CN108861997B - Integral hoisting tool for upper frame and guide shoe - Google Patents

Integral hoisting tool for upper frame and guide shoe Download PDF

Info

Publication number
CN108861997B
CN108861997B CN201810967965.6A CN201810967965A CN108861997B CN 108861997 B CN108861997 B CN 108861997B CN 201810967965 A CN201810967965 A CN 201810967965A CN 108861997 B CN108861997 B CN 108861997B
Authority
CN
China
Prior art keywords
frame
fixing
guide shoe
annular structure
frames
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810967965.6A
Other languages
Chinese (zh)
Other versions
CN108861997A (en
Inventor
崔春
田媛
沈雅芳
杜巍
吴保金
李喆夫
李毅飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mudanjiang Hydraulic Electrogenerating Total Factory Of Heilongjiang Power Co Of State Grid
State Grid Corp of China SGCC
Original Assignee
Mudanjiang Hydraulic Electrogenerating Total Factory Of Heilongjiang Power Co Of State Grid
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mudanjiang Hydraulic Electrogenerating Total Factory Of Heilongjiang Power Co Of State Grid, State Grid Corp of China SGCC filed Critical Mudanjiang Hydraulic Electrogenerating Total Factory Of Heilongjiang Power Co Of State Grid
Priority to CN201810967965.6A priority Critical patent/CN108861997B/en
Publication of CN108861997A publication Critical patent/CN108861997A/en
Application granted granted Critical
Publication of CN108861997B publication Critical patent/CN108861997B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The invention provides an integral hoisting tool for an upper frame and guide shoes, which aims to solve the problems that the efficiency is low, the guide shoe surface is easy to damage and constructors are injured when the guide shoes of the existing vertical hydraulic generator are dismounted and mounted. The invention comprises M fixing devices, N fixing frames and N connecting frames; in the form of connecting every two fixing frames through a connecting frame, N fixing frames and N connecting frames are assembled in a crossed mode to form a central symmetrical annular structure, and the inner diameter of the annular structure is equal to that of the upper frame; m fasteners are distributed around the annular structure, and two ends of each fastener are respectively connected with the annular structure and the upper rack; each fixing frame is fixed with a guide shoe, M is a positive integer greater than 3, and N represents the number of the guide shoes. In the process of disassembling and installing the upper frame and the guide shoe, the invention can hoist integrally according to the requirement, the guide shoe surface is not damaged in the whole process, the upper frame is ensured not to collide with the main shaft, the equipment safety is protected, and the construction efficiency is improved.

Description

Integral hoisting tool for upper frame and guide shoe
Technical Field
The invention relates to a hoisting tool, in particular to an integral hoisting tool for an upper frame and a guide shoe.
Background
The generally known vertical hydraulic generator guide shoe is dismantled and installed without adopting an integral hoisting tool, and the method comprises the steps of fixing the guide shoe by using a hoisting ring, hoisting the guide shoe to an upper frame by using a crane, placing the guide shoe at a wood plate, manually pushing the guide shoe to a position capable of being hoisted by using the crane along the wood plate, and hoisting the guide shoe to enable the guide shoe to be in place. In the process of placing the guide tiles on the wood board and manually pushing the guide tiles, the method is not easy to adjust the balance of the guide tiles, and is easy to fall off to hurt people and equipment. The process is low in efficiency, the tile guide surface is easy to damage and constructors are injured, improvement is needed, and the technical problems are solved.
Disclosure of Invention
The invention aims to solve the problems that the existing vertical hydraulic generator guide shoe is low in efficiency and easy to damage the guide shoe surface and hurt constructors when being dismounted and mounted, and provides an integral hoisting tool for an upper frame and the guide shoe.
The invention relates to an integral hoisting tool for an upper frame and a guide shoe, which comprises M fixing devices 1, N fixing frames 2 and N connecting frames 3;
in the form of connecting every two fixing frames 2 through one connecting frame 3, N fixing frames 2 and N connecting frames 3 are assembled in a crossed mode to form a central symmetrical annular structure, and the inner diameter of the annular structure is equal to that of the upper frame; the M fixtures 1 are distributed around the annular structure, and two ends of each fixture 1 are respectively connected with the annular structure and the upper rack;
each fixing frame 2 is fixed with a guide shoe, M is a positive integer greater than 3, and N represents the number of the guide shoes.
Preferably, the fixing frame 2 comprises a frame body 2-1, a fixing handle 2-2 and a connecting ring 2-3;
the guide shoe is arranged in the frame body 2-1, threads are arranged outside the fixed handle 2-2, a threaded hole matched with the threads is formed in the top of the frame body 2-1, one end of the fixed handle 2-2 penetrates through the threaded hole and penetrates into the frame body from the outside of the frame body 2-1 to be in contact with the guide shoe, and the guide shoe is fixed;
the top and the bottom of the two sides of the frame body 2-1 are respectively provided with a connecting ring 2-3 for connecting with the connecting frame 3.
Preferably, the connecting frame 3 comprises an upper connecting frame and a lower connecting frame; the upper connecting frame and the lower connecting frame have the same structure and are axially symmetrically arranged;
the upper connecting frame comprises two L-shaped long rods 3-1 and a threaded pipe 3-2, threads are arranged at the ends of the long handles of the two L-shaped long rods 3-1, the ends of the long handles of the two L-shaped long rods 3-1 are respectively in threaded connection with the two ends of the threaded pipe 3-2, the length of the long handle of the L-shaped long rod 3-1 screwed into the threaded pipe can be adjusted, and the short handle of the L-shaped long rod 3-1 is inserted into a corresponding connecting ring 2-3 of the fixing frame 2 to achieve connection.
Preferably, the holder is a permanent magnet holder 1.
Preferably, M is 4,4 anchors 1 distributed at four symmetrical positions of the annular structure.
The above-described features may be combined in various suitable ways or replaced by equivalent features as long as the object of the present invention can be achieved.
The invention has the beneficial effects that the invention is a special tool used when the upper frame and the guide tiles are hoisted during overhauling of the hydroelectric generating set, the guide tile fixing frame and the connecting frame are determined according to the number of the guide tiles, and the fixing frame and the connecting frame form a stable annular structure. Through the mount, can be with the guide shoe fixed, be connected annular structure and last frame by the fixer again. The hoisting tool provided by the invention is made of a material with good welding performance, easy processing and better weight under the condition of ensuring strength. The fixing frame and the connecting frame have good bending resistance, can bear the weight of the guide shoe and are not bent. In the process of disassembling and installing the upper frame and the guide shoe, the invention can hoist integrally according to the requirement, the guide shoe surface is not damaged in the whole process, the upper frame is ensured not to collide with the main shaft, the equipment safety is protected, and the construction efficiency is improved.
Drawings
FIG. 1 is a schematic diagram of the structure of the present invention;
fig. 2 is a schematic view of the assembly of the fixing frame 2 and the connecting frame 3;
fig. 3 is a schematic structural view of the fixing frame 2;
FIG. 4 is a left side view of FIG. 3;
FIG. 5 is a top view of FIG. 3;
fig. 6 is a schematic structural view of the connection frame 3;
FIG. 7 is a left side view of FIG. 6;
FIG. 8 is a top view of FIG. 6;
fig. 9 is a schematic structural view of a permanent magnet holder.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
It should be noted that, without conflict, the embodiments of the present invention and features of the embodiments may be combined with each other.
The invention is further described below with reference to the drawings and specific examples, which are not intended to be limiting.
The integral hoisting tool for the upper frame and the guide shoe in the embodiment comprises M fixing devices 1, N fixing frames 2 and N connecting frames 3 as shown in fig. 1;
in the form of connecting every two fixing frames 2 through one connecting frame 3, N fixing frames 2 and N connecting frames 3 are assembled in a crossed mode to form a central symmetrical annular structure, and the inner diameter of the annular structure is equal to that of the upper frame; the M fixtures 1 are distributed around the annular structure, and two ends of each fixture 1 are respectively connected with the annular structure and the upper rack;
each fixing frame 2 is fixed with a guide shoe, M is a positive integer greater than 3, and N represents the number of the guide shoes.
The special tool used when the rack and the guide tiles are hoisted during overhauling of the hydroelectric generating set is used in the embodiment, and the guide tile fixing frame 2 and the connecting frame 3 are determined according to the number of the guide tiles. The integral hoisting tool of the embodiment is of an annular structure and is centrosymmetric after being assembled. The guide shoe can be fixed through the fixing frame 2, and then the annular structure is connected with the upper frame through the fixing device. The hoisting tool of the embodiment is made of a material which has good welding performance and is easy to process, and the lighter the weight is, the better the strength is ensured. The fixing frame 2 and the connecting frame 3 have good bending resistance, can bear the weight of the guide shoe and do not bend. The technical problem that the upper frame of the hydraulic generator meets when disassembling and installing the guide shoe is solved, and the construction efficiency is improved. In a preferred embodiment, as shown in fig. 3 to 5, the fixing frame 2 of the present embodiment includes a frame body 2-1, a fixing handle 2-2, and a connection ring 2-3;
the guide shoe is arranged in the frame body 2-1, threads are arranged outside the fixed handle 2-2, a threaded hole matched with the threads is formed in the top of the frame body 2-1, one end of the fixed handle 2-2 penetrates through the threaded hole and penetrates into the frame body from the outside of the frame body 2-1 to be in contact with the guide shoe, and the guide shoe is fixed;
the top and the bottom of the two sides of the frame body 2-1 are respectively provided with a connecting ring 2-3 for connecting with the connecting frame 3.
In the embodiment, the guide shoe is placed in the frame body 2-1, the fixing handle 2-2 is screwed, and the fixing handle 2-2 fixes the guide shoe in the frame body 2-1; the connecting rings 2-3 on the two sides of the frame body 2-1 are fixedly connected with the connecting frame; the fixing frame 2 can firmly fix the guide shoe, so that the guide shoe cannot fall off in the installation process, and meanwhile, the guide shoe is convenient to operate in the construction process.
In a preferred embodiment, as shown in fig. 2, 6, 7 and 8, the connection frame 3 of the present embodiment includes an upper connection frame and a lower connection frame; the upper connecting frame and the lower connecting frame have the same structure and are axially symmetrically arranged;
the upper connecting frame comprises two L-shaped long rods 3-1 and a threaded pipe 3-2, threads are arranged at the ends of the long handles of the two L-shaped long rods 3-1, the ends of the long handles of the two L-shaped long rods 3-1 are respectively in threaded connection with the two ends of the threaded pipe 3-2, the length of the long handle of the L-shaped long rod 3-1 screwed into the threaded pipe can be adjusted, and the short handle of the L-shaped long rod 3-1 is inserted into a corresponding connecting ring 2-3 of the fixing frame 2 to achieve connection.
The connecting frame 3 of this embodiment can carry out length adjustment, guarantees that the internal diameter of integral hoisting instrument and the internal diameter of last frame cooperation are good after the installation.
As shown in fig. 2, the fixing frame 2 and the connecting frame 3 of the present embodiment are assembled in a double-layer ring shape, and the assembled parts are centrosymmetric. The fixing frame 2 and the connecting frame 3 of the embodiment are made of materials with good welding performance and easy processing, and have light weight and very good bending resistance, and cannot bend when bearing the weight of the guide shoe by 2 times.
In a preferred embodiment, the holder of the present embodiment is a permanent magnet holder 1, as shown in fig. 9.
The permanent magnet holder 3 is connected with the annular structure in a pin connection manner and can bear at least 3 times of the sum of the weights of the guide shoe, the fixing frame 2 and the connecting frame 3. The material has good welding performance and is easy to process. After assembly, the permanent magnet fixer can firmly suck the whole body consisting of the guide shoe, the fixing frame 2 and the connecting frame 3 onto the upper frame, so that the guide shoe is prevented from falling off in the process of disassembly and installation, and meanwhile, the permanent magnet fixer is convenient to operate in the construction process and strong in environment adaptability.
The present embodiment comprises 4 holders 1 as shown in fig. 1,4 holders 1 being distributed in symmetrical four-way positions of the ring-shaped structure.
The parameters of the permanent magnet fixer 1, the fixing frame 2 and the connecting frame 3 in the embodiment are determined according to the parameters of the power generation guide shoe of the specific water turbine.
Although the invention herein has been described with reference to particular embodiments, it is to be understood that these embodiments are merely illustrative of the principles and applications of the present invention. It is therefore to be understood that numerous modifications may be made to the illustrative embodiments and that other arrangements may be devised without departing from the spirit and scope of the present invention as defined by the appended claims. It should be understood that the different dependent claims and the features described herein may be combined in ways other than as described in the original claims. It is also to be understood that features described in connection with separate embodiments may be used in other described embodiments.

Claims (2)

1. The integral hoisting tool for the upper frame and the guide shoe is characterized by comprising M fixing devices (1), N fixing frames (2) and N connecting frames (3);
in the form of connecting every two fixing frames (2) through a connecting frame (3), N fixing frames (2) and N connecting frames (3) are assembled in a crossed mode to form a central symmetrical annular structure, and the inner diameter of the annular structure is equal to that of the upper frame; m fixing devices (1) are distributed around the annular structure, and two ends of each fixing device (1) are respectively connected with the annular structure and the upper frame;
each fixing frame (2) is provided with a guide shoe, M is a positive integer greater than 3, and N represents the number of the guide shoes;
the fixing frame (2) comprises a frame body (2-1), a fixing handle (2-2) and a connecting ring (2-3);
the guide shoe is arranged in the frame body (2-1), threads are arranged outside the fixed handle (2-2), a threaded hole matched with the threads is formed in the top of the frame body (2-1), one end of the fixed handle (2-2) penetrates through the threaded hole, penetrates into the frame body (2-1) from the outside, is contacted with the guide shoe, and plays a role in fixing the guide shoe;
the top and the bottom of the two sides of the frame body (2-1) are respectively provided with a connecting ring (2-3) for connecting with the connecting frame (3);
the connecting frame (3) comprises an upper connecting frame and a lower connecting frame; the upper connecting frame and the lower connecting frame have the same structure and are axially symmetrically arranged;
the upper connecting frame comprises two L-shaped long rods (3-1) and a threaded pipe (3-2), threads are arranged at the ends of the long handles of the two L-shaped long rods (3-1), the ends of the long handles of the two L-shaped long rods (3-1) are respectively in threaded connection with the two ends of the threaded pipe (3-2), the length of the long handles of the L-shaped long rods (3-1) screwed into the threaded pipe can be adjusted, and the short handles of the L-shaped long rods (3-1) are inserted into corresponding connecting rings (2-3) of the fixing frame (2) to realize connection;
the fixer is a permanent magnet fixer (1).
2. The upper frame and guide shoe integral hoisting tool according to claim 1, characterized in that M-pieces of 4,4 holders (1) are distributed in four symmetrical directions of the ring structure.
CN201810967965.6A 2018-08-23 2018-08-23 Integral hoisting tool for upper frame and guide shoe Active CN108861997B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810967965.6A CN108861997B (en) 2018-08-23 2018-08-23 Integral hoisting tool for upper frame and guide shoe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810967965.6A CN108861997B (en) 2018-08-23 2018-08-23 Integral hoisting tool for upper frame and guide shoe

Publications (2)

Publication Number Publication Date
CN108861997A CN108861997A (en) 2018-11-23
CN108861997B true CN108861997B (en) 2023-09-29

Family

ID=64321310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810967965.6A Active CN108861997B (en) 2018-08-23 2018-08-23 Integral hoisting tool for upper frame and guide shoe

Country Status (1)

Country Link
CN (1) CN108861997B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002348088A (en) * 2001-05-22 2002-12-04 Isuzu Motors Ltd Cylindrical body handling accessory
KR20120001588U (en) * 2010-08-27 2012-03-07 대우조선해양 주식회사 Tool for fastening and separating of screw type pipe installed in the ship
CN103935878A (en) * 2014-05-07 2014-07-23 国家电网公司 Upper guide shoe mounting tool of vertical hydro generator
CN203765251U (en) * 2014-04-22 2014-08-13 国家电网公司 Clamping devices and device for disassembling and assembling lower guide oil box of vertical hydro-generator
CN204209612U (en) * 2014-08-29 2015-03-18 大唐碧口水力发电厂 Guide shoe tool specially for attaching and detaching on a kind of turbine-generator units
JP2016023021A (en) * 2014-07-17 2016-02-08 大和リース株式会社 Column lifting tool and method of using the same
CN208617201U (en) * 2018-08-23 2019-03-19 国网黑龙江省电力有限公司牡丹江水力发电总厂 A kind of upper spider and guide shoe integral hoisting tool

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002348088A (en) * 2001-05-22 2002-12-04 Isuzu Motors Ltd Cylindrical body handling accessory
KR20120001588U (en) * 2010-08-27 2012-03-07 대우조선해양 주식회사 Tool for fastening and separating of screw type pipe installed in the ship
CN203765251U (en) * 2014-04-22 2014-08-13 国家电网公司 Clamping devices and device for disassembling and assembling lower guide oil box of vertical hydro-generator
CN103935878A (en) * 2014-05-07 2014-07-23 国家电网公司 Upper guide shoe mounting tool of vertical hydro generator
JP2016023021A (en) * 2014-07-17 2016-02-08 大和リース株式会社 Column lifting tool and method of using the same
CN204209612U (en) * 2014-08-29 2015-03-18 大唐碧口水力发电厂 Guide shoe tool specially for attaching and detaching on a kind of turbine-generator units
CN208617201U (en) * 2018-08-23 2019-03-19 国网黑龙江省电力有限公司牡丹江水力发电总厂 A kind of upper spider and guide shoe integral hoisting tool

Also Published As

Publication number Publication date
CN108861997A (en) 2018-11-23

Similar Documents

Publication Publication Date Title
US9478962B2 (en) Method and apparatus for reducing wind induced vibration damage to electrical power line towers
CN104037657B (en) Pendency glass insulator strings lifting dogs
CN211059496U (en) Assembly type building structure with electromechanical pipeline support
CN108861997B (en) Integral hoisting tool for upper frame and guide shoe
CN103818840B (en) A kind of lifting part and hanging method
CN102774742B (en) Current transformer (CT) coil lifting device
CN205187730U (en) Electric power angle -steel tower is with supplementary hoisting device
AU2009352311A1 (en) Kit for mounting a photovoltaic assembly
CN204675726U (en) Purlin lifting auxiliary device
CN104988916A (en) Pile leg and pile shoe connecting apparatus and method for ship
CN105015796A (en) Following weight-deducting pulley block system
CN202586230U (en) Anti-slip pre-twisted shockproof hammer
CN206417793U (en) A kind of simple and easy hoisting facility for being installed on building edge
CN202440976U (en) Integrated equipment belt mounting structure
CN207896447U (en) A kind of novel distribution cabinet being easily installed
CN201397251Y (en) Multifunctional blade testing desk
CN207736212U (en) A kind of special fixture for dismantling cutter
KR20170001054U (en) Apparatus for replacing insulator
CN205398035U (en) Climbing ware
CN220416461U (en) Basement fire control pipeline anti-sedimentation structure
JP2017057702A (en) Base device coping with inclined plane
CN216471901U (en) Auxiliary lifting device for hoisting bridge tower
CN210655786U (en) Anchor clamps are assembled to hoist
CN104495645A (en) Structure capable of mounting and dismounting balancing weight automatically by tower crane
CN219526052U (en) Anti-shaking lifting equipment for installing new energy fan

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant