JP2018118795A - Guy arm and crane arm with guy arm - Google Patents

Guy arm and crane arm with guy arm Download PDF

Info

Publication number
JP2018118795A
JP2018118795A JP2017009181A JP2017009181A JP2018118795A JP 2018118795 A JP2018118795 A JP 2018118795A JP 2017009181 A JP2017009181 A JP 2017009181A JP 2017009181 A JP2017009181 A JP 2017009181A JP 2018118795 A JP2018118795 A JP 2018118795A
Authority
JP
Japan
Prior art keywords
frame member
arm
vertical frame
engagement portion
lock pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2017009181A
Other languages
Japanese (ja)
Other versions
JP6917048B2 (en
Inventor
一郎 綱木
Ichiro Tsunaki
一郎 綱木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUNIPAA KK
Original Assignee
YUNIPAA KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUNIPAA KK filed Critical YUNIPAA KK
Priority to JP2017009181A priority Critical patent/JP6917048B2/en
Publication of JP2018118795A publication Critical patent/JP2018118795A/en
Application granted granted Critical
Publication of JP6917048B2 publication Critical patent/JP6917048B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Jib Cranes (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a guy arm which is easily attached/detached and capable of completely preventing a falling or loosing accident of a bolt/nut, and a crane arm provided with the guy arm.SOLUTION: A crane arm 1 has a vertical frame member 5 that is attached roughly vertically, and a lateral frame member 6 that is roughly perpendicularly coupled to the vertical frame member 5. The lateral frame member 6 is provided with a first engaging part 10, and a second engaging part 11 that is positioned closer to the vertical frame member 5 side than the first engaging part 10, and a guy arm 13 attached to the crane arm 1 is provided with a third engaging part 16 that is engaged with the first engaging part 10, and a fourth engaging part 17 that is engaged with the second engaging part 11. A winch side pulley attaching part 8 at the lower end of the vertical frame member 5 has a key hole 34 of a rope retaining pin 33 in a side plate. The rope retaining pin 33 has a projected part corresponding to the key hole 34, and a knob part 22b rotates perpendicularly downward by gravity after inserted into a notch of the key hole.SELECTED DRAWING: Figure 1

Description

本願発明は、足場部材(仮設材)等を吊り上げする際に用いられるクレーンアームの介錯アーム、および介錯アームを備えたクレーンアームに関する。   The present invention relates to an intermediate arm of a crane arm used when lifting a scaffold member (temporary material) or the like, and a crane arm provided with the intermediate arm.

一般に建設現場では、建物周囲に仮設足場を組み上げ、作業員が建物の外周にアクセスできるようにするとともに、建設資材を吊り上げて仮設足場の所定の場所や建物の所定階に搬入することがおこなわれている。   In general, at construction sites, temporary scaffolding is built around the building so that workers can access the outer periphery of the building, and construction materials are lifted and carried to a predetermined location of the temporary scaffolding or a predetermined floor of the building. ing.

足場部材を吊り上げるために、クレーンアームを先行設置した仮設足場に取り付け、クレーンアームに備えられた滑車を含む複数の滑車にロープを巻装し、動力としてウィンチ装置を使用し、簡易クレーンを構成して使用することが広く行われている。簡易クレーンには、必要に応じて介錯アームが取り付けられる。   In order to lift the scaffolding member, a crane arm is attached to a temporary scaffold previously installed, ropes are wound around a plurality of pulleys including a pulley provided in the crane arm, a winch device is used as power, and a simple crane is constructed. It is widely used. An intervening arm is attached to a simple crane as needed.

図9に従来の簡易クレーンの使用例を示す。図9(a)はクレーンアームと介錯アーム部分を拡大して示している。   FIG. 9 shows an example of using a conventional simple crane. FIG. 9 (a) shows an enlarged view of the crane arm and the intermediate arm portion.

仮設足場50は、建物51の外周に必要な高さに組み上げられている。仮設足場50は門形のフレームをブレース部材と踏み板部材で横方向に複数連結し、かつ、上下方向には図示するように複数段組み上げている。   The temporary scaffold 50 is assembled at a height necessary for the outer periphery of the building 51. The temporary scaffold 50 has a plurality of gate-shaped frames connected in the horizontal direction by brace members and stepping plate members, and a plurality of stages are assembled in the vertical direction as shown in the figure.

クレーンアーム52は、通常は仮設足場50の最上段の適当な縦の部材50aに、複数のクランプ53を介して着脱自在に装着されている。クランプ53はクレーンアーム52の基部支柱54に取り付けられており、クランプ53を介してクレーンアーム52の基部支柱54が仮設足場の縦の部材50aと平行に取り付けられている。   The crane arm 52 is normally detachably attached to an appropriate vertical member 50 a at the uppermost stage of the temporary scaffold 50 via a plurality of clamps 53. The clamp 53 is attached to the base column 54 of the crane arm 52, and the base column 54 of the crane arm 52 is attached in parallel to the vertical member 50 a of the temporary scaffold via the clamp 53.

基部支柱54には旋回ヒンジ55が取り付けられており、旋回ヒンジ55を介してクレーンアームの縦枠部材56が取り付けられている。縦枠部材56の上端部には、横枠部材57が縦枠部材56に対して直角に取り付けられている。縦枠部材56と横枠部材57の間には斜めのブレース部材58が取り付けられている。   A swing hinge 55 is attached to the base column 54, and a vertical frame member 56 of a crane arm is attached via the swing hinge 55. A horizontal frame member 57 is attached to the upper end portion of the vertical frame member 56 at a right angle to the vertical frame member 56. An oblique brace member 58 is attached between the vertical frame member 56 and the horizontal frame member 57.

縦枠部材56と横枠部材57とブレース部材58はクレーンアームのブラケット部分を構成し、このクレーンアームのブラケット部分は旋回ヒンジ55の作用によって水平面内で旋回できるようになっている。   The vertical frame member 56, the horizontal frame member 57, and the brace member 58 constitute a bracket portion of the crane arm, and the bracket portion of the crane arm can be turned in a horizontal plane by the action of the turning hinge 55.

クレーンアーム52のブラケット部分の旋回の動きをコントロールしたい場合には、クレーンアーム52の横枠部材57の先端部に介錯アーム59を取り付ける。図9は介錯アーム59が取り付けられている状態を示している。   When it is desired to control the turning motion of the bracket portion of the crane arm 52, the intervention arm 59 is attached to the distal end portion of the horizontal frame member 57 of the crane arm 52. FIG. 9 shows a state in which the interposition arm 59 is attached.

介錯アーム59はアーム部材60を有し、アーム部材60は両側面に二組の固定金具61を有し、ボルト・ナット62によってクレーンアーム52の横枠部材57に着脱自在に固定されている。   The interposition arm 59 has an arm member 60, the arm member 60 has two sets of fixing brackets 61 on both sides, and is detachably fixed to the lateral frame member 57 of the crane arm 52 by bolts and nuts 62.

縦枠部材56の下端部には、ウィンチ側滑車63が取り付けられている。また、横枠部材57の先端部には、荷側滑車取付金具64が取り付けられており、荷側滑車取付金具64には荷側滑車65が取り付けられている。介錯アーム59の先端部にはガイドロープ取付金具66が取り付けられている。   A winch side pulley 63 is attached to the lower end portion of the vertical frame member 56. Further, a load side pulley mounting bracket 64 is attached to the front end portion of the horizontal frame member 57, and a load side pulley 65 is attached to the load side pulley mounting bracket 64. A guide rope fitting 66 is attached to the tip of the interposition arm 59.

荷吊り用のワイヤーロープ67は、ウィンチ装置68から繰り出され、ウィンチ側滑車63に巻装され、荷側滑車65に掛け回され、吊りフック69に接続されている。
吊りフック69には、シャックルを介してガイドロープ用滑車70のステー71と玉掛けロープ72が取り付けられている。
The wire rope 67 for lifting the load is fed out from the winch device 68, wound around the winch side pulley 63, hung around the load side pulley 65, and connected to the hanging hook 69.
A stay 71 and a sling rope 72 of a guide rope pulley 70 are attached to the suspension hook 69 via a shackle.

ガイドロープ取付金具66にはフックを介してガイドロープガイドロープ73の一端が取り付けられ、ガイドロープ73はガイドロープ用滑車70に掛け回されて地上まで垂れている。   One end of a guide rope guide rope 73 is attached to the guide rope mounting bracket 66 via a hook, and the guide rope 73 is hung on a guide rope pulley 70 and hangs down to the ground.

荷を吊り上げるときは、人数を限定するものではないが、地上に作業員A、仮設足場50上に作業員Bを配置し、作業員Aが玉掛けロープ72を吊り荷74に取り付け、ウィンチ装置68を操作して荷吊り用のワイヤーロープ67を巻き取り、吊り荷74を吊り上げる。   When lifting the load, the number of persons is not limited, but the worker A is placed on the ground, the worker B is placed on the temporary scaffold 50, the worker A attaches the sling rope 72 to the suspended load 74, and the winch device 68. Is operated to wind up the wire rope 67 for lifting the load and lift the suspended load 74.

吊り荷74が作業員Bの高さに到達したとき、作業員Bが必要に応じてクレーンアーム52のブラケット部分を旋回させ、吊り荷74を手繰り寄せて、玉掛けロープ72を解いて吊り荷74を建物51など所定の場所に搬送する。   When the suspended load 74 reaches the height of the worker B, the worker B turns the bracket portion of the crane arm 52 as necessary, pulls the suspended load 74, unwinds the sling rope 72, and lifts the suspended load 74. Is transported to a predetermined place such as the building 51.

吊り荷74を吊り上げる途中では、作業員Aがガイドロープ73の下端部を把持し、吊り荷74の横振れを制御し、かつ、作業員Bが吊り荷74を取り込むときに必要に応じて作業員Bと協働してクレーンアーム52のブラケット部分の旋回を制御する。   During the lifting of the suspended load 74, the worker A grips the lower end of the guide rope 73, controls the lateral swing of the suspended load 74, and the worker B works as necessary when taking in the suspended load 74. In cooperation with member B, the turning of the bracket portion of the crane arm 52 is controlled.

なお、ウィンチ側滑車63がクレーンアーム52のブラケット部分の旋回の中心に位置しているため、クレーンアーム52のブラケット部分が水平面内で旋回しているときも、荷吊り用のワイヤーロープ67がウィンチ装置68からウィンチ側滑車63まで、垂直でほぼ定位置を維持し、そのため、ウィンチ側滑車63から荷吊り用のワイヤーロープ67が外れることが少ない。   Since the winch side pulley 63 is positioned at the center of turning of the bracket portion of the crane arm 52, the wire rope 67 for lifting the load can be used even when the bracket portion of the crane arm 52 is turning in a horizontal plane. From the device 68 to the winch side pulley 63, a vertical and substantially fixed position is maintained, so that the wire rope 67 for lifting the load is less likely to come off from the winch side pulley 63.

特許第5948542号明細書Japanese Patent No. 5948542

上記従来の技術では、クレーンアームに介錯アームを設け、ガイドロープを把持することにより、荷吊り時のクレーンアームの揺動が安定するようになった。しかし、建設現場で介錯アームを取り外したり取り付けたりする場合には、改良すべきところがあった。   In the above-described conventional technology, the crane arm is stabilized in swinging when the load is suspended by providing an intervening arm on the crane arm and gripping the guide rope. However, when removing or installing the interposition arm at the construction site, there was a place to be improved.

クレーンアームは前述したごとく仮設足場の最上段に取り付けて使用するものであるが、クレーンアームを仮設足場の最上段まで運び上げるため、少しでも軽量化する必要があり、このため、クレーンアームのみを運び上げて取付場所に取り付け、しかる後に介錯アームをクレーンアームの先端に取り付けることがあった。   As described above, the crane arm is attached to the uppermost stage of the temporary scaffold, but it is necessary to reduce the weight as much as possible to carry the crane arm to the uppermost stage of the temporary scaffold. They were lifted and attached to the installation location, and then an intervening arm was attached to the tip of the crane arm.

また、介錯アームを使用しないでクレーンアームのみを使用することもあり、その後に必要に応じて介錯アームを取り付けることがあった。   In some cases, only the crane arm is used without using the intervening arm, and then the intervening arm is attached as necessary.

このような場合の介錯アームの取付けや取外しは高所での作業となることが多かった。   In such a case, the installation and removal of the interventional arm is often performed at a high place.

従来の介錯アームにおいては、取り外しの時を例に説明すれば、介錯アームをクレーンアームの横枠部材に固定しているボルト・ナットを取り外さなければならず、その際に作業に細心の注意が払われるが、それでもボルト・ナットの落下の可能性を完全に払拭することはできなかった。   In the case of the conventional intervention arm, if it is explained as an example of removal, the bolts and nuts that fix the intervention arm to the horizontal frame member of the crane arm must be removed, and at that time careful attention is required for the work. Although it was paid, the possibility of dropping the bolts and nuts could not be completely wiped out.

また、クレーンアームの横枠部材の上でボルト・ナットを取付け・取外す作業は、高所であることもあって、困難であり、作業効率が悪かった。   Also, the work of attaching and removing bolts and nuts on the horizontal frame member of the crane arm is difficult due to its high location, and the work efficiency is poor.

さらに、たとえ細心の注意を払ってボルト・ナットを安全に取り外したとしても、建設資材が多数存在する建設現場では取り外したボルトやナットを紛失する可能性があった。   Furthermore, even if the bolts and nuts are safely removed with great care, there is a possibility that the removed bolts and nuts may be lost at construction sites where there are many construction materials.

そこで、本願発明は、上記従来の技術の課題を解決し、取外しや取付けが簡単であり、かつ、ボルト・ナットの落下事故または紛失を完全に防止できる介錯アームと、介錯アームを備えたクレーンアームを提供することを目的とする。   Therefore, the present invention solves the above-mentioned problems of the prior art, is an easy-to-remove and attach- ment, and an intervening arm that can completely prevent a bolt or nut from dropping or losing, and a crane arm having the intervening arm The purpose is to provide.

本願は、上記課題の少なくとも一部を解決する手段を複数含んでいるが、その例を挙げるならば、以下の通りである。   The present application includes a plurality of means for solving at least a part of the above-described problems. Examples of the means are as follows.

本願発明による介錯アームは、クレーンアームに取り付け可能な介錯アームであって、前記クレーンアームは、略垂直に取り付けられる縦枠部材と、前記縦枠部材に略直角に結合した横枠部材とを備え、前記横枠部材には、第一係合部と、当該第一係合部より前記縦枠部材側に位置する第二係合部とが設けられており、前記介錯アームは、前記第一係合部に係合するための第三係合部と、前記第二係合部材に係合するための第四係合部と、を備えることを特徴とする。   The intervention arm according to the present invention is an intervention arm that can be attached to a crane arm, and the crane arm includes a vertical frame member that is attached substantially vertically and a horizontal frame member that is coupled to the vertical frame member at a substantially right angle. The horizontal frame member is provided with a first engagement portion and a second engagement portion located on the vertical frame member side with respect to the first engagement portion, and the interposition arm has the first engagement portion. A third engagement portion for engaging with the engagement portion and a fourth engagement portion for engaging with the second engagement member are provided.

本願発明による他の介錯アームによれば、前記第三係合部は、前記第一係合部と係合することにより、前記介錯アームが縦枠部材から離れる方向への移動を制限し、前記第四係合部は、前記第二係合部と係合することにより、前記介錯アームが縦枠部材へ近づく方向への移動を制限するようにすることができる。   According to another intervening arm according to the present invention, the third engaging portion engages with the first engaging portion to restrict movement of the interposing arm in a direction away from the vertical frame member, The fourth engaging portion can restrict movement of the interposition arm in a direction approaching the vertical frame member by engaging with the second engaging portion.

本願発明による他の介錯アームによれば、前記第三係合部は、前記縦枠部材の位置とは反対方向が開放した切欠きであり、当該切欠きに、前記第一係合部の突起部が係合するようにすることができる。   According to another intervening arm according to the present invention, the third engaging portion is a notch opened in a direction opposite to the position of the vertical frame member, and the protrusion of the first engaging portion is formed in the notch. The parts can be engaged.

本願発明による他の介錯アームによれば、前記第二係合部は、前記介錯アームの前記縦枠部材方向の末端面と当接するための接合面と、前記横枠部材と平行なロックピンとを備え、前記第四係合部は、前記縦枠部材方向末端面に、貫通孔を備え、前記貫通孔に前記ロックピンが挿入され、前記末端面に前記第二係合部の前記接合面が当接することにより、前記第二係合部と係合するようにすることができる。   According to another intervening arm according to the present invention, the second engaging portion includes a joining surface for contacting the end surface of the interposing arm in the vertical frame member direction, and a lock pin parallel to the horizontal frame member. The fourth engagement portion includes a through hole at the end surface in the vertical frame member direction, the lock pin is inserted into the through hole, and the joining surface of the second engagement portion is at the end surface. It can be made to engage with said 2nd engaging part by contact | abutting.

前記ロックピンは、平行に移動することができる。   The lock pin can move in parallel.

本願発明による他の介錯アームによれば、前記ロックピンは、コイルバネにより、前記ロックピンの先端が前記貫通孔に挿入される方向に付勢されているようにすることができる。   According to another intervening arm according to the present invention, the lock pin can be urged by a coil spring in a direction in which a tip of the lock pin is inserted into the through hole.

本願発明による他の介錯アームによれば、前記ロックピンは、前記横枠部材に平行なロックピン本体部と、前記ロックピン本体部に垂直に結合する摘み部を有する概略L字形状からなり、前記摘み部の先端は、板バネのストッパー部により、移動が制限されているようにすることができる。   According to another intervening arm according to the present invention, the lock pin has a substantially L-shape having a lock pin main body portion parallel to the horizontal frame member and a knob portion coupled perpendicularly to the lock pin main body portion, Movement of the tip of the knob can be restricted by a stopper portion of a leaf spring.

本願発明による他の介錯アームによれば、前記第四係合部は、前記貫通孔を潜った前記ロックピンの少なくとも一部分が目視で確認できる覗き穴を有するようにすることができる。   According to another intervening arm according to the present invention, the fourth engaging portion may have a peephole in which at least a part of the lock pin that has penetrated the through hole can be visually confirmed.

本願発明によるクレーンアームは、前記介錯アームのいずれかを備えることを特徴とする。   The crane arm according to the present invention includes any one of the intervening arms.

本願発明による他のクレーンアームによれば、前記縦枠部材の下端部にウィンチ側滑車取付部が設けられ、前記ウィンチ側滑車取付部は、滑車と、前記滑車を回転可能に支承する一対の側板と、前記側板に挿通される荷吊り用ロープの浮き上がり防止のロープ留めピンを備え、前記側板の一方は前記ロープ留めピンを挿通させる貫通孔を有し、前記側板の他方は前記ロープ留めピンの先端部を挿通させ円周縁の一部に切欠きを有する鍵穴を有し、前記ロープ留めピンは、本体部と摘み部からなる概略L字の形状を有しており、前記本体部の先端部に、前記鍵穴の切欠きを挿通した後に重力によって前記摘み部が垂直下方に回動したときに前記鍵穴の切欠きと整合しない位置に突出部を有するようにすることができる。   According to another crane arm according to the present invention, a winch side pulley mounting portion is provided at a lower end portion of the vertical frame member, and the winch side pulley mounting portion includes a pulley and a pair of side plates that rotatably support the pulley. And a rope retaining pin for preventing the lifting of the load hanging rope inserted into the side plate, wherein one of the side plates has a through-hole through which the rope retaining pin is inserted, and the other of the side plate is the rope retaining pin. A keyhole having a notch in a part of a circular periphery through which the distal end is inserted, and the rope fastening pin has a substantially L-shape including a main body portion and a knob portion, and the distal end portion of the main body portion In addition, a protrusion may be provided at a position that does not align with the notch of the keyhole when the knob is rotated vertically downward by gravity after being inserted through the notch of the keyhole.

本願発明による他のクレーンアームによれば、略垂直に取り付けられる縦枠部材と、前記縦枠部材に略直角に結合した横枠部材とを備え、前記縦枠部材の下端部にウィンチ側滑車取付部が設けられ、前記ウィンチ側滑車取付部は、滑車と、前記滑車を回転可能に支承する一対の側板と、前記側板に挿通される荷吊り用ロープの浮き上がり防止のロープ留めピンを備え、前記側板の一方は前記ロープ留めピンを挿通させる貫通孔を有し、前記側板の他方は前記ロープ留めピンの先端部を挿通させ円周縁の一部に切欠きを有する鍵穴を有し、前記ロープ留めピンは、本体部と摘み部からなる概略L字の形状を有しており、前記本体部の先端部に、前記鍵穴の切欠きを挿通した後に重力によって前記摘み部が垂直下方に回動したときに前記鍵穴の切欠きと整合しない位置に突出部を有するようにすることができる。   According to another crane arm according to the present invention, a vertical frame member attached substantially vertically and a horizontal frame member coupled to the vertical frame member at a substantially right angle are provided, and a winch side pulley is attached to a lower end portion of the vertical frame member. The winch side pulley mounting portion includes a pulley, a pair of side plates that rotatably support the pulley, and a rope fastening pin for preventing the lifting of a load hanging rope inserted through the side plate, One of the side plates has a through-hole through which the rope fastening pin is inserted, and the other of the side plates has a keyhole having a notch in a part of a circular circumference through the tip of the rope fastening pin, The pin has a substantially L-shape consisting of a main body portion and a knob portion, and the knob portion is rotated vertically downward by gravity after the notch of the key hole is inserted into the distal end portion of the main body portion. Sometimes the keyhole is cut It can be made to have a projection at a position not come and aligned.

本願発明によれば、クレーンアームが第一係合部と第二係合部を備え、介錯アームが第三係合部と第四係合部を備え、介錯アームとクレーンアームの取り付けや取り外しは、これら係合部同士の瞬時の着脱で行うことができる。このため、介錯アームの取付けと取外し作業が容易かつ効率的になる。さらに、本願発明によれば、ボルト・ナット等の締結金具を使用しないため、ボルト・ナット等の落下事故と紛失を完全に防止することができる。上記した以外の課題、構成、および効果は、以下の実施形態の説明により明らかにされる。   According to the present invention, the crane arm includes the first engagement portion and the second engagement portion, the interposition arm includes the third engagement portion and the fourth engagement portion, and the interposition arm and the crane arm are attached and detached. It can be performed by instantaneous attachment and detachment of these engaging portions. For this reason, the installation and removal work of the interposition arm becomes easy and efficient. Furthermore, according to the present invention, since fastening fasteners such as bolts and nuts are not used, it is possible to completely prevent accidents and loss of bolts and nuts. Problems, configurations, and effects other than those described above will be clarified by the following description of embodiments.

本願発明の一実施形態による介錯アームとクレーンアームの全体組立図である。It is the whole assembly figure of the intervention arm and crane arm by one Embodiment of this invention. 本願発明の一実施形態による介錯アームの平面図2(a)と、平面図2(a)の矢印A−A方向に見た側面図2(b)と、側面図2(b)の矢印B−B方向に見た側面図2(c)である。Plan view 2 (a) of the interposition arm according to the embodiment of the present invention, side view 2 (b) seen in the direction of arrow A-A in plan view 2 (a), and arrow B in side view 2 (b) It is the side view 2 (c) seen in the -B direction. 本願発明の一実施形態によるクレーンアームの第二係合部のガイド壁構造体の平面図3(a)と、平面図3(a)の矢印A−A方向に見た側面図3(b)と、平面図3(a)の矢印B−B方向に見た側面図3(c)と、固定板の平面図3(d)と平面図3(d)の矢印C−C方向に見た側面図3(e)である。FIG. 3A is a plan view of a guide wall structure of a second engaging portion of a crane arm according to an embodiment of the present invention, and FIG. 3B is a side view of the guide wall structure viewed in the direction of arrow AA in FIG. FIG. 3 (c) is a side view seen in the direction of arrow BB in FIG. 3 (a), and FIG. 3 (d) is a plan view of the fixing plate and it is seen in the direction of arrow CC in FIG. 3 (d). FIG. 3 (e) is a side view. 本願発明の一実施形態によるクレーンアームの第二係合部の板バネの平面図4(a)と、平面図4(a)の矢印A−A方向に見た側面図4(b)である。It is the top view 4 (a) of the leaf | plate spring of the 2nd engaging part of the crane arm by one Embodiment of this invention, and the side view 4 (b) seen from the arrow AA direction of the top view 4 (a). . 本願発明の一実施形態によるクレーンアームの旋回ヒンジの側面図である。It is a side view of the swing hinge of the crane arm by one Embodiment of this invention. 本願発明の一実施形態によるクレーンアームのウィンチ側滑車取付部の第一側板の側面図である。It is a side view of the 1st side plate of the winch side pulley attachment part of the crane arm by one Embodiment of this invention. 本願発明の一実施形態によるクレーンアームのウィンチ側滑車取付部の第二側板の側面図7(a)と、側面図7(a)の矢印A−A方向に見た正面図7(b)である。In side view 7 (a) of the second side plate of the winch side pulley mounting portion of the crane arm according to one embodiment of the present invention, and in front view 7 (b) seen in the direction of arrow AA in side view 7 (a). is there. 本願発明の一実施形態によるロープ留めピンの平面図8(a)と、その側面図8(b)である。It is the top view 8 (a) of the rope fastening pin by one Embodiment of this invention, and its side view 8 (b). 従来のクレーンアームの使用状態を示す説明図である。It is explanatory drawing which shows the use condition of the conventional crane arm.

以下に本願発明が適用された例である、一実施形態を説明する。   An embodiment, which is an example to which the present invention is applied, will be described below.

図1は本願発明の一実施形態による介錯アームと、本願発明の一実施形態によるクレーンアームの全体の組立図を示している。   FIG. 1 shows an overall assembly diagram of an intermediary arm according to an embodiment of the present invention and a crane arm according to an embodiment of the present invention.

クレーンアーム1は、複数のクランプ2を介して図示しない仮設足場の縦の部材に取り付けられる基部支柱3と、基部支柱3に取り付けられた上下二つの旋回ヒンジ4と、旋回ヒンジ4の旋回側に取り付けられた縦枠部材5と、縦枠部材5の上端部に直角に取り付けられた横枠部材6と、縦枠部材5と横枠部材6との間に斜めに掛け渡されたブレース部材7と、縦枠部材5の下端部に取り付けられたウィンチ側滑車取付部8とを有している。   The crane arm 1 includes a base column 3 attached to a vertical member of a temporary scaffold (not shown) via a plurality of clamps 2, two upper and lower swing hinges 4 attached to the base column 3, and a swing side of the swing hinge 4. The attached vertical frame member 5, the horizontal frame member 6 attached at right angles to the upper end of the vertical frame member 5, and the brace member 7 that is slanted between the vertical frame member 5 and the horizontal frame member 6. And a winch side pulley attachment portion 8 attached to the lower end portion of the vertical frame member 5.

横枠部材6の先端には荷吊り用の滑車を取り付けるための荷側滑車取付金具9が取り付けられている。また、横枠部材6の先端部には、後述する介錯アーム13と係合する第一係合部10が設けられている。第一係合部10は、具体的にはたとえば横枠部材6の側方からわずかに突出する突起部を有する棒状部材によって形成することができる。   A load side pulley mounting bracket 9 for attaching a load-carrying pulley is attached to the front end of the horizontal frame member 6. Further, a first engaging portion 10 that engages with an intervening arm 13 described later is provided at the distal end portion of the horizontal frame member 6. Specifically, the first engaging portion 10 can be formed by a rod-like member having a protruding portion that slightly protrudes from the side of the lateral frame member 6, for example.

第一係合部10より縦枠部材5に近い位置に、横枠部材6の第二係合部11が設けられている。また、クレーンアーム1の重心位置の上方の横枠部材6の一部にはクレーンアーム1を吊り上げるためのシャックル12が設けられている。   A second engaging portion 11 of the horizontal frame member 6 is provided at a position closer to the vertical frame member 5 than the first engaging portion 10. A shackle 12 for lifting the crane arm 1 is provided on a part of the horizontal frame member 6 above the position of the center of gravity of the crane arm 1.

図1(a)に示すように、介錯アーム13は取付状態でクレーンアーム1の横枠部材6の上に取り付けられている。図2は、介錯アーム13を単体で示している。図2(a)は介錯アーム13の平面図、図2(b)は図2(a)の矢印A−A方向に見た介錯アーム13の側面図、図2(c)は図2(b)の矢印B−B方向に見た介錯アーム13の他の側面図を示している。以下の介錯アーム13の説明については図1と図2を併せて参照することにより理解が容易となる。   As shown in FIG. 1 (a), the interposition arm 13 is mounted on the horizontal frame member 6 of the crane arm 1 in the mounted state. FIG. 2 shows the intervening arm 13 as a single unit. 2 (a) is a plan view of the interposition arm 13, FIG. 2 (b) is a side view of the interposition arm 13 as viewed in the direction of arrow AA in FIG. 2 (a), and FIG. 2 (c) is FIG. The other side view of the interposition arm 13 seen in the direction of arrow BB in FIG. The explanation of the following intervening arm 13 can be easily understood by referring to FIGS. 1 and 2 together.

介錯アーム13は、横枠部材6と略平行に取り付けられているアーム部材14を有し、アーム部材14の先端部にはガイドロープをかけるガイドロープ取付金具15が取り付けられている。図1(b)は図1(a)の矢印A−A方向から見た正面図であって、図に示すようにクレーンアーム1と介錯アーム13を正面から見たときは、アーム部材14の先端部とガイドロープ取付金具15と荷側滑車取付金具9が見えている。   The intervening arm 13 includes an arm member 14 that is mounted substantially parallel to the horizontal frame member 6, and a guide rope mounting bracket 15 that attaches a guide rope is attached to the tip of the arm member 14. FIG. 1 (b) is a front view as seen from the direction of arrow AA in FIG. 1 (a). As shown in the figure, when the crane arm 1 and the interposition arm 13 are seen from the front, The tip, guide rope mounting bracket 15 and load side pulley mounting bracket 9 are visible.

アーム部材14の先端より基端側でクレーンアーム1の横枠部材6の第一係合部10と整合する位置には、第一係合部10と係合する第三係合部16が設けられている。   A third engagement portion 16 that engages with the first engagement portion 10 is provided at a position that aligns with the first engagement portion 10 of the lateral frame member 6 of the crane arm 1 on the proximal side from the distal end of the arm member 14. It has been.

アーム部材14の基端部であってクレーンアーム1の横枠部材6の第二係合部11と整合する位置には、第二係合部11と係合する第四係合部17が設けられている。   A fourth engagement portion 17 that engages with the second engagement portion 11 is provided at a position that is the base end portion of the arm member 14 and aligns with the second engagement portion 11 of the horizontal frame member 6 of the crane arm 1. It has been.

第三係合部16は、図1(a)、図2(a),2(b)に示すように、たとえばアーム部材14の両側面に固定された一対の板部材からなり、該板部材は第一係合部10の棒状部材の突起部と係合する切欠きを有し、該切欠きは介錯アーム13の先端側すなわちクレーンアーム1の縦枠部材5の位置の反対方向に開放した切欠きとなっている。   As shown in FIGS. 1 (a), 2 (a), and 2 (b), the third engagement portion 16 is composed of, for example, a pair of plate members fixed to both side surfaces of the arm member 14, and the plate members Has a notch that engages with the protrusion of the rod-like member of the first engaging portion 10, and the notch is opened in the direction opposite to the distal end side of the interposition arm 13, that is, the position of the vertical frame member 5 of the crane arm 1. It is a notch.

第四係合部17は、図1(a),1(c)、図2(a),2(b),2(c)に示すように、アーム部材14の基端部に固定した概略コの字状に曲げられた板部材18を有している。板部材18のコの字状に曲げた両側は開放されて見通すことができるようになっており、後述するロックピン22の貫通状態を確認する覗き穴19を形成している。板部材18の縦壁部分には貫通孔20が穿設されている。   As shown in FIGS. 1 (a), 1 (c) and FIGS. 2 (a), 2 (b), 2 (c), the fourth engaging portion 17 is fixed to the base end portion of the arm member 14. The plate member 18 is bent into a U-shape. Both sides of the plate member 18 bent in a U-shape are opened so that they can be seen through, and a peep hole 19 for confirming a penetration state of a lock pin 22 described later is formed. A through hole 20 is formed in the vertical wall portion of the plate member 18.

図1(c)はクレーンアーム1の第二係合部11と介錯アーム13の第四係合部17の係合部分を拡大して示し、第二係合部11と第四係合部17の係合状態を示している。図1(a),1(c)は第二係合部11の全体を示し、図1(c’)は第二係合部11のロックピン22を抜いた状態を示し、図3は第二係合部11のロックピン22のためのガイド部を示しており、図4はロックピン22の動きを制御するための板バネを示している。図3(a)はロックピン22のためのガイド壁構造体の平面図、図3(b)は図3(a)の矢印A−A方向に見たガイド壁構造体の側面図、図3(c)は図3(a)の矢印B−B方向に見たガイド壁構造体の側面図を示している。図3(d)は板バネを固定するための固定板の平面図、図3(e)は図3(d)の矢印C−C方向に見た固定板の側面図である。図4(a)は板バネの平面図、図4(b)は図4(a)の矢印A−A方向に見た板バネの側面図を示している。以下の第二係合部11の説明については図1と図3と図4を併せて参照することにより理解が容易となる。   FIG. 1 (c) is an enlarged view of the engaging portion of the second engaging portion 11 of the crane arm 1 and the fourth engaging portion 17 of the interposition arm 13, and the second engaging portion 11 and the fourth engaging portion 17. The engagement state is shown. 1 (a) and 1 (c) show the entire second engaging portion 11, FIG. 1 (c ′) shows a state in which the lock pin 22 of the second engaging portion 11 is removed, and FIG. FIG. 4 shows a leaf spring for controlling the movement of the lock pin 22. FIG. 4 shows a guide portion for the lock pin 22 of the second engagement portion 11. 3 (a) is a plan view of the guide wall structure for the lock pin 22, FIG. 3 (b) is a side view of the guide wall structure as viewed in the direction of arrow AA in FIG. 3 (a), and FIG. (c) has shown the side view of the guide wall structure seen in the arrow BB direction of Fig.3 (a). FIG. 3 (d) is a plan view of a fixing plate for fixing the leaf spring, and FIG. 3 (e) is a side view of the fixing plate seen in the direction of arrow CC in FIG. 3 (d). 4A is a plan view of the leaf spring, and FIG. 4B is a side view of the leaf spring as viewed in the direction of arrow AA in FIG. The following description of the second engaging portion 11 can be easily understood by referring to FIG. 1, FIG. 3, and FIG.

第二係合部11は、特に図1(c)に明らかに示すように、横枠部材6に固定された門形板部材21と、ロックピン22と、ガイド壁構造体23と、板バネ24と、コイルバネ25を有している。   As clearly shown particularly in FIG. 1 (c), the second engaging portion 11 includes a portal plate member 21 fixed to the lateral frame member 6, a lock pin 22, a guide wall structure 23, a leaf spring. 24 and a coil spring 25.

門形板部材21の縦壁部分には、係合した状態で第四係合部17の貫通孔20と整合する位置に貫通孔26,27が設けられている。係合状態では第二係合部11の貫通孔26,27と第四係合部17の貫通孔20が整合し、ロックピン22が図1(a),1(c)に示すように挿通される。   On the vertical wall portion of the portal plate member 21, through holes 26 and 27 are provided at positions that are aligned with the through holes 20 of the fourth engaging portion 17. In the engaged state, the through holes 26 and 27 of the second engaging portion 11 and the through holes 20 of the fourth engaging portion 17 are aligned, and the lock pin 22 is inserted as shown in FIGS. 1 (a) and 1 (c). Is done.

ロックピン22は、横枠部材6と平行な、断面円形の棒状の本体部22aと、略垂直に連結する摘み部22bとを有し、全体としてL字形状を有している。本体部22aの先端部からやや摘み部22b側に、不図示の溝が形成されており、その溝にE形止め輪28eが嵌っており、E形止め輪28eの摘み部22b側にリング状のロックワッシャー28が設けられている。コイルバネ25はロックワッシャー28をE形止め輪28eとともに押圧することによって、ロックピン22を介錯アーム13の先端方向すなわち第四係合部17の方向に付勢している。なお、E型留め輪28eが門形板部材21の壁に直接当たらないように、E型留め輪28eから見て、ロックピンの先端側に、ワッシャー28wが嵌められている。   The lock pin 22 has a rod-shaped main body portion 22a that is parallel to the horizontal frame member 6 and has a circular cross section, and a knob portion 22b that is connected substantially vertically, and has an L shape as a whole. A groove (not shown) is formed on the side of the knob 22b slightly from the tip of the main body 22a, and an E-shaped retaining ring 28e is fitted in the groove, and a ring-shaped portion is formed on the knob 22b side of the E-shaped retaining ring 28e. The lock washer 28 is provided. The coil spring 25 presses the lock washer 28 together with the E-shaped retaining ring 28 e to urge the lock pin 22 toward the distal end direction of the interposition arm 13, that is, toward the fourth engagement portion 17. A washer 28w is fitted on the front end side of the lock pin as viewed from the E-type retaining ring 28e so that the E-shaped retaining ring 28e does not directly contact the wall of the portal plate member 21.

ガイド壁構造体23は、横枠部材6に溶接され固定されている。ガイド壁構造体23の対向する一対の壁部分の間には溝が形成され、ロックピン22の摘み部22bの下端部がその間を通りこれをガイドするようになっている。   The guide wall structure 23 is welded and fixed to the horizontal frame member 6. A groove is formed between a pair of opposing wall portions of the guide wall structure 23, and the lower end portion of the knob portion 22 b of the lock pin 22 passes through and guides it.

固定板29は、ガイド壁構造体23に固定されている。板バネ24は、基端部24aが固定板29にネジで固定され、図4(b)に示すように先端にいくにつれて高くなる傾斜部24bを有し、最先端は折り曲げられてストッパー部24cを有している。   The fixed plate 29 is fixed to the guide wall structure 23. The plate spring 24 has a base end portion 24a fixed to the fixing plate 29 with a screw, and has an inclined portion 24b that becomes higher as it goes to the tip end as shown in FIG. have.

第二係合部11と第四係合部17が係合するときは、図1(c)に示すように第四係合部17の板部材18の縦枠部材5の方向の末端面18’と、第二係合部11の門形板部材21の接合面21’が互いに当接し、貫通孔20と貫通孔26が整合した状態におかれる。なお、縦枠部材5の方向の末端面18’と、第二係合部11の門形板部材21の接合面21’は、必ずしも常時当接しなくてもよく、僅かなクリアランスがあってもよい。ただし、クリアランスを設けた場合に、末端面18’と接合面21’とが当接する方向に介錯アーム13がずれた場合に、第三係合部13の切欠きから、第一係合部10の棒状部材の突起部が外れないようにする必要がある。したがって、クリアランスがある場合、その距離の最大値が、第三係合部13の切欠きの深さを超えないようにする。   When the second engaging portion 11 and the fourth engaging portion 17 are engaged, the end face 18 in the direction of the vertical frame member 5 of the plate member 18 of the fourth engaging portion 17 as shown in FIG. 'And the joint surface 21' of the portal plate member 21 of the second engagement portion 11 are in contact with each other, and the through hole 20 and the through hole 26 are in alignment. Note that the end face 18 ′ in the direction of the vertical frame member 5 and the joint surface 21 ′ of the portal plate member 21 of the second engaging portion 11 do not always have to contact each other, even if there is a slight clearance. Good. However, when the clearance arm is provided and the intervening arm 13 is displaced in the direction in which the end face 18 ′ and the joint surface 21 ′ are in contact with each other, the first engagement portion 10 is removed from the notch of the third engagement portion 13. It is necessary to prevent the protruding portion of the rod-shaped member from being detached. Therefore, when there is a clearance, the maximum value of the distance is prevented from exceeding the notch depth of the third engagement portion 13.

ロックピン22は、係合を確かにするときは、コイルバネ25によって第四係合部17の方向に付勢されることによって、摘み部22bがガイド壁構造体23の溝にガイドされながら、本体部22aが横枠部材6と平行に移動する。   When the lock pin 22 is surely engaged, the lock pin 22 is urged by the coil spring 25 in the direction of the fourth engagement portion 17, so that the knob 22 b is guided by the groove of the guide wall structure 23. The part 22 a moves in parallel with the horizontal frame member 6.

ロックピン22の先端が第四係合部17の板部材18の貫通孔20に挿入した後に、摘み部22bの下端が板バネ24の傾斜部24bを乗り越え、これによって、板バネ24の先端部が跳ね上がり、ストッパー部24cがロックピン22の摘み部22bの下端部と係合し、ロックピン22が逆戻りしないようにロックピン22の動きを制限する。   After the distal end of the lock pin 22 is inserted into the through hole 20 of the plate member 18 of the fourth engaging portion 17, the lower end of the knob 22 b gets over the inclined portion 24 b of the leaf spring 24, thereby the distal end portion of the leaf spring 24. The stopper portion 24c engages with the lower end portion of the knob portion 22b of the lock pin 22, and the movement of the lock pin 22 is restricted so that the lock pin 22 does not return backward.

反対に、第二係合部11と第四係合部17の係合を解除するときは、板バネ24の先端部を指で押し下げ、板バネ24のストッパー部24cとロックピン22の摘み部22bの係合を解除し、ロックピン22の摘み部22bを掴んで縦枠部材5の方向に引っ張ることによってロックピン22が縦枠部材5の方向に平行移動し、その先端部が図1(c’)に示すように第四係合部17の板部材18の貫通孔20から抜け出ることによって、第二係合部11と第四係合部17の係合が解除される。   On the other hand, when releasing the engagement between the second engagement portion 11 and the fourth engagement portion 17, the tip end portion of the leaf spring 24 is pushed down with a finger, and the stopper portion 24 c of the leaf spring 24 and the knob portion of the lock pin 22. The engagement of 22b is released, and the pin 22b of the lock pin 22 is grasped and pulled in the direction of the vertical frame member 5, whereby the lock pin 22 is translated in the direction of the vertical frame member 5, and the tip thereof is shown in FIG. As shown in c ′), the second engagement portion 11 and the fourth engagement portion 17 are disengaged by coming out of the through hole 20 of the plate member 18 of the fourth engagement portion 17.

図5は旋回ヒンジ4の構造を示している。図5に示すように、旋回ヒンジ4は基部支柱3に固定された第一ヒンジ部材4aと、縦枠部材5に固定された第二ヒンジ部材4bと、第一ヒンジ部材4aと第二ヒンジ部材4bを旋回可能に挿通する支軸4cとを有している。   FIG. 5 shows the structure of the swing hinge 4. As shown in FIG. 5, the swing hinge 4 includes a first hinge member 4a fixed to the base column 3, a second hinge member 4b fixed to the vertical frame member 5, a first hinge member 4a, and a second hinge member. And a support shaft 4c through which 4b is pivotably inserted.

旋回ヒンジ4は基部支柱3と縦枠部材5の間に上下に少なくとも二つ設けられている。これにより、取付状態では、ほぼ支軸(ピボットピン)4cを中心に、クレーンアーム1と介錯アーム13が水平面内で旋回することができ、その場合に、ウィンチ側滑車取付部8のロープの入口の位置がほとんど変動しないため、荷吊り時にクレーンアーム1と介錯アーム13が旋回しても、荷吊り用のロープが安定しウィンチ側滑車取付部8から外れることがない。   At least two swivel hinges 4 are provided between the base column 3 and the vertical frame member 5 in the vertical direction. As a result, in the mounted state, the crane arm 1 and the interposition arm 13 can turn in a horizontal plane substantially around the support shaft (pivot pin) 4c. In this case, the rope entrance of the winch side pulley mounting portion 8 Therefore, even if the crane arm 1 and the intermediary arm 13 turn during the load hanging, the load hanging rope is stabilized and does not come off the winch side pulley mounting portion 8.

図1(d)は、図1(a)の矢印B−B方向に見たウィンチ側滑車取付部8の縦断面図である。図1(e)は図1(a)の矢印C−C方向に見たウィンチ側滑車取付部8の側面図である。   FIG.1 (d) is the longitudinal cross-sectional view of the winch side pulley attachment part 8 seen in the arrow BB direction of Fig.1 (a). FIG.1 (e) is a side view of the winch side pulley attachment part 8 seen in the arrow CC direction of Fig.1 (a).

ウィンチ側滑車取付部8は、互いに対向する第一側板30と、第二側板31と、第一側板30と第二側板31の間に回転可能に設けられたシーブ32と、第一側板30と第二側板31の間に架け渡されるロープ留めピン33とを有している。   The winch side pulley mounting portion 8 includes a first side plate 30, a second side plate 31, a sheave 32 rotatably provided between the first side plate 30 and the second side plate 31, and a first side plate 30. A rope fastening pin 33 is provided between the second side plates 31.

図6は、第一側板30の側面図を示している。図7は、第二側板31の側面図7(a)と、側面図7(a)の矢印A−A方向に見た正面図7(b)を示している。図8はロープ留めピン33の平面図と側面図を示している。以下のウィンチ側滑車取付部8の説明については図1を併せて参照することにより理解が容易となる。   FIG. 6 shows a side view of the first side plate 30. FIG. 7 shows a side view 7 (a) of the second side plate 31 and a front view 7 (b) viewed in the direction of the arrow AA in the side view 7 (a). FIG. 8 shows a plan view and a side view of the rope fastening pin 33. The following explanation of the winch side pulley mounting portion 8 is easy to understand by referring also to FIG.

ウィンチ側滑車取付部8はクレーンアーム1の縦枠部材5の下端部に固定されている。ウィンチ側滑車取付部8の第一側板30は図6に示すように周縁部の一部に切欠きを有している鍵穴34を有している。鍵穴34の切欠きは、ウィンチ側滑車取付部8の使用状態で下向きに切り欠かれている。   The winch side pulley mounting portion 8 is fixed to the lower end portion of the vertical frame member 5 of the crane arm 1. As shown in FIG. 6, the first side plate 30 of the winch side pulley mounting portion 8 has a key hole 34 having a notch in a part of the peripheral edge portion. The notch of the key hole 34 is notched downward in the use state of the winch side pulley mounting portion 8.

ウィンチ側滑車取付部8の第二側板31は図7に示すように、第一側板30の鍵穴34に整合する位置に、ロープ留めピン33を挿通させるための挿通孔35を有している。挿通孔35の周縁部にはロープ留めピン33を安定させるスリーブ36が設けられている。   As shown in FIG. 7, the second side plate 31 of the winch side pulley mounting portion 8 has an insertion hole 35 for inserting the rope fastening pin 33 at a position aligned with the key hole 34 of the first side plate 30. A sleeve 36 for stabilizing the rope fastening pin 33 is provided at the peripheral edge of the insertion hole 35.

ロープ留めピン33は、図8に示すように、第一側板30と第二側板31の間に架け渡されるロープ留めピン本体部33aと、ロープ留めピン本体部33aに対して略直角に形成されたロープ留めピン摘み部33bとを有している。   As shown in FIG. 8, the rope fastening pin 33 is formed at a substantially right angle with respect to the rope fastening pin main body portion 33a spanned between the first side plate 30 and the second side plate 31, and the rope fastening pin main body portion 33a. And a rope retaining pin picking portion 33b.

ロープ留めピン本体部33aの先端部には孔37が設けられており、外方に弾力的に拡大するスプリングピン38が孔37に装着されている。スプリングピン38は圧縮された状態で孔37に装着された後は、外方に拡大する弾力によって孔37から脱落することがないようになっている。   A hole 37 is provided at the tip of the rope fastening pin main body 33a, and a spring pin 38 that elastically expands outward is mounted in the hole 37. After the spring pin 38 is attached to the hole 37 in a compressed state, the spring pin 38 is prevented from dropping from the hole 37 due to the elastic force expanding outward.

スプリングピン38の突出部は、鍵穴34の切欠きの深さよりわずかに短いように構成されている。   The protruding portion of the spring pin 38 is configured to be slightly shorter than the depth of the cutout of the key hole 34.

スプリングピン38は、ロープ留めピン本体部33aの先端部を挿通孔35に挿通した後に装着されたものである。したがって、ロープ留めピン33が、第二側板31から抜け落ちることはなく、ロープ留めピン33の落下や紛失を防ぐことができる。   The spring pin 38 is mounted after the distal end portion of the rope fastening pin main body portion 33a is inserted into the insertion hole 35. Therefore, the rope fastening pin 33 does not fall off from the second side plate 31, and the rope fastening pin 33 can be prevented from dropping or losing.

クレーンアーム1を使用するときは、図示しないウィンチ装置からの荷吊り用のワイヤーロープがウィンチ側滑車取付部8のシーブ32に掛け回され、さらに荷側滑車取付金具9から吊り下げられた荷側滑車(図示せず)に巻装され、吊りフック(図示せず)に接続される。   When the crane arm 1 is used, a load-side wire rope from a winch device (not shown) is hung around the sheave 32 of the winch-side pulley mounting portion 8 and is further suspended from the load-side pulley mounting bracket 9. It is wound around a pulley (not shown) and connected to a hanging hook (not shown).

荷吊り用のワイヤーロープがウィンチ側滑車取付部8のシーブ32に掛け回された後に、ロープ留めピン33が鍵穴34に挿通される。鍵穴34にロープ留めピン33の先端部を挿通するときは、スプリングピン38の突起が鍵穴34の切欠きと整合するように、ロープ留めピンの摘み部33bを上向きにして挿通させる。   After the wire rope for hanging is hung around the sheave 32 of the winch side pulley mounting portion 8, the rope fastening pin 33 is inserted into the key hole 34. When the tip of the rope retaining pin 33 is inserted into the key hole 34, the rope retaining pin knob 33b is inserted upward so that the protrusion of the spring pin 38 is aligned with the notch of the key hole 34.

ロープ留めピン33の先端部が鍵穴34を通過した後は、ロープ留めピン摘み部33bの重さで摘み部33bが下方に落下し、これによってロープ留めピン33は略180°回転し、スプリングピン38の突起が鍵穴34と係合してロープ留めピン33の脱落を防止する。   After the tip of the rope retaining pin 33 has passed through the keyhole 34, the knob 33b falls downward due to the weight of the rope retaining pin 33b, whereby the rope retaining pin 33 is rotated by approximately 180 °, and the spring pin 38 projections engage with the keyhole 34 to prevent the rope pin 33 from falling off.

ロープ留めピン33を装着することにより、ウィンチ側滑車取付部8に掛け回された荷吊り用のワイヤーロープがシーブ32から浮き上がることがなく、荷吊り用のワイヤーロープがシーブ32から外れることを防止することができる。   By attaching the rope fixing pin 33, the wire rope for hanging around the winch side pulley mounting portion 8 does not lift from the sheave 32, and the wire rope for hanging is prevented from coming off the sheave 32. can do.

図1(f)は図1(a)の矢印D−D方向に見たクランプ2の平面図を示している。図1(g)は図1(a)の矢印E−E方向に見たクランプ2の底面図を示している。図に示すように、クランプ2はボルトとクランプ部材の締付と開放によって、クレーンアーム1を図示しない仮設足場の縦の部材の任意の所に着脱可能に取り付けることができる。   FIG.1 (f) has shown the top view of the clamp 2 seen in the arrow DD direction of Fig.1 (a). FIG.1 (g) has shown the bottom view of the clamp 2 seen in the arrow EE direction of Fig.1 (a). As shown in the figure, the clamp 2 can detachably attach the crane arm 1 to an arbitrary vertical member of a temporary scaffold (not shown) by tightening and releasing a bolt and a clamp member.

次に、本願発明による介錯アーム13の取り付け・取り外しについて説明する。   Next, attachment / detachment of the interposition arm 13 according to the present invention will be described.

クレーンアーム1は、前述したごとく仮設足場の最上段に取り付けて使用するものであるが、クレーンアーム1を仮設足場の最上段まで運び上げるため、少しでも軽量化する必要がある。このため、クレーンアーム1のみを運び上げて取付場所に取り付け、しかる後に介錯アーム13をクレーンアーム1の先端に取り付けることが多い。通常、この取付作業は高所作業になり、作業が困難であり、かつ、ボルト・ナット等の取付金具が落下しないようにしなければならない。介錯アーム13を取り外す場合も同様である。   As described above, the crane arm 1 is used by being attached to the uppermost stage of the temporary scaffold. However, since the crane arm 1 is carried to the uppermost stage of the temporary scaffold, it is necessary to reduce the weight as much as possible. For this reason, it is often the case that only the crane arm 1 is carried and attached to the mounting location, and then the intermediary arm 13 is attached to the tip of the crane arm 1. Usually, this mounting work is a work at a high place, it is difficult to perform the work, and it is necessary to prevent mounting brackets such as bolts and nuts from dropping. The same applies when removing the interposition arm 13.

これに対して、本願発明によれば、ボルト・ナット等が落下事故を完全に防止することができ、かつ、取付・取外作業が瞬時かつ容易に完了することができる。   On the other hand, according to the present invention, bolts, nuts and the like can completely prevent a drop accident, and attachment / detachment operations can be completed instantly and easily.

すなわち、介錯アーム13を取り付けるときは、まず介錯アーム13を、先端部が下がるように斜めにした状態で、第三係合部16のアーム部材14の両側面に固定された一対の板部材が、横枠部材6の第一係合部10の基端側の位置に、該一対の板部材が横枠部材6の両側にまたがるように配置する。しかる後に、第三係合部16を第一係合部10に向けて摺動させ、第三係合部16の切欠きを第一係合部10の突起部に係合させる。これにより、第三係合部16がそれ以上介錯アーム13の先端側に移動する動きが制限され、かつ、第三係合部16の切欠きが縦枠部材5の方向とは反対方向に開放しているため、介錯アーム13が横枠部材6から離れる動きが制限される。   That is, when attaching the interposition arm 13, first, a pair of plate members fixed to both side surfaces of the arm member 14 of the third engagement portion 16 in a state where the interposition arm 13 is inclined so that the tip end portion is lowered. The pair of plate members are arranged at the position of the base end side of the first engaging portion 10 of the horizontal frame member 6 so as to straddle both sides of the horizontal frame member 6. Thereafter, the third engagement portion 16 is slid toward the first engagement portion 10, and the notch of the third engagement portion 16 is engaged with the protrusion of the first engagement portion 10. As a result, the movement of the third engagement portion 16 further moving toward the distal end side of the interposition arm 13 is restricted, and the notch of the third engagement portion 16 opens in the direction opposite to the direction of the vertical frame member 5. Therefore, the movement of the interposition arm 13 away from the horizontal frame member 6 is limited.

第三係合部16の切欠きを第一係合部10の突起部に係合させるのとほぼ同時に、突起部を回転軸として、介錯アーム13を縦方向に回動することにより、介錯アーム13の基端部を横枠部材6に近づけ、介錯アーム13の第四係合部17の板部材18の縦枠部材方向の末端面18’と、横枠部材6の第二係合部11の門形板部材21の横枠部材先端側の接合面21’とを当接させる。   Almost simultaneously with engaging the notch of the third engagement portion 16 with the projection of the first engagement portion 10, the intervention arm 13 is rotated in the vertical direction about the projection as a rotation axis. The proximal end portion of 13 is brought close to the horizontal frame member 6, the end face 18 ′ of the plate member 18 of the fourth engagement portion 17 of the interposition arm 13 in the vertical frame member direction, and the second engagement portion 11 of the horizontal frame member 6. The joint surface 21 ′ on the distal end side of the horizontal frame member of the portal plate member 21 is brought into contact.

介錯アーム13が正しく横枠部材6の上に配置された状態で、介錯アーム13の第四係合部17の板部材18の貫通孔20と、横枠部材6の第二係合部11の門形板部材21の貫通孔26が整合するので、ロックピン22の先端部を貫通孔20に挿通する。   In a state where the interposition arm 13 is correctly disposed on the horizontal frame member 6, the through hole 20 of the plate member 18 of the fourth engagement portion 17 of the interposition arm 13 and the second engagement portion 11 of the horizontal frame member 6. Since the through hole 26 of the portal plate member 21 is aligned, the distal end portion of the lock pin 22 is inserted into the through hole 20.

ロックピン22の先端部が貫通孔20を貫通するまで、ロックピンの本体部22aはコイルバネ25に付勢されながら平行移動し、ロックピンの摘み部22bはガイド壁構造体23の間の溝を通り、その下端部が板バネ24の上面をスライドしながら通過する。
ロックピン22の先端部が貫通孔20を貫通すると、ロックピン22の先端部が覗き穴19から目視で確認することができる。また、ロックピン22が正しく装着される位置に到達すると、ロックピン22の摘み部22bは板バネ24の傾斜部24bを乗り越え、板バネ24が跳ね上がり、ストッパー部24cが摘み部22bと係合してロックピン22の逆戻りを防止する。
Until the tip of the lock pin 22 penetrates the through hole 20, the lock pin body 22 a moves in parallel while being urged by the coil spring 25, and the lock pin knob 22 b passes through the groove between the guide wall structures 23. The lower end passes through the upper surface of the leaf spring 24 while sliding.
When the distal end portion of the lock pin 22 penetrates the through hole 20, the distal end portion of the lock pin 22 can be visually confirmed from the peep hole 19. When the lock pin 22 reaches the correct mounting position, the knob 22b of the lock pin 22 gets over the inclined portion 24b of the plate spring 24, the plate spring 24 jumps up, and the stopper 24c engages with the knob 22b. Thus, the lock pin 22 is prevented from returning backward.

反対に、介錯アーム13を取り外すときは、まず板バネ24の傾斜部24bを指で押し下げて、ロックピン22の摘み部22bを摘まんで引っ張り、コイルバネ25の力に抗してロックピン22を縦枠部材5の方向に移動させ、ロックピン22の先端部を介錯アーム13の第四係合部17の板部材18の貫通孔20から抜き出す(図1(c’)参照)。次に、第一係合部10と第三係合部16の係合を維持したまま、介錯アーム13の基端部を持ち上げ、第二係合部11と第四係合部17の係合を解除させる。次に、介錯アーム13の第三係合部16の板部材の切欠きを、第一係合部10の突起部から外す。これによって第一係合部10と第三係合部16の係合が解除される。   On the other hand, when removing the interposition arm 13, first, the inclined portion 24 b of the leaf spring 24 is pushed down with a finger, the knob 22 b of the lock pin 22 is picked and pulled, and the lock pin 22 is moved vertically against the force of the coil spring 25. It moves to the direction of the frame member 5, and extracts the front-end | tip part of the lock pin 22 from the through-hole 20 of the plate member 18 of the 4th engaging part 17 of the interposition arm 13 (refer FIG.1 (c ')). Next, while maintaining the engagement between the first engagement portion 10 and the third engagement portion 16, the proximal end portion of the interposition arm 13 is lifted, and the second engagement portion 11 and the fourth engagement portion 17 are engaged. To cancel. Next, the notch of the plate member of the third engagement portion 16 of the interposition arm 13 is removed from the protruding portion of the first engagement portion 10. As a result, the engagement between the first engagement portion 10 and the third engagement portion 16 is released.

以上の説明から明なように、本願発明によれば、介錯アーム13の取付けや取外しは全くボルト・ナット等の分離した締結金具を使用せず、かつ、二つの動作によって介錯アーム13の取付けと取外しを完了することができる。介錯アーム13が通常高所において行われることを考えると、締結金具の落下事故を完全に防止でき、きわめて安全な介錯アームとクレーンアームを得ることができる。また、高所における作業がきわめて簡単になり、仮設足場の高さの変化に対応してクレーンアームを仮設足場の最上段に複数回運び上げ、その都度介錯アームの取外しと取付け作業を行うことを考えると、作業の大幅な効率化を図ることができる。さらに、本願発明によれば、分離した締結金具がないため、締結金具の紛失を完全に防止することができる。   As is clear from the above description, according to the present invention, the attachment and detachment of the interposition arm 13 does not use a separate fastener such as a bolt and a nut, and the attachment and detachment of the interposition arm 13 by two operations. Removal can be completed. Considering that the intervening arm 13 is normally performed at a high place, it is possible to completely prevent the fastening bracket from being dropped and to obtain an extremely safe intervening arm and crane arm. In addition, work at high places becomes extremely easy, and in response to changes in the height of the temporary scaffolding, the crane arm is moved to the uppermost stage of the temporary scaffolding several times, and the intermediary arm is removed and attached each time. Considering this, the work efficiency can be greatly improved. Furthermore, according to the present invention, since there is no separate fastening member, it is possible to completely prevent the fastening member from being lost.

上記の記載に基づいて、当業者であれば、本発明の追加の効果や種々の変形を想到できるかもしれないが、本発明の態様は、上述した実施形態に限定されるものではない。特許請求の範囲に規定された内容及びその均等物から導き出される本願発明の概念的な思想と趣旨を逸脱しない範囲で種々の追加、変更及び部分的削除が可能である。   Based on the above description, those skilled in the art may be able to conceive additional effects and various modifications of the present invention, but the aspects of the present invention are not limited to the above-described embodiments. Various additions, modifications, and partial deletions can be made without departing from the concept and spirit of the present invention derived from the contents defined in the claims and equivalents thereof.

1 クレーンアーム
2 クランプ
3 基部支柱
4 旋回ヒンジ
4a 第一ヒンジ部材
4b 第二ヒンジ部材
4c 支軸
5 縦枠部材
6 横枠部材
7 ブレース部材
8 ウィンチ側滑車取付部
9 荷側滑車取付金具
10 第一係合部
11 第二係合部
12 シャックル
13 介錯アーム
14 アーム部材
15 ガイドロープ取付金具
16 第三係合部
17 第四係合部
18 板部材
18’ 末端面
19 覗き穴
20 貫通孔
21 門形板部材
21’ 接合面
22 ロックピン
22a 本体部
22b 摘み部
23 ガイド壁構造体
24 板バネ
24a 基端部
24b 傾斜部
24c ストッパー部
25 コイルバネ
26 貫通孔
27 貫通孔
28 ロックワッシャー
28e E形止め輪
28w ワッシャー
29 固定板
30 第一側板
31 第二側板
32 シーブ
33 ロープ留めピン
33a ロープ留めピン本体部
33b ロープ留めピン摘み部
34 鍵穴
35 挿通孔
36 スリーブ
37 孔
38 スプリングピン
DESCRIPTION OF SYMBOLS 1 Crane arm 2 Clamp 3 Base support | pillar 4 Turning hinge 4a 1st hinge member 4b 2nd hinge member 4c Support shaft 5 Vertical frame member 6 Horizontal frame member 7 Brace member 8 Winch side pulley attachment part 9 Load side pulley attachment metal fitting 10 First Engagement part 11 Second engagement part 12 Shackle 13 Intermediary arm 14 Arm member 15 Guide rope mounting bracket 16 Third engagement part 17 Fourth engagement part 18 Plate member 18 'End surface 19 Peep hole 20 Through hole 21 Gate shape Plate member 21 'Joint surface 22 Lock pin 22a Main body portion 22b Knob portion 23 Guide wall structure 24 Leaf spring 24a Base end portion 24b Inclined portion 24c Stopper portion 25 Coil spring 26 Through hole 27 Through hole 28 Lock washer 28e E-shaped retaining ring 28w Washer 29 Fixed plate 30 First side plate 31 Second side plate 32 Sheave 33 Rope pin 33a Rope pin main body 3b rope pinning knob 34 keyhole 35 through hole 36 sleeve 37 bore 38 spring pin

Claims (11)

クレーンアームに取り付け可能な介錯アームであって、
前記クレーンアームは、
略垂直に取り付けられる縦枠部材と、前記縦枠部材に略直角に結合した横枠部材とを備え、
前記横枠部材には、第一係合部と、当該第一係合部より前記縦枠部材側に位置する第二係合部とが設けられており、
前記介錯アームは、
前記第一係合部に係合するための第三係合部と、
前記第二係合部に係合するための第四係合部と、を備える
ことを特徴とする介錯アーム。
An intervening arm that can be attached to a crane arm,
The crane arm is
A vertical frame member attached substantially vertically, and a horizontal frame member coupled to the vertical frame member at a substantially right angle;
The horizontal frame member is provided with a first engagement portion and a second engagement portion located on the vertical frame member side from the first engagement portion,
The intervening arm is
A third engagement portion for engaging with the first engagement portion;
And a fourth engagement portion for engaging with the second engagement portion.
前記第三係合部は、前記第一係合部と係合することにより、前記介錯アームが縦枠部材から離れる方向への移動を制限し、
前記第四係合部は、前記第二係合部と係合することにより、前記介錯アームが縦枠部材へ近づく方向への移動を制限することを特徴とする請求項1記載の介錯アーム。
The third engagement portion is engaged with the first engagement portion to restrict movement of the interposition arm in a direction away from the vertical frame member,
The interventional arm according to claim 1, wherein the fourth engagement part is engaged with the second engagement part to restrict movement of the interventional arm in a direction approaching the vertical frame member.
前記第三係合部は、前記縦枠部材の位置とは反対方向が開放した切欠きであり、当該切欠きに、前記第一係合部の突起部が係合することを特徴とする請求項1または2に記載の介錯アーム。   The third engagement portion is a notch that is open in a direction opposite to the position of the vertical frame member, and the protrusion of the first engagement portion engages with the notch. Item 3. The intervening arm according to Item 1 or 2. 前記第二係合部は、
前記介錯アームの前記縦枠部材方向の末端面と当接するための接合面と、前記横枠部材と平行なロックピンとを備え、
前記第四係合部は、
前記縦枠部材方向末端面に、貫通孔を備え、
前記貫通孔に前記ロックピンが挿入され、前記末端面に前記第二係合部の前記接合面が当接することにより、前記第二係合部と係合することを特徴とする請求項1〜3のいずれか一項に記載の介錯アーム。
The second engaging portion is
A joining surface for contacting the end face of the interposition arm in the vertical frame member direction, and a lock pin parallel to the horizontal frame member,
The fourth engaging portion is
The longitudinal frame member direction end surface is provided with a through hole,
The lock pin is inserted into the through hole, and the joining surface of the second engagement portion is brought into contact with the end surface to engage with the second engagement portion. The intervening arm according to any one of 3 above.
前記ロックピンは、平行に移動可能である請求項4に記載の介錯アーム。   The interventional arm according to claim 4, wherein the lock pin is movable in parallel. 前記ロックピンは、コイルバネにより、前記ロックピンの先端が前記貫通孔に挿入される方向に付勢されていることを特徴とする請求項4または5に記載の介錯アーム。   The interposition arm according to claim 4 or 5, wherein the lock pin is urged by a coil spring in a direction in which a tip of the lock pin is inserted into the through hole. 前記ロックピンは、前記横枠部材に平行なロックピン本体部と、前記ロックピン本体部に垂直に結合する摘み部を有する概略L字形状からなり、
前記摘み部の先端は、板バネのストッパー部により、移動が制限されていることを特徴とする請求項4〜6のいずれか一項に記載の介錯アーム。
The lock pin has a substantially L shape having a lock pin main body portion parallel to the horizontal frame member and a knob portion coupled vertically to the lock pin main body portion,
The interposition arm according to any one of claims 4 to 6, wherein movement of the tip of the knob is restricted by a stopper portion of a leaf spring.
前記第四係合部は、前記貫通孔を潜った前記ロックピンの少なくとも一部分が目視で確認できる覗き穴を有していることを特徴とする請求項4〜7のいずれか一項に記載の介錯アーム。   The said 4th engaging part has a peephole which can confirm at least one part of the said lock pin which dived the said through hole visually, The any one of Claims 4-7 characterized by the above-mentioned. Intervening arm. 請求項1〜8のいずれか一項に記載の介錯アームを備えたことを特徴とするクレーンアーム。   The crane arm provided with the interposition arm as described in any one of Claims 1-8. 前記縦枠部材の下端部にウィンチ側滑車取付部が設けられ、
前記ウィンチ側滑車取付部は、滑車と、前記滑車を回転可能に支承する一対の側板と、前記側板に挿通される荷吊り用ロープの浮き上がり防止のロープ留めピンを備え、
前記側板の一方は前記ロープ留めピンを挿通させる貫通孔を有し、前記側板の他方は前記ロープ留めピンの先端部を挿通させ円周縁の一部に切欠きを有する鍵穴を有し、
前記ロープ留めピンは、本体部と摘み部からなる概略L字の形状を有しており、前記本体部の先端部に、前記鍵穴の切欠きを挿通した後に重力によって前記摘み部が垂直下方に回動したときに前記鍵穴の切欠きと整合しない位置に突出部を有していることを特徴とする請求項9に記載のクレーンアーム。
A winch side pulley mounting portion is provided at the lower end of the vertical frame member,
The winch side pulley mounting portion includes a pulley, a pair of side plates that rotatably support the pulley, and a rope fastening pin for preventing the lifting of a load hanging rope inserted through the side plate,
One of the side plates has a through-hole through which the rope fastening pin is inserted, and the other of the side plates has a keyhole having a notch in a part of a circular circumference through the tip of the rope fastening pin,
The rope fastening pin has a substantially L-shape consisting of a main body part and a knob part, and the knob part is vertically lowered by gravity after the notch of the key hole is inserted into the tip part of the main body part. The crane arm according to claim 9, wherein the crane arm has a protrusion at a position that does not align with the notch of the keyhole when rotated.
略垂直に取り付けられる縦枠部材と、
前記縦枠部材に略直角に結合した横枠部材とを備え、
前記縦枠部材の下端部にウィンチ側滑車取付部が設けられ、
前記ウィンチ側滑車取付部は、滑車と、前記滑車を回転可能に支承する一対の側板と、前記側板に挿通される荷吊り用ロープの浮き上がり防止のロープ留めピンを備え、
前記側板の一方は前記ロープ留めピンを挿通させる貫通孔を有し、前記側板の他方は前記ロープ留めピンの先端部を挿通させ円周縁の一部に切欠きを有する鍵穴を有し、
前記ロープ留めピンは、本体部と摘み部からなる概略L字の形状を有しており、前記本体部の先端部に、前記鍵穴の切欠きを挿通した後に重力によって前記摘み部が垂直下方に回動したときに前記鍵穴の切欠きと整合しない位置に突出部を有していることを特徴とするクレーンアーム。
A vertical frame member attached substantially vertically;
A horizontal frame member coupled to the vertical frame member at a substantially right angle;
A winch side pulley mounting portion is provided at the lower end of the vertical frame member,
The winch side pulley mounting portion includes a pulley, a pair of side plates that rotatably support the pulley, and a rope fastening pin for preventing the lifting of a load hanging rope inserted through the side plate,
One of the side plates has a through-hole through which the rope fastening pin is inserted, and the other of the side plates has a keyhole having a notch in a part of a circular circumference through the tip of the rope fastening pin,
The rope fastening pin has a substantially L-shape consisting of a main body part and a knob part, and the knob part is vertically lowered by gravity after the notch of the key hole is inserted into the tip part of the main body part. A crane arm having a protrusion at a position that does not align with the notch of the keyhole when rotated.
JP2017009181A 2017-01-23 2017-01-23 Kaishakunin arm, and a crane arm with a kaishakunin arm Active JP6917048B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017009181A JP6917048B2 (en) 2017-01-23 2017-01-23 Kaishakunin arm, and a crane arm with a kaishakunin arm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017009181A JP6917048B2 (en) 2017-01-23 2017-01-23 Kaishakunin arm, and a crane arm with a kaishakunin arm

Publications (2)

Publication Number Publication Date
JP2018118795A true JP2018118795A (en) 2018-08-02
JP6917048B2 JP6917048B2 (en) 2021-08-11

Family

ID=63043439

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017009181A Active JP6917048B2 (en) 2017-01-23 2017-01-23 Kaishakunin arm, and a crane arm with a kaishakunin arm

Country Status (1)

Country Link
JP (1) JP6917048B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020197110A (en) * 2019-05-31 2020-12-10 Ykk Ap株式会社 Face material construction device and face material construction method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS49142423U (en) * 1973-04-03 1974-12-09
JPS49151213U (en) * 1973-04-28 1974-12-27
JPS54179666U (en) * 1978-06-08 1979-12-19
JPS5665792A (en) * 1979-11-02 1981-06-03 Nansei Kk Expansion device for beam in crane
JPH02286591A (en) * 1989-04-27 1990-11-26 Natl House Ind Co Ltd Suspension patch
JPH03216495A (en) * 1990-01-19 1991-09-24 Kito Corp Truck crane having swivel resistance giving device
US5341898A (en) * 1993-08-19 1994-08-30 Morris Baziuk Foldable boom for mounting on a roof of a building
JP2010007228A (en) * 2008-06-24 2010-01-14 Ichiro Nagayoshi Load hanging device
JP5948542B1 (en) * 2015-06-09 2016-07-06 株式会社古屋興産 Simple crane

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS49142423U (en) * 1973-04-03 1974-12-09
JPS49151213U (en) * 1973-04-28 1974-12-27
JPS54179666U (en) * 1978-06-08 1979-12-19
JPS5665792A (en) * 1979-11-02 1981-06-03 Nansei Kk Expansion device for beam in crane
JPH02286591A (en) * 1989-04-27 1990-11-26 Natl House Ind Co Ltd Suspension patch
JPH03216495A (en) * 1990-01-19 1991-09-24 Kito Corp Truck crane having swivel resistance giving device
US5341898A (en) * 1993-08-19 1994-08-30 Morris Baziuk Foldable boom for mounting on a roof of a building
JP2010007228A (en) * 2008-06-24 2010-01-14 Ichiro Nagayoshi Load hanging device
JP5948542B1 (en) * 2015-06-09 2016-07-06 株式会社古屋興産 Simple crane

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020197110A (en) * 2019-05-31 2020-12-10 Ykk Ap株式会社 Face material construction device and face material construction method
JP7256763B2 (en) 2019-05-31 2023-04-12 Ykk Ap株式会社 Face material construction device and face material construction method

Also Published As

Publication number Publication date
JP6917048B2 (en) 2021-08-11

Similar Documents

Publication Publication Date Title
US7380849B2 (en) Remote release apparatus and method for lifting and releasing a load
JP2018118795A (en) Guy arm and crane arm with guy arm
JP6270524B2 (en) Hanging tool
JP5571041B2 (en) Lifting equipment
US5108139A (en) Device for remotely actuating the safety latch of a hoist hook
JP2011259550A (en) Hanging sheave
RU2335452C2 (en) Crane for loads lifting into window aperture, on recessed balconies and balconies of buildings being under construction or repair
JP2008280814A (en) Apparatus for opening and closing metal lid of manhole
KR100974255B1 (en) semi automatic hook apparatus using pulling a heavy load
KR102327935B1 (en) Gang-form safety hanger bracket
KR20160076616A (en) Semi-automatic shackle
KR101640388B1 (en) Safety locking device of claws for excavators
GB2437291A (en) Clamp with releasable handle
KR20120055515A (en) Semiautomatic shackle for fulling of gang form
KR20180094754A (en) Shackle having a structural stability
JP5131746B2 (en) Fall prevention device mounting member
US5895083A (en) Automatic cable disconnector
RU69049U1 (en) CRANE FOR LIFTING AND DELIVERY OF GOODS TO A WINDOW OPENING, ON LOGGIA AND BALCONIES OF CONSTRUCTING AND REPAIRED BUILDINGS
JP2017001813A (en) Simple crane
CN105947878B (en) Hanger plate
KR101610302B1 (en) Safety locking device of claws for excavators
JP4781090B2 (en) Hook holding device
KR200418719Y1 (en) Signboard installing device for ladder
JP2018003497A (en) Suspension auxiliary tool
JP2555540B2 (en) Channel box suspension for assembling nuclear fuel assemblies

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200107

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20201015

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20201201

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210120

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210629

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210712

R150 Certificate of patent or registration of utility model

Ref document number: 6917048

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350