JP2016076077A - Schedule management system, method, and program - Google Patents

Schedule management system, method, and program Download PDF

Info

Publication number
JP2016076077A
JP2016076077A JP2014205888A JP2014205888A JP2016076077A JP 2016076077 A JP2016076077 A JP 2016076077A JP 2014205888 A JP2014205888 A JP 2014205888A JP 2014205888 A JP2014205888 A JP 2014205888A JP 2016076077 A JP2016076077 A JP 2016076077A
Authority
JP
Japan
Prior art keywords
construction
service
availability
data
schedule
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2014205888A
Other languages
Japanese (ja)
Other versions
JP6296956B2 (en
Inventor
和哉 竹内
Kazuya Takeuchi
和哉 竹内
久詞 加藤
Hisashi Kato
久詞 加藤
政幸 林
Masayuki Hayashi
政幸 林
正道 竹田
Masamichi Takeda
正道 竹田
勝 道野
Masaru Michino
勝 道野
隆夫 窪田
Takao Kubota
隆夫 窪田
拓司 田上
Takuji Tagami
拓司 田上
活昭 渡邉
Katsuaki Watanabe
活昭 渡邉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NTT Comware Corp
Original Assignee
NTT Comware Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NTT Comware Corp filed Critical NTT Comware Corp
Priority to JP2014205888A priority Critical patent/JP6296956B2/en
Publication of JP2016076077A publication Critical patent/JP2016076077A/en
Application granted granted Critical
Publication of JP6296956B2 publication Critical patent/JP6296956B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

PROBLEM TO BE SOLVED: To present accurate operation availability data indicating the availability of work teams in a designated work block, even when a plurality of work teams separately take charge of a plurality of work blocks.SOLUTION: A data acquisition unit 16 confirms a work team that takes charge of a designated work block with the in-charge block data of an in-charge block setting database 11, acquires operation possibility data pertaining to these work teams in charge from an operation possibility setting database 12, and acquires schedule data pertaining to these work teams in charge from a schedule management book database 13. An availability presentation unit 17 totals operation availability pertaining to each work team in charge of the work block on the basis of the acquired operation possibility data and schedule data, generates an approximate work calendar indicating daily operation availability on the basis of the obtained totalization result, and presents the generated approximate work calendar as operation availability data pertaining to the work block.SELECTED DRAWING: Figure 1

Description

本発明は、スケジュール管理技術に関し、特に異なる複数のサービス提供場所で発生する各サービスを複数のサービス提供者が手分けして担当する際、サービス提供場所ごとに当該サービス提供場所を担当する各サービス提供者の空き状況を管理するスケジュール管理技術に関する。   The present invention relates to a schedule management technique, and in particular, when each service occurring at a plurality of different service providing locations is handled by a plurality of service providers, each service providing is in charge of the service providing location for each service providing location. The present invention relates to a schedule management technique for managing a person's availability.

近年、インターネットの普及に伴い、サービス提供者が提供するサービスを、利用者がインターネットを介して予約するスケジュール管理技術が広く利用されつつある。
従来、このようなスケジュール管理技術の1つとして、インターネットを介して利用者からサービスの利用予約を受け付ける予約受付システムが提案されている(例えば、特許文献1など参照)。
In recent years, with the spread of the Internet, a schedule management technique in which a user reserves a service provided by a service provider via the Internet is being widely used.
Conventionally, as one of such schedule management techniques, a reservation acceptance system that accepts service use reservations from users via the Internet has been proposed (see, for example, Patent Document 1).

この予約受付システムでは、インターネットを介して利用者端末からアクセスがあった場合、サーバがサービスの利用可否を示す稼働空き状況データを利用者端末に提示して画面表示し、これに応じて利用者端末での予約可能日の選択操作に応じて、サーバが当該予約可能日におけるサービスの予約を受け付けるものとなっている。これにより、電話受付と比較して、誤りなく正確にサービス予約を受け付けることができるとともに、予約受付に要する作業負担を大幅に削減することができる。   In this reservation reception system, when there is an access from a user terminal via the Internet, the server presents operating availability data indicating whether the service can be used or not to the user terminal and displays it on the screen. The server accepts a reservation for a service on the available reservation date according to a selection operation on the available reservation date on the terminal. This makes it possible to accept service reservations accurately and without error as compared to telephone reception, and to greatly reduce the work burden required for reservation reception.

特開2001−216349号公報JP 2001-216349 A 特開2014−092896号公報JP 2014-092896 A

ビジネスホンなどの特殊な設備を設置する場合、専門的な知識や技術を持つ工事班が設備を設置するための設備工事を行うものとなっている。この際、利用者から設備工事の依頼があった場合、指定された工事日に対応可能な工事班が存在するかどうか、工事班のスケジュールを確認して、工事日の予約を受け付ける必要がある。したがって、設備工事を一種のサービス提供と捉えれば、前述した従来の予約受付システムを設備工事のスケジュール管理業務に適用して、設備工事の空き状況を示す稼働空き状況データを提示することが検討される。   When installing special equipment such as a business phone, a construction team with specialized knowledge and technology will perform equipment construction to install the equipment. At this time, if there is a request for equipment construction from the user, it is necessary to check the schedule of the construction team to see if there is a construction team that can handle the designated construction date and to accept the construction day reservation. . Therefore, if facility construction is regarded as a type of service provision, it is considered to apply the above-mentioned conventional reservation reception system to facility construction schedule management work and present operational availability data indicating the availability of facility construction. The

ここで、従来技術にかかるスケジュール管理技術で想定しているサービス提供形態は、マッサージ、医者、美容院などに代表されるように、予め決められた固定的なサービス提供場所でサービスを提供する形態であり、サービス提供場所とサービス提供者とは、1:N(Nは1以上の整数)の関係にある。このため、従来技術では、サービス提供者に空きがあれば、基本的には制約なく利用者にサービスを提供できることが前提となっている。   Here, the service provision form assumed in the schedule management technique according to the prior art is a form in which service is provided at a predetermined fixed service provision place, as represented by massage, doctor, beauty salon, etc. The service providing place and the service provider have a relationship of 1: N (N is an integer of 1 or more). For this reason, in the prior art, if there is a vacancy in the service provider, it is basically assumed that the service can be provided to the user without restriction.

一方、設備工事を受け付ける場合、効率よく設備工事を行うため、複数の工事班で手分けして設備工事を担当するものとなっている。この際、工事班の拠点と設備工事を行う範囲すなわち工事ブロックとの地理的関係に応じて各工事班が担当可能な工事ブロックが限定される。これは拠点から工事現場まで移動する時間が工事作業の効率に影響するからである。また、各工事ブロックにおいて設備工事は定期的に発生するのではなく不規則に発生する。
したがって、効率よく設備工事を行うためには、複数の工事ブロックを複数の工事班が手分けして担当する形態が適切であり、工事ブロックと工事班との関係は、M:N(M,Nは2以上の整数)の関係となる。
On the other hand, when accepting facility construction, in order to perform the facility construction efficiently, the construction work is performed in charge by a plurality of construction teams. At this time, the construction blocks that each construction team can handle are limited according to the geographical relationship between the construction team base and the facility construction, that is, the construction block. This is because the time taken from the base to the construction site affects the efficiency of the construction work. In addition, in each construction block, facility construction occurs irregularly rather than periodically.
Therefore, in order to efficiently perform the facility construction, it is appropriate that a plurality of construction teams divide and take charge of a plurality of construction blocks, and the relationship between the construction blocks and the construction team is M: N (M, N Is an integer of 2 or more.

このため、設備工事を受け付ける場合、当該設備工事の工事場所が含まれる工事ブロックにおける工事スケジュールだけを確認するだけではなく、当該工事ブロックを担当する各工事班について、これら工事班が担当する他の工事ブロックにおけるスケジュールも確認する必要がある。   Therefore, when accepting equipment construction, not only confirm the construction schedule for the construction block that includes the construction location of the equipment construction, but also other construction departments in charge of each construction team responsible for the construction block. It is also necessary to check the schedule in the construction block.

しかしながら、従来技術にかかるスケジュール管理技術では、サービス提供者が他のサービス提供場所でサービス提供することは考慮されていない。このため、従来技術にかかるスケジュール管理技術を用いても、このような設備工事に関するスケジュール管理に対応して、指定された工事ブロックにおける工事班の空き状況を示す正確な稼働空き状況データを提示することができない。   However, in the schedule management technique according to the prior art, it is not considered that the service provider provides the service at another service providing place. For this reason, even if the schedule management technology according to the prior art is used, accurate operating availability data indicating the availability of the construction team in the designated construction block is presented in correspondence with the schedule management related to such equipment construction. I can't.

したがって、設備工事のスケジュール管理業務において、1:1または1:Nを前提とした従来技術にかかるスケジュール管理技術を利用できないことから、管理者が工事班ごとのスケジュールを帳票で別個に管理しておき、営業担当者からの電話による問い合わせに応じて、これら帳票を手作業で突き合わせて指定された工事ブロックでの工事可否を判断していた。このため、電話による営業担当者と管理者とのやり取りが長時間にわたることがしばしば発生し、管理者が不在の場合も同様となる。これにより、各営業担当者からの問い合わせが滞り、結果として利用者(顧客)交渉をスムーズに進めることができないという問題点があった。   Therefore, since the schedule management technology according to the prior art based on 1: 1 or 1: N cannot be used in the schedule management work for facility construction, the administrator manages the schedule for each construction team separately in a form. In response to telephone inquiries from sales representatives, these forms were manually matched to determine whether construction was possible in the designated construction block. For this reason, communication between the sales staff and the manager over the telephone often takes a long time, and the same is true even when the manager is absent. As a result, inquiries from sales representatives are delayed, and as a result, there is a problem in that user (customer) negotiations cannot proceed smoothly.

本発明はこのような課題を解決するためのものであり、複数の工事班(サービス提供者)が複数の工事ブロック(サービス提供場所)を手分けして担当する場合でも、指定された工事ブロックにおける工事班の空き状況を示す正確な稼働空き状況データを提示できるスケジュール管理技術を提供することを目的としている。   The present invention is for solving such a problem. Even when a plurality of construction teams (service providers) separately handle a plurality of construction blocks (service provision locations), the present invention is applied to the designated construction blocks. The purpose is to provide a schedule management technology that can present accurate operational availability data indicating the availability of a construction team.

このような目的を達成するために、本発明にかかるスケジュール管理システムは、サービスを提供するサービス提供場所ごとに、当該サービスの提供を担当するサービス提供者のスケジュールを管理するスケジュール管理システムであって、前記サービス提供者が担当する前記サービス提供場所を示す担当ブロックデータを記憶する担当ブロック設定DBと、前記サービス提供者が稼働可能な日時を示す稼働可否データを記憶する稼働可否設定DBと、前記サービス提供場所で前記サービス提供者が担当するサービスのスケジュールを示すスケジュールデータを記憶するスケジュール管理簿DBと、指定されたサービス提供場所を担当する担当サービス提供者を前記担当ブロック設定DBの担当ブロックデータで確認し、これら担当サービス提供者に関する稼働可否データを前記稼働可否設定DBから取得するとともに、これら担当サービス提供者に関するスケジュールデータを前記スケジュール管理簿DBから取得するデータ取得部と、取得した前記稼働可否データおよび前記スケジュールデータに基づき、当該サービス提供場所の各担当サービス提供者に関する稼働の空き状況を集計し、得られた集計結果に基づき日ごとの稼働空き状況を示す概略サービスカレンダーを生成し、生成した概略サービスカレンダーを当該サービス提供場所に関する稼働空き状況データとして提示する空き状況提示部とを備えている。   In order to achieve such an object, a schedule management system according to the present invention is a schedule management system for managing a schedule of a service provider in charge of providing a service for each service providing place that provides the service. A responsible block setting DB that stores responsible block data indicating the service providing location that the service provider is responsible for, an operational availability setting DB that stores operational availability data indicating the date and time when the service provider can operate, and A schedule management list DB for storing schedule data indicating a schedule of a service for which the service provider is responsible at the service providing location, and a responsible service provider in charge of the designated service providing location for the responsible block setting DB Check with these responsible services The operation availability data regarding the provider is acquired from the operation availability setting DB, and the schedule data regarding these service providers is acquired from the schedule management DB, and the acquired operation availability data and the schedule data are included in the acquired data. Based on the service availability for each service provider in the service provision location, and based on the obtained summary results, generate a summary service calendar showing the daily availability of the service. And a vacancy status presenting section that presents the vacancy status data relating to the service providing location.

また、本発明にかかる上記スケジュール管理システムの一構成例は、前記稼働可否データが、前記日時ごとに前記サービス提供者が担当可能な作業規模を示す稼働工数を含み、前記空き状況提示部は、取得した前記稼働可否データおよび前記スケジュールデータに基づき、前記サービス提供場所の各担当サービス提供者に関する稼働の登録済工数または空き工数を当該担当サービス提供者ごとに集計し、得られた集計結果に基づき日ごとの稼働工数空き状況を示す詳細サービスカレンダーを当該担当サービス提供者ごとに生成し、生成したこれら詳細サービスカレンダーを前記稼働空き状況データとして提示するようにしたものである。   Further, in one configuration example of the schedule management system according to the present invention, the availability data includes an operation man-hour indicating a work scale that can be handled by the service provider for each date and time. Based on the obtained operation availability data and the schedule data, the registered registered man-hours or vacant man-hours for each service provider in charge at the service providing location are totaled for each service provider in charge, and based on the obtained total result A detailed service calendar indicating the availability of operating man-hours per day is generated for each service provider concerned, and the generated detailed service calendar is presented as the operating availability status data.

また、本発明にかかる上記スケジュール管理システムの一構成例は、前記空き状況提示部が、サービスを受注する営業担当者の担当者端末から空き状況確認要求を受信した場合には、前記概略サービスカレンダーを生成して当該サービス提供場所に関する稼働空き状況データとして当該担当者端末へ提示し、前記サービス提供者が担当するサービスのスケジュールを調整する管理者の管理者端末から空き状況確認要求を受信した場合には、前記詳細サービスカレンダーを生成して当該サービス提供場所に関する稼働空き状況データとして当該管理者端末へ提示するようにしたものである。   Also, in one configuration example of the schedule management system according to the present invention, when the availability presenting unit receives a availability confirmation request from a person-in-charge terminal of a salesperson who orders a service, the general service calendar Is generated and presented to the person-in-charge terminal as operating availability data relating to the service providing location, and an availability confirmation request is received from the administrator terminal of the administrator who adjusts the schedule of the service for which the service provider is responsible In this case, the detailed service calendar is generated and presented to the manager terminal as operating availability data relating to the service providing location.

また、本発明にかかる上記スケジュール管理システムの一構成例は、サービスを受注する営業担当者の担当者端末からのサービス調整依頼に応じて、当該サービス調整依頼の帳票フォームの記載内容を調整依頼データの入力フォームに取り込みを行うサービス管理部をさらに備え、前記サービス管理部は、前記取り込みの際、予め登録されている複写定義データに基づいて、前記帳票フォームを示す複写元Webページから、当該複写定義データで定義されている複写元項目オブジェクトの識別情報と対応する項目オブジェクトの項目データをそれぞれ取得し、これら項目データを、前記入力フォームを示す複写先のWebページのうち、当該複写定義データで定義されている複写先項目オブジェクトの識別情報と対応する項目オブジェクトの項目データとして複写するようにしたものである。   In addition, according to the configuration example of the schedule management system according to the present invention, in response to a service adjustment request from a person-in-charge terminal of a salesperson who receives an order for a service, the description content of the form form of the service adjustment request is adjusted to the adjustment request data. A service management unit that captures the input form from the copy source Web page indicating the form form based on the copy definition data registered in advance at the time of the capture. The item data of the item object corresponding to the identification information of the copy source item object defined in the definition data is acquired, and these item data are stored in the copy definition data in the copy destination Web page indicating the input form. Item object corresponding to the identification information of the defined copy destination item object It is obtained so as to replicate as item data.

また、本発明にかかる上記スケジュール管理システムの一構成例は、前記サービスが工事作業からなり、前記サービス提供場所が工事作業を管理する範囲として予め設定した工事ブロックからなり、前記サービス提供者が当該工事ブロックを担当する各工事班からなり、工事ブロックごとに当該工事ブロックを担当する各工事班のスケジュールを管理するようにしたものである。   Also, one configuration example of the schedule management system according to the present invention is such that the service includes construction work, the service providing place includes a construction block set in advance as a range for managing the construction work, and the service provider Each construction block is in charge of a construction block, and the schedule of each construction group in charge of the construction block is managed for each construction block.

また、本発明にかかるスケジュール管理方法は、サービスを提供するサービス提供場所ごとに、当該サービスの提供を担当するサービス提供者のスケジュールを管理するスケジュール管理方法であって、前記サービス提供者が担当する前記サービス提供場所を示す担当ブロックデータを担当ブロック設定DBで記憶するステップと、前記サービス提供者が稼働可能な日時を示す稼働可否データを稼働可否設定DBで記憶するステップと、前記サービス提供場所で前記サービス提供者が担当するサービスのスケジュールを示すスケジュールデータをスケジュール管理簿DBで記憶するステップと、データ取得部が、指定されたサービス提供場所を担当する担当サービス提供者を前記担当ブロック設定DBの担当ブロックデータで確認し、これら担当サービス提供者に関する稼働可否データを前記稼働可否設定DBから取得するとともに、これら担当サービス提供者に関するスケジュールデータを前記スケジュール管理簿DBから取得するデータ取得ステップと、空き状況提示部が、取得した前記稼働可否データおよび前記スケジュールデータに基づき、当該サービス提供場所の各担当サービス提供者に関する稼働の空き状況を集計し、得られた集計結果に基づき日ごとの稼働空き状況を示す概略サービスカレンダーを生成し、生成した概略サービスカレンダーを当該サービス提供場所に関する稼働空き状況データとして提示する空き状況提示ステップとを備えている。   A schedule management method according to the present invention is a schedule management method for managing a schedule of a service provider in charge of providing a service for each service providing place that provides the service, and the service provider is in charge of the schedule management method. Storing the responsible block data indicating the service providing location in the responsible block setting DB; storing the availability data indicating the date and time when the service provider can operate in the availability setting DB; and the service providing location. A step of storing schedule data indicating a schedule of a service for which the service provider is in charge in the schedule management book DB; and a data acquisition unit that designates a service provider in charge of the designated service providing location in the block setting DB Check with the responsible block data, and these A data acquisition step for acquiring operation availability data relating to the service provider from the operation availability setting DB, and acquiring schedule data relating to the service provider in charge from the schedule management book DB, and the availability presenting unit acquired the data Based on the availability data and the schedule data, the operational availability for each responsible service provider at the service provision location is aggregated, and based on the obtained aggregated result, a rough service calendar showing the daily operational availability is generated. And a vacancy status presentation step of presenting the generated general service calendar as operating vacancy status data relating to the service providing location.

また、本発明にかかるプログラムは、コンピュータを、上記スケジュール管理システムを構成する各部として機能させるためのプログラムである。   Moreover, the program concerning this invention is a program for functioning a computer as each part which comprises the said schedule management system.

本発明によれば、担当工事班(サービス提供者)が空き状況確認要求で指定された工事ブロック(サービス提供場所)以外の他の工事ブロックも担当している場合、データ取得部が取得したスケジュールデータに他の工事ブロックに関する稼働予定も含まれていることになる。このため、空き状況提示部がスケジュールデータを集計する際、他の工事ブロックに関する稼働予定も一緒に集計されるため、任意の担当工事班に対して他の工事ブロックでの稼働予定が登録されている日時については、当該担当工事班について空き状況確認要求で指定された工事ブロックでの稼働予定が登録されていなくても稼働空きなしとして集計される。   According to the present invention, when the construction team (service provider) is also in charge of another construction block other than the construction block (service provision location) designated in the availability check request, the schedule acquired by the data acquisition unit The operation schedule for other construction blocks is included in the data. For this reason, when the availability status presentation unit aggregates the schedule data, the operation schedules related to other construction blocks are also counted together, so the operation schedules in other construction blocks are registered for any construction team in charge. The operation date and time for the construction group in charge is counted as having no operation vacancy even if the operation schedule in the construction block designated in the availability check request is not registered.

したがって、複数の工事班が複数の工事ブロックを手分けして担当しており、工事ブロックと工事班との関係がM:N(M,Nは2以上の整数)の関係である場合でも、指定された工事ブロックにおける工事班の空き状況を示す正確な稼働空き状況データを提示することが可能となる。   Therefore, even if a plurality of construction teams are in charge of a plurality of construction blocks, and the relationship between the construction blocks and the construction team is M: N (M, N is an integer of 2 or more), it is designated. It is possible to present accurate operating availability data indicating the availability of the construction team in the construction block.

特に、1:1または1:Nの関係を前提とする前述の従来技術にかかるスケジュール管理技術を利用できないため、管理者が工事ブロックでの工事可否を手作業で判断していた状況では、営業担当者からの問い合わせが滞り、利用者(顧客)交渉をスムーズに進めることができないという問題点があった。本実施の形態によれば、正式に工事を申し込む前に、営業担当者が工事班に関する稼働空き状況を、担当者端末で極めて容易かつ迅速に確認できるため、利用者交渉をスムーズに進めることができ、利用者へのサービスアップにも繋がる。   In particular, since the schedule management technology according to the above-described conventional technology based on the relationship of 1: 1 or 1: N cannot be used, the business is in a situation where the manager manually determines whether or not construction is possible in the construction block. There was a problem that user (customer) negotiations could not be proceeded smoothly because of inquiries from the person in charge. According to the present embodiment, the sales representative can check the operating availability of the construction team very easily and quickly on the person-in-charge terminal before officially applying for the construction. It can also lead to service improvement for users.

スケジュール管理システムの構成を示すブロック図である。It is a block diagram which shows the structure of a schedule management system. サービス提供形態例を示す説明図である。It is explanatory drawing which shows the example of a service provision form. 担当ブロック設定DBの構成例である。It is a structural example of a charge block setting DB. 稼働可否設定DBの構成例である。It is a structural example of operation availability setting DB. スケジュール管理簿DBの構成例である。It is an example of composition of schedule management book DB. スケジュール登録動作の概略を示すシーケンス図である。It is a sequence diagram which shows the outline of a schedule registration operation | movement. 概略空き状況提示動作を示すフローチャートである。It is a flowchart which shows an outline empty condition presentation operation | movement. 概略工事カレンダーの構成例である。It is a structural example of a general construction calendar. 詳細空き状況提示動作を示すフローチャートである。It is a flowchart which shows detailed empty condition presentation operation | movement. 詳細工事カレンダーの構成例である。It is a structural example of a detailed construction calendar. 概略工事カレンダーの詳細表示画面例である。It is an example of a detailed display screen of a general construction calendar. 詳細工事カレンダーの詳細表示画面例である。It is an example of a detailed display screen of a detailed construction calendar. 複写定義データの構成例である。It is a structural example of replication definition data. 工事調整依頼の取り込み画面を示す画面表示例である。It is an example of a screen display which shows the import screen of a construction adjustment request.

次に、本発明の実施の形態について図面を参照して説明する。
[第1の実施の形態]
まず、図1を参照して、本発明の第1の実施の形態にかかるスケジュール管理システム10について説明する。図1は、スケジュール管理システムの構成を示すブロック図である。
Next, embodiments of the present invention will be described with reference to the drawings.
[First Embodiment]
First, a schedule management system 10 according to the first exemplary embodiment of the present invention will be described with reference to FIG. FIG. 1 is a block diagram showing the configuration of the schedule management system.

このスケジュール管理システム10は、M個(Mは2以上の整数)の工事ブロックで発生する各設備工事を、N個(Nは2以上の整数)の工事班が手分けして担当することを前提として、指定された工事ブロックにおける工事班の空き状況を示すスケジュールデータを提示するシステムである。システム構成としては、1つのサーバ装置で構成することが可能であるが、複数のサーバ装置に処理やデータベースを分散して構成してもよい。   This schedule management system 10 is based on the assumption that N (N is an integer greater than or equal to 2) construction teams will be responsible for each facility work that occurs in M (M is an integer greater than or equal to 2) construction blocks. The system presents schedule data indicating the availability of a construction team in a designated construction block. The system configuration can be configured with a single server device, but the processing and database may be distributed to a plurality of server devices.

スケジュール管理システム10は、通信回線Lおよび通信ネットワーク20を介して、工事を受注する営業担当者の担当者端末21や、各工事班のスケジュールを調整する管理者の管理者端末22と接続し、これら担当者端末21や管理者端末22からのスケジュール確認要求に応じて、指定された工事ブロックや工事班の空き状況を示すスケジュールデータを、通信ネットワーク20を介して要求元となる担当者端末21や管理者端末22へ配信して、営業担当者や管理者に提示する機能を有している。   The schedule management system 10 is connected via a communication line L and a communication network 20 to a person-in-charge terminal 21 of a salesperson who receives an order for construction and an administrator terminal 22 of an administrator who adjusts the schedule of each construction team. In response to a schedule confirmation request from the person-in-charge terminal 21 or the manager terminal 22, schedule data indicating the availability status of the designated construction block or construction group is sent via the communication network 20 to the person-in-charge terminal 21 serving as a request source. And a function of delivering to the manager terminal 22 and presenting it to the sales staff and manager.

本実施の形態では、スケジュール管理システム10において、工事作業を管理する範囲として予め設定した工事ブロックごとに、当該工事ブロックを担当する各工事班のスケジュールを管理する場合を例として説明する。
この際、スケジュール管理システム10の適用先については、工事班のスケジュール管理に限定されるものではなく、サービス提供場所とサービス提供者がM:N(M,Nは2以上の整数)の関係にあるサービス提供形態であれば、例えば、複数の店舗を複数の従業員が手分けして担当するような、工事班のスケジュール管理以外のサービス提供形態でのスケジュール管理に適用することができる。
In the present embodiment, an example will be described in which the schedule management system 10 manages the schedule of each construction team in charge of a construction block for each construction block set in advance as a range for managing the construction work.
At this time, the application destination of the schedule management system 10 is not limited to the schedule management of the construction team, but the service providing place and the service provider have a relationship of M: N (M and N are integers of 2 or more). If it is a certain service provision form, for example, it can be applied to schedule management in a service provision form other than the schedule management of a construction team, in which a plurality of stores are handled by a plurality of employees.

また、本実施の形態に記載した、スケジュール管理システム10を工事班のスケジュール管理に適用した場合における、工事作業、工事ブロック、工事班、概略工事カレンダー、および詳細工事カレンダーは、請求項に記載した、一般的なサービス提供のスケジュール管理に適用した場合における、サービス、サービス提供場所、サービス提供者、概略サービスカレンダー、および詳細サービスカレンダーに相当する。   Further, when the schedule management system 10 described in the present embodiment is applied to the schedule management of the construction team, the construction work, the construction block, the construction team, the general construction calendar, and the detailed construction calendar are described in the claims. This corresponds to a service, a service providing place, a service provider, a general service calendar, and a detailed service calendar when applied to general service provision schedule management.

[サービス提供形態]
次に、図2を参照して、本実施の形態にかかるスケジュール管理システム10が管理対象とする設備工事サービスのサービス提供形態について説明する。図2は、サービス提供形態例を示す説明図である。
[Service provision form]
Next, with reference to FIG. 2, the service provision form of the facility construction service to be managed by the schedule management system 10 according to the present embodiment will be described. FIG. 2 is an explanatory diagram illustrating an example of a service provision form.

スケジュール管理システム10のサービス提供形態は、図2に示すように、複数の工事班が複数の工事ブロックを手分けして担当する形態である。本実施の形態では、このようなサービス提供形態を例として説明するが、これら限定されるものではない。
図2には、スケジュール管理システム10において、「東営業所」、「南営業所」、「中央営業所」、「西営業所」、および「北営業所」からなる5つの営業所で受け付ける設備工事のスケジュールを一括管理する例が示されている。
As shown in FIG. 2, the service providing form of the schedule management system 10 is a form in which a plurality of construction teams handle a plurality of construction blocks separately. In the present embodiment, such a service providing form will be described as an example, but the present invention is not limited thereto.
FIG. 2 shows that the schedule management system 10 accepts equipment received at five sales offices including “East Sales Office”, “South Sales Office”, “Central Sales Office”, “West Sales Office”, and “North Sales Office”. An example of managing the construction schedule collectively is shown.

このうち、「東営業所」と「南営業所」は、「湾岸エリア」という工事エリアに属しており、「中央営業所」、「西営業所」、および「北営業所」は、「市街地エリア」という工事エリアに属している。営業所ごとに、設備工事を受け付ける曜日および時間の組み合わせからなる工事時間帯が予め設定されている。
例えば「東営業所」には「全日」という工事時間帯が設定されており、すべての平日の午前・午後で設備工事可能である。
Of these, “East Sales Office” and “South Sales Office” belong to the construction area “Wangan Area”, and “Central Sales Office”, “West Sales Office”, and “North Sales Office” It belongs to a construction area called “Area”. For each sales office, a construction time zone is set in advance, which is a combination of day of the week and time for receiving facility construction.
For example, “East Sales Office” has a construction time zone of “All Day”, and facilities can be constructed on all weekday mornings and afternoons.

また、「南営業所」には「水曜PM,金曜PM」という工事時間帯が設定されており、水曜日および金曜日の午後で設備工事可能である。同じく「中央営業所」および「西営業所」には「月曜・木曜」という工事時間帯が設定されており、水曜日および金曜日の午前・午後で設備工事可能である。同じく「北営業所」には「火曜AM,金曜AM」という工事時間帯が設定されており、火曜日および金曜日の午前で設備工事可能である。   In addition, a construction time zone of “Wednesday PM, Friday PM” is set at the “South Business Office”, and facilities can be constructed on Wednesday and Friday afternoons. Similarly, the “Central Sales Office” and “West Sales Office” have a construction time zone of “Monday / Thursday”, and facilities can be constructed on Wednesday and Friday mornings and afternoons. Similarly, a construction time zone of “Tuesday AM, Friday AM” is set at “North Sales Office”, and facilities can be constructed on Tuesday and Friday mornings.

また、各営業所の工事時間帯は、工事ブロックとして管理されており、同一工事エリアに属する営業所間に同一工事時間帯が設定されている場合には、これら営業所に同一工事ブロックが割り当てられている。
例えば、「東営業所」、「南営業所」、「北営業所」には、それぞれ工事ブロックX1,X2,Y2が割り当てられており、「中央営業所」および「西営業所」には同一の工事ブロックY1が割り当てられている。
In addition, the construction hours of each sales office are managed as construction blocks. If the same construction hours are set between sales offices belonging to the same construction area, the same construction blocks are allocated to these sales offices. It has been.
For example, construction blocks X1, X2, and Y2 are assigned to “East Sales Office”, “South Sales Office”, and “North Sales Office”, respectively, and “Central Sales Office” and “West Sales Office” are the same. The construction block Y1 is assigned.

また、これら工事ブロックと工事班との関係は、複数の工事ブロックをそれぞれ1つまたは複数の工事班で担当するよう割り当てられている。
例えば、「湾岸エリア」のブロックX1,X2については、「班A」と「班B」の2つの工事班が手分けして担当するよう割り当てられている。したがって、ブロックX1,X2において、工事ブロックと工事班とはそれぞれ1:2の関係となっているが、「湾岸エリア」で見た場合、工事ブロックと工事班とが2:2の関係となっている。
The relationship between the construction blocks and the construction teams is assigned so that a plurality of construction blocks are assigned to one or more construction teams.
For example, for the blocks X1 and X2 in the “Wangan Area”, the two construction teams “Team A” and “Team B” are assigned to be in charge. Therefore, in the blocks X1 and X2, the construction block and the construction team have a 1: 2 relationship. However, when viewed in the “gulf area”, the construction block and the construction team have a 2: 2 relationship. ing.

また、「市街地エリア」において、ブロックY1については、「班C」、「班D」、および「班E」の3つの工事班が手分けして担当するよう割り当てられており、ブロックY2については、「班D」、「班E」、および「班F」の3つの工事班が手分けして担当するよう割り当てられている。したがって、ブロックY1,Y2において、工事ブロックと工事班とはそれぞれ1:3の関係となっているが、その組み合わせはブロックY1,Y2において異なっており、「市街地エリア」で見た場合、工事ブロックと工事班とが2:4の関係となっている。   In addition, in the “urban area”, the block Y1 is assigned so that the three construction teams “team C”, “team D”, and “team E” are in charge, and the block Y2 is Three construction teams, “Group D”, “Group E”, and “Group F”, are assigned to be in charge. Therefore, in the blocks Y1 and Y2, the construction block and the construction team have a 1: 3 relationship, but the combination is different in the blocks Y1 and Y2, and the construction block when viewed in the “urban area” And the construction team have a 2: 4 relationship.

[スケジュール管理システム]
次に、図1および図2を参照して、スケジュール管理システム10の構成について詳細に説明する。
スケジュール管理システム10には、主な機能部として、担当ブロック設定DB11、稼働可否設定DB12、スケジュール管理簿DB13、設定管理部14、工事管理部15、データ取得部16、および空き状況提示部17が設けられている。
[Schedule management system]
Next, the configuration of the schedule management system 10 will be described in detail with reference to FIGS. 1 and 2.
The schedule management system 10 includes a responsible block setting DB 11, an operation availability setting DB 12, a schedule management list DB 13, a setting management unit 14, a construction management unit 15, a data acquisition unit 16, and a vacancy status presentation unit 17 as main functional units. Is provided.

これら機能部のうち、担当ブロック設定DB11、稼働可否設定DB12、スケジュール管理簿DB13は、ハードディスクや半導体メモリなどの記憶装置からなる。それぞれ個別の記憶装置で実現してもよく、いずれか2つまたは全部を1つの記憶装置で実現してもよい。また、設定管理部14、工事管理部15、および空き状況提示部17は、CPUとその周辺回路からなり、プログラムを実行することにより各種処理部を実現する演算処理部で実現すればよい。   Among these functional units, the assigned block setting DB 11, the operation availability setting DB 12, and the schedule management book DB 13 are composed of storage devices such as a hard disk and a semiconductor memory. Each may be realized by an individual storage device, or any two or all of them may be realized by one storage device. The setting management unit 14, the construction management unit 15, and the vacancy status presentation unit 17 may be realized by an arithmetic processing unit that includes a CPU and its peripheral circuits and realizes various processing units by executing a program.

担当ブロック設定DB11は、工事班が担当する工事ブロックを示す担当ブロックデータを記憶するデータベースである。
図3は、担当ブロック設定DBの構成例である。ここでは、工事班を識別するための班IDごとに、工事班の班名、工事班の連絡先、工事班が担当する工事ブロックを示す担当ブロックなどのデータの組が、担当ブロックデータとして担当ブロック設定DB11に登録されている。これら担当ブロックデータは、工事班からの申請に応じて管理者により予め担当ブロック設定DB11に設定される。
The assigned block setting DB 11 is a database that stores assigned block data indicating the construction blocks handled by the construction group.
FIG. 3 is a configuration example of the assigned block setting DB. Here, for each group ID for identifying the construction group, a group of data such as the name of the construction group, the contact information of the construction group, and the responsible block indicating the construction block in charge of the construction group is in charge as the responsible block data. Registered in the block setting DB 11. The responsible block data is set in advance in the responsible block setting DB 11 by the administrator in response to an application from the construction team.

稼働可否設定DB12は、工事班が稼働可能な日時を示す稼働可否データを記憶するデータベースである。
図4は、稼働可否設定DBの構成例である。ここでは、工事班を識別するための班IDごとに、工事班が担当する工事ブロックを示す担当ブロックと、工事班が当該担当ブロック稼働可能な具体的な日時を示す日付および時間帯と、これら日時ごとに工事班が稼働可能な稼働工数などのデータの組が、稼働可否データとして稼働可否設定DB12に登録されている。これら稼働可否データは、工事班からの申請に応じて管理者により予め稼働可否設定DB12に設定される。なお、稼働工数とは、工事班が担当可能な作業規模を示す数であり、基準となる工事作業規模を稼働工数「1」として計数したものである。
The operation availability setting DB 12 is a database that stores operation availability data indicating the date and time when the construction team can operate.
FIG. 4 is a configuration example of the operation availability setting DB. Here, for each group ID for identifying a construction group, a responsible block that indicates a construction block that the construction group is responsible for, a date and time zone that indicates a specific date and time when the construction team can operate the block, and these A set of data such as operation man-hours that the construction team can operate for each date and time is registered in the operation availability setting DB 12 as operation availability data. These operational availability data are set in advance in the operational availability setting DB 12 by the administrator in response to an application from the construction team. The operating man-hour is a number indicating the work scale that can be handled by the construction team, and the reference work work scale is counted as the operating man-hour “1”.

スケジュール管理簿DB13は、工事ブロックで工事班が担当することが決定した工事の稼働予定を示すスケジュールデータを記憶するデータベースである。
図5は、スケジュール管理簿DBの構成例である。ここでは、工事スケジュールを識別するスケジュールIDごとに、設備工事が行われる工事ブロック、設備工事の日付および時間帯、設備工事を担当する工事班を示す班ID、設備工事に必要となる必要工数などのデータの組が、スケジュールデータとしてスケジュール管理簿DB13に登録されている。これらスケジュールデータは、営業担当者からの申請に応じて管理者により予めスケジュール管理簿DB13に設定される。
The schedule management book DB 13 is a database that stores schedule data indicating an operation schedule of a work determined to be handled by a work group in a work block.
FIG. 5 is a configuration example of the schedule management book DB. Here, for each schedule ID for identifying a construction schedule, a construction block in which equipment construction is performed, a date and time of equipment construction, a team ID indicating a construction team in charge of equipment construction, a required man-hour required for equipment construction, etc. Is registered in the schedule management book DB 13 as schedule data. These schedule data are set in advance in the schedule management book DB 13 by the administrator according to the application from the sales staff.

設定管理部14は、管理者操作に応じて管理者端末22から通信ネットワーク20を介して通知された担当ブロックデータを担当ブロック設定DB11へ設定する機能と、管理者操作に応じて管理者端末22から通信ネットワーク20を介して通知された稼働可否データを稼働可否設定DB12へ設定する機能とを有している。   The setting management unit 14 sets the responsible block data notified from the administrator terminal 22 via the communication network 20 according to the administrator operation to the responsible block setting DB 11 and the administrator terminal 22 according to the administrator operation. The operation availability data notified from the communication network 20 via the communication network 20 is set in the operation availability setting DB 12.

工事管理部15は、営業担当者の操作に基づき担当者端末21から通信ネットワーク20を介して通知された工事調整依頼を受け付けて、この依頼内容を含む調整依頼データをスケジュール管理簿DB13に登録する機能と、この工事調整依頼を通信ネットワーク20を介して管理者端末22へ通知する機能と、管理者操作に応じて管理者端末22から通信ネットワーク20を介して通知されたスケジュールデータをスケジュール管理簿DB13へ設定する機能とを有している。   The construction management unit 15 receives a construction adjustment request notified from the person-in-charge terminal 21 via the communication network 20 based on the operation of the sales person, and registers adjustment request data including the contents of the request in the schedule management book DB 13. Function, a function for notifying the administrator terminal 22 of the work adjustment request via the communication network 20, and schedule data notified from the administrator terminal 22 via the communication network 20 according to the administrator operation. And a function to set in the DB 13.

データ取得部16は、営業担当者の操作に基づき担当者端末21から通信ネットワーク20を介して通知された空き状況確認要求や、管理者操作に基づき管理者端末22から通信ネットワーク20を介して通知された空き状況確認要求に応じて、これら空き状況確認要求で指定された工事ブロックを担当する担当工事班を担当ブロック設定DBの担当ブロックデータで確認する機能と、これら担当工事班に関する稼働可否データを稼働可否設定DB12から取得する機能と、これら担当工事班に関するスケジュールデータをスケジュール管理簿DB13から取得する機能とを有している。   The data acquisition unit 16 sends a free status confirmation request notified from the person-in-charge terminal 21 via the communication network 20 based on the operation of the sales person, or a notification from the administrator terminal 22 via the communication network 20 based on the administrator operation. In response to the requested availability check request, a function for checking the assigned work group in charge of the construction block specified in the available status check request with the assigned block data in the assigned block setting DB, and operation availability data regarding these assigned work groups Is obtained from the operation availability setting DB 12 and the function is obtained from the schedule management book DB 13 for schedule data relating to these assigned construction groups.

空き状況提示部17は、営業担当者の操作に基づき担当者端末21から通信ネットワーク20を介して通知された空き状況確認要求に応じて、データ取得部16で取得した稼働可否データおよびスケジュールデータに基づき当該工事ブロックの各担当工事班に関する稼働の空き状況を集計する機能と、得られた集計結果に基づき日ごとの稼働空き状況を示す概略工事カレンダーを生成する機能と、生成した概略工事カレンダーを当該工事ブロックに関する稼働空き状況データとして、通信ネットワーク20を介して担当者端末21へ配信して提示する機能とを有している。   In response to the availability check request notified from the person-in-charge terminal 21 via the communication network 20 based on the operation of the sales representative, the availability status presenting section 17 displays the availability data and schedule data acquired by the data acquisition section 16. Based on the function of totaling the operating availability for each construction team in charge of the construction block, the function of generating a rough construction calendar showing the daily working availability based on the obtained counting results, and the generated rough construction calendar It has a function of delivering and presenting to the person-in-charge terminal 21 via the communication network 20 as operational availability data relating to the construction block.

また、空き状況提示部17は、管理者操作に基づき管理者端末22から通信ネットワーク20を介して通知された空き状況確認要求に応じて、データ取得部16で取得した稼働可否データおよびスケジュールデータに基づき当該工事ブロックの各担当工事班に関する稼働の登録済工数または空き工数を担当工事班ごとに集計する機能と、得られた集計結果に基づき日ごとの稼働工数空き状況を示す詳細工事カレンダーを担当工事班ごとに生成し、生成したこれら詳細工事カレンダーを稼働空き状況データとして、通信ネットワーク20を介して担当者端末21へ配信して提示する機能とを有している。   Also, the vacancy status presenting unit 17 adds the availability data and schedule data acquired by the data acquisition unit 16 in response to the vacancy status confirmation request notified from the administrator terminal 22 via the communication network 20 based on the administrator operation. Based on the function that counts the number of registered man-hours or vacant man-hours for each work group in charge of the construction block based on the work block and the detailed work calendar that shows the daily work-hours availability status based on the results obtained It has a function of generating for each construction group, and distributing and presenting the generated detailed construction calendar as operating availability data to the person-in-charge terminal 21 via the communication network 20.

スケジュール管理システム10における、担当者端末21や管理者端末22からの空き状況確認要求の受付や、稼働空き状況データの配信については、一般的なWebページ提供機能を用いればよい。例えば、空き状況確認要求の受付ページや稼働空き状況データの提示ページを作成して、担当者端末21や管理者端末22から通信ネットワーク20を介して閲覧可能とすればよい。   A general Web page providing function may be used for accepting the availability check request from the person-in-charge terminal 21 or the administrator terminal 22 and distributing the operating availability data in the schedule management system 10. For example, a reception page for an availability check request and a presentation page for operating availability data may be created so as to be viewable from the person-in-charge terminal 21 or the administrator terminal 22 via the communication network 20.

[第1の実施の形態の動作]
次に、図6を参照して、本実施の形態にかかるスケジュール管理システム10のスケジュール登録動作の概略について説明する。図6は、スケジュール登録動作の概略を示すシーケンス図である。なお、スケジュール登録動作の開始時点において、担当ブロック設定DB11、稼働可否設定DB12、およびスケジュール管理簿DB13には、それぞれ担当ブロックデータ、稼働可否データ、およびスケジュールデータが既に登録されているものとする。
[Operation of First Embodiment]
Next, an outline of the schedule registration operation of the schedule management system 10 according to the present exemplary embodiment will be described with reference to FIG. FIG. 6 is a sequence diagram showing an outline of the schedule registration operation. It is assumed that the assigned block data, the availability data, and the schedule data are already registered in the assigned block setting DB 11, the operation availability setting DB 12, and the schedule management book DB 13, respectively, at the start of the schedule registration operation.

[スケジュール登録動作の概略]
まず、利用者(顧客)から営業担当者に対して電話により工事依頼があった場合(ステップ100)、営業担当者は、利用者から工事内容を確認した後、担当者端末21を操作して、通信ネットワーク20を介してスケジュール管理システム10にアクセスし、工事場所に対応する工事ブロックを指定した空き状況確認要求を、スケジュール管理システム10へ通知する(ステップ101)。
[Schedule registration operation overview]
First, when a construction request is made by telephone from the user (customer) to the sales person (step 100), the sales person confirms the construction content from the user and then operates the person in charge terminal 21. Then, the schedule management system 10 is accessed via the communication network 20, and a request for checking availability of the construction block corresponding to the construction location is notified to the schedule management system 10 (step 101).

スケジュール管理システム10は、担当者端末21からの空き状況確認要求に応じて、指定された工事ブロックに関する概略工事カレンダーを生成し(ステップ102)、通信ネットワーク20を介して要求元の担当者端末21へ稼働空き状況データとして配信する(ステップ103)。これにより、指定された工事ブロックに関する概略工事カレンダーが担当者端末21の画面に表示され(ステップ104)、営業担当者に指定された概略工事ブロックの稼働空き状況データが提示される。   The schedule management system 10 generates a rough construction calendar for the designated construction block in response to the availability check request from the person-in-charge terminal 21 (step 102), and the person-in-charge terminal 21 as the request source via the communication network 20 Is distributed as operation availability data (step 103). As a result, a rough construction calendar related to the designated construction block is displayed on the screen of the person-in-charge terminal 21 (step 104), and operational availability data of the rough construction block designated by the sales person is presented.

営業担当者は、この概略工事カレンダーにより工事を実施可能な日時を利用者に電話で伝えて(ステップ105)、利用者との間で工事日時を決定し、担当者端末21を操作して工事日時などを指定した工事調整依頼を、通信ネットワーク20を介してスケジュール管理システム10へ通知する(ステップ106)。
スケジュール管理システム10は、担当者端末21からの工事調整依頼に応じて、工事調整依頼を一旦受け付けて(ステップ107)、調整依頼があったことを示す調整依頼発生を、通信ネットワーク20を介して管理者端末22へ通知する(ステップ108)。これにより、受け付けた工事の工事内容が管理者端末22の画面に表示される(ステップ109)。
The sales representative notifies the user of the date and time when the construction can be carried out by using this general construction calendar (step 105), determines the construction date and time with the user, and operates the person in charge terminal 21 to perform the construction. A work adjustment request specifying the date and time is notified to the schedule management system 10 via the communication network 20 (step 106).
In response to the construction adjustment request from the person-in-charge terminal 21, the schedule management system 10 once accepts the construction adjustment request (step 107), and generates an adjustment request indicating that the adjustment request has been made via the communication network 20. The administrator terminal 22 is notified (step 108). Thereby, the construction content of the accepted construction is displayed on the screen of the manager terminal 22 (step 109).

管理者は、管理者端末22の画面で工事内容を確認し、管理者端末22を操作して工事場所と対応する工事ブロックを指定した空き状況確認要求を、通信ネットワーク20を介してスケジュール管理システム10へ通知する(ステップ110)。   The administrator confirms the construction contents on the screen of the administrator terminal 22, operates the administrator terminal 22, and sends a free space confirmation request specifying the construction block corresponding to the construction place via the communication network 20 to the schedule management system. 10 is notified (step 110).

スケジュール管理システム10は、管理者端末22からの空き状況確認要求に応じて、指定された工事ブロックを担当する担当工事班ごとに詳細工事カレンダーを生成し(ステップ111)、通信ネットワーク20を介して要求元の管理者端末22へ稼働空き状況データを配信する(ステップ112)。これにより、指定された工事ブロックを担当する担当工事班ごとに、複数の工事ブロックにわたる詳細工事カレンダーが管理者端末22の画面に表示され(ステップ113)、管理者に担当工事班ごとの稼働空き状況データが提示される。   The schedule management system 10 generates a detailed construction calendar for each construction team in charge of the designated construction block in response to the availability check request from the administrator terminal 22 (step 111), and via the communication network 20 The operating availability data is distributed to the requesting administrator terminal 22 (step 112). As a result, for each construction team in charge of the designated construction block, a detailed construction calendar covering a plurality of construction blocks is displayed on the screen of the administrator terminal 22 (step 113), and the administrator has an available operating space for each construction team. Status data is presented.

管理者は、指定した工事ブロックを担当する各担当工事班の詳細工事カレンダーを管理者端末22の画面で確認し、申込のあった工事日に稼働可能でああって、かつ、工事内容に合致した工事を実施できる適切な工事班を選択し、管理者端末22を操作して当該工事班のスケジュールを正式に登録するためのスケジュール登録要求を、通信ネットワーク20を介してスケジュール管理システム10へ通知する(ステップ114)。   The administrator confirms the detailed construction calendar of each construction team in charge of the designated construction block on the screen of the manager terminal 22 and can be operated on the construction day on which the application is made. An appropriate construction team that can perform the construction is selected, and a schedule registration request for officially registering the schedule of the construction team by operating the administrator terminal 22 is notified to the schedule management system 10 via the communication network 20. (Step 114).

スケジュール管理システム10は、管理者端末22からのスケジュール登録要求に応じて、指定された日時および工事班に基づきスケジュールデータを登録し(ステップ115)、一連のスケジュール登録動作を終了する。   In response to the schedule registration request from the administrator terminal 22, the schedule management system 10 registers the schedule data based on the designated date and time and the construction team (step 115), and ends the series of schedule registration operations.

[概略空き状況提示動作]
次に、図7を参照して、本実施の形態にかかるスケジュール管理システム10での概略空き状況提示動作について説明する。図7は、概略空き状況提示動作を示すフローチャートである。
[Summary availability operation]
Next, with reference to FIG. 7, an outline empty state presenting operation in the schedule management system 10 according to the present exemplary embodiment will be described. FIG. 7 is a flowchart showing an outline empty state presentation operation.

スケジュール管理システム10は、営業担当者の操作に基づき担当者端末21から通信ネットワーク20を介して通知された空き状況確認要求に応じて、図7の概略空き状況提示動作を実行する。なお、概略空き状況提示動作の開始時点において、担当ブロック設定DB11、稼働可否設定DB12、およびスケジュール管理簿DB13には、それぞれ担当ブロックデータ、稼働可否データ、およびスケジュールデータが既に登録されているものとする。   The schedule management system 10 executes the general availability state presenting operation of FIG. 7 in response to the availability status confirmation request notified from the person in charge terminal 21 via the communication network 20 based on the operation of the salesperson. It should be noted that, at the time of starting the general availability presenting operation, the assigned block data, the availability data, and the schedule data are already registered in the assigned block setting DB 11, the operation availability setting DB 12, and the schedule management book DB 13, respectively. To do.

まず、データ取得部16は、担当者端末21からの空き状況確認要求で指定された工事ブロックに基づき、この工事ブロックを担当する担当工事班の担当ブロックデータを担当ブロック設定DB11から取得して、担当工事班を確認する(ステップ120)。
続いて、データ取得部16は、これら担当工事班に関する稼働可否データを稼働可否設定DB12から取得するとともに(ステップ121)、これら担当工事班に関するスケジュールデータをスケジュール管理簿DB13から取得する(ステップ122)。
First, the data acquisition unit 16 acquires from the responsible block setting DB 11 the responsible block data of the responsible construction group responsible for the construction block based on the construction block specified in the availability check request from the responsible person terminal 21. The responsible construction group is confirmed (step 120).
Subsequently, the data acquisition unit 16 acquires operation availability data relating to these assigned construction groups from the operation availability setting DB 12 (step 121), and acquires schedule data relating to these assigned construction groups from the schedule management book DB 13 (step 122). .

次に、空き状況提示部17は、データ取得部16で取得した稼働可否データおよびスケジュールデータに基づき当該工事ブロックの各担当工事班に関する稼働の空き状況を、日付ごと、さらには日付および時間帯の組み合わせごとに集計する(ステップ123)。
この際、例えば図2に示すように、当該工事ブロックと対応する営業所に関連して工事時間帯が設定されているため、図4に示す稼働可否データでこれら工事時間帯以外の時間帯については、工事の受付を行わない。このため、スケジュールデータで工事予定が登録されていなくても、これら工事時間帯以外の時間帯については稼働空きなしとして集計されることになる。
Next, the vacancy status presenting unit 17 indicates the vacancy status of the operation for each work team in charge of the construction block based on the availability data and schedule data acquired by the data acquisition unit 16 for each date, and for the date and time zone. The total is calculated for each combination (step 123).
At this time, for example, as shown in FIG. 2, since the construction time zone is set in relation to the sales office corresponding to the construction block, the operation availability data shown in FIG. 4 is used for time zones other than these construction time zones. Will not accept construction work. For this reason, even if the construction schedule is not registered in the schedule data, the time zones other than these construction time zones are counted as having no operating space.

また、データ取得部16で取得されたスケジュールデータは、空き状況確認要求で指定された工事ブロックを担当する各担当工事班の稼働予定を示すものであるが、これら担当工事班が空き状況確認要求で指定された工事ブロック以外の他の工事ブロックも担当している場合は、他の工事ブロックに関する稼働予定も含まれている。
したがって、スケジュールデータを集計する際、他の工事ブロックに関する工事予定も一緒に集計されるため、任意の担当工事班に対して他の工事ブロックでの工事予定が登録されている日時については、当該担当工事班について空き状況確認要求で指定された工事ブロックでの稼働予定が登録されていなくても稼働空きなしとして集計される。
In addition, the schedule data acquired by the data acquisition unit 16 indicates the operation schedule of each construction team in charge of the construction block designated in the availability check request. If other construction blocks other than the construction blocks specified in the above are also in charge, the operation schedule for other construction blocks is included.
Therefore, when schedule data is aggregated, construction schedules related to other construction blocks are also aggregated, so the date and time when construction schedules in other construction blocks are registered for any construction team in charge Even if the operation schedule in the construction block specified in the availability check request is not registered for the work group in charge, it is counted as no operation available.

続いて、空き状況提示部17は、得られた集計結果に基づき日ごとの概略の稼働空き状況を示す概略工事カレンダーを生成する(ステップ124)。
図8は、概略工事カレンダーの構成例である。ここでは、空き状況確認要求で指定された工事ブロック「X2」を担当する各担当工事班の稼働空き状況が日付ごとに集計されて、稼働空き状況が「○」,「×」などの文字や図柄で概略表示されている。
Subsequently, the vacancy status presenting unit 17 generates a schematic construction calendar indicating an approximate operational vacancy status for each day based on the obtained counting results (step 124).
FIG. 8 is a configuration example of a schematic construction calendar. Here, the operating availability of each construction team in charge of the construction block “X2” specified in the availability check request is aggregated for each date, and the operating availability is indicated by characters such as “○” and “×” It is schematically displayed with symbols.

図8の例では、すべての担当工事班に稼働予定が設定されている日付については稼働空きなしと判定され、概略工事カレンダーで「×」表示される。また、いずれかの担当工事班に稼働予定が設定されていない日付については稼働空きありと判定され、概略工事カレンダーで「○」表示される。なお、稼働空きありの担当工事班の数が予め設定したしきい値以下で稼働空きありの担当工事班の数が残り少ない場合、概略工事カレンダーで「△」表示するようにしてもよい。   In the example of FIG. 8, it is determined that there is no operation vacancy for the dates for which operation schedules are set for all of the construction teams in charge, and “X” is displayed on the general construction calendar. On the other hand, if there is no operation schedule set for any of the construction teams in charge, it is determined that there is an operation vacancy, and “O” is displayed on the general construction calendar. If the number of construction teams with operating vacancy is less than or equal to a preset threshold and the number of construction teams with operating vacancy is small, “Δ” may be displayed on the general construction calendar.

この後、空き状況提示部17は、生成した概略工事カレンダーを当該工事ブロックに関する稼働空き状況データとして、通信ネットワーク20を介して担当者端末21へ配信して提示する(ステップ125)。
これにより、当該工事ブロックの概略工事カレンダーが担当者端末21で画面表示され、空き状況確認要求で指定した工事ブロックにおける稼働空き状況データが提示されることになる。
Thereafter, the vacancy status presentation unit 17 distributes and presents the generated general construction calendar to the person-in-charge terminal 21 via the communication network 20 as operating vacancy status data relating to the construction block (step 125).
As a result, the general construction calendar of the construction block is displayed on the screen of the person-in-charge terminal 21, and the operation availability data in the construction block designated by the availability confirmation request is presented.

[詳細空き状況提示動作]
次に、図9を参照して、本実施の形態にかかるスケジュール管理システム10での詳細空き状況提示動作について説明する。図9は、詳細空き状況提示動作を示すフローチャートである。
[Detailed availability presentation]
Next, with reference to FIG. 9, the detailed availability state presenting operation in the schedule management system 10 according to the present exemplary embodiment will be described. FIG. 9 is a flowchart showing the detailed availability state presenting operation.

スケジュール管理システム10は、営業担当者の操作に基づき担当者端末21から通信ネットワーク20を介して通知された空き状況確認要求に応じて、図9の詳細空き状況提示動作を実行する。なお、詳細空き状況提示動作の開始時点において、担当ブロック設定DB11、稼働可否設定DB12、およびスケジュール管理簿DB13には、それぞれ担当ブロックデータ、稼働可否データ、およびスケジュールデータが既に登録されているものとする。   The schedule management system 10 executes the detailed availability state presenting operation of FIG. 9 in response to the availability status confirmation request notified from the person in charge terminal 21 via the communication network 20 based on the operation of the sales person in charge. It should be noted that at the time of starting the detailed availability state presentation operation, the assigned block data, the availability data, and the schedule data are already registered in the assigned block setting DB 11, the operation availability setting DB 12, and the schedule management book DB 13, respectively. To do.

まず、データ取得部16は、担当者端末21からの空き状況確認要求で指定された工事ブロックに基づき、この工事ブロックを担当する担当工事班の担当ブロックデータを担当ブロック設定DB11から取得して、担当工事班を確認する(ステップ130)。
続いて、データ取得部16は、これら担当工事班に関する稼働可否データを稼働可否設定DB12から取得するとともに(ステップ131)、これら担当工事班に関するスケジュールデータをスケジュール管理簿DB13から取得する(ステップ132)。
First, the data acquisition unit 16 acquires from the responsible block setting DB 11 the responsible block data of the responsible construction group responsible for the construction block based on the construction block specified in the availability check request from the responsible person terminal 21. The responsible construction group is confirmed (step 130).
Subsequently, the data acquisition unit 16 acquires operation availability data regarding these assigned construction teams from the operation availability setting DB 12 (step 131), and acquires schedule data regarding these assigned construction groups from the schedule management book DB 13 (step 132). .

次に、空き状況提示部17は、データ取得部16で取得した稼働可否データおよびスケジュールデータに基づき当該工事ブロックの各担当工事班に関する稼働工数、すなわち登録済工数または空き工数を、日付ごと、さらには日付および時間帯の組み合わせごとに、担当工事班ごとに集計する(ステップ133)。
この際、例えば図2に示すように、当該工事ブロックと対応する営業所に関連して工事時間帯が設定されているため、図4に示す稼働可否データでこれら工事時間帯以外の時間帯については、工事の受付を行わない。このため、スケジュールデータで工事予定が登録されていなくても、これら工事時間帯以外の時間帯については、各担当工事班における当該工事ブロックでの空き工数が0として集計されることになる。
Next, the vacancy status presentation unit 17 calculates the operation man-hours related to each work team in charge of the construction block based on the operation availability data and schedule data acquired by the data acquisition unit 16, that is, the registered man-hours or the man-hours for each date. For each combination of date and time zone and for each construction team in charge (step 133).
At this time, for example, as shown in FIG. 2, since the construction time zone is set in relation to the sales office corresponding to the construction block, the operation availability data shown in FIG. 4 is used for time zones other than these construction time zones. Will not accept construction work. For this reason, even if the construction schedule is not registered in the schedule data, the vacant man-hours in the construction block in each responsible construction group are counted as 0 for the time zones other than these construction time zones.

また、データ取得部16で取得されたスケジュールデータは、空き状況確認要求で指定された工事ブロックを担当する各担当工事班の稼働予定を示すものであるが、これら担当工事班が空き状況確認要求で指定された工事ブロック以外の他の工事ブロックも担当している場合は、他の工事ブロックに関する稼働予定も含まれている。
したがって、スケジュールデータを集計する際、他の工事ブロックに関する登録済工数も一緒に集計されるため、任意の担当工事班に対して他の工事ブロックで稼働工数が登録されている日時については、当該担当工事班について空き状況確認要求で指定された工事ブロックで稼働工数が登録されていなくても登録済工数が集計されることになる。
In addition, the schedule data acquired by the data acquisition unit 16 indicates the operation schedule of each construction team in charge of the construction block designated in the availability check request. If other construction blocks other than the construction blocks specified in the above are also in charge, the operation schedule for other construction blocks is included.
Therefore, when the schedule data is aggregated, the registered man-hours related to other construction blocks are also aggregated together. The registered man-hours will be totaled even if the working man-hours are not registered in the construction block specified in the availability check request for the responsible construction group.

続いて、空き状況提示部17は、得られた集計結果に基づき日ごとの詳細な稼働工数空き状況を示す詳細工事カレンダーを、担当工事班ごとに生成する(ステップ134)。
図10は、詳細工事カレンダーの構成例である。ここでは、空き状況確認要求で指定された工事ブロック「X2」を担当する担当工事班「A」の登録済工数と全工数とが日付ごとに集計されて、稼働工数空き状況として表示されている。
図10の例では、日付ごとに担当工事班「A」の登録済工数と全工数とが表示されているため、管理者は、これら登録済工数と全工数の差分から残りの登録可能工数を確認することができる。
Subsequently, the empty status presenting unit 17 generates a detailed construction calendar indicating the detailed operating man-hour availability status for each day based on the obtained counting result for each construction team in charge (step 134).
FIG. 10 is a configuration example of a detailed construction calendar. Here, the registered man-hours and the total man-hours of the construction team “A” in charge of the construction block “X2” designated in the availability check request are aggregated for each date and displayed as the operating man-hour availability status. .
In the example of FIG. 10, the registered man-hours and the total man-hours of the assigned construction team “A” are displayed for each date. Therefore, the administrator determines the remaining man-hours that can be registered from the difference between these registered man-hours and the total man-hours. Can be confirmed.

この後、空き状況提示部17は、生成した詳細工事カレンダーを当該工事ブロックに関する稼働空き状況データとして、通信ネットワーク20を介して管理者端末22へ配信して提示する(ステップ135)。
これにより、当該工事ブロックの詳細工事カレンダーが管理者端末22で画面表示され、空き状況確認要求で指定した工事ブロックにおける稼働空き状況データが提示されることになる。
Thereafter, the vacancy status presentation unit 17 distributes the generated detailed work calendar as operation vacancy status data related to the work block to the manager terminal 22 through the communication network 20 and presents it (step 135).
As a result, the detailed construction calendar of the construction block is displayed on the screen of the manager terminal 22, and the operation availability data in the construction block designated by the availability confirmation request is presented.

概略工事カレンダーや詳細工事カレンダーについては、図8や図10に示した構成例に限定されるものではなく、他の書式で構成してもよい。例えば、図8の「○」,「×」,「△」に代えて色分け表示してもよく、図10の登録済工数と全工数に代えて、これら差分からなる残りの登録可能工数を表示してもよい。   The general construction calendar and the detailed construction calendar are not limited to the configuration examples shown in FIGS. 8 and 10, and may be configured in other formats. For example, instead of “◯”, “×”, “Δ” in FIG. 8, color-coded display may be performed, and instead of the registered man-hours and the total man-hours in FIG. May be.

また、概略工事カレンダーや詳細工事カレンダーのうち任意の日付欄に対するマウス選択操作に応じて、当該日付における稼働空き状況を時間帯ごとにポップアップ画面で詳細表示してもよい。
図11は、概略工事カレンダーの詳細表示画面例である。ここでは、午前および午後に2つずつ設けられている時間帯「AM1」,「AM2」,「PM1」,「PM2」ごとに、選択された日付における稼働空き状況がポップアップ画面で詳細表示されている。
Further, according to a mouse selection operation on an arbitrary date column in the general construction calendar or the detailed construction calendar, the operating availability on the date may be displayed in detail on a pop-up screen for each time zone.
FIG. 11 is an example of a detailed display screen of the general construction calendar. Here, for each time zone “AM1”, “AM2”, “PM1”, “PM2” provided in the morning and in the afternoon, the operating availability on the selected date is displayed in detail on a pop-up screen. Yes.

図12は、詳細工事カレンダーの詳細表示画面例である。ここでは、午前および午後に2つずつ設けられている時間帯「AM1」,「AM2」,「PM1」,「PM2」ごとに、選択された日付における登録済工数と全工数がポップアップ画面で詳細表示されている。
また、図12の詳細表示画面において、登録済工数と全工数に代えて、当該日付、時間帯、および工事班と対応するスケジュールデータを、スケジュール管理簿DB13から取得して、ポップアップ画面で詳細表示するようにしてもよい。
FIG. 12 is an example of a detailed display screen of the detailed construction calendar. Here, for each time zone “AM1”, “AM2”, “PM1”, “PM2” provided in the morning and in the afternoon, the registered man-hours and the total man-hours on the selected date are displayed in detail on the pop-up screen. It is displayed.
Further, in the detailed display screen of FIG. 12, instead of the registered man-hours and the total man-hours, schedule data corresponding to the date, time zone, and construction team is acquired from the schedule management book DB 13 and displayed in detail on a pop-up screen. You may make it do.

[第1の実施の形態の効果]
このように、本実施の形態は、データ取得部16が、指定された工事ブロックを担当する担当工事班を担当ブロック設定DB11の担当ブロックデータで確認し、これら担当工事班に関する稼働可否データを稼働可否設定DB12から取得するとともに、これら担当工事班に関するスケジュールデータをスケジュール管理簿DB13から取得し、空き状況提示部17が、取得した稼働可否データおよびスケジュールデータに基づき、当該工事ブロックの各担当工事班に関する稼働の空き状況を集計し、得られた集計結果に基づき日ごとの稼働空き状況を示す概略工事カレンダーを生成し、生成した概略工事カレンダーを当該工事ブロックに関する稼働空き状況データとして提示するようにしたものである。
[Effect of the first embodiment]
As described above, in this embodiment, the data acquisition unit 16 confirms the assigned work group in charge of the designated work block with the assigned block data in the assigned block setting DB 11 and operates the availability data on these assigned work groups. Acquired from the availability setting DB 12 and also acquired schedule data related to these assigned construction groups from the schedule management book DB 13, and the vacancy status presentation unit 17, based on the obtained availability data and schedule data, each assigned construction group for the construction block. To calculate the construction availability calendar showing the daily availability of operation based on the obtained counting results, and present the generated construction calendar as operation availability data for the construction block It is a thing.

これにより、担当工事班が空き状況確認要求で指定された工事ブロック以外の他の工事ブロックも担当している場合、データ取得部16が取得したスケジュールデータに他の工事ブロックに関する稼働予定も含まれていることになる。このため、空き状況提示部17がスケジュールデータを集計する際、他の工事ブロックに関する稼働予定も一緒に集計されるため、任意の担当工事班に対して他の工事ブロックでの稼働予定が登録されている日時については、当該担当工事班について空き状況確認要求で指定された工事ブロックでの稼働予定が登録されていなくても稼働空きなしとして集計される。   As a result, when the construction team in charge is in charge of other construction blocks other than the construction block specified in the availability check request, the schedule data acquired by the data acquisition unit 16 includes the operation schedule related to other construction blocks. Will be. For this reason, when the availability state presentation unit 17 aggregates the schedule data, the operation schedules related to other construction blocks are also aggregated together. Therefore, the operation schedules in other construction blocks are registered for any construction team in charge. The operation date is counted as no operation available even if the operation schedule in the construction block designated in the availability confirmation request is not registered for the construction group in charge.

したがって、複数の工事班が複数の工事ブロックを手分けして担当しており、工事ブロックと工事班との関係がM:N(M,Nは2以上の整数)の関係である場合でも、指定された工事ブロックにおける工事班の空き状況を示す正確な稼働空き状況データを提示することが可能となる。   Therefore, even if a plurality of construction teams are in charge of a plurality of construction blocks, and the relationship between the construction blocks and the construction team is M: N (M, N is an integer of 2 or more), it is designated. It is possible to present accurate operating availability data indicating the availability of the construction team in the construction block.

特に、1:1または1:Nの関係を前提とする前述の従来技術にかかるスケジュール管理技術を利用できないため、管理者が工事ブロックでの工事可否を手作業で判断していた状況では、営業担当者からの問い合わせが滞り、利用者(顧客)交渉をスムーズに進めることができないという問題点があった。本実施の形態によれば、正式に工事を申し込む前に、営業担当者が工事班に関する稼働空き状況を、担当者端末21で極めて容易かつ迅速に確認できるため、利用者(顧客)交渉をスムーズに進めることができ、利用者へのサービスアップにも繋がる。   In particular, since the schedule management technology according to the above-described conventional technology based on the relationship of 1: 1 or 1: N cannot be used, the business is in a situation where the manager manually determines whether or not construction is possible in the construction block. There was a problem that user (customer) negotiations could not be proceeded smoothly because of inquiries from the person in charge. According to the present embodiment, before a formal application for construction is made, the sales representative can check the availability of the construction team on the person-in-charge terminal 21 very easily and quickly. Can lead to improved service to users.

また、本実施の形態は、稼働可否データに、日時ごとに工事班が担当可能な作業規模を示す稼働工数を含むものとし、空き状況提示部17が、取得した稼働可否データおよびスケジュールデータに基づき、工事ブロックの各担当工事班に関する稼働の登録済工数または空き工数を当該担当工事班ごとに集計し、得られた集計結果に基づき日ごとの稼働工数空き状況を示す詳細工事カレンダーを当該担当工事班ごとに生成し、生成したこれら詳細工事カレンダーを稼働空き状況データとして提示するようにしたものである。
したがって、指定された工事ブロックにおける各工事班の空き状況が稼働工数で提示されるため、極めて詳細に各工事班の稼働空き状況を把握することができる。
Further, in the present embodiment, the operation availability data includes the operation man-hour indicating the work scale that the construction team can handle for each date and time, and the vacancy status presentation unit 17 is based on the acquired operation availability data and schedule data. Total number of registered or vacant man-hours for operation for each work group in charge of the construction block is counted for each work group in charge, and a detailed work calendar showing the daily availability of work hours based on the obtained count results Each of these detailed work calendars is generated and presented as operational availability data.
Therefore, since the availability of each construction group in the designated construction block is presented in terms of the number of operating man-hours, it is possible to grasp the availability of each construction group in very detail.

また、本実施の形態は、営業担当者すなわち担当者端末21から空き状況確認要求を受け取った場合には、各工事班に関する個別の稼働空き状況を含まない概略工事カレンダーを生成して担当者端末21へ提示し、管理者すなわち管理者端末22から空き状況確認要求を受け取った場合には、各工事班に関する個別の稼働空き状況を含む詳細工事カレンダーを生成して管理者端末22へ提示するようにしたものである。
これにより、営業担当者には利用者(顧客)交渉に必要となる最低限の稼働空き状況データだけを提供することができる。したがって、営業担当者に詳細な稼働空き状況データを提示した場合に発生しうる、営業担当者の都合による稼働設定や工事班に対する負担増を抑制できる。また、それぞれの工事が持つ優先度や緊急性に応じて、管理者が稼働スケジュールを適切に調整することが可能となる。
Further, according to the present embodiment, when the availability check request is received from the sales representative, that is, the person in charge terminal 21, a general construction calendar not including the individual operation availability for each construction team is generated and the person in charge terminal is created. 21. When a vacancy status confirmation request is received from the administrator, that is, the manager terminal 22, a detailed construction calendar including individual operating vacancy status for each construction team is generated and presented to the manager terminal 22. It is a thing.
As a result, the sales staff can be provided with only the minimum operating availability data necessary for user (customer) negotiations. Therefore, it is possible to suppress an increase in the burden on the operation setting and the construction team, which may occur when detailed operating availability data is presented to the sales staff. In addition, the manager can appropriately adjust the operation schedule according to the priority and urgency of each construction.

[第2の実施の形態]
次に、本発明の第2の実施の形態にかかるスケジュール管理システム10について説明する。
前述した図6のステップ106において、営業担当者が管理者に対して、工事調整依頼によりスケジュール調整を依頼する場合、電話や電子メールにより依頼してもよい。しかしながら、このような依頼には、具体的な工事内容を管理者に説明する必要があるため、電話ではやり取りが長時間となり作業効率が悪い。また、電子メールでは説明文書の作成に時間を要するとともに、その取り込みを自動化するのは難しく、人手による入力では作業効率が悪い。
[Second Embodiment]
Next, the schedule management system 10 according to the second exemplary embodiment of the present invention will be described.
In step 106 of FIG. 6 described above, when the sales representative requests the manager to adjust the schedule by a construction adjustment request, it may be requested by telephone or e-mail. However, for such a request, it is necessary to explain the details of the construction work to the administrator, so that communication takes a long time by telephone and the work efficiency is poor. In addition, e-mail takes time to create an explanatory document, and it is difficult to automate importing, and manual input is inefficient.

本実施の形態では、営業担当者が担当者端末21を操作して、スケジュール管理システム10に工事調整依頼を行う場合、電子帳票を用いて調整依頼を行う場合の詳細について説明する。
前述したように、工事管理部15は、営業担当者の操作に基づき担当者端末21から通信ネットワーク20を介して通知された工事調整依頼を受け付けて、この調整依頼内容を含む調整依頼データをスケジュール管理簿DB13に登録する機能を有している。
In the present embodiment, details will be described in the case where the sales person operates the person-in-charge terminal 21 to make a construction adjustment request to the schedule management system 10 and the adjustment request is made using an electronic form.
As described above, the construction management unit 15 receives the construction adjustment request notified from the person-in-charge terminal 21 via the communication network 20 based on the operation of the sales person, and schedules the adjustment request data including the contents of the adjustment request. It has a function of registering in the management book DB 13.

電子帳票を用いた工事調整依頼については、表計算ファイルから帳票フォームを作成する技術(例えば、特許文献2など参照)を利用すればよい。しかし、この帳票フォームに記載された内容を、スケジュール管理システム10と連携させるには、工事管理部15で、帳票フォームの各項目データを、調整依頼データの各項目データとして取り込む必要がある。   For a construction adjustment request using an electronic form, a technique for creating a form form from a spreadsheet file (see, for example, Patent Document 2) may be used. However, in order to link the content described in the form form with the schedule management system 10, the construction management unit 15 needs to fetch each item data of the form form as each item data of the adjustment request data.

この際、専用の連携プログラムを作成すれば、帳票フォームの各項目データを調整依頼データの各項目データに取り込むことができるが、設備工事の種類などスケジュール管理業務によって取り込み処理の詳細が異なる。このため、スケジュール管理システム10が利用される作業環境に応じて連携プログラムを変更する必要があり、開発コストの増大に繋がる。   At this time, if a dedicated linkage program is created, each item data of the form form can be imported into each item data of the adjustment request data, but the details of the import process differ depending on the schedule management work such as the type of facility construction. For this reason, it is necessary to change a cooperation program according to the work environment where the schedule management system 10 is utilized, which leads to an increase in development cost.

ここで、電子帳票を画面表示する際に用いるフォームについては、HTMLなどのマークアップ言語で記述することが一般的であり、これらフォームはWebページとしてブラウザ機能により画面表示される。
また、ブラウザ機能のレンダリング処理により生成されたWebページの各種オブジェクトについては、同じくWebページに記述されるスクリプト系プログラムから、DOM(Document Object Model)技術を用いてアクセスすることが可能である。
Here, a form used when displaying an electronic form on a screen is generally described in a markup language such as HTML, and these forms are displayed on the screen as a Web page by a browser function.
In addition, various objects of the Web page generated by the rendering process of the browser function can be accessed from a script program described in the Web page using DOM (Document Object Model) technology.

本実施の形態は、このような観点から、工事調整依頼の帳票フォームを示すWebページと調整依頼データの入力フォームを示すWebページとの間で、対応する項目を予め複写定義データで定義しておき、ブラウザ機能により画面表示されたこれらWebページの項目オブジェクト間で、複写定義データに基づき各項目データを複写するようにしたものである。   In this embodiment, from this point of view, the corresponding items are defined in advance in the copy definition data between the Web page indicating the work adjustment request form and the Web page indicating the adjustment request data input form. In addition, each item data is copied between the item objects of these Web pages displayed on the screen by the browser function based on the copy definition data.

Webページに表示される各項目データは、それぞれタグを用いて記述されており、これらタグには「name」や「id」などの識別情報を付与することができる。また、これらタグは、Webページの子オブジェクトとして、Webページの先頭からの記述順序(位置情報)からなる識別情報で特定することもできる。   Each item data displayed on the Web page is described using tags, and identification information such as “name” and “id” can be given to these tags. These tags can also be specified as identification objects consisting of the description order (position information) from the top of the Web page as child objects of the Web page.

図13は、複写定義データの構成例である。ここでは、工事調整依頼の帳票フォームを示す複写元Webページの識別情報(例えばページタイトル)や、調整依頼データの入力フォームを示す複写先Webページの識別情報(例えばページタイトル)に加えて、複写する項目データ対に固有の項目IDごとに、複写元Webページ上における当該項目データと対応する複写元項目オブジェクトの識別情報と、複写先Webページ上における当該項目データと対応する複写先項目オブジェクトの識別情報とが登録される。   FIG. 13 is a configuration example of copy definition data. Here, in addition to the identification information (for example, page title) of the copy source Web page indicating the form form of the construction adjustment request and the identification information (for example, page title) of the copy destination Web page indicating the input form of the adjustment request data, copying is performed. For each item ID unique to the item data pair to be copied, identification information of the copy source item object corresponding to the item data on the copy source Web page and the copy destination item object corresponding to the item data on the copy destination Web page Identification information is registered.

このような工事調整依頼の取り込みは、管理者による管理者端末22での操作に応じて工事管理部15が実行する。
図14は、工事調整依頼の取り込み画面を示す画面表示例である。ここでは、取り込み画面左側には、複写先となる調整依頼データの入力フォームが表示されており、取り込み画面右側には、工事調整依頼の帳票フォームが表示されている。
Such a construction adjustment request is taken in by the construction management unit 15 in accordance with an operation performed by the manager on the manager terminal 22.
FIG. 14 is a screen display example showing a construction adjustment request fetch screen. Here, an input form for adjustment request data serving as a copy destination is displayed on the left side of the capture screen, and a form form for construction adjustment requests is displayed on the right side of the capture screen.

管理者の操作に応じて、工事管理部15はこの取り込み画面を管理者端末22で表示し、この取り込み画面での取り込み開始操作に応じて、工事管理部15は、まず複写元のWebページから、複写定義データで定義されている複写元項目オブジェクトの識別情報と対応する項目オブジェクトの項目データをそれぞれ取得し、次に、これら項目データを、複写先のWebページのうち、複写定義データで定義されている複写先項目オブジェクトの識別情報と対応する項目オブジェクトの項目データとして複写する。   In response to the operation of the administrator, the construction management unit 15 displays this capture screen on the administrator terminal 22, and in response to the capture start operation on this capture screen, the construction management unit 15 first starts from the copy source Web page. The item data of the item object corresponding to the identification information of the copy source item object defined in the copy definition data is acquired, and then the item data is defined in the copy definition data in the copy destination Web page. It is copied as item data of the item object corresponding to the identification information of the copy destination item object.

これにより、例えば図14のうち、工事調整依頼の帳票フォームに記載されている工事希望日および希望時間帯が、調整依頼データの入力フォームの工事日および時間帯の項目欄にそれぞれ複写される。同じく、工事調整依頼の帳票フォームに記載されているお客様名および設置住所が、調整依頼データの入力フォームのお客様名およびお客様住所の項目欄にそれぞれ複写される。   Thus, for example, in FIG. 14, the desired construction date and desired time zone described in the work adjustment request form are copied to the construction date and time zone fields of the adjustment request data input form, respectively. Similarly, the customer name and installation address described in the work adjustment request form are copied to the customer name and customer address fields of the adjustment request data input form.

[第2の実施の形態の効果]
このように本実施の形態では、工事管理部15が、工事を受注する営業担当者の担当者端末21からの工事調整依頼に応じて、当該工事調整依頼の帳票フォームの記載内容を調整依頼データの入力フォームに取り込みを行うようにしたものである。より具体的には、工事管理部15が、取り込みの際、予め登録されている複写定義データに基づいて、帳票フォームを示す複写元Webページから、当該複写定義データで定義されている複写元項目オブジェクトの識別情報と対応する項目オブジェクトの項目データをそれぞれ取得し、これら項目データを、入力フォームを示す複写先のWebページのうち、当該複写定義データで定義されている複写先項目オブジェクトの識別情報と対応する項目オブジェクトの項目データとして複写するようにしたものである。
[Effect of the second embodiment]
As described above, in the present embodiment, the construction management unit 15 responds to the construction adjustment request from the person-in-charge terminal 21 of the salesperson who receives an order for the construction, and describes the description content of the form form of the construction adjustment request as the adjustment request data. It is intended to import into the input form. More specifically, the copy source item defined by the copy definition data from the copy source Web page showing the form form based on the copy definition data registered in advance by the construction management unit 15 Each item data of the item object corresponding to the object identification information is acquired, and the item data is identified from the copy destination item object defined in the copy definition data in the copy destination Web page indicating the input form. Are copied as item data of the corresponding item object.

これにより、営業担当者の操作に基づき担当者端末21から通信ネットワーク20を介して通知された工事調整依頼の内容を、スケジュール管理システム10と連携させることができる。この際、複写定義データを編集するだけで、スケジュール管理システム10が利用される作業環境に対応することができ、専用の連携プログラムを作成する場合と比較して、開発コストを大幅に削減できる。   Thereby, the content of the construction adjustment request notified from the person in charge terminal 21 via the communication network 20 based on the operation of the sales person in charge can be linked with the schedule management system 10. At this time, it is possible to cope with the work environment in which the schedule management system 10 is used only by editing the copy definition data, and the development cost can be greatly reduced as compared with the case of creating a dedicated linkage program.

[実施の形態の拡張]
以上、実施形態を参照して本発明を説明したが、本発明は上記実施形態に限定されるものではない。本発明の構成や詳細には、本発明のスコープ内で当業者が理解しうる様々な変更をすることができる。また、各実施形態については、矛盾しない範囲で任意に組み合わせて実施することができる。
[Extended embodiment]
The present invention has been described above with reference to the embodiments, but the present invention is not limited to the above embodiments. Various changes that can be understood by those skilled in the art can be made to the configuration and details of the present invention within the scope of the present invention. In addition, each embodiment can be implemented in any combination within a consistent range.

10…スケジュール管理システム、11…担当ブロック設定DB、12…稼働可否設定DB、13…スケジュール管理簿DB、14…設定管理部、15…工事管理部、16…データ取得部、17…空き状況提示部、20…通信ネットワーク、21…担当者端末、22…管理者端末、L…通信回線。   DESCRIPTION OF SYMBOLS 10 ... Schedule management system, 11 ... Responsible block setting DB, 12 ... Operation availability setting DB, 13 ... Schedule management book DB, 14 ... Setting management part, 15 ... Construction management part, 16 ... Data acquisition part, 17 ... Space availability presentation , 20 ... communication network, 21 ... responsible person terminal, 22 ... administrator terminal, L ... communication line.

Claims (7)

サービスを提供するサービス提供場所ごとに、当該サービスの提供を担当するサービス提供者のスケジュールを管理するスケジュール管理システムであって、
前記サービス提供者が担当する前記サービス提供場所を示す担当ブロックデータを記憶する担当ブロック設定DBと、
前記サービス提供者が稼働可能な日時を示す稼働可否データを記憶する稼働可否設定DBと、
前記サービス提供場所で前記サービス提供者が担当するサービスのスケジュールを示すスケジュールデータを記憶するスケジュール管理簿DBと、
指定されたサービス提供場所を担当する担当サービス提供者を前記担当ブロック設定DBの担当ブロックデータで確認し、これら担当サービス提供者に関する稼働可否データを前記稼働可否設定DBから取得するとともに、これら担当サービス提供者に関するスケジュールデータを前記スケジュール管理簿DBから取得するデータ取得部と、
取得した前記稼働可否データおよび前記スケジュールデータに基づき、当該サービス提供場所の各担当サービス提供者に関する稼働の空き状況を集計し、得られた集計結果に基づき日ごとの稼働空き状況を示す概略サービスカレンダーを生成し、生成した概略サービスカレンダーを当該サービス提供場所に関する稼働空き状況データとして提示する空き状況提示部と
を備えることを特徴とするスケジュール管理システム。
A schedule management system for managing a schedule of a service provider in charge of providing the service for each service providing place that provides the service,
A responsible block setting DB for storing responsible block data indicating the service providing location that the service provider is in charge of;
An operation availability setting DB for storing operation availability data indicating the date and time when the service provider can operate;
A schedule management book DB for storing schedule data indicating a schedule of services handled by the service provider at the service providing location;
The responsible service provider in charge of the designated service providing location is confirmed by the responsible block data in the responsible block setting DB, and the availability data regarding these responsible service providers is acquired from the availability setting DB, and these responsible services A data acquisition unit for acquiring schedule data related to the provider from the schedule management book DB;
Based on the acquired availability data and the schedule data, an outline service calendar that summarizes the availability of operation for each service provider at the service provision location and indicates the availability of operation every day based on the obtained aggregation result And a vacancy status presentation unit that presents the generated general service calendar as operational vacancy status data related to the service providing location.
請求項1に記載のスケジュール管理システムにおいて、
前記稼働可否データは、前記日時ごとに前記サービス提供者が担当可能な作業規模を示す稼働工数を含み、
前記空き状況提示部は、取得した前記稼働可否データおよび前記スケジュールデータに基づき、前記サービス提供場所の各担当サービス提供者に関する稼働の登録済工数または空き工数を当該担当サービス提供者ごとに集計し、得られた集計結果に基づき日ごとの稼働工数空き状況を示す詳細サービスカレンダーを当該担当サービス提供者ごとに生成し、生成したこれら詳細サービスカレンダーを前記稼働空き状況データとして提示する
ことを特徴とするスケジュール管理システム。
In the schedule management system according to claim 1,
The operation availability data includes an operation man-hour indicating a work scale that can be handled by the service provider for each date and time,
The availability state presenting unit, based on the acquired availability data and the schedule data, totals the registered man-hours or vacant man-hours for each service provider in charge for each service provider, A detailed service calendar showing the availability of operating man-hours per day based on the obtained counting results is generated for each service provider concerned, and the generated detailed service calendar is presented as the operating availability data. Schedule management system.
請求項2に記載のスケジュール管理システムにおいて、
前記空き状況提示部は、サービスを受注する営業担当者の担当者端末から空き状況確認要求を受信した場合には、前記概略サービスカレンダーを生成して当該サービス提供場所に関する稼働空き状況データとして当該担当者端末へ提示し、前記サービス提供者が担当するサービスのスケジュールを調整する管理者の管理者端末から空き状況確認要求を受信した場合には、前記詳細サービスカレンダーを生成して当該サービス提供場所に関する稼働空き状況データとして当該管理者端末へ提示することを特徴とするスケジュール管理システム。
In the schedule management system according to claim 2,
When the availability presenting unit receives an availability confirmation request from a person in charge of a salesperson who receives an order for service, the availability presenting unit generates the general service calendar and operates as the availability data on the service providing location. When the availability check request is received from the administrator terminal of the administrator who presents to the user terminal and adjusts the schedule of the service for which the service provider is responsible, the detailed service calendar is generated to relate to the service providing location. A schedule management system characterized in that it is presented to the manager terminal as operating availability data.
請求項1〜請求項3のいずれか1つに記載のスケジュール管理システムにおいて、
サービスを受注する営業担当者の担当者端末からのサービス調整依頼に応じて、当該サービス調整依頼の帳票フォームの記載内容を調整依頼データの入力フォームに取り込みを行うサービス管理部をさらに備え、
前記サービス管理部は、前記取り込みの際、予め登録されている複写定義データに基づいて、前記帳票フォームを示す複写元Webページから、当該複写定義データで定義されている複写元項目オブジェクトの識別情報と対応する項目オブジェクトの項目データをそれぞれ取得し、これら項目データを、前記入力フォームを示す複写先のWebページのうち、当該複写定義データで定義されている複写先項目オブジェクトの識別情報と対応する項目オブジェクトの項目データとして複写する
ことを特徴とするスケジュール管理システム。
In the schedule management system according to any one of claims 1 to 3,
In response to a service adjustment request from the person in charge of a salesperson who receives an order for a service, the service management unit further incorporates the description content of the form form of the service adjustment request into the input form of the adjustment request data.
The service management unit, based on the copy definition data registered in advance at the time of the import, identifies the copy source item object defined by the copy definition data from the copy source Web page indicating the form form. And item data corresponding to the item object corresponding to the copy destination item object defined in the copy definition data in the copy destination Web page indicating the input form. A schedule management system characterized by copying as item data of an item object.
請求項1〜請求項4のいずれか1つに記載のスケジュール管理システムにおいて、
前記サービスが工事作業からなり、前記サービス提供場所が工事作業を管理する範囲として予め設定した工事ブロックからなり、前記サービス提供者が当該工事ブロックを担当する各工事班からなり、工事ブロックごとに当該工事ブロックを担当する各工事班のスケジュールを管理することを特徴とするスケジュール管理システム。
In the schedule management system according to any one of claims 1 to 4,
The service is composed of construction work, the service providing place is composed of construction blocks set in advance as a range for managing the construction work, and the service provider is composed of respective construction teams in charge of the construction block. A schedule management system that manages the schedule of each construction group in charge of construction blocks.
サービスを提供するサービス提供場所ごとに、当該サービスの提供を担当するサービス提供者のスケジュールを管理するスケジュール管理方法であって、
前記サービス提供者が担当する前記サービス提供場所を示す担当ブロックデータを担当ブロック設定DBで記憶するステップと、
前記サービス提供者が稼働可能な日時を示す稼働可否データを稼働可否設定DBで記憶するステップと、
前記サービス提供場所で前記サービス提供者が担当するサービスのスケジュールを示すスケジュールデータをスケジュール管理簿DBで記憶するステップと、
データ取得部が、指定されたサービス提供場所を担当する担当サービス提供者を前記担当ブロック設定DBの担当ブロックデータで確認し、これら担当サービス提供者に関する稼働可否データを前記稼働可否設定DBから取得するとともに、これら担当サービス提供者に関するスケジュールデータを前記スケジュール管理簿DBから取得するデータ取得ステップと、
空き状況提示部が、取得した前記稼働可否データおよび前記スケジュールデータに基づき、当該サービス提供場所の各担当サービス提供者に関する稼働の空き状況を集計し、得られた集計結果に基づき日ごとの稼働空き状況を示す概略サービスカレンダーを生成し、生成した概略サービスカレンダーを当該サービス提供場所に関する稼働空き状況データとして提示する空き状況提示ステップと
を備えることを特徴とするスケジュール管理方法。
A schedule management method for managing a schedule of a service provider in charge of providing the service for each service providing place that provides the service,
Storing responsible block data indicating the service providing location that the service provider is responsible for in the responsible block setting DB;
Storing operation availability data indicating the date and time when the service provider can operate in an operation availability setting DB;
Storing schedule data indicating a schedule of services handled by the service provider at the service providing place in a schedule management book DB;
The data acquisition unit confirms the responsible service provider in charge of the designated service providing location with the responsible block data in the responsible block setting DB, and acquires the availability data on these responsible service providers from the availability setting DB. And a data acquisition step of acquiring schedule data related to these responsible service providers from the schedule management book DB;
Based on the obtained availability data and the schedule data, the availability status presenting unit aggregates the availability status of each service provider at the service providing location, and the daily availability based on the obtained count result A schedule management method comprising: generating an outline service calendar indicating a situation, and presenting the generated outline service calendar as operational availability data relating to the service providing location.
コンピュータを、請求項1〜請求項5のいずれか1つに記載のスケジュール管理システムを構成する各部として機能させるためのプログラム。   The program for functioning a computer as each part which comprises the schedule management system as described in any one of Claims 1-5.
JP2014205888A 2014-10-06 2014-10-06 Schedule management system, method, and program Active JP6296956B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014205888A JP6296956B2 (en) 2014-10-06 2014-10-06 Schedule management system, method, and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014205888A JP6296956B2 (en) 2014-10-06 2014-10-06 Schedule management system, method, and program

Publications (2)

Publication Number Publication Date
JP2016076077A true JP2016076077A (en) 2016-05-12
JP6296956B2 JP6296956B2 (en) 2018-03-20

Family

ID=55951414

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014205888A Active JP6296956B2 (en) 2014-10-06 2014-10-06 Schedule management system, method, and program

Country Status (1)

Country Link
JP (1) JP6296956B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019101857A (en) * 2017-12-05 2019-06-24 三菱電機株式会社 Schedule management system and schedule management program

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003085287A (en) * 2001-09-14 2003-03-20 Toshiba Corp Helper dispatch scheduling method and system and server and its program
US20040111313A1 (en) * 2002-10-29 2004-06-10 Ingman Robert Mitchell Methods and systems for assigning multiple tasks
JP2005050157A (en) * 2003-07-29 2005-02-24 Nec Corp Inquiry management system and program
JP2008102858A (en) * 2006-10-20 2008-05-01 Moz Sekkei Jimusho:Kk Information processor and program
JP2009223618A (en) * 2008-03-17 2009-10-01 Fujitsu Ltd Construction reservation apparatus, construction reservation processing method and program

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003085287A (en) * 2001-09-14 2003-03-20 Toshiba Corp Helper dispatch scheduling method and system and server and its program
US20040111313A1 (en) * 2002-10-29 2004-06-10 Ingman Robert Mitchell Methods and systems for assigning multiple tasks
JP2005050157A (en) * 2003-07-29 2005-02-24 Nec Corp Inquiry management system and program
JP2008102858A (en) * 2006-10-20 2008-05-01 Moz Sekkei Jimusho:Kk Information processor and program
JP2009223618A (en) * 2008-03-17 2009-10-01 Fujitsu Ltd Construction reservation apparatus, construction reservation processing method and program

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019101857A (en) * 2017-12-05 2019-06-24 三菱電機株式会社 Schedule management system and schedule management program

Also Published As

Publication number Publication date
JP6296956B2 (en) 2018-03-20

Similar Documents

Publication Publication Date Title
US20140257694A1 (en) Constrained service restoration with heuristics
US20100191552A1 (en) Apparatus, method and article to facilitate propagation of current appointment availability in a network environment
US20160149763A1 (en) Systems and Methods for Providing an Administrative Framework in a Cloud Architecture
US9467545B1 (en) Specifically programmed computer-implemented engine systems for real-time on-demand discovery of available time slots across programmed schedule objects and methods of use thereof
US9058596B2 (en) Determining availability based on percentage available
US20160239810A1 (en) Method and System of Scheduling, Optimizing and Dynamically Updating Appointment Slots in a Booking System
WO2019223150A1 (en) Scheduling method, server, and computer readable storage medium
US20160048806A1 (en) Computer-based project management methods and systems
JP7370627B2 (en) Industrial property cost estimation system and method
US20140149134A1 (en) Pharmaceutical Representative Expense Report Management Software, Systems, And Methodologies
JP6296956B2 (en) Schedule management system, method, and program
JP2013077111A (en) Care attendance management system
JP6291183B2 (en) Information providing system, information unification method, and information unification program
JP6649235B2 (en) Business support system, business support device, and program
JP2019175032A (en) Production planning device, production planning system, production planning method, and program
US20020077994A1 (en) System and associated methods for providing claimant services with prioritized dispatch
US20180144407A1 (en) Supplemental electronic note data message distribution in near real-time
CN107220815A (en) Agenda managing method, device, system and storage medium
US20020091552A1 (en) System and associated methods for providing claimant services and access to claimant records and reports via a computer network
JP6411024B2 (en) Data storage device, data storage method, and data storage program
JP2016040658A (en) Inventory support device, inventory support method, and program
JP5981607B1 (en) Gas equipment work management system
JP2016024530A (en) Business support method and business support system
JP2003122885A (en) Business activity supporting system and computer program
JP2014096079A (en) Business activity support method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170207

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180126

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180213

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180220

R150 Certificate of patent or registration of utility model

Ref document number: 6296956

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250