JP2017021580A - BIM system and method - Google Patents
BIM system and method Download PDFInfo
- Publication number
- JP2017021580A JP2017021580A JP2015138813A JP2015138813A JP2017021580A JP 2017021580 A JP2017021580 A JP 2017021580A JP 2015138813 A JP2015138813 A JP 2015138813A JP 2015138813 A JP2015138813 A JP 2015138813A JP 2017021580 A JP2017021580 A JP 2017021580A
- Authority
- JP
- Japan
- Prior art keywords
- bim
- information
- bim model
- unit
- integrated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 44
- 238000004458 analytical method Methods 0.000 claims description 22
- 238000006243 chemical reaction Methods 0.000 claims description 17
- 230000004044 response Effects 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract 1
- 230000006870 function Effects 0.000 description 22
- 238000012545 processing Methods 0.000 description 22
- 238000004891 communication Methods 0.000 description 20
- 238000013461 design Methods 0.000 description 19
- 230000008569 process Effects 0.000 description 16
- 238000010586 diagram Methods 0.000 description 13
- 238000012384 transportation and delivery Methods 0.000 description 7
- 230000010365 information processing Effects 0.000 description 6
- 238000004590 computer program Methods 0.000 description 4
- 238000009434 installation Methods 0.000 description 4
- 239000000463 material Substances 0.000 description 4
- 230000008859 change Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000013439 planning Methods 0.000 description 2
- 208000016261 weight loss Diseases 0.000 description 2
- 239000013585 weight reducing agent Substances 0.000 description 2
- 125000002066 L-histidyl group Chemical group [H]N1C([H])=NC(C([H])([H])[C@](C(=O)[*])([H])N([H])[H])=C1[H] 0.000 description 1
- 238000007792 addition Methods 0.000 description 1
- 238000004378 air conditioning Methods 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 239000004973 liquid crystal related substance Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
本発明の実施形態は、BIMシステム及び方法に関する。 Embodiments of the present invention relate to BIM systems and methods.
従来、店舗を有する建築物の集客性や利用者の動線などは、当該建築物の竣工後における集計データをもとにして分析することしかできなかった。そこで、近年、3D形状の建築物のBIMモデルを利用して、建築物の竣工前に当該建築物を仮想的に竣工し、更に仮想的に建築物内の店舗の営業を開始することで、竣工後の建築物の利用状況を確認する技術が求められていた。また、建築物の竣工前だけでなく竣工後についても、3D形状の建築物のBIMモデルを利用して、目的地までのルート検索を行うことや、建築物の管理者が店舗レイアウトのシミュレーションを行えることが望ましい。 Conventionally, the ability to attract customers and the flow of users of a building having a store could only be analyzed based on the aggregated data after completion of the building. Therefore, in recent years, by using the BIM model of a 3D-shaped building, the building is virtually completed before the building is completed, and the store in the building is virtually started. There was a need for technology to confirm the use of buildings after completion. In addition, not only before the building is completed but also after it is completed, the BIM model of the 3D-shaped building is used to search the route to the destination, and the building manager can simulate the store layout. It is desirable to be able to do it.
本実施形態が解決しようとする課題は、店舗を有する建築物の集客性や利用者の動線などを当該建築物の竣工前に分析可能なように、当該建築物における利用者の昇降機や店舗の利用状況を取得可能なBIMシステム及び方法を提供することである。 The problem to be solved by the present embodiment is that the user's elevator and store in the building can be analyzed before the completion of the building, such as the ability to attract customers and the flow of users of the building having the store It is to provide a BIM system and method capable of acquiring the usage status of the system.
実施形態のBIMシステムは、サーバ装置および端末装置を通信可能に接続して構成される。サーバ装置は、制御部と記憶部とを少なくとも備える。端末装置は、制御部と表示部と入力部とを少なくとも備える。ここで、サーバ装置の記憶部は、BIMモデル記憶手段と、パーツ情報記憶手段と、を備える。BIMモデル記憶手段は、店舗のBIMパーツを含む建築物のBIMモデルを記憶する。パーツ情報記憶手段は、建築物のBIMモデルに組込可能な昇降機のBIMパーツを作成するためのパーツに関するパーツ情報を記憶する。また、サーバ装置の制御部は、昇降機モデリング手段と、統合モデリング手段と、統合BIMモデル変換手段と、情報配信手段と、を備える。昇降機モデリング手段は、設計者により入力される作成条件に対応する昇降機のBIMパーツを、パーツ情報記憶手段に記憶されたパーツ情報を用いて作成する。統合モデリング手段は、昇降機モデリング手段により作成された昇降機のBIMパーツを、BIMモデル記憶手段に記憶された建築物のBIMモデルに組み込んだ状態の昇降機組込建築物に対応する統合BIMモデルを作成する。統合BIMモデル変換手段は、統合モデリング手段により作成された統合BIMモデルに基づいて、当該統合BIMモデルを軽量化統合BIMモデルに変換する。情報配信手段は、統合BIMモデル変換手段により変換された軽量化統合BIMモデルを端末装置へ送信する。また、端末装置の制御部は、情報取得手段と、操作画面生成手段と、表示制御手段と、利用情報取得手段と、情報提供手段と、を備える。情報取得手段は、サーバ装置から情報配信手段により送信された軽量化統合BIMモデルを受信する。操作画面生成手段は、情報取得手段により受信された軽量化統合BIMモデルを含む操作画面を生成する。表示制御手段は、操作画面生成手段により生成された操作画面を表示部に表示する。利用情報取得手段は、利用者により入力部を介して操作画面上で操作された軽量化統合BIMモデルの利用状況を示す利用情報であって、利用者によって昇降機のBIMパーツを移動手段として利用した店舗のBIMパーツまでの移動経路を示す経路情報を少なくとも含む利用情報を取得する。情報提供手段は、利用情報取得手段により取得された利用情報をサーバ装置へ送信する。 The BIM system of the embodiment is configured by connecting a server device and a terminal device so that they can communicate with each other. The server device includes at least a control unit and a storage unit. The terminal device includes at least a control unit, a display unit, and an input unit. Here, the storage unit of the server device includes a BIM model storage unit and a parts information storage unit. The BIM model storage means stores the BIM model of the building including the BIM parts of the store. The part information storage means stores part information related to a part for creating a BIM part of an elevator that can be incorporated into a BIM model of a building. In addition, the control unit of the server device includes elevator modeling means, integrated modeling means, integrated BIM model conversion means, and information distribution means. The elevator modeling means creates elevator BIM parts corresponding to the creation conditions input by the designer using the part information stored in the part information storage means. The integrated modeling means creates an integrated BIM model corresponding to the elevator built-in building in which the elevator BIM parts created by the elevator modeling means are incorporated in the BIM model of the building stored in the BIM model storage means. . The integrated BIM model conversion means converts the integrated BIM model into a light weight integrated BIM model based on the integrated BIM model created by the integrated modeling means. The information distribution unit transmits the light weight integrated BIM model converted by the integrated BIM model conversion unit to the terminal device. In addition, the control unit of the terminal device includes information acquisition means, operation screen generation means, display control means, usage information acquisition means, and information provision means. The information acquisition unit receives the light weight integrated BIM model transmitted from the server device by the information distribution unit. The operation screen generation unit generates an operation screen including the light weight integrated BIM model received by the information acquisition unit. The display control unit displays the operation screen generated by the operation screen generation unit on the display unit. The usage information acquisition means is usage information indicating the usage status of the light weight integrated BIM model operated on the operation screen by the user via the input unit, and the user uses the BIM part of the elevator as the moving means. Usage information including at least route information indicating a movement route to the BIM part of the store is acquired. The information providing means transmits the usage information acquired by the usage information acquiring means to the server device.
以下に、本発明にかかるBIMシステムおよび方法の実施形態を図面に基づいて詳細に説明する。なお、この実施形態によりこの発明が限定されるものではない。 Embodiments of a BIM system and method according to the present invention will be described below in detail with reference to the drawings. In addition, this invention is not limited by this embodiment.
ここで、図1を参照して、実施形態において利用されるBIM(ビルディングインフォーメーションモデリング)の概要について説明する。図1は、建築物の設計図書およびBIMモデルの一例を示す概念図である。図1では、建築物の設計図書による設計方法とBIMによる設計方法との違いを表している。図1の左側に示すように、建築物の設計図書による設計方法では、建築物の設計に関わる各業種が個々に専門図面を作成しているため、各々が関連性および整合性を各々とる必要がある。つまり、建築物の設計図書による設計方法では、例えば関連する設計図書の修正が必要となり、その整合性のチェックも必要となる。一方、図1の右側に示すBIMによる設計方法では、各業種にて建物全体のデータである建築物の3次元モデル(すなわち、建築物のBIMモデル)を共有することができるので、1個のデータ上で関連性および整合性の確認を行うことができる。 Here, with reference to FIG. 1, an outline of BIM (building information modeling) used in the embodiment will be described. FIG. 1 is a conceptual diagram showing an example of a building design book and a BIM model. FIG. 1 shows a difference between a design method based on a building design book and a design method based on BIM. As shown on the left side of FIG. 1, in the design method based on the building design document, each industry involved in building design individually creates specialized drawings, so each must have relevance and consistency. There is. That is, in a design method using a building design book, for example, the related design book needs to be corrected, and its consistency must be checked. On the other hand, the BIM design method shown on the right side of FIG. 1 can share a three-dimensional model of a building (that is, a BIM model of a building) that is data for the entire building in each industry. Relevance and consistency can be checked on the data.
以下、本実施形態の構成および処理について詳細に説明する。 Hereinafter, the configuration and processing of this embodiment will be described in detail.
[実施形態]
本実施形態について、図2乃至図8を参照して以下に説明する。なお、本実施形態で例示するBIMシステムにおけるサーバ側と端末側の機能分散の形態は以下に限られず、同様の効果や機能を奏し得る範囲において、任意の単位で機能的または物理的に分散・統合して構成することができる。
[Embodiment]
This embodiment will be described below with reference to FIGS. In addition, the form of function distribution on the server side and the terminal side in the BIM system exemplified in this embodiment is not limited to the following, and functionally or physically distributed in arbitrary units within a range where the same effects and functions can be obtained. Can be integrated and configured.
最初に図2を参照しながら、本実施形態におけるBIMシステムの概要について説明する。図2は、実施形態におけるBIMシステムの概要を説明するための図である。 First, an outline of the BIM system in the present embodiment will be described with reference to FIG. FIG. 2 is a diagram for explaining the outline of the BIM system in the embodiment.
本実施形態において、まず、建築物の設計者は、3D形状の建築物のBIMモデル(図2において、昇降機のBIMパーツ及び店舗のBIMパーツを含む統合BIMモデル)を、3DCAD等を用いて作成する。この統合BIMモデルは、部屋、廊下、階段、エレベータなどを備えた建築物全体の3Dモデルである。建築物の設計者が、統合BIMモデルをサーバ装置200に保存すると、データ変換によりデータ容量を軽量化した3D形状の建物データベースモデル(図2において、軽量化統合BIMモデル)に変換される。建築物の利用者は、インターネット経由でこの軽量化統合BIMモデルを、スマートフォン100−1、タブレット100−2、パーソナルコンピュータ100−3などの端末装置100を用いて入手する。そして、建築物の利用者は、竣工前の建築物の3Dモデルである軽量化統合BIMモデルを、当該建築物に実際に訪れて利用する際と同様に仮想的に利用する。建築物の利用者がこの軽量化統合BIMモデルを仮想的に利用する際には、建築物の利用者が軽量化統合BIMモデル内で移動したルートや訪れる店舗の順番などを示す経路情報を、建築物の利用状況を示すデータ(本実施形態において、利用情報)としてサーバ装置200に保存する。これにより、建築物の設計者は、保存された利用情報をもとに、建物物の利用者が少ない移動距離で建築物内を移動可能な店舗のレイアウトや、エレベータやエスカレータ等の昇降機の最適な配置などを、建築物の設計や事業計画の際に提案することができる。
In this embodiment, first, a building designer creates a 3D-shaped building BIM model (in FIG. 2, an integrated BIM model including an elevator BIM part and a store BIM part) using 3D CAD or the like. To do. This integrated BIM model is a 3D model of the entire building including rooms, corridors, stairs, elevators, and the like. When the architect of the building saves the integrated BIM model in the
また、図2に示すように、軽量化統合BIMモデルには、店舗が提供する商品に関する写真や値段や大きさなどの商品情報を含む店舗のBIMパーツを配置しているため、建築物の利用者は、商品の購入予約を行うことも可能となる。このように、軽量化統合BIMモデルを用いて、建築物内の店舗を仮想的に営業させることが可能である。ここで、建築物の利用者が店舗から購入予約した商品の情報はサーバ装置200に保存されるため、建築物の設計者や店舗の出店者等は商品に関する最新のトレンド分析を行うことも可能である。よって、建築物の竣工前に店舗計画や商品仕入れを判断することが可能となる。また、その商品の購入情報を購買システムへつなげて、営業開始時に商品の購入数を決定することも可能である。
In addition, as shown in FIG. 2, since the BIM parts of the store including product information such as photos and prices and sizes related to the products provided by the store are arranged in the light weight integrated BIM model, the use of the building The person can also make a purchase reservation for the product. In this way, it is possible to virtually operate a store in a building using the light weight integrated BIM model. Here, since the information on the product that the user of the building has reserved for purchase from the store is stored in the
また、サーバ装置200に保存された利用情報(例えば、建築物の利用者が移動したルートや訪れる店舗の順番などの利用状況のデータ)をもとに、最適な店舗の商品配置やレイアウトやデザインを提案することが可能である。更に、店舗入居予定者は、軽量化統合BIMモデル内で、店舗に陳列する商品をモデル内で移動や配置を行って、実際の店舗の配置をシミュレーションすることが可能である。更に、軽量化統合BIMモデルを用いて仮想的に営業する際、サーバ装置200に保存された利用情報(例えば、建築物の利用者の滞在時間や移動経路等のデータ)から、昇降機設備、照明、空調、電源装置などのビル設備の最適スペックを計算することも可能である。そして、建築物の設計者は、その結果を建築物全体の設計へフィードバックすることで、竣工前の段階でランニングコストの算出を行うことも可能である。 In addition, based on the usage information stored in the server device 200 (for example, usage status data such as the route traveled by the building user and the order of the stores visited), the optimal store product layout, layout, and design. Can be proposed. Furthermore, the store occupant can simulate the actual store arrangement by moving and arranging the products to be displayed in the store in the light weight integrated BIM model. Furthermore, when operating virtually using the light weight integrated BIM model, the elevator equipment, lighting, and the like are obtained from the usage information stored in the server device 200 (for example, data such as the staying time and travel route of the building user). It is also possible to calculate the optimum specifications of building equipment such as air conditioners and power supplies. The architect of the building can also calculate the running cost at the stage before completion by feeding back the result to the design of the entire building.
更に、本実施形態におけるBIMシステムにおいては、建築物の竣工後であっても、建築物の利用者は軽量化統合BIMモデルを操作画面上で利用可能である。例えば、建築物の利用者が軽量化統合BIMモデルを操作画面上で用いた際に取得した利用情報(例えば、商品購入履歴や移動経路)をもとに、ルート検索サービスを行うことが可能である。例えば、建築物の利用者は、端末装置100を用いて、目的(例えば、トイレ、靴屋、上の階へ移動)や目的地(例えば、店舗名など)や欲しい商品などの検索条件を入力し、経路探索の結果を取得することが可能である。その際、利用者全ての検索条件や利用情報等のデータを保存することで、混雑していないルート案内をすることで、建築物内の混雑を緩和させることも可能である。また、建築物の利用者が建築物に訪れた際に、端末装置100に、建築物で行うことや、欲しい商品などの目的を全て入力することで、最適な店舗訪問ルートを提示することも可能である。
Furthermore, in the BIM system in the present embodiment, even after the building is completed, the user of the building can use the light weight integrated BIM model on the operation screen. For example, it is possible to provide a route search service based on usage information (for example, product purchase history and travel route) acquired when a building user uses a light weight integrated BIM model on the operation screen. is there. For example, a user of a building uses the
以下、本実施形態におけるBIMシステムの構成及び処理の詳細について説明する。 The details of the configuration and processing of the BIM system in this embodiment will be described below.
[本実施形態におけるBIMシステムの構成]
続いて、本実施形態におけるBIMシステムの構成の一例について、図3を参照して以下に説明する。図3は、本実施形態におけるBIMシステムの構成の一例を示すブロック図であり、該構成のうち主要な部分を概念的に示している。
[Configuration of BIM System in this Embodiment]
Next, an example of the configuration of the BIM system in the present embodiment will be described below with reference to FIG. FIG. 3 is a block diagram showing an example of the configuration of the BIM system in the present embodiment, and conceptually shows main parts of the configuration.
図3に示すように、実施形態のBIMシステムは、概略的に、昇降機の3次元モデル(すなわち、昇降機のBIMパーツ)及び店舗の3次元モデル(すなわち、店舗のBIMパーツ)を含む建築物の統合BIMモデルのデータ容量を軽量化した軽量化統合BIMモデル等の情報を配信できるサーバ装置200、および、単数または複数のBIMアプリケーション等を搭載した端末装置100、を通信可能に接続して構成される。ここで、図3に示すように、通信には、一例として、ネットワーク300を介した有線・無線通信等の遠隔通信等を含む。また、これらBIMシステムの各部は任意の通信路を介して通信可能に接続されている。
As shown in FIG. 3, the BIM system of the embodiment schematically includes a three-dimensional model of an elevator (ie, a BIM part of an elevator) and a three-dimensional model of a store (ie, a BIM part of a store). A
図3に示すように、本実施形態のBIMシステムにおいて、サーバ装置200は、概略的に、制御部202と記憶部206とを少なくとも備えており、端末装置100は、出力部(表示部114および音声出力部116)と入力部118と制御部102と記憶部106とを少なくとも備える。
As shown in FIG. 3, in the BIM system of the present embodiment, the
[サーバ装置200の構成]
ここで、図3において、サーバ装置200は、通信制御インターフェース部204を介してネットワーク300を経由し、建築物の利用者が使用する端末装置100や建築物の設計者が使用する外部装置400と相互に通信可能に接続されており、制御部202と記憶部206とを備える。制御部202は、各種処理を行う制御手段である。通信制御インターフェース部204は、通信回線や電話回線等に接続されるアンテナやルータ等の通信装置(図示せず)に接続されるインターフェースであり、サーバ装置200とネットワーク300との間における通信制御を行う機能を有する。すなわち、通信制御インターフェース部204は、端末装置100等と通信回線を介してデータを通信する機能を有している。記憶部206は、HDD(Hard Disk Drive)等の固定ディスク装置またはSSD(Solid State Drive)等のストレージ手段であり、各種のデータベースやテーブル(BIMモデルデータベース206aやパーツ情報データベース206b等)を格納する。
[Configuration of Server Device 200]
Here, in FIG. 3, the
これら記憶部206の各構成要素のうち、BIMモデルデータベース206aは、店舗のBIMパーツを含む建築物のBIMモデルを記憶するBIMモデル記憶手段である。本実施形態において、BIMモデルデータベース206aには、予め設計者により設計された店舗のBIMパーツを含む建築物のBIMモデルが格納されている。BIMモデルには、例えば、建物形状、空間関係、地理情報、建物部材の数量や特性、部材強度、固有振動数、耐用年数等の構造情報が含まれるが、これらに限定されない。この他、構造情報は、建物用途、建物規模、階床数、階床名、階高、各階の使用用途、フロア人員、占有面積等から算出可能な昇降機の利用人数などの情報を含んでいてもよい。更に、構造情報は、対象の建築物を構成する各構造ユニットに関する寸法、位置等を示す情報を含んでいてもよい。ここで、BIMモデルを構成する各構造ユニットとしては、例えば、建築物に配置される部屋、壁、通路、非常階段、避難経路、ガス管、水道管、火災報知機、スプリンクラー、梁、安全対策品等が挙げられる。なお、本実施形態において、店舗のBIMパーツは、当該店舗が提供する商品に関する商品情報を含んで構成されるものとする。
Among these components of the
また、パーツ情報データベース206bは、建築物のBIMモデルに組込可能な昇降機のBIMパーツを作成するためのパーツに関するパーツ情報を記憶するパーツ情報記憶手段である。本実施形態において、昇降機は、エレベータおよび乗客コンベアを含む概念であり、乗客コンベアは、エスカレータおよび動く歩道を含む。ここで、パーツ情報は、設計者が昇降機のBIMパーツを設計する上で必要となるあらゆる情報を含む。パーツ情報としては、例えば、用途、定員、積載量、動作速度、色、機種等といった昇降機の仕様、昇降機を建築物に設置する際に必要とされるスペース、寸法、各種付属設備に関する情報、昇降機を構成する必要部材の部材強度、価格、寸法、質量、色、素材、固有振動数といった情報の他、納期、在庫状況、据付時間、仕上げ材、耐用年数、メーカ情報、品番型番などが挙げられるが、上記に限定されない。 The parts information database 206b is part information storage means for storing part information relating to parts for creating a BIM part of an elevator that can be incorporated into a BIM model of a building. In the present embodiment, the elevator is a concept including an elevator and a passenger conveyor, and the passenger conveyor includes an escalator and a moving sidewalk. Here, the parts information includes all information necessary for the designer to design the BIM parts of the elevator. Parts information includes, for example, elevator specifications such as usage, capacity, loading capacity, operating speed, color, model, etc., space and dimensions required when installing elevators in buildings, information on various accessories, elevators In addition to information such as member strength, price, dimensions, mass, color, material, and natural frequency of the necessary components that make up the product, delivery date, inventory status, installation time, finishing material, service life, manufacturer information, product model number, etc. However, it is not limited to the above.
より具体的には、本実施形態において、パーツ情報は、例えば、後述の制御部202によりBIMパーツをBIMモデルに組み込む際等に参照されるBIMパーツのサイズ情報を含む。ここで、BIMパーツのサイズ情報は、BIMパーツを構成するパーツ(すなわち、各ユニットや構成部品)のサイズ情報も含む。BIMパーツを構成する各ユニットとしては、例えば、本実施形態のように昇降機がエレベータである場合には、昇降路、乗りかご、カウンタウェイト、メインロープ、巻上機、ガイドレール、乗り場ホール関連品、機械室、制御盤、電源設備、各種配線配管等が挙げられる。また、BIMパーツを構成する各ユニットとしては、例えば、昇降機がエスカレータである場合には、トラス、踏段、踏段チェーン、移動手摺、乗降板、欄干、駆動装置、機械室、制御盤、電源設備、各種配線配管等が挙げられる。また、パーツ情報は、例えば、制御部202によりBIMパーツを変更する際に用いられる設定パラメータを含む。ここで、設定パラメータは、BIMパーツを構成する各ユニットのサイズ、色、材質、上記各種配線配管等を規定するパラメータを含む。なお、BIMパーツは、典型的なBIMモデルと同様に、このBIMパーツ自体に対象の昇降機に関連するパーツ情報等の属性情報を含んでいる。
More specifically, in the present embodiment, the part information includes, for example, size information of the BIM part that is referred to when the BIM part is incorporated into the BIM model by the
また、本実施形態において、パーツ情報データベース206bは、上述の昇降機のBIMパーツを作成するためのパーツに関するパーツ情報の他、店舗のBIMパーツを作成するためのパーツに関するパーツ情報を含んでいてもよい。これら昇降機のBIMパーツ及び/又は店舗のBIMパーツを作成するためのパーツに関するパーツ情報は、後述の制御部202により統合BIMモデルを変更する際に適宜参照されて使用されるものとする。
Moreover, in this embodiment, the parts information database 206b may include part information related to parts for creating store BIM parts, in addition to parts information related to parts for creating BIM parts for elevators. . The parts information regarding the parts for creating the elevator BIM parts and / or the store BIM parts are referred to as appropriate when the integrated BIM model is changed by the
また、利用情報データベース206cは、端末装置100から情報提供される後述の利用情報を記憶する利用情報記憶手段である。
The
また、制御部202は、OS(Operating System)等の制御プログラムや、各種の処理手順等を規定したプログラム、および、所要データを格納するための内部メモリを有する。そして、制御部202は、これらのプログラム等により、種々の処理を実行するための情報処理を行う。制御部202は、機能概念的に、情報受信部202a、昇降機モデリング部202b、統合モデリング部202c、統合BIMモデル変換部202d、情報配信部202e、統合BIMモデル変更部202f、及び、分析結果作成部202gを備える。
The
このうち、情報受信部202aは、外部装置400から送信される作成条件を受信する作成条件受信手段である。ここで、作成条件は、建築物の設計者が所望する昇降機の仕様等を示す条件である。つまり、作成条件は、建築物のBIMモデルに組込可能な昇降機のBIMパーツを作成するための条件を指定する。作成条件は、例えば、機種、色、素材、希望の価格、納期、設計者の嗜好性等のうちの少なくとも1つを含んでもよい。また、作成条件は、設計者により外部装置400において入力部を介して入力されたものであってもよいし、予め作成条件が記憶された外部記憶装置(図示せず)から読み込まれたものであってもよい。この他、情報受信部202aは、後述する利用情報を端末装置100から受信する機能も有する。
Among these, the
また、昇降機モデリング部202bは、情報受信部202aにより受信された作成条件に対応する昇降機のBIMパーツを、パーツ情報データベース206bに記憶されたパーツ情報を用いて作成する昇降機モデリング手段である。昇降機モデリング部202bは、例えば、図4に示すようなエレベータの3次元のBIMパーツを作成する。ここで、図4は、昇降機のBIMパーツの一例を示す図である。図4の左側は、昇降路、乗りかご、ガイドレール等のユニットから構成される昇降機のBIMパーツであり、図4の右側は、乗り場ホーム関連品の一例として、乗降口のドアのユニット等から構成される昇降機のBIMパーツである。
The
ここで、昇降機モデリング部202bは、建築物の設計者が画面上で確認しながら選択可能なように、作成条件を満たす複数の昇降機のBIMパーツを作成してもよい。昇降機モデリング部202bは、例えば、情報受信部202aにより受信された作成条件に基づいた上述のBIMモデルの構造情報等に基づいて、建築物の概要、規模、設置位置、電源設備容量等から当該建築物に設置可能な昇降機のBIMパーツを単数あるいは複数作成する。また、昇降機モデリング部202bは、情報受信部202aにより受信された作成条件に基づいた納期、価格、あるいは、嗜好性に応じてBIMパーツを自動的に最適化して作成するようにしてもよい。例えば、昇降機モデリング部202bは、設計者によって昇降機の設置に際し納期優先の選択がなされている場合には、設置可能な昇降機のBIMパーツのうち納期が早いものから順に自動で複数作成するようにしてもよい。同様に、昇降機モデリング部202bは、設計者によって価格優先の選択がなされている場合には、設置可能な複数の昇降機のBIMパーツのうち価格が安いものから順に自動で複数作成するようにしてもよい。昇降機モデリング部202bは、設計者によって利用者の嗜好性が設定されている場合には、設置可能な複数の昇降機のBIMパーツのうち嗜好性にあったものから順に自動で複数作成するようにしてもよい。ここで、昇降機モデリング部202bは、作成した昇降機のBIMパーツを記憶部206に格納して、BIMパーツデータベース(図示せず)を構築してもよい。
Here, the
また、統合モデリング部202cは、昇降機モデリング部202bにより作成された昇降機のBIMパーツを、BIMモデルデータベース206aに記憶された建築物のBIMモデルに組み込んだ状態の昇降機組込建築物に対応する統合BIMモデルを作成する統合モデリング手段である。例えば、統合モデリング部202cは、図5に示すような、エレベータのBIMパーツが建築物のBIMモデルに組み込まれた状態の昇降機組込建築物に対応する統合BIMモデルを作成する。ここで、図5は、昇降機のBIMパーツを建築物のBIMモデルに組み込んだ状態の昇降機組込建築物に対応する統合BIMモデルの一例を示す図である。図5では、昇降機組込建築物の完成時におけるエレベータの設置状態を示す統合BIMモデルの一部が示されている。ここで、統合モデリング部202cは、作成した統合BIMモデルを記憶部206に格納して、統合BIMモデルデータベース(図示せず)を構築してもよい。
The integrated modeling unit 202c also integrates the BIM part of the elevator created by the
また、統合BIMモデル変換部202dは、統合モデリング部202cにより作成された統合BIMモデルに基づいて、当該統合BIMモデルを軽量化統合BIMモデルに変換する統合BIMモデル変換手段である。例えば、統合BIMモデル変換部202dは、図2に示したように、データ変換によりデータ容量を軽量化することで、統合BIMモデルを軽量化統合BIMモデルに変換する。
The integrated BIM
また、情報配信部202eは、統合BIMモデル変換部202dにより変換された軽量化統合BIMモデルを端末装置100へ送信する情報配信手段である。ここで、情報配信部202eは、端末装置100の利用者の要求に応じて、後述する利用情報や分析結果等の情報も端末装置100へ送信する機能を有する。
The
また、統合BIMモデル変更部202fは、端末装置100から送信される後述の利用情報に基づいて、統合モデリング部202cにより作成された統合BIMモデルに含まれる昇降機のBIMパーツ及び店舗のBIMパーツのうち少なくとも一方を変更する統合BIMモデル変更手段である。
Further, the integrated BIM
また、分析結果作成部202fは、端末装置100から送信される後述の利用情報に基づく分析結果を作成する分析結果作成手段である。
The analysis
[端末装置100の構成]
図3において、端末装置100は、例えば、一般に市販されるデスクトップ型またはノート型のパーソナルコンピュータ等の情報処理装置、携帯電話、スマートフォン、PHS、およびPDA等の携帯端末装置等である。端末装置100は、インターネットブラウザ等を搭載していてもよく、BIMアプリケーション等を搭載していてもよい。端末装置100は、表示部114と音声出力部116とを少なくとも含む出力部を備えていてもよい。端末装置100は、データ入力等を行う入力部118を備えていてもよい。
[Configuration of Terminal Device 100]
In FIG. 3, the
図3において、表示部114は、アプリケーション等の表示画面を表示する表示手段(例えば、液晶または有機EL等から構成されるディスプレイ、モニタ、および、タッチパネル等)であってもよい。音声出力部116は、音声情報を音声として出力する音声出力手段(例えば、スピーカ等)であってもよい。入力部118は、例えば、キー入力部、タッチパネル、コントロールパッド(例えば、タッチパッド、および、ゲームパッド等)、マウス、キーボード、および、マイク等であってもよい。入出力制御インターフェース部108は、表示部114、音声出力部116、および、入力部118等の制御を行う。
In FIG. 3, the
図3において、通信制御インターフェース部104は、通信回線や電話回線等に接続されるアンテナやルータ等の通信装置(図示せず)に接続されるインターフェースであり、端末装置100とネットワーク300との間における通信制御を行う機能を有する。すなわち、通信制御インターフェース部104は、サーバ装置200等と通信回線を介してデータを通信する機能を有している。ネットワーク300は、端末装置100およびサーバ装置200と、外部装置400と、図示しない外部機器または外部システム(例えば、外部のデータベース装置など)とを相互に接続する機能を有し、例えば、インターネット、電話回線網(携帯端末回線網および一般電話回線網等)、イントラネット、または、電力線通信(PLC)等であってもよい。
In FIG. 3, a communication
図3において、記憶部106は、HDDやSSD等の大容量のストレージ手段、および/または、SRAM(Static Random Access Memory)等を用いて構成される小容量高速メモリ(例えば、キャッシュメモリ)等のストレージ手段であり、各種のデータベースやファイルやテーブル(軽量化統合BIMモデルデータベース106a等)を格納してもよい。ここで、記憶部106は、各種のファイル等を一時的に記憶するものであってもよい。この他、図示しないが、記憶部106は、軽量化統合BIMモデルから抽出されるネットワークデータも保存している。本実施形態において、ネットワークデータは、一般的に経路探索に利用されるデータ構造を有しており、例えば、店舗等の各拠点に対応するノードと、各ノードを接続する移動手段や通路に対応するリンクから構成されるデータである。
In FIG. 3, the
このうち、軽量化統合BIMモデルデータベース106aは、サーバ装置200から受信した軽量化統合BIMモデルを記憶する軽量化統合BIMモデル記憶手段である。
Among these, the light weight integrated
図3において、制御部102は、OS(Operating System)等の制御プログラムや、各種の処理手順等を規定したプログラム、および、所要データを格納するための内部メモリを有する。そして、制御部102は、これらのプログラム等により、種々の処理を実行するための情報処理を行う。制御部102は、機能概念的に、情報取得部102a、操作画面生成部102b、表示制御部102c、利用情報取得部102d、情報提供部102e、及び、経路探索部102fを備える。
In FIG. 3, the
このうち、情報取得部102aは、サーバ装置200から送信される軽量化統合BIMモデルを受信する情報取得手段である。ここで、情報取得部102aは、サーバ装置200の利用情報データベース206cに記憶された利用情報を、サーバ装置200から受信する機能も有する。この他、情報取得部102aは、サーバ装置200から分析結果を受信する機能も有する。
Among these, the
また、操作画面生成部102bは、情報取得部102aにより受信された軽量化統合BIMモデルを含む操作画面を生成する操作画面生成手段である。本実施形態における操作画面の一例についての説明は後述する。
The operation
また、表示制御部102cは、操作画面生成部102bにより生成された操作画面を表示部114に表示する表示制御手段である。本実施形態において、表示制御部102cは、操作画面生成部102bにより生成された操作画面上に、店舗のBIMパーツに対応づけられた商品情報を表示部114に表示してもよい。また、表示制御部102cは、後述の経路探索部102fにより行われた経路探索の結果を操作画面上に表示させてもよい。
The
また、利用情報取得部102dは、利用者により入力部118を介して操作画面上で操作された軽量化統合BIMモデルの利用状況を示す利用情報であって、利用者によって昇降機のBIMパーツを移動手段として利用した店舗のBIMパーツまでの移動経路を示す経路情報を少なくとも含む利用情報を取得する利用情報取得手段である。本実施形態において、利用情報取得部102dは、利用者により操作画面上で行われる商品に対する予約購入操作に応じて入力された当該商品の予約購入情報を、利用情報に含めて取得してもよい。また、利用情報取得部102dは、操作画面上で利用者により選択された後述の訪問計画を、利用情報に含めて取得してもよい。
The usage
また、情報提供部102eは、利用情報取得部102dにより取得された利用情報をサーバ装置200へ送信する情報提供手段である。
The
また、経路探索部102fは、情報取得部102aにより受信された利用情報、及び、利用者により入力部118を介して入力される目的地または目的を少なくとも含む検索条件に基づいて、軽量化統合BIMモデル内における経路探索を行う経路探索手段である。ここで、検索条件は、商品情報を更に含んでいてもよい。本実施形態において、経路探索部102fは、軽量化統合BIMモデル内で経路探索を行った全ての利用者が入力した検索条件に基づいて、昇降機のBIMパーツの混雑状況を予測し、当該混雑状況を回避する経路探索を行ってもよい。また、経路探索部102fは、情報取得部102aにより受信された分析結果に基づいて、軽量化統合BIMモデル内において対象の利用者に推奨される店舗の訪問計画を示す経路探索を行ってもよい。
In addition, the
ここで、図6及び図7を参照して、本実施形態における操作画面の一例について説明する。図6は、検索条件を入力する際の操作画面の一例を示す図である。図7は、軽量化統合BIMモデル内を利用者が店舗まで移動する際の操作画面の一例を示す図である。図6及び図7は、建築物の利用者の端末装置100(例えば、携帯端末や、建物内に設置されたタブレット等)を用いる際の入力画面として機能する操作画面である。建築物の利用者が、利用者の端末装置100に表示される図6に示すような操作画面において必要な情報を入力すると、軽量化統合BIMモデルを利用するための利用画面として機能する図7の操作画面が表示される。ここで、図6の操作画面では、入力画面として機能するため、検索条件の入力欄1〜3が表示されている。入力欄1には検索条件として目的を入力可能であり、入力欄2には検索条件として購入したい商品を入力可能である。更に入力欄3にはその他の項目を検索条件として入力可能である。利用者は入力欄に検索条件を入力するとともに、検索開始ボタン4を選択することで、図7の操作画面に遷移する。図7の操作画面には建築物を3Dで表現し、ボタン5〜7を操作することで目的地までの経路を表示させたり、手動による建築物内のウォークスルーを行うことが可能な利用画面となっている。ここで、図7の操作画面では、実際に利用者が建築物に訪れて店舗へ商品を購入しにいくといった体験を体感可能な視点で、軽量化統合BIMモデル内の様子が表現されている。図7のボタン5は、ルート再生ボタンである。利用者がボタン5を選択すると、図7の操作画面上に、目的地までの経路が表示されてルート案内が実行される。図7のボタン6は一時停止ボタンであり、ルート案内を一時的に停止させるためのボタンである。図7のボタン7は手動操作モードボタンである。利用者がボタン7を選択すると、利用者は、図7の操作画面上で、入力部118の操作に応じて利用者が建築物内を自由に移動して、店舗で商品を購入する等の体験を体感可能となる。
Here, an example of the operation screen in the present embodiment will be described with reference to FIGS. 6 and 7. FIG. 6 is a diagram illustrating an example of an operation screen when inputting search conditions. FIG. 7 is a diagram illustrating an example of an operation screen when the user moves to the store in the light weight integrated BIM model. 6 and 7 are operation screens that function as input screens when using a building user's terminal device 100 (for example, a mobile terminal or a tablet installed in a building). When the user of the building inputs necessary information on the operation screen as shown in FIG. 6 displayed on the
以上で、本実施形態におけるBIMシステムの構成の一例の説明を終える。 Above, description of an example of a structure of the BIM system in this embodiment is finished.
[本実施形態におけるBIMシステムの処理]
次に、このように構成された本実施形態におけるBIMシステムの処理の一例について、以下に図8を参照して詳細に説明する。図8は、実施形態におけるBIMシステムにおいて実行される処理の一例を示すフローチャートである。
[Process of BIM system in this embodiment]
Next, an example of processing of the BIM system in the present embodiment configured as described above will be described in detail with reference to FIG. FIG. 8 is a flowchart illustrating an example of processing executed in the BIM system according to the embodiment.
図8に示すように、サーバ装置200の昇降機モデリング部202bは、建築物の設計者により入力された作成条件に対応する昇降機のBIMパーツを、パーツ情報データベース206bに記憶されたパーツ情報を用いて作成する(ステップS1)。そして、サーバ装置200の統合モデリング部202cは、ステップS1において昇降機モデリング部202bの処理により作成された昇降機のBIMパーツを、BIMモデルデータベース206aに記憶された建築物のBIMモデルに組み込んだ状態の昇降機組込建築物に対応する統合BIMモデルを作成する(ステップS2)。そして、サーバ装置200の統合BIMモデル変換部202dは、ステップS3において統合モデリング部202cの処理により作成された統合BIMモデルに基づいて、当該統合BIMモデルを軽量化統合BIMモデルに変換する(ステップS3)。そして、サーバ装置200の情報配信部202eは、ステップS3において統合BIMモデル変換部202dの処理により変換された軽量化統合BIMモデルを端末装置100へ送信する(ステップS4)。
As shown in FIG. 8, the
そして、端末装置100の情報取得部102aは、ステップS4において情報配信部202eの処理によりサーバ装置200から送信される軽量化統合BIMモデルを受信する(ステップS5)。そして、端末装置100の操作画面生成部102bは、ステップS5において情報取得部102aの処理により受信された軽量化統合BIMモデルを含む操作画面を生成する(ステップS6)。そして、端末装置100の表示制御部102cは、ステップS6において操作画面生成部102bの処理により生成された操作画面を表示部114に表示する(ステップS7)。
And the
そして、端末装置100の制御部102は、ステップS7において表示制御部102cの処理により表示部114に表示された操作画面に対する建築物の利用者の操作が有るか否かを判定する(ステップS8)。ステップS8において、利用者の操作は、入力部118を介して検出される。
And the
ここで、ステップS8において、端末装置100の制御部102は、操作画面に対する建築物の利用者の操作が有ると判定した場合(ステップS8:Yes)、次のステップS9の処理へ移行する。一方、ステップS8において、端末装置100の制御部102は、操作画面に対する建築物の利用者の操作が無いと判定した場合(ステップS8:No)、
ステップS8の処理に戻る。
Here, in Step S8, when it judges with
The process returns to step S8.
そして、端末装置100の利用情報取得部102dは、ステップS8において利用者により入力部118を介して操作画面上で操作された軽量化統合BIMモデルの利用状況を示す利用情報であって、利用者によって昇降機のBIMパーツを移動手段として利用した店舗のBIMパーツまでの移動経路を示す経路情報を少なくとも含む利用情報を取得する(ステップS9)。ステップS9において、利用情報取得部102dは、利用者により操作画面上で行われる商品に対する予約購入操作に応じて入力された当該商品の予約購入情報を、利用情報に含めて取得してもよい。また、利用情報取得部102dは、操作画面上で利用者により選択された後述の訪問計画を、利用情報に含めて取得してもよい。そして、端末装置100の情報提供部102eは、ステップS9において利用情報取得部102dの処理により取得された利用情報をサーバ装置200へ送信する(ステップS10)。
The usage
そして、サーバ装置200の情報受信部202aは、ステップS10において情報提供部102eの処理により送信された利用情報を端末装置100から受信する(ステップS11)。そして、サーバ装置200の分析結果作成部202dは、ステップS11において情報受信部202aの処理により受信された利用情報に基づく分析結果を作成する(ステップS12)。そして、統合BIMモデル変更部202fは、情報受信部202aの処理により受信された利用情報に基づいて、ステップS2において統合モデリング部202cの処理により作成された統合BIMモデルに含まれる昇降機のBIMパーツ及び店舗のBIMパーツのうち少なくとも一方を変更する(ステップS13)。その後、本処理を終了する。
Then, the
なお、本実施形態においては、上述のステップS1〜S13の処理を実行後に、ステップS8において、利用者の操作が有ると判定された場合には(ステップS8:Yes)、端末装置100の経路探索部102fは、情報取得部102aの処理により受信される利用情報、及び、利用者により入力部118を介して入力される目的地または目的を少なくとも含む検索条件に基づいて、軽量化統合BIMモデル内における経路探索を行ってもよい。ここで、検索条件は、商品情報を更に含んでいてもよい。更に、この場合には、経路探索部102fは、軽量化統合BIMモデル内で経路探索を行った全ての利用者が入力した検索条件に基づいて、昇降機のBIMパーツの混雑状況を予測し、当該混雑状況を回避する経路探索を行ってもよい。また、経路探索部102fは、情報取得部102aにより受信された分析結果に基づいて、軽量化統合BIMモデル内において対象の利用者に推奨される店舗の訪問計画を示す経路探索を行ってもよい。
In this embodiment, after performing the processing of steps S1 to S13 described above, if it is determined in step S8 that there is a user operation (step S8: Yes), the route search of the
以上で、実施形態におけるBIMシステムの処理の一例の説明を終える。 Above, description of an example of the process of the BIM system in embodiment is finished.
このように構成された本実施形態におけるBIMシステムによって、例えば、以下に示すような効果が得られる。従来、店舗を有する建築物の集客性や利用者の動線などは、当該建築物の竣工後における集計データをもとにして分析することしかできなかったが、本実施形態におけるBIMシステムによれば、軽量化統合BIMモデルを操作画面上で利用して、建築物の竣工前に当該建築物を仮想的に竣工し、更に仮想的に建築物内の店舗の営業を開始することで、竣工後の建築物の利用状況を確認することが可能となる。また、建築物の竣工前だけでなく竣工後についても、軽量化統合BIMモデルを操作画面上で利用して、目的地までのルート検索を行うことや、建築物の管理者が店舗レイアウトのシミュレーションを行うことが可能となる。 For example, the following effects can be obtained by the BIM system according to the present embodiment configured as described above. Conventionally, the ability to attract customers and the flow of users of a building having a store could only be analyzed based on the aggregated data after completion of the building, but according to the BIM system in this embodiment, For example, by using the light weight integrated BIM model on the operation screen, the building is virtually completed before the building is completed, and the store in the building is virtually started. It becomes possible to confirm the use situation of the building afterwards. In addition, not only before the building is completed but also after it is completed, the lightweight integrated BIM model can be used on the operation screen to search the route to the destination, and the building manager can simulate the store layout. Can be performed.
また、本実施形態におけるBIMシステムは、竣工前の建築物に対応する軽量化統合BIMモデル内の店舗ごとに、商品の写真や値段、大きさなどの商品情報を登録できる機能を有する。これにより、本実施形態におけるBIMシステムによれば、軽量化統合BIMモデルを建築物の利用者へ配布し、建築物の利用者に対して端末装置100を介して、建築物を仮想的に営業させることができる。例えば、建築物の利用者は、軽量化統合BIMモデル内を散策すると同時に、軽量化統合BIMモデル内で商品を予約購入することが可能である。この購入した商品の情報は、仮想営業情報として利用情報に含まれてサーバ装置200のデータベースに保存される。その結果、建築物の設計者や店舗入居予定者等は、最新のトレンド分析や、竣工前に店舗計画や商品仕入れを詳細に検討可能となる。また、本実施形態におけるBIMシステムによれば、建築物の設計者は、サーバ装置200のデータベースに保存された仮想営業情報としての利用情報から、統合BIMモデル内の店舗ごとに、店舗の配置やレイアウトやデザインを提案でき、更に、店舗入居予定者は、統合BIMモデル内で、店舗に陳列する商品をモデル内で移動や配置を行い、店舗の営業計画を実施可能となる。
In addition, the BIM system in the present embodiment has a function of registering product information such as product photos, prices, and sizes for each store in the light weight integrated BIM model corresponding to the building before completion. Thereby, according to the BIM system in this embodiment, a light weight integrated BIM model is distributed to the building user, and the building is virtually operated to the building user via the
また、本実施形態におけるBIMシステムは、軽量化統合BIMモデル内の店舗で仮想的に営業を開始した際に取得される利用情報を集計する機能を有するため、本実施形態におけるBIMシステムによれば、実際の営業開始時に必要な用品や商品の購買システムへつなげることもできる。更に、本実施形態におけるBIMシステムは、軽量化統合BIMモデル内の店舗で仮想的に営業を開始した際に取得される利用情報から、建築物の維持管理を検証できる機能を有するため、本実施形態におけるBIMシステムによれば、昇降機設備、照明、空調、電源装置などのビル設備の最適スペックを設計へフィードバックでき、更に、竣工前の段階でランニングコストを算出可能となる。 In addition, since the BIM system in the present embodiment has a function of totaling usage information acquired when business is virtually started at a store in the light weight integrated BIM model, according to the BIM system in the present embodiment. It can also be connected to a purchasing system for supplies and products required at the time of actual business start-up. Furthermore, since the BIM system in the present embodiment has a function that can verify the maintenance management of the building from the usage information acquired when the business is virtually started in the store in the light weight integrated BIM model, According to the BIM system in the embodiment, it is possible to feed back the optimum specifications of building equipment such as elevator equipment, lighting, air conditioning, and power supply device to the design, and it is possible to calculate the running cost before completion.
更に、本実施形態におけるBIMシステムによれば、建築物の竣工後に、軽量化統合BIMモデルを用いて、仮想的に営業した際に取得した過去の実績データとしての利用情報から、建築物の利用者が自身の端末装置100(例えば、携帯端末や建物内に設置された固定のタブレット等)から、目的地(店舗名など)や目的(トイレ、靴屋など)といった検索条件を入力することで、目的までのルート検索サービスを行うことが可能である。その際、検索を行う際に入力した検索条件を取得し、利用者全てのデータとして保存する。そして、本実施形態におけるBIMシステムによれば、その情報をもとに、通路やエレベータの混雑状況を把握し、混雑していないルート案内をすることで、建築物内の混雑緩和を可能とする。この他、軽量化統合BIMモデル内の店舗ごとに、商品の写真や値段、大きさなどの商品情報を掲載し、建築物内の商品情報を一括管理することで、建築物の利用者は、欲しい商品、値段、色などから検索し、その商品の店舗までの経路を検索することも可能となる。 Furthermore, according to the BIM system in the present embodiment, after the building is completed, the use of the building is obtained from the usage information as past performance data acquired when the building is virtually operated using the light weight integrated BIM model. When a person inputs a search condition such as a destination (store name, etc.) and a purpose (toilet, shoe store, etc.) from his / her terminal device 100 (for example, a mobile terminal or a fixed tablet installed in a building). It is possible to provide a route search service to the purpose. At that time, the search condition input when the search is performed is acquired and stored as data of all users. And according to the BIM system in this embodiment, based on the information, the congestion situation of a passage and an elevator is grasped, and the congestion in a building is enabled by guiding a route that is not crowded. . In addition, for each store in the lightweight integrated BIM model, product information such as product photos, prices, sizes, etc. is posted, and product information in the building is managed collectively, so users of the building can It is also possible to search from the desired product, price, color, etc., and to search the route to the store of the product.
更に、本実施形態におけるBIMシステムは、建築物の竣工後に、軽量化統合BIMモデルを用いて、仮想的に営業した際に取得した過去の実績データとしての利用情報から、対象の利用者の履歴に基づいて、お奨めする商品がある店舗を分析して、建築物の利用者の端末装置100へお勧めする店舗訪問ルートを提示可能である。そして、本実施形態におけるBIMシステムによれば、対象の利用者は店舗訪問ルートに基づいて店舗の訪問を予約することで訪問計画がデータベースに登録され、各店舗の端末装置へ対象の利用者の訪問情報が提供される。これにより、店舗側は訪問情報を来客情報として活用し顧客サービスを向上させることができ、利用者側にとっては各店舗での待ち時間を削減できる。この他、本実施形態におけるBIMシステムは、予約された対象の利用者の店舗訪問ルートから、昇降機の利用スケジュールを想定し、設備の稼動計画に反映する機能を有する。これにより、事前予約を行った端末装置100を有する利用者を、専用運転のエレベータ等の昇降機に優先的に誘導することも可能であり、利用者のエレベータの待ち時間を削減することもできる。更に、昇降機に端末装置100と通信できる機能を持たせれば、利用者がエレベータの乗り場に近づくと、自動的に呼びを登録し、利用者を利用スケジュールのフロアへ案内することもできる。
Furthermore, the BIM system according to the present embodiment uses the weight-reduced integrated BIM model after the building is completed and uses the history of the target user from the usage information as past performance data acquired when operating virtually. Based on the above, it is possible to analyze a store having a recommended product and present a recommended store visit route to the
[他の実施形態]
本発明のいくつかの実施形態を説明したが、これらの実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これら新規な実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これら実施形態やその変形は、発明の範囲や要旨に含まれるとともに、特許請求の範囲に記載された発明とその均等の範囲に含まれる。
[Other Embodiments]
Although several embodiments of the present invention have been described, these embodiments are presented by way of example and are not intended to limit the scope of the invention. These novel embodiments can be implemented in various other forms, and various omissions, replacements, and changes can be made without departing from the scope of the invention. These embodiments and modifications thereof are included in the scope and gist of the invention, and are included in the invention described in the claims and the equivalents thereof.
例えば、上述の実施形態では、昇降機としてエスカレータやエレベータを例にして説明したが、動く歩道等の乗客コンベアについても同様に本発明を適用できる。 For example, in the above-described embodiment, an escalator or an elevator has been described as an example of an elevator, but the present invention can be similarly applied to a passenger conveyor such as a moving sidewalk.
また、実施形態において説明した各処理のうち、自動的に行われるものとして説明した処理の全部または一部を手動的に行うこともでき、あるいは、手動的に行われるものとして説明した処理の全部または一部を公知の方法で自動的に行うこともできる。 In addition, among the processes described in the embodiment, all or a part of the processes described as being automatically performed can be manually performed, or all of the processes described as being manually performed can be performed. Alternatively, a part can be automatically performed by a known method.
この他、上記文献中や図面中で示した処理手順、制御手順、具体的名称、各処理の登録データや検索条件等のパラメータを含む情報、画面例、データベース構成については、特記する場合を除いて任意に変更することができる。 In addition, the processing procedures, control procedures, specific names, information including parameters such as registration data and search conditions for each processing, screen examples, and database configurations shown in the above documents and drawings, unless otherwise specified. Can be changed arbitrarily.
また、端末装置100およびサーバ装置200に関して、図示の各構成要素は機能概念的なものであり、必ずしも物理的に図示の如く構成されていることを要しない。
Further, regarding the
例えば、端末装置100およびサーバ装置200の各装置が備える処理機能、特に制御部102及び制御部202にて行われる各処理機能については、その全部または任意の一部を、CPU(Central Processing Unit)および当該CPUにて解釈実行されるプログラムにて実現してもよく、また、ワイヤードロジックによるハードウェアとして実現してもよい。なお、プログラムは、後述する記録媒体に記録されており、必要に応じて端末装置100およびサーバ装置200に機械的に読み取られる。すなわち、ROMまたはHDDなどの記憶部106および記憶部206などには、OS(Operating System)と協働してCPUに命令を与え、各種処理を行うためのコンピュータプログラムが記録されている。このコンピュータプログラムは、RAMにロードされることによって実行され、CPUと協働して制御部を構成する。
For example, the processing functions provided in each device of the
また、このコンピュータプログラムは、端末装置100およびサーバ装置200に対して任意のネットワーク300を介して接続されたアプリケーションプログラムサーバに記憶されていてもよく、必要に応じてその全部または一部をダウンロードすることも可能である。
The computer program may be stored in an application program server connected to the
また、本発明に係るプログラムを、コンピュータで読み取り可能な記録媒体に格納してもよく、また、プログラム製品として構成することもできる。ここで、この「記録媒体」とは、メモリーカード、USBメモリ、SDカード、フレキシブルディスク、光磁気ディスク、ROM、EPROM、EEPROM、CD−ROM、MO、DVD、および、Blu−ray(登録商標) Disc等の任意の「可搬用の物理媒体」を含むものとする。 Further, the program according to the present invention may be stored in a computer-readable recording medium, or may be configured as a program product. Here, the “recording medium” means a memory card, USB memory, SD card, flexible disk, magneto-optical disk, ROM, EPROM, EEPROM, CD-ROM, MO, DVD, and Blu-ray (registered trademark). It includes any “portable physical medium” such as Disc.
また、「プログラム」とは、任意の言語や記述方法にて記述されたデータ処理方法であり、ソースコードやバイナリコード等の形式を問わない。なお、「プログラム」は必ずしも単一的に構成されるものに限られず、複数のモジュールやライブラリとして分散構成されるものや、OS(Operating System)に代表される別個のプログラムと協働してその機能を達成するものをも含む。なお、実施の形態に示した各装置において記録媒体を読み取るための具体的な構成、読み取り手順、あるいは、読み取り後のインストール手順等については、周知の構成や手順を用いることができる。 The “program” is a data processing method described in an arbitrary language or description method, and may be in any format such as source code or binary code. The “program” is not necessarily limited to a single configuration, but is distributed in the form of a plurality of modules and libraries, or in cooperation with a separate program represented by an OS (Operating System). Including those that achieve the function. Note that a well-known configuration and procedure can be used for a specific configuration for reading a recording medium, a reading procedure, an installation procedure after reading, and the like in each device described in the embodiment.
記憶部106および記憶部206に格納される各種のデータベース等(例えば、軽量化統合BIMモデルデータベース106a、BIMモデルデータベース206a、パーツ情報データベース206b、利用情報データベース206c等)は、RAM、ROM等のメモリ装置、ハードディスク等の固定ディスク装置、フレキシブルディスク、および、光ディスク等のストレージ手段であり、各種処理やウェブサイト提供に用いる各種のプログラム、テーブル、データベース、および、ウェブページ用ファイル等を格納する。
Various databases and the like stored in the
また、端末装置100およびサーバ装置200は、既知のパーソナルコンピュータ、ワークステーション等の情報処理装置として構成してもよく、また、該情報処理装置に任意の周辺装置を接続して構成してもよい。また、端末装置100およびサーバ装置200は、該情報処理装置に本発明の方法を実現させるソフトウェア(プログラム、データ等を含む)を実装することにより実現してもよい。
The
更に、装置の分散・統合の具体的形態は図示するものに限られず、その全部または一部を、各種の付加等に応じて、または、機能負荷に応じて、任意の単位で機能的または物理的に分散・統合して構成することができる。すなわち、上述した実施形態を任意に組み合わせて実施してもよく、実施形態を選択的に実施してもよい。 Furthermore, the specific form of distribution / integration of the devices is not limited to that shown in the figure, and all or a part of them may be functional or physical in arbitrary units according to various additions or according to functional loads. Can be distributed and integrated. That is, the above-described embodiments may be arbitrarily combined and may be selectively implemented.
以上で説明した実施形態に係るBIMシステムおよび方法によれば、店舗を有する建築物の集客性や利用者の動線などを当該建築物の竣工前に分析可能なように、当該建築物における利用者の昇降機や店舗の利用状況を取得することができる。 According to the BIM system and the method according to the embodiment described above, the use in the building so that the customer-collectability of the building having the store and the flow line of the user can be analyzed before the completion of the building. It is possible to acquire the usage status of the person's elevator and store.
100 端末装置
102 制御部
102a 情報取得部
102b 操作画面生成部
102c 表示制御部
102d 利用情報取得部
102e 情報提供部
102f 経路探索部
104 通信制御インターフェース部
106 記憶部
106a 軽量化統合BIMモデルデータベース
108 入出力制御インターフェース部
114 表示部
116 音声出力部
118 入力部
200 サーバ装置
202 制御部
202a 情報受信部
202b 昇降機モデリング部
202c 統合モデリング部
202d 統合BIMモデル変換部
202e 情報配信部
202f 統合BIMモデル変更部
202g 分析結果作成部
204 通信制御インターフェース部
206 記憶部
206a BIMモデルデータベース
206b パーツ情報データベース
206c 利用情報データベース
300 ネットワーク
400 外部装置
DESCRIPTION OF
実施形態のBIMシステムは、サーバ装置および端末装置を通信可能に接続して構成される。サーバ装置は、制御部と記憶部とを少なくとも備える。端末装置は、制御部と表示部と入力部とを少なくとも備える。ここで、サーバ装置の記憶部は、BIMモデル記憶手段と、パーツ情報記憶手段と、を備える。BIMモデル記憶手段は、店舗のBIMパーツを含む建築物のBIMモデルを記憶する。パーツ情報記憶手段は、建築物のBIMモデルに組込可能な昇降機のBIMパーツを作成するためのパーツに関するパーツ情報を記憶する。また、サーバ装置の制御部は、昇降機モデリング手段と、統合モデリング手段と、統合BIMモデル変換手段と、情報配信手段と、を備える。昇降機モデリング手段は、設計者により入力される作成条件に対応する昇降機のBIMパーツを、パーツ情報記憶手段に記憶されたパーツ情報を用いて作成する。統合モデリング手段は、昇降機モデリング手段により作成された昇降機のBIMパーツを、BIMモデル記憶手段に記憶された建築物のBIMモデルに組み込んだ状態の昇降機組込建築物に対応する統合BIMモデルを作成する。統合BIMモデル変換手段は、統合モデリング手段により作成された統合BIMモデルに基づいて、当該統合BIMモデルを軽量化統合BIMモデルに変換する。情報配信手段は、統合BIMモデル変換手段により変換された軽量化統合BIMモデルを端末装置へ送信する。また、端末装置の制御部は、情報取得手段と、操作画面生成手段と、表示制御手段と、利用情報取得手段と、情報提供手段と、を備える。情報取得手段は、サーバ装置から情報配信手段により送信された軽量化統合BIMモデルを受信する。操作画面生成手段は、情報取得手段により受信された軽量化統合BIMモデルを含む操作画面を生成する。表示制御手段は、操作画面生成手段により生成された操作画面を表示部に表示する。利用情報取得手段は、利用者により入力部を介して操作画面上で操作された軽量化統合BIMモデルの利用状況を示す利用情報であって、利用者によって昇降機のBIMパーツを移動手段として利用した店舗のBIMパーツまでの移動経路を示す経路情報を少なくとも含む利用情報を取得する。情報提供手段は、利用情報取得手段により取得された利用情報をサーバ装置へ送信する。さらに、サーバ装置の制御部は、情報受信手段と、分析結果作成手段と、統合BIMモデル変更手段と、を備える。情報受信手段は、端末装置から送信された利用情報を受信する。分析結果作成手段は、受信された利用情報に基づいて分析結果を作成する。統合BIMモデル変更手段は、受信された利用情報に基づいて、統合モデリング手段により作成された統合BIMモデルに含まれる昇降機のBIMパーツ及び店舗のBIMパーツのうち少なくとも一方を変更する。 The BIM system of the embodiment is configured by connecting a server device and a terminal device so that they can communicate with each other. The server device includes at least a control unit and a storage unit. The terminal device includes at least a control unit, a display unit, and an input unit. Here, the storage unit of the server device includes a BIM model storage unit and a parts information storage unit. The BIM model storage means stores the BIM model of the building including the BIM parts of the store. The part information storage means stores part information related to a part for creating a BIM part of an elevator that can be incorporated into a BIM model of a building. In addition, the control unit of the server device includes elevator modeling means, integrated modeling means, integrated BIM model conversion means, and information distribution means. The elevator modeling means creates elevator BIM parts corresponding to the creation conditions input by the designer using the part information stored in the part information storage means. The integrated modeling means creates an integrated BIM model corresponding to the elevator built-in building in which the elevator BIM parts created by the elevator modeling means are incorporated in the BIM model of the building stored in the BIM model storage means. . The integrated BIM model conversion means converts the integrated BIM model into a light weight integrated BIM model based on the integrated BIM model created by the integrated modeling means. The information distribution unit transmits the light weight integrated BIM model converted by the integrated BIM model conversion unit to the terminal device. In addition, the control unit of the terminal device includes information acquisition means, operation screen generation means, display control means, usage information acquisition means, and information provision means. The information acquisition unit receives the light weight integrated BIM model transmitted from the server device by the information distribution unit. The operation screen generation unit generates an operation screen including the light weight integrated BIM model received by the information acquisition unit. The display control unit displays the operation screen generated by the operation screen generation unit on the display unit. The usage information acquisition means is usage information indicating the usage status of the light weight integrated BIM model operated on the operation screen by the user via the input unit, and the user uses the BIM part of the elevator as the moving means. Usage information including at least route information indicating a movement route to the BIM part of the store is acquired. The information providing means transmits the usage information acquired by the usage information acquiring means to the server device. Further, the control unit of the server device includes an information receiving unit, an analysis result creating unit, and an integrated BIM model changing unit. The information receiving means receives usage information transmitted from the terminal device. The analysis result creating means creates an analysis result based on the received usage information. The integrated BIM model changing unit changes at least one of the elevator BIM part and the store BIM part included in the integrated BIM model created by the integrated modeling unit based on the received usage information.
本実施形態において、まず、建築物の設計者は、3D形状の建築物のBIMモデル(図2において、昇降機のBIMパーツ及び店舗のBIMパーツを含む統合BIMモデル)を、3DCAD等を用いて作成する。この統合BIMモデルは、部屋、廊下、階段、エレベータなどを備えた建築物全体の3Dモデルである。建築物の設計者が、統合BIMモデルをサーバ装置200に保存すると、データ変換によりデータ容量を軽量化した3D形状の建物データベースモデル(図2において、軽量化統合BIMモデル)に変換される。建築物の利用者は、インターネット経由でこの軽量化統合BIMモデルを、スマートフォン100−1、タブレット100−2、パーソナルコンピュータ100−3などの端末装置100を用いて入手する。そして、建築物の利用者は、竣工前の建築物の3Dモデルである軽量化統合BIMモデルを、当該建築物に実際に訪れて利用する際と同様に仮想的に利用する。建築物の利用者がこの軽量化統合BIMモデルを仮想的に利用する際には、建築物の利用者が軽量化統合BIMモデル内で移動したルートや訪れる店舗の順番などを示す経路情報を、建築物の利用状況を示すデータ(本実施形態において、利用情報)としてサーバ装置200に保存する。これにより、建築物の設計者は、保存された利用情報をもとに、建物の利用者が少ない移動距離で建築物内を移動可能な店舗のレイアウトや、エレベータやエスカレータ等の昇降機の最適な配置などを、建築物の設計や事業計画の際に提案することができる。
In this embodiment, first, a building designer creates a 3D-shaped building BIM model (in FIG. 2, an integrated BIM model including an elevator BIM part and a store BIM part) using 3D CAD or the like. To do. This integrated BIM model is a 3D model of the entire building including rooms, corridors, stairs, elevators, and the like. When the architect of the building saves the integrated BIM model in the
Claims (12)
前記サーバ装置の前記記憶部は、
店舗のBIMパーツを含む建築物のBIMモデルを記憶するBIMモデル記憶手段と、
前記BIMモデルに組込可能な昇降機のBIMパーツを作成するためのパーツに関するパーツ情報を記憶するパーツ情報記憶手段と、
を備え、
前記サーバ装置の前記制御部は、
設計者により入力される作成条件に対応する前記昇降機のBIMパーツを、前記パーツ情報記憶手段に記憶された前記パーツ情報を用いて作成する昇降機モデリング手段と、
前記昇降機モデリング手段により作成された前記昇降機のBIMパーツを、前記BIMモデル記憶手段に記憶された前記BIMモデルに組み込んだ状態の昇降機組込建築物に対応する統合BIMモデルを作成する統合モデリング手段と、
前記統合モデリング手段により作成された前記統合BIMモデルに基づいて、当該統合BIMモデルを軽量化統合BIMモデルに変換する統合BIMモデル変換手段と、
前記統合BIMモデル変換手段により変換された前記軽量化統合BIMモデルを前記端末装置へ送信する情報配信手段と、
を備え、
前記端末装置の前記制御部は、
前記サーバ装置から前記情報配信手段により送信された前記軽量化統合BIMモデルを受信する情報取得手段と、
前記情報取得手段により受信された前記軽量化統合BIMモデルを含む操作画面を生成する操作画面生成手段と、
前記操作画面生成手段により生成された前記操作画面を前記表示部に表示する表示制御手段と、
利用者により前記入力部を介して前記操作画面上で操作された前記軽量化統合BIMモデルの利用状況を示す利用情報であって、前記利用者によって前記昇降機のBIMパーツを移動手段として利用した前記店舗のBIMパーツまでの移動経路を示す経路情報を少なくとも含む前記利用情報を取得する利用情報取得手段と、
前記利用情報取得手段により取得された前記利用情報を前記サーバ装置へ送信する情報提供手段と、
を備えることを特徴とするBIMシステム。 A BIM system in which a server device including at least a control unit and a storage unit, and a terminal device including at least a control unit, a display unit, and an input unit are communicably connected,
The storage unit of the server device is
BIM model storage means for storing a BIM model of a building including BIM parts of a store;
Parts information storage means for storing parts information relating to parts for creating BIM parts of an elevator that can be incorporated into the BIM model;
With
The control unit of the server device includes:
Elevator modeling means for creating a BIM part of the elevator corresponding to a creation condition input by a designer using the part information stored in the parts information storage means;
Integrated modeling means for creating an integrated BIM model corresponding to a built-in elevator structure in which the BIM parts of the elevator created by the elevator modeling means are incorporated in the BIM model stored in the BIM model storage means; ,
Based on the integrated BIM model created by the integrated modeling means, an integrated BIM model converting means for converting the integrated BIM model into a light weight integrated BIM model;
Information distribution means for transmitting the weight-reduced integrated BIM model converted by the integrated BIM model converting means to the terminal device;
With
The control unit of the terminal device is
Information acquisition means for receiving the light weight integrated BIM model transmitted from the server device by the information distribution means;
Operation screen generation means for generating an operation screen including the light weight integrated BIM model received by the information acquisition means;
Display control means for displaying the operation screen generated by the operation screen generation means on the display unit;
Usage information indicating a usage status of the light weight integrated BIM model operated on the operation screen by the user via the input unit, wherein the user uses a BIM part of the elevator as a moving unit. Usage information acquisition means for acquiring the usage information including at least route information indicating a travel route to a BIM part of the store;
Information providing means for transmitting the usage information acquired by the usage information acquiring means to the server device;
A BIM system comprising:
前記表示制御手段は、前記操作画面生成手段により生成された前記操作画面上に、前記店舗のBIMパーツに対応づけられた前記商品情報を前記表示部に表示し、
前記利用情報取得手段は、前記利用者により前記操作画面上で行われる前記商品に対する予約購入操作に応じて入力された当該商品の予約購入情報を、前記利用情報に含めて取得する請求項1又は2に記載のBIMシステム。 The BIM parts of the store include product information related to products provided by the store,
The display control means displays the product information associated with the BIM parts of the store on the display unit on the operation screen generated by the operation screen generation means,
The usage information acquisition unit includes the usage information to acquire reservation purchase information of the product input in response to a reservation purchase operation for the product performed on the operation screen by the user. 2. The BIM system according to 2.
前記端末装置の前記制御部は、前記情報取得手段により受信された前記利用情報、及び、前記利用者により前記入力部を介して入力される目的地または目的を少なくとも含む検索条件に基づいて、前記軽量化統合BIMモデル内における経路探索を行う経路探索手段、を更に備え、
前記表示制御手段は、前記経路探索手段により行われた前記経路探索の結果を前記操作画面上に表示させる請求項1乃至4のいずれか1項に記載のBIMシステム。 The information acquisition means receives the usage information stored in the server device from the server device,
The control unit of the terminal device, based on the use information received by the information acquisition unit, and a search condition including at least a destination or purpose input by the user via the input unit, Route search means for performing a route search in the light weight integrated BIM model,
The BIM system according to any one of claims 1 to 4, wherein the display control unit displays a result of the route search performed by the route search unit on the operation screen.
前記経路探索手段は、前記情報取得手段により受信された前記分析結果に基づいて、前記軽量化統合BIMモデル内において対象の利用者に推奨される前記店舗の訪問計画を示す経路探索を行い、
前記利用情報取得手段は、前記操作画面上で前記利用者により選択された訪問計画を、前記利用情報に含めて取得する請求項5乃至7のいずれか一項に記載のBIMシステム。 The information acquisition means receives the analysis result from the server device,
The route search means performs a route search indicating the store visit plan recommended for the target user in the light weight integrated BIM model based on the analysis result received by the information acquisition means,
The BIM system according to any one of claims 5 to 7, wherein the usage information acquisition unit acquires the usage plan including a visit plan selected by the user on the operation screen.
前記サーバ装置の前記記憶部は、
店舗のBIMパーツを含む建築物のBIMモデルを記憶するBIMモデル記憶手段と、
前記BIMモデルに組込可能な昇降機のBIMパーツを作成するためのパーツに関するパーツ情報を記憶するパーツ情報記憶手段と、
を備え、
前記方法は、
前記サーバ装置の前記制御部において実行される、設計者により入力される作成条件に対応する前記昇降機のBIMパーツを、前記パーツ情報記憶手段に記憶された前記パーツ情報を用いて作成する昇降機モデリングステップと、
前記サーバ装置の前記制御部において実行される、前記昇降機モデリングステップにて作成された前記昇降機のBIMパーツを、前記BIMモデル記憶手段に記憶された前記BIMモデルに組み込んだ状態の昇降機組込建築物に対応する統合BIMモデルを作成する統合モデリングステップと、
前記サーバ装置の前記制御部において実行される、前記統合モデリングステップにて作成された前記統合BIMモデルに基づいて、当該統合BIMモデルを軽量化統合BIMモデルに変換する統合BIMモデル変換ステップと、
前記サーバ装置の前記制御部において実行される、前記統合BIMモデル変換ステップにて変換された前記軽量化統合BIMモデルを前記端末装置へ送信する情報配信ステップと、
前記端末装置の前記制御部において実行される、前記サーバ装置から前記情報配信ステップにて送信された前記軽量化統合BIMモデルを受信する情報取得ステップと、
前記端末装置の前記制御部において実行される、前記情報取得ステップにて受信された前記軽量化統合BIMモデルを含む操作画面を生成する操作画面生成ステップと、
前記端末装置の前記制御部において実行される、前記操作画面生成ステップにて生成された前記操作画面を前記表示部に表示する表示制御ステップと、
前記端末装置の前記制御部において実行される、利用者により前記入力部を介して前記操作画面上で操作された前記軽量化統合BIMモデルの利用状況を示す利用情報であって、前記利用者によって前記昇降機のBIMパーツを移動手段として利用した前記店舗のBIMパーツまでの移動経路を示す経路情報を少なくとも含む前記利用情報を取得する利用情報取得ステップと、
前記利用情報取得ステップにて取得された前記利用情報を前記サーバ装置へ送信する情報提供ステップと、
を含むことを特徴とする方法。 A method executed in a BIM system in which a server device including at least a control unit and a storage unit, and a terminal device including at least a control unit, a display unit, and an input unit are communicably connected,
The storage unit of the server device is
BIM model storage means for storing a BIM model of a building including BIM parts of a store;
Parts information storage means for storing parts information relating to parts for creating BIM parts of an elevator that can be incorporated into the BIM model;
With
The method
Elevator modeling step for creating BIM parts of the elevator corresponding to the creation condition input by the designer, which is executed in the control unit of the server device, using the part information stored in the parts information storage means. When,
The elevator built-in building in a state in which the BIM part of the elevator created in the elevator modeling step executed in the controller of the server device is incorporated in the BIM model stored in the BIM model storage means An integrated modeling step to create an integrated BIM model corresponding to
An integrated BIM model conversion step for converting the integrated BIM model into a light weight integrated BIM model based on the integrated BIM model created in the integrated modeling step, which is executed in the control unit of the server device;
An information distribution step for transmitting the weight-reduced integrated BIM model converted in the integrated BIM model conversion step to the terminal device, executed in the control unit of the server device;
An information acquisition step of receiving the weight-reduced integrated BIM model transmitted in the information distribution step from the server device, executed in the control unit of the terminal device;
An operation screen generating step for generating an operation screen including the light weight integrated BIM model received in the information acquisition step, which is executed in the control unit of the terminal device;
A display control step for displaying the operation screen generated in the operation screen generation step, which is executed in the control unit of the terminal device, on the display unit;
Usage information indicating a usage status of the lightweight integrated BIM model operated on the operation screen by the user via the input unit, which is executed in the control unit of the terminal device, and is performed by the user A usage information acquisition step of acquiring the usage information including at least route information indicating a moving route to the BIM part of the store using the BIM part of the elevator as a moving unit;
An information providing step of transmitting the usage information acquired in the usage information acquisition step to the server device;
A method comprising the steps of:
前記表示制御ステップにおいて、前記操作画面生成ステップにて生成された前記操作画面上に、前記店舗のBIMパーツに対応づけられた前記商品情報が前記表示部に表示され、
前記利用情報取得ステップにおいて、前記利用者により前記操作画面上で行われる前記商品に対する予約購入操作に応じて入力された当該商品の予約購入情報が、前記利用情報に含めて取得される請求項9又は10に記載の方法。 The BIM parts of the store include product information related to products provided by the store,
In the display control step, the product information associated with the BIM parts of the store is displayed on the display unit on the operation screen generated in the operation screen generation step.
10. In the usage information acquisition step, reservation purchase information of the product input in response to a reservation purchase operation for the product performed on the operation screen by the user is included in the usage information and acquired. Or the method according to 10.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015138813A JP6034455B1 (en) | 2015-07-10 | 2015-07-10 | BIM system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015138813A JP6034455B1 (en) | 2015-07-10 | 2015-07-10 | BIM system and method |
Publications (2)
Publication Number | Publication Date |
---|---|
JP6034455B1 JP6034455B1 (en) | 2016-11-30 |
JP2017021580A true JP2017021580A (en) | 2017-01-26 |
Family
ID=57419807
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2015138813A Active JP6034455B1 (en) | 2015-07-10 | 2015-07-10 | BIM system and method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6034455B1 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106896749A (en) * | 2017-03-10 | 2017-06-27 | 中铁四局集团有限公司 | construction management client based on BIM technology |
CN106991214A (en) * | 2017-03-10 | 2017-07-28 | 中铁四局集团有限公司 | BIM-based informatization management method for high-speed railway precast beam yard |
CN107025516A (en) * | 2017-03-10 | 2017-08-08 | 中铁四局集团有限公司 | BIM-based information management system for high-speed railway precast beam yard |
JP2019003490A (en) * | 2017-06-16 | 2019-01-10 | 清水建設株式会社 | System for supporting planning of logistic traffic line in facility |
KR102587724B1 (en) * | 2023-01-27 | 2023-10-11 | 주식회사 오하이오컴퍼니 | Interior provision system suitable for unmanned commercial space |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107220738B (en) * | 2017-08-01 | 2020-12-22 | 贺州学院 | High-altitude falling object early warning method and device |
CN107558642A (en) * | 2017-08-22 | 2018-01-09 | 中国十七冶集团有限公司 | A kind of method in the large-scale open stone curtain wall installation based on BIM |
CN110700623A (en) * | 2019-09-05 | 2020-01-17 | 中国十七冶集团有限公司 | Building integral displacement construction method based on BIM |
CN110795848B (en) * | 2019-10-29 | 2024-02-27 | 江苏开放大学(江苏城市职业学院) | Large-scale commercial complex logistics intelligent operation and maintenance method |
CN111241622A (en) * | 2020-01-19 | 2020-06-05 | 杭州群核信息技术有限公司 | Self-adaptive water heating electric pipeline adjusting system and method |
CN111460659A (en) * | 2020-03-31 | 2020-07-28 | 广东电网有限责任公司 | Electrical equipment refinement modeling method, computer and computer program |
CN111666433B (en) * | 2020-04-30 | 2023-03-17 | 中铁第一勘察设计院集团有限公司 | Railway four-electrical engineering BIM model Web lightweight method |
CN112308975A (en) * | 2020-11-06 | 2021-02-02 | 中国石油天然气集团有限公司 | RVM binary model analysis method and system for three-dimensional lightweight engine |
CN114491752B (en) * | 2022-01-20 | 2023-04-28 | 深圳迅维数字孪生技术有限公司 | BIM model light weight method and system |
CN115908762A (en) * | 2022-11-11 | 2023-04-04 | 广州烽云信息科技有限公司 | Wisdom computer lab based on BIM remote monitoring and operation |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002245294A (en) * | 2001-02-19 | 2002-08-30 | Nippon Telegr & Teleph Corp <Ntt> | Model dwelling house system utilizing virtual space |
JP2007072682A (en) * | 2005-09-06 | 2007-03-22 | Toshiba Elevator Co Ltd | Cad system |
JP2014010659A (en) * | 2012-06-29 | 2014-01-20 | Toshiba Elevator Co Ltd | Bim system, server device, terminal device, method, and program |
JP2014174618A (en) * | 2013-03-06 | 2014-09-22 | Toshiba Elevator Co Ltd | Bim system and method |
JP2014222487A (en) * | 2013-05-14 | 2014-11-27 | 大成建設株式会社 | Simulation device and program |
-
2015
- 2015-07-10 JP JP2015138813A patent/JP6034455B1/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002245294A (en) * | 2001-02-19 | 2002-08-30 | Nippon Telegr & Teleph Corp <Ntt> | Model dwelling house system utilizing virtual space |
JP2007072682A (en) * | 2005-09-06 | 2007-03-22 | Toshiba Elevator Co Ltd | Cad system |
JP2014010659A (en) * | 2012-06-29 | 2014-01-20 | Toshiba Elevator Co Ltd | Bim system, server device, terminal device, method, and program |
JP2014174618A (en) * | 2013-03-06 | 2014-09-22 | Toshiba Elevator Co Ltd | Bim system and method |
JP2014222487A (en) * | 2013-05-14 | 2014-11-27 | 大成建設株式会社 | Simulation device and program |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106896749A (en) * | 2017-03-10 | 2017-06-27 | 中铁四局集团有限公司 | construction management client based on BIM technology |
CN106991214A (en) * | 2017-03-10 | 2017-07-28 | 中铁四局集团有限公司 | BIM-based informatization management method for high-speed railway precast beam yard |
CN107025516A (en) * | 2017-03-10 | 2017-08-08 | 中铁四局集团有限公司 | BIM-based information management system for high-speed railway precast beam yard |
JP2019003490A (en) * | 2017-06-16 | 2019-01-10 | 清水建設株式会社 | System for supporting planning of logistic traffic line in facility |
JP7042563B2 (en) | 2017-06-16 | 2022-03-28 | 清水建設株式会社 | Facility flow line planning support system |
KR102587724B1 (en) * | 2023-01-27 | 2023-10-11 | 주식회사 오하이오컴퍼니 | Interior provision system suitable for unmanned commercial space |
Also Published As
Publication number | Publication date |
---|---|
JP6034455B1 (en) | 2016-11-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6034455B1 (en) | BIM system and method | |
JP5489310B1 (en) | BIM system and method | |
JP5645321B2 (en) | BIM system, method and program | |
JP6611868B1 (en) | BIM system and method | |
JP5591881B2 (en) | BIM system, server device, terminal device, method and program | |
JP6231169B1 (en) | BIM system, method and program | |
JP5619126B2 (en) | BIM system | |
JP6321076B2 (en) | BIM system, method and program | |
JP6058778B1 (en) | BIM system, method and program | |
JP5518943B2 (en) | BIM system and method | |
JP2016211260A (en) | BIM system, method and program | |
JP5623573B2 (en) | BIM system and method | |
JP5518945B2 (en) | BIM system, server device, terminal device, method and program | |
JP5623466B2 (en) | BIM system, method and program | |
JP5354629B1 (en) | BIM system, server device, terminal device, method and program | |
JP5645315B2 (en) | BIM system, method and program | |
JP5489307B1 (en) | BIM system, method and program | |
JP6555768B1 (en) | BIM system and method | |
JP6239034B2 (en) | BIM system and method | |
JP6242952B1 (en) | BIM system, method and program | |
JP5518944B2 (en) | BIM system, server device, terminal device, method and program | |
JP6769670B1 (en) | BIM system, server equipment, and method | |
JP5619114B2 (en) | BIM system | |
JP6801049B2 (en) | Information processing method and information processing equipment | |
JP7279139B1 (en) | BIM system and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20160829 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20160927 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20161027 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6034455 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |