JP2017184355A - 太陽光発電システムおよび太陽光パネルの温度異常検知方法 - Google Patents
太陽光発電システムおよび太陽光パネルの温度異常検知方法 Download PDFInfo
- Publication number
- JP2017184355A JP2017184355A JP2016065300A JP2016065300A JP2017184355A JP 2017184355 A JP2017184355 A JP 2017184355A JP 2016065300 A JP2016065300 A JP 2016065300A JP 2016065300 A JP2016065300 A JP 2016065300A JP 2017184355 A JP2017184355 A JP 2017184355A
- Authority
- JP
- Japan
- Prior art keywords
- power
- solar
- solar panels
- fire
- relay
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Fire-Detection Mechanisms (AREA)
- Photovoltaic Devices (AREA)
Abstract
Description
このような太陽光発電システムは、メンテナンスフリーといわれ、普及が進んでいる。その一方で、普及台数の増加に伴い、太陽光発電システムに起因する火災(例えば、太陽光パネルを構成する太陽電池モジュールの製品不良、経年劣化、施工不良などによる異常発熱や火災)の増加が問題となっている。
まず始めに、本発明が用いられる太陽光発電システムについて、以下に説明する。図1は、本発明が使用される一般的な太陽光発電システムの構成図である。太陽光発電システム100は、太陽光パネル10、接続箱20、パワーコンディショナ30、分電盤40、および売電メータ50を含んで構成されている。
・周囲の温度上昇をキャッチし、信号を発信することができる。
・温度上昇の緩急にかかわらず、一定温度に達すると確実に作動する。
・火災検知可能な部分が連続した線状になっているため、広い範囲をカバーできる。
・耐油・耐薬品性、耐候性、耐水性に優れており、幅広い環境条件下で使用できる。
・細く軽い電線形状のため延線、取付けが容易であり、動作機構も簡単なため、取付け後の保守も特殊技術を必要としない。
Claims (5)
- 太陽からの光エネルギーを電力に変換して、直流電力を生成する複数の太陽光パネルと、
前記複数の太陽光パネルのそれぞれで生成された前記直流電力を集電する接続箱と、
集電後の直流電力を交流電力に変換し、負荷に供給するパワーコンディショナと
を備える太陽光発電システムにおいて、
前記複数の太陽光パネルで生成された前記直流電力が、前記太陽光パネルから前記接続箱を経由して前記パワーコンディショナに供給されるまでの経路上に、開状態と閉状態を切り替え可能なリレー接点が挿入されたリレーと、
前記複数の太陽光パネルに張り巡らされ、前記複数の太陽光パネルの少なくとも1つが、あらかじめ設定された許容温度を超えた温度異常状態を検出する火災検知線と、
前記火災検知線の両端が接続され、前記火災検知線で前記温度異常状態が検出された場合には、前記リレー接点を前記開状態に切り換え、前記経路上を流れる直流電流を遮断する制御信号を出力する火災検知装置と
を備える太陽光発電システム。 - 前記火災検知装置は、前記制御信号を前記パワーコンディショナに対して出力し、
前記パワーコンディショナは、前記火災検知装置から受信した前記制御信号を出力することで、前記リレーのコイルを非励磁状態とし、前記リレー接点を前記開状態に切り換える
請求項1に記載の太陽光発電システム。 - 前記リレーのコイルに対する電源供給ラインに挿入された接点を有し、前記接点が開状態となることで、前記リレーのコイルを非励磁状態とし、前記リレー接点を前記開状態に切り換える緊急遮断ボタンをさらに備える
請求項1または2に記載の太陽光発電システム。 - 前記複数の太陽光パネルは、直並列構成を有し、N個の太陽光パネルを直列接続して構成されたストリングをM個並列接続することで、複数のストリングとして構成され、
前記リレーは、前記複数のストリングと同数のM個で構成され、前記複数のストリングのそれぞれと前記接続箱とを接続するそれぞれの経路上に前記M個のリレーの対応するリレー接点が配置され、
ここで、NおよびMは、2以上の整数である
請求項1から3のいずれか1項に記載の太陽光発電システム。 - 太陽光発電システムで使用される太陽光パネルが許容温度を超えてしまう温度異常状態を検出するための太陽光パネルの温度異常検知方法であって、
複数の太陽光パネルを経由するように張り巡らされ、前記複数の太陽光パネルの少なくとも1つが、前記温度異常状態となったことを検出する火災検知線から、異常検出信号を受信する検知ステップと、
前記異常検出信号を受信した際に、前記温度異常状態が発生したことを報知するとともに、前記複数の太陽光パネルから出力される直流電力の経路上に挿入されたリレー接点を開状態に切り替えることで、前記経路上を流れる直流電流を遮断させる防火処理ステップと
を有する太陽光パネルの温度異常検知方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2016065300A JP2017184355A (ja) | 2016-03-29 | 2016-03-29 | 太陽光発電システムおよび太陽光パネルの温度異常検知方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2016065300A JP2017184355A (ja) | 2016-03-29 | 2016-03-29 | 太陽光発電システムおよび太陽光パネルの温度異常検知方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2017184355A true JP2017184355A (ja) | 2017-10-05 |
Family
ID=60008746
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2016065300A Pending JP2017184355A (ja) | 2016-03-29 | 2016-03-29 | 太陽光発電システムおよび太陽光パネルの温度異常検知方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2017184355A (ja) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109450523A (zh) * | 2018-12-21 | 2019-03-08 | 国网思极神往位置服务(北京)有限公司 | 一种应用北斗应急通信技术的低压智能配电箱 |
CN110417348A (zh) * | 2018-04-28 | 2019-11-05 | 北京汉能光伏投资有限公司 | 太阳能组件接线盒、太阳能系统及太阳能组件控制方法 |
WO2021038916A1 (ja) * | 2019-08-27 | 2021-03-04 | オムロン株式会社 | 太陽光発電網遮断ユニットおよびこれを備えた太陽光発電網遮断システム |
CN113283113A (zh) * | 2021-06-11 | 2021-08-20 | 中国人民解放军国防科技大学 | 航天器太阳电池阵发电电流预测模型训练方法、异常检测方法、设备及介质 |
KR20210132263A (ko) * | 2020-04-24 | 2021-11-04 | (주)삼호엔씨티 | 엘이디 조명등에 공급되는 배터리의 전력 제어시스템 |
WO2021256170A1 (ja) | 2020-06-18 | 2021-12-23 | 株式会社カネカ | 異常判定システム及び発電システム |
US11689016B2 (en) | 2019-08-27 | 2023-06-27 | Omron Corporation | Solar power generation network shut-off unit and a solar power generation network shut-off system provided with same |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2014068509A (ja) * | 2012-09-27 | 2014-04-17 | Hochiki Corp | 太陽光発電システム |
JP2015014918A (ja) * | 2013-07-05 | 2015-01-22 | 能美防災株式会社 | 火災検出装置および火災検出方法 |
JP2015103196A (ja) * | 2013-11-28 | 2015-06-04 | 能美防災株式会社 | 火災検出装置および火災検出方法 |
JP2015186286A (ja) * | 2014-03-20 | 2015-10-22 | 株式会社竹中工務店 | 出力制御装置 |
US20160036235A1 (en) * | 2014-07-30 | 2016-02-04 | Robert Getsla | Safety Shutdown System for Photovoltaic Power Generators |
-
2016
- 2016-03-29 JP JP2016065300A patent/JP2017184355A/ja active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2014068509A (ja) * | 2012-09-27 | 2014-04-17 | Hochiki Corp | 太陽光発電システム |
JP2015014918A (ja) * | 2013-07-05 | 2015-01-22 | 能美防災株式会社 | 火災検出装置および火災検出方法 |
JP2015103196A (ja) * | 2013-11-28 | 2015-06-04 | 能美防災株式会社 | 火災検出装置および火災検出方法 |
JP2015186286A (ja) * | 2014-03-20 | 2015-10-22 | 株式会社竹中工務店 | 出力制御装置 |
US20160036235A1 (en) * | 2014-07-30 | 2016-02-04 | Robert Getsla | Safety Shutdown System for Photovoltaic Power Generators |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110417348A (zh) * | 2018-04-28 | 2019-11-05 | 北京汉能光伏投资有限公司 | 太阳能组件接线盒、太阳能系统及太阳能组件控制方法 |
CN109450523A (zh) * | 2018-12-21 | 2019-03-08 | 国网思极神往位置服务(北京)有限公司 | 一种应用北斗应急通信技术的低压智能配电箱 |
WO2021038916A1 (ja) * | 2019-08-27 | 2021-03-04 | オムロン株式会社 | 太陽光発電網遮断ユニットおよびこれを備えた太陽光発電網遮断システム |
US11689016B2 (en) | 2019-08-27 | 2023-06-27 | Omron Corporation | Solar power generation network shut-off unit and a solar power generation network shut-off system provided with same |
KR20210132263A (ko) * | 2020-04-24 | 2021-11-04 | (주)삼호엔씨티 | 엘이디 조명등에 공급되는 배터리의 전력 제어시스템 |
KR102413407B1 (ko) * | 2020-04-24 | 2022-06-28 | (주) 삼호엔씨티 | 엘이디 조명등에 공급되는 배터리의 전력 제어시스템 |
WO2021256170A1 (ja) | 2020-06-18 | 2021-12-23 | 株式会社カネカ | 異常判定システム及び発電システム |
CN113283113A (zh) * | 2021-06-11 | 2021-08-20 | 中国人民解放军国防科技大学 | 航天器太阳电池阵发电电流预测模型训练方法、异常检测方法、设备及介质 |
CN113283113B (zh) * | 2021-06-11 | 2022-04-15 | 中国人民解放军国防科技大学 | 太阳电池阵发电电流预测模型训练方法、异常检测方法、设备及介质 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2017184355A (ja) | 太陽光発電システムおよび太陽光パネルの温度異常検知方法 | |
KR101913546B1 (ko) | 화재예방 및 차단기능을 활용한 지능형 태양광 발전 시스템 | |
CN107037302B (zh) | 故障检测系统和电路 | |
JP5830802B2 (ja) | 危険状態において光起電力設備の発電機電圧を制限するための方法及び光起電力設備 | |
WO2012026448A1 (ja) | 太陽光発電装置及びその制御方法 | |
WO2012026447A1 (ja) | 太陽光発電用集電箱 | |
JP6042682B2 (ja) | 太陽光発電システム | |
JP6486115B2 (ja) | 太陽光発電システム | |
KR101679829B1 (ko) | 태양광 발전 시스템 | |
US20170317500A1 (en) | System and method of sensing and isolating a ground fault in a dc-to-ac power conversion system | |
JP2011019312A (ja) | 電力変換装置 | |
CN105021977A (zh) | 一种光伏逆变器并网前交流继电器检测方法及系统 | |
JP2002091586A (ja) | 太陽光発電装置およびその制御方法 | |
US8084890B2 (en) | Apparatus and method for fire protection of electrical installations | |
JP2011187807A (ja) | 太陽光発電システム | |
JP2016032369A (ja) | 太陽光発電システムの保護装置および太陽光発電システムの保護方法 | |
KR101868433B1 (ko) | 태양광 모듈 스트링 사고예방을 위한 스트링 블록 디바이스가 구비된 태양광 발전 시스템용 접속반 및 이를 구비한 태양광발전시스템 | |
KR20180059006A (ko) | 고효율 태양광 발전용 고장 우회 기능을 갖는 접속반 및 모니터링시스템 | |
JP2014042364A (ja) | 太陽光発電システムおよびアーク検出保護装置 | |
KR20120086558A (ko) | 감시 및 중성선 대체기능이 구비된 태양광 발전시스템 | |
KR102155203B1 (ko) | 다중 입력 개폐가 가능한 고전압 dc 스위치 | |
CN105529737B (zh) | 电网解列装置及方法 | |
KR20140131483A (ko) | 선택적 병렬 운전이 가능한 태양광 발전 시스템 | |
KR20140130770A (ko) | 선택적 병렬 운전이 가능한 태양광 발전 시스템 | |
KR101030925B1 (ko) | 감시 및 중성선 대체기능이 구비된 태양광 발전시스템 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20190122 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20191118 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20191203 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20200331 |
|
C60 | Trial request (containing other claim documents, opposition documents) |
Free format text: JAPANESE INTERMEDIATE CODE: C60 Effective date: 20200624 |
|
C22 | Notice of designation (change) of administrative judge |
Free format text: JAPANESE INTERMEDIATE CODE: C22 Effective date: 20201110 |
|
C13 | Notice of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: C13 Effective date: 20210406 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20210531 |
|
C22 | Notice of designation (change) of administrative judge |
Free format text: JAPANESE INTERMEDIATE CODE: C22 Effective date: 20210622 |
|
C23 | Notice of termination of proceedings |
Free format text: JAPANESE INTERMEDIATE CODE: C23 Effective date: 20210706 |
|
C03 | Trial/appeal decision taken |
Free format text: JAPANESE INTERMEDIATE CODE: C03 Effective date: 20210803 |
|
C30A | Notification sent |
Free format text: JAPANESE INTERMEDIATE CODE: C3012 Effective date: 20210803 |