JP2017213965A JP2016108200A JP2016108200A JP2017213965A JP 2017213965 A JP2017213965 A JP 2017213965A JP 2016108200 A JP2016108200 A JP 2016108200A JP 2016108200 A JP2016108200 A JP 2016108200A JP 2017213965 A JP2017213965 A JP 2017213965A
Authority
JP
Japan
Prior art keywords
vehicle
train
temporary
work
operations
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2016108200A
Other languages
Japanese (ja)
Inventor
和也 弓倉
Kazuya Yumikura
和也 弓倉
松本 隆
Takashi Matsumoto
隆 松本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East Japan Railway Co
Original Assignee
East Japan Railway Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East Japan Railway Co filed Critical East Japan Railway Co
Priority to JP2016108200A priority Critical patent/JP2017213965A/en
Publication of JP2017213965A publication Critical patent/JP2017213965A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a vehicle operation work assisting device capable of automatically determining classification of formations (i.e. basic formation, additional formation) to be applied to an emergency operation on the basis of information on the emergency operation.SOLUTION: A vehicle operation work assisting device comprises an arithmetic processing unit and a storage unit, and performs management of vehicle operations and works on the basis of vehicle operation data stored in the storage unit. The vehicle operations include operations for each formation, operations with coupled multiple formations, and additional operations not included in a basic operation plan. Data for additional operations supplied from outside includes train information and route information indicating that trains are in a coupled state coupling two or more formations. The arithmetic processing unit is configured to include: means for recognizing the additional operations being those done by coupled trains, on the basis of train information included in the additional operation data; and means for determining classification of formations to be set at a front side or rear side in a traveling direction of the coupled trains on the basis of the route information.SELECTED DRAWING: Figure 6

Description

本発明は、輸送障害が発生した際の運転整理に伴う車両運用の変更を元の計画運用に戻す作業等を支援する車両運用業務支援技術に関する。   The present invention relates to a vehicle operation business support technology that supports a work or the like for returning a change in vehicle operation associated with operation arrangement when a transportation failure occurs to the original planned operation.

鉄道輸送において列車の安全かつ円滑な運行を行うためには、列車ダイヤに電車などの車両(編成)を割り当てて、列車として運転できるように整備されていることが必要である。このような車両の使用計画のことを車両運用といい、おおむね1日周期で作成されている。基本的にはそれぞれの運用は例えば1か月のような期間で循環して繰り返され、定期的に検査等が実施できるように計画されており、計画運用と呼ばれている。
ところが、車両故障や事故、災害などによって、列車運行に乱れが生じた時には、ダイヤを適切に変更して、列車の運行を正常に戻す運転整理が行われる。この運転整理によって車両運用も計画とは大幅に変更になる。変更の仕方によっては、ダイヤ平復が遅れたりダイヤ平復後の運用戻しに手間取るといったことが発生する。
In order to perform safe and smooth operation of trains in rail transportation, it is necessary to allocate trains (trains) to train schedules so that they can be operated as trains. Such a vehicle use plan is referred to as vehicle operation, and is generally created in a cycle of one day. Basically, each operation is repeated in a cycle of, for example, one month, and is planned so that inspection and the like can be carried out periodically, which is called planned operation.
However, when the train operation is disturbed due to a vehicle failure, an accident, a disaster, or the like, operation arrangement is performed by appropriately changing the diagram and returning the train operation to normal. This driving arrangement will greatly change the vehicle operation from the plan. Depending on how the change is made, it may occur that the diamond restoration is delayed or that it takes time to restore the operation after the diamond restoration.

従来、列車運行に乱れが生じた時には、ダイヤを適切に変更して列車の運行を正常な運行に戻す運転整理に関しては、例えば特許文献1に開示されているような発明が提案されているが、運転整理によって車両運用に変更が生じ、そのままでは所定の期日までに実行しなければならない仕業検査や交番検査が実行できなくなるおそれがある。そのため、ダイヤ平復後に、変更された車両運用を計画運用に戻す必要がある。   Conventionally, when the train operation is disturbed, an invention as disclosed in, for example, Patent Document 1 has been proposed with regard to operation arrangement for appropriately changing the diagram and returning the train operation to normal operation. There is a possibility that a change in the vehicle operation occurs due to the driving arrangement, and that it is impossible to execute the work inspection and the alternation inspection that must be performed by a predetermined date. Therefore, it is necessary to return the changed vehicle operation to the planned operation after the diamond restoration.

ダイヤ平復後に、検査予定車両の未入区や車両形式等の違いによる入線不可車両の入線が当日中に発生する場合は、運用担当指令と車両配置区所等(車両基地)の車両区所当直でチェックして、回避するための車両運用変更を輸送指令に依頼していた。1線区に2車種以上存在する線区の場合は、車種を元の計画に戻すための運用変更も必要である。さらに、2箇所以上の車両配置区所等(車両基地)が存在する線区の場合は、それぞれの所属の車両を元の車両配置区所に戻すための運用変更も必要である。また、当日行う車両運用変更の方法としては、区所入区後の差し替え、折返し駅における折返変更、車両交換等がある。なお、「車種」とは一般的には車両の型の相違を意味するが、本明細書では、車両の連結数などの編成形態が異なるもの(例えば5両編成と10両編成)を指す用語として使用する。   If a vehicle that cannot be entered due to a non-inspection of the vehicle to be inspected or a difference in vehicle type occurs during the day after the restoration of the schedule, the operation supervisor and the vehicle ward location on the vehicle placement ward (vehicle base) I asked the Transportation Directive to change the vehicle operation to avoid it. In the case of two or more types of cars in one line, it is necessary to change the operation to return the car type to the original plan. Furthermore, in the case of a line section where there are two or more vehicle placement wards or the like (vehicle bases), it is also necessary to change the operation for returning the respective belonging vehicle to the original vehicle placement ward. In addition, the vehicle operation change method performed on the day includes replacement after entering the ward, return change at the return station, vehicle replacement, and the like. In addition, “vehicle type” generally means a difference in the type of vehicle, but in this specification, a term indicating a different knitting form such as the number of vehicles connected (for example, a 5-car train and a 10-car train). Use as

特許第4670081号公報Japanese Patent No. 4670081

従来、この運用戻しは、もっぱら手作業によって行われており、多大な労力と時間を要するという課題があった。具体的には、運用戻しは、先ず、車両の運用を担う車両配置区所等(車両基地)で、輸送指令からFAXなどにより送付された運転計画書の内容(運転変更指示)を列車ダイヤに記入し、車両の運用、編成を把握することから開始される。その後、車両配置区所は、翌日以降の検査予定等にあわせるため、自区所入区後に車両の差し替えを行うことにより元の計画運用へ戻す計画を立てることとなる。
なお、「編成」とは複数の車両を連結したものを意味し、それらを区別するために付与されるのが編成番号である。また、「運用」は、編成単位の1日の運行スケジュールで、それらを区別するために付与されるのが運用番号である。
Conventionally, this operation return has been performed by manual work, and there has been a problem of requiring a great deal of labor and time. Specifically, in operation return, first of all, the contents of the operation plan (operation change instruction) sent from the transportation instruction by FAX etc. to the train diagram at the vehicle placement ward etc. (vehicle base) responsible for the operation of the vehicle It starts from filling in and grasping the operation and organization of the vehicle. Thereafter, the vehicle placement ward will make a plan to return to the original planned operation by replacing the vehicle after entering the ward ward in order to match the inspection schedule and the like after the next day.
The “knitting” means a combination of a plurality of vehicles, and a knitting number is given to distinguish them. In addition, “operation” is a daily operation schedule of a composition unit, and an operation number is given to distinguish them.

計画運用へ戻す際、1線区に2車種(例えば5両編成と10両編成)以上存在する線区において、2つの編成が併結されている場合には併結された状態(15両編成)のまま、また併結されていない編成は分割された状態のまま、運用を変更するようにすれば、無駄な分割作業や併結作業を回避することができる。ところが、編成単位で管理している場合、併結している編成同士であってもそれぞれの編成はシステム上では別々の運用に割り付けられているため、運用番号を指標として併結を認識することはできない。その結果、2つの編成を併結したまま運用変更する提案ができないという課題がある。   When returning to planned operation, if two trains are combined in a line with more than two vehicle types (for example, 5-car train and 10-car train) in the first track, they are combined (15-car train). If the operation is changed while the knitting that is not combined and is not divided, the useless division work and the combination work can be avoided. However, when managed in organization units, even if the organizations are combined, each organization is assigned to a different operation on the system, so the combination cannot be recognized using the operation number as an index. . As a result, there is a problem that it is not possible to make a proposal to change the operation while the two organizations are combined.

また、休日が連続する期間のような繁忙期等には、車両管理計画システムにより計画運用に追加する形で、臨時運用が作成されることがある。一方、1線区に2車種(例えば5両編成と10両編成)以上存在する線区では、臨時運用の計画を受けとった車両区所当直(運用担当指令)が、その臨時運用に割り当てる編成を決定するため、当該臨時運用が10両編成(以下、基本編成と称する)なのか、5両編成(以下、付属編成と称する)なのか、あるいは併結編成(15両編成)なのかを判断する必要がある。   Also, during busy periods such as a period in which holidays are consecutive, temporary operations may be created in addition to planned operations by the vehicle management planning system. On the other hand, in a line with more than two types of cars (for example, a 5-car train and a 10-car train) in one line, the vehicle ward station duty (operation instruction) that has received the plan for temporary operation assigns the train assigned to the temporary operation. To determine, it is necessary to determine whether the temporary operation is a 10-car train (hereinafter referred to as a basic train), a 5-car train (hereinafter referred to as an accessory train), or a combined train (15-car train). There is.

しかしながら、上位のシステムである車両管理計画システムは、複数の線区の運用計画を担っているため、1線区に2車種以上存在する線区に関して、基本編成や付属編成など編成の分類(運用グループ)を指定せずに臨時運用の情報を作成して車両区所当直(運用担当指令)へ渡すことがある。その結果、コンピュータを利用して車両区所当直(運用担当指令)の業務を支援する業務支援システムを構築した場合、何らかの工夫をしないと、コンピュータが、受け取った臨時運用に関する情報(運用行路や列車番号)から編成の分類を把握することができず、臨時運用に割り当てる編成を決定することが困難になるという課題があることが明らかとなった。   However, since the vehicle management planning system, which is a higher system, is responsible for the operation plan of multiple line sections, the classification (operations) such as basic trains and accessory trains for the line sections that exist in two or more types in one line section There is a case where information on temporary operation is created without specifying a group and is passed to the vehicle ward duty (operation instruction). As a result, when a business support system is built that uses a computer to support the work of a vehicle ward office duty (operations mandate), the computer receives information on temporary operations (operating routes and trains) if no measures are taken. It was revealed that there was a problem that it was difficult to determine the organization to be allocated to the temporary operation because the classification of the organization could not be grasped from the number).

また、車両管理計画システムによって臨時運用の中には年末年始の終夜運転列車のように日跨りで連続して走行する特殊な運用が組まれることがあり、このような特殊な運用には、通常の運用と識別可能な運用番号が付与される。しかしながら、車両区所当直(運用担当指令)の業務支援システムを構築した場合、システム内の管理処理を合理的に行うために、日跨りで走行する運用を走行日に応じて2つに分ける必要がある。しかるに、1つの運用を2つに分けて当初の運用番号をそのまま翌日の運用番号にも使用すると、車両管理計画システムによって設定された他の臨時運用の運用番号等と重複してしまうことがあり、合理的な管理が行えなくなるおそれがあるという課題が生じる。   In addition, special operations that run continuously across the day, such as a year-end and new-year operation train, may be included in the temporary operation by the vehicle management planning system. An operation number that can be distinguished from the operation is assigned. However, when a business support system for vehicle ward office duty (operation instruction) is built, it is necessary to divide the operation that runs across the day into two according to the day of travel in order to perform the management process in the system rationally. There is. However, if one operation is divided into two and the original operation number is used as it is for the next day's operation number, it may overlap with other temporary operation operation numbers set by the vehicle management planning system. There arises a problem that rational management may not be performed.

本発明は、上記のような事情に鑑みてなされたもので、臨時運用に関する情報からその臨時運用に適用すべき編成の分類(基本編成、付属編成等)を自動的に判断することが可能な車両運用業務支援装置を提供することを目的とするものである。
本発明の他の目的は、日跨りで連続して走行する特殊な運用が計画された場合にも、合理的な管理を行うことができる車両運用業務支援装置を提供することにある。
The present invention has been made in view of the circumstances as described above, and it is possible to automatically determine the classification of a composition (basic composition, accessory composition, etc.) to be applied to the special operation from information on the special operation. An object of the present invention is to provide a vehicle operation work support apparatus.
Another object of the present invention is to provide a vehicle operation work support apparatus capable of performing rational management even when a special operation that continuously travels across days is planned.

前記課題を解決するために、本発明は、
演算処理装置および記憶装置を備え、前記記憶装置に記憶されている車両の運用計画に関する車両運用データに基づいて車両の運用を管理する車両運用業務支援装置であって、
前記車両の運用には、編成ごとの運用および複数の編成を結合した状態での運用と、基本運用計画にはない臨時運用とが含まれ、
外部より供給される前記臨時運用のデータには、2以上の編成が結合された併結状態の列車であることを示す列車情報および行路情報が含まれており、
前記演算処理装置は、
前記臨時運用のデータに含まれる前記列車情報に基づいて、当該臨時運用が、併結状態の列車による運用であることを認識する認識手段と、前記行路情報に基づいて併結状態の列車の進行方向前側または後側に設定すべき編成の分類を判断する分類判断手段とを有するように構成したものである。
上記のような構成によれば、臨時運用のデータに基づいて併結状態の列車として運用すべきか否かを認識することができるとともに、併結状態の列車の場合には進行方向前側と後側に設定すべき編成の分類(車種や運用グループ)を自動的に判断することができる。
In order to solve the above problems, the present invention provides:
A vehicle operation business support device that includes an arithmetic processing unit and a storage device, and manages vehicle operation based on vehicle operation data related to a vehicle operation plan stored in the storage device,
The operation of the vehicle includes operation for each formation and operation in a state in which a plurality of formations are combined, and temporary operation not included in the basic operation plan,
The temporary operation data supplied from the outside includes train information and route information indicating that the trains are in a combined state in which two or more trains are combined.
The arithmetic processing unit includes:
Recognizing means for recognizing that the temporary operation is an operation by a combined train based on the train information included in the temporary operation data, and a traveling direction front side of the combined train based on the route information Or it comprises so that it may have a classification judgment means for judging the classification of the organization to be set on the rear side.
According to the above configuration, it is possible to recognize whether or not to operate as a combined train based on temporary operation data, and in the case of a combined train, set to the front side and the rear side in the traveling direction. The organization classification (vehicle type and operation group) to be organized can be automatically determined.

ここで、望ましくは、前記演算処理装置は、前記分類判断手段による判断結果に応じて前記臨時運用に割り当てる編成を提案可能な運用整理案作成手段を備えるように構成する。
かかる構成によれば、臨時運用に割り当てる編成を自動的に提案させ、臨時運用を含む運用計画の変更を短時間に完了することができる
Here, preferably, the arithmetic processing unit is configured to include an operation arrangement plan creation unit capable of proposing an organization to be allocated to the temporary operation according to a determination result by the classification determination unit.
According to such a configuration, it is possible to automatically propose the organization to be allocated to the temporary operation and complete the change of the operation plan including the temporary operation in a short time.

また、望ましくは、前記演算処理装置は、
前記車両運用データに基づいて、縦軸に複数の駅名をとり、横軸に時間をとって各列車の運行を線で表した運用ダイヤを編集する運用ダイヤ編集処理手段を備え、
前記運用ダイヤ編集処理手段は、前記臨時運用のデータに基づいて臨時運用の列車の運行を線で表した運用ダイヤを生成可能であるように構成する。
かかる構成によれば、臨時運用に割り当てる編成が決定される前の段階においても、臨時列車の運行線を運用ダイヤの画面に表示させることができ、ダイヤ全体に対する臨時列車の運行の位置付けを把握し易くなる。また、臨時列車の運行線を選択することで、運用ダイヤの画面から臨時運用に割り当てる編成を設定する処理を実行可能にすることができる。
Preferably, the arithmetic processing unit includes:
Based on the vehicle operation data, the operation axis edit processing means for editing the operation diagram in which the vertical axis takes a plurality of station names and the horizontal axis takes time to represent the operation of each train,
The operation diagram edit processing means is configured to be able to generate an operation diagram in which the operation of the temporary operation train is represented by a line based on the temporary operation data.
According to such a configuration, the operation line of the temporary train can be displayed on the operation diagram screen even before the organization to be allocated to the temporary operation is determined, and the position of the operation of the temporary train with respect to the entire diagram can be grasped. It becomes easy. Moreover, the process which sets the organization allocated to temporary operation from the screen of an operation diagram can be performed by selecting the operation line of a temporary train.

さらに、望ましくは、前記運用ダイヤ編集処理手段により編集された前記臨時運用の列車の運行線を含む運用ダイヤを表示装置に表示させる表示処理手段を備え、
前記認識手段は、前記運用ダイヤの表示中に前記臨時運用の列車の運行線が選択された場合に、当該臨時運用が併結状態の列車による運用であるか否か判断し、
前記分類判断手段は、前記認識手段により併結状態の列車であると判断された臨時運用について、当該臨時運用のデータに含まれる行路情報に基づいて併結状態の列車の進行方向前側または後側に設定すべき編成の分類を判断するように構成する。
かかる構成によれば、運用ダイヤの画面上から臨時運用を選択して、当該臨時運用の列車が併結状態の列車として運用すべきか否か、および併結状態の列車の場合には進行方向前側と後側に設定すべき編成の分類(車種や運用グループ)を判断することができるため、臨時運用に割り当てる編成を容易に決定することができる。
Furthermore, preferably, comprising a display processing means for displaying on the display device the operation diagram including the operation line of the temporary operation train edited by the operation diagram editing processing means,
The recognizing means determines whether or not the temporary operation is an operation by a combined train when the operation line of the temporary operation train is selected while the operation diagram is displayed,
The classification judging means is set to the front side or the rear side in the traveling direction of the train in the combined state based on the route information included in the data of the temporary operation for the temporary operation determined to be a train in the combined state by the recognizing means. It is configured to determine the classification of the organization to be performed.
According to such a configuration, the temporary operation is selected on the operation diagram screen, whether or not the temporary operation train should be operated as a combined train, and in the case of a combined train, the front side and the rear side in the traveling direction. Since the organization classification (vehicle type and operation group) to be set on the side can be determined, the organization assigned to the temporary operation can be easily determined.

また、望ましくは、前記臨時運用のデータには、さらに時刻情報が含まれており、
前記演算処理装置は、前記臨時運用のデータに含まれる前記時刻情報に基づいて夜間の所定時刻を越えて走行する日跨りの運用を認識する手段と、当該手段により日跨りの運用と認識された臨時運用を所定の時刻で2つの運用に分割し、分割された運用のうち翌日の運用には、識別符号を付記した新たな運用番号を付与する手段と、を備えるように構成する。
Preferably, the temporary operation data further includes time information,
The arithmetic processing unit is recognized as day-to-day operation by means for recognizing day-to-day operation that travels beyond a predetermined time at night based on the time information included in the temporary operation data. The temporary operation is divided into two operations at a predetermined time, and the operation of the next day among the divided operations is provided with means for assigning a new operation number with an identification code added thereto.

上記のような構成によれば、日跨りで連続して走行する特殊な運用が計画された場合に、自動的に1つの臨時運用を2つの運用に分割して2日間の別運用として設定することができるとともに、同一の日に同一の運用番号が設定されるのを回避することができるため、合理的な管理を行うことができる。また、1運用を2運用に分割することで、同一の日に同一の運用番号が設定されたような場合には、運用番号をチェックする機能を設け、重複した番号が見つかったときは番号に設定ミスがあることを表示装置に表示させることで、注意を喚起するように構成することができる。   According to the above configuration, when a special operation that runs continuously across days is planned, one temporary operation is automatically divided into two operations and set as a separate operation for two days. In addition, since it is possible to avoid setting the same operation number on the same day, rational management can be performed. Also, by dividing one operation into two operations, if the same operation number is set on the same day, a function to check the operation number is provided, and if a duplicate number is found, the number is It can be configured to call attention by displaying on the display device that there is a setting error.

本発明によれば、臨時運用に関する情報からその臨時運用に適用すべき運用グループ(基本編成、付属編成等)を自動的に判別することが可能な車両運用業務支援装置を実現することができる。また、日跨りで連続して走行する特殊な運用が計画された場合にも、合理的な管理を行うことができる車両運用業務支援装置を実現することができるという効果がある。   ADVANTAGE OF THE INVENTION According to this invention, the vehicle operation work support apparatus which can determine automatically the operation group (basic organization, auxiliary organization, etc.) which should be applied to the temporary operation from the information regarding temporary operation is realizable. In addition, there is an effect that it is possible to realize a vehicle operation work support apparatus that can perform rational management even when special operations that run continuously across days are planned.

本実施形態の車両運用業務支援装置を構成する車両運用業務支援装置の一例を示す構成図である。It is a block diagram which shows an example of the vehicle operation work support apparatus which comprises the vehicle operation work support apparatus of this embodiment. 実施形態の車両運用業務支援装置における運用表画面の一例を示す図である。It is a figure which shows an example of the operation table screen in the vehicle operation work support apparatus of embodiment. 本実施形態の車両運用業務支援装置を利用した運用戻しおよびそれに伴う仕業検査等の作業計画の変更の手順を示すフローチャートである。It is a flowchart which shows the procedure of change of work plans, such as operation return using the vehicle operation work support device of this embodiment, and a work inspection accompanying it. 実施形態の車両運用業務支援装置における運用ダイヤの画面の一例を示す図である。It is a figure which shows an example of the screen of the operation diagram in the vehicle operation work support apparatus of embodiment. 実施形態の車両運用業務支援装置における運用順序表の画面の一例を示す図である。It is a figure which shows an example of the screen of the operation order table in the vehicle operation work support apparatus of embodiment. 本実施形態の車両運用業務支援装置において、上位の車両管理計画システムから臨時運用の計画を受け取った場合の車両運用業務支援装置における対応処理を説明するためのもので、(A)は併結編成を使用する臨時運用が計画された場合の基本編成と付属編成の分類の仕方を示す図、(B)は午前4時を跨ぐ終夜運転の日跨り臨時運用が計画された場合の運用の分割の仕方を示す図である。In the vehicle operation work support apparatus of this embodiment, it is for demonstrating the corresponding process in the vehicle operation work support apparatus when the plan of temporary operation is received from the host vehicle management planning system. The figure which shows the method of classification of the basic organization and the accessory organization when the temporary operation to be used is planned, (B) is the method of dividing the operation when the temporary operation across the day of the overnight operation over 4 am is planned FIG. 実施形態の車両運用業務支援装置において、図3の運用表画面で「運用一括入力」機能を選択した際に表示されるダイヤログボックスの一例を示す図である。FIG. 4 is a diagram illustrating an example of a dialog box displayed when an “operation batch input” function is selected on the operation table screen of FIG. 3 in the vehicle operation work support apparatus of the embodiment. 運用ダイヤの画面や運用順序表の画面で運用変更機能を実行させる際の入力用サブ画面の一例を示す図である。It is a figure which shows an example of the subscreen for an input at the time of making an operation change function be performed on the screen of an operation diagram or the screen of an operation sequence table. 車両運用業務支援装置の処理実行制御部によって行われる運用整理処理の手順の一例を示すフローチャートである。It is a flowchart which shows an example of the procedure of the operation organization process performed by the process execution control part of a vehicle operation work support apparatus. 図9の運用整理処理のステップS5で行われる運用整理案作成処理の具体的な手順の一例を示すフローチャートである。It is a flowchart which shows an example of the specific procedure of the operation arrangement plan creation process performed by step S5 of the operation arrangement process of FIG. 実施形態の車両運用業務支援装置において、図2の運用表画面で「運用整理自動提案」機能を選択した際に表示されるダイヤログボックスの一例を示す図である。FIG. 3 is a diagram showing an example of a dialog box displayed when an “operation organization automatic proposal” function is selected on the operation table screen of FIG. 2 in the vehicle operation work support apparatus of the embodiment.

以下、図面を参照しつつ、本発明に係る車両運用業務支援装置の実施形態について説明する。
図1は、本実施形態の車両運用業務支援装置を使用したシステムの一実施例を示す。
車両運用業務支援装置100は、CPU(中央演算処理装置)等の演算処理装置で構成される処理実行制御部110、ROM(リードオンリメモリ)やRAM(ランダムアクセスメモリ)等の記憶装置で構成されるデータ記憶部120、キーボード141やマウス142などの入力操作装置からの入力を処理する入力処理部131、液晶パネル等の表示装置143に画像を表示させる表示処理部132、及びこれらの間でデータの送受信を可能に接続するバス133などからなる。本実施形態では、上記車両運用業務支援装置100と、入力操作装置(141,142)と、表示装置143とによって車両運用業務支援システムが構成されている。
Hereinafter, embodiments of a vehicle operation work support apparatus according to the present invention will be described with reference to the drawings.
FIG. 1 shows an example of a system using the vehicle operation work support apparatus of this embodiment.
The vehicle operation work support apparatus 100 includes a processing execution control unit 110 configured by an arithmetic processing device such as a CPU (Central Processing Unit), and a storage device such as a ROM (Read Only Memory) and a RAM (Random Access Memory). A data storage unit 120, an input processing unit 131 that processes input from an input operation device such as a keyboard 141 and a mouse 142, a display processing unit 132 that displays an image on a display device 143 such as a liquid crystal panel, and data between them. The bus 133 is connected so as to be able to transmit and receive data. In the present embodiment, the vehicle operation work support apparatus 100, the input operation devices (141, 142), and the display device 143 constitute a vehicle operation work support system.

本実施形態では、処理実行制御部110は、車両運用データに基づいて運用表を作成したり変更する機能を有する運用表編集処理部111、運用ダイヤを作成したり変更する機能を有する運用ダイヤ編集処理部112、運用順序表を作成したり変更する機能を有する運用順序表編集処理部113、車両運用を変更する機能を有する運用整理部114、仕業検査や交番検査等の作業計画および実績を管理する仕業検査等作業管理部115などの機能部を備える。   In this embodiment, the process execution control unit 110 includes an operation table editing processing unit 111 having a function of creating and changing an operation table based on vehicle operation data, and an operation diagram editing having a function of creating and changing an operation diagram. Management unit 112, operation sequence table editing processing unit 113 having a function to create or change an operation sequence table, operation organizing unit 114 having a function to change vehicle operation, and management of work plans and results such as work inspection and alternation inspection A functional unit such as a work management unit 115 such as a work inspection is provided.

また、データ記憶部120には、上記処理実行制御部110が実行する車両運用整理支援プログラムを格納するプログラム記憶部121、車両運用の基礎となる車両運用データを格納する車両運用データ記憶部122、車両運用データに基づいて生成される運用表データを格納する運用表データ記憶部123、運用表で割り当てられた仕業検査や交番検査等の作業の実績データを格納する作業実績管理データ記憶部124等が設けられている。
ここで、「仕業検査」は、例えば2−6日毎の短い周期で行なわれる検査で、集電装置や台車、ブレーキなど特に運転に必要不可欠な装置の点検を、車両を運用から外さずに行う検査である。また、「交番検査」は、仕業検査よりも長い周期(例えば30日)で行われるもので、仕業検査と同じく車両を分解せずに行われる検査であるが、仕業検査よりも詳細な検査が行われる。
The data storage unit 120 also includes a program storage unit 121 that stores a vehicle operation organization support program executed by the process execution control unit 110, a vehicle operation data storage unit 122 that stores vehicle operation data serving as a basis for vehicle operation, Operation table data storage unit 123 that stores operation table data generated based on vehicle operation data, work result management data storage unit 124 that stores operation result data such as work inspections and alternation inspections assigned in the operation table, etc. Is provided.
Here, the “work inspection” is an inspection that is performed at a short cycle of, for example, every 2-6 days, and inspects a device that is indispensable for driving, such as a current collector, a carriage, and a brake, without removing the vehicle from operation. It is an inspection. “Alternative inspection” is performed at a longer cycle (for example, 30 days) than the industrial inspection, and is an inspection performed without disassembling the vehicle as in the industrial inspection. Done.

車両運用データは、管理下に置かれている全編成すなわち運用対象の車両基地に属する全編成について、編成単位の1日の運行スケジュール(列車番号、列車種別、行き先、列車番号と、当該列車の駅毎の到着時間、駅出発時間、使用する番線などの情報)を記述したもので、当該車両運用業務支援システムとは別のシステムである車両管理計画システムにより基本運用データが作成され、車両運用データ記憶部122に予め格納される。また、運用の中には、仕業検査や交番検査等の作業も割り当てられている。ここで、「編成」とは複数の車両を連結したものを意味し、それらを区別するために付与されるのが編成番号である。また、「列車番号」とは、時刻表(ダイヤ)上で列車を区別するために付与される番号である。車両運用データ記憶部122に記憶される車両運用データには、各編成のローテーションを設定した基本運用データと、日付をつけて使用予定を設定した計画運用データと、輸送混乱等による変更運用データとがあり、これらのデータが上書きされることなくそれぞれ記憶される。   The vehicle operation data includes the daily operation schedule (train number, train type, destination, train number, and train number) of all trains under management, that is, all trains belonging to the target vehicle base. (Information such as arrival time, station departure time, number of lines used, etc.) for each station). Basic operation data is created by the vehicle management planning system, which is a system separate from the vehicle operation business support system. Stored in the data storage unit 122 in advance. Also, operations such as work inspections and police inspections are assigned in the operation. Here, “knitting” means a combination of a plurality of vehicles, and a knitting number is assigned to distinguish them. The “train number” is a number assigned to distinguish trains on a timetable (diamond). The vehicle operation data stored in the vehicle operation data storage unit 122 includes basic operation data in which rotation of each train is set, planned operation data in which a use schedule is set with a date, changed operation data due to transportation disruption, etc. These data are stored without being overwritten.

本実施形態においては、車両運用データ記憶部122に記憶されている車両運用データおよび運用表データ記憶部123に記憶されている運用表データには、併結編成に関してT06D(前)またはT06D(後)のように、列車番号で特定される列車が15両編成のような2編成が併結された併結編成であることが分かるようにされている。また、運用表データには、2編成を併結する併結作業とその場所(車両基地や駅等)を表わす情報および併結編成を分割する分割作業とその場所を表わす情報も含ませている。
なお、本実施形態の説明では、15両編成は、10両編成と5両編成とが併結(連結)されたものを指し、併結編成と称する。また、併結されていない分割状態の10両編成を「基本編成」と呼び、5両編成を「付属編成」と呼び、「基本編成」と「付属編成」とが併結されているか分割されているか判断することを「ペア認識」と呼ぶこととする。
In the present embodiment, the vehicle operation data stored in the vehicle operation data storage unit 122 and the operation table data stored in the operation table data storage unit 123 include T06D (front) or T06D (rear) regarding the combined formation. As described above, the train specified by the train number is a combined train in which two trains such as a 15-car train are joined together. Further, the operation table data includes information indicating the merged work for merging the two trains and their locations (vehicle bases, stations, etc.), and the division work for dividing the merged knitting and the information representing the locations thereof.
In the description of this embodiment, the 15-car train refers to a combination of 10 car trains and 5 car trains (connected), and is referred to as a joint train. In addition, a 10-car train in a divided state that is not combined is called a “basic train”, and a 5-car train is called an “attached train”. Whether the “basic train” and the “attached train” are combined or divided This determination is called “pair recognition”.

上記のように、併結編成のそれぞれに対して列車番号T06D(前)またはT06D(後)が記載されていれば、他方の編成は列車番号を指標として運用表データを調べることで、併結の相手の編成を見つけることができる。
また、本実施形態は、複数の車両配置区所(車両基地)に属する編成が運行される線区(路線)においても、区所内はもちろんのこと区所間でも各編成に付与される編成番号が重複していないことを条件に、異なる区所に属する編成同士を併結して運用する場合にも適用することができる。
As described above, if the train number T06D (front) or T06D (rear) is described for each of the combined trains, the other trainer examines the operation table data using the train number as an index. Can be found.
In addition, in the present embodiment, the knitting number assigned to each knitting not only in the ward but also between the wards in the line ward (route) where the knitting belonging to the plurality of vehicle arrangement ward (vehicle bases) is operated. It can also be applied to the case where the organizations belonging to different wards are combined and operated on the condition that there is no overlap.

図2には上記運用表編集処理部111により生成される運用表とこの表を表示する画面の構成例が示されている。
図2に示されているように、運用表は、左側の縦の欄に運用対象の編成番号A01,A02,A03……が順に記述され、上側の横の欄に日付が順に記述され、縦欄と横欄の交差する位置(マス目)に運用番号が#1,#2,#3……が記述されている。マス目に黒丸(●)の印が付されている運用は、当日に仕業検査が設定されていることを意味している。図2は基本となる計画運用表であり、この図から分かるように、運用番号#1,#2,#3……は、各編成に対して例えば1か月のような期間で循環して割り当てられる。
FIG. 2 shows a configuration example of an operation table generated by the operation table editing processing unit 111 and a screen for displaying the table.
As shown in FIG. 2, in the operation table, the organization numbers A01, A02, A03... To be operated are sequentially described in the left vertical column, the dates are sequentially described in the upper horizontal column, Operation numbers # 1, # 2, # 3,... Are described at positions (columns) where the column and the horizontal column intersect. Operation with a black circle (●) on the square means that work inspection is set on that day. FIG. 2 is a basic planned operation table. As can be seen from this figure, operation numbers # 1, # 2, # 3,... Assigned.

なお、特に限定されるものでないが、本実施形態では、各編成に対して、1日の前半(午前)と後半(午後)とに分けて、それぞれ異なる運用を割り当てることができるように構成されている。図2の中に、「♯3/♯9」と記載されているのは、前半と後半で運用が異なっていることを意味している。
また、図2に示されている運用表の表示画面の上部には、作業メニュー欄WMCに設けられ、この作業メニュー欄WMCには、「運用ダイヤ」や「運用順序表」など他の表示に切り替えるための「表示切替」ボタンDB、運用グループを切り替えるための「運用グループ切替」ボタンGB、日付を切り替えるための「日付切替」ボタンCB、「運用一括変更」や「運用整理自動提案」、「エラー一覧表示」などの機能を選択するための「機能」ボタンFBが設けられている。
Although not particularly limited, the present embodiment is configured so that different operations can be assigned to each organization in the first half (morning) and second half (afternoon) of the day. ing. In FIG. 2, “# 3 / # 9” indicates that the operation is different between the first half and the second half.
In addition, an upper part of the operation table display screen shown in FIG. 2 is provided in the work menu column WMC. In this work menu column WMC, other displays such as “operation diagram” and “operation order table” are displayed. “Switch display” button DB for switching, “Switch operation group” button GB for switching the operation group, “Date switch” button CB for switching the date, “Operation batch change”, “Automatic operation organizing proposal”, “ A “function” button FB for selecting a function such as “display error list” is provided.

ここで、「運用グループ」とは、所属する車両基地(A車両基地とB車両基地等)や車種(基本編成または付属編成等)によって編成を分類して、グループ分けしたものを意味する。基本設定(計画運用データ)では、運用グループごとに運用順序が循環設定される。
また、「機能」ボタンFBにより選択可能な機能には、上記「エラー一覧表示」の他、複数の運用の変更を一括で入力するための「運用一括変更」と、列車の運用や作業の割当を設定するための「運用作業割当」と、「運用整理案自動提案」と、1日単位で実施箇所ごとの仕業検査を管理する「仕業検査管理」とがある。「運用作業割当」機能では、運用番号の変更の他、仕業検査や交番検査、全般清掃、計画清掃、汚物抜き、その他の指定作業などの作業の割当てが可能である。
Here, the “operation group” means a group in which the knitting is classified according to the vehicle base (A vehicle base and B vehicle base, etc.) and the vehicle type (basic knitting or auxiliary knitting, etc.) to which it belongs. In the basic setting (planned operation data), the operation order is cyclically set for each operation group.
The functions that can be selected using the “Function” button FB include “Error List Display”, “Operation Batch Change” for inputting multiple operation changes at once, and train operation and work assignment. There are “operation work allocation”, “operation arrangement plan automatic proposal”, and “work inspection management” for managing the work inspection for each execution place on a daily basis. The “operation work assignment” function can assign work such as work inspection, alternation inspection, general cleaning, planned cleaning, filth removal, and other designated work in addition to changing the operation number.

ここで、本実施形態の車両運用業務支援システムを利用した運用戻しおよびそれに伴う仕業検査等の作業計画の変更の手順について、図3を用いて説明する。
運用戻しにおいては、先ず乱れたダイヤを回復するために行われた運用変更をシステムに反映するための運用変更入力が行なわれる(ステップS101)。続いて、変更された内容を反映した現状の運用を把握するため運用表や運用ダイヤ、運用順序表を表示させる(ステップS102)。その後、運用戻しのための運用の変更や作業の割り付けを手作業で個別に行う(ステップS103)。
Here, a procedure for changing a work plan such as an operation return using the vehicle operation work support system of the present embodiment and a work inspection associated therewith will be described with reference to FIG.
In the operation return, first, an operation change input for reflecting, in the system, an operation change made to recover a disturbed diagram is performed (step S101). Subsequently, an operation table, an operation diagram, and an operation order table are displayed to grasp the current operation reflecting the changed contents (step S102). Thereafter, the operation change and operation allocation for operation return are individually performed manually (step S103).

それから、変更された内容の良否を確認するために、システムによるエラーチェックとエラー一覧表の表示が行われる(ステップS104)。ここで、エラーがなければ変更が確定されることとなる(ステップS105→S106)が、通常はエラーが含まれているので、ステップS103へ戻って再度を運用の変更や作業の割り付けを行う。あるいは、ステップS107へ移行して、システムが有する運用整理自動提案機能を利用した運用整理案の作成(ステップS107)を実行しても良い。   Then, in order to confirm the quality of the changed content, an error check by the system and an error list display are performed (step S104). Here, if there is no error, the change is confirmed (steps S105 → S106). However, since an error is usually included, the process returns to step S103 and the operation is changed or the work is assigned again. Or you may transfer to step S107 and may create the operation arrangement plan (step S107) using the operation arrangement automatic proposal function which the system has.

また、手作業による個別の設定(ステップS103)を行う代わりに、ステップS101で運用変更入力を行なった後、直ちにシステムによる運用整理案の作成提案(ステップS101→S107)を実行しても良い。そして、再びステップS104へ戻って、提案された運用整理案に対してエラーチェックとエラー一覧表の表示を行い、上記ループを繰り返すことでエラーのない運用整理案が作成されるようになっている。
なお、ステップS107の運用整理自動提案機能については後に詳しく説明するが、運用整理自動提案では、先ず条件の入力設定が行われる。そのときの条件が、エラーチェック結果に従って入力される。
Further, instead of performing individual manual settings (step S103), an operation change plan creation proposal (step S101 → S107) may be executed immediately after the operation change input in step S101. Then, returning to step S104 again, an error check and an error list are displayed for the proposed operation arrangement plan, and an operation arrangement plan without error is created by repeating the above loop. .
Note that the operation organization automatic suggestion function in step S107 will be described in detail later, but in the operation organization automatic proposal, first, the condition input setting is performed. The conditions at that time are input according to the error check result.

次に、図4を用いて運用ダイヤについて説明する。
図4に示されているように、運用ダイヤは、縦軸に運用対象路線の駅名を記述し、横軸に時刻をとって1日の全列車の運行スケジュール(行路)を棒線(スジ)で表したものである。
従来の運用ダイヤは、各列車のスジに沿って列車番号のみが表記されていたが、本実施形態では、各列車のスジに沿った列車番号T01U,T02U,T03U……; T01D,T02D,T03D……の他に、各列車のスジの始点と終点すなわち運用開始と運用終了の箇所に、それぞれ運用番号#1,#2,#3……と編成番号A01,A02,A03……が記述されるようになっている。
Next, the operation diagram will be described with reference to FIG.
As shown in FIG. 4, the operation diagram describes the station name of the operation target route on the vertical axis, the time on the horizontal axis, and the operation schedule (route) of all the trains for one day as a bar (streaks). It is represented by.
In the conventional operation diagram, only the train numbers are indicated along the lines of each train, but in this embodiment, the train numbers T01U, T02U, T03U along the lines of the respective trains; T01D, T02D, T03D ...... In addition, operation numbers # 1, # 2, # 3, and organization numbers A01, A02, A03,... Are described at the start and end points of each train, that is, at the start and end of operation. It has become so.

なお、列車番号の末尾の「U」と「D」は、例えば「上り」と「下り」(あるいは「北行」と「南行」)のように、列車の走行方向を示す符号である。図4には示されていないが、臨時運用の列車に対しては、例えば列車番号の頭に「臨」あるいは「E」などの符号を付すことで通常の運用と区別できるように表示される。また、臨時運用の列車のスジについては、他の列車のスジとは異なる色で表示させるようにしても良い。
臨時運用に関しては、車両管理計画システムから、臨時運用であること、運用日、運用番号、列車番号、行路(始発駅〜終着駅)、連結の有無(位置)を示す「前」または「後」の情報等を含む臨時運用情報が車両運用業務支援装置100へ送信されて来るので、それらの情報を一旦車両運用データ記憶部122に記憶する。以下、車両管理計画システムから最初に送られてきた臨時運用情報を初期情報と称する。
Note that “U” and “D” at the end of the train number are codes indicating the traveling direction of the train, such as “up” and “down” (or “north” and “south”). Although not shown in FIG. 4, for a temporary operation train, for example, a symbol such as “Temporary” or “E” is added at the beginning of the train number so that it can be distinguished from normal operation. . Further, the streaks of temporary trains may be displayed in a color different from that of other trains.
With regard to temporary operation, “front” or “rear” indicating temporary operation, operation date, operation number, train number, route (first station to end station), presence / absence of connection (position) from the vehicle management planning system Since the temporary operation information including the above information is transmitted to the vehicle operation work support apparatus 100, the information is temporarily stored in the vehicle operation data storage unit 122. Hereinafter, the temporary operation information sent first from the vehicle management planning system is referred to as initial information.

そして、運用ダイヤ画面の表示要求がなされると、車両運用データ記憶部122から、通常運用の運用表データと共に臨時運用に関する初期情報を読み出して臨時運用の列車のスジを決定し表示装置143に表示させることができる。なお、臨時運用の初期情報の段階では、連結の有無を示す「前」または「後」の情報から併結編成(15両)を使用することは分かっても、進行方向の前側と後側のいずれに基本編成(10両)を接続するかまでは不明である。このような臨時運用への編成の割り当ての仕方については、後に詳しく説明する。   When the operation diagram screen display request is made, the initial information regarding the temporary operation is read from the vehicle operation data storage unit 122 together with the normal operation operation table data, and the streaks of the temporary operation train are determined and displayed on the display device 143. Can be made. In the initial information stage of the temporary operation, even if it is understood that the combined organization (15 cars) is used from the “front” or “rear” information indicating the presence or absence of connection, either the front side or the rear side in the traveling direction It is unclear until the basic train (10 cars) is connected to. A method of assigning the composition to such a temporary operation will be described in detail later.

また、図4において、○印は当該列車が車両配置区所等(車両基地)から行路である線路に出る「出区(運用開始)」を意味し、△は当該列車が行路である線路から車両配置区所等(車両基地)へ入る「入区(運用終了)」を意味している。
また、本実施形態の運用ダイヤには、車両運用データもしくは運用表データに基づいて、併結作業を行う箇所には併結作業を意味する記号(例えば□の中に「併」なる文字を付記したもの)および分割作業を行う箇所には分割作業を意味する記号(例えば□の中に「分」なる文字を付記したもの)記載されている。
このような運用ダイヤを表示することによって、各列車番号と運用および編成との関係、さらには併結車両であるかそうでないかを容易に把握することができる。
In FIG. 4, “O” means “departure (start of operation)” in which the train goes out to the track that is the route from the vehicle placement ward, etc. (vehicle base), and △ is from the track where the train is the route It means “entry (end of operation)” to enter a vehicle placement ward or the like (vehicle base).
In addition, the operation diagram of the present embodiment is based on vehicle operation data or operation table data, and a symbol (for example, a letter “combined” in □ is added to the place where the operation is performed). ) And a symbol indicating the division work (for example, a letter “minute” added in □) is written at the place where the division work is performed.
By displaying such an operation diagram, it is possible to easily grasp the relationship between each train number and operation and organization, and whether it is a combined vehicle or not.

次に、図5を用いて運用順序表について説明する。
図5に示されているように、運用順序表は、縦軸に運用番号が#1,#2,#3……を記述し、横軸に時刻をとって、運用のつながりを線(サオ)で表したものである。また、各運用#1,#2,#3……に該当させる編成の番号A01,A02,A03……を、運用番号#1,#2,#3……の隣に記載してある。さらに、運用のつながりを示す線(サオ)には、対応する列車番号T11U,T12U,T13U……; T21D,T22D,T23D……が付記してある。このような運用順序表を表示することによって、各運用の相互関係や検査の割り付けを容易に把握することができる。
Next, the operation order table will be described with reference to FIG.
As shown in FIG. 5, in the operation sequence table, the operation numbers # 1, # 2, # 3,... Are written on the vertical axis, and the time is plotted on the horizontal axis. ). Also, the organization numbers A01, A02, A03... Corresponding to the operations # 1, # 2, # 3... Are listed next to the operation numbers # 1, # 2, # 3. Furthermore, the corresponding train numbers T11U, T12U, T13U... T21D, T22D, T23D. By displaying such an operation order table, it is possible to easily grasp the interrelationship between each operation and the allocation of inspections.

なお、本実施形態においては、臨時運用に関しては、編成の割当てが決定するまで図5の運用順序表には表示されない。ただし、図5の運用順序表の「運用」を臨時とし「編成番号」を空欄にして横棒を表示するようにすることも可能である。また、臨時運用に対する編成の割当てが決定する前であっても、受信した臨時運用情報から列車番号と走行方向は分かるので、列車番号の末尾に方向を区別する符号「U」,「D」を付記して表示することができる。そして、この運用順序表から、臨時運用を選択して臨時運用の初期情報を車両運用データ記憶部122から読み出して、編成の割当ての設定を行なえるように構成することも可能である。   In the present embodiment, the temporary operation is not displayed in the operation order table of FIG. 5 until the organization assignment is determined. However, it is also possible to display a horizontal bar with “operation” in the operation sequence table of FIG. Further, even before the allocation of the organization for the temporary operation is determined, the train number and the traveling direction can be known from the received temporary operation information. Therefore, the codes “U” and “D” for distinguishing the direction are added at the end of the train number. It can be added and displayed. Further, it is possible to select a temporary operation from the operation order table, read out the initial information of the temporary operation from the vehicle operation data storage unit 122, and set the composition allocation.

また、サオに付記されている列車番号には、例えば図5に示すように、T21U(前),T15D(後)のように併結列車の前側あるいは後側であることが分かるようになっている。このT21U(前)やT15D(後)のような記載は、運用表データの情報に基いて付記されたもので、運用表データにそのような情報が含まれていれば、図5の運用順序表に表記されていなくても車両運用業務支援装置100は併結列車の前側あるいは後側であること認識することができる。
なお、図5においても、○印は当該列車が「出区(運用開始)」であることを意味し、△は当該列車が「入区(運用終了)」であることを意味している。
また、図5の運用順序表にも、運用表データに基づいて、併結作業を行う箇所には併結作業を意味する記号(□の中に「併」なる文字を付記したもの)および分割作業を行う箇所には分割作業を意味する記号(□の中に「分」なる文字を付記したもの)記載されている。
In addition, as shown in FIG. 5, for example, T21U (front) and T15D (rear) indicate that the train number attached to Sao is the front side or the rear side of the combined train. . The descriptions such as T21U (front) and T15D (rear) are added based on the information of the operation table data. If such information is included in the operation table data, the operation sequence of FIG. Even if it is not written in the table, it can be recognized that the vehicle operation work support apparatus 100 is the front side or the rear side of the combined train.
In FIG. 5, “O” means that the train is “departure (operation start)”, and “Δ” means that the train is “entrance (operation end)”.
Also, in the operation sequence table of FIG. 5, based on the operation table data, a symbol indicating a consolidating operation (a character in which “combined” is added in □) and a dividing operation are included in a place where the consolidating operation is performed. In the place to be performed, a symbol indicating division work (characters with “minute” added in □) is described.

さらに、前述したように、運用の中には、仕業検査や交番検査等の作業も割り当てられており、図5においては、これらの作業が、例えば○印の中に「仕」なる文字などが付記された記号が表示され、その時間帯でそれらの作業が計画されていることが示されている。
ここで、「仕業検査」は、例えば2−6日毎の短い周期で行なわれる検査で、集電装置や台車、ブレーキなど特に運転に必要不可欠な装置の点検を、車両を運用から外さずに行う検査である。また、「交番検査」は、仕業検査よりも長い周期(例えば30日)で行われるもので、仕業検査と同じく車両を分解せずに行われる検査であるが、仕業検査よりも詳細な検査が行われる。
Furthermore, as described above, operations such as work inspection and police inspection are also assigned to the operation. In FIG. 5, these operations are indicated by, for example, a letter “finish” in a circle. An accompanying symbol is displayed, indicating that the work is planned for that time period.
Here, the “work inspection” is an inspection that is performed at a short cycle of, for example, every 2-6 days, and inspects a device that is indispensable for driving, such as a current collector, a carriage, and a brake, without removing the vehicle from operation. It is an inspection. “Alternative inspection” is performed at a longer cycle (for example, 30 days) than the industrial inspection, and is an inspection performed without disassembling the vehicle as in the industrial inspection. Done.

なお、図2、図4および図5において、作業メニュー欄WMCに設けられている符号DBが付されているボタンは、表示切替ボタンであって、この表示切替ボタンDBをマウス142でクリックすると、「運用表」、「運用ダイヤ」、「運用順序表」の3つの語が列記されたサブ画面が表示され、3つの中から1つを選択してクリックすると、表示装置143に対応する画面が切替え表示されるように構成されている。
また、図4の運用ダイヤ画面の作業メニュー欄WMCには、「運用グループ切替」ボタンGBまたは「線区切替」ボタンLBが設けられており、「運用グループ切替」ボタンGBをクリックすると複数の「運用グループ」が、また「線区切替」ボタンLBをクリックすると、例えば「X線区」、「Y線区」、「Z線区」など対象エリア内に存在する複数の線区名(路線名)が列記されたサブ画面が表示され、これらの中から1つを選択してクリックすると、表示装置143の表示画面が、選択された運用グループまたは線区(路線もしくはその一部の区間)の運用ダイヤ画面に切り替わるように構成されている。
2, 4, and 5, the button with the symbol DB provided in the work menu column WMC is a display switching button, and when this display switching button DB is clicked with the mouse 142, A sub-screen on which three words “operation table”, “operation diagram”, and “operation order table” are listed is displayed. When one of the three words is selected and clicked, a screen corresponding to the display device 143 is displayed. It is configured to be switched and displayed.
In addition, in the work menu column WMC of the operation diagram screen of FIG. 4, an “operation group switching” button GB or a “line section switching” button LB is provided, and when the “operation group switching” button GB is clicked, a plurality of “ When the “operation group” again clicks the “switch line section” button LB, a plurality of line section names (route names) existing in the target area such as “X line section”, “Y line section”, “Z line section”, and the like. ) Is displayed, and when one of these is selected and clicked, the display screen of the display device 143 displays the selected operation group or line section (route or part of the section thereof). It is configured to switch to the operation diagram screen.

本実施形態の車両運用業務支援装置100の処理実行制御部110には、上述したような機能の他に、変更の入力機能と、検索機能と運用変更機能が設けられている。
このうち、先ず検索機能について説明する。検索は、図4に示す運用ダイヤの画面と図5に示す運用順序表の画面において可能である。具体的には、各画面の上部のメニュー欄に、「列番検索」ボタンSB1や「運用検索」ボタンSB2、「編成検索」ボタン(運用ダイヤ上でのみ可)SB3が設けられており、マウス142を操作してこれらのボタンのいずれかにカーソルを合わせて、マウス142の左ボタンをクリックすると、番号を入力するサブ画面が出現するので、キーボード141を使用して、列車番号または運用番号または編成番号を入力する。
In addition to the functions described above, the process execution control unit 110 of the vehicle operation work support apparatus 100 of the present embodiment is provided with a change input function, a search function, and an operation change function.
Of these, the search function will be described first. The search can be performed on the operation diagram screen shown in FIG. 4 and the operation sequence table screen shown in FIG. Specifically, a “column number search” button SB1, an “operation search” button SB2, and an “organization search” button (only possible on the operation diagram) SB3 are provided in the menu column at the top of each screen, and the mouse 142, move the cursor to one of these buttons and click the left button of the mouse 142. A sub-screen for entering the number appears. Use the keyboard 141 to select the train number or operation number or Enter the organization number.

すると、図4の運用ダイヤの画面では、例えば選択された番号の「スジ」が太線等で強調表示され、図5の運用順序表の画面では、選択された「列車」または「運用」が一番上に表示されるようなスクロール処理が行われるようになっている。これにより、検索対象の列車や運用の内容をいち早く把握することができる。
なお、図4の運用ダイヤの画面では、マウス142を操作していずれかの「スジ」にカーソルを合わせて、マウス142の左ボタンをクリックすると、選択された「スジ」とそれに対応した列車番号、運用番号、編成番号が、太字等により強調表示されるようにする機能を設けてもよい。
Then, on the operation diagram screen of FIG. 4, for example, the selected number “Streak” is highlighted with a thick line or the like, and on the operation sequence table screen of FIG. 5, the selected “train” or “operation” is displayed. A scroll process such as that displayed at the top is performed. Thereby, it is possible to quickly grasp the train to be searched and the contents of operation.
In the operation diagram screen of FIG. 4, when the mouse 142 is operated to move the cursor to one of the “streaks” and the left button of the mouse 142 is clicked, the selected “streaks” and the corresponding train number are displayed. In addition, a function may be provided so that the operation number and the organization number are highlighted in bold or the like.

上述したように、本実施形態の車両運用業務支援装置は、「運用表」、「運用ダイヤ」、「運用順序表」の3つの画面を選択表示させることができるとともに、「運用ダイヤ」、「運用順序表」の画面において、列車番号や運用番号等を指定して検索し強調表示させる機能が設けられているため、ダイヤ平復後に、変更された車両運用を計画運用に戻す運用戻しを実行するに際して、担当者が現状を迅速かつ正確に把握することができる。   As described above, the vehicle operation work support apparatus of the present embodiment can selectively display the three screens of “operation table”, “operation diagram”, and “operation order table”, as well as “operation diagram”, “ A function to search and highlight train numbers, operation numbers, etc. on the operation sequence table screen is provided, so that after vehicle restoration, operation return is performed to return the changed vehicle operation to planned operation. In this case, the person in charge can grasp the current situation quickly and accurately.

ところで、前述した1線区に2車種(例えば、10両の基本編成と5両の付属編成)以上が存在しかつ併結編成(例えば、15両編成)で走行する運用がある線区では、図6(A)に示すように、併結の際に基本編成と付属編成をどちらの側に接続するか予め決められている場合がある。例えば、X方向へ向かう運行で基本編成が先頭側に来るように決められていると、Xと逆方向である−X方向へ向かう運行では付属編成が先頭側に来ることとなる(なお、本実施形態では、図6(A)における1つの車両の記号がそれぞれ例えば5両連結の車両を表わしている)。
また、図4の運用ダイヤでは、1個の列車のスジを見れば走行方向が分かる。具体的には、右上がりのスジの列車をX方向へ向かう運行とすれば、右下がりのスジの列車は逆方向である−X方向へ向かう運行となる。
By the way, in the above-mentioned line section in which there are two or more types of cars (for example, 10 basic trains and five accessory trains) in the above-mentioned one line segment and there are operations that run in a combined train (for example, 15-car train). As shown in FIG. 6 (A), there is a case where it is determined in advance which side the basic knitting and the accessory knitting are connected to when merging. For example, if it is determined that the basic train is to be on the top side in the operation in the X direction, the accessory organization will be in the top side in the operation in the -X direction, which is the opposite direction to X (this book In the embodiment, the symbol of one vehicle in FIG. 6A represents, for example, a vehicle with five cars connected).
Further, in the operation diagram of FIG. 4, the traveling direction can be understood by looking at the streak of one train. Specifically, if a line train that goes up to the right is set to run in the X direction, a line train that goes down to the right goes to the -X direction, which is the opposite direction.

そこで、本実施形態の車両運用業務支援装置100においては、車両管理計画システムから送られて来た臨時運用データを受信すると、運用整理部114が、臨時運用に関して、臨時運用の初期情報に含まれている連結の有無を示す「前」または「後」の情報と、走行方向とに基づいて、編成の分類(運用グループ)を判断する機能を有するように構成されている。走行方向は、臨時運用の初期情報に含まれている行路情報(始発駅〜終着駅)から自動的に認識することができる。   Therefore, in the vehicle operation work support apparatus 100 of the present embodiment, when the temporary operation data sent from the vehicle management planning system is received, the operation organizing unit 114 is included in the initial information of the temporary operation regarding the temporary operation. It is configured to have a function of determining the classification (operation group) of the organization based on the “front” or “rear” information indicating the presence or absence of the connection and the traveling direction. The traveling direction can be automatically recognized from the route information (first station to last station) included in the initial information of the temporary operation.

具体的には、図6(A)の場合、X方向へ走行する併結編成の列車の前方の編成は基本編成で、後方の編成は付属編成であり、−X方向へ走行する併結編成の列車の前方の編成は付属編成で、後方の編成は基本編成であると判断する。一方、連結の有無を示す「前」または「後」の情報が臨時運用情報に含まれていない場合には、単独走行であるが基本編成(10両の列車)の運行か付属編成(5両の列車)の運行かは分からないので、その場合には、基本編成での運行として扱う。その結果、運用整理部114は、臨時運用に対して割り付ける編成番号を提案することが可能となる。これにより、編成の分類(運用グループ)が不明な臨時運用の編成に関しても分類を把握して、割り当てるべき編成の属する運用グループを決定することができる。   Specifically, in the case of FIG. 6A, the front train of the combined train traveling in the X direction is the basic train, the rear train is the accessory train, and the combined train traveling in the -X direction. It is determined that the front knitting is an accessory knitting and the rear knitting is a basic knitting. On the other hand, if the “previous” or “rear” information indicating the presence or absence of the connection is not included in the temporary operation information, the operation of the basic train (10 trains) or the accessory train (5 trains) is performed. In that case, it is treated as a basic train operation. As a result, the operation organizing unit 114 can propose a composition number to be assigned to the temporary operation. As a result, it is possible to grasp the classification of the organization of the temporary operation whose organization classification (operation group) is unknown, and to determine the operation group to which the organization to be assigned belongs.

また、本実施形態の車両運用業務支援システムにおいては、臨時運用の中に年末年始の終夜運転列車のように日跨りで連続して走行する特殊な運用が組まれることを許容している。しかし、システム内の管理処理のためには、日跨りで走行する運用を走行日によって2つに分ける必要がある。しかるに、当初の運用番号をそのまま翌日の運用番号として使用すると、設定された他の臨時運用の運用番号等と重複してしまい、正しい管理が行えなくなるおそれがある。
そこで、車両管理計画システムからの臨時運用情報(初期情報)を車両運用業務支援装置100が受信した時点で、図6(B)の(a)に示すように、例えば午前4時を跨がる運用については、同図(b)に示すように、行路データを4時前と4時以降に分割し、4時前の行路データについては受信した臨時運用情報に基づく運用番号(例えば#901)で管理する。
Moreover, in the vehicle operation work support system of this embodiment, it is permitted that special operations that run continuously across the day like a year-end and New Year all-day operation train are set in the temporary operation. However, for the management process in the system, it is necessary to divide the operation of traveling across days into two according to the traveling day. However, if the original operation number is used as it is as the next day's operation number, it may overlap with other temporary operation numbers that have been set, and correct management may not be performed.
Therefore, when the temporary operation information (initial information) from the vehicle management planning system is received by the vehicle operation work support device 100, as shown in FIG. As for operation, as shown in FIG. 5B, the route data is divided into before 4 o'clock and after 4 o'clock, and for the route data before 4 o'clock, the operation number based on the received temporary operation information (for example, # 901). Manage with.

一方、4時以降の行路データについては、新たに運用番号を設定して運用開始時刻を4時とする別の運用に変換し、新運用の施行日は受信時の臨時運用の施行日翌日に設定する。新運用番号は、例えば受信した臨時運用の運用番号の頭に「9」を付けて、例えば#9901のようにする。臨時運用以外の通常運用についても、午前4時を跨がる運用については上記と同様に2つの運用に分割して扱うようにすることができる。
上記のような運用分割処理を行うことで、日跨りで連続して走行する特殊な運用が計画された場合にも、システム内で合理的な管理を行うことができる
On the other hand, for route data after 4 o'clock, a new operation number is set and converted to another operation with an operation start time of 4 o'clock. Set. The new operation number is, for example, # 9901 by adding “9” to the head of the received operation number for the temporary operation. As for the normal operation other than the temporary operation, the operation over 4 am can be divided into two operations as described above.
By performing the operation division process as described above, it is possible to perform rational management within the system even when special operations that run continuously across days are planned.

次に、本実施形態の車両運用業務支援装置100における運用変更機能について説明する。図7には、「機能」ボタンFBから「運用一括変更」が選択された場合に表示される「運用変更一括入力画面」の一例が示されている。なお、この「運用一括変更」は、運用表画面(図2)の「機能」ボタンFBにより選択されることで有効にされる。
この「運用変更一括入力画面」において、輸送指令からの運転計画書に記載されている内容を見ながら、変更入力欄TLCへ運用の変更を順次入力してから、「登録」ボタンRBをクリックすると変更後の現在の状態(運用実績)がシステムに反映されることとなる。
また、運用や作業の変更は、図2の運用表画面において、メニュー欄の一番左側の「機能」ボタンFBをクリックすると表示されるサブ画面で、「運用作業割当」を選択するか、図4または図5のダイヤ表示画面において、「機能」ボタンFBをクリックすると表示されるサブ画面で、「運用変更」あるいは「運用指定作業設定」を選択することで個別に行うことも可能である。
Next, the operation change function in the vehicle operation work support apparatus 100 of this embodiment will be described. FIG. 7 shows an example of an “operation change batch input screen” displayed when “operation batch change” is selected from the “function” button FB. This “operation batch change” is made effective by being selected by the “function” button FB on the operation table screen (FIG. 2).
In this “Operation Change Batch Entry Screen”, while looking at the contents described in the operation plan from the transport instruction, enter the operation changes in the change input field TLC in sequence, and then click the “Register” button RB. The current state (operation results) after the change will be reflected in the system.
To change the operation or work, select “assign operation work” on the sub-screen displayed when the “function” button FB on the leftmost side of the menu column is clicked on the operation table screen of FIG. In the diagram display screen of FIG. 4 or FIG. 5, it is also possible to individually perform by selecting “operation change” or “operation designation work setting” on the sub-screen displayed when the “function” button FB is clicked.

図8には、図4に示す運用ダイヤの画面や図5に示す運用順序表の画面において、マウス142とキーボード141を使用して機能ボタンFBがクリックされて、「運用変更」が選択されると表示されるダイヤログボックスのサブ画面が示されている。
このサブ画面で、「運用変更項目選択」ボタンCPBをクリックすると現れる操作項目リストの中から1つを選択する。そして、列車番号、運用番号または編成番号を入力するとともに、変更の内容(例えば併結の位置等)を入力すると、車両運用データおよび運用表データに変更内容が直ちに反映される。さらに、運用ダイヤの画面(図4)や運用順序表の画面(図5)、運用表画面(図3)へも、変更した運用内容を反映し表示可能に構成されている。
In FIG. 8, the function button FB is clicked using the mouse 142 and the keyboard 141 on the operation diagram screen shown in FIG. 4 and the operation sequence table screen shown in FIG. A dialog box sub-screen is displayed.
On this sub-screen, one of the operation item lists that appears when the “select operation change item” button CPB is clicked is selected. When the train number, operation number, or organization number is input, and the details of the change (for example, the position of consolidation) are input, the change is immediately reflected in the vehicle operation data and the operation table data. Furthermore, the operation diagram screen (FIG. 4), the operation sequence table screen (FIG. 5), and the operation table screen (FIG. 3) are configured to reflect the changed operation contents.

本実施形態における運用変更には、「運用接続」「運用分断」「運休設定」「併結設定」「分割設定」「復活設定」「臨時作成」「延長作成」の項目がある。さらに、指令手配による輸送計画変更の項目(折返変更、運行変更など)を含ませても良い。
ここで、各項目の意味を簡単に説明すると、「運用接続」は2つの運用を接続し1つの運用にまとめること、「運用分断」は1つの運用を分断して2つの運用を作成することである。また、「併結設定」は新たに2つの編成を併結すること、「分割設定」は併結している編成を2つに分割すること、「運休設定」は列車の運転を取りやめること、「復活設定」は運休している列車(運用)を復活することである。上記「運用分断」の機能を用いて、図6(B)を用いて説明した日跨りの臨時運用を2つの運用に分ける処理を実行させることができる。
The operation change in this embodiment includes items of “operation connection”, “operation division”, “suspension setting”, “consolidation setting”, “division setting”, “restoration setting”, “temporary creation”, and “extension creation”. Furthermore, items for changing the transportation plan by order arrangement (turnback change, operation change, etc.) may be included.
Here, the meaning of each item is explained briefly. “Operational connection” means that two operations are connected and combined into one operation. “Operational division” means that one operation is divided and two operations are created. It is. In addition, “Combination setting” is to merge two new trains, “Split setting” is to split the combined trains into two, “Suspension setting” is to cancel train operation, “Restoration setting” "Restoring a suspended train (operation)." By using the above-mentioned “operation division” function, it is possible to execute processing for dividing the day-to-day temporary operation described with reference to FIG. 6B into two operations.

さらに、「臨時作成」は新たに臨時列車運用を設定すること、「延長作成」は運用(運転)区間を延長することである。また、「折返変更」とは終着駅または途中駅で折返す際、所定ダイヤで予定されている列車番号とは違う列車番号として列車を運用することである。「運行変更」とは、遅延している場合などに、途中駅から列車番号を後続の列車のものに変更して列車を運用し、見た目上遅延がないようにすることである。図6(B)を用いて説明した日跨りの臨時運用を、「運用変更」の機能を使用して午前4時で運用を終了とし、残りの部分を翌日の臨時運用として新たに設定することで、2つの運用に分けることも可能である。   Furthermore, “temporary creation” is to set a new temporary train operation, and “extension creation” is to extend the operation (operation) section. Further, “turn-back change” means that a train is operated as a train number different from a train number scheduled at a predetermined time when returning at a terminal station or a halfway station. “Change in operation” means that, for example, when there is a delay, the train number is changed from the middle station to that of the subsequent train, and the train is operated so that there is no apparent delay. The day-to-day temporary operation described with reference to FIG. 6B is terminated at 4 am using the “change operation” function, and the remaining part is newly set as the temporary operation for the next day. It can be divided into two operations.

上述したように、本実施形態の車両運用業務支援装置は、「運用表」、「運用ダイヤ」、「運用順序表」の3つの画面において、列車番号や運用番号等を指定して運用を変更する機能が設けられているため、ダイヤ平復後に、変更された車両運用を計画運用に戻す運用戻しを短時間に完了することができる。また、日跨りの臨時運用計画が車両管理計画システムから送られて来た場合に、2つの運用に分けて翌日分に関しては新たな識別性のある運用番号を設定することによって、重複した運用番号が存在すること(終夜運転の臨時運用が連続して2日計画された場合など)で合理的な管理が行えなくなる事態が発生するのを回避することができる。   As described above, the vehicle operation work support apparatus of this embodiment changes operation by specifying a train number, operation number, etc. on the three screens of “operation table”, “operation diagram”, and “operation order table”. Therefore, after the diamond recovery, the operation return for returning the changed vehicle operation to the planned operation can be completed in a short time. In addition, when a temporary operation plan across the day is sent from the vehicle management planning system, duplicate operation numbers are set by setting a new identification number for the next day divided into two operations. It is possible to avoid the occurrence of a situation where rational management cannot be performed due to the presence of (for example, when extraordinary operation for overnight operation is planned for two consecutive days).

次に、運用表画面のメニュー欄の「機能」ボタンFBにより選択可能な、運用整理案をシステムに提案させるための「運用自動提案」機能について説明する。なお、「機能」ボタンFBにより選択可能な機能として、上記「運用自動提案」の他に、「運用作業割当」、「エラー一覧」「仕業検査管理」機能がある。「運用作業割当」を選択すると所定のダイヤログボックスが表示され、運用や仕業を1つずつ手作業で入力することができる。「エラー一覧」を選択すると、上記「運用作業割当」機能により割当てが行われた運用および作業に不適切な内容がないか検査して、結果がエラー一覧として表示される。   Next, the “automatic operation proposal” function for making the system propose an operation arrangement plan that can be selected by the “function” button FB in the menu column of the operation table screen will be described. In addition to the above “automatic operation proposal”, functions that can be selected by the “function” button FB include “operation work assignment”, “error list”, and “work inspection management” functions. When “allocate operation work” is selected, a predetermined dialog box is displayed, and operations and operations can be manually input one by one. When “error list” is selected, the operation and work assigned by the “operation work assignment” function is checked for inappropriate contents, and the result is displayed as an error list.

本実施形態において、エラーの項目には、編成に未だ割り当てていない運用があるか否か(運用未充当チェック)、複数の編成に割り当てた運用があるか否か(運用過充当チェック)、種類の異なる編成の運用を割り当てるなど不当な割付け運用があるか否か(運用適切チェック)、指定作業が実施できない運用を割り当てていないか(指定作業適切チェック)、前日の運用から続けて割当てできない運用があるか否か(運用接続チェック)、1日の中の前半運用と後半運用あるいは前日または翌日と当日の運用が差し替えできるものであるか否か(前後接続チェック)、指定作業の回帰日数などが超過していないか(指定作業回帰日数チェック)、所定運用(計画運用)で仕業検査が計画されている間合いに作業が割り当てられているか(所定作業未実施チェック)、仕業検査が連続した日に割り付けていないか(仕業検査連続チェック)などがある。また、日跨りの臨時運用を2運用に分割した際に、同一の日に同一の運用番号が誤って設定されてしまったような場合には、この「エラー一覧」の機能によって、運用番号の設定にミスがあることを表示装置に表示させることができ、それによって作業者に注意を喚起することができる。   In this embodiment, whether there are operations that have not yet been assigned to the organization (operation unappropriation check), whether there are operations assigned to multiple organizations (operation overcharge check), type Whether there is an illegal assignment operation such as assigning operations with different organization (operation appropriateness check), whether an operation that cannot perform the specified operation is assigned (specified operation appropriate check), or operation that cannot be assigned continuously from the previous day's operation (Operation connection check), whether the first half operation in the day and the second half operation, or the previous day or the next day and the current day operation can be interchanged (pre- and post-connection check), the number of days for the designated work to return, etc. Is not exceeded (checking the number of days for the specified work return), or whether work is allocated during the time when the work inspection is planned in the specified operation (planned operation) ( Constant work not yet performed check), and the like or not assigned to the date on which act inspection has been continuous (handiwork inspection continuous check). If the same operation number is mistakenly set on the same day when the temporary operation across the day is divided into two operations, the operation number It is possible to display on the display device that there is a mistake in the setting, thereby alerting the operator.

本実施形態の車両運用業務支援装置100は、上記のようなエラー一覧表示機能を備えるため、不適切な運用変更や作業の割当てを容易に把握することができる。
また、本実施形態の車両運用業務支援装置100は、前述したように、運用整理自動提案を備えており、上記チェック機能を利用して不適切な運用変更や作業の割り付けを把握して、運用整理自動提案処理における条件を適切に設定して、効率良く運用整理案を作成することができる。
Since the vehicle operation work support apparatus 100 according to the present embodiment has the error list display function as described above, it is possible to easily grasp inappropriate operation changes and work assignments.
In addition, as described above, the vehicle operation work support apparatus 100 according to the present embodiment includes an automatic operation organization proposal, and uses the check function to grasp improper operation changes and work assignments. It is possible to efficiently create an operation arrangement plan by appropriately setting conditions in the automatic arrangement proposal process.

次に、前述した運用整理自動提案処理について、図9および図10のフローチャートを用いて説明する。このうち、図9は運用整理自動提案の全体の流れを、図10は図9の中の「運用整理案作成処理」の具体的な手順の一例が示されている。
なお、運用整理部114による運用整理案の作成処理は、図2の運用表画面の作業メニュー欄WMCの左側に設けられている「機能」ボタンFBをマウス142でクリックすると表示されるサブ画面で、「運用整理自動提案」を選択することによって実行される機能である。この「運用整理自動提案」を選択されると、例えば図11に示すような、日付を指定することができる日付指定ボタン(b)や、運用の固定などの条件を設定したり設定済みの仕業検査をクリアしたりするチェックリスト欄CLC、処理を開始させる支持を与える実行ボタン(r)などを含むダイヤログボックスCNBが表示される。
Next, the above-described operation organization automatic suggestion process will be described with reference to the flowcharts of FIGS. Of these, FIG. 9 shows the overall flow of automatic operation arrangement proposal, and FIG. 10 shows an example of a specific procedure of “operation arrangement proposal creation processing” in FIG.
The operation organizing plan creation process by the operation organizing unit 114 is a sub-screen displayed when the “function” button FB provided on the left side of the work menu column WMC on the operation table screen of FIG. , A function executed by selecting “automatic operation proposal”. When this “operation organization automatic proposal” is selected, for example, as shown in FIG. 11, a date designation button (b) for designating a date, a condition such as fixed operation, or a set work has been set. A dialog box CNB including a check list field CLC for clearing the examination and an execution button (r) for giving support for starting the processing is displayed.

上記チェックリスト欄CLCに、前述した日跨りの臨時運用を2運用に分割する処理を実行させるためのチェックボックスを設けるとともに、該チェックボックスにチェックマークが付記された場合には自動的に運用を分割する処理を実行する機能を、運用整理部114に持たせるように構成することも可能である。
図11のダイヤログボックスCNBで条件を設定してから実行ボタン(r)をクリックすると、運用整理案作成処理が開始される。なお、この運用整理案作成処理を開始させる前に、図7に示すような運用変更一括入力画面を表示させてこの画面を使用して運用の実績を入力してシステムに現状を反映させる処理(図9のステップS1,S2)が行なわれる。ここで、運用の実績(運用変更)は、ダイヤ乱れが発生した際に正常な列車の運行に戻すために、輸送指令からFAX(ファクシミリ)等で送られて来る複数の手配(運転計画書)に記載されている内容である。
The check list column CLC is provided with a check box for executing the process of dividing the above-mentioned temporary operation across the day into two operations, and the operation is automatically performed when a check mark is added to the check box. It is also possible to configure the operation organizing unit 114 to have a function of executing the process of dividing.
When the execution button (r) is clicked after conditions are set in the dialog box CNB of FIG. 11, the operation arrangement plan creation process is started. Before starting the operation arrangement plan creation process, a process for displaying the operation change batch input screen as shown in FIG. 7 and inputting the operation results using this screen to reflect the current state in the system ( Steps S1 and S2) of FIG. 9 are performed. Here, the results of operation (operation change) are the multiple arrangements (operation plan) sent by FAX (facsimile) etc. from the transportation order to return to normal train operation when a time disturbance occurs It is the contents described in.

図9のステップS1の「運用変更一括入力画面表示」は、図2の運用表画面の作業メニュー欄WMCの左側に設けられている「機能」ボタンFBをマウス142でクリックすると表示されるサブ画面で、「運用一括入力」を選択することによって表示される。そして、この「運用変更一括入力画面」(図7参照)において、輸送指令からの運転計画書に記載されている内容を見ながら、変更入力欄TLCへ運用の変更を順次入力してから、「登録」ボタンRBをクリックすると変更後の現在の状態(運用実績)がシステムに反映されることとなる。   The “operation change batch input screen display” in step S1 of FIG. 9 is a sub-screen displayed when the “function” button FB provided on the left side of the work menu column WMC of the operation table screen of FIG. This is displayed by selecting "Operation batch input". Then, in this “operation change batch input screen” (see FIG. 7), while watching the contents described in the operation plan from the transportation instruction, the operation changes are sequentially input to the change input field TLC, and then “ When the “Register” button RB is clicked, the current state (operation result) after the change is reflected in the system.

その後、処理実行制御部110は、「運用整理自動提案」が選択されたか否か判定し(ステップS3)、選択された(Yes)と判定するとステップS4へ進み、運用表データ(計画運用およびステップS2で入力された実績データ)を記憶部120から読み出した後、運用整理部114による運用整理案の作成処理(ステップS5)を実行する。このとき、ダイヤログボックスCNBの表示は、図11(B)のように変わる。
そして、作成した運用整理案を反映した運用表(図2)を表示する(ステップS6)。このとき表示する運用整理案は、完璧なものでなく仕業検査の割当等が決まっていない状態のものでよい。なお、未決定あるいは矛盾(不整合)等がある場合には、それが分かるように例えば色を変えたり所定のマークを付記したりするなどの処理をして表示する。
Thereafter, the process execution control unit 110 determines whether or not “operation organization automatic proposal” has been selected (step S3). If it is determined that the selection has been made (Yes), the process execution control unit 110 proceeds to step S4, and operation table data (plan operation and step After reading out the actual data (inputted in S2) from the storage unit 120, an operation organizing plan creation process (step S5) by the operation organizing unit 114 is executed. At this time, the display of the dialog box CNB changes as shown in FIG.
Then, an operation table (FIG. 2) reflecting the created operation arrangement plan is displayed (step S6). The operation arrangement plan displayed at this time is not perfect and may be a state in which work inspection allocation and the like are not determined. In addition, when there is undecided or contradiction (inconsistency) or the like, for example, the color is changed or a predetermined mark is added and displayed, for example.

ステップS6の後、条件の変更および実行ボタン(r)のクリックが行なわれたか否か判定し(ステップS7)、条件の変更および実行ボタン(r)のクリックが行なわれなかった場合(ステップS7:No)は、ステップS5へ戻って上記処理を繰り返す。一方、ステップS7で、「Yes」と判定した時は、ステップS8へ進んで、「確定」ボタン(s)または「破棄」ボタン(t)がクリックされたか判定し、「確定」ボタン(s)がクリックされた場合には、作成された運用整理案のデータを記憶部120に記憶する(ステップS9)。また、「破棄」ボタン(t)がクリックされた場合には、作成された運用整理案のデータを破棄して終了する(ステップS10)。   After step S6, it is determined whether or not the condition change and execution button (r) have been clicked (step S7). If the condition change and execution button (r) have not been clicked (step S7: No) returns to step S5 and repeats the above process. On the other hand, if “Yes” is determined in step S7, the process proceeds to step S8 to determine whether the “confirm” button (s) or the “discard” button (t) is clicked, and the “confirm” button (s). When is clicked, the created operation arrangement plan data is stored in the storage unit 120 (step S9). If the “discard” button (t) is clicked, the created operation arrangement plan data is discarded and the process ends (step S10).

図10には、図9のステップS5の「運用整理案の作成処理」の具体的な手順が示されている。この「運用整理案の作成処理」では、先ず、図11のダイヤログボックスCNBのチェックリスト欄CLCで、運用を戻す範囲日数や仕業検査を割り付けるか否か、交番検査を割り付けるか否かなど、運用整理案作成実行の条件を設定する(ステップS51)。条件設定後、実行ボタン(r)がクリックされると、チェックリスト欄CLCの「運用固定」チェックボックス(e)にチェックマーク「v」が付されている場合には、交番検査を計画しているなどの制約から運用を変えられないものを固定する(ステップS52)。
次に、チェックリスト欄CLCの「仕業検査計画クリア」チェックボックス(j)にチェックマークが付されていると、その時点で設定されている仕業検査計画を一旦破棄する(ステップS53)。これにより、運用整理の際の制約を緩めることができる。
FIG. 10 shows a specific procedure of “operation arrangement plan creation processing” in step S5 of FIG. In this “operation organizing plan creation process”, first, in the check list field CLC of the dialog box CNB of FIG. 11, whether or not to allocate the number of days to return the operation, whether to perform the work inspection, whether to assign the alternating inspection, etc. Conditions for executing the operation arrangement plan creation are set (step S51). When the execution button (r) is clicked after setting the conditions, if a check mark “v” is added to the “fixed operation” check box (e) in the check list field CLC, an alternate inspection is planned. Those whose operation cannot be changed due to restrictions such as being present are fixed (step S52).
Next, if the “clear inspection plan” check box (j) in the check list column CLC is checked, the operation inspection plan set at that time is temporarily discarded (step S53). Thereby, the restriction | limiting at the time of operation arrangement | positioning can be loosened.

続いて、チェックリスト欄CLCの「運用割当」チェックボックス(k)にチェックマークが付されていると、自由度の低いものから順に運用を割り当てて行く処理を行なう(ステップS54)。具体的には、例えば先ず自由度の低い滞泊運用の割当てを行い、次に自由度の高い日帰り運用の割当てを行う。また、夜間の滞泊時間帯に同じ車両基地に存在する編成の翌日の運用を交換することを優先して判断し、次に昼間の同じ時間帯に同じ場所(車両基地,留置線)に存在する編成の運用の交換(差し替え)を判断する。さらに、運用表データに基づいて編成のペア認識を行い、当該併結編成には、併結編成で運行する運用番号を優先して割り当てるようにする。また、チェックリスト欄CLCに「臨時運用分割」チェックボックス(w)を設け、このチェックボックスにチェックマークが付されると、日跨りの臨時運用で4時を越えて走行するものがあるときには、その運用を2つの運用に分割する処理(ステップS54b)が実行されるようにしてもよい。   Subsequently, if a check mark is added to the “operation allocation” check box (k) in the check list column CLC, a process of assigning operations in order from the one with the lowest degree of freedom is performed (step S54). Specifically, for example, allocation of late operation with a low degree of freedom is performed first, and next day operation with a high degree of freedom is performed. In addition, it is decided to give priority to replacing the operation of the next day of the organization that exists in the same vehicle base during the nighttime staying hours, and then exists in the same place (vehicle base, detention line) in the same time zone in the daytime. Determine the replacement (replacement) of the operation of the organization to be performed. Furthermore, a pair of formations is recognized based on the operation table data, and an operation number operated in the combined formation is preferentially assigned to the combined formation. In addition, when a check box (w) is provided in the check list column CLC and a check mark is added to this check box, when there is something that travels beyond 4 o'clock in a day-to-day temporary operation, A process of dividing the operation into two operations (step S54b) may be executed.

その後、所定仕業検査設定を意味する「所定」チェックボックス(o)にチェックマークが付されていると、仕業検査計画の基本設定すなわち所定(計画運用)で仕業検査可能なすべての運用に対して仕業検査の設定を行う(ステップS55)。それから、「その他」チェックボックス(p)にチェックマークが付されていると、所定仕業検査が設定されている編成以外で仕業検査の回帰日数エラーが発生している編成に対して、入区から出区までの間合い時間を見て、可能な間合いに対して仕業検査を割り当てる処理を行う(ステップS56)。続いて、未決定あるいは矛盾(不整合)した項目がないかチェックし、あればそれらを抽出してエラー一覧を作成するとともに、一覧表の当該エラー表示の箇所の色を変えたり、図3の運用表において該当箇所にアンダーラインを付記するなど注意喚起(ワーニング)の表示をさせる(ステップS57)。   After that, if the “predetermined” check box (o), which means the predetermined work inspection setting, is checked, for all operations that can be inspected with the basic settings of the work inspection plan, that is, the predetermined (planned operation) Setting of work inspection is performed (step S55). Then, if the “Others” check box (p) is marked with a check mark, it will not be possible to enter an organization that has an error in the number of days of regression in the work inspection other than the work set for the specified work inspection. A process for assigning a work inspection to a possible waiting time is performed by looking at the waiting time until departure (step S56). Subsequently, it is checked whether there are undecided or inconsistent (inconsistent) items, and if they are extracted, an error list is created, and the color of the error display location in the list is changed. In the operation table, a warning (warning) is displayed, for example, an underline is added to the corresponding part (step S57).

なお、上記各ステップS51〜S56は、それぞれ対応するチェックボックスのチェックを外すことで飛ばすことができる。また、ステップS57で作成したエラー一覧表は、図3の運用表表示画面において、作業メニュー欄の「機能」ボタンFBをクリックして機能を表示させ、「エラー一覧表示」を選択することで表示させることができる。
従って、「所定仕業検査設定」チェックボックス(o)にチェックマークを付さずに運用整理案作成処理を実行すると、仕業検査計画の基本設定すなわち所定(計画運用)で仕業検査の設定がなされていない場合、注意喚起(ワーニング)の表示がされることとなる。
The above steps S51 to S56 can be skipped by unchecking the corresponding check boxes. The error list created in step S57 is displayed by clicking the “function” button FB in the work menu column on the operation table display screen of FIG. 3 to display the function and selecting “display error list”. Can be made.
Therefore, if the operation arrangement plan creation process is executed without adding a check mark to the “predetermined work inspection setting” check box (o), the operation inspection is set in the basic setting of the work inspection plan, that is, the predetermined (planned operation). If not, a warning message will be displayed.

以上の説明から、本実施形態における運用整理案作成処理は逐次型の処理であることが分かる。そして、このような逐次型の運用整理案作成処理を実行することによって、完成度の高い運用整理案を1回の処理で提案する方法に比べて、装置の負担を減らすことができ、処理速度の遅いCPUであっても比較的短い時間で、満足できる運用整理案を提案することができる。また、エラー一覧を表示させることができるため、エラーを考慮して条件を設定して再度提案処理を実行させることで、見落としのない運用整理案を得ることができる。なお、上記運用整理案の提案では、例えば提案した回数を計数するなどして、併結編成に対して過度に提案しないようにするのが望ましい。   From the above description, it can be seen that the operation arrangement plan creation process in the present embodiment is a sequential process. By executing such a sequential operation arrangement plan creation process, the burden on the apparatus can be reduced and the processing speed can be reduced compared to a method in which an operation arrangement plan with a high degree of completion is proposed in a single process. Even a slow CPU can propose a satisfactory operation arrangement plan in a relatively short time. In addition, since an error list can be displayed, an operation arrangement plan without oversight can be obtained by setting conditions in consideration of errors and executing the proposal process again. In the proposal of the above operation arrangement plan, it is desirable not to excessively propose the combined organization, for example, by counting the number of proposals.

以上本発明者によってなされた発明を実施形態に基づき具体的に説明したが、本発明は前記実施形態に限定されるものではない。例えば、前記実施形態では、10両の基本編成と5両の付属編成が併結される場合を例にとって説明したが、併結される編成は10両と5両に限定されず、7両と3両、5両と5両等であっても良い。
また、前記実施形態では、運用表編集処理部111と運用ダイヤ編集処理部112と運用順序表編集処理部113と運用整理部114と仕業検査等作業管理部115を、1つのCPUで構成しているが、これらの機能部を複数のCPUで構成するようにしても良い。
Although the invention made by the present inventor has been specifically described based on the embodiment, the present invention is not limited to the embodiment. For example, in the above-described embodiment, the case where 10 basic knitting and 5 attached knitting are combined is described as an example, but the combined knitting is not limited to 10 and 5 but 7 and 3 both. Five cars and five cars may be used.
In the embodiment, the operation table editing processing unit 111, the operation diagram editing processing unit 112, the operation order table editing processing unit 113, the operation organizing unit 114, and the work management unit 115 such as work inspection are configured by one CPU. However, these functional units may be configured by a plurality of CPUs.

100 車両運用業務支援装置
110 処理実行制御部
111 運用表編集処理部
112 運用ダイヤ編集処理部
113 運用順序表編集処理部
114 運用整理部(運用整理案作成手段)
115 仕業検査等作業管理部
120 データ記憶部
121 車両運用業務支援プログラム記憶部
122 車両運用データ記憶部
123 運用表データ記憶部
124 作業実績管理データ記憶部
143 表示装置
DESCRIPTION OF SYMBOLS 100 Vehicle operation work support apparatus 110 Process execution control part 111 Operation table edit process part 112 Operation diagram edit process part 113 Operation sequence table edit process part 114 Operation arrangement | positioning part (operation arrangement plan preparation means)
115 Work Inspection and Other Work Management Unit 120 Data Storage Unit 121 Vehicle Operation Work Support Program Storage Unit 122 Vehicle Operation Data Storage Unit 123 Operation Table Data Storage Unit 124 Work Performance Management Data Storage Unit 143 Display Device

Claims (5)

演算処理装置および記憶装置を備え、前記記憶装置に記憶されている車両の運用計画に関する車両運用データに基づいて車両の運用を管理する車両運用業務支援装置であって、
前記車両の運用には、編成ごとの運用および複数の編成を結合した状態での運用と、基本運用計画にはない臨時運用とが含まれ、
外部より供給される前記臨時運用のデータには、2以上の編成が結合された併結状態の列車であることを示す列車情報および行路情報が含まれており、
前記演算処理装置は、
前記臨時運用のデータに含まれる前記列車情報に基づいて、当該臨時運用が、併結状態の列車による運用であることを認識する認識手段と、前記行路情報に基づいて併結状態の列車の進行方向前側または後側に設定すべき編成の分類を判断する分類判断手段とを有することを特徴とする車両運用業務支援装置。
A vehicle operation business support device that includes an arithmetic processing unit and a storage device, and manages vehicle operation based on vehicle operation data related to a vehicle operation plan stored in the storage device,
The operation of the vehicle includes operation for each formation and operation in a state in which a plurality of formations are combined, and temporary operation not included in the basic operation plan,
The temporary operation data supplied from the outside includes train information and route information indicating that the trains are in a combined state in which two or more trains are combined.
The arithmetic processing unit includes:
Recognizing means for recognizing that the temporary operation is an operation by a combined train based on the train information included in the temporary operation data, and a traveling direction front side of the combined train based on the route information Or a vehicle operation work support apparatus, characterized by comprising classification judgment means for judging the classification of the organization to be set on the rear side.
前記演算処理装置は、
前記分類判断手段による判断結果に応じて前記臨時運用に割り当てる編成を提案可能な運用整理案作成手段を備えることを特徴とする請求項1に記載の車両運用業務支援装置。
The arithmetic processing unit includes:
The vehicle operation work support apparatus according to claim 1, further comprising an operation arrangement plan creation unit capable of proposing a composition to be allocated to the temporary operation according to a determination result by the classification determination unit.
前記演算処理装置は、
前記車両運用データに基づいて、縦軸に複数の駅名をとり、横軸に時間をとって各列車の運行を線で表した運用ダイヤを編集する運用ダイヤ編集処理手段を備え、
前記運用ダイヤ編集処理手段は、前記臨時運用のデータに基づいて臨時運用の列車の運行を線で表した運用ダイヤを生成可能であることを特徴とする請求項1または2に記載の車両運用業務支援装置。
The arithmetic processing unit includes:
Based on the vehicle operation data, the operation axis edit processing means for editing the operation diagram in which the vertical axis takes a plurality of station names and the horizontal axis takes time to represent the operation of each train,
3. The vehicle operation business according to claim 1, wherein the operation diagram editing processing unit is capable of generating an operation diagram that represents the operation of a temporary operation train as a line based on the temporary operation data. 4. Support device.
前記運用ダイヤ編集処理手段により編集された前記臨時運用の列車の運行線を含む運用ダイヤを表示装置に表示させる表示処理手段を備え、
前記認識手段は、前記運用ダイヤの表示中に前記臨時運用の列車の運行線が選択された場合に、当該臨時運用が併結状態の列車による運用であるか否か判断し、
前記分類判断手段は、前記認識手段により併結状態の列車であると判断された臨時運用について、当該臨時運用のデータに含まれる行路情報に基づいて併結状態の列車の進行方向前側または後側に設定すべき編成の分類を判断することを特徴とする請求項3に記載の車両運用業務支援装置。
Comprising display processing means for displaying on the display device an operation diagram including the operation line of the temporary operation train edited by the operation diagram editing processing means;
The recognizing means determines whether or not the temporary operation is an operation by a combined train when the operation line of the temporary operation train is selected while the operation diagram is displayed,
The classification judging means is set to the front side or the rear side in the traveling direction of the train in the combined state based on the route information included in the data of the temporary operation for the temporary operation determined to be a train in the combined state by the recognizing means. The vehicle operation work support apparatus according to claim 3, wherein a classification of a knitting to be determined is determined.
前記臨時運用のデータには、さらに時刻情報が含まれており、
前記演算処理装置は、前記臨時運用のデータに含まれる前記時刻情報に基づいて夜間の所定時刻を越えて走行する日跨りの運用を認識する手段と、当該手段により日跨りの運用と認識された臨時運用を所定の時刻で2つの運用に分割し、分割された運用のうち翌日の運用には、識別符号を付記した新たな運用番号を付与する手段と、を備えることを特徴とする請求項1〜4のいずれかに記載の車両運用業務支援装置。
The temporary operation data further includes time information,
The arithmetic processing unit is recognized as day-to-day operation by means for recognizing day-to-day operation that travels beyond a predetermined time at night based on the time information included in the temporary operation data. The temporary operation is divided into two operations at a predetermined time, and the operation of the next day among the divided operations is provided with means for assigning a new operation number with an identification code added thereto. The vehicle operation work support apparatus according to any one of 1 to 4.
JP2016108200A 2016-05-31 2016-05-31 Vehicle operation work assisting device Pending JP2017213965A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016108200A JP2017213965A (en) 2016-05-31 2016-05-31 Vehicle operation work assisting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016108200A JP2017213965A (en) 2016-05-31 2016-05-31 Vehicle operation work assisting device

Publications (1)

Publication Number Publication Date
JP2017213965A true JP2017213965A (en) 2017-12-07

Family

ID=60575114

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016108200A Pending JP2017213965A (en) 2016-05-31 2016-05-31 Vehicle operation work assisting device

Country Status (1)

Country Link
JP (1) JP2017213965A (en)

Similar Documents

Publication Publication Date Title
WO2005007483A1 (en) Device for supporting vehicle replacement schedule generation
JP2001278052A (en) Train planned schedule preparation method and preparation support device
JP7022039B2 (en) Vehicle allocation support systems, methods, and programs
JP2018090137A (en) Vehicle application business support system
JP6603539B2 (en) How to create a vehicle cleaning work plan
JP2018090139A (en) Vehicle application business support system
JPH06144230A (en) Train diagram automatic generating device
JP2017213964A (en) Vehicle operation work assisting device and vehicle operation work assisting system
JP2017213965A (en) Vehicle operation work assisting device
JP6603540B2 (en) Vehicle operation business support device
JP2018062249A (en) Vehicle operation business assistance system
JP2017081262A (en) Business assisting system for vehicle operation
JP6611243B2 (en) Vehicle operation support system
JP6603542B2 (en) Vehicle operation business support device
JP6490760B2 (en) Vehicle operation support system
JP2004291817A (en) Information and apparatus for supporting preparation of train schedule
JP6594733B2 (en) Vehicle operation support system
JP6603541B2 (en) Vehicle operation support system
JP6760725B2 (en) Vehicle operation business support system
JP2017213963A (en) Vehicle operation work assisting system
JP6611242B2 (en) Vehicle operation work support device and vehicle operation work support system
JP6611244B2 (en) Vehicle operation business support device
JP2017081269A (en) Business assisting system for vehicle operation
JP6781028B2 (en) Vehicle operation business support system
JP2018090138A (en) Vehicle application business support system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190405

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200318

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200414

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20201027