JP2018021300A - Overhung sidewalk constituent body, and construction method of overhung sidewalk using the same - Google Patents
Overhung sidewalk constituent body, and construction method of overhung sidewalk using the same Download PDFInfo
- Publication number
- JP2018021300A JP2018021300A JP2016151124A JP2016151124A JP2018021300A JP 2018021300 A JP2018021300 A JP 2018021300A JP 2016151124 A JP2016151124 A JP 2016151124A JP 2016151124 A JP2016151124 A JP 2016151124A JP 2018021300 A JP2018021300 A JP 2018021300A
- Authority
- JP
- Japan
- Prior art keywords
- foundation
- vertical wall
- overhanging
- embedded
- sidewalk
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000000470 constituent Substances 0.000 title abstract description 6
- 238000010276 construction Methods 0.000 title description 18
- 239000004567 concrete Substances 0.000 claims abstract description 105
- 239000004576 sand Substances 0.000 claims description 42
- 238000000034 method Methods 0.000 claims description 16
- 238000009933 burial Methods 0.000 claims description 4
- 239000011796 hollow space material Substances 0.000 claims description 4
- 238000000926 separation method Methods 0.000 abstract description 10
- 239000013049 sediment Substances 0.000 abstract description 3
- 239000000945 filler Substances 0.000 abstract 1
- 239000002689 soil Substances 0.000 description 17
- 239000000463 material Substances 0.000 description 13
- 238000009434 installation Methods 0.000 description 12
- 239000011178 precast concrete Substances 0.000 description 8
- 238000003780 insertion Methods 0.000 description 7
- 230000037431 insertion Effects 0.000 description 7
- 239000004575 stone Substances 0.000 description 7
- 230000002265 prevention Effects 0.000 description 6
- 239000010426 asphalt Substances 0.000 description 5
- 239000004570 mortar (masonry) Substances 0.000 description 5
- 229910001220 stainless steel Inorganic materials 0.000 description 5
- 239000010935 stainless steel Substances 0.000 description 5
- 238000009412 basement excavation Methods 0.000 description 4
- 238000005096 rolling process Methods 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 230000003014 reinforcing effect Effects 0.000 description 3
- 239000000725 suspension Substances 0.000 description 3
- 210000001217 buttock Anatomy 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000009415 formwork Methods 0.000 description 2
- 239000003673 groundwater Substances 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 2
- 239000000088 plastic resin Substances 0.000 description 2
- 238000004080 punching Methods 0.000 description 2
- 239000000758 substrate Substances 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 238000007747 plating Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 238000012876 topography Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 239000013585 weight reducing agent Substances 0.000 description 1
- 230000037303 wrinkles Effects 0.000 description 1
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
Description
本発明は、道路の周囲に歩道を拡幅する用地の乏しい場所、たとえば、山間部の切り立った崖に沿って配された道路や、川岸や海岸あるいは湖岸の道路などにおいて、歩道を片持ち状に張出すように形成させることによって、歩道の真下に歩道を直接支承する路盤を必要としない、張出歩道を構成するコンクリートブロック製の構造体に関する。 The present invention cantilever the sidewalk in a place where the site for expanding the sidewalk around the road is scarce, such as a road arranged along a steep cliff in a mountainous area, a riverside, coastal or lakeside road. The present invention relates to a structure made of a concrete block that constitutes an overhanging sidewalk that does not require a roadbed that directly supports the sidewalk directly under the sidewalk by being formed to overhang.
一般に歩道の設置にあたっては、「道路構造令」の規定に基づき、地形や当該道路の歩行者等の交通の状況を考慮し、かつ、対象とする道路の種類、ネットワーク特性、沿道の立地状況等の地域特性を十分に考慮し、歩道の設置の要否や幅員等の構造を決定するものとされている。特に、地方部における第三種の道路においては、道路構造令第11条第2項により、必要な場合に歩道を設置する規定となっている。
In general, when installing sidewalks, considering the topography and traffic conditions such as pedestrians on the road based on the provisions of the Road Structure Ordinance, the type of target road, network characteristics, roadside location, etc. In consideration of the regional characteristics, the necessity of installing sidewalks and the structure such as width are determined. In particular, for roads of
すると、既存の道路でも、交通事情や必要性に応じて、後から歩道を拡幅工事で敷設することも少なくない。ところが、山間の道路では、山側の斜面が切り立った岩壁である一方、谷側の道路脇は、全く拡幅できる土地ではなく、宙に張り出す以外に方法がないことも多い。このように、地勢上、車道及び歩道を全体として一体の高架物として構築してしまえる余地のない、狭隘な路肩の既存道路では、歩道のための拡幅は困難となるので、従来から、張出歩道としてコンクリートブロックを片持式に車道側から空中に歩道を張り出すことで空間を利用する工夫がなされてきている。 Then, even on existing roads, sidewalks are often laid out by widening work later depending on traffic conditions and needs. However, on mountain roads, the slopes on the mountain side are rocky walls. On the other hand, the roadsides on the valley side are not land that can be widened at all. In this way, widening for sidewalks is difficult on existing roads with narrow shoulders where there is no room to build roadways and sidewalks as a unitary elevated structure as a whole. As a sidewalk, concrete blocks have been cantilevered so that the space can be used by projecting the sidewalk from the roadway into the air.
ところが、片持式のブロックを安定的に設置するためには、ブロックには、張り出す部分と、これのカウンターとなる埋設部位となる基板側部分を車道下に設けて一体とする必要がある。張出部位の自重に加えて、設計安全上求められる歩道上に加わる荷重を支承しなければならないので、カウンターウエイトとなる埋設部位は、基本的に重量が必要となってくる。そこで、カウンターウエイトを十分に備えた片持ち式ブロック構造体をプレキャストコンクリートで形成すると、強固で設置も簡便な張出歩道を提供しうることとなる。しかし、一方で、それでは地面に埋設する部分が巨大化して重くなりすぎることから、現場までの搬送、現場での設置作業への負担が大きくなり、大がかりな重機や輸送手段が必要となるほか、施工の際の安全への配慮もさらに厚くする必要が生じるなどするので、重量増や大型化による負荷の影響は実際上は極めて大きいものとなってくる。 However, in order to stably install the cantilever type block, it is necessary to provide the block with an overhanging portion and a substrate side portion serving as a buried portion serving as a counter of the block under the roadway. . In addition to the weight of the overhanging part, the load applied on the sidewalk required for design safety must be supported, so that the embedding part serving as the counterweight basically requires weight. Therefore, if a cantilever block structure sufficiently equipped with a counterweight is formed of precast concrete, an overhanging sidewalk that is strong and easy to install can be provided. However, on the other hand, the part buried in the ground becomes too large and heavy, which increases the burden on transportation to the site and installation work on the site, requiring large heavy equipment and transportation means, Since it is necessary to increase the safety considerations during construction, the impact of load due to weight increase and size increase is actually extremely large.
そこで、片持ち式のブロックのカウンターウエイトとなる埋設部分側について、コンクリートを現場打ちする工法も採用されている。たしかに現場へのブロックの搬送は必要なくなるが、他方、現場打ちでは、コンクリートを養生して硬化させるのに3日程度は要することとなるので、工期を短縮することができなくなる。しかしながら、歩道の工事のために車道に大幅な影響が長期に渡って生じることは、昨今の交通事情にそぐわない。さらに、一般的な工法では、その養生期間中は、打設した間詰コンクリートの上部に車道側の路盤材あるいは側溝ブロックや歩車道境界ブロックなどを敷設するなどの、上部工事である埋め戻しが実施できないままとなるのが通常であった。 Therefore, a method is also employed in which concrete is cast in place on the buried portion side that is the counterweight of the cantilever block. Certainly, it is not necessary to transport the block to the site, but on the other hand, it takes about 3 days to cure and harden the concrete, so the construction period cannot be shortened. However, the long-term impact on the roadway due to the construction of the sidewalks does not match the current traffic conditions. Furthermore, in the general construction method, during the curing period, refilling, which is the upper work, such as laying roadbed material on the roadway side, side gutter blocks, pedestrian boundary blocks, etc. on the upper part of the filled concrete that has been placed, is performed. It was normal to remain unworkable.
そこで、本願出願人は、プレキャストブロックを用いつつも、設置の際に間詰コンクリートの養生による固化を待つことなく上方の作業を進行できる方法を発明した。具体的には、間詰コンクリートの養生を待たずに、間詰コンクリートの上に床版拡張用平板を載置することで、さらに車道側の路盤材あるいは側溝ブロックや歩車道境界ブロックなどを敷設するなどの上部工事である埋め戻しを可能とすることを意図したものであって、これによりコンクリート製張出歩道構成体を用いた片持ち形式からなる張出歩道や、張出歩道を備えた車道を建設する、という方法の発明である(たとえば特許文献1参照。)。 Therefore, the applicant of the present application has invented a method that allows the work to proceed upward without waiting for solidification due to the curing of the interstitial concrete during installation while using the precast block. Specifically, without waiting for the curing of the padded concrete, by placing a plate for expanding the slab on the padded concrete, laying a roadbed material on the roadway side, a side groove block, a pedestrian boundary block, etc. It is intended to allow backfilling, which is an upper construction such as to be done, and with this, it was equipped with a cantilevered overhanging trail using a concrete overhanging trail structure and an overhanging walkway It is an invention of a method of constructing a roadway (see, for example, Patent Document 1).
具体的には「車道方向に延びる車道側基礎部と該車道側基礎部に平行な縦壁側基礎部からなり、該車道側基礎部と該縦壁側基礎部との間の両基礎部の中央部を直角に係合する直角接合部を有し、該縦壁側基礎部から垂直に路面まで立ち上がる縦壁と該縦壁の上端から車道側基礎部と反対側に水平に張り出す張出歩道部を有し、該直角接合部の上面に車道側基礎部と平行な複数本の半円溝からなる抜き型を配設し、該張出歩道部の端部に手摺用柱挿着用孔を有する縁石状の防護壁部を形成し、該縦壁背面部に張出支柱及び該張出歩道下面部に張出梁部を一体形成して張出歩道コンクリートブロックとし、該車道側基礎部と該縦壁側基礎部の間に打設する間詰コンクリートを被覆防護するための床版及び該張出歩道コンクリートブロックからなることを特徴とするコンクリート製張出歩道構成体」である。 Specifically, it is composed of a roadway side base portion extending in the roadway direction and a vertical wall side base portion parallel to the roadway side base portion, and both base portions between the roadway side base portion and the vertical wall side base portion are A vertical wall that has a right angle joint that engages the central part at a right angle, and rises vertically from the vertical wall side foundation to the road surface, and an overhang that projects horizontally from the upper end of the vertical wall to the opposite side of the roadway side foundation It has a sidewalk part, and a punching die comprising a plurality of semicircular grooves parallel to the roadway side base part is arranged on the upper surface of the right-angled joint part, and a handrail pillar insertion hole is provided at the end of the overhanging sidewalk part A curb-like protective wall portion is formed, and a projecting pillar concrete block is formed by integrally forming a projecting post on the rear surface of the vertical wall and a projecting beam portion on the lower surface of the projecting sidewalk, and the roadway side foundation portion And a floor slab for covering and protecting the padded concrete placed between the vertical wall side foundation and the overhanging concrete block Door is a concrete overhang the sidewalk structure which is characterized ".
また、この構成体を用いた「車道の下部の基礎工の路盤上に基礎コンクリートを打設し、該基礎コンクリートの上に車道側に張り出した張出歩道コンクリートブロックの車道側基礎部を載置し、車道側基礎部と縦壁側基礎部の間の中央部の直角接合部と、隣接配置した他の張出歩道コンクリートブロックの車道側基礎部と縦壁側基礎部の間の中央部の直角接合部との両者間に間詰コンクリートを現場打ちし、該間詰コンクリートの養生を待つことなく直ちに間詰コンクリート上に床版を車道基礎部と縦壁基礎部の上に載置して車道路用の路盤材を敷設し、さらにアスファルト舗装し、かつ縦壁に沿って円形水路を内在する側溝を設置しかつ歩車道境界ブロックである縁石を敷設することを特徴とする張出歩道を有する車道の建設方法」である。 In addition, using this structure, “foundation concrete is placed on the roadbed of the foundation work at the bottom of the roadway, and the roadway side foundation part of the overhanging concrete block overhanging on the roadway side is placed on the foundation concrete. The right angle joint at the center between the roadway side foundation and the vertical wall side foundation, and the central part between the roadway side foundation and the vertical wall side foundation of another overhanging concrete block placed adjacent to each other Place concrete on the gap between the right angle joint and place the floor slab on the concrete foundation and vertical wall foundation immediately without waiting for curing of the concrete. A projecting sidewalk characterized by laying roadbed materials for roadways, asphalt pavement, and installing a gutter that forms a circular waterway along the vertical wall and laying curb that is a pedestrian boundary block Is a construction method of a roadway
たしかに従前に本願出願人が発明した構成体や建設方法によれば、プレキャストコンクリートブロックを用い、カウンターウエイトとなる間詰コンクリートの上を床版で蓋をすることができるので、養生を待たずとも支障なく作業を進めることができる。 Certainly, according to the structure and construction method invented by the applicant of the present application, it is possible to use a precast concrete block and cover the padded concrete that becomes the counterweight with a floor slab, without waiting for curing. Work can be done without any problems.
しかしながら、そもそも、プレキャスト製のコンクリートブロックが全体として大きく重いことから、さらなる軽量化によってプレキャストコンクリートブロックの搬送・設置にかかる作業を軽減化することが望まれている。また、カウンターウエイトとして、養生後に硬化してコンクリートブロックと一体化する必要があることから、間詰コンクリートを大量に投入する必要があるが、レディミクストコンクリート(生コン)をミキサー車で運び込むとき、現場周辺が何台ものミキサー車に起因して混雑する要因ともなっている。そこで、養生の必要がなくとも現場打ちのコンクリート投入量自体も減らしていくことが望まれている。 However, in the first place, since the precast concrete block is large and heavy as a whole, it is desired to reduce the work for transporting and installing the precast concrete block by further reducing the weight. Also, as the counterweight, it is necessary to harden after curing and be integrated with the concrete block, so it is necessary to add a large amount of interstitial concrete, but when carrying ready-mixed concrete (raw concrete) with a mixer truck, The surrounding area is also a cause of congestion due to the number of mixer trucks. Therefore, it is desired to reduce the amount of on-site concrete input without the need for curing.
また、張出歩道の敷設のためには、コンクリートブロックの基礎部を埋設するために、既存道路を一部大きく掘り下げる必要がある。すると、残土が大量に発生するので、これを適切に廃棄処理する必要があり、そのための搬送トラックも必要となり、さらに周囲が混雑することともなる。片持ち式の張出歩道においては、基礎部にカウンターウエイトを付与することが重要だが、掘り下げつつも、一方では排出する残土を減らすことも要請されている。 In addition, in order to lay the overhanging sidewalk, it is necessary to dig a part of the existing road in order to bury the foundation of the concrete block. Then, since a large amount of residual soil is generated, it is necessary to dispose of it appropriately, and a transport truck for that purpose is also required, and the surroundings are also congested. In cantilevered overhanging trails, it is important to add a counterweight to the foundation, but it is also required to reduce the remaining soil while digging down.
なお、間詰コンクリートを用いて(基礎ブロック部内にも鉄筋を縦貫させて)一体固化しているのは、張出歩道面が片持ちであることから、この重量を余裕をもって支えるだけのカウンターウエイトを得るには、単に残土を埋め戻すだけでは不十分だからである。残土を埋め戻して転圧したぐらいでは、基礎部のコンクリートが仮に動こうとしたとき、土砂が崩れて動く余地があるので、土圧が押さえにならないのである。土砂が移動できるとなれば、それはカウンターウエイトとして十分な効きとはいえないからである。そこで、残土を埋め戻す場合には、カウンターウエイトとして機能するように、基礎部が動かないよう、簡単に崩れないようにカウンターウエイトとしてコンクリートブロックと協働して維持できなければならない。そこで、これまでは鉄筋を通したうえで、間詰コンクリートを流し込んで一体化している。 In addition, because the overhanging sidewalk surface is cantilevered, it is counterweight that only supports this weight with a margin because the concrete is solidified using interstitial concrete (with reinforcing bars running through the foundation block). This is because it is not enough to simply backfill the remaining soil. As the remaining soil is backfilled and rolled, when the concrete of the foundation part tries to move, there is room for the earth and sand to collapse and move, so the earth pressure does not act as a hold-down. If the earth and sand can move, it cannot be said that it is effective enough as a counterweight. Therefore, when the remaining soil is backfilled, it must be able to be maintained in cooperation with the concrete block as a counterweight so that the foundation does not move and does not easily collapse so as to function as a counterweight. So, until now, after passing through the reinforcing bars, the concrete is poured and integrated.
また、ブロックを埋めるには、一度地面を掘削するので、その土砂を残土として処理する必要が生じる。また、カウンターウエイトは、間詰コンクリートを用いる関係で、それらの残土は外部への排出が前提となるので、搬出用の車両がさらに待機することとなり、周辺交通を阻害することとなる。そこで、残土の排出を減らすことができるのであれば、そうした工夫も望まれている。 Moreover, since the ground is excavated once in order to fill the block, it is necessary to treat the earth and sand as remaining soil. Moreover, since the counterweight uses interstitial concrete, the remaining soil is premised to be discharged to the outside, so that the vehicle for carrying out further waits and obstructs surrounding traffic. Therefore, if it is possible to reduce the discharge of residual soil, such a device is also desired.
さらに、山間部などの斜面や崖と隣接する道路では、道路が崩れないよう道路下の排水への配慮が重要となる。そして、基礎部を埋設することから、埋設箇所のあたりの強度を下げないように、基礎部内の雨水や地下水を適切に排出処理する仕組みを簡易に構築できる構造であることも望まれている。 Furthermore, on roads adjacent to slopes and cliffs in mountainous areas, it is important to consider drainage under the roads so that the roads do not collapse. And since a foundation part is embed | buried, it is also desired that it is a structure which can construct | assemble easily the structure which discharges | emits appropriately the rain water and groundwater in a foundation part, so that the intensity | strength around a burial location may not be reduced.
そこで、本発明が解決しようとする課題は、狭道部に盛り土を要することなく、歩行者や自転車が通行可能な張出歩道を構築できる片持ち式の張出歩道ものであって、現場への搬送・設置が容易なプレキャストコンクリートブロックがさらに軽量化されたものであって、コンクリートの養生を要さず工期を短縮しうるもので、さらに、掘削で発生する土砂にもカウンターウエイトとしての積極的な利用価値をもたせることで残土排出量を抑制せしめた、張出歩道構造体およびこれを用いた張出歩道の建設方法を提供することである。そして、排水が適切にできうるよう顧慮された構造体を提供することである。 Therefore, the problem to be solved by the present invention is a cantilever type extended sidewalk that can construct an extended sidewalk where pedestrians and bicycles can pass without requiring embankment in the narrow street part, and Precast concrete blocks that are easy to transport and install are lighter in weight and can shorten the construction period without requiring concrete curing. It is to provide an overhanging footpath structure and a method for constructing an overhanging footpath using the same, in which residual soil discharge is suppressed by giving a practical use value. And it is providing the structure considered so that drainage could be performed appropriately.
本発明の課題を解決するための第1の手段は、上段の歩道用の上平面を備えた張出床版と、該張出床版の一端から下方に立設された縦壁を介して該張出床版を片持式に支持する下段の埋設基礎部とを備えたコンクリートブロック製の張出歩道構成体であって、該埋設基礎部には、該縦壁の下方に縦壁埋設基礎部と、該縦壁埋設基礎部と離間対向する内部埋設基礎部と、該縦壁埋設基礎部と該内部埋設基礎部とを接合する接合部とを有し、該縦壁埋設基礎部と該内部埋設基礎部は、その対向する面の下端がそれぞれ肉厚となるようにして縦壁埋設基礎部傾斜壁と内部埋設基礎部傾斜壁を備えており、該縦壁埋設基礎部傾斜壁と該内部埋設基礎部傾斜壁とで形成された逆テーパ状の離間空間には、その下底部に、鍔部を備えた受け板部材が渡されており、該受け板部材の鍔部には、該縦壁埋設基礎部傾斜壁と当接する前傾鍔部と、該内部埋設基礎部傾斜壁と当接する後傾鍔部とが備わっていること、を特徴とする受け板部材を備えたコンクリートブロック製の張出歩道構成体である。 The first means for solving the problems of the present invention is through an extended floor slab having an upper plane for an upper sidewalk, and a vertical wall erected downward from one end of the extended floor slab. A concrete block overhang structure comprising a lower embedded foundation for cantilever-supporting the extended floor slab, wherein the embedded foundation is embedded with a vertical wall below the vertical wall A base portion, an internal embedded base portion that faces and separates from the vertical wall embedded base portion, and a joint portion that joins the vertical wall embedded base portion and the internal embedded base portion, the vertical wall embedded base portion, The internal embedded foundation includes a vertical wall embedded foundation inclined wall and an internal embedded foundation inclined wall so that the lower ends of the opposing surfaces are each thick, and the vertical wall embedded foundation inclined wall; A receiving plate member having a flange portion is passed to the lower bottom portion of the inversely tapered spaced space formed by the inner embedded base portion inclined wall. The flange portion of the backing plate member is provided with a front inclined portion that comes into contact with the vertical wall embedded base portion inclined wall and a rear inclined portion that comes into contact with the inner embedded base portion inclined wall; It is an overhang sidewalk structure body made of a concrete block provided with a backing plate member characterized by the above.
その第2の手段は、前記接合部が縦壁埋設基礎部と内部埋設基礎部との中央に柱状に設けられており、接合部を挟んで左右の離間空間にそれぞれ受け板部材を配していること、を特徴とする第1の手段に記載の張出歩道構成体である。 The second means is that the joint portion is provided in a columnar shape in the center between the vertical wall embedded base portion and the inner embedded base portion, and a receiving plate member is disposed in each of the left and right spaced spaces across the joint portion. The overhanging trail structure according to the first means characterized by that.
その第3の手段は、前記受け板部材は、その1枚の横幅が一方の離間空間の横幅の略倍の幅を有していることを特徴とする、第2の手段に記載の張出歩道構成体である。 The third means is the overhang according to the second means, characterized in that the lateral width of one of the backing plate members is substantially double the lateral width of one of the separated spaces. It is a sidewalk structure.
その第4の手段は、前記縦壁埋設基礎部の下端に、縦壁埋設基礎部斜面壁から縦壁の外表面に向かって挿通された排水口が設けられていること、を特徴とする第1から第3の手段のいずれか1の手段に記載の張出歩道構成体である。 The fourth means is characterized in that a drainage port is provided at the lower end of the vertical wall embedded base portion and is inserted from the vertical wall embedded base portion slope wall toward the outer surface of the vertical wall. It is an overhang sidewalk constituent body given in any 1 means of the 1st to 3rd means.
その第5の手段は、前記第1ないし第4の手段のいずれか1の手段に記載の張出歩道構成体の、その上段と下段の段差方向を張出方向とし、この張出方向と水平に直交する向きを幅方向とするとき、複数基の該張出歩道構成体のコンクリートブロックを、順次、幅方向に並列させていくことで、張出床版の上平面の高さを隣接する上平面とを揃えて形成せしめた、張出床版上平面を通行面とする張出歩道である。 The fifth means has an overhanging direction in the upper and lower steps of the overhanging trail structure according to any one of the first to fourth means, and the overhang direction and the horizontal direction. When the direction orthogonal to the width direction is the width direction, the height of the upper plane of the overhanging slab is adjacent by sequentially arranging the concrete blocks of the overhanging sidewalk structure in the width direction. This is an extended sidewalk that is formed by aligning the upper plane with the upper plane of the extended floor slab.
その第6の手段は、車道路盤下に基盤面を設け、該基盤面上に基礎コンクリートを打設し、打設された該基礎コンクリートの上には、上段の張出床版と下段の埋設基礎部とを縦壁を介して一体形成させた階段状の張出歩道構成体のコンクリートブロックのうち、上段の該張出床版を道路路盤脇の中空空間へと張り出させるように下段の該埋設基礎部を載置し、縦壁の下部に設けられた縦壁埋設基礎部と内部埋設基礎部とが離間対向する間を柱状の接続部によって連結された前記埋設基礎部は、その該縦壁埋設基礎部と内部埋設基礎部とを離間空間を挟んで対向させかつ対向する側の下端部分が根太となるように縦壁埋設基礎部傾斜壁と内部埋設基礎部傾斜壁とを備えたものであって、この離間空間下底に前傾鍔部と後傾鍔部とを備えた受け板部材を、該前傾鍔部を該縦壁埋設基礎部傾斜壁に、該後傾鍔部を該内部埋設基礎部傾斜壁にそれぞれ当接させるようにして、該離間空間下底部に配し、埋設基礎部及び受け板部材の上に土砂を埋め戻し、さらにその上に車道路盤を敷設せしめることで、張出床版を片持式に支持しうるものとした、受け板部材を備えた張出歩道構成体による張出歩道の片持式の支持方法である。
The sixth means is that a base surface is provided under the roadway board, foundation concrete is placed on the base surface, and an upper overhanging slab and a lower stage are placed on the foundation concrete. Of the concrete blocks of the staircase-like overhanging footpath structure that is integrally formed with the buried foundation through a vertical wall, the lower stage so that the overhanging floor slab is projected into the hollow space beside the roadbed The buried foundation portion is placed between the vertical wall buried foundation portion and the inner buried foundation portion provided at the lower portion of the vertical wall and connected to each other by a columnar connecting portion. The vertical wall embedded base portion and the internal embedded base portion are opposed to each other with a spacing space therebetween, and the vertical wall embedded base portion inclined wall and the internal embedded base portion inclined wall are provided so that the lower end portion on the opposite side becomes joist. And a receiving plate having a forward inclined portion and a rear inclined portion on the lower bottom of the space. A material is arranged on the lower bottom portion of the separation space such that the forward inclined portion is brought into contact with the vertical wall embedded base portion inclined wall and the rear inclined portion is brought into contact with the inner embedded basic portion inclined wall, respectively. It was equipped with a backing plate member that was able to support the overhanging slab in a cantilevered manner by backfilling the earth and sand on the buried foundation and backing plate member, and further laying a roadway board on it. This is a cantilever-type support method for the overhang sidewalk by the overhang sidewalk structure.
その第7の手段は、第6の手段に示した方法で埋設設置する張出歩道構成体を、車道脇に片持式の張出歩道として複数基埋設していくことで、車道脇に連続的な片持式のブロックによる張出歩道を備えた車道を全体として構築する方法である。すなわち、第7の手段では、車道路盤下に基盤面を設け、該基盤面上に基礎コンクリートを打設し、打設された該基礎コンクリートの上には、上段の張出床版と下段の埋設基礎部とを縦壁を介して一体形成させた階段状の張出歩道構成体のコンクリートブロックのうち、上段の該張出床版を道路路盤脇の中空空間へと張り出させるように下段の該埋設基礎部を載置し、さらに張出歩道構成体の上段と下段の段差方向を張出方向とし、この張出方向と水平に直交する向きを幅方向とするとき、張出床版の上平面の高さを隣接する上平面が揃うようにしながら、複数基の張出歩道構成体のコンクリートブロックを、その下段の埋設基礎部を順次幅方向に並列させるように基礎コンクリート上に載置し、また、これらの各コンクリートブロックは、その縦壁の下部に設けられた縦壁埋設基礎部と内部埋設基礎部とが離間対向する間を柱状の接続部によって連結された前記埋設基礎部は、その該縦壁埋設基礎部と内部埋設基礎部とを離間空間を挟んで対向させかつ対向する側の下端部分が根太となるように縦壁埋設基礎部傾斜壁と内部埋設基礎部傾斜壁とを備えたものであって、この離間空間下底に前傾鍔部と後傾鍔部とを備えた受け板部材を、該前傾鍔部を該縦壁埋設基礎部傾斜壁に、該後傾鍔部を該内部埋設基礎部傾斜壁にそれぞれ当接させるようにして、該離間空間下底部に配したものであって、埋設基礎部及び受け板部材の上に土砂を埋め戻した後、さらにその上に車道路盤を敷設することで、受け板部材を備えた張出歩道構成体を複数並列させることで形成する片持式の張出歩道を備えた車道の構築方法である。 The seventh means is to continually beside the roadway by burying a plurality of overhanging structures that are embedded and installed by the method shown in the sixth means as cantilevered sidewalks on the side of the roadway. This is a method of constructing a roadway with an overhanging sidewalk with a typical cantilever block as a whole. That is, in the seventh means, a foundation surface is provided under the road surface board, foundation concrete is placed on the foundation surface, and an upper overhanging slab and a lower stage are placed on the foundation foundation. Of the concrete blocks of the staircase-like overhanging sidewalk structure that is integrally formed with the buried foundation portion through the vertical wall, the overhanging floor slab is projected into the hollow space beside the roadbed When the lower embedded base is placed, and the upper and lower steps of the overhanging trail structure are overhanging and the direction perpendicular to the overhanging direction is the width direction, the overhanging floor While aligning the upper planes of the upper plate with the adjacent upper planes, the concrete blocks of multiple overhanging sidewalk structures are placed on the foundation concrete so that the underlying foundations in the lower row are arranged in parallel in the width direction. And each of these concrete blocks The embedded base portion connected by a columnar connecting portion between the vertical wall embedded foundation portion and the internal embedded foundation portion provided at the lower part of the vertical wall is separated from and opposed to the vertical wall embedded base portion. A vertical wall embedded base portion inclined wall and an internal embedded base portion inclined wall are provided so that the base portion is opposed to the base portion with a space between them and the lower end portion on the opposite side is joisted. A receiving plate member having a front inclined portion and a rear inclined portion on a lower bottom, the forward inclined portion as the vertical wall embedded base portion inclined wall, and the rear inclined portion as the inner embedded base portion inclined wall. Are placed in the lower bottom portion of the separation space, and after the earth and sand are backfilled on the buried base portion and the receiving plate member, a roadway board is further laid thereon. And cantilevered sidewalks formed by juxtaposing multiple sidewalk components with backing plates A roadway of the construction method with.
さて、これらの手段の張出歩道構成体に用いるコンクリートブロックは、狭隘な路肩の既存道路に沿って中空に片持式に張出した歩道を形成させるためのものであって、上段と下段の1段からなる階段状のブロックであり、上段の上平面を通行面とする張出床版は、その一端を道路端に位置させて、その一端から下に延びる縦壁と、その縦壁の下部から車道下に埋設されるように展開された下段側の埋設基礎部とで階段状となったコンクリートブロックである。 Now, the concrete blocks used for the overhanging structure of these means are for forming a cantilevered sidewalk extending along the existing road with a narrow road shoulder. A stretched slab that is a stepped block consisting of steps, with the upper plane of the upper stage as a running surface, with one end positioned at the end of the road, a vertical wall extending downward from one end, and a lower portion of the vertical wall It is a concrete block that has a staircase shape with the lower burial foundation that is deployed to be buried under the roadway.
そして、埋設基礎部が道路下に埋設されることで、張出床版は中空に張り出すようにして歩道部分を形成することができるので、こうしたコンクリートブロック複数を、その上段同士と下段同士が隣り合うようにしながら順次に並べていくことで、張出床版の上平面を歩行面とした張出歩道を連続して形成させていくことができる。 And, since the buried foundation part is buried under the road, the overhanging slab can form a sidewalk part so as to project into the hollow, so that the upper stage and the lower stage of these concrete blocks By arranging them side by side while being adjacent to each other, it is possible to continuously form an overhanging sidewalk with the upper plane of the overhanging floor plate as a walking surface.
こうしたコンクリートブロックは、あらかじめ工場で型枠にコンクリートを流し込んで成形したプレキャストコンクリートブロックとして一体に得ることができる。張出歩道は、この張出歩道構成体を複数並列させていくことから、同じ形状のブロックを複数得ることが必要であって、工場で型枠製造をすると、安定的に同一の形状を繰り返し得ることができる。 Such a concrete block can be obtained integrally as a precast concrete block formed by pouring concrete into a formwork in advance at a factory. Since the overhanging sidewalk has multiple juxtaposed sidewalk components in parallel, it is necessary to obtain multiple blocks with the same shape. When the formwork is manufactured at the factory, the same shape is stably repeated. Can be obtained.
そして、張出歩道構成体は、張出床版が道路から外に張り出す上段と下段の段差方向を張出方向とし、張出方向と水平に直交する方向を幅方向とするとき、複数の張出歩道構成体のコンクリートブロックを、張出床版の上平面の高さを隣接する上平面と揃えるようにして幅方向に連続的に並べていくことができ、これにより張出床版上平面を通行面とする連続的な張出歩道を形成せしめることができる。 The overhang sidewalk structure includes a plurality of overhanging floor slabs, where the upper and lower steps extending from the road are defined as the overhanging direction, and the direction perpendicular to the overhanging direction is defined as the width direction. The concrete blocks of the overhanging sidewalk structure can be continuously arranged in the width direction so that the height of the upper plane of the overhanging floor slab is aligned with the adjacent upper plane. It is possible to form a continuous overhanging sidewalk with a passing surface.
そして、隣同士の縦壁が幅方向に並び、張出床版の上平面側面は、幅方向に隣接配置される張出床版の上平面側面と高さを揃って配置させてあるので、歩行者がスムーズに通行できるものとなる。水平のみならず、ゆるやかに張出床版を幅方向に傾けることで、緩やかな坂路を形成させることもできる。 And because the adjacent vertical walls are aligned in the width direction, the upper plane side surface of the overhanging slab is arranged with the same height as the upper plane side surface of the overhanging floor slab adjacently arranged in the width direction. Pedestrians can pass smoothly. A gentle slope can be formed by gently tilting the overhanging slab not only horizontally but also in the width direction.
また、縦壁埋設基礎部と内部埋設基礎部とは、互いに対向離間しているものであって、その間を1本もしくは複数本の柱状の接続部で連結させることで一体の埋設基礎部を備えたコンクリートブロックとなっている。張出床版を片持式に支えるために埋設されることとなるので、縦壁埋設基礎部と内部埋設基礎部は離間しているものの、接続部によって一体に接続されている必要がある。一方で、埋設基礎部がカウンターウエイトとしての土圧を十分に確保するためには、従来の埋設部のように大きな平板の底板状のものであると、荷重が増すこととなるので、本発明の手段では、途中に離間空間を設けつつ、柱状の接続部を設けることによって、軽量化している。搬送や設置時にはコンクリートブロックは吊り上げられることから、縦壁埋設基礎部と内部埋設基礎部との間の接続部は、たとえば中央底部に設けた太さのある柱状のものであって、さらに内部に適宜鉄筋などが配されて強化されているものを用いることができる。第2の手段では、接続部は中央に位置するものであるが、第1の手段においては、中央以外にも、左右に接続部の柱を設けて中央底部を離間空間としているものであってもよい。 Further, the vertical wall embedded foundation and the internal embedded foundation are opposed to each other and are connected to each other by one or a plurality of columnar connecting portions, thereby providing an integral embedded foundation. It has become a concrete block. Since it is embedded in order to support the overhanging floor slab in a cantilever manner, the vertical wall embedded base portion and the internal embedded base portion need to be integrally connected by a connecting portion, although they are separated from each other. On the other hand, in order to ensure sufficient earth pressure as a counterweight, the buried foundation portion is a large flat bottom plate like the conventional buried portion, so that the load increases. In the above means, the weight is reduced by providing the columnar connection portion while providing the separation space in the middle. Since the concrete block is lifted during transportation and installation, the connection between the vertical wall embedded foundation and the internal embedded foundation is, for example, a columnar column with a thickness provided at the center bottom and further inside. What is strengthened by appropriately arranging reinforcing bars or the like can be used. In the second means, the connecting portion is located in the center, but in the first means, in addition to the center, the pillars of the connecting portion are provided on the left and right sides, and the central bottom portion is a separated space. Also good.
さて、縦壁埋設基礎部と内部埋設基礎部とは対向離間しているところ、接続部以外の対向離間空間には、底板となるようなコンクリートが一面に配されているわけではない。そこでコンクリートブロック全体の重量増は避けられ軽量化が得られているものの、一方で、底板のない対向空間となっているので、埋設されることで得られるはずの埋設基礎部上方に埋設される土や路版基礎がカウンターウエイトとして効きにくくなり、これだけでは上方の土が流動しやすく捉えきることができない。すなわち、内部埋設基礎部が動いてしまいやすいので、そのままでは片持式に張出床版を支持するためには十分といえないものとなる。 Now, the vertical wall buried foundation and the inner buried foundation are opposed to and separated from each other. However, concrete that serves as a bottom plate is not arranged on one side in the opposed separation space other than the connecting portion. Therefore, although the weight increase of the entire concrete block is avoided and the weight is reduced, on the other hand, since it is a facing space without a bottom plate, it is buried above the buried foundation which should be obtained by being buried The soil and road foundations are less effective as counterweights, and this alone makes it difficult for the soil above to flow. That is, since the internal embedded base portion tends to move, it cannot be said to be sufficient to support the overhanging slab in a cantilever manner.
もっとも、従来のように現場打ちで間詰コンクリートを流し込んで周囲を固めながらカウンターウエイトを確保しようとすると、現場での養生に時間を数日単位で要することとなるので、交通規制などの影響が数日間にもわたることとなってしまう。そこで、本発明では、縦壁埋設基礎部と内部埋設基礎部との間に鍔部を有する土砂受け用の受け板部材を渡して、間詰コンクリートで固めずに、埋め戻す上方の土砂の重量を受け板部材から縦壁埋設基礎部と内部埋設基礎部に伝えて、土砂がすべて流動しないカウンターウエイトとして機能させるようにしている。そこで、縦壁埋設基礎部及び内部埋設基礎部は、その離間空間に面した対向面同士が側面視で逆テーパとなるように傾斜した面となっており、下方の離間空間が狭まるような、縦壁埋設基礎部傾斜面と、内部埋設基礎傾斜面とを備えている。 However, if you try to secure the counterweight while pouring concrete on the spot and solidifying the surroundings like before, the time required for curing at the site will take several days. It will last for several days. Therefore, in the present invention, the weight of the upper earth and sand to be backed up without passing through the padded concrete by passing the receiving plate member for receiving the earth and sand having the flange between the vertical wall buried foundation and the inner buried foundation. It is transmitted from the receiving plate member to the vertical wall embedded base portion and the internal embedded base portion so as to function as a counterweight that does not allow all the earth and sand to flow. Therefore, the vertical wall buried foundation and the inner buried foundation are inclined surfaces so that the opposing surfaces facing the separated space are inversely tapered in a side view, and the lower separated space is narrowed, A vertical wall embedded foundation inclined surface and an internal embedded foundation inclined surface are provided.
さて、土砂受け用の受け板部材には、前記の各傾斜面とそれぞれ面接触できるように、少なくとも前傾鍔部と後傾鍔部が備わっている。さらに受け板の鍔部は全周にわたっていてもよい。そして、受け板部材は、硬質プラスチック樹脂や、ステンレス鋼板など、一定の土圧に耐えうるものであれば、好適に適用できる。たとえば、ステンレス鋼板の場合は、平板の両端を鍔部として鈑金加工で曲げ加工して得ることができるので、特段金型を要することなく、平板のみから簡易に製造しうるものとなる。 Now, the receiving plate member for receiving earth and sand is provided with at least a forward inclined portion and a rear inclined portion so as to be in surface contact with the respective inclined surfaces. Furthermore, the collar part of the backing plate may extend over the entire circumference. And a receiving plate member can apply suitably, if it can endure a fixed earth pressure, such as hard plastic resin and a stainless steel plate. For example, in the case of a stainless steel plate, since both ends of a flat plate can be obtained by bending with a plating process using both ends of the flat plate, it can be easily manufactured from only a flat plate without requiring a special mold.
そして、受け板部材は、受け板部材の前傾鍔部が縦壁埋設基礎部傾斜壁と、受け板部材の後傾鍔部が内部埋設基礎部傾斜壁と面接触しているので、受け板部材の上に土砂を投入すると、その荷重が埋設基礎部全体に一体的にかかってくることとなる。そこで、特段間詰コンクリートを流し込まずとも、張出床版に対して、これを片持式に支承する際にそのカウンターウエイトとして投入された埋戻しの土砂のみでも十分に作用しうることとなる。 Further, the receiving plate member has a front inclined portion of the receiving plate member that is in surface contact with the vertical wall embedded base portion inclined wall and a rear inclined portion of the receiving plate member that is in surface contact with the inner embedded basic portion inclined wall. If earth and sand are thrown on a member, the load will be applied to the whole embedding foundation part integrally. Therefore, even if the concrete is not poured into the concrete, only the back-filled earth and sand introduced as the counterweight when the cantilever is supported on the overhanging slab can sufficiently work. .
なお、この受け板部材も、段差方向の断面が逆テーパー状となる鍔を備えており、受け板底面が鍔の上端よりも狭まっている。そこで、鍔のついた皿が鍔の部分が埋設基礎部の傾斜壁と面接触しやすいものとなっており、離間空間にいわば底抜けしないようバケット状に嵌まり込むものとなっている。このように、受け板部材を備えたコンクリートブロック製の張出歩道構成体は、離間空間下底に受け板部材を配した埋設基礎部によるカウンターウエイトを効かせることで片持式に張出床版を支持しうるものである。 In addition, this receiving plate member is also provided with a flange whose cross section in the step direction is an inversely tapered shape, and the bottom surface of the receiving plate is narrower than the upper end of the flange. Therefore, the plate with the ridge is such that the portion of the ridge easily comes into surface contact with the inclined wall of the embedded foundation portion, and is fitted into a bucket shape so as not to slip out into the space. In this way, a concrete block overhanging walkway structure with a backing plate member cantilevered in a cantilevered manner by applying a counterweight by an embedded foundation with a backing plate member arranged in the lower bottom of the space. The plate can be supported.
なお、前記縦壁埋設基礎部の下端に、縦壁埋設基礎部斜面壁から縦壁の外表面に向かって挿通された開口が設けることができ、この開口は水抜き孔として機能するので、受け板部材のバケット部分に雨水や地下水が浸入してきても、これを適切に排水することができる。開口は、たとえば、縦壁埋設基礎部の両側面下端を縦壁埋設基礎部斜面壁から縦壁の外表面に向かって切欠くことで、開口となるよに形成せしめてもよい。 In addition, an opening inserted from the inclined wall of the vertical wall embedded foundation toward the outer surface of the vertical wall can be provided at the lower end of the vertical wall embedded foundation, and this opening functions as a drain hole. Even if rainwater or groundwater enters the bucket portion of the plate member, it can be drained appropriately. The opening may be formed so as to be an opening by, for example, notching the lower ends of both side surfaces of the vertical wall embedded base portion from the vertical wall embedded base portion inclined wall toward the outer surface of the vertical wall.
本発明の受け板部材を備えた張出歩道構成体を用いることで、現場で埋設基礎部上に間詰コンクリートを打設する必要がなくなり、現場打ちの間詰コンクリートのための養生期間を設けること必要がなく、埋め戻し土砂の上に車道路面の路盤材を敷設し、又アスファルト舗装を行うことができ、早期な施工が可能となる。したがって、現場で工事のために車両規制をする期間が短期間で済み、早期に工事区間を解放できるので、交通を大きく妨げることなく安全であり、かつ、建設コストを大幅に低減できる。 By using the overhang sidewalk structure provided with the backing plate member of the present invention, it is not necessary to place the interstitial concrete on the buried foundation at the site, and a curing period for the interstitial concrete is provided. Therefore, it is possible to lay roadbed material on the road surface on the backfill earth and sand, and to perform asphalt pavement, thereby enabling early construction. Therefore, the time period for restricting the vehicle for construction on site is short, and the construction section can be released at an early stage. Therefore, traffic can be safely prevented and construction costs can be greatly reduced.
また、片持式に張り出す張出歩道を支えるカウンターウエイトを、埋設基礎部とその上に埋め戻す土砂や車道路盤とで十分に付与しうる一方で、埋設基礎部内に離間空間を設けて受け板部材と組み合わせることにすることで、コンクリートブロックの面積を減らして、大きく軽量化することができることとなったので、搬送、施工の際の作業負担が軽減され、安全な作業手順を簡易に構築しやすくなっている。 In addition, the counterweight that supports the overhanging sidewalk projecting in a cantilevered manner can be sufficiently provided by the buried foundation and the earth and sand and the roadway board backfilled thereon, while providing a space in the buried foundation. By combining with the backing plate member, the area of the concrete block can be reduced and the weight can be greatly reduced, reducing the work load during transportation and construction, and simplifying the safe work procedure Easy to build.
そして、受け板部材を設けたことで、埋設基礎部を載置する基礎面まで掘削した土砂を、埋設基礎部上に土砂として埋め戻すことができることとなり、現場から排出する残土の搬出量を大幅に低減することができるうえに、残土排出のための搬出トラックの台数を削減できるとなれば、周辺に待機するトラックによる周辺交通の阻害しにくくなる。そして、間詰コンクリートを使用せずともよくなることから、さらにコンクリートミキサー車の台数も削減できることとなり、円滑な周辺交通の維持に資することができる。 And by providing the backing plate member, the earth and sand excavated to the foundation surface on which the buried foundation part is placed can be backfilled as earth and sand on the buried foundation part, greatly increasing the amount of unloading residual soil discharged from the site. If the number of carry-out trucks for discharging the remaining soil can be reduced, it becomes difficult to hinder surrounding traffic due to trucks waiting in the vicinity. And since it becomes unnecessary to use interstitial concrete, the number of concrete mixer trucks can be further reduced, which contributes to the maintenance of smooth surrounding traffic.
さらに、受け板部材を幅広なものとして、隣接するブロックの埋設基礎部の離間空間と兼用で嵌め込むようにすると、カウンターウエイトとして埋め戻される土砂がより広い面積の受け板部材で押圧されることとなるので、より流動しにくくなることから、片持式に支持する際の安定度を向上させることができる。 Furthermore, if the backing plate member is wide and is fitted together with the spacing space of the buried base portion of the adjacent block, the earth and sand to be backfilled as the counterweight is pressed by the backing plate member having a larger area. Therefore, since it becomes difficult to flow, the stability at the time of supporting in a cantilever type can be improved.
また、縦壁の下方に設けた縦壁埋設基礎部の下端に切欠き等の開口を設けることで埋設基礎部内部の離間空間及び受け板部材上の排水が適切になされるので、土砂が水を含んで流動性が高まってしまうこともなく、適切にカウンターウエイトを確保しつづけるものとして機能させることができる。 In addition, by providing an opening, such as a notch, at the lower end of the vertical wall embedded foundation provided below the vertical wall, the space on the embedded foundation and the drainage on the backing plate member are appropriately drained. The liquidity does not increase and the counterweight can be appropriately functioned to continue to be secured.
本発明の実施の形態について、適宜図面を参照しつつ以下に説明する。
まず、本発明の実施品のコンクリートブロック製の張出歩道構成体(1)は、図3に示すように、複数基を、互いの側面が隣合うように上段と下段の段差の向きを揃えて幅方向(23)に並列配置していくものであって、連続的に並べていくことで、張出床版(3)の上平面を通行面とする張出歩道(21)を車道(29)脇の中空に張り出すように形成させていくことができる。この張出歩道構成体(1)は、図1に示すように、車道(29)の一端から一部を掘削するなどして下方に基礎工の路盤(26)を形成し、その基板面(25)の上に張出歩道構成体(1)の埋設基礎部(6)を載置し、その上方に土砂を埋め戻した後、車道を舗装して車道路盤を形成することから、埋設基礎部(6)はその上に土砂や車道路盤材(28)をカウンターウエイトに利用しながら、縦壁(5)を介して車道脇に張り出した張出床版(6)を片持式に支持するようになっている。
Embodiments of the present invention will be described below with reference to the drawings as appropriate.
First, as shown in FIG. 3, the concrete block overhang structure (1) of the concrete block according to the present invention has a plurality of units and the direction of the upper and lower steps are aligned so that the side surfaces are adjacent to each other. Are arranged side by side in the width direction (23), and by arranging them side by side, the overhanging sidewalk (21) with the upper plane of the overhanging floor slab (3) as the traveling surface is used as the roadway (29 ) It can be formed to project into the hollow side. As shown in FIG. 1, the overhang sidewalk structure (1) forms a foundation roadbed (26) below by excavating a part from one end of the roadway (29), and the substrate surface ( 25) Place the buried foundation part (6) of the overhang sidewalk structure (1) on top of it, fill the earth and sand above it, and then pave the roadway to form a roadway board. The foundation (6) is cantilevered with the overhanging floor slab (6) overhanging the side of the roadway through the vertical wall (5) while using earth and sand and roadway board material (28) as a counterweight. It comes to support.
なお、埋設基礎部(6)は、幅方向に車道縁に設けられる縦壁(5)の下部に設けられた縦壁埋設基礎部(7)と、これに離間して対向する内部埋設基礎部(9)とが、接合部(11)によって一体に連接されてることで形成されている。そして、対向する縦壁埋設基礎部(7)と内部埋設基礎部(9)との対向した箇所は、接合部(11)の柱状の部分以外はコンクリートがなく、軽量化のために離間空間(12)となっている。離間空間(12)だけでは、その周囲に埋め戻した土砂は荷重がかかると流動して動いてしまうことから、そのままではカウンターバランスを効かせにくいものとなっている。とりわけ、水分を帯びた土砂だと流動化しやすいので不都合となる。そこで、離間空間(12)の下底部に鍔のついた受け板部材(14)を渡しこんで、受け板部材(14)の前傾鍔部(16)を縦壁埋設基礎部斜面壁(8)に、後傾鍔部(17)を内部埋設基礎部斜面壁(10)に面接触させるようにしている。これにより受け板部材(14)は、埋設基礎部(6)の下底部(13)にひっかかって吊り下がる。すると、埋設基礎部(6)の離間空間(12)の下底部(13)に渡された受け板部材(14)の上方の間詰土砂は、受け板部材(14)によって、底抜けしないように下支えされることとなる。すると、埋設基礎部(6)には、大きな間詰土砂の重量がかかってきて、容易に動くことのないカウンターウイエトが十分に効くこととなる。 The buried foundation portion (6) is a vertical wall buried foundation portion (7) provided at the lower portion of the vertical wall (5) provided on the edge of the roadway in the width direction, and an inner buried foundation portion that is spaced from and opposed thereto. (9) is integrally connected by the joint (11). And the opposing part of the vertical wall embedment foundation part (7) and the internal embedment foundation part (9) facing each other has no concrete other than the columnar part of the joint part (11). 12). In the separated space (12) alone, the earth and sand buried back around it flows and moves when a load is applied, so that it is difficult to effect counterbalance as it is. In particular, it is inconvenient because it is easily fluidized when it is soil with water. Therefore, a receiving plate member (14) with a ridge is transferred to the lower bottom portion of the separation space (12), and the forward inclined portion (16) of the receiving plate member (14) is set to the vertical wall embedded base slope wall (8 ), The rearwardly inclined portion (17) is brought into surface contact with the inner embedded base slope wall (10). As a result, the backing plate member (14) is hung on the lower bottom portion (13) of the embedded base portion (6). Then, the padding earth sand above the backing plate member (14) passed to the lower bottom portion (13) of the separation space (12) of the embedded foundation portion (6) is prevented from falling out by the backing plate member (14). It will be supported. Then, the weight of the large padded soil is applied to the buried foundation (6), and the counter weight that does not move easily is sufficiently effective.
さて、柱状の接合部(11)は、図面上では中央に描かれているが、この構成に限られるものではなく、左右に2本の柱状の接合部であってもよい。これらの構成により柱状にした分だけ軽量化が実現されることとなる。もちろん、そのままでは底がないので、従来工法のように、離間空間には間詰コンクリートを現場打ちで流さないままでは、一体化したカウンターウエイトとして機能することにならないが、受け板部材(14)を渡すことで底抜けせず、カウンターウエイトとして機能しうるものとなる。そこで現場打ちの間詰コンクリートを省くことができる。さらに、排出するはずの土砂を用いて埋め戻しすることもできるので、カウンターウエイトを搬出搬入の無駄なしに簡便に得ることができる。 The columnar joint (11) is drawn at the center in the drawing, but is not limited to this configuration, and may be two columnar joints on the left and right. With these configurations, weight reduction is realized by the amount of the columnar shape. Of course, since there is no bottom as it is, it will not function as an integrated counterweight if the concrete is not poured in the space as in the conventional method, but it will not function as an integrated counterweight. By passing, you can function as a counterweight without going through the bottom. Therefore, it is possible to omit the concrete packed in the field. Furthermore, since it can be backfilled with earth and sand that should be discharged, the counterweight can be easily obtained without waste of carry-in / carry-in.
図1は、本発明の張出歩道構成体(1)を車道(29)と、車道路盤材(28)の下に埋設載置する様子を示す図である。車道路盤材(28)のアスファルト舗装面(32)には、車道路肩付近に側溝(30)の円形水路(30a)が配され、さらに張出床版(3)と車道との境界は、縁石ブロック(31)で区切られており、縁石ブロック(31)の上には、車道脇ガードレール(33)が設置されている。車道路盤材(28)の下は、受け板部材(14)を下底に配した埋設基礎部(6)のブロックは、その上に埋め戻し土砂によって間詰めされており、宙に張り出した張出床版(3)の先端部の外周縁石(40)上には、転落防止柵(34)が設置されている。なお、張出床版(3)の上平面(4)は、コンクリートブロックの平滑な面としてもよいが、降雨等で濡れると表面が滑りやすくなるので、上平面(4)に滑り止めの1mm程度の突起か、リング状の凹みを設けるなどをしておいてもよい。 FIG. 1 is a diagram showing a state in which the overhanging sidewalk structure (1) of the present invention is embedded and placed under a roadway (29) and a roadway board material (28). On the asphalt pavement surface (32) of the roadway board material (28), a circular waterway (30a) of a gutter (30) is arranged near the shoulder of the roadway, and the boundary between the overhanging floor slab (3) and the roadway is It is delimited by a curb block (31), and a roadside guardrail (33) is installed on the curb block (31). Underneath the roadway board material (28), the block of the buried foundation part (6) with the backing plate member (14) arranged on the bottom bottom is padded with backfill earth and sand and overhangs in the air. A fall prevention fence (34) is provided on the outer peripheral stone (40) at the tip of the overhanging floor slab (3). The upper plane (4) of the overhanging slab (3) may be a smooth surface of a concrete block, but the surface becomes slippery when wet by rain, etc. A protrusion of a certain degree or a ring-shaped dent may be provided.
さて、本発明の実施の形態として、具体的な張出歩道構成体(1)のコンクリートブロックの一例を以下に示す。サイズもその一例であり、これに限定はされない。このブロックは、横幅が約1.5m、段差方向の長さが約3.9m、張出床版(3)の上平面から埋設基礎部(6)の下端までの高さが1.3mである。この段差の高さは、必要に応じて適宜変更しうる。縦壁の厚みは約13cmで、縦壁の右に張出床版(3)、左に埋設基礎部(6)とすると、右が1.85m、左が1.85となっている。縦壁(5)の内面側には、中程に左右2カ所、吊り下げ穴が開口しており、縦壁のあたりからフックで吊り下げることが可能となっている。そして、埋設基礎部(6)の中央に配される接合部(11)は、上底50cm、下底60cm、高さ25cmの断面台形の柱構造である。内部埋設基礎部(9)は、側面からみて、上辺が長さ90cm、下辺が長さ105cm、高さ33cmであり、離間空間(12)に面する内部埋設基礎部斜面壁(10)は、下端側が上端側より15cmせり出した斜面となっている。他方、縦壁下の縦壁埋設基礎部(7)は、縦壁下に側面視が台形の束石のようであり、下底の長さが50cm、上底の長さが35cm、高さ28cmであり、離間空間(12)に面する縦壁埋設基礎部斜面壁(8)は、下端が15cm上端よりせり出している。そこで、離間空間は、下方に向かってすり鉢のようにすぼまっており、側面視すると逆テーパ状となっている。離間空間は左右にあるが、その1つの下底のサイズが、横幅約45cm、長さ55cmである。上記の張出歩道構成体(1)の1基の重量が約4トンである。 Now, as an embodiment of the present invention, an example of a concrete block of a concrete overhanging trail structure (1) is shown below. Size is one example, and is not limited thereto. This block has a width of about 1.5 m, a length in the step direction of about 3.9 m, and a height from the upper plane of the overhanging slab (3) to the lower end of the embedded foundation (6) is 1.3 m. is there. The height of the step can be changed as necessary. The thickness of the vertical wall is about 13 cm. When the overhanging slab (3) is on the right side of the vertical wall and the embedded foundation (6) is on the left side, the right side is 1.85 m and the left side is 1.85. On the inner surface side of the vertical wall (5), two left and right hanging holes are opened in the middle, and it is possible to hang it with a hook from around the vertical wall. And the junction part (11) distribute | arranged to the center of an embedding foundation part (6) is a cross-sectional trapezoid pillar structure of upper base 50cm, lower base 60cm, and height 25cm. The internal embedded foundation (9) has an upper side of 90 cm in length, a lower side of 105 cm in length, and a height of 33 cm, as viewed from the side, and the internal embedded basic unit slope wall (10) facing the separated space (12) is: The lower end is a slope that protrudes 15 cm from the upper end. On the other hand, the vertical wall embedded foundation (7) below the vertical wall looks like a trapezoidal stone in a side view below the vertical wall, and the bottom length is 50 cm, the top length is 35 cm, and the height is high. The vertical wall embedded foundation slope wall (8) which is 28 cm and faces the separation space (12) has a lower end protruding from the upper end of 15 cm. Therefore, the spaced-apart space is narrowed down like a mortar and has a reverse tapered shape when viewed from the side. The spacing space is on the left and right, but the size of one of its bottoms is about 45 cm wide and 55 cm long. The weight of one of the above-described overhanging trail structure (1) is about 4 tons.
なお、縦壁埋設基礎部斜面壁(8)及び内部埋設基礎部斜面壁(10)の下方には、それぞれ、受け板部材を固定するためのアンカーボルトを挿し入れるインサート挿入孔(41)を設けることができる。このインサート挿入孔(41)にはあらかじめインサート用受け金具を入れ込んでおく。そして、受け板部材の固定に際しては、まず、受け板部材の鍔部のインサート用開口(39)を各埋設基礎部斜面壁のインサート挿入孔(41)と位置合わせするようにしながら、受け板部材(14)の鍔部(15,15)を各斜面壁(8,10)に載せ置く。そして、アンカーボルトを、受け板部材のインサート用開口(39)の上から、斜面壁のインサート挿入孔(41)内まで通してボルト締めする。こうすることで、アンカーボルトによって受け板部材(14)を斜面壁へとしっかり固定させることができる。 In addition, below the vertical wall embedded foundation slope wall (8) and the internal buried foundation slope wall (10), there are provided insert insertion holes (41) into which anchor bolts for fixing the backing plate member are inserted, respectively. be able to. An insert metal fitting is inserted into the insert insertion hole (41) in advance. When the backing plate member is fixed, first, the backing plate member is positioned while aligning the insert opening (39) of the flange portion of the backing plate member with the insert insertion hole (41) of each embedded base slope wall. Place the buttocks (15, 15) of (14) on the slope walls (8, 10). Then, the anchor bolt is passed through the insert opening (39) of the backing plate member into the insert insertion hole (41) of the slope wall, and is bolted. By doing so, the backing plate member (14) can be firmly fixed to the slope wall by the anchor bolt.
受け板材は、3mm厚のステンレス鋼板で、その下底の大きさは、幅約45cm、長さ55cm、下底部にぴったり収まるものであって、約10cmの鍔部(15)は、たとえば前傾鍔部(16)が約107°、後傾鍔部(17)が約114°となるように平面から鍔が起き上がっている。この受け板材は、左右の離間空間にそれぞれ1枚ずつが嵌まり込むものとなっている。左右が図5に示すように左右対称のものであったり、あるいは、図6に示すように左右同形状のものであってもよい。また、図示しないが、鍔部(15)は、4方の周囲に側壁のように立設してもよい。さらに、取扱いの便宜のために、適宜把持部(18)を設けてもよい。なお、受け板部材の鍔部の両端または中央には、切れ込みや切欠きが設けられている部分があるが、これは、雨水等が皿状の受け板部材に溜まることがないように、水抜きのための切欠き(19)である。雨水が水抜きから抜けるので、内部の土砂が液状化したり流動化しやすくなりにくく、適切にカウンターウエイトとして機能することとなる。 なお、水抜きについては、さらに縦壁(5)の中腹にも、別途の水抜用の開口(43)を設けておくことで、下方に水が溜まりにくくしたりすることもできるので、そうした他の水抜用の開口と組み合わせてもよい。 The backing plate material is a stainless steel plate having a thickness of 3 mm, and the size of the lower base is about 45 cm wide and 55 cm long and fits exactly in the lower bottom. The wrinkles are raised from the plane so that the flange portion (16) is about 107 ° and the rear tilt portion (17) is about 114 °. One sheet of the backing plate material is fitted in each of the left and right spaced spaces. The left and right sides may be symmetrical as shown in FIG. 5, or the left and right sides may be the same shape as shown in FIG. Moreover, although not shown in figure, the collar part (15) may stand up like a side wall around 4 directions. Further, for the convenience of handling, a gripping part (18) may be provided as appropriate. Note that there are cuts or notches at both ends or in the center of the collar portion of the backing plate member. This is to prevent rainwater, etc. A cutout (19) for punching. Since rainwater is drained from the drain, it is difficult for the internal sediment to be liquefied or fluidized easily and to function as a counterweight appropriately. As for draining, it is possible to make it difficult for water to collect downward by providing a separate draining opening (43) on the middle of the vertical wall (5). You may combine with the opening for draining.
なお、第3の手段に記載の場合のように、受け板部材を倍の横幅とすることもできる。中央に柱状の接合部を備えた張出歩道構成体(1)のコンクリートブロックを複数配列させる場合、左の隣接空間は、隣のブロックの右の隣接空間と連続的に形成されている。そこで、この二つの空間をあわせて1枚の受け板部材が嵌まり込むように、図9に示すように、幅が約89cmの受け板部材を用いてもよい。この場合、ステンレス製の板は幅広になると重いので、把持部(18)をとりつけて作業性を向上させてもよい。また、前傾鍔部(16)の中央に水抜き穴への排水用の見切りに切れ込みを設けておくなどする。さて、幅広の1枚板とすると、前傾鍔部(16)と後傾鍔部(17)は、2基のコンクリートブロックの各斜面壁(8,8)(10,10)と面接触するので、隣同士のコンクリートブロック(2)同士がカウンターウェイトとして連携して一体に張出歩道を片持式に支持しうるようになる。コンクリートブロック同士をつなぎあわさずとも、兼用の大型受け板部材を用意するだけで、簡易にカウンターウエイトが生じて安定しやすいもとなるので、連接しながら作業するなどする際に、わずかでも方持式の安定性が増すので、作業途中でのブロックの転倒が回避しやすくなり、安全性をより担保しやすくなる。 As in the case described in the third means, the backing plate member can be doubled in width. When arranging a plurality of concrete blocks of the overhang sidewalk structure (1) having a columnar joint at the center, the left adjacent space is formed continuously with the right adjacent space of the adjacent block. Therefore, as shown in FIG. 9, a receiving plate member having a width of about 89 cm may be used so that one receiving plate member fits in the two spaces. In this case, since the stainless steel plate is heavy when it becomes wide, the workability may be improved by attaching the gripping portion (18). In addition, a cut is provided in the center of the forward tilting portion (16) in the parting for drainage to the drain hole. Now, assuming that it is a single wide plate, the front inclined part (16) and the rear inclined part (17) are in surface contact with the inclined walls (8, 8) (10, 10) of the two concrete blocks. Therefore, the adjacent concrete blocks (2) can cooperate with each other as a counterweight to integrally support the overhanging sidewalk in a cantilever manner. Even if you do not connect the concrete blocks together, just preparing a large-sized backing plate member can easily generate counterweight and it is easy to stabilize. Since the stability of the formula is increased, it is easy to avoid overturning of the block during the work, and it becomes easier to ensure safety.
また、縦壁埋設基礎部(7)は、その両側下端を2cmほど面取りしておくことで、これを水抜き穴となる排水口の開口とすることができる。すなわち、隣合うブロックとの隙間が2cm角の穴となるので、ブロックの両側下端から外方向に排水することができることとなる。もちろん、両端以外にも、縦壁埋設基礎部(7)の下端付近を貫通する穴を開口させることでもよい。とはいえ、両下端を切り欠いて隣り合わせて排水路とするのが簡易であり、鍔部の脇から排水をすることができる。すると、埋設土砂が間詰のカウンターウエイトとして機能する際に、雨水の流入を速やかに外部に排出しうることとなる。そこで土砂が雨水を帯びて流動化しやすくなることが避けられ、適切なカウンターウエイトを維持しうることとなる。 Moreover, a vertical wall embedment base part (7) can be made into the opening of the drain outlet used as a drain hole by chamfering the both-sides lower end about 2 cm. That is, since the gap between adjacent blocks is a 2 cm square hole, drainage can be performed outward from the lower ends on both sides of the block. Of course, besides the both ends, a hole penetrating the vicinity of the lower end of the vertical wall embedded base portion (7) may be opened. However, it is easy to cut out both lower ends and put them together to form a drainage channel, and drain water from the side of the buttock. Then, when the buried earth and sand functions as a counterweight for clogging, the inflow of rainwater can be quickly discharged to the outside. Therefore, it is avoided that the earth and sand easily get fluidized due to rainwater, and an appropriate counterweight can be maintained.
なお、離間空間に間詰の土砂を埋め戻した後、床版拡張用平板(フラットボード)(36)で埋設基礎部(6)の上方を蓋するようにしておくと、埋設基礎部(6)全体が上方の車道路盤材(28)の荷重をフラットボードが面として受け止めることから、路盤が流動しにくく、埋設基礎部(6)が一体的なウエイトを得やすく、より万全にカウンターウエイトを確保しうるものとなる。また、床版拡張用平板(36)を用いると、その下の間詰の埋め戻し土砂を転圧して固めるなどしなくても、普通に充填するだけで作業を先に進めることができる。なお、図11に示すように、床版拡張用平板(36)を用いずとも、土砂を埋め戻すだけでも、本発明を適用することができる。 It is to be noted that after the padded earth and sand are backfilled in the separated space, the upper portion of the embedded base portion (6) is covered with a flat plate (36) for expanding the floor slab. ) Since the flat board receives the load of the upper roadway board material (28) as a whole, it is difficult for the roadbed to flow, the embedded foundation (6) can easily obtain an integral weight, and the counterweight is more thorough. Can be secured. In addition, when the flat plate (36) for expanding the floor slab is used, the work can be advanced by simply filling it normally without rolling and solidifying the backfilled earth and sand. As shown in FIG. 11, the present invention can be applied only by backfilling the earth and sand without using the flat plate expansion plate (36).
(張出歩道の構築方法手順について)
さて、本発明の受け板部材(14)を備えた張出歩道構成体(1)を用いた車道脇に形成する張出歩道(21)の構築手順について、以下説明する。一般的な手順のひとつは、図10のフロー図に一例として示している。たとえば、i)埋設基礎部載置のための掘削、ii)整地、iii)基礎工の路盤の形成のためのベースコンクリートの打設・養生、iv)プレキャストコンクリートブロックの搬入、v)据え付け、並列配置と受け板部材の設置、vi)離間空間への間詰土砂充填、vii)張出床版の端の転落防止柵の設置、viii)路盤下の土砂埋め戻し、側溝等配置、xi)目地等充填の仕上げ、x)車道路盤の舗装の順で構築される。これらの工程が要素として含まれていれば順番を入れ替えることもできる工程については、適宜入れ替えて作業が可能であるから、以下に記載の順序のみに限定する意図ではないことはもちろんである。
(About construction method procedure of overhang sidewalk)
Now, the construction procedure of the extended sidewalk (21) formed on the side of the roadway using the extended sidewalk structure (1) provided with the backing plate member (14) of the present invention will be described below. One general procedure is shown as an example in the flow diagram of FIG. For example, i) excavation for placement of buried foundation, ii) leveling, iii) placement and curing of base concrete for formation of foundation roadbed, iv) loading of precast concrete block, v) installation, parallel Placement and installation of backing plate members, vi) Filling the padded soil into the space, vii) Installing a fall prevention fence at the end of the overhanging floor slab, viii) Sediment backfilling under the roadbed, side grooves, etc., xi) Joints It is constructed in the order of finish of equal filling, x) pavement of roadway board. If these steps are included as elements, the order of the steps can be changed, so that the steps can be appropriately changed and the operations can be performed. Therefore, it is needless to say that the steps are not intended to be limited to the following order.
掘削、整地、打設、養生について
まず、掘削は、基盤面(25)の深さ1.3mより深い1.5m程度まで、重機などで道路端を幅2mほど掘削する。掘削深さは、埋設基礎部の設定レベルにみあった深さであればよいが、レベル出しができる高さを考慮する必要がある。そして、基礎工の路盤(26)は、たとえば、基礎砕石を所定の高さに敷いて十分な転圧作業をし、さらに切込砕石を補充して目つぶし作業を行い十分に充填することで整地したうえで、基礎コンクリート(27)を打設し、十分な強度が確保できるまで3日程度養生することで、基盤面(25)を得る。なお、掘削した土砂は間詰土砂(35)に転用しうるので、残土として排出せず、一部は確保しておくままとする。
About excavation, leveling, placing, and curing First, excavation is performed by excavating the road edge to a depth of about 1.5 m, which is deeper than the depth of 1.3 m of the base surface (25), by about 2 m in width. The excavation depth may be a depth that matches the set level of the buried foundation, but it is necessary to consider the height at which the level can be obtained. Then, the roadbed (26) of the foundation works, for example, by laying the foundation crushed stone at a predetermined height and performing sufficient rolling work, and further filling the cut crushed stone to perform crushing work and sufficiently filling the ground. After that, the foundation surface (25) is obtained by placing foundation concrete (27) and curing for about 3 days until sufficient strength can be secured. Since the excavated earth and sand can be diverted to the interstitial earth and sand (35), the excavated earth and sand are not discharged as residual soil, and a part of them is kept assured.
搬入について
次に、あらかじめ工場で型枠生産されたプレキャストコンクリートブロック製の張出歩道構成体のコンクリートブロック(2)を周辺交通事情に配慮しつつ搬入する。搬入車両のトラックの荷台には、コンクリートブロック(2)を横倒しの状態で複数基を段差を少しずつずらして詰めて並べて積み込んでいくことにすると、現場に搬入するトラックの台数を減らすことができる。そして、製品重量の3倍の荷重に対応可能なクレーン車を用いて現場で吊り下げ据えつける。なお、縦壁の内面側にフック穴の吊り穴(37)があるので、回転自在なフックをアンカー止めしておけば(たとえばDリフトアンカーやDリフトカプラー)、吊り上げたときに、重量バランスから、埋設基礎部をやや下にして吊り下がるので、無理なく安全に吊り上げ吊り下げ作業を進めることができる。
About carrying-in Next, the concrete block (2) of the precast concrete block overhang sidewalk structure which was form-produced in the factory beforehand is carried in taking into consideration the surrounding traffic situation. If the concrete blocks (2) are laid down on the truck bed of the incoming vehicle, the number of trucks to be brought into the site can be reduced by placing a plurality of units with the steps shifted in stages. . Then, it is suspended and installed on site using a crane truck capable of handling a load three times the product weight. Since there is a hook hole (37) on the inner surface side of the vertical wall, if the rotatable hook is anchored (for example, D lift anchor or D lift coupler), the weight balance will be increased when lifted. Since it is suspended with the buried foundation part slightly down, it can be lifted and suspended safely without difficulty.
据え付けについて
据え付け時には、2cm程度の敷モルタルを敷き均してから、あらかじめ墨出しした位置にコンクリートブロック(2)を載置する。搬送時に横倒しになっているコンクリートブロックには、その縦壁の吊り穴(37)に軸芯となるリフトアンカー(たとえばDリフトアンカー)を打ち込み、この軸芯の回りを回動自在に回転しうるフック状の治具(たとえばDリフトカップラー)をとりつけることで、吊り下げる際にコンクリートブロックが荷重で回転してもフックがねじれてちぎれない構造のものとしておくとよい。すなわち、この治具は、半球の下穴にすっぽり嵌まり込むゴムの中央を貫く円柱突起のアンカーを備え、この円柱の軸芯の回りを回動する治具であるから、吊り上げる際、スムーズにブロックが回転するのである。そして、縦壁の吊り孔(37)の一方(横倒しされた状態で上側にくるフック穴)のリフトアンカーにとりつけた回転自在な治具のフックをクレーンで吊り上げ、横倒しされていたブロックを90°回転させる。回転後に残りのフック穴にも同様の治具をとりつけておき、左右のフック穴の位置でバランスよく吊り上げながら、ブロック全体をあらかじめ墨出しした静置位置に静かに載置する。
About installation At the time of installation, after laying the floor mortar of about 2cm, place the concrete block (2) in the position where ink is drawn out in advance. A concrete anchor that is laid down during transportation can be driven with a lift anchor (for example, a D lift anchor) serving as a shaft core in a suspension hole (37) in the vertical wall, and can rotate freely around the shaft core. By attaching a hook-shaped jig (for example, a D lift coupler), it is preferable to have a structure in which the hook is not twisted and torn even when the concrete block is rotated by a load when suspended. In other words, this jig is equipped with a cylindrical projection anchor that penetrates the center of the rubber that fits perfectly into the pilot hole of the hemisphere, and rotates around the axis of this cylinder. The block rotates. Then, the hook of the rotatable jig attached to the lift anchor of one of the suspension holes (37) on the vertical wall (the hook hole that is on the upper side in the state of being laid down) is lifted by a crane, and the block that has been laid down by 90 ° Rotate. A similar jig is attached to the remaining hook holes after the rotation, and the entire block is gently placed in a stationary position where ink is drawn in advance while lifting it in a balanced manner at the positions of the left and right hook holes.
なお、張出床版(3)の上平面(4)の高さを隣接するブロックと揃えることとし、細かい高さやレベルの調整は、吊り下げワイヤーを張った状態で少し効かせるようにすると、適切に行うことができる。もっとも、いまだ張出床版は片持式のカウンターウエイトが十分ではないので、この段階では上平面(4)は歩行しないものとする。なお、こうした微調整時に、再度、敷モルタルの充填を行うことで、1つずつブロックの据えつけを完了させていく。 If the height of the upper plane (4) of the overhanging slab (3) is aligned with the adjacent block, and fine adjustment of the height and level is made to work a little with the hanging wire stretched, Can be done appropriately. However, the cantilever type counterweight is still not sufficient for the overhanging slab, so the upper plane (4) will not walk at this stage. In addition, at the time of such fine adjustment, the installation of the block is completed one by one by filling the mortar again.
その際、隣同士のコンクリートブロック(2,2)は、段差の方向を揃えて幅方向(23)に順次並置していくこととなる。その際、縦壁(5)を長手に揃え、かつ、張出床版(3)の上平面(4)を揃えるようにして並置いていく。なお、道路がカーブしている場合には、曲率に応じて、図7に示すように張出床版の先端を隣接するブロックと接するようにしつつ縦壁のあたりを少し離間させたりして円弧状に配したり、図8に示すように内部埋設基礎部の端同士、あるいは縦壁側の端同士を隣接するブロックのそれと接するようにさせつつ張出床版の先端を離間させるようにするなどすることで扇状に配したりすることで、カーブの円弧にあわせていくこととする。開いた隙間はモルタル等で適宜目地埋めする。このように若干円弧に配することで、同一形状のコンクリートブロックを複数用いている場合であっても、適宜カーブにも対応させていくことができる構造となっている。 At that time, the adjacent concrete blocks (2, 2) are sequentially juxtaposed in the width direction (23) with the direction of the steps aligned. At that time, the vertical walls (5) are aligned in the longitudinal direction, and the upper flat surface (4) of the extended floor slab (3) is aligned. If the road is curved, depending on the curvature, circle the vertical wall slightly apart while keeping the tip of the overhanging slab in contact with the adjacent block as shown in FIG. Arranged in an arc shape, or as shown in FIG. 8, the ends of the overhanging slabs are spaced apart while the ends of the internal embedded bases or the ends on the vertical wall side are in contact with those of adjacent blocks. By arranging them in a fan shape, etc., we will match the arc of the curve. Open gaps are filled with mortar as appropriate. In this way, by arranging them in a slightly circular arc, even when a plurality of concrete blocks having the same shape are used, the structure can be adapted to a curve as appropriate.
なお、さらに施工の安全性と確実性を担保するために、こうしたブロックの仮置き時に、隣接するブロックの縦壁同士をプレート状の連結金具(42)で固定しておくことが望ましい。内部埋設基礎部の立壁同士をプレート状の連結金具(42)も適宜固定してことが望ましい。こうした連結金具を埋め戻し前の仮置き時に締結しておくと、ブロックの位置ずれが防止しやすくなり、埋め戻し作業までの間の作業者の安全性や、ブロック自体の設置安定性が担保されやすくなるので、設置作業を迅速かつ的確に進めることになる。 In addition, in order to ensure the safety and reliability of construction, it is desirable to fix the vertical walls of adjacent blocks with plate-shaped connecting fittings (42) when temporarily placing such blocks. It is desirable that the standing walls of the internal buried foundation portion are also appropriately fixed to the plate-shaped connecting fitting (42). Fastening these connecting brackets during temporary placement before backfilling makes it easier to prevent block misalignment, ensuring the safety of workers up to backfilling work and the installation stability of the blocks themselves. Since it becomes easy, installation work will be advanced promptly and accurately.
間詰土砂(35)の埋め戻し充填について
まず、土砂の埋め戻しの前には、埋設基礎部(6)の離間空間(12)の下底部(13)に、鍔部を斜面壁に当節させるようにして受け板部材(14)を嵌めこんで、インサート挿入孔(41)にアンカーボルトで念のため固定しておく。この土砂受け用のステンレス鋼製のプレートは、耐食性があれば、硬質プラスチック樹脂であってもよい。
間詰土砂の埋め戻しは、片持式に張り出した張出床版(3)の早期の安定のために、可及的速やかに実施することが必要であるから、プレートの設置後、すぐに埋め戻しの間詰土砂(35)を離間空間内に充填する。本発明では、この充填作業までが極めて迅速に実施できるので、ブロックの転倒事故などを低減しやすいものとなっている。間詰土砂は、30cm以上投入して、離間空間を完全に埋めるように十分充填する。
なお、間詰土砂の一番底には、砕石などを若干底石に入れて、排水を考慮した対応をしてもよい。
About the backfilling of the interstitial earth and sand (35) First, before the backfilling of the earth and sand, at the lower bottom part (13) of the space (12) of the buried foundation part (6), the heel part is placed on the slope wall. In this manner, the receiving plate member (14) is fitted and fixed to the insert insertion hole (41) with an anchor bolt just in case. The plate made of stainless steel for receiving earth and sand may be a hard plastic resin as long as it has corrosion resistance.
The backfilling of the interstitial earth and sand must be carried out as soon as possible for the early stability of the cantilevered overhanging slab (3). During the backfilling, the padding sand (35) is filled into the space. In the present invention, the process up to the filling operation can be carried out very quickly, so that it is easy to reduce the accident of the block falling. The interstitial earth and sand should be filled more than 30 cm so that the space is completely filled.
It should be noted that a little crushed stone or the like may be put in the bottom stone at the bottom of the interstitial earth and sand to take into account the drainage.
転落防止柵の設置
間詰土砂(35)によって、張出床版に作業者が乗って作業しうる安全性が確保されたので、この段階で転落防止柵を速やかに設置する。支柱間隔は3m以下、支柱の埋め込み深さは20cm以上として、歩行者等の転落がないようにして、作業の安全性を確保する。コンクリートブロック(2)の張出床版(3)の上平面の先端中央に、転落防止柵の支柱基礎穴(38)を開口させておき、そこに支柱を投入して迅速かつ確実に固定しうるものとしておくことで、安定的に素早く柵が設置できる。
Installation of fall prevention fences Since the padded earth sand (35) secures the safety for workers to work on the overhanging slabs, the fall prevention fences are installed promptly at this stage. The distance between the columns is 3 m or less, and the depth of embedding the columns is 20 cm or more, so that pedestrians and the like do not fall to ensure work safety. A support base hole (38) of the fall prevention fence is opened at the center of the top surface of the overhanging slab (3) of the concrete block (2), and the support is inserted into the support block to fix it quickly and securely. By making it possible, the fence can be installed quickly and stably.
目地等充填の仕上げ、路盤下の土砂埋め戻し、側溝等配置
土砂の埋め戻しは、可及的速やかに行うことが望ましい。そこで、目地モルタルを充填したり、コンクリートブロック(2)の伸縮を見込んで伸縮目地などを挿入したのち、埋設基礎部(6)の上にたとえば床板拡張用平板(36)を載せ置いてから、車道路盤(28)の舗装厚みの手前まで土砂を埋め戻す。なお、図11のとおり、床板拡張用平板(36)を用いなくても実施できるのはいうまでもない。
また、コンクリートブロック(2)の損傷がないように留意しながら、ランマーなどで締め固めてもよい。また、車道(29)と張出歩道(21)の境界付近に、縁石ブロック(31)や、円形水路の側溝(30)をセットする。
It is desirable to finish filling of joints, etc., backfilling earth and sand under roadbeds, and arranging side ditches as soon as possible. Therefore, after filling the joint mortar or inserting the expansion joints in anticipation of the expansion and contraction of the concrete block (2), for example, placing the flat plate (36) for expanding the floorboard on the embedded foundation (6), The earth and sand are backfilled to the level of the pavement thickness of the roadway board (28). Needless to say, the present invention can be carried out without using the flat plate (36) for expanding the floor plate as shown in FIG.
Moreover, you may compact with a rammer etc., paying attention not to damage the concrete block (2). Further, a curb block (31) and a side groove (30) of a circular waterway are set near the boundary between the roadway (29) and the overhanging sidewalk (21).
車道路盤の舗装
車道(29)は、最後にアスファルト舗装することで車道路盤(28)を形成する。舗装には、大型の転圧ローラーは用いずに、プレートランマーないしは手押しローラーで無振動転圧を実施するなどする。
以上により、車道脇に張出歩道を備えた道路を簡易迅速かつ安全に構築することができる。
Roadway Pavement The roadway (29) is finally paved with asphalt to form the roadway board (28). For paving, without using a large rolling roller, vibrationless rolling is carried out with a plate rammer or a hand roller.
As described above, a road having an overhanging sidewalk on the side of the roadway can be easily and quickly constructed.
1 張出歩道構成体
2 コンクリートブロック
3 張出床版
4 上平面
5 縦壁
6 埋設基礎部
7 縦壁埋設基礎部
8 縦壁埋設基礎部斜面壁
9 内部埋設基礎部
10 内部埋設基礎部斜面壁
11 接合部
12 離間空間
13 下底部
14 受け板部材
15 鍔部
16 前傾鍔部
17 後傾鍔部
18 把手部
19 切欠き
20 インサート
21 張出歩道
22 段差方向
23 幅方向
24 排水穴
25 基盤面
26 基礎工の路盤
27 基礎コンクリート
28 車道路盤材
29 車道
30 側溝(円形水路)
31 縁石ブロック
32 アスファルト舗装面
33 車道脇ガードレール
34 転落防止柵
35 間詰土砂
36 床版拡張用平板(フラットボード)
37 吊り穴
38 支柱基礎穴
39 インサート用開口
40 外周縁石
41 インサート挿入孔
42 連結金具
43 水抜用の開口
DESCRIPTION OF
31
37
Claims (7)
該張出床版の一端から下方に立設された縦壁を介して該張出床版を片持式に支持する下段の埋設基礎部と
を備えたコンクリートブロック製の張出歩道構成体であって、
該埋設基礎部には、該縦壁の下方に縦壁埋設基礎部と、
該縦壁埋設基礎部と離間対向する内部埋設基礎部と、
該縦壁埋設基礎部と該内部埋設基礎部とを接合する接合部とを有し、
該縦壁埋設基礎部と該内部埋設基礎部は、その対向する面の下端がそれぞれ肉厚となるようにして縦壁埋設基礎部傾斜壁と内部埋設基礎部傾斜壁を備えており、
該縦壁埋設基礎部傾斜壁と該内部埋設基礎部傾斜壁とで形成された逆テーパ状の離間空間には、その下底部に、鍔部を備えた受け板部材が渡されており、
該受け板部材の鍔部には、該縦壁埋設基礎部傾斜壁と当接する前傾鍔部と、該内部埋設基礎部傾斜壁と当接する後傾鍔部とが備わっていること、
を特徴とする受け板部材を備えたコンクリートブロック製の張出歩道構成体。 A stretched floor slab with an upper plane for the upper sidewalk,
A concrete block overhang sidewalk structure including a lower embedded base portion that supports the overhang floor slab in a cantilever manner through a vertical wall standing downward from one end of the overhang floor slab There,
The embedded foundation includes a vertical wall embedded foundation below the vertical wall,
An internal buried foundation part that is spaced apart from the vertical wall buried foundation part, and
It has a joint part for joining the vertical wall buried foundation part and the internal buried foundation part,
The vertical wall embedded foundation and the internal embedded foundation are each provided with a vertical wall embedded foundation inclined wall and an internal embedded foundation inclined wall so that the lower ends of the opposing surfaces are each thick.
A reverse plate-shaped spaced space formed by the vertical wall embedded foundation inclined wall and the internal embedded foundation inclined wall is provided with a receiving plate member having a flange on the lower bottom thereof,
The flange portion of the backing plate member is provided with a front inclined portion that comes into contact with the vertical wall embedded base portion inclined wall, and a rear inclined portion that comes into contact with the inner embedded basic portion inclined wall,
An overhang sidewalk structure made of a concrete block provided with a backing plate member characterized by the above.
該基盤面上に基礎コンクリートを打設し、
打設された該基礎コンクリートの上には、上段の張出床版と下段の埋設基礎部とを縦壁を介して一体形成させた階段状の張出歩道構成体のコンクリートブロックのうち、上段の該張出床版を道路路盤脇の中空空間へと張り出させるように下段の該埋設基礎部を載置し、
縦壁の下部に設けられた縦壁埋設基礎部と内部埋設基礎部とが離間対向する間を柱状の接続部によって連結された前記埋設基礎部は、その該縦壁埋設基礎部と内部埋設基礎部とを離間空間を挟んで対向させかつ対向する側の下端部分が根太となるように縦壁埋設基礎部傾斜壁と内部埋設基礎部傾斜壁とを備えたものであって、この離間空間下底に前傾鍔部と後傾鍔部とを備えた受け板部材を、該前傾鍔部を該縦壁埋設基礎部傾斜壁に、該後傾鍔部を該内部埋設基礎部傾斜壁にそれぞれ当接させるようにして、該離間空間下底部に配し、
埋設基礎部及び受け板部材の上に土砂を埋め戻し、さらにその上に車道路盤を敷設せしめることで、
張出床版を片持式に支持しうるものとした、受け板部材を備えた張出歩道構成体による張出歩道の片持式の支持方法。 A base plane is set under the roadway board,
Place foundation concrete on the foundation surface,
Of the concrete blocks of the staircase-like overhang sidewalk structure in which the upper bulging floor slab and the lower burial foundation are integrally formed via a vertical wall on the foundation concrete placed, The bottom of the buried foundation is placed so that the overhanging slab of bulges out into the hollow space beside the roadbed,
The embedded base portion connected by a columnar connecting portion between the vertically embedded base portion and the internally embedded foundation portion provided at the lower part of the vertical wall is separated from the vertical wall embedded base portion and the internally embedded foundation. With a vertical wall embedded foundation inclined wall and an internal embedded foundation inclined wall so that the lower end of the opposite side becomes a joist A receiving plate member having a forward inclined portion and a rear inclined portion at the bottom, the forward inclined portion as the vertical wall embedded base portion inclined wall, and the rear inclined portion as the internal embedded base portion inclined wall. Arrange them on the lower bottom of the space,
By refilling the earth and sand on the buried foundation and backing plate member, and further laying the roadway board on it,
A cantilever supporting method for an overhanging walkway by a overhanging walkway structure provided with a backing plate member, which can support the overhanging floor cantilever.
該基盤面上に基礎コンクリートを打設し、
打設された該基礎コンクリートの上には、上段の張出床版と下段の埋設基礎部とを縦壁を介して一体形成させた階段状の張出歩道構成体のコンクリートブロックのうち、上段の該張出床版を道路路盤脇の中空空間へと張り出させるように下段の該埋設基礎部を載置し、
さらに張出歩道構成体の上段と下段の段差方向を張出方向とし、この張出方向と水平に直交する向きを幅方向とするとき、張出床版の上平面の高さを隣接する上平面が揃うようにしながら、複数基の張出歩道構成体のコンクリートブロックを、その下段の埋設基礎部を順次幅方向に並列させるように基礎コンクリート上に載置し、
また、これらの各コンクリートブロックは、その縦壁の下部に設けられた縦壁埋設基礎部と内部埋設基礎部とが離間対向する間を柱状の接続部によって連結された前記埋設基礎部は、その該縦壁埋設基礎部と内部埋設基礎部とを離間空間を挟んで対向させかつ対向する側の下端部分が根太となるように縦壁埋設基礎部傾斜壁と内部埋設基礎部傾斜壁とを備えたものであって、この離間空間下底に前傾鍔部と後傾鍔部とを備えた受け板部材を、該前傾鍔部を該縦壁埋設基礎部傾斜壁に、該後傾鍔部を該内部埋設基礎部傾斜壁にそれぞれ当接させるようにして、該離間空間下底部に配したものであって、
埋設基礎部及び受け板部材の上に土砂を埋め戻した後、さらにその上に車道路盤を敷設することで、
受け板部材を備えた張出歩道構成体を複数並列させることで形成する片持式の張出歩道を備えた車道の構築方法。 A base plane is set under the roadway board,
Place foundation concrete on the foundation surface,
Of the concrete blocks of the staircase-like overhang sidewalk structure in which the upper bulging floor slab and the lower burial foundation are integrally formed via a vertical wall on the foundation concrete placed, The bottom of the buried foundation is placed so that the overhanging slab of bulges out into the hollow space beside the roadbed,
Furthermore, when the direction of the upper and lower steps of the overhanging footpath is the overhanging direction, and the direction perpendicular to the overhanging direction is the width direction, the height of the upper plane of the overhanging slab is adjacent to the upper side. Place the concrete blocks of the multiple overhanging footpath structures on the foundation concrete so that the underlying foundations in the lower stage are arranged side by side in the width direction in order to align the plane.
Further, each of these concrete blocks has a buried base portion connected by a column-shaped connecting portion between a vertical wall buried foundation portion and an inner buried foundation portion provided at a lower portion of the vertical wall. The vertical wall embedded base portion and the internal embedded base portion are opposed to each other with a spacing space therebetween, and the vertical wall embedded base portion inclined wall and the internal embedded base portion inclined wall are provided so that the lower end portion on the opposite side becomes joist. A receiving plate member having a forward inclined portion and a rear inclined portion on the lower bottom of the separated space, the forward inclined portion as the vertical wall embedded base portion inclined wall, and the rear inclined portion Each of which is disposed on the lower bottom portion of the spacing space so as to abut the inner embedded foundation inclined wall,
After burying earth and sand on the buried foundation and backing plate member, laying a roadway board on it,
A method for constructing a roadway provided with a cantilever type overhanging sidewalk formed by juxtaposing a plurality of overhanging sidewalk structures having a backing plate member.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2016151124A JP6340044B2 (en) | 2016-08-01 | 2016-08-01 | Overhang trail construction body and construction method of overhang trail using these |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2016151124A JP6340044B2 (en) | 2016-08-01 | 2016-08-01 | Overhang trail construction body and construction method of overhang trail using these |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2018021300A true JP2018021300A (en) | 2018-02-08 |
JP6340044B2 JP6340044B2 (en) | 2018-06-06 |
Family
ID=61165898
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2016151124A Active JP6340044B2 (en) | 2016-08-01 | 2016-08-01 | Overhang trail construction body and construction method of overhang trail using these |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6340044B2 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110792006A (en) * | 2019-12-05 | 2020-02-14 | 中铁二院工程集团有限责任公司 | Existing railway roadbed side width structure, side width system and construction method thereof |
JP2021092065A (en) * | 2019-12-10 | 2021-06-17 | 大和クレス株式会社 | Cover |
CN114411464A (en) * | 2021-12-24 | 2022-04-29 | 吕永涛 | Bridgehead settlement prevention and control method for highway maintenance |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0614201U (en) * | 1992-07-31 | 1994-02-22 | 株式会社ホクコン | Overhang walkway block and overhang walkway structure using it |
JPH10306402A (en) * | 1997-05-08 | 1998-11-17 | Nippon Samikon Kk | Overhang road structure made of concrete |
JP2002356801A (en) * | 2001-03-26 | 2002-12-13 | Shouda:Kk | Road formation method and superstructure work slab used therefor |
JP5318257B1 (en) * | 2012-06-28 | 2013-10-16 | ケイコン株式会社 | CONCRETE EXTENDED WAY COMPOSITION AND METHOD FOR CONSTRUCTING A VEHICLE WITH AN EXTENDED WAY |
JP2016079741A (en) * | 2014-10-21 | 2016-05-16 | ランデス株式会社 | Road widening block |
JP2016084641A (en) * | 2014-10-28 | 2016-05-19 | 日本興業株式会社 | Overhanging sidewalk block |
-
2016
- 2016-08-01 JP JP2016151124A patent/JP6340044B2/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0614201U (en) * | 1992-07-31 | 1994-02-22 | 株式会社ホクコン | Overhang walkway block and overhang walkway structure using it |
JPH10306402A (en) * | 1997-05-08 | 1998-11-17 | Nippon Samikon Kk | Overhang road structure made of concrete |
JP2002356801A (en) * | 2001-03-26 | 2002-12-13 | Shouda:Kk | Road formation method and superstructure work slab used therefor |
JP5318257B1 (en) * | 2012-06-28 | 2013-10-16 | ケイコン株式会社 | CONCRETE EXTENDED WAY COMPOSITION AND METHOD FOR CONSTRUCTING A VEHICLE WITH AN EXTENDED WAY |
JP2016079741A (en) * | 2014-10-21 | 2016-05-16 | ランデス株式会社 | Road widening block |
JP2016084641A (en) * | 2014-10-28 | 2016-05-19 | 日本興業株式会社 | Overhanging sidewalk block |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110792006A (en) * | 2019-12-05 | 2020-02-14 | 中铁二院工程集团有限责任公司 | Existing railway roadbed side width structure, side width system and construction method thereof |
CN110792006B (en) * | 2019-12-05 | 2024-06-11 | 中铁二院工程集团有限责任公司 | Existing railway roadbed side width structure, side width system and construction method thereof |
JP2021092065A (en) * | 2019-12-10 | 2021-06-17 | 大和クレス株式会社 | Cover |
CN114411464A (en) * | 2021-12-24 | 2022-04-29 | 吕永涛 | Bridgehead settlement prevention and control method for highway maintenance |
Also Published As
Publication number | Publication date |
---|---|
JP6340044B2 (en) | 2018-06-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5471811A (en) | Combination traffic barrier and retaining wall and method of construction | |
KR101090400B1 (en) | Construction method of road for extending breadth of road on slope face | |
KR101344063B1 (en) | The construction method of steel-concrete underpass | |
CN106968256A (en) | Foundation ditch assembled steel trestle construction method | |
KR101363878B1 (en) | Temporary construction and originally construction the outer layer of a 2-layer wall type underground road building method | |
CN109403170B (en) | Steep slope road and construction method thereof | |
CN110438914B (en) | Water passing box culvert on soft soil foundation and construction method thereof | |
JP6340044B2 (en) | Overhang trail construction body and construction method of overhang trail using these | |
CN111254772A (en) | Large cantilever structure suitable for widening old roads of cliff road sections and construction method | |
CN112832079A (en) | Construction method of foamed light soil spliced wide-height highway embankment | |
CN210262555U (en) | Light soil road structure | |
KR101726725B1 (en) | Construction method for a sidewalk enlargement installation | |
CN109024324B (en) | Steep slope ladder culvert for dismantling-free and protection of pipeline and construction method | |
CN211922133U (en) | Large cantilever structure suitable for widening old road of cliff road section | |
US20100272509A1 (en) | Traffic barrier section | |
CN110700116A (en) | Overpass reverse construction method suitable for loess area | |
KR100592416B1 (en) | How to secure the sidewalk and widen the roadway using concrete retaining wall blocks and truss-shaped pedestals on narrow roads | |
US20110110717A1 (en) | Structure for Supporting Vehicular Traffic | |
JP2518390Y2 (en) | Overhang walkway block and overhang walkway structure using it | |
JP2001329545A (en) | Bridge pier foundation construction method and floor slab for bridge pier | |
NL2031687A (en) | Ramp Supporting Structure and Construction Method of Narrow Foundation Pit | |
JP5318257B1 (en) | CONCRETE EXTENDED WAY COMPOSITION AND METHOD FOR CONSTRUCTING A VEHICLE WITH AN EXTENDED WAY | |
CN110983886B (en) | Combined type town road | |
CN113106801A (en) | Pavement widening method for highway engineering | |
JP3856791B2 (en) | How to lay an overhanging sidewalk |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20171106 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20180103 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20180508 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20180511 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6340044 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |