JP2015072571A - Electric power system - Google Patents

Electric power system Download PDF

Info

Publication number
JP2015072571A
JP2015072571A JP2013207523A JP2013207523A JP2015072571A JP 2015072571 A JP2015072571 A JP 2015072571A JP 2013207523 A JP2013207523 A JP 2013207523A JP 2013207523 A JP2013207523 A JP 2013207523A JP 2015072571 A JP2015072571 A JP 2015072571A
Authority
JP
Japan
Prior art keywords
power
converter
output
inverter
maximum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2013207523A
Other languages
Japanese (ja)
Other versions
JP6106568B2 (en
Inventor
永井 正彦
Masahiko Nagai
正彦 永井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanyo Electric Co Ltd
Sanyo Denki Co Ltd
Original Assignee
Sanyo Electric Co Ltd
Sanyo Denki Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanyo Electric Co Ltd, Sanyo Denki Co Ltd filed Critical Sanyo Electric Co Ltd
Priority to JP2013207523A priority Critical patent/JP6106568B2/en
Priority to CN201410503377.9A priority patent/CN104516393A/en
Priority to PH12014000274A priority patent/PH12014000274B1/en
Publication of JP2015072571A publication Critical patent/JP2015072571A/en
Application granted granted Critical
Publication of JP6106568B2 publication Critical patent/JP6106568B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control Of Electrical Variables (AREA)
  • Inverter Devices (AREA)

Abstract

PROBLEM TO BE SOLVED: To utilize electric power generated by entire solar battery modules as much as possible.SOLUTION: An electric power conversion system includes: a plurality of DC/DC converters 110 and 120 provided independently of each other to correspond to a plurality of solar battery modules 210 and 220, respectively and converting voltages output from the respective solar battery modules 210 and 220 to desired voltages; a DC/AC inverter 130 converting DC power output from the DC/DC converters 110 and 120 to AC power; a power control unit 148 exerting a basic power control over each of the DC/DC converters 110 and 120 and the DC/AC inverter 130; and a maximum-power-point control unit 140 transmitting a command to the power control unit 148 to execute a maximum-power-point control.

Description

本発明は、複数の太陽電池モジュールを有する太陽光発電システムにおいて、太陽電池モジュール全体の発電電力を最大限に引き出すことができる電力変換装置に関する。   The present invention relates to a power conversion device capable of extracting the generated power of the entire solar cell module to the maximum in a solar power generation system having a plurality of solar cell modules.

近年、商用電源系統と連系し負荷に電力を供給する太陽電池発電システムが用いられている。太陽電池モジュール(複数の太陽電池が直列接続されている)は、その出力電圧によって出力電力が大きく変動するという特性を有している。このため、太陽電池発電システムには、太陽電池モジュールの出力電力を最大限に利用するための工夫が施されている。   In recent years, a solar battery power generation system that is connected to a commercial power supply system and supplies power to a load has been used. A solar cell module (a plurality of solar cells are connected in series) has a characteristic that output power fluctuates greatly depending on its output voltage. For this reason, the solar cell power generation system is devised to make maximum use of the output power of the solar cell module.

その工夫の1つに、山登り法による最大電力点追尾制御(MPPT制御)がある。   One of the devices is maximum power point tracking control (MPPT control) by a hill-climbing method.

図9は従来のMPPT制御の説明図である。太陽電池モジュールの出力電力Pを太陽電池モジュールの出力電圧Vに対してプロットすると、プロットした点群は、図の曲線A又はBに示すようにほぼ山形状の曲線(電圧−電力特性曲線)を形成する。なお、曲線Aは、比較的太陽の日射量が大きく太陽電池モジュールの温度が低い場合を示し、曲線Bは、曲線Aの場合よりも太陽の日射量が小さく太陽電池モジュールの温度が高い場合を示す。   FIG. 9 is an explanatory diagram of conventional MPPT control. When the output power P of the solar cell module is plotted against the output voltage V of the solar cell module, the plotted point group has a substantially mountain-shaped curve (voltage-power characteristic curve) as shown by the curve A or B in the figure. Form. Curve A shows a case where the solar radiation amount is relatively large and the temperature of the solar cell module is low, and curve B shows a case where the solar radiation amount is smaller than the case of curve A and the temperature of the solar cell module is high. Show.

曲線Aの場合、電圧−電力特性曲線の頂点は、太陽電池モジュールの出力電力Pが最大となる最大電力点Pmaxである。最大電力点Pmaxのときの太陽電池モジュールの出力電圧Vは最適動作点Vaである。電圧−電力特性曲線は、太陽の日射量及び温度の変動に応じて変化する。太陽の日射量及び温度が小さくなり、たとえば、曲線Aから曲線Bのように変化すると、太陽電池モジュールの最大出力点Pmax及び最適動作点Vaは、最大出力点PmaxからP´maxに、及び、最適動作点VaからVbに変化する。   In the case of the curve A, the vertex of the voltage-power characteristic curve is a maximum power point Pmax at which the output power P of the solar cell module is maximum. The output voltage V of the solar cell module at the maximum power point Pmax is the optimum operating point Va. The voltage-power characteristic curve changes according to the solar radiation and temperature fluctuations. When the solar radiation amount and temperature are decreased, for example, when the solar radiation module changes from the curve A to the curve B, the maximum output point Pmax and the optimum operating point Va of the solar cell module are changed from the maximum output point Pmax to P′max, and The optimum operating point Va changes to Vb.

最大電力点は、太陽の日射量及び温度の変動によって常に変化するので、太陽電池モジュールの出力電力を最大限に利用しようとすると、最大電力点を追尾するMPPT制御が必要になる。MPPT制御では、太陽電池モジュールの出力電力Pを周期的に計測し、出力電力Pが増加するように、太陽電池モジュールの動作電圧を制御する。   Since the maximum power point always changes depending on the amount of solar radiation and temperature, MPPT control for tracking the maximum power point is required to maximize the output power of the solar cell module. In MPPT control, the output power P of the solar cell module is periodically measured, and the operating voltage of the solar cell module is controlled so that the output power P increases.

以上は、太陽電池発電システムにおいて1台の太陽電池モジュールを設けた場合であるが、太陽電池発電システムによっては複数の太陽電池モジュールを設けたものもある。複数の太陽電池モジュールを有する太陽電池発電システムでは、太陽電池モジュールごとに上記のMPPT制御が実施される必要がある。たとえば2系統の太陽電池モジュールが曲線A、曲線Bであったとして、それぞれの最大出力点Pmax、P´maxにおける太陽電池モジュールの出力電圧は異なるVa、Vbである。MPPT制御を実施しないで、双方の太陽電池モジュールから電力を取り出すと、それぞれの出力電圧は同じ電圧で動作する。このため、たとえばVa、Vb、Vcのどこで動作しても、それぞれの太陽電池モジュールの発電電力は、点Pmax、P´maxからずれており、総和の発電電力は最大ではない。よって、総和の発電電力が最大となるように運転するためには、太陽電池モジュールごとにMPPT制御を実施することで出力電圧を個々に調整し、曲線A側はVa、曲線B側はVbで運転する必要がある。   The above is a case where one solar cell module is provided in the solar cell power generation system. However, some solar cell power generation systems include a plurality of solar cell modules. In a solar cell power generation system having a plurality of solar cell modules, the above MPPT control needs to be performed for each solar cell module. For example, assuming that two systems of solar cell modules are curve A and curve B, the output voltages of the solar cell modules at the maximum output points Pmax and P′max are different Va and Vb. If power is extracted from both solar cell modules without performing MPPT control, the respective output voltages operate at the same voltage. For this reason, for example, wherever Va, Vb, and Vc operate, the generated power of each solar cell module deviates from the points Pmax and P′max, and the total generated power is not the maximum. Therefore, in order to operate so that the total generated power is maximized, the output voltage is individually adjusted by performing MPPT control for each solar cell module, and the curve A side is Va and the curve B side is Vb. I need to drive.

下記特許文献1では、それぞれの太陽電池モジュールの出力電圧を個別に調整して、それぞれの太陽電池モジュールの発電電力を最大限に利用できるようにしている。   In the following Patent Document 1, the output voltage of each solar cell module is individually adjusted so that the generated power of each solar cell module can be utilized to the maximum.

特開2013−101498号公報JP 2013-101498 A

しかし、上記特許文献1に記載されている技術では、それぞれの昇圧チョッパ回路のみでMPPT制御を実施しているため、昇圧チョッパ回路の動作の依存度が高い。このため、各入力系統の太陽電池の発電電力が変動した場合などに、その変動が、総合の発電電力に影響を与えやすい問題がある。   However, in the technique described in Patent Document 1, MPPT control is performed only by each boost chopper circuit, so that the operation dependency of the boost chopper circuit is high. For this reason, when the generated power of the solar cell of each input system fluctuates, there is a problem that the fluctuation tends to affect the total generated power.

本発明は、以上のような従来の問題を解消するために成されたものであり、複数の太陽電池モジュールを有する太陽光発電システムにおいて、太陽電池モジュール全体の発電電力を安定的にかつ、より最大限に引き出すことができる電力変換装置の提供を目的とする。   The present invention has been made to solve the conventional problems as described above, and in a photovoltaic power generation system having a plurality of solar cell modules, the generated power of the entire solar cell module can be stably and more An object of the present invention is to provide a power conversion device that can be pulled out to the maximum.

上記目的を達成するための本発明に係る電力変換装置は、複数のDC/DCコンバータ、DC/ACインバータ及び最大電力点制御部を有する。   In order to achieve the above object, a power converter according to the present invention includes a plurality of DC / DC converters, a DC / AC inverter, and a maximum power point control unit.

複数のDC/DCコンバータは、複数の太陽電池モジュールのそれぞれに対して独立して設ける。各DC/DCコンバータは、太陽電池モジュールの出力する電圧を所望の電圧に変換する。   The plurality of DC / DC converters are provided independently for each of the plurality of solar cell modules. Each DC / DC converter converts the voltage output from the solar cell module into a desired voltage.

DC/ACインバータは、複数のDC/DCコンバータが出力する直流電力を交流電力に変換する。   The DC / AC inverter converts DC power output from a plurality of DC / DC converters into AC power.

最大電力点制御部は、DC/DCコンバータのそれぞれとDC/ACインバータに対して最大電力点制御を実施する。   The maximum power point control unit performs maximum power point control on each of the DC / DC converters and the DC / AC inverter.

本発明に係る電力変換装置は、最大電力点制御部が、複数のDC/DCコンバータ及び、DC/ACインバータの双方において、最大電力点制御を実施するので、太陽電池モジュール全体の発電電力を最大限に引き出すことができる。   In the power conversion device according to the present invention, the maximum power point control unit performs the maximum power point control in both the plurality of DC / DC converters and the DC / AC inverter, so that the generated power of the entire solar cell module is maximized. It can be pulled out to the limit.

本実施形態に係る電力変換装置の概略構成を示すブロック図である。It is a block diagram which shows schematic structure of the power converter device which concerns on this embodiment. 本実施形態に係る電力変換装置の詳細な構成図である。It is a detailed block diagram of the power converter device which concerns on this embodiment. 本実施形態に係る最大電力点追従制御部の機能ブロック図である。It is a functional block diagram of the maximum electric power point tracking control part which concerns on this embodiment. 本実施形態に係る最大電力点制御部のメインフローチャートである。It is a main flowchart of the maximum power point control part which concerns on this embodiment. タスクスイッチの切替処理を示すフローチャートである。It is a flowchart which shows the switching process of a task switch. MPPT0処理を示すフローチャートである。It is a flowchart which shows a MPPT0 process. MPPT1処理を示すフローチャートである。It is a flowchart which shows a MPPT1 process. MPPT2処理を示すフローチャートである。It is a flowchart which shows a MPPT2 process. 従来のMPPT制御の説明図である。It is explanatory drawing of the conventional MPPT control.

以下、本発明に係る電力変換装置の一実施形態を図面に基づいて詳細に説明する。   Hereinafter, an embodiment of a power converter according to the present invention will be described in detail with reference to the drawings.

〔電力変換装置の構成〕
(概略構成)
図1は、本実施形態に係る電力変換装置の概略構成を示すブロック図である。電力変換装置100は、DC/DCコンバータ110、DC/DCコンバータ120、DC/ACインバータ130、最大電力点制御部140及び電力制御部148により構成される。
[Configuration of power converter]
(Outline configuration)
FIG. 1 is a block diagram illustrating a schematic configuration of a power conversion device according to the present embodiment. The power conversion device 100 includes a DC / DC converter 110, a DC / DC converter 120, a DC / AC inverter 130, a maximum power point control unit 140, and a power control unit 148.

DC/DCコンバータ110は、太陽電池モジュール210に対し独立して接続する。DC/DCコンバータ110は、太陽電池モジュール210が出力する直流電圧を所望の異なる電圧に変換する。   The DC / DC converter 110 is connected to the solar cell module 210 independently. The DC / DC converter 110 converts the DC voltage output from the solar cell module 210 into a desired different voltage.

DC/DCコンバータ120は、太陽電池モジュール220に対し独立して接続する。DC/DCコンバータ120は、太陽電池モジュール220が出力する直流電圧を所望の異なる電圧に変換する。   The DC / DC converter 120 is connected to the solar cell module 220 independently. The DC / DC converter 120 converts the DC voltage output from the solar cell module 220 into a desired different voltage.

DC/ACインバータ130は、DC/DCコンバータ110及びDC/DCコンバータ120が出力する直流電力を入力し、所望の周波数の交流電力に変換する。DC/ACインバータ130が変換した交流電力は商用電源230に供給され、商用電源系統と並列に接続された負荷240等で消費される。   The DC / AC inverter 130 receives the DC power output from the DC / DC converter 110 and the DC / DC converter 120 and converts it into AC power having a desired frequency. The AC power converted by the DC / AC inverter 130 is supplied to the commercial power supply 230 and consumed by a load 240 or the like connected in parallel with the commercial power supply system.

電力制御部148は、DC/DCコンバータ110、DC/DCコンバータ120及びDC/ACインバータ130の全てに対して基本的な電力制御を実施する。最大電力点制御部140は、DC/DCコンバータ110に対する最大電力点制御を後述するMPPT1処理によって演算し、電力制御部148に指令を与えることでMPPTを実施する。最大電力点制御部140は、DC/DCコンバータ120に対する最大電力点制御を後述するMPPT2処理によって演算し、電力制御部148に指令を与えることでMPPTを実施する。最大電力点制御部140は、DC/ACインバータ130に対する最大電力点制御を後述するMPPT0処理によって演算し、電力制御部148に指令を与えることでMPPTを実施する。   The power control unit 148 performs basic power control on all of the DC / DC converter 110, the DC / DC converter 120, and the DC / AC inverter 130. The maximum power point control unit 140 calculates the maximum power point control for the DC / DC converter 110 by MPPT1 processing described later, and implements MPPT by giving a command to the power control unit 148. The maximum power point control unit 140 performs MPPT by calculating maximum power point control for the DC / DC converter 120 by MPPT2 processing, which will be described later, and giving a command to the power control unit 148. The maximum power point control unit 140 calculates the maximum power point control for the DC / AC inverter 130 by MPPT0 processing described later, and implements MPPT by giving a command to the power control unit 148.

MPPT1処理、MPPT2処理、MPPT0処理のそれぞれは、DC/DCコンバータ110とDC/DCコンバータ120とから出力される直流電力の和が最大になるように、又は、DC/ACインバータ130から出力される交流電力が最大になるように、最大電力点制御を実施する。   Each of the MPPT1 process, the MPPT2 process, and the MPPT0 process is output from the DC / AC inverter 130 so that the sum of the DC power output from the DC / DC converter 110 and the DC / DC converter 120 is maximized. Maximum power point control is performed so that AC power is maximized.

(詳細構成)
図2は、本実施形態に係る電力変換装置の詳細な構成図である。DC/DCコンバータ110及びDC/DCコンバータ120は、同一の構成を有し、コンデンサC、リアクトルL及びスイッチングトランジスタTRを有する。
(Detailed configuration)
FIG. 2 is a detailed configuration diagram of the power conversion device according to the present embodiment. The DC / DC converter 110 and the DC / DC converter 120 have the same configuration, and include a capacitor C, a reactor L, and a switching transistor TR.

コンデンサC及びリアクトルLは平滑回路を形成する。平滑回路は太陽電池モジュール210又は太陽電池モジュール220が出力する直流電流の波形を平滑化しながら、太陽電池モジュールの電圧を、MPPTを行うに最適な直流電圧に変換する。図2は昇圧回路を例にあげているが、昇圧か降圧は問わない。   Capacitor C and reactor L form a smoothing circuit. The smoothing circuit converts the voltage of the solar cell module into the optimum DC voltage for performing MPPT while smoothing the waveform of the DC current output from the solar cell module 210 or the solar cell module 220. Although FIG. 2 shows a booster circuit as an example, it does not matter whether it is boosted or lowered.

スイッチングトランジスタTRは、平滑回路で平滑化された直流電流を、入力されるPWMパルスにしたがってスイッチングし、平滑回路から出力される直流電圧とは異なる電圧の直流電圧に変換する。   The switching transistor TR switches the direct current smoothed by the smoothing circuit according to the input PWM pulse, and converts the direct current into a direct current voltage different from the direct current voltage output from the smoothing circuit.

最大電力点制御は、最大電力点制御部140、電力演算部142、電力演算部144、電力演算部146及びDC/DCコンバータ制御1、2、DC/ACインバータ制御機能を有する電力制御部148により実施される。   The maximum power point control is performed by the maximum power point control unit 140, the power calculation unit 142, the power calculation unit 144, the power calculation unit 146, the DC / DC converter control 1 and 2, and the power control unit 148 having a DC / AC inverter control function. To be implemented.

電力演算部142は、太陽電池モジュール210が出力する直流電圧E1と平滑回路が出力する直流電流I1とを掛け合わせて、太陽電池モジュール210が出力する直流電力P1を演算する。   The power calculation unit 142 calculates the DC power P1 output from the solar cell module 210 by multiplying the DC voltage E1 output from the solar cell module 210 and the DC current I1 output from the smoothing circuit.

電力演算部144は、太陽電池モジュール220が出力する直流電圧E2と平滑回路が出力する直流電流I2とを掛け合わせて、太陽電池モジュール220が出力する直流電力P2を演算する。   The power calculation unit 144 multiplies the DC voltage E2 output from the solar cell module 220 and the DC current I2 output from the smoothing circuit to calculate the DC power P2 output from the solar cell module 220.

電力演算部146は、DC/ACインバータ130が出力する交流電圧V0と交流電流I0とを掛け合わせて、DC/ACインバータ130が出力する交流電力W0を演算する。   The power calculation unit 146 calculates the AC power W0 output from the DC / AC inverter 130 by multiplying the AC voltage V0 output from the DC / AC inverter 130 and the AC current I0.

最大電力追従制御部140は、電力演算部142から直流電力P1を、電力演算部144から直流電力P2を、電力演算部146から交流電力W0を、それぞれ入力する。最大電力追従制御部140は、DC/DCコンバータ110とDC/DCコンバータ120とから出力される直流電力の和が最大になるように、又は、DC/ACインバータ130から出力される交流電力が最大になるように、DC/DCコンバータ110、DC/DCコンバータ120、DC/ACインバータ130の電力制御を司る電力制御部148に指令を与え、それぞれに出力するPWMパルスのデューティー比を調整する。つまり、最大電力追従制御部140は、MPPT1処理、MPPT2処理、MPPT0処理を実施する。   Maximum power tracking control unit 140 receives DC power P1 from power calculation unit 142, DC power P2 from power calculation unit 144, and AC power W0 from power calculation unit 146. The maximum power tracking control unit 140 maximizes the AC power output from the DC / AC inverter 130 so that the sum of the DC power output from the DC / DC converter 110 and the DC / DC converter 120 is maximized. Thus, a command is given to the power control unit 148 that controls the power of the DC / DC converter 110, the DC / DC converter 120, and the DC / AC inverter 130, and the duty ratio of the PWM pulse output to each is adjusted. That is, the maximum power follow-up control unit 140 performs MPPT1 processing, MPPT2 processing, and MPPT0 processing.

図3は、本実施形態に係る最大電力点追従制御部の機能ブロック図である。最大電力点追従制御部140は、DC/DCコンバータ110のMPPT1処理を実施するコンバータ制御1、DC/DCコンバータ120のMPPT2処理を実施するコンバータ制御2及びDC/ACインバータ130のMPPT0処理を実施するインバータ制御の、それぞれの機能を有する。   FIG. 3 is a functional block diagram of the maximum power point tracking control unit according to the present embodiment. Maximum power point tracking control unit 140 executes converter control 1 for performing MPPT1 processing of DC / DC converter 110, converter control 2 for performing MPPT2 processing of DC / DC converter 120, and MPPT0 processing of DC / AC inverter 130. Each function of inverter control.

コンバータ制御1は次のようにしてMPPT1処理からの指令を受け、MPPTを実施する。   Converter control 1 receives a command from MPPT1 processing as follows and executes MPPT.

DC/DCコンバータ110とDC/DCコンバータ120とがDC/ACインバータ130に出力する直流電圧Vdcoの目標値をVdco指令値1として入力し、MPPT1処理によるVdco調整値1と加算する。Vdco指令値1+MPPT1処理によるVdco調整値1の値から直流電圧Vdcoを減算してK1倍する。K1(Vdco指令値1+MPPT1処理によるVdco調整値1−Vdco)からI1を引いてK2倍した値と、K1(Vdco指令値1+MPPT1処理によるVdco調整値1−Vdco)とを加算し、これをPWM制御にかけることで、PWMパルスを生成する。   The DC / DC converter 110 and the DC / DC converter 120 input the target value of the direct-current voltage Vdco output to the DC / AC inverter 130 as the Vdco command value 1, and add it to the Vdco adjustment value 1 by the MPPT1 process. The DC voltage Vdco is subtracted from the value of the Vdco command value 1 + MPPT1 Vdco adjustment value 1 and multiplied by K1. The value obtained by subtracting I1 from K1 (Vdco command value 1 + Vdco adjustment value 1-Vdco by MPPT1 processing) and multiplying by K2 is added to K1 (Vdco command value 1 + Vdco adjustment value 1-Vdco by MPPT1 processing), and this is PWM-controlled. To generate a PWM pulse.

コンバータ制御2は次のようにしてMPPT2処理からの指令を受け、MPPTを実施する。   The converter control 2 receives the command from the MPPT2 process as follows and executes the MPPT.

DC/DCコンバータ110とDC/DCコンバータ120とがDC/ACインバータ130に出力する直流電圧Vdcoの目標値をVdco指令値2として入力し、MPPT2処理によるVdco調整値2と加算する。Vdco指令値2+MPPT2処理によるVdco調整値2の値から直流電圧Vdcoを減算してK1倍する。K1(Vdco指令値2+MPPT2処理によるVdco調整値2−Vdco)からI2を引いてK2倍した値と、k1(Vdco指令値2+MPPT2処理によるVdco調整値2−Vdco)とを加算し、これをPWM制御にかけることで、PWMパルスを生成する。   The DC / DC converter 110 and the DC / DC converter 120 input the target value of the DC voltage Vdco output to the DC / AC inverter 130 as the Vdco command value 2 and adds it to the Vdco adjustment value 2 by the MPPT2 process. The DC voltage Vdco is subtracted from the value of the Vdco adjustment value 2 by the Vdco command value 2 + MPPT2 process and multiplied by K1. The value obtained by subtracting I2 from K1 (Vdco command value 2 + MPd2 processing Vdco adjustment value 2-Vdco) and multiplying by K2 and k1 (Vdco command value 2 + MPPT2 processing Vdco adjustment value 2-Vdco) are added, and this is PWM controlled. To generate a PWM pulse.

インバータ制御は次のようにしてMPPT0処理からの指令を受け、MPPTを実施する。   Inverter control receives a command from the MPPT0 process as follows and executes MPPT.

DC/ACインバータ130が出力する交流電圧V0を基にした正弦波情報と、DC/ACインバータ130のMPPT0処理による電力指令値とを掛け合わせる。この掛け合わせた値から交流電圧V0を減算した値をK3倍し、K3倍した値からDC/ACインバータ130が出力する交流電流I0を差し引き、これをPWM制御にかけることでPWMパルスを生成する。   The sine wave information based on the AC voltage V0 output from the DC / AC inverter 130 is multiplied by the power command value obtained by the MPPT0 process of the DC / AC inverter 130. A value obtained by subtracting the AC voltage V0 from the multiplied value is multiplied by K3, and the AC current I0 output from the DC / AC inverter 130 is subtracted from the value multiplied by K3, and this is subjected to PWM control to generate a PWM pulse. .

〔電力変換装置の動作〕
(概略動作)
最大電力点制御部140は、インバータ電流I0を調整して、DC/ACコンバータ130が出力する電力W0を最大にする、MPPT0処理を実施し、次に、MPPT1処理によるVdco調整値1を調整して、DC/DCコンバータ110が出力する電力P1を最大にする、MPPT1処理を実施し、次に、MPPT2処理によるVdco調整値2を調整して、DC/DCコンバータ120が出力する電力P2を最大にする、MPPT2処理を実施する。
[Operation of power converter]
(Outline operation)
Maximum power point controller 140 adjusts inverter current I0 to maximize power W0 output from DC / AC converter 130, performs MPPT0 processing, and then adjusts Vdco adjustment value 1 by MPPT1 processing. Then, the MPPT1 process for maximizing the power P1 output from the DC / DC converter 110 is performed, and then the Vdco adjustment value 2 by the MPPT2 process is adjusted to maximize the power P2 output from the DC / DC converter 120. Execute MPPT2 processing.

DC/DCコンバータ110が出力する電力P1がDC/DCコンバータ120が出力する電力P2よりも小さいとき(P1<P2)には、MPPT1処理が実施され、その後、MPPT0処理が実施される。   When the power P1 output from the DC / DC converter 110 is smaller than the power P2 output from the DC / DC converter 120 (P1 <P2), the MPPT1 process is performed, and then the MPPT0 process is performed.

また、DC/DCコンバータ110が出力する電力P1がDC/DCコンバータ120が出力する電力P2よりも大きいとき(P1>P2)には、MPPT2処理が実施され、その後、MPPT0処理が実施される。   When the power P1 output from the DC / DC converter 110 is larger than the power P2 output from the DC / DC converter 120 (P1> P2), the MPPT2 process is performed, and then the MPPT0 process is performed.

つまり、P1<P2のときには、MPPT0処理→MPPT1処理→MPPT0処理→MPPT1処理…となり、MPPT0処理とMPPT1処理とが交互に繰り返される。このとき、電力W0又は電力P1+P2が最大になる点を探す電力点制御が行われる。   That is, when P1 <P2, MPPT0 process → MPPT1 process → MPPT0 process → MPPT1 process, and so on. The MPPT0 process and the MPPT1 process are alternately repeated. At this time, power point control for searching for a point at which the power W0 or the power P1 + P2 is maximized is performed.

また、P1≧P2のときには、MPPT0処理→MPPT2処理→MPPT0処理→MPPT2処理…となり、MPPT0処理とMPPT2処理とが交互に繰り返される。このとき、電力W0又は電力P1+P2が最大になる点を探す電力点制御が行われる。   When P1 ≧ P2, MPPT0 process → MPPT2 process → MPPT0 process → MPPT2 process, and so on, and the MPPT0 process and the MPPT2 process are alternately repeated. At this time, power point control for searching for a point at which the power W0 or the power P1 + P2 is maximized is performed.

以上のように、本実施形態に係る電力変換装置100は、電力P1と電力P2との大小関係が入れ替わらない限り、MPPT1処理かMPPT2処理かがMPPT0処理と交互に実施される。電力P1と電力P2との大小関係が入れ替わると、MPPT1処理からMPPT2処理に、又は、MPPT2処理からMPPT1処理に、処理が変更される。   As described above, in the power conversion device 100 according to the present embodiment, the MPPT1 process or the MPPT2 process is alternately performed with the MPPT0 process unless the magnitude relationship between the power P1 and the power P2 is switched. When the magnitude relationship between the power P1 and the power P2 is switched, the process is changed from the MPPT1 process to the MPPT2 process or from the MPPT2 process to the MPPT1 process.

なお、処理が頻繁に変更されることのないように、電力P1と電力P2の大小判定にはヒステリシスを持たせておく。たとえば、ヒステリシス量は、電力P1+P2の10%から50%の間に設定しておく。このようにしておけば、電力P1と電力P2の大小関係が頻繁に変わったとしても、安定したMPPT処理ができる。   In order to prevent the processing from being changed frequently, the magnitude determination of the power P1 and the power P2 is provided with hysteresis. For example, the hysteresis amount is set between 10% and 50% of the electric power P1 + P2. In this way, stable MPPT processing can be performed even if the magnitude relationship between the power P1 and the power P2 changes frequently.

以上のようにMPPT処理1、MPPT処理2を切り替える理由は、より安定的にMPPTを実施するためであり、どちらかのDC/DCコンバータ一方のみでMPPT1処理、又はMPPT2処理を実施してもよい。   As described above, the reason for switching between MPPT processing 1 and MPPT processing 2 is to perform MPPT more stably, and MPPT1 processing or MPPT2 processing may be performed by only one of the DC / DC converters. .

(詳細動作)
図4は、本実施形態に係る最大電力点制御部のメインフローチャートである。メインフローチャートの処理について説明する。
(Detailed operation)
FIG. 4 is a main flowchart of the maximum power point control unit according to the present embodiment. The process of the main flowchart will be described.

プログラムがスタートすると、タスクスイッチの切替処理を実施する。タスクスイッチの切替処理は、MPPT0処理を実施させるのか、MPPT1処理を実施させるのか、MPPT2処理を実施させるのか、を選択的に指示するための処理である。タスクスイッチ切替処理では、MPPT0処理は必ず実施させるようにしてあり、MPPT0処理を実施した次回の処理に、MPPT1処理かMPPT2処理のいずれかを実施させる(ステップS100)。   When the program starts, task switch switching processing is performed. The task switch switching process is a process for selectively instructing whether to execute the MPPT0 process, the MPPT1 process, or the MPPT2 process. In the task switch switching process, the MPPT0 process is always executed, and the MPPT1 process or the MPPT2 process is executed in the next process in which the MPPT0 process is executed (step S100).

次に、タスクスイッチによる分岐処理を実施する。タスクスイッチによる分岐処理は、前段のタスクスイッチの切替処理によって、選択的に指示されたMPPT0処理、MPPT1処理、MPPT2処理を実施するために、次に処理するプログラムを選択する(ステップS110)。   Next, a branch process by a task switch is performed. In the branch process by the task switch, the program to be processed next is selected in order to execute the MPPT0 process, the MPPT1 process, and the MPPT2 process selectively instructed by the task switch switching process in the previous stage (step S110).

前段のタスクスイッチによる分岐処理でMPPT0処理が選択された場合には、MPPT0処理が実施される。MPPT0処理は、図1に示すように、最大電力点制御部140がDC/ACインバータ130に対して行うMPPT制御である。MPPT0処理は、図2及び図3に示すように、DC/ACインバータ130から出力される交流電力W0を変化させるための、MPPT0処理による電力指令値を増減し、これを電力制御部148に指令として与えることで、太陽電池モジュール210から出力される電力P1と太陽電池モジュール220から出力される電力P2の和が最大になるようにするか、又は、DC/ACインバータ130から出力される電力W0が最大になるようにする(ステップS120)。   When the MPPT0 process is selected in the branch process by the task switch in the previous stage, the MPPT0 process is performed. The MPPT0 process is MPPT control performed by the maximum power point control unit 140 on the DC / AC inverter 130 as shown in FIG. As shown in FIGS. 2 and 3, the MPPT0 process increases or decreases the power command value by the MPPT0 process for changing the AC power W0 output from the DC / AC inverter 130, and sends this command to the power control unit 148. As a result, the sum of the power P1 output from the solar cell module 210 and the power P2 output from the solar cell module 220 is maximized, or the power W0 output from the DC / AC inverter 130 is set. Is maximized (step S120).

前段のタスクスイッチによる分岐処理でMPPT1処理が選択された場合には、MPPT1処理が実施される。MPPT1処理は、図1に示すように、最大電力点制御部140がDC/DCコンバータ110に対して行うMPPT制御である。MPPT1処理は、図2及び図3に示すように、DC/DCインバータ110から出力される電力P1を変化させるための、MPPT1処理によるVdco調整値1を増減し、これを電力制御部148に指令として与えることで、太陽電池モジュール210から出力される電力P1と太陽電池モジュール220から出力される電力P2の和が最大になるようにするか、又は、DC/ACインバータ130から出力される電力W0が最大になるようにする(ステップS130)。   When the MPPT1 process is selected in the branch process by the task switch in the previous stage, the MPPT1 process is performed. The MPPT1 processing is MPPT control performed by the maximum power point control unit 140 on the DC / DC converter 110 as shown in FIG. 2 and 3, the MPPT1 process increases or decreases the Vdco adjustment value 1 by the MPPT1 process for changing the power P1 output from the DC / DC inverter 110, and instructs the power control unit 148 to change this. As a result, the sum of the power P1 output from the solar cell module 210 and the power P2 output from the solar cell module 220 is maximized, or the power W0 output from the DC / AC inverter 130 is set. Is maximized (step S130).

前段のタスクスイッチによる分岐処理でMPPT2処理が選択された場合には、MPPT2処理が実施される。MPPT2処理は、図1に示すように、最大電力点制御部140がDC/DCコンバータ120に対して行うMPPT制御である。MPPT2処理は、図2及び図3に示すように、DC/DCインバータ120から出力される電力P2を変化させるための、MPPT2処理によるVdco調整値2を増減し、これを電力制御部148に指令として与えることで、太陽電池モジュール210から出力される電力P1と太陽電池モジュール220から出力される電力P2の和が最大になるようにするか、又は、DC/ACインバータ130から出力される電力W0が最大になるようにする(ステップS140)。   When the MPPT2 process is selected in the branch process by the task switch in the previous stage, the MPPT2 process is performed. The MPPT2 process is MPPT control performed by the maximum power point control unit 140 on the DC / DC converter 120 as shown in FIG. 2 and 3, the MPPT2 process increases or decreases the Vdco adjustment value 2 by the MPPT2 process for changing the power P2 output from the DC / DC inverter 120, and instructs the power control unit 148 to change this. As a result, the sum of the power P1 output from the solar cell module 210 and the power P2 output from the solar cell module 220 is maximized, or the power W0 output from the DC / AC inverter 130 is set. Is maximized (step S140).

図5は、タスクスイッチの切替処理を示すフローチャートである。タスクスイッチの切替処理のフローチャートの処理について説明する。   FIG. 5 is a flowchart showing task switch switching processing. The process of the task switch switching process will be described.

最大電力点制御部140は、プログラムがスタートすると、まず、MPPT処理を指示する(ステップS101)。   When the program starts, the maximum power point control unit 140 first instructs MPPT processing (step S101).

次に、最大電力点制御部140(パワーコンディショナの監視部)は、DC/DCコンバータ110及びDC/DCコンバータ120が正常に運転可能な条件か判断する。太陽電池モジュール210及び太陽電池モジュール220の発電量が十分であれば運転し、十分でなければ停止する。この判断は、たとえば、図2に示した直流電圧E1及び直流電圧E2の大きさで判断する。直流電圧E1が設定値を超えていればDC/DCコンバータ110は運転可能、超えていなければ運転不可と判断し、電力制御部148に運転または停止の指令を与える。また、直流電圧E2が設定値を超えていればDC/DCコンバータ120は運転可能、超えていなければ運転不可と判断し、電力制御部148に運転または停止の指令を与える。   Next, the maximum power point control unit 140 (power conditioner monitoring unit) determines whether or not the DC / DC converter 110 and the DC / DC converter 120 can be operated normally. If the amount of power generated by the solar cell module 210 and the solar cell module 220 is sufficient, the solar cell module 210 is operated. This determination is made based on, for example, the magnitudes of the DC voltage E1 and the DC voltage E2 shown in FIG. If the DC voltage E1 exceeds the set value, the DC / DC converter 110 is determined to be operable, and if not, the operation is determined to be impossible, and an operation or stop command is given to the power control unit 148. Further, if the DC voltage E2 exceeds the set value, the DC / DC converter 120 is determined to be operable, and if not, the operation is determined to be impossible, and an operation or stop command is given to the power control unit 148.

最大電力点制御部140はDC/DCコンバータ110及びDC/DCコンバータ120が運転状態であるか否かを判断する(ステップS102)。   The maximum power point control unit 140 determines whether or not the DC / DC converter 110 and the DC / DC converter 120 are in an operating state (step S102).

ステップS102の処理でDC/DCコンバータ110またはDC/DCコンバータ120が正常に動作していないと判断されたときには(ステップS102:NO)、再びMPPT0処理を指示する。したがって、タスクスイッチの切替処理では、DC/DCコンバータ110またはDC/DCコンバータ120が正常に動作していないときには、最大電力点制御部140は、Vdco調整値1及びVdco調整値2を0にして(ステップS107)、MPPT0処理だけを指示する(ステップS103)。   When it is determined in step S102 that the DC / DC converter 110 or the DC / DC converter 120 is not operating normally (step S102: NO), the MPPT0 process is instructed again. Therefore, in the task switch switching process, when the DC / DC converter 110 or the DC / DC converter 120 is not operating normally, the maximum power point control unit 140 sets the Vdco adjustment value 1 and the Vdco adjustment value 2 to 0. (Step S107), only the MPPT0 process is instructed (Step S103).

ステップS102の処理でDC/DCコンバータ110及びDC/DCコンバータ120が正常に動作していると判断されたときには(ステップS102:YES)、最大電力点制御部140は、DC/DCコンバータ110が出力している電力P1とDC/DCコンバータ120が出力している電力P2との大小関係を比較する。なお、DC/DCコンバータ110が出力している電力P1は、図2に示す電力演算部142がE1とI1とを用いて演算し、DC/DCコンバータ120が出力している電力P2は、図2に示す電力演算部144がE2とI2とを用いて演算する(ステップS104)。   When it is determined in step S102 that the DC / DC converter 110 and the DC / DC converter 120 are operating normally (step S102: YES), the maximum power point control unit 140 outputs the output from the DC / DC converter 110. The magnitude relationship between the current power P1 and the power P2 output from the DC / DC converter 120 is compared. The power P1 output from the DC / DC converter 110 is calculated by the power calculation unit 142 shown in FIG. 2 using E1 and I1, and the power P2 output from the DC / DC converter 120 is 2 calculates using E2 and I2 (step S104).

ステップS104の処理でDC/DCコンバータ110が出力している電力P1がDC/DCコンバータ120が出力している電力P2よりも小さい(P1<P2)と判断されたときには(ステップS104:YES)、最大電力点制御部140は、MPPT1処理を指示する(ステップS105)。   When it is determined in step S104 that the power P1 output from the DC / DC converter 110 is smaller than the power P2 output from the DC / DC converter 120 (P1 <P2) (step S104: YES). Maximum power point control section 140 instructs MPPT1 processing (step S105).

ステップS104の処理でDC/DCコンバータ110が出力している電力P1がDC/DCコンバータ120が出力している電力P2よりも小さくない(P1≧P2)と判断されたときには(ステップS104:NO)、最大電力点制御部140は、MPPT2処理を指示する(ステップS106)。   When it is determined in step S104 that the power P1 output from the DC / DC converter 110 is not smaller than the power P2 output from the DC / DC converter 120 (P1 ≧ P2) (step S104: NO) The maximum power point control unit 140 instructs MPPT2 processing (step S106).

以上のように、DC/DCコンバータ110が出力している電力P1とDC/DCコンバータ120が出力している電力P2との大小関係によって、MPPT1処理を指示するのか、MPPT2処理を指示するのかが選択される。ただし、前述のようにMPPT処理1、MPPT処理2を切り替える理由は、より安定的にMPPTを実施するためであり、どちらかのDC/DCコンバータ一方のみでMPPT1処理、又はMPPT2処理を実施してもよい。   As described above, whether to instruct MPPT1 processing or MPPT2 processing depending on the magnitude relationship between the power P1 output from the DC / DC converter 110 and the power P2 output from the DC / DC converter 120. Selected. However, as described above, the reason for switching between MPPT processing 1 and MPPT processing 2 is to implement MPPT more stably. Only one of the DC / DC converters performs MPPT1 processing or MPPT2 processing. Also good.

図6は、MPPT0処理を示すフローチャートである。MPPT0処理のフローチャートについて説明する。   FIG. 6 is a flowchart showing the MPPT0 process. A flowchart of the MPPT0 process will be described.

最大電力点追従制御部140は、図6のステップS121のように、インバータの電力指令値を増減し、P1+P1またはW0が最大の点を探すことが基本動作である。この電力指令値が図3のインバータ制御部に入力され、最終的にインバータ電流I0が増減されることで、パワーコンディショナの出力電力W0が最大になる点を探す。この動作がMPPTの基礎となる。   The basic operation of the maximum power point tracking control unit 140 is to increase or decrease the power command value of the inverter and search for a point where P1 + P1 or W0 is maximum, as in step S121 of FIG. This power command value is input to the inverter control unit shown in FIG. 3, and finally the inverter current I0 is increased or decreased to find a point where the output power W0 of the power conditioner becomes maximum. This operation is the basis of MPPT.

図3に示すように、DC/ACインバータ130が出力する交流電圧V0を基にした正弦波情報と、MPPT0処理による電力指令値とを乗算し、乗算後の値からDC/ACインバータ130の出力電圧V0を差し引く。差し引いた後の値をK3倍してDC/ACインバータ130のインバータ電流I0を差し引き、差し引いた後の値に基づいて、これをPWM制御にかけることで、DC/ACインバータ130に出力するPWMパルスを生成する。生成したPWMパルスに基づいてインバータ電流I0が増減されることで、MPPTが実施される(ステップS121)。   As shown in FIG. 3, the sine wave information based on the AC voltage V0 output from the DC / AC inverter 130 is multiplied by the power command value by the MPPT0 process, and the output of the DC / AC inverter 130 is obtained from the multiplied value. Subtract voltage V0. The PWM pulse output to the DC / AC inverter 130 by subtracting the inverter current I0 of the DC / AC inverter 130 and subtracting the inverter current I0 of the DC / AC inverter 130 and applying the PWM control based on the subtracted value. Is generated. MPPT is performed by increasing / decreasing the inverter current I0 based on the generated PWM pulse (step S121).

最大電力点追従制御部140は、電力演算部142が演算した電力P1、電力演算部144が演算した電力P2及び電力演算部146が演算した電力W0を見て、電力P1+P2又は電力W0が最大となる点を探す(ステップS122)。   The maximum power point tracking control unit 140 looks at the power P1 calculated by the power calculation unit 142, the power P2 calculated by the power calculation unit 144, and the power W0 calculated by the power calculation unit 146, and the power P1 + P2 or the power W0 is maximum. Is searched for (step S122).

ステップS121とステップS122とが繰り返されることによって、太陽電池モジュール全体の発電電力を最大限に引き出すことができる。   By repeating step S121 and step S122, the generated power of the entire solar cell module can be extracted to the maximum.

図7は、MPPT1処理を示すフローチャートである。MPPT1処理のフローチャートについて説明する。   FIG. 7 is a flowchart showing the MPPT1 process. A flowchart of the MPPT1 process will be described.

電力制御部148は、図3に示すように、DC/ACインバータ130に入力される電圧Vdcoを制御するためのVdco指令値1と、最大電力点追従制御部140のMPPT1処理によるVdco指令値1とを加算し、加算後の値からVdcoを差し引く。差し引いた後の値をK1倍し、K1倍後の値とK1倍後の値からコンバータ電流I1を差し引いてK2倍した値とを加算し、加算後の値に基づいて、これをPWM制御にかけることで、DC/DCコンバータ110に出力するPWMパルスを生成する。生成したPWM制御パルスに基づいてVdcoを増減し、最大電力点追従制御部140は、DC/DCコンバータ110のMPPT制御を行う(ステップS131)。なお、DC/DCコンバータの回路形態及び電力制御部148の制御式は一例であり、この限りではない。   As shown in FIG. 3, the power control unit 148 has a Vdco command value 1 for controlling the voltage Vdco input to the DC / AC inverter 130 and a Vdco command value 1 by the MPPT1 process of the maximum power point tracking control unit 140. And Vdco is subtracted from the added value. The subtracted value is multiplied by K1, and the value after K1 is multiplied by the value after subtracting the converter current I1 from the value after K1 and multiplied by K2, and this is added to the PWM control based on the value after addition. As a result, a PWM pulse output to the DC / DC converter 110 is generated. Based on the generated PWM control pulse, Vdco is increased or decreased, and maximum power point tracking control section 140 performs MPPT control of DC / DC converter 110 (step S131). Note that the circuit configuration of the DC / DC converter and the control expression of the power control unit 148 are examples, and are not limited thereto.

最大電力点追従制御部140は、電力演算部142が演算した電力P1、電力演算部144が演算した電力P2及び電力演算部146が演算した電力W0を見て、電力P1+P2又は電力W0が最大となる点を探す(ステップS132)。   The maximum power point tracking control unit 140 looks at the power P1 calculated by the power calculation unit 142, the power P2 calculated by the power calculation unit 144, and the power W0 calculated by the power calculation unit 146, and the power P1 + P2 or the power W0 is maximum. Is searched for (step S132).

最大電力点追従制御部140は、以上の処理が終了したら、図7に示すように、MPPT2処理で用いられるVdco調整値2を0に初期化する。   When the above processing ends, the maximum power point tracking control unit 140 initializes the Vdco adjustment value 2 used in the MPPT2 processing to 0 as shown in FIG.

図8は、MPPT2処理を示すフローチャートである。MPPT2処理のフローチャートについて説明する。   FIG. 8 is a flowchart showing the MPPT2 process. A flowchart of the MPPT2 process will be described.

電力制御部148は、図3に示すように、DC/ACインバータ130に入力される電圧Vdcoを制御するためのVdco指令値2と、最大電力点追従制御部140のMPPT2処理によるVdco指令値2とを加算し、加算後の値からVdcoを差し引く。差し引いた後の値をK1倍し、K1倍後の値とK1倍後の値からコンバータ電流I2を差し引いてK2倍した値とを加算し、加算後の値に基づいて、これをPWM制御にかけることで、DC/DCコンバータ120に出力するPWMパルスを生成する。生成したPWMパルスに基づいてVdcoを増減し、最大電力点追従制御部140は、DC/DCコンバータ120のMPPT制御を行う(ステップS141)。なお、DC/DCコンバータの回路形態及び電力制御部148の制御式は一例であり、この限りではない。   As shown in FIG. 3, the power control unit 148 includes a Vdco command value 2 for controlling the voltage Vdco input to the DC / AC inverter 130 and a Vdco command value 2 by MPPT2 processing of the maximum power point tracking control unit 140. And Vdco is subtracted from the added value. The subtracted value is multiplied by K1, the value after K1 is multiplied by the value after subtracting the converter current I2 from the value after K1 and multiplied by K2, and this is added to the PWM control based on the value after addition. As a result, a PWM pulse to be output to the DC / DC converter 120 is generated. Based on the generated PWM pulse, Vdco is increased or decreased, and maximum power point tracking control section 140 performs MPPT control of DC / DC converter 120 (step S141). Note that the circuit configuration of the DC / DC converter and the control expression of the power control unit 148 are examples, and are not limited thereto.

最大電力点追従制御部140は、電力演算部142が演算した電力P1、電力演算部144が演算した電力P2及び電力演算部146が演算した電力W0を見て、電力P1+P2又は電力W0が最大となる点を探す(ステップS142)。   The maximum power point tracking control unit 140 looks at the power P1 calculated by the power calculation unit 142, the power P2 calculated by the power calculation unit 144, and the power W0 calculated by the power calculation unit 146, and the power P1 + P2 or the power W0 is maximum. Is searched for (step S142).

最大電力点追従制御部140は、以上の処理が終了したら、図8に示すように、MPPT1処理で用いられるVdco調整値1を0に初期化する。   When the above processing ends, the maximum power point tracking control unit 140 initializes the Vdco adjustment value 1 used in the MPPT1 processing to 0 as shown in FIG.

本実施形態に係る電力変換装置100は以上のように動作する。したがって、DC/DCコンバータ110、DC/DCコンバータ120、DC/ACインバータ130の全てに対してMPPT制御をすることができるので、太陽電池モジュール全体の発電電力を最大限に引き出すことができる。   The power conversion apparatus 100 according to the present embodiment operates as described above. Therefore, since MPPT control can be performed for all of the DC / DC converter 110, the DC / DC converter 120, and the DC / AC inverter 130, the generated power of the entire solar cell module can be extracted to the maximum.

また、太陽電池モジュール210または太陽電池モジュール220のいずれか又は両方の出力電圧が設定値に満たない場合には、DC/ACインバータ130に対してだけMPPT制御をするので、日射量の少ない場合でも、太陽電池モジュール全体の発電電力を最大限に引き出すことができる。   In addition, when the output voltage of either or both of the solar cell module 210 and the solar cell module 220 is less than the set value, MPPT control is performed only for the DC / AC inverter 130, so even if the amount of solar radiation is small Thus, the generated power of the entire solar cell module can be maximized.

以上、本発明の好適な実施形態を説明したが、これらは本発明の説明のための例示であり、本発明の範囲をこれらの実施形態にのみ限定する趣旨ではない。本発明は、その要旨を逸脱しない範囲で、上記実施形態とは異なる種々の態様で実施することができる。   The preferred embodiments of the present invention have been described above, but these are examples for explaining the present invention, and the scope of the present invention is not intended to be limited to these embodiments. The present invention can be implemented in various modes different from the above-described embodiments without departing from the gist thereof.

たとえば、本実施形態では、太陽電池モジュールを発電源として例示したが、風力発電機、水力発電機、波力発電機など、太陽電池モジュール以外の自然エネルギーから電力を生成する発電源に対しても、本発明を適用することができる。   For example, in the present embodiment, the solar cell module is exemplified as the power generation source. However, for the power generation source that generates power from natural energy other than the solar cell module, such as a wind power generator, a hydroelectric power generator, and a wave power generator. The present invention can be applied.

100 電力変換装置、
110、120 DC/DCコンバータ、
130 DC/ACインバータ、
140 最大電力点制御部、
142、144,146 電力演算部、
148 電力制御部
210、220 太陽電池モジュール、
230 商用電源、
240 負荷。
100 power converter,
110, 120 DC / DC converter,
130 DC / AC inverter,
140 Maximum power point control unit,
142, 144, 146 power calculation unit,
148 Power control unit 210, 220 Solar cell module,
230 Commercial power supply,
240 Load.

Claims (8)

複数の太陽電池モジュールのそれぞれに対して独立して設け、前記太陽電池モジュールが出力する電圧を所望の電圧に変換する複数のDC/DCコンバータと、
前記複数のDC/DCコンバータが出力する直流電力を交流電力に変換するDC/ACインバータと、
前記DC/DCコンバータのそれぞれと前記DC/ACインバータに対して最大電力点制御を実施する最大電力点制御部と、
を有することを特徴とする電力変換装置。
A plurality of DC / DC converters provided independently for each of the plurality of solar cell modules, for converting the voltage output by the solar cell module into a desired voltage;
A DC / AC inverter for converting DC power output from the plurality of DC / DC converters into AC power;
A maximum power point control unit that performs maximum power point control on each of the DC / DC converters and the DC / AC inverter;
The power converter characterized by having.
前記最大電力点制御部は、
前記複数のDC/DCコンバータが出力する電力の和、又は、前記DC/ACインバータが出力する電力が最大になるように、前記DC/DCコンバータのそれぞれと前記DC/ACインバータに対して最大電力点制御を実施することを特徴とする請求項1に記載の電力変換装置。
The maximum power point controller is
The maximum power for each of the DC / DC converters and the DC / AC inverter so that the sum of the power output by the plurality of DC / DC converters or the power output by the DC / AC inverter is maximized. The power conversion apparatus according to claim 1, wherein point control is performed.
前記最大電力点制御部は、
前記複数のDC/DCコンバータの内のいずれかが動作できない場合には、前記DC/ACインバータが出力する電力が最大になるように、前記DC/ACインバータに対して最大電力点制御を実施することを特徴とする請求項1に記載の電力変換装置。
The maximum power point controller is
When any of the plurality of DC / DC converters cannot operate, maximum power point control is performed on the DC / AC inverter so that the power output from the DC / AC inverter is maximized. The power conversion apparatus according to claim 1.
前記複数のDC/DCコンバータの内の一方のDC/DCコンバータの出力電力が他方のDC/DCコンバータの出力電力よりも大きいときには、前記最大電力点制御部は、前記一方のDC/DCコンバータ及び前記DC/ACインバータに対して最大電力点制御を実施することを特徴とする請求項1に記載の電力変換装置。   When the output power of one DC / DC converter of the plurality of DC / DC converters is larger than the output power of the other DC / DC converter, the maximum power point control unit includes the one DC / DC converter and The power converter according to claim 1, wherein maximum power point control is performed on the DC / AC inverter. 前記複数のDC/DCコンバータの内の一方のDC/DCコンバータの出力電力が他方のDC/DCコンバータの出力電力よりも小さいときには、前記最大電力点制御部は、前記他方のDC/DCコンバータ及び前記DC/ACインバータに対して最大電力点制御を実施することを特徴とする請求項1に記載の電力変換装置。   When the output power of one DC / DC converter of the plurality of DC / DC converters is smaller than the output power of the other DC / DC converter, the maximum power point control unit includes the other DC / DC converter and The power converter according to claim 1, wherein maximum power point control is performed on the DC / AC inverter. 前記最大電力点制御部は、前記一方のDC/DCコンバータに対する最大電力点制御と前記DC/ACインバータに対する最大電力点制御とを交互に行うことを特徴とする請求項4に記載の電力変換装置。   5. The power converter according to claim 4, wherein the maximum power point control unit alternately performs maximum power point control for the one DC / DC converter and maximum power point control for the DC / AC inverter. . 前記最大電力点制御部は、前記他方のDC/DCコンバータに対する最大電力点制御と前記DC/ACインバータに対する最大電力点制御とを交互に行うことを特徴とする請求項5に記載の電力変換装置。   The power converter according to claim 5, wherein the maximum power point control unit alternately performs maximum power point control on the other DC / DC converter and maximum power point control on the DC / AC inverter. . 前記太陽電池モジュールに換えて、風力発電機、水力発電機、波力発電機のいずれかを用いることを特徴とする請求項1から7のいずれかに記載の電力変換装置。   8. The power conversion device according to claim 1, wherein any one of a wind power generator, a hydraulic power generator, and a wave power generator is used instead of the solar cell module.
JP2013207523A 2013-10-02 2013-10-02 Power converter Active JP6106568B2 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2013207523A JP6106568B2 (en) 2013-10-02 2013-10-02 Power converter
CN201410503377.9A CN104516393A (en) 2013-10-02 2014-09-26 Power conversion device
PH12014000274A PH12014000274B1 (en) 2013-10-02 2014-09-30 Power converter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013207523A JP6106568B2 (en) 2013-10-02 2013-10-02 Power converter

Publications (2)

Publication Number Publication Date
JP2015072571A true JP2015072571A (en) 2015-04-16
JP6106568B2 JP6106568B2 (en) 2017-04-05

Family

ID=52791862

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013207523A Active JP6106568B2 (en) 2013-10-02 2013-10-02 Power converter

Country Status (3)

Country Link
JP (1) JP6106568B2 (en)
CN (1) CN104516393A (en)
PH (1) PH12014000274B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105656690A (en) * 2016-03-08 2016-06-08 成都国蓉科技有限公司 Data transmission method between optimizers in solar base station

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105659643B (en) 2013-10-22 2019-09-24 诺基亚技术有限公司 The method and apparatus of communication for the multiple mark profiles of management and utilization
JP7402416B2 (en) 2020-03-23 2023-12-21 Agc株式会社 window glass with holder

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001309560A (en) * 2000-04-27 2001-11-02 Sharp Corp System interconnection inverter device
JP2002238246A (en) * 2001-02-14 2002-08-23 Sharp Corp Booster unit, power conditioner, and photovoltaic power generation system
WO2012132949A1 (en) * 2011-03-30 2012-10-04 三洋電機株式会社 Current collection box
WO2013129683A1 (en) * 2012-03-02 2013-09-06 日揮株式会社 Power supply device, electricity storage device, and electricity storage system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001309560A (en) * 2000-04-27 2001-11-02 Sharp Corp System interconnection inverter device
JP2002238246A (en) * 2001-02-14 2002-08-23 Sharp Corp Booster unit, power conditioner, and photovoltaic power generation system
WO2012132949A1 (en) * 2011-03-30 2012-10-04 三洋電機株式会社 Current collection box
WO2013129683A1 (en) * 2012-03-02 2013-09-06 日揮株式会社 Power supply device, electricity storage device, and electricity storage system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105656690A (en) * 2016-03-08 2016-06-08 成都国蓉科技有限公司 Data transmission method between optimizers in solar base station

Also Published As

Publication number Publication date
JP6106568B2 (en) 2017-04-05
PH12014000274A1 (en) 2016-04-04
PH12014000274B1 (en) 2016-04-04
CN104516393A (en) 2015-04-15

Similar Documents

Publication Publication Date Title
US8810069B2 (en) System and method for maximizing power output of photovoltaic strings
JP5503745B2 (en) Photovoltaic power generation system, control device used in solar power generation system, control method and program thereof
JP5320144B2 (en) Solar cell maximum output power tracking control device
JP6167252B2 (en) Power conversion apparatus, power management method, and power conversion system
JP2005235082A (en) Method for tracking and controlling maximum power, and power converting device
JP6539172B2 (en) Power supply
WO2011135658A1 (en) System interconnection inverter
WO2012169013A1 (en) Operation control device for photovoltaic power generation system
JP2012016150A (en) Photovoltaic power generation device
JP5733558B2 (en) Output control method of photovoltaic power generation system
JP6106568B2 (en) Power converter
JP2013236435A (en) Buck/boost dc/dc converter
WO2015145971A1 (en) Power conversion device and power conversion method
JP6045814B2 (en) Photovoltaic power generation system and operating point correction device used therefor
Kajiwara et al. Performance-Improved Maximum Power Point Tracking Control for PV System
US9680394B2 (en) Energy voltage regulator and control method applicable thereto
Shaw et al. Small signal stability analysis of a battery connected standalone photovoltaic system
JP6618870B2 (en) Power conversion device for solar power generation, control method, and solar power generation system
JP2015154517A (en) PV power conditioner
WO2018159383A1 (en) Power conversion control device, power generation system, and power conversion control method
JP7438489B2 (en) Power systems and power supplies
CN111969945B (en) quasi-MPPT novel photovoltaic panel tracking method, equipment and storage medium
KR20140093355A (en) Photovoltaic system that contains the string voltage booster
Mali et al. Maximum power point tracking along with perturb and observe method in hybrid micro-grid
JP6907796B2 (en) Power generation system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160121

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20160215

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20160223

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20161116

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20161122

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20161212

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170221

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170306

R150 Certificate of patent or registration of utility model

Ref document number: 6106568

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250