 against Obiki 12 in the vertical direction.
According to the floor construction method described above, the soil floor FL is formed after the underfloor unit 20 in which the large pull 12 supporting the floor panel 11 and the bundle 13 are integrated. Then, by burying a part of the bundle 13 in the soil FL, the bundle 13 can be fixed to the soil FL.
And according to said floor construction method, after placing the floor panel 11 on the underfloor unit 20, the height of the bundle | flux 13 can be adjusted. At this time, since the height of the bundle 13 can be adjusted from the top of the floor panel 11, the vertical position of the pullout 12 and the floor panel 11 can be easily adjusted.
That is, according to said floor construction method, the man-hour of floor construction can be reduced and the labor which concerns on floor construction can be reduced.

[2]上記の床施工方法において、大引12の上下位置を調整するためのネジ頂部17の操作は、床パネル11において大引12の上に載った部分のうち、ネジ頂部17の上方位置に設けられた開口部を通じて行われる。
こうすることで、ネジ頂部17を操作しやすくすることができる。これにより、ネジ頂部17を操作して大引12の上下位置を調整することが簡単になる。
[2] In the floor construction method described above, the operation of the screw top 17 for adjusting the vertical position of the large pull 12 is the position above the screw top 17 in the portion of the floor panel 11 that rests on the large pull 12. This is done through an opening provided in the.
By doing so, the screw top 17 can be easily operated. Thereby, it becomes easy to operate the screw top part 17 and adjust the vertical position of the large pull 12.

[3]上記の床施工方法において、大引12の上下位置を調整するためのネジ頂部17の操作は、床パネル11において大引12の上に載った部分のうち、ネジ頂部17の上方位置に形成された穴(円穴11c)又は切り欠き(切り欠き11a、切り欠き11b)を通じて行われる。
こうすることで、床パネル11において大引12の上に載った部分のうち、ネジ頂部17の上方位置には、開口部として形成された穴又は切り欠きが設けられており、大引12の上下位置を調整する際には、この穴又は切り欠きを通じてネジ頂部17の操作が可能である。これにより、ネジ頂部17を操作して大引12の上下位置を調整することが一層簡単になる。
[3] In the floor construction method described above, the operation of the screw top portion 17 for adjusting the vertical position of the large pull 12 is the position above the screw top portion 17 of the portion of the floor panel 11 that is placed on the large pull 12. This is done through a hole (circular hole 11c) or a notch (notch 11a, notch 11b).
By doing so, a hole or notch formed as an opening is provided at a position above the screw top portion 17 of the portion of the floor panel 11 that is placed on the large pull 12. When adjusting the vertical position, the screw top 17 can be operated through this hole or notch. This makes it easier to adjust the vertical position of the large pull 12 by operating the screw top 17.

[4]上記の床施工方法において、束13は、大引12が嵌合可能な受け部14と、受け部14の底壁14aを貫通して該底壁14aよりも上方に突出したネジ頂部17とを備え、床下ユニット20は、束13の受け部14に、ネジ頂部17が大引12の底を貫通するように大引12を嵌合させて構成される。
こうすることで、束13の受け部14に大引12を嵌合させることで、束13を大引12に簡単に組み付けることが可能となる。
[4] In the floor construction method described above, the bundle 13 includes a receiving portion 14 into which the large pull 12 can be fitted, and a screw top portion protruding through the bottom wall 14a of the receiving portion 14 and projecting upward from the bottom wall 14a. The underfloor unit 20 is configured by fitting the large pull 12 to the receiving portion 14 of the bundle 13 so that the screw top portion 17 penetrates the bottom of the large pull 12.
By doing so, it is possible to easily assemble the bundle 13 to the large pull 12 by fitting the large pull 12 to the receiving portion 14 of the bundle 13.

[5]上記の床施工方法において、束13のうち、ネジ頂部17を上端部に有する支柱本体15を、大引12に形成された挿入孔に挿入して束13が大引12に組み付けられ、大引12の上下位置を調整するためのネジ頂部17の操作は、床パネル11において大引12の上に載った部分のうち、挿入孔の上方位置に形成された開口部を通じて行われる。
こうすることで、大引12に形成された挿入孔に束13の支柱本体15を挿入することで、束13を大引12に適切に組み付けることが可能となる。
[5] In the floor construction method described above, the bundle 13 is assembled to the pulling 12 by inserting the column main body 15 having the screw top 17 at the upper end of the bundle 13 into the insertion hole formed in the pulling 12. The operation of the screw top portion 17 for adjusting the vertical position of the large pull 12 is performed through an opening formed at a position above the insertion hole in the portion of the floor panel 11 placed on the large pull 12.
In this way, the bundle 13 can be appropriately assembled to the large pull 12 by inserting the column main body 15 of the bundle 13 into the insertion hole formed in the large pull 12.

[6]上記の床施工方法において、建物1の基礎Bの立ち上がり部Rには、互いに離間して配置された一対の保持具40が設置されており、床下ユニット20は、一対の保持具40に、床下ユニット20の大引12のそれぞれの端部12dを保持させるようにして配置される。
こうすることで、大引12の配置の位置決めを簡単に行うことができる。
[6] In the floor construction method described above, a pair of holders 40 that are spaced apart from each other are installed on the rising portion R of the foundation B of the building 1, and the underfloor unit 20 includes the pair of holders 40. Are arranged so as to hold the respective end portions 12 d of the large pull 12 of the underfloor unit 20.
By doing so, the positioning of the arrangement of the large pull 12 can be easily performed.

[7]上記の床施工方法において、束13は、ネジ山が形成された第2ネジ部15cを有し、脚部材16は、第2ネジ部15cに螺合し、束13を軸として回転させることで第2ネジ部15cに沿って上下に移動する板状部材である。
こうすることで、脚部材16を簡単な構造により実現できる。また、脚部材16が板状に構成されていることで、束13による支持を安定させることができる。
[7] In the floor construction method described above, the bundle 13 has a second screw portion 15c formed with a thread, and the leg member 16 is screwed into the second screw portion 15c and rotates around the bundle 13 as an axis. This is a plate-like member that moves up and down along the second screw portion 15c.
By doing so, the leg member 16 can be realized with a simple structure. Moreover, the support by the bundle | flux 13 can be stabilized because the leg member 16 is comprised by plate shape.

[8]また、本実施形態に係る床構造は、建物1の床構造である。床構造は、建物1の床が設置されるベース部と、ベース部に設置され、建物1の床を構成する床パネル11を支持する大引12と、大引12を支持する束13とを一体化した床下ユニット20と、床パネル11から束13の上部が露出するように、大引12の上に配置される床パネル11と、を備える。床下ユニット20の大引12は、建物1の基礎Bの立ち上がり部Rに架設され、束13の下端は、ベース部に埋設している。束13は、束13に設けられ、束13に対して上下に移動可能な脚部材16と、大引12の上下位置を調整するために、大引12に組み付けられた束13の上部に設けられたネジ頂部17と、を有し、脚部材16は、土間FLに当接している。
上記の床構造によれば、土間FLに束13の一部を埋設するようにしたことで、土間FLに束13を固定することができる。そして、束13に対して上下に移動する脚部材16を土間FL材と当接させるようにしたことで、束13による床の支持を安定させることができる。
また、上記の床構造によれば、床下ユニット20の上に床パネル11を置いてから、束13の高さを調整することができる。この際、床パネル11の上から束13の高さ調整が可能であるため、大引12及び床パネル11の上下位置の調整を簡単に行うことができる。
[8] The floor structure according to the present embodiment is the floor structure of the building 1. The floor structure includes a base portion on which the floor of the building 1 is installed, a large pull 12 that supports the floor panel 11 that is installed in the base portion and forms the floor of the building 1, and a bundle 13 that supports the large pull 12. An integrated underfloor unit 20 and a floor panel 11 disposed on the large pull 12 so that the upper portion of the bundle 13 is exposed from the floor panel 11 are provided. The big drawer 12 of the underfloor unit 20 is erected on the rising portion R of the foundation B of the building 1, and the lower end of the bundle 13 is embedded in the base portion. The bundle 13 is provided on the bundle 13 and is provided on the leg member 16 movable up and down with respect to the bundle 13 and the upper portion of the bundle 13 assembled to the large pull 12 to adjust the vertical position of the large pull 12. The leg member 16 is in contact with the soil gap FL.
According to the above floor structure, the bundle 13 can be fixed to the soil FL by burying a part of the bundle 13 in the soil FL. The floor member 16 moving up and down with respect to the bundle 13 is brought into contact with the soil FL material, so that the floor support by the bundle 13 can be stabilized.
Moreover, according to said floor structure, after placing the floor panel 11 on the underfloor unit 20, the height of the bundle 13 can be adjusted. At this time, since the height of the bundle 13 can be adjusted from the top of the floor panel 11, the vertical position of the pullout 12 and the floor panel 11 can be easily adjusted.

1 建物
10 床
11 床パネル(パネル材)
11a 切り欠き(開口部)
11b 切り欠き(開口部)
11c 円穴(開口部、穴)
12 大引(固定材)
12a 操作孔
12b 係合凹部
12c ネジ挿入孔
12d 端部
13 束(支柱)
14 受け部
14a 底壁
14b 側壁
14c 貫通孔
14d 係合突起
15 支柱本体
15a 第1ネジ部
15b 筒状部
15c 第2ネジ部
15ca 下端部
15d 定着板
16 脚部材
17 ネジ頂部(被操作部)
18 下方ナット
19 上方ナット
20 床下ユニット
30 大引(固定材)
30a 挿入孔
31 ネジ保持部材
32 束(支柱)
33 支柱本体
33a 小径ネジ部
33b 中径部
33c 大径ネジ部
34 嵌合孔
35 軸頂部(被操作部)
36 ベース部
36a 接地部
36b 立設部
40 保持具
41 板部材
41A 第1プレート
41B 第2プレート
41C 載置面部
42 高さ調整部
42A 第1高さ調整部
42B 第2高さ調整部
B 基礎
BF 地業
FL 土間
R 立ち上がり部
T 治具
Ta 嵌合突起
1 building 10 floor 11 floor panel (panel material)
11a Notch (opening)
11b Notch (opening)
11c Circular hole (opening, hole)
12 Daiki (fixing material)
12a Operation hole 12b Engaging recess 12c Screw insertion hole 12d End 13 Bundle (support)
14 receiving part 14a bottom wall 14b side wall 14c through-hole 14d engaging projection 15 column main body 15a first screw part 15b cylindrical part 15c second screw part 15ca lower end part 15d fixing plate 16 leg member 17 screw top part (operated part)
18 Lower nut 19 Upper nut 20 Underfloor unit 30 Large draw (fixing material)
30a Insertion hole 31 Screw holding member 32 Bundle (support)
33 Prop body 33a Small-diameter screw portion 33b Medium-diameter portion 33c Large-diameter screw portion 34 Fitting hole 35 Shaft top (operated portion)
36 Base part 36a Grounding part 36b Standing part 40 Holder 41 Plate member 41A First plate 41B Second plate 41C Placement surface part 42 Height adjustment part 42A First height adjustment part 42B Second height adjustment part B Foundation BF Groundwork FL Dough R Rising part T Jig Ta Fitting protrusion

Claims (8)

建物の床を構成するパネル材を支持する固定材と、前記固定材を支持する支柱とを一体化した床下ユニットの前記固定材を前記建物の基礎の立ち上がり部に架設して、前記床下ユニットを配置する工程と、
前記床下ユニットを配置した後に、前記支柱の下端部より高い位置までコンクリートを打設して前記床のベース部を形成する工程と、
前記床のベース部を形成した後に、前記支柱に設けられ、前記支柱に対して上下に移動可能な脚部材を下方に移動させて前記床のベース部に定着させる工程と、
前記パネル材から前記支柱の上部が露出するように、前記固定材の上に前記パネル材を配置する工程と、
前記固定材の上下位置を調整するために、前記固定材に組み付けられた前記支柱の上部に設けられた被操作部を操作して、前記固定材に対する前記支柱の組み付け位置を上下方向において変更する工程と、を含むことを特徴とする床施工方法。
The under-floor unit is constructed on a rising portion of the foundation of the building by laying the fixing material of the under-floor unit, in which a fixing material that supports a panel material constituting the floor of the building and a support column that supports the fixing material are integrated. Arranging, and
After placing the underfloor unit, placing concrete to a position higher than the lower end of the support column to form the base of the floor;
After forming the base portion of the floor, a step of moving a leg member that is provided on the column and is movable up and down with respect to the column to fix it to the base portion of the floor;
A step of disposing the panel material on the fixing material such that an upper portion of the column is exposed from the panel material;
In order to adjust the vertical position of the fixing material, the operation portion provided on the upper side of the support column assembled to the fixing material is operated to change the assembly position of the support column relative to the fixing material in the vertical direction. A floor construction method comprising the steps of:
前記固定材の上下位置を調整するための前記被操作部の操作は、前記パネル材において前記固定材の上に載った部分のうち、前記被操作部の上方位置に設けられた開口部を通じて行われることを特徴とする請求項1に記載の床施工方法。   The operation of the operated portion for adjusting the vertical position of the fixing material is performed through an opening provided at a position above the operated portion, of the portion of the panel material that is placed on the fixing material. The floor construction method according to claim 1, wherein: 前記固定材の上下位置を調整するための前記被操作部の操作は、前記パネル材において前記固定材の上に載った部分のうち、前記被操作部の上方位置に形成された穴又は切り欠きを通じて行われることを特徴とする請求項2に記載の床施工方法。   The operation of the operated portion for adjusting the vertical position of the fixing material is a hole or a notch formed at a position above the operated portion in a portion of the panel material that is placed on the fixing material. The floor construction method according to claim 2, wherein the floor construction method is performed. 前記支柱は、前記固定材が嵌合可能な受け部と、前記受け部の底壁を貫通して該底壁よりも上方に突出した前記被操作部とを備え、
前記床下ユニットは、前記支柱の前記受け部に、前記被操作部が前記固定材の底を貫通するように前記固定材を嵌合させて構成されることを特徴とする請求項2又は3に記載の床施工方法。
The support column includes a receiving portion into which the fixing material can be fitted, and the operated portion that protrudes upward from the bottom wall through the bottom wall of the receiving portion,
The underfloor unit is configured by fitting the fixing member to the receiving portion of the support so that the operated portion penetrates the bottom of the fixing member. The floor construction method described.
前記支柱のうち、前記被操作部を上端部に有する支柱本体を、前記固定材に形成された挿入孔に挿入して前記支柱が前記固定材に組み付けられ、
前記固定材の上下位置を調整するための前記被操作部の操作は、前記パネル材において前記固定材の上に載った部分のうち、前記挿入孔の上方位置に形成された前記開口部を通じて行われることを特徴とする請求項2乃至4のいずれか一項に記載の床施工方法。
Of the struts, a strut body having the operated portion at the upper end is inserted into an insertion hole formed in the fixing material, and the strut is assembled to the fixing material,
The operation of the operated portion for adjusting the vertical position of the fixing material is performed through the opening formed in the upper position of the insertion hole in the portion of the panel material placed on the fixing material. The floor construction method according to any one of claims 2 to 4, wherein the floor construction method is provided.
前記建物の基礎の立ち上がり部には、互いに離間して配置された一対の保持具が設置されており、
前記床下ユニットは、前記一対の前記保持具に、前記床下ユニットの前記固定材のそれぞれの端部を保持させるようにして配置されることを特徴とする請求項1乃至5のいずれかに記載の床施工方法。
At the rising portion of the foundation of the building, a pair of holders arranged apart from each other are installed,
The said underfloor unit is arrange | positioned so that each said edge part of the said fixing material of the said underfloor unit may be hold | maintained to the said pair of said holders, The Claim 1 thru | or 5 characterized by the above-mentioned. Floor construction method.
前記支柱は、ネジ山が形成されたネジ部を有し、
前記脚部材は、前記ネジ部に螺合し、前記支柱を軸として回転させることで前記ネジ部に沿って上下に移動する板状部材であることを特徴とする請求項1乃至6のいずれかに記載の床施工方法。
The support column has a threaded portion formed with a thread,
The said leg member is a plate-shaped member which moves up and down along the said screw part by screwing together with the said screw part and rotating it using the said support | pillar as an axis | shaft. The floor construction method described in 1.
建物の床構造であって、
前記建物の床が設置されるベース部と、
前記ベース部に設置され、前記建物の床を構成するパネル材を支持する固定材と、前記固定材を支持する支柱とを一体化した床下ユニットと、
前記パネル材から前記支柱の上部が露出するように、前記固定材の上に配置される前記パネル材と、を備え、
前記床下ユニットの前記固定材は、前記建物の基礎の立ち上がり部に架設され、
前記支柱の下端は、前記ベース部に埋設しており、
前記支柱は、
前記支柱に設けられ、前記支柱に対して上下に移動可能な脚部材と、
前記固定材の上下位置を調整するために、前記固定材に組み付けられた前記支柱の上部に設けられた被操作部と、を有し、
前記脚部材は、前記ベース部に当接していることを特徴とする床構造。
The floor structure of the building,
A base on which the floor of the building is installed;
An underfloor unit that is integrated with a fixing material that is installed in the base portion and supports a panel material that constitutes the floor of the building, and a column that supports the fixing material,
The panel material disposed on the fixing material so that the upper portion of the support column is exposed from the panel material,
The fixing material of the underfloor unit is erected on the rising portion of the foundation of the building,
The lower end of the column is embedded in the base part,
The column is
A leg member provided on the column and movable up and down with respect to the column;
In order to adjust the vertical position of the fixing material, the operation portion provided on the upper portion of the support post assembled to the fixing material,
The floor structure, wherein the leg member is in contact with the base portion.
JP2018069521A 2018-03-30 2018-03-30 Floor construction method and floor structure Pending JP2019178586A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018069521A JP2019178586A (en) 2018-03-30 2018-03-30 Floor construction method and floor structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018069521A JP2019178586A (en) 2018-03-30 2018-03-30 Floor construction method and floor structure

Publications (1)

Publication Number Publication Date
JP2019178586A true JP2019178586A (en) 2019-10-17

Family

ID=68278136

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018069521A Pending JP2019178586A (en) 2018-03-30 2018-03-30 Floor construction method and floor structure

Country Status (1)

Country Link
JP (1) JP2019178586A (en)

Similar Documents

Publication Publication Date Title
JP2010059765A (en) Structure for fastening sill and column
JP6964427B2 (en) Floor construction method
JP7075263B2 (en) Floor construction method
JP2019161986A (en) Support structure, support frame, and solar power generation equipment
JP2019178587A (en) Floor construction method
JP2019178586A (en) Floor construction method and floor structure
JP3156999U (en) Prop fixture
JP2008014123A (en) Vertical lumber member installation hardware
JP4813199B2 (en) Anchor member of simple structure
JP4669955B2 (en) Anchor frame
JP4628838B2 (en) Steel foundation structure
JP2019011582A (en) Structure
JP5198668B1 (en) Column base joints and building structures
JP5940322B2 (en) Pillar fixture
JP6901429B2 (en) Prop fixing device and fence using this
JP7193258B2 (en) Building and floor construction method
JP2017008504A (en) Connection structure of foundation pile and unit, and unit construction method using the same
JP2020002657A (en) Construction method of building foundation
JPH11182101A (en) Fence attaching structure and fence attaching apparatus
JP2006124973A (en) Panel mounting fixture and method of mounting base fitting for mounting panel
CN216516147U (en) Low-rise assembled light steel structure house
JP2011220046A (en) Connection fitting
JP5159430B2 (en) The basic structure of wooden buildings
JP5638859B2 (en) Prop holder
JP5095424B2 (en) Wall panel mounting structure and mounting method