JP2014183665A - Power management device and program - Google Patents

Power management device and program Download PDF

Info

Publication number
JP2014183665A
JP2014183665A JP2013057238A JP2013057238A JP2014183665A JP 2014183665 A JP2014183665 A JP 2014183665A JP 2013057238 A JP2013057238 A JP 2013057238A JP 2013057238 A JP2013057238 A JP 2013057238A JP 2014183665 A JP2014183665 A JP 2014183665A
Authority
JP
Japan
Prior art keywords
power
adjustment amount
power consumption
unit
average demand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2013057238A
Other languages
Japanese (ja)
Inventor
Fumitoshi Ogaki
史迅 大垣
Hideaki Nagatoshi
英昭 永利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Corp
Original Assignee
Panasonic Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panasonic Corp filed Critical Panasonic Corp
Priority to JP2013057238A priority Critical patent/JP2014183665A/en
Publication of JP2014183665A publication Critical patent/JP2014183665A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a power management device and a program for functioning the power management device capable of calculating an adjustment amount for adjusting the power consumption so that average demand power for a prescribed period does not exceed a target value.SOLUTION: An arithmetic processing section 10 measures the power consumption of an electrical apparatus on the basis of a power source voltage measured by a voltage measurement section 11 and a load current measured by a current measurement unit 12 to calculate the power consumption for a prescribed period from a start point to the present of every prescribed period. The arithmetic processing section 10 calculates a measured value of the average demand power from a start point of the prescribed period to the present on the basis of the power consumption and elapsed time from the start point of the prescribed period to the present. The arithmetic processing section 10 calculates an adjustment amount for increasing or reducing the average demand power in a remaining period of time by dividing a value which is obtained by subtracting the measured value from the target value of the average demand power by a ratio of a remaining period of the prescribed period to a time range of the prescribed period, and displays the adjustment amount on a display 15.

Description

本発明は、電力管理装置、この電力管理装置を実現するためのプログラムに関するものである。   The present invention relates to a power management apparatus and a program for realizing the power management apparatus.

従来、複数の電気機器の消費電力を測定し、測定結果を30分毎に集計することで平均需要電力を求め、平均需要電力が最大需要電力或いは任意に設定された目標値を超えると、その旨を表示するようにした電力量管理装置があった(例えば特許文献1参照)。   Conventionally, the average power demand is obtained by measuring the power consumption of a plurality of electrical devices and totaling the measurement results every 30 minutes, and when the average demand power exceeds the maximum demand power or an arbitrarily set target value, There is an electric energy management device that displays the effect (see, for example, Patent Document 1).

特開2006−87158号公報JP 2006-87158 A

上述の電力管理装置では、最大需要電力よりも低い値に目標値を設定しておけば、所定期間の平均需要電力が目標値を超えた際にその旨が表示されるから、平均需要電力が最大需要電力に近付いていることを需要家に知らしめることができる。この表示を見た需要家は、平均需要電力が最大需要電力を超えないように、電気機器を停止して電力消費を抑えようとする。   In the power management apparatus described above, if the target value is set to a value lower than the maximum demand power, this is displayed when the average demand power for the predetermined period exceeds the target value. The customer can be informed that the maximum power demand is approaching. The customer who sees this display tries to suppress the power consumption by stopping the electric device so that the average demand power does not exceed the maximum demand power.

しかしながら、平均需要電力が目標値を超えたという表示だけでは、平均需要電力が目標値をどの程度超過しているのか、或いは、平均需要電力が最大需要電力を超えるまでどの程度余裕があるのかが判らず、対策がとりにくいという問題があった。   However, just indicating that the average demand power has exceeded the target value, how much the average demand power exceeds the target value, or how much margin is available until the average demand power exceeds the maximum demand power. There was a problem that it was difficult to take countermeasures.

本発明は上記課題に鑑みて為されたものであり、その目的とするところは、所定期間の平均需要電力が目標値を超えないように消費電力を調整する調整量を求めることができる電力管理装置、この電力管理装置を実現するためのプログラムを提供することにある。   The present invention has been made in view of the above problems, and its purpose is to provide power management capable of obtaining an adjustment amount for adjusting power consumption so that average demand power in a predetermined period does not exceed a target value. An apparatus and a program for realizing the power management apparatus are provided.

本発明の電力管理装置は測定部と平均需要電力算出部と調整量算出部とを備えることを特徴とする。測定部は電気機器の消費電力を測定する。平均需要電力算出部は、所定期間毎に所定期間の開始時から現在まで前記消費電力を積算した値をもとに所定期間の開始時から現在までの平均需要電力の実測値を算出する。調整量算出部は、平均需要電力の目標値から前記実測値を減算して得た値を、所定期間の時間幅に対する所定期間の残り期間の比率で除算することによって、前記残り期間における平均需要電力を増減させる調整量を算出する。   The power management apparatus of the present invention includes a measurement unit, an average demand power calculation unit, and an adjustment amount calculation unit. The measurement unit measures the power consumption of the electrical equipment. The average demand power calculation unit calculates an actual measurement value of the average demand power from the start of the predetermined period to the present based on a value obtained by integrating the power consumption from the start of the predetermined period to the present for each predetermined period. The adjustment amount calculation unit divides the value obtained by subtracting the actual measurement value from the target value of the average demand power by the ratio of the remaining period of the predetermined period to the time width of the predetermined period, thereby calculating the average demand in the remaining period. An adjustment amount for increasing or decreasing the power is calculated.

この電力管理装置において、前記測定部は、複数の前記電気機器の消費電力を個別に測定して、消費電力の総和を求めており、報知部を備えることも好ましい。報知部は、前記調整量が負の値の場合、前記調整量と、前記測定部が測定した各々の前記電気機器の消費電力とに基づいて、平均需要電力を前記調整量以上削減するために停止させる必要がある前記電気機器を報知する。   In this power management apparatus, it is preferable that the measurement unit individually measures the power consumption of the plurality of electric devices to obtain the total power consumption, and includes a notification unit. When the adjustment amount is a negative value, the notification unit reduces the average demand power more than the adjustment amount based on the adjustment amount and the power consumption of each of the electric devices measured by the measurement unit. The electric device that needs to be stopped is notified.

この電力管理装置において、前記測定部は、複数の前記電気機器の消費電力を個別に測定して、消費電力の総和を求めており、記憶部と、制御部とを備えることも好ましい。記憶部は、複数の前記電気機器の優先順位を記憶する。制御部は、前記調整量が負の値の場合、前記調整量と、前記測定部が測定した各々の前記電気機器の消費電力とに基づいて、平均需要電力を前記調整量以上削減するために優先順位の低い前記電気機器から順番に前記電気機器を停止させる。   In this power management apparatus, it is preferable that the measurement unit individually measures power consumption of the plurality of electric devices to obtain a total power consumption, and includes a storage unit and a control unit. The storage unit stores priorities of the plurality of electric devices. When the adjustment amount is a negative value, the control unit reduces the average demand power more than the adjustment amount based on the adjustment amount and the power consumption of each electric device measured by the measurement unit. The electrical devices are stopped in order from the electrical device with the lowest priority.

本発明のプログラムは、コンピュータを電力管理装置として動作させるためのプログラムである。電力管理装置は測定部と平均需要電力算出部と調整量算出部とを備える。測定部は、電気機器の消費電力を測定する。平均需要電力算出部は、所定期間毎に所定期間の開始時から現在まで前記消費電力を積算した値をもとに所定期間の開始時から現在までの平均需要電力の実測値を求める。調整量算出部は、平均需要電力の目標値から前記実測値を減算して得た値を、所定期間の時間幅に対する所定期間の残り期間の比率で除算することによって、前記残り期間における平均需要電力を増減させる調整量を算出する。   The program of the present invention is a program for causing a computer to operate as a power management apparatus. The power management apparatus includes a measurement unit, an average demand power calculation unit, and an adjustment amount calculation unit. The measurement unit measures the power consumption of the electric device. The average demand power calculation unit obtains an actual measurement value of average demand power from the start of the predetermined period to the present based on a value obtained by integrating the power consumption from the start of the predetermined period to the present for each predetermined period. The adjustment amount calculation unit divides the value obtained by subtracting the actual measurement value from the target value of the average demand power by the ratio of the remaining period of the predetermined period to the time width of the predetermined period, thereby calculating the average demand in the remaining period. An adjustment amount for increasing or decreasing the power is calculated.

このプログラムにおいて、前記測定部は、複数の前記電気機器の消費電力を個別に測定して、消費電力の総和を求めており、前記調整量が負の値の場合、前記調整量と、前記測定部が測定した各々の前記電気機器の消費電力とに基づいて、平均需要電力を前記調整量以上削減するために停止させる必要がある前記電気機器を報知する報知部を備えた電力管理装置として、コンピュータを動作させるものでもよい。   In this program, the measurement unit individually measures the power consumption of the plurality of electrical devices to obtain the total power consumption, and when the adjustment amount is a negative value, the adjustment amount and the measurement Based on the power consumption of each of the electrical devices measured by the unit, as a power management device including a notification unit for notifying the electrical device that needs to be stopped to reduce the average demand power more than the adjustment amount, A computer may be operated.

このプログラムにおいて、前記測定部は、複数の前記電気機器の消費電力を個別に測定して、消費電力の総和を求めており、前記調整量が負の値の場合、前記調整量と、前記測定部が測定した各々の前記電気機器の消費電力と、各々の前記電気機器に設定された優先順位とに基づいて、平均需要電力を前記調整量以上削減するために優先順位の低い前記電気機器から順番に前記電気機器を停止させる制御部を備えた電力管理装置として、コンピュータを動作させるものでもよい。   In this program, the measurement unit individually measures the power consumption of the plurality of electrical devices to obtain the total power consumption, and when the adjustment amount is a negative value, the adjustment amount and the measurement Based on the power consumption of each of the electrical devices measured by the unit and the priority set for each of the electrical devices, from the electrical device having a lower priority in order to reduce the average demand power more than the adjustment amount A computer may be operated as a power management apparatus including a control unit that sequentially stops the electrical devices.

本発明の電力管理装置によれば、所定期間毎に所定期間の開始時から現在までの使用電力量をもとに平均需要電力の実測値を求め、目標値から実測値を減算して得た値から、所定期間の残り期間における平均需要電力を増減させる調整量を求めている。実測値が目標値を超えている場合、需要家は、調整量算出部が算出した調整量をもとに、消費電力をどの程度削減すればよいかが判るから、削減量が不足して目標値を超えてしまったり、必要量を超えて過剰に消費電力を削減したりする事態が起こりにくくなる。また、実測値が目標値を下回っている場合、需要家は、調整量算出部が算出した調整量をもとに、どの程度消費電力が増えると平均需要電力が目標値を超えるかが判るので、平均需要電力が目標値を超えないように電力消費の増加に留意することができる。   According to the power management apparatus of the present invention, an actual measurement value of average demand power is obtained based on the amount of power used from the start of a predetermined period to the present every predetermined period, and obtained by subtracting the actual measurement value from a target value. From the value, an adjustment amount for increasing or decreasing the average demand power in the remaining period of the predetermined period is obtained. When the actual measurement value exceeds the target value, the consumer knows how much power consumption should be reduced based on the adjustment amount calculated by the adjustment amount calculation unit. It is less likely that the power consumption will be exceeded or the power consumption will be excessively reduced beyond the required amount. In addition, when the actual measurement value is lower than the target value, the consumer can determine how much the power consumption increases and the average power demand exceeds the target value based on the adjustment amount calculated by the adjustment amount calculation unit. Therefore, attention can be paid to the increase in power consumption so that the average power demand does not exceed the target value.

本発明のプログラムによれば、上述のような電力管理装置としてコンピュータを動作させることによって、実測値が目標値を超えている場合、需要家は、調整量算出部が算出した調整量をもとに消費電力をどの程度削減すればよいかが判る。また実測値が目標値を下回っている場合、需要家は、調整量算出部が算出した調整量をもとに消費電力がどの程度増えると、平均需要電力が目標値を超えてしまうかが判る。   According to the program of the present invention, when the measured value exceeds the target value by operating the computer as the power management apparatus as described above, the consumer uses the adjustment amount calculated by the adjustment amount calculation unit. It can be seen how much power consumption should be reduced. When the measured value is below the target value, the consumer can see how much the average power demand exceeds the target value when the power consumption increases based on the adjustment amount calculated by the adjustment amount calculation unit. .

本実施形態の電力管理装置のブロック図である。It is a block diagram of the power management apparatus of this embodiment. 同上の電力管理装置の他の形態を示すブロック図である。It is a block diagram which shows the other form of a power management apparatus same as the above. 同上の電力管理装置のまた別の形態を示し、(a)はブロック図、(b)は電力管理装置を用いた全体システムの概略回路図である。The other form of a power management apparatus same as the above is shown, (a) is a block diagram, (b) is a schematic circuit diagram of the whole system using a power management apparatus.

本発明に係る電力管理装置の実施形態を図面に基づいて説明する。   An embodiment of a power management apparatus according to the present invention will be described with reference to the drawings.

図1は電力管理装置1の概略構成を示すブロック図である。電力管理装置1は、演算処理部10と、電圧計測部11と、電流計測部12と、操作部13と、データ管理部14と、表示部15と、接点16と、接点開閉部17と、電源部18とを備える。   FIG. 1 is a block diagram showing a schematic configuration of the power management apparatus 1. The power management apparatus 1 includes an arithmetic processing unit 10, a voltage measurement unit 11, a current measurement unit 12, an operation unit 13, a data management unit 14, a display unit 15, a contact point 16, a contact opening / closing unit 17, And a power supply unit 18.

演算処理部10はマイクロコンピュータからなり、このマイクロコンピュータがROM(図示せず)などに記憶されたプログラムを実行することによって、電力管理装置1の各機能(すなわち測定部、平均需要電力算出部、調整量算出部、報知部、制御部としての機能)が実現される。   The arithmetic processing unit 10 is composed of a microcomputer, and this microcomputer executes a program stored in a ROM (not shown) or the like, whereby each function of the power management apparatus 1 (that is, a measurement unit, an average demand power calculation unit, Functions as an adjustment amount calculation unit, a notification unit, and a control unit) are realized.

電圧計測部11は、商用電源2から供給される電源電圧を計測し、計測結果を演算処理部10に出力する。   The voltage measurement unit 11 measures the power supply voltage supplied from the commercial power supply 2 and outputs the measurement result to the arithmetic processing unit 10.

電流計測部12は、電気機器に供給される電流(負荷電流)を測定する電流センサ3(例えばカレントトランスなど)の出力をもとに、電気機器に流れる電流(負荷電流)を計測し、計測結果を演算処理部10に出力する。   The current measuring unit 12 measures and measures the current (load current) flowing through the electrical device based on the output of the current sensor 3 (for example, a current transformer) that measures the current (load current) supplied to the electrical device. The result is output to the arithmetic processing unit 10.

操作部13は、複数個の操作釦(図示せず)を備え、ユーザによって操作釦が操作されると、操作に応じた信号を演算処理部10に出力する。例えば操作部13は所定期間における平均需要電力の目標値を設定するために用いられる。需要家が操作部13を用いて平均需要電力の目標値を入力すると、演算処理部10は、操作部13から入力された目標値をデータ管理部14に記憶させる。   The operation unit 13 includes a plurality of operation buttons (not shown), and outputs a signal corresponding to the operation to the arithmetic processing unit 10 when the operation button is operated by the user. For example, the operation unit 13 is used to set a target value of average demand power in a predetermined period. When a consumer inputs a target value of average demand power using the operation unit 13, the arithmetic processing unit 10 stores the target value input from the operation unit 13 in the data management unit 14.

データ管理部14は、例えばSDメモリカードのようなメモリカードが装着されるカードスロット(図示せず)を備え、カードスロットに装着されたメモリカードに、消費電力の計測値や平均需要電力の目標値などのデータを記憶させる。なおデータ管理部14は、演算処理部10の制御の元に、カードスロットに装着されたメモリカードへのデータの書き込みや、メモリカードからのデータの読み出しを行うように構成されている。   The data management unit 14 includes a card slot (not shown) in which a memory card such as an SD memory card is mounted, for example, and a measured value of power consumption and a target of average demand power are stored in the memory card mounted in the card slot. Store data such as values. The data management unit 14 is configured to write data to and read data from a memory card mounted in the card slot under the control of the arithmetic processing unit 10.

表示部15は、例えば液晶ディスプレイからなる。表示部15の表示内容は演算処理部10によって制御され、演算処理部10は表示部15に例えば消費電力の測定値などを表示させる。   The display unit 15 is composed of a liquid crystal display, for example. The display content of the display unit 15 is controlled by the arithmetic processing unit 10, and the arithmetic processing unit 10 causes the display unit 15 to display, for example, a measured value of power consumption.

接点16は出力端子t1,t2間に接続される。出力端子t1,t2には例えば外部の警告灯が接続されており、接点16がオンになると警告灯が点灯し、接点16がオフになると警告灯が消灯するようになっている。なお出力端子t1,t2にはブザーなどが接続されていてもよく、その場合は接点16がオンになるとブザーが鳴動し、接点16がオフになるとブザーが停止する
接点開閉部17は、演算処理部10からの制御信号に応じて接点16をオン又はオフにする。
The contact 16 is connected between the output terminals t1 and t2. For example, an external warning light is connected to the output terminals t1 and t2, and the warning light is turned on when the contact 16 is turned on, and the warning light is turned off when the contact 16 is turned off. A buzzer or the like may be connected to the output terminals t1 and t2. In this case, the buzzer sounds when the contact 16 is turned on, and the buzzer stops when the contact 16 is turned off. The contact 16 is turned on or off in accordance with a control signal from the unit 10.

電源部18は、商用電源2から供給される交流電圧を直流電圧に変換して、電力管理装置1が備える回路のそれぞれに動作電圧を供給する。   The power supply unit 18 converts an AC voltage supplied from the commercial power supply 2 into a DC voltage, and supplies an operating voltage to each circuit included in the power management apparatus 1.

本実施形態の電力管理装置1は、電気事業者から電力を受電する需要家が、使用電力を管理するために用いるものである。   The power management apparatus 1 according to this embodiment is used by a consumer who receives power from an electric power company to manage power consumption.

電気事業者と需要家との契約では、当月から過去11ヶ月の最大需要電力のうち最も大きい最大需要電力を契約電力とし、この契約電力をもとに電気料金が決定される。なお最大需要電力(いわゆるデマンド値)とは、30分単位(毎時0分から30分までの30分間と、毎時30分から60分までの30分間)で求めた平均需要電力のうち、その月で最大の平均需要電力のことを言う。   In a contract between an electric power company and a consumer, the largest maximum demand power among the maximum demand power in the past 11 months from the current month is set as the contract power, and the electricity rate is determined based on this contract power. The maximum demand power (so-called demand value) is the maximum of the average demand power calculated in 30-minute units (30 minutes from 0 to 30 minutes per hour and 30 minutes from 30 to 60 minutes per hour) in the month. The average power demand.

上記のような契約のため、当月の最大需要電力が、過去11ヶ月の最大需要電力のうち最も大きい最大需要電力を上回ると、契約電力が高くなり、それに伴って電気料金が高額になる。需要家にとって電気料金の値上がりは好ましくないから、需要家は、30分毎の平均需要電力を監視する電力管理装置1を設置し、平均需要電力が最大需要電力を超えないように消費電力の抑制を図っている。電力管理装置1には、例えば過去11ヶ月の最大需要電力のうち最も大きい最大需要電力の90%の値が目標値として設定されている。電力管理装置1は、30分毎に平均需要電力を計測しており、平均需要電力が目標値を超えそうになると警報を発するので、この警報を聞いた需要家は電気機器の使用を制限して、平均需要電力が最大需要電力を超えないようにしている。   Because of the contract as described above, when the maximum demand power for the current month exceeds the largest maximum demand power among the maximum demand powers for the past 11 months, the contract power becomes high and the electricity bill becomes high accordingly. Since the increase in electricity charges is not desirable for consumers, consumers install a power management device 1 that monitors the average demand power every 30 minutes, and suppresses power consumption so that the average demand power does not exceed the maximum demand power I am trying. In the power management apparatus 1, for example, 90% of the largest maximum demand power among the maximum demand powers for the past 11 months is set as the target value. The power management apparatus 1 measures the average demand power every 30 minutes, and issues a warning when the average demand power is likely to exceed the target value. Therefore, the customer who hears this warning restricts the use of the electric equipment. Therefore, the average demand power is kept from exceeding the maximum demand power.

この電力管理装置1の動作を以下に説明する。   The operation of the power management apparatus 1 will be described below.

所定の計測周期が経過する毎に、電圧計測部11は電源電圧を計測し、電流計測部12は電気機器に流れる電流(負荷電流)を計測する。演算処理部10は、電圧計測部11が計測した電源電圧と、電流計測部12が計測した負荷電流をもとに、電気機器の消費電力を演算により求め、データ管理部14に計測結果を逐次記憶させる。演算処理部10は、消費電力を演算すると、所定期間毎(毎正時から30分毎)に所定期間の開始時から現在までの消費電力を積算して、現在までの使用電力量WH1[Wh]を求める。演算処理部10は、現在までの使用電力量WH1[Wh]を、所定期間の開始時から現在までの経過時間[hr]で除算することによって、所定期間における平均需要電力の実測値を求める。すなわち、所定期間の開始時から現在までの使用電力量をWH1[Wh]、所定期間の開始時から現在までの経過時間をdt1[分]とすると、平均需要電力の実測値P1[W]は次式により求めることができる。   Each time a predetermined measurement cycle elapses, the voltage measurement unit 11 measures a power supply voltage, and the current measurement unit 12 measures a current (load current) flowing through the electrical device. The arithmetic processing unit 10 calculates the power consumption of the electrical device based on the power supply voltage measured by the voltage measuring unit 11 and the load current measured by the current measuring unit 12, and sequentially sends the measurement results to the data management unit 14. Remember. When calculating the power consumption, the arithmetic processing unit 10 integrates the power consumption from the start of the predetermined period to the present for every predetermined period (every hour from every hour), and uses the power consumption WH1 [Wh to the present. ]. The arithmetic processing unit 10 obtains an actual measurement value of the average demand power in the predetermined period by dividing the electric power consumption WH1 [Wh] used up to the present by the elapsed time [hr] from the start of the predetermined period to the present. That is, assuming that the amount of power used from the start of the predetermined period to the present is WH1 [Wh] and the elapsed time from the start of the predetermined period to the present is dt1 [minutes], the actual measured value P1 [W] of the average demand power is It can be obtained by the following equation.

P1=WH1/(dt1/60)=WH1×60/dt1 …(1)
次に演算処理部10は、平均需要電力の目標値P2から実測値P1を減算して得た値を、所定期間の時間幅T1に対する残り期間(T1−dt1)の比率R1で除算することにより、残り期間における平均需要電力を実測値P1から増減させる調整量P3を算出する。
P1 = WH1 / (dt1 / 60) = WH1 × 60 / dt1 (1)
Next, the arithmetic processing unit 10 divides the value obtained by subtracting the actual measurement value P1 from the target value P2 of the average demand power by the ratio R1 of the remaining period (T1-dt1) with respect to the time width T1 of the predetermined period. Then, an adjustment amount P3 for increasing or decreasing the average demand power in the remaining period from the actual measurement value P1 is calculated.

P3=(P2−P1)/R1
R1=(T1−dt1)/T1
∴P3=(P2−P1)×T1/(T1−dt1) …(2)
演算処理部10は調整量P3を算出すると、調整量P3の算出結果を表示部15に表示させており、残り期間における平均需要電力の調整量P3を需要家に知らしめることができる。所定期間の開始時から現在までの実測値P1が目標値P2を下回っている場合は、調整量P3が正の値となり、所定期間の残り期間において消費電力の増加分が調整量P3以内に収まっていれば、平均需要電力が最大需要電力を上回ることはない。所定期間の開始時から現在までの実測値P1が目標値P2を上回っている場合は、調整量P3が負の値となり、所定期間の残り期間において消費電力を調整量P3の絶対値以上削減しなければ、平均需要電力が最大需要電力を超えてしまう。
P3 = (P2-P1) / R1
R1 = (T1-dt1) / T1
∴P3 = (P2-P1) × T1 / (T1-dt1) (2)
When the arithmetic processing unit 10 calculates the adjustment amount P3, the calculation result of the adjustment amount P3 is displayed on the display unit 15, and the consumer can be informed of the adjustment amount P3 of the average demand power in the remaining period. When the actual measurement value P1 from the start of the predetermined period to the present is below the target value P2, the adjustment amount P3 is a positive value, and the increase in power consumption is within the adjustment amount P3 in the remaining period of the predetermined period. If so, the average power demand will not exceed the maximum power demand. When the actual measurement value P1 from the start of the predetermined period to the present exceeds the target value P2, the adjustment amount P3 becomes a negative value, and the power consumption is reduced by more than the absolute value of the adjustment amount P3 in the remaining period of the predetermined period. Otherwise, the average demand power exceeds the maximum demand power.

このように、表示部15には調整量P3が表示されるから、需要家は、表示部15に表示された調整量P3を見て、平均需要電力の実測値P1が目標値P2をどの程度上回っているか、或いは、実測値P1が目標値P2をどの程度下回っているかを判断できる。平均需要電力の実測値P1が目標値P2を上回っている場合、需要家は、所定期間の平均需要電力を最大需要電力以下に抑制するために、消費電力をどの程度削減すればよいかを判断できる。よって、需要家が必要以上に消費電力を削減してしまう事態や、削減量が不足して最大需要電力を超えてしまう事態が起こりにくくなる。また、平均需要電力の実測値P1が目標値P2を下回っている場合、需要家は、調整量P3の値から、現状よりどの程度消費電力を増やすと、所定期間の平均需要電力が最大需要電力を上回ってしまうかを理解でき、需要家に対して注意を喚起することができる。   Thus, since the adjustment amount P3 is displayed on the display unit 15, the consumer looks at the adjustment amount P3 displayed on the display unit 15 and how much the actual measured value P1 of the average demand power has the target value P2. It can be determined whether the measured value P1 is higher than the target value P2. When the actual measured value P1 of the average demand power exceeds the target value P2, the consumer determines how much power consumption should be reduced in order to suppress the average demand power for the predetermined period to the maximum demand power or less. it can. Therefore, it is difficult for a consumer to reduce power consumption more than necessary or to reduce the amount of reduction and exceed the maximum demand power. In addition, when the actual measured value P1 of the average demand power is lower than the target value P2, when the consumer increases the power consumption from the value of the adjustment amount P3, the average demand power for the predetermined period becomes the maximum demand power. You can understand whether it will exceed the limit, and alert customers.

例えば、平均需要電力の目標値P2が38kWに設定されており、正時より0分から25分までの間に使用された使用電力量WH1が17kWhであった場合、調整量P3は以下のように求められる。   For example, when the target value P2 of the average demand power is set to 38 kW and the used power amount WH1 used between 0 minutes and 25 minutes from the hour is 17 kWh, the adjustment amount P3 is as follows: Desired.

先ず、演算処理部10は上記の式(1)を用いて平均需要電力の実測値P1を算出する。   First, the arithmetic processing unit 10 calculates an actual demand value P1 of the average demand power using the above formula (1).

P1=17×60/25=40.8[kW]
次に、演算処理部10は上記の式(2)を用いて調整量P3を求める。
P1 = 17 × 60/25 = 40.8 [kW]
Next, the arithmetic processing part 10 calculates | requires adjustment amount P3 using said Formula (2).

P3=(38−40.8)×30/(30−25)=−16.8[kW]
この場合、30分間の平均需要電力を目標値P2以下に抑制するためには、残り期間における平均需要電力を実測値の40.8kWから16.8kW以上削減する必要がある。すなわち、残り期間である25分から30分までの5分間における平均需要電力を24kW以下に抑制する必要がある。
P3 = (38-40.8) × 30 / (30-25) = − 16.8 [kW]
In this case, in order to suppress the average demand power for 30 minutes to the target value P2 or less, it is necessary to reduce the average demand power in the remaining period from the actual measurement value of 40.8 kW to 16.8 kW or more. That is, it is necessary to suppress the average demand power in the remaining period of 5 minutes from 25 minutes to 30 minutes to 24 kW or less.

演算処理部10は、調整量P3の値(−16.8kW)を表示部15に表示させており、この表示をもとに需要家は消費電力を16.8kW以上削減すれば、所定期間における平均需要電力を目標値の38kW以下に収めることができると判断できる。なお本実施形態では報知部としての表示部15が、調整量P3を液晶ディスプレイに文字情報として表示しているが、例えば音声合成技術によって合成された音声で調整量P3をスピーカ(図示せず)から出力させてもよい。   The arithmetic processing unit 10 displays the value (−16.8 kW) of the adjustment amount P3 on the display unit 15. Based on this display, if the consumer reduces the power consumption by 16.8 kW or more, the calculation processing unit 10 displays a predetermined period. It can be determined that the average demand power can be kept below the target value of 38 kW. In the present embodiment, the display unit 15 serving as a notification unit displays the adjustment amount P3 on the liquid crystal display as character information. For example, the adjustment amount P3 is displayed by a speaker (not shown) using voice synthesized by voice synthesis technology. May be output.

また上記の実施形態では、演算処理部10が、電源電圧の計測結果と負荷電流の計測結果をもとに消費電力を演算して使用電力量を積算しているが、図2に示すように外部の電力積算計4で電力量を積算した結果をもとに使用電力量を求めてもよい。   Further, in the above embodiment, the arithmetic processing unit 10 calculates the power consumption based on the measurement result of the power supply voltage and the measurement result of the load current and integrates the used electric energy, as shown in FIG. The amount of power used may be obtained based on the result of integrating the amount of power with the external power integrator 4.

図2に示す電力管理装置1では、上述の電圧計測部11及び電流計測部12に代えて、電力積算計4から出力されるパルス信号を計数するパルス計測部19を備えている。電力積算計4は、電気機器で消費される電力量を計測して、積算し、その積算値が一定量増加する毎にパルス信号を1パルス出力する。パルス計測部19は、所定期間の開始時から現在までに電力積算計4から出力されるパルス信号の数をカウントする。演算処理部10は、パルス計測部19の計測結果をもとに、所定期間の開始時から現在までの消費電力を積算し、所定期間の開始時からの経過時間[hr]で積算値[Wh]を除算することによって、現在までの平均需要電力を求めている。なお消費電力の測定方法以外は図1に示す電力管理装置1と同様であるので、共通する構成要素には同一の符号を付して、その説明は省略する。   The power management apparatus 1 shown in FIG. 2 includes a pulse measurement unit 19 that counts the pulse signals output from the power integrator 4 in place of the voltage measurement unit 11 and the current measurement unit 12 described above. The power integrator 4 measures and integrates the amount of power consumed by the electrical equipment, and outputs one pulse signal each time the integrated value increases by a certain amount. The pulse measuring unit 19 counts the number of pulse signals output from the power integrator 4 from the start of the predetermined period to the present. The arithmetic processing unit 10 integrates the power consumption from the start of the predetermined period to the present based on the measurement result of the pulse measurement unit 19, and the integrated value [Wh] as the elapsed time [hr] from the start of the predetermined period. ] To obtain the average demand power to date. Since the method other than the method for measuring power consumption is the same as that of the power management apparatus 1 shown in FIG. 1, common components are denoted by the same reference numerals and description thereof is omitted.

また演算処理部10は、所定期間の平均需要電力が目標値を超えると、接点開閉部17に制御信号を出力して接点16をオンにしており、出力端子t1,t2に接続された警告灯を点灯させることによって、平均需要電力が最大需要電力を超えそうなことを報知する。   Further, when the average demand power for a predetermined period exceeds the target value, the arithmetic processing unit 10 outputs a control signal to the contact opening / closing unit 17 to turn on the contact 16, and a warning light connected to the output terminals t1 and t2. Is turned on to notify that the average demand power is likely to exceed the maximum demand power.

以上説明したように、本実施形態の電力管理装置1は、測定部と、平均需要電力算出部と、調整量算出部とを備える。測定部は、電圧計測部11と電流計測部12と演算処理部10(又はパルス計測部19と演算処理部10)からなり、電気機器の消費電力を測定する。平均需要電力算出部は演算処理部10からなり、所定期間毎に所定期間の開始時から現在まで測定部が測定した消費電力を積算した値をもとに所定期間の開始時から現在までの平均需要電力の実測値を算出する。調整量算出部は演算処理部10からなり、平均需要電力の目標値から実測値を減算して得た値を、所定期間の時間幅に対する、所定期間の残り期間の比率で除算することによって、残り期間における平均需要電力を増減させる調整量を算出する。   As described above, the power management apparatus 1 according to the present embodiment includes the measurement unit, the average demand power calculation unit, and the adjustment amount calculation unit. The measurement unit includes a voltage measurement unit 11, a current measurement unit 12, and an arithmetic processing unit 10 (or a pulse measurement unit 19 and an arithmetic processing unit 10), and measures the power consumption of the electric device. The average demand power calculation unit is composed of the arithmetic processing unit 10 and is averaged from the start of the predetermined period to the present based on the value obtained by integrating the power consumption measured by the measurement unit from the start of the predetermined period to the present every predetermined period. Calculate the measured value of power demand. The adjustment amount calculation unit includes the arithmetic processing unit 10 and divides the value obtained by subtracting the actual measurement value from the target value of the average demand power by the ratio of the remaining period of the predetermined period to the time width of the predetermined period, An adjustment amount for increasing or decreasing the average demand power in the remaining period is calculated.

このように、平均需要電力算出部は、所定期間毎に所定期間の開始時から現在までの使用電力量から平均需要電力の実測値を求めている。調整量算出部は、平均需要電力の目標値から実測値を減算して得た値から、所定期間の残り期間における平均需要電力を実測値から増減させる調整量を求めている。したがって、実測値が目標値を超えている場合、需要家は、算出された調整量をもとに消費電力をどの程度削減すればよいかが判るから、削減量が不足して目標値を超えてしまったり、必要量を超えて過剰に消費電力を削減したりする事態が起こりにくくなる。また、実測値が目標値を下回っている場合、需要家は、算出された調整量をもとに消費電力がどの程度増えると、所定期間の平均需要電力が最大需要電力を超えてしまうかが判り、最大需要電力を超えないように電気機器の使用に留意することができる。   As described above, the average demand power calculation unit obtains an actual measurement value of the average demand power from the amount of power used from the start of the predetermined period to the present for each predetermined period. The adjustment amount calculating unit obtains an adjustment amount for increasing or decreasing the average demand power in the remaining period of the predetermined period from the value obtained by subtracting the actual measurement value from the target value of the average demand power. Therefore, if the actual measurement value exceeds the target value, the consumer knows how much power consumption should be reduced based on the calculated adjustment amount, so the reduction amount is insufficient and the target value is exceeded. It is less likely that the power consumption will be excessively reduced beyond the required amount. In addition, when the actual measurement value is lower than the target value, the consumer determines how much the power consumption increases based on the calculated adjustment amount and the average demand power for the predetermined period exceeds the maximum demand power. Obviously, attention can be paid to the use of electrical equipment so as not to exceed the maximum power demand.

ところで、上記の実施形態では、演算処理部10が、算出した調整量を表示部15に表示させているが、平均需要電力の実測値が目標値を超えている場合、演算処理部10が電気機器を自動的に停止させて、所定期間の平均需要電力を目標値以下に削減してもよい。   By the way, in said embodiment, although the arithmetic processing part 10 displays the calculated adjustment amount on the display part 15, when the measured value of average demand electric power exceeds the target value, the arithmetic processing part 10 is electric. The device may be automatically stopped to reduce the average demand power for a predetermined period to a target value or less.

この場合の電力管理装置1のブロック図を図3(a)に、電力管理装置1を用いた全体システムの概略的な回路図を図3(b)に示す。なお図1に示した電力管理装置1と共通する構成要素には同一の符号を付して、その説明は省略する。   A block diagram of the power management apparatus 1 in this case is shown in FIG. 3A, and a schematic circuit diagram of the entire system using the power management apparatus 1 is shown in FIG. In addition, the same code | symbol is attached | subjected to the component which is common in the power management apparatus 1 shown in FIG. 1, and the description is abbreviate | omitted.

電流計測部12には複数の電流センサ3a,3b,3cが接続されている。電流センサ3a,3b,3cは例えばカレントトランスからなり、それぞれ対応する電気機器への給電路に接続されている。電流センサ3aは電気機器6aへの給電路に設けられ、電気機器6aに流れる電流(負荷電流)を計測する。電流センサ3bは電気機器6bへの給電路に設けられ、電気機器6bに流れる電流を計測する。電流センサ3cは電気機器6cへの給電路に設けられ、電気機器6cに流れる電流を計測する。   A plurality of current sensors 3a, 3b, 3c are connected to the current measuring unit 12. The current sensors 3a, 3b, and 3c are formed of, for example, a current transformer, and are connected to power supply paths to the corresponding electric devices. The current sensor 3a is provided in a power supply path to the electric device 6a, and measures a current (load current) flowing through the electric device 6a. The current sensor 3b is provided in a power feeding path to the electric device 6b and measures a current flowing through the electric device 6b. The current sensor 3c is provided in a power feeding path to the electric device 6c and measures a current flowing through the electric device 6c.

電流計測部12は電流センサ3a,3b,3cの出力をもとに、電気機器6a,6b,6cに流れる電流を個別に計測し、その計測結果を演算処理部10に出力する。   The current measurement unit 12 individually measures the currents flowing through the electric devices 6a, 6b, and 6c based on the outputs of the current sensors 3a, 3b, and 3c, and outputs the measurement results to the arithmetic processing unit 10.

演算処理部10は、電圧計測部11が計測した電源電圧と、電流計測部12が計測した各電気機器6a,6b,6cの消費電流をもとに、各電気機器6a,6b,6cの消費電力を個別に演算し、その総和を計算することで、全体の消費電力を求める。   The arithmetic processing unit 10 uses the power supply voltage measured by the voltage measuring unit 11 and the current consumption of each electric device 6a, 6b, 6c measured by the current measuring unit 12 to consume the electric devices 6a, 6b, 6c. The power consumption is calculated individually, and the total power is calculated by calculating the sum.

また電力管理装置1は、例えば電磁リレーからなる遮断装置5a,5b,5cのオン/オフを制御する遮断制御部20を備えている。遮断制御部20は、演算処理部10からの制御信号に応じて、遮断装置5a,5b,5cのオン/オフを個別に制御する。遮断装置5aは、商用電源2と電気機器6aとの間に接続され、電気機器6aに給電する状態と、電気機器6aへの給電を遮断する状態とを切り替える。遮断装置5bは、商用電源2と電気機器6bとの間に接続され、電気機器6bに給電する状態と、電気機器6bへの給電を遮断する状態とを切り替える。遮断装置5cは、商用電源2と電気機器6cとの間に接続され、電気機器6cに給電する状態と、電気機器6cへの給電を遮断する状態とを切り替える。   The power management apparatus 1 also includes a cutoff control unit 20 that controls on / off of the cutoff devices 5a, 5b, and 5c made of, for example, electromagnetic relays. The shut-off control unit 20 individually controls on / off of the shut-off devices 5a, 5b, and 5c in accordance with a control signal from the arithmetic processing unit 10. The interruption | blocking apparatus 5a is connected between the commercial power source 2 and the electric equipment 6a, and switches the state which supplies electric power to the electric equipment 6a, and the state which interrupts | blocks the electric power feeding to the electric equipment 6a. The interruption | blocking apparatus 5b is connected between the commercial power source 2 and the electric equipment 6b, and switches the state which supplies electric power to the electric equipment 6b, and the state which interrupts | blocks the electric power feeding to the electric equipment 6b. The interruption | blocking apparatus 5c is connected between the commercial power source 2 and the electric equipment 6c, and switches the state which supplies electric power to the electric equipment 6c, and the state which interrupts | blocks the electric power feeding to the electric equipment 6c.

需要家は、操作部13を用いて複数ある電気機器6a,6b,6cの優先順位を予め設定しており、演算処理部10は、需要家が入力した各電気機器6a,6b,6cの優先順位をデータ管理部14に記憶させる。   The consumer uses the operation unit 13 to set the priorities of a plurality of electric devices 6a, 6b, 6c in advance, and the arithmetic processing unit 10 prioritizes the electric devices 6a, 6b, 6c input by the consumer. The rank is stored in the data management unit 14.

この電力管理装置1においても、図1を参照して説明した電力管理装置1と同様に、所定の計測周期が経過する毎に、電圧計測部11は電源電圧を計測し、電流計測部12は各電気機器6a,6b,6cに流れる電流(負荷電流)を個別に計測する。演算処理部10は、電圧計測部11が計測した電源電圧と、電流計測部12が計測した電気機器毎の負荷電流とから、電気機器毎の消費電力を演算により求め、データ管理部14に消費電力の演算結果を逐次記憶させる。演算処理部10は、電気機器毎の消費電力を演算すると、所定期間(毎正時から30分毎)の開始時から現在までの全体の消費電力(各電気機器の消費電力の合計値)を積算して、現在までの使用電力量WH1を求める。演算処理部10は、現在までの使用電力量WH1[Wh]を、所定期間の開始時から現在までの経過時間[hr]で除算することによって、平均需要電力の実測値を求める。ここで、所定期間の開始時から現在までの使用電力量をWH1、経過時間をdt1[分]とすると、平均需要電力の実測値P1は上記の式(1)で求められる。   In the power management apparatus 1 as well, as in the power management apparatus 1 described with reference to FIG. 1, the voltage measurement unit 11 measures the power supply voltage every time a predetermined measurement cycle elapses, and the current measurement unit 12 The current (load current) flowing through each electric device 6a, 6b, 6c is individually measured. The arithmetic processing unit 10 calculates the power consumption for each electrical device from the power supply voltage measured by the voltage measurement unit 11 and the load current for each electrical device measured by the current measurement unit 12 and consumes it in the data management unit 14. The calculation result of power is stored sequentially. When calculating the power consumption for each electrical device, the arithmetic processing unit 10 calculates the total power consumption (total value of power consumption of each electrical device) from the start of a predetermined period (every 30 minutes from every hour) to the present. Integration is performed to determine the amount of power used WH1 up to now. The arithmetic processing unit 10 obtains an actual measurement value of the average demand power by dividing the power consumption amount WH1 [Wh] used up to the present time by the elapsed time [hr] from the start of the predetermined period to the present time. Here, assuming that the amount of power used from the start of the predetermined period to the present is WH1, and the elapsed time is dt1 [minutes], the actual measured value P1 of the average demand power is obtained by the above equation (1).

平均需要電力の実測値P1が算出されると、演算処理部10は、平均需要電力の目標値P2から実測値P1を減算して得た値を、所定期間の時間幅T1に対する所定期間の残り期間(T1−dt1)の比率で除算することによって、残り期間における平均需要電力を実測値から増減させる調整量P3を算出する。   When the actual measurement value P1 of the average demand power is calculated, the arithmetic processing unit 10 obtains the value obtained by subtracting the actual measurement value P1 from the target value P2 of the average demand power for the remaining of the predetermined period with respect to the time width T1 of the predetermined period. By dividing by the ratio of the period (T1-dt1), an adjustment amount P3 for increasing or decreasing the average demand power in the remaining period from the actual measurement value is calculated.

ここで、所定期間の開始時から現在までの実測値P1が目標値P2を上回っている場合は、調整量P3が負の値となり、所定期間の残り期間において消費電力を調整量P3以上削減しなければ、平均需要電力が最大需要電力を超えてしまう。演算処理部10は、上述の演算により得られた調整量P3が負の値であれば、データ管理部14に記憶された各電気機器6a,6b,6cの消費電力及び優先順位に基づいて、消費電力を調整量P3以上削減するために、停止させるべき電気機器を選択する。すなわち、演算処理部10は、優先順位の低い電気機器から順番に、選択した電気機器の全消費電力が調整量P3以上となるまで、1乃至複数台の電気機器を選択する。そして、演算処理部10は、選択した電気機器を停止させる制御信号を遮断制御部20に出力し、遮断制御部20が、対応する遮断装置をオフさせる。これにより、演算処理部10が選択した電気機器を停止させることができ、所定期間の平均需要電力を目標値以下に自動的に抑制することができる。   Here, when the actual measurement value P1 from the start of the predetermined period to the present exceeds the target value P2, the adjustment amount P3 becomes a negative value, and the power consumption is reduced by the adjustment amount P3 or more in the remaining period of the predetermined period. Otherwise, the average demand power exceeds the maximum demand power. If the adjustment amount P3 obtained by the above calculation is a negative value, the arithmetic processing unit 10 is based on the power consumption and the priority order of the electrical devices 6a, 6b, 6c stored in the data management unit 14. In order to reduce the power consumption by the adjustment amount P3 or more, an electric device to be stopped is selected. That is, the arithmetic processing unit 10 selects one or more electric devices in order from the electric device with the lowest priority until the total power consumption of the selected electric device becomes equal to or greater than the adjustment amount P3. And the arithmetic processing part 10 outputs the control signal which stops the selected electric equipment to the interruption | blocking control part 20, and the interruption | blocking control part 20 turns off a corresponding interruption | blocking apparatus. Thereby, the electric equipment selected by the arithmetic processing unit 10 can be stopped, and the average demand power for a predetermined period can be automatically suppressed to a target value or less.

以上のように、測定部(演算処理部10、電圧計測部11、及び、電流計測部12)は、複数の電気機器6a,6b,6cの消費電力を個別に測定して、消費電力の総和を求めている。データ管理部14からなる記憶部は複数の電気機器6a,6b,6cの優先順位を記憶している。調整量P3が負の値の場合、調整量P3と各電気機器の消費電力とに基づき、平均需要電力を調整量P3以上削減するために優先順位の低い電気機器から順番に電気機器を停止させる制御部(演算処理部10及び遮断制御部20からなる)を電力管理装置1が備える。   As described above, the measurement units (the arithmetic processing unit 10, the voltage measurement unit 11, and the current measurement unit 12) individually measure the power consumption of the plurality of electrical devices 6a, 6b, and 6c, and sum the power consumption. Seeking. The storage unit composed of the data management unit 14 stores the priorities of the plurality of electric devices 6a, 6b, 6c. When the adjustment amount P3 is a negative value, based on the adjustment amount P3 and the power consumption of each electric device, the electric devices are stopped in order from the electric device with the lowest priority in order to reduce the average demand power by the adjustment amount P3 or more. The power management apparatus 1 includes a control unit (comprising the arithmetic processing unit 10 and the cutoff control unit 20).

これにより、制御部が、調整量P3と各電気機器の消費電力とに基づいて優先順位の低い電気機器から順番に停止させるべき電気機器を選択しているので、消費電力を調整量P3以上削減し、所定期間の平均需要電力を目標値以下まで自動的に削減することができる。   Thereby, since the control part has selected the electric device which should be stopped in order from the electric device with the lowest priority based on the adjustment amount P3 and the power consumption of each electric device, the power consumption is reduced by the adjustment amount P3 or more. In addition, the average demand power for a predetermined period can be automatically reduced to a target value or less.

なお調整量P3が負の値の場合、演算処理部10は、優先順位の低い電気機器から順番に選択した電気機器を自動的に停止させることで、消費電力を低減しているが、選択した電気機器を需要家に対して報知してもよい。   When the adjustment amount P3 is a negative value, the arithmetic processing unit 10 reduces power consumption by automatically stopping the electrical devices selected in order from the electrical device with the lowest priority, but the selected amount is selected. You may alert | report a consumer with an electric equipment.

上述のように、演算処理部10が調整量P3を算出した場合に、所定期間の開始時から現在までの実測値P1が目標値P2を上回っていれば、調整量P3は負の値となる。この場合、少なくとも調整量P3だけ消費電力を削減しなければ、平均需要電力が最大需要電力を超えてしまう。したがって、演算処理部10は、上述の演算で得られた調整量P3が負の値であれば、データ管理部14に記憶された各電気機器6a,6b,6cの消費電力及び優先順位に基づいて、消費電力を調整量P3以上削減するために、停止させるべき電気機器を選択する。すなわち、演算処理部10は、選択した電気機器の全消費電力が調整量P3以上となるように、1乃至複数台の電気機器を選択し、選択した電気機器の情報(例えば名称や識別番号など)を表示部15に表示させる。需要家は、表示部15の表示内容をもとに、所定期間の平均需要電力を目標値以下に抑制するために、停止させる必要がある電気機器を知ることができ、表示された電気機器を停止させることで、所定期間の平均需要電力を目標値以下に抑制することができる。   As described above, when the arithmetic processing unit 10 calculates the adjustment amount P3, if the actual measurement value P1 from the start of the predetermined period to the present exceeds the target value P2, the adjustment amount P3 becomes a negative value. . In this case, unless the power consumption is reduced by at least the adjustment amount P3, the average demand power exceeds the maximum demand power. Therefore, if the adjustment amount P3 obtained by the above calculation is a negative value, the arithmetic processing unit 10 is based on the power consumption and the priority order of the electrical devices 6a, 6b, 6c stored in the data management unit 14. Thus, in order to reduce the power consumption by the adjustment amount P3 or more, the electric device to be stopped is selected. That is, the arithmetic processing unit 10 selects one or a plurality of electric devices so that the total power consumption of the selected electric device is equal to or greater than the adjustment amount P3, and information on the selected electric devices (for example, name, identification number, etc.) ) Is displayed on the display unit 15. Based on the display content of the display unit 15, the consumer can know the electrical equipment that needs to be stopped in order to suppress the average demand power for a predetermined period below the target value. By stopping, the average demand power for a predetermined period can be suppressed below the target value.

また、記憶部(データ管理部14)に複数の電気機器6a,6b,6cの優先順位を記憶させておき、演算処理部10が、調整量P3と、電気機器毎の消費電力の計測結果と、優先順位とに基づいて、消費電力を調整量P3以上削減するために、停止させるべき電気機器を選択するようにしてもよい。すなわち、演算処理部10は、優先順位の低い電気機器から順番に、選択した電気機器の全消費電力が調整量P3以上となるまで、1乃至複数台の電気機器を選択し、選択した電気機器の情報(例えば名称や識別番号など)を表示部15に表示させる。需要家は、表示部15の表示内容をもとに、所定期間の平均需要電力を目標値以下に抑制するために、停止させる必要がある電気機器を知ることができ、表示された電気機器を停止させることで、所定期間の平均需要電力を目標値以下に抑制することができる。   The storage unit (data management unit 14) stores the priorities of the plurality of electric devices 6a, 6b, and 6c, and the arithmetic processing unit 10 determines the adjustment amount P3 and the measurement result of the power consumption for each electric device. Based on the priority order, the electric device to be stopped may be selected in order to reduce the power consumption by the adjustment amount P3 or more. That is, the arithmetic processing unit 10 selects one or a plurality of electric devices in order from the electric device with the lowest priority until the total power consumption of the selected electric device becomes equal to or greater than the adjustment amount P3, and the selected electric device. Information (for example, name and identification number) is displayed on the display unit 15. Based on the display content of the display unit 15, the consumer can know the electrical equipment that needs to be stopped in order to suppress the average demand power for a predetermined period below the target value. By stopping, the average demand power for a predetermined period can be suppressed below the target value.

なお、演算処理部10が選択した電気機器を報知する方法は文字などによる表示に限定されるものではなく、演算処理部10は、選択した電気機器の名称や識別情報を、音声合成により合成した音声でスピーカから出力させてもよい。   Note that the method of notifying the electrical device selected by the arithmetic processing unit 10 is not limited to display using characters or the like, and the arithmetic processing unit 10 synthesizes the name and identification information of the selected electrical device by speech synthesis. You may make it output from a speaker with an audio | voice.

以上のように、測定部(電圧計測部11、電流計測部12及び演算処理部10)は、複数の電気機器6a,6b,6cの消費電力を個別に測定して、消費電力の総和を求めている。電力管理装置1は、調整量P3が負の値の場合に、調整量P3と各電気機器の消費電力とに基づいて、平均需要電力を調整量P3以上削減するために停止させる必要がある電気機器を報知する報知部(演算処理部10及び表示部15からなる)を備えている。   As described above, the measurement units (the voltage measurement unit 11, the current measurement unit 12, and the arithmetic processing unit 10) individually measure the power consumption of the plurality of electrical devices 6a, 6b, and 6c to obtain the total power consumption. ing. When the adjustment amount P3 is a negative value, the power management device 1 needs to be stopped based on the adjustment amount P3 and the power consumption of each electric device in order to reduce the average demand power more than the adjustment amount P3. An informing unit (comprising the arithmetic processing unit 10 and the display unit 15) for informing the device is provided.

これにより、需要家は、報知部の報知内容をもとに、消費電力を調整量P3以上削減するために停止する必要がある電気機器を知ることができ、報知された電気機器を停止させることで、所定期間の平均需要電力を目標値以下に抑制することができる。   Thereby, the consumer can know the electric device that needs to be stopped to reduce the power consumption by the adjustment amount P3 or more based on the notification content of the notification unit, and stop the notified electric device. Thus, the average demand power for a predetermined period can be suppressed below the target value.

なお図3(a)(b)の例では、電気機器6a,6b,6cの台数が3台であるが、システム構成に応じて電気機器の台数は適宜変更が可能である。   In the example of FIGS. 3A and 3B, the number of electrical devices 6a, 6b, and 6c is three, but the number of electrical devices can be appropriately changed according to the system configuration.

また、図3の回路構成では、個々の電気機器に流れる電流を電流センサで計測し、電流の計測結果と電源電圧の計測結果をもとに個々の電気機器の消費電力を計測しているが、個々の電気機器の消費電力を計測する電力積算計を用いてもよい。電力積算計は、個々の電気機器の消費電力を計測し、消費電力の積算値が一定量に達する毎にパルス信号を出力する。電力管理装置1では、各電力積算計から出力されるパルス信号を計数することによって、電気機器の消費電力を個別に計測することができる。   In the circuit configuration of FIG. 3, the current flowing through each electrical device is measured by a current sensor, and the power consumption of each electrical device is measured based on the current measurement result and the power supply voltage measurement result. A power accumulator that measures the power consumption of each electrical device may be used. The power integrator measures the power consumption of each electric device and outputs a pulse signal each time the integrated value of the power consumption reaches a certain amount. The power management apparatus 1 can individually measure the power consumption of the electrical equipment by counting the pulse signals output from each power integrator.

1 電力管理装置
3,3a,3b,3c 電流センサ
5a,5b,5c 遮断装置
6a,6b,6c 電気機器
10 演算処理部(測定部、平均需要電力算出部、調整量算出部、報知部、制御部)
11 電圧計測部(測定部)
12 電流計測部(測定部)
14 データ管理部(記憶部)
15 表示部(報知部)
19 パルス計測部(測定部)
20 遮断制御部(制御部)
t1,t2 出力端子
DESCRIPTION OF SYMBOLS 1 Power management apparatus 3, 3a, 3b, 3c Current sensor 5a, 5b, 5c Breaker 6a, 6b, 6c Electric equipment 10 Arithmetic processing part (measurement part, average demand power calculation part, adjustment amount calculation part, notification part, control Part)
11 Voltage measurement unit (measurement unit)
12 Current measurement unit (measurement unit)
14 Data management unit (storage unit)
15 Display unit (notification unit)
19 Pulse measurement unit (measurement unit)
20 Blocking control unit (control unit)
t1, t2 output terminals

Claims (6)

電気機器の消費電力を測定する測定部と、
所定期間毎に所定期間の開始時から現在まで前記消費電力を積算した値をもとに所定期間の開始時から現在までの平均需要電力の実測値を算出する平均需要電力算出部と、
平均需要電力の目標値から前記実測値を減算して得た値を、所定期間の時間幅に対する所定期間の残り期間の比率で除算することによって、前記残り期間における平均需要電力を増減させる調整量を算出する調整量算出部と、
を備えたことを特徴とする電力管理装置。
A measurement unit for measuring the power consumption of the electrical equipment;
An average demand power calculation unit that calculates an actual measurement value of average demand power from the start of the predetermined period to the present based on a value obtained by integrating the power consumption from the start of the predetermined period to the present for each predetermined period;
Adjustment amount to increase or decrease the average demand power in the remaining period by dividing the value obtained by subtracting the actual measurement value from the target value of the average demand power by the ratio of the remaining period of the predetermined period to the time width of the predetermined period An adjustment amount calculation unit for calculating
A power management apparatus comprising:
前記測定部は、複数の前記電気機器の消費電力を個別に測定して、消費電力の総和を求めており、
前記調整量が負の値の場合、前記調整量と、前記測定部が測定した各々の前記電気機器の消費電力とに基づいて、平均需要電力を前記調整量以上削減するために停止させる必要がある前記電気機器を報知する報知部を備えたことを特徴とする請求項1記載の電力管理装置。
The measuring unit individually measures the power consumption of the plurality of electric devices to obtain a total power consumption,
When the adjustment amount is a negative value, it is necessary to stop the average demand power to reduce the adjustment amount or more based on the adjustment amount and the power consumption of each electric device measured by the measurement unit. The power management apparatus according to claim 1, further comprising a notification unit that notifies a certain electric device.
前記測定部は、複数の前記電気機器の消費電力を個別に測定して、消費電力の総和を求めており、
複数の前記電気機器の優先順位を記憶する記憶部と、
前記調整量が負の値の場合、前記調整量と、前記測定部が測定した各々の前記電気機器の消費電力とに基づいて、平均需要電力を前記調整量以上削減するために優先順位の低い前記電気機器から順番に前記電気機器を停止させる制御部とを備えたことを特徴とする請求項1記載の電力管理装置。
The measuring unit individually measures the power consumption of the plurality of electric devices to obtain a total power consumption,
A storage unit for storing a priority order of the plurality of electrical devices;
When the adjustment amount is a negative value, the priority is low in order to reduce the average demand power more than the adjustment amount based on the adjustment amount and the power consumption of each electric device measured by the measurement unit. The power management apparatus according to claim 1, further comprising a control unit configured to stop the electric device in order from the electric device.
コンピュータを、
電気機器の消費電力を測定する測定部と、
所定期間毎に所定期間の開始時から現在まで前記消費電力を積算した値をもとに所定期間の開始時から現在までの平均需要電力の実測値を算出する平均需要電力算出部と、
平均需要電力の目標値から前記実測値を減算して得た値を、所定期間の時間幅に対する所定期間の残り期間の比率で除算することによって、前記残り期間における平均需要電力を増減させる調整量を算出する調整量算出部とを備える電力管理装置、
として動作させるためのプログラム。
Computer
A measurement unit for measuring the power consumption of the electrical equipment;
An average demand power calculation unit that calculates an actual measurement value of average demand power from the start of the predetermined period to the present based on a value obtained by integrating the power consumption from the start of the predetermined period to the present for each predetermined period;
Adjustment amount to increase or decrease the average demand power in the remaining period by dividing the value obtained by subtracting the actual measurement value from the target value of the average demand power by the ratio of the remaining period of the predetermined period to the time width of the predetermined period A power management device comprising an adjustment amount calculation unit for calculating
Program to operate as.
請求項4記載のプログラムであって、
前記測定部は、複数の前記電気機器の消費電力を個別に測定して、消費電力の総和を求めており、
前記調整量が負の値の場合、前記調整量と、前記測定部が測定した各々の前記電気機器の消費電力とに基づいて、平均需要電力を前記調整量以上削減するために停止させる必要がある前記電気機器を報知する報知部を備えた電力管理装置として、
コンピュータを動作させるためのプログラム。
The program according to claim 4,
The measuring unit individually measures the power consumption of the plurality of electric devices to obtain a total power consumption,
When the adjustment amount is a negative value, it is necessary to stop the average demand power to reduce the adjustment amount or more based on the adjustment amount and the power consumption of each electric device measured by the measurement unit. As a power management device including a notification unit that notifies a certain electric device,
A program for operating a computer.
請求項4記載のプログラムであって、
前記測定部は、複数の前記電気機器の消費電力を個別に測定して、消費電力の総和を求めており、
前記調整量が負の値の場合、前記調整量と、前記測定部が測定した各々の前記電気機器の消費電力と、各々の前記電気機器に設定された優先順位とに基づいて、平均需要電力を前記調整量以上削減するために優先順位の低い前記電気機器から順番に前記電気機器を停止させる制御部を備えた電力管理装置として、
コンピュータを動作させるためのプログラム。
The program according to claim 4,
The measuring unit individually measures the power consumption of the plurality of electric devices to obtain a total power consumption,
When the adjustment amount is a negative value, the average demand power based on the adjustment amount, the power consumption of each electric device measured by the measurement unit, and the priority set for each electric device. In order to reduce the adjustment amount or more, as a power management device comprising a control unit for stopping the electrical equipment in order from the electrical equipment with a low priority,
A program for operating a computer.
JP2013057238A 2013-03-19 2013-03-19 Power management device and program Pending JP2014183665A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013057238A JP2014183665A (en) 2013-03-19 2013-03-19 Power management device and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013057238A JP2014183665A (en) 2013-03-19 2013-03-19 Power management device and program

Publications (1)

Publication Number Publication Date
JP2014183665A true JP2014183665A (en) 2014-09-29

Family

ID=51701897

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013057238A Pending JP2014183665A (en) 2013-03-19 2013-03-19 Power management device and program

Country Status (1)

Country Link
JP (1) JP2014183665A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017022847A (en) * 2015-07-09 2017-01-26 株式会社東光高岳 Demand controller
CN106470266A (en) * 2015-08-19 2017-03-01 中兴通讯股份有限公司 Equipment power dissipation data capture method and device in a kind of terminal

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5174245A (en) * 1974-12-24 1976-06-28 Matsushita Electric Ind Co Ltd
JP2004328940A (en) * 2003-04-25 2004-11-18 Mitsubishi Electric Corp Energy monitor control process, energy monitor control system and energy monitor controller

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5174245A (en) * 1974-12-24 1976-06-28 Matsushita Electric Ind Co Ltd
JP2004328940A (en) * 2003-04-25 2004-11-18 Mitsubishi Electric Corp Energy monitor control process, energy monitor control system and energy monitor controller

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017022847A (en) * 2015-07-09 2017-01-26 株式会社東光高岳 Demand controller
CN106470266A (en) * 2015-08-19 2017-03-01 中兴通讯股份有限公司 Equipment power dissipation data capture method and device in a kind of terminal

Similar Documents

Publication Publication Date Title
JP5336918B2 (en) Power supply system
MX338444B (en) Service voltage load protection in an electric utility meter.
JP2014183665A (en) Power management device and program
JP2010223628A (en) Watt-hour meter
WO2015104787A1 (en) Energy management device and energy management system
JP2017200297A (en) Monitoring control device
JP4657965B2 (en) Power monitoring system
JP5289648B2 (en) Electronic circuit breaker
JP2014183667A (en) Power management device and program
JP2010025635A (en) Electronic watt-hour meter
JP5152964B2 (en) Distribution board
JP5765736B2 (en) Current limiter current indicator
US20130257447A1 (en) Portable electronic device
JP5480522B2 (en) Electricity meter
WO2015159426A1 (en) Charging/discharging control system, control apparatus, charging/discharging control method, and program
KR20130019474A (en) Multi functional electronic motor protection relay
JP5505124B2 (en) Battery remaining amount estimation device, electronic device equipped with the same, battery remaining amount estimation method, and program
JP2014183666A (en) Power management device and program
JP5650893B2 (en) Electricity meter
JP2014145686A (en) Power margin determination device, power margin notification system, and power margin notification method
JP2002090398A (en) Electronic watt-hour meter
CN109980620A (en) A kind of protective relaying device with change relay parameter function
JP2011130591A (en) Digital protection relay
KR101119613B1 (en) Sub Power Supply Management System and Method therefor
KR20130071746A (en) Status information displaying method and digital protective relay using the same

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20150312

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20151111

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20160719

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20160726

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20160926

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20170124