JP2017097514A - Power generation plan creation device, power generation plan coordination device and program - Google Patents

Power generation plan creation device, power generation plan coordination device and program Download PDF

Info

Publication number
JP2017097514A
JP2017097514A JP2015227230A JP2015227230A JP2017097514A JP 2017097514 A JP2017097514 A JP 2017097514A JP 2015227230 A JP2015227230 A JP 2015227230A JP 2015227230 A JP2015227230 A JP 2015227230A JP 2017097514 A JP2017097514 A JP 2017097514A
Authority
JP
Japan
Prior art keywords
power generation
generation plan
plan data
power
submission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2015227230A
Other languages
Japanese (ja)
Inventor
彬 二宮
Akira Ninomiya
彬 二宮
北村 慎吾
Shingo Kitamura
慎吾 北村
幸一郎 宮林
Koichiro Miyabayashi
幸一郎 宮林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Industry and Control Solutions Co Ltd
Original Assignee
Hitachi Industry and Control Solutions Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Industry and Control Solutions Co Ltd filed Critical Hitachi Industry and Control Solutions Co Ltd
Priority to JP2015227230A priority Critical patent/JP2017097514A/en
Publication of JP2017097514A publication Critical patent/JP2017097514A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To enable an accurate power generation plan to be easily created.SOLUTION: A power generation plan creation device comprises: a prescribed value storage section (1035) which stores a prescribed vale prescribing electric energy that a power generation facility can generate in every predetermined time (30 minutes); a facility operation information storage section (1036) which stores facility operation information including a scheduled date for maintaining the power generation facility and a content of an effect of maintenance on the electric energy; and a power generation plan creation section (1033) which creates power generation plan data, a plan of the electric energy to be generated by the power generation facility in a specific time zone on a specific day, on the basis of the prescribed value and the facility operation information.SELECTED DRAWING: Figure 1

Description

本発明は、発電計画作成装置、発電計画取り纏め装置およびプログラムに関する。   The present invention relates to a power generation plan creation device, a power generation plan management device, and a program.

現在、電力自由化が計画されつつあり、比較的事業規模の小さい電気事業者が事業規模を拡大できるように、複数の電気事業者が協働してスケールメリットを享受できるバランシンググループ制度が創設された。バランシンググループ制度では、代表契約者となる電気事業者が複数の他の電気事業者(一般契約者)を取りまとめ、電力広域的運営推進機関に発電計画等の系統利用計画を提出する。   Currently, electricity liberalization is being planned, and a balancing group system has been created that allows multiple electric power companies to collaborate and enjoy the benefits of scale so that relatively small electric power companies can expand their business scale. It was. In the balancing group system, an electric power company that serves as a representative contractor gathers several other electric power companies (general contractors) and submits a grid usage plan such as a power generation plan to a power regional operation promotion organization.

その詳細なビジネスプロトコルは、下記非特許文献1に示されている。その第4頁には、「1.1 業務目的 業務目的 管轄制御エリアの安定的かつ公平な系統運用を行うため、小売電気事業者又は発電事業者は、本機関又は送配電事業者の需給運用に必要な系統利用計画を本機関へ提出する。また、本機関は、受領した系統利用計画を送配電事業者に送信し、送配電事業者はこれを受信する。」と記載されている。   The detailed business protocol is shown in the following nonpatent literature 1. The fourth page includes “1.1 Business Purposes Business Purposes. In order to carry out stable and fair system operation in the jurisdiction control area, retail electric power companies or power generation companies must The grid utilization plan necessary for the system is submitted to the Organization, and the Organization transmits the received grid utilization plan to the transmission and distribution operator, which is received by the transmission and distribution operator.

電力広域的運営推進機関、発電計画等受領業務ビジネスプロトコル標準規格(計画値同時同量編)(Ver. 3A)、[online]、[平成27年10月27日検索]、インターネット〈URL:https://www.occto.or.jp/jigyosha/shisutemurenkei/files/hatudenkeikakuBP_V3A.pdf 〉Electricity wide-area operation promotion organization, power generation plan and other receiving business protocol standards (simultaneous amount of planned values) (Ver. 3A), [online], [October 27, 2015 search], Internet <URL: https : //www.occto.or.jp/jigyosha/shisutemurenkei/files/hatudenkeikakuBP_V3A.pdf〉

しかし、非特許文献1に規定されたビジネスプロトコルは複雑であり、期限内に、正確な系統利用計画(発電計画データ)を電力広域的運営推進機関に提出することは煩雑であった。仮に、提出した発電計画が不正確になると、ペナルティ(適用されるインバランス料金が高額になる)が課され、経済的損失が生じる場合もある。
この発明は上述した事情に鑑みてなされたものであり、正確な発電計画を簡易に作成できる発電計画作成装置、発電計画取り纏め装置およびプログラムを提供することを目的とする。
However, the business protocol specified in Non-Patent Document 1 is complicated, and it is complicated to submit an accurate grid usage plan (power generation plan data) to the power wide-area operation promotion organization within the time limit. If the power generation plan submitted is inaccurate, penalties (applicable imbalance fees will be high) may be imposed and economic losses may occur.
The present invention has been made in view of the above-described circumstances, and an object thereof is to provide a power generation plan creation device, a power generation plan collecting device, and a program that can easily create an accurate power generation plan.

上記課題を解決するため本発明の発電計画作成装置は、
発電設備が所定時間の時間帯毎に発電可能な電力量を規定した規定値を記憶する規定値記憶部と、
前記発電設備に対するメンテナンスの予定日と、前記メンテナンスによる前記電力量に対する影響の内容とを含む設備稼働情報を記憶する設備稼働情報記憶部と、
前記規定値と、前記設備稼働情報とに基づいて、前記発電設備によって特定の日の前記時間帯に発電される電力量の計画である発電計画データを作成する発電計画作成部と、
を有することを特徴とする。
In order to solve the above problems, the power generation plan creation device of the present invention is:
A specified value storage unit that stores a specified value that defines the amount of power that the power generation facility can generate every predetermined time period; and
A facility operation information storage unit for storing facility operation information including a scheduled date of maintenance for the power generation facility and the content of the influence on the electric energy by the maintenance;
A power generation plan creation unit that creates power generation plan data that is a plan of the amount of power generated by the power generation facility in the time zone on a specific day based on the specified value and the facility operation information;
It is characterized by having.

本発明の発電計画作成装置、発電計画取り纏め装置およびプログラムによれば、正確な発電計画データを簡易に作成できる。   According to the power generation plan creation device, power generation plan management device and program of the present invention, accurate power generation plan data can be easily created.

本発明の一実施形態による発電計画提出システムのブロック図である。1 is a block diagram of a power generation plan submission system according to an embodiment of the present invention. 発電計画作成提出装置の処理構成設定ルーチンのフローチャートである。It is a flowchart of the process structure setting routine of a power generation plan preparation submission apparatus. 発電計画作成処理ルーチンのフローチャートである。It is a flowchart of a power generation plan creation processing routine. 発電計画取り纏め処理ルーチンのフローチャートである。It is a flowchart of a power generation plan summary processing routine. 発電計画提出処理ルーチンのフローチャートである。It is a flowchart of a power generation plan submission processing routine. 事業者情報登録画面を示す図である。It is a figure which shows a provider information registration screen. 計画データ提出先事業者確認画面を示す図である。It is a figure which shows a plan data presentation destination company confirmation screen. 計画データ提出元事業者確認画面を示す図である。It is a figure which shows a plan data presentation origin company confirmation screen. メンテナンス計画管理画面を示す図である。It is a figure which shows a maintenance plan management screen. 一般契約者用計画データ作成画面を示す図である。It is a figure which shows the plan data creation screen for general contractors. 自動作成方法選択画面を示す図である。It is a figure which shows the automatic creation method selection screen. 計画データ作成画面を示す図である。It is a figure which shows a plan data creation screen. 計画データ提出管理画面を示す図である。It is a figure which shows a plan data presentation management screen. プロラタ優先度設定画面を示す図である。It is a figure which shows a prolata priority setting screen. 代表契約者用計画データ受領管理画面を示す図である。It is a figure which shows the plan data receipt management screen for representative contractors.

[実施形態の構成]
次に、図1に示すブロック図を参照し、本発明の一実施形態による発電計画提出システムSの詳細を説明する。
図1において、広域機関装置101は、広域機関(例えば電力広域的運営推進機関)が運営する装置であり、様々なバランシンググループに係るデータを蓄積するBGマスタDB(バランシンググループ・マスタ・データベース)1011を有している。発電計画作成提出装置102(発電計画取り纏め装置、発電計画データ取得部、発電計画データ取得手段、発電計画取り纏め部、発電計画取り纏め手段)は、あるバランシンググループの代表契約者である新電力事業者Xによって運営される。なお、本明細書において「新電力事業者」とは、一般電気事業者以外の電気事業者を指す。
[Configuration of the embodiment]
Next, details of the power generation plan submission system S according to an embodiment of the present invention will be described with reference to the block diagram shown in FIG.
In FIG. 1, a wide area engine apparatus 101 is an apparatus operated by a wide area engine (for example, a power wide area operation promotion organization), and a BG master DB (balancing group master database) 1011 that stores data related to various balancing groups. have. The power generation plan creation and submission device 102 (power generation plan management device, power generation plan data acquisition unit, power generation plan data acquisition unit, power generation plan management unit, power generation plan management unit) is a new power company X that is a representative contractor of a certain balancing group. Operated by. In the present specification, “new electric power company” refers to an electric power company other than a general electric power company.

また、発電計画作成提出装置103A,103B,103C(発電計画作成装置,以下、これらを総称して「発電計画作成提出装置103」と呼ぶことがある)は、該バランシンググループの一般契約者である新電力事業者A,B,Cによってそれぞれ運営される。広域機関装置101、発電計画作成提出装置102,103は、インターネット等のIP通信網100を介して相互に通信できるように構成されている。   Moreover, the power generation plan creation / submission devices 103A, 103B, 103C (power generation plan creation devices, hereinafter collectively referred to as “power generation plan creation / submission device 103”) are general contractors of the balancing group. Operated by new power operators A, B, and C, respectively. The wide-area engine device 101 and the power generation plan creation / submission devices 102 and 103 are configured to be able to communicate with each other via an IP communication network 100 such as the Internet.

発電計画作成提出装置102,103は、CPU(Central Processing Unit)、RAM(Random Access Memory)、ROM(Read Only Memory)、HDD(Hard Disk Drive)、キーボード、マウス、ディスプレイ等、一般的なコンピュータとしてのハードウエアを備えており、HDDには、OS(Operating System)、アプリケーションプログラム、各種データ等が格納されている。OSおよびアプリケーションプログラムは、RAMに展開され、CPUによって実行される。図1において、発電計画作成提出装置102,103の内部は、RAMに展開されたアプリケーションプログラム等によって実現される機能を、ブロックとして示している。   The power generation plan creation and submission devices 102 and 103 are a general computer such as a CPU (Central Processing Unit), a RAM (Random Access Memory), a ROM (Read Only Memory), a HDD (Hard Disk Drive), a keyboard, a mouse, and a display. The HDD stores an OS (Operating System), application programs, various data, and the like. The OS and application programs are expanded in the RAM and executed by the CPU. In FIG. 1, the functions of the power generation plan creation / submission apparatuses 102 and 103 are shown as blocks of functions realized by application programs or the like developed in the RAM.

代表契約者用の発電計画作成提出装置102は、データベース1021と、装置構成切替部1022と、発電計画取り纏め・作成部1023と、発電計画提出部1024とを有している。装置構成切替部1022は、発電計画作成提出装置102の処理構成(詳細は後述する)を切り替える。発電計画取り纏め・作成部1023は、個々の一般契約者の発電計画データに基づいて、バランシンググループ全体の発電計画データの内容を作成する。発電計画提出部1024は、該発電計画データを広域機関装置101に提出(送信)する。また、データベース1021は、規定値DB1025(規定値データベース)と、設備稼働情報DB1026(設備稼働情報データベース)と、発電計画DB1027(発電計画データベース)と、設備設置計画DB1028(設備設置計画データベース)とを有している。   The power generation plan creation / submission device 102 for the representative contractor includes a database 1021, a device configuration switching unit 1022, a power generation plan summarizing / creation unit 1023, and a power generation plan submission unit 1024. The device configuration switching unit 1022 switches the processing configuration (details will be described later) of the power generation plan creation / submission device 102. The power generation plan summarizing / creating unit 1023 creates the contents of the power generation plan data for the entire balancing group based on the power generation plan data of each general contractor. The power generation plan submission unit 1024 submits (transmits) the power generation plan data to the wide area engine apparatus 101. The database 1021 includes a specified value DB 1025 (specified value database), an equipment operation information DB 1026 (equipment operation information database), a power generation plan DB 1027 (power generation plan database), and an equipment installation plan DB 1028 (equipment installation plan database). Have.

規定値DB1025は、各時間帯におけるバランシンググループ全体の発電計画データの規定値を記憶する。ここで、「規定値」とは、発電設備の設置、更新、メンテナンス等、発電設備の停止や発電電力の減少を起こす事象が無かったと仮定した場合の発電計画データを意味する。規定値には、「翌日」、「週間」、「月間」、「年間」の区分があり、「週間」、「月間」、「年間」の規定値を「長期規定値」と呼ぶことがある。   The specified value DB 1025 stores the specified value of the power generation plan data for the entire balancing group in each time zone. Here, the “specified value” means power generation plan data when it is assumed that there is no event that causes a stop of the power generation facility or a decrease in generated power, such as installation, renewal, and maintenance of the power generation facility. Specified values include “next day”, “weekly”, “monthly”, and “annual” categories, and the “weekly”, “monthly”, and “annual” specified values may be referred to as “long-term specified values”. .

なお、「時間帯」とは、より具体的には、1日を30分毎に区切った時刻コード(01〜48)である。また、設備稼働情報DB1026は、バランシンググループ内で、メンテナンス等によって設備のメンテナンス作業を行う日時や、その影響度(例えば、全停止、80%運転等)を記憶する。また、設備設置計画DB1028は、バランシンググループ全体の設備設置計画(設備の新設や更新等)の内容を記憶する。また、発電計画DB1027は、規定値DB1025、設備稼働情報DB1026、設備設置計画DB1028の内容に基づいて算出された発電計画データの内容を記憶する。   The “time zone” is more specifically a time code (01 to 48) obtained by dividing one day every 30 minutes. In addition, the facility operation information DB 1026 stores the date and time when the facility maintenance work is performed by maintenance or the like in the balancing group, and the degree of influence (for example, full stop, 80% operation, etc.). In addition, the equipment installation plan DB 1028 stores the contents of the equipment installation plan for the entire balancing group (such as new installation or update of equipment). The power generation plan DB 1027 stores the contents of the power generation plan data calculated based on the contents of the specified value DB 1025, the equipment operation information DB 1026, and the equipment installation plan DB 1028.

また、一般契約者用の発電計画作成提出装置103Aは、データベース1031と、装置構成切替部1032と、発電計画作成部1033(発電計画作成手段)と、発電計画提出部1034とを有している。装置構成切替部1032、発電計画作成提出装置103の処理構成(詳細は後述する)を切り替える。発電計画作成部1033は、当該新電力事業者Aの発電計画データの内容を記憶する。発電計画提出部1034は、該発電計画データを、代表契約者用の発電計画作成提出装置102に提出(送信)する。   Further, the power generation plan creation / submission device 103A for a general contractor has a database 1031, a device configuration switching unit 1032, a power generation plan creation unit 1033 (power generation plan creation means), and a power generation plan submission unit 1034. . The processing configuration (details will be described later) of the device configuration switching unit 1032 and the power generation plan creation / submission device 103 are switched. The power generation plan creation unit 1033 stores the contents of the power generation plan data of the new electric power company A. The power generation plan submission unit 1034 submits (transmits) the power generation plan data to the power generation plan creation / submission device 102 for the representative contractor.

データベース1031は、規定値DB1035(規定値記憶部、規定値記憶手段)と、設備稼働情報DB1036(設備稼働情報記憶部、設備稼働情報記憶手段)と、発電計画DB1037と、設備設置計画DB1038とを有している。規定値DB1035は、各時間帯における、当該新電力事業者Aの発電計画データの規定値を記憶する。上述した規定値DB1025と同様に、規定値DB1035に記憶される規定値にも、「翌日」、「週間」、「月間」、「年間」の区分がある。   The database 1031 includes a specified value DB 1035 (specified value storage unit, specified value storage unit), an equipment operation information DB 1036 (equipment operation information storage unit, facility operation information storage unit), a power generation plan DB 1037, and an equipment installation plan DB 1038. Have. The specified value DB 1035 stores specified values of the power generation plan data of the new electric power company A in each time zone. Similar to the above-described prescribed value DB 1025, the prescribed values stored in the prescribed value DB 1035 also have categories of “next day”, “week”, “month”, and “annual”.

また、設備稼働情報DB1036は、当該新電力事業者Aにおけるメンテナンス作業の予定や、その影響度(例えば、全停止、80%運転等)を記憶する。また、設備設置計画DB1038は、当該新電力事業者Aの設備設置計画(設備の新設や更新等)の内容を記憶する。また、発電計画DB1037は、規定値DB1035、設備稼働情報DB1036、設備設置計画DB1038の内容に基づいて算出された発電計画データの内容を記憶する。   In addition, the facility operation information DB 1036 stores a maintenance work schedule and a degree of influence (for example, total stoppage, 80% operation, etc.) of the new electric power company A. In addition, the facility installation plan DB 1038 stores the contents of the facility installation plan (new installation or update of facilities) of the new electric power company A. Further, the power generation plan DB 1037 stores the contents of the power generation plan data calculated based on the contents of the specified value DB 1035, the equipment operation information DB 1036, and the equipment installation plan DB 1038.

なお、発電計画作成提出装置103B,103Cの内部については図示を省略するが、これらは発電計画作成提出装置103Aと同様に構成されている。また、上述した「発電計画データ」は、具体的にはXML形式のファイルであり、広域機関装置101、発電計画作成提出装置102,103間においては、例えばSMTP(Simple Mail Transfer Protocol)に基づいて、発電計画データ等が送受信される。   In addition, although illustration is abbreviate | omitted about the inside of the electric power generation plan preparation submission apparatus 103B, 103C, these are comprised similarly to the electric power generation plan preparation submission apparatus 103A. The above-mentioned “power generation plan data” is specifically an XML format file, and is based on, for example, SMTP (Simple Mail Transfer Protocol) between the wide-area engine device 101 and the power generation plan creation / submission devices 102 and 103. , Power generation plan data and the like are transmitted and received.

[実施形態の動作]
<処理構成設定処理>
次に、図2に示すフローチャートを参照し、発電計画作成提出装置102,103にて、共通して起動される処理構成設定ルーチンの処理を説明する。
図2において処理がステップS202に進むと、装置構成切替部1022,1032は、広域機関装置101のBGマスタDB1011から、事業者コードに基づいて、バランシンググループ情報を取得する。ここで、事業者コードとは、新電力事業者A,B,C,Xに対して割り当てられている固有の識別コードである。また、バランシンググループ情報とは、バランシンググループに属する代表契約者の事業者コードと、一般契約者の事業者コードとを特定する情報である。
[Operation of the embodiment]
<Process configuration setting process>
Next, with reference to the flowchart shown in FIG. 2, the processing configuration setting routine that is started in common in the power generation plan creation and submission devices 102 and 103 will be described.
When the processing proceeds to step S202 in FIG. 2, the device configuration switching units 1022 and 1032 acquire balancing group information from the BG master DB 1011 of the wide-area engine device 101 based on the business operator code. Here, the operator code is a unique identification code assigned to the new electric power operators A, B, C, and X. The balancing group information is information that identifies the business operator code of the representative contractor belonging to the balancing group and the business operator code of the general contractor.

すなわち、装置構成切替部1022,1032は、ステップS202においては、自機の事業者コードを伴って、広域機関装置101に対してバランシンググループ情報の送信を要求し、広域機関装置101から送信されたバランシンググループ情報を取得する。次に、処理がステップS204に進むと、装置構成切替部1022,1032は、取得したバランシンググループ情報において、自機が「代表契約者」の発電計画作成提出装置として指定されているか否かを判定する。   That is, the device configuration switching units 1022 and 1032 requested the wide-area engine device 101 to transmit the balancing group information and transmitted from the wide-area engine device 101 with the operator code of the own device in step S202. Get balancing group information. Next, when the process proceeds to step S204, the device configuration switching units 1022 and 1032 determine whether or not the own device is designated as the “representative contractor” power generation plan creation and submission device in the acquired balancing group information. To do.

ステップS204において「YES」と判定されると、処理はステップS206に進み、装置構成切替部1022,1032は、当該発電計画作成提出装置102,103の処理構成を、代表契約者用の構成(図1の発電計画作成提出装置102の構成)に設定する。一方、ステップS204において「NO」と判定されると、処理はステップS208に進み、装置構成切替部1022,1032は、当該発電計画作成提出装置102,103の処理構成を、一般契約者用の構成(図1の発電計画作成提出装置103Aの構成))に設定する。   If “YES” is determined in step S204, the process proceeds to step S206, and the device configuration switching units 1022 and 1032 change the processing configuration of the power generation plan creation and submission devices 102 and 103 to the configuration for the representative contractor (FIG. 1 of the power generation plan creation / submission apparatus 102). On the other hand, if “NO” is determined in step S204, the process proceeds to step S208, and the device configuration switching units 1022 and 1032 change the processing configuration of the power generation plan creation and submission devices 102 and 103 to the configuration for the general contractor. (Configuration of power generation plan creation / submission apparatus 103A in FIG. 1)).

先に、図1において発電計画作成提出装置102は代表契約者用であり、発電計画作成提出装置103は一般契約者用であると述べたが、実際には発電計画作成提出装置102,103のハードウエアは共通であり、何れを代表契約者用にし、何れを一般契約者用にするかは、バランシンググループ情報に基づいて、処理構成設定ルーチン(図2)の実行時に決定されることになる。これにより、本実施形態によれば、バランシンググループをフレキシブルに運用することができる。但し、以下の説明においては、図1に示した通り、発電計画作成提出装置102は代表契約者用であり、発電計画作成提出装置103は一般契約者用であることとする。   In FIG. 1, the power generation plan creation / submission device 102 is for a representative contractor and the power generation plan creation / submission device 103 is for a general contractor. The hardware is the same, and which is used for the representative contractor and which is used for the general contractor is determined based on the balancing group information when the processing configuration setting routine (FIG. 2) is executed. . Thereby, according to this embodiment, a balancing group can be operated flexibly. However, in the following description, as shown in FIG. 1, the power generation plan creation / submission device 102 is for a representative contractor, and the power generation plan creation / submission device 103 is for a general contractor.

<発電計画作成処理>
一般契約者用の発電計画作成提出装置103において、所定の操作が行われると、図3に示す発電計画作成処理ルーチンが起動される。なお、「発電計画」には、「翌日」、「週間」、「月間」、「年間」の区分があるが、本ルーチンは、「翌日」の発電計画を作成する際に起動される。
<Power generation plan creation process>
When a predetermined operation is performed in the power generation plan creation / submission device 103 for general contractors, a power generation plan creation processing routine shown in FIG. 3 is started. The “power generation plan” includes “next day”, “week”, “month”, and “annual”, but this routine is started when the power generation plan for “next day” is created.

図3において処理がステップS302に進むと、発電計画作成部1033によって、規定値DB1035から、規定値、すなわち発電設備の停止や発電電力の減少を起こす事象が無かったと仮定した場合の各時間帯における当該新電力事業者の発電電力の値が読み出され、読み出された値が計画日当日の発電計画データに設定される。ここで、「計画日」とは、発電計画に係る発電を行おうとする日(通常は翌日)を指す。また、「発電計画データ」とは、計画日の各時間帯における当該新電力事業者の発電電力の計画を示すデータである。   When the process proceeds to step S302 in FIG. 3, the power generation plan creation unit 1033 from the specified value DB 1035 in each time zone when it is assumed that there is no specified value, that is, there is no event that causes the generation facility to stop or the generated power to decrease. The value of the generated power of the new electric power company is read, and the read value is set in the power generation plan data on the planned date. Here, the “planned date” refers to the day (usually the next day) on which power generation according to the power generation plan is to be performed. The “power generation plan data” is data indicating a plan of generated power of the new electric power company in each time zone on the planned date.

次に、処理がステップS304に進むと、発電計画作成部1033によって、計画日当日に設備設置(設備の新設や更新等)を行う計画データが設備設置計画DB1038に含まれているか否かが判定される。ここで「YES」と判定されると、処理はステップS306に進み、発電計画作成部1033によって、設備設置に伴う発電計画への影響度が算出され、算出された影響度が現在設定している発電計画データの数値に反映される。なお、ステップS304において「NO」と判定された場合は、ステップS306はスキップされる。   Next, when the process proceeds to step S304, the power generation plan creation unit 1033 determines whether or not the facility installation plan DB 1038 includes plan data for performing facility installation (such as new installation or update of facilities) on the day of the plan. Is done. If “YES” is determined here, the process proceeds to step S306, and the power generation plan creation unit 1033 calculates the degree of influence on the power generation plan accompanying the installation of the equipment, and the calculated degree of influence is currently set. It is reflected in the numerical value of the power generation plan data. If “NO” is determined in the step S304, the step S306 is skipped.

次に、処理がステップS308に進むと、発電計画作成部1033によって、計画日当日の設備のメンテナンス作業を示すデータが設備稼働情報DB1036に含まれているか否かが判定される。ここで「YES」と判定されると、処理はステップS310に進み、発電計画作成部1033によって、設備のメンテナンス作業に伴う発電計画への影響度が算出され、算出された影響度が現在設定している発電計画データの数値に反映される。なお、ステップS308において「NO」と判定された場合は、ステップS310はスキップされる。次に、処理がステップS312に進むと、発電計画作成部1033によって、現在設定している発電計画データが、発電計画DB1037に登録される。   Next, when the process proceeds to step S308, the power generation plan creating unit 1033 determines whether or not the equipment operation information DB 1036 includes data indicating the equipment maintenance work on the scheduled date. If "YES" is determined here, the process proceeds to step S310, and the power generation plan creation unit 1033 calculates the degree of influence on the power generation plan accompanying the maintenance work of the facility, and the calculated degree of influence is currently set. It is reflected in the numerical value of the power generation plan data. If “NO” is determined in step S308, step S310 is skipped. Next, when the process proceeds to step S312, the power generation plan creation unit 1033 registers the currently set power generation plan data in the power generation plan DB 1037.

<発電計画取り纏め処理>
一般契約者用の発電計画作成提出装置103にて、上述した発電計画作成処理ルーチン(図3)が実行された後、作成された発電計画データは、代表契約者用の発電計画作成提出装置102に送信される。その後、代表契約者用の発電計画作成提出装置102においては、図4に示す発電計画取り纏め処理ルーチンが実行される。
図4において処理がステップS402に進むと、発電計画作成提出装置102の発電計画取り纏め・作成部1023は、一般契約者である一または複数の新電力事業者(図1においては新電力事業者A,B,C)から送信された発電計画データを取得する。
<Power generation plan summary processing>
After the above-described power generation plan creation processing routine (FIG. 3) is executed by the power generation plan creation / submission device 103 for general contractors, the generated power generation plan data is generated as the power generation plan creation / submission device 102 for representative contractors. Sent to. Thereafter, in the power generation plan creation / submission apparatus 102 for the representative contractor, a power generation plan summarizing process routine shown in FIG. 4 is executed.
In FIG. 4, when the process proceeds to step S402, the power generation plan summarizing / creating unit 1023 of the power generation plan creation / submission apparatus 102 includes one or a plurality of new power providers (new power provider A in FIG. 1). , B, C) is acquired.

次に、処理がステップS404に進むと、発電計画取り纏め・作成部1023は、先にステップS402にて取得した一または複数の発電計画データに基づいて、バランシンググループ全体の発電計画データを作成する。より具体的には、計画日の各時間帯に、複数の一般契約者の発電電力を合計することにより、バランシンググループ全体の発電計画データを作成する。次に、処理がステップS406に進むと、作成されたバランシンググループ全体の発電計画データが、発電計画取り纏め・作成部1023によって、発電計画DB1027に登録される。   Next, when the process proceeds to step S404, the power generation plan summarizing / creating unit 1023 creates power generation plan data for the entire balancing group based on the one or more power generation plan data acquired in step S402. More specifically, the power generation plan data for the entire balancing group is created by summing the power generated by a plurality of general contractors in each time zone on the planned date. Next, when the processing proceeds to step S406, the generated power generation plan data of the entire balancing group is registered in the power generation plan DB 1027 by the power generation plan collecting / creating unit 1023.

<発電計画提出処理>
一般契約者用の発電計画作成提出装置103にて、個々の発電計画データを代表契約者用の発電計画作成提出装置102に送信する場合、あるいは、発電計画作成提出装置102にて、バランシンググループ全体の発電計画を広域機関装置101に送信する場合、図5に示す発電計画提出処理ルーチンが起動される。
図5において処理がステップS502に進むと、発電計画提出部1024,1034によって、本ルーチンを起動した発電計画作成提出装置102,103の処理構成が「一般契約者用」であるか否かが判定される。
<Power generation plan submission process>
When the individual power generation plan data is transmitted to the power generation plan creation / submission device 102 for the representative contractor by the power generation plan creation / submission device 103 for the general contractor, or the entire balancing group is transmitted by the power generation plan creation / submission device 102. When the power generation plan is transmitted to the wide area engine apparatus 101, the power generation plan submission processing routine shown in FIG. 5 is started.
In FIG. 5, when the process proceeds to step S502, the power generation plan submission units 1024 and 1034 determine whether or not the processing configuration of the power generation plan creation and submission devices 102 and 103 that started this routine is “for general contractors”. Is done.

一般契約者用の発電計画作成提出装置103の発電計画提出部1034においては、ここで「YES」と判定され、処理はステップS504に進む。ステップS504では、発電計画提出部1034によって、発電計画DB1037に登録している個別の発電計画データが、代表契約者用装置(図1の例では発電計画作成提出装置102)に送信される。一方、代表契約者用の発電計画作成提出装置102においては、ステップS502において「NO」と判定され、処理はステップS506に進む。ステップS506では、発電計画提出部1024によって、発電計画DB1027に登録しているバランシンググループ全体の発電計画データが、広域機関装置101に送信される。   In the power generation plan submission unit 1034 of the power generation plan creation / submission apparatus 103 for general contractors, “YES” is determined here, and the process proceeds to step S504. In step S504, the individual power generation plan data registered in the power generation plan DB 1037 is transmitted by the power generation plan submission unit 1034 to the representative contractor device (the power generation plan creation / submission device 102 in the example of FIG. 1). On the other hand, in the power generation plan creation / submission apparatus 102 for the representative contractor, “NO” is determined in step S502, and the process proceeds to step S506. In step S506, the power generation plan submission unit 1024 transmits the power generation plan data of the entire balancing group registered in the power generation plan DB 1027 to the wide area engine apparatus 101.

<事業者情報登録画面>
次に、発電計画作成提出装置102,103のディスプレイ(図示せず)に表示される各種画面の例について説明する。
まず、発電計画作成提出装置102,103において所定の操作が行われると、発電計画作成提出装置102,103は、図6に示す事業者情報登録画面500をディスプレイに表示させる。事業者情報登録画面500の内部において、事業者コード欄502、事業者名欄504およびメールアドレス欄506には、ユーザによって、事業者コード、事業者名および電子メールアドレスがそれぞれ入力される。
<Business information registration screen>
Next, examples of various screens displayed on the displays (not shown) of the power generation plan creation and submission devices 102 and 103 will be described.
First, when a predetermined operation is performed in the power generation plan creation / submission devices 102 and 103, the power generation plan creation / submission devices 102 and 103 cause the operator information registration screen 500 shown in FIG. 6 to be displayed on the display. In the business operator information registration screen 500, the business operator code column 502, the business operator name column 504, and the mail address column 506 are respectively input with the business operator code, the business operator name, and the e-mail address by the user.

そして、ユーザによって登録ボタン508が押下されると、(例えばマウスでクリックされると)、入力された事業者コード、事業者名および電子メールアドレスが、当該発電計画作成提出装置102,103によって、その内部のデータベース1021,1031に登録されるとともに、広域機関装置101に送信され、広域機関装置101においても登録される。なお、ユーザによってキャンセルボタン510が押下されると、事業者情報登録画面500は閉じられる。   When the registration button 508 is pressed by the user (for example, when clicked with the mouse), the entered business code, business name, and e-mail address are input by the power generation plan creation and submission devices 102 and 103, respectively. The information is registered in the internal databases 1021 and 1031, transmitted to the wide area engine apparatus 101, and registered in the wide area engine apparatus 101. When the cancel button 510 is pressed by the user, the business operator information registration screen 500 is closed.

<計画データ提出先事業者確認画面>
また、一般契約者用の発電計画作成提出装置103において所定の操作が行われると、発電計画作成提出装置103は、バランシンググループ情報を広域機関装置101から取得し、これによって自機に関係する提出先事業者を特定し、図7に示す計画データ提出先事業者確認画面530をディスプレイに表示させる。計画データ提出先事業者確認画面530内の提出先事業者リスト540は、バランシンググループ情報に基づいて、発電計画データ等の提出先事業者を一覧形式で表示するものである。提出先事業者リスト540の内部において、ナンバ欄542は、提出先事業者の通し番号を表示する。
<Plan data submission destination company confirmation screen>
In addition, when a predetermined operation is performed in the power generation plan creation / submission device 103 for the general contractor, the power generation plan creation / submission device 103 acquires the balancing group information from the wide-area engine device 101, and thereby submits the submission related to the own device. The destination company is specified, and the plan data submission destination company confirmation screen 530 shown in FIG. 7 is displayed on the display. The submission destination operator list 540 in the plan data submission destination operator confirmation screen 530 displays the destination enterprises such as power generation plan data in a list format based on the balancing group information. In the submission destination company list 540, the number column 542 displays the serial number of the submission destination company.

事業者コード表示欄544、事業者名表示欄545、およびメールアドレス欄546は、提出先事業者の事業者コード、事業者名および電子メールアドレスを各々表示する。チェックボックス欄547には、各提出先事業者に対応するチェックボックスが表示されており、ユーザは、任意のチェックボックスにチェックを入れることにより、一または複数の提出先事業者を選択することができる。一または複数の提出先事業者を選択した後、ユーザによってテストメール送信ボタン532が押下されると、発電計画作成提出装置103は、チェックボックス欄547にて選択された提出先事業者に対して、テスト用の電子メールを送信する。   The company code display field 544, the company name display field 545, and the mail address field 546 display the company code, the company name, and the e-mail address of the submitting company. The check box column 547 displays a check box corresponding to each submitting business operator, and the user can select one or more submitting business operators by checking any check box. it can. When the user presses the test mail transmission button 532 after selecting one or a plurality of submission destination businesses, the power generation plan creation / submission device 103 selects the submission organization selected in the check box field 547. Send a test email.

<計画データ提出元事業者確認画面>
また、代表契約者用の発電計画作成提出装置102において所定の操作が行われると、発電計画作成提出装置102は、バランシンググループ情報を広域機関装置101から取得し、これによって自機に関係する提出元事業者を特定し、図8に示す計画データ提出元事業者確認画面550をディスプレイに表示させる。計画データ提出元事業者確認画面550内の提出元事業者リスト560は、バランシンググループ情報に基づいて、発電計画データ等の提出元事業者を一覧形式で表示するものである。提出元事業者リスト560の内部において、ナンバ欄562は、提出元事業者の通し番号を表示する。
<Plan data submission source company confirmation screen>
In addition, when a predetermined operation is performed in the power generation plan creation / submission device 102 for the representative contractor, the power generation plan creation / submission device 102 acquires the balancing group information from the wide-area engine device 101, and thereby submits the submission related to the own device. The former business operator is specified, and the plan data submitting business operator confirmation screen 550 shown in FIG. 8 is displayed on the display. The submitting company list 560 in the plan data submitting company confirmation screen 550 displays the submitting company such as power generation plan data in a list format based on the balancing group information. In the submitting company list 560, the number column 562 displays the serial number of the submitting company.

事業者コード表示欄564、事業者名表示欄565、およびメールアドレス欄566は、提出元事業者の事業者コード、事業者名および電子メールアドレスを各々表示する。チェックボックス欄567には、各提出元事業者に対応するチェックボックスが表示されており、ユーザは、任意のチェックボックスにチェックを入れることにより、一または複数の提出元事業者を選択することができる。一または複数の提出元事業者を選択した後、ユーザによってテストメール送信ボタン552が押下されると、発電計画作成提出装置102は、チェックボックス欄567にて選択された提出元事業者に対して、テスト用の電子メールを送信する。   The company code display field 564, the company name display field 565, and the mail address field 566 display the company code, the company name, and the e-mail address of the submitting company. The check box column 567 displays a check box corresponding to each submitting company, and the user can select one or a plurality of submitting companies by checking an arbitrary check box. it can. When the test mail transmission button 552 is pressed by the user after selecting one or a plurality of submitting business operators, the power generation plan creation submitting device 102 selects the submitting business operator selected in the check box field 567. Send a test email.

<メンテナンス計画管理画面>
また、一般契約者用の発電計画作成提出装置103において所定の操作が行われると、発電計画作成提出装置103は、図9に示すメンテナンス計画管理画面600をディスプレイに表示させる。なお、この画面は、当該一般契約者において、発電設備の稼働停止または出力減少を伴うメンテナンス作業のスケジュールを管理するものである。
<Maintenance plan management screen>
When a predetermined operation is performed in the power generation plan creation / submission device 103 for general contractors, the power generation plan creation / submission device 103 displays a maintenance plan management screen 600 shown in FIG. 9 on the display. In addition, this screen manages the schedule of the maintenance work accompanied by the operation stop of the power generation facility or the output reduction in the general contractor.

メンテナンス計画管理画面600内のメンテナンス計画リスト610は、メンテナンス作業を一覧形式で表示するものである。メンテナンス計画リスト610の内部において、ナンバ欄611は、メンテナンス作業の通し番号を表示する。また、停止計画名設定欄612は、メンテナンス作業の名称を表示する。   The maintenance plan list 610 in the maintenance plan management screen 600 displays maintenance work in a list format. In the maintenance plan list 610, the number column 611 displays the serial number of the maintenance work. The stop plan name setting field 612 displays the name of the maintenance work.

また、区分欄613は、メンテナンス作業の区分を表示する。すなわち、区分欄613には、発電設備の稼働が停止する場合は「Outage」の文字列が表示され、出力の減少が起こる場合は、「Online」の文字列と、定格出力の何パーセントの出力が可能であるかが表示される。連系切離日欄614には、発電設備が送電系統から切り離される予定日時が表示される。また、発電開始日欄615には、発電設備による発電が開始される予定日時が表示され、連系接続日欄616には、発電設備が送電系統に接続される予定日時が表示される。   In addition, the category column 613 displays the category of maintenance work. That is, in the classification column 613, the character string “Outage” is displayed when the operation of the power generation facility is stopped, and the character string “Online” and the output of what percentage of the rated output when the output decreases. Whether or not is possible. In the grid disconnection date column 614, the scheduled date and time when the power generation facility is disconnected from the power transmission system is displayed. In addition, the power generation start date column 615 displays the scheduled date and time when power generation by the power generation facility is started, and the interconnection connection date column 616 displays the scheduled date and time when the power generation facility is connected to the power transmission system.

メンテナンス計画リスト610にて表示される内容は、発電設備のメンテナンス管理を行う他のシステムから取り込まれる。そして、発電計画作成提出装置103は、この他のシステムから、新たなデータを受信すると、受信したデータに沿ってメンテナンス計画リスト610の表示内容を更新する。   The content displayed in the maintenance plan list 610 is taken in from another system that performs maintenance management of the power generation equipment. Then, upon receiving new data from this other system, the power generation plan creation / submission device 103 updates the display content of the maintenance plan list 610 along with the received data.

<一般契約者用計画データ作成画面(図10)>
一般契約者用の発電計画作成提出装置103にて所定の操作が行われると、発電計画作成提出装置103は、図10に示す一般契約者用計画データ作成画面200をディスプレイに表示させる。なお、この画面は、一般契約者である新電力事業者A,B,Cが、発電計画データの規定値を作成し、規定値DB1035に格納する場合、または発電計画データの規定値を編集する場合に表示される画面である。
<Plan data creation screen for general contractors (Fig. 10)>
When a predetermined operation is performed in the power generation plan creation / submission device 103 for the general contractor, the power generation plan creation / submission device 103 displays the general contractor plan data creation screen 200 shown in FIG. 10 on the display. Note that this screen is used when the new power companies A, B, and C, which are general contractors, create a specified value of the power generation plan data and store it in the specified value DB 1035, or edit the specified value of the power generation plan data. It is a screen displayed in the case.

図10において提出先事業者名指定コンボボックス202は、発電計画データの提出先である代表契約者を指定する画面である。図1に示した例においては、新電力事業者A,B,C,Xは一つのバランシンググループに属することを想定しているが、実際には各新電力事業者は、複数のバランシンググループに属することが可能になっている。そこで、提出先事業者名指定コンボボックス202では、発電計画データの提出先を、これらバランシンググループの代表契約者の中から任意に選択できるようになっている。   In FIG. 10, a submission destination company name designation combo box 202 is a screen for designating a representative contractor to whom power generation plan data is submitted. In the example shown in FIG. 1, it is assumed that the new electric power operators A, B, C, and X belong to one balancing group, but in reality, each new electric power operator belongs to a plurality of balancing groups. It is possible to belong. Therefore, the submitting company name designation combo box 202 can arbitrarily select the submitting destination of the power generation plan data from the representative contractors of these balancing groups.

一般契約者用計画データ作成画面200において、計画データ一覧リスト210は、作成/提出すべき発電計画データの様式(以下、ビジネスプロトコルという)を一覧形式で表示するものである。上述した非特許文献1によると、発電計画データには、「翌日」、「週間」、「月間」、「年間」の区分が定められている。計画データ一覧リスト210の各行は、「翌日」、「週間」、「月間」、「年間」の発電計画データに対応する。また、計画データ一覧リスト210においてナンバ欄211は、各発電計画データの通し番号を表示する。ビジネスプロトコルID欄212は、各発電計画データに係るビジネスプロトコルのID番号を表示する。   In the general contractor plan data creation screen 200, the plan data list 210 displays a format of power generation plan data to be created / submitted (hereinafter referred to as a business protocol) in a list format. According to Non-Patent Document 1 described above, the power generation plan data includes the categories of “next day”, “week”, “month”, and “annual”. Each line of the plan data list 210 corresponds to the power generation plan data of “next day”, “week”, “month”, and “annual”. In the plan data list 210, the number column 211 displays a serial number of each power generation plan data. The business protocol ID column 212 displays the ID number of the business protocol related to each power generation plan data.

本実施形態においては、「翌日」、「週間」、「月間」、「年間」のビジネスプロトコルに対して、「BP150」、「BP160」、「BP170」、「BP180」のID番号が付与されている。ビジネスプロトコル名欄213は、各ビジネスプロトコルの名称を表示する。次回提出期日欄214は、発電計画データを次回提出する期日を表示する。最終更新日時欄215は、発電計画データの規定値を更新した最終日を表示する。編集ボタン欄216には、ビジネスプロトコル毎に編集ボタン222が表示され、継承作成欄217には、ビジネスプロトコル毎に継承作成ボタン224が表示されている。   In this embodiment, ID numbers “BP150”, “BP160”, “BP170”, and “BP180” are assigned to the business protocols “next day”, “week”, “month”, and “annual”. Yes. The business protocol name column 213 displays the name of each business protocol. The next submission due date column 214 displays a date for the next submission of power generation plan data. The last update date / time column 215 displays the last date when the specified value of the power generation plan data is updated. The edit button column 216 displays an edit button 222 for each business protocol, and the inheritance creation column 217 displays an inheritance creation button 224 for each business protocol.

<自動作成方法選択画面>
一般契約者用計画データ作成画面200(図10)において、何れかの継承作成ボタン224が押下されると、発電計画作成提出装置103は、一般契約者用計画データ作成画面200上のポップアップウィンドウとして、図11に示す自動作成方法選択画面250をディスプレイに表示させる。
<Automatic creation method selection screen>
When one of the inheritance creation buttons 224 is pressed on the general contractor plan data creation screen 200 (FIG. 10), the power generation plan creation / submission device 103 is displayed as a pop-up window on the general contractor plan data creation screen 200. Then, the automatic creation method selection screen 250 shown in FIG. 11 is displayed on the display.

自動作成方法選択画面250の内部においてラジオボタン252は、提出済みのデータ(提出された発電計画データの元になった規定値)を複製して、新たな規定値とする作成方法を選択するものである。また、ラジオボタン254(規定値作成部)は、上位計画を利用する作成方法を選択するものである。ラジオボタン252,254は、ユーザによって択一的に選択できる。また、作成ボタン256は、ラジオボタン252,254によって選択された作成方法による発電計画データの規定値の作成を指示するものであり、キャンセルボタン258は、自動作成をキャンセルするものである。   Within the automatic creation method selection screen 250, a radio button 252 selects a creation method that duplicates the submitted data (the specified value that is the basis of the submitted power generation plan data) and sets it as a new specified value. It is. The radio button 254 (specified value creation unit) is used to select a creation method that uses a higher-level plan. The radio buttons 252 and 254 can be alternatively selected by the user. The creation button 256 is used to instruct the creation of the specified value of the power generation plan data by the creation method selected by the radio buttons 252 and 254, and the cancel button 258 is used to cancel the automatic creation.

ここで、「上位計画」とは、より期間の長い計画を指し、「翌日」の上位は「週間」、「週間」の上位は「月間」、「月間」の上位は「年間」になる。また、「上位計画を利用する」とは、「上位計画の要素の中から流用できるものは流用し、上位計画の要素に基づいて計算できるものは計算する」という意味である。   Here, “upper plan” refers to a plan with a longer period, where “next week” is higher in “week”, “week” is higher in “month”, and “month” is higher in “year”. Further, “uses a higher level plan” means “uses what can be diverted from the elements of the higher level plan and calculates what can be calculated based on the elements of the higher level plan”.

例えば、上述した非特許文献1によれば、「翌日」、「週間」、「月間」、「年間」の各発電計画データには、「送信者コード」(当該発電計画データを送信する事業者の事業者コード)を含めることが必須になっている。「年間」の発電計画データに含まれる送信者コードは、そのまま「月間」、「週間」、「翌日」の発電計画データとして流用して差し支えない場合が多いと考えられる。従って、ラジオボタン254が選択され作成ボタン256が押下されると、発電計画作成提出装置103は、上位計画の送信者コードを下位の発電計画データにコピーする。   For example, according to the above-mentioned Non-Patent Document 1, each of the “next day”, “week”, “month”, and “annual” power generation plan data includes a “sender code” (an operator that transmits the power generation plan data). It is mandatory to include the operator code). It is considered that the sender code included in the “annual” power generation plan data may be used as the “monthly”, “weekly”, and “next day” power generation plan data in many cases. Therefore, when the radio button 254 is selected and the creation button 256 is pressed, the power generation plan creation / submission device 103 copies the higher-order plan sender code to the lower-order power generation plan data.

また、非特許文献1によると、30分毎の時間帯の発電量(販売量)は、「週間」、「月間」、「年間」の各発電計画データにおいては「電力[kW]」が単位になっているが、「翌日」の発電計画データでは、「電力量[kWh]」が単位になっている。ここで、「週間」のある時間帯の発電計画データに示された「電力[kW]」は、「翌日」の同じ時間帯に渡って継続する可能性が高いと考えられる。従って、ラジオボタン254が選択され作成ボタン256が押下されると、発電計画作成提出装置103は、「週間」の発電計画データに示されたある時間帯の「電力[kW]」に「0.5」を乗じた値を、「翌日」の同時間帯における「電力量[kWh]」に設定する。   Further, according to Non-Patent Document 1, the power generation amount (sales amount) every 30 minutes is expressed in units of “electric power [kW]” in the power generation plan data of “week”, “month”, and “annual”. However, in the power generation plan data for “next day”, “power amount [kWh]” is a unit. Here, it is considered that “power [kW]” indicated in the power generation plan data in a certain time zone of “week” is likely to continue over the same time zone of “next day”. Therefore, when the radio button 254 is selected and the creation button 256 is pressed, the power generation plan creation / submission apparatus 103 sets “0...” To “power [kW]” in a certain time zone indicated in the “weekly” power generation plan data. A value obtained by multiplying “5” is set to “power amount [kWh]” in the same time zone of “next day”.

<計画データ作成画面>
一般契約者用計画データ作成画面200(図10)において、何れかの編集ボタン222が押下されると、発電計画作成提出装置103は、図12に示す計画データ作成画面270をディスプレイに表示させる。
計画データ作成画面270の内部において、出力ファイル名称情報欄272は、発電計画データ(XMLファイル)のファイル名を決定するための各種項目が表示され、これら項目の内容は、必要に応じてユーザによって編集される。
<Plan data creation screen>
When any one of the edit buttons 222 is pressed on the general contractor plan data creation screen 200 (FIG. 10), the power generation plan creation / submission apparatus 103 displays the plan data creation screen 270 shown in FIG. 12 on the display.
In the plan data creation screen 270, the output file name information field 272 displays various items for determining the file name of the power generation plan data (XML file), and the contents of these items are determined by the user as needed. Edited.

また、基本情報欄274は、発電計画データの送信者や提出先事業者等の基本情報を構成する各種項目が表示され、これら項目の内容は、必要に応じてユーザによって編集される。発電計画データを作成するためには、上述した以外の様々な項目を設定するが、これら項目の具体的内容は、上述した非特許文献1に記載されている。図示したもの以外の項目は、スクロールバー278をスクロールすることにより、計画データ作成画面270上に表示させることができる。   In the basic information column 274, various items constituting basic information such as a sender of power generation plan data and a destination business operator are displayed, and the contents of these items are edited by the user as necessary. In order to create the power generation plan data, various items other than those described above are set. The specific contents of these items are described in Non-Patent Document 1 described above. Items other than those shown in the figure can be displayed on the plan data creation screen 270 by scrolling the scroll bar 278.

また、計画データ作成画面270の右部には、XMLファイル読込ボタン275、XMLファイル出力ボタン276、および終了ボタン277が表示されている。XMLファイル読込ボタン275がユーザによって押下されると、発電計画作成提出装置103は、読み込むべきファイル名を指定するダイアログボックスをディスプレイに表示させるとともに、指定されたファイルから発電計画データの規定値を読み出し、計画データ作成画面270に表示する。   In addition, an XML file read button 275, an XML file output button 276, and an end button 277 are displayed on the right part of the plan data creation screen 270. When the XML file read button 275 is pressed by the user, the power generation plan creation / submission apparatus 103 displays a dialog box for designating the file name to be read on the display and reads the specified value of the power generation plan data from the designated file. And displayed on the plan data creation screen 270.

また、XMLファイル出力ボタン276がユーザによって押下されると、発電計画作成提出装置103は、出力すべきファイル名を指定するダイアログボックスをディスプレイに表示させるとともに、計画データ作成画面270にて設定された発電計画データの規定値を、指定されたファイルに出力する。また、終了ボタン277が押下されると、計画データ作成画面270は閉じられる。
以上のように発電計画データの規定値が作成されると、上述した発電計画作成処理ルーチン(図3)によって、設備の設置やメンテナンス等の影響を加味した発電計画データを作成できるようになる。
When the XML file output button 276 is pressed by the user, the power generation plan creation / submission apparatus 103 displays a dialog box for designating a file name to be output on the display and is set on the plan data creation screen 270. Output the specified value of power generation plan data to the specified file. When the end button 277 is pressed, the plan data creation screen 270 is closed.
When the specified value of the power generation plan data is created as described above, the power generation plan data that takes into account the influence of installation and maintenance of the facilities can be created by the above-described power generation plan creation processing routine (FIG. 3).

<計画データ提出管理画面>
一般契約者用の発電計画作成提出装置103にて所定の操作が行われると、発電計画作成提出装置103は、図13に示す計画データ提出管理画面300をディスプレイに表示させる。なお、この画面は、一般契約者である新電力事業者A,B,Cが、代表契約者である新電力事業者Xに発電計画データを送信する場合に表示される画面である。
<Plan data submission management screen>
When a predetermined operation is performed in the power generation plan creation / submission device 103 for the general contractor, the power generation plan creation / submission device 103 displays the plan data submission management screen 300 shown in FIG. 13 on the display. In addition, this screen is a screen displayed when the new power operators A, B, and C, which are general contractors, transmit the power generation plan data to the new power operator X, which is the representative contractor.

計画データ提出管理画面300の内部において、提出先一覧リスト310(提出期限別アイコン表示部)は、今後提出すべき(および過去に提出した)発電計画データ等の提出先およびビジネスプロトコルのID番号等を一覧表にしたものである。提出期限が同一である発電計画データ等を、「データ・グループ」と呼び、提出先一覧リスト310では発電計画データがデータ・グループ毎に分類して表示される。提出先一覧リスト310の内部において、ナンバ欄312は、データ・グループの通し番号を表示する。提出年月日欄314は、発電計画データ等を提出した年月日または提出すべき年月日を表示する。   In the plan data submission management screen 300, the submission destination list 310 (the icon display section for each submission deadline) is the destination of the power generation plan data to be submitted (and submitted in the past) and the ID number of the business protocol. Is a list. The power generation plan data having the same submission deadline is called a “data group”, and the power generation plan data is classified and displayed for each data group in the submission destination list 310. In the submission destination list 310, the number column 312 displays the serial number of the data group. The date of submission column 314 displays the date of submission of the power generation plan data or the like, or the date of submission.

提出先事業者コード表示欄315は、発電計画データ等の提出先事業者(代表契約者)の事業者コードを表示し、提出先事業者名表示欄316は、その事業者名を表示する。ビジネスプロトコルID欄317(未提出アイコン表示態様設定部)は、今後提出すべき(および過去に提出した)発電計画データ等のビジネスプロトコルをアイコンによって表示する。これらアイコンは、発電計画データ等の状態に応じて、異なる表示態様で表示される。   The submission destination company code display column 315 displays the company code of the submission destination company (representative contractor) such as power generation plan data, and the submission destination company name display column 316 displays the company name. The business protocol ID column 317 (unsubmitted icon display mode setting unit) displays business protocols such as power generation plan data to be submitted in the future (and submitted in the past) by icons. These icons are displayed in different display modes depending on the state of the power generation plan data and the like.

凡例表示部302は、アイコンの表示態様の凡例を表示する。図示のように、「提出済み」のアイコンは、枠線が破線であり、「当日提出期限かつ未作成」のアイコンは、枠線が一点鎖線である。また、「提出先のチェックにてエラーが発生した」アイコンは枠線が太実線であり、「提出予定」(現時点では未提出)のアイコンは、枠線が細実線にされる。また、何れのアイコンも、枠線の内部には、発電計画データ等に係るビジネスプロトコルのID番号が表示される。このように、図示の例では、「アイコンの表示態様」とは「枠線の線種」であるが、実際は、アイコンの色彩(赤、青、黄、灰等)によって発電計画データ等の状態を区別することが望ましい。特に、「提出先のチェックにてエラーが発生した」アイコンは「赤」で表示することが望ましい。   The legend display unit 302 displays a legend of icon display modes. As shown in the figure, the “submitted” icon has a broken line, and the “present deadline and not yet created” icon has a dashed line. In addition, the “error occurred in the check of the submission destination” icon has a thick solid line, and the icon of “scheduled to submit” (currently unsubmitted) has a thin solid line. In any icon, the ID number of the business protocol related to the power generation plan data and the like is displayed inside the frame. Thus, in the illustrated example, the “icon display mode” is “line type of frame line”, but in reality, the state of the power generation plan data and the like depending on the color of the icon (red, blue, yellow, gray, etc.) It is desirable to distinguish between In particular, it is desirable to display “red” for an icon “an error has occurred during submission check”.

提出先一覧リスト310のNo.1のデータ・グループにおいては、ビジネスプロトコルID欄317のアイコンは全て「提出済み」(破線)になっている。また、No.2,3のデータ・グループにおいては、当日に提出しようとする発電計画データ等のアイコンが示されており、これの表示態様としては、「当日提出期限かつ未作成」(一点鎖線)、「提出予定」(細実線)、「提出先のチェックにてエラーが発生した」(太実線)が混在している。また、No.4,5のデータ・グループには、翌日以降に提出予定の発電計画データ等のアイコンが示されており、これらの表示態様は全て「提出予定」(細実線)である。   No. in the submission list 310. In one data group, all the icons in the business protocol ID column 317 are “submitted” (broken line). No. In a few data groups, icons such as power generation plan data to be submitted on the day are displayed, and the display mode of this is “the deadline for submission on the day and not yet created” (dashed line), “submission” "Schedule" (thin solid line) and "An error occurred during submission check" (thick solid line) are mixed. No. In the data groups 4 and 5, icons such as power generation plan data to be submitted from the next day are shown, and all of these display modes are “scheduled to submit” (thin solid line).

チェックボックス欄311には、データ・グループ毎にチェックボックスが表示されており、ユーザは、提出しようとするデータ・グループに対応するチェックボックスにチェックを入れることにより、データ・グループを選択することができる。図示の例では、No.2,3のデータ・グループが選択されている。提出ボタン304は、選択されたデータ・グループを提出する際に、ユーザによって押下される。   The check box column 311 displays a check box for each data group, and the user can select a data group by checking the check box corresponding to the data group to be submitted. it can. In the example shown in FIG. A few data groups have been selected. A submit button 304 is pressed by the user when submitting the selected data group.

<プロラタ優先度設定画面>
計画データ提出管理画面300(図13)において複数のデータ・グループが選択され、提出ボタン304が押下されると、発電計画作成提出装置103は、図14に示すプロラタ優先度設定画面350を、計画データ提出管理画面300上のポップアップウィンドウとしてディスプレイに表示させる。
<Prolater priority setting screen>
When a plurality of data groups are selected on the plan data submission management screen 300 (FIG. 13) and the submit button 304 is pressed, the power generation plan creation / submission apparatus 103 displays the prorater priority setting screen 350 shown in FIG. A pop-up window on the data submission management screen 300 is displayed on the display.

上述したように、各新電力事業者は複数のバランシンググループに属することができる。これらバランシンググループの代表契約者の集合を「プロラタ」と呼ぶ。一般契約者が複数の代表契約者に対して発電計画データを提出する際、これら代表契約者に対して、電力を供給する優先順位を定めることができる。この優先順位を「プロラタ優先度」という。プロラタ優先度設定画面350は、このプロラタ優先度を設定するための画面である。   As described above, each new power company can belong to a plurality of balancing groups. A set of representative contractors of these balancing groups is called “prolater”. When a general contractor submits power generation plan data to a plurality of representative contractors, the priority order of supplying power to these representative contractors can be determined. This priority is referred to as “prolater priority”. The pro-later priority setting screen 350 is a screen for setting the pro-later priority.

プロラタ優先度設定画面350の内部において、プロラタ優先度設定リスト360は、発電計画データの提出先である代表契約者を一覧表にしたものである。この画面における「提出先」とは、計画データ提出管理画面300(図13参照)にて選択されたデータ・グループに係る代表契約者である。図13の例では、No.2,3のデータ・グループが選択されたので、これらに対応する事業者コード「bbbb1」,「aaaa1」の事業者名が、図14のプロラタ優先度設定リスト360内に表示されている。   In the prolater priority setting screen 350, the prolater priority setting list 360 is a list of representative contractors to whom power generation plan data is submitted. The “submission destination” on this screen is a representative contractor related to the data group selected on the plan data submission management screen 300 (see FIG. 13). In the example of FIG. Since a few data groups have been selected, the operator names of the operator codes “bbbb1” and “aaa1” corresponding to them are displayed in the prolater priority setting list 360 of FIG.

プロラタ優先度設定リスト360の内部において、ナンバ欄361は、提出先事業者の通し番号を表示する。提出先事業者コード表示欄362は、提出先事業者の事業者コードを表示し、提出先事業者名表示欄363は、これらの事業者名を表示する。プロラタ優先度設定欄364は、これら提出先事業者のプロラタ優先度を表示する。図示の例では、事業者コード「bbbb1」の事業者に対して、最も優先度の高いプロラタ優先度「1」が設定され、事業者コード「aaaa1」の事業者に対して、次に優先度の高いプロラタ優先度「2」が設定されている。ユーザは、このプロラタ優先度設定欄364の内容を適宜編集することができる。   In the Prolater priority setting list 360, the number column 361 displays the serial number of the submitting company. The submission destination company code display field 362 displays the company code of the submission destination company, and the submission destination company name display field 363 displays these company names. The pro-later priority setting column 364 displays the pro-later priority of these submitting companies. In the illustrated example, the highest-priority pro rata priority “1” is set for the operator with the operator code “bbbb1”, and the next priority for the operator with the operator code “aaa1”. A high prolater priority “2” is set. The user can edit the contents of the pro-later priority setting field 364 as appropriate.

ユーザが、プロラタ優先度設定欄364の内容を適宜編集した後、提出実行ボタン352を押下すると、発電計画作成提出装置103は、プロラタ優先度設定欄364に設定されたプロラタ優先度に基づいて、発電計画データを提出先事業者に送信する。なお、ユーザがキャンセルボタン354を押下すると、プロラタ優先度設定画面350が閉じられ、ディスプレイには、計画データ提出管理画面300(図13参照)が再び表示される。   When the user appropriately edits the content of the prolater priority setting field 364 and then presses the submit execution button 352, the power generation plan creation / submission device 103 is based on the prorata priority set in the prorata priority setting field 364. Send the power generation plan data to the submitting company. When the user presses the cancel button 354, the prolater priority setting screen 350 is closed, and the plan data submission management screen 300 (see FIG. 13) is displayed again on the display.

なお、計画データ提出管理画面300(図13)において一のデータ・グループのみが選択され、提出ボタン304が押下された場合、発電計画作成提出装置103は、プロラタ優先度設定画面350(図14)を表示することなく、発電計画データを提出先事業者に送信する。   When only one data group is selected on the plan data submission management screen 300 (FIG. 13) and the submit button 304 is pressed, the power generation plan creation / submission apparatus 103 displays the prorater priority setting screen 350 (FIG. 14). The power generation plan data is transmitted to the submitting company without displaying.

<計画データ受領管理画面>
また、代表契約者用の発電計画作成提出装置102にて所定の操作が行われると、発電計画作成提出装置102は、図15に示す代表契約者用計画データ受領管理画面400をディスプレイに表示させる。なお、この画面は、代表契約者である新電力事業者Xが、一般契約者である新電力事業者A,B,Cから発電計画データ等を受領した実績や、受領する予定を管理する画面である。
<Plan data receipt management screen>
When a predetermined operation is performed in the power generation plan creation / submission device 102 for the representative contractor, the power generation plan creation / submission device 102 displays the representative contractor plan data reception management screen 400 shown in FIG. 15 on the display. . Note that this screen is a screen for managing the results and plans of receiving the power generation plan data, etc., from the new power operators A, B and C, which are general contractors, by the new power operator X as the representative contractor. It is.

図15の代表契約者用計画データ受領管理画面400において、提出元一覧リスト410(受領期限別アイコン表示部)は、今後受領すべき(および過去に受領した)発電計画データ等の提出元およびビジネスプロトコルのID番号等を、データ・グループ毎に一覧表にしたものである。提出元一覧リスト410の内部において、ナンバ欄412は、データ・グループの通し番号を表示する。受領年月日欄414は、発電計画データ等を受領した年月日または受領すべき年月日を表示する。   In the representative contractor plan data reception management screen 400 of FIG. 15, the submission source list 410 (reception deadline-based icon display portion) is the source and business of the power generation plan data to be received (and received in the past). Protocol ID numbers and the like are listed for each data group. In the submission source list 410, the number column 412 displays the serial number of the data group. The date of receipt column 414 displays the date of receipt of power generation plan data or the like, or the date of receipt.

提出元事業者コード表示欄415は、発電計画データ等の提出元事業者(一般契約者)の事業者コードを表示し、提出元事業者名表示欄416は、その事業者名を表示する。ビジネスプロトコルID欄417(未受領アイコン表示態様設定部)は、今後受領すべき(および過去に受領した)発電計画データ等のビジネスプロトコルをアイコンによって表示する。   The submitting company code display field 415 displays the business code of the submitting company (general contractor) such as power generation plan data, and the submitting company name display field 416 displays the name of the company. The business protocol ID column 417 (unreceived icon display mode setting unit) displays business protocols such as power generation plan data to be received (and received in the past) by icons.

凡例表示部402は、アイコンの表示態様の凡例を表示する。図示のように、「受領済み」のアイコンは、枠線が破線であり、「当日受領期限かつ未受領」のアイコンは、枠線が一点鎖線である。また、「受領チェック時にエラーが発生した」アイコンは枠線が太実線であり、将来に「受領予定」のアイコンは、枠線が細実線にされる。また、何れのアイコンも、枠線の内部には、発電計画データ等に係るビジネスプロトコルのID番号が表示される。提出元一覧リスト410においても、発電計画データ等の状態は、アイコンの色彩(赤、青、黄、灰等)によって区別することが望ましい。   The legend display unit 402 displays a legend of icon display modes. As shown in the figure, the “Received” icon has a broken frame line, and the “Received due date and not received” icon has a dashed line. Also, the “error occurred during receipt check” icon has a thick solid line, and the icon “scheduled to receive” in the future has a thin solid line. In any icon, the ID number of the business protocol related to the power generation plan data and the like is displayed inside the frame. Also in the submission source list 410, it is desirable to distinguish the state of power generation plan data and the like by the color of the icon (red, blue, yellow, gray, etc.).

また、当日の所定時刻を経過した際、発電計画作成提出装置102は、「受領チェック時にエラーが発生した」、および「当日受領期限かつ未受領」のアイコンに係る発電計画データをリストアップする。そして、これら発電計画データを提出すべき一般契約者の発電計画作成提出装置103に対して、催促メールを送信する。   In addition, when a predetermined time of the day has passed, the power generation plan creation / submission apparatus 102 lists the power generation plan data related to the icons “an error has occurred at the time of receipt check” and “the receipt deadline on the day and not received”. Then, a reminder mail is transmitted to the power generation plan creation / submission device 103 of the general contractor who should submit the power generation plan data.

[変形例]
本発明は上述した実施形態に限定されるものではなく、種々の変形が可能である。上述した実施形態は本発明を理解しやすく説明するために例示したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。また、ある実施形態の構成の一部を他の実施形態の構成に置き換えることが可能であり、また、ある実施形態の構成に他の実施形態の構成を加えることも可能である。また、各実施形態の構成の一部について削除し、若しくは他の構成の追加・置換をすることが可能である。上記実施形態に対して可能な変形は、例えば以下のようなものである。
[Modification]
The present invention is not limited to the above-described embodiments, and various modifications can be made. The above-described embodiments are illustrated for easy understanding of the present invention, and are not necessarily limited to those having all the configurations described. Further, a part of the configuration of an embodiment can be replaced with the configuration of another embodiment, and the configuration of another embodiment can be added to the configuration of an embodiment. Further, it is possible to delete a part of the configuration of each embodiment, or to add or replace another configuration. Examples of possible modifications to the above embodiment are as follows.

(1)上記実施形態における発電計画作成提出装置102,103のハードウエアは一般的なコンピュータによって実現できるため、図2〜図5等に示したプログラム等を記憶媒体に格納し、または伝送路を介して頒布してもよい。
(2)図2〜図5等に示した処理は、上記実施形態ではプログラムを用いたソフトウエア的な処理として説明したが、その一部または全部をASIC(Application Specific Integrated Circuit;特定用途向けIC)、あるいはFPGA(field-programmable gate array)等を用いたハードウエア的な処理に置き換えてもよい。
(1) Since the hardware of the power generation plan creation and submission devices 102 and 103 in the above embodiment can be realized by a general computer, the programs shown in FIGS. It may be distributed through.
(2) Although the processing shown in FIGS. 2 to 5 and the like has been described as software processing using a program in the above embodiment, a part or all of the processing is ASIC (Application Specific Integrated Circuit). ), Or hardware processing using an FPGA (field-programmable gate array) or the like.

102 発電計画作成提出装置(発電計画取り纏め装置、発電計画データ取得部、発電計画データ取得手段、発電計画取り纏め部、発電計画取り纏め手段)
103,103A,103B,103C 発電計画作成提出装置(発電計画作成装置)
254 ラジオボタン(規定値作成部)
310 提出先一覧リスト(提出期限別アイコン表示部)
317 ビジネスプロトコルID欄(未提出アイコン表示態様設定部)
410 提出元一覧リスト(受領期限別アイコン表示部)
417 ビジネスプロトコルID欄(未受領アイコン表示態様設定部)
1033 発電計画作成部(発電計画作成手段)
1035 規定値DB(規定値記憶部、規定値記憶手段)
1036 設備稼働情報DB(設備稼働情報記憶部、設備稼働情報記憶手段)
S402 ステップ(発電計画データ取得部、発電計画データ取得手段)
S404 ステップ(発電計画取り纏め部、発電計画取り纏め手段)
102 Power generation plan preparation and submission device (power generation plan management device, power generation plan data acquisition unit, power generation plan data acquisition unit, power generation plan management unit, power generation plan management unit)
103, 103A, 103B, 103C Power generation plan creation and submission device (power generation plan creation device)
254 radio button (specified value creation part)
310 Submission list (icon display section by submission deadline)
317 Business Protocol ID field (unsubmitted icon display mode setting part)
410 Submitter list (icon display section by deadline for receipt)
417 Business protocol ID field (unreceived icon display mode setting part)
1033 Power generation plan creation unit (power generation plan creation means)
1035 specified value DB (specified value storage unit, specified value storage means)
1036 equipment operation information DB (equipment operation information storage unit, equipment operation information storage means)
S402 step (power generation plan data acquisition unit, power generation plan data acquisition means)
S404 step (power generation plan collecting unit, power generation plan collecting means)

Claims (6)

発電設備が所定時間の時間帯毎に発電可能な電力量を規定した規定値を記憶する規定値記憶部と、
前記発電設備に対するメンテナンスの予定日と、前記メンテナンスによる前記電力量に対する影響の内容とを含む設備稼働情報を記憶する設備稼働情報記憶部と、
前記規定値と、前記設備稼働情報とに基づいて、前記発電設備によって特定の日の前記時間帯に発電される電力量の計画である発電計画データを作成する発電計画作成部と、
を有することを特徴とする発電計画作成装置。
A specified value storage unit that stores a specified value that defines the amount of power that the power generation facility can generate every predetermined time period; and
A facility operation information storage unit for storing facility operation information including a scheduled date of maintenance for the power generation facility and the content of the influence on the electric energy by the maintenance;
A power generation plan creation unit that creates power generation plan data that is a plan of the amount of power generated by the power generation facility in the time zone on a specific day based on the specified value and the facility operation information;
A power generation plan creation device characterized by comprising:
前記規定値記憶部は、少なくとも1週間以上の期間に渡って前記時間帯毎に前記発電設備が発電可能な電力を規定した長期規定値を記憶するものであり、
前記長期規定値に規定された前記電力に基づいて前記電力量を計算して前記規定値を作成する規定値作成部
をさらに有することを特徴とする請求項1に記載の発電計画作成装置。
The specified value storage unit stores a long-term specified value that defines the power that can be generated by the power generation facility for each time period over a period of at least one week,
The power generation plan creation device according to claim 1, further comprising a prescribed value creation unit that creates the prescribed value by calculating the amount of electric power based on the electric power prescribed in the long-term prescribed value.
複数の前記発電計画データに対応する複数のアイコンを、提出期限に応じて分類して表示する提出期限別アイコン表示部と、
複数の前記アイコンを、提出済みの前記発電計画データに係るものと、未提出の前記発電計画データに係るものとで表示態様を異ならせる未提出アイコン表示態様設定部と、
をさらに有することを特徴とする請求項2に記載の発電計画作成装置。
A plurality of icons corresponding to a plurality of the power generation plan data, classified according to the submission deadline, and an icon display section by submission deadline,
A plurality of the icons, a non-submitted icon display mode setting unit that changes a display mode according to the power generation plan data that has been submitted and a thing that relates to the power plan data that has not been submitted;
The power generation plan creation device according to claim 2, further comprising:
所定のグループに属する複数の発電設備によって特定の日の所定時間の時間帯毎に発電される電力量の計画である複数の発電計画データを取得する発電計画データ取得部と、
受信した複数の前記発電計画データに対応する複数のアイコンを、受領期限に応じて分類して表示する受領期限別アイコン表示部と、
複数の前記アイコンを、受領済みの前記発電計画データに係るものと、未受領の前記発電計画データに係るものとで表示態様を異ならせる未受領アイコン表示態様設定部と、
複数の前記発電計画データに含まれる前記電力量を前記時間帯毎に合計して前記グループ全体の発電計画データを作成する発電計画取り纏め部と、
を有することを特徴とする発電計画取り纏め装置。
A power generation plan data acquisition unit that acquires a plurality of power generation plan data that is a plan of an amount of power generated by a plurality of power generation facilities belonging to a predetermined group every predetermined time period on a specific day;
A plurality of icons corresponding to a plurality of the power generation plan data received, an icon display unit for each due date for receiving and displaying classified according to the due date,
A plurality of the icons, an unaccepted icon display mode setting unit that changes display modes depending on the received power generation plan data and the unreceived power generation plan data;
A power generation plan summarizing unit that creates the power generation plan data of the entire group by summing the amount of power included in the plurality of power generation plan data for each time period;
A power generation plan summarizing apparatus comprising:
コンピュータを、発電設備が所定時間の時間帯毎に発電可能な電力量を規定した規定値を記憶する規定値記憶手段、
前記発電設備に対するメンテナンスの予定日と、前記メンテナンスによる前記電力量に対する影響の内容とを含む設備稼働情報を記憶する設備稼働情報記憶手段、
前記規定値と、前記設備稼働情報とに基づいて、前記発電設備によって特定の日の前記時間帯に発電される電力量の計画である発電計画データを作成する発電計画作成手段、
として機能させるためのプログラム。
A prescribed value storage means for storing a prescribed value that defines the amount of electric power that the power generation facility can generate every predetermined time period;
Facility operation information storage means for storing facility operation information including a scheduled date of maintenance for the power generation facility and the content of the influence on the electric energy by the maintenance;
Power generation plan creation means for creating power generation plan data that is a plan of the amount of power generated by the power generation facility in the time zone on a specific day based on the specified value and the facility operation information;
Program to function as.
コンピュータを、
所定のグループに属する複数の発電設備によって特定の日の所定時間の時間帯毎に発電される電力量の計画である複数の発電計画データを取得する発電計画データ取得手段、
受信した複数の前記発電計画データに対応する複数のアイコンを、受領期限に応じて分類して表示する手段、
複数の前記アイコンを、受領済みの前記発電計画データに係るものと、未受領の前記発電計画データに係るものとで表示態様を異ならせる手段、
複数の前記発電計画データに含まれる前記電力量を前記時間帯毎に合計して前記グループ全体の発電計画データを作成する発電計画取り纏め手段と、
として機能させるためのプログラム。
Computer
Power generation plan data acquisition means for acquiring a plurality of power generation plan data, which is a plan of the amount of power generated by a plurality of power generation facilities belonging to a predetermined group every predetermined time period on a specific day
Means for classifying and displaying a plurality of icons corresponding to the plurality of power generation plan data received, according to a reception deadline;
Means for differentiating display states of the plurality of icons according to the received power generation plan data and those related to the unreceived power generation plan data;
A power generation plan summarizing means for generating the power generation plan data of the entire group by summing up the power amounts included in a plurality of the power generation plan data for each time period;
Program to function as.
JP2015227230A 2015-11-20 2015-11-20 Power generation plan creation device, power generation plan coordination device and program Pending JP2017097514A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015227230A JP2017097514A (en) 2015-11-20 2015-11-20 Power generation plan creation device, power generation plan coordination device and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015227230A JP2017097514A (en) 2015-11-20 2015-11-20 Power generation plan creation device, power generation plan coordination device and program

Publications (1)

Publication Number Publication Date
JP2017097514A true JP2017097514A (en) 2017-06-01

Family

ID=58817882

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015227230A Pending JP2017097514A (en) 2015-11-20 2015-11-20 Power generation plan creation device, power generation plan coordination device and program

Country Status (1)

Country Link
JP (1) JP2017097514A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020149355A (en) * 2019-03-13 2020-09-17 三菱電機株式会社 Monitoring system, and method of monitoring simultaneous balancing of electric power supply and demand

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006180697A (en) * 2001-03-29 2006-07-06 Hitachi Ltd Plan-drawing method of power generation amount, and plan-offering service for power generation amount
JP2007034428A (en) * 2005-07-22 2007-02-08 Matsushita Electric Works Ltd Document registration system and document registration program
JP2007181385A (en) * 2005-12-28 2007-07-12 Chugoku Electric Power Co Inc:The System, method and program for power supply and demand plan management support
JP2010026993A (en) * 2008-07-24 2010-02-04 Dainippon Screen Mfg Co Ltd Workflow management system, workflow chart creation device, and workflow chart creation program
WO2011099142A1 (en) * 2010-02-12 2011-08-18 日本風力開発株式会社 Wind turbine generator system
JP2015156770A (en) * 2014-02-21 2015-08-27 富士通株式会社 Operation plan support program, operation plan support method and operation plan support system
JP2015201114A (en) * 2014-04-10 2015-11-12 日本ソフトウェアマネジメント株式会社 Work management device, and meal charge management device, meal charge management method and meal charge management program

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006180697A (en) * 2001-03-29 2006-07-06 Hitachi Ltd Plan-drawing method of power generation amount, and plan-offering service for power generation amount
JP2007034428A (en) * 2005-07-22 2007-02-08 Matsushita Electric Works Ltd Document registration system and document registration program
JP2007181385A (en) * 2005-12-28 2007-07-12 Chugoku Electric Power Co Inc:The System, method and program for power supply and demand plan management support
JP2010026993A (en) * 2008-07-24 2010-02-04 Dainippon Screen Mfg Co Ltd Workflow management system, workflow chart creation device, and workflow chart creation program
WO2011099142A1 (en) * 2010-02-12 2011-08-18 日本風力開発株式会社 Wind turbine generator system
JP2015156770A (en) * 2014-02-21 2015-08-27 富士通株式会社 Operation plan support program, operation plan support method and operation plan support system
JP2015201114A (en) * 2014-04-10 2015-11-12 日本ソフトウェアマネジメント株式会社 Work management device, and meal charge management device, meal charge management method and meal charge management program

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020149355A (en) * 2019-03-13 2020-09-17 三菱電機株式会社 Monitoring system, and method of monitoring simultaneous balancing of electric power supply and demand
JP7262255B2 (en) 2019-03-13 2023-04-21 三菱電機株式会社 Monitoring system and simultaneous power equality monitoring method

Similar Documents

Publication Publication Date Title
US11574023B2 (en) Document processing system and method
US8676953B2 (en) Use of aggregated groups for managing demand response resources
US8639555B1 (en) Workflow discovery through user action monitoring
CN101364956A (en) System and method for collaboration
US20100235838A1 (en) Method, computer program product, and apparatus for enabling task aggregation in an enterprise environment
US20050108232A1 (en) Electronic submittal method and system
AU2016200559B2 (en) Method and system for communicating product development information
US20240265476A1 (en) Communication terminal, tracking system, displaying method, and non-transitory recording medium
KR20170127806A (en) System and method for generating and submitting a legal document using a mobile application
JP2002091818A (en) System for sharing/exchanging data file between enterprises and business cooperating system
JP2003288476A (en) Line capacity integrated evaluation/management operation system for production line and line capacity integrated evaluation/management operation method for the production line
JP2017097514A (en) Power generation plan creation device, power generation plan coordination device and program
US8984004B2 (en) Information collecting system
US20200234204A1 (en) System and method for construction estimating
US20150112768A1 (en) Information gathering and price forecasting for heavy equipment sales
CN112801446B (en) Cloud service station and cloud service method
JP6634782B2 (en) Business management device, business management method and program
JP2008210286A (en) Commodity exchange program, commodity exchange method, and commodity exchange device
Simonova Identification of IT-service metrics for a business process when planning a transition to outsourcing
JP5490161B2 (en) Business exchange support device and business exchange support system
JP2020042711A (en) Program, information processing method, and information processing device
WO2024106181A1 (en) Display control method and display control system
US20170270459A1 (en) Device, System, and Method for Tracking Job Management
US20210295274A1 (en) Workflow management device, workflow management system, method of managing workflow, and non-transitory recording medium
CN107590650A (en) The marketing method of natural gas, device and emergent sell gas system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180220

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190125

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190226

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20190910