JP2015055062A - Lift type work scaffold device of tower crane - Google Patents

Lift type work scaffold device of tower crane Download PDF

Info

Publication number
JP2015055062A
JP2015055062A JP2013187683A JP2013187683A JP2015055062A JP 2015055062 A JP2015055062 A JP 2015055062A JP 2013187683 A JP2013187683 A JP 2013187683A JP 2013187683 A JP2013187683 A JP 2013187683A JP 2015055062 A JP2015055062 A JP 2015055062A
Authority
JP
Japan
Prior art keywords
work
tower crane
lifting
mast
lowering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2013187683A
Other languages
Japanese (ja)
Inventor
信夫 川瀬
Nobuo Kawase
信夫 川瀬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KAWASE CO Ltd
Original Assignee
KAWASE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KAWASE CO Ltd filed Critical KAWASE CO Ltd
Priority to JP2013187683A priority Critical patent/JP2015055062A/en
Publication of JP2015055062A publication Critical patent/JP2015055062A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a lift type work scaffold device which utilizes a mast post of a large-scale tower crane and is superior in workability, safety, and economical efficiency.SOLUTION: A lift type work scaffold device includes: a lift driving unit 8 attached to a mast post 2 of a large-scale tower crane 1; and a work deck 3 integrally connected with the lift driving unit, which can be lifted along a mast of the tower crane. Though a mast of a conventional tower crane has been used only for lifting a tower crane body, the mast is also used for lifting the lift type work scaffold device.

Description

本発明は、たとえば建設用大型タワークレーンの作業足場に係り、特に、タワークレーンのマスト支柱に用いることができる昇降式作業足場及びその跳ね上げ/跳ね降ろし式昇降足場(タワークレーン(廻りの)跳ね上げ/跳ね降ろし式昇降足場を含む)に関する。   The present invention relates to a work platform for a large tower crane for construction, for example, and in particular, a lift work platform that can be used for a mast column of a tower crane and its up / down lift platform (tower crane (around)). Including lifting / bounce-down lifting platform).

一般的に、高所作業、特に高層ビルなどで代表される大型構造物の建設作業現場は最上階の高さが数百メートルになる場合も少なくない。このような高層建築物の建設工事においては大型のタワークレーンが使用されており、このタワークレーンによって建設用資材、機材などが地上から高所の建設現場に運搬供給される。   In general, the height of the top floor is often several hundred meters in a construction work site of a large structure represented by high-altitude work, particularly a high-rise building. In the construction work of such a high-rise building, a large tower crane is used, and construction materials, equipment, etc. are transported and supplied from the ground to a high construction site.

従来から、高層建築物の建設工事では、マストクライミング式のタワークレーンが多く用いられている。マストクライミング式のタワークレーンは、地表面の基礎の上に立設されるマスト部材に沿って上昇可能なクレーン本体を備え、クレーン本体は、油圧シリンダの伸長と収縮を交互に繰り返すことにより、クレーン本体をマスト部材に沿って上昇させるようになっている。クレーン本体がマスト部材の上端付近まで上昇すると、本体アームにより地上から新たなマスト部材を吊り上げ、新たなマスト部材の下端を既設のマスト部材の上端に接続した後、新たなマスト部材に沿ってクレーン本体が更に上昇するようになっている。   Conventionally, mast climbing type tower cranes are often used in the construction work of high-rise buildings. A mast-climbing tower crane has a crane main body that can be raised along a mast member that is erected on a foundation on the ground surface. The crane main body alternately extends and contracts a hydraulic cylinder, The main body is raised along the mast member. When the crane body rises to the vicinity of the upper end of the mast member, a new mast member is lifted from the ground by the main body arm, the lower end of the new mast member is connected to the upper end of the existing mast member, and then the crane is moved along the new mast member. The main body is further raised.

このようにタワークレーンは、建設工事が進行し、建築物の高さが高くなるにつれて支柱であるマストを高所へと延伸させて、それに伴いタワークレーンの高さ及び/もしくは位置も順次高所へと押し上げられていく。マスト部材は一定の長さを有する基本単位マストの連結により上方へと延伸されていく。   In this way, tower cranes extend the mast, which is a column, to a high place as the construction progresses and the height of the building rises, and accordingly the height and / or position of the tower crane also rises to a high place. It is pushed up to. The mast member is extended upward by connecting basic unit masts having a certain length.

一方、大型ビルなどの高層建築物の外壁の建設工事においては、人間による作業の足場を確保するために、昇降式作業足場装置が用いられる。昇降式作業足場装置は、上述のタワークレーンと同様の小型のマストを支柱として、マストに沿って昇降又は下降する作業足場デッキを有しており、高層建築物の外壁に沿って昇降することによって、作業者の足場及び資材・機材の供給手段として利用されている。   On the other hand, in the construction work of the outer wall of a high-rise building such as a large building, an elevating work scaffold device is used in order to secure a scaffold for human work. The elevating work scaffold device has a work scaffold deck that moves up and down along the mast with a small mast similar to the tower crane described above as a support, and moves up and down along the outer wall of the high-rise building. It is used as a scaffold for workers and a means of supplying materials and equipment.

上記大型タワークレーンに用いられる支柱としてのマスト及び昇降式作業足場装置のマストは大きさや仕様が異なるものの、基本的には、強固なトラス構造を有する基本単位マストの連結によって延伸されていく。タワークレーン用マストは、重量物である大型タワークレーンを最上部で支えてさらに上方へと延伸させる強固な支柱タワーとしての機能をなしている。また昇降式作業足場装置のマストは、作業者等を効率よく高所作業現場へと輸送しかつ資材・機材を現場に供給するために十分な広さの作業足場デッキを高所作業場所まで昇降させるために機能する。   Although the mast as a support used in the large tower crane and the mast of the lifting type work scaffolding device have different sizes and specifications, they are basically extended by connecting basic unit masts having a strong truss structure. The mast for a tower crane functions as a strong support tower that supports a large tower crane, which is a heavy object, at the top and extends further upward. In addition, the mast of the lifting work platform device lifts and lowers a work platform deck that is large enough to efficiently transport workers etc. to the work site and supply materials and equipment to the work site. To function.

特開平5−178577号公報Japanese Patent Laid-Open No. 5-178777 特開2000−351577号公報Japanese Patent Laid-Open No. 2000-351577 特開2011−246894号公報JP 2011-246894 A

上述のタワークレーン用マストは、従来から、大型タワークレーンの昇降のために立設され、昇降式作業足場装置のマストは、足場である作業デッキの昇降のためにのみ使用されてきた。建設作業における労働安全衛生法上の制約等があり、例えば高層建築物の大きな躯体建設や大型構造物等の建設作業においては、大型タワークレーンが必要とされる台数だけ大型のマストの立設が必要であり、それに伴って安全で強固な土台となる地表スペースを確保して立設される。   The tower crane mast described above has conventionally been erected for raising and lowering large tower cranes, and the mast of the lifting work scaffold device has been used only for raising and lowering a work deck that is a scaffold. There are restrictions in the occupational safety and health law in construction work.For example, in the construction work of large buildings of high-rise buildings or construction work of large structures, large masts must be erected as many as the number of large tower cranes required. Necessary, and along with that, it will be erected with a ground space that will be a safe and strong foundation.

一方、建築物の躯体外壁の工事など人手作業の伴う工事においては、昇降式作業足場装置が用いられ、必要な作業足場を確保するために十分な広さを持つ作業デッキ及びその昇降に必要な支柱であるマストが、建設物躯体壁面近傍の地表に必要な数だけ安全法規を満たして立設されることになる。   On the other hand, in work that involves manual work such as construction of the building outer wall of a building, a lifting work scaffold device is used, and a work deck having a sufficient area to secure a necessary work scaffold and its lifting and lowering are required. As many masts as support columns will be erected in compliance with the safety regulations as many as necessary on the ground surface near the wall of the building structure.

同じ高層建築物の建設工事において、このようにタワークレーンによる工事と昇降式作業足場装置による工事とは区別されており、それぞれの工事に必要な数のマストがすべて地上より上空に向けて立設されているのが現状である。   In the construction work of the same high-rise building, the construction by the tower crane and the construction by the lifting work scaffolding device are thus distinguished, and all the necessary masts for each construction are standing up from the ground. This is the current situation.

タワークレーン及び昇降式作業足場装置各々のマストの建設においては、安全で強硬な安定した地盤と必要な敷地面積の確保はもちろん、マスト立設に係る資材・機材の確保、供給、また場合によってはマスト建設のための小型クレーンの設置など、非常に煩雑で費用の掛かる工事が各々のマスト立設について必要であった。   In the construction of masts for tower cranes and elevating work scaffolding devices, secure and secure stable ground and necessary site area as well as securing and supplying materials and equipment related to mast standing, and in some cases The installation of a small crane for the construction of the mast required very complicated and expensive construction for each mast.

タワークレーン用のマストには、昇降式作業足場装置の設置は成されず、同様に昇降式作業足場装置のマストには重量物を輸送するタワークレーンを設置することはできない。つまりタワークレーン用マストは、昇降式作業足場装置のマストとしての共用化はされず、タワークレーン用マストはタワークレーンの昇降の目的のためだけに使用され、昇降式作業足場装置のマストは作業デッキの昇降の目的のためだけに使用されてきた。   The tower crane mast is not provided with an elevating work scaffold device, and similarly, the tower crane for transporting heavy objects cannot be installed on the mast of the elevating work scaffold device. In other words, the tower crane mast is not shared as the mast of the lifting work scaffold device, the tower crane mast is used only for the purpose of lifting the tower crane, and the mast of the lifting work scaffold device is the work deck. Has been used only for the purpose of lifting and lowering.

例えば、タワークレーン最上部にいる建設作業者が、昇降式作業足場を使用する建築物躯体の壁面作業を必要とする際は、タワークレーンのマストに沿った昇降機を利用して一旦地上まで降りた後、昇降式作業足場装置及びそのマストを使って再び高層作業現場に向かって上昇移動しなければならなかった。また、一つのタワークレーンから他のタワークレーンへの移動の際も、同様に一旦地上まで降りた後、他のタワークレーンのマストを用いて再度昇る必要があった。つまりタワークレーンのマストには作業足場として有効に活用できる昇降可能な作業デッキや、他の構造物に近接して作業するための張り出し足場等が存在していなかったと言える。   For example, when a construction worker at the top of a tower crane needs to work on the wall surface of a building frame that uses a lifting work platform, he / she once got down to the ground using an elevator along the mast of the tower crane. Later, it had to be moved up again toward the high-rise work site using the lifting work scaffold device and its mast. Similarly, when moving from one tower crane to another tower crane, it was necessary to descend to the ground and then ascend again using the masts of the other tower cranes. In other words, it can be said that the mast of the tower crane did not have a work deck that can be lifted and lowered that can be effectively used as a work scaffold, and an overhanging scaffold for working close to other structures.

特許文献1には、タワークレーンのマストステーを高層建築物外壁に取り付けるための専用ステージをマストに設ける技術思想についての記載があるが、これは建設工事に係る作業足場をタワークレーンのマストに提供するものではない。このステージは工事作業における広さも十分ではなく、建築物壁面への密着作業を意図した張り出し作業足場を敷設する目的のものではない。   Patent Document 1 describes a technical idea of providing a mast with a dedicated stage for attaching a tower crane mast stay to an outer wall of a high-rise building. This provides a working scaffold for construction work to the mast of a tower crane. Not what you want. This stage is not large enough for construction work, and is not intended for laying an overhanging scaffold intended for close contact with the building wall.

同様に特許文献2においても、タワークレーンへの昇降設備からマストに降りた際の足場に関する記載が、図3、図4、図5において説明されているが、これも高層建築物壁面への工事作業を目的とした張り出された作業足場をタワークレーンのマストに供給することについての技術思想を開示するものではない。またこの足場はマスト外周に沿って敷設される仮足場としての技術概念であり、離れた建設物躯体壁面に密接して行う作業に必要な広さや長さとしては十分なものではない。   Similarly, in Patent Document 2, the description about the scaffold when descending from the lifting equipment to the tower crane to the mast is explained in FIGS. 3, 4, and 5, but this is also the construction on the wall of the high-rise building. It does not disclose the technical idea of supplying an overhanging work scaffold for the purpose of work to the tower crane mast. Moreover, this scaffold is a technical concept as a temporary scaffold laid along the outer periphery of the mast, and is not sufficient as a size and a length required for work closely performed on the wall surface of a separate building structure.

本発明は上述のような従来技術上の問題点を解決することを企図したものであり、高層建築物の建設作業の安全性及び作業性を格段に向上させつつ、経済効率も格段に向上させることの可能な作業足場を提供することをその課題とする。   The present invention is intended to solve the above-described problems in the prior art, and dramatically improves the safety and workability of construction work for high-rise buildings, while also dramatically improving economic efficiency. It is an object to provide a working scaffold that can be used.

本発明は、上述の課題を解決するための手段として、タワークレーンのマストに敷設された各種の昇降式作業足場装置を提供するものである。   As a means for solving the above-described problems, the present invention provides various lifting work scaffolding devices laid on the mast of a tower crane.

上述の課題を解決するために開発された本発明に係る大型タワークレーンの昇降式作業足場装置は、タワークレーンのマスト支柱を昇降する昇降駆動部と、前記昇降駆動部に連結して敷設された作業デッキと、前記昇降駆動部に電力を供給する電力供給部と、前記昇降駆動部を制御する制御部とを具備し、タワークレーンのマスト支柱に沿って昇降する作業足場を形成することを特徴とする。   A lifting tower for a large tower crane according to the present invention, which was developed to solve the above-described problems, was laid in conjunction with a lifting drive unit that lifts and lowers the mast column of the tower crane, and the lifting drive unit. It comprises a work deck, a power supply unit that supplies power to the lift drive unit, and a control unit that controls the lift drive unit, and forms a work scaffold that moves up and down along the mast column of the tower crane. And

大型構造物の建設やビルメンテナンス等の高所作業を行う作業用足場装置は、地上のベースフレームに取り付けられたマスト支柱を昇降する昇降駆動部と、この昇降駆動部に連結された作業デッキとを有する昇降式作業用足場装置等としても実現される。   A work scaffolding device that performs high place work such as construction of a large structure or building maintenance includes a lift drive unit that lifts and lowers a mast column attached to a base frame on the ground, and a work deck coupled to the lift drive unit. It is also realized as an elevating work scaffolding device having

作業デッキとは、マスト支柱に対して昇降自在に取り付けられているユニットである。好適にはマスト支柱の縦軸材に挿着された柱部とこれに接続された作業足場床(以降、作業足場床を「デッキプレート」と称する。)を支えるデッキ下構造と、所望の場所までの位置移動を可能にする駆動装置と、所望位置で固定し降下を防止するストッパ機構とを備えている。作業デッキのデッキ下構造の上に敷設されたデッキプレートは、建設工事作業者の作業足場として機能し、工事用の資材や機材もデッキプレート上に確保される。駆動装置は、作業デッキを昇降させる原動力となる機能を有する装置等であり、電動式、空圧式モーター等の自動回転駆動装置等を用いて実現される。   The work deck is a unit attached to the mast column so as to be movable up and down. Preferably, a column structure inserted into the vertical axis material of the mast strut and a deck lower structure for supporting a work scaffold floor connected thereto (hereinafter referred to as a “deck plate”), and a desired location And a stopper mechanism that is fixed at a desired position and prevents a descent. The deck plate laid on the structure under the deck of the work deck functions as a working scaffold for construction workers, and construction materials and equipment are also secured on the deck plate. The drive device is a device having a function as a driving force for moving the work deck up and down, and is realized by using an automatic rotation drive device such as an electric motor or a pneumatic motor.

本発明に係るタワークレーンの昇降式作業足場装置は、大型のタワークレーンのマスト支柱に昇降駆動部が挿着され、その昇降駆動部と接続され一体となった足場デッキがタワークレーンのマストに沿って昇降することができる昇降式作業足場装置である。従来のタワークレーンのマストはタワークレーン本体の昇降のみに用いられていたが、本願では、昇降式作業足場装置を昇降させるマストとしても併用して活用させることに特徴を有する。   In the tower crane lifting and lowering work scaffolding apparatus according to the present invention, the lifting drive unit is inserted into the mast column of a large tower crane, and the integrated scaffolding deck connected to the lifting drive unit is along the mast of the tower crane. It is a lifting type working scaffold device that can be lifted up and down. A conventional tower crane mast has been used only for raising and lowering the tower crane main body. However, the present application is characterized in that it is also used as a mast for raising and lowering a lifting work scaffold device.

大型高層建築物の建設においては、必要とする大型タワークレーンの台数だけ大型のマスト支柱が必要であり、それに見合う安全で強固な土台となる地表場所を確保して立設される。同様に建築物の躯体外壁の工事など人手作業を伴う工事においては、昇降式作業足場装置が用いられ、必要な作業足場を確保するために十分な広さを持つ作業デッキとその昇降に必要な支柱であるマストとが、建設物躯体壁面近傍に必要な数だけ配設されることになる。   In the construction of a large high-rise building, as many large mast columns as the number of large tower cranes required are necessary, and a ground surface that will serve as a safe and strong foundation is secured and set up. Similarly, in work involving manual work such as construction of the building outer wall of a building, an elevating work scaffold device is used, and a work deck having a sufficient area to secure the necessary work scaffold and necessary for raising and lowering the work deck are used. As many masts as support columns are arranged in the vicinity of the wall surface of the building structure.

同じ高層建築物の建設工事において、このようにタワークレーンによる工事と昇降式作業足場装置による工事とは区別されており、それぞれの工事に必要な数のマストがすべて地上より上空に向けて立設されていたのであるが、本発明に係るタワークレーンの昇降式作業足場装置は、タワークレーンのマストを昇降式作業足場のマストとして兼用するものであり、マスト建設作業工期を短縮するとともに、マストに用いる部材・資材そして費用を大きく削減できる。   In the construction work of the same high-rise building, the construction by the tower crane and the construction by the lifting work scaffolding device are thus distinguished, and all the necessary masts for each construction are standing up from the ground. However, the tower crane lifting and lowering work scaffolding device according to the present invention combines the mast of the tower crane as the mast of the lifting and lowering working scaffold, shortening the mast construction work period, The materials, materials and costs used can be greatly reduced.

同様に、立設する必要があるマスト支柱の数を削減できるため、マスト立設のための強固な地盤を有する安全な設置場所の確保が極めて容易になる。もちろん安全及び効率化を共通に最優先させることを前提にタワークレーンと昇降式足場装置とのマストの共用化を企図することが本発明の基本的な技術思想である。   Similarly, since the number of mast struts that need to be erected can be reduced, it is extremely easy to secure a safe installation place having a solid ground for erection of the mast. Of course, the basic technical idea of the present invention is to contemplate the sharing of the mast between the tower crane and the liftable scaffolding device on the premise that safety and efficiency are commonly given top priority.

また、本発明に係るタワークレーンの昇降式作業足場は、一つのタワークレーンのマストに設置された昇降式作業足場装置の作業デッキが、他のタワークレーンのマスト支柱を昇降する昇降駆動部に連結して構成されていてもよい。つまり二本以上のタワークレーンのマストに連結する昇降式作業足場装置を提供することも本願発明の技術思想に包含される。   In addition, the tower crane lifting / lowering work scaffold according to the present invention is connected to the lifting / lowering drive unit that lifts and lowers the mast column of the other tower crane by the work deck of the lifting / lowering work scaffolding device installed on the mast of one tower crane. It may be configured as. That is, it is also included in the technical idea of the present invention to provide an elevating work scaffold device connected to the masts of two or more tower cranes.

一定の長さを必要とする作業デッキの場合、一本のタワークレーンのマスト支柱のみでは安定性を欠くことがある。この場合は、他のもう一本のタワーリフトのマスト支柱にも昇降駆動部を設けて、長い作業デッキのもう一端を連結させることによって、2本のマスト支柱に支えられて昇降する安定性のよい安全で且つ広いスペースをもつ昇降式作業足場の確保が可能となる。   In the case of a work deck that requires a certain length, stability may be lacking with only one mast column of a tower crane. In this case, the other mast column of the other tower lift is also provided with an elevating drive unit, and the other end of the long work deck is connected to support the stability of the elevating and lowering supported by the two mast columns. It is possible to secure an elevating work platform with good safety and a large space.

これにより、作業者がひとつのタワークレーンから他のタワークレーンへの移動の際、従来は一旦地上まで降りてから他のタワークレーンに昇り直していた煩雑な移動工程を、二つ以上のタワークレーンのマストに連結された昇降式作業足場装置の作業デッキを経由することによって、高所のままで移動することができるようになる。作業者の高所における工事対象場所の移動が極めて容易になる。   As a result, when an operator moves from one tower crane to another tower crane, the troublesome movement process that once went down to the ground and then ascended to the other tower crane can be performed. By moving through the work deck of the lifting type work scaffolding device connected to the mast, it becomes possible to move in a high place. It becomes extremely easy to move the construction target place at the height of the worker.

別の態様において、本発明に係るタワークレーンの昇降式作業足場は、前記作業デッキが張り出されたその先端近傍部をタワークレーンのアームからのワイヤーによって吊り下げることにより固定することができる。   In another aspect, the tower crane lifting and lowering work platform according to the present invention can be fixed by suspending the vicinity of the tip of the work deck overhanging with a wire from the arm of the tower crane.

一定の長さを必要とする作業デッキの場合、一本のタワークレーンのマスト支柱のみでは安定性を欠くことがある。この場合は、張り出された作業デッキの先端部をタワークレーンのアームから吊り下げるワイヤーに連結することにより安定性と十分な強度とを有する張り出し足場とすることができる。タワークレーンのマストから水平に張り出された不安定な張り出し足場先端の安全性を確保することができる。これにより、高層建築物の入り組んだ部分や奥まった躯体壁面に作業者が密着して作業を行うことができる。   In the case of a work deck that requires a certain length, stability may be lacking with only one mast column of a tower crane. In this case, it is possible to provide an overhanging scaffold having stability and sufficient strength by connecting the tip of the overhanging work deck to a wire suspended from the arm of the tower crane. It is possible to ensure the safety of the tip of the unstable overhanging scaffold that is horizontally projected from the mast of the tower crane. Thereby, an operator can work in close contact with an intricate part of a high-rise building or an inner wall of a building.

本発明に係るタワークレーンの昇降式作業足場装置の更に別の実施形態は、昇降駆動部に敷設された作業デッキが、その一端を前記昇降駆動部に連結敷設されており、他の一端を前記連結敷設部を軸に上下方向に跳ね上げ又は跳ね降ろすことによって略水平に形成される点を特徴とする跳ね上げ/跳ね降ろし式昇降足場である。以降、本発明に係るタワークレーンの昇降式作業足場装置のこの実施形態である作業デッキを有する作業足場を「跳ね上げ/跳ね降ろし式昇降足場」と称する。   Still another embodiment of the lifting / lowering work scaffolding device for a tower crane according to the present invention is such that a work deck laid on a lifting drive unit has one end connected to the lifting drive unit and the other end connected to the lifting drive unit. A lifting / lowering type lifting scaffold characterized in that it is formed substantially horizontally by jumping up or down in the vertical direction around a connecting laying portion. Hereinafter, the working scaffold having the work deck which is this embodiment of the lifting / lowering working scaffold device for a tower crane according to the present invention will be referred to as “bounce-up / fall-down lifting scaffold”.

本発明に係るタワークレーンの昇降式作業足場装置の跳ね上げ/跳ね降ろし式昇降足場は、足場デッキの一端がマストに沿った昇降駆動部に上下方向に対して回転可能な構造で接合されており、当初は上下垂直方向にマストと平行した形態で昇降駆動部に固定されている。このため、上下垂直状態のままで昇降駆動部と共にマストを昇降することができる。昇降移動して所望の作業位置高さに達した時点で、作業デッキのもう一方の端が略水平に跳ね上がり又は跳ね降ろされて張り出し足場を略水平に形成することができる。   The raising / lowering type lifting scaffolding of the lifting / lowering working scaffold device of the tower crane according to the present invention has one end of the scaffolding deck joined to the lifting drive unit along the mast with a structure that can rotate in the vertical direction. Initially, it is fixed to the elevating drive unit in a form parallel to the mast in the vertical direction. For this reason, a mast can be raised / lowered with a raising / lowering drive part with an up-down vertical state. When the desired work position height is reached by moving up and down, the other end of the work deck jumps up or down substantially horizontally, and the overhanging scaffold can be formed substantially horizontally.

跳ね上げ/跳ね降ろし式昇降足場の作業デッキ跳ね上げ/跳ね降ろし駆動構造は、ラックアンドピニオン機構等を用いた油圧駆動機構であってもよいし、電動駆動機構であってもよい。   The work deck bounce / bounce down drive structure of the bounce / bounce down type lifting scaffold may be a hydraulic drive mechanism using a rack and pinion mechanism or the like, or may be an electric drive mechanism.

前記作業デッキの先端が張り出す際、その先端が下方向に展開して張り出す場合は、跳ね降ろし式であり、その先端が上方向に展開して張り出す場合は跳ね上げ式である。どちらの構造を用いてもよいことは言うまでもない。   When the front end of the work deck is extended, when the front end expands and protrudes downward, it is a flip-down type, and when the front end is extended upward and protrudes, it is a flip-up type. It goes without saying that either structure may be used.

これにより、タワークレーンのマストから近接する建築物躯体壁面に対する工事は、前記跳ね上げ/跳ね降ろし式昇降足場を張り出すことにより一層密接して作業することができるようになる。また、従来のように昇降式作業足場装置のためだけのマストを改めて立設する必要がない。   As a result, the work on the wall of the building frame adjacent to the mast of the tower crane can be performed more closely by projecting the up / down type lifting scaffold. Moreover, it is not necessary to stand a new mast only for the lifting type working scaffold device as in the prior art.

上述のように本発明に係るタワークレーンの昇降式作業足場を用いることにより、タワークレーンにのみ利用されていたマストを昇降式作業足場装置のマストとして利用することが可能になる。よってタワークレーンのマストが立設されている部分での昇降式作業足場装置用のマストの立設は不要となり、必要最小数のマストを立設だけで高層建築物のタワークレーンを用いた構造建設と昇降式作業足場装置を用いた躯体壁面密着工事とが可能になる。   As described above, by using the lifting / lowering work scaffold of the tower crane according to the present invention, the mast used only for the tower crane can be used as the mast of the lifting / lowering work scaffold device. Therefore, it is not necessary to set up the mast for the lifting work scaffolding device at the part where the tower crane mast is erected, and it is possible to construct a structure using a tower crane of a high-rise building with only the minimum number of masts erected. And wall surface close-contact construction using a lifting work scaffold device.

このように本発明に係るタワークレーンの昇降式作業足場装置を活用した建設工事を行うことによって、上述以外にも様々な効果が期待できる。従来は昇降式作業足場装置とともに上昇下降を繰り返して調達してきた高層建築物の高所現場への部材、機材、工具等の運搬搬入が、タワークレーンのアームワイヤー運搬によって逐次行うことができる。昇降式作業足場装置の昇降移動による工事の中断を必要とせず、部材、機材、工具等の運搬搬入が短時間で簡易にできるという効果が発生する。このため工期の大幅な短縮及び工費の大幅削減につながる。   As described above, various effects other than those described above can be expected by performing the construction using the tower crane lifting and lowering working scaffold device according to the present invention. Conventionally, transportation of members, equipment, tools, etc. to a high-altitude site of a high-rise building that has been procured by repeatedly raising and lowering together with a lifting work scaffolding device can be sequentially performed by arm wire transportation of a tower crane. There is an effect that it is not necessary to interrupt the construction by moving up and down of the lifting work scaffolding device, and it is possible to easily carry in and carry members, equipment, tools and the like in a short time. For this reason, the construction period is greatly shortened and the construction cost is greatly reduced.

本発明に係るタワークレーンの昇降式作業足場装置によって、高層構造物の建設工事は、総合的により大きな作業性の向上、安全性の確保、工期短縮、施工管理の容易化などの工費の削減を含めた優位性を十分に発揮することができるようになる。   With the tower crane lifting and lowering work scaffolding device according to the present invention, the construction work of high-rise structures can be performed in a comprehensive manner, improving workability, ensuring safety, shortening the work period, and reducing construction costs such as ease of construction management. It will be possible to fully demonstrate the superiority.

本発明の一実施形態に係るタワークレーンの昇降式作業足場装置の全体イメージを示した概念図である。It is the conceptual diagram which showed the whole image of the raising / lowering type work scaffold apparatus of the tower crane which concerns on one Embodiment of this invention. 本発明の一実施形態に係るタワークレーンの昇降式作業足場装置のマスト1本で構成された全体イメージを示した概念図である。It is the conceptual diagram which showed the whole image comprised with one mast of the raising / lowering type working scaffold apparatus of the tower crane which concerns on one Embodiment of this invention. 本発明の一実施形態に係るタワークレーンの昇降式作業足場装置の作業デッキ先端をタワークレーンで吊り下げた状態を示した概念図である。It is the conceptual diagram which showed the state which suspended the work deck front-end | tip of the raising / lowering type work scaffold apparatus of the tower crane which concerns on one Embodiment of this invention with the tower crane. タワークレーンの昇降式作業足場装置の跳ね上げ/跳ね降ろし式昇降足場の全体イメージを示した概念図である。It is the conceptual diagram which showed the whole image of the raising / lowering type lifting scaffold of the raising / lowering working scaffold apparatus of a tower crane.

以下、図面を参照して本発明を実施するための形態について説明する。なお、以下では本発明の目的を達成するための説明に必要な範囲を模式的に示し、本発明の該当部分の説明に必要な範囲を主に説明することとし、説明を省略する箇所については公知技術によるものとする。   Hereinafter, embodiments for carrying out the present invention will be described with reference to the drawings. In the following, the range necessary for the description for achieving the object of the present invention is schematically shown, and the range necessary for the description of the relevant part of the present invention will be mainly described. According to a known technique.

図1は、本発明の一実施形態に係るタワークレーンの昇降式作業足場装置の全体イメージを示した概念図である。2台のタワークレーン1のマスト2を支柱として、昇降式作業足場装置3が敷設されている。   FIG. 1 is a conceptual diagram showing an overall image of a lifting and lowering work scaffold device for a tower crane according to an embodiment of the present invention. An elevating work scaffold device 3 is laid using the masts 2 of the two tower cranes 1 as columns.

図1に示すように本発明に係るタワークレーンの昇降式作業足場装置3は、大型のタワークレーン1のマスト支柱2に昇降駆動部8が挿着され、その昇降駆動部8と接続され一体となった作業デッキ9がタワークレーン1のマスト2に沿って昇降することができる昇降式作業足場装置である。従来のタワークレーンのマストはタワークレーン本体の昇降のみに用いられていたが、昇降式作業足場装置3を昇降させるマストとしても併用的に活用させることに特徴を有する。   As shown in FIG. 1, the tower crane lifting / lowering work scaffold device 3 according to the present invention has a lifting drive unit 8 inserted in a mast column 2 of a large tower crane 1 and connected to the lifting drive unit 8 to be integrated. This is an elevating work scaffolding device in which the work deck 9 that has become can be moved up and down along the mast 2 of the tower crane 1. A conventional tower crane mast has been used only for raising and lowering the tower crane main body. However, the tower crane mast is characterized in that it is also used as a mast for raising and lowering the lifting work scaffold device 3.

作業デッキ9とは、マスト支柱2に対して昇降自在に取り付けられているユニットである。マスト支柱2の縦軸材に挿着された昇降駆動部8とこれに接続されたデッキプレート10とを支えるデッキ下構造11と、所望の場所までの位置移動を可能にする駆動装置と、所望位置で固定し降下を防止するストッパ機構とを備えている。(駆動装置とストッパ機構の詳細を示す図は省略する。)   The work deck 9 is a unit attached to the mast column 2 so as to be movable up and down. A deck lower structure 11 that supports a lifting drive unit 8 inserted in the vertical axis material of the mast column 2 and a deck plate 10 connected thereto, a drive device that enables position movement to a desired location, and a desired And a stopper mechanism that is fixed in position and prevents the descent. (The figure which shows the detail of a drive device and a stopper mechanism is abbreviate | omitted.)

作業デッキ9のデッキ下構造11の上に敷設されたデッキプレート10は、建設工事作業者の作業足場として機能し、工事用の資材や機材もデッキプレート10の上に確保される。昇降駆動部8に敷設された駆動装置は、作業デッキ9を昇降させる原動力となる機能を有する装置等であり、電動式、空圧式モーター等の自動回転駆動装置等を用いて実現される。   The deck plate 10 laid on the lower deck structure 11 of the work deck 9 functions as a working scaffold for construction workers, and construction materials and equipment are also secured on the deck plate 10. The driving device laid on the lifting / lowering drive unit 8 is a device having a function as a driving force for moving the work deck 9 up and down, and is realized by using an automatic rotation driving device such as an electric motor or a pneumatic motor.

図2は、本発明の一実施形態に係るタワークレーンの昇降式作業足場装置のマスト1本で構成された全体イメージを示した概念図である。図2は、1本のマスト2に昇降駆動部8が押着され、作業デッキ9が接続されている最もシンプルなタワークレーンの昇降式作業足場装置3を示している。   FIG. 2 is a conceptual diagram showing an overall image composed of one mast of a tower crane lifting work scaffolding apparatus according to an embodiment of the present invention. FIG. 2 shows the simplest tower crane elevating work scaffold device 3 in which the elevating drive unit 8 is pressed onto one mast 2 and the work deck 9 is connected.

また、図1においては2台のタワークレーン1のマスト2本に敷設された1台の昇降式作業足場装置3を示しているが、タワークレーンの数及びマストの数は2台以上であってもよく、昇降式作業足場装置も2台以上の複数台であってもよい。例えば、3台以上のタワークレーンであって、三角形状に並ぶ3本のマストに敷設された昇降式作業足場装置の作業デッキが、3台同じ高さでマストを頂点とする三角形状に連結されていてもよい。この場合は昇降式作業足場装置の作業デッキが3台でトラス構造をもって連結されているため、3台まとまったタワークレーン全体として構造上の強度を付加されることになり、高所におけるタワークレーンの安定性が増加するという効果も期待できる。   In addition, in FIG. 1, one lifting work scaffolding device 3 laid on two masts of two tower cranes 1 is shown, but the number of tower cranes and the number of masts are two or more. There may be two or more lifting / lowering work scaffolding devices. For example, three or more tower cranes, the work decks of the lifting work scaffolding devices laid on three masts arranged in a triangle shape, are connected in a triangular shape with the same height and the mast as the apex. It may be. In this case, since the work decks of the elevating work scaffolding device are connected with a truss structure in three units, structural strength is added to the whole tower crane as a unit, and the tower crane at a high place The effect of increased stability can also be expected.

このようにタワークレーン1と昇降式作業足場装置3が同じマスト2を支柱に連結敷設されることにより、作業者の高所における移動や資材・機材の供給運搬が一段と容易になり、建設工事全体に大きなメリットを及ぼすことは明白である。   As described above, the tower crane 1 and the lifting work scaffolding device 3 are constructed by connecting the same mast 2 to the support column, thereby making it easier for the worker to move at a high place and to supply and transport materials and equipment. It is obvious that it has a great advantage on

図3は、本発明の一実施形態に係るタワークレーンの昇降式作業足場装置の作業デッキ先端をタワークレーンで吊り下げた状態を示した概念図である。図3に示す本発明に係るタワークレーンの昇降式作業足場装置3は、大型のタワークレーン1のマスト支柱2に昇降駆動部8が挿着され、その昇降駆動部8と接続され一体となった作業デッキ9の先端が片持ち梁式に大きく張り出された状態になっている。この片側に大きく張り出された作業デッキ9の先端側は、安定性を確保するために上方にあるタワークレーン本体のアーム7から吊り下げられたワイヤー12によって連結されて強度補強されている。これにより先端部の撓みが抑制されて、マストが一本であっても片方向に大きく張り出された作業デッキ9を有する昇降式作業足場装置の敷設上の安全性確保が可能になる。   FIG. 3 is a conceptual diagram showing a state in which the tip of the work deck of the tower-type lifting work scaffolding device according to the embodiment of the present invention is suspended by the tower crane. In the tower crane lifting / lowering work scaffold device 3 according to the present invention shown in FIG. 3, the lifting drive unit 8 is inserted into the mast column 2 of the large tower crane 1 and connected to the lifting drive unit 8 to be integrated. The front end of the work deck 9 is in a state of projecting greatly in a cantilever manner. The front end side of the work deck 9 projecting greatly to one side is connected and strengthened by a wire 12 suspended from the arm 7 of the tower crane main body located above in order to ensure stability. As a result, the bending of the tip portion is suppressed, and it is possible to ensure the safety on the laying of the lifting work scaffolding apparatus having the work deck 9 that is greatly extended in one direction even if there is only one mast.

この場合、昇降駆動装置によって成される昇降式作業足場装置3の上下方向への昇降は、タワークレーンのアーム7からのワイヤー12の伸縮と連動して操作されることは当然のことである。また、昇降駆動部8の構造において、作業デッキ9がマスト2を軸に水平回転できる接続構造を付加することにより、作業デッキ9は、マスト2を軸に360度の水平回転移動も可能になる。この際もタワークレーンのアーム7の回転移動も連動して操作されることは当然のことである。これにより、マスト2を中心軸として360度水平方向にある建設物躯体壁面への張り出し作業デッキを用いた密接作業が可能になる。   In this case, it is a matter of course that the lifting / lowering of the lifting / lowering work scaffold device 3 formed by the lifting / lowering driving device is operated in conjunction with the expansion / contraction of the wire 12 from the arm 7 of the tower crane. In addition, in the structure of the lift drive unit 8, by adding a connection structure that allows the work deck 9 to rotate horizontally around the mast 2, the work deck 9 can also move 360 degrees horizontally around the mast 2. . At this time, it is natural that the rotational movement of the arm 7 of the tower crane is also operated in conjunction. Thereby, the close work using the projecting work deck on the wall surface of the building frame in the 360-degree horizontal direction with the mast 2 as the central axis is possible.

昇降式作業足場装置のデッキプレートは、大型構造物の建設になるほど広くかつ長いデッキプレートが必要となる。このような昇降式作業足場装置の全体のデッキプレートを以降「メインデッキプレート」と称する。この場合、メインデッキプレートは、複数の基本単位作業デッキ14のデッキプレート10が連結結合されて必要な長さに構成されている。つまりメインデッキプレートは、基本単位の長さの作業デッキ上部のデッキプレート10の連結によって形成されている。この基本単位作業デッキ14を連結させることにより、作業デッキ9は任意に延長させて延ばすことができる。上述の図1、図2、図3に示した昇降式作業足場装置の作業デッキは、すべて基本単位作業デッキ14の連結により任意の所望長さに構成できる。   The deck plate of the lifting work scaffold device needs a wide and long deck plate so as to construct a large structure. The entire deck plate of such a lifting type work scaffolding apparatus is hereinafter referred to as “main deck plate”. In this case, the main deck plate is configured to have a required length by connecting and connecting the deck plates 10 of the plurality of basic unit work decks 14. That is, the main deck plate is formed by connecting the deck plate 10 on the upper part of the work deck having a basic unit length. By connecting the basic unit work deck 14, the work deck 9 can be arbitrarily extended and extended. All of the work decks of the lifting work scaffold apparatus shown in FIGS. 1, 2, and 3 can be configured to have any desired length by connecting the basic unit work decks 14.

上述の本発明のひとつの実施形態に係るタワークレーンの昇降式作業足場装置を利用することによって、デザイン性豊かな大型構造物の建築工事において、奥まった部分や複雑な構造部分の躯体壁面に作業デッキ9の先端を密接させて、安全かつ極めて安易に工事作業を実施できるようになる。   By using the tower crane lifting and lowering work scaffolding device according to one embodiment of the present invention described above, in the construction work of a large structure rich in design, work on the wall surface of a deep part or a complicated structure part Construction work can be carried out safely and extremely easily by bringing the end of the deck 9 into close contact.

図4は、タワークレーンの昇降式作業足場装置の跳ね上げ/跳ね降ろし式昇降足場を示した概念図である。図4は、タワークレーンの昇降式作業足場装置の第二の実施形態を示している。図4に示す本発明に係るタワークレーン1の昇降式作業足場装置3は、大型のタワークレーン1のマスト支柱2に昇降駆動部8が挿着され、その昇降駆動部8と接続され一体となった作業デッキ9がマスト2から駆動移動して水平に張り出された状態になって固定されることを特徴とする。   FIG. 4 is a conceptual diagram showing a raising / lowering type lifting scaffold of a lifting / lowering working scaffold device of a tower crane. FIG. 4 shows a second embodiment of the lifting and lowering work scaffold device for a tower crane. The lifting / lowering work scaffold device 3 of the tower crane 1 according to the present invention shown in FIG. 4 has a lifting / lowering drive unit 8 inserted into the mast column 2 of the large tower crane 1 and connected to the lifting / lowering drive unit 8 to be integrated. The work deck 9 is driven and moved from the mast 2 and is fixed in a state where it is horizontally projected.

図4においてマスト2の右側に示した作業デッキ9は跳ね上げ式昇降足場4の場合を示した図であり、マスト2の左側に示した作業デッキ9は跳ね降ろし式昇降足場5である場合を示した図である。   In FIG. 4, the work deck 9 shown on the right side of the mast 2 is a view showing the case of the flip-up type lifting scaffold 4, and the work deck 9 shown on the left side of the mast 2 is the case of the flip-down type lifting scaffold 5. FIG.

本実施形態に係るタワークレーンの昇降式作業足場装置3の跳ね上げ/跳ね降ろし式昇降足場4及び5は、作業デッキ9の一端がマスト2に沿った昇降駆動部8に上下方向に回転移動可能な構造で接合されており、当初使用前は、作業デッキ9は天地垂直方向にマスト2と平行した形態で昇降駆動部8に固定されている。   The lifting / lowering type lifting scaffolds 4 and 5 of the lifting / lowering working scaffold device 3 of the tower crane according to the present embodiment can be moved up and down to the lifting / lowering drive unit 8 along the mast 2 at one end of the work deck 9. Before the initial use, the work deck 9 is fixed to the lift drive unit 8 in a form parallel to the mast 2 in the vertical direction.

本実施形態に係るタワークレーンの昇降式作業足場装置3は、昇降駆動部8に敷設された作業デッキ9がその一端を昇降駆動部8に連結敷設されており、他の一端を前記連結敷設部を軸に上方に略水平になるまで跳ね上げることによって固定され、跳ね上げ式昇降足場4を形成する。同様に、作業デッキ9の昇降駆動部8に連結敷設されていない一端を連結敷設部を軸に下方向に略水平になるまで跳ね降ろすことによって固定されて、跳ね降ろし式昇降足場5を形成する。   In the lifting / lowering work scaffold device 3 for a tower crane according to the present embodiment, a work deck 9 laid on a lifting drive unit 8 is connected to one end of the lifting drive unit 8 and the other end is connected to the connection laying unit. The shaft is fixed by flipping up upwards until it becomes substantially horizontal, thereby forming a flip-up type lifting scaffold 4. Similarly, one end of the work deck 9 that is not connected to the lifting / lowering drive unit 8 is fixed by bouncing down on the connecting laying unit as an axis until it becomes substantially horizontal downward, thereby forming the lifting / lowering type lifting scaffold 5. .

本実施形態に係るタワークレーンの昇降式作業足場装置3は、昇降式作業足場装置のマスト2に沿った昇降移動の際は、作業デッキ9は昇降駆動部8と並列密着した天地垂直状態のままで昇降駆動部と共にマスト支柱を昇降する。よって昇降移動時に建設物等に接触して破損事故等を起こす心配がない。そして、昇降移動して所望の作業位置高さに達した時点で、ストッパ機構を働かせて昇降駆動部8はマスト2に固定される。その後、跳ね上げ/跳ね降ろし式昇降足場を上述のように展開させて作業デッキ9が略水平に固定される。跳ね上げ式昇降足場又は跳ね降ろし式昇降足場のどちらを選択するかの制約はない。また両方が同一の昇降式作業足場装置に存在しても、本願技術思想上は何ら支障はない。   The lifting / lowering work scaffold device 3 of the tower crane according to the present embodiment remains in a vertical state in which the work deck 9 is in close contact with the lifting / lowering drive unit 8 in parallel when moving up and down along the mast 2 of the lifting / lowering work scaffold device. The mast column is moved up and down together with the lifting drive. Therefore, there is no fear of causing damage accidents by touching constructions when moving up and down. And when it moves up and down and reaches the desired work position height, the elevating drive unit 8 is fixed to the mast 2 by operating the stopper mechanism. Thereafter, the work deck 9 is fixed substantially horizontally by unfolding the lifting / lowering type lifting scaffold as described above. There is no restriction on whether to select a flip-up lifting platform or a lifting-down lifting platform. Moreover, even if both are present in the same lifting / lowering work scaffolding device, there is no problem in terms of the present technical idea.

跳ね上げ/跳ね降ろし式昇降足場を展開させて略水平に固定させる駆動機構については、例えば昇降駆動部8及び作業デッキ9のデッキ下構造11において、ラックアンドピニオンギヤ機構等の駆動機構を用いることによって電動又は手動で略水平になるまで跳ね上げ/跳ね降ろし駆動させることができる。また、ネジ軸アンドウォームギヤ機構又は滑車アンドワイヤー機構によるものであってもよい。いずれも例えば上記機構によって押し出される支持支柱の先端が、一定の角度で作業デッキに連接していることにより作業デッキを跳ね上げ/跳ね降ろし移動させる構造であればよい。またこれらは油圧駆動であってもよく、公知技術の範囲内で対応できるものであるため詳細の説明は省略する。(特許文献3の図4、図5、図6を特に参照。)   Regarding the drive mechanism for deploying the flip-up / bounce-down lift platform and fixing it substantially horizontally, for example, by using a drive mechanism such as a rack and pinion gear mechanism in the lift drive unit 8 and the deck lower structure 11 of the work deck 9. It can be driven up or down by electric or manual operation until it is substantially horizontal. Further, a screw shaft and worm gear mechanism or a pulley and wire mechanism may be used. In any case, any structure may be used as long as the tip of the support column pushed out by the mechanism is connected to the work deck at a certain angle to move the work deck up and down. These may be hydraulically driven and can be handled within the scope of the publicly known technology, and thus detailed description thereof is omitted. (Refer particularly to FIGS. 4, 5, and 6 of Patent Document 3.)

本発明に係るタワークレーンの昇降式作業足場装置3の第二の実施形態によれば、タワークレーン1の近傍である高層建築物躯体の壁面であれば、高さに制限されることなく作業デッキ9を近接させて工事作業を実施することができる。作業デッキ9は軽量であれば駆動エネルギー使用量が少なく容易に可動させることができる。また作業デッキ9が一定基本単位作業デッキ14の連結体であれば、必要な長さになるまで予め連結された作業デッキ9を跳ね上げ/跳ね降ろし式昇降足場として用いることによって、構造物躯体壁面にいっそう密接させて作業することが可能になる。   According to the second embodiment of the tower crane lifting and lowering work scaffold device 3 according to the present invention, the work deck is not limited to a height as long as it is a wall surface of a high-rise building frame in the vicinity of the tower crane 1. Construction work can be carried out with 9 close to each other. If the work deck 9 is lightweight, the amount of drive energy used is small and can be easily moved. Further, if the work deck 9 is a connected body of the fixed basic unit work deck 14, the work deck 9 connected in advance until the required length is used as a lifting / falling-type lifting scaffold until the required length is obtained. It becomes possible to work more closely.

本発明に係るタワークレーンの昇降式作業足場装置3は、上述の第二の実施形態において、作業デッキ9が略水平に張り出された際、先端部において予想される荷重によるたわみを防止するため、3点支持のための支持支柱15などの補強構造をデッキ下構造11に予め敷設させることを除外するものではない。同様に、作業デッキ9が略水平に張り出された際、先端部において予想される荷重によるたわみを防止するため、図4に示すようにマスト2からのワイヤー12によって支持補強してもよい。また同様に、作業デッキ9が略水平に張り出された際、先端部において予想される荷重によるたわみを予め想定して、作業デッキ9の張り出される角度を水平から若干の必要角度だけ上方に補正設定することを除外するものではなく、これらの技術は公知技術の範囲内の対応で足りるものである。   The tower crane lifting and lowering work scaffold device 3 according to the present invention prevents deflection due to a load expected at the tip portion when the work deck 9 extends substantially horizontally in the second embodiment described above. It is not excluded that the reinforcing structure such as the support column 15 for supporting the three points is laid on the deck lower structure 11 in advance. Similarly, when the work deck 9 is extended substantially horizontally, the wire 12 from the mast 2 may be supported and reinforced as shown in FIG. Similarly, when the work deck 9 is projected substantially horizontally, the deflection due to the expected load at the tip is assumed in advance, and the angle at which the work deck 9 is projected is slightly upward from the horizontal. The correction setting is not excluded, and these techniques need only correspond within the scope of known techniques.

なお、本発明は上述した実施形態に限定されるものではなく、本発明の主旨を逸脱しない範囲内で種々変更して実施することが可能である。これらはすべて、本技術思想の一部である。   Note that the present invention is not limited to the above-described embodiment, and various modifications can be made without departing from the spirit of the present invention. These are all part of this technical idea.

上述したように、本願に係る発明によれば、高層建築物のタワークレーンを用いた建築工事において、工事の安全性及び作業性を格段に向上させつつ、工期短縮等の経済効率も格段に向上させることが可能となる。したがって、本発明は、建設業その他関連する各種産業において大きな有益性をもたらすものであり、建設工事における安全法令等の制約が解除された場合であっても、将来における産業上の利用可能性は非常に大きい。   As described above, according to the invention according to the present application, in the construction work using the tower crane of the high-rise building, the safety and workability of the construction are remarkably improved, and the economic efficiency such as the shortening of the construction period is remarkably improved. It becomes possible to make it. Therefore, the present invention provides great benefits in the construction industry and other related industries, and even if the restrictions on safety laws and regulations in construction work are lifted, future industrial applicability will not be Very big.

1 タワークレーン
2 マスト(支柱)
3 昇降式作業足場装置
4 跳ね上げ式昇降足場
5 跳ね降ろし式昇降足場
6 ベースフレーム
7 アーム
8 昇降駆動部
9 作業デッキ
10 デッキプレート
11 デッキ下構造
12 ワイヤー
13 手すり
14 基本単位作業デッキ
15 支持支柱
1 Tower crane 2 Mast
DESCRIPTION OF SYMBOLS 3 Lifting type work scaffold apparatus 4 Bounce-up type lifting scaffold 5 Bounce-down type lifting scaffold 6 Base frame 7 Arm 8 Lifting drive part 9 Work deck 10 Deck plate 11 Deck lower structure 12 Wire 13 Handrail 14 Basic unit work deck 15 Support column

Claims (5)

タワークレーンのマスト支柱を昇降する昇降駆動部と、
前記昇降駆動部に連結して敷設された作業デッキと、
前記昇降駆動部に電力を供給する電力供給部と、
前記昇降駆動部を制御する制御部と
を具備し、
前記タワークレーンのマスト支柱に沿って前記作業デッキを昇降させることを特徴とするタワークレーンの昇降式作業足場装置。
Elevating drive unit that raises and lowers the mast column of the tower crane,
A work deck laid in connection with the elevating drive unit;
A power supply unit for supplying power to the elevating drive unit;
A control unit for controlling the lifting drive unit,
A tower crane lifting and lowering work scaffolding device, wherein the work deck is lifted and lowered along a mast column of the tower crane.
前記作業デッキは、複数の前記タワークレーンのマスト支柱を昇降する複数の前記昇降駆動部に連結して構成されていることを特徴とする請求項1記載のタワークレーンの昇降式作業足場装置。   2. The tower crane elevating work scaffolding device according to claim 1, wherein the work deck is configured to be connected to the plurality of elevating drive units that elevate mast struts of the plurality of tower cranes. 前記作業デッキは、張り出されたその先端近傍部を前記タワークレーンのアームからのワイヤーによって吊り下げ固定されていることを特徴とする請求項1記載のタワークレーンの昇降式作業足場装置。   2. The tower crane lifting and lowering work scaffolding device according to claim 1, wherein the work deck is fixed by suspending a protruding portion near the tip thereof by a wire from an arm of the tower crane. 前記作業デッキは、その一端を前記昇降駆動部に略垂直方向に回転可能な構造で連結されており、もう一端を、前記連結部を軸に上方向に跳ね上げる又は下方向に跳ね降ろすことによって略水平に形成される跳ね上げ/跳ね降ろし式昇降足場であることを特徴とする請求項1若しくは3記載のタワークレーンの昇降式作業足場装置。   One end of the work deck is connected to the elevating drive unit in a structure that is rotatable in a substantially vertical direction, and the other end is jumped up or down with the connection unit as an axis. 4. The tower crane lifting and lowering work scaffolding device according to claim 1 or 3, wherein the lifting and lowering scaffolding is formed substantially horizontally. 前記タワークレーンのマスト支柱を昇降する前記昇降駆動部又は前記作業デッキは、該マスト支柱を回転軸として略水平に回転移動可能な連結構造を有し、前記作業デッキの張り出す方向を略水平方向に対して自在に可変であることを特徴とする請求項1乃至4のうちのいずれか1項記載のタワークレーンの昇降式作業足場装置。   The raising / lowering drive unit for raising and lowering the mast column of the tower crane or the work deck has a connecting structure that can be moved substantially horizontally around the mast column as a rotation axis, and the projecting direction of the work deck is substantially horizontal. The tower crane lifting and lowering work scaffolding device according to any one of claims 1 to 4, characterized in that it is freely variable with respect to the tower crane.
JP2013187683A 2013-09-10 2013-09-10 Lift type work scaffold device of tower crane Pending JP2015055062A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013187683A JP2015055062A (en) 2013-09-10 2013-09-10 Lift type work scaffold device of tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013187683A JP2015055062A (en) 2013-09-10 2013-09-10 Lift type work scaffold device of tower crane

Publications (1)

Publication Number Publication Date
JP2015055062A true JP2015055062A (en) 2015-03-23

Family

ID=52819666

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013187683A Pending JP2015055062A (en) 2013-09-10 2013-09-10 Lift type work scaffold device of tower crane

Country Status (1)

Country Link
JP (1) JP2015055062A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109421904A (en) * 2017-08-25 2019-03-05 惠生(南通)重工有限公司 Hanging jack up drilling platform scaffold
US10658892B2 (en) 2016-03-31 2020-05-19 Aisin Aw Co., Ltd. Rotor for rotating electrical machine
US11043863B2 (en) 2016-03-31 2021-06-22 Aisin Aw Co., Ltd. Rotor manufacturing method
CN113323366A (en) * 2021-06-17 2021-08-31 广西博强建筑科技有限公司 Attached lifting scaffold
CN115217216A (en) * 2022-08-18 2022-10-21 中建二局阳光智造有限公司 Construction method of tower crown structure of super high-rise building

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10658892B2 (en) 2016-03-31 2020-05-19 Aisin Aw Co., Ltd. Rotor for rotating electrical machine
US11043863B2 (en) 2016-03-31 2021-06-22 Aisin Aw Co., Ltd. Rotor manufacturing method
CN109421904A (en) * 2017-08-25 2019-03-05 惠生(南通)重工有限公司 Hanging jack up drilling platform scaffold
CN113323366A (en) * 2021-06-17 2021-08-31 广西博强建筑科技有限公司 Attached lifting scaffold
CN115217216A (en) * 2022-08-18 2022-10-21 中建二局阳光智造有限公司 Construction method of tower crown structure of super high-rise building

Similar Documents

Publication Publication Date Title
JP2015055062A (en) Lift type work scaffold device of tower crane
CN204644884U (en) High pier over-form construction reinforced bar installs mobile stock
JP2009073599A (en) Supporting structure of tower crane and climbing method
JP6893188B2 (en) Demolition system and demolition method of existing structures
CN205296803U (en) Elevator automatic lifting operation panel
CN108002244B (en) Hoisting system and method for high pier column steel bar formwork
JP5914203B2 (en) Disassembly method, disassembly assistance device
CN104989111A (en) Construction method for steel structure high-rise hoisting
CN106006455A (en) Hydraulic elevator capable of achieving formwork erecting without scaffold
JP6508958B2 (en) Demolition system and demolition method
JP2010133084A (en) Method of constructing hollow high structure
JP6712501B2 (en) High-rise building demolition system and demolition method
JP6736226B2 (en) Structure and construction method of the structure constructed on the tower-shaped building
JP5558757B2 (en) Climbing crane refilling mechanism and floor climbing method
CN101664963B (en) Multifunctional operating platform for large-volume prestressed concrete box girder tensioning
JP6508959B2 (en) Demolition system and demolition method
CN109372242B (en) Elevator shaft construction safety lifting platform device and using method
JP5773343B2 (en) Method for constructing multi-story building and lifting device for multi-story scaffold used therefor
CN202689494U (en) Elevator shaft template support
JP4876817B2 (en) Construction method of tower structure, tower structure
JP5581476B2 (en) Lifting type moving scaffold
Zhang et al. Significant progress in construction equipment of super high-rise building
CN103711299A (en) Liftable scaffold for building outer wall
CN104695694A (en) Worm and gear lead screw lifting type attached scaffold
JP2016017291A (en) Demolition method and demolition system