CN202440976U - Integrated equipment belt mounting structure - Google Patents

Integrated equipment belt mounting structure Download PDF

Info

Publication number
CN202440976U
CN202440976U CN2012200262496U CN201220026249U CN202440976U CN 202440976 U CN202440976 U CN 202440976U CN 2012200262496 U CN2012200262496 U CN 2012200262496U CN 201220026249 U CN201220026249 U CN 201220026249U CN 202440976 U CN202440976 U CN 202440976U
Authority
CN
China
Prior art keywords
keel
integrated equipment
mounting structure
clad
carries
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200262496U
Other languages
Chinese (zh)
Inventor
孙春丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG MUTU BUILDING DECORATION ENGINEERING CO LTD
Original Assignee
ZHEJIANG MUTU BUILDING DECORATION ENGINEERING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG MUTU BUILDING DECORATION ENGINEERING CO LTD filed Critical ZHEJIANG MUTU BUILDING DECORATION ENGINEERING CO LTD
Priority to CN2012200262496U priority Critical patent/CN202440976U/en
Application granted granted Critical
Publication of CN202440976U publication Critical patent/CN202440976U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model discloses an integrated equipment belt mounting structure, which comprises a plurality of lifting rods (1) fixed on a ceiling, wherein a bearing keel (6) is arranged on the lifting rods (1); a coated keel (8) which is crossed with the bearing keel (6) is arranged below the bearing keel (6); and an integrated equipment belt (5) is fixed below the coated keel (8). The integrated equipment belt mounting structure is convenient to adjust, simple to mount and good in effect after installation.

Description

The mounting structure of integrated equipment band
Technical field
The utility model relates to a kind of mounting structure, particularly a kind of mounting structure of integrated equipment band.
Background technology
At present, when the integrated equipment band is installed, mostly is employed in some suspension rods are installed on the ceiling; The integrated equipment band is directly installed in the suspension rod below; Though it is relatively poor that this mode structure simply, is installed effect, and the back is installed because the integrated equipment band is directly fixing through suspension rod; The adjusting level is difficulty comparatively, and installation difficulty is bigger.
The utility model content
The purpose of the utility model is, a kind of mounting structure of integrated equipment band is provided.The utility model is not only easy to adjust, install simply, and effect is better after installing.
The technical scheme of the utility model: the mounting structure of integrated equipment band; It is characterized in that: comprise many suspension rods that are fixed on the ceiling; Suspension rod is provided with the carrying keel, carries the keel below and is provided with and carries keel clad can keel arranged in a crossed manner, fixed set forming apparatus band under the clad can keel.
In the mounting structure of aforesaid integrated equipment band, described suspension rod lower end is provided with the threaded portion, and the threaded portion is provided with G shape suspension member through adjusting nut, the fixing keel that carry in the G shape suspension member.
In the mounting structure of aforesaid integrated equipment band, be provided with convex slot in the described clad can keel, be provided with in the convex slot and be used to connect the cingulum that carries keel.
In the mounting structure of aforesaid integrated equipment band, described carrying keel and clad can keel all are lightgage steel joist or rough ground.
In the mounting structure of aforesaid integrated equipment band, described carrying keel comprise that U type, C type and cassette carry keel.
Compared with prior art, the utility model is installed the integrated equipment band through carrying keel and clad can keel, adjusts the position during installation easily, makes that installation is comparatively simple, and integrated equipment band comparatively level in back is installed, and effect is better; Secondly, carry keel and clad can keel and all adopt lightgage steel joist, lighter weight, the convenient installation; The setting of convex slot in the clad can keel can be adjusted the horizontal level of clad can keel, and the adjusting nut of suspension rod lower end can be regulated the upper-lower position of carrying keel, makes easy to adjust.The utility model also has the characteristics simple in structure and easy to use of implementing.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Being labeled as in the accompanying drawing: the 1-suspension rod, the 2-adjusting nut, the 3-threaded portion, 4-G shape suspension member, 5-integrated equipment band, 6-carries keel, 7-cingulum, 8-clad can keel, 9-convex slot.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is further described, but not as the foundation to the utility model restriction.
Embodiment.The mounting structure of integrated equipment band; Constitute as shown in Figure 1ly, comprise the many suspension rods 1 that are fixed on the ceiling, suspension rod 1 is provided with and carries keel 6; Carry keel 6 belows and be provided with and carry keel 6 clad can keel 8 arranged in a crossed manner, 8 times fixed set forming apparatus of clad can keel band 5.
Described suspension rod 1 lower end is provided with threaded portion 3, and threaded portion 3 is provided with G shape suspension member 4 through adjusting nut 2, the fixing keel 6 that carry in the G shape suspension member 4.
Be provided with convex slot 9 in the described clad can keel 8, be provided with in the convex slot 9 and be used to connect the cingulum 7 that carries keel 6.
Described carrying keel 6 all are lightgage steel joist or rough ground with clad can keel 8.
Described carrying keel 6 comprise that U type, C type and cassette carry keel.
The utility model is installed the integrated equipment band through carrying keel and clad can keel, adjusts the position during installation easily, makes that installation is comparatively simple, and integrated equipment band comparatively level in back is installed, and effect is better; Secondly, carry keel and clad can keel and all adopt lightgage steel joist, lighter weight, the convenient installation; The setting of convex slot in the clad can keel can be adjusted the horizontal level of clad can keel, and the adjusting nut of suspension rod lower end can be regulated the upper-lower position of carrying keel, makes easy to adjust.The utility model also has the characteristics simple in structure and easy to use of implementing.

Claims (5)

1. the mounting structure of integrated equipment band; It is characterized in that: comprise the many suspension rods (1) that are fixed on the ceiling; Suspension rod (1) is provided with and carries keel (6), carries keel (6) below and is provided with and carries keel (6) clad can keel (8) arranged in a crossed manner, and clad can keel (8) are fixed set forming apparatus band (5) down.
2. the mounting structure of integrated equipment band according to claim 1 is characterized in that: described suspension rod (1) lower end is provided with threaded portion (3), and threaded portion (3) are provided with G shape suspension member (4) through adjusting nut (2), the fixing keel (6) that carry in the G shape suspension member (4).
3. the mounting structure of integrated equipment band according to claim 1 is characterized in that: be provided with convex slot (9) in the described clad can keel (8), be provided with the cingulum (7) that is used for connecting carrying keel (6) in the convex slot (9).
4. according to the mounting structure of claim 1,2 or 3 described integrated equipment bands, it is characterized in that: described carrying keel (6) and clad can keel (8) all are lightgage steel joist or rough ground.
5. according to the mounting structure of claim 1,2 or 3 described integrated equipment bands, it is characterized in that: described carrying keel (6) comprise that U type, C type and cassette carry keel.
CN2012200262496U 2012-01-19 2012-01-19 Integrated equipment belt mounting structure Expired - Fee Related CN202440976U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200262496U CN202440976U (en) 2012-01-19 2012-01-19 Integrated equipment belt mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200262496U CN202440976U (en) 2012-01-19 2012-01-19 Integrated equipment belt mounting structure

Publications (1)

Publication Number Publication Date
CN202440976U true CN202440976U (en) 2012-09-19

Family

ID=46822430

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200262496U Expired - Fee Related CN202440976U (en) 2012-01-19 2012-01-19 Integrated equipment belt mounting structure

Country Status (1)

Country Link
CN (1) CN202440976U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104314224A (en) * 2014-10-27 2015-01-28 苏州金螳螂建筑装饰股份有限公司 Lengthened large hanger structure
CN105971180A (en) * 2016-06-29 2016-09-28 浙江亚厦装饰股份有限公司 Integrated suspended ceiling assembly and assembling method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104314224A (en) * 2014-10-27 2015-01-28 苏州金螳螂建筑装饰股份有限公司 Lengthened large hanger structure
CN105971180A (en) * 2016-06-29 2016-09-28 浙江亚厦装饰股份有限公司 Integrated suspended ceiling assembly and assembling method thereof

Similar Documents

Publication Publication Date Title
CN206034649U (en) Flexible cable net support of photovoltaic power generation
CN202946629U (en) Chain wheel tensioning device
CN204042187U (en) A kind of flexible pipeline support bracket
CN202440976U (en) Integrated equipment belt mounting structure
CN204986318U (en) Electric power iron tower vertical direction equipment fixing fastener
CN204810204U (en) Ground solar photovoltaic support
CN205212179U (en) But angle regulation's lightning rod
CN204056680U (en) A kind of adjustable supports
CN203921194U (en) The helicopter adjustable tail displacement structure of taking photo by plane
CN107255208A (en) Damping base
CN202769052U (en) Pipeline movable cradle
CN102777701A (en) Bidirectional adjustable hinge type pipeline support frame
CN206129905U (en) Bearing stand support structure of adjustable elevation
CN201741706U (en) Solar energy component support with adjustable angle
CN202065554U (en) Bilaterally adjustable hinge type pipeline support frame
CN201892006U (en) Liftable base for safe
CN201862584U (en) Adjustable CCD (charged coupled device) lens holder
CN201420933Y (en) Spring feet and refrigerator with spring feet
CN201223915Y (en) Screw pitch external diameter holding mechanism of spring coiling machine
CN201568029U (en) Pumping unit with adjustable walking beam balancing weight
CN204074503U (en) Vibratory sieve angle regulator
CN204756332U (en) Fixed structure of heat exchanger
CN210593969U (en) Double-layer supporting leg
CN202252724U (en) Mounting device of liquid crystal television
CN203331806U (en) Engine installation support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120919

Termination date: 20210119

CF01 Termination of patent right due to non-payment of annual fee