JP2017068452A - Work machine operation system - Google Patents

Work machine operation system Download PDF

Info

Publication number
JP2017068452A
JP2017068452A JP2015191622A JP2015191622A JP2017068452A JP 2017068452 A JP2017068452 A JP 2017068452A JP 2015191622 A JP2015191622 A JP 2015191622A JP 2015191622 A JP2015191622 A JP 2015191622A JP 2017068452 A JP2017068452 A JP 2017068452A
Authority
JP
Japan
Prior art keywords
information
work machine
command
control device
permission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2015191622A
Other languages
Japanese (ja)
Other versions
JP6470667B2 (en
Inventor
三浦 敬典
Takanori Miura
敬典 三浦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kubota Corp
Original Assignee
Kubota Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kubota Corp filed Critical Kubota Corp
Priority to JP2015191622A priority Critical patent/JP6470667B2/en
Priority to PCT/JP2016/078274 priority patent/WO2017057275A1/en
Priority to DE112016004426.7T priority patent/DE112016004426T5/en
Publication of JP2017068452A publication Critical patent/JP2017068452A/en
Priority to US15/938,670 priority patent/US11335133B2/en
Application granted granted Critical
Publication of JP6470667B2 publication Critical patent/JP6470667B2/en
Priority to US17/718,836 priority patent/US20220237957A1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

PROBLEM TO BE SOLVED: To allow the operation of a work machine to be simply controlled according to a use time limit.SOLUTION: An operation system of a work machine comprises: a control device mounted on the work machine and capable of controlling the work machine; and a command device capable of outputting a command on control of the control device to the control device by radio. The command device includes: an acquisition unit capable of acquiring the use time limit of the work machine from the outside; a time calculation unit for finding a time; a processing unit for determining whether or not the time found by the time calculation unit has reached the use time limit; and a communication unit for outputting a first command to restrict control of the control device if it has reached the use time limit, and for outputting a second command not to restrict control of the control device if it has not reached the use time limit.SELECTED DRAWING: Figure 1

Description

本発明は、作業機の動作システムに関する。   The present invention relates to an operation system for a work machine.

従来の作業機の使用期限を管理するシステムとして、特許文献1に示す技術が知られている。
特許文献1の作業機では、使用期限が記憶された使用期限記憶手段と、使用期限に達したときに駆動部の動作を制限する動作制限手段と、使用期限を延長する使用期限延長手段と、使用期限の延長を許可する許可信号を予め設定された無線通信エリアに入ったときに受信可能な無線端末を備えている。
As a conventional system for managing the expiration date of a working machine, a technique disclosed in Patent Document 1 is known.
In the working machine of Patent Document 1, an expiration date storage unit that stores an expiration date, an operation limitation unit that limits the operation of the drive unit when the expiration date is reached, an expiration date extension unit that extends the expiration date, A wireless terminal is provided that can receive a permission signal permitting extension of the expiration date when entering a preset wireless communication area.

特開2013−016119号公報JP2013-016119A

特許文献1では、作業機側に使用期限が記憶されていて、使用期限が来ると作業機の制限を行っている。このような方式である場合、作業機側に使用期限を書き込む必要があり、使用期限を設定する場合には必ず外部のサーバ等から作業機側に接続する必要がある。即ち、作業機の使用期限の設定や判定等に関して、大変な処理が必要である。
本発明は、上記したような従来技術の問題点を解決すべくなされたものであって、簡単に使用期限に応じて作業機の動作を制御することができる作業機の動作システムを提供することを目的とする。
In Patent Document 1, the expiration date is stored on the work machine side, and when the expiration date comes, the work machine is restricted. In such a system, it is necessary to write the expiration date on the work machine side. When setting the expiration date, it is necessary to connect to the work machine side from an external server or the like. That is, a great deal of processing is required for setting and determining the expiration date of the work implement.
The present invention has been made to solve the above-described problems of the prior art, and provides an operation system for a work implement that can easily control the operation of the work implement according to the expiration date. With the goal.

上述の目的を達成するため、本発明においては以下の技術的手段を講じた。
請求項1に係る発明は、作業機に搭載され且つ、前記作業機の制御可能な制御装置と、前記制御装置の制御に関する指令を、無線によって前記制御装置に出力可能な指令装置と、を備え、前記指令装置は、前記作業機の使用期限を外部から取得可能な取得部と、時間を求める時間算出部と、前記時間算出部で求めた時間が、前記使用期限に達したか否かを判断する処理部と、前記使用期限に達した場合には、前記制御装置の制御を制限する第1指令を出力し、前記使用期限に達していない場合には、前記制御装置の制御を制限なく行う第2指令を出力する通信部と、を有している。
In order to achieve the above-described object, the present invention takes the following technical means.
The invention according to claim 1 includes a control device mounted on a work machine and capable of controlling the work machine, and a command device capable of outputting a command related to control of the control device to the control device wirelessly. The command device includes an acquisition unit capable of acquiring an expiration date for use of the work implement from the outside, a time calculation unit for obtaining time, and whether the time obtained by the time calculation unit has reached the expiration date. When the expiration date has been reached, a first command for limiting the control of the control device is output. When the expiration date has not been reached, the control of the control device is not limited. And a communication unit that outputs a second command to be performed.

請求項2に係る発明は、前記制御装置は判定情報を記憶する記憶部を有し、前記取得部は、前記制御装置の制御を制限なくための許可情報と、前記制御装置の記憶部に記憶された判定情報とを取得可能であり、前記処理部は、前記許可情報と前記判定情報との認証が成立し且つ前記使用期限に達しない場合には、前記通信部に前記第2指令を出力させる。
請求項3に係る発明は、前記取得部は、前記使用期限の延長期間、延長期間を有効にするための許可コードを外部から取得可能であり、前記処理部は、前記取得部が取得した許可コードと、外部から入力された外部コードとの認証が成立した場合に、前記延長期間に基づいて使用期限を延長する。
According to a second aspect of the present invention, the control device includes a storage unit that stores determination information, and the acquisition unit stores permission information for limiting the control of the control device without limitation and a storage unit of the control device. And the processing unit outputs the second command to the communication unit when authentication between the permission information and the determination information is established and the expiration date is not reached. Let
According to a third aspect of the present invention, the acquisition unit can acquire an extension period of the expiration date and a permission code for validating the extension period from the outside, and the processing unit acquires the permission acquired by the acquisition unit. When the authentication between the code and the external code input from the outside is established, the expiration date is extended based on the extension period.

請求項4に係る発明は、前記作業機は前記外部コードを入力可能な表示装置を備え、前記処理部は、前記制御装置に対して前記表示装置に入力された前記外部コードを要求可能である。   According to a fourth aspect of the present invention, the work machine includes a display device capable of inputting the external code, and the processing unit can request the external code input to the display device from the control device. .

本発明によれば、簡単に使用期限に応じて作業機の動作を制御することができる。   According to the present invention, the operation of the work implement can be easily controlled according to the expiration date.

作業機のレンタルシステムの概略図である。It is the schematic of the rental system of a working machine. 第1記憶部が記憶している作業機情報の一例である。It is an example of the work machine information which the 1st storage part has memorized. 第2記憶部が記憶しているレンタル情報の一例である。It is an example of the rental information which the 2nd memory | storage part has memorize | stored. 第3記憶部が記憶している作業機情報の一例である。It is an example of the work machine information which the 3rd storage part has memorized. 発行部による特定情報の割り出しを説明する図である。It is a figure explaining the determination of the specific information by an issuing part. 他のレンタルシステムの概略図である。It is the schematic of another rental system. バックホーの側面図である。It is a side view of a backhoe.

以下、本発明に係る作業機の動作システムについて、適宜図面を参照しながら説明する。
[第1実施形態]
作業機の動作システムは、作業機の動作を管理するシステムで、例えば、作業機のレンタルシステムに適用することができる。作業機の動作システムの説明の前に、作業機のレンタルシステムについて説明する。なお、作業機の動作システムは、作業機のレンタル以外にも適用は可能であり、後述する作業機のレンタルシステムに限定されない。
Hereinafter, an operation system of a working machine according to the present invention will be described with reference to the drawings as appropriate.
[First embodiment]
The work machine operation system is a system for managing the work machine operation, and can be applied to, for example, a work machine rental system. Prior to the description of the operation system of the work machine, the work machine rental system will be described. The operation system of the work machine can be applied to other than the work machine rental, and is not limited to the work machine rental system described later.

図1は、作業機のレンタルシステムの概略図である。
作業機のレンタルシステム1は、建設機械(例えば、バックホー)、農業機械(例えば、トラクタ、コンバイン、田植機)等の作業機のレンタルシステムを行うシステムである。
図1に示すように、作業機のレンタルシステム1は、第1管理サーバ2と、第2管理サーバ3とを備えている。
FIG. 1 is a schematic diagram of a work machine rental system.
The work machine rental system 1 is a system that performs a work machine rental system such as a construction machine (for example, a backhoe) and an agricultural machine (for example, a tractor, a combine, a rice transplanter).
As shown in FIG. 1, the work machine rental system 1 includes a first management server 2 and a second management server 3.

第1管理サーバ2は、作業機4のレンタルを管理するサーバであって、例えば、レンタル会社等が所有する。第2管理サーバ3は、作業機4の製造又は販売するメーカ等が所有する。第1管理サーバ2と、第2管理サーバ3とはネットワークNを通じて互いに情報の送受信が行えるようになっている。第2管理サーバ3は、例えば、作業機4の製造、又は、販売に関する様々な情報(部品情報、仕様情報、操作マニュアル、メンテナンス情報等)を第1管理サーバ2に提供することが可能である。一方で、第1管理サーバ2は、後述するように、レンタルに関する情報を第2管理サーバ3に提供することができる。   The first management server 2 is a server that manages the rental of the work machine 4 and is owned by, for example, a rental company. The second management server 3 is owned by a manufacturer or the like that manufactures or sells the work machine 4. The first management server 2 and the second management server 3 can exchange information with each other through the network N. The second management server 3 can provide, for example, various information (part information, specification information, operation manual, maintenance information, etc.) related to the manufacture or sale of the work machine 4 to the first management server 2. . On the other hand, the 1st management server 2 can provide the information regarding a rental to the 2nd management server 3 so that it may mention later.

第1管理サーバ2には、ネットワークNを通じて、様々な機器(通信機器という)5が接続可能である。例えば、第1管理サーバ2には、パーソナルコンピュータ(PC)、スマートフォン(多機能携帯電話)、PDA(携帯端末)、タブレット等の通信機器5が接続可能である。通信機器5を、第1管理サーバ2に接続することによって、作業機4のレンタルに関する処理を行うことができる。   Various devices (referred to as communication devices) 5 can be connected to the first management server 2 through the network N. For example, the first management server 2 can be connected to a communication device 5 such as a personal computer (PC), a smartphone (multifunctional mobile phone), a PDA (mobile terminal), a tablet, or the like. By connecting the communication device 5 to the first management server 2, processing related to the rental of the work machine 4 can be performed.

作業機4のレンタルを行うには、まず、通信機器5を第1管理サーバ2に接続をする。第1管理サーバ2は、通信機器5が接続されたことを受けて、当該通信機器5に入力画面(例えば、Web画面)を表示させる。通信機器5に表示された入力画面には、レンタルを行うのに必要な事項(情報)が入力することができる。例えば、入力画面には、作業機を借りる者(借方)に関する情報である借方者情報(借方者の住所、氏名、電話番号等)、借方希望情報(レンタルを希望する作業機の機種、当該機種の希望台数、貸出期間等)を入力することができる。   In order to rent the work machine 4, first, the communication device 5 is connected to the first management server 2. In response to the connection of the communication device 5, the first management server 2 displays an input screen (for example, a Web screen) on the communication device 5. On the input screen displayed on the communication device 5, items (information) necessary for renting can be input. For example, on the input screen, the borrower information (debitor's address, name, phone number, etc.), which is information related to the person (debiter) who rents the work machine, debit request information (the model of the work machine desired to be rented, the model concerned) Desired number of units, lending period, etc.).

第1管理サーバ2は、借方希望情報に基づき、希望する貸出期間中に希望する作業機4が貸し出しを行えるか否かを判断し、希望する貸出期間中に作業機4の貸出が行える場合は、第2管理サーバ3に対して、レンタルの許可の問い合わせを行う。第2管理サーバ3からレンタルの許可がなされると、第1管理サーバ2は、作業機の貸出が行えるように所定の処理を行う。このように、作業機のレンタルシステム1では、第1管理サーバ2と第2管理サーバ3とを連携させることにより、作業機4のレンタルを行っている。   Based on the debit request information, the first management server 2 determines whether or not the desired work machine 4 can lend during the desired lending period, and if the work machine 4 can be lent during the desired lending period The second management server 3 is inquired about rental permission. When the second management server 3 permits the rental, the first management server 2 performs a predetermined process so that the work machine can be rented. Thus, in the work machine rental system 1, the work machine 4 is rented by linking the first management server 2 and the second management server 3.

以下、第1管理サーバ及び第2管理サーバについて詳しく説明する。
第1管理サーバ2は、第1記憶部(第1作業機情報記憶部)10と、第2記憶部(レンタル情報記憶部)11と、処理部(第1処理部)12と、第1通信部13とを備えている。第1記憶部10及び第2記憶部11は、不揮発性のメモリ等で構成されている。第1処理部12及び第1通信部13は、第1管理サーバ2に組み込まれた電気・電子部品、プログラム等で構成されている。
Hereinafter, the first management server and the second management server will be described in detail.
The first management server 2 includes a first storage unit (first work machine information storage unit) 10, a second storage unit (rental information storage unit) 11, a processing unit (first processing unit) 12, and a first communication. Part 13. The 1st memory | storage part 10 and the 2nd memory | storage part 11 are comprised by the non-volatile memory. The first processing unit 12 and the first communication unit 13 are configured by electric / electronic components, programs, and the like incorporated in the first management server 2.

第1記憶部10は、レンタル会社が所有する作業機の情報(作業機情報)を記憶している。第1記憶部10は、例えば、図2Aに示すように、作業機の管理番号、作業機の特定情報、作業機の機種等を記憶している。作業機の管理番号は、レンタル会社がレンタルの管理のために付した番号である。作業機の特定情報は、作業機を特定する情報であって作業機に割り当てられた固有の情報(例えば、製造番号、シリアル番号等)である。作業機の機種は、作業機の仕様、作業機の大きさ等によって、製造メーカが独自に設定した名称等である。   The first storage unit 10 stores work machine information (work machine information) owned by the rental company. The first storage unit 10 stores, for example, a work machine management number, work machine identification information, a work machine model, and the like, as shown in FIG. 2A. The management number of the work machine is a number assigned for rental management by the rental company. The work machine identification information is information that identifies the work machine and is unique information (for example, a manufacturing number, a serial number, etc.) assigned to the work machine. The model of the work machine is a name uniquely set by the manufacturer according to the specifications of the work machine, the size of the work machine, and the like.

第2記憶部11は、作業機のレンタルに関する情報(レンタル情報という)を記憶している。第2記憶部11は、例えば、図2Bに示すように、レンタル情報として、レンタルを行った作業機の管理番号、作業機の特定情報、許可情報、借方者情報、貸出期間等を記憶している。許可情報とは、レンタルを行う際に第2管理サーバ3から通知されたレンタルの許可を示す番号(許可指令情報)等である。   The second storage unit 11 stores information on rental of the work machine (referred to as rental information). For example, as shown in FIG. 2B, the second storage unit 11 stores, as rental information, a management number of the working machine that has rented, identification information of the working machine, permission information, debiter information, a lending period, and the like. Yes. The permission information is a number (permission instruction information) indicating the permission of rental notified from the second management server 3 when performing the rental.

第1通信部13は、第2管理サーバ3、通信機器5等と様々な情報を送受信する装置である。第1通信部13は、第1管理サーバ2、第2管理サーバ3及び通信機器5の処理に応じて、所定の情報を送受信する。
第1処理部12は、レンタルに関する様々な処理を行う部分である。例えば、第1管理サーバ2に通信機器5が接続し、当該第1管理サーバ2に対してレンタルを行いたいという要求(入力画面の要求)があると、第1処理部12は、通信機器5に入力画面を表示させる処理を行う。また、第1処理部12は、入力画面に借方者情報、借方希望情報等が入力されると、借方希望情報に基づき、希望する貸出期間中に希望する作業機が貸し出しを行えるか否かを判断する処理を行う。詳しくは、第1処理部12は、第1記憶部10に記憶している作業機の機種を参照して、レンタルを希望する作業機の機種が、何台所有しているかを算出する。即ち、第1処理部12は、レンタル希望の機種におけるレンタル会社の所有台数を算出する。なお、作業機を予め機種毎に整理することで、所持している台数を第1記憶部10に記憶していてもよい。
The 1st communication part 13 is an apparatus which transmits / receives various information with the 2nd management server 3, the communication apparatus 5, etc. FIG. The first communication unit 13 transmits and receives predetermined information according to the processes of the first management server 2, the second management server 3, and the communication device 5.
The first processing unit 12 is a part that performs various processes related to rental. For example, when the communication device 5 is connected to the first management server 2 and there is a request (input screen request) to rent the first management server 2, the first processing unit 12 To display the input screen. In addition, when the debitor information, the debit request information, etc. are input on the input screen, the first processing unit 12 determines whether or not the desired working machine can lend during the desired lending period based on the debit request information. Perform a process to determine. Specifically, the first processing unit 12 refers to the model of the work machine stored in the first storage unit 10 and calculates how many kitchens the model of the work machine desired to be rented has. That is, the first processing unit 12 calculates the number of rental companies owned by the model desired to be rented. Note that the number of possessed machines may be stored in the first storage unit 10 by arranging the work machines in advance for each model.

そして、第1処理部12は、第2記憶部11を参照して、貸出期間中において既にレンタルを行っている作業機の台数(貸出台数)を算出し、貸出台数と所有台数とからレンタルが可能な作業機の台数(貸出可能台数)を算出する。第1処理部12は、貸出可能台数が、希望台数以上である場合、希望している作業機に対して貸出が行えると判断する。
なお、例えば、貸出可能台数が3台、希望台数が5台である場合、少なくとも貸出可能台数である3台の作業機は、レンタルすることが可能である。この場合は、第1処理部12は、貸出可能台数を通信機器5に通知し、通信機器5に希望台数の変更を求め、変更後の希望台数が貸出可能台数以下の場合には、第1処理部12は、貸し出しを行えると判断する。
Then, the first processing unit 12 refers to the second storage unit 11 to calculate the number of working machines that have already been rented during the lending period (the number of lending), and the rental is determined from the number of lending and the number of owned units. Calculate the number of work machines that can be rented. The first processing unit 12 determines that the desired working machine can be lent when the rentable number is equal to or larger than the desired number.
For example, when the rentable number is three and the desired number is five, at least three working machines that are lent can be rented. In this case, the first processing unit 12 notifies the communication device 5 of the rentable number, asks the communication device 5 to change the desired number, and if the desired number after the change is less than the rentable number, the first processing unit 12 The processing unit 12 determines that lending can be performed.

第1処理部12は、希望している作業機に対して貸出が行えると判断後、即ち、所定の作業機に対してレンタル予約が行われた場合、第1情報を、第1通信部13から第2管理サーバ3に送信する処理を行う。第1情報とは、所定の作業機、即ち、貸出可能な作業機の情報であって、第1管理サーバ2が管理している情報である。第1情報は、作業機の管理番号、作業機を特定する特定情報、作業機の機種等である。   After determining that the desired working machine can be rented, that is, when a rental reservation is made for a predetermined working machine, the first processing unit 12 sends the first information to the first communication unit 13. To the second management server 3 is performed. The first information is information on a predetermined work machine, that is, a work machine that can be rented, and is information managed by the first management server 2. The first information includes a work machine management number, identification information for identifying the work machine, a model of the work machine, and the like.

この実施形態では、作業機に対してレンタル予約が行われた場合、第1処理部12は、第1記憶部10及び第2記憶部11を参照し、希望している作業機と同じ作業機の特定情報(第1特定情報という)を抽出する。第1通信部13は、第1処理部12が抽出した第1特定情報を含む第1情報と、レンタル許可要求とを第2管理サーバ3に送信する。
さて、第2管理サーバ3は、第3記憶部(第2作業機情報記憶部)20と、第2通信部21と、発行部22とを有している。第3記憶部20は、不揮発性のメモリ等で構成されている。第2通信部21、発行部22は、第2管理サーバ3に組み込まれた電気・電子部品、プログラム等で構成されている。
In this embodiment, when a rental reservation is made for a work machine, the first processing unit 12 refers to the first storage unit 10 and the second storage unit 11 and the same work machine as the desired work machine. Specific information (referred to as first specific information) is extracted. The first communication unit 13 transmits the first information including the first specific information extracted by the first processing unit 12 and the rental permission request to the second management server 3.
The second management server 3 includes a third storage unit (second work machine information storage unit) 20, a second communication unit 21, and an issuing unit 22. The third storage unit 20 is configured by a non-volatile memory or the like. The second communication unit 21 and the issuing unit 22 are configured by electric / electronic components, programs, and the like incorporated in the second management server 3.

第3記憶部20は、製造した作業機の情報、又は、販売した作業機の情報を記憶している。製造した作業機の情報、又は、販売した作業機の情報のことを第2情報という。第3記憶部20は、例えば、図3Aに示すように、第2情報として、作業機の特定情報、作業機の機種等を記憶している。
第2通信部21は、第1管理サーバ2等と様々な情報を送受信する装置である。第2通信部21は、第1管理サーバ2、第2管理サーバ3等の処理に応じて、所定の情報を受信したり送信する。
The 3rd memory | storage part 20 has memorize | stored the information of the manufactured working machine, or the information of the sold working machine. Information on manufactured work machines or sold work machines is referred to as second information. For example, as illustrated in FIG. 3A, the third storage unit 20 stores work machine identification information, a work machine model, and the like as the second information.
The 2nd communication part 21 is an apparatus which transmits / receives various information with the 1st management server 2 grade | etc.,. The second communication unit 21 receives or transmits predetermined information according to processing of the first management server 2, the second management server 3, and the like.

発行部22は、まず、第1管理サーバ2から送信された第1情報と、第3記憶部20に記憶された第2情報とを参照して、レンタル許可する作業機(レンタル作業機という)を割り出す。具体的には、第1管理サーバ2が第1特定情報を含む第1情報及びレンタル許可要求を受信すると、発行部22は、レンタル許可要求を受けて割出処理を開始する。発行部22は、第1管理サーバ2が受信した第1特定情報と一致する第2特定情報が、第3記憶部20に記憶されているか否かを判定する。   The issuing unit 22 first refers to the first information transmitted from the first management server 2 and the second information stored in the third storage unit 20, and permits a work machine (referred to as a rental work machine) to permit the rental. Is determined. Specifically, when the first management server 2 receives the first information including the first specific information and the rental permission request, the issuing unit 22 starts the indexing process in response to the rental permission request. The issuing unit 22 determines whether or not the second specific information that matches the first specific information received by the first management server 2 is stored in the third storage unit 20.

例えば、図3Bに示すように、第1特定情報が「K-RX253200」である場合、発行部22は、第3記憶部20を参照して、当該第3記憶部20の中に「K-RX253200」で示された第2特定情報が記憶されているかを判定する。この場合、第3記憶部20中に第2特定情報として、「K-RX253200」が記憶されているため、発行部22は、第1特定情報と一致する第2特定情報が記憶されている(作業機有り)と判定する。   For example, as illustrated in FIG. 3B, when the first specific information is “K-RX253200”, the issuing unit 22 refers to the third storage unit 20 and stores “K− It is determined whether the second specific information indicated by “RX253200” is stored. In this case, since “K-RX253200” is stored as the second specifying information in the third storage unit 20, the issuing unit 22 stores the second specifying information that matches the first specifying information ( It is determined that there is a work implement.

発行部22は、作業機有りの場合、第2特定情報(「K-RX253200」)と一致する第1特定情報(「K-RX253200」)に対応する作業機を、レンタル許可するレンタル作業機として認定し、認定したことを示す指令情報(許可指令情報)を発行する。許可指令情報とは、第1特定情報の作業機を、レンタル作業機として認定したことを示す情報(レンタル許可を示す情報)であって、数桁の数字等で示される。また、許可指令情報は、予め作業機と関連付けられていて、予め第2特定情報(「K-RX253200」)と許可指令情報とは対応づけられている。即ち、発行部22は、予め第2特定情報に対応付けられた許可指令情報を発行する。   When there is a work machine, the issuing unit 22 sets the work machine corresponding to the first specific information (“K-RX253200”) that matches the second specific information (“K-RX253200”) as a rental work machine that permits rental. Authorize and issue command information (permission command information) indicating that it has been certified. The permission command information is information (information indicating rental permission) indicating that the work machine of the first specific information is certified as a rental work machine, and is indicated by a number of digits. The permission command information is associated with the work machine in advance, and the second specifying information (“K-RX253200”) and the permission command information are associated with each other in advance. That is, the issuing unit 22 issues permission command information associated with the second specific information in advance.

したがって、発行部22は、第1管理サーバ2から通知された第1特定情報に対して、対応付けられた許可指令情報を発行することで、当該第1特定情報の作業機に対してレンタル許可を行う。
なお、上述した説明では、発行部22は、第1管理サーバ2から通知された第1特定情報に、レンタル許可を示すフラグ等を許可指令情報(許可情報)とすることで、当該第1特定情報の作業機に対してレンタル許可を行ってもよい。
Accordingly, the issuing unit 22 issues rental permission to the work machine of the first specific information by issuing the associated permission command information to the first specific information notified from the first management server 2. I do.
In the above description, the issuing unit 22 uses the flag indicating rental permission or the like as permission command information (permission information) in the first identification information notified from the first management server 2, so that the first identification is performed. Rental permission may be given to the information work machine.

一方、第1特定情報が「K-253800」である場合、発行部22は、第3記憶部20の中に第2特定情報として、「K-253800」が記憶されていないため、発行部22は、第1特定情報と一致する第2特定情報は記憶ない(作業機無し)と判定する。
発行部22は、作業機無しの場合、第1特定情報(「K-253800」)に対応する作業機を、レンタルを許可できない作業機とし、レンタルが不許可であることを示す不許可指令情報を発行する。この場合、不許可指令情報とは、第1特定情報の作業機は、レンタルの許可を発行することができない作業機であることを示す情報(レンタル不許可を示す情報)である。
On the other hand, when the first specific information is “K-253800”, the issuing unit 22 does not store “K-253800” as the second specific information in the third storage unit 20. Determines that the second specific information that matches the first specific information is not stored (no work implement).
If there is no work machine, the issuing unit 22 sets the work machine corresponding to the first specific information (“K-253800”) as a work machine that cannot be rented, and non-permission instruction information indicating that the rental is not permitted. Issue. In this case, the disapproval command information is information (information indicating that the rental is not permitted) indicating that the work machine of the first specific information is a work machine that cannot issue a rental permission.

第2管理サーバ3の第2通信部21は、発行部22によって、許可指令情報又は不許可指令情報が発行されると、許可指令情報又は不許可指令情報を第1管理サーバ2に送信する。
第1管理サーバ2の第1通信部13が許可指令情報又は不許可指令情報を受信すると、第1処理部12は、許可指令情報又は不許可指令情報に対応して処理を行う。第1管理サーバ2が許可指令情報を受信した場合、第1処理部12は、借方者が希望している作業機がレンタル可能であるとして、通信機器5にレンタル予約が完了したことを示す情報を通知する。また、第1処理部12及び第2記憶部11は、第2記憶部11の情報を更新する処理を行う。第1処理部12は、管理番号、レンタル許可が下りた作業機(レンタル作業機)の第1特定情報、許可情報(許可指令情報)、借方者情報、貸出期間等を第2記憶部11に送信する。第2記憶部11は、管理番号、第1特定情報、許可情報(許可指令情報)、借方者情報、貸出期間等を記憶する。
The second communication unit 21 of the second management server 3 transmits the permission command information or the non-permission command information to the first management server 2 when the issuing unit 22 issues the permission command information or the non-permission command information.
When the first communication unit 13 of the first management server 2 receives the permission command information or the non-permission command information, the first processing unit 12 performs processing corresponding to the permission command information or the non-permission command information. When the first management server 2 receives the permission command information, the first processing unit 12 indicates that the rental machine has been rented and the work device desired by the debiter can be rented. To be notified. In addition, the first processing unit 12 and the second storage unit 11 perform a process of updating information in the second storage unit 11. The first processing unit 12 stores, in the second storage unit 11, the management number, the first specific information of the work machine (rental work machine) for which the rental permission has been granted, permission information (permission command information), debiter information, the lending period, and the like. Send. The second storage unit 11 stores a management number, first specifying information, permission information (permission command information), debiter information, a lending period, and the like.

一方、第1管理サーバ2が不許可指令情報を受信した場合、第1処理部12は、不許可指令情報に対応する第1特定情報の作業機のレンタル許可がなされなかったとして処理を続ける。例えば、第1処理部12は、貸出期間中で貸出可能な作業機を抽出し、当該作業機をレンタルの不許可になった作業機に代わる代替機とし、代替機の第1特定情報を第2管理サーバ3に通知することで、代替機のレンタル許可要求を行う。第2管理サーバ3は、上述した同様の方法で代替機について、レンタル作業機として認定するか否かの処理を行う。代替機に対してレンタル許可がなされる(代替機に対応する許可指令情報を受信する)と、第1処理部12は、借方者が希望している作業機の代わりに、代替機のレンタルが可能であるという情報を、通信機器5に送信する。第1処理部12は、第1管理サーバ2が代替機でも良いことを示す情報を受信すると、通信機器5にレンタル予約が完了したことを示す情報を通知する。   On the other hand, when the first management server 2 receives the non-permission command information, the first processing unit 12 continues the process on the assumption that the rental of the work machine having the first specific information corresponding to the non-permission command information is not permitted. For example, the first processing unit 12 extracts a work machine that can be lent during the lending period, sets the work machine as a substitute machine that replaces the work machine that is not permitted to rent, and uses the first specific information of the substitute machine as the first specification information. 2 By making a notification to the management server 3, a rental permission request for an alternative device is made. The second management server 3 performs a process for determining whether or not the substitute machine is authorized as a rental work machine in the same manner as described above. When the rental permission is given to the substitute machine (receives the permission command information corresponding to the substitute machine), the first processing unit 12 rents the substitute machine instead of the work machine desired by the borrower. Information that it is possible is transmitted to the communication device 5. When receiving information indicating that the first management server 2 may be an alternative device, the first processing unit 12 notifies the communication device 5 of information indicating that the rental reservation has been completed.

そして、第1処理部12は、管理番号、当該管理番号、レンタル許可が下りた代替機(レンタル作業機)の第1特定情報、許可情報(許可指令情報)、借方者情報、貸出期間等を第2記憶部11に送信する。第2記憶部11は、管理番号、第1特定情報、許可情報(許可指令情報)、借方者情報、貸出期間等を記憶する。
次に、レンタル作業機が決定後の処理について説明する。レンタル作業機の決定後の処理は、以下の実施形態に限定されない。
Then, the first processing unit 12 obtains the management number, the management number, the first specifying information of the alternative machine (rental work machine) for which the rental permission has been granted, the permission information (permission command information), the debiter information, the lending period, etc. Transmit to the second storage unit 11. The second storage unit 11 stores a management number, first specifying information, permission information (permission command information), debiter information, a lending period, and the like.
Next, processing after the rental work machine is determined will be described. The processing after the rental work machine is determined is not limited to the following embodiment.

まず、作業機4について詳しく説明する。
図5は、作業機4の一例であるバックホーを示したものである。
図5に示すように、バックホー4は、下部の走行装置40と、上部の機体41とを備えている。
走行装置40は、ゴム製覆帯を有する走行体42を有している。走行体42を走行モータで駆動するようにしたクローラ式走行装置が採用されている。また、走行装置40の前部にはドーザ43が設けられている。
First, the working machine 4 will be described in detail.
FIG. 5 shows a backhoe which is an example of the work machine 4.
As shown in FIG. 5, the backhoe 4 includes a lower traveling device 40 and an upper body 41.
The traveling device 40 has a traveling body 42 having a rubber cover. A crawler type traveling device is adopted in which the traveling body 42 is driven by a traveling motor. A dozer 43 is provided at the front of the traveling device 40.

機体41は、旋回台44と、作業装置(掘削装置)45とを備えている。旋回台44は、走行装置40上にベアリング58を介して旋回軸回りに旋回自在に支持されている。作業装置45は、旋回台44の前部に備えられている。旋回台44上には、エンジン,ラジエータ,運転席46,燃料タンク,作動油タンク等が設けられている。
作業装置45は、スイングブラケット47と、ブーム50と、アーム51と、バケット52とを備えている。スイングブラケット47は、支持体48に縦軸回りに揺動自在に支持されている。スイングブラケット47は、旋回台44内に備えられたスイングシリンダの伸縮によって揺動する。ブーム50は、スイングブラケット47に横軸回りに揺動自在に支持されている。ブーム50は、当該ブーム50とスイングブラケット47とのの間に介装されたブームシリンダ54の伸縮によって揺動する。アーム51は、ブーム50の先端に横軸回りに揺動自在に支持されている。アーム51は、当該アーム51とブーム50との間に介装されたアームシリンダ55の伸縮によって揺動する。バケット52は、アーム51の先端にスクイ・ダンプ動作可能に設けられている。バケット52は、当該バケット52とアーム51との間に介装されたバケットシリンダ53の伸縮によってスクイ・ダンプ動作される。
The machine body 41 includes a swivel base 44 and a work device (excavation device) 45. The swivel base 44 is supported on the traveling device 40 via a bearing 58 so as to be pivotable about a swivel axis. The work device 45 is provided at the front portion of the swivel base 44. On the swivel base 44, an engine, a radiator, a driver's seat 46, a fuel tank, a hydraulic oil tank, and the like are provided.
The work device 45 includes a swing bracket 47, a boom 50, an arm 51, and a bucket 52. The swing bracket 47 is supported by the support 48 so as to be swingable about the vertical axis. The swing bracket 47 swings due to the expansion and contraction of the swing cylinder provided in the swivel base 44. The boom 50 is supported by the swing bracket 47 so as to be swingable about the horizontal axis. The boom 50 swings by expansion and contraction of a boom cylinder 54 interposed between the boom 50 and the swing bracket 47. The arm 51 is supported at the tip of the boom 50 so as to be swingable about the horizontal axis. The arm 51 swings due to the expansion and contraction of an arm cylinder 55 interposed between the arm 51 and the boom 50. The bucket 52 is provided at the tip of the arm 51 so that a squeeze / dump operation is possible. The bucket 52 is squeezed and dumped by expansion and contraction of a bucket cylinder 53 interposed between the bucket 52 and the arm 51.

図1に示すように、バックホーは、作業機の駆動(作動)に関する様々な制御を行う制御装置60を備えている。制御装置60は、例えば、オートアイドル制御(AI制御)、流量制御等の様々な制御を行う。なお、バックホーなどの作業機における制御は、下記に説明するものに限定されない。
制御装置60には、スイングシリンダ、ブームシリンダ54、アームシリンダ55、バケットシリンダ53などの各種アクチュエータを操作する操作部材(例えば、図5に示す操作レバー49や操作スイッチ)の操作量、ガバナセンサからのガバナ角度(ガバナ位置)、アクセルレバーの操作量(角度)、アイドルスイッチ(AI−SW)のオン信号/オフ信号、エンジン回転センサからのエンジン回転数などの各種制御信号が入力される。
As shown in FIG. 1, the backhoe includes a control device 60 that performs various controls related to driving (operation) of the work machine. The control device 60 performs various controls such as auto idle control (AI control) and flow rate control. In addition, control in working machines, such as a backhoe, is not limited to what is demonstrated below.
The control device 60 includes an operation amount of an operation member (for example, an operation lever 49 and an operation switch shown in FIG. 5) for operating various actuators such as a swing cylinder, a boom cylinder 54, an arm cylinder 55, and a bucket cylinder 53, and from a governor sensor. Various control signals such as a governor angle (a governor position), an operation amount (angle) of an accelerator lever, an on / off signal of an idle switch (AI-SW), and an engine speed from an engine rotation sensor are input.

AI制御は、アーム51(アームシリンダ55)やブーム50(ブームシリンダ54)などを操作する操作部材が操作されているときは、アクセルレバーの操作量に応じてエンジン回転数を増減し、操作部材が操作されていないときは、エンジン回転数をアイドリング状態に固定する。
具体的には、制御装置60によるAI制御では、操作レバー49を中立位置にしてアイドルスイッチのオン信号が入力されると、アクセルレバーの操作量に関わらず、オートアイドルモータにアイドル信号を出力してオートアイドルモータを駆動し、エンジン回転数をアイドル回転数にする。また、制御装置60によるAI制御では、操作レバー49を前後又は左右に揺動してアイドルスイッチのオフ信号を入力すると、アクセル位置の信号に基づきオートアイドルモータに作動信号を出力してオートアイドルモータを駆動する。オートアイドルモータを駆動するとガバナレバーが作動しエンジン回転数が、アクセルレバーに対応した回転数になる。
In the AI control, when an operation member for operating the arm 51 (arm cylinder 55), the boom 50 (boom cylinder 54) or the like is operated, the engine speed is increased / decreased according to the operation amount of the accelerator lever. When is not being operated, the engine speed is fixed to the idling state.
Specifically, in the AI control by the control device 60, when an idle switch ON signal is input with the operation lever 49 in the neutral position, an idle signal is output to the auto idle motor regardless of the operation amount of the accelerator lever. The auto idle motor is driven to set the engine speed to the idle speed. In the AI control by the control device 60, when an idle switch OFF signal is input by swinging the operation lever 49 back and forth or left and right, an operation signal is output to the auto idle motor based on the accelerator position signal. Drive. When the auto idle motor is driven, the governor lever is actuated and the engine speed becomes the speed corresponding to the accelerator lever.

流量制御は、操作部材の操作量に応じてアクチュエータを動作させるものである。
制御装置60による流量制御では、例えば、操作レバー49を中立位置より揺動させると、作業機に設けられた電磁比例弁のソレノイドに、操作レバー49の操作量に対応した所定値の電流(作動信号)を出力する。そうすると、電磁比例弁は電流値(操作量)に応じて開き、アクチュエータに対応する制御弁のパイロット圧が制御され、アクチュエータが動作する。
In the flow rate control, the actuator is operated according to the operation amount of the operation member.
In the flow rate control by the control device 60, for example, when the operation lever 49 is swung from the neutral position, a current (actuated) of a predetermined value corresponding to the operation amount of the operation lever 49 is applied to the solenoid of the electromagnetic proportional valve provided in the work implement. Signal). Then, the electromagnetic proportional valve opens according to the current value (operation amount), the pilot pressure of the control valve corresponding to the actuator is controlled, and the actuator operates.

制御装置60は、第4記憶部61と、第3通信部64とを有している。第4記憶部61は、不揮発性のメモリ等で構成され、作業機の特定情報(第3特定情報)を記憶すると共に、第3特定情報に対応した判定情報を記憶している。判定情報とは、後述するように制御装置60で制御を行う際の判定に用いられるもので、例えば、発行部22で発行された許可指令情報と同じ情報である。なお、第3特定情報及び判定情報は、作業機4の製造時や作業機4の販売時等に第4記憶部61に書き込まれる。   The control device 60 includes a fourth storage unit 61 and a third communication unit 64. The fourth storage unit 61 is configured by a non-volatile memory or the like, stores identification information (third identification information) of the work implement, and stores determination information corresponding to the third identification information. The determination information is used for determination when control is performed by the control device 60, as will be described later. For example, the determination information is the same information as the permission command information issued by the issuing unit 22. The third specifying information and the determination information are written in the fourth storage unit 61 when the work machine 4 is manufactured or when the work machine 4 is sold.

第3通信部64は、様々な情報を通信することができる。第3通信部64は、例えば、WiFi(R)、Bluetoooth(R)、ZigBee(R)等の無線通信を行う装置である。なお、第3通信部64は、携帯電話通信網に接続可能な通信装置であってもよい。
図1に示すように、作業機の動作システムは、制御装置60と、指令装置30と、書込み装置31とを備えている。指令装置30は、指令情報を記憶可能で且つ時間(時刻)を計時することが可能な装置である。即ち、指令装置30は、少なくとも時刻を計時すると共に所定の処理を行えるCPU等の演算部(処理部)を有するもので、例えば、CPUを有するタグやICカード等である。なお、指令装置30は、CPU等の演算部を有さないRFID等とは異なる装置である。また、指令装置30は、第3通信部64と通信可能な装置である。
The third communication unit 64 can communicate various information. The third communication unit 64 is a device that performs wireless communication such as WiFi (R), Bluetooth (R), and ZigBee (R), for example. Note that the third communication unit 64 may be a communication device that can be connected to a mobile phone communication network.
As shown in FIG. 1, the operating system of the work machine includes a control device 60, a command device 30, and a writing device 31. The command device 30 is a device capable of storing command information and measuring time (time). That is, the command device 30 has a calculation unit (processing unit) such as a CPU that can measure at least the time and perform a predetermined process, and is, for example, a tag or an IC card having a CPU. Note that the command device 30 is a device different from an RFID or the like that does not have a calculation unit such as a CPU. The command device 30 is a device that can communicate with the third communication unit 64.

書込み装置31は、ネットワークを通じて第1管理サーバ2又は第2管理サーバ3に接続可能であり、例えば、許可指令情報を含むレンタル情報をネットワークを通じて取得可能である。所定の作業機(レンタル作業機)のレンタル情報を第1管理サーバ2から取得し且つ、指令装置30に接続すると、書込み装置31は、レンタル情報を指令装置30に書き込む。   The writing device 31 can be connected to the first management server 2 or the second management server 3 through a network. For example, rental information including permission command information can be acquired through the network. When the rental information of a predetermined work machine (rental work machine) is acquired from the first management server 2 and connected to the command device 30, the writing device 31 writes the rental information into the command device 30.

例えば、書込み装置31は、第1特定情報が「K-RX253200」であるレンタル作業機のレンタル情報を取得した場合、当該第1特定情報を示す「K-RX253200」、貸出期間(9/1〜9/25)、許可指令情報を示す「015501-389761」を指令装置30に書き込む。
指令装置30は、取得部32と、時間算出部(計時部)33と、第4通信部34と、処理部(第2処理部)35とを備えている。指令装置30は、取得部32、時間算出部(計時部)33、第4通信部34及び第2処理部35は、指令装置30に組み込まれた電気・電子部品、プログラム等で構成されている。第2処理部35は、CPU等で構成されている。
For example, when the writing device 31 acquires the rental information of the rental work machine whose first specific information is “K-RX253200”, the writing device 31 indicates “K-RX253200” indicating the first specific information, the lending period (9 / 1˜ 9/25), “015501-389761” indicating permission command information is written in the command device 30.
The command device 30 includes an acquisition unit 32, a time calculation unit (timer unit) 33, a fourth communication unit 34, and a processing unit (second processing unit) 35. The command device 30 includes an acquisition unit 32, a time calculation unit (timer unit) 33, a fourth communication unit 34, and a second processing unit 35, which are configured by electric / electronic components, programs, and the like incorporated in the command device 30. . The second processing unit 35 is configured by a CPU or the like.

取得部32は、貸出期間(使用期限)を含むレンタル情報を取得するもので、書込み装置31の書込みによりレンタル情報を取得する。例えば、書込み装置31が指令装置30に対して、「K-RX253200」で示される第1特定情報、「9/1〜9/25」で示される貸出期間と、許可指令情報(許可情報)を書き込むと、取得部32は、「K-RX253200」、「9/1〜9/25」、許可指令情報等を取得する。   The acquisition unit 32 acquires rental information including a lending period (expiration date), and acquires rental information by writing by the writing device 31. For example, the writing device 31 gives the command device 30 the first specific information indicated by “K-RX253200”, the lending period indicated by “9/1 to 9/25”, and the permission command information (permission information). When written, the acquisition unit 32 acquires “K-RX253200”, “9/1 to 9/25”, permission command information, and the like.

なお、取得部32は、レンタル情報を書込み装置31を介して取得する代わりに、第1管理サーバ2の第1通信部13から送信されたレンタル情報を、第4通信部34を介して取得してもよい。時間算出部33は、現在の時刻を求めるタイマである。
第4通信部34は、様々な情報を通信することができる。第4通信部34は、例えば、IWiFi(R)、Bluetoooth(R)、ZigBee(R)等の近距離無線通信、或いは、短距離無線通信を行う装置である。
The acquisition unit 32 acquires the rental information transmitted from the first communication unit 13 of the first management server 2 via the fourth communication unit 34 instead of acquiring the rental information via the writing device 31. May be. The time calculation unit 33 is a timer for obtaining the current time.
The fourth communication unit 34 can communicate various information. The fourth communication unit 34 is a device that performs short-range wireless communication or short-range wireless communication such as IWiFi (R), Bluetooth (R), and ZigBee (R), for example.

指令装置30の第4通信部34と制御装置60の第3通信部64とが通信可能範囲(通信エリア内)入ると、指令装置30は、制御装置60に対して第3特定情報及び判定情報の要求を行う。その後、制御装置60から送信された第3特定情報を、指令装置30が取得する。そして、第2処理部35は、第3特定情報と第1特定情報との認証を行い、第3特定情報と第1特定情報とが一致すると、判定情報と許可指令情報との認証を行う。第2処理部35は、判定情報と許可指令情報の認証が成立すると(判定情報と許可指令情報とが一致する)、現在の時間(時刻)が貸出期間内であるか否かを判断する。即ち、現在の時刻が使用期限に達しているか否かを判断する。   When the fourth communication unit 34 of the command device 30 and the third communication unit 64 of the control device 60 enter the communicable range (within the communication area), the command device 30 notifies the control device 60 of the third specific information and the determination information. Make a request. Thereafter, the command device 30 acquires the third specifying information transmitted from the control device 60. Then, the second processing unit 35 authenticates the third specific information and the first specific information, and authenticates the determination information and the permission command information when the third specific information matches the first specific information. When authentication of the determination information and the permission command information is established (the determination information and the permission command information match), the second processing unit 35 determines whether or not the current time (time) is within the lending period. That is, it is determined whether or not the current time has reached the expiration date.

第2処理部35は、例えば、特定情報の一致する(認証成立)、及び、許可情報が一致する(許可情報の認証成立)と、時間算出部33で求めた現在の時間(時刻)を参照し、現在の時刻が貸出期間内であるか否かを判断する。即ち、時間算出部33で求めた時刻に基づき、現在の時刻が使用期限に達しているか否かを判断する。
なお、使用期限とは、貸出期間のうち、貸出期間の最後の日であって最後の日を超えない時刻であり、例えば、貸出期間が9/1〜9/25であれば、「9/25,23:59:59」が使用期限となる。
For example, the second processing unit 35 refers to the current time (time) obtained by the time calculation unit 33 when the specific information matches (authentication establishment) and the permission information matches (authorization information authentication establishment). Then, it is determined whether or not the current time is within the lending period. That is, based on the time obtained by the time calculation unit 33, it is determined whether or not the current time has reached the expiration date.
The expiration date is the last day of the lending period and does not exceed the last day. For example, if the lending period is 9/1 to 9/25, “9 / 25,23: 59: 59 "is the expiration date.

第2処理部35は、現在の時刻が使用期限に達していない場合、制御装置60による制御の制限を行わないと判断する。第4通信部34は、第2処理部35が制御の制限を行わないと判断した場合、制御の制限を行わないという許可指令(第2指令)を制御装置60に出力する。制御装置60は、指令装置30(第4通信部34)から送信された許可指令(第2指令)を取得すると、走行系や作業系の制御を制限せずに通常通り制御を行う。   If the current time has not reached the expiration date, the second processing unit 35 determines that control by the control device 60 is not restricted. If the second processing unit 35 determines not to limit the control, the fourth communication unit 34 outputs a permission command (second command) not to limit the control to the control device 60. When the control device 60 acquires the permission command (second command) transmitted from the command device 30 (fourth communication unit 34), the control device 60 performs control as usual without restricting the control of the traveling system and the working system.

一方、第2処理部35は、時間算出部33で求めた現在の時間(時刻)が貸出期間を超える、即ち、現在の時刻が使用期限に達した場合は、制御装置60による制御の制限を行うと判断する。第4通信部34は、第2処理部35が制御装置60による制御の制限を行うと判断した場合は、制御の制限を行うという制限指令(第1指令)を制御装置60に出力する。制御装置60は、指令装置30(第4通信部34)から送信された制限指令(第1指令)を取得すると、走行系や作業系の制御の制限をする。制御装置60は、例えば、AI制御や流量制御を行わないようにして、作業機4の通常制御を制限する。つまり、制御装置60による制御の制限が働くと、作業機4は通常制御が行えなくなり、作業機4の動作を停止することができる。   On the other hand, the second processing unit 35 limits the control by the control device 60 when the current time (time) obtained by the time calculating unit 33 exceeds the lending period, that is, when the current time reaches the expiration date. Judge to do. When the second processing unit 35 determines that the control device 60 restricts the control, the fourth communication unit 34 outputs a restriction command (first command) for restricting the control to the control device 60. When the control device 60 obtains the restriction command (first command) transmitted from the command device 30 (fourth communication unit 34), the control device 60 restricts control of the traveling system and the working system. For example, the control device 60 limits the normal control of the work machine 4 so as not to perform AI control or flow rate control. That is, when the control of the control device 60 is restricted, the work machine 4 cannot perform normal control, and the operation of the work machine 4 can be stopped.

なお、上述した実施形態では、貸出期間が過ぎる(使用期限が切れる)と、作業機4を動かすことができなかったが、これに加え、貸出期間を延長することができるようにしてもよい。貸出期間の延長の変形例について説明する。
管理サーバ2の第1処理部12は、借方が希望する作業機について、貸出期間を経過後も貸出が可能である場合(貸出期間を過ぎても続けて貸し出すことができると推測できる場合)には、第1処理部12は、貸出が可能な範囲で、貸出期間に連続する延長期間を予め設定する。例えば、貸出期間が9/1〜9/25である場合、10日間貸出が可能であれば、延長期間を9/26〜10/5に設定する。
In the above-described embodiment, the work machine 4 cannot be moved when the lending period expires (the expiration date expires), but in addition to this, the lending period may be extended. A modification of extending the lending period will be described.
The first processing unit 12 of the management server 2 is able to lend the work machine desired by the debiter even after the lending period has elapsed (when it can be estimated that lending can be continued after the lending period). The first processing unit 12 sets in advance an extension period that is continuous to the lending period within a range in which lending is possible. For example, if the lending period is 9/1 to 9/25 and the lending period is 10 days, the extension period is set to 9/26 to 10/5.

第1処理部12は、許可情報(許可指令情報)に対応付けた延長期間を発行する。第2記憶部11は、貸出期間とは別に、許可情報に対応付けられた延長期間を記憶する。また、許可情報に対応付けられた延長期間は、指令装置30(書込み装置31)がレンタル情報を取得する際、即ち、許可指令情報を取得する際に同時に第1管理サーバ2から、指令装置30(書込み装置31)に送信される。   The first processing unit 12 issues an extended period associated with permission information (permission command information). The second storage unit 11 stores an extension period associated with the permission information separately from the lending period. Further, the extension period associated with the permission information is transmitted from the first management server 2 simultaneously with the command device 30 when the command device 30 (writing device 31) acquires the rental information, that is, when the permission command information is acquired. It is transmitted to (writing device 31).

指令装置30の取得部32は、許可情報に対応付けられた延長期間を取得可能である。取得部32は、書込み装置31が指令装置30に対して、許可情報に対応付けられた延長期間を書き込むと、書き込まれた延長期間を取得する。指令装置30には、スイッチが設けられている。指令装置30の第2処理部35は、許可情報と判定情報とが一致し且つ、当該許可情報に対応付けられた延長期間が指令装置30に保持されている状態で、スイッチが押されると、延長期間の使用を許可する。即ち、第2処理部35は、使用期限を延長期間の最後の日まで延長する。   The acquisition unit 32 of the command device 30 can acquire the extended period associated with the permission information. When the writing device 31 writes the extension period associated with the permission information to the command device 30, the acquisition unit 32 acquires the written extension period. The command device 30 is provided with a switch. When the switch is pressed in a state where the permission information matches the determination information and the extension period associated with the permission information is held in the command device 30, the second processing unit 35 of the command device 30 Allow use of extended period. That is, the second processing unit 35 extends the expiration date to the last day of the extension period.

なお、第1処理部12は、延長期間とは別に、許可情報とは異なるコード(許可コード)を発行してもよい。この場合、第2記憶部11は、貸出期間とは別に、延長期間及び許可コードを記憶する。また、延長期間及びコードは、指令装置30(書込み装置31)がレンタル情報を取得する際、即ち、許可指令情報を取得する際に同時に第1管理サーバ2から、指令装置30(書込み装置31)に送信される。   Note that the first processing unit 12 may issue a code (permission code) different from the permission information, apart from the extension period. In this case, the second storage unit 11 stores an extension period and a permission code separately from the lending period. Further, the extension period and the code are obtained from the first management server 2 at the same time when the command device 30 (writing device 31) acquires rental information, that is, when permission command information is acquired. Sent to.

指令装置30の取得部32は、延長期間及び許可コードを取得可能である。取得部32は、書込み装置31が指令装置30に対して、延長期間及び許可コードを書き込むと、書き込まれた延長期間及び許可コードを取得する。一方、作業機4に搭載された表示装置等には、コード(外部コード)が入力可能である。指令装置30に設けられたスイッチ等を入れると、指令装置30の第2処理部35は、制御装置60に外部コードの要求を行う。一方、指令装置30からの外部コードの要求後に表示装置等に外部コードが入力されると、制御装置60は、外部コードを指令装置30に送信する。指令装置30の第2処理部35は、制御装置60から送信された外部コードと、許可コードが一致すると、延長期間の使用を許可する。即ち、第2処理部35は、使用期限を延長期間の最後の日まで延長する。   The acquisition unit 32 of the command device 30 can acquire the extension period and the permission code. When the writing device 31 writes the extension period and the permission code to the command device 30, the acquisition unit 32 acquires the written extension period and the permission code. On the other hand, a code (external code) can be input to the display device or the like mounted on the work machine 4. When a switch or the like provided in the commanding device 30 is turned on, the second processing unit 35 of the commanding device 30 requests the control device 60 for an external code. On the other hand, when an external code is input to the display device or the like after requesting the external code from the command device 30, the control device 60 transmits the external code to the command device 30. When the external code transmitted from the control device 60 matches the permission code, the second processing unit 35 of the command device 30 permits the use of the extended period. That is, the second processing unit 35 extends the expiration date to the last day of the extension period.

このようにすれば、作業機4のレンタルを開始後には、延長期間が指令装置30に書き込まれているため、延長を行いたいと思った時に、指令装置30を第1管理サーバ2に接続しなくても、オフラインで簡単に使用期限を延長することができる。
なお、書込み装置31は、数字等で示される許可指令情報(許可情報)を指令装置30に書き込んでいたが、数字等で示された「015501-389761」を指令装置30に書き込む代わりに、貸出期間(9/1〜9/25)において、第1特定情報が「K-RX253200」であるレンタル作業機に対してレンタルが許可されていることを示すフラグ(制限なく通常通り制御を行ってもよいという情報)を指令装置30に書き込んでもよい。この場合、指令装置30は、現在の時刻が使用期限に達しておらず且つ許可情報を取得した場合には、制御装置60による制御の制限を行わないと判断する。一方、指令装置30は、現在の時刻が使用期限に達していない場合であっても、許可情報が取得できなかった場合には、制御装置60による制御の制限を行う。
In this way, after the rental of the work equipment 4 is started, the extension period is written in the command device 30, so that when the user wishes to extend, the command device 30 is connected to the first management server 2. Even without it, you can easily extend the expiration date offline.
The writing device 31 has written permission command information (permission information) indicated by numbers or the like to the command device 30, but instead of writing “015501-389761” indicated by numbers or the like to the command device 30 During the period (9 / 1-9 / 25), a flag indicating that the rental work machine whose first specific information is “K-RX253200” is permitted to be rented (even if the normal control is performed without restriction) Information may be written to the command device 30. In this case, when the current time has not reached the expiration date and the permission information has been acquired, the command device 30 determines that the control device 60 does not restrict the control. On the other hand, the command device 30 restricts the control by the control device 60 when the permission information cannot be acquired even if the current time has not reached the expiration date.

以上のように、レンタル会社が所有する第1管理サーバ2と、メーカが所有する第2管理サーバ3とを連携させることによって、レンタル会社による作業機4の管理を簡単にすることができる。例えば、レンタルの許可をメーカが行い、作業機4を駆動するための許可指令情報(許可情報)は、メーカ側から発行されるため、レンタル会社では、所有する多数の作業機4について、駆動するためのキー(許可情報)を管理する手間を省くことができる。即ち、メーカが製造時や販売時に管理している情報(作業機情報)を活用することで、レンタル作業機を作動するためのキーを簡単に生成して、レンタル会社に提供することができる。   As described above, by linking the first management server 2 owned by the rental company and the second management server 3 owned by the manufacturer, the management of the work machine 4 by the rental company can be simplified. For example, since the manufacturer gives permission for rental and permission command information (permission information) for driving the work machine 4 is issued by the manufacturer, the rental company drives a number of work machines 4 owned by the rental company. Can be saved the trouble of managing the key (permission information). That is, by using information (work machine information) managed by the manufacturer at the time of manufacture or sale, a key for operating the rental work machine can be easily generated and provided to the rental company.

また、レンタル会社が所有する第1管理サーバ2と、メーカが所有する第2管理サーバ3とを連携させているため、レンタル会社とメーカとの情報共有が行え、作業機4のレンタルをスムーズに行うことができる。
また、指令装置30が時刻を計時し且つ制御装置60においてどのような制御を行うかの権限を有しているため、指令装置30では、貸出期間が経過した状態では、作業機4の制御装置60に判断を行わせずに作業機4を停止することができる。即ち、制御装置60に計時する部分や使用期限が来たか否かの判断部等を設けなくてもよい。
[第2実施形態]
図4は、他の作業機のレンタルシステムを示している。
In addition, since the first management server 2 owned by the rental company and the second management server 3 owned by the manufacturer are linked, information sharing between the rental company and the manufacturer can be performed, and the rental of the work machine 4 can be performed smoothly. It can be carried out.
In addition, since the command device 30 has the authority to measure the time and what kind of control the control device 60 performs, the command device 30 controls the work device 4 when the lending period has elapsed. The work implement 4 can be stopped without making a determination at 60. That is, it is not necessary to provide a timing unit for the control device 60 or a determination unit for determining whether or not the expiration date has come.
[Second Embodiment]
FIG. 4 shows another work machine rental system.

図4に示す作業機のレンタルシステムは、第2管理サーバ3を無くし、許可指令情報(許可情報)の発行を第1管理サーバ2が行うシステムである。上述した実施形態と同様の構成は説明を省略する。
第1管理サーバ2は、発行部23を備えている。発行部23は、第1管理サーバ2に組み込まれた電気・電子部品、プログラム等で構成されている。発行部23は、第1処理部12が希望している作業機に対して貸出が行えると判断後に、貸出が可能とされた作業機をレンタル許可するレンタル作業機として認定し、認定したことを示す指令情報(許可指令情報)を発行する。許可指令情報の発行後は、第1処理部12は、借方者が希望している作業機がレンタル可能であるとして、通信機器5にレンタル予約が完了したことを示す情報を通知する。また、第1処理部12及び第2記憶部11は、第2記憶部11の情報を更新する処理を行う。第1処理部12は、管理番号、当該管理番号、レンタル許可が下りた作業機(レンタル作業機)の第1特定情報、許可情報(許可指令情報)、借方者情報、貸出期間等を第2記憶部11に送信する。第2記憶部11は、管理番号、第1特定情報、許可情報(許可指令情報)、借方者情報、貸出期間等を記憶する。
The work machine rental system shown in FIG. 4 is a system in which the second management server 3 is eliminated and the first management server 2 issues permission command information (permission information). The description of the same configuration as the above-described embodiment is omitted.
The first management server 2 includes an issuing unit 23. The issuing unit 23 includes electrical / electronic components, programs, and the like incorporated in the first management server 2. After determining that the work machine desired by the first processing unit 12 can be rented, the issuing unit 23 recognizes that the work machine that has been lent is authorized as a rental work machine that permits rental. The command information (permission command information) indicated is issued. After issuing the permission command information, the first processing unit 12 notifies the communication device 5 of information indicating that the rental reservation has been completed, assuming that the work machine desired by the debiter can be rented. In addition, the first processing unit 12 and the second storage unit 11 perform a process of updating information in the second storage unit 11. The first processing unit 12 sets the management number, the management number, the first specific information of the work machine (rental work machine) for which the rental permission has been granted, the permission information (permission command information), the debiter information, the lending period, etc. The data is transmitted to the storage unit 11. The second storage unit 11 stores a management number, first specifying information, permission information (permission command information), debiter information, a lending period, and the like.

作業機のレンタルを行う場合は、書込み装置31は、ネットワークを通じて第1管理サーバ2に接続して、許可指令情報を含むレンタル情報をネットワークを通じて取得する。そして、指令装置30を書込み装置31に接続すると、当該指令装置30には、レンタル作業機の第1特定情報、貸出期間、許可指令情報等のレンタル情報が書き込まれる。なお、第2実施形態における指令装置30は上述した実施形態と同じである。   When renting a work machine, the writing device 31 is connected to the first management server 2 through a network, and acquires rental information including permission command information through the network. Then, when the command device 30 is connected to the writing device 31, rental information such as the first specifying information of the rental work machine, the rental period, and the permission command information is written in the command device 30. The command device 30 in the second embodiment is the same as that in the above-described embodiment.

このように、指令装置30が時刻を計時し且つ制御装置60においてどのような制御を行うかの権限を有しているため、指令装置30では、貸出期間が経過した状態では、作業機4の制御装置60に判断を行わせずに作業機4を停止することができる。
今回開示された実施の形態はすべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は上記した説明ではなくて特許請求の範囲によって示され、特許請求の範囲と均等の意味及び範囲内での全ての変更が含まれることが意図される。
上述した実施形態では、第2管理サーバ3側で、作業機の特定情報に対応する許可指令情報を発行する一方で、制御装置60には、作業機の特定情報に対応する判定情報を予め記憶しておくことで、同一の特定情報を有する作業機においては、許可指令情報と判定情報とが一致し、制御装置60による通常制御を制限なく行えるようにしていた。これに代え、制御装置60には判定情報を記憶させずに、制御装置60による通常制御を制限なく行えるようにしてもよい。
As described above, since the command device 30 has the authority to measure the time and what kind of control is performed in the control device 60, the command device 30 allows the work machine 4 to be used when the lending period has elapsed. The work machine 4 can be stopped without making a determination to the control device 60.
The embodiment disclosed this time should be considered as illustrative in all points and not restrictive. The scope of the present invention is defined by the terms of the claims, rather than the description above, and is intended to include any modifications within the scope and meaning equivalent to the terms of the claims.
In the embodiment described above, the second management server 3 issues permission command information corresponding to work machine specific information, while the control device 60 stores in advance determination information corresponding to work machine specific information. By doing so, in the work machine having the same specific information, the permission command information and the determination information match, and the normal control by the control device 60 can be performed without restriction. Instead of this, the control device 60 may be configured to perform normal control by the control device 60 without limitation without storing the determination information.

この場合は、第2管理サーバ3の発行部22が発行した許可指令情報を用いて、第1特定情報を暗号化する。そして、第2管理サーバ3は、暗号化した第1特定情報と、暗号化していない第1特定情報と、許可指令情報を第1管理サーバ2に送信する。書込装置31は、暗号化した第1特定情報、許可指令情報及び貸出期限を指令装置30に書き込む。指令装置30は、第2処理部35は、暗号化した第1特定情報と許可指令情報を用いて暗号化した第1特定情報の復元を行い、第3特定情報と、復元後の第1特定情報とが一致しているか否かを判断する。この場合も、制御装置60に判定情報を書き込まなくても、許可指令情報が正当であるか否かを判断することができる。   In this case, the first specifying information is encrypted using the permission command information issued by the issuing unit 22 of the second management server 3. Then, the second management server 3 transmits the encrypted first identification information, the unencrypted first identification information, and the permission command information to the first management server 2. The writing device 31 writes the encrypted first specific information, permission command information, and lending time limit to the command device 30. In the command device 30, the second processing unit 35 restores the first specific information encrypted by using the encrypted first specific information and the permission command information, the third specific information, and the first specific information after the restoration. It is determined whether or not the information matches. Also in this case, it is possible to determine whether or not the permission command information is valid without writing the determination information in the control device 60.

上述した実施形態では、制御装置60では、制御の制限として、AI制御や流量制御を行わないとしていたが、当然の如くこれに限定されず、例えば、エンジン回転数を低速に固定したり、エンジン始動のそのものを停止(エンジン始動の禁止)したり、その他、様々な制御に対して制限をかけることで、作業機4を通常通り動かさないようにすればよい。   In the embodiment described above, the control device 60 does not perform AI control or flow rate control as a control restriction. However, the control device 60 is not limited to this as a matter of course. For example, the engine speed is fixed at a low speed, The work machine 4 may be prevented from moving normally by stopping the start itself (prohibiting engine start) or restricting various other controls.

上述した実施形態では、第1管理サーバ2から送信された許可指令情報(許可信号)を含むレンタル情報を指令装置30に書き込んでいたが、レンタル情報は、第1管理サーバ2から得られるものでなくてもよい。例えば、指令装置30をパーソナルコンピュータ等に接続して、当該パーソナルコンピュータで、レンタル情報に相当する情報を作成して、作成したレンタル情報を指令装置30に書き込んでもよい。   In the embodiment described above, the rental information including the permission command information (permission signal) transmitted from the first management server 2 is written in the command device 30, but the rental information is obtained from the first management server 2. It does not have to be. For example, the command device 30 may be connected to a personal computer or the like, information corresponding to rental information may be created by the personal computer, and the created rental information may be written into the command device 30.

1 作業機
20 第3記憶部
21 第2通信部
22 発行部
30 指令装置
31 書込み装置
32 取得部
33 時間算出部(計時部)
34 第4通信部
35 処理部
60 制御装置
61 第4記憶部
64 第3通信部
N ネットワーク
DESCRIPTION OF SYMBOLS 1 Work implement 20 3rd memory | storage part 21 2nd communication part 22 Issuing part 30 Command apparatus 31 Writing device 32 Acquisition part 33 Time calculation part (time-measurement part)
34 fourth communication unit 35 processing unit 60 control device 61 fourth storage unit 64 third communication unit N network

Claims (4)

作業機に搭載され且つ、前記作業機の制御可能な制御装置と、
前記制御装置の制御に関する指令を、無線によって前記制御装置に出力可能な指令装置と、
を備え、
前記指令装置は、
前記作業機の使用期限を外部から取得可能な取得部と、
時間を求める時間算出部と、
前記時間算出部で求めた時間が、前記使用期限に達したか否かを判断する処理部と、
前記使用期限に達した場合には、前記制御装置の制御を制限する第1指令を出力し、前記使用期限に達していない場合には、前記制御装置の制御を制限なく行う第2指令を出力する通信部と、
を有している作業機の動作システム。
A control device mounted on the work machine and capable of controlling the work machine;
A command device capable of outputting a command related to control of the control device to the control device wirelessly;
With
The command device is:
An acquisition unit capable of acquiring from the outside the expiration date of the work implement;
A time calculation unit for obtaining time;
A processing unit for determining whether the time obtained by the time calculation unit has reached the expiration date;
When the expiration date is reached, a first command for limiting the control of the control device is output, and when the usage date is not reached, a second command for controlling the control device without limitation is output. A communication unit
A working machine operating system.
前記制御装置は判定情報を記憶する記憶部を有し、
前記取得部は、前記制御装置の制御を制限なくための許可情報と、前記制御装置の記憶部に記憶された判定情報とを取得可能であり、
前記処理部は、前記許可情報と前記判定情報との認証が成立し且つ前記使用期限に達しない場合には、前記通信部に前記第2指令を出力させる請求項1に記載の作業機の動作システム。
The control device includes a storage unit that stores determination information;
The acquisition unit is capable of acquiring permission information for controlling the control device without limitation and determination information stored in the storage unit of the control device,
The operation of the work machine according to claim 1, wherein the processing unit causes the communication unit to output the second command when authentication between the permission information and the determination information is established and the expiration date is not reached. system.
前記取得部は、前記使用期限の延長期間、延長期間を有効にするための許可コードを外部から取得可能であり、
前記処理部は、前記取得部が取得した許可コードと、外部から入力された外部コードとの認証が成立した場合に、前記延長期間に基づいて使用期限を延長する請求項1に記載の作業機の動作システム。
The acquisition unit is able to acquire from the outside an extension code of the expiration date, an authorization code for validating the extension period,
The work machine according to claim 1, wherein the processing unit extends the expiration date based on the extension period when authentication of the permission code acquired by the acquisition unit and the external code input from the outside is established. Operating system.
前記作業機は前記外部コードを入力可能な表示装置を備え、
前記処理部は、前記制御装置に対して前記表示装置に入力された前記外部コードを要求可能である請求項3に記載の作業機の動作システム。
The work machine includes a display device capable of inputting the external code,
The work system operation system according to claim 3, wherein the processing unit can request the external code input to the display device from the control device.
JP2015191622A 2015-09-29 2015-09-29 Work machine operation system Active JP6470667B2 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
JP2015191622A JP6470667B2 (en) 2015-09-29 2015-09-29 Work machine operation system
PCT/JP2016/078274 WO2017057275A1 (en) 2015-09-29 2016-09-26 System for managing work machine
DE112016004426.7T DE112016004426T5 (en) 2015-09-29 2016-09-26 Management system for working machine
US15/938,670 US11335133B2 (en) 2015-09-29 2018-03-28 Management system for working machine
US17/718,836 US20220237957A1 (en) 2015-09-29 2022-04-12 Management system for working machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015191622A JP6470667B2 (en) 2015-09-29 2015-09-29 Work machine operation system

Publications (2)

Publication Number Publication Date
JP2017068452A true JP2017068452A (en) 2017-04-06
JP6470667B2 JP6470667B2 (en) 2019-02-13

Family

ID=58494769

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015191622A Active JP6470667B2 (en) 2015-09-29 2015-09-29 Work machine operation system

Country Status (1)

Country Link
JP (1) JP6470667B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08273015A (en) * 1995-03-29 1996-10-18 Hitachi Constr Mach Co Ltd Managing system for rental working machine
JP2013016119A (en) * 2011-07-06 2013-01-24 Kubota Corp Work machine, and price payment management system of work machine

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08273015A (en) * 1995-03-29 1996-10-18 Hitachi Constr Mach Co Ltd Managing system for rental working machine
JP2013016119A (en) * 2011-07-06 2013-01-24 Kubota Corp Work machine, and price payment management system of work machine

Also Published As

Publication number Publication date
JP6470667B2 (en) 2019-02-13

Similar Documents

Publication Publication Date Title
KR101593281B1 (en) Work machine and data communication system for work machine
US10901408B2 (en) System for monitoring functions of a work machine
JP6470668B2 (en) Work machine rental system
CN104702589A (en) Method and Apparatus for Virtual Key Delivery
JP5748627B2 (en) Work machine and work machine rental management system
US20220237957A1 (en) Management system for working machine
JP5809503B2 (en) Working machine operating system
JP6605291B2 (en) Control parameter change system for construction machinery
CN107276760A (en) Operator's certification for work machine
JP5809502B2 (en) Work machine and data communication system for work machine
US20170297530A1 (en) Electronic car key and communication system
US8689323B2 (en) Method for activating functions of a tachograph
JP6470667B2 (en) Work machine operation system
JP5943562B2 (en) Work machine and payment system for work machine payment
JP5777966B2 (en) Work machine and function acquisition system of work machine
WO2019087476A1 (en) Communication monitoring device, communication monitoring system, and communication monitoring method
JP5758217B2 (en) Working machine
CN111915776B (en) Engineering machinery driver identity recognition system and method
JP2008146292A (en) Visit plan preparation method
JP2023022551A (en) Anti-theft system for construction machine
JP2013208919A (en) Working machine, anti-theft system for the working machine, and program for control device for the working machine
JP2012073912A (en) Operation restriction system for work machine
JP2012071776A (en) Actuating system of working machine

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20150929

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20151001

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20171222

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20181023

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20181225

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190115

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190118

R150 Certificate of patent or registration of utility model

Ref document number: 6470667

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150