JP2017538996A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2017538996A5 JP2017538996A5 JP2017522000A JP2017522000A JP2017538996A5 JP 2017538996 A5 JP2017538996 A5 JP 2017538996A5 JP 2017522000 A JP2017522000 A JP 2017522000A JP 2017522000 A JP2017522000 A JP 2017522000A JP 2017538996 A5 JP2017538996 A5 JP 2017538996A5
- Authority
- JP
- Japan
- Prior art keywords
- computer program
- version
- data
- data processing
- data source
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021198695A JP2022037061A (ja) | 2014-11-05 | 2021-12-07 | アプリケーション・テスト |
Applications Claiming Priority (5)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201462075451P | 2014-11-05 | 2014-11-05 | |
| US62/075,451 | 2014-11-05 | ||
| US14/715,807 US9880818B2 (en) | 2014-11-05 | 2015-05-19 | Application testing |
| US14/715,807 | 2015-05-19 | ||
| PCT/US2015/059136 WO2016073665A1 (en) | 2014-11-05 | 2015-11-05 | Application testing |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2021198695A Division JP2022037061A (ja) | 2014-11-05 | 2021-12-07 | アプリケーション・テスト |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JP2017538996A JP2017538996A (ja) | 2017-12-28 |
| JP2017538996A5 true JP2017538996A5 (OSRAM) | 2018-12-13 |
| JP7076208B2 JP7076208B2 (ja) | 2022-05-27 |
Family
ID=55852789
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2017522000A Active JP7076208B2 (ja) | 2014-11-05 | 2015-11-05 | アプリケーション・テスト |
| JP2021198695A Pending JP2022037061A (ja) | 2014-11-05 | 2021-12-07 | アプリケーション・テスト |
Family Applications After (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2021198695A Pending JP2022037061A (ja) | 2014-11-05 | 2021-12-07 | アプリケーション・テスト |
Country Status (9)
| Country | Link |
|---|---|
| US (2) | US9880818B2 (OSRAM) |
| EP (2) | EP3783494A1 (OSRAM) |
| JP (2) | JP7076208B2 (OSRAM) |
| KR (1) | KR20170078770A (OSRAM) |
| CN (2) | CN115292160B (OSRAM) |
| AU (1) | AU2015343095B2 (OSRAM) |
| CA (1) | CA2966533C (OSRAM) |
| SG (2) | SG10201901587VA (OSRAM) |
| WO (1) | WO2016073665A1 (OSRAM) |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9880818B2 (en) | 2014-11-05 | 2018-01-30 | Ab Initio Technology Llc | Application testing |
| US10282277B2 (en) * | 2015-12-01 | 2019-05-07 | International Business Machines Corporation | Streams: intelligent operator subset for debug |
| US10936289B2 (en) * | 2016-06-03 | 2021-03-02 | Ab Initio Technology Llc | Format-specific data processing operations |
| US10282175B2 (en) * | 2017-01-24 | 2019-05-07 | Salesforce.Com, Inc. | Methods and systems for performing a partial build |
| US10223242B1 (en) * | 2018-08-27 | 2019-03-05 | Capital One Services, Llc | Testing an application in a production infrastructure temporarily provided by a cloud computing environment |
| US12008040B2 (en) | 2021-03-25 | 2024-06-11 | Databricks, Inc. | Dataflow graph processing with expectations |
| DE112022004826T5 (de) | 2021-10-08 | 2024-07-18 | Ab Initio Technology Llc | Automatisierte modifikation von computerprogrammen |
| CN115629973B (zh) * | 2022-10-20 | 2025-08-22 | 长沙方维科技有限公司 | Cht技术处理器在线调试系统 |
Family Cites Families (39)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS626344A (ja) * | 1985-07-02 | 1987-01-13 | Nec Corp | プログラムデバツグ方式 |
| US5966072A (en) | 1996-07-02 | 1999-10-12 | Ab Initio Software Corporation | Executing computations expressed as graphs |
| JPH1083328A (ja) * | 1996-09-05 | 1998-03-31 | Nec Corp | 単体テスト用疑似入出力実現方式 |
| US6102968A (en) | 1998-05-21 | 2000-08-15 | Lucent Technologies Inc. | Method for automatically closing open reactive systems |
| US6389429B1 (en) * | 1999-07-30 | 2002-05-14 | Aprimo, Inc. | System and method for generating a target database from one or more source databases |
| US6983317B1 (en) * | 2000-02-28 | 2006-01-03 | Microsoft Corporation | Enterprise management system |
| US6957769B2 (en) * | 2001-04-13 | 2005-10-25 | The Code Corporation | System and method for encoding and decoding data and references to data in machine-readable graphical codes |
| US7529822B2 (en) * | 2002-05-31 | 2009-05-05 | Symantec Operating Corporation | Business continuation policy for server consolidation environment |
| US8020148B2 (en) * | 2002-09-23 | 2011-09-13 | Telefonaktiebolaget L M Ericsson (Publ) | Bi-directional probing and testing of software |
| US7039645B1 (en) * | 2002-09-26 | 2006-05-02 | Requisite Technology, Inc. | Managing content of an electronic catalog by collaboration with another electronic catalog |
| US8676720B1 (en) * | 2002-09-26 | 2014-03-18 | Requisite Software, Inc. | Collaborative method for managing electronic catalogs |
| US7756873B2 (en) * | 2003-09-15 | 2010-07-13 | Ab Initio Technology Llc | Functional dependency data profiling |
| US7747958B2 (en) * | 2005-04-18 | 2010-06-29 | Research In Motion Limited | System and method for enabling assisted visual development of workflow for application tasks |
| US7716630B2 (en) | 2005-06-27 | 2010-05-11 | Ab Initio Technology Llc | Managing parameters for graph-based computations |
| CN100405323C (zh) * | 2005-09-20 | 2008-07-23 | 中国科学院计算技术研究所 | 一种在指令级随机测试中支持ejtag测试的实现方法 |
| US20070074175A1 (en) | 2005-09-23 | 2007-03-29 | Telefonaktiebolaget L M Ericsson (Publ) | Method and system for dynamic probes for injection and extraction of data for test and monitoring of software |
| US7660666B2 (en) * | 2005-11-18 | 2010-02-09 | Navteq North America, Llc | Geographic database with detailed local data |
| US7870556B2 (en) * | 2006-05-16 | 2011-01-11 | Ab Initio Technology Llc | Managing computing resources in graph-based computations |
| US8079019B2 (en) | 2007-11-21 | 2011-12-13 | Replay Solutions, Inc. | Advancing and rewinding a replayed program execution |
| US7849446B2 (en) * | 2006-06-09 | 2010-12-07 | Oracle America, Inc. | Replay debugging |
| CN101529351A (zh) * | 2006-08-24 | 2009-09-09 | 西门子能量及自动化公司 | 用于配置可编程逻辑控制器的设备、系统和方法 |
| GB2446175B (en) * | 2007-01-31 | 2011-06-29 | Hewlett Packard Development Co | Method of updating data |
| US7860905B2 (en) | 2007-04-24 | 2010-12-28 | Microsoft Corporation | Systems and methods for modularizing data flows |
| CN101990661B (zh) | 2007-12-28 | 2013-11-06 | 松下电器产业株式会社 | 通信装置、通信系统、图像提示方法以及程序 |
| US8949140B2 (en) | 2008-04-21 | 2015-02-03 | International Business Machines Corporation | Method and system for dynamic software reconfiguration triggered by component- or system- initiated events |
| US8132184B2 (en) * | 2009-10-21 | 2012-03-06 | Microsoft Corporation | Complex event processing (CEP) adapters for CEP systems for receiving objects from a source and outputing objects to a sink |
| CN102754072B (zh) * | 2009-12-14 | 2016-10-19 | 起元技术有限责任公司 | 规定用户界面元素 |
| CN107066241B (zh) | 2010-06-15 | 2021-03-09 | 起元技术有限责任公司 | 用于动态加载基于图的计算的系统和方法 |
| US8627296B1 (en) | 2010-09-15 | 2014-01-07 | Google Inc. | Unified unit and integration test with automatic mock creation |
| US20120131559A1 (en) * | 2010-11-22 | 2012-05-24 | Microsoft Corporation | Automatic Program Partition For Targeted Replay |
| AU2012204292B2 (en) * | 2011-01-07 | 2016-05-19 | Ab Initio Technology Llc | Flow analysis instrumentation |
| US8874622B2 (en) | 2011-03-28 | 2014-10-28 | Microsoft Corporation | Flexible order of authoring for data integration solutions |
| US8863082B2 (en) * | 2011-09-07 | 2014-10-14 | Microsoft Corporation | Transformational context-aware data source management |
| JP5906789B2 (ja) * | 2012-02-17 | 2016-04-20 | 株式会社ソシオネクスト | メッセージ出力制御装置及びメッセージ出力制御方法 |
| US9002348B2 (en) * | 2012-11-20 | 2015-04-07 | Aeris Communications, Inc. | Utilizing devices nearby |
| US10055333B2 (en) | 2014-11-05 | 2018-08-21 | Ab Initio Technology Llc | Debugging a graph |
| US9880818B2 (en) | 2014-11-05 | 2018-01-30 | Ab Initio Technology Llc | Application testing |
| CN108475189B (zh) | 2015-12-21 | 2021-07-09 | 起元技术有限责任公司 | 子图接口生成的方法、系统及计算机可读介质 |
| JP6433614B1 (ja) * | 2018-04-16 | 2018-12-05 | Jeインターナショナル株式会社 | チャットボット検索システムおよびプログラム |
-
2015
- 2015-05-19 US US14/715,807 patent/US9880818B2/en active Active
- 2015-11-05 SG SG10201901587VA patent/SG10201901587VA/en unknown
- 2015-11-05 CN CN202210769407.5A patent/CN115292160B/zh active Active
- 2015-11-05 CA CA2966533A patent/CA2966533C/en active Active
- 2015-11-05 EP EP20186842.9A patent/EP3783494A1/en active Pending
- 2015-11-05 WO PCT/US2015/059136 patent/WO2016073665A1/en not_active Ceased
- 2015-11-05 CN CN201580072406.3A patent/CN107250988B/zh active Active
- 2015-11-05 EP EP15797523.6A patent/EP3215947B1/en active Active
- 2015-11-05 JP JP2017522000A patent/JP7076208B2/ja active Active
- 2015-11-05 KR KR1020177014623A patent/KR20170078770A/ko not_active Ceased
- 2015-11-05 SG SG11201703191TA patent/SG11201703191TA/en unknown
- 2015-11-05 AU AU2015343095A patent/AU2015343095B2/en active Active
-
2018
- 2018-01-29 US US15/881,979 patent/US10705807B2/en active Active
-
2021
- 2021-12-07 JP JP2021198695A patent/JP2022037061A/ja active Pending
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2017538996A5 (OSRAM) | ||
| JP2020504862A5 (OSRAM) | ||
| US8671397B2 (en) | Selective data flow analysis of bounded regions of computer software applications | |
| JP2016522476A5 (OSRAM) | ||
| JP2016524756A5 (OSRAM) | ||
| JP2015109059A5 (OSRAM) | ||
| CN104536810B (zh) | 一种基于栈的异常检测方法和装置 | |
| RU2017117425A (ru) | Автоматическое обнаружение несовпадения схем | |
| RU2017132283A (ru) | Условно управляемое стилевое оформление | |
| JP6258159B2 (ja) | プログラム情報生成システム、方法、及びプログラム | |
| JP2014501412A5 (OSRAM) | ||
| RU2018135284A (ru) | Генерирование представлений контекстного поиска | |
| JP2018515822A5 (OSRAM) | ||
| JP2018520452A5 (OSRAM) | ||
| JP2018505506A5 (OSRAM) | ||
| JP2016502219A5 (OSRAM) | ||
| JP2016514296A5 (OSRAM) | ||
| CN105630585A (zh) | 周期性任务的处理方法及装置 | |
| JP2018524689A5 (OSRAM) | ||
| CN112825033A (zh) | 界面代码的生成方法、装置、设备及存储介质 | |
| JPWO2021079495A5 (OSRAM) | ||
| JP2018106556A5 (OSRAM) | ||
| CN113076084A (zh) | 资源文件处理方法、装置、设备及存储介质 | |
| JP2019521430A5 (OSRAM) | ||
| US20130346055A1 (en) | Modeling and cooperative simulation of systems with interdependent discrete and continuous elements |