JP2015069309A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2015069309A5 JP2015069309A5 JP2013201668A JP2013201668A JP2015069309A5 JP 2015069309 A5 JP2015069309 A5 JP 2015069309A5 JP 2013201668 A JP2013201668 A JP 2013201668A JP 2013201668 A JP2013201668 A JP 2013201668A JP 2015069309 A5 JP2015069309 A5 JP 2015069309A5
- Authority
- JP
- Japan
- Prior art keywords
- event
- terminal device
- information terminal
- scheduling
- probability distribution
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004220 aggregation Methods 0.000 claims description 6
- 230000002776 aggregation Effects 0.000 claims description 6
- 238000000034 method Methods 0.000 claims 7
- 230000003252 repetitive effect Effects 0.000 claims 3
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2013201668A JP2015069309A (ja) | 2013-09-27 | 2013-09-27 | 情報端末装置ならびにそのスケジューリング方法およびプログラム |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2013201668A JP2015069309A (ja) | 2013-09-27 | 2013-09-27 | 情報端末装置ならびにそのスケジューリング方法およびプログラム |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2015069309A JP2015069309A (ja) | 2015-04-13 |
| JP2015069309A5 true JP2015069309A5 (enExample) | 2016-10-20 |
Family
ID=52835939
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2013201668A Pending JP2015069309A (ja) | 2013-09-27 | 2013-09-27 | 情報端末装置ならびにそのスケジューリング方法およびプログラム |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2015069309A (enExample) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2017222030A1 (ja) * | 2016-06-22 | 2017-12-28 | 真実 梶田 | 事象予測装置および事象予測方法 |
| JP7260148B2 (ja) * | 2019-03-12 | 2023-04-18 | Necソリューションイノベータ株式会社 | タイミング決定装置、決定方法、プログラム、および記録媒体 |
| CN111695711A (zh) * | 2020-06-15 | 2020-09-22 | 北京交通发展研究院 | 一种预约方法及装置 |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2004203531A (ja) * | 2002-12-24 | 2004-07-22 | Canon Inc | 商品の適正在庫管理 |
| JP2007072656A (ja) * | 2005-09-06 | 2007-03-22 | Seiko Epson Corp | 端末装置、日程管理システム、端末装置の日程管理方法およびそのプログラム |
| JP2008090409A (ja) * | 2006-09-29 | 2008-04-17 | Brother Ind Ltd | スケジュール調整装置およびスケジュール調整プログラム |
| WO2008041413A1 (en) * | 2006-09-29 | 2008-04-10 | Brother Kogyo Kabushiki Kaisha | Schedule adjusting device and schedule adjusting program |
| JP4369460B2 (ja) * | 2006-10-05 | 2009-11-18 | 株式会社Osk | 教育システム |
| JP4950823B2 (ja) * | 2007-09-27 | 2012-06-13 | みずほ情報総研株式会社 | 期日管理支援処理システム、期日管理支援処理方法及び期日管理支援処理プログラム |
| JP2013158100A (ja) * | 2012-01-27 | 2013-08-15 | Univ Of Tsukuba | 充電案内装置、利用者端末、充電案内システムおよびプログラム |
-
2013
- 2013-09-27 JP JP2013201668A patent/JP2015069309A/ja active Pending
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Blonigen et al. | Dumping and antidumping duties | |
| WO2012170074A3 (en) | Resource scheduling method and system for use with computer directed assembly and manufacture | |
| SG11202013049XA (en) | Method for scheduling a task, resource sharing use method and system based on preemptive scheduling, scheduler, device, and storage medium | |
| WO2008113986A3 (en) | Data transmission scheduler | |
| WO2011157372A3 (en) | Status reporting of a structured collection procedure | |
| Chakraborty et al. | Sequential clinical scheduling with patient no-show: The impact of pre-defined slot structures | |
| CN104199790B (zh) | 数据处理方法及装置 | |
| EP2808789A3 (en) | Multi-core apparatus and job scheduling method thereof | |
| EP2800404A3 (en) | Information providing apparatus and method thereof | |
| EP3220264A3 (en) | Display object pre-generation | |
| JP2017512006A5 (enExample) | ||
| MX2014010373A (es) | Derivaciones agregadas flexibles basadas en tiempo para analisis avanzado. | |
| EP2293157A3 (en) | Before/after specific weekday determination device, program and method; specific date data structure; daylight saving time determination device; and timepiece | |
| SG11201808118PA (en) | Method and apparatus for task scheduling | |
| Lin et al. | Order acceptance and scheduling to maximize total net revenue in permutation flowshops with weighted tardiness | |
| WO2014014944A3 (en) | Managing multi-threaded operations in a multimedia authoring environment | |
| Liu et al. | On the identical parallel-machine rescheduling with job rework disruption | |
| JP2015069309A5 (enExample) | ||
| Rudek | On single processor scheduling problems with learning dependent on the number of processed jobs | |
| WO2014003831A3 (en) | Method and system for creating in real-time, a day-specific online record of events, social networking, and an online community of users | |
| MX2016005370A (es) | Gestion y rastreo de inventario. | |
| Fomin et al. | An exact algorithm for the preemptive single machine scheduling of equal-length jobs | |
| MX2013002348A (es) | Monitoreo de aplicacion. | |
| MX2016011886A (es) | Infraestructura de flujo de tareas en aplicaciones. | |
| RU2016105694A (ru) | Способ и система реализации минимально мешающего горизонтально-ориентированного календаря и компьютерный носитель для выполнения способа с использованием системы |