JP2018053699A - Installation method of aseismic slit material - Google Patents

Installation method of aseismic slit material Download PDF

Info

Publication number
JP2018053699A
JP2018053699A JP2017043347A JP2017043347A JP2018053699A JP 2018053699 A JP2018053699 A JP 2018053699A JP 2017043347 A JP2017043347 A JP 2017043347A JP 2017043347 A JP2017043347 A JP 2017043347A JP 2018053699 A JP2018053699 A JP 2018053699A
Authority
JP
Japan
Prior art keywords
slit
formwork
pier
earthquake
slit material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2017043347A
Other languages
Japanese (ja)
Other versions
JP6330163B2 (en
Inventor
勝志 片山
Katsushi Katayama
勝志 片山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Katayamagumi Co Ltd
Original Assignee
Katayamagumi Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Katayamagumi Co Ltd filed Critical Katayamagumi Co Ltd
Priority to JP2017043347A priority Critical patent/JP6330163B2/en
Publication of JP2018053699A publication Critical patent/JP2018053699A/en
Application granted granted Critical
Publication of JP6330163B2 publication Critical patent/JP6330163B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a fitting structure for an aseismic slit material and an installation method for the same capable of firmly fixing the aseismic slit material to first and second frame structures, therefore preventing dropout of the aseismic slit material due to concrete pressure, at the same time significantly simplifying work steps and reliably finishing a concrete surface.SOLUTION: First and second frame structures 1, 2 include frames 10A, 10B (20A, 20B) installed next to each other, and a slit crosspiece 3 fixed between the frames at a fitting position of an aseismic slit material 4. A cross-section form of the slit crosspiece 3 is hexagonal, and integrates a trapezoidal part and a square part. The square part is sandwiched and fixed between the adjacent frames. Support members 5, 6 of the aseismic slit material 4 are inserted into the trapezoidal part for fitting the aseismic slit material.SELECTED DRAWING: Figure 2

Description

本発明は、コンクリート建築物の壁体等に埋設される耐震スリット材を型枠に取り付けるための取り付け構造、及びその施工方法に関する。   The present invention relates to an attachment structure for attaching an earthquake-resistant slit material embedded in a wall or the like of a concrete building to a formwork, and a construction method thereof.

鉄筋コンクリートや鉄骨鉄筋コンクリート等のコンクリート建築物においては、地震の揺れによる破壊を防止するため、壁体の横断方向に耐震スリット材を埋設して構造的に切り離された部分(耐震スリット)を作る技術が知られている。そのためには、コンクリートの型枠に、予め耐震スリット材を取り付けておく必要がある。耐震スリット材の取り付け構造としては、図7に示すように、型枠91、92に釘等の固定具Nで目地棒Mを固定しておき、この目地棒Mに、スリット材本体95の両端部に装着された支持部材93、94の溝部を嵌合させて取り付ける技術が広く普及している(例えば、下記特許文献1参照)。   In concrete buildings such as reinforced concrete and steel-framed reinforced concrete, there is a technology to create structurally separated parts (earthquake-resistant slits) by embedding earthquake-resistant slit materials in the transverse direction of the wall to prevent destruction due to earthquake shaking. Are known. For that purpose, it is necessary to attach an earthquake-resistant slit material to a concrete formwork in advance. As shown in FIG. 7, the seismic slit material is attached to a joint 91 with a fixing tool N such as a nail. The joint rod M is fixed to both ends of the slit material main body 95. A technique in which the groove portions of the support members 93 and 94 attached to the portions are fitted and attached is widely used (see, for example, Patent Document 1 below).

しかし、図7に示す取り付け構造によれば、目地棒Mが型枠に固定具Nのみで固定されているため、空間Sにコンクリートを打設すると、流し込まれたコンクリートの圧力で固定具Nが脱落し、支持部材93、94やスリット材本体95が所定位置から移動してしまうという問題があった(一般に、「パンク現象」と呼ばれている)。そのため、1つの目地棒Mに打ち込む固定具の間隔(ピッチ)を狭くして固定箇所を増やしたり、別の固定手段で補強したりしなければならず、作業工程が増えるという問題があった。   However, according to the mounting structure shown in FIG. 7, since the joint rod M is fixed to the mold frame only by the fixture N, when the concrete is placed in the space S, the fixture N is caused by the pressure of the poured concrete. There is a problem that the support members 93 and 94 and the slit material body 95 are moved from a predetermined position due to falling off (generally called “puncture phenomenon”). For this reason, it is necessary to increase the number of fixing points by narrowing the interval (pitch) between the fixing tools driven into one joint rod M, or to reinforce it with another fixing means, resulting in an increase in work processes.

そこで、「パンク現象」を防止するための対策として、目地棒の一部を型枠間に挟み込む技術も知られている。例えば、下記特許文献2には、固定部材4(目地棒)に支持板4bを設けて型枠で挟み込む技術が開示されている。また、下記特許文献3には、予め耐震スリット材と一体に組み付けた目地部形成用治具13(目地棒)を、型枠で挟み込む技術が開示されている。   Therefore, as a countermeasure for preventing the “puncture phenomenon”, a technique of sandwiching a part of the joint rod between the molds is also known. For example, Patent Document 2 below discloses a technique in which a support plate 4b is provided on a fixing member 4 (joint rod) and sandwiched between molds. Patent Document 3 below discloses a technique for sandwiching a joint portion forming jig 13 (joint rod) that is assembled in advance with an earthquake-resistant slit material in a mold.

特開2002−194920号公報JP 2002-194920 A 特開2001−214634号公報JP 2001-214634 A 特開平10−317666号公報JP-A-10-317666

特許文献2に示される技術では、型枠間に挟み込まれる部分(支持板4b)が、固定部材4の他の部分より薄く形成されているため変形しやすく、強度や耐久性の面で不安がある。また、固定部材4に位置決め部19が設けられているため、位置決め部19と型枠表面との間にコンクリートが入り込みやすく、施工不良を起こしやすいという問題がある。
また、特許文献3に示される技術では、目地部形成用治具13、固定用治具14、スリット部材12を事前にボルトで組み付けて一体化する作業が必要となるため、作業工程が増えるという問題がある。
In the technique shown in Patent Document 2, since the portion (support plate 4b) sandwiched between the molds is formed thinner than the other portions of the fixing member 4, it is easily deformed, and there is anxiety in terms of strength and durability. is there. Moreover, since the positioning part 19 is provided in the fixing member 4, there exists a problem that concrete tends to enter between the positioning part 19 and the formwork surface, and it is easy to cause a construction defect.
Further, in the technique disclosed in Patent Document 3, it is necessary to work by previously assembling the joint portion forming jig 13, the fixing jig 14, and the slit member 12 with bolts, so that the work process is increased. There's a problem.

本発明の課題は、耐震スリット材を型枠に強固に固定して「パンク現象」を防止するとともに、作業工程を著しく簡略化することができ、しかも、コンクリート面を確実に仕上げることのできる耐震スリット材の取り付け構造とその施工方法を提供することにある。   The problem of the present invention is that the seismic slit material is firmly fixed to the formwork to prevent the “puncture phenomenon”, the work process can be greatly simplified, and the concrete surface can be finished with certainty. It is in providing the attachment structure of a slit material, and its construction method.

上記課題を解決するため、本発明に係る耐震スリット材の取付け構造は、対向して設置された第一及び第二の型枠構造体1、2と、前記型枠構造体間に横断的に配置された耐震スリット材4とを備える型枠構造における、耐震スリット材4の取り付け構造であって、第一及び第二の型枠構造体1、2は、並べて設置された複数の型枠と、耐震スリット材4の取り付け位置において型枠10A、10B(20A、20B)間に固定されたスリット桟木3とをそれぞれ有しており、各型枠は、型枠板11と、その外側面に固定された複数の型枠桟木12とを備えており、各スリット桟木3の断面形状は、頂面3aと、頂面に平行な底面3dと、底面に垂直な2つの側面3c、3c’と、頂面から各側面に向けてハの字状に傾斜した2つの傾斜面3b、3b’とを備えることにより、台形部と方形部とを一体化した六角形状をなしており、各スリット桟木3は、台形部を型枠の内側に向けて突出させ、かつ、方形部を隣接する型枠10A、10B(20A、20B)間に挟まれた状態で配置され、
前記スリット桟木3の両側面は、それぞれを隣接する型枠の型枠板11の木口面と型枠桟木12の側面に当接させた状態で、壁体と平行に打ち込まれた釘8によって各型枠桟木12と固定されており、
耐震スリット材4は、板状のスリット材本体7と、一対の支持部材5、6とを有し、各支持部材は内側溝部51、61と外側溝部52、62を有しており、内側溝部51、61にスリット材本体7の両端部が嵌め込まれているとともに、外側溝部52、62に各スリット桟木3の台形部が嵌め込まれていることを特徴とする。
In order to solve the above-described problems, an earthquake-resistant slit material mounting structure according to the present invention includes a first and second mold frame structures 1 and 2 installed opposite to each other, and a horizontal cross section between the mold frame structures. In the formwork structure provided with the seismic slit material 4 arranged, the seismic slit material 4 is attached. The first and second formwork structures 1 and 2 are a plurality of formwork installed side by side. , Each having a slit bar 3 fixed between the molds 10A, 10B (20A, 20B) at the attachment position of the earthquake-resistant slit material 4, and each mold is provided on the mold plate 11 and the outer surface thereof. A plurality of fixed formwork piers 12 are provided. The cross-sectional shape of each slit pier 3 includes a top surface 3a, a bottom surface 3d parallel to the top surface, and two side surfaces 3c and 3c ′ perpendicular to the bottom surface. , Two inclined surfaces 3b inclined in a C shape from the top surface toward each side surface 3b 'to form a hexagonal shape in which the trapezoidal part and the square part are integrated, and each slit bar 3 projects the trapezoidal part toward the inside of the formwork, and the square part is Arranged in a state sandwiched between adjacent molds 10A, 10B (20A, 20B) ,
Both side surfaces of the slit pier 3 are respectively connected by the nails 8 driven in parallel to the wall body in a state where they are brought into contact with the chamfer surface of the adjacent mold frame 11 and the side surface of the mold pier 12. It is fixed to the formwork pier 12,
The earthquake-resistant slit material 4 has a plate-shaped slit material body 7 and a pair of support members 5 and 6, and each support member has inner groove portions 51 and 61 and outer groove portions 52 and 62. Both ends of the slit material main body 7 are fitted into 51 and 61, and the trapezoidal part of each slit bar 3 is fitted into the outer grooves 52 and 62.

また、本発明に係る耐震スリット材の施工方法は、対向して設置される第一及び第二の型枠構造体1、2と、前記型枠構造体間に横断的に配置される耐震スリット材4を有する型枠構造における、耐震スリット材4の施工方法であって、第一及び第二の型枠構造体1、2は、並べて設置された複数の型枠と、耐震スリット材4の取り付け位置において型枠10A、10B(20A、20B)間に固定されたスリット桟木3とをそれぞれ有しており、各型枠は、型枠板11と、その外側面に固定された複数の型枠桟木12とを備えており、各スリット桟木3の断面形状は、頂面3aと、頂面に平行な底面3dと、底面に垂直な2つの側面3c、3c’と、頂面から各側面に向けてハの字状に傾斜した2つの傾斜面3b、3b’とを備えることにより、台形部と方形部とを一体化した六角形状をなしており、耐震スリット材4は、板状のスリット本体7と、一対の支持部材5、6とを有し、各支持部材5、6は内側溝部51、61と外側溝部52、62を有しており、スリット本体7の両端部が、各支持部材5、6の内側溝部51、61に予め嵌め込まれて一体化されたものであり、前記施工方法は、一の型枠10Aを設置した後、スリット桟木3を、台形部が型枠の内側を向くように配置し、前記スリット桟木3の一方の側面3cを、前記一の型枠10Aの型枠板11の木口面と型枠桟木12の側面に当接させ、壁体と平行に釘8Aを打ち込むことにより、前記スリット桟木3を前記一の型枠10Aに固定する工程と、前記スリット桟木3の他方の側面3c’に、他の型枠10Bの型枠板11の木口面と型枠桟木12の側面を当接させ、型枠桟木12側からスリット桟木3に向かって壁体と平行に釘8Bを打ち込むことにより、前記他の型枠10Bを前記スリット桟木3に固定する工程と、を含む、第一の型枠構造体設置ステップと、前記第一の型枠構造体1から突出する前記スリット桟木3の台形部に、耐震スリット材4の一方の支持部材5の外側溝部52を取り付けて固定する工程を含む、耐震スリット材設置ステップと、固定された前記耐震スリット材4の他方の支持部材6の外側溝部62に、新たなスリット桟木3の台形部を嵌め込んで位置決めを行うとともに、前記新たなスリット桟木3の一方の側面3cを、第一の型枠構造体1に対向して配置される一の型枠20Aの型枠板11の木口面と型枠桟木12の側面に当接させ、壁体と平行に釘8Cを打ち込むことにより、前記新たなスリット桟木3を前記一の型枠20Aに固定する工程と、前記新たなスリット桟木3の他方の側面3c’に、他の型枠20Bの型枠板11の木口面と型枠桟木12の側面を当接させ、型枠桟木12側からスリット桟木3に向かって壁体と平行に釘8Dを打ち込むことにより、前記他の型枠20Bを前記新たなスリット桟木3に固定する工程と、を含む、第二の型枠構造体設置ステップを含むことを特徴とする。 Moreover, the construction method of the earthquake-resistant slit material which concerns on this invention is the 1st and 2nd formwork structures 1 and 2 installed facing, and the earthquake-proof slit arrange | positioned transversely between the said formwork structures It is a construction method of the seismic slit material 4 in the formwork structure having the material 4, and the first and second formwork structures 1 and 2 are formed by arranging a plurality of formwork and the seismic slit material 4. mold 10A in the mounting position, 10B (20A, 20B) have respective fixed slit桟木3 and the in between each mold includes a mold plate 11, a plurality of the type fixed to the outer surface The cross-sectional shape of each slit frame 3 includes a top surface 3a, a bottom surface 3d parallel to the top surface, two side surfaces 3c and 3c 'perpendicular to the bottom surface, and each side surface from the top surface. And two inclined surfaces 3b and 3b 'inclined in a C shape toward The trapezoidal part and the square part have a hexagonal shape, and the earthquake-resistant slit material 4 has a plate-like slit body 7 and a pair of support members 5 and 6, and each support member 5 and 6. Has inner groove portions 51 and 61 and outer groove portions 52 and 62, and both end portions of the slit body 7 are integrated by being fitted in the inner groove portions 51 and 61 of the support members 5 and 6 in advance. In the construction method, after the one mold 10A is installed, the slit bar 3 is arranged so that the trapezoidal part faces the inside of the mold, and one side surface 3c of the slit bar 3 is placed on the one mold. Fixing the slit pier 3 to the one mold 10A by bringing the nail 8A into contact with the wooden face of the mold plate 11 of the frame 10A and the side of the mold pier 12 and driving in parallel with the wall body; , the other on the side surface 3c 'of the slit桟木3, mold plates of the other mold 10B The sides of one of the butt end face and the mold桟木12 brought into contact, by implanting wall parallel to the nail 8B toward the mold桟木12 side slit桟木3, the other mold 10B the slit桟木And a step of securing the seismic slit material 4 to the trapezoidal portion of the slit piercing 3 protruding from the first formwork structure 1. The trapezoidal part of the new slit pier 3 is provided in the step of installing the seismic slit material including the step of attaching and fixing the outer groove part 52 of the member 5 and the outer groove part 62 of the other support member 6 of the fixed seismic slit material 4. And positioning one side surface 3c of the new slit pier 3 at the front end of the mold plate 11 of the one mold frame 20A arranged to face the first mold structure 1 And the side of the formwork pier 12 The nail 8C is driven in parallel with the wall body to fix the new slit bar 3 to the one mold frame 20A, and to the other side surface 3c ′ of the new slit bar 3, another mold By contacting the wooden face of the form plate 11 of the frame 20B and the side surface of the formwork frame 12 and driving the nail 8D in parallel to the wall body from the formwork frame 12 side toward the slit frame 3, the other mold Including a step of fixing the frame 20B to the new slit pier 3; and a second formwork structure installation step.

また、スリット桟木は、着色された樹脂製フィルムによって予め被覆されていることが望ましい。   Moreover, it is desirable that the slit pier is previously coated with a colored resin film.

本発明によれば、型枠の設置作業とスリット桟木(従来の目地棒に相当)の固定作業が同時に行われるので、スリット桟木の取り付け位置を正しく定めることができるとともに、作業工程を著しく簡略化することができる。また、流し込まれるコンクリートの圧力をスリット桟木を介して型枠全体で受けるため、耐震スリット材が移動するおそれがなく、「パンク現象」を確実に防止することができる。さらに、スリット桟木と型枠の間に隙間が生じるおそれがなく、コンクリートの施工不良をなくすことができる。   According to the present invention, the installation work of the formwork and the fixing work of the slit pier (equivalent to the conventional joint rod) are performed at the same time, so that the installation position of the slit pier can be determined correctly and the work process is remarkably simplified. can do. Moreover, since the pressure of the poured concrete is received by the whole formwork through the slit pier, there is no possibility that the earthquake-resistant slit material moves, and the “puncture phenomenon” can be surely prevented. Furthermore, there is no possibility that a gap is generated between the slit bar and the formwork, and it is possible to eliminate the concrete construction failure.

また、 スリット桟木を樹脂フィルムで被覆した場合には、スリット桟木の強度と耐久性が向上するとともに、コンクリートの付着を防止することができる。さらに、着色された樹脂フィルムを用いることにより、視認性が高まり、暗い場所での作業がしやすくなるという効果もある。  Further, when the slit pier is covered with a resin film, the strength and durability of the slit pier are improved and the adhesion of concrete can be prevented. Furthermore, by using a colored resin film, there is an effect that visibility is improved and it is easy to work in a dark place.

本発明に係る耐震スリット材の取り付け構造の分解斜視図である。It is a disassembled perspective view of the attachment structure of the earthquake-resistant slit material which concerns on this invention. 本発明に係る耐震スリット材の取り付け構造の断面図である。It is sectional drawing of the attachment structure of the earthquake-resistant slit material which concerns on this invention. 第一の型枠構造体の設置工程を示す断面図である。It is sectional drawing which shows the installation process of a 1st formwork structure. 第一の型枠構造体の設置工程(続き)を示す断面図である。It is sectional drawing which shows the installation process (continuation) of a 1st formwork structure. 実施例1におけるスリット桟木の拡大断面図である。1 is an enlarged cross-sectional view of a slit pier in Example 1. FIG. 実施例2におけるスリット桟木の拡大断面図である。It is an expanded sectional view of a slit pier in Example 2. 従来例の取り付け構造の断面図である。It is sectional drawing of the attachment structure of a prior art example.

以下、図面を参照しながら、本発明の実施例1について詳細に説明する。   Hereinafter, Example 1 of the present invention will be described in detail with reference to the drawings.

本実施例において、コンクリート型枠は、図1、図2に示すように、壁体等を形成するために一定の間隔をおいて対向して設置される第一の型枠構造体1及び第二の型枠構造体2と、その間のコンクリート打設空間Sに横断的に設置される耐震スリット材4とを備える。   In this embodiment, as shown in FIGS. 1 and 2, the concrete formwork is a first formwork structure 1 and a first formwork that are installed facing each other at a predetermined interval to form a wall or the like. A second formwork structure 2 and a seismic slit material 4 installed across the concrete placement space S therebetween are provided.

耐震スリット材4は、図2に示すように、発泡樹脂(ポリエチレンフォーム等)からなる板状のスリット材本体7の両端部に、硬質樹脂(塩化ビニル等)で形成された一対の支持部材5、6を取り付けて一体化したものであり、「耐震スリット材」等の名称で市販されている既製品を使用することもできる。   As shown in FIG. 2, the earthquake-resistant slit material 4 includes a pair of support members 5 formed of hard resin (vinyl chloride or the like) at both ends of a plate-like slit material body 7 made of foamed resin (polyethylene foam or the like). , 6 are integrated and an off-the-shelf product marketed under a name such as “seismic slit material” can also be used.

各支持部材5、6は長尺形状であり、内側溝部51、61と外側溝部52、62を備える。このうち、内側溝部51、61は、スリット材本体7の端部を嵌め込むことができるように略コの字状とされており、外側溝部52、62は、後述するスリット桟木3を嵌め込むことができるように略テーパ状とされている。そして、現場での施工作業を行う前に、スリット材本体7の両端部を各支持部材5、6の内側溝部51、61に嵌め込んで予め一体化してある。なお、71は耐火材として充填されたロックウール材である。   Each of the support members 5 and 6 has a long shape and includes inner groove portions 51 and 61 and outer groove portions 52 and 62. Among these, the inner groove portions 51 and 61 are formed in a substantially U shape so that the end portion of the slit material body 7 can be fitted, and the outer groove portions 52 and 62 fit the slit pier 3 described later. It is substantially tapered so that it can be made. And before performing construction work on the spot, both ends of the slit material body 7 are fitted into the inner grooves 51 and 61 of the support members 5 and 6 and integrated in advance. Reference numeral 71 denotes a rock wool material filled as a refractory material.

第一の型枠構造体1と第二の型枠構造体2は、いずれも複数の型枠10A、10B・・・、20A、20B・・・とスリット桟木3を壁体の長さ方向に並べて配置し、釘などの固定具8で固定して構成されている(以下、第一の型枠構造体1の構成要素である型枠を総称して「型枠10」、第二の型枠構造体2の構成要素である型枠を総称して「型枠20」という)。なお、説明を簡略化するため、図1〜4では、各型枠構造体1、2のそれぞれにつき、スリット桟木1個とそれに隣接する型枠2枚の要部のみを示すが、実際には、複数の型枠がこれに連なって配置される。また、壁体が柱や梁と接する部位では、型枠もそれに対応する形状となるように配置されるが、この点は従来どおりであるので詳細な説明は省略する。   Each of the first mold structure 1 and the second mold structure 2 includes a plurality of molds 10A, 10B,..., 20A, 20B. They are arranged side by side and fixed by a fixture 8 such as a nail (hereinafter, the molds that are constituent elements of the first mold structure 1 are collectively referred to as “form 10”, the second mold The molds that are the components of the frame structure 2 are collectively referred to as “mold 20”). In order to simplify the description, in FIGS. 1 to 4, only the main part of one slit crosspiece and two adjacent molds is shown for each of the mold structures 1 and 2. A plurality of molds are arranged continuously. Further, at the portion where the wall body is in contact with the column or beam, the mold is also arranged so as to have a shape corresponding thereto. However, since this point is the same as the conventional one, detailed description is omitted.

第一及び第二の型枠構造体1、2を構成する型枠10、20は、合板等からなる型枠板11と、その裏面(外側面)に固定された複数の型枠桟木12とを備えている。なお、型枠桟木12は、型枠板11の両端部とその中間部に間隔をおいて固定されている(図2)。   Forms 10 and 20 constituting the first and second formwork structures 1 and 2 are a formwork plate 11 made of plywood and the like, and a plurality of formwork bridges 12 fixed to the back surface (outer side) thereof. It has. The formwork pier 12 is fixed to both end portions of the formwork plate 11 and the middle portion thereof with a gap (FIG. 2).

次に、本発明の特徴であるスリット桟木3について説明する。スリット桟木3は従来の目地棒に相当するものであり、耐震スリット材4を取り付けるために用いられる。材質はラワン材等の木材で作製することが望ましいが、これに限られるものではない。図5に示すように、スリット桟木3の断面形状は、頂面3aと、頂面に平行な底面3dと、底面に垂直な2つの側面3c、3c’と、頂面から各側面に向けてハの字状に傾斜した2つの傾斜面3b、3b’を備えており、台形部と方形部とを一体化した六角形状となっている。スリット桟木3の各部分の寸法の一例を図5に示す(単位はmm)。スリット桟木3の底面3dの幅寸法Wを25mmとした場合、支持部材5、6の仕様にもよるが、約25〜40mm程度の幅の耐震スリット材4の施工に使用することが可能である。また、スリット桟木3の方形部の高さ(側面3c、3c’の長さ)Lは、図2から明らかであるように、型枠10、20の厚み寸法(型枠板11と型枠桟木12の厚みの合計)と一致させることが望ましい。   Next, the slit pier 3 which is a feature of the present invention will be described. The slit pier 3 corresponds to a conventional joint rod, and is used to attach the seismic slit material 4. The material is preferably made of wood such as lauan, but is not limited thereto. As shown in FIG. 5, the cross-sectional shape of the slit pier 3 includes a top surface 3a, a bottom surface 3d parallel to the top surface, two side surfaces 3c and 3c ′ perpendicular to the bottom surface, and from the top surface toward each side surface. It has two inclined surfaces 3b and 3b 'inclined in a C shape, and has a hexagonal shape in which a trapezoidal part and a square part are integrated. An example of the size of each part of the slit bar 3 is shown in FIG. 5 (unit: mm). When the width dimension W of the bottom surface 3d of the slit bar 3 is 25 mm, it can be used for the construction of the earthquake-resistant slit material 4 having a width of about 25 to 40 mm depending on the specifications of the support members 5 and 6. . Moreover, the height (length of the side surfaces 3c, 3c ′) L of the rectangular part of the slit bar 3 is the thickness dimension of the molds 10, 20 (the form plate 11 and the form bar), as is apparent from FIG. It is desirable to match the total thickness of 12).

図2に示すように、第一及び第二の型枠構造体1、2のいずれにおいても、スリット桟木3は台形部を内側に向けた状態で、隣接する左右の型枠10A、10B間、及び20A、20B間に方形部を挟まれてそれぞれ固定されている。そして、各スリット木3の台形部が耐震スリット材4の取り付け位置に対応しており、各台形部が各支持部材5、6の外側溝部52、62と嵌合することにより、耐震スリット材4が型枠構造体1、2に取り付けられている。   As shown in FIG. 2, in any of the first and second formwork structures 1 and 2, the slit crosspiece 3 is between the adjacent left and right formwork 10A, 10B with the trapezoidal part facing inward. And 20A and 20B, and a rectangular portion is sandwiched between them and fixed. And the trapezoid part of each slit tree 3 respond | corresponds to the attachment position of the earthquake-resistant slit material 4, and when each trapezoid part fits the outer groove parts 52 and 62 of each support member 5,6, the earthquake-resistant slit material 4 is provided. Are attached to the formwork structures 1 and 2.

なお、通常、耐震スリット材4の取り付け位置は、建築物の設計段階で事前に決められている。そこで、作業者は、予め構造図面等で耐震スリット材4の位置を確認し、スリット桟木3の位置が耐震スリット材4の取り付け位置と一致するように、型枠10、20の横幅寸法(壁体の長さ方向の寸法)を加工しておく。これにより、現場では、型枠とスリット桟木3を並べて設置していくだけで、耐震スリット材4の取り付け位置を正確に定めることができる。   Normally, the attachment position of the earthquake-resistant slit material 4 is determined in advance at the design stage of the building. Therefore, the operator confirms the position of the earthquake-resistant slit material 4 in advance with a structural drawing or the like, and the width dimensions (walls) of the molds 10 and 20 so that the position of the slit bar 3 matches the mounting position of the earthquake-resistant slit material 4. Process the body length dimension). Thereby, in the field, the installation position of the earthquake-resistant slit material 4 can be accurately determined only by arranging the formwork and the slit piercing 3 side by side.

図示は省略したが、コンクリート打設空間Sには、鉄筋や鉄骨が配置されるほか、型枠間の間隔を一定に保つセパレータ等が設置される。   Although illustration is omitted, in the concrete placing space S, a reinforcing bar and a steel frame are arranged, and a separator and the like for maintaining a constant interval between the molds are installed.

次に、本実施例の耐震スリット材4の施工方法について、図3ないし図5に基づいて詳細に説明する。   Next, the construction method of the earthquake-resistant slit material 4 of the present embodiment will be described in detail with reference to FIGS.

(第一の型枠構造体の設置作業)
最初に、第一の型枠構造体1を構成する型枠10を、壁体の長さ方向に並べて設置していく。そして、耐震スリット材4の取り付け位置に到達したら、以下の手順で型枠間にスリット桟木3を固定する。
(Installation work of the first formwork structure)
First, the formwork 10 which comprises the 1st formwork structure 1 is installed side by side in the length direction of a wall body. And if the attachment position of the earthquake-resistant slit material 4 is reached | attained, the slit crosspiece 3 will be fixed between mold forms with the following procedures.

まず、図3に示すように、スリット桟木3を、台形部を内側に向けた状態で、先に設置した一の型枠10Aに隣接させて配置し、前記スリット桟木3の一方の側面3cを、前記型枠10Aの型枠板11の木口面と型枠桟木12の側面に当接させる。そして、この状態で釘8A(固定具)を壁体と平行に(すなわち、壁体の長さ方向に)打ち込むことにより、スリット桟木3を型枠10Aに固定する(第一の工程)。その際、釘8Aは、図3のように型枠桟木12側からスリット桟木3に向かって打ち込んでもよいし、反対に、スリット桟木3側から型枠桟木12に向かって打ち込んでもよいが、図3のように型枠桟木12側から打ち込んだ方が、スリット桟木3の表面に傷(打痕)が付くおそれがないため、スリット桟木3をより長持ちさせることができる。   First, as shown in FIG. 3, with the trapezoidal part facing inward, the slit bar 3 is disposed adjacent to the one mold 10A previously installed, and one side surface 3c of the slit bar 3 is disposed. The formwork plate 11 of the formwork 10A is brought into contact with the side surface of the formwork pier 12 and the side face of the formwork frame 12. In this state, the slit bar 3 is fixed to the mold 10A by driving a nail 8A (fixing tool) parallel to the wall body (that is, in the length direction of the wall body) (first step). At that time, the nail 8A may be driven from the side of the formwork pier 12 toward the slit pier 3 as shown in FIG. 3, or conversely, may be driven from the side of the slit pier 3 toward the formwork pier 12; As shown in FIG. 3, since the surface driven from the side of the formwork pier 12 has no risk of scratches (scratches) on the surface of the slit pier 3, the slit pier 3 can be made to last longer.

次に、図4に示すように、他の型枠10Bを、先に固定したスリット桟木3に隣接させて配置し、前記型枠10Bの型枠板11の木口面と型枠桟木12の側面を、スリット桟木3の他方の側面3c’に当接させる。この状態で、型枠桟木12側からスリット桟木3に向かって壁体と平行に釘8Bを打ち込むことにより、他の型枠10Bをスリット桟木3に固定する(第二の工程)。これにより、スリット桟木3の方形部は、型枠間10A、10Bに両側を挟まれた状態で強固に固定されるので、釘を打ち込むピッチを気にする必要がない。また、スリット桟木を片手で支えながら釘を打ち込むことができるので、作業者が一人でも簡単に固定作業を行うことができる。   Next, as shown in FIG. 4, another mold frame 10B is arranged adjacent to the slit frame 3 fixed earlier, and the side of the mold plate 11 and the frame frame 12 of the mold plate 11 of the mold frame 10B. Is brought into contact with the other side surface 3c ′ of the slit bar 3. In this state, the other mold 10B is fixed to the slit pier 3 by driving a nail 8B in parallel to the wall body from the mold pier 12 toward the slit pier 3 (second step). Thereby, since the square part of the slit pier 3 is firmly fixed in a state where both sides are sandwiched between the molds 10A and 10B, there is no need to worry about the pitch at which the nails are driven. In addition, since the nail can be driven while supporting the slit pier with one hand, even one worker can easily perform the fixing work.

その後、前記型枠10Bに新たな型枠(図示省略)を隣接させて設置する。同様の手順で残りの型枠を設置していき、再び耐震スリット材4の取り付け位置に到達した場合は、前記第一の工程および第二の工程と同様の手順で型枠間にスリット桟木3を固定する。型枠構造体1の設置作業が終了したら、コンクリート打設空間Sに所定の鉄筋や鉄骨を配置して固定する(図示省略)。   Thereafter, a new mold (not shown) is placed adjacent to the mold 10B. When the remaining formwork is installed in the same procedure and the position where the seismic slit material 4 is attached is reached again, the slit pier 3 is placed between the formwork in the same procedure as the first step and the second step. To fix. When the installation work of the formwork structure 1 is completed, predetermined reinforcing bars and steel frames are arranged and fixed in the concrete placement space S (not shown).

(耐震スリット材の設置作業)
第一の型枠構造体1の設置作業を終えた状態では、型枠の表面からスリット桟木3の台形部が内側に突出しており(図4)、これが耐震スリット材4の取り付け位置に対応する。そこで、作業者は、耐震スリット材4の端部に取り付けられている支持部材5の外側溝部52を、スリット桟木3の台形部に嵌合させて固定する。なお、先に説明したように、スリット材本体7と支持部材5、6は予め一体化されているので、これにより耐震スリット材4自体の設置作業が終了する(図1に示す状態となる)。
(Installation work of earthquake-resistant slit material)
In the state where the installation work of the first formwork structure 1 has been completed, the trapezoidal portion of the slit piercing 3 protrudes inward from the surface of the formwork (FIG. 4), and this corresponds to the mounting position of the earthquake-resistant slit material 4. . Then, an operator fits and fixes the outer side groove part 52 of the supporting member 5 attached to the edge part of the earthquake-resistant slit material 4 to the trapezoid part of the slit piercing 3. As described above, since the slit material body 7 and the support members 5 and 6 are integrated in advance, this completes the installation work of the seismic slit material 4 itself (the state shown in FIG. 1 is reached). .

(第二の型枠構造体の設置作業)
続いて、第二の型枠構造体2を構成する型枠20を、第一の型枠構造体1に対向するように、壁体の長さ方向に並べて設置していく。そして、耐震スリット材4の取り付け位置に到達したら、以下の手順により、型枠間にスリット桟木3を固定する(図2の下側のスリット桟木3と型枠20A、20Bを参照)。
(Installation work of the second formwork structure)
Subsequently, the formwork 20 constituting the second formwork structure 2 is placed side by side in the length direction of the wall so as to face the first formwork structure 1. Then, when the attachment position of the earthquake-resistant slit material 4 is reached, the slit bar 3 is fixed between the molds by the following procedure (see the lower slit bar 3 and the molds 20A and 20B in FIG. 2).

まず、スリット桟木3を、台形部を型枠の内側に向けた状態で、先に設置した一の型枠20Aに隣接させて配置する。このとき、スリット桟木3の台形部付近に、先に設置した耐震スリット材4の支持部材6の外側溝部62が位置しているので、台形部を外側溝部62に嵌め込んで位置決めを行う。そして、このスリット桟木3の一方の側面3c’を、型枠20Aの型枠板11の木口面と型枠桟木12の側面とに当接させた状態で、壁体と平行に釘8Cを打ち込むことにより、スリット桟木3を型枠20Aに固定する(第一の工程)。この場合も、釘8Cは型枠桟木12側からスリット桟木3に向かって打ち込むようにすると、スリット桟木3の表面に傷が付くことを防止できる。なお、上記説明では、先に一の型枠20Aを設置してから、その隣にスリット桟木3を配置するようにしているが、先にスリット桟木3の位置決めを行ってから、その隣に一の型枠20Aを設置するようにしてもよい。   First, the slit pier 3 is arranged adjacent to the one mold 20A previously installed with the trapezoidal portion facing the inside of the mold. At this time, since the outer groove portion 62 of the support member 6 of the earthquake-resistant slit material 4 previously installed is located near the trapezoidal portion of the slit pier 3, the trapezoidal portion is fitted into the outer groove portion 62 for positioning. The nail 8C is driven in parallel with the wall body in a state where one side surface 3c ′ of the slit frame 3 is brought into contact with the chamfer surface of the mold plate 11 of the mold frame 20A and the side surface of the frame frame 12. Thus, the slit bar 3 is fixed to the mold 20A (first step). Also in this case, the nail 8C can be prevented from being scratched on the surface of the slit pier 3 if it is driven toward the slit pier 3 from the form pier 12 side. In the above description, the slit frame 3 is arranged next to the first frame 20A after the first frame 20A is installed. The mold 20A may be installed.

次に、他の型枠20Bを、先に固定したスリット桟木3に隣接させて配置し、前記型枠20Bの型枠板11の木口面と型枠桟木12の側面を、スリット桟木3の他方の側面3cに当接させた状態で、型枠桟木12側からスリット桟木3に向かって壁体と平行に釘8Dを打ち込むことにより、他の型枠20Bをスリット桟木3に固定する(第二の工程)。これにより、スリット桟木3の方形部が型枠間20A、20Bに挟まれて強固に固定された状態になるので、釘を打ち込むピッチを気にする必要がない。また、作業者は、型枠の外側に立った状態で、スリット桟木を片手で支えながら釘を打ち込むことができるので、一人でも簡単に固定作業を行うことができる。   Next, another mold frame 20B is arranged adjacent to the slit frame 3 fixed earlier, and the side of the mold plate 11 and the frame frame 12 of the mold frame 11 of the mold frame 20B are connected to the other side of the slit frame 3. The other mold 20B is fixed to the slit pier 3 by driving a nail 8D in parallel with the wall body from the side of the mold pier 12 toward the slit pier 3 in a state of being in contact with the side surface 3c of the second rim 3c. Process). As a result, the rectangular portion of the slit pier 3 is sandwiched between the molds 20A and 20B and is firmly fixed, so there is no need to worry about the pitch for driving nails. Further, since the operator can drive the nail while standing on the outside of the formwork while supporting the slit pier with one hand, one person can easily perform the fixing work.

その後、先に設置した型枠20Bに新たな型枠(図示省略)を隣接させて設置する。同様の手順で残りの型枠を設置していき、再び耐震スリット材4の取り付け位置に到達した場合は、前記第一の工程および第二の工程と同様の手順で型枠間にスリット桟木3を固定する。   Thereafter, a new formwork (not shown) is placed adjacent to the previously placed formwork 20B. When the remaining formwork is installed in the same procedure and the position where the seismic slit material 4 is attached is reached again, the slit pier 3 is placed between the formwork in the same procedure as the first step and the second step. To fix.

(コンクリートの打設及び養生)
第二の型枠構造体2の設置作業が終了したら、空間Sにコンクリートを打設する。このとき、流し込まれたコンクリートの圧力は、支持部材5、6を介してスリット桟木3に伝えられるが、スリット桟木3の方形部が型枠10A、10B及び20A、20Bに挟み込まれているので、強い圧力を受けても脱落するおそれがない。また、スリット桟木3と型枠との間に隙間が生じるおそれがないため、コンクリートを確実に充填することができる。
(Concrete placement and curing)
When the installation work of the second formwork structure 2 is completed, concrete is placed in the space S. At this time, the pressure of the poured concrete is transmitted to the slit pier 3 via the support members 5 and 6, but the rectangular portion of the slit pier 3 is sandwiched between the molds 10A, 10B and 20A, 20B. There is no risk of dropping off even under strong pressure. Moreover, since there is no possibility that a gap is generated between the slit pier 3 and the formwork, the concrete can be reliably filled.

コンクリートの打設後、コンクリートの気泡を除去するとともに隅々まで充填させるために、型枠構造体1、2にバイブレータや木槌で振動を与える作業を行う。このとき、耐震スリット材4の周辺部分は施工不良が生じやすいため、特に入念に振動を与える必要がある。しかるに、本発明では、スリット桟木3の底面3dが型枠構造体1、2の外側に露出しており、その内側に耐震スリット材4が位置しているので(図2参照)、作業者は、型枠の内側を覗き込まなくても、スリット桟木3の底面3dを目印とすることにより、耐震スリット材4が埋設されている位置を外側から目視で把握することができる。そこで、作業者は底面3dの周辺部分に重点的に振動を与えることにより、耐震スリット材4の周辺のコンクリートを確実に充填することが可能となる。   After the concrete is placed, in order to remove the bubbles in the concrete and fill the corners of the concrete, work is performed on the formwork structures 1 and 2 with a vibrator or a mallet. At this time, the peripheral portion of the earthquake-resistant slit material 4 is prone to construction failure, so it is particularly necessary to carefully vibrate. However, in the present invention, the bottom surface 3d of the slit pier 3 is exposed to the outside of the formwork structures 1 and 2 and the seismic slit material 4 is located on the inside thereof (see FIG. 2). Even without looking into the inside of the formwork, the position where the seismic slit material 4 is embedded can be visually recognized from the outside by using the bottom surface 3d of the slit bar 3 as a mark. Therefore, the operator can surely fill the concrete around the seismic slit material 4 by giving the vibration mainly to the peripheral portion of the bottom surface 3d.

一定期間の養生後、型枠構造体1、2(型枠10、20とスリット桟木3)を解体して取り外す。このとき、耐震スリット材4(支持部材5、6及びスリット材本体7)はコンクリート壁体内に埋設されており、支持部材5、6の外側溝部52、62のみが外部に露出して目地を形成する。そこで、この目地部にシール材を施工することにより、耐震スリットを備えたコンクリート壁体の施工が完了する。なお、取り外された型枠10、20とスリット桟木3は、繰り返して使用することができる。   After curing for a certain period, the mold structures 1 and 2 (the molds 10 and 20 and the slit bar 3) are disassembled and removed. At this time, the earthquake-resistant slit material 4 (support members 5 and 6 and slit material body 7) is embedded in the concrete wall, and only the outer grooves 52 and 62 of the support members 5 and 6 are exposed to the outside to form joints. To do. Then, construction of the concrete wall provided with the earthquake-resistant slit is completed by constructing a sealing material on the joint. The removed molds 10 and 20 and the slit bar 3 can be used repeatedly.

次に、実施例1により得られる効果について説明する。
(1)型枠構造体1、2の設置作業と同時に、耐震スリット材4の取付け部位となるスリット桟木3を固定することができるので、耐震スリット材4の取り付け位置が正確に定まり、取付け位置を誤るおそれがない。
(2)型枠とスリット桟木3の設置作業、及びスリット桟木3に対する耐震スリット材4の取り付け作業を一人で行うことが可能となり、作業工程が著しく簡略化される。
(3)スリット桟木3の方形部が型枠間に挟まれて固定されるので、固定具の数やピッチによらず、コンクリート打設時の圧力により耐震スリット材が外れてしまうこと(パンク現象)を確実に防止できる。
(4)スリット桟木3と型枠との間に隙間が生じるおそれがなく、また、スリット桟木3の底面3dを目印として耐震スリットの位置を外部から目で見て確認できるので、コンクリートの施工不良を防止し、確実に充填することができる。
Next, the effect obtained by Example 1 is demonstrated.
(1) At the same time as the installation work of the mold structures 1 and 2, the slit pier 3 as the attachment part of the seismic slit material 4 can be fixed, so that the installation position of the seismic slit material 4 is accurately determined and the installation position. There is no risk of mistakes.
(2) The installation work of the mold and the slit pier 3 and the installation work of the seismic slit material 4 to the slit pier 3 can be performed by one person, and the work process is remarkably simplified.
(3) Since the square part of the slit pier 3 is sandwiched and fixed between the molds, the seismic slit material is removed by the pressure during concrete placement regardless of the number and pitch of fixtures (puncture phenomenon). ) Can be reliably prevented.
(4) There is no possibility of a gap between the slit pier 3 and the formwork, and the position of the seismic slit can be visually confirmed from the outside using the bottom surface 3d of the slit pier 3 as a mark, so that the concrete construction is poor. It can prevent and can be filled reliably.

次に、実施例2について図6を参照しながら説明する。    Next, Example 2 will be described with reference to FIG.

実施例2は、スリット桟木に着色された樹脂フィルムを予め巻き付けることにより、スリット桟木の表面を被覆したものである。なお、それ以外の構成は実施例1と同一であるから説明を省略する。   In Example 2, the surface of the slit pier is coated by winding a colored resin film around the slit pier in advance. Since the other configuration is the same as that of the first embodiment, the description thereof is omitted.

図6において、30はスリット桟木、31は樹脂フィルムである。樹脂フィルム31の材質としては、例えばポリエチレン等を使用することができる。樹脂フィルムの色としては、赤、青、蛍光色等、視認性が高く、夜間でも目立つ色を使用することが望ましい。   In FIG. 6, 30 is a slit pier and 31 is a resin film. As a material of the resin film 31, for example, polyethylene or the like can be used. As the color of the resin film, it is desirable to use a color that is highly visible and is conspicuous even at night, such as red, blue, and fluorescent color.

実施例2では、実施例1により得られる効果に加えて以下のような効果が得られる。
(1)スリット桟木30に樹脂フィルム31を巻き付けることにより、木材を単体で用いた場合よりも強度と耐久性が向上する。
(2)樹脂フィルム31により、スリット桟木30にコンクリートが付着しにくくなるため、コンクリート養生後にスリット桟木を取り外す作業が容易となり、繰り返しの使用に耐えることができる。
(3)樹脂フィルム31が着色されているので、スリット桟木30の位置が視認しやすく、暗い場所でも施工作業がしやすくなる。
In Example 2, in addition to the effects obtained in Example 1, the following effects are obtained.
(1) By winding the resin film 31 around the slit pier 30, the strength and durability are improved as compared with the case where wood is used alone.
(2) Since the resin film 31 makes it difficult for the concrete to adhere to the slit pier 30, it is easy to remove the slit pier after curing the concrete and can withstand repeated use.
(3) Since the resin film 31 is colored, the position of the slit pier 30 is easy to visually recognize, and the construction work can be easily performed even in a dark place.

なお、本発明の実施態様は実施例1、2に限られるものではなく、各構成部分の具体的構成は適宜設計し得るものである。   The embodiment of the present invention is not limited to the first and second embodiments, and the specific configuration of each component can be designed as appropriate.

本発明は、壁体に限られず、さまざまな部位に耐震スリット材を埋設するためにも利用することができる。   The present invention is not limited to a wall body, and can also be used for embedding earthquake-resistant slit materials in various parts.

1 第一の型枠構造体
2 第二の型枠構造体
3、30 スリット桟木
3a 頂面
3b 傾斜面
3c 側面
3d 底面
4 耐震スリット材
5、6 支持部材
7 スリット材本体
8A〜8D 固定具(釘)
10、20 型枠
11 型枠板
12 型枠桟木
31 樹脂フィルム
51、61 内側溝部
52、62 外側溝部
71 ロックウール
S コンクリート打設空間
DESCRIPTION OF SYMBOLS 1 1st formwork structure 2 2nd formwork structure 3, 30 Slit bar 3a Top surface 3b Inclined surface 3c Side surface 3d Bottom surface 4 Earthquake-resistant slit material 5, 6 Support member 7 Slit material main body 8A-8D Fixing tool ( nail)
10, 20 Formwork 11 Formwork plate 12 Formwork base 31 Resin film 51, 61 Inner groove 52, 62 Outer groove 71 Rock wool S Concrete placement space

本発明は、コンクリート建築物の壁体等に埋設される耐震スリット材を型枠に取り付けるための施工方法に関する。 The present invention relates to a construction method for attaching an earthquake-resistant slit material embedded in a wall or the like of a concrete building to a formwork.

そして、本発明に係る耐震スリット材の施工方法は、対向して設置される第一及び第二の型枠構造体1、2と、前記型枠構造体間に横断的に配置される耐震スリット材4を有する型枠構造における、耐震スリット材4の施工方法であって、第一及び第二の型枠構造体1、2は、並べて設置された複数の型枠と、耐震スリット材4の取り付け位置において型枠10A、10B(20A、20B)間に固定されたスリット桟木3とをそれぞれ有しており、各型枠は、型枠板11と、その外側面に固定された複数の型枠桟木12とを備えており、各スリット桟木3は木材から作製されており、その断面形状は、頂面3aと、頂面に平行な底面3dと、底面に垂直な2つの側面3c、3c’と、頂面から各側面に向けてハの字状に傾斜した2つの傾斜面3b、3b’とを備えることにより、台形部と方形部とを一体化した六角形状をなしており、耐震スリット材4は、板状のスリット本体7と、一対の支持部材5、6とを有し、各支持部材5、6は内側溝部51、61と外側溝部52、62を有しており、スリット本体7の両端部が、各支持部材5、6の内側溝部51、61に予め嵌め込まれて一体化されたものであり、前記施工方法は、一の型枠10Aを設置した後、スリット桟木3を、台形部が型枠の内側を向くように配置し、前記スリット桟木3の一方の側面3cを、前記一の型枠10Aの型枠板11の木口面と型枠桟木12の側面に当接させ、壁体と平行に釘8Aを打ち込むことにより、前記スリット桟木3を前記一の型枠10Aに固定する第一の工程と、前記スリット桟木3の他方の側面3c’に、他の型枠10Bの型枠板11の木口面と型枠桟木12の側面を当接させ、型枠桟木12側からスリット桟木3に向かって壁体と平行に釘8Bを打ち込むことにより、前記他の型枠10Bを前記スリット桟木3に固定する第二の工程とからなる、第一の型枠構造体設置ステップと、前記第一の型枠構造体1から突出する前記スリット桟木3の台形部に、耐震スリット材4の一方の支持部材5の外側溝部52を取り付けて固定する工程を含む、耐震スリット材設置ステップと、固定された前記耐震スリット材4の他方の支持部材6の外側溝部62に、新たなスリット桟木3の台形部を嵌め込んで位置決めを行うとともに、前記新たなスリット桟木3の一方の側面3cを、第一の型枠構造体1に対向して配置される一の型枠20Aの型枠板11の木口面と型枠桟木12の側面に当接させ、壁体と平行に釘8Cを打ち込むことにより、前記新たなスリット桟木3を前記一の型枠20Aに固定する第一の工程と、前記新たなスリット桟木3の他方の側面3c’に、他の型枠20Bの型枠板11の木口面と型枠桟木12の側面を当接させ、型枠桟木12側からスリット桟木3に向かって壁体と平行に釘8Dを打ち込むことにより、前記他の型枠20Bを前記新たなスリット桟木3に固定する第二の工程とからなる、第二の型枠構造体設置ステップを含むことを特徴とする。 And the construction method of the earthquake-resistant slit material which concerns on this invention is the 1st and 2nd formwork structures 1 and 2 installed facing, and the earthquake-proof slit arrange | positioned transversely between the said formwork structures It is a construction method of the seismic slit material 4 in the formwork structure having the material 4, and the first and second formwork structures 1 and 2 are formed by arranging a plurality of formwork and the seismic slit material 4. Each has a slit crosspiece 3 fixed between the molds 10A, 10B (20A, 20B) at the mounting position. and a frame桟木12, each slit桟木3 is made of wood, its cross-sectional shape, the top face 3a and a bottom face 3d parallel to the top surface, perpendicular to the bottom surface two sides 3c, 3c 'and two inclined surfaces inclined in a C shape from the top surface toward each side surface 3b and 3b ′, the trapezoidal part and the rectangular part are integrated into a hexagonal shape. The earthquake-resistant slit material 4 includes a plate-like slit body 7 and a pair of support members 5 and 6. Each supporting member 5, 6 has inner groove portions 51, 61 and outer groove portions 52, 62, and both end portions of the slit body 7 are fitted in the inner groove portions 51, 61 of each supporting member 5, 6 in advance. In the construction method, after installing one mold 10A, the slit bar 3 is arranged so that the trapezoidal part faces the inside of the mold, and one of the slit bars 3 is arranged. Side surface 3c is brought into contact with the chamfer surface of the mold plate 11 of the one mold 10A and the side surface of the mold frame 12, and a nail 8A is driven in parallel with the wall body, thereby the slit frame 3 is A first step of fixing to the mold 10A, and the other of the slit pier 3 The side face 3c ′ is brought into contact with the chamfer surface of the formwork plate 11 of the other formwork 10B and the side face of the formwork pier 12 so that the nail 8B is parallel to the wall body from the formwork pier 12 side toward the slit pier 3. by implanting, and a second step of fixing the other mold 10B to the slit桟木3, a first mold structure installation step, said protruding from said first mold structure 1 A step of installing the seismic slit material including the step of attaching and fixing the outer groove 52 of one support member 5 of the seismic slit material 4 to the trapezoidal part of the slit pier 3 and the other support of the seismic slit material 4 fixed. The trapezoidal portion of the new slit pier 3 is fitted into the outer groove 62 of the member 6 for positioning, and one side surface 3c of the new slit pier 3 is opposed to the first formwork structure 1. Mold of one formwork 20A to be arranged A first step of fixing the new slitting frame 3 to the one formwork 20A by bringing the nail 8C into contact with the wooden mouth surface of the frame plate 11 and the side surface of the formwork frame 12 and driving in parallel with the wall body. Then, the other side surface 3c ′ of the new slit frame 3 is brought into contact with the chamfer surface of the mold plate 11 of the other mold 20B and the side surface of the mold frame 12, and the slit frame 3 from the mold frame 12 side. by implanting wall parallel to the nail 8D toward includes a second step consisting of a second mold structure installation step of fixing the other mold 20B to a new slit桟木3 wherein It is characterized by that.

Claims (2)

対向して設置された第一及び第二の型枠構造体と、前記型枠構造体間に横断的に配置された耐震スリット材とを備える型枠構造における、耐震スリット材の取り付け構造であって、
第一及び第二の型枠構造体は、並べて設置された複数の型枠と、耐震スリット材の取り付け位置において型枠間に固定されたスリット桟木とをそれぞれ有しており、
各型枠は、型枠板と、その外側面に固定された複数の型枠桟木とを備えており、
各スリット桟木の断面形状は、頂面と、頂面に平行な底面と、底面に垂直な2つの側面と、頂面から各側面に向けてハの字状に傾斜した2つの傾斜面とを備えることにより、台形部と方形部とを一体化した六角形状をなしており、
各スリット桟木は、台形部を型枠の内側に向けて突出させ、かつ、方形部を隣接する型枠間に挟まれた状態で配置され、
前記スリット桟木の両側面は、それぞれを隣接する型枠の型枠板の木口面と型枠桟木の側面に当接させた状態で、壁体と平行に打ち込まれた釘によって各型枠桟木と固定されており、
耐震スリット材は、板状のスリット材本体と、一対の支持部材とを有し、各支持部材は内側溝部と外側溝部を有しており、内側溝部にスリット材本体の両端部が嵌め込まれているとともに、外側溝部に各スリット桟木の台形部が嵌め込まれていることを特徴とする、
耐震スリット材の取り付け構造。
A seismic slit material mounting structure in a mold structure comprising first and second formwork structures disposed opposite to each other and a seismic slit material disposed transversely between the formwork structures. And
The first and second formwork structures each have a plurality of formwork installed side by side and a slit bar fixed between the formwork at the mounting position of the earthquake-resistant slit material,
Each formwork is provided with a formwork plate and a plurality of formwork ties fixed to the outer surface thereof,
The cross-sectional shape of each slit pier has a top surface, a bottom surface parallel to the top surface, two side surfaces perpendicular to the bottom surface, and two inclined surfaces inclined in a C shape from the top surface to each side surface. By providing, it has a hexagonal shape that integrates the trapezoidal part and the square part,
Each slit bar is arranged in a state where the trapezoidal part protrudes toward the inside of the mold, and the square part is sandwiched between adjacent molds ,
Each side surface of the slit pier is in contact with each formwork pier by nails that are driven in parallel with the wall body in a state where the both sides of the slit pierce are in contact with the side of the mold plate of the adjacent formwork and the side surface of the formwork pier. Fixed,
The earthquake-resistant slit material has a plate-shaped slit material body and a pair of support members, each support member has an inner groove portion and an outer groove portion, and both ends of the slit material body are fitted into the inner groove portion. And a trapezoidal part of each slit pier is fitted in the outer groove part,
Mounting structure for earthquake-resistant slit material.
対向して設置される第一及び第二の型枠構造体と、前記型枠構造体間に横断的に配置される耐震スリット材を有する型枠構造における、耐震スリット材の施工方法であって、
第一及び第二の型枠構造体は、並べて設置された複数の型枠と、耐震スリット材の取り付け位置において型枠間に固定されたスリット桟木とをそれぞれ有しており、
各型枠は、型枠板と、その外側面に固定された複数の型枠桟木とを備えており、
各スリット桟木の断面形状は、頂面と、頂面に平行な底面と、底面に垂直な2つの側面と、頂面から各側面に向けてハの字状に傾斜した2つの傾斜面とを備えることにより、台形部と方形部とを一体化した六角形状をなしており、
耐震スリット材は、板状のスリット本体と、一対の支持部材とを有し、各支持部材は内側溝部と外側溝部を有しており、スリット本体の両端部が、各支持部材の内側溝部に予め嵌め込まれて一体化されたものであり、
前記施工方法は、一の型枠を設置した後、スリット桟木を、台形部が型枠の内側を向くように配置し、前記スリット桟木の一方の側面を、前記一の型枠の型枠板の木口面と型枠桟木の側面に当接させ、壁体と平行に釘を打ち込むことにより、前記スリット桟木を前記一の型枠に固定する工程と、
前記スリット桟木の他方の側面に、他の型枠の型枠板の木口面と型枠桟木の側面を当接させ、型枠桟木側からスリット桟木に向かって壁体と平行に釘を打ち込むことにより、前記他の型枠を前記スリット桟木に固定する工程と、を含む、第一の型枠構造体設置ステップと、
前記第一の型枠構造体から突出する前記スリット桟木の台形部に、耐震スリット材の一方の支持部材の外側溝部を取り付けて固定する工程を含む、耐震スリット材設置ステップと、
固定された前記耐震スリット材の他方の支持部材の外側溝部に、新たなスリット桟木の台形部を嵌め込んで位置決めを行うとともに、前記新たなスリット桟木の一方の側面を、第一の型枠構造体に対向して配置される一の型枠の型枠板の木口面と型枠桟木の側面に当接させ、壁体と平行に釘を打ち込むことにより、前記新たなスリット桟木を前記一の型枠に固定する工程と、前記新たなスリット桟木の他方の側面に、他の型枠の型枠板の木口面と型枠桟木の側面を当接させ、型枠桟木側からスリット桟木に向かって壁体と平行に釘を打ち込むことにより、前記他の型枠を前記新たなスリット桟木に固定する工程と、を含む、第二の型枠構造体設置ステップを含むことを特徴とする、
耐震スリット材の施工方法。
A method for constructing an earthquake-resistant slit material in a form-frame structure having first and second form-frame structures installed opposite to each other and an earthquake-resistant slit material arranged transversely between the form-frame structures. ,
The first and second formwork structures each have a plurality of formwork installed side by side and a slit bar fixed between the formwork at the mounting position of the earthquake-resistant slit material,
Each formwork is provided with a formwork plate and a plurality of formwork ties fixed to the outer surface thereof,
The cross-sectional shape of each slit pier has a top surface, a bottom surface parallel to the top surface, two side surfaces perpendicular to the bottom surface, and two inclined surfaces inclined in a C shape from the top surface to each side surface. By providing, it has a hexagonal shape that integrates the trapezoidal part and the square part,
The earthquake-resistant slit material has a plate-like slit body and a pair of support members, each support member has an inner groove portion and an outer groove portion, and both end portions of the slit body are in the inner groove portion of each support member. Pre-inserted and integrated,
In the construction method, after installing the one formwork, the slit crosspiece is arranged so that the trapezoidal part faces the inside of the formwork, and one side surface of the slit crosspiece is placed on the formwork plate of the one formwork. Fixing the slit pedestal to the one formwork by bringing it into contact with the side surface of the wooden frame and the side of the formwork piercing and driving a nail parallel to the wall body ;
The other side of the slit pier is brought into contact with the side of the form plate of the other formwork and the side of the form pier, and a nail is driven in parallel to the wall from the form pier toward the slit pier. A step of fixing the other formwork to the slit pier, and a first formwork structure installation step,
A step of installing an anti-seismic slit material, including a step of attaching and fixing an outer groove portion of one support member of the anti-seismic slit material to the trapezoidal portion of the slit piercing protruding from the first formwork structure;
The trapezoidal part of the new slit frame is fitted into the outer groove of the other support member of the fixed seismic slit material for positioning, and one side surface of the new slit frame is formed into the first formwork structure. The new slit pier is placed in contact with the side of the formwork plate and the side of the form pier of the form plate placed opposite to the body, and driven into the nail parallel to the wall body . The process of fixing to the formwork and the other side face of the new formwork plate are brought into contact with the side face of the formwork plate of the other formwork and the side face of the formwork formwork, and from the formwork work piece side toward the slit work piece. Fixing the other formwork to the new slit pier by driving nails parallel to the wall body , and including a second formwork structure installation step,
Construction method of earthquake-resistant slit material.
JP2017043347A 2017-03-07 2017-03-07 Construction method of earthquake-resistant slit material Active JP6330163B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017043347A JP6330163B2 (en) 2017-03-07 2017-03-07 Construction method of earthquake-resistant slit material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017043347A JP6330163B2 (en) 2017-03-07 2017-03-07 Construction method of earthquake-resistant slit material

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2016190195A Division JP6120194B1 (en) 2016-09-28 2016-09-28 Seismic slit material mounting structure and construction method

Publications (2)

Publication Number Publication Date
JP2018053699A true JP2018053699A (en) 2018-04-05
JP6330163B2 JP6330163B2 (en) 2018-05-30

Family

ID=61835551

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017043347A Active JP6330163B2 (en) 2017-03-07 2017-03-07 Construction method of earthquake-resistant slit material

Country Status (1)

Country Link
JP (1) JP6330163B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07139215A (en) * 1993-11-15 1995-05-30 Taiyo Sangyo Kk Construction method for defective earthquake-resistant building and its construction device
JPH10317666A (en) * 1997-05-21 1998-12-02 Toda Constr Co Ltd Method for constructing earthquake resisting wall and slit material unit for use in the same
JP2002180694A (en) * 2000-12-12 2002-06-26 Okabe Co Ltd Earthquake resisting slit material
JP2003176627A (en) * 2002-10-31 2003-06-27 Kanegafuchi Chem Ind Co Ltd Wall structure for earthquake-resistant defective structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07139215A (en) * 1993-11-15 1995-05-30 Taiyo Sangyo Kk Construction method for defective earthquake-resistant building and its construction device
JPH10317666A (en) * 1997-05-21 1998-12-02 Toda Constr Co Ltd Method for constructing earthquake resisting wall and slit material unit for use in the same
JP2002180694A (en) * 2000-12-12 2002-06-26 Okabe Co Ltd Earthquake resisting slit material
JP2003176627A (en) * 2002-10-31 2003-06-27 Kanegafuchi Chem Ind Co Ltd Wall structure for earthquake-resistant defective structure

Also Published As

Publication number Publication date
JP6330163B2 (en) 2018-05-30

Similar Documents

Publication Publication Date Title
US11035114B2 (en) Pillar fixing metal fitting
JP6120194B1 (en) Seismic slit material mounting structure and construction method
KR101397800B1 (en) Method for reinforcing seismic capability of existing moment frames buildings of reinforced concrete by section enlargement
JP2016023476A (en) Concrete mold for aseismic and vibration control reinforcement of concrete structure, and aseismic and vibration control reinforcement method for concrete structure using the same
JP2016216899A (en) Earthquake-proof wall structure
JP6330163B2 (en) Construction method of earthquake-resistant slit material
JP6632290B2 (en) Steel column leg structure and steel column leg construction method
JP2016037761A (en) Temporary support structure for base-isolating work, and base-isolating method for existing building
JP6849491B2 (en) Exposed column base structure of steel columns and its construction method
JP3807695B2 (en) Damping structure of reinforced concrete building and its construction method
JP2009121082A (en) Method of fixing a plurality of pc-steel stranded wires in unbonded method and implement used for performing the method
JP4385127B2 (en) Slope protection retaining wall construction method and retaining wall building unit
JP2010095963A (en) Aseismatic reinforcing structure and method for existing building
JP2015129385A (en) Earthquake-resisting wall reinforcement method and structure therefor
JP5926985B2 (en) Method for reinforcing steel structure and steel structure
JP5483059B2 (en) Steel pipe erection stand and steel pipe erection structure using the same
JP3289750B2 (en) Construction method, construction device, and wall structure of earthquake-resistant structure
KR102153283B1 (en) Assembly type mold panel for mortar filling
JPH0893266A (en) Earthquake resisting slit member
JPH084203A (en) Steel framed reinforcement beam and execution method thereof
JP2017110452A (en) Seismic reinforcement structure and seismic reinforcement method of existing building
JP5067819B1 (en) Tile outer wall repair method
JP2003176627A (en) Wall structure for earthquake-resistant defective structure
JPH10331438A (en) Earthquake resistant reinforcing method for existing column
JP4699185B2 (en) Seismic wall and its construction method

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180131

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180305

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180329

R150 Certificate of patent or registration of utility model

Ref document number: 6330163

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150