JP2017008696A - Construction method for steel pipe pile foundation for being used in common for reduction in negative frictional force, ground compaction and the like - Google Patents

Construction method for steel pipe pile foundation for being used in common for reduction in negative frictional force, ground compaction and the like Download PDF

Info

Publication number
JP2017008696A
JP2017008696A JP2015133903A JP2015133903A JP2017008696A JP 2017008696 A JP2017008696 A JP 2017008696A JP 2015133903 A JP2015133903 A JP 2015133903A JP 2015133903 A JP2015133903 A JP 2015133903A JP 2017008696 A JP2017008696 A JP 2017008696A
Authority
JP
Japan
Prior art keywords
steel pipe
pipe pile
pile
piles
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2015133903A
Other languages
Japanese (ja)
Inventor
一榮 石井
Kazue Ishii
一榮 石井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2015133903A priority Critical patent/JP2017008696A/en
Publication of JP2017008696A publication Critical patent/JP2017008696A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a construction method for a steel pipe pile foundation for preventing liquefaction and consolidation settlement, in such a case that large construction machinery cannot be carried in.SOLUTION: Small construction machinery appropriate for a lot area is selected. A steel pipe foundation pile 1 is inserted to a predetermined depth by a welding joint when object ground is deep. Compression and consolidation are concurrently performed even in laminated ground by the concurrent use of compaction and forced drainage methods. The steel pipe foundation pile 1 serves not only as a pile but also as means capable of performing gravitational drainage.SELECTED DRAWING: Figure 1

Description

今後発生する地震に備え、液状化及び圧蜜沈下現象を前もって防止することを考慮し開発した工法である、新規に大規模に今後開発する場合は在来迄の各種地盤改良工法で良いが、小規模の場合、又は大型機械の搬入が困難な場合施工が困難でコスト高の要素が考えられるケースが多いので本工法を考案した。In preparation for earthquakes that will occur in the future, this method has been developed in consideration of preventing liquefaction and subsidence in advance.When newly developing on a large scale in the future, various conventional ground improvement methods may be used. This method was devised because there are many cases where construction is difficult and costly factors are considered when small-scale or large-scale machines are difficult to carry.

技術的背景Technical background

軟弱な砂質系地盤あるいはシルト及び粘土層の粘性系地盤改良工法としては各種締固め工法、各種脱水、固化工法、強制排水工法があるがこれらの工

Figure 2017008696
し、実施してきた背景があるThere are various compaction methods, various dewatering, solidification methods, and forced drainage methods for soft sandy soils or silt and clay layer viscous ground methods.
Figure 2017008696
And there is a background that has been implemented

沖積地盤の軟弱層の粘性系及び砂質系又は互層地盤の場合で堆積層が厚く施工機械も大型が必要とされるが小規模の場合敷地面積も小さく搬入路も狭い場所で施工することは課題である又経済的でない、In the case of alluvial ground's soft layer and sandy system or alternate layer ground, the sedimentary layer is thick and the construction machinery is required to be large, but in the case of a small scale it is necessary to construct in a place where the site area is small and the carry-in route is narrow The problem is not economical

課題を解決する手段Means to solve the problem

課題を解決する手段として施工機械は小型化し、搬入物は短くし目的に応じられる施工可能な工法として考案した工法である、尚土質力学的には十分マッチした工法として考案した工法である、As a means to solve the problem, the construction machine is reduced in size, the load is shortened and the construction method devised as a construction method that can be applied according to the purpose, the construction method devised as a construction method well matched in terms of soil mechanics,

発明の実施形態Embodiment of the Invention

実施に当たり土質調査を行い荷重条件に応じた設計をし圧縮、圧蜜沈下量を算出し、圧密、圧縮時間を算出し敷地面積に応じれる施工機械を選定し実施施工し圧縮、圧密沈下量を測定分析し、基礎梁工を構築し建造物を立ち上げる形態とするIn conducting the soil investigation, design according to the load conditions, calculating the compression and squeeze settlement amount, calculating the consolidation and compression time, selecting the construction machine according to the site area, and implementing the compression and consolidation settlement amount Measure and analyze, build foundation beam work and start building

負の摩擦力軽減及び地盤締固その他兼用鋼管基礎杭工法平面図Negative frictional force reduction and ground compaction and other combined steel pipe foundation pile method top view 負の摩擦力軽減及び地盤締固その他兼用鋼管基礎杭工法断面図Cross section of steel pipe foundation pile construction method for reducing negative frictional force and ground compaction 鋼管基礎杭詳細Steel pipe foundation pile details

1、鋼管基礎杭(長さ6m〜10m、複数リブ付き、スリット付き、切込砂利、又は硅砂7荒目砂3混合フィルター材中詰)
2、鋼管基礎杭(4隅と中心部、強制排水可能設備付き鋼管)
3、強制排水揚水管挿入済み鋼管
4、水平ドレーン有孔管(塩ビ75mm)
5、フィルター材(切込砂利、又は硅砂7荒目砂3混合材)
6、ケーシング付帯リブ
7、捨コンクリート
8、基礎梁
9、U字溝
10、振動締固め有効径範囲
11、基礎梁立ち上がり部
12、スリット加工(幅2mm×長さ20cm千鳥配置)
1. Steel pipe foundation pile (length 6m ~ 10m, with multiple ribs, with slits, cutting gravel, or paddy sand 7 coarse sand 3 mixed filter material filling)
2. Steel pipe foundation pile (4 corners and center, steel pipe with equipment capable of forced drainage)
3. Steel pipe with forced drainage pump inserted 4. Horizontal drain perforated pipe (PVC 75mm)
5. Filter material (cutting gravel or dredged sand 7 coarse sand 3 mixed material)
6, Rib with casing 7, Discard concrete 8, Foundation beam 9, U-shaped groove 10, Vibration compaction effective diameter range 11, Foundation beam rising part 12, Slit processing (width 2mm x length 20cm staggered arrangement)

負の摩擦力軽減及び地盤締固その他兼用鋼管基礎杭工法平面図  Negative frictional force reduction and ground compaction and other combined steel pipe foundation pile method top view 負の摩擦力軽減及び地盤締固その他兼用鋼管基礎杭工法断面図  Cross section of steel pipe foundation pile construction method for reducing negative frictional force and ground compaction

Claims (4)

本発明は液状化現象又は圧密沈下が生ずる地盤に一戸建て住宅又は一般的建造物を構築する場合に次の役割を兼用できる鋼管杭として開発したもので第1に建物を支持する杭として、第2は鋼管杭挿入時、鋼管杭を通じ周辺地盤を締固め改良が出来る杭として、第3に鋼管を通じて、地下水低下工法が出来る、第4に鋼管打設後更に地震が発生した場合、地震時発生する過剰間隙水を自然排水出来ることを兼ね備えた特殊鋼管杭を特許請求のはんいとする。The present invention was developed as a steel pipe pile that can be used for the following roles when building a detached house or a general structure on the ground where liquefaction phenomenon or consolidation subsidence occurs. Is a pile that can compact and improve the surrounding ground through the steel pipe pile when inserted into the steel pipe pile, and thirdly, the groundwater reduction method can be done through the steel pipe, and fourth, when an earthquake occurs after the steel pipe is placed, it occurs at the time of the earthquake A special steel pipe pile that can naturally drain excess pore water is claimed. 本発明鋼管杭は一般住宅又は小規模建造物の基礎として使用する場合の鋼管径は10cm〜30cmの範囲とし、住宅又は小規模建造物の単位当たりの加重の大きさと対象地盤の深度により鋼管径を変え、鋼管杭長は6m又は10mを一定長とし、対象地盤の深度により現場溶接ジョイント方式を取り所定深度迄挿入できる構造とする、The steel pipe pile of the present invention has a steel pipe diameter in the range of 10 cm to 30 cm when used as a foundation of a general house or a small building, and the steel pipe diameter depends on the weight per unit of the house or the small building and the depth of the target ground. The steel pipe pile length is set to a fixed length of 6 m or 10 m, and a structure that can be inserted up to a predetermined depth by adopting a field welding joint method according to the depth of the target ground, 鋼管杭6m又は10m長の下部20cm上がりから上部に2m〜3mのリブを複数取り付けた構造とし、リブ幅は管径の1/4までとした構造とする鋼管全周断面には幅2mm、長さ20cmの千鳥配置にスリットを設けた構造とし、強制排水及び自然排水の出来る構造とした鋼管杭を特許請求の範囲とする。Steel pipe pile 6m or 10m long 20cm from the bottom and a structure with a plurality of 2m to 3m ribs attached to the top, and the rib width is up to 1/4 of the pipe diameter. A steel pipe pile having a structure in which slits are provided in a staggered arrangement of 20 cm in length and capable of forced drainage and natural drainage is claimed. 一般住宅又は小規模建造物の基礎としての鋼管杭の平面的配置は対象面積内に均等に鋼管杭を配置し、建造物平面配置の4隅と中心部の鋼管杭は地下水位低下工法のとれる配置とし、その他鋼管杭は切り込み砂利又は2号硅砂7荒目砂3の割合の混合材を投入し、地震時過剰間隙水を自然排水の出来る構造とし、4隅及び中心部の鋼管杭は強制排水の出来る構造とし、水位低下による加重増加及び負圧を利用して圧縮、圧蜜を促進し、杭に与える負の摩擦力を前もって除去できる経済的安全な杭として兼用できる鋼管杭を特許請求の範囲とする。Planar layout of steel pipe piles as a foundation for ordinary houses or small buildings is to arrange steel pipe piles evenly within the target area, and the steel pipe piles at the four corners and the center of the building plane layout can be used for groundwater level lowering method. The other steel pipe piles are made of cut gravel or mixed material with a ratio of No. 2 dredged sand 7 coarse sand 3 so that excess pore water can be drained naturally during an earthquake, and the steel pipe piles at the four corners and the center are forced. Claims for steel pipe piles that can be used as economically safe piles that can be drained, promote compression and compaction using increased pressure and negative pressure due to water level drop, and eliminate negative frictional forces applied to piles in advance The range.
JP2015133903A 2015-06-16 2015-06-16 Construction method for steel pipe pile foundation for being used in common for reduction in negative frictional force, ground compaction and the like Pending JP2017008696A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015133903A JP2017008696A (en) 2015-06-16 2015-06-16 Construction method for steel pipe pile foundation for being used in common for reduction in negative frictional force, ground compaction and the like

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015133903A JP2017008696A (en) 2015-06-16 2015-06-16 Construction method for steel pipe pile foundation for being used in common for reduction in negative frictional force, ground compaction and the like

Publications (1)

Publication Number Publication Date
JP2017008696A true JP2017008696A (en) 2017-01-12

Family

ID=57764362

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015133903A Pending JP2017008696A (en) 2015-06-16 2015-06-16 Construction method for steel pipe pile foundation for being used in common for reduction in negative frictional force, ground compaction and the like

Country Status (1)

Country Link
JP (1) JP2017008696A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115075228A (en) * 2022-05-11 2022-09-20 中铁时代建筑设计院有限公司 Connecting device of cast-in-place pipe pile water storage system, water storage system and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115075228A (en) * 2022-05-11 2022-09-20 中铁时代建筑设计院有限公司 Connecting device of cast-in-place pipe pile water storage system, water storage system and construction method

Similar Documents

Publication Publication Date Title
Indraratna et al. Soft soil foundation improved by vacuum and surcharge loading
Xiao Geotechnical engineering design
CN106948340B (en) A kind of construction method of the Manual excavated pile structure of high polymer grouting protection
CN107090842A (en) A kind of processing method of the big thickness collapsible loess foundation in subway station
Indraratna et al. Sustainable soil improvement via vacuum preloading
CN103967015B (en) A kind of water seal for deep foundation pit excavation method and structure thereof
JP2006336434A (en) Floatation-settlement preventing method for structure
CN104005416B (en) The processing method of large diameter hole stake collapse hole under the conditions of a kind of plain fill back-pressure for high gradient slope
Tarawneh et al. Lessons learned from 11 million m2 of dynamic compaction and replacement
JP2017008696A (en) Construction method for steel pipe pile foundation for being used in common for reduction in negative frictional force, ground compaction and the like
Sun et al. Pilot tests on methods to form working platform on soft clay
JP6277755B2 (en) Ground improvement method and ground improvement system
CN104727289B (en) A kind of construction method controlling multi-layered aquifer leakage-releasing water protection surrounding
Athanasopoulos et al. Installation and performance of a steel sheet pile wall for supporting an excavation in urban environment
Spagnoli et al. Trench cutter case histories and their possible application for offshore piles as relieve drilling
RU2534570C2 (en) Method to create combined wall drainage with vertical collectors
Tan et al. Methodology for design of piled raft for 5-story buildings on very soft clay
RU2380485C1 (en) Landslide protection works
Panchal et al. Physical modelling of lime stabilisation in soft soils around deep excavations
RU2579780C1 (en) Multistage method of making sealing curtain (assembly) being built by "wall in ground" on slope with inclination of more than 3°
JP5850545B2 (en) Improved ground structure near the pole and ground improvement method
Triastuti Bore pile foundation tall buildings closed in the heritage building
Tang et al. Construction Drainage
RU132810U1 (en) PILED FOUNDATION WITH INTERMEDIATE SAND PILLOW
López-Acosta et al. Numerical Modeling and Performance of Two Test Embankments Based on Surcharge Preloading, PVDs and Vacuum: Drain-to-Drain and Airtight Membrane