JP2015014163A - Greening slope structure and construction method for the same - Google Patents

Greening slope structure and construction method for the same Download PDF

Info

Publication number
JP2015014163A
JP2015014163A JP2013142272A JP2013142272A JP2015014163A JP 2015014163 A JP2015014163 A JP 2015014163A JP 2013142272 A JP2013142272 A JP 2013142272A JP 2013142272 A JP2013142272 A JP 2013142272A JP 2015014163 A JP2015014163 A JP 2015014163A
Authority
JP
Japan
Prior art keywords
slope
soil
greening
fastening
improved soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2013142272A
Other languages
Japanese (ja)
Other versions
JP6280322B2 (en
Inventor
将路 佐藤
Masamichi Sato
将路 佐藤
和彦 千野
Kazuhiko Chino
和彦 千野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2013142272A priority Critical patent/JP6280322B2/en
Publication of JP2015014163A publication Critical patent/JP2015014163A/en
Application granted granted Critical
Publication of JP6280322B2 publication Critical patent/JP6280322B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a greening slope structure that can suppress the length of a reinforcement material and that enables easy execution of slope planting, and a construction method for the same.SOLUTION: A greening slope structure 30 includes: a slope section 31 that is formed by making use of ordinary earth; a fill body 32 that is formed by making use of improved earth; a plurality of slope units (slope anchorage materials) 34 that are arranged in the height direction of the slope section 31; and main and auxiliary reinforcement materials 35a and 35b which are fixed to the slope units 34, respectively, and which are arranged on the rear sides of the slope units 34, respectively.

Description

本発明は、緑化法面構造及び緑化法面構造の構築方法に関する。   The present invention relates to a greening slope structure and a method for constructing a greening slope structure.

道路脇等に盛土を造成し、盛土の法面を緑化する従来の技術として、例えば次に述べる技術がある。   For example, the following techniques are known as conventional techniques for creating embankments on roadsides and greening the slopes of embankments.

第1の技術は、図5に示すように、法留め材(壁面材)として、ネット状で側面形状がL字型の法面ユニット12を用い、法面ユニット12の背面側に植生シート13を配置する、というものである。   As shown in FIG. 5, the first technique uses a sloped surface unit 12 having a net shape and an L-shaped side surface as a fastening material (wall surface material), and a vegetation sheet 13 on the back side of the sloped unit 12. Is to arrange.

第2の技術は、特許文献1,2に記載されている工法である。この工法は、法面を造成した後に、法面に植生基材を吹き付ける工法である。   The second technique is a construction method described in Patent Documents 1 and 2. This construction method is a construction method in which a vegetation base material is sprayed on a slope after the slope has been created.

特許第3128437号公報Japanese Patent No. 3318437 特許第3466978号公報Japanese Patent No. 3466978

第1の技術においては、補強材14が法面の後ろに長く延びていることから、杭や地下室等を形成することができず、土地利用が制約されてしまう。また、盛土の奥行きが小さい場合には、補強材14の設置が困難になる虞もある。なお、改良土を盛土材とすれば、補強材14の延長を短くすることはできるが、改良土を使用すると、緑化(植生)が困難になるという問題がある。   In the first technique, since the reinforcing material 14 extends long behind the slope, a pile, a basement or the like cannot be formed, and land use is restricted. Moreover, when the depth of embankment is small, there exists a possibility that installation of the reinforcing material 14 may become difficult. If the improved soil is a banking material, the extension of the reinforcing material 14 can be shortened. However, when the improved soil is used, there is a problem that greening (vegetation) becomes difficult.

第2の技術においては、法面を形成した後に植生基材を吹き付ける必要があるので、高所作業にならざるを得ない。   In the 2nd technique, since it is necessary to spray a vegetation base material after forming a slope, it has to work in a high place.

このような観点から、本発明は、補強材の長さを抑制することができ、かつ、法面の緑化を容易に行うことができる緑化法面構造及び緑化法面構造の構築方法を提供することを課題とする。   From such a point of view, the present invention provides a greening slope structure and a method for constructing a greening slope structure that can suppress the length of the reinforcing material and that can easily perform slope planting. This is the issue.

上記課題を解決する本発明は、普通土で形成された法面部と、この法面部の背後に改良土で形成された盛土本体とから成る緑化法面構造であって、前記法面部と前記盛土本体が、層状に積み上げられている、ことを特徴とする。   The present invention for solving the above problems is a greening slope structure comprising a slope portion formed of ordinary soil and a bank body formed of improved soil behind the slope portion, wherein the slope portion and the fill The main body is stacked in layers.

本発明によれば、法面緑化のための草木が生育し易い普通土による法面部と、改良土からなる盛土本体とを同時期に同一層に造成し、これを上に積み上げるので、緑化法面構造を容易に造成することができる。   According to the present invention, since the slope portion of the normal soil where the plants for slope planting are easy to grow and the embankment body made of the improved soil are created in the same layer at the same time, and this is stacked on top, the planting method The surface structure can be easily created.

また、前記法面部の高さ方向に複数配設された法留め材と、前記法留め材の各々に固定され、当該法留め材の後方側に配設される補強材とを備え、前記法面部は、前記盛土本体の前面と前記法留め材の背面との間に設けられており、前記補強材は、前記盛土本体に定着されている、ことを特徴とする。   And a plurality of method fastening members arranged in the height direction of the slope portion, and a reinforcing member fixed to each of the method fastening members and disposed on the rear side of the method fastening member, The surface portion is provided between the front surface of the embankment main body and the back surface of the fastening material, and the reinforcing material is fixed to the embankment main body.

本発明によれば、改良土からなる盛土本体に補強材を定着しているので、補強材を短くした場合であっても、所用のせん断抵抗を確保することが可能となる。補強材を短くできれば、土地利用が制約される範囲も狭まるため、盛土上に構造物等を構築することも可能となる。また、本発明によれば、盛土本体と法留め材との間に普通土が配置されているので、改良土に対して直接植生を行う場合に比べて、緑化を行い易くなる。   According to the present invention, since the reinforcing material is fixed to the embankment main body made of the improved soil, it is possible to ensure the required shear resistance even when the reinforcing material is shortened. If the reinforcing material can be shortened, the area where land use is restricted is narrowed, so it is possible to construct a structure or the like on the embankment. Moreover, according to this invention, since normal soil is arrange | positioned between the embankment main body and the fastening material, it becomes easy to perform greening compared with the case where vegetation is directly performed with respect to improved soil.

前記法面部は、前記普通土を覆う植生手段(例えば、植生シート、植生マット、植生土嚢など)または前記普通土に混合された種子を有するものであることが好ましい。このようにすると、種子の飛来を待たずして緑化を行うことが可能になる。   It is preferable that the slope portion has vegetation means (for example, a vegetation sheet, a vegetation mat, a vegetation sandbag, etc.) covering the normal soil or seeds mixed with the normal soil. If it does in this way, it will become possible to perform greening without waiting for the arrival of seeds.

本発明に係る緑化法面構造の構築方法は、法面を保持する法留め材を設置するとともに、前記法留め材の後方に延在する補強材を前記法留め材に連結する第1ステップと、前記補強材上に改良土を盛土して改良土層を形成するとともに、前記改良土層と前記法留め材との間に普通土を配置する第2ステップとを、所定高さの法面が造成されるまで交互に繰り返す緑化法面構造の構築方法であって、前記第2ステップでは、前記法留め材の背面に沿って植生シート又は植生マットを配置した状態で普通土を盛土する、ことを特徴とする。   The method for constructing a greening slope structure according to the present invention includes a first step of installing a fastening member for holding a slope and connecting a reinforcing member extending behind the fastening member to the fastening member. A second step of embedding the improved soil on the reinforcing material to form an improved soil layer and disposing the ordinary soil between the improved soil layer and the fastening member, and a slope having a predetermined height. In the second step, the normal soil is filled with a vegetation sheet or a vegetation mat arranged along the back surface of the fastening material. It is characterized by that.

また、本発明に係る他の緑化法面構造の構築方法は、法面を保持する法留め材を設置するとともに、前記法留め材の後方に延在する補強材を前記法留め材に連結する第1ステップと、前記補強材上に改良土を盛土して改良土層を形成するとともに、前記改良土層と前記法留め材との間に普通土を配置する第2ステップとを、所定高さの法面が造成されるまで交互に繰り返す緑化法面構造の構築方法であって、前記第2ステップでは、普通土を詰めた植生土嚢を設置するか、または、種子を混合した普通土を盛土する、ことを特徴とする。   Further, according to another method of constructing a greening slope structure according to the present invention, a fastening member that holds a slope is installed, and a reinforcing material that extends behind the fastening member is connected to the fastening member. A first step and a second step of embedding improved soil on the reinforcing material to form an improved soil layer, and placing ordinary soil between the improved soil layer and the fastening material, have a predetermined height. In the second step, a vegetation sandbag filled with normal soil is set or a normal soil mixed with seeds is used. It is characterized by embankment.

本発明によれば、盛土(法面)の造成とともに植生工が行われるため、法面を形成した後に植生基材の吹き付けを行う場合に比べて、工期を短縮することができ、さらには、高所作業を削減することができる。つまり、本発明によれば、安全性を高めつつも工期短縮を図ることができる。   According to the present invention, since the vegetation work is performed together with the creation of the embankment (slope), the construction period can be shortened compared to the case where the vegetation base material is sprayed after the slope is formed, Work at height can be reduced. That is, according to the present invention, it is possible to shorten the construction period while improving safety.

本発明によれば、補強材の長さを抑制することができ、かつ、法面の緑化を容易に行うことができる。   According to the present invention, the length of the reinforcing material can be suppressed and the slope can be easily greened.

本発明の実施形態に係る緑化法面構造を示す断面図である。It is sectional drawing which shows the greening slope structure which concerns on embodiment of this invention. 本実施形態の法面ユニット及び補強材の構成を示す斜視図である。It is a perspective view which shows the structure of the slope unit and reinforcement material of this embodiment. 本実施形態の法面ユニット及び補強材の構成を示す側面図である。It is a side view which shows the structure of the slope unit and reinforcement material of this embodiment. 緑化法面構造の構築方法を説明するための断面図である。It is sectional drawing for demonstrating the construction method of a greening slope structure. 従来の緑化法面構造を示す断面図である。It is sectional drawing which shows the conventional greening slope structure.

以下、本発明の実施形態を、図面を参照して説明する。
図1は、本発明の実施形態に係る緑化法面構造を示す断面図である。本実施形態の緑化法面構造30は、地山20を切り開いて開発された道路21の脇に造成されている。なお、本実施形態では、片盛土に適用した場合を例示するが、両盛土や腹付盛土に適用してもよい。
Embodiments of the present invention will be described below with reference to the drawings.
FIG. 1 is a sectional view showing a greening slope structure according to an embodiment of the present invention. The green slope structure 30 of the present embodiment is formed on the side of the road 21 developed by cutting the ground 20. In addition, in this embodiment, although the case where it applies to a piece embankment is illustrated, you may apply to a both embankment and a belly embankment.

緑化法面構造30は、普通土を利用して形成した法面部31と、改良土を利用して形成した盛土本体32と、法面部31の高さ方向に複数配設された法面ユニット(法留め材)34と、法面ユニット34の各々に固定され、法面ユニット34の後方側に配設される主補強材35aおよび補助補強材35bと、を備えている。なお、以下では、主補強材35a及び補助補強材35bを、単に、補強材35a,35bと称する場合がある。   The greening slope structure 30 includes a slope part 31 formed using ordinary soil, a bank body 32 formed using improved soil, and a plurality of slope units arranged in the height direction of the slope part 31 ( And a main reinforcing member 35a and an auxiliary reinforcing member 35b which are fixed to each of the slope unit 34 and disposed on the rear side of the slope unit 34. Hereinafter, the main reinforcing material 35a and the auxiliary reinforcing material 35b may be simply referred to as reinforcing materials 35a and 35b.

法面部31は、盛土本体32の前面と法面ユニット34の背面との間に設けられている。本実施形態の法面部31は、普通土からなる表層盛土と、植生シート37とを備えている。普通土は、植物の生育に適した地盤材料からなる。普通土には、セメント等の固化材が混合されていない。植生シート37は、保湿性のある不織布、綿、紙、わら、フェルト等に種子や肥料を仕込んだものである。   The slope portion 31 is provided between the front surface of the embankment main body 32 and the back surface of the slope unit 34. The slope portion 31 of the present embodiment includes a surface embankment made of ordinary soil and a vegetation sheet 37. Ordinary soil consists of ground materials suitable for plant growth. Ordinary soil is not mixed with solidifying material such as cement. The vegetation sheet 37 is prepared by adding seeds and fertilizer to a non-woven fabric, cotton, paper, straw, felt or the like having moisture retention.

なお、植生シート37に代えて、植生マットを使用してもよいし、普通土を詰めた植生土嚢を使用してもよい。また、植生シート37を省略し、種子を混合した普通土(種子混合土)を使用してもよい。   In place of the vegetation sheet 37, a vegetation mat may be used, or a vegetation sandbag filled with ordinary soil may be used. Alternatively, the vegetation sheet 37 may be omitted, and ordinary soil (seed mixed soil) in which seeds are mixed may be used.

盛土本体32は、改良土を盛土材とする盛土(いわゆる改良盛土)であり、地山20の斜面20aの脇に形成されている。改良土は、地盤材料にセメント等の固化材を混合したものである。   The embankment main body 32 is a embankment (so-called improved embankment) using the improved soil as a embankment material, and is formed beside the slope 20 a of the natural ground 20. The improved soil is a material in which a solid material such as cement is mixed with the ground material.

法面ユニット34は、図2に示すように正面から見て、高さ方向及び幅方向に複数配列されている。法面ユニット34は、ネット状で、図3にも示すように、側面形状がL字状を成している。なお、図2および図3では、盛土材(普通土、改良土)の図示を省略している。   As shown in FIG. 2, the slope unit 34 is arranged in the height direction and the width direction when viewed from the front. The slope unit 34 has a net shape, and the side surface is L-shaped as shown in FIG. In FIG. 2 and FIG. 3, illustration of embankment material (normal soil, improved soil) is omitted.

本実施形態の法面ユニット34は、高強度で腐食しない高分子材料により形成されており、法面を保持する保持部34aと、後方に延在する水平部34bと、保持部34aを支える筋交い状の連結金具34cとを備えている。保持部34aは、法面勾配で傾斜している。水平部34bの長さ(法面ユニット34の奥行き)は、法面部31の幅(奥行き)と略等しい。なお、法面ユニット34の構成は適宜変更してもよい。図示は省略するが、例えば、法面ユニット34を鋼製としてもよいし、ネット状の法面ユニット34に代えて、緑化コンクリートブロック(前面に植栽を設置できるポケットを有するもの)を使用してもよい。   The slope unit 34 of the present embodiment is made of a high-strength, non-corrosive polymer material, a holding portion 34a that holds the slope, a horizontal portion 34b that extends rearward, and a brace that supports the holding portion 34a. And a connecting metal fitting 34c. The holding part 34a is inclined with a slope. The length of the horizontal part 34 b (depth of the slope unit 34) is substantially equal to the width (depth) of the slope part 31. The configuration of the slope unit 34 may be changed as appropriate. Although illustration is omitted, for example, the slope unit 34 may be made of steel, and instead of the net-like slope unit 34, a green concrete block (having a pocket on which a planting can be installed on the front surface) is used. May be.

主補強材35aおよび補助補強材35bは、いずれも面状のジオテキスタイルであり、法面ユニット34の水平部34bに連結されている。図2に示すように、各補強材35a,35bは、法面ユニット34と同じ幅の長方形のネット状であり、図3に示すように、法面ユニット34の後方側に延びた状態で配置され、U字状の固定ピン39により地盤(原地盤または盛土本体32)に固定されている。本実施形態の補強材35a,35bは、法面ユニット34と同じ材料からなる。補強材35a,35bは、最終的には盛土本体32に埋設され、摩擦抵抗によって盛土本体32に定着される。   The main reinforcing material 35 a and the auxiliary reinforcing material 35 b are both planar geotextiles and are connected to the horizontal portion 34 b of the slope unit 34. As shown in FIG. 2, each of the reinforcing members 35a and 35b has a rectangular net shape having the same width as the slope unit 34, and is arranged in a state extending to the rear side of the slope unit 34 as shown in FIG. It is fixed to the ground (original ground or embankment main body 32) by a U-shaped fixing pin 39. The reinforcing members 35 a and 35 b of the present embodiment are made of the same material as the slope unit 34. The reinforcing members 35a and 35b are finally embedded in the embankment body 32 and fixed to the embankment body 32 by frictional resistance.

補強材35a,35bは、せん断抵抗の大きい盛土本体32に定着されているため、普通土に定着する場合に比べて水平長さが大幅に短い。例えば、主補強材35aの長さL1は2mであり、補助補強材35bの長さL2は1.5mである。なお、主補強材35aの長さL1は、補助補強材35bの長さL2よりも長くなっているが、補強材35a,35bを同じ長さとしてもよい。また、補強材35a,35bの構成は適宜変更してもよい。例えば、図示は省略するが、面状のジオテキスタイルに代えて、帯鋼、鋼棒、アンカー材を補強材としてもよい。   Since the reinforcing members 35a and 35b are fixed to the embankment main body 32 having a large shear resistance, the horizontal length is significantly shorter than the case of fixing to the normal soil. For example, the length L1 of the main reinforcing member 35a is 2 m, and the length L2 of the auxiliary reinforcing member 35b is 1.5 m. Although the length L1 of the main reinforcing material 35a is longer than the length L2 of the auxiliary reinforcing material 35b, the reinforcing materials 35a and 35b may be the same length. Moreover, you may change suitably the structure of the reinforcing materials 35a and 35b. For example, although not shown, a steel strip, a steel bar, or an anchor material may be used as the reinforcing material instead of the planar geotextile.

次に、図4を参照して、緑化法面構造30の構築方法を説明する。
緑化法面構造30は、n層に分けて構築するものとし、各層において以下に説明する第1ステップと第2ステップを行う。すなわち、緑化法面構造30を構築するには、所定高さHの法面が造成されるまで第1ステップと第2ステップを交互に繰り返せばよい。なお、各層の高さは、法面ユニット34の高さと略同じとしているが、適宜変更してもよい。
Next, with reference to FIG. 4, the construction method of the greening slope structure 30 will be described.
The greening slope structure 30 is constructed by dividing into n layers, and the first step and the second step described below are performed in each layer. That is, in order to construct the greening slope structure 30, the first step and the second step may be repeated alternately until a slope having a predetermined height H is created. The height of each layer is substantially the same as the height of the slope unit 34, but may be changed as appropriate.

第1ステップは、法面ユニット34を設置するとともに、主補強材35a又は補助補強材35bを法面ユニット34に連結する工程である。   The first step is a step of installing the slope unit 34 and connecting the main reinforcing member 35 a or the auxiliary reinforcing member 35 b to the slope unit 34.

第2ステップは、主補強材35a又は補助補強材35b上に改良土を盛土して改良土層(1層分の盛土本体32)を形成するとともに、改良土層と法面ユニット34との間に普通土を配置する工程である。   In the second step, the improved soil is embanked on the main reinforcing material 35a or the auxiliary reinforcing material 35b to form an improved soil layer (the embankment main body 32 for one layer), and between the improved soil layer and the slope unit 34. This is the process of placing ordinary soil in

以下、緑化法面構造30の構築方法をより詳細に説明する。
まず、整地した原地盤の地面40の上に、法面ユニット34を設置するとともに、主補強材35aを法面ユニット34に連結する(1回目の第1ステップ)。主補強材35aは、地面40に敷設し、U字状の固定ピン39を地面40に打ち込むことで、地面40に固定する。また、法面ユニット34の背面(保持部34aの背面)に沿って植生シート37を配置する。植生シート37は、保持部34aの背面を覆うように配置し、番線等を用いて保持部34aに固定する。なお、植生シート37は、保持部34aの背面に予め取り付けておいてもよい。
Hereinafter, the construction method of the greening slope structure 30 will be described in more detail.
First, the slope unit 34 is installed on the ground 40 of the prepared ground, and the main reinforcing member 35a is connected to the slope unit 34 (first first step). The main reinforcing member 35 a is laid on the ground 40 and fixed to the ground 40 by driving U-shaped fixing pins 39 into the ground 40. A vegetation sheet 37 is disposed along the back surface of the slope unit 34 (the back surface of the holding portion 34a). The vegetation sheet 37 is disposed so as to cover the back surface of the holding portion 34a, and is fixed to the holding portion 34a using a wire or the like. The vegetation sheet 37 may be attached in advance to the back surface of the holding portion 34a.

次に、1層目H1の盛土を行う(1回目の第2ステップ)。
具体的には、法面ユニット34の保持部34aの背面側に、普通土を所定幅で盛土して法面部31を1層分(法面ユニット34の高さ分)だけ形成するとともに、法面部31の後方側に改良土を盛土して改良土層(1層分の盛土本体32)を形成する。普通土及び改良土は、振動ローラ等で転圧して締め固める。普通土は、植生シート37に密着させる。なお、1層目H1の盛土は、1回(1層)で行う場合と、複数層に分けて行う場合がある。また、改良土層を形成した後に、法面ユニット34と改良土層との間に普通土を盛土してもよい。
Next, the first layer H1 is filled (first second step).
Specifically, on the back side of the holding portion 34a of the slope unit 34, normal soil is filled with a predetermined width to form the slope portion 31 for one layer (the height of the slope unit 34). An improved soil is embanked on the rear side of the surface portion 31 to form an improved soil layer (an embankment main body 32 for one layer). Normal soil and improved soil are compacted by rolling with a vibrating roller. The normal soil is brought into close contact with the vegetation sheet 37. The embankment of the first layer H1 may be performed once (one layer) or divided into a plurality of layers. Further, after forming the improved soil layer, normal soil may be filled between the slope unit 34 and the improved soil layer.

なお、植生シート37に代えて植生土嚢を使用する場合には、普通土を詰め込んだ植生土嚢を法面部31と改良土層(盛土本体32)との間に積み上げればよい。   In addition, when using a vegetation sandbag instead of the vegetation sheet 37, a vegetation sandbag filled with normal soil may be stacked between the slope portion 31 and the improved soil layer (filling body 32).

1層目H1を構築したら、1層目H1の法面部31の上に、2層目H2の法面ユニット34を設置するとともに、補助補強材35bを法面ユニット34に連結する(2回目の第1ステップ)。2層目H2の法面ユニット34は、その保持部34aが1層目H1の法面ユニット34の保持部34aと略面一になるように配置する。補助補強材35bは、1層目H1の改良土層の上面に敷設し、改良土層に固定ピン39を打ち込むことで、改良土層に固定する。また、法面ユニット34の背面(保持部34aの背面)に沿って植生シート37を配置する。   When the first layer H1 is constructed, the slope unit 34 of the second layer H2 is installed on the slope part 31 of the first layer H1, and the auxiliary reinforcing member 35b is connected to the slope unit 34 (second time). First step). The slope unit 34 of the second layer H2 is arranged so that its holding part 34a is substantially flush with the holding part 34a of the slope unit 34 of the first layer H1. The auxiliary reinforcing material 35b is laid on the upper surface of the improved soil layer of the first layer H1, and fixed to the improved soil layer by driving a fixing pin 39 into the improved soil layer. A vegetation sheet 37 is disposed along the back surface of the slope unit 34 (the back surface of the holding portion 34a).

次に、2層目H2の盛土を行う(2回目の第2ステップ)。
具体的には、2層目H2の法面ユニット34の保持部34aの背面側に、普通土を所定幅で盛土して法面部31を1層分(法面ユニット34の高さ分)だけ形成するとともに、法面部31の後方側に改良土を盛土して2層目の改良土層を形成する。
Next, the second layer H2 is filled (second second step).
Specifically, on the back side of the holding portion 34a of the slope unit 34 of the second layer H2, normal soil is filled with a predetermined width, and the slope portion 31 is one layer (the height of the slope unit 34). At the same time, the improved soil is filled on the rear side of the slope portion 31 to form a second improved soil layer.

3層目H3以降、n層目Hnまでの構築方法は、2層目H2と同様に行われる。
その後、所定期間を経ると、改良土が固化することによって盛土本体32のせん断抵抗(引き抜き耐力)が増大し、各層H1〜Hnの補強材35a,35bが、固化した改良土に保持される。また、植生シート37から発芽した草木が普通土に活着することにより、緑化法面構造30の法面が緑化される。
The construction method from the third layer H3 to the nth layer Hn is performed in the same manner as the second layer H2.
Thereafter, after a predetermined period, the improved soil is solidified to increase the shear resistance (pullout strength) of the embankment main body 32, and the reinforcing members 35a and 35b of the layers H1 to Hn are held in the solidified improved soil. Moreover, when the plants sprouted from the vegetation sheet 37 are settled on ordinary soil, the slope of the greening slope structure 30 is greened.

本実施形態の緑化法面構造30によれば、改良土からなる盛土本体32に補強材35a,35bを定着しているので、補強材35a,35bを短くした場合であっても、所用のせん断抵抗を確保することが可能となる。とくに、本実施形態の補強材35a,35bはネット状なので、強い摩擦抵抗によっても保持される。補強材35a,35bを短くできれば、土地利用が制約される範囲も狭まるため、盛土上に構造物等を構築することも可能となる。また、盛土本体32と法面ユニット34との間に普通土が配置されているので、改良土に対して直接植生を行う場合に比べて、緑化を行い易くなる。   According to the greening slope structure 30 of the present embodiment, since the reinforcing members 35a and 35b are fixed to the embankment main body 32 made of improved soil, even if the reinforcing members 35a and 35b are shortened, the required shearing is performed. Resistance can be secured. In particular, since the reinforcing members 35a and 35b of the present embodiment are net-like, they are held even by strong frictional resistance. If the reinforcing members 35a and 35b can be shortened, the range in which land use is restricted is narrowed, so that it is possible to construct a structure or the like on the embankment. Moreover, since normal soil is arrange | positioned between the embankment main body 32 and the slope unit 34, it becomes easy to perform greening compared with the case where vegetation is directly performed with respect to improved soil.

また、本実施形態の緑化法面構造の構築方法によれば、盛土(法面)の造成とともに植生工が行われるため、法面を形成した後に植生基材の吹き付けを行う場合に比べて、高所作業を削減するとともに、工期を短くすることができる。   Moreover, according to the construction method of the greening slope structure of this embodiment, because vegetation is performed together with the creation of the embankment (slope), compared to the case of spraying the vegetation substrate after forming the slope, Work in high places can be reduced and the construction period can be shortened.

なお、上記実施形態の緑化法面構造及び緑化法面構造の構築方法は、道路法面に適用する場合を説明したが、この他、堤防やダム関連法面、宅地・工場造成地、公園・ゴルフ場・鉄道等の法面等に適用することが可能である。   In addition, although the construction method of the greening slope structure and the greening slope structure of the above embodiment was applied to a road slope, in addition to this, a dike, a dam-related slope, a residential land / factory development site, a park / It can be applied to slopes of golf courses and railways.

30 緑化法面構造
31 法面部
32 盛土本体
34 法面ユニット(法留め材)
35a 主補強材(補強材)
35b 補助補強材(補強材)
37 植生シート
30 Greening Slope Structure 31 Slope Part 32 Embankment Body 34 Slope Unit (Screw Material)
35a Main reinforcing material (reinforcing material)
35b Auxiliary reinforcement (reinforcing material)
37 Vegetation sheet

Claims (5)

普通土で形成された法面部と、この法面部の背後に改良土で形成された盛土本体とから成る緑化法面構造であって、
前記法面部と前記盛土本体が、層状に積み上げられている、ことを特徴とする緑化法面構造。
It is a greening slope structure composed of a slope part formed with ordinary soil and a bank body formed with improved soil behind this slope part,
The said slope part and the said embankment main body are piled up in layers, The greening slope structure characterized by the above-mentioned.
前記法面部の高さ方向に複数配設された法留め材と、
前記法留め材の各々に固定され、当該法留め材の後方側に配設される補強材と
を備え、
前記法面部は、前記盛土本体の前面と前記法留め材の背面との間に設けられており、
前記補強材は、前記盛土本体に定着されている、ことを特徴とする請求項1に記載の緑化法面構造。
A plurality of method fastening materials disposed in the height direction of the slope portion,
A fixing member fixed to each of the fastening members and disposed on the rear side of the fastening member,
The slope portion is provided between the front surface of the embankment main body and the back surface of the retaining material,
The greening slope structure according to claim 1, wherein the reinforcing material is fixed to the embankment main body.
前記法面部は、前記普通土を覆う植生手段または前記普通土に混合された種子を有する、ことを特徴とする請求項1又は2に記載の緑化法面構造。   The green slope structure according to claim 1 or 2, wherein the slope part has vegetation means for covering the plain soil or seed mixed with the plain soil. 法面を保持する法留め材を設置するとともに、前記法留め材の後方に延在する補強材を前記法留め材に連結する第1ステップと、
前記補強材上に改良土を盛土して改良土層を形成するとともに、前記改良土層と前記法留め材との間に普通土を配置する第2ステップとを、
所定高さの法面が造成されるまで交互に繰り返す緑化法面構造の構築方法であって、
前記第2ステップでは、前記法留め材の背面に沿って植生シート又は植生マットを配置した状態で普通土を盛土する、ことを特徴とする緑化法面構造の構築方法。
A first step of installing a fastening member for retaining the slope and connecting a reinforcing member extending rearward of the fastening member to the fastening member;
A second step of embedding improved soil on the reinforcing material to form an improved soil layer, and placing ordinary soil between the improved soil layer and the fastening material;
A method of constructing a greening slope structure that repeats alternately until a slope with a predetermined height is created,
In the second step, normal soil is embanked with a vegetation sheet or a vegetation mat disposed along the back surface of the fastening material.
法面を保持する法留め材を設置するとともに、前記法留め材の後方に延在する補強材を前記法留め材に連結する第1ステップと、
前記補強材上に改良土を盛土して改良土層を形成するとともに、前記改良土層と前記法留め材との間に普通土を配置する第2ステップとを、
所定高さの法面が造成されるまで交互に繰り返す緑化法面構造の構築方法であって、
前記第2ステップでは、普通土を詰めた植生土嚢を設置するか、または、種子を混合した普通土を盛土する、ことを特徴とする緑化法面構造の構築方法。
A first step of installing a fastening member for retaining the slope and connecting a reinforcing member extending rearward of the fastening member to the fastening member;
A second step of embedding improved soil on the reinforcing material to form an improved soil layer, and placing ordinary soil between the improved soil layer and the fastening material;
A method of constructing a greening slope structure that repeats alternately until a slope with a predetermined height is created,
In the second step, a vegetation sandbag filled with ordinary soil is installed, or ordinary soil mixed with seeds is embanked.
JP2013142272A 2013-07-08 2013-07-08 Greening slope structure and method for constructing green slope structure Active JP6280322B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013142272A JP6280322B2 (en) 2013-07-08 2013-07-08 Greening slope structure and method for constructing green slope structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013142272A JP6280322B2 (en) 2013-07-08 2013-07-08 Greening slope structure and method for constructing green slope structure

Publications (2)

Publication Number Publication Date
JP2015014163A true JP2015014163A (en) 2015-01-22
JP6280322B2 JP6280322B2 (en) 2018-02-14

Family

ID=52436077

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013142272A Active JP6280322B2 (en) 2013-07-08 2013-07-08 Greening slope structure and method for constructing green slope structure

Country Status (1)

Country Link
JP (1) JP6280322B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759404A (en) * 2017-02-24 2017-05-31 陈仕涛 A kind of multiple method for green for slowing down the steep mine gradient high
CN109723067A (en) * 2019-01-04 2019-05-07 杰瑞(莱州)矿山治理有限公司 A kind of ecological body of rod laying method administered applied to Green Mine

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0369721A (en) * 1989-08-09 1991-03-26 Shimizu Corp Steep gradient banking
JPH09279580A (en) * 1996-04-10 1997-10-28 Shimizu Corp Reinforcing banking method using geotextile
JP2001090074A (en) * 1999-09-17 2001-04-03 Maeda Kosen Kk Protective retaining wall
JP2005315011A (en) * 2004-04-30 2005-11-10 Hirose & Co Ltd Reinforcing wall body and reinforcing mud wall structure
US7850402B1 (en) * 2007-05-17 2010-12-14 Henry Justiniano Cement-treated soil blocks with vegetative faces
JP2011026792A (en) * 2009-07-22 2011-02-10 Maeda Kosen Co Ltd Structure and construction method of reinforced soil banking

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0369721A (en) * 1989-08-09 1991-03-26 Shimizu Corp Steep gradient banking
JPH09279580A (en) * 1996-04-10 1997-10-28 Shimizu Corp Reinforcing banking method using geotextile
JP2001090074A (en) * 1999-09-17 2001-04-03 Maeda Kosen Kk Protective retaining wall
JP2005315011A (en) * 2004-04-30 2005-11-10 Hirose & Co Ltd Reinforcing wall body and reinforcing mud wall structure
US7850402B1 (en) * 2007-05-17 2010-12-14 Henry Justiniano Cement-treated soil blocks with vegetative faces
JP2011026792A (en) * 2009-07-22 2011-02-10 Maeda Kosen Co Ltd Structure and construction method of reinforced soil banking

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759404A (en) * 2017-02-24 2017-05-31 陈仕涛 A kind of multiple method for green for slowing down the steep mine gradient high
CN109723067A (en) * 2019-01-04 2019-05-07 杰瑞(莱州)矿山治理有限公司 A kind of ecological body of rod laying method administered applied to Green Mine

Also Published As

Publication number Publication date
JP6280322B2 (en) 2018-02-14

Similar Documents

Publication Publication Date Title
CN103669399B (en) Concrete slab reinforced soil retaining wall and construction method thereof
US8246274B1 (en) Earth fill retaining wall system and method
KR100737768B1 (en) Environmental vegetation mat pannels
CN107893422B (en) A kind of reinforcement type ecological slope protection structure and its construction method
EP2556196B1 (en) Method of protecting a soil from erosion
CN107354911A (en) A kind of ecological flexible geogrid reinforcement Wharf Construction method
JP2007530833A (en) Reinforced soil retaining wall system and construction method
KR20060108595A (en) Vegetation soil-bags by nonwoven geotextiles and jute or coconut nets
CN114182745B (en) Ecological slope protection roadbed of high-liquid limit soil ecological retaining wall and construction method
KR100959828B1 (en) A vegetation slope structure
JP6280322B2 (en) Greening slope structure and method for constructing green slope structure
KR100889257B1 (en) Precast concrete facing panel using greening of retaining panel's front
CN207244552U (en) A kind of ecology flexible geogrid reinforcement harbour
KR101311313B1 (en) A vegitation-oriented gabion mat assembly and a method of producing the same
KR102116085B1 (en) A Eco-friendly retain wall structure
KR20010026934A (en) Landscape block for protecting a slop side and carrying out method of using it
CN212316949U (en) Supporting construction of side slope
CN113322895A (en) Three-dimensional water and soil protection revetment and construction method thereof
CN206843873U (en) The road structure that a kind of slate filler fills
KR101334749B1 (en) Vegetation block in tiers for retaining wall and method for construction of retaining wall using the same
KR100992076B1 (en) Structure of raising the ground level and excecution method thereof
CN110939141A (en) Supporting construction of side slope
KR100930115B1 (en) Environment-friendly slope type fill section structure and its construction method
JP2750364B2 (en) Steep embankment
RU2765408C1 (en) Method for constructing a vertical slope of a road embankment and a retaining block for implementing such a method

Legal Events

Date Code Title Description
RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20160506

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160621

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170529

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170606

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170731

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180109

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180119

R150 Certificate of patent or registration of utility model

Ref document number: 6280322

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250