JP2016023021A JP2014146760A JP2014146760A JP2016023021A JP 2016023021 A JP2016023021 A JP 2016023021A JP 2014146760 A JP2014146760 A JP 2014146760A JP 2014146760 A JP2014146760 A JP 2014146760A JP 2016023021 A JP2016023021 A JP 2016023021A
Authority
JP
Japan
Prior art keywords
column
suspension
ring
pillar
jig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2014146760A
Other languages
Japanese (ja)
Inventor
享宜 永島
Yukinobu Nagashima
享宜 永島
勝則 鈴木
Katsunori Suzuki
勝則 鈴木
敦 安藤
Atsushi Ando
敦 安藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa Lease Co Ltd
Original Assignee
Daiwa Lease Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa Lease Co Ltd filed Critical Daiwa Lease Co Ltd
Priority to JP2014146760A priority Critical patent/JP2016023021A/en
Publication of JP2016023021A publication Critical patent/JP2016023021A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a column lifting tool making it possible to safely and efficiently perform an operation of disposing a column by lifting the column by a crane at an erection position in a construction site of a building, or the like.SOLUTION: A column lifting tool 1 is a tool used when lifting a column 30 in a standing posture by a crane. The column lifting tool 1 includes a ring-shaped member 2, a plurality of upper ropes 3, and a plurality of lower ropes 4. The ring-shaped member 2 is disposed so as to surround a periphery of a vertical intermediate part of the column 30. One ends of the upper ropes 3 are connected to different circumferential locations of the ring-shaped member 2, and their respective other ends are hung on a hook 40 of the crane. The lower ropes 4 are connected to different circumferential locations of the ring-shaped member 2, and their respective other ends are connected to a lower end of the column 30.SELECTED DRAWING: Figure 1

Description

この発明は、学校、事務所、倉庫、商業施設等の2、3階建てのプレハブ建物等の建築現場において、クレーンにより柱を吊り上げて建て込むときに用いられる柱吊り治具、およびその使用方法に関する。   The present invention relates to a column-hanging jig used when a column is lifted and built by a crane in a construction site such as a two- or three-story prefabricated building such as a school, office, warehouse, or commercial facility, and a method of using the same. About.

上記プレハブ建物の建築現場では、地面に横倒しに置かれている柱をクレーンにより起こし、吊り上げ、建て込み位置に設置する。その際、従来は、柱に吊索を直接玉掛けして吊り上げていた。すなわち、図17に示すように、吊索50の一端を、柱30の中央部よりも下側に設けられたガセットプレート(3階建て建物用の柱30の場合、2階床梁の高さのガセットプレート)35にシャックル25を用いて結合し、柱30の中央部よりもやや上部に吊索50の中間部を2巻き以上のあだ巻きする。そして、図18に示すように、吊索50の他端をクレーンのフック40に掛けて、クレーンにより柱30を吊り上げる。   In the construction site of the prefabricated building, a pillar placed on the ground is raised by a crane, lifted, and installed in a building position. At that time, in the past, the suspension rope was hung directly on the pillar. That is, as shown in FIG. 17, one end of the suspension cable 50 is connected to the gusset plate provided below the center of the column 30 (in the case of the column 30 for a three-story building, the height of the second-floor floor beam). The gusset plate) 35 is coupled using a shackle 25, and the intermediate portion of the suspension cable 50 is wound more than two times slightly above the central portion of the column 30. Then, as shown in FIG. 18, the other end of the suspension cable 50 is hung on the hook 40 of the crane, and the pillar 30 is lifted by the crane.

特開2012−193576号公報JP 2012-193576 A

図17、図18に示す従来の玉掛けによる柱の吊上げ方法は、柱30に対して吊上げ前の吊索50の巻付け作業、および柱設置後の吊索50を外す作業を行わねばならないため、作業効率が悪かった。特に、吊索50を外す作業は、地上から数メートル(3メートル程度)の高さにある前記ガセットプレート35から吊索50の一端を外してから行わねばならず、手間がかかるうえ、高所作業となり危険を伴う。また、柱30を吊り上げたときに、図18に示すように、あだ巻きの吊索巻付け位置Pを中心にして柱30が少し傾いた姿勢となるため、柱30の上部がクレーンのフック40に接触し、吊り上げられた柱30が振れる可能性がある。さらに、柱30を建て込み位置に設置する際に柱30の姿勢を修正する必要があり、柱30の設置作業が難しい。   17 and 18, the conventional lifting method of the column by the sling has to perform the work of winding the suspension cable 50 before lifting the column 30 and the work of removing the suspension cable 50 after the column installation, Work efficiency was bad. In particular, the work of removing the suspension cable 50 must be performed after removing one end of the suspension cable 50 from the gusset plate 35 at a height of several meters (about 3 meters) from the ground. It becomes work and is dangerous. Further, when the column 30 is lifted, as shown in FIG. 18, the column 30 is slightly inclined with the suspending rope winding position P as the center, so that the upper portion of the column 30 is the hook of the crane. There is a possibility that the suspended column 30 may come into contact with 40 and swing. Furthermore, it is necessary to correct the posture of the pillar 30 when installing the pillar 30 at the built-in position, and the work of installing the pillar 30 is difficult.

この発明の目的は、建物の建築現場等においてクレーンで柱を吊上げて建込み位置に設置する作業を安全にかつ効率良く行うことを可能にする柱吊り治具を提供することである。
この発明の他の目的は、設置された柱から柱吊り治具を安全かつ迅速に取り外すことができる柱吊り治具の使用方法を提供することである。
この発明の他の目的は、柱に対してリング状部材を上方に抜くことが難しい場合でも、柱から柱吊り治具を取り外すことができる柱吊り治具の使用方法を提供することである。
An object of the present invention is to provide a column suspension jig that can safely and efficiently perform an operation of lifting a column with a crane and installing it at a built-in position in a building construction site or the like.
Another object of the present invention is to provide a method of using a column suspension jig that can safely and quickly remove the column suspension jig from an installed column.
Another object of the present invention is to provide a method of using a column suspension jig that can remove the column suspension jig from the column even when it is difficult to pull the ring-shaped member upward with respect to the column.

この発明の柱吊り治具は、クレーンで柱を立てた姿勢で吊り上げるときに用いられる治具であって、前記柱の上下方向中間部の周囲を囲むリング状部材と、このリング状部材の互いに周方向の異なる箇所に一端がそれぞれ結合され他端が前記クレーンのフックに掛けられる複数本の上側吊索と、前記リング状部材の互いに周方向の異なる箇所に一端がそれぞれ結合され他端が前記柱の下端部に結合される複数本の下側吊索とを有することを特徴とする。   The column suspension jig according to the present invention is a jig used when lifting a column in a posture in which the column is raised, and a ring-shaped member surrounding the periphery of the middle portion in the vertical direction of the column and the ring-shaped member A plurality of upper suspension ropes, one end of which is coupled to a different circumferential direction and the other end of which is hooked to the hook of the crane, and one end of each of the ring-shaped members is coupled to each other in the circumferential direction. And a plurality of lower suspension ropes coupled to the lower end of the column.

この構成の柱吊り治具を用いてクレーンで柱を吊り上げる場合、リング状部材を柱の上下方向中間部の周囲を囲むように配置し、上側吊索の前記他端をクレーンのフックに掛け、かつ複数本の下側吊索の前記他端を柱の下端部に結合する。この状態で、クレーンで上側吊索を引き上げることにより、柱を吊り上げる。複数の上側吊索により互いに周方向に異なる箇所が吊られたリング状部材は、水平姿勢となる。この水平姿勢のリング状部材により柱の上下方向中間部の周囲が囲まれて、柱の上下方向中間部の水平移動が限定される。また、リング状部材の互いに周方向の異なる箇所に結合された複数の下側吊索により柱の下端部が支持されるため、柱の下端部の位置が水平面上で振れずに安定する。これらのことから、吊り上げられた柱は、ほぼ垂直の姿勢に安定して保持される。吊り上げられた柱を下降させて所定の建て込み位置に設置するときも、柱が上記安定姿勢に保持されるため、柱の設置を安全かつ容易に行うことができる。   When lifting the column with a crane using the column suspension jig of this configuration, arrange the ring-shaped member so as to surround the periphery of the middle part in the vertical direction of the column, hang the other end of the upper suspension rope on the hook of the crane, And the said other end of several lower side suspension rope is couple | bonded with the lower end part of a pillar. In this state, the column is lifted by lifting the upper suspension rope with a crane. A ring-shaped member in which different portions in the circumferential direction are suspended by a plurality of upper suspension ropes has a horizontal posture. This horizontal ring-shaped member surrounds the periphery of the intermediate portion in the vertical direction of the column, and the horizontal movement of the intermediate portion in the vertical direction of the column is limited. Moreover, since the lower end part of the column is supported by a plurality of lower suspension ropes coupled to the ring-shaped members in different circumferential directions, the position of the lower end part of the column is stabilized without shaking on the horizontal plane. For these reasons, the suspended column is stably held in a substantially vertical posture. Even when the suspended pillar is lowered and installed at a predetermined built-in position, the pillar is held in the above-described stable posture, so that the pillar can be installed safely and easily.

柱吊り治具を用いた柱の吊り上げに際しては、以下の作業を行う。すなわち、吊上げ前には、リング状部材の中に柱の上下方向中間部を入れ、複数本の上側吊索の前記他端をクレーンのフックに掛け、複数本の下側吊索の前記他端を柱の下端部に結合する。上側吊索の他端は、クレーンのフックに掛けたままであっても良い。また、柱を設置した後には、複数本の下側吊索の前記他端を柱の下端部から外す。これにより、クレーンで上側吊索を引き上げることで、柱に対してリング状部材を上方に抜いて、柱から柱吊り治具を取り外すことが可能になる。従来の玉掛けによる柱の吊上げ方法のように、柱に吊索を巻き付けたり、外したりする作業が不要であるため、作業効率が良い。また、柱から吊索を外すための高所作業をしなくてよいので、安全である。   The following operations are performed when lifting a column using a column hanging jig. That is, before lifting, put the vertical middle part of the pillar in the ring-shaped member, hang the other end of the plurality of upper suspension ropes on the hook of the crane, and the other end of the plurality of lower suspension ropes To the bottom end of the column. The other end of the upper suspension line may remain on the crane hook. Moreover, after installing a pillar, the said other end of several lower suspension rope is removed from the lower end part of a pillar. Thereby, it is possible to remove the column suspension jig from the column by pulling the ring-shaped member upward with respect to the column by pulling up the upper suspension rope with the crane. The work efficiency is good because there is no need to wrap or remove the suspension rope around the pillar as in the conventional method of lifting the pillar by sling. Moreover, it is safe because it is not necessary to work at a high place to remove the suspension cable from the pillar.

この発明において、前記リング状部材の周方向の少なくとも一箇所に、開状態で前記柱の出入りが可能な開閉部を設けると良い。
リング状部材に開閉部が設けられていると、柱吊上げ前に、開状態の開閉部を通してリング状部材の中に柱の上下方向中間部を容易に入れることができる。また、柱設置後、リング状部材を地面または地面近くの高さまで下降させることにより、リング状部材の開状態にした開閉部を通して、リング状部材の中から外へ柱を出すことができる。つまり、リング状部材に開閉部が設けられていると、前述のリング状部材を上方に抜いて柱から柱吊り治具を取り外す方法と、リング状部材の開閉部から柱を出すことで柱から柱吊り治具を取り外す方法とを、状況に応じて使い分けることができる。例えば、柱に横方向に大きく張り出す部材が取り付けられており、柱に対してリング状部材を上方に抜くことが難しい場合等に、後者の方法を選択すると良い。
In this invention, it is good to provide the opening-and-closing part which can go in and out of the said pillar in an open state in at least one place of the circumferential direction of the said ring-shaped member.
If the ring-shaped member is provided with the opening / closing portion, the vertical intermediate portion of the column can be easily put into the ring-shaped member through the opened / closed portion before the column is lifted. In addition, after the column is installed, the ring-shaped member is lowered to the ground or a height near the ground, so that the column can be taken out from the ring-shaped member through the open / close portion opened in the ring-shaped member. In other words, when the ring-shaped member is provided with an opening / closing part, the above-mentioned ring-shaped member is pulled upward to remove the column suspension jig from the pillar, and the column is removed from the pillar by pulling out the pillar from the opening / closing part of the ring-shaped member. The method of removing the column suspension jig can be used properly according to the situation. For example, the latter method may be selected when a member that protrudes in the lateral direction is attached to the column and it is difficult to pull the ring-shaped member upward with respect to the column.

前記開閉部を有するリング状部材は、例えば以下の構成とすると良い。すなわち、前記リング状部材は周方向に分割された2つの半割部材を有し、前記リング状部材を前記2つの半割部材に分割する2つの分割部のうちの片方の分割部は、前記2つの半割部材を互いに回動自在に連結したピン結合構造であり、もう片方の分割部は、前記2つの半割部材同士を連結手段により互いに係脱可能に連結した構造とする。この場合、前記もう片方の分割部が前記開閉部となる。
この構成であると、連結手段を外して2つの半割部材をもう片方の分割部で分離することで、開閉部であるもう片方の分割部が開状態ととなり、また連結手段により2つの半割部材同士を互いに連結することで、開閉部であるもう片方の分割部が閉状態になる。この構成は、簡易な機構でありながら、確実な動作が期待できる。
For example, the ring-shaped member having the opening / closing portion may have the following configuration. That is, the ring-shaped member has two halved members divided in the circumferential direction, and one of the two divided parts dividing the ring-shaped member into the two halved members is the It is a pin coupling structure in which two halved members are rotatably connected to each other, and the other divided portion has a structure in which the two halved members are detachably connected to each other by a connecting means. In this case, the other divided portion becomes the opening / closing portion.
With this configuration, by removing the connecting means and separating the two halved members at the other divided part, the other divided part, which is an opening / closing part, is opened, and two halves are opened by the connecting means. By connecting the split members to each other, the other split portion that is the opening and closing portion is closed. Although this configuration is a simple mechanism, reliable operation can be expected.

この発明の第1の柱吊り治具の使用方法は、請求項1ないし請求項3のいずれか1項に記載の柱吊り治具を用いる。この柱吊り治具の使用方法は、施工前の前記柱に対して前記柱吊り治具を取り付ける過程と、前記柱を前記クレーンにより吊り上げ、かつ建て込み位置に設置する過程と、前記建て込み位置に設置された前記柱から前記柱吊り治具を取り外す過程とを含む。前記柱吊り治具を取り外す過程は、前記複数本の下側吊索と前記柱の下端部との結合を外した後、前記クレーンにより前記柱吊り治具を前記リング状部材が前記柱の上端よりも高くなる高さまで上昇させて、前記柱に対し前記リング状部材を上方に抜くことにより、前記柱から前記柱吊り治具を取り外す。
この柱吊り治具の使用方法によると、柱吊り治具を取り外す過程において、複数本の下側吊索と柱の下端部との結合を外すだけで、柱に対してリング状部材を上方に抜いて、柱から柱吊り治具を取り外すことができる。複数本の下側吊索と柱の下端部との結合を外す作業は、地上で行うことができるため安全である。また、複数本の下側吊索と柱の下端部との結合を外す作業は、柱の設置が完了した時点の状態で行うことができるので、柱吊り治具を下降させる等の前作業が不要であり、柱吊り治具の取外しを迅速に行える。
The method of using the first column suspension jig of the present invention uses the column suspension jig according to any one of claims 1 to 3. The method of using the column suspension jig includes a step of attaching the column suspension jig to the column before construction, a step of lifting the column by the crane, and installing the column at a built-in position, and the built-in position. Removing the column suspension jig from the column installed in the column. In the process of removing the column suspension jig, after the coupling between the plurality of lower suspension ropes and the lower end portion of the column is removed, the ring suspension member is attached to the column suspension jig by the crane. The column suspension jig is removed from the column by lifting the ring-shaped member upward with respect to the column.
According to this method of using the column suspension jig, in the process of removing the column suspension jig, the ring-shaped member is moved upward with respect to the column only by removing the connection between the plurality of lower suspension ropes and the lower end of the column. It is possible to remove the column suspension jig from the column. The operation of removing the connection between the plurality of lower suspension ropes and the lower ends of the pillars is safe because it can be performed on the ground. In addition, the work of removing the connection between the plurality of lower suspension ropes and the lower end of the column can be performed at the time when the installation of the column is completed. It is not necessary and can quickly remove the column suspension jig.

この発明の第2の柱吊り治具の使用方法は、請求項2または請求項3に記載の柱吊り治具を用いる。この柱吊り治具の使用方法は、施工前の前記柱に対して前記柱吊り治具を取り付ける過程と、前記柱を前記クレーンにより吊り上げ、かつ建て込み位置に設置する過程と、前記建て込み位置に設置された前記柱から前記柱吊り治具を取り外す過程とを含む。前記柱吊り治具を取り外す過程は、前記複数本の下側吊索と前記柱の下端部との結合を外した後、前記クレーンにより前記柱吊り治具を前記リング状部材が地面または地面近くの高さとなるまで下降させ、地面または地面近くの高さに位置する前記リング状部材の前記開閉部を開状態とし、この開状態の開閉部を通じて前記リング状部材の中から外へ前記柱を出すことにより、前記柱から前記柱吊り治具を取り外す。
この柱吊り治具の使用方法によると、柱に横方向に大きく張り出す部材が取り付けられている等の理由により、柱に対してリング状部材を上方に抜くことが難しい場合でも、柱から柱吊り治具を取り外すことができる。
The method for using the second column suspension jig of the present invention uses the column suspension jig according to claim 2 or claim 3. The method of using the column suspension jig includes a step of attaching the column suspension jig to the column before construction, a step of lifting the column by the crane, and installing the column at a built-in position, and the built-in position. Removing the column suspension jig from the column installed in the column. In the process of removing the column suspension jig, after the coupling between the plurality of lower suspension ropes and the lower end portion of the column is removed, the ring suspension member is connected to the ground or near the ground by the crane. The opening and closing portion of the ring-shaped member located at the ground or near the ground is opened, and the column is moved out of the ring-shaped member through the opening and closing portion. By removing the column suspension jig, the column suspension jig is removed from the column.
According to the method of using this column suspension jig, even if it is difficult to pull the ring-shaped member upward from the column due to the fact that a member that protrudes in the lateral direction is attached to the column, the column to column The hanging jig can be removed.

この発明の柱吊り治具は、クレーンで柱を立てた姿勢で吊り上げるときに用いられる治具であって、前記柱の上下方向中間部の周囲を囲むリング状部材と、このリング状部材の互いに周方向の異なる箇所に一端がそれぞれ結合され他端が前記クレーンのフックに掛けられる複数本の上側吊索と、前記リング状部材の互いに周方向の異なる箇所に一端がそれぞれ結合され他端が前記柱の下端部に結合される複数本の下側吊索とを有するため、建物の建築現場等で、横倒しに置かれた柱を吊上げて建込み位置に設置する作業を、安全にかつ効率良く行うことが可能となる。   The column suspension jig according to the present invention is a jig used when lifting a column in a posture in which the column is raised, and a ring-shaped member surrounding the periphery of the middle portion in the vertical direction of the column and the ring-shaped member A plurality of upper suspension ropes, one end of which is coupled to a different circumferential direction and the other end of which is hooked to the hook of the crane, and one end of each of the ring-shaped members is coupled to each other in the circumferential direction. Since it has multiple lower suspension ropes coupled to the lower end of the pillar, it is safe and efficient to lift the pillar placed on its side and install it in the building position at the building construction site, etc. Can be done.

この発明の第1の柱吊り治具の使用方法は、請求項1ないし請求項3のいずれか1項に記載の柱吊り治具を使用し、施工前の前記柱に対して前記柱吊り治具を取り付ける過程と、前記柱を前記クレーンにより吊り上げ、かつ建て込み位置に設置する過程と、前記建て込み位置に設置された前記柱から前記柱吊り治具を取り外す過程とを含み、前記柱吊り治具を取り外す過程は、前記複数本の下側吊索と前記柱の下端部との結合を外した後、前記クレーンにより前記柱吊り治具を前記リング状部材が前記柱の上端よりも高くなる高さまで上昇させて、前記柱に対し前記リング状部材を上方に抜くことにより、前記柱から前記柱吊り治具を取り外すため、設置された柱から柱吊り治具を安全かつ迅速に取り外すことができる。   The method of using the first column suspension jig of the present invention uses the column suspension jig according to any one of claims 1 to 3, and the column suspension jig is applied to the column before construction. A step of attaching a tool, a step of lifting the column by the crane and installing the column at a built-in position, and a step of removing the column-hanging jig from the column installed at the built-in position. In the process of removing the jig, after the coupling between the plurality of lower suspension ropes and the lower end portion of the column is removed, the ring hanging member is made higher than the upper end of the column by the crane. The column suspension jig is removed from the installed column safely and quickly in order to remove the column suspension jig from the column by lifting the ring-shaped member upward with respect to the column. Can do.

この発明の第2の柱吊り治具の使用方法は、請求項2または請求項3に記載の柱吊り治具を使用し、施工前の前記柱に対して前記柱吊り治具を取り付ける過程と、前記柱を前記クレーンにより吊り上げ、かつ建て込み位置に設置する過程と、前記建て込み位置に設置された前記柱から前記柱吊り治具を取り外す過程とを含み、前記柱吊り治具を取り外す過程は、前記複数本の下側吊索と前記柱の下端部との結合を外した後、前記クレーンにより前記柱吊り治具を前記リング状部材が地面または地面近くの高さとなるまで下降させ、地面または地面近くの高さに位置する前記リング状部材の前記開閉部を開状態とし、この開状態の開閉部を通じて前記リング状部材の中から外へ前記柱を出すことにより、前記柱から前記柱吊り治具を取り外すため、柱に対してリング状部材を上方に抜くことが難しい場合でも、柱から柱吊り治具を取り外すことができる。   The method of using the second column suspension jig of the present invention uses the column suspension jig according to claim 2 or claim 3, and attaches the column suspension jig to the column before construction. A step of removing the column suspension jig, including a step of lifting the column by the crane and installing the column at a built-in position; and a step of removing the column suspension jig from the column installed at the built-in position. After removing the connection between the plurality of lower suspension ropes and the lower end of the pillar, the crane is lowered by the crane until the ring-shaped member is at a level near the ground or the ground, By opening the opening / closing portion of the ring-shaped member located at the height of the ground or near the ground, the column is removed from the ring-shaped member through the opening / closing portion in the open state, and the column is removed from the column. Remove the column suspension jig Even if it is difficult to pull out the ring-shaped member upward with respect to the pillar, it is possible to remove the hanging posts from pillar jig.

(A)はこの発明の一実施形態にかかる柱吊り治具を柱に取り付けた状態を示す正面図、(B)はその側面図である。(A) is a front view which shows the state which attached the pillar hanging jig concerning one Embodiment of this invention to the pillar, (B) is the side view. 同柱吊り治具のリング状部材の平面図に柱の平面図を加えた図である。It is the figure which added the top view of the pillar to the top view of the ring-shaped member of the pillar hanging jig. 図2のIII矢視図である。FIG. 3 is a view taken in the direction of arrow III in FIG. 2. 図2のIV矢視図である。FIG. 4 is a view taken along arrow IV in FIG. 2. 図2のV−V断面図である。It is VV sectional drawing of FIG. (A),(B)は図4のVI部の互いに異なる状態を示す拡大図である。(A), (B) is an enlarged view which shows the mutually different state of the VI section of FIG. (A)は同リング状部材における2つの半割部材のもう片方の分割部の平面図、(B)はその正面図である。(A) is a top view of the other division | segmentation part of the two half member in the ring-shaped member, (B) is the front view. 同リング状部材の開閉部が開状態であるときの平面図である。It is a top view when the opening-and-closing part of the ring-shaped member is an open state. 同柱吊り治具の上側吊索または下側吊索を示す図である。It is a figure which shows the upper side suspension line or the lower side suspension line of the pillar suspension jig. 同柱吊り治具のリング状部材と上側吊索および下側吊索との結合部を示す正面図である。It is a front view which shows the coupling | bond part of the ring-shaped member of the pillar hanging jig, an upper suspension rope, and a lower suspension rope. 同柱吊り治具の下側吊索と柱の下端部との結合部、および柱と基礎との結合部を示す正面図である。It is a front view which shows the coupling | bond part of the lower suspension rope and the lower end part of a pillar, and the coupling | bond part of a pillar and a foundation. 同柱吊り治具の下側吊索と柱の下端部との結合部、および柱と基礎との結合部を示す平面図である。It is a top view which shows the coupling | bond part of the lower suspension rope and the lower end part of a pillar, and the coupling | bond part of a pillar and a foundation. リング状部材の異なる例の平面図である。It is a top view of the example from which a ring-shaped member differs. 同柱吊り治具を用いて柱を起こし、吊り上げ、設置する作業の説明図である。It is explanatory drawing of the operation | work which raises a column using the same column hanging jig | tool, lifts, and installs. 柱から同柱吊り治具を取り外す作業の一例の説明図である。It is explanatory drawing of an example of the operation | work which removes the pillar suspension jig from a pillar. 柱から同柱吊り治具を取り外す作業の異なる例の説明図である。It is explanatory drawing of the example from which the operation | work which removes the same column hanging jig | tool from a pillar differs. 従来の柱の吊上げ方法の説明図である。It is explanatory drawing of the conventional lifting method of a pillar. 従来の柱の吊上げ方法による柱吊上げ時の状態を示す図である。It is a figure which shows the state at the time of column lifting by the conventional column lifting method.

この発明の一実施形態を図面と共に説明する。
図1は、この発明の一実施形態にかかる柱吊り治具を柱に取り付けた状態を示す。柱吊り治具1は、リング状部材2と、このリング状部材2にそれぞれ一端が結合された各2本の上側吊索3および下側吊索4とで構成される。なお、以下の説明において、上側吊索3および下側吊索4を合わせて「上下の吊索3,4」と呼称することもある。
An embodiment of the present invention will be described with reference to the drawings.
FIG. 1 shows a state in which a column suspension jig according to an embodiment of the present invention is attached to a column. The column suspension jig 1 includes a ring-shaped member 2 and two upper suspension lines 3 and a lower suspension line 4 each having one end coupled to the ring-shaped member 2. In the following description, the upper suspension cable 3 and the lower suspension cable 4 may be collectively referred to as “upper and lower suspension cables 3, 4”.

この柱吊り治具1が適用される柱30は、例えば3階建てプレハブ建物の鉄骨柱であり、この例の場合、図2に示すように、1本の角形鋼管31と2本のリップ溝形鋼32とを組み合わせてなる。図1において、柱30の下端には、ベースプレート33と左右一対のブレースシート34とが溶接により接合されている。また、柱30の2階床梁の高さ、3階床梁の高さ、および小屋梁の高さには、左右一対のブレースシート34と、それぞれの梁と連結するためのガセットプレート35とが溶接により接合されている。さらに、柱30の上端には、屋根作業用のスタンション36が取り付けられている。3階建てプレハブ建物用の柱30の全長は、スタンション36も含めて、約12〜13mである。図1、図2に示す柱30は一例であって、この柱吊り治具1が適用される柱はこれに限定されない。   The column 30 to which the column hanging jig 1 is applied is, for example, a steel column of a three-story prefabricated building. In this example, as shown in FIG. 2, one square steel pipe 31 and two lip grooves are provided. It is formed by combining the shape steel 32. In FIG. 1, a base plate 33 and a pair of left and right brace sheets 34 are joined to the lower end of a column 30 by welding. In addition, the height of the second floor beam of the pillar 30, the height of the third floor beam, and the height of the shed beam include a pair of left and right brace sheets 34 and a gusset plate 35 for connecting to each beam. Are joined by welding. Further, a stanchion 36 for roof work is attached to the upper end of the column 30. The total length of the pillar 30 for the three-story prefabricated building is about 12 to 13 m including the stanchion 36. The column 30 shown in FIGS. 1 and 2 is an example, and the column to which the column hanging jig 1 is applied is not limited to this.

柱吊り治具1の前記リング状部材2を図2〜図8に示す。リング状部材2は、帯鋼等の鋼材を主材料としてなり、平面形状円形で上下幅が一定に形成されている。リング状部材2の内径Dは、図2に示すように、水平に保持したリング状部材2の中空部5内に、立てた姿勢の柱30が余裕を持って挿通される寸法、例えば約400〜500mmである。図5に示すように、リング状部材2の骨格を構成する帯鋼等の鋼材6の上下両端に、柱30の傷防止のために、塩化ビニール、ニトルゴム等の樹脂材からなる養生材7が被せられている。   The ring-shaped member 2 of the column suspension jig 1 is shown in FIGS. The ring-shaped member 2 is made of a steel material such as a strip steel as a main material, and has a circular shape in a plane shape and a constant vertical width. As shown in FIG. 2, the inner diameter D of the ring-shaped member 2 is such that the pillar 30 in a standing posture is inserted with sufficient margin into the hollow portion 5 of the ring-shaped member 2 held horizontally, for example, about 400. ~ 500 mm. As shown in FIG. 5, a curing material 7 made of a resin material such as vinyl chloride or nitrile rubber is provided on the upper and lower ends of a steel material 6 such as a steel strip constituting the skeleton of the ring-shaped member 2 in order to prevent scratches on the pillar 30. It is covered.

図2〜図4において、リング状部材2の円周方向の互いに対向する2箇所には、上下の吊索3,4を結合するための吊索結合部材である吊りプレート10が設けられている。この吊りプレート10は、リング状部材2の外周面に溶接により接合された上側吊索結合用板部11と、この上側吊索結合用板部11に対して垂直に接合され外径側へ延びる下側吊索結合用板部12とからなり、前記上側吊索結合用板部11のリング状部材2よりも上方に延びた部分に上側吊索結合用孔13が形成され、前記下側吊索結合用板部12に下側吊索結合用孔14が形成されている。   In FIG. 2 to FIG. 4, suspension plates 10, which are suspension rope coupling members for coupling the upper and lower suspension ropes 3, 4, are provided at two positions facing each other in the circumferential direction of the ring-shaped member 2. . The suspension plate 10 is bonded to the outer peripheral surface of the ring-shaped member 2 by welding, and the upper suspension rope coupling plate portion 11 is joined perpendicularly to the upper suspension rope coupling plate portion 11 and extends to the outer diameter side. An upper suspension rope coupling hole 13 is formed in a portion of the upper suspension rope coupling plate portion 11 that extends upward from the ring-shaped member 2 of the upper suspension rope coupling plate portion 11. A lower suspension cable coupling hole 14 is formed in the cable coupling plate portion 12.

この実施形態のリング状部材2は、周方向に分割された2つの半割部材2A,2Bからなる。リング状部材2を2つの半割部材2A,2Bに分割する2つの分割部15,16のうちの片方の分割部15は、両半割部材2A,2Bを丁番17を介して互いに回動自在に連結した構造であり、もう片方の分割部16は、両半割部材2A,2B同士を連結手段18により係脱可能に連結する構造である。   The ring-shaped member 2 of this embodiment is composed of two halved members 2A and 2B divided in the circumferential direction. One of the two divided portions 15 and 16 that divides the ring-shaped member 2 into two halved members 2A and 2B is configured such that the two divided members 2A and 2B rotate with respect to each other via a hinge 17. The other divided portion 16 has a structure in which the halved members 2A and 2B are connected to each other by a connecting means 18 so as to be detachable.

具体的には、丁番17を介して連結した片方の分割部15は、両半割部材2A,2Bの外周面に固定された丁番プレート2Aa,2Baの対向端同士を丁番17により連結している。丁番17は、丁番プレート2Aa,2Baの対向端にそれぞれ形成された各ピン孔にピンを挿入して互いに回動自在に連結したピン結合構造である。これにより、図8に示すように、両半割部材2A,2Bが丁番17を支点として回動し、差込みピン19により連結されるもう片方の分割部16が開閉する。つまり、もう片方の分割部16がリング状部材2の開閉部である。   Specifically, one of the divided portions 15 connected via the hinge 17 connects the opposing ends of the hinge plates 2Aa and 2Ba fixed to the outer peripheral surfaces of the halved members 2A and 2B with the hinge 17. doing. The hinge 17 has a pin coupling structure in which a pin is inserted into each pin hole formed at the opposite end of the hinge plates 2Aa and 2Ba and connected to each other so as to be rotatable. As a result, as shown in FIG. 8, the two half members 2 </ b> A and 2 </ b> B rotate about the hinge 17 as a fulcrum, and the other divided portion 16 connected by the insertion pin 19 opens and closes. That is, the other divided portion 16 is an opening / closing portion of the ring-shaped member 2.

連結手段18は、図6に示すように、差込みピン19と、ピン差込み孔形成体である円筒体20A,20B,20Aとで構成される。図7に示すように、2つの円筒体20A,20Aは、互いに上下に離して配置され、それぞれが片方の半割部材2Aの外径屈曲端2Abに溶接により固定されている。また、円筒体20Bは、前記2つの円筒体20A,20Aの間の上下高さに配置され、もう片方の半割部材2Bの外径屈曲端2Bbに溶接により固定されている。図6(B)のように、差込みピン19を互いに中心を揃えた前記各円筒体20A,20B,20Aに挿通することで、半割部材2A,2B同士を連結する。差込みピン19の上端には、円筒体20A,20B,20Aの内径よりも幅寸法が大きい円環状つまみ19aが設けられている。   As shown in FIG. 6, the connecting means 18 includes an insertion pin 19 and cylindrical bodies 20A, 20B, and 20A that are pin insertion hole forming bodies. As shown in FIG. 7, the two cylindrical bodies 20A, 20A are arranged apart from each other in the vertical direction, and each is fixed to the outer-diameter bent end 2Ab of one half member 2A by welding. The cylindrical body 20B is disposed at a vertical height between the two cylindrical bodies 20A and 20A, and is fixed to the outer-diameter bent end 2Bb of the other half member 2B by welding. As shown in FIG. 6B, the half members 2A and 2B are connected to each other by inserting the insertion pin 19 through the cylindrical bodies 20A, 20B and 20A whose centers are aligned with each other. At the upper end of the insertion pin 19, an annular knob 19a having a width dimension larger than the inner diameter of the cylindrical bodies 20A, 20B, 20A is provided.

上の円筒体20Aの外周面および差込みピン19の下端部に、それぞれ落下防止具取付リング21,22が設けられている。これら落下防止具取付リング21,22は、円筒体20A,20A,20Aに挿通された差込みピン19の抜けを防止するために、落下防止具23の両端をそれぞれ取り付けるためのものである。落下防止具23は、ワイヤ等の可撓性紐状体23aの両端に落下防止具取付リング21,22に取付可能な止め具23bを設けたものであり、例えば「セーフティコード」の名称で商品化されているものを使用することができる。   Drop prevention device mounting rings 21 and 22 are provided on the outer peripheral surface of the upper cylindrical body 20A and the lower end portion of the insertion pin 19, respectively. These fall prevention device attaching rings 21 and 22 are for attaching both ends of the fall prevention device 23 in order to prevent the insertion pin 19 inserted through the cylindrical bodies 20A, 20A, and 20A from coming off. The fall prevention tool 23 is provided with stoppers 23b that can be attached to the fall prevention tool attachment rings 21 and 22 at both ends of a flexible string-like body 23a such as a wire. Can be used.

落下防止具23は、差込みピン19を円筒体20A,20B,20Aに挿通したときにだけ両端の止め具23bをそれぞれ落下防止具取付リング21,22に取り付けてもよいが、次のようにしても良い。すなわち、図6(A)のように、差込みピン19が円筒体20A,20B,20Aに挿通されていないときは、落下防止具23の両側の止め具23bをそれぞれ円筒体20Aの落下防止具取付リング21および差込みピン19の円環状つまみ19aに取り付けておき、差込みピン19を円筒体20A,20B,20Aに挿通してから、図6(B)のように、差込みピン19の円環状つまみ19aに取り付けられていた止め具23bを落下防止具取付リング22に付け直す。これにより、差込みピン19の紛失を防止できる。   The fall prevention device 23 may attach the stoppers 23b at both ends to the fall prevention device attaching rings 21 and 22 only when the insertion pin 19 is inserted into the cylindrical bodies 20A, 20B and 20A, respectively. Also good. That is, as shown in FIG. 6A, when the insertion pin 19 is not inserted through the cylindrical bodies 20A, 20B, 20A, the stoppers 23b on both sides of the fall prevention tool 23 are respectively attached to the fall prevention tools of the cylindrical body 20A. After attaching the ring 21 and the annular knob 19a of the insertion pin 19 and inserting the insertion pin 19 into the cylindrical bodies 20A, 20B, 20A, as shown in FIG. 6B, the annular knob 19a of the insertion pin 19 is inserted. Reattach the stopper 23b attached to the fall prevention tool attachment ring 22. Thereby, loss of the insertion pin 19 can be prevented.

上側吊索3および下側吊索4は、例えば図9に示すようなワイヤロープであり、両端にそれぞれアイ3a,3b,4a,4bを有する。適用される柱30の長さが約12〜13mである場合、上側吊索3の長さは約4m、下側吊索4の長さは約9mとされる。上側吊索3および下側吊索4は、ワイヤロープ以外の紐状体であってもよい。   The upper suspension cable 3 and the lower suspension cable 4 are wire ropes as shown in FIG. 9, for example, and have eyes 3a, 3b, 4a, 4b at both ends, respectively. When the length of the pillar 30 to be applied is about 12 to 13 m, the length of the upper suspension line 3 is about 4 m, and the length of the lower suspension line 4 is about 9 m. The upper suspension rope 3 and the lower suspension rope 4 may be string-like bodies other than the wire rope.

図10に示すように、上側吊索3の下端は、シャックル25を介して、リング状部材2の吊りプレート10の上側吊索結合用板部11に結合されている。その結合方法は、上側吊索3のアイ3aにシャックル25のU字形本体25aに通し、上側吊索結合用板部11に形成された上側吊索結合用孔13にシャックル25のピン25bを挿通して行う。同様に、下側吊索4の上端は、シャックル25を介して、吊りプレート10の下側吊索結合用板部12に接続されている。その結合方法は、下側吊索4のアイ4aにシャックル25のU字形本体25aに通し、吊りプレート10の下側吊索結合用板部12に形成された下側吊索結合用孔14にシャックル25のピン25bを挿通して行う。   As shown in FIG. 10, the lower end of the upper suspension cable 3 is coupled to the upper suspension cable coupling plate portion 11 of the suspension plate 10 of the ring-shaped member 2 through a shackle 25. The connecting method is such that the U-shaped main body 25a of the shackle 25 is passed through the eye 3a of the upper suspension rope 3, and the pin 25b of the shackle 25 is inserted into the upper suspension rope connection hole 13 formed in the upper suspension rope connection plate portion 11. And do it. Similarly, the upper end of the lower suspension cable 4 is connected to the lower suspension cable connection plate 12 of the suspension plate 10 via a shackle 25. The connecting method is such that the lower suspension rope connection hole 14 formed in the lower suspension rope connection plate portion 12 of the suspension plate 10 is passed through the U-shaped main body 25a of the shackle 25 through the eye 4a of the lower suspension rope 4. This is done by inserting the pin 25b of the shackle 25.

上記柱吊り治具1を用いて、クレーンにより、地面に横倒しに置かれた柱30を起こし、吊り上げ、建て込み位置に設置する方法を説明する。
<柱に対して柱吊り治具を取り付ける過程>
まず、図8のようにリング状部材2の開閉部である分割部16を開状態とし、その開状態の分割部16を通して、横倒しに置かれた柱30の上下方向中間部をリング状部材2の中空部5に入れる。次いで、リング状部材2の分割部16を閉じ、各円筒体20A,20B,20Aに差込みピン19を挿通して、両半割部材2A,2Bを連結する。その後、落下防止具取付リング21,22に落下防止具23の両端の止め具23bを取り付けて、円筒体20A,20B,20Aから差込みピン19が抜けないようにする。
A method will be described in which the pillar 30 placed on the ground is raised by a crane using the pillar suspension jig 1, lifted, and installed at the built-in position.
<The process of attaching the column hanging jig to the column>
First, as shown in FIG. 8, the divided portion 16 that is the opening and closing portion of the ring-shaped member 2 is opened, and the vertically intermediate portion of the column 30 placed on its side is passed through the divided portion 16 in the opened state. Into the hollow part 5 of Next, the divided portion 16 of the ring-shaped member 2 is closed, and the insertion pins 19 are inserted into the cylindrical bodies 20A, 20B, 20A to connect the two half members 2A, 2B. Thereafter, the stoppers 23b at both ends of the fall prevention tool 23 are attached to the fall prevention tool mounting rings 21 and 22, so that the insertion pin 19 does not come off from the cylindrical bodies 20A, 20B, 20A.

次に、図11、図12に示すように、下側吊索4の下端を、シャックル25を介して、柱30の下端部に設けられたブレースシート34に結合する。その結合方法は、下側吊索4のアイ4bにシャックル25のU字形本体25aに通し、ブレースシート34に形成された孔34aにシャックル25のピン25bを挿通して行う。なお、図11、図12は柱30が基礎41上の建て込み位置に建て込まれた状態を示しているが、柱30が建て込み前で横倒しになっている場合も、下側吊索4とブレースシート34の結合構造は同じである。   Next, as shown in FIGS. 11 and 12, the lower end of the lower suspension rope 4 is coupled to the brace sheet 34 provided at the lower end portion of the column 30 via the shackle 25. The connecting method is performed by passing the U-shaped main body 25a of the shackle 25 through the eye 4b of the lower suspension rope 4 and inserting the pin 25b of the shackle 25 into the hole 34a formed in the brace sheet 34. 11 and 12 show a state in which the pillar 30 is built at the built-in position on the foundation 41, but the lower suspension rope 4 can also be used when the pillar 30 is laid down before being built. The brace sheet 34 has the same coupling structure.

そして、上側吊索3の上端のアイ3bを、クレーンのフック40(図14)に掛ける。前記リング状部材2の中空部5に柱30の上下方向中間部を入れる作業や、下側吊索4の下端をブレースシート34に結合する作業に先行して、上側吊索3の上端のアイ3bをクレーンのフック40に掛けておいてもよい。図14(A)は、上記各作業が終了した状態を示す。   Then, the eye 3b at the upper end of the upper suspension rope 3 is hung on the hook 40 (FIG. 14) of the crane. Prior to the operation of inserting the middle portion of the column 30 in the hollow portion 5 of the ring-shaped member 2 and the operation of joining the lower end of the lower suspension rope 4 to the brace sheet 34, the upper eye of the upper suspension rope 3 3b may be hung on the hook 40 of the crane. FIG. 14A shows a state where each of the above operations is completed.

<柱を吊り上げ・設置する過程>
図14(A)の状態でクレーンのフック40を上昇させると、図14(B)のように、リング状部材2によって柱30の上下方向中間部が支えられながら柱30が起立する。さらにフック40を上昇させると、図14(C)のように、下側吊索4によって柱30の下端が引き上げられて、柱30が吊り上げられる。2本の上側吊索3により互いに対向する2箇所が吊られたリング状部材2は水平姿勢となる。この水平姿勢のリング状部材2により柱30の上下方向中間部の周囲が囲まれて、上下方向中間部の水平移動が限定される。また、柱30の下端部の両側に設けられたブレースシート34が2本の下側吊索4で支持されるため、柱30の下端部の位置が水平面上で振れずに安定する。これらのことから、吊り上げられた柱30は、ほぼ垂直の姿勢に安定して保持される。
<The process of lifting and installing the pillar>
When the crane hook 40 is raised in the state shown in FIG. 14A, the column 30 stands up while the middle part of the column 30 is supported by the ring-shaped member 2 as shown in FIG. 14B. When the hook 40 is further raised, the lower end of the pillar 30 is pulled up by the lower suspension rope 4 and the pillar 30 is lifted as shown in FIG. The ring-shaped member 2 in which two places opposite to each other are suspended by the two upper suspension ropes 3 is in a horizontal posture. The ring-shaped member 2 in the horizontal posture surrounds the periphery of the intermediate portion in the vertical direction of the column 30 and the horizontal movement of the intermediate portion in the vertical direction is limited. Moreover, since the brace sheet | seat 34 provided in the both sides of the lower end part of the pillar 30 is supported by the two lower suspension ropes 4, the position of the lower end part of the pillar 30 is stabilized without shaking on a horizontal plane. For these reasons, the suspended column 30 is stably held in a substantially vertical posture.

吊上げられた柱30を基礎41上の建て込み位置の上方まで移動させてから、図14(D)のように、フック40を下降させて柱30を建て込み位置に設置する。このとき、柱30がほぼ垂直の姿勢に保持されたまま下降するため、柱30を安全かつ容易に設置することができる。   After the suspended pillar 30 is moved to above the building position on the foundation 41, the hook 30 is lowered and the pillar 30 is installed at the building position as shown in FIG. At this time, since the column 30 is lowered while being held in a substantially vertical posture, the column 30 can be installed safely and easily.

柱30を設置した後、図11、図12に示すように、柱30の下端を基礎41に固定する。すなわち、柱30のベースプレート33に設けられた貫通孔(図示せず)に、基礎天端から上方に突出するアンカーボルト42を挿通し、そのアンカーボルト42のベースプレート33よりも突出した部分にナット43を螺着することで固定する。   After the pillar 30 is installed, the lower end of the pillar 30 is fixed to the foundation 41 as shown in FIGS. That is, an anchor bolt 42 protruding upward from the base top end is inserted into a through hole (not shown) provided in the base plate 33 of the pillar 30, and a nut 43 is inserted into a portion of the anchor bolt 42 protruding from the base plate 33. It is fixed by screwing.

<柱から柱吊り治具を取り外す過程(第1の取外し方法)>
その後、図15(A)のように、各下側吊索4を柱30のブレースシート34から外し、図15(B)のように、クレーンのフック40を上昇させることにより、柱30に対してリング状部材2を上方に抜いて、柱30から柱吊り治具1を取り外す。この柱吊り治具1の取外し方法であると、作業者は地上で下側吊索4をブレースシート34から外す作業を行うだけでよく、高所作業をしなくてよいので安全である。
<The process of removing the column hanging jig from the column (first removal method)>
Thereafter, as shown in FIG. 15A, each lower suspension rope 4 is removed from the brace sheet 34 of the pillar 30 and the crane hook 40 is raised as shown in FIG. Then, the ring-shaped member 2 is pulled upward to remove the column suspension jig 1 from the column 30. With this method of removing the column suspension jig 1, it is safe because the operator only needs to remove the lower suspension rope 4 from the brace sheet 34 on the ground and does not have to work at a high place.

<柱から柱吊り治具を取り外す過程(第2の取外し方法)>
図16は、上記とは異なる柱吊り治具1の取外し方法を示す。同図(A)のように、リング状部材2が地面または地面近くの高さとなるまで柱吊り治具1を下降させ、そのリング状部材2の開閉部である分割部16を開状態(図8参照)とし、この開状態の分割部16を通ってリング状部材2の中空部5(図8)から柱30を抜くことにより、柱30から柱吊り治具1を取り外す。この柱吊り治具1の取外し方法も、作業者は地上で作業を行うだけでよく、高所作業をしなくてよいので、安全である。
<The process of removing the column suspension jig from the column (second removal method)>
FIG. 16 shows a method of removing the column suspension jig 1 different from the above. As shown in FIG. 6A, the column suspension jig 1 is lowered until the ring-shaped member 2 reaches the ground level or near the ground, and the divided portion 16 that is an opening / closing portion of the ring-shaped member 2 is opened (see FIG. 8), the column suspension jig 1 is removed from the column 30 by removing the column 30 from the hollow portion 5 (FIG. 8) of the ring-shaped member 2 through the open divided portion 16. This method of removing the pole-hanging jig 1 is also safe because the operator only has to work on the ground and does not have to work at a high place.

上記2通りの柱吊り治具の取外し方法は、柱30の形態や作業現場の状況等に応じて適宜使い分けると良い。例えば、図1に示す柱30に設けられているガセットプレート35やスタンション36よりも横方向に大きく張り出す部材が設けられている柱(図示せず)については、図15のように柱に対してリング状部材2を上方に抜くことが困難であるため、図16の取外し方法を採用する。 The above two methods for removing the column-hanging jig may be appropriately used depending on the form of the column 30 or the situation at the work site. For example, with respect to a column (not shown) provided with a member that protrudes more in the lateral direction than the gusset plate 35 or stanchion 36 provided on the column 30 shown in FIG. Since it is difficult to pull the ring-shaped member 2 upward, the removal method shown in FIG. 16 is adopted.

上記2通りの柱吊り治具の取外し方法のいずれを採用する場合でも、この発明の柱吊り治具1を使用して柱30を起こし、吊り上げ、設置すると、従来の玉掛けによる柱の吊上げ方法のように、柱に吊索を巻き付けたり、外したりする作業が不要であるため、作業効率が良い。また、高所作業をしなくてよいので、安全である。   Regardless of which of the above two methods for removing the column suspension jig is employed, when the column 30 is raised, lifted and installed using the column suspension jig 1 of the present invention, the conventional method for lifting the column by slinging is used. Thus, work efficiency is good because the work of wrapping or removing the suspension cable around the pillar is unnecessary. In addition, it is safe because it is not necessary to work at high places.

上記実施形態では、上下の吊索3,4の本数を各2本としたが、3本以上の複数本としてもよい。その場合、リング状部材2の互いに周方向の異なる箇所に、上下の吊索3,4の一端をそれぞれ結合する。   In the above-described embodiment, the number of the upper and lower suspension ropes 3 and 4 is two, but may be three or more. In that case, one end of each of the upper and lower suspension ropes 3 and 4 is coupled to the ring-shaped member 2 at different locations in the circumferential direction.

また、上記実施形態では、リング状部材2の平面形状を円形としたが、例えば図13のように、リング状部材2の平面形状は四角形であってもよく、あるいはそれ以外の形状であってもよい。図13に示す平面形状が四角形のリング状部材2も2つの半割部材2A,2Bからなり、片方の分割部15は、両半割部材2A,2Bを互いに丁番17を介して互いに回動自在に連結した構造であり、もう片方の分割部16は、両半割部材2A,2B同士を連結手段18により係脱可能に連結する構造であり、もう片方の分割部16が開閉部となる。   Moreover, in the said embodiment, although the planar shape of the ring-shaped member 2 was circular, for example, as shown in FIG. 13, the planar shape of the ring-shaped member 2 may be a square or other shapes. Also good. The ring-shaped member 2 having a quadrangular planar shape shown in FIG. 13 is also composed of two halved members 2A and 2B, and one divided portion 15 rotates both halved members 2A and 2B with respect to each other via a hinge 17. The other divided portion 16 is a structure in which the two split members 2A and 2B are detachably connected by the connecting means 18, and the other divided portion 16 serves as an opening / closing portion. .

リング状部材2は、柱30の出入りが可能な開閉部が設けられていなくてもよい。その場合、図15に示す柱から柱吊り治具を取り外す方法は実施できるが、図16に示す柱から柱吊り治具を取り外す方法は実施できない。リング状部材2に柱30の出入りが可能な開閉部となる分割部16が設けられている場合、分割部16を遠隔で開閉可能とすると、図16に示す柱から柱吊り治具を取り外す過程において、リング状部材2が地面または地面近くの高さとなるまで柱吊り治具1を下降させることが不要となり、より一層作業効率を向上させることができる。   The ring-shaped member 2 does not need to be provided with an opening / closing part that allows the column 30 to enter and exit. In that case, the method of removing the column suspension jig from the column shown in FIG. 15 can be implemented, but the method of removing the column suspension jig from the column shown in FIG. 16 cannot be implemented. When the ring-shaped member 2 is provided with the dividing portion 16 serving as an opening / closing portion that allows the column 30 to enter and exit, the process of removing the column suspension jig from the column shown in FIG. In this case, it is not necessary to lower the column hanging jig 1 until the ring-shaped member 2 reaches the ground level or near the ground level, and the working efficiency can be further improved.

1…柱吊り治具
2…リング状部材
2A,2B…半割部材
3…上側吊索
4…下側吊索
15…片方の分割部
16…もう片方の分割部(開閉部)
17…丁番(ピン結合構造)
18…連結手段
30…柱
40…フック
41…基礎
DESCRIPTION OF SYMBOLS 1 ... Column suspension jig 2 ... Ring-shaped member 2A, 2B ... Half member 3 ... Upper suspension rope 4 ... Lower suspension rope 15 ... One division part 16 ... The other division part (opening-closing part)
17 ... Hinges (pin coupling structure)
18 ... connecting means 30 ... pillar 40 ... hook 41 ... basic

Claims (5)

クレーンで柱を立てた姿勢で吊り上げるときに用いられる治具であって、前記柱の上下方向中間部の周囲を囲むリング状部材と、このリング状部材の互いに周方向の異なる箇所に一端がそれぞれ結合され他端が前記クレーンのフックに掛けられる複数本の上側吊索と、前記リング状部材の互いに周方向の異なる箇所に一端がそれぞれ結合され他端が前記柱の下端部に結合される複数本の下側吊索とを有することを特徴とする柱吊り治具。   It is a jig used when lifting in a posture in which a pillar is raised with a crane, and one end of each ring-shaped member surrounding the periphery of the middle part in the vertical direction of the pillar and a different circumferential direction of the ring-shaped member A plurality of upper suspension ropes that are coupled to each other and hooked to the hook of the crane, and a plurality of one ends that are coupled to different locations in the circumferential direction of the ring-shaped member and the other end is coupled to the lower end of the column. A pillar suspension jig comprising a lower suspension rope of a book. 請求項1に記載の柱吊り治具において、前記リング状部材の周方向の少なくとも一箇所に、開状態で前記柱の出入りが可能な開閉部を設けた柱吊り治具。   The column suspension jig according to claim 1, wherein an opening / closing portion capable of entering and exiting the column in an open state is provided at least in one circumferential direction of the ring-shaped member. 請求項2に記載の柱吊り治具において、前記リング状部材は周方向に分割された2つの半割部材を有し、前記リング状部材を前記2つの半割部材に分割する2つの分割部のうちの片方の分割部は、前記2つの半割部材を互いに回動自在に連結したピン結合構造であり、もう片方の分割部は、前記2つの半割部材同士を連結手段により互いに係脱可能に連結した構造であり、前記もう片方の分割部が前記開閉部となる柱吊り治具。   3. The pillar-hanging jig according to claim 2, wherein the ring-shaped member has two halved members divided in the circumferential direction, and the two divided portions divide the ring-shaped member into the two halved members. One of the divided portions has a pin coupling structure in which the two halved members are rotatably connected to each other, and the other divided portion is engaged with and disengaged from each other by the connecting means. A pillar-hanging jig that has a structure that is connected so that the other divided portion serves as the opening / closing portion. 請求項1ないし請求項3のいずれか1項に記載の柱吊り治具を使用する方法であって、
施工前の前記柱に対して前記柱吊り治具を取り付ける過程と、前記柱を前記クレーンにより吊り上げ、かつ建て込み位置に設置する過程と、前記建て込み位置に設置された前記柱から前記柱吊り治具を取り外す過程とを含み、
前記柱吊り治具を取り外す過程は、前記複数本の下側吊索と前記柱の下端部との結合を外した後、前記クレーンにより前記柱吊り治具を前記リング状部材が前記柱の上端よりも高くなる高さまで上昇させて、前記柱に対し前記リング状部材を上方に抜くことにより、前記柱から前記柱吊り治具を取り外す柱吊り治具の使用方法。
A method of using the column suspension jig according to any one of claims 1 to 3,
The process of attaching the pillar suspension jig to the pillar before construction, the process of lifting the pillar by the crane and installing it at the built-in position, and the pillar suspension from the pillar installed at the built-in position Removing the jig,
In the process of removing the column suspension jig, after the coupling between the plurality of lower suspension ropes and the lower end portion of the column is removed, the ring suspension member is attached to the column suspension jig by the crane. A method of using a column suspension jig that removes the column suspension jig from the column by raising the height to a height that is higher than that and pulling the ring-shaped member upward with respect to the column.
請求項2または請求項3に記載の柱吊り治具を使用する方法であって、
施工前の前記柱に対して前記柱吊り治具を取り付ける過程と、前記柱を前記クレーンにより吊り上げ、かつ建て込み位置に設置する過程と、前記建て込み位置に設置された前記柱から前記柱吊り治具を取り外す過程とを含み、
前記柱吊り治具を取り外す過程は、前記複数本の下側吊索と前記柱の下端部との結合を外した後、前記クレーンにより前記柱吊り治具を前記リング状部材が地面または地面近くの高さとなるまで下降させ、地面または地面近くの高さに位置する前記リング状部材の前記開閉部を開状態とし、この開状態の開閉部を通じて前記リング状部材の中から外へ前記柱を出すことにより、前記柱から前記柱吊り治具を取り外す柱吊り治具の使用方法。
A method of using the column suspension jig according to claim 2 or 3,
The process of attaching the pillar suspension jig to the pillar before construction, the process of lifting the pillar by the crane and installing it at the built-in position, and the pillar suspension from the pillar installed at the built-in position Removing the jig,
In the process of removing the column suspension jig, after the coupling between the plurality of lower suspension ropes and the lower end portion of the column is removed, the ring suspension member is connected to the ground or near the ground by the crane. The opening and closing portion of the ring-shaped member located at the ground or near the ground is opened, and the column is moved out of the ring-shaped member through the opening and closing portion. A method of using a column suspension jig that removes the column suspension jig from the column by removing the column suspension jig.
JP2014146760A 2014-07-17 2014-07-17 Column lifting tool and method of using the same Pending JP2016023021A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014146760A JP2016023021A (en) 2014-07-17 2014-07-17 Column lifting tool and method of using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014146760A JP2016023021A (en) 2014-07-17 2014-07-17 Column lifting tool and method of using the same

Publications (1)

Publication Number Publication Date
JP2016023021A true JP2016023021A (en) 2016-02-08

Family

ID=55270143

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014146760A Pending JP2016023021A (en) 2014-07-17 2014-07-17 Column lifting tool and method of using the same

Country Status (1)

Country Link
JP (1) JP2016023021A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108861997A (en) * 2018-08-23 2018-11-23 国网黑龙江省电力有限公司牡丹江水力发电总厂 A kind of upper spider and guide shoe integral hoisting tool
JP2021031900A (en) * 2019-08-21 2021-03-01 前田建設工業株式会社 Through-hole positioning jig and through-hole positioning method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54137228U (en) * 1978-03-17 1979-09-22
JPS5762770U (en) * 1980-09-29 1982-04-14
JPH0473163U (en) * 1990-11-06 1992-06-26
JPH053497U (en) * 1991-06-28 1993-01-19 大和ハウス工業株式会社 Steel pillar erection hardware
JP3053296B2 (en) * 1992-05-27 2000-06-19 株式会社竹中工務店 Pillar hanging jig

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54137228U (en) * 1978-03-17 1979-09-22
JPS5762770U (en) * 1980-09-29 1982-04-14
JPH0473163U (en) * 1990-11-06 1992-06-26
JPH053497U (en) * 1991-06-28 1993-01-19 大和ハウス工業株式会社 Steel pillar erection hardware
JP3053296B2 (en) * 1992-05-27 2000-06-19 株式会社竹中工務店 Pillar hanging jig

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108861997A (en) * 2018-08-23 2018-11-23 国网黑龙江省电力有限公司牡丹江水力发电总厂 A kind of upper spider and guide shoe integral hoisting tool
CN108861997B (en) * 2018-08-23 2023-09-29 国网黑龙江省电力有限公司牡丹江水力发电总厂 Integral hoisting tool for upper frame and guide shoe
JP2021031900A (en) * 2019-08-21 2021-03-01 前田建設工業株式会社 Through-hole positioning jig and through-hole positioning method
JP7368142B2 (en) 2019-08-21 2023-10-24 前田建設工業株式会社 Through-hole positioning jig and through-hole positioning method

Similar Documents

Publication Publication Date Title
CN101611199B (en) An improved fall safety barrier
JP2014074304A (en) Hanger device, top end positioning tool for reinforcement cage, hanging method for reinforcement cage, and erecting method for reinforcement cage
CN104452516B (en) For the instrument of the prefabricated concrete roads plate of handling
JP2007022789A (en) Suspension tool and vertical pipe construction method
JP2016023021A (en) Column lifting tool and method of using the same
JP6098453B2 (en) Jib hanger
JP5984064B2 (en) Net body or sheet body for ballproof etc., and moving method of net body or sheet body for ballproof etc.
JP2007230665A (en) Elevator installing device and installing construction method using same
JP5888603B2 (en) Method of moving net suspension to indoor space and apparatus for moving net suspension to indoor space
JP2007145509A (en) Simple boom device
JP5769094B2 (en) NET REINFORCING ROPE AND NET SUSTAINING METHOD USING THE REINFORCING ROPE
JP5377361B2 (en) Net extension device for steel pipe support
KR101804044B1 (en) hook assembly for lifting heavy object
JP2021008722A (en) Column suspending jig and wire fixture
JP2007070083A (en) Hoisting method and device of block
CN106041389B (en) Bracket positioning welding temporary fastening device and its application method on steel column
CN204213262U (en) A kind of linkage structure of suspending wirerope and balance weight body in midair
CN105621241A (en) Adjustable simple lifting bracket
JP7301762B2 (en) Slope Drilling Machine Movement Auxiliary Machine, Slope Drilling Device, and Method for Moving Slope Drilling Device
KR20120065004A (en) Handling jig for heavy weight product
JP7096468B1 (en) Anti-scattering net tension structure and anti-scattering net tension method
JP2012067521A (en) Guide member for vertical pipe construction and vertical pipe construction method
KR20120050043A (en) Semi-auto shackle
JP6692529B1 (en) Anti-scattering device and curing method using the same
AU2009100302A4 (en) Confined spaces access device and system

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20151027