JP2017008696A - Construction method for steel pipe pile foundation for being used in common for reduction in negative frictional force, ground compaction and the like - Google Patents
Construction method for steel pipe pile foundation for being used in common for reduction in negative frictional force, ground compaction and the like Download PDFInfo
- Publication number
- JP2017008696A JP2017008696A JP2015133903A JP2015133903A JP2017008696A JP 2017008696 A JP2017008696 A JP 2017008696A JP 2015133903 A JP2015133903 A JP 2015133903A JP 2015133903 A JP2015133903 A JP 2015133903A JP 2017008696 A JP2017008696 A JP 2017008696A
- Authority
- JP
- Japan
- Prior art keywords
- steel pipe
- pipe pile
- pile
- piles
- ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
Description
今後発生する地震に備え、液状化及び圧蜜沈下現象を前もって防止することを考慮し開発した工法である、新規に大規模に今後開発する場合は在来迄の各種地盤改良工法で良いが、小規模の場合、又は大型機械の搬入が困難な場合施工が困難でコスト高の要素が考えられるケースが多いので本工法を考案した。In preparation for earthquakes that will occur in the future, this method has been developed in consideration of preventing liquefaction and subsidence in advance.When newly developing on a large scale in the future, various conventional ground improvement methods may be used. This method was devised because there are many cases where construction is difficult and costly factors are considered when small-scale or large-scale machines are difficult to carry.
軟弱な砂質系地盤あるいはシルト及び粘土層の粘性系地盤改良工法としては各種締固め工法、各種脱水、固化工法、強制排水工法があるがこれらの工
し、実施してきた背景があるThere are various compaction methods, various dewatering, solidification methods, and forced drainage methods for soft sandy soils or silt and clay layer viscous ground methods.
And there is a background that has been implemented
沖積地盤の軟弱層の粘性系及び砂質系又は互層地盤の場合で堆積層が厚く施工機械も大型が必要とされるが小規模の場合敷地面積も小さく搬入路も狭い場所で施工することは課題である又経済的でない、In the case of alluvial ground's soft layer and sandy system or alternate layer ground, the sedimentary layer is thick and the construction machinery is required to be large, but in the case of a small scale it is necessary to construct in a place where the site area is small and the carry-in route is narrow The problem is not economical
課題を解決する手段として施工機械は小型化し、搬入物は短くし目的に応じられる施工可能な工法として考案した工法である、尚土質力学的には十分マッチした工法として考案した工法である、As a means to solve the problem, the construction machine is reduced in size, the load is shortened and the construction method devised as a construction method that can be applied according to the purpose, the construction method devised as a construction method well matched in terms of soil mechanics,
実施に当たり土質調査を行い荷重条件に応じた設計をし圧縮、圧蜜沈下量を算出し、圧密、圧縮時間を算出し敷地面積に応じれる施工機械を選定し実施施工し圧縮、圧密沈下量を測定分析し、基礎梁工を構築し建造物を立ち上げる形態とするIn conducting the soil investigation, design according to the load conditions, calculating the compression and squeeze settlement amount, calculating the consolidation and compression time, selecting the construction machine according to the site area, and implementing the compression and consolidation settlement amount Measure and analyze, build foundation beam work and start building
1、鋼管基礎杭(長さ6m〜10m、複数リブ付き、スリット付き、切込砂利、又は硅砂7荒目砂3混合フィルター材中詰)
2、鋼管基礎杭(4隅と中心部、強制排水可能設備付き鋼管)
3、強制排水揚水管挿入済み鋼管
4、水平ドレーン有孔管(塩ビ75mm)
5、フィルター材(切込砂利、又は硅砂7荒目砂3混合材)
6、ケーシング付帯リブ
7、捨コンクリート
8、基礎梁
9、U字溝
10、振動締固め有効径範囲
11、基礎梁立ち上がり部
12、スリット加工(幅2mm×長さ20cm千鳥配置)1. Steel pipe foundation pile (length 6m ~ 10m, with multiple ribs, with slits, cutting gravel, or paddy sand 7 coarse sand 3 mixed filter material filling)
2. Steel pipe foundation pile (4 corners and center, steel pipe with equipment capable of forced drainage)
3. Steel pipe with forced drainage pump inserted 4. Horizontal drain perforated pipe (PVC 75mm)
5. Filter material (cutting gravel or dredged sand 7 coarse sand 3 mixed material)
6, Rib with casing 7, Discard concrete 8, Foundation beam 9, U-shaped groove 10, Vibration compaction effective diameter range 11, Foundation beam rising part 12, Slit processing (width 2mm x length 20cm staggered arrangement)
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015133903A JP2017008696A (en) | 2015-06-16 | 2015-06-16 | Construction method for steel pipe pile foundation for being used in common for reduction in negative frictional force, ground compaction and the like |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015133903A JP2017008696A (en) | 2015-06-16 | 2015-06-16 | Construction method for steel pipe pile foundation for being used in common for reduction in negative frictional force, ground compaction and the like |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2017008696A true JP2017008696A (en) | 2017-01-12 |
Family
ID=57764362
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2015133903A Pending JP2017008696A (en) | 2015-06-16 | 2015-06-16 | Construction method for steel pipe pile foundation for being used in common for reduction in negative frictional force, ground compaction and the like |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2017008696A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115075228A (en) * | 2022-05-11 | 2022-09-20 | 中铁时代建筑设计院有限公司 | Connecting device of cast-in-place pipe pile water storage system, water storage system and construction method |
-
2015
- 2015-06-16 JP JP2015133903A patent/JP2017008696A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115075228A (en) * | 2022-05-11 | 2022-09-20 | 中铁时代建筑设计院有限公司 | Connecting device of cast-in-place pipe pile water storage system, water storage system and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Indraratna et al. | Soft soil foundation improved by vacuum and surcharge loading | |
Xiao | Geotechnical engineering design | |
CN106948340B (en) | A kind of construction method of the Manual excavated pile structure of high polymer grouting protection | |
CN107090842A (en) | A kind of processing method of the big thickness collapsible loess foundation in subway station | |
Indraratna et al. | Sustainable soil improvement via vacuum preloading | |
CN103967015B (en) | A kind of water seal for deep foundation pit excavation method and structure thereof | |
JP2006336434A (en) | Floatation-settlement preventing method for structure | |
CN104005416B (en) | The processing method of large diameter hole stake collapse hole under the conditions of a kind of plain fill back-pressure for high gradient slope | |
Tarawneh et al. | Lessons learned from 11 million m2 of dynamic compaction and replacement | |
JP2017008696A (en) | Construction method for steel pipe pile foundation for being used in common for reduction in negative frictional force, ground compaction and the like | |
Sun et al. | Pilot tests on methods to form working platform on soft clay | |
JP6277755B2 (en) | Ground improvement method and ground improvement system | |
CN104727289B (en) | A kind of construction method controlling multi-layered aquifer leakage-releasing water protection surrounding | |
Athanasopoulos et al. | Installation and performance of a steel sheet pile wall for supporting an excavation in urban environment | |
Spagnoli et al. | Trench cutter case histories and their possible application for offshore piles as relieve drilling | |
RU2534570C2 (en) | Method to create combined wall drainage with vertical collectors | |
Tan et al. | Methodology for design of piled raft for 5-story buildings on very soft clay | |
RU2380485C1 (en) | Landslide protection works | |
Panchal et al. | Physical modelling of lime stabilisation in soft soils around deep excavations | |
RU2579780C1 (en) | Multistage method of making sealing curtain (assembly) being built by "wall in ground" on slope with inclination of more than 3° | |
JP5850545B2 (en) | Improved ground structure near the pole and ground improvement method | |
Triastuti | Bore pile foundation tall buildings closed in the heritage building | |
Tang et al. | Construction Drainage | |
RU132810U1 (en) | PILED FOUNDATION WITH INTERMEDIATE SAND PILLOW | |
López-Acosta et al. | Numerical Modeling and Performance of Two Test Embankments Based on Surcharge Preloading, PVDs and Vacuum: Drain-to-Drain and Airtight Membrane |