JP2019104306A - Traffic operational information integrated management system and traffic operational information integrated management method - Google Patents

Traffic operational information integrated management system and traffic operational information integrated management method Download PDF

Info

Publication number
JP2019104306A
JP2019104306A JP2017236769A JP2017236769A JP2019104306A JP 2019104306 A JP2019104306 A JP 2019104306A JP 2017236769 A JP2017236769 A JP 2017236769A JP 2017236769 A JP2017236769 A JP 2017236769A JP 2019104306 A JP2019104306 A JP 2019104306A
Authority
JP
Japan
Prior art keywords
information
train
integrated
terminal
integrated transportation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2017236769A
Other languages
Japanese (ja)
Other versions
JP7122107B2 (en
Inventor
貴寛 赤澤
Takahiro Akazawa
貴寛 赤澤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Systems Ltd
Original Assignee
Hitachi Systems Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Systems Ltd filed Critical Hitachi Systems Ltd
Priority to JP2017236769A priority Critical patent/JP7122107B2/en
Publication of JP2019104306A publication Critical patent/JP2019104306A/en
Application granted granted Critical
Publication of JP7122107B2 publication Critical patent/JP7122107B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

To provide a traffic operational information integrated management system which collects operational information about vehicles, motormen and crews required to respond to a train operational diagram change and sends the information to railway staff timely.SOLUTION: A traffic operational information integrated management system 1000 comprises: a train operation system 2 which generates train information for one or plural track sections on the basis of train diagram information and manages a train operation; a transport information management system 3 which generates schedule system information that is operational information about vehicles, a motorman and crews of a train; an operation change terminal 4 which changes the schedule system information generated by the transport information management system; and an integrated transport information display terminal 5 which displays the changed schedule system information. A terminal input part 51 of the integrated transport information display terminal receives any designation of operational information about vehicles, a motorman or crews of a train. A terminal management part 54 sends an acquisition request of the newest operational information to an integrated transport management server 1. A display part 52 displays the newest operational information received from the integrated transport management server.SELECTED DRAWING: Figure 1

Description

本発明は、鉄道等の公共交通機関をはじめとする交通の運用情報を管理する交通運用情報統合管理システム、交通運用情報統合管理方法に関する。   The present invention relates to a traffic operation information integrated management system that manages operation information of traffic including public transportation such as railways, and a traffic operation information integrated management method.

長期間にわたる列車運行ダイヤ及び計画した列車に乗務する乗務員・運転士の運用と車両の運用情報(総称して計画系情報と呼称する)を作成・管理する情報処理装置(EDP:Electric Data Processor)及びEDPにて作成された列車運行ダイヤに基づいて当日制御する列車の在線状況を元に信号・転轍機の動作を判断し、CTC(Centralized Traffic Control)へ動作指示を行う装置(PRC:Programmed Route Control)、列車運行に関する情報(総称して当日系情報と呼称する)が、交通運用情報統合管理システムが有する各々のシステム内に備えられている。列車運行ダイヤに変更が発生した場合、計画系情報のみを参照している乗務員や車両区所の鉄道職員には、その変更が電話・FAXといった通信手段を用いて伝達されるため、必ずしも必要な時に必要とする情報が展開されているわけではない。特に輸送障害時には、ダイヤが大幅に変更されると、乗務員・運転士・車両の情報は計画時から大幅な差異が発生する。   An information processing device (EDP: Electric Data Processor) that creates and manages train operation diagrams over a long period of time, operations of crews and drivers on the planned trains, and operation information of vehicles (collectively referred to as planning system information) A device (PRC: Programmed Route Control) that issues an operation instruction to CTC (Centralized Traffic Control) based on the train operation schedule created by EDP and based on the train availability to control the signal and switch operation based on the train status. And information on train operation (collectively referred to as on-the-day information) are provided in each system included in the traffic operation information integrated management system. When a change occurs in the train operation schedule, the change is transmitted to the crew members who are only referring to the plan information and to the railway staff of the ward district using communication means such as telephone and fax, so it is not always necessary. The information needed at times is not expanded. Particularly in the case of transportation failure, if the diagram is changed significantly, the information on the crew, driver and vehicle will differ significantly from the time of planning.

上記技術では、各種の列車運行管理装置は、長期間にわたる列車運行ダイヤ計画と列車が跨って運行される複数の線区ごとに独立して設置されている。このため、各種装置内で情報が閉じられており、情報の集約および利用が行われていないという問題があった。そのような問題に鑑みて、特許文献1では、運行管理装置12a1〜12a3が、各線区の運行制御機器11a1〜11anにより検出された各線区の複数の列車のリアルタイムの運行状態を表す運行状態データに基づいて、各列車の現在走行位置を表す情報や各列車の実績ダイヤ情報を収集している。   In the above-mentioned technology, various train operation control devices are installed independently for each of a plurality of line sections operated by straddling a train operation diagram plan for a long period and a train. For this reason, there is a problem that the information is closed in various devices, and the information is not aggregated and used. In view of such a problem, in Patent Document 1, operation status data representing operation statuses of the plurality of trains in each line segment in real time detected by the operation control devices 11a1 to 11an in each line segment. Based on the above, information representing the current travel position of each train and the performance diamond information of each train are collected.

特許第4557453号Patent No. 4557453

しかしながら、上記特許文献1では、各列車のダイヤ情報を収集することはできるが、乗務員、運転士、車両の運用情報については収集することができず、必ずしも列車運行ダイヤの変更に対応するために必要な情報が鉄道職員に提供されないという問題があった。   However, in the patent document 1, although it is possible to collect the schedule information of each train, it is not possible to collect the operation information of the crew, the driver and the vehicle, and it is necessary to correspond to the change of the train operation diagram. There was a problem that necessary information was not provided to railway staff.

本発明は、上記に鑑みてなされたものであって、変更された列車運行ダイヤ情報を収集し、列車運行ダイヤの変更に伴う乗務員・運転士・車両の運用情報を、適時鉄道職員に提供することが可能な交通運用情報統合管理システム、交通運用情報統合管理方法を提供することを目的とする。   The present invention has been made in view of the above, and collects train operation diagram information that has been changed, and provides train staff with operation information on crews, drivers, and vehicles accompanying the change in the train operation diagram on a timely basis. An object of the present invention is to provide a traffic operation information integrated management system and a traffic operation information integrated management method that can be achieved.

上述した課題を解決し、目的を達成するために、本発明にかかる交通運用情報統合管理システムは、列車のダイヤ情報に基づいて1または複数の線区に対応する列車の列車情報を作成して前記列車の運行を管理する列車運行システムと、列車計画及びその計画により運行される列車の車両及び前記列車の運転士及び乗務員に関する運用情報である計画系情報を作成する輸送情報管理システムと、前記列車運行システムによって作成された列車情報に基づいて前記輸送情報管理システムで作成された前記計画系情報を変更する運用変更端末と、前記運用変更端末により変更された前記計画系情報を表示する統合輸送情報表示端末と、前記列車運行システムと前記輸送情報管理システムと運用変更端末と統合輸送情報表示端末とを制御する統合輸送管理サーバとを備えた交通運用情報統合管理システムであって、前記統合輸送情報表示端末は、前記計画系情報のうち、前記列車の車両、前記列車の乗務員、前記列車の運転士の運用情報のいずれかの指定を受け付ける端末入力部と、前記端末入力部から指定された前記運用情報に基づいて、前記統合輸送管理サーバに対して最新の前記運用情報の取得要求を送信する端末制御部と、前記取得要求に基づいて前記統合輸送管理サーバから受信した最新の前記運用情報を表示する表示部と、を備え、前記統合輸送管理サーバは、前記統合輸送情報表示端末から受信した前記運用情報に基づいて、記憶部に記憶されている前記車両運用データベース、運転士運用データベース、乗務員運用データベースを読み取り、最新の前記運用情報を前記統合輸送情報表示端末に送信するサーバ制御部と、を備えることを特徴とする交通運用情報統合管理システムとして構成される。   In order to solve the problems described above and achieve the purpose, the traffic operation information integrated management system according to the present invention creates train information of trains corresponding to one or more line areas based on train timetable information. A train operation system for managing the operation of the train; a transport information management system for generating planning system information which is operation information about a train plan and a train vehicle operated by the plan and the plan and an operator and a crew member of the train; An operation change terminal for changing the planning system information generated by the transportation information management system based on train information generated by a train operation system, and an integrated transportation for displaying the planning system information changed by the operation change terminal Integrated transport controlling information display terminal, train operation system, transport information management system, operation change terminal and integrated transport information display terminal A traffic operation information integrated management system comprising a management server, wherein the integrated transportation information display terminal is a part of the plan system information including a train vehicle, a crew member of the train, and operation information of a driver of the train. A terminal input unit that accepts any specification, and a terminal control unit that transmits an acquisition request for the latest operation information to the integrated transportation management server based on the operation information specified by the terminal input unit; And a display unit for displaying the latest operation information received from the integrated transportation management server based on the acquisition request, and the integrated transportation management server is based on the operation information received from the integrated transportation information display terminal. Read the vehicle operation database, the driver's operation database, and the crew operation database stored in the storage unit, and update the latest operation information And the server control unit that transmits the transportation information display terminal, configured for transportation operation information integrated management system comprising: a.

また、本発明は、上記交通運用情報統合管理システムで行われる交通運用情報統合管理方法としても把握される。   The present invention is also understood as a traffic operation information integrated management method performed by the above-described traffic operation information integrated management system.

本発明によれば、変更された列車運行ダイヤ情報を収集し、列車運行ダイヤの変更に伴う乗務員・運転士・車両の運用情報を、適時鉄道職員に提供することが可能となる。   According to the present invention, it is possible to collect changed train operation timetable information and to provide train staff, driver, and vehicle operation information according to the change in the train operation timely to the railway staff in a timely manner.

統合輸送情報管理システムの全体構成を示す図である。It is a figure which shows the whole structure of an integrated transportation information management system. 車両情報要求処理の処理手順を示すフローチャートである。It is a flowchart which shows the process sequence of a vehicle information request | requirement process. 列車情報要求処理の処理手順を示すフローチャートである。It is a flow chart which shows the processing procedure of train information demand processing. 乗務員情報要求処理の処理手順を示すフローチャートである。It is a flow chart which shows a processing procedure of crew member information demand processing. 運転士情報要求処理の処理手順を示すフローチャートである。It is a flowchart which shows the process sequence of driver | operator information request | requirement process.

以下に添付図面を参照して、本発明にかかる交通運用情報統合管理システム、交通運用情報統合管理方法の実施の形態を詳細に説明する。   Hereinafter, with reference to the attached drawings, embodiments of a traffic operation information integrated management system and a traffic operation information integrated management method according to the present invention will be described in detail.

図1は、本発明の実施の形態に係る統合輸送情報管理システム1000の全体構成を示す図である。図1に示すように、統合輸送情報管理システム1000は、統合輸送管理サーバ1と、一または複数の列車運行システム2と、輸送情報管理システム3と、運用変更端末4と、統合輸送情報表示端末5とを有して構成されている。なお、統合輸送管理サーバ1、列車運行システム2、輸送情報管理システム3の間は、WAN(Wide Area Network)等の一般的な広域回線網6により接続され、統合輸送管理サーバ1、運用変更端末4、統合輸送情報表示端末5は、LAN(Local Area Network)等の一般的な構内回線網7により接続されている。統合輸送管理サーバ1と運用変更端末4との間は、バス等のコネクタにより直接接続されていてもよい。   FIG. 1 is a diagram showing an overall configuration of an integrated transportation information management system 1000 according to an embodiment of the present invention. As illustrated in FIG. 1, the integrated transportation information management system 1000 includes an integrated transportation management server 1, one or more train operation systems 2, a transportation information management system 3, an operation change terminal 4, and an integrated transportation information display terminal. And 5 are configured. The integrated transportation management server 1, the train operation system 2, and the transportation information management system 3 are connected by a general wide area network 6, such as a wide area network (WAN), and the integrated transportation management server 1, the operation change terminal 4. The integrated transportation information display terminal 5 is connected by a common local area network 7 such as a LAN (Local Area Network). The integrated transportation management server 1 and the operation change terminal 4 may be directly connected by a connector such as a bus.

統合輸送管理サーバ1は、本システムの全体を制御するサーバである。列車運行システム2は、複数の線区(複数の列車の交通経路毎の区別を表すものであり、本実施形態では、A線区、B線区の2線区とする)に対応する複数の列車を運行管理・制御するシステムである。本例では、列車運行システム2は、1または複数の線区に対応する列車の列車情報を作成して前記列車の運行を管理するシステムである。輸送情報管理システム3は、長期間の列車計画及びその計画に対する車両運用及び各列車の乗務員運用情報を作成・管理するシステムである。本例では、輸送情報管理システム3は、列車計画及びその計画により運行される列車の車両及び列車の運転士及び乗務員に関する運用情報である計画系情報を作成するシステムである。運用変更端末4は、列車運行システム2によって変更された列車情報をリアルタイムに閲覧しながら、輸送情報管理システム3で作成された列車に関わる各種運用を変更可能とする端末である。本例では、運用変更端末4は、列車運行システム2によって作成された列車情報に基づいて輸送情報管理システム3で作成された計画系情報を変更する端末である。統合輸送情報表示端末5は、上記運用変更端末4と各線区に対応する複数の駅構内の随所にそれぞれ設置された最新の統合輸送情報を表示するための端末である。   The integrated transportation management server 1 is a server that controls the entire system. The train operation system 2 corresponds to a plurality of line segments (representing the distinction of each traffic route of a plurality of trains, and in the present embodiment, a plurality of line segments A and B). It is a system that manages and controls trains. In this example, the train operation system 2 is a system that creates train information of trains corresponding to one or more line segments and manages the operation of the trains. The transportation information management system 3 is a system for creating and managing a long-term train plan and vehicle operation for the plan and crew operation information of each train. In this example, the transportation information management system 3 is a system for creating planning system information which is operation information about a train plan and train vehicles and train drivers operated by the plan. The operation change terminal 4 is a terminal capable of changing various operations related to the train created by the transportation information management system 3 while viewing the train information changed by the train operation system 2 in real time. In this example, the operation change terminal 4 is a terminal that changes the planning system information created by the transportation information management system 3 based on the train information created by the train operation system 2. The integrated transportation information display terminal 5 is a terminal for displaying the latest integrated transportation information installed at various places in the station yard corresponding to the operation change terminal 4 and the line sections.

統合輸送管理サーバ1は、例えば、一般的なコンピュータから構成され、各線区に対応する複数の列車の運行ダイヤ情報を記憶する実行ダイヤDB1011、列車情報に対応する乗務員の運用情報を記憶する乗務員運用DB1012、列車情報に対応する車両の運用情報を記憶する車両運用DB1013、列車情報に対応する運転士の運用情報を記憶する運転士運用DB1014、運行された列車の実績ダイヤを記憶する実績ダイヤDB1015を記憶する記憶部101と、統合輸送情報管理システム1000内の他のシステムや端末、装置との間で各種情報を送受信する通信部102と、上記各部および統合輸送管理サーバ1で行われる処理を制御する制御部103と、を有して構成されている。   The integrated transportation management server 1 is composed of, for example, a general computer, an execution schedule DB 1011 that stores operation schedule information of a plurality of trains corresponding to each line segment, and a crew operation that stores operation information of a crew corresponding to the train information. DB1012, a vehicle operation DB1013 for storing operation information of a vehicle corresponding to train information, a driver operation DB1014 for storing operation information of an operator corresponding to the train information, and a result diagram DB1015 for storing a performance diamond of an operated train Control the processing performed by the storage unit 101 to be stored, the communication unit 102 for transmitting and receiving various information to and from other systems, terminals, and devices in the integrated transportation information management system 1000, and the above units and the integrated transportation management server 1 And a control unit 103.

実行ダイヤDB1011は、各線区の列車運行システム2からWAN3等を介して送信され、各線区内で運行されると計画されている列車の実行ダイヤを線区毎に記憶する。実績ダイヤ1015は、各線区の列車運行システム2からWAN3等を介して送信され、各線区内で実際に運行された複数の列車の実績ダイヤを線区毎に記憶する。各列車に対する運用情報(乗務員運用DB1012、車両運用DB1013、運転士運用DB1014)は、輸送情報管理システム3からWAN3等を介して送信され、各列車に対する運用情報として記憶される。   The execution schedule DB 1011 is transmitted from the train operation system 2 of each line section via the WAN 3 or the like, and stores, for each line section, the execution schedule of the train planned to be operated in each line section. The performance diamond 1015 is transmitted from the train operation system 2 of each line district via the WAN 3 or the like, and stores the performance diamonds of a plurality of trains actually operated in each line district, for each line district. The operation information for each train (the crew operation DB 1012, the vehicle operation DB 1013, the driver operation DB 1014) is transmitted from the transportation information management system 3 via the WAN 3 or the like, and stored as operation information for each train.

例えば、乗務員運用DB1012は、上記実行ダイヤDB1011および実績ダイヤ1015に記憶されているダイヤと、そのダイヤで実行されるまたは実行された列車の乗務員とを対応付けて記憶する。統合輸送管理サーバ装置1の制御部103は、列車運行システム2から、変更された実行ダイヤや実績ダイヤを受け取ると、上記実行ダイヤDB1011および実績ダイヤ1015を、受信したこれらの情報に更新するとともに、変更された実行ダイヤや実績ダイヤに対応する乗務員運用DB1012(例えば、これらのダイヤに記載されている列車の乗務員に関する情報)を更新する。   For example, the crew operation DB 1012 stores the diamond stored in the above-mentioned execution diagram DB 1011 and the performance diagram 1015 in association with the crew of the train executed or executed by the diagram. When the control unit 103 of the integrated transportation management server device 1 receives the changed execution diagram and the achievement diagram from the train operation system 2, the control unit 103 updates the execution diagram DB 1011 and the achievement diagram 1015 to the received information. The crew operation DB 1012 (for example, information on the crew of the train described in these diamonds) corresponding to the changed execution diamond and actual diamond is updated.

また、例えば、車両運用DB1013は、上記実行ダイヤDB1011および実績ダイヤ1015に記憶されているダイヤと、運行されるまたは運行された列車の構成とを対応付けて記憶する。統合輸送管理サーバ装置1の制御部103は、列車運行システム2から、変更された実行ダイヤや実績ダイヤを受け取ると、上記実行ダイヤDB1011および実績ダイヤ1015を、受信したこれらの情報に更新するとともに、変更された実行ダイヤや実績ダイヤに対応する車両運用DB1013(例えば、これらのダイヤに記載されている列車の車両編成に関する情報)を更新する。   Further, for example, the vehicle operation DB 1013 associates and stores the diamond stored in the above-mentioned execution timetable DB 1011 and the performance timetable 1015 with the configuration of the operated or operated train. When the control unit 103 of the integrated transportation management server device 1 receives the changed execution diagram and the achievement diagram from the train operation system 2, the control unit 103 updates the execution diagram DB 1011 and the achievement diagram 1015 to the received information. The vehicle operation DB 1013 (for example, information on the train formation of the train described in these diamonds) corresponding to the changed execution diamond and actual diamond is updated.

また、例えば、運転士運用DB1014は、上記実行ダイヤDB1011および実績ダイヤ1015に記憶されているダイヤと、そのダイヤで実行されるまたは実行された列車の運転士とを対応付けて記憶する。統合輸送管理サーバ装置1の制御部103は、列車運行システム2から、変更された実行ダイヤや実績ダイヤを受け取ると、上記実行ダイヤDB1011および実績ダイヤ1015を、受信したこれらの情報に更新するとともに、変更された実行ダイヤや実績ダイヤに対応する運転士運用DB1014(例えば、これらのダイヤに記載されている列車の運転士に関する情報)を更新する。   Further, for example, the driver's operation DB 1014 associates and stores the diagram stored in the execution diagram DB 1011 and the performance diagram 1015 with the driver of the train executed or executed by the diagram, and stores them. When the control unit 103 of the integrated transportation management server device 1 receives the changed execution diagram and the achievement diagram from the train operation system 2, the control unit 103 updates the execution diagram DB 1011 and the achievement diagram 1015 to the received information. The driver's operation DB 1014 (for example, information on the driver of the train described in these diamonds) corresponding to the changed execution diagram and actual diagram is updated.

なお、上記乗務員運用DB1012、車両運用DB1013、運転士運用DB1014は、あらかじめ長期間にわたる列車の運行ダイヤ情報とともに定められているものであるため、これらの運用に関する情報を総称して計画系情報と呼ぶ。また、上記計画系情報に対して、列車の運行ダイヤ情報に基づいて定められる当日の列車の運行を含む列車の運用に関する情報を、当日系情報と呼ぶ。   In addition, since the above-mentioned crew operation DB 1012, vehicle operation DB 1013, and driver operation DB 1014 are determined in advance together with train schedule information over a long period of time, information on these operations is generically called planning system information. . Further, information related to the operation of the train including the operation of the train of the day determined based on the operation schedule information of the train with respect to the above-mentioned plan system information is referred to as the day information.

統合輸送管理サーバ装置1の制御部103は、各線区の自動進路制御装置22に対して実行ダイヤの出力要求を送信する。その要求を受信した自動進路制御装置22では、その時点の実行ダイヤが統合輸送管理サーバ1に送信され、制御部103は、その実行ダイヤを実行ダイヤDB1011に登録する。   The control unit 103 of the integrated transportation management server device 1 transmits an output request of the execution schedule to the automatic route control device 22 of each line section. In the automatic route control device 22 that has received the request, the execution schedule at that time is transmitted to the integrated transportation management server 1, and the control unit 103 registers the execution schedule in the execution schedule DB 1011.

同様に、統合輸送管理サーバ1の制御部103は、各線区の自動進路制御装置22に対して実績ダイヤの出力要求および列車位置情報の出力要求を順次送信する。これらの要求を受信した自動進路制御装置22では、その時点の実績ダイヤが統合輸送管理サーバ1に送信され、制御部103は、その実績ダイヤを実績ダイヤDB1015に登録する。   Similarly, the control unit 103 of the integrated transportation management server 1 sequentially transmits an output request of the result diagram and an output request of the train position information to the automatic route control device 22 of each line section. In the automatic route control device 22 that has received these requests, the track record diagram at that time is transmitted to the integrated transportation management server 1, and the control unit 103 registers the track record diagram in the track record diagram DB 1015.

さらに、統合輸送管理サーバ1の制御部103は、輸送情報管理システム3に対して上記計画系情報(車両・乗務員・運転士の運用情報)の出力要求を送信する。その要求を受信した輸送情報管理システム3では、その時点のこれらの運用情報が統合輸送管理サーバ1に送信され、制御部103は、その運用情報を、それぞれ乗務員運用DB1012、車両運用DB1013、運転士運用DB1014に登録する。   Furthermore, the control unit 103 of the integrated transportation management server 1 transmits, to the transportation information management system 3, an output request for the above-mentioned plan system information (operation information of a vehicle, a crew, a driver). In the transport information management system 3 having received the request, the operation information at that time is transmitted to the integrated transportation management server 1, and the control unit 103 transmits the operation information to the crew operation DB 1012, the vehicle operation DB 1013, and the driver. Register in the operation DB 1014.

また、統合輸送管理サーバ1の制御部103は、列車運行システム2から収集した実行ダイヤ、実績ダイヤを、それぞれ実行ダイヤDB1011、実績ダイヤDB1015に順次蓄積する。したがって、統合輸送管理サーバ1には、常にリアルタイムの実行ダイヤおよび実績ダイヤが記憶されることになる。   Further, the control unit 103 of the integrated transportation management server 1 sequentially accumulates the execution timetable and the performance timetable collected from the train operation system 2 in the execution timetable DB 1011 and the performance timetable DB 1015, respectively. Therefore, the integrated transportation management server 1 always stores a real-time execution schedule and a performance schedule.

列車運行システム2は、一または複数のコンピュータから構成され、列車集中制御装置21と、自動進路制御装置22と、ダイヤ管理装置23とを有している。列車集中制御装置21は、各線区に対応する複数の列車の運行を制御する複数の運行制御機器、軌道回路等の列車の運行に必要な装置を制御する列車集中制御装置である。運行制御機器とは、例えば、信号機、転徹器(分岐用機器)、保安制御装置を制御する機器である。保安制御装置は、例えば、信号機、転徹器等を効率よく制御して閉塞制御運転を行なう装置である。   The train operation system 2 is configured of one or more computers, and includes a train concentration control device 21, an automatic route control device 22, and a diagram management device 23. The train concentration control device 21 is a train concentration control device that controls a plurality of operation control devices that control the operation of a plurality of trains corresponding to each line segment, and devices necessary for the operation of the train such as track circuits. The operation control device is, for example, a device that controls a traffic light, a switch (a device for branching), and a security control device. The security control device is, for example, a device that controls a traffic signal, a switch, and the like efficiently to perform blockage control operation.

また、軌道回路とは、レール間に専用の電流を流しておき、列車の存在検知を行なう回路である。自動進路制御装置22は、上記列車集中制御装置21に動作の指示を出す装置である。ダイヤ管理装置23は、各線区に対応する複数の列車の運行ダイヤ情報および災害や事故等に起因した走行予定列車の運休情報等を、列車毎および駅毎に記憶して管理する装置である。運行ダイヤ情報には、当日以降の運行ダイヤである実行ダイヤを含む。実行ダイヤとは、各線区に対応する複数の列車の複数の駅に対する着発予定時刻を定めたものであり、臨時に列車が増発された場合、その増発列車の着発予定時刻を含むものである。上記各装置は、列車の運行や進路、ダイヤを管理する専用の装置である前提で説明しているが、例えば、一般的なコンピュータから構成されていてもよい。   The track circuit is a circuit that detects the presence of a train by supplying a dedicated current between the rails. The automatic route control device 22 is a device that issues an operation instruction to the train centralized control device 21. The diagram management device 23 is a device that stores and manages operation schedule information of a plurality of trains corresponding to each line segment and suspension information and the like of a scheduled train due to a disaster or an accident for each train and each station. The operation diagram information includes an execution diagram that is an operation diagram after the day. The execution schedule is to define the arrival and departure scheduled times of a plurality of trains corresponding to each line segment to a plurality of stations, and includes the arrival and arrival scheduled times of the additional trains when the number of trains is increased temporarily. Although each said apparatus is demonstrated on the premise which is an apparatus for exclusive use which manages the operation | work and course of a train, and a diagram, it may be comprised, for example from a general computer.

列車運行システム2では、線区毎に列車の運行制御を行なう列車集中制御装置21は、ダイヤ管理装置23により管理された実行ダイヤに基づいて、各線区の自動進路制御装置22に対して制御指示データを送信し、線区内の列車の運行を制御する。自動進路制御装置22は、列車集中制御装置21を介して運行制御機器及び軌道回路により検出された各線区の複数の列車のリアルタイムの運行状態を表す運行状態データに基づいて、各列車の現在走行位置を表す情報や各列車の実際に走行した実績ダイヤに含まれる着発時刻等を収集して管理する。   In the train operation system 2, the train concentration control device 21 performing train operation control for each line section instructs the automatic route control unit 22 of each line section based on the execution schedule managed by the diagram management device 23. Send data and control train operation in the line area. The automatic route control device 22 travels the current travel of each train based on the operation status data representing the real-time operation status of a plurality of trains of each line segment detected by the operation control device and track circuit via the train concentration control device 21. It collects and manages information indicating the position and arrival and departure times and the like included in actual trains traveled by each train.

各線区の自動進路制御装置22は、輸送情報管理システム3で作成された列車情報を参照し、列車集中制御装置21からリアルタイムで順次送信されてくる運行状態データに基づいて、その運行状況に対応するために変更した列車の実行ダイヤを生成し、装置内の不図示の記憶装置に記憶する。また、上記自動進路制御装置22は、上記リアルタイムの運行状態データに基づいて変更された当日の各列車の実績ダイヤと現在走行位置を表す列車走行位置情報とを生成し、それぞれ実績ダイヤを順次更新する。   The automatic route control device 22 of each line section refers to the train information created by the transportation information management system 3 and responds to the operation status based on the operation status data sequentially transmitted from the train concentration control device 21 in real time In order to create a train run schedule that has been changed, it is stored in a storage device (not shown) in the device. Further, the automatic route control device 22 generates the actual timetable of each train on the day changed based on the real-time operation status data and the train travel position information representing the current travel position, and sequentially updates the actual timetable. Do.

輸送情報管理システム3は、一または複数のコンピュータから構成され、不図示の記憶部に、長期間の列車情報とその列車情報に紐づく車両運用及び乗務員・運転士運用情報を保持している。なお、各列車情報との紐付けには、各列車に振られた列車番号(特急列車の場合には1M、2M等の番号)が用いられている。上記システムは、列車の運行や進路、ダイヤを管理する専用の装置である前提で説明しているが、列車運行システム2と同様、例えば、一般的なコンピュータから構成されていてもよい。なお、上記列車情報とは、例えば、運行ダイヤや実績ダイヤに記憶されている情報(例えば、車両編成数、車両の型式、運行区間、運行時期等の情報を含む)である。   The transportation information management system 3 is configured of one or more computers, and holds long-term train information and vehicle operation and crew / operator operation information linked to the train information in a storage unit (not shown). The train numbers assigned to the respective trains (in the case of the limited express trains, the numbers such as 1M and 2M) are used for linking with the respective train information. Although the above-mentioned system is explained on the premise that it is a dedicated device for managing the operation and course of trains and diagrams, it may be composed of, for example, a general computer, like the train operation system 2. In addition, the said train information is the information (For example, the information of the number of formation of vehicles, a model of a vehicle, an operation area, an operation time, etc. is stored), for example in operation schedule and performance schedule.

運用変更端末4は、例えば、一般的なコンピュータから構成され、入力部41と、表示部42と、通信部43と、制御部44とを有して構成されている。入力部44は、例えば、キーボードやマウス等の入力装置であり、表示部42は、例えば、LCD(Liquid Crystal Display)等の表示装置である。また、通信部43は、NIC(Network Interface Card)等の通信機器であり、制御部44は、CPU(Central Processing Unit)等の演算装置である。制御部44は、統合輸送管理サーバ1の記憶部101に登録された実行ダイヤDB1011及び実績ダイヤDB1015を参照しながら、列車運行の状況に応じて、車両運用情報・乗務員運用情報・運転士運用情報を実行ダイヤ情報に沿って変更し、統合輸送管理サーバ1内の各種計画系情報(乗務員運用DB1012、車両運用DB1013、運転士運用DB1014)を最新の情報に更新する。これらの情報を最新の情報に更新するタイミングは、これらの情報に変更が生じた場合、運用変更端末4が職員から入力を受け付けて手動で行われてもよいし、上記変更が生じた場合、それらの変更情報を、構内回線網7を介して他の装置から受信する都度、リアルタイムに自動的に実行されてもよい。また、本例では、運用変更端末4が上記計画系情報を更新しているが、統合輸送管理サーバ1の制御部103が実行してもよい。   The operation change terminal 4 is configured of, for example, a general computer, and includes an input unit 41, a display unit 42, a communication unit 43, and a control unit 44. The input unit 44 is, for example, an input device such as a keyboard and a mouse, and the display unit 42 is, for example, a display device such as an LCD (Liquid Crystal Display). The communication unit 43 is a communication device such as a network interface card (NIC), and the control unit 44 is an arithmetic device such as a central processing unit (CPU). The control unit 44 refers to the performance schedule DB 1011 and the performance schedule DB 1015 registered in the storage unit 101 of the integrated transportation management server 1 and according to the status of the train operation, vehicle operation information, crew operation information, driver's operation information Change according to the execution schedule information, and update various plan system information in the integrated transportation management server 1 (the crew operation DB 1012, the vehicle operation DB 1013, the driver operation DB 1014) to the latest information. The timing to update these pieces of information to the latest information may be performed manually when the operation change terminal 4 receives an input from a staff member when a change occurs in these pieces of information, or when the above change occurs, The change information may be automatically executed in real time each time it is received from another device via the local area network 7. Moreover, in this example, although the operation change terminal 4 updates the said planning system information, you may perform the control part 103 of the integrated transportation management server 1. FIG.

統合輸送情報表示端末5は、例えば、一般的なコンピュータから構成され、運用変更端末4と同様の入力部51と、表示部52と、通信部53と、制御部54とを有して構成されている。入力部44は、例えば、上記計画系情報のうち、列車の車両、列車の乗務員、列車の運転士の運用情報のいずれかの指定を受け付ける。制御部54は、輸送情報表示画面を統合輸送情報管理サーバ1から各種の情報をダウンロードし、表示部52に表示する。例えば、制御部54は、入力部51から指定された計画系情報の運用情報に基づいて、統合輸送管理サーバ1に対して最新の上記運用情報の取得要求を送信し、統合輸送管理サーバ1が、その要求に基づいて処理を実行した結果を表示部52に表示する。この場合、統合輸送管理サーバ1の制御部103は、統合輸送情報表示端末5から受信した上記運用情報に基づいて、記憶部に記憶されている車両運用DB1013、運転士運用DB1014、乗務員運用DB1012を読み取り、その時点で最新の上記運用情報を、統合輸送情報表示端末5に送信する。   The integrated transportation information display terminal 5 is formed of, for example, a general computer, and includes an input unit 51 similar to the operation change terminal 4, a display unit 52, a communication unit 53, and a control unit 54. ing. The input unit 44 receives, for example, designation of any of the train vehicle, the train crew, and the operation information of the train driver among the above-mentioned plan system information. The control unit 54 downloads various information from the integrated transportation information management server 1 on the transportation information display screen and displays the information on the display unit 52. For example, the control unit 54 transmits the acquisition request of the latest operation information to the integrated transportation management server 1 based on the operation information of the plan system information specified by the input unit 51, and the integrated transportation management server 1 The display unit 52 displays the result of executing the process based on the request. In this case, based on the operation information received from the integrated transportation information display terminal 5, the control unit 103 of the integrated transportation management server 1 stores the vehicle operation DB 1013, the driver operation DB 1014, and the crew operation DB 1012 stored in the storage unit. Reading, the latest operation information at that time is transmitted to the integrated transportation information display terminal 5.

各線区における駅員や乗務員区所あるいは車両所区所に駐屯する職員である利用者は、各駅・各区所に設置された統合輸送情報表示端末5の入力部51を操作して、統合輸送情報管理サーバ1から各種の情報をダウンロードし、表示部52に表示する。続いて、本システムで行われる処理について説明する。   Users who are station staff in each line ward, staff members stationed in crew wards or vehicle wards, operate the input unit 51 of the integrated transportation information display terminal 5 installed in each station and each district, and integrated transportation information management Various types of information are downloaded from the server 1 and displayed on the display unit 52. Subsequently, processing performed in the present system will be described.

図2は、統合輸送情報表示端末5が、本システムで管理される車両の運用情報を要求して表示するまでの処理(車両情報要求処理)の処理手順を示すフローチャートである。図2に示すように、車両情報要求処理では、まず、統合輸送情報表示端末5の入力部51は、職員である利用者から、その職員所望の輸送情報(例えば、列車の運行状況を示す情報、上記計画系情報を含む。図2では、車両の運用情報の場合)の指定を受け付け、制御部54は、Webブラウザに基づく処理により、通信部53を介して、最新の車両の運用情報を取得する要求を、構内回線網7を介して、統合輸送管理サーバ装置1に送信する(ステップS21)。   FIG. 2 is a flowchart showing a processing procedure of processing (vehicle information request processing) until the integrated transportation information display terminal 5 requests and displays operation information of a vehicle managed by the present system. As shown in FIG. 2, in the vehicle information request process, first, the input unit 51 of the integrated transportation information display terminal 5 receives from the user who is the staff the transportation information desired by the staff (for example, information indicating the train operation status) In the case of the operation information of the vehicle (FIG. 2), the control unit 54 receives the latest operation information of the vehicle via the communication unit 53 by the processing based on the web browser. The request to be acquired is transmitted to the integrated transportation management server device 1 via the local area network 7 (step S21).

このとき、統合輸送管理サーバ1の制御部103は、構内回線網7および通信部102を介して受信した上記要求が車両の運用情報であるか否かを判定する。制御部103は、上記判定の結果、上記要求が車両の運用情報であると判定した場合、上記要求に含まれる車両が、記憶部101に記憶されている車両運用DB1013に記憶されているか否かを判定する。制御部103は、上記要求に含まれている車両が、車両運用DB1013に記憶されていると判定した場合、車両運用DB1013の中から、その車両に対応する情報を読み取る。例えば、上記要求に含まれている車両を特定するための識別情報をキーにして、車両運用DB1013の中から、その識別情報に一致する識別情報を読み取り、読み取った上記一致する識別情報に対応する情報(例えば、その車両の運用情報)を読み取る。制御部103は、読み取った上記対応する情報を、要求された統合輸送情報表示端末5に送信する(ステップS22)。例えば、制御部103は、上記対応する情報を、Webブラウザで閲覧可能なHTML形式で生成し、生成した情報を、統合輸送情報表示端末5に送信する。   At this time, the control unit 103 of the integrated transportation management server 1 determines whether the request received via the local area network 7 and the communication unit 102 is the operation information of the vehicle. When the control unit 103 determines that the request is the operation information of a vehicle as a result of the determination, whether the vehicle included in the request is stored in the vehicle operation DB 1013 stored in the storage unit 101 Determine If the control unit 103 determines that the vehicle included in the request is stored in the vehicle operation DB 1013, the control unit 103 reads information corresponding to the vehicle from the vehicle operation DB 1013. For example, using the identification information for specifying the vehicle included in the request as a key, the identification information matching the identification information is read from the vehicle operation DB 1013, and the read identification information corresponds to the matching identification information Read the information (for example, the operation information of the vehicle). The control unit 103 transmits the read corresponding information to the requested integrated transportation information display terminal 5 (step S22). For example, the control unit 103 generates the corresponding information in the HTML format that can be browsed by the Web browser, and transmits the generated information to the integrated transportation information display terminal 5.

統合輸送情報表示端末5の制御部54は、統合輸送管理サーバ1から受信した上記対応する情報を、表示部52に表示する(ステップS23)。ステップS23の処理が終了すると、図2に示した車両情報要求処理が終了する。   The control unit 54 of the integrated transportation information display terminal 5 displays the corresponding information received from the integrated transportation management server 1 on the display unit 52 (step S23). When the process of step S23 ends, the vehicle information request process shown in FIG. 2 ends.

図3は、統合輸送情報表示端末5が、本システムで管理される列車の運用情報を要求して表示するまでの処理(列車情報要求処理)の処理手順を示すフローチャートである。図3に示すように、列車情報要求処理では、まず、統合輸送情報表示端末5の入力部51は、職員である利用者から、その職員所望の輸送情報(例えば、列車の運行状況を示す情報、上記当日系情報を含む。図3では、列車の運用情報の場合)の指定を受け付け、制御部54は、Webブラウザに基づく処理により、通信部53を介して、最新の列車の運用情報を取得する要求を、構内回線網7を介して、統合輸送管理サーバ装置1に送信する(ステップS31)。   FIG. 3 is a flowchart showing a processing procedure of processing (train information request processing) until the integrated transportation information display terminal 5 requests and displays operation information of a train managed by the present system. As shown in FIG. 3, in the train information request process, first, the input unit 51 of the integrated transportation information display terminal 5 receives from the user who is the staff the transportation information desired by the staff (for example, information indicating the operation status of the train) In the case of train operation information in FIG. 3, the control unit 54 receives the latest train operation information through the communication unit 53 by processing based on the web browser. The request to be acquired is transmitted to the integrated transportation management server device 1 via the local area network 7 (step S31).

このとき、統合輸送管理サーバ1の制御部103は、構内回線網7および通信部102を介して受信した上記要求が列車の運用情報であるか否かを判定する。制御部103は、上記判定の結果、上記要求が列車の運用情報であると判定した場合、上記要求に含まれる列車が、記憶部101に記憶されている実行ダイヤDB1011または実績ダイヤDB1015に記憶されているか否かを判定する。制御部103は、上記要求に含まれている列車が、実行ダイヤDB1011または実績ダイヤDB1015に記憶されていると判定した場合、実行ダイヤDB1011または実績ダイヤDB1015の中から、その列車に対応する情報を読み取る。例えば、上記要求に含まれている列車を特定するための識別情報をキーにして、実行ダイヤDB1011または実績ダイヤDB1015の中から、その識別情報に一致する識別情報を読み取り、読み取った上記一致する識別情報に対応する情報(例えば、その列車の運用情報)を読み取る。制御部103は、読み取った上記対応する情報を、要求された統合輸送情報表示端末5に送信する(ステップS32)。例えば、制御部103は、上記対応する情報を、Webブラウザで閲覧可能なHTML形式で生成し、生成した情報を、統合輸送情報表示端末5に送信する。   At this time, the control unit 103 of the integrated transportation management server 1 determines whether the above request received via the local area network 7 and the communication unit 102 is train operation information. If the control unit 103 determines that the request is train operation information as a result of the determination, the train included in the request is stored in the execution schedule DB 1011 or the performance schedule DB 1015 stored in the storage unit 101. It is determined whether the If the control unit 103 determines that the train included in the request is stored in the execution schedule DB 1011 or the performance schedule DB 1015, the information corresponding to the train is selected from the execution schedule DB 1011 or the performance schedule DB 1015. read. For example, using the identification information for specifying the train included in the request as a key, the identification information that matches the identification information is read from the execution diagram DB 1011 or the performance diagram DB 1015, and the read identification information that matches The information corresponding to the information (for example, the operation information of the train) is read. The control unit 103 transmits the read corresponding information to the requested integrated transportation information display terminal 5 (step S32). For example, the control unit 103 generates the corresponding information in the HTML format that can be browsed by the Web browser, and transmits the generated information to the integrated transportation information display terminal 5.

統合輸送情報表示端末5の制御部54は、統合輸送管理サーバ1から受信した上記対応する情報を、表示部52に表示する(ステップS33)。ステップS33の処理が終了すると、図3に示した列車情報要求処理が終了する。   The control unit 54 of the integrated transportation information display terminal 5 displays the corresponding information received from the integrated transportation management server 1 on the display unit 52 (step S33). When the process of step S33 ends, the train information request process shown in FIG. 3 ends.

図4は、統合輸送情報表示端末5が、本システムで管理される乗務員の運用情報を要求して表示するまでの処理(乗務員情報要求処理)の処理手順を示すフローチャートである。図3に示すように、乗務員情報要求処理では、まず、統合輸送情報表示端末5の入力部51は、職員である利用者から、その職員所望の輸送情報(例えば、列車の運行状況を示す情報、上記計画系情報を含む。図4では、乗務員の運用情報の場合)の指定を受け付け、制御部54は、Webブラウザに基づく処理により、通信部53を介して、最新の乗務員の運用情報を取得する要求を、構内回線網7を介して、統合輸送管理サーバ装置1に送信する(ステップS41)。   FIG. 4 is a flow chart showing a processing procedure of processing (crew member information request processing) until integrated transportation information display terminal 5 requests and displays operation information of a crew managed by the present system. As shown in FIG. 3, in the crew information request process, first, the input unit 51 of the integrated transportation information display terminal 5 receives from the user who is the staff the transportation information desired by the staff (for example, information indicating the train operation status) In the case of the operation information of the crew in FIG. 4, the control unit 54 receives the latest operation information of the crew via the communication unit 53 by the processing based on the web browser. The request to be acquired is transmitted to the integrated transportation management server device 1 via the local area network 7 (step S41).

このとき、統合輸送管理サーバ1の制御部103は、構内回線網7および通信部102を介して受信した上記要求が乗務員の運用情報であるか否かを判定する。制御部103は、上記判定の結果、上記要求が乗務員の運用情報であると判定した場合、上記要求に含まれる乗務員が、記憶部101に記憶されている乗務員運用DB1012に記憶されているか否かを判定する。制御部103は、上記要求に含まれている乗務員が、乗務員運用DB1012に記憶されていると判定した場合、乗務員運用DB1012の中から、その乗務員に対応する情報を読み取る。例えば、上記要求に含まれている乗務員を特定するための識別情報をキーにして、乗務員運用DB1012の中から、その識別情報に一致する識別情報を読み取り、読み取った上記一致する識別情報に対応する情報(例えば、その乗務員の運用情報)を読み取る。制御部103は、読み取った上記対応する情報を、要求された統合輸送情報表示端末5に送信する(ステップS42)。例えば、制御部103は、上記対応する情報を、Webブラウザで閲覧可能なHTML形式で生成し、生成した情報を、統合輸送情報表示端末5に送信する。   At this time, the control unit 103 of the integrated transportation management server 1 determines whether the above request received via the local area network 7 and the communication unit 102 is the operation information of the crew. When the control unit 103 determines that the above request is the operation information of the crew as a result of the above determination, whether or not the crew included in the above request is stored in the crew operation DB 1012 stored in the storage unit 101 Determine If the control unit 103 determines that the crew included in the request is stored in the crew operation DB 1012, the control unit 103 reads information corresponding to the crew from the crew operation DB 1012. For example, using the identification information for specifying the crew included in the request as a key, the identification information corresponding to the identification information is read from the crew operation DB 1012, and the read identification information corresponds to the matching identification information Read the information (for example, the operation information of the crew). The control unit 103 transmits the read corresponding information to the requested integrated transportation information display terminal 5 (step S42). For example, the control unit 103 generates the corresponding information in the HTML format that can be browsed by the Web browser, and transmits the generated information to the integrated transportation information display terminal 5.

統合輸送情報表示端末5の制御部54は、統合輸送管理サーバ1から受信した上記対応する情報を、表示部52に表示する(ステップS43)。ステップS43の処理が終了すると、図4に示した乗務員情報要求処理が終了する。   The control unit 54 of the integrated transportation information display terminal 5 displays the corresponding information received from the integrated transportation management server 1 on the display unit 52 (step S43). When the process of step S43 ends, the crew information request process shown in FIG. 4 ends.

図5は、統合輸送情報表示端末5が、本システムで管理される運転士の運用情報を要求して表示するまでの処理(運転士情報要求処理)の処理手順を示すフローチャートである。図3に示すように、運転士情報要求処理では、まず、統合輸送情報表示端末5の入力部51は、職員である利用者から、その職員所望の輸送情報(例えば、列車の運行状況を示す情報、上記計画系情報を含む。図5では、運転士の運用情報の場合)の指定を受け付け、制御部54は、Webブラウザに基づく処理により、通信部53を介して、最新の運転士の運用情報を取得する要求を、構内回線網7を介して、統合輸送管理サーバ装置1に送信する(ステップS51)。   FIG. 5 is a flowchart showing a processing procedure of processing (driver information request processing) until the integrated transportation information display terminal 5 requests and displays operation information of the driver managed by the present system. As shown in FIG. 3, in the driver information request process, first, the input unit 51 of the integrated transportation information display terminal 5 displays transportation information desired by the staff member (for example, train operation status) from the user who is the staff member. Information, including the above-mentioned plan system information (in the case of operation information of the driver in FIG. 5), the control unit 54 receives the latest driver's operation via the communication unit 53 by the processing based on the web browser. A request for acquiring operation information is transmitted to the integrated transportation management server device 1 via the local area network 7 (step S51).

このとき、統合輸送管理サーバ1の制御部103は、構内回線網7および通信部102を介して受信した上記要求が運転士の運用情報であるか否かを判定する。制御部103は、上記判定の結果、上記要求が運転士の運用情報であると判定した場合、上記要求に含まれる運転士が、記憶部101に記憶されている運転士運用DB1014に記憶されているか否かを判定する。制御部103は、上記要求に含まれている乗務員が、運転士運用DB1014に記憶されていると判定した場合、運転士運用DB1014の中から、その運転士に対応する情報を読み取る。例えば、上記要求に含まれている運転士を特定するための識別情報をキーにして、運転士運用DB1014の中から、その識別情報に一致する識別情報を読み取り、読み取った上記一致する識別情報に対応する情報(例えば、その運転士の運用情報)を読み取る。制御部103は、読み取った上記対応する情報を、要求された統合輸送情報表示端末5に送信する(ステップS52)。例えば、制御部103は、上記対応する情報を、Webブラウザで閲覧可能なHTML形式で生成し、生成した情報を、統合輸送情報表示端末5に送信する。   At this time, the control unit 103 of the integrated transportation management server 1 determines whether the above request received via the local area network 7 and the communication unit 102 is the operation information of the driver. If the control unit 103 determines that the request is the driver's operation information as a result of the determination, the driver included in the request is stored in the driver operation DB 1014 stored in the storage unit 101. Determine if there is. When it is determined that the crew included in the request is stored in the driver's operation DB 1014, the control unit 103 reads information corresponding to the driver from the driver's operation DB 1014. For example, using the identification information for identifying the driver included in the request as a key, the identification information corresponding to the identification information is read from the driver operation DB 1014 and the read identification information is read. Read the corresponding information (for example, the operation information of the driver). The control unit 103 transmits the read corresponding information to the requested integrated transportation information display terminal 5 (step S52). For example, the control unit 103 generates the corresponding information in the HTML format that can be browsed by the Web browser, and transmits the generated information to the integrated transportation information display terminal 5.

統合輸送情報表示端末5の制御部54は、統合輸送管理サーバ1から受信した上記対応する情報を、表示部52に表示する(ステップS53)。ステップS53の処理が終了すると、図5に示した運転士情報要求処理が終了する。   The control unit 54 of the integrated transportation information display terminal 5 displays the corresponding information received from the integrated transportation management server 1 on the display unit 52 (step S53). When the process of step S53 ends, the driver information request process shown in FIG. 5 ends.

図2から5に示したように、本システムでは、ステップS23、S33、S43、S53の各処理を実行することにより、統合輸送情報表示端末5の表示部52に、上記のような各輸送情報が閲覧可能に表示される。したがって、利用者は、ディスプレイを視認することにより、例えば、列車の運行状況を示す情報、車両の運用情報、乗務員の運用情報、運転士の運用情報を含む輸送情報など、所望の情報を最新の状態で把握することができる。   As shown in FIGS. 2 to 5, in the present system, by executing each process of steps S23, S33, S43, and S53, each transportation information as described above is displayed on the display unit 52 of the integrated transportation information display terminal 5. Is displayed for browsing. Therefore, the user updates the desired information such as information indicating the operation status of the train, operation information of the vehicle, operation information of the crew, transportation information including operation information of the driver, and the like by visually recognizing the display. It can be grasped in the state.

以上述べたように、本実施形態によれば、利用者は、自ら利用可能な統合輸送情報表示端末を、ネットワークを経由して統合輸送管理サーバ装置に接続することにより、利用者は、リアルタイムの列車運行状況情報、最新の車両運用・乗務員運用・運転士運用を、直接統合輸送情報表示端末にダウンロードしてその端末を介して閲覧・確認することができるため、職員は、列車運行の乱れに対して迅速かつ的確に対処することができ、列車運行の乱れを早期に回復させるとともに、引いては乗客の満足度を大幅に向上させることができる。   As described above, according to the present embodiment, the user can connect the integrated transportation information display terminal that can be used by himself to the integrated transportation management server device via the network so that the user can perform real-time operation. Because the train operation status information and the latest vehicle operation, crew operation, and driver operation can be directly downloaded to the integrated transportation information display terminal and viewed / confirmed through the terminal, the staff members can disturb the train operation. It is possible to cope with the situation quickly and accurately, to recover the disturbance of train operation early, and thus to greatly improve the passenger satisfaction.

例えば、本システムでは、線区に対応する列車および列車車両情報または乗務する乗務員・運転士の情報を作成・管理する情報管理装置とその情報に基づいて当日の制御する線区の列車の在線位置・発着駅情報・遅延時分の情報を管理する。そして、列車の在線状況を元に信号・転轍機の動作を判断し、列車集中制御へ動作指示を行う進路制御装置、及び路線・一定区間の単位で信号や分岐器の連動装置を運転指令所又は列車制御所にて遠隔制御できるようにした列車集中制御及び当日の列車の変更に合わせて車両情報または乗務する乗務員・運転士の情報を修正する。このため、統合輸送情報管理システムに対して通信可能であり、各区所に設置してある利用者の端末に対して列車の運行状況及び乗務員・運転士・車両運用の変更に関する情報を提供することができる。   For example, in the present system, an information management apparatus that creates and manages train and train vehicle information corresponding to a line area or information of crew and drivers who are on board and the train location of the line area line to be controlled based on that information. · Manage departure and arrival station information, and information on delay time. Then, based on the train status, determine the operation of the signal / switching machine, and instruct the train concentration control to control the operation of the route control device, and the unit of the route / fixed section signal interlocking device or branch commander In accordance with the train central control that can be remotely controlled at the train control station and the change of the train on the day, the vehicle information or the information of the crew and driver who are on duty is corrected. Therefore, it is possible to communicate with the integrated transportation information management system, and to provide information on the operation status of the train and the change in the operation of the crew, the driver, and the vehicle to the terminal of the user installed in each district Can.

また、輸送に関わる情報である計画系情報及び当日系情報を一元管理できる。また、鉄道職員に対して従来より正確な変更情報をリアルタイムに配信するとともに、各関連部署にも迅速に各種の変更情報を提供することを実現することができる。さらに、複数の独立した列車運行管理装置・情報それぞれが保有する列車運行関連情報を蓄積して統合することにより統合データベース装置を構築し、上記統合データベースに接続した統合輸送管理サーバにより、線区を越えた列車運行関連情報を入手可能である。また、各乗務員・運転士に対しても詳細な運行情報及び最新の車両・乗務員・運転士の運用をタイムリーに提供することが可能となる。   In addition, it is possible to centrally manage planning information and information on the day, which are information related to transportation. Further, it is possible to deliver to the railway staff a more accurate change information in real time than in the past, and to quickly provide various change information to each related department. Furthermore, an integrated database device is constructed by accumulating and integrating the train operation related information possessed by each of a plurality of independent train operation control devices and information, and the line section is constructed by the integrated transportation management server connected to the integrated database. Train operation related information is available. In addition, detailed operation information and the latest operation of vehicles, crews and drivers can be provided to each crew and driver in a timely manner.

また、輸送に関わる情報は大きく分けて計画系と当日系の2つが存在し、そのうち計画系の情報の運用(例えば、乗務員・運転士・車両の運用情報)については、当日の列車の運行管理上十分に活用されていなかった。当該システムでは、その運用に関わる情報を当日の運行管理においても活用することで、輸送障害時における運行管理の精度を向上させることができる。したがって、輸送障害発生時における車両の手配、運転士及び乗務員の割り当てを迅速かつ確実に行い、輸送障害による列車運行の乱れの回復を図ることができる。   In addition, there are two major types of information related to transportation, the plan system and the day system, and of these, the operation of the plan system information (for example, operation information of crews, drivers, and vehicles), train operation management of the day It was not fully utilized. In the said system, the accuracy in the operation management at the time of a transport failure can be improved by utilizing the information in connection with the operation also in the operation management on the day. Therefore, it is possible to promptly and reliably allocate the vehicle and allocate the driver and the crew at the occurrence of the transport failure, and to recover the disturbance of the train operation due to the transport failure.

なお、本発明は上記実施例に限定されるものではなく、様々な変形例が含まれ、必ずしも説明した全ての構成を備えるものに限定されるものではない。   The present invention is not limited to the above-described embodiment, but includes various modifications and is not necessarily limited to those having all the configurations described.

1・・・統合輸送管理サーバ
2・・・列車運行システム
3・・・輸送情報管理システム
4・・・運用変更端末
5・・・統合輸送情報表示端末
6・・・ネットワーク(WAN)
7・・・ネットワーク(LAN)。
1 integrated transportation management server 2 train operation system 3 transportation information management system 4 operation change terminal 5 integrated transportation information display terminal 6 network (WAN)
7 ・ ・ ・ Network (LAN).

Claims (4)

列車のダイヤ情報に基づいて1または複数の線区に対応する列車の列車情報を作成して前記列車の運行を管理する列車運行システムと、列車計画及びその計画により運行される列車の車両及び前記列車の運転士及び乗務員に関する運用情報である計画系情報を作成する輸送情報管理システムと、前記列車運行システムによって作成された列車情報に基づいて前記輸送情報管理システムで作成された前記計画系情報を変更する運用変更端末と、前記運用変更端末により変更された前記計画系情報を表示する統合輸送情報表示端末と、前記列車運行システムと前記輸送情報管理システムと運用変更端末と統合輸送情報表示端末とを制御する統合輸送管理サーバとを備えた交通運用情報統合管理システムであって、
前記統合輸送情報表示端末は、
前記計画系情報のうち、前記列車の車両、前記列車の乗務員、前記列車の運転士の運用情報のいずれかの指定を受け付ける端末入力部と、
前記端末入力部から指定された前記運用情報に基づいて、前記統合輸送管理サーバに対して最新の前記運用情報の取得要求を送信する端末制御部と、
前記取得要求に基づいて前記統合輸送管理サーバから受信した最新の前記運用情報を表示する表示部と、を備え、
前記統合輸送管理サーバは、
前記統合輸送情報表示端末から受信した前記運用情報に基づいて、記憶部に記憶されている前記車両運用データベース、運転士運用データベース、乗務員運用データベースを読み取り、最新の前記運用情報を前記統合輸送情報表示端末に送信するサーバ制御部と、
を備えることを特徴とする交通運用情報統合管理システム。
A train operation system for creating train information of a train corresponding to one or a plurality of line districts based on train schedule information and managing the operation of the train; a train plan and a train vehicle operated by the plan; A transportation information management system for generating planning information, which is operation information on train drivers and crews, and the planning information generated by the transportation information management system based on train information generated by the train operating system Operation change terminal to be changed, integrated transportation information display terminal for displaying the plan system information changed by the operation change terminal, the train operation system, the transportation information management system, operation change terminal, and integrated transportation information display terminal Integrated traffic management information management system with an integrated transportation management server that controls
The integrated transportation information display terminal
A terminal input unit that receives designation of any one of the train system, a crew of the train, and operation information of a driver of the train from the plan information;
A terminal control unit that transmits an acquisition request for the latest operation information to the integrated transportation management server based on the operation information specified by the terminal input unit;
And a display unit for displaying the latest operation information received from the integrated transportation management server based on the acquisition request.
The integrated transportation management server
Based on the operation information received from the integrated transportation information display terminal, the vehicle operation database, the driver's operation database, and the crew operation database stored in the storage unit are read, and the latest transportation information is displayed in the integrated transportation information display A server control unit to send to the terminal;
A traffic operation information integrated management system comprising:
前記統合輸送情報表示端末は、
前記端末入力部が、前記列車のダイヤ情報に基づいて定められる当日の列車に関する運用情報である当日系情報の指定を受け付け、
前記端末制御部が、前記端末入力部から指定された前記当日系情報である運用情報に基づいて、前記統合輸送管理サーバに対して最新の前記運用情報の取得要求を送信し、前記取得要求に基づいて前記統合輸送管理サーバから受信した最新の前記運用情報を表示部に表示し、
前記統合輸送管理サーバは、
前記サーバ制御部が、前記統合輸送情報表示端末から受信した前記運用情報に基づいて、記憶部に記憶されている前記ダイヤ情報を読み取り、最新の前記運用情報を前記統合輸送情報表示端末に送信する、
ことを特徴とする請求項1に記載の交通運用情報統合管理システム。
The integrated transportation information display terminal
The terminal input unit receives specification of on-the-day information that is operation information on the train of the day determined based on the train schedule information,
The terminal control unit transmits the acquisition request for the latest operation information to the integrated transportation management server based on the operation information which is the on-day information specified from the terminal input unit, and the acquisition request is made to the acquisition request. Displaying the latest operation information received from the integrated transportation management server based on the display unit;
The integrated transportation management server
The server control unit reads the diamond information stored in the storage unit based on the operation information received from the integrated transportation information display terminal, and transmits the latest operation information to the integrated transportation information display terminal ,
The traffic operation information integrated management system according to claim 1, characterized in that.
列車のダイヤ情報に基づいて1または複数の線区に対応する列車の列車情報を作成して前記列車の運行を管理する列車運行システムと、列車計画及びその計画により運行される列車の車両及び前記列車の運転士及び乗務員に関する運用情報である計画系情報を作成する輸送情報管理システムと、前記列車運行システムによって作成された列車情報に基づいて前記輸送情報管理システムで作成された前記計画系情報を変更する運用変更端末と、前記運用変更端末により変更された前記計画系情報を表示する統合輸送情報表示端末と、前記列車運行システムと前記輸送情報管理システムと運用変更端末と統合輸送情報表示端末とを制御する統合輸送管理サーバとを備えた交通運用情報統合管理システムで行われる交通運用情報統合管理方法であって、
前記統合輸送情報表示端末の端末入力部が、前記計画系情報のうち、前記列車の車両、前記列車の乗務員、前記列車の運転士の運用情報のいずれかの指定を受け付け、
前記統合輸送情報表示端末の端末制御部が、前記端末入力部から指定された前記運用情報に基づいて、前記統合輸送管理サーバに対して最新の前記運用情報の取得要求を送信し、
前記統合輸送管理サーバのサーバ制御部が、前記統合輸送情報表示端末から受信した前記運用情報に基づいて、記憶部に記憶されている前記車両運用データベース、運転士運用データベース、乗務員運用データベースを読み取り、最新の前記運用情報を前記統合輸送情報表示端末に送信し、
前記統合輸送情報表示端末の端末制御部が、前記取得要求に基づいて前記統合輸送管理サーバから受信した最新の前記運用情報を表示部に表示する、
をことを特徴とする交通運用情報統合管理方法。
A train operation system for creating train information of a train corresponding to one or a plurality of line districts based on train schedule information and managing the operation of the train; a train plan and a train vehicle operated by the plan; A transportation information management system for generating planning information, which is operation information on train drivers and crews, and the planning information generated by the transportation information management system based on train information generated by the train operating system Operation change terminal to be changed, integrated transportation information display terminal for displaying the plan system information changed by the operation change terminal, the train operation system, the transportation information management system, operation change terminal, and integrated transportation information display terminal Traffic operation information integrated management method carried out by the traffic operation information integrated management system provided with an integrated transportation management server that controls ,
The terminal input unit of the integrated transportation information display terminal receives specification of any of the train system's train, train crew, and operation information of the train's driver among the planning system information,
The terminal control unit of the integrated transportation information display terminal transmits an acquisition request for the latest operation information to the integrated transportation management server based on the operation information specified by the terminal input unit,
Based on the operation information received from the integrated transportation information display terminal, the server control unit of the integrated transportation management server reads the vehicle operation database, the driver's operation database, and the crew operation database stored in the storage unit. Sending the latest operation information to the integrated transportation information display terminal;
The terminal control unit of the integrated transportation information display terminal displays the latest operation information received from the integrated transportation management server on a display unit based on the acquisition request.
A traffic management information integrated management method characterized in that.
前記統合輸送情報表示端末の前記端末入力部が、前記列車のダイヤ情報に基づいて定められる当日の列車に関する運用情報である当日系情報の指定を受け付け、
前記統合輸送情報表示端末の前記端末制御部が、前記端末入力部から指定された前記当日系情報である運用情報に基づいて、前記統合輸送管理サーバに対して最新の前記運用情報の取得要求を送信し、
前記統合輸送管理サーバの前記サーバ制御部が、前記統合輸送情報表示端末から受信した前記運用情報に基づいて、記憶部に記憶されている前記ダイヤ情報を読み取り、最新の前記運用情報を前記統合輸送情報表示端末に送信し、
前記統合輸送情報表示端末の前記端末制御部が、前記取得要求に基づいて前記統合輸送管理サーバから受信した最新の前記運用情報を表示部に表示する、
ことを特徴とする請求項3に記載の交通運用情報統合管理方法。
The terminal input unit of the integrated transportation information display terminal receives specification of on-the-day information that is operation information on the train of the day determined based on the train schedule information,
The terminal control unit of the integrated transportation information display terminal requests the integrated transportation management server to obtain the latest operation information based on the operation information that is the on-the-day information specified from the terminal input unit. Send
The server control unit of the integrated transportation management server reads the diagram information stored in the storage unit based on the operation information received from the integrated transportation information display terminal, and the integrated transportation of the latest operation information is integrated Send to the information display terminal,
The terminal control unit of the integrated transportation information display terminal displays the latest operation information received from the integrated transportation management server on a display unit based on the acquisition request.
The traffic operation information integrated management method according to claim 3, characterized in that:
JP2017236769A 2017-12-11 2017-12-11 TRAFFIC OPERATION INFORMATION INTEGRATED MANAGEMENT SYSTEM, TRAFFIC OPERATION INFORMATION INTEGRATED MANAGEMENT METHOD Active JP7122107B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017236769A JP7122107B2 (en) 2017-12-11 2017-12-11 TRAFFIC OPERATION INFORMATION INTEGRATED MANAGEMENT SYSTEM, TRAFFIC OPERATION INFORMATION INTEGRATED MANAGEMENT METHOD

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017236769A JP7122107B2 (en) 2017-12-11 2017-12-11 TRAFFIC OPERATION INFORMATION INTEGRATED MANAGEMENT SYSTEM, TRAFFIC OPERATION INFORMATION INTEGRATED MANAGEMENT METHOD

Publications (2)

Publication Number Publication Date
JP2019104306A true JP2019104306A (en) 2019-06-27
JP7122107B2 JP7122107B2 (en) 2022-08-19

Family

ID=67062169

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017236769A Active JP7122107B2 (en) 2017-12-11 2017-12-11 TRAFFIC OPERATION INFORMATION INTEGRATED MANAGEMENT SYSTEM, TRAFFIC OPERATION INFORMATION INTEGRATED MANAGEMENT METHOD

Country Status (1)

Country Link
JP (1) JP7122107B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102127777B1 (en) * 2020-01-15 2020-06-29 김형목 Operation plan wireless transmission system for railway vehicle
WO2020246540A1 (en) 2019-06-04 2020-12-10 三菱ケミカル株式会社 Non-aqueous electrolyte and non-aqueous electrolyte battery

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004224290A (en) * 2003-01-27 2004-08-12 Toshiba Corp Crew scheduling and arrangement plan preparation support device for recovering train schedule and crew scheduling and arrangement plan preparation support program for recovering train schedule
JP2006079440A (en) * 2004-09-10 2006-03-23 Mitsubishi Electric Corp Apparatus for preparing crew operation control plan
US20100185472A1 (en) * 2009-01-20 2010-07-22 Todd Goodermuth Locomotive Assistant
JP2015085876A (en) * 2013-10-31 2015-05-07 東日本旅客鉄道株式会社 Transportation service support system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004224290A (en) * 2003-01-27 2004-08-12 Toshiba Corp Crew scheduling and arrangement plan preparation support device for recovering train schedule and crew scheduling and arrangement plan preparation support program for recovering train schedule
JP2006079440A (en) * 2004-09-10 2006-03-23 Mitsubishi Electric Corp Apparatus for preparing crew operation control plan
US20100185472A1 (en) * 2009-01-20 2010-07-22 Todd Goodermuth Locomotive Assistant
JP2015085876A (en) * 2013-10-31 2015-05-07 東日本旅客鉄道株式会社 Transportation service support system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020246540A1 (en) 2019-06-04 2020-12-10 三菱ケミカル株式会社 Non-aqueous electrolyte and non-aqueous electrolyte battery
KR102127777B1 (en) * 2020-01-15 2020-06-29 김형목 Operation plan wireless transmission system for railway vehicle

Also Published As

Publication number Publication date
JP7122107B2 (en) 2022-08-19

Similar Documents

Publication Publication Date Title
US20160016598A1 (en) Device for interfacing railway driver advisory system
CN103258424B (en) Intelligent public transport service system and control method
JP5959419B2 (en) Train operation management system and control method of train operation management system
JP4805133B2 (en) Content display control method and content distribution server
JP6138934B2 (en) Traffic demand control device
JP2007112321A (en) Train operation information providing system for station staff
JP2015013487A (en) Train operation control system, train operation simulation device, and train operation simulation method
JP2019104306A (en) Traffic operational information integrated management system and traffic operational information integrated management method
KR100831387B1 (en) Train operation management system
WO2010106982A1 (en) Data input support device and data input support method
JP5219222B2 (en) Train operation information notification device
JP2018090139A (en) Vehicle application business support system
JP2009301078A (en) Vehicle operation system
JP6788488B2 (en) Vehicle operation business support system
WO2012169333A1 (en) Operation rescheduling support system
JP4733358B2 (en) Railway advertisement distribution system
JP2008184032A (en) Diagram preparation device
KR20200086258A (en) Navigation system and method in track network
JP2004229456A (en) Delivery system for distribution system map data
JP2015039994A (en) Train operation command apparatus and train operation management system
JP4221254B2 (en) Vehicle base diamond creation device
JP2004189043A (en) Train information transfer system
JP4420316B2 (en) Train operation information notification device
JP4157458B2 (en) Transportation information display system
CN109249964A (en) A kind of clock system based on Centralized Dispatching System

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20201207

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20211013

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20211019

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20211215

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220510

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220706

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220802

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220808

R150 Certificate of patent or registration of utility model

Ref document number: 7122107

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150