JP2017179703A JP2016063313A JP2016063313A JP2017179703A JP 2017179703 A JP2017179703 A JP 2017179703A JP 2016063313 A JP2016063313 A JP 2016063313A JP 2016063313 A JP2016063313 A JP 2016063313A JP 2017179703 A JP2017179703 A JP 2017179703A
Authority
JP
Japan
Prior art keywords
box
lower box
carriage
installation
upper box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2016063313A
Other languages
Japanese (ja)
Inventor
克洋 宮元
Katsuhiro Miyamoto
克洋 宮元
邦靖 足立
Kuniyasu Adachi
邦靖 足立
勉 屋代
Tsutomu Yashiro
勉 屋代
吾郎 磐田
Goro Iwata
吾郎 磐田
直純 清板
Naozumi Kiyoita
直純 清板
裕之 内村
Yushi Uchimura
裕之 内村
直弘 渡邉
Naohiro Watanabe
直弘 渡邉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP2016063313A priority Critical patent/JP2017179703A/en
Publication of JP2017179703A publication Critical patent/JP2017179703A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an installation method of a precast box culvert that enables a precast box culvert to be installed in a same direction as a transport direction.SOLUTION: An installation method of a precast box culvert includes: a transport step in which a lower box 1a and an upper box 1b that have been rotated in a horizontal direction are respectively mounted on a carrier 2 for the lower box and a carrier 3 for the upper box, and transported inside a precast box culvert 1 already installed toward an installation location; a lower box rotation step in which the lower box 1a is rotated in the horizontal direction on a pit face side of the lower box 1a already installed; a lower box lifting step in which the lower box 1a is lifted; a lower box installation step in which the lower box 1a is installed at the installation location; an upper box rotation step in which the upper box 1b is rotated in the horizontal direction on a pit face side of the upper box 1b already installed; an upper box transfer step in which the upper box 1b is transferred above an installation location; and an upper box installation step in which the upper box 1b is installed at the installation location.SELECTED DRAWING: Figure 2

Description

本発明は、プレキャストボックスカルバート(以下、PCボックスカルバートと称す)をトンネル坑内等の狭い場所に設置するPCボックスカルバートの設置方法に関する。   The present invention relates to a PC box culvert installation method for installing a precast box culvert (hereinafter referred to as a PC box culvert) in a narrow place such as a tunnel mine.

PCボックスカルバートの設置に際し、走行台車等を用いて掘削空間内を設置箇所まで搬送する工法が提案されている(例えば、特許文献1参照)。特許文献1によると、クレーン等を用いてPCボックスカルバートを上部から吊り込む必要がなく、狭い掘削断面内でPCボックスカルバートの設置を行うことができる。   In installing the PC box culvert, a construction method has been proposed in which a traveling carriage or the like is used to convey the inside of the excavation space to the installation location (see, for example, Patent Document 1). According to Patent Document 1, it is not necessary to suspend the PC box culvert from above using a crane or the like, and the PC box culvert can be installed within a narrow excavation section.

特開平06−240733号公報Japanese Patent Laid-Open No. 06-240733

しかしながら、従来技術では、PCボックスカルバートの搬送方向は、PCボックスカルバートが設置によって延伸される方向と逆方向であるため、PCボックスカルバートの設置は掘進完了後になってしまう。すなわち、従来技術では、PCボックスカルバートをトンネルの坑口側から切羽側に搬送し、トンネルの切羽側から坑口側に設置するため、PCボックスカルバートの設置を掘進等の他の作業と同時並行で行うことができないという問題点があった。   However, in the prior art, since the PC box culvert is transported in the direction opposite to the direction in which the PC box culvert is extended by installation, the PC box culvert is installed after completion of excavation. That is, in the prior art, the PC box culvert is transported from the tunnel head side to the face side and installed from the tunnel face side to the head side, so the PC box culvert is installed in parallel with other work such as excavation. There was a problem that it was not possible.

本発明は、このような状況に鑑みてなされたものであり、上述の課題を解消し、搬送方向と同一方向にPCボックスカルバートを設置していくことができるPCボックスカルバートの設置方法を提供することにある。   This invention is made | formed in view of such a condition, provides the installation method of PC box culvert which can eliminate the above-mentioned subject and can install PC box culvert in the same direction as a conveyance direction. There is.

本発明のプレキャストボックスカルバートの設置方法は、プレキャストボックスカルバートは、上下に分割された下ボックスと上ボックスとで構成され、水平方向に回転させた状態の前記下ボックスと前記上ボックスとをそれぞれ下ボックス用台車、上ボックス用台車に積載して、設置済みの既設下ボックス及び既設上ボックスの内を設置箇所に向けて搬送する搬送工程と、前記下ボックス用台車の走行路を前記既設下ボックスよりも搬送方向下流側に延長する走行路延長工程と、前記下ボックス用台車を前記走行路延長工程によって延長した走行路上に移動させる下ボックス移動工程と、前記既設下ボックスよりも搬送方向下流側で、前記下ボックスを水平方向に回転させて設置する向きに戻す下ボックス回転工程と、前記下ボックスを前記下ボックス用台車から持ち上げて設置箇所の上方に位置させる下ボックス揚重工程と、前記下ボックス用台車と前記走行路延長工程によって延長した走行路とを設置箇所から待避させ、前記下ボックスを下ろして設置箇所に設置する下ボックス設置工程と、前記上ボックス用台車を前記既設上ボックスよりも搬送方向下流側に移動させ、前記既設上ボックスよりも搬送方向下流側で、前記上ボックスを水平方向に回転させて設置する向きに戻す上ボックス回転工程と、前記上ボックスを設置箇所の上方に位置させ、前記上ボックスを下ろして設置箇所に設置する上ボックス設置工程と、を有することを特徴とする。
さらに、本発明のプレキャストボックスカルバートの設置方法において、前記走行路延長工程では、延長する走行路を備え、前記下ボックスの設置面を走行可能な走行路延長台車を前記既設下ボックスよりも搬送方向下流側に用意しておき、前記走行路延長台車によって前記下ボックス用台車の走行路を前記既設下ボックスよりも搬送方向下流側に延長しても良い。
さらに、本発明のプレキャストボックスカルバートの設置方法において、前記下ボックス用台車には、積載された前記下ボックスを水平方向に回転させる下ボックス用ターンテーブルが設けられていても良い。
さらに、本発明のプレキャストボックスカルバートの設置方法において、前記下ボックスを前記上ボックスよりも先行して設置した下ボックス先行設置区間を設け、前記上ボックス回転工程では、前記上ボックス用台車を前記下ボックス先行設置区間に移動させて、前記上ボックスを前記既設下ボックスよりも上方に持ち上げた後、前記上ボックスを水平方向に回転させて設置する向きに戻しても良い。
さらに、本発明のプレキャストボックスカルバートの設置方法において、前記上ボックス用台車には、積載された前記上ボックスを垂直方向に持ち上げる車載揚重機と、当該車載揚重機によって持ち上げられた状態の前記上ボックスを水平方向に回転させる上ボックス用ターンテーブルとが設けられていても良い。
In the precast box culvert installation method of the present invention, the precast box culvert is composed of a lower box and an upper box which are divided into upper and lower parts, and the lower box and the upper box in a state of being rotated in the horizontal direction are respectively lowered. Loading on the cart for the upper box and the cart for the upper box, and transporting the installed lower box and the existing upper box toward the installation location; and the path of the lower box cart for the existing lower box A travel path extending step extending further downstream in the transport direction, a lower box moving step of moving the lower box carriage on the travel path extended by the travel path extending step, and a transport direction downstream side of the existing lower box The lower box rotating step for rotating the lower box in the horizontal direction to return to the installation direction, and the lower box in front Lowering the lower box by lowering the lower box lifting process, which is lifted from the lower box carriage and positioned above the installation position, and the lower box carriage and the travel path extended by the travel path extension process from the installation position. A lower box installation step to be installed at the installation location, and the upper box carriage is moved to the downstream side in the transport direction from the existing upper box, and the upper box is moved in the horizontal direction downstream from the existing upper box in the transport direction. An upper box rotating step for returning to the installation direction by rotating the upper box, and an upper box installation step for positioning the upper box above the installation location and lowering the upper box to install at the installation location. To do.
Furthermore, in the installation method of the precast box culvert of the present invention, in the travel path extending step, a travel path extension carriage that includes a travel path to be extended and can travel on the installation surface of the lower box is transported more than the existing lower box. It may be prepared on the downstream side, and the travel path of the lower box carriage may be extended to the downstream side in the transport direction from the existing lower box by the travel path extension carriage.
Furthermore, in the precast box culvert installation method of the present invention, the lower box carriage may be provided with a lower box turntable for rotating the loaded lower box in the horizontal direction.
Further, in the precast box culvert installation method of the present invention, a lower box preceding installation section in which the lower box is installed in advance of the upper box is provided, and in the upper box rotating step, the upper box carriage is moved to the lower box. After moving to the box preceding installation section and lifting the upper box above the existing lower box, the upper box may be rotated in the horizontal direction to return to the installation direction.
Further, in the precast box culvert installation method of the present invention, the upper box carriage includes an in-vehicle lifter that lifts the loaded upper box in a vertical direction, and the upper box that is lifted by the in-vehicle lifter. There may be provided an upper box turntable for rotating the frame horizontally.

本発明によれば、PCボックスカルバートの設置ルート自体がPCボックスカルバートの独立した搬送路として確保されるため、PCボックスカルバートの設置ルート以外にPCボックスカルバートの搬送路を設けることなく、搬送方向と同一方向にPCボックスカルバートを設置していくことができるという効果を奏する。   According to the present invention, since the installation route of the PC box culvert itself is secured as an independent conveyance path for the PC box culvert, the conveyance direction and the conveyance direction of the PC box culvert can be determined without providing the conveyance path for the PC box culvert. There is an effect that the PC box culvert can be installed in the same direction.

本発明に係るPCボックスカルバートの設置方法で設置するPCボックスカルバートの構成を示す図である。It is a figure which shows the structure of PC box culvert installed with the installation method of PC box culvert concerning this invention. 本発明に係るPCボックスカルバートの設置方法によるPCボックスカルバートの搬送工程を説明する説明図である。It is explanatory drawing explaining the conveyance process of PC box culvert by the installation method of PC box culvert which concerns on this invention. 本発明に係るPCボックスカルバートの設置方法に用いる台車の構成を示す図である。It is a figure which shows the structure of the trolley | bogie used for the installation method of PC box culvert concerning this invention. 本発明に係るPCボックスカルバートの設置方法による走行路延長工程を説明する説明図である。It is explanatory drawing explaining the traveling path extension process by the installation method of PC box culvert concerning the present invention. 本発明に係るPCボックスカルバートの設置方法による下ボックス移動工程を説明する説明図である。It is explanatory drawing explaining the lower box moving process by the installation method of PC box culvert concerning the present invention. 本発明に係るPCボックスカルバートの設置方法による下ボックス回転工程を説明する説明図である。It is explanatory drawing explaining the lower box rotation process by the installation method of PC box culvert which concerns on this invention. 本発明に係るPCボックスカルバートの設置方法による下ボックス揚重工程を説明する説明図である。It is explanatory drawing explaining the lower box lifting process by the installation method of PC box culvert which concerns on this invention. 本発明に係るPCボックスカルバートの設置方法による下ボックス設置工程を説明する説明図である。It is explanatory drawing explaining the lower box installation process by the installation method of PC box culvert which concerns on this invention. 本発明に係るPCボックスカルバートの設置方法による上ボックス揚重工程を説明する説明図である。It is explanatory drawing explaining the upper box lifting process by the installation method of PC box culvert which concerns on this invention. 本発明に係るPCボックスカルバートの設置方法による上ボックス回転工程を説明する説明図である。It is explanatory drawing explaining the upper box rotation process by the installation method of PC box culvert which concerns on this invention. 本発明に係るPCボックスカルバートの設置方法による上ボックス設置工程を説明する説明図である。It is explanatory drawing explaining the upper box installation process by the installation method of the PC box culvert concerning this invention.

次に、本発明を実施するための形態(以下、単に「実施形態」という)を、図面を参照して具体的に説明する。   Next, modes for carrying out the present invention (hereinafter, simply referred to as “embodiments”) will be specifically described with reference to the drawings.

本実施形態で設置するPCボックスカルバート1は、図1を参照すると、上下に分割された下ボックス1aと上ボックス1bとからなる。図1において、(a)は正面図であり、(b)は側面図である。また、PCボックスカルバート1の長さ(差し口が形成されている場合には、差し口を含む長さ)をLとすると、長さLは、内幅Wiよりも短く構成されている。本実施形態では、PCボックスカルバート1は上下に1/2に分割され、下ボックス1aの外高Hdoと、上ボックス1bの外高Huoとは、いずれもPCボックスカルバート1の外高Hoの1/2であり、PCボックスカルバート1の内高Hiよりも短く構成されている。   A PC box culvert 1 installed in the present embodiment is composed of a lower box 1a and an upper box 1b which are divided into upper and lower parts, as shown in FIG. In FIG. 1, (a) is a front view and (b) is a side view. Further, when the length of the PC box culvert 1 (the length including the slot when the slot is formed) is L, the length L is configured to be shorter than the inner width Wi. In the present embodiment, the PC box culvert 1 is vertically divided into ½, and the outer height Hdo of the lower box 1 a and the outer height Huo of the upper box 1 b are both 1 of the outer height Ho of the PC box culvert 1. / 2, which is shorter than the inner height Hi of the PC box culvert 1.

(搬送工程)
本実施形態のPCボックスカルバート1の設置方法では、図2に示すように、下ボックス1aと上ボックス1bとを、設置済みのPCボックスカルバート1内を設置箇所に向けて坑口側から切羽側に搬送し、下ボックス1a及び上ボックス1bの搬送方向上流側である坑口側から下ボックス1a及び上ボックス1bの搬送方向下流側である切羽側に向けてPCボックスカルバート1を設置していく。図1において、(a)は側断面図であり、(b)は坑口側から見た側面図である。設置済みのPCボックスカルバート1の断面は、内幅Wi×内高Hiである。従って、下ボックス1aと上ボックス1bとは、設置済みのPCボックスカルバート1に対してそれぞれ水平方向に90度回転させた状態で搬送する。上述のように、下ボックス1a及び上ボックス1b(PCボックスカルバート1)の長さLは、PCボックスカルバート1の内幅Wiよりも短く構成されている。これにより、下ボックス1a及び上ボックス1bは、設置済みのPCボックスカルバート1の側壁11に接触することなく搬送可能となる。なお、搬送する下ボックス1a及び上ボックス1bと設置済みのPCボックスカルバート1の側壁11との間に余裕がある場合には、下ボックス1a及び上ボックス1bの水平方向の回転角度は必ずしも90度である必要はない。しかしながら、搬送時の重量バランスを鑑みると、下ボックス1aと上ボックス1bとをそれぞれ水平方向に90度回転させた状態で搬送するのが好適である。
(Conveying process)
In the installation method of the PC box culvert 1 according to the present embodiment, as shown in FIG. 2, the lower box 1a and the upper box 1b are placed from the wellhead side to the face side with the installed PC box culvert 1 facing the installation location. The PC box culvert 1 is installed from the wellhead side which is the upstream side in the transport direction of the lower box 1a and the upper box 1b toward the face side which is the downstream side in the transport direction of the lower box 1a and the upper box 1b. In FIG. 1, (a) is a side sectional view, and (b) is a side view as seen from the wellhead side. The cross section of the installed PC box culvert 1 has an inner width Wi × inner height Hi. Therefore, the lower box 1a and the upper box 1b are transported in a state where they are rotated by 90 degrees in the horizontal direction with respect to the installed PC box culvert 1, respectively. As described above, the length L of the lower box 1a and the upper box 1b (PC box culvert 1) is configured to be shorter than the inner width Wi of the PC box culvert 1. Thereby, the lower box 1a and the upper box 1b can be transported without contacting the side wall 11 of the installed PC box culvert 1. If there is a margin between the lower box 1a and the upper box 1b to be transported and the side wall 11 of the installed PC box culvert 1, the horizontal rotation angle of the lower box 1a and the upper box 1b is not necessarily 90 degrees. Need not be. However, in view of the weight balance at the time of transport, it is preferable to transport the lower box 1a and the upper box 1b while being rotated 90 degrees in the horizontal direction.

下ボックス1aは下ボックス用台車2に、上ボックス1bは上ボックス用台車3にそれぞれ積載して搬送する。下ボックス用台車2と上ボックス用台車3とは、バッテリーロコ等の駆動台車4に、切羽側から下ボックス用台車2、上ボックス用台車3、駆動台車4の順に連結されている。本実施形態では、下ボックス用台車2、上ボックス用台車3及び駆動台車4は、設置済みのPCボックスカルバート1の床面12に敷設された軌条5の上を走行させるように構成した。下ボックス用台車2、上ボックス用台車3及び駆動台車4の車輪をタイヤとして、設置済みのPCボックスカルバート1の床面12の上を走行させるように構成しても良い。なお、下ボックス用台車2と上ボックス用台車3とを人力で走行させる場合や、下ボックス用台車2と上ボックス用台車3とにそれぞれモーター等の駆動部を備え、自走可能に構成されている場合には、下ボックス用台車2と上ボックス用台車3とをそれぞれ単独で走行させるようにしても良い。   The lower box 1a is loaded on the lower box carriage 2 and the upper box 1b is loaded on the upper box carriage 3 for conveyance. The lower box carriage 2 and the upper box carriage 3 are connected to a drive carriage 4 such as a battery locomotive in order of the lower box carriage 2, the upper box carriage 3, and the drive carriage 4 from the face side. In the present embodiment, the lower box carriage 2, the upper box carriage 3, and the drive carriage 4 are configured to run on the rails 5 laid on the floor surface 12 of the installed PC box culvert 1. The wheels of the lower box carriage 2, the upper box carriage 3, and the driving carriage 4 may be configured to run on the floor surface 12 of the installed PC box culvert 1 using tires. The lower box carriage 2 and the upper box carriage 3 are driven manually, or the lower box carriage 2 and the upper box carriage 3 are each provided with a drive unit such as a motor so that they can run independently. In this case, the lower box carriage 2 and the upper box carriage 3 may be caused to travel independently.

下ボックス用台車2は、図3(a)に示すように、積載された下ボックス1aを水平方向に回転させる下ボックス用ターンテーブル21を備えている。また、下ボックス用台車2は、PCボックスカルバート1の床面12から下ボックス1aの積載面までの高さHaが、(PCボックスカルバート1の内高Hi−下ボックス1aの外高Hdo)よりも低く構成されている。これにより、積載した下ボックス1aを設置済みのPCボックスカルバート1の天井面13に接触することなく搬送することができる。   As shown in FIG. 3A, the lower box carriage 2 includes a lower box turntable 21 that rotates the loaded lower box 1a in the horizontal direction. Further, in the lower box carriage 2, the height Ha from the floor surface 12 of the PC box culvert 1 to the loading surface of the lower box 1a is greater than (the inner height Hi of the PC box culvert 1−the outer height Hdo of the lower box 1a). It is also configured low. Thereby, the loaded lower box 1a can be transported without contacting the ceiling surface 13 of the installed PC box culvert 1.

上ボックス用台車3は、図3(b)に示すように、積載された上ボックス1bを垂直方向に持ち上げるジャッキ31と、ジャッキ31によって持ち上げられた状態の上ボックス1bを水平方向に回転させる上ボックス用ターンテーブル32と、上ボックス1bの持ち上げ時の反力をとるウエイト33とを備えている。また、上ボックス用台車3は、PCボックスカルバート1の床面12から上ボックス1bの積載面までの高さHbが、(PCボックスカルバート1の内高Hi−上ボックス1bの外高Huo)よりも低く構成されている。これにより、積載した上ボックス1bを設置済みのPCボックスカルバート1の天井面13に接触することなく搬送することができる。   As shown in FIG. 3 (b), the upper box carriage 3 includes a jack 31 that lifts the stacked upper box 1 b in the vertical direction, and an upper box 1 b that is lifted by the jack 31 that rotates in the horizontal direction. A box turntable 32 and a weight 33 for taking a reaction force when the upper box 1b is lifted are provided. Further, in the upper box carriage 3, the height Hb from the floor surface 12 of the PC box culvert 1 to the loading surface of the upper box 1b is (the inner height Hi of the PC box culvert 1−the outer height Huo of the upper box 1b). It is also configured low. Thus, the loaded upper box 1b can be transported without contacting the ceiling surface 13 of the installed PC box culvert 1.

次に、下ボックス1a及び上ボックス1bを設置箇所に設置する工程を図4乃至図11を参照して詳細に説明する。図4乃至図11において、(a)は側面図であり、(b)は切羽側から設置箇所を見た図である。また、図4乃至図11の(b)において、設置済みのPCボックスカルバート1は省略されている。   Next, the process of installing the lower box 1a and the upper box 1b at the installation location will be described in detail with reference to FIGS. 4 to 11, (a) is a side view, and (b) is a view of the installation location from the face side. Also, in FIG. 4 to FIG. 11B, the installed PC box culvert 1 is omitted.

本実施形態のPCボックスカルバート1の設置方法では、図4に示すように、下ボックス1aを上ボックス1bよりも先行して設置した下ボックス先行設置区間を設ける。下ボックス先行設置区間は、上ボックス用台車3に積載された上ボックス1bが下ボックス先行設置区間内に移動できるように設ける。すなわち、本実施形態のように下ボックス用台車2と上ボックス用台車3とが連結されている場合、下ボックス先行設置区間は、下ボックス用台車2及び上ボックス用台車3が共に区間内に位置することができる長さに設定される。   In the installation method of the PC box culvert 1 of the present embodiment, as shown in FIG. 4, a lower box preceding installation section in which the lower box 1a is installed before the upper box 1b is provided. The lower box preceding installation section is provided so that the upper box 1b loaded on the upper box carriage 3 can move into the lower box preceding installation section. That is, when the lower box carriage 2 and the upper box carriage 3 are connected as in the present embodiment, the lower box carriage 2 and the upper box carriage 3 are both within the section. Set to a length that can be located.

(走行路延長工程)
図4を参照すると、下ボックス先行設置区間の切羽側には、下ボックス用台車2の走行路を延長する走行路延長台車として機能する軌条台車7が用意されている。軌条台車7は、PCボックスカルバート1(下ボックス1a)を設置する設置面6を走行可能に構成されている。設置面6は、例えば、インバートコンクリートを打設することで形成される。軌条台車7には、延長する走行路として、設置済みのPCボックスカルバート1の床面12に敷設された軌条5と接続する接続軌条5aが敷設されている。軌条台車7に敷設された接続軌条5aのレール面は、図3(c)に示すように、設置済みのPCボックスカルバート1の床面12に敷設された軌条5のレール面と同じ高さに設定されている。なお、下ボックス用台車2が設置済みのPCボックスカルバート1の床面12を走行する場合には、床面12と同じ高さの接続床面が形成された走行路延長台車が用いられる。
(Runway extension process)
Referring to FIG. 4, a rail carriage 7 that functions as a traveling path extension carriage that extends the traveling path of the lower box carriage 2 is prepared on the face side of the lower box preceding installation section. The rail carriage 7 is configured to be able to travel on the installation surface 6 on which the PC box culvert 1 (lower box 1a) is installed. The installation surface 6 is formed by placing invert concrete, for example. The rail carriage 7 is provided with a connecting rail 5a connected to the rail 5 laid on the floor surface 12 of the installed PC box culvert 1 as an extended traveling path. The rail surface of the connecting rail 5a laid on the rail carriage 7 is at the same height as the rail surface of the rail 5 laid on the floor surface 12 of the installed PC box culvert 1, as shown in FIG. 3 (c). Is set. When the lower box cart 2 travels on the floor surface 12 of the PC box culvert 1 in which the lower box cart 2 is installed, a travel path extension cart in which a connection floor surface having the same height as the floor surface 12 is formed is used.

図4に矢印で示すように、軌条台車7を坑口側に移動させ、軌条台車7に敷設された接続軌条5aと、設置済みのPCボックスカルバート1の床面12に敷設された軌条5とを接続する。なお、設置済みのPCボックスカルバート1の床面12に敷設する軌条5は、新たな下ボックス1aを設置するため、下ボックス先行設置区間から切羽側に突出させることができない。従って、軌条台車7に敷設された軌条5を坑口側に突出させるように構成すると良い。また、接続軌条5aと軌条5との接続に際し、床面12に敷設する軌条5の長さ等に起因する、接続軌条5aと軌条5との間に間隙が生じる場合、この間隙を補完する補完軌条を用意すると良い。   As shown by the arrows in FIG. 4, the rail carriage 7 is moved to the wellhead side, the connection rail 5 a laid on the rail carriage 7, and the rail 5 laid on the floor surface 12 of the installed PC box culvert 1. Connecting. The rail 5 laid on the floor 12 of the installed PC box culvert 1 cannot be projected from the lower box preceding installation section to the face side because a new lower box 1a is installed. Therefore, it is good to comprise so that the rail 5 laid in the rail carriage 7 may protrude to the wellhead side. Further, when a gap is generated between the connecting rail 5a and the rail 5 due to the length of the rail 5 to be laid on the floor surface 12 when the connecting rail 5a and the rail 5 are connected, a supplement for complementing the gap is provided. It is good to prepare a rail.

(下ボックス移動工程)
次に、下ボックス用台車2を切羽側に移動させて軌条台車7上に位置させ、図5に示すように、下ボックス用台車2に積載された下ボックス1aを下ボックス先行設置区間よりも切羽側に位置させる。なお、軌条台車7に敷設された接続軌条5aの長さは、下ボックス1a(PCボックスカルバート1)の外幅Wo以上に設定されている。
(Lower box moving process)
Next, the lower box carriage 2 is moved to the face side so as to be positioned on the rail carriage 7, and as shown in FIG. 5, the lower box 1a loaded on the lower box carriage 2 is set to be lower than the lower box preceding installation section. Position it on the face side. Note that the length of the connecting rail 5a laid on the rail carriage 7 is set to be equal to or greater than the outer width Wo of the lower box 1a (PC box culvert 1).

(下ボックス回転工程)
次に、下ボックス用台車2の下ボックス用ターンテーブル21を90度回転させ、図6に示すように、下ボックス1aを設置する向き(設置済みの下ボックス1aと同じ向き)に戻す。なお、下ボックス用ターンテーブル21の回転は、モーター等の動力を用いて行うようにしても良く、人力で行うようにしても良い。
(Lower box rotation process)
Next, the lower box turntable 21 of the lower box carriage 2 is rotated by 90 degrees and returned to the direction in which the lower box 1a is installed (the same direction as the installed lower box 1a) as shown in FIG. The rotation of the lower box turntable 21 may be performed using power such as a motor, or may be performed manually.

(下ボックス揚重工程)
図7を参照すると、下ボックス先行設置区間の切羽側には、下ボックス1aを持ち上げる揚重機として機能する坑内クレーン8が用意されている。次に、下ボックス用台車2を坑口側に移動させて、下ボックス1aを設置箇所の上方に位置させる。次に、坑内クレーン8によって下ボックス1aを下ボックス用台車2から持ち上げる。なお、坑内クレーン8が設置面6を走行する機能を備えている場合には、下ボックス1aを下ボックス用台車2から持ち上げた後に、持ち上げた下ボックス1aを坑内クレーン8を走行させて設置箇所の上方に位置させるようにしても良い。また、図7(c)に示すように、下ボックス1aを持ち上げる揚重機としてジャッキ9を用いるようにしても良い。
(Lower box lifting process)
If FIG. 7 is referred, the underground crane 8 which functions as a lifting machine which lifts the lower box 1a will be prepared on the face side of the lower box preceding installation section. Next, the lower box carriage 2 is moved to the wellhead side, and the lower box 1a is positioned above the installation location. Next, the lower box 1 a is lifted from the lower box carriage 2 by the underground crane 8. In addition, when the underground crane 8 has a function of traveling on the installation surface 6, after the lower box 1a is lifted from the lower box carriage 2, the lifted lower box 1a is moved on the underground crane 8 and installed. You may make it position above. Moreover, as shown in FIG.7 (c), you may make it use the jack 9 as a lifting machine which lifts the lower box 1a.

(下ボックス設置工程)
次に、図8に示すように、下ボックス用台車2を坑口側に移動させると共に、軌条台車7を切羽側に移動させ、坑内クレーン8によって持ち上げられた下ボックス1aの下から下ボックス用台車2及び軌条台車7を退避させる。そして、坑内クレーン8によって下ボックス1aを下ろし、下ボックス1aを設置箇所に設置する。
(Lower box installation process)
Next, as shown in FIG. 8, the lower box carriage 2 is moved to the wellhead side, the rail carriage 7 is moved to the face side, and the lower box carriage is moved from below the lower box 1 a lifted by the underground crane 8. 2 and the rail carriage 7 are retracted. And the lower box 1a is lowered | hung with the underground crane 8, and the lower box 1a is installed in an installation location.

(上ボックス揚重工程)
次に、上ボックス用台車3を切羽側に移動させて、図9に示すように、上ボックス用台車3に積載された上ボックス1bを下ボックス先行設置区間に位置させた後、ジャッキ31によって上ボックス1bを垂直方向に持ち上げる。ジャッキ31は、上ボックス1bを持ち上げる車載揚重機として機能し、上ボックス1bの下端部が設置済みの下ボックス1aの上端部を超える位置まで上ボックス1bを持ち上げる。
(Upper box lifting process)
Next, the upper box carriage 3 is moved to the face side, and the upper box 1b loaded on the upper box carriage 3 is positioned in the lower box preceding installation section as shown in FIG. The upper box 1b is lifted in the vertical direction. The jack 31 functions as an in-vehicle lifting machine that lifts the upper box 1b, and lifts the upper box 1b to a position where the lower end of the upper box 1b exceeds the upper end of the installed lower box 1a.

(上ボックス回転工程)
次に、上ボックス用台車3の上ボックス用ターンテーブル32を90度回転させ、図10に示すように、上ボックス1bを設置する向き(設置済みの上ボックス1bと同じ向き)に戻す。なお、上ボックス用ターンテーブル32の回転は、モーター等の動力を用いて行うようにしても良く、人力で行うようにしても良い。
(Upper box rotation process)
Next, the upper box turntable 32 of the upper box carriage 3 is rotated by 90 degrees to return to the direction in which the upper box 1b is installed (the same direction as the installed upper box 1b) as shown in FIG. The rotation of the upper box turntable 32 may be performed using the power of a motor or the like, or may be performed manually.

(上ボックス設置工程)
次に、図11に示すように、上ボックス用台車3を坑口側に移動させて、ジャッキ31によって持ち上げた状態の上ボックス1bを設置箇所の上方に位置させる。次に、ジャッキ31によって上ボックス1bを下ろし、上ボックス1bを設置箇所に設置する。
(Upper box installation process)
Next, as shown in FIG. 11, the upper box carriage 3 is moved to the wellhead side, and the upper box 1 b lifted by the jack 31 is positioned above the installation location. Next, the upper box 1b is lowered by the jack 31, and the upper box 1b is installed at the installation location.

以下、(搬送工程)〜(上ボックス設置工程)の工程を繰り返して、PCボックスカルバート1を坑口側から切羽側に向けて設置していく。なお、PCボックスカルバート1の設置開始時には、(走行路延長工程)〜(下ボックス設置工程)の工程によって下ボックス先行設置区間を形成する。そして、PCボックスカルバート1の設置終了時には、(上ボックス揚重工程)〜(上ボックス設置工程)の構成によって、下ボックス先行設置区間上に上ボックス1bを設置する。   Hereinafter, the steps of (conveying step) to (upper box installing step) are repeated to install the PC box culvert 1 from the wellhead side toward the face side. When the installation of the PC box culvert 1 is started, the lower box preceding installation section is formed by the processes of (travel path extension process) to (lower box installation process). Then, at the end of the installation of the PC box culvert 1, the upper box 1b is installed on the lower box preceding installation section by the configuration of (upper box lifting process) to (upper box installation process).

なお、本実施の形態では、下ボックス先行設置区間に位置させた上ボックス1bを持ち上げて回転させるように構成したが、軌条台車7を接続することで、上ボックス用台車3の走行路を延長させ、軌条台車7上で上ボックス1bを回転させるようにしても良い。この場合には、軌条台車7を接続する上ボックス用台車3用の走行路延長工程が増えることになるが、下ボックス先行設置区間を形成する必要がなくなる。また、上ボックス用台車3のジャッキ31を用いることなく、坑内クレーン8で上ボックス1bを持ち上げた後に、持ち上げた上ボックス1bを坑内クレーン8を走行させて設置箇所の上方に位置させるようにしても良い。   In the present embodiment, the upper box 1b positioned in the lower box preceding installation section is lifted and rotated. However, by connecting the rail carriage 7, the travel path of the upper box carriage 3 is extended. The upper box 1b may be rotated on the rail carriage 7. In this case, the travel path extending process for the upper box bogie 3 for connecting the rail bogie 7 is increased, but it is not necessary to form the lower box preceding installation section. Further, the upper box 1b is lifted by the underground crane 8 without using the jack 31 of the upper box carriage 3, and the lifted upper box 1b is moved on the underground crane 8 so as to be positioned above the installation location. Also good.

以上説明したように、本実施形態は、PCボックスカルバート1は、上下に分割された下ボックス1aと上ボックス1bとで構成され、水平方向に回転させた状態の下ボックス1aと上ボックス1bとをそれぞれ下ボックス用台車2、上ボックス用台車3に積載して、設置済みのPCボックスカルバート1(下ボックス1a及び上ボックス1b)の内を設置箇所に向けて搬送する搬送工程と、下ボックス用台車2の走行路を設置済みの下ボックス1aよりも搬送方向下流側(切羽側)に延長する走行路延長工程と、下ボックス用台車2を走行路延長工程によって延長した走行路上に移動させ下ボックス移動工程と、設置済みの下ボックス1aよりも搬送方向下流側(切羽側)で、下ボックス1aを水平方向に回転させて設置する向きに戻す下ボックス回転工程と、下ボックス1aを下ボックス用台車2から持ち上げて設置箇所の上方に位置させる下ボックス揚重工程と、下ボックス用台車2と走行路延長工程によって延長した走行路とを設置箇所から待避させ、下ボックス1aを下ろして設置箇所に設置する下ボックス設置工程と、上ボックス用台車3を設置済みの上ボックス1bよりも搬送方向下流側(切羽側)に移動させ、設置済みの上ボックス1bよりも搬送方向下流側(切羽側)で、上ボックス1bを水平方向に回転させて設置する向きに戻す上ボックス回転工程と、上ボックス1bを設置箇所の上方に位置させ、上ボックス1bを下ろして設置箇所に設置する上ボックス設置工程と、を有する。
この構成により、PCボックスカルバート1の設置ルート自体がPCボックスカルバート1の独立した搬送路として確保されるため、PCボックスカルバート1の設置ルート以外にPCボックスカルバート1の搬送路を設けることなく、搬送方向と同一方向にPCボックスカルバート1を設置していくことができる。従って、PCボックスカルバート1の設置を掘進等の他の作業と同時並行で行うことができる。例えば、シールド掘進作業と分離してPCボックスカルバート1の設置作業を行えるため、お互いの作業進捗による影響がなくなる。加えて、幅輳作業の減少により安全確保が行える。
As described above, in the present embodiment, the PC box culvert 1 is composed of the lower box 1a and the upper box 1b that are divided vertically, and the lower box 1a and the upper box 1b that are rotated in the horizontal direction. Are loaded on the lower box carriage 2 and the upper box carriage 3 respectively, and the inside of the installed PC box culvert 1 (the lower box 1a and the upper box 1b) is conveyed toward the installation location, and the lower box A travel path extending process for extending the travel path of the carriage 2 to the downstream side (face side) in the transport direction from the installed lower box 1a; and the lower box carriage 2 is moved onto the travel path extended by the travel path extending process. The lower box moving step and the lower box 1a in the transport direction downstream side (face side) with respect to the installed lower box 1a, the lower box 1a is rotated horizontally to return to the installation direction. The installation location includes a box rotation process, a lower box lifting process in which the lower box 1a is lifted from the lower box carriage 2 and positioned above the installation location, and a travel path extended by the lower box carriage 2 and the travel path extension process. The lower box 1a is lowered and installed at the installation location, and the upper box carriage 3 is moved to the downstream side (face side) in the transport direction from the installed upper box 1b. An upper box rotating step for returning the upper box 1b to the installation direction by rotating the upper box 1b in the horizontal direction on the downstream side (face side) of the upper box 1b with respect to the conveying direction, and positioning the upper box 1b above the installation location. And an upper box installation step in which 1b is lowered and installed at the installation location.
With this configuration, the installation route itself of the PC box culvert 1 is secured as an independent conveyance path of the PC box culvert 1, so that the conveyance can be performed without providing the conveyance path of the PC box culvert 1 in addition to the installation route of the PC box culvert 1. The PC box culvert 1 can be installed in the same direction as the direction. Therefore, the installation of the PC box culvert 1 can be performed simultaneously with other work such as excavation. For example, since the installation work of the PC box culvert 1 can be performed separately from the shield excavation work, the influence of the progress of the work is eliminated. In addition, safety can be ensured by reducing the congestion work.

さらに、本実施形態において、走行路延長工程では、延長する走行路を備え、下ボックス1aの設置面を走行可能な走行路延長台車として機能する軌条台車7を設置済みの下ボックス1aよりも搬送方向下流側(切羽側)に用意しておき、軌条台車7によって下ボックス用台車2の走行路を設置済みの下ボックス1aよりも搬送方向下流側(切羽側)に延長する。
この構成により、走行路延長工程での走行路の延長と、下ボックス設置工程での延長した走行路の退避とを容易に行うことができる。
Further, in the present embodiment, in the travel path extending step, the rail carriage 7 that functions as a travel path extension carriage that has an extended travel path and that can travel on the installation surface of the lower box 1a is conveyed more than the installed lower box 1a. Prepared on the downstream side in the direction (face side), the rail carriage 7 extends the travel path of the lower box carriage 2 to the downstream side (face side) in the transport direction from the lower box 1a that has been installed.
With this configuration, it is possible to easily extend the travel path in the travel path extension process and retreat the extended travel path in the lower box installation process.

さらに、本実施形態において、下ボックス用台車2には、積載された下ボックス1aを水平方向に回転させる下ボックス用ターンテーブル21が設けられている。
この構成により、下ボックス1aを回転させる機材を設置済みの下ボックス1aよりも搬送方向下流側(切羽側)に用意しておく必要がなく、下ボックス回転工程において簡単に下ボックス1aを水平方向に回転させることができる。
Furthermore, in this embodiment, the lower box carriage 2 is provided with a lower box turntable 21 that rotates the loaded lower box 1a in the horizontal direction.
With this configuration, it is not necessary to prepare equipment for rotating the lower box 1a on the downstream side (face side) in the transport direction with respect to the installed lower box 1a. Can be rotated.

さらに、本実施形態において、下ボックス1aを上ボックス1bよりも先行して設置した下ボックス先行設置区間を設け、上ボックス回転工程では、上ボックス用台車3を下ボックス先行設置区間に移動させて、上ボックス1bを設置済みの下ボックス1aよりも上方に持ち上げた後、上ボックス1bを水平方向に回転させて設置する向きに戻す。
この構成により、上ボックス用台車3用の走行路の延長させることなく、上ボックス1bを水平方向に回転させて設置する向きに戻すことができる。
Further, in the present embodiment, a lower box preceding installation section in which the lower box 1a is installed ahead of the upper box 1b is provided, and in the upper box rotating process, the upper box carriage 3 is moved to the lower box preceding installation section. After the upper box 1b is lifted above the installed lower box 1a, the upper box 1b is rotated in the horizontal direction to return to the installation direction.
With this configuration, the upper box 1b can be rotated in the horizontal direction and returned to the installation direction without extending the travel path for the upper box carriage 3.

さらに、本実施形態において、上ボックス用台車3には、積載された上ボックス1bを垂直方向に持ち上げる車載揚重機として機能するジャッキ31と、ジャッキ31によって持ち上げられた状態の上ボックス1bを水平方向に回転させる上ボックス用ターンテーブル32とが設けられている。
この構成により、上ボックス1bを持ち上げて回転させる機材を設置済みの上ボックス1bよりも搬送方向下流側(切羽側)に用意しておく必要がなく、上ボックス回転工程において簡単に上ボックス1bを持ち上げて水平方向に回転させることができる。
Further, in the present embodiment, the upper box carriage 3 has a jack 31 functioning as an in-vehicle lifting machine that lifts the loaded upper box 1b in the vertical direction, and the upper box 1b lifted by the jack 31 in the horizontal direction. An upper box turntable 32 is provided for rotation.
With this configuration, it is not necessary to prepare equipment for lifting and rotating the upper box 1b on the downstream side (face side) in the transport direction from the installed upper box 1b, and the upper box 1b can be easily installed in the upper box rotating process. Can be lifted and rotated horizontally.

以上、本発明を実施の形態をもとに説明した。この実施の形態は例示であり、それらの各構成要素の組み合わせ等にいろいろな変形例が可能なこと、またそうした変形例も本発明の範囲にあることは当業者に理解されるところである。   The present invention has been described based on the embodiments. This embodiment is an exemplification, and it will be understood by those skilled in the art that various modifications can be made to combinations of these components, and that such modifications are within the scope of the present invention.

1 プレキャスト(PC)ボックスカルバート
1a 下ボックス
1b 上ボックス
2 下ボックス用台車
3 上ボックス用台車
4 駆動台車
5 軌条
5a 接続軌条
6 設置面
7 軌条台車
8 坑内クレーン
9 ジャッキ
11 側壁
12 床面
13 天井面
21 下ボックス用ターンテーブル
31 ジャッキ
32 上ボックス用ターンテーブル
33 ウエイト
DESCRIPTION OF SYMBOLS 1 Precast (PC) box culvert 1a Lower box 1b Upper box 2 Lower box cart 3 Upper box cart 4 Drive cart 5 Rail 5a Connection rail 6 Installation surface 7 Rail cart 8 Underground crane 9 Jack 11 Side wall 12 Floor surface 13 Ceiling surface 21 Turntable for lower box 31 Jack 32 Turntable for upper box 33 Weight

Claims (5)

プレキャストボックスカルバートは、上下に分割された下ボックスと上ボックスとで構成され、
水平方向に回転させた状態の前記下ボックスと前記上ボックスとをそれぞれ下ボックス用台車、上ボックス用台車に積載して、設置済みの既設下ボックス及び既設上ボックスの内を設置箇所に向けて搬送する搬送工程と、
前記下ボックス用台車の走行路を前記既設下ボックスよりも搬送方向下流側に延長する走行路延長工程と、
前記下ボックス用台車を前記走行路延長工程によって延長した走行路上に移動させる下ボックス移動工程と、
前記既設下ボックスよりも搬送方向下流側で、前記下ボックスを水平方向に回転させて設置する向きに戻す下ボックス回転工程と、
前記下ボックスを前記下ボックス用台車から持ち上げて設置箇所の上方に位置させる下ボックス揚重工程と、
前記下ボックス用台車と前記走行路延長工程によって延長した走行路とを設置箇所から待避させ、前記下ボックスを下ろして設置箇所に設置する下ボックス設置工程と、
前記上ボックス用台車を前記既設上ボックスよりも搬送方向下流側に移動させ、前記既設上ボックスよりも搬送方向下流側で、前記上ボックスを水平方向に回転させて設置する向きに戻す上ボックス回転工程と、
前記上ボックスを設置箇所の上方に位置させ、前記上ボックスを下ろして設置箇所に設置する上ボックス設置工程と、を有することを特徴とするプレキャストボックスカルバートの設置方法。
The precast box culvert is composed of a lower box and an upper box that are divided vertically.
The lower box and the upper box that are rotated in the horizontal direction are loaded on the lower box carriage and the upper box carriage, respectively, and the inside of the existing lower box and the existing upper box are directed toward the installation location. A transport process to transport;
A travel path extending step of extending the travel path of the lower box carriage to the downstream side in the transport direction from the existing lower box;
A lower box moving step of moving the lower box carriage on the traveling road extended by the traveling road extending step;
A lower box rotating step for returning to the direction in which the lower box is rotated in the horizontal direction and installed on the downstream side in the transport direction from the existing lower box,
A lower box lifting step in which the lower box is lifted from the lower box carriage and positioned above the installation location;
A lower box installation step of retracting the lower box carriage and the travel path extended by the travel path extension process from the installation location, and lowering the lower box and installing the installation location;
Rotating the upper box carriage to the downstream side in the transport direction from the existing upper box, and rotating the upper box in the horizontal direction to return to the installation direction downstream from the existing upper box in the transport direction Process,
A method for installing a precast box culvert, comprising: an upper box installation step in which the upper box is positioned above the installation location, and the upper box is lowered and installed at the installation location.
前記走行路延長工程では、延長する走行路を備え、前記下ボックスの設置面を走行可能な走行路延長台車を前記既設下ボックスよりも搬送方向下流側に用意しておき、前記走行路延長台車によって前記下ボックス用台車の走行路を前記既設下ボックスよりも搬送方向下流側に延長することを特徴とする請求項1記載のプレキャストボックスカルバートの設置方法。   In the travel path extending step, a travel path extension carriage that includes an extended travel path and that can travel on the installation surface of the lower box is prepared on the downstream side in the transport direction from the existing lower box, and the travel path extension carriage The precast box culvert installation method according to claim 1, wherein a travel path of the lower box carriage is extended downstream in the transport direction from the existing lower box. 前記下ボックス用台車には、積載された前記下ボックスを水平方向に回転させる下ボックス用ターンテーブルが設けられていることを特徴とする請求項1又は2記載のプレキャストボックスカルバートの設置方法。   The method for installing a precast box culvert according to claim 1 or 2, wherein the lower box carriage is provided with a lower box turntable for horizontally rotating the loaded lower box. 前記下ボックスを前記上ボックスよりも先行して設置した下ボックス先行設置区間を設け、
前記上ボックス回転工程では、前記上ボックス用台車を前記下ボックス先行設置区間に移動させて、前記上ボックスを前記既設下ボックスよりも上方に持ち上げた後、前記上ボックスを水平方向に回転させて設置する向きに戻すことを特徴とする請求項1乃至3のいずれかに記載のプレキャストボックスカルバートの設置方法。
A lower box preceding installation section in which the lower box is installed in advance of the upper box;
In the upper box rotating step, the upper box carriage is moved to the lower box preceding installation section, the upper box is lifted above the existing lower box, and then the upper box is rotated in the horizontal direction. 4. The precast box culvert installation method according to claim 1, wherein the installation direction is returned to the installation direction.
前記上ボックス用台車には、積載された前記上ボックスを垂直方向に持ち上げる車載揚重機と、当該車載揚重機によって持ち上げられた状態の前記上ボックスを水平方向に回転させる上ボックス用ターンテーブルとが設けられていることを特徴とする請求項4記載のプレキャストボックスカルバートの設置方法。   The upper box carriage includes an in-vehicle lifter that lifts the loaded upper box in a vertical direction, and an upper box turntable that rotates the upper box that is lifted by the in-vehicle lifter in a horizontal direction. The precast box culvert installation method according to claim 4, wherein the precast box culvert is provided.
JP2016063313A 2016-03-28 2016-03-28 Installation method of precast box culvert Pending JP2017179703A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016063313A JP2017179703A (en) 2016-03-28 2016-03-28 Installation method of precast box culvert

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016063313A JP2017179703A (en) 2016-03-28 2016-03-28 Installation method of precast box culvert

Publications (1)

Publication Number Publication Date
JP2017179703A true JP2017179703A (en) 2017-10-05

Family

ID=60005159

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016063313A Pending JP2017179703A (en) 2016-03-28 2016-03-28 Installation method of precast box culvert

Country Status (1)

Country Link
JP (1) JP2017179703A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112195970A (en) * 2020-10-20 2021-01-08 鲁亦楠 River-crossing tunnel engineering waterproof construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112195970A (en) * 2020-10-20 2021-01-08 鲁亦楠 River-crossing tunnel engineering waterproof construction method

Similar Documents

Publication Publication Date Title
CN103711499A (en) Shield tunneling machine split starting construction method
JP5485076B2 (en) Tunnel construction equipment and construction method
CN103527243B (en) The inclined shaft hoisting transportation system of subway work and method to set up
JP5852520B2 (en) Material conveying device and material conveying method
CN103726421A (en) Height and span adjustable track paver for metro construction
CN110985073A (en) Automatic conveying system for pipe sheets
JP2013177813A (en) Floor slab for shield tunnel, building method of floor slab in shield tunnel and construction method of shield tunnel
JP5407665B2 (en) Method for extending tailpiece carriage and continuous belt conveyor
JP5032603B2 (en) Conveying installation apparatus and concrete product installation method
JP4765119B2 (en) Tunnel material transport method and transport device
JP2017179703A (en) Installation method of precast box culvert
JP5793062B2 (en) Tunnel construction apparatus and tunnel construction method
JP2017115316A (en) Shield tunnel inside construction method
CN205171288U (en) Magnetism floats section of track and moves gantry crane
CN109748049B (en) Auxiliary transfer device for loading and unloading rails of equipment
JP5144571B2 (en) Bogie replacement device in the shaft
JP2010053533A (en) Transport device and transport method for segment
JP6696258B2 (en) How to install the precast box culvert
JP2008248604A (en) Method of advancing shield machine and shield machine
JP6463897B2 (en) How to replace sleepers for shield tunnels and sleepers for shield tunnels.
JP4694859B2 (en) Inclined passenger conveyor equipment, installation method thereof, and delivery method thereof
JP2020037807A (en) Center rail delivery system and center
CN110318789B (en) Shield segment conveying device and conveying method
JP2018053456A (en) Device for stocking of and automatically conveying segments
JP2007231560A (en) Equipment and method for conveying segment