JP2016205036A - Open shield method - Google Patents

Open shield method Download PDF

Info

Publication number
JP2016205036A
JP2016205036A JP2015089954A JP2015089954A JP2016205036A JP 2016205036 A JP2016205036 A JP 2016205036A JP 2015089954 A JP2015089954 A JP 2015089954A JP 2015089954 A JP2015089954 A JP 2015089954A JP 2016205036 A JP2016205036 A JP 2016205036A
Authority
JP
Japan
Prior art keywords
concrete box
open shield
joint
concrete
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2015089954A
Other languages
Japanese (ja)
Other versions
JP6039736B1 (en
Inventor
植村 誠
Makoto Uemura
誠 植村
賢治郎 植村
Kenjiro Uemura
賢治郎 植村
廣明 竹川
Hiroaki Takegawa
廣明 竹川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2015089954A priority Critical patent/JP6039736B1/en
Application granted granted Critical
Publication of JP6039736B1 publication Critical patent/JP6039736B1/en
Publication of JP2016205036A publication Critical patent/JP2016205036A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an open shield method, which enables a fixing bolt to be fastened and fixed for preventing displacement of box bodies to each other during construction (box body installation) based on the open shield method and also the fixing bolt to be loosened to be used as a flexible joint when a reaction force is not necessary for the box bodies, and can ensure waterproofness with a belt-like sealing material such as a rubber packing and a joint material before and after the flexible joint is made.SOLUTION: In an open shield method, a joint groove is formed on an inner end face of a concrete box body 4. When a new concrete box body 4 is suspended in a tail part of an open shield machine and connected to an existing concrete box body 4, a cushioning material is inserted between the concrete box bodies 4, a belt-like sealing material such as a rubber packing is set and those concrete box bodies 4 are fastened with each other with a fixing bolt. A liquid joint filler that becomes elastic after curing is charged into the joint groove formed between the combined concrete box bodies 4 to form a flexible joint.SELECTED DRAWING: Figure 1

Description

本発明は、市街地に上下水道、地下道等の地下構造物を施工するオープンシールド工法に関する。   The present invention relates to an open shield method for constructing underground structures such as water and sewage systems and underground passages in an urban area.

オープンシールド工法は、開削工法(オープンカット工法)とシールド工法の長所を生かした合理性に富む工法で、上部開放型シールド機(オープンシールド機)を使用して推進させ土砂崩壊を防ぎながら、その内部で函体布設を行う工法である。   The open shield method is a rational method that makes use of the advantages of the open cut method (open cut method) and the shield method, and is promoted using an upper open type shield machine (open shield machine) while preventing sediment collapse. This is a method of laying a box inside.

図7、図8にその概略を示すと、図中1はオープンシールド機で、これは左右の側壁板とこれら側壁板に連結する底板とからなる前面、後面及び上面を開口したシールド機である。   7 and 8, the outline is shown in FIG. 7. In FIG. 7, reference numeral 1 denotes an open shield machine, which is a shield machine having left and right side wall plates and bottom plates connected to these side wall plates, with front, rear and top surfaces opened. .

該オープンシールド機1は、機体を前後方向で複数に分割し、フロント部1aとしての前方の機体の後端にテール部1bとしての後方の機体の前端が嵌入して、相互の嵌合部で中折れ部2を形成して屈曲可能としている。   The open shield machine 1 is divided into a plurality of bodies in the front-rear direction, and the front end of the rear body as the tail portion 1b is fitted into the rear end of the front body as the front portion 1a. The middle bent portion 2 is formed to be bendable.

フロント部1aは主として掘削を行うもので、前端と上面を開放面としてあり、機体内で後部に後方へ向けて中折ジャッキを左右によせて、また上下複数段に配設した。   The front part 1a is mainly used for excavation, and has a front end and an upper surface as open surfaces. Inside the machine body, the middle jacks are arranged on the left and right and rearward and rearward in a plurality of stages.

これに対してテール部1bはコンクリート函体4の設置を行うもので、底板5を有し、機体内で前部に後方へ向けて推進ジャッキ(シールドジャッキ)3を左右によせて、また上下複数段に配設している。   On the other hand, the tail portion 1b is used to install the concrete box 4 and has a bottom plate 5, and the propulsion jack (shield jack) 3 is directed to the front and rear in the body, and is moved up and down. It is arranged in multiple stages.

図中6はフロント部1aの前端に設けたスライド土留板、8はプレスバー(押角)である。   In the figure, 6 is a slide earth retaining plate provided at the front end of the front portion 1a, and 8 is a press bar (push angle).

次に、このようなオープンシールド機1を用いたオープンシールド工法について説明すると、図示は省略するが、発進立坑内にこのオープンシールド機1を設置して、オープンシールド機1の推進ジャッキ3を伸長して発進坑内の反力壁に反力をとってオープンシールド機1を前進させ、地下構造物を形成する第1番目のコンクリート函体4をクレーン等の揚重機14により上方から吊り降し、オープンシールド機1のテール1b部内で縮めた推進ジャッキ3の後方にセットする。   Next, an open shield construction method using such an open shield machine 1 will be described. Although illustration is omitted, the open shield machine 1 is installed in the start shaft and the propulsion jack 3 of the open shield machine 1 is extended. Then, the open shield machine 1 is moved forward by taking the reaction force against the reaction wall in the starting pit, and the first concrete box 4 forming the underground structure is suspended from above by a lifting machine 14 such as a crane, It is set behind the propulsion jack 3 contracted in the tail 1b portion of the open shield machine 1.

ショベル等の掘削機7でオープンシールド機1の前面又は上面から土砂を掘削しかつ排土する。この排土工程と同時またはその後に推進ジャッキ3を伸長してオープンシールド機1を前進させる。   The excavator 7 such as an excavator excavates and removes soil from the front or upper surface of the open shield machine 1. At the same time as or after this earth removal step, the propulsion jack 3 is extended to advance the open shield machine 1.

そして前記第1番目のコンクリート函体4の前に第2番目のコンクリート函体4をオープンシールド機1のテール部1b内に吊り降す。以下、同様の排土工程、前進工程、コンクリート函体4のセット工程を適宜繰返して、順次コンクリート函体4をオープンシールド機1の前進に伴い縦列に地中に残置し、さらにこのコンクリート函体4の上面に埋戻しを施す。   Then, the second concrete box 4 is suspended in the tail portion 1 b of the open shield machine 1 in front of the first concrete box 4. Thereafter, the same soil removal process, advance process, and setting process of the concrete box 4 are repeated as appropriate, and the concrete boxes 4 are sequentially left in the ground as the open shield machine 1 moves forward. 4. Backfill the upper surface of 4.

なお、コンクリート函体4をオープンシールド機1のテール部1b内に吊り降す際には、コンクリートブロック等による高さ調整材をコンクリート函体4下に配設し、このテール部1b内でコンクリート函体4の左右および下部の空隙に瞬結性グラウト材を用いた裏込注入材9を充填して一次注入を行い、さらに、オープンシールド機1の前進後、二次注入として、コンクリート函体4の内側からグラウトホールにより、外側に裏込注入材9を注入する。   When the concrete box 4 is suspended in the tail part 1b of the open shield machine 1, a height adjusting material such as a concrete block is disposed under the concrete box 4 and the concrete part 4 is placed inside the tail part 1b. Filling the backside injection material 9 using the instantaneous setting grout material in the left and right and lower gaps of the box 4 to perform the primary injection, and after the open shield machine 1 moves forward, as a secondary injection, the concrete box Back injection material 9 is injected from the inside of 4 to the outside by a grout hole.

このようにして、オープンシールド機1が到達坑まで達したならばこれを撤去して工事を完了する。   In this way, if the open shield machine 1 reaches the reaching mine, it is removed and the construction is completed.

ところで、地中に縦列に埋設されるコンクリート函体4は、既設のコンクリート函体4に対して新たなコンクリート函体4をオープンシールド機1のテール部1b内に吊り降した際に定着ボルトで締結していき、定着部10が形成される。   By the way, the concrete boxes 4 buried in a column in the ground are fixed bolts when a new concrete box 4 is suspended in the tail portion 1b of the open shield machine 1 with respect to the existing concrete box 4. The fixing portion 10 is formed by fastening.

定着部10を形成するコンクリート函体4同士の接続は、図示は省略するがコーナー部に前後方向の貫通孔を設け、長ボルト等のPC鋼棒の緊結をもって縦列に並ぶものを接続していく。   The concrete boxes 4 forming the fixing unit 10 are connected to each other, although not shown in the drawing, through-holes in the front-rear direction are provided at the corners, and those connected in tandem are connected by tightly connecting PC steel bars such as long bolts. .

また、カラーと称せられるリング状で断面T字形の継手を前後位置のコンクリート函体4,4の間に介装し、このカラーで前後のコンクリート函体4を接続することもある。   Further, a ring-shaped joint having a T-shaped cross section called a collar may be interposed between the concrete boxes 4 and 4 at the front and rear positions, and the front and rear concrete boxes 4 may be connected by this collar.

ところで、かかるコンクリート函体4による地中構造物では、地震等の耐震対策や軟弱地盤における地盤沈対策として、コンクリート函体4同士の接続を可撓継手とすることが要求される。   By the way, in the underground structure by such a concrete box 4, it is requested | required that the connection of concrete boxes 4 should be made into a flexible joint as a countermeasure against earthquakes, such as an earthquake, and a ground subsidence in soft ground.

かかるコンクリート函体の可撓継手に関しては例えば、下記特許文献のようなものがある。
特開平9−60099号公報 特開2001−295251号公報
Regarding the flexible joint of such a concrete box, for example, there are the following patent documents.
JP-A-9-60099 JP 2001-295251 A

前記特許文献1は、中央に空間部を有する閉鎖断面のボックスカルバートを多数連結して設置することで、共同溝や下水道等を構築する時において、前記各ボックスカルバートの連結部に用いる可撓性連結構造であり、前記各ボックスカルバートの空間部周囲における各ボックスカルバートどうしの連結部には止水板が設けられていると共に、各ボックスカルバートの連結はPC鋼棒によって行われており、前記止水板は、設置地盤の軟弱化および地震等で生じる、前記各ボックスカルバートの設置位置の変位に対して、前記連結部の止水効果を維持しながら追従できるように構成されており、前記PC鋼棒は、前記止水板の設計変位量を越えた場合に、その変位を抑えて前記止水板の破損を防ぐことができると共に、自身の定着状態も前記止水板の設計変位に追従可能な定着部によって維持できるように構成されていることを特徴とするボックスカルバートにおける可撓性連結構造である。   Patent Document 1 discloses a flexible structure that is used for connecting portions of the box culverts when constructing joint grooves and sewers by connecting and installing a large number of closed cross-section box culverts having a space in the center. The box culvert is provided with a water stop plate at the connection portion between the box culverts around the space of the box culverts, and the box culverts are connected by a PC steel rod. The water plate is configured to follow the displacement of the installation position of each box culvert that occurs due to softening of the installation ground, earthquake, etc., while maintaining the water stop effect of the connecting portion, and the PC When the steel rod exceeds the design displacement amount of the water stop plate, the steel bar can suppress the displacement and prevent the water stop plate from being damaged. It is flexible coupling structure in box culvert, characterized in that is configured to be maintained by the fixing portion capable of following the design displacement water plate.

特許文献2は、一対のコンクリート函体と、このコンクリート函体の各接合端面同士を接続した接合部からなるプレキャストカルバートの可撓継手構造において、前記接合部は、前記各接合端面の内部に各端部が埋設された固体型可撓性連結部材と、前記各接合端面同士の隙間に充填された可撓性部材と、前記一対のコンクリート函体の接合部の外周面および/または内周面に形成された凹部に充填された、充填時に液状で硬化後にゴム弾性機能を持つ充填型可撓性部材とから構成されていることを特徴とするプレキャストカルバートの可撓継手構造である。   Patent Document 2 discloses a flexible joint structure of a precast culvert composed of a pair of concrete boxes and joints connecting the joint end faces of the concrete box, and the joints are provided inside the joint end faces. A solid-type flexible connecting member with embedded end portions, a flexible member filled in a gap between the joint end surfaces, and an outer peripheral surface and / or an inner peripheral surface of the joint portion of the pair of concrete boxes A flexible joint structure of a precast culvert, which is composed of a filling type flexible member which is filled in a concave portion and which is liquid at the time of filling and has a rubber elastic function after being cured.

オープンシールド工法では、ショベル等の掘削機でオープンシールド機の前面又は上面から土砂を掘削しかつ排土し、この排土工程と同時またはその後に推進ジャッキを伸長してオープンシールド機を前進させるもので、コンクリート函体はジャッキ推力の反力を受けるため設置時にはしっかりとした締結が要求され、その後、コンクリート函体4同士の接続を可撓継手とすることが求められる。   In the open shield method, excavator such as excavator excavates and removes soil from the front or top surface of the open shield machine, and advances the open shield machine by extending the propulsion jack at the same time or after this earth removal process. Thus, since the concrete box receives a reaction force of the jack thrust, a firm fastening is required at the time of installation, and thereafter, the connection between the concrete boxes 4 is required to be a flexible joint.

本発明の目的はこのようなオープンシールド工法の特殊性を考慮して、オープンシールド工法の施工時(函体据付時)は函体と函体のずれ防止用に定着ボルトを締付定着でき、函体に反力が必要なくなったときにボルト定着部を緩めて可撓継手とすることができるとともに、ゴムパッキング等による帯状シール材と目地材との双方で行うので確実であり、止水性は可撓継手とする前と後とのいずれの場合でも止水性はいずれの場合でも確保できるオープンシールド工法を提供することにある。   The purpose of the present invention is to consider the special characteristics of the open shield method, and when fixing the open shield method (when installing the box), the fixing bolt can be fastened and fixed to prevent the box and box from slipping, When the reaction force on the box is no longer needed, the bolt fixing part can be loosened to make a flexible joint, and it is reliable because it is done with both a band-like sealant and joint material by rubber packing etc. An object of the present invention is to provide an open shield method that can ensure water-stopping in any case before and after forming a flexible joint.

前記目的を達成するため本発明は、左右側壁板の内側に推進ジャッキを配設し、前面、後面及び上面を開口したオープンシールド機の前面又は上面開口より前方の土砂を掘削排土する工程と、推進ジャッキを伸長して左右側板と上床板と下床板とからなるコンクリート函体を反力にしてシールド機を前進させる工程と、シールド機のテール部内で縮めた推進ジャッキの後方に新たなコンクリート函体を上方から吊り降して既設コンクリート函体に接合する据え付け工程とを適宜繰り返して順次コンクリート函体を縦列に埋設するオープンシールド工法において、コンクリート函体の内方端面に目地溝を形成し、既設のコンクリート函体に対して新たなコンクリート函体をオープンシールド機のテール部内に吊り降して接続する際に、コンクリート函体間にゴム等のクッション材を介在させ、かつ、ゴムパッキング等による帯状シール材を配設して、コンクリート函体相互は定着ボルトで締結し、また、コンクリート函体相互で形成する合体目地溝内に充填時に液状で硬化後弾性状となる目地材を充填して可撓継手として形成することを要旨とするものである。   In order to achieve the above-mentioned object, the present invention includes a step of excavating and discharging soil in front of the front or upper surface opening of an open shield machine in which a propulsion jack is disposed inside the left and right side wall plates, and the front, rear and upper surfaces are opened. The process of advancing the shield machine using the concrete box composed of the left and right side panels, the upper floor board, and the lower floor board as a reaction force to extend the propulsion jack, and the new concrete behind the propulsion jack shrunk in the tail part of the shield machine In the open shield method of burying concrete boxes in tandem by repeating the installation process of hanging the box from above and joining it to the existing concrete box, joint grooves are formed on the inner end face of the concrete box. When a new concrete box is suspended from the existing concrete box in the tail part of the open shield machine and connected, A rubber cushion or other cushioning material is interposed between the two boxes, and a belt-like sealing material such as rubber packing is arranged. The concrete boxes are fastened with fixing bolts, and the concrete boxes are formed with each other. The gist of the invention is to form a flexible joint by filling the joint groove with a joint material that is liquid and becomes elastic after curing.

本発明によれば、オープンシールド工法の施工時(函体据付時)は定着ボルトを締付定着することで、ジャッキ推力の反力を受けても函体と函体のずれ防止を行うことができ、しかも、ゴム等のクッション材の反発弾性が定着ボルトの緩み防止と、コンクリート函体の接続部において端面同士が部分的にしか接触しない所謂ポイントタッチが生じ、当該接触部分に応力が集中してコンクリートが破損してしまうおそれを防止できる。   According to the present invention, during the construction of the open shield method (when the box is installed), the fixing bolt is tightened and fixed, so that the box and box can be prevented from slipping even when the reaction force of the jack thrust is received. In addition, the rebound resilience of cushioning materials such as rubber prevents the fixing bolts from loosening, and the so-called point touch where the end faces are only partially in contact with each other at the connecting part of the concrete box, stress is concentrated on the contact part. Can prevent the concrete from being damaged.

また、コンクリート函体の接続部の止水に関しては、コンクリート函体の端面に貼設した帯状シール材が相互に圧接することと、コンクリート函体相互で形成する合体目地溝内に充填した目地材で止水が確保できる。このようにゴムパッキング等による帯状シール材と目地材との双方で行うのでいずれか一方が不完全でも止水が確実である。   In addition, with regard to the water stoppage of the connection part of the concrete box, the joint material filled in the union joint groove formed between the concrete box and the band-shaped sealing material affixed to the end face of the concrete box The water stop can be secured. Thus, since it carries out by both the strip-shaped sealing material by rubber packing etc. and joint material, even if any one is incomplete, water stop is reliable.

一方、函体に反力が必要なくなったときにボルト定着部を緩めて、コンクリート函体の挙動に追従できる可撓継手とすることができ、その場合に合体目地溝内に充填した目地材は硬化後ゴム弾性状となるものなのでボルト定着部を緩めて、コンクリート函体が変位しても伸展し、止水の確保は継続できる。   On the other hand, when the reaction force on the box is no longer needed, the bolt fixing part can be loosened to make a flexible joint that can follow the behavior of the concrete box. In that case, the joint material filled in the joint joint groove is Since it becomes rubber elastic after curing, the bolt fixing part can be loosened, and even if the concrete box is displaced, it can extend and keep water still.

以上述べたように本発明のオープンシールド工法は、オープンシールド工法の施工時(函体据付時)は函体と函体のずれ防止用に定着ボルトを締付定着でき、函体に反力が必要なくなったときにボルト定着部を緩めて可撓継手とすることができるとともに、ゴムパッキング等による帯状シール材と目地材との双方で行うので確実であり、止水性は可撓継手とする前と後とのいずれの場合でも確保できるものである。   As described above, the open shield method of the present invention can fix the fixing bolt to prevent the box from slipping when the open shield method is installed (when the box is installed). When it is no longer needed, the bolt fixing part can be loosened to make a flexible joint, and since it is performed with both a band-like sealing material and a joint material made of rubber packing, etc., it is reliable. It can be secured in both cases.

以下、図面について本発明の実施の形態を詳細に説明する。図1は本発明のオープンシールド工法において使用するコンクリート函体を示すもので、コンクリート函体4は鉄筋コンクリート製またはPCコンクリート製のもので、左側板4a、右側板4bと上床板4cと下床板4dとからなるもので、前後面が開口として開放されている。   Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. FIG. 1 shows a concrete box used in the open shield method of the present invention. The concrete box 4 is made of reinforced concrete or PC concrete, and includes a left side plate 4a, a right side plate 4b, an upper floor plate 4c, and a lower floor plate 4d. The front and rear surfaces are open as openings.

さらに、コンクリート函体4は相互に接合する場合のインサート(ボルト挿入孔)12を設けている。   Furthermore, the concrete box 4 is provided with an insert (bolt insertion hole) 12 for joining together.

このインサート(ボルト挿入孔)12から先は図5に示すようにシース孔16として形成され、その先に定着部10が形成されるための箱抜き穴がある。   The tip of the insert (bolt insertion hole) 12 is formed as a sheath hole 16 as shown in FIG. 5, and a box opening hole for forming the fixing portion 10 is provided at the tip.

また、コンクリート函体4は地下構造物として耐震性を持たせるため可撓継手とするもので、本発明は、コンクリート函体4間にゴム等のクッション材11を介在させ、かつ、ゴムパッキング等による帯状シール材13を配設している。   Moreover, the concrete box 4 is a flexible joint for providing earthquake resistance as an underground structure, and the present invention interposes a cushion material 11 such as rubber between the concrete boxes 4 and rubber packing or the like. A belt-like sealing material 13 is provided.

クッション材11は、コンクリート函体4の左側板4a、右側板4bの端面を上下に沿って覆うものとして、幅広の帯板である。   The cushion material 11 is a wide band plate that covers the end surfaces of the left side plate 4a and the right side plate 4b of the concrete box 4 along the vertical direction.

シール材13は、図2、図3にも示すようにコンクリート函体4の端面に形成する周方向に伸びる浅い溝に貼設する断面矩形(20mm×30mm)の帯状シール材で、弾性圧縮性がある。   The sealing material 13 is a belt-shaped sealing material having a rectangular cross section (20 mm × 30 mm) pasted in a shallow groove extending in the circumferential direction formed on the end face of the concrete box 4 as shown in FIGS. There is.

また、コンクリート函体4の内方端面に目地溝20aを形成し、コンクリート函体4が相互に接続する際にはこれら目地溝20a同士で合体目地溝20が形成されるようにした。   Moreover, the joint groove 20a was formed in the inner end surface of the concrete box 4, and when the concrete box 4 connected mutually, the joint groove 20 was formed by these joint grooves 20a.

なお、オープンシールド工法の概要については、前記図7、図8で説明した通りであり、発進立坑内にこのオープンシールド機1を設置して、オープンシールド機1の推進ジャッキ3を伸長して発進坑内の反力壁に反力をとってオープンシールド機1を前進させ、地下構造物を形成する第1番目のコンクリート函体4をクレーン等の揚重機14により上方から吊り降し、オープンシールド機1のテール1b部内で縮めた推進ジャッキ3の後方にセットする。   The outline of the open shield construction method is as described with reference to FIGS. 7 and 8. The open shield machine 1 is installed in the start shaft, and the propulsion jack 3 of the open shield machine 1 is extended to start. The open shield machine 1 is moved forward by taking the reaction force against the reaction wall in the mine, and the first concrete box 4 forming the underground structure is suspended from above by a lifting machine 14 such as a crane. 1 is set behind the propulsion jack 3 contracted in the tail 1b portion.

ショベル等の掘削機7でオープンシールド機1の前面又は上面から土砂を掘削しかつ排土する。この排土工程と同時またはその後に推進ジャッキ3を伸長してオープンシールド機1を前進させる。   The excavator 7 such as an excavator excavates and removes soil from the front or upper surface of the open shield machine 1. At the same time as or after this earth removal step, the propulsion jack 3 is extended to advance the open shield machine 1.

そして前記第1番目のコンクリート函体4の前に第2番目のコンクリート函体4をオープンシールド機1のテール部1b内に吊り降す。以下、同様の排土工程、前進工程、コンクリート函体4のセット工程を適宜繰返して、順次コンクリート函体4をオープンシールド機1の前進に伴い縦列に地中に残置し、さらにこのコンクリート函体4の上面に埋戻しを施す。   Then, the second concrete box 4 is suspended in the tail portion 1 b of the open shield machine 1 in front of the first concrete box 4. Thereafter, the same soil removal process, advance process, and setting process of the concrete box 4 are repeated as appropriate, and the concrete boxes 4 are sequentially left in the ground as the open shield machine 1 moves forward. 4. Backfill the upper surface of 4.

このようにして、オープンシールド機1が到達坑まで達したならばこれを撤去して工事を完了する。   In this way, if the open shield machine 1 reaches the reaching mine, it is removed and the construction is completed.

本発明のオープンシールド工法も新たなコンクリート函体4をオープンシールド機のテール部内に吊り降ろして、既設のコンクリート函体4に接続させるもので、位置決めとしてガイドピン挿入孔15にガイドピン(図示せず)を挿入する。   The open shield method of the present invention also suspends a new concrete box 4 from the tail part of an open shield machine and connects it to the existing concrete box 4 and guide pins (not shown) are inserted into the guide pin insertion holes 15 for positioning. Insert).

また、シース孔16に抜け出し防止用金具として定着ボルト17を挿通させ、定着部10において定着部プレート21を介在させてナット22で締結する。   Further, the fixing bolt 17 is inserted into the sheath hole 16 as a metal fitting for preventing it from coming out, and the fixing unit 10 is fastened with the nut 22 with the fixing unit plate 21 interposed therebetween.

コンクリート函体4の接続の際には、合体目地溝20内にバックアップ材23と弾性目地材24を充填してシールする。   When the concrete box 4 is connected, the union joint groove 20 is filled with the backup material 23 and the elastic joint material 24 and sealed.

弾性目地材24としては、例えば、伸縮性・耐久性を有する変成シリコーン樹脂とエポキシ樹脂の2液を混合させ、硬化後弾性状となり、目地の動きに追従し、かつ止水性を発揮できる目地材を使用するが、目地部への接着性と、充填後地震時のコンクリート函体の変位に追従性を有するものであれば、他の目地材でも良い。   As the elastic joint material 24, for example, two liquids of a modified silicone resin having elasticity and durability and an epoxy resin are mixed, become elastic after curing, follow the movement of the joint, and exhibit water-stopping properties. However, other joint materials may be used as long as they have adhesion to the joint portion and followability to the displacement of the concrete box during an earthquake after filling.

新たなコンクリート函体4を設置するまでは図2、図3の(a)に示すようにシール材13同士は離れているが、掘進時として図4の(a)にナット22を仮締めすると、図2、図3の(b)に示すようにシール材13同士は潰れた状態で相互に圧接する。   Until the new concrete box 4 is installed, the sealing members 13 are separated from each other as shown in FIG. 2 and FIG. 3A. However, when the nut 22 is temporarily tightened in FIG. 2 and 3B, the sealing materials 13 are in pressure contact with each other in a crushed state.

また、既設のコンクリート函体4に貼り付けてあるクッション材11はコンクリート函体4同士で挟着される。   Further, the cushion material 11 attached to the existing concrete box 4 is sandwiched between the concrete boxes 4.

掘進が終わりコンクリート函体4に反力が必要なくなった時に定着ボルト17を緩め、緩衝ゴムリングによる緩衝材18を介在させて定着ボルト17を固定し、定着部10でボルト端部周囲に無収縮モルタル19を充填して可撓継手として形成する。   When the excavation is completed and the reaction force is no longer necessary for the concrete box 4, the fixing bolt 17 is loosened, and the fixing bolt 17 is fixed by interposing a cushioning material 18 with a buffer rubber ring. The mortar 19 is filled to form a flexible joint.

次に、地震時のコンクリート函体4の変位について説明すると、図6に示すように、コンクリート函体4の接続時およびその後に通常時に対して地震時は曲げ状態となってコンクリート函体4相互の継手に開きや圧縮が生じる場合や、抜け状態となって開きを生じる場合がある。   Next, the displacement of the concrete box 4 at the time of an earthquake will be described. As shown in FIG. In some cases, opening and compression of the joints may occur, or in a disconnected state, opening may occur.

抜け状態の場合は、コンクリート函体4相互が目地が開くように挙動し、曲げ状態の場合もコンクリート函体4相互が目地が開くように挙動するが、定着ボルト17が抜け出し防止金具として作用し、図4(C)に示すように緩衝材18が潰れるように変形し、コンクリート函体4の変化に追随する。   The concrete box 4 behaves as if the joints are open in the detached state, and the concrete box 4 behaves as if the joints are opened in the bent state. 4 (C), the cushioning material 18 is deformed so as to be crushed, and follows the change of the concrete box 4.

また、この時図2、図3の(c)に示すようにシール材13同士は潰れた状態が多少緩むが相互の圧接は維持され、止水性は確保される。   Further, at this time, as shown in FIG. 2 and FIG. 3C, the seal members 13 are slightly crushed, but the pressure contact between them is maintained, and the water stopping property is secured.

さらに、弾性目地材24は目地間隔が広がった場合でも隙間に追従し、止水を継続する。   Furthermore, the elastic joint material 24 follows the gap even when the joint interval is widened, and continues water stopping.

本発明のオープンシールド工法に使用するコンクリート函体の1実施形態を示す斜視図である。It is a perspective view which shows one Embodiment of the concrete box used for the open shield method of this invention. 図1のA矢視図で、函体状態に応じた変化を示す説明図である。It is explanatory drawing which shows the change according to a box state by A arrow view of FIG. 図1のB矢視図で、函体状態に応じた変化を示す説明図である。It is explanatory drawing which shows the change according to a box state by the arrow B figure of FIG. 定着部の函体状態に応じた変化を示す説明図である。It is explanatory drawing which shows the change according to the box state of a fixing | fixed part. コンクリート函体の側面図である。It is a side view of a concrete box. 地震時のコンクリート函体の変位を示す説明図である。It is explanatory drawing which shows the displacement of the concrete box at the time of an earthquake. オープンシールド工法の函体据付時の説明図である。It is explanatory drawing at the time of box installation of an open shield construction method. オープンシールド工法の函体接続時の説明図である。It is explanatory drawing at the time of the box connection of an open shield construction method. オープンシールド工法での完成した地下構造物の側面図である。It is a side view of the completed underground structure by the open shield method.

1…オープンシールド機 1a…フロント部
1b…テール部 2…中折れ部
3…推進ジャッキ(シールドジャッキ)
4…コンクリート函体 4a…左側板
4b…右側板 4c…上床板
4d…下床板
5…底板 6…スライド土留板
7…掘削機 8…プレスバー(押角)
9…裏込注入材 10…定着部
11…クッション材 12…インサート(ボルト挿入孔)
13…シール材 14…揚重機
15…ガイドピン挿入孔 16…シース孔
17…定着ボルト 18…緩衝材
19…無収縮モルタル 20…合体目地溝
20a…目地溝
21…定着部プレート 22…ナット
23…バックアップ材 24…弾性目地材
DESCRIPTION OF SYMBOLS 1 ... Open shield machine 1a ... Front part 1b ... Tail part 2 ... Folding part 3 ... Propulsion jack (shield jack)
4 ... Concrete box 4a ... Left side plate 4b ... Right side plate 4c ... Upper floor plate 4d ... Lower floor plate 5 ... Bottom plate 6 ... Slide retaining plate 7 ... Excavator 8 ... Press bar (push angle)
9 ... Back injection material 10 ... Fixing part 11 ... Cushion material 12 ... Insert (bolt insertion hole)
DESCRIPTION OF SYMBOLS 13 ... Sealing material 14 ... Lifting machine 15 ... Guide pin insertion hole 16 ... Sheath hole 17 ... Fixing bolt 18 ... Buffer material 19 ... Non-shrink mortar 20 ... Combined joint groove 20a ... Joint groove 21 ... Fixing part plate 22 ... Nut 23 ... Backup material 24 ... Elastic joint material

Claims (1)

左右側壁板の内側に推進ジャッキを配設し、前面、後面及び上面を開口したオープンシールド機の前面又は上面開口より前方の土砂を掘削排土する工程と、推進ジャッキを伸長して左右側板と上床板と下床板とからなるコンクリート函体を反力にしてシールド機を前進させる工程と、シールド機のテール部内で縮めた推進ジャッキの後方に新たなコンクリート函体を上方から吊り降して既設コンクリート函体に接合する据え付け工程とを適宜繰り返して順次コンクリート函体を縦列に埋設するオープンシールド工法において、
コンクリート函体の内方端面に目地溝を形成し、コンクリート函体の端面に相互に圧接可能な帯状シール材を貼設し、
既設のコンクリート函体に対して新たなコンクリート函体をオープンシールド機のテール部内に吊り降して接続する際に、コンクリート函体間にゴム等のクッション材を介在させてコンクリート函体相互は定着ボルトで締結して帯状シール材相互を圧接させ、また、コンクリート函体相互で形成する合体目地溝内に充填時に液状で硬化後弾性状となる目地材を充填して可撓継手として形成することを特徴とするオープンシールド工法。
Protrusion jacks are disposed inside the left and right side wall plates, and a step of excavating and discharging the earth and sand ahead of the front or upper surface opening of the open shield machine having the front, rear and upper surfaces opened, The process of advancing the shield machine with the reaction of the concrete box composed of the upper floor board and the lower floor board, and a new concrete box hung from the upper side behind the propulsion jack shrunk in the tail part of the shield machine. In the open shield method of burying concrete boxes in columns one after another by repeating the installation process to join the concrete box as appropriate,
A joint groove is formed on the inner end face of the concrete box, and a band-shaped sealing material that can be pressed against each other is pasted on the end face of the concrete box.
When a new concrete box is suspended and connected to the existing concrete box in the tail part of an open shield machine, a cushioning material such as rubber is interposed between the concrete boxes to fix the concrete box to each other. Fastened with bolts to press the band-shaped sealing materials together, and the joint joint groove formed between the concrete boxes is filled with a joint material that is liquid and elastic after hardening to form a flexible joint. Open shield construction method characterized by
JP2015089954A 2015-04-27 2015-04-27 Open shield method Active JP6039736B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015089954A JP6039736B1 (en) 2015-04-27 2015-04-27 Open shield method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015089954A JP6039736B1 (en) 2015-04-27 2015-04-27 Open shield method

Publications (2)

Publication Number Publication Date
JP6039736B1 JP6039736B1 (en) 2016-12-07
JP2016205036A true JP2016205036A (en) 2016-12-08

Family

ID=57483189

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015089954A Active JP6039736B1 (en) 2015-04-27 2015-04-27 Open shield method

Country Status (1)

Country Link
JP (1) JP6039736B1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001295251A (en) * 2000-04-13 2001-10-26 Kobe Steel Ltd Flexible joint structure for precast culvert
JP2008038529A (en) * 2006-08-09 2008-02-21 Makoto Uemura Concrete caisson
JP2009114643A (en) * 2007-11-02 2009-05-28 Makoto Uemura Connecting structure of underground structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001295251A (en) * 2000-04-13 2001-10-26 Kobe Steel Ltd Flexible joint structure for precast culvert
JP2008038529A (en) * 2006-08-09 2008-02-21 Makoto Uemura Concrete caisson
JP2009114643A (en) * 2007-11-02 2009-05-28 Makoto Uemura Connecting structure of underground structure

Also Published As

Publication number Publication date
JP6039736B1 (en) 2016-12-07

Similar Documents

Publication Publication Date Title
EP1279882B1 (en) Duct repairing material, repairing structure, and repairing method
KR101433344B1 (en) Method for constructing a culvet structure assembly
JP5686693B2 (en) Invert construction method and precast member
JP2009114643A (en) Connecting structure of underground structure
JP5944970B2 (en) Open shield method
JP6039734B1 (en) Open shield method
JP2010095932A (en) Water cut-off joint
JP6254657B1 (en) Flexible joint structure of concrete box
KR101463427B1 (en) Composite type steel temporary construction and construction method thereof
JP5989718B2 (en) Concrete box used for open shield method
JP4598731B2 (en) Concrete box
JP6290986B2 (en) Open shield method using concrete box with flexible joint
JP6039736B1 (en) Open shield method
JP6039735B1 (en) Open shield method
JP3127038U (en) Box culvert
JP6568897B2 (en) Open shield method and concrete box used for it
KR100950956B1 (en) Under-drain block
CN110671114B (en) Recovery type round vertical shaft supporting device and method
JP6139631B2 (en) Waterproof joint method for concrete box for open shield method
JP6979417B2 (en) Arrangement method of sealing material for flexible joint of concrete box for open shield method
JP6307135B2 (en) Open shield method
JP6636989B2 (en) Open shield method and concrete box used for it
JP5727863B2 (en) Water stop member for manhole repair and manhole repair method
JP2019157621A (en) Composite segment
JP6321710B2 (en) Concrete box for open shield method

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20161101

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20161104

R150 Certificate of patent or registration of utility model

Ref document number: 6039736

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250